Arizona 2023 2023 Regular Session

Arizona House Bill HB2496 Comm Sub / Analysis

Filed 03/07/2023

                    Assigned to NREW 	FOR COMMITTEE 
 
 
 
 
ARIZONA STATE SENATE 
Fifty-Sixth Legislature, First Regular Session 
 
FACT SHEET FOR H.B. 2496 
 
transmission lines; definition 
Purpose 
Adjusts the definition of transmission line. 
Background 
Laws 1971, Chapter 67 directed the Arizona Corporation Commission to establish the  
11-member Power Plant and Transmission Line Siting Committee (Committee) to provide a single 
forum for the expeditious resolution of all matters concerning the location of electric generating 
plants and transmission lines in a single proceeding to which access will be open to interested and 
affected individuals, groups, county and municipal governments and public bodies to enable them 
to participate in these decisions.  
If a utility plans to construct a plant or transmission line in Arizona, the utility must first 
file an application for a Certificate of Environmental Compatibility (certificate) from the 
Committee with respect to the proposed site. A utility may not construct a plant or transmission 
line until it receives a certificate. The Committee may approve or deny an application for a 
certificate and impose reasonable conditions on the issuance of a certificate (A.R.S. §§ 40-360.03; 
40-360.06; and 40-360.07).  
A transmission line is a series of new structures that are erected above ground and support 
one or more conductors designed for the transmission of electric energy at nominal voltages of 
115,000 volts or more and all new switchyards to be used therewith and related thereto for which 
expenditures or financial commitments for land acquisition, materials, construction or engineering 
exceeding $50,000 have not been made before August 13, 1971 (A.R.S. § 40-360).   
There is no anticipated fiscal impact to the state General Fund associated with this 
legislation.  
Provisions 
1. Adds, to the definition of transmission line, five or more new structures, rather than a series of 
new structures, that span more than one mile in length as measured from the first structure 
outside of the substation, switchyard or generating site to which the line connects to the fifth 
structure.  
2. Excludes, from the definition of transmission line, structures located on the substation, 
switchyard or generating site to which the line connects.  
3. Makes technical changes.   FACT SHEET 
H.B. 2496 
Page 2 
 
 
4. Becomes effective on the general effective date.  
House Action 
NREW 1/32/23 DPA 6-4-0-0 
3
rd
 Read 2/21/23  38-22-0 
 
Prepared by Senate Research 
March 7, 2023 
RA/FB/slp