Colorado 2023 2023 Regular Session

Colorado Senate Bill SB135 Engrossed / Bill

Filed 02/08/2023

                    First Regular Session
Seventy-fourth General Assembly
STATE OF COLORADO
ENGROSSED
This Version Includes All Amendments Adopted
on Second Reading in the House of Introduction
LLS NO. 23-0393.01 Carolyn Kampman x4959
SENATE BILL 23-135
Senate Committees House Committees
Appropriations
A BILL FOR AN ACT
C
ONCERNING FUNDING FOR CAPITAL CONSTRUCTION , AND MAKING101
SUPPLEMENTAL APPROPRIATIONS IN CONNECTION THEREWITH	.102
Bill Summary
(Note:  This summary applies to this bill as introduced and does
not reflect any amendments that may be subsequently adopted. If this bill
passes third reading in the house of introduction, a bill summary that
applies to the reengrossed version of this bill will be available at
http://leg.colorado.gov
.)
Supplemental appropriations are made for capital construction
projects.
Be it enacted by the General Assembly of the State of Colorado:1
SENATE
2nd Reading Unamended
February 8, 2023
SENATE SPONSORSHIP
Zenzinger, Bridges, Kirkmeyer
HOUSE SPONSORSHIP
Bird, Sirota, Bockenfeld
Shading denotes HOUSE amendment.  Double underlining denotes SENATE amendment.
Capital letters or bold & italic numbers indicate new material to be added to existing law.
Dashes through the words or numbers indicate deletions from existing law. SECTION 1. Capital construction appropriations for the fiscal1
year beginning July 1, 2022. In Session Laws of Colorado 2022, amend2
section 3 of chapter 507, (HB 22-1329), as follows:3
Section 3.  Capital Construction Appropriation.4
135
-2- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
PART I	1
CONTROLLED MAINTENANCE	2
3
(1) STATE AGENCIES	4
(A) Department of Agriculture	5
Fire Sprinkler Installation, Code	6
Upgrades, 4-H Complex	7 1,432,425 1,432,425
a
8
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	9
10
(B) Department of Corrections	11
Improve Door Security, Lower	12
North, Buena Vista Correctional	13
Facility	14 1,768,537
135
-3- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
Replace Roofs, Living Units and	1
Support Buildings, Delta	2
Correctional Center	3 1,689,002
Replace Roof, Rifle Correctional	4
Center 5 1,492,686
Replace Roof, Programs and	6
Support Buildings, Trinidad	7
Correctional Facility	8 1,991,473
Replace Roof, Minimum Living	9
Unit, Sterling Correctional	10
Facility	11 1,109,909
12 8,051,607 8,051,607
a
13
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	14
15
16
135
-4- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
(C) Department of Education	1
Install Fire Sprinklers and	2
Update HVAC and ADA, Hubert	3
Work Gymnasium, Colorado	4
School for the Deaf and the	5
Blind 6 1,988,134
Roof Replacements, West and	7
Argo Halls, Colorado School for	8
the Deaf and the Blind	9 689,611
Repair Parapet Walls, Industrial	10
Building, Colorado School for	11
the Deaf and the Blind	12 350,000
13 3,027,745 3,027,745
a
14
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	15
16
135
-5- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
(D) Office of the Governor - Office of Information Technology	1
Office of Information	2
Technology, Replace Microwave	3
Towers, Group F	4 1,315,802 1,315,802
a
5
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	6
7
(E) Department of Higher Education - History Colorado	8
Fire Mitigation, Georgetown	9
Railway Loop, Area C	10 411,851
Paint High Bridge, Georgetown	11
Mining and Railroad Park	12 792,628
13 1,204,479 1,204,479
a
14
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	15
135
-6- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
1
(F) Department of Human Services	2
Refurbish Ash Conveyor System,	3
Heat Plant, Colorado Mental	4
Health Institute at Pueblo	5 1,966,852
Refurbish HVAC and	6
Mechanical Equipment, Zebulon	7
Pike, Pueblo, and Spring Creek	8
Youth Services Centers	9 1,016,426
Refurbish Secondary and	10
Emergency Electrical Systems,	11
