General Assembly Substitute Bill No. 876 January Session, 2013 *_____SB00876ED_FIN040113____* General Assembly Substitute Bill No. 876 January Session, 2013 *_____SB00876ED_FIN040113____* AN ACT CONCERNING AUTHORIZATION OF STATE GRANT COMMITMENTS FOR SCHOOL BUILDING PROJECTS AND ROOF PITCH REQUIREMENTS FOR SCHOOL BUILDINGS. Be it enacted by the Senate and House of Representatives in General Assembly convened: Section 1. (Effective from passage) The Commissioner of Construction Services, having reviewed applications for state grants for public school building projects in accordance with section 10-283 of the general statutes on the basis of priorities for such projects and standards for school construction established by the State Board of Education, and having prepared a listing of all such eligible projects ranked in order of priority, including a separate schedule of previously authorized projects which have changed substantially in scope or cost, as determined by said commissioner together with the amount of the estimated grant with respect to each eligible project, and having submitted such listing of eligible projects, prior to December 15, 2012, to a committee of the General Assembly established under section 10-283a of the general statutes for the purpose of reviewing such listing, is hereby authorized to enter into grant commitments on behalf of the state in accordance with said section 10-283 with respect to the priority listing of such projects and in such estimated amounts as approved by said committee prior to February 1, 2013, as follows: (1) Estimated Grant Commitments. T1 School District Estimated Estimated T2 School Project Costs Grant T3 Project Number T4 T5 ELLINGTON T6 Crystal Lake School T7 048-0058 EA/RR/PS $ 18,457,497 $ 10,744,109 T8 T9 MILFORD T10 East Shore Middle School T11 084-0185 EA 18,950,000 10,422,500 T12 T13 NORWALK T14 Rowayton School T15 103-0241 EA 7,695,260 2,473,257 T16 T17 NORWALK T18 Naramake Elementary School T19 103-0242 EA 4,139,284 1,330,366 T20 T21 ROCKY HILL T22 Rocky Hill High School T23 119-0049 EA/RR 44,955,000 19,910,570 T24 T25 WATERBURY T26 John F. Kennedy High School T27 151-0288 EA 25,232,000 12,706,835 T28 T29 WETHERSFIELD T30 Wethersfield High School T31 159-0100 EA/RR 74,816,617 37,939,506 T32 T33 CREC T34 Gtr. Htfd. Acad. of Arts Elementary T35 Magnet T36 241-0102 MAG/N/PS 49,673,596 39,738,877 T37 T38 CREC T39 Gtr. Htfd. Acad. of Arts Middle T40 Magnet T41 241-0103 MAG/N/PS 74,614,104 59,691,283 T42 T43 CREC T44 Two Rivers Magnet High School T45 241-0104 MAG/N/PS 108,308,509 86,646,807 T46 T47 EAST WINDSOR T48 Broad Brook Elementary T49 047-0035 E/EC 3,770,000 2,181,322 T50 T51 ELLINGTON T52 Windermere School T53 048-0059 A 2,582,503 1,503,275 T54 T55 HARTFORD T56 Weaver High School T57 064-0307 A/RR/EC 100,000,000 80,000,000 T58 T59 GREENWICH T60 Greenwich High School T61 057-0111 EA 30,115,000 6,023,000 T62 T63 NAUGATUCK T64 Naugatuck High School T65 088-0067 EA/EC 77,967,900 58,475,925 T66 T67 SOUTHINGTON T68 Joseph A. DePaolo Middle School T69 131-0127 EA/RR/PS 45,000,000 25,231,500 T70 T71 SOUTHINGTON T72 John F. Kennedy Middle School T73 131-0128 EA/RR/PS 45,000,000 25,231,500 T74 T75 REGIONAL DISTRICT 6 T76 Wamogo Regional H.S. (Vo-Ag) T77 206-0049 VE 61,740 49,392 T78 T79 REGIONAL DISTRICT 16 T80 Region 16 PK-5 Elementary School T81 216-0026 N 36,609,000 21,310,099 T82 T83 REGIONAL DISTRICT 16 T84 Laurel Ledge School T85 216-0027 EA/RR 7,746,000 5,283,547 T86 T87 NAUGATUCK T88 Central Administration T89 088-0068 BE/EA 3,032,100 1,137,038 T90 T91 STAMFORD T92 Dolan School T93 135-0269 EC 1,225,019 354,398 T94 T95 STAMFORD T96 Davenport Ridge School T97 135-0270 EC 1,000,000 528,600 T98 T99 WALLINGFORD T100 Mark T. Sheehan High School T101 148-0162 EC 174,135 87,694 T102 T103 WALLINGFORD T104 Lyman Hall High School T105 148-0163 EC 131,135 66,040 T106 T107 REGIONAL DISTRICT 16 T108 Central Administration T109 216-0028 BE/A 2,371,000 808,630 T110 T111 REGIONAL DISTRICT 18 T112 Mile Creek School T113 218-0037 