Connecticut 2025 2025 Regular Session

Connecticut House Bill HB05933 Introduced / Bill

Filed 01/21/2025

                     
 
LCO No. 2557   	1 of 1 
 
General Assembly  Proposed Bill No. 5933  
January Session, 2025  
LCO No. 2557 
 
 
Referred to Committee on ENERGY AND TECHNOLOGY  
 
 
Introduced by:  
REP. MUSHINSKY, 85th Dist. 
REP. WINTER, 94th Dist. 
 
 
 
 
AN ACT REQUIRING THE INSTALLATION OF ADVANCED 
CONDUCTORS IN NEW OR EXISTING TRANSMISSION LINES. 
Be it enacted by the Senate and House of Representatives in General 
Assembly convened: 
 
That the general statutes be amended to require that electric 1 
distribution companies install advanced conductors with an efficiency 2 
rating not less than fifteen per cent higher than standard steel core 3 
conductors in any new or existing transmission line. 4 
Statement of Purpose:   
To require that electric distribution companies install advanced 
conductors with an efficiency rating not less than fifteen per cent higher 
than steel core conductors in any new or existing transmission line.