Tier 1, Colorado Mental Health	12
Institute at Pueblo	13 1,981,039
Remove/Replace Plumbing and	14
Life Safety Systems, Grand Mesa	15
Youth Services Center	16 1,252,543
135
-7- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
Repair/Replace Sewer and Steam	1
Producers, Colorado Mental	2
Health Institute at Fort Logan	3 1,666,730
Replace HVAC Systems, Platte	4
Valley and Marvin Foote Youth	5
Services Centers	6 682,682
Replace Hydronic Valves,	7
Southern District	8 1,015,351
Replace Roof, Platte Valley	9
Youth Services Center	10 1,382,405
Replace Roofs, Five Buildings,	11
Colorado Mental Health Institute	12
at Fort Logan	13 1,733,905
Upgrade Interiors, Group	14
Homes, Pueblo Regional Center	15 1,228,584
16 13,926,517 13,926,517
a
135
-8- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
1
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	2
3
(G) Department of Local Affairs	4
Refurbish Water Tower, Fort	5
Lyon 6 190,347
Replace Emergency Generators,	7
Buildings 6 and 8, Fort Lyon	8 687,440
9 877,787 877,787
a
10
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	11
12
13
14
15
135
-9- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
1
(H) Department of Military and Veterans Affairs	2
Replace Fire Alarm, Buckley Air	3
Force Base Aviation Readiness	4
Center, Building 1000	5 672,716 168,179
a
504,537(I)
Replace Roof and Upgrade Site	6
Security, Joint Forces	7
Headquarters	8 1,325,970 662,985
a
662,985(I)
Replace Roofs at Fort Collins,	9
Watkins, and Aurora Readiness	10
Centers	11 1,195,616 597,808
a
597,808(I)
12 3,194,302
13
a
 These amounts shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	14
15
16
135
-10- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
(I) Department of Personnel	1
Controlled Maintenance	2
Emergency Account	3 2,000,000
Replace Plumbing and Abate	4
Asbestos, Centennial Building	5 1,465,818
Replace Short Tunnel Roof,	6
Capitol	7 1,794,236
Upgrade/Replace HVAC	8
Systems, 390 and 700 Kipling	9 1,741,938
10 7,001,992 7,001,992
a
11
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	12
13
14
15
135
-11- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
1
(J) Department of Public Safety	2
Repairs/Upgrades to Mechanical,	3
Electrical Systems, Fort Collins	4
and Castle Rock	5 1,142,004 1,142,004
a
6
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S.	7
8
9 41,174,660
10
(2) INSTITUTIONS OF HIGHER EDUCATION	11
(A) Adams State University	12`
Repair Electrical Distribution,	13
Campuswide	14 1,795,309
135
-12- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
Upgrade Campus Security and	1
Safety 2 721,310
3 2,516,619 2,516,619
a
4
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	5
6
(B) Arapahoe Community College	7
Expand Sprinkler System, Main	8
Building	9 1,885,584
Replace HVAC Primary	10
Equipment, Main Building	11 1,473,641
12 3,359,225 3,359,225
a
13
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	14
15
135
-13- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
(C) Auraria Higher Education Center	1
Install Fire Sprinkler System, St.	2
Cajetan's and PE Gymnasium	3 637,050
Provide ADA Walkways, Curtis	4
and Champa Streets and	5
Classroom Courtyard	6 648,648
Replace Mechanical System,	7
King Center	8 1,909,778
Replace Transformers at North	9
Chiller and PE Events Center	10 518,943
11 3,714,419 3,714,419
a
12
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	13
14
15
16
135
-14- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
(D) Community College of Aurora	1
Upgrade Campus Access and	2
Accessability	3 1,710,415 1,710,415
a
4
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S.	5
6
(E) Colorado Community College System at	7
Lowry 8
Replace Roof, Building 758	9 1,115,169
Replace Chiller, Building 901	10 639,075
Upgrade HVAC, Building 849	11 928,928
Install New Windows and Doors,	12
Building 905	13 1,260,504
14 3,943,676 3,943,676
a
15
135
-15- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	1
2
