Connecticut 2023 2023 Regular Session

Connecticut House Bill HB06936 Comm Sub / Bill

Filed 05/24/2023

                     
 
LCO 6777  \\PRDFS1\HCOUSERS\BARRYJN\WS\2023HB-06936-R01-
HB.docx  
1 of 3 
  
General Assembly  Raised Bill No. 6936  
January Session, 2023  
LCO No. 6777 
 
 
Referred to Committee on GOVERNMENT 
ADMINISTRATION AND ELECTIONS 
 
 
Introduced by:  
(GAE)  
 
 
 
AN ACT CONVEYING PARCELS OF STATE LAND TO THE NEW 
HAVEN PORT AUTHORITY.  
Be it enacted by the Senate and House of Representatives in General 
Assembly convened: 
 
Section 1. (Effective from passage) (a) (1) Notwithstanding any 1 
provision of the general statutes, the Commissioner of Transportation 2 
shall convey to the New Haven Port Authority five parcels of land 3 
located in the city of New Haven, at a cost equal to the fair market 4 
value of the properties, as determined by the average of the appraisals 5 
of two independent appraisers selected by the commissioner, plus the 6 
administrative costs of making such conveyance. 7 
(2) (A) The first parcel of land has an area of approximately 1.49 8 
acres and is identified as "Release Area=6,032 ± m² (1.490 ± Acres)" on 9 
a map entitled "Compilation Plan, Town of New Haven, Map Showing 10 
Land Released to New Haven Port Authority by the State of 11 
Connecticut Department of Transportation, Waterfront Street @ 12 
Waterfront Connector, Scale 1:500, December 2016, Scott A. Hill, P.E., 13 
Chief Engineer–Bureau of Engineering and Construction", revised 14 
February 27, 2023. Said parcel shall be conveyed subject to (i) a 15  Bill No. 6936 
 
 
LCO 6777  {\\PRDFS1\HCOUSERS\BARRYJN\WS\2023HB-06936-
R01-HB.docx }   
2 of 3 
 
drainage right-of-way in favor of the state, (ii) an easement for the 16 
purposes of inspection, maintenance, rehabilitation and future 17 
construction of bridge structures and supporting tiers in favor of the 18 
state, and (iii) a pipeline easement in favor of Magellan Terminal 19 
Holdings, L.P., n/k/a Buckeye PT Terminals LP. 20 
(B) The second parcel of land has an area of approximately .293 acre 21 
and is identified as "Release Area=1184.9 ± m² (12,754 ± Sq. Ft.)" on a 22 
map entitled "Compilation Plan, Town of New Haven, Map Showing 23 
Land Released to New Haven Port Authority by the State of 24 
Connecticut Department of Transportation, Waterfront Connector @ 25 
Stiles Street, Scale 1:500, August 2015, Scott A. Hill, P.E., Chief 26 
Engineer–Bureau of Engineering and Construction", revised June 8, 27 
2016, and February 27, 2023. 28 
(C) The third parcel of land has an area of approximately .898 acre 29 
and is identified as "Release Area=3637.2 ± m² (39,152 ± Sq. Ft.)" on a 30 
map entitled "Compilation Plan, Town of New Haven, Map Showing 31 
Land Released to New Haven Port Authority by the State of 32 
Connecticut Department of Transportation, Waterfront Connector (S.R. 33 
921), Scale 1:500, August 2018, Scott A. Hill, P.E., Chief Engineer–34 
Bureau of Engineering and Construction", revised February 27, 2023. 35 
Said parcel shall be conveyed subject to a drainage right-of-way in 36 
favor of the state. 37 
(D) The fourth parcel of land has an area of approximately .111 acre 38 
and is identified as "Release Area=447.3 ± m² (4,815 ± Sq. Ft.)" on a map 39 
entitled "Compilation Plan, Town of New Haven, Map Showing Land 40 
Released to New Haven Port Authority by the State of Connecticut 41 
Department of Transportation, Waterfront Connector (S.R. 921), Scale 42 
1:500, February 2021, Scott A. Hill, P.E., Chief Engineer–Bureau of 43 
Engineering and Construction", revised February 27, 2023. Said parcel 44 
shall be conveyed subject to an easement for existing utilities in favor 45 
of the state. 46 
(E) The fifth parcel of land has an area of approximately .192 acre 47  Bill No. 6936 
 
 
LCO 6777  {\\PRDFS1\HCOUSERS\BARRYJN\WS\2023HB-06936-
R01-HB.docx }   
3 of 3 
 
and is identified as "Parcel B Release Area=777.9 ± m² (8,373 ± Sq. Ft.)" 48 
on a map entitled "Compilation Plan, Town of New Haven, Map 49 
Showing Land Released to New Haven Port Authority by the State of 50 
Connecticut Department of Transportation, Reconstruction of I-95 over 51 
West River New Haven-West Haven, Scale 1:500, July 2021, Scott A. 52 
Hill, P.E., Chief Engineer–Bureau of Engineering and Construction", 53 
revised July 26, 2021, and March 1, 2023. Said parcel shall be conveyed 54 
subject to (i) an easement for existing utilities in favor of the state, and 55 
(ii) an easement for sewer lateral in favor of the state. 56 
(3) The conveyance of the parcels described in subdivision (2) of this 57 
subsection shall be subject to the approval of the State Properties 58 
Review Board. 59 
(b) The State Properties Review Board shall complete its review of 60 
the conveyance of said parcels of land not later than thirty days after it 61 
receives a proposed agreement from the Department of 62 
Transportation. The land shall remain under the care and control of 63 
said department until a conveyance is made in accordance with the 64 
provisions of this section. The State Treasurer shall execute and deliver 65 
any deed or instrument necessary for a conveyance under this section, 66 
which deed or instrument shall include provisions concerning 67 
property rights retained by the state under subdivision (2) of 68 
subsection (a) of this section. The Commissioner of Transportation 69 
shall have the sole responsibility for all other incidents of such 70 
conveyance. 71 
This act shall take effect as follows and shall amend the following 
sections: 
 
Section 1 from passage New section 
 
GAE Joint Favorable