EC 597,900 209,265 T1 School District Estimated Estimated T2 School Project Costs Grant T3 Project Number T4 T5 ELLINGTON T6 Crystal Lake School T7 048-0058 EA/RR/PS $ 18,457,497 $ 10,744,109 T8 T9 MILFORD T10 East Shore Middle School T11 084-0185 EA 18,950,000 10,422,500 T12 T13 NORWALK T14 Rowayton School T15 103-0241 EA 7,695,260 2,473,257 T16 T17 NORWALK T18 Naramake Elementary School T19 103-0242 EA 4,139,284 1,330,366 T20 T21 ROCKY HILL T22 Rocky Hill High School T23 119-0049 EA/RR 44,955,000 19,910,570 T24 T25 WATERBURY T26 John F. Kennedy High School T27 151-0288 EA 25,232,000 12,706,835 T28 T29 WETHERSFIELD T30 Wethersfield High School T31 159-0100 EA/RR 74,816,617 37,939,506 T32 T33 CREC T34 Gtr. Htfd. Acad. of Arts Elementary T35 Magnet T36 241-0102 MAG/N/PS 49,673,596 39,738,877 T37 T38 CREC T39 Gtr. Htfd. Acad. of Arts Middle T40 Magnet T41 241-0103 MAG/N/PS 74,614,104 59,691,283 T42 T43 CREC T44 Two Rivers Magnet High School T45 241-0104 MAG/N/PS 108,308,509 86,646,807 T46 T47 EAST WINDSOR T48 Broad Brook Elementary T49 047-0035 E/EC 3,770,000 2,181,322 T50 T51 ELLINGTON T52 Windermere School T53 048-0059 A 2,582,503 1,503,275 T54 T55 HARTFORD T56 Weaver High School T57 064-0307 A/RR/EC 100,000,000 80,000,000 T58 T59 GREENWICH T60 Greenwich High School T61 057-0111 EA 30,115,000 6,023,000 T62 T63 NAUGATUCK T64 Naugatuck High School T65 088-0067 EA/EC 77,967,900 58,475,925 T66 T67 SOUTHINGTON T68 Joseph A. DePaolo Middle School T69 131-0127 EA/RR/PS 45,000,000 25,231,500 T70 T71 SOUTHINGTON T72 John F. Kennedy Middle School T73 131-0128 EA/RR/PS 45,000,000 25,231,500 T74 T75 REGIONAL DISTRICT 6 T76 Wamogo Regional H.S. (Vo-Ag) T77 206-0049 VE 61,740 49,392 T78 T79 REGIONAL DISTRICT 16 T80 Region 16 PK-5 Elementary School T81 216-0026 N 36,609,000 21,310,099 T82 T83 REGIONAL DISTRICT 16 T84 Laurel Ledge School T85 216-0027 EA/RR 7,746,000 5,283,547 T86 T87 NAUGATUCK T88 Central Administration T89 088-0068 BE/EA 3,032,100 1,137,038 T90 T91 STAMFORD T92 Dolan School T93 135-0269 EC 1,225,019 354,398 T94 T95 STAMFORD T96 Davenport Ridge School T97 135-0270 EC 1,000,000 528,600 T98 T99 WALLINGFORD T100 Mark T. Sheehan High School T101 148-0162 EC 174,135 87,694 T102 T103 WALLINGFORD T104 Lyman Hall High School T105 148-0163 EC 131,135 66,040 T106 T107 REGIONAL DISTRICT 16 T108 Central Administration T109 216-0028 BE/A 2,371,000 808,630 T110 T111 REGIONAL DISTRICT 18 T112 Mile Creek School T113 218-0037 EC 597,900 209,265 (2) Previously Authorized Projects That Have Changed Substantially in Scope or Cost which are Seeking First Reauthorization. T114 School District Authorized Requested T115 School T116 Project Number T117 T118 BROOKLYN T119 Brooklyn Middle School T120 019-0027 EA T121 T122 Estimated… T123 Total Project Costs $ 1,700,000 $ 2,065,000 T124 Total Grant $ 1,250,690 $ 1,519,221 T125 T126 EASTFORD T127 Eastford Elementary School T128 039-0012 EC T129 T130 Estimated… T131 Total Project Costs $ 150,000 $ 409,271 T132 Total Grant $ 90,000 $ 245,563 T133 T134 MERIDEN T135 Francis T. Maloney High School T136 080-0092 RNV/E T137 T138 Estimated… T139 Total Project Costs $ 107,500,000 $ 107,500,000 T140 Total Grant $ 82,925,500 $ 82,925,500 T141 T142 NEW HAVEN T143 (New) East Rock Global Magnet T144 School T145 093-0355 N T146 T147 Estimated… T148 Total Project Costs $ 40,000,000 $ 49,000,000 T149 Total Grant $ 31,428,000 $ 38,499,300 T150 T151 STRATFORD T152 Honeyspot House (Stratford T153 Academy) T154 138-0094 N T155 T156 Estimated… T157 Total Project Costs $ 13,850,654 $ 15,850,000 T158 Total Grant $ 7,815,924 $ 8,944,155 T159 T160 CREC T161 International Magnet for Global T162 Citizenship T163 241-0098 MAG/N/PS T164 T165 Estimated… T166 Total Project Costs $ 26,564,305 $ 31,581,500 T167 Total Grant $ 25,236,090 $ 30,002,425 T114 School District Authorized Requested T115 School T116 Project Number T117 T118 BROOKLYN T119 Brooklyn Middle School T120 019-0027 EA T121 T122 Estimated… T123 Total Project Costs $ 1,700,000 $ 2,065,000 T124 Total Grant $ 1,250,690 $ 1,519,221 T125 T126 EASTFORD T127 Eastford Elementary School T128 039-0012 EC T129 T130 Estimated… T131 Total Project Costs $ 150,000 $ 409,271 T132 Total Grant $ 90,000 $ 245,563 T133 T134 MERIDEN T135 Francis T. Maloney High School T136 080-0092 RNV/E T137 T138 Estimated… T139 Total Project Costs $ 107,500,000 $ 107,500,000 T140 Total Grant $ 82,925,500 $ 82,925,500 T141 T142 NEW HAVEN T143 (New) East Rock Global Magnet T144 School T145 093-0355 N T146 T147 Estimated… T148 Total Project Costs $ 40,000,000 $ 49,000,000 T149 Total Grant $ 31,428,000 $ 38,499,300 T150 T151 STRATFORD T152 Honeyspot House (Stratford T153 Academy) T154 138-0094 N T155 T156 Estimated… T157 Total Project Costs $ 13,850,654 $ 15,850,000 T158 Total Grant $ 7,815,924 $ 8,944,155 T159 T160 CREC T161 International Magnet for Global T162 Citizenship T163 241-0098 MAG/N/PS T164 T165 Estimated… T166 Total Project Costs $ 26,564,305 $ 31,581,500 T167 Total Grant $ 25,236,090 $ 30,002,425 (3) Previously Authorized Project For The Technical High School System That Has Changed Substantially in Scope or Cost which is Seeking Reauthorization. T168 School District Authorized Requested T169 School T170 Project Number T171 T172 CTHSS (HAMDEN) T173 Eli Whitney T174 900-0007 VT/EA T175 T176 Estimated… T177 Total Project Costs $ 98,000,000 $ 104,075,000 T178 Total Grant $ 98,000,000 $ 104,075,000 T168 School District Authorized Requested T169 School T170 Project Number T171 T172 CTHSS (HAMDEN) T173 Eli Whitney T174 900-0007 VT/EA T175 T176 Estimated… T177 Total Project Costs $ 98,000,000 $ 104,075,000 T178 Total Grant $ 98,000,000 $ 104,075,000 Sec. 2. Subdivision (2) of subsection (b) of section 10-291 of the general statutes is repealed and the following is substituted in lieu thereof (Effective July 1, 2013): (2) The plans incorporate new roof construction or total replacement of an existing roof and do not provide for the following: (A) A minimum roof pitch [of one-half inch per foot, except that for a total replacement of an existing roof, the Commissioner of Construction Services may permit the minimum roof pitch to be reduced to one-quarter inch per foot if the commissioner finds, based upon written certification from a licensed architect or engineer provided by the town or regional board of education, that (i) such reduction of roof pitch will not impede drainage or cause pooling of water that may leak into the building to a greater degree than that of a roof of a minimum roof pitch of one-half inch per foot, (ii) the cost of replacing the roof with a minimum roof pitch of one-half inch per foot would substantially exceed the cost of replacing the roof with a minimum roof pitch of one-quarter inch per foot, (iii) the time needed to replace the roof with a minimum roof pitch of one-half inch per foot would be substantially longer than the time needed to replace the roof with a minimum roof pitch of one-quarter inch per foot, and (iv) the existing building would not support a roof with a roof pitch of one-half inch per foot without a substantial rebuilding of the existing building] that conforms with the requirements of the State Building Code, (B) a minimum twenty-year unlimited manufacturer's guarantee for water tightness covering material and workmanship on the entire roofing system, (C) the inclusion of vapor retarders, insulation, bitumen, felts, membranes, flashings, metals, decks and any other feature required by the roof design, and (D) that all manufacturer's materials to be used in the roofing system are specified to meet the latest standards for individual components of the roofing systems of the American Society for Testing and Materials; This act shall take effect as follows and shall amend the following sections: Section 1 from passage New section Sec. 2 July 1, 2013 10-291(b)(2) This act shall take effect as follows and shall amend the following sections: Section 1 from passage New section Sec. 2 July 1, 2013 10-291(b)(2) ED Joint Favorable Subst. C/R FIN ED Joint Favorable Subst. C/R FIN