(F) Colorado Mesa University	3
Replace Roof, Wubben/Science	4
Building	5 379,682
Replace HVAC, Fine Arts	6
Building	7 1,683,875
Upgrade HVAC,	8
Wubben/Science Building	9 193,975
10 2,257,532 2,257,532
a
11
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	12
13
14
15
135
-16- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
(G) Colorado Northwestern Community College	1
Repair/Replace Parking Lots and	2
Adjacent Sidewalks, Rangely	3
Campus 4 971,078
Upgrade Electrical Service and	5
Install Backup Generator,	6
Johnson Building, Rangely	7
Campus 8 1,554,542
Upgrade Lighting, Rangely	9
Campus	10 107,877
11 2,633,497 2,633,497
a
12
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	13
14
(H) Colorado School of Mines	15
Remediate Campus Fall Hazards	16 547,737 547,737
a
135
-17- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
Repair Elevators, Five Buildings	1 618,036 618,036
a
Replace Hazardous Lab	2
Controls, General Research Lab	3
Building	4 632,795 632,795
a
Replace Hazardous Laboratory	5
Exhaust Fans	6 1,511,564 1,511,564
a
7 3,310,132 3,310,132
a
8
a
 This amount
 T
HESE AMOUNTS
 shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	9
10
(I) Colorado State University	11
Rehabilitate Irrigation Wells, San	12
Luis Valley Research Center	13 326,040
Replace Pitkin Eastern	14
Switchgear	15 1,425,249
135
-18- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
Replace Roofs, A, D, and E	1
Wings, Engineering Building	2 1,418,851
Upgrade Campus Exterior	3
Lighting	4 610,895
Upgrade Exterior ADA, Various	5
Locations	6 354,458
Upgrade Fire Lane and ADA	7
Accessibility, Molecular &	8
Radial Biosciences Building to	9
Chemistry	10 1,464,774
Upgrade Foothills Underground	11
Electric, Rampart Road	12 1,995,242
13 7,595,509 7,595,509
a
14
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	15
16
135
-19- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
(J) Colorado State University - Pueblo	1
Replace/Upgrade Building Fire	2
Alarm Equipment, Campuswide	3 1,480,224
Replace Roofs, Physical Plant,	4
Heat Plant, and Music Building	5 1,384,639
Replace Campus Water Lines	6 924,495
7 3,789,358 3,789,358
a
8
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	9
10
(K) Fort Lewis College	11
Replace/Upgrade Building Fire	12
Alarm Equipment, Campuswide	13 1,432,689
Replace Roof, Aquatic Center	14 1,014,088
135
-20- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
Replace Roof, Whalen	1
Gymnasium	2 1,532,694
3 3,979,471 3,979,471
a
4
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S.	5
6
(L) Front Range Community College	7
Replace Interior Mechanical	8
System, Blanca Peak Building,	9
Larimer Campus	10 2,379,000
Replace Roof Top Units, Blanca	11
Peak Building, Larimer Campus	12 1,985,000
Replace Roof Top Units, South	13
Roof, Westminster Campus	14 830,000
15 5,194,000 5,194,000
a
16
135
-21- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
a
 Of this amount, $4,806,000 shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S., a	nd $388,000 shall be from institutional	1
reserves.	2
3
(M) Lamar Community College	4
Replace Chiller, Valves, Pipes,	5
and Controls, Bowman Building	6 627,000
Replace Pumps, Controls, and	7
Valves, Campus Irrigation	8
System 9 525,000
10 1,152,000 1,152,000
a
11
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	12
13
14
15
135
-22- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
(N) Morgan Community College	1
Replace Roof-top Units,	2
Cottonwood, Aspen, and Spruce	3
Halls, and Bloedorn Center	4 1,153,423 1,153,423
a
5
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	6
7
(O) Otero Junior College	8
Improve Campus Storm Water	9
Flood Control	10 779,350 779,350
a
11
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	12
13
14
15
135
-23- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
(P) Pikes Peak Community College	1
Replace Chiller, Valves, Pipes,
2
and Controls, Bowman Building
3
I
MPROVE 
E
LECTRICAL
4
I
NFRASTRUCTURE
,
 R
