Florida 2022 2022 Regular Session

Florida House Bill H0965 Analysis / Analysis

Filed 02/11/2022

                    This docum ent does not reflect the intent or official position of the bill sponsor or House of Representatives. 
STORAGE NAME: h0965b.ANR 
DATE: 2/11/2022 
 
HOUSE OF REPRESENTATIVES STAFF ANALYSIS  
 
BILL #: CS/HB 965    Environmental Management 
SPONSOR(S): Environment, Agriculture & Flooding Subcommittee, Truenow 
TIED BILLS:   IDEN./SIM. BILLS: CS/SB 1426 
 
REFERENCE 	ACTION ANALYST STAFF DIRECTOR or 
BUDGET/POLICY CHIEF 
1) Environment, Agriculture & Flooding 
Subcommittee 
16 Y, 1 N, As CS Gawin Moore 
2) Agriculture & Natural Resources Appropriations 
Subcommittee 
 	White Pigott 
3) State Affairs Committee    
SUMMARY ANALYSIS 
The Department of Environmental Protection (DEP) regulates activities in, on, or over surface waters, as well 
as any activity that alters surface water flows, through environmental resource permits (ERPs). ERPs are 
required for development or construction activities typically involving the dredging or filling of surface waters, 
construction of flood protection facilities, building dams or reservoirs, or any other activities that affect state 
waters. The federal Clean Water Act (CWA) requires states to maintain the quality of their waters. In Florida, 
water quality is addressed through water quality standards, total maximum daily loads, basin management 
action plans (BMAPs), and permits. Water quality trading is a market-based approach that can be used to 
attain water quality improvements. Water quality trading allows one source of pollution to control a pollutant at 
levels greater than required and sell credits to another source, the buyer, which uses the credits to supplement 
their level of water treatment in order to comply with regulatory requirements.  
 
The bill authorizes the creation of water quality enhancement areas (WQEAs), which are defined as natural 
systems constructed, operated, managed, and maintained under an ERP permit for the purpose of providing 
offsite, compensatory regional treatment within an identified enhancement service area for which enhancement 
credits may be provided. In addition, the bill requires the construction, operation, management, and 
maintenance of a WQEA to be approved through an ERP permit and requires a WQEA to address the 
contributions of pollutants in an enhancement service area that does not meet state water quality standards.  
 
To obtain a WQEA permit, the bill requires an applicant to provide certain reasonable assurances about the 
proposed WQEA. The bill also requires that the WQEA permit provide for the assessment, valuation, and 
award of credits based on units of pollutants removed. 
 
The bill specifies that a WQEA may only provide enhancement credits in an enhancement service area, with 
certain exceptions, and specifies that enhancement credits may only be sold to governmental entities. The bill 
requires DEP or the water management districts to authorize the sale and use of enhancement credits to offset 
adverse water quality impacts of permitted activities or to assist governmental entities seeking to meet an 
assigned BMAP allocation or Reasonable Assurance Plan (RAP). The bill prohibits enhancement credits from 
being used by point source dischargers to satisfy regulatory requirements other than those necessary to obtain 
an ERP for construction and operation of the surface water management system of the site. 
 
The bill specifies that whether or not a dwelling is owner occupied is not an eligibility criterion for a developer or 
homebuilder to receive density or intensity bonuses for implementing graywater technologies. 
 
The bill may have a significant negative fiscal impact on the state and no impact on local governments.  
 
The bill provides an effective date of July 1, 2022. 
 
 
FULL ANALYSIS  STORAGE NAME: h0965b.ANR 	PAGE: 2 
DATE: 2/11/2022 
  
I.  SUBSTANTIVE ANALYSIS 
 
A. EFFECT OF PROPOSED CHANGES: 
Background  
 
Environmental Resource Permits  
State law provides that a water management district (WMD) or the Department of Environmental 
Protection (DEP) may require an environmental resource permit (ERP) and impose reasonable 
conditions necessary to assure the construction or alteration of any stormwater management system,
1
 
dam,
2
 impoundment,
3
 reservoir,
4
 appurtenant work,
5
 or works
6
 complies with state law and applicable 
rules and will not be harmful to water resources.
7
 A person proposing such construction or alteration 
must apply to the WMD or DEP for an ERP permit authorizing the construction or alteration. The 
application must contain the applicant’s name and address, the name and address of the owner of the 
land where the works are to be constructed, a legal description of the land, location of the work, 
sketches of construction, name and address of the person who prepared the plans and specifications of 
construction, and the person who will construct the proposed work, general purpose of the proposed 
work, and other information as DEP or the WMD may require.
8
 
 
Water Quality  
The CWA requires states to adopt water quality standards (WQS) for navigable waters.
9
 The CWA also 
requires states to develop lists of water bodies that do not meet WQS, which are called impaired 
waters. States must then develop a total maximum daily load (TMDL) for the particular pollutants 
causing the impairment. The TMDL is the maximum allowable amount of the pollutants the water body 
can receive while still maintaining WQS.
10
  
