Arizona 2023 2023 Regular Session

Arizona House Bill HB2449 Comm Sub / Analysis

Filed 03/23/2023

                    Assigned to TAT & APPROP 	FOR COMMITTEE 
 
 
 
 
ARIZONA STATE SENATE 
Fifty-Sixth Legislature, First Regular Session 
 
FACT SHEET FOR H.B. 2449 
 
appropriation; Pinal East-West Corridor 
Purpose 
Appropriates $9,700,000 from the state General Fund (state GF) in FY 2024 to the Arizona 
Department of Transportation (ADOT) to distribute to Pinal County for the engineering and design 
of the West Pinal Parkway East-West Corridor. 
Background 
ADOT is responsible for the design and construction of state public transportation systems 
and the maintenance and operation of state highways in Arizona (A.R.S. § 28-332). ADOT may 
contract and do all things necessary to secure the full benefits available to Arizona for 
transportation purposes under federal law. ADOT may cooperate with: 1) federal, state and local 
government agencies; 2) Indian tribes; 3) private and public organizations; and 4) private 
individuals. ADOT may exchange federal monies with local governments in order to receive local 
monies and may include additional federal monies in the exchange to offset the matching costs 
required of local governments (A.R.S. § 28-334).  
H.B. 2449 appropriates $9,700,000 from the state GF in FY 2024 to ADOT to distribute to 
Pinal County for the engineering and design of the West Pinal Parkway East-West Corridor. 
Provisions 
1. Appropriates $9,700,000 from the state GF in FY 2024 to ADOT to distribute to Pinal County 
for the engineering and design of the West Pinal Parkway East-West Corridor. 
2. Becomes effective on the general effective date. 
House Action 
TI 2/1/23 DP 11-0-0-0 
APPROP 2/15/23 DP 15-0-0-0 
3
rd
 Read 2/28/23  31-29-0  
Prepared by Senate Research 
March 22, 2023 
KJA/sr