AMPART
5
R
ANGE 
C
AMPUS
6 1,115,826
Replace Pumps, Controls, and
7
Valves, Campus Irrigation
8
System
 R
EPLACE 
C
HILLER
,	9
P
UMPS
,
 AND 
A
NCILLARY
10
C
OMPONENTS
,
 R
AMPART 
R
ANGE
11
C
AMPUS
12 1,773,750
13 2,889,576 2,889,576
a
14
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	15
16
135
-24- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
(Q) Pueblo Community College	1
Repair Exterior Walls, Gorsich	2
Advanced Technology Center	3 1,371,505
Replace Fire Suppression and	4
Notification Panel	5 427,250
6 1,798,755 1,798,755
a
7
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	8
9
(R) Red Rocks Community College	10
Replace East Wing Roof,	11
Lakewood Campus	12 1,482,580 1,482,580
a
13
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	14
15
135
-25- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
(S) Trinidad State Junior College	1
Install Boiler System and	2
Upgrade Associated Building	3
Automation System, Berg	4
Building	5 1,993,739
Install Card Access and Update	6
Door Hardware	7 615,039
8 2,608,778 2,608,778
a
9
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	10
11
(T) University of Colorado at Boulder	12
Repair Exterior Structure, Hale	13
Science 	14 803,551
Repair Exterior Structure, Macky	15
Auditorium	16 1,363,493
135
-26- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
Replace Heat Exchangers, Fiske,	1
Porter, DLC, Regent, and	2
Theater Buildings	3 690,005
Upgrade Elevators, Ramaley and	4
SLHS Buildings	5 851,015
6 3,708,064 3,708,064
a
7
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	8
9
10
(U) University of Colorado at Colorado Springs	11
Install Fire Suppression,	12
Cragmor Hall	13 1,058,476
Modernize Elevators	14 553,164
Replace Roof, Columbine Hall	15 1,423,323
135
-27- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
Upgrade HVAC Controls,	1
Columbine Hall	2 1,020,018
3 4,054,981 4,054,981
a
4
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	5
6
(V) University of Colorado Denver	7
Improve Heating System,	8
Building 500	9 970,439
Repair Cagewash Exhaust	10
System, R1 North	11 1,280,513
Repair Exterior Curtain Walls,	12
Academic Office Building	13 1,505,441
Replace Chiller, Fitzsimons	14
Building	15 1,742,483
135
-28- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
Upgrade Electrical Systems, CU	1
Denver Building	2 1,209,056
3 6,707,932 6,707,932
a
4
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	5
6
(W) University of Northern Colorado	7
Install Fire Sprinklers, Arts	8
Annex Addition	9 242,722
Replace Roof, Butler Hancock	10 1,429,785
11 1,672,507 1,672,507
a
12
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	13
14
15
135
-29- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
(X) Western Colorado University	1
Upgrade Lighting for Security	2
and Efficiency	3 1,868,581 1,868,581
a
4
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	5
6
7 73,880,380
8
9
TOTALS PART I	10
(CONTROLLED	11
MAINTENANCE)	12 $115,055,040 $113,289,710 $1,765,330
13
14
15
135
-30- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
PART II	1
STATE AGENCIES	2
3
(1) CAPITAL RENEWAL AND RECAPITALIZATION	4
(A) Department of Agriculture	5
Replace Roof, HVAC, and	6
Windows at Palace of	7
Agriculture (Capital Renewal)	8 5,278,877 5,278,877
a
9
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	10
11
(B) Department of Corrections	12
Utility Water Lines Replacement,	13
Arkansas Valley Correctional	14
Facility (Capital Renewal)	15 9,539,209
135
-31- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
Kitchen Renovation, Sterling	1
Correctional Facility (Capital	2
Renewal)	3 2,800,000
Water Tank Repair and	4
Replacement, East CaƱon City	5
Prison Complex (Capital	6
Renewal)	7 5,349,710
Sanitary Sewer Line	8
Replacement, Buena Vista	9
Correctional Facility (Capital	10
Renewal)	11 2,324,904
135
-32- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
Critical Living Unit	1
Shower/Drain and Toilet Room	2