 
Total Maximum Daily Loads 
The Florida Watershed Restoration Act guides the development and implementation of TMDLs.
11
 
TMDLs must include reasonable and equitable pollutant load allocations between or among point 
sources (e.g., pipes and culverts discharging from a permitted facility, such as a domestic wastewater 
treatment facility) and nonpoint sources (e.g., agriculture, septic tanks, golf courses) that will alone, or 
in conjunction with other management and restoration activities, reduce pollutants and achieve WQS.
12
 
The allocation must consider cost-effective approaches coordinated between contributing point and 
nonpoint sources of pollution for impaired water bodies and may include both non-regulatory and 
incentive-based programs.
13
 However, under the Florida Watershed Restoration Act, DEP is not 
                                                
1
 Section 373.403(10), F.S., defines “stormwater management system” to mean a system designed and constructed or implemented to 
control discharges which are necessitated by rainfall events, incorporating methods to collect, convey, store, absorb, inhibit, treat, use, 
or reuse water to prevent or reduce flooding, overdrainage, environmental degradation, and water pollution or otherwise affect the 
quantity and quality of discharges from the system. 
2
 Section 373.403(1), F.S., defines “dam” to mean any artificial or natural barrier, with appurtenant works, raised to obstruct or 
impound, or which does obstruct or impound, any of the surface waters of the state. 
3
 Section 373.403(3), F.S., defines “impoundment” to mean any lake, reservoir, pond, or other containment of surface water occupying 
a bed or depression in the earth’s surface and having a discernible shoreline. 
4
 Section 373.403(4), F.S., defines “reservoir” to mean any artificial or natural holding area which contains or will contain the water 
impounded by a dam. 
5
 Section 373.403(2), F.S., defines “appurtenant works” to mean any artificial improvements to a dam that might affect the safety of 
such dam or, when employed, might affect the holding capacity of such dam or of the reservoir or impoundment created by such dam. 
6
 Section 373.403(5), F.S., defines “works” to mean all artificial structures, including, but not limited to, ditches, canals, conduits, 
channels, culverts, pipes, and other construction that connects to, draws water from, drains water into, or is placed in or across the 
waters in the state. 
7
 Section 373.413(1), F.S. 
8
 Section 373.413(2), F.S. 
9
 33 U.S.C. s. 1313. 
10
 33 U.S.C. s. 1313; see s. 403.067, F.S. 
11
 Section 403.067, F.S.; ch. 99-223, Laws of Fla. 
12
 Section 403.067(6)(b), F.S. 
13
 Section 403.067(1), F.S.  STORAGE NAME: h0965b.ANR 	PAGE: 3 
DATE: 2/11/2022 
  
required to develop a TMDL if there is existing reasonable assurance that there are existing or 
proposed pollution control mechanisms or programs that will effectively address the impairment.
14
  
 
Basin Management Action Plans  
DEP is the lead agency coordinating the development and implementation of TMDLs.
15
 Once a TMDL 
is adopted,
16
 DEP may develop and implement a basin management action plan (BMAP), which is a 
restoration plan for the watersheds and basins connected to the impaired water body.
17
 A BMAP must 
integrate appropriate management strategies available to the state through existing water quality 
protection programs to achieve the TMDL.
18
 The BMAP must also include milestones for 
implementation and water quality improvement, and associated water quality monitoring, which 
determine whether there has been reasonable progress in pollutant load reductions. DEP must assess 
progress every five years, and revisions to the BMAP must be made as appropriate.
19
 
 
For point source discharges, any management strategies and pollutant reduction requirements 
associated with a TMDL must be incorporated into subsequent permits or permit modifications. DEP 
may not impose limits or conditions implementing an adopted TMDL in a permit until the permit expires, 
the discharge is modified, or the permit is reopened pursuant to an adopted BMAP.
20
 
 
A best management practice (BMP) is a practice or combination of practices adopted by rule by the 
Department of Agriculture and Consumer Services, DEP, or the applicable WMD as an effective and 
practicable means for reducing nutrient inputs and improving water quality, taking into account 
economic and technological considerations.
21
 Where there is an adopted BMP for a nonpoint source, 
the BMAP must require the nonpoint source to implement the applicable BMPs. The nonpoint source 
discharger must demonstrate compliance with BMP implementation or conduct water quality monitoring 
prescribed by DEP or the WMD. If the discharger fails to demonstrate compliance, the discharger may 
be subject to enforcement action.
22
 