Improvements, Arkansas Valley	3
Correctional Facility (Capital	4
Renewal)	5 12,402,937
6 32,416,760 32,416,760
a
7
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S.	8
9
(C) Department of Education	10
State Board Room Renovation	11 1,774,654 1,774,654
a
12
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S.	13
14
15
135
-33- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
(D) Department of Higher Education	1
(1) History Colorado	2
Georgetown Loop Preservation	3
Projects	4 385,000 385,000
a
5
a
 This amount shall be from the Museum and Preservation Operatio ns Account of the State Histori cal Fund created in Section 44-30 -1201 (5)(c)(I)(B), C.R.S. 	6
7
(E) Department of Human Services	8
Campus Utility Infrastructure,	9
Colorado Mental Health Institute	10
at Fort Logan (Capital Renewal)	11 19,114,483 19,114,483
a
Campus Utility Infrastructure,	12
Colorado Mental Health Institute	13
at Pueblo (Capital Renewal)	14 10,682,004 10,682,004
a
135
-34- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
HVAC Replacement in Four	1
Buildings, Colorado Mental	2
Health Institute at Pueblo	3
(Capital Renewal)	4 17,559,780 17,559,780
a
Suicide Risk Mitigation	5
Continuation, Colorado Mental	6
Health Institute at Pueblo	7 5,123,993 5,123,993
a
Office of Behavioral Health	8
Transitional Housing	9 2,341,663 2,341,663
a
Depreciation Fund Capital	10
Improvements	11 1,037,372 1,037,372
b
12 55,859,295
13
a
 These amounts shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S. 	14
b
 This amount shall be from the Regional Center Depreciation Account in the Capital Construction Fund, created in Section 24-75- 302 (3.8)(a) , C.R.S.	15
16
135
-35- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
(F) Department of Natural Resources	1
(1) Division of Parks and Wildlife	2
Infrastructure and Real Property	3
Maintenance	4 46,502,450 46,502,450
a
5
a
 Of this amount, $44,202,450 shall be from the Wildlife Cash Fund created in Section 33-1-112 (1)(a), C.R.S., $2,000,000 shall 	be from the Parks and Outdoor Recreation Cash Fund	6
created in Section 33-10-111 (1), C.R.S., and $300,000 shall be from the Highway Users Tax Fund created in Section 43-4-201 (1)	(a), C.R.S., and appropriated pursuant to Section	7
33-10-111 (4), C.R.S.	8
9
(G) Department of Transportation	10
Highway Construction Projects	11 500,000 500,000
12
13 142,717,036
14
15
135
-36- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
(2) CAPITAL EXPANSION	1
(A) Department of Natural Resources	2
(1) Division of Parks and Wildlife	3
Property Acquisition and	4
Improvements	5 11,000,000 11,000,000
a
6
a
 This amount shall be from the Wildlife Cash Fund created in Section 33-1-112 (1)(a), C.R.S.	7
8
(B)
 D
EPARTMENT OF 
M
ILITARY AND 
V
ETERANS 
A
FFAIRS
9
F
IELD 
A
RTILLERY 
R
EADINESS
10
C
ENTER 
L
AND 
A
CQUISITION
,	11
R
OCKY 
M
OUNTAIN
12
M
ETROPOLITAN 
A
IRPORT
13 11,292,930 5,592,930 5,700,000
a
14
a
 T
HIS AMOUNT SHALL BE FROM THE ACCOUNT SPECIFIED IN 
S
ECTION
 28-3-106 (1)(s)(I), C.R.S. 	15
135
-37- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
1
2 11,000,000
3 22,292,930	4	5
TOTALS PART II	6
(STATE AGENCIES)	7 $153,717,036
$500,000
$153,217,036
8 $165,009,966 $6,092,930 $158,917,036
9
10
11
12
13
14
15
135
-38- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
PART III	1
INSTITUTIONS OF HIGHER EDUCATION	2
3
(1) CAPITAL RENEWAL AND RECAPITALIZATION	4
(A) Auraria Higher Education Center	5
Critical Campus-wide Building	6
Envelope and Energy Code	7
Deficiencies (Capital Renewal)	8 22,147,382 22,147,382
a
9
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S.	10
11
(B) Fort Lewis College	12
Berndt Hall 300s (Capital	13
Renewal)	14 4,421,473 4,421,473
a
15
135
-39- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
a
 Of this amount, $4,200,399 shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S., a	nd $221,074 shall be from institutional	1
reserves.	2
3
(C) Lamar Community College	4
Bowman Building Renovation	5
(Capital Renewal)	6 3,944,152 3,944,152
a
7
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S.	8
9
(D) Pueblo Community College	10
Health Science Consolidation	11 6,300,000 6,300,000
a
12
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S.	13
14
15
135
-40- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
(E) Trinidad State Junior College	1
Freudenthal Library Renovation	2 1,165,125 1,165,125
a
3
a
 This amount shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S.	4
5
(F) University of Colorado at Boulder	6
Hellems Arts and Sciences	7
Building Renovation and Mary	8
Rippon Outdoor Theatre	9
Renovation	10 27,170,095 27,170,095
a
11
a
 Of this amount, $10,868,038 shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S., 	and $16,302,057 shall be from a mix of debt	12
and capital reserves. 	13
14
15
135
-41- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
(G) University of Northern Colorado	1
Gray Hall Mechanical Systems	2
Improvements (Capital Renewal)	3 4,586,656 4,586,656
a
4
a
 Of this amount, $4,540,656 shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S., a	nd $46,000 shall be from capital reserves.	5
6
7 69,734,883
8
(2) CAPITAL EXPANSION	9
(A) Multiple Institutions	10
Senate Bill 20-219 Lease	11
Purchase Payments	12 4,746,375 4,746,375
13
14
15
135
-42- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
(B) Community College of Denver	1
Boulder Creek Building Remodel	2
and Addition	3 22,938,122 22,938,122
a
4
a
 Of this amount, $21,080,134 shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S., 	and $1,857,988 shall be from institutional	5
reserves and donations. 	6
7
(C) Colorado Mesa University	8
Robinson Theater Replacement	9 43,886,756 43,886,756
a
10
a
 Of this amount, $39,454,194 shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S., 	and $4,432,562 shall be from institutional	11
reserves and donations.	12
13
(D) Colorado State University	14
Clark Building Revitalization	15 38,000,000 38,000,000
a
135
-43- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
National Western Center Lease	1
Purchase Payments	2 17,496,791 17,496,791
b
3 55,496,791
4
a
 Of this amount, $8,000,000 shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S., a	nd $30,000,000 shall be from institutional	5
sources and donations. 	6
b
 This amount shall be from the National Western Center Trust Fund created in Section 23-31-902 (2), C.R.S.	7
8
(E) Metropolitan State University of Denver	9
Health Institute	10 10,000,000
10,000,000
a
11 12,950,000 12,950,000
a
12
a
 This amount
 O
F THIS AMOUNT
,
 $10,000,000
 shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S.,
 AND 
$2,950,000
 SHALL BE FROM
13
INSTITUTIONAL SOURCES
.	14
15
135
-44- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
(F) Northeastern Junior College	1
Applied Technology Campus	2
Expansion and Remodel	3 12,575,000 12,575,000
a
4
a
 Of this amount, $11,500,000 shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S., 	and $1,075,000 shall be from the Northeastern	5
Junior College Foundation and other donations. 	6
7
(G) Fort Lewis College	8
Health Sciences Center	9 2,952,432 2,952,432
a
10
a
 This amount shall be from donations and institutional reserves.	11
12
13 152,595,476
14 155,545,476	15
135
-45- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
1
TOTALS PART III	2
(INSTITUTIONS OF	3
HIGHER EDUCATION)	4 $222,330,359
$4,746,375 $217,583,984
5 $225,280,359 $220,533,984
6
7
GRAND TOTALS	8
(CAPITAL	9
CONSTRUCTION)	10 $491,102,435
$5,246,375
$484,090,730
a
 $1,765,330
b
11 $505,345,365 $10,839,305 $492,740,730
a
 
12
a
 Of this amount, $300,000 shall be from the Highway Users Tax Fund created in Section 43-4-201 (1)(a), C.R.S., and appropriated pursuant to Section 33-10-111 (4), C.R.S.	13
b
 This amount contains an (I) notation.	14
15
135
-46- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
SECTION 2.   Capital construction appropriations for the fiscal year beginning July 1, 2019. In Session Laws of Colorado 2019, section 3 of chapter 454, (SB 19-207),	1