 
The adopted BMAPs are illustrated in the graphic below:
23
 
                                                
14
 DEP, Restoration Plan Guidance (June 2015), 2, available at https://floridadep.gov/sites/default/files/4b4ePlansGuidance.pdf (last 
visited Jan. 24, 2022). 
15
 Section 403.061, F.S. DEP has the power and the duty to control and prohibit pollution of air and water in accordance with the law 
and rules adopted and promulgated by it. Section 403.061(22), F.S., allows DEP to advise, consult, cooperate, and enter into 
agreements with other state agencies, the federal government, other states, interstate agencies, etc. 
16
 Section 403.067(6)(c), F.S. 
17
 Section 403.067(7)(a)1., F.S. 
18
 Id. 
19
 Section 403.067(7)(a)6., F.S. 
20
 Section 403.067(7)(b)2., F.S. 
21
 Rule 62-306.200(2), F.A.C.; defines “best management practice” as a practice or combination of practices adopted by rule by the 
Department of Agriculture and Consumer Services, DEP, or the applicable WMD as an effective and practicable means for reducing 
nutrient inputs and improving water quality, taking into account economic and technological considerations.  
22
 Sections 403.067(7)(b)2.g. and 2.h., F.S. 
23
 DEP, Impaired Waters, TMDLs, and Basin Management Action Plans Interactive Map, available at 
https://floridadep.gov/dear/water-quality-restoration/content/impaired-waters-tmdls-and-basin-management-action-plans (last visited 
Jan. 23, 2022).  STORAGE NAME: h0965b.ANR 	PAGE: 4 
DATE: 2/11/2022 
  
 
 
Reasonable Assurance Plans  
The U.S. Environmental Protection Agency (EPA) allows states to place certain impaired waterbodies 
into Category 4b for Clean Water Act section 303(d) reporting purposes, meaning that the 
establishment of a TMDL is not required for an impaired waterbody if other required control measures 
are expected to result in the attainment of WQS in a reasonable period of time.
24
  
 
A Reasonable Assurance Plan (RAP) is a control measure that DEP may implement for Category 4b 
impaired waterbodies.
25
 DEP first determines if a waterbody is impaired or may be reasonably expected 
to become impaired within the next five years.
26
 If a waterbody fits this criterion, DEP evaluates whether 
existing or proposed technology-based effluent limitations and other pollution control programs are 
sufficient to result in the attainment of WQS. If the waterbody is expected to attain WQS in the future 
and to make reasonable progress towards attainment of those standards in a certain timeframe, the 
waterbody will not require a TMDL. DEP’s decision must be based on a plan that provides reasonable 
assurance that proposed pollution control mechanisms and expected water quality improvements in the 
waterbody will attain WQS.
27
 Currently, RAPs exist for the Florida Keys; Lake Seminole; Shell, Prairie, 
and Joshua Creeks; Tampa Bay Estuary; and Mosquito Lagoon.
28
 
 
Planning Units 
Planning units provide a more detailed geographic basis for identifying and assessing water quality 
improvement activities. A planning unit is either an individual large tributary basin or a group of smaller 
                                                
24
 EPA, EPA Integrated Reporting (IR) Categories and How ATTAINS Calculates Them, 1 (Aug. 31, 2018) available at 
https://www.epa.gov/sites/default/files/2018-09/documents/attains_calculations_of_epa_ir_categories_2018-08-31.pdf (last visited 
Jan. 28, 2022). 
25
 DEP, Alternative Restoration Plans, https://floridadep.gov/DEAR/Alternative-Restoration-Plans (last visited Jan. 28, 2022). 
26
 Rule 62-303.600, F.A.C.  
27
 Rule 62-303.600, F.A.C.  
28
 DEP, Reasonable Assurance Plans (RAPs) Category 4b Assessments and Documentation, https://floridadep.gov/dear/alternative-
restoration-plans/content/reasonable-assurance-plans-raps-category-4b-assessments (last visited Jan. 26, 2022).  STORAGE NAME: h0965b.ANR 	PAGE: 5 
DATE: 2/11/2022 
  
adjacent tributary basins with similar characteristics.
29
 Planning units help organize information and 
management strategies around prominent watershed characteristics, and they provide a more detailed 
geographic basis for identifying and assessing water quality improvement activities.
30
 
 
Stormwater Management 
Stormwater is the flow of water resulting from, and immediately following, a rainfall event.
31
 When 
stormwater falls on pavement, buildings, and other impermeable surfaces, the runoff flows quickly and 
can pick up sediment, trash, chemicals, and other pollutants.
32
 Stormwater is a major source of water 
pollution in Florida.
33
 
 
The regulatory programs that address reductions in water quality caused by stormwater are the federal 
National Pollution Discharge Elimination System (NPDES), which regulates discharges of pollutants 
into waters of the U.S.,
34
 and the state’s ERP program.
35
 NPDES regulates stormwater pollution from 
certain municipal storm sewer systems and runoff from certain construction and industrial activities.
36
 
The state’s ERP program regulates activities that create stormwater runoff, as well as dredging and 
filling in wetlands and other surface waters.
37
 ERPs aim