add footnote 98 to Part I (7) and footnote 99 to Part II (8), as Part II (8) is added and the affected totals are amended by secti	on 1 of chapter 325 (HB 20-1259), Session Laws of Colorado	2
2020, and as the affected totals are further amended by section 2 of chapter 503 (SB 21-052), Session Laws of Colorado 2021, an	d section 3 of chapter 505 (HB 22-1184), Session Laws	3
of Colorado 2022, as follows:	4
Section 3. Capital Construction Appropriation.	5
PART I	6
CONTROLLED MAINTENANCE	7
8
(7) DEPARTMENT OF MILITARY AND VETERANS AFFAIRS	9
Upgrade Restrooms for Code	10
Compliance, Longmont Readiness	11
Center
 C
ENTER
98
12 794,740 397,370 397,370(I)
13
TOTALS PART I	14
(CONTROLLED	15
MAINTENANCE)	16 $57,094,173 $54,561,688 $2,135,115 $397,370
135
-47- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
1
PART II	2
CAPITAL RENEWAL AND RECAPITALIZATION	3
4
(8) DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT	5
Replace Mechanical System,	6
Laboratory Building (capital	7
renewal)
 
RENEWAL
)
99
8 2,821,506 2,821,506
Replace Generator, State	9
Laboratory	10 912,982 912,982
a
11 $3,734,488
12
a
 This amount shall be from the Newborn Screening and Genetic Counseling Cash Funds created in Section 25-4-1006 (1), C.R.S.	13
14
15
135
-48- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
TOTALS PART II	1
(CAPITAL RENEWAL AND	2
RECAPITALIZATION)	3 $91,899,372 $77,069,736 $14,829,636
4
GRAND TOTALS	5
(CAPITAL CONSTRUCTION)	6 $270,952,736 $183,210,158 $64,234,179
a
 $8,911,836 $14,596,563
b
 
7
a
 Of this amount, $300,000 shall be from the Highway Users Tax Fund created in Section 43-4-201 (1)(a), C.R.S., and appropriated pursuant to Section 33-10-111 (4), C.R.S.	8
b
 This amount contains an (I) notation.	9
10
FOOTNOTES -- The following statements are referenced to the numbered footnotes throughout section 2.	11
12
98
C
APITAL 
C
ONSTRUCTION
,
 C
ONTROLLED 
M
AINTENANCE
,
 D
EPARTMENT OF 
M
ILITARY AND 
V
ETERANS 
A
FFAIRS
,
 U
PGRADE 
R
ESTROOMS FOR 
C
ODE 
C
OMPLIANCE
,	13
L
ONGMONT 
R
EADINESS 
C
ENTER 
--
 
T
HIS APPROPRIATION REMAINS AVAILABLE FOR EXPENDITURE UNTIL COMPLETION OF THE PROJECT OR THE CLOSE OF THE
14
2022-23
 STATE FISCAL YEAR
,
 WHICHEVER COMES FIRST
.
 
15
16
135
-49- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
99
C
APITAL 
C
ONSTRUCTION
,
 C
APITAL 
R
ENEWAL AND 
R
ECAPITALIZATION
,
 D
EPARTMENT OF 
P
UBLIC 
H
EALTH AND 
E
NVIRONMENT
,
 R
EPLACE 
M
ECHANICAL 
S
YSTEM
,	1
L
ABORATORY 
B
UILDING 
(
CAPITAL RENEWAL
)
 --
 T
HIS APPROPRIATION REMAINS AVAILABLE FOR EXPENDITURE UNTIL COMPLETION OF THE PROJECT OR THE CLOSE
2
OF THE 
2024-25
 STATE FISCAL YEAR
,
 WHICHEVER COMES FIRST
.	3
135
-50- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
SECTION 3. Capital construction appropriations for the fiscal year beginning July 1, 2021. In Session Laws of Colorado 2021, section 3 of chapter 504, (SB 21-205),	1
amend Part II (1)(B), Part III (1)(A), (1)(B), (1)(E), (1)(G), (2)(A) an	d the affected totals, as the affected totals are amended by section 1 of chapter 505, (HB 22-1184), Session Laws	2
of Colorado 2022, as follows:	3
Section 3.  Capital Construction Appropriation.	4
PART II	5
STATE AGENCIES	6
7
(1) CAPITAL RENEWAL AND RECAPITALIZATION	8
(B) Department of Corrections	9
Steam Condensate Line	10
Replacement, Sterling Correctional	11
Facility (Capital Renewal)
12
R
ENEWAL
),
 P
HASE 
I	13 8,487,496 8,487,496
14
TOTALS PART II	15
(STATE AGENCIES)	16 $66,299,100 $29,595,509 $32,659,341 $1,800,000 $2,244,250
135
-51- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
1
PART III	2
INSTITUTIONS OF HIGHER EDUCATION	3
4
(1) CAPITAL RENEWAL AND RECAPITALIZATION	5
(A) Arapahoe Community College	6
Health Programs Integration and	7
Annex Building Renovation	8 11,152,093
8,364,000 2,788,093
a
9 14,652,093 6,288,093
a
10
a
 This amount shall be from unrestricted institutional reserves.
 
RESERVES AND 
A
MERICAN 
R
ESCUE 
P
LAN 
A
CT FUNDS RECEIVED THROUGH 
A
RAPAHOE 
C
OUNTY
.	11
12
13
14
15
135
-52- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
(B) Auraria Higher Education Center	1
AHEC Campus-wide
 HVAC	2
Infrastructure Replacement (Capital	3
Renewal) R
ENEWAL
),
 T
HREE
4
B
UILDINGS
5 20,563,100 20,353,100 210,000
a
6
a
 This amount shall be from deferred maintenance funds received from each of the three institutions on the AHEC campus.	7
8
(E) Colorado State University - Pueblo	9
Technology Building Renovation	10
and Addition
 A
DDITION
,
 P
HASE 
I	11 17,122,654 16,952,654 170,000
a
12
a
 This amount shall be from CSU-Pueblo institutional reserves.	13
14
15
135
-53- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
(G) Trinidad State Junior College	1
Freudenthal Library Renovation
2
R
ENOVATION
,
 ENTRY
,
 S
TUDY
3
L
OUNGE
,
 G
ALLERY 
L
OUNGE
,
 AND
4
L
EVEL 
1
 THROUGH 
3
 R
ESTROOMS
5 6,276,339 6,276,339
6
(2) CAPITAL EXPANSION	7
(A) Community College of Aurora	8
Diesel and Support Services	9
Building	10 9,395,879
6,188,439 3,207,440
a
11 13,995,465 7,807,026
a
12
a
 This amount shall be from the Community College of Aurora Foundation and unrestricted institutional reserves.
 F
OUNDATION
,
 UNRESTRICTED INSTITUTIONAL RESERVES
,	13
DONATIONS
,
 AND 
A
MERICAN 
R
ESCUE 
P
LAN 
A
CT FUNDS RECEIVED THROUGH 
A
RAPAHOE 
C
OUNTY
.
 
14
15
16
135
-54- APPROPRIATION FROM
ITEM &
SUBTOTAL
TOTAL CAPITAL 
CONSTRUCTION
FUND
CASH
FUNDS
REAPPROPRIATED
FUNDS
FEDERAL
FUNDS
$$ $ $ $ $
TOTALS PART III	1
(INSTITUTIONS OF HIGHER	2
EDUCATION)	3 $150,593,576
$104,841,923 $45,751,653
4 $158,693,162 $53,851,239
5
6
GRAND TOTALS	7
(CAPITAL CONSTRUCTION)	8 $306,480,200
$221,508,241 $80,079,276
a
$1,800,000 $3,092,683
b
9 $314,579,786 $88,178,862
a
10
a
 Of this amount, $400,000 shall be from the Highway Users Tax Fund created in Section 43-4-201 (1)(a), C.R.S., and appropriated pursuant to Section 33-10-111 (4), C.R.S.	11
b
 This amount contains an (I) notation.	12
13
135
-55- SECTION 4.   Safety clause. The general assembly hereby finds,1
determines, and declares that this act is necessary for the immediate2
preservation of the public peace, health, and safety.3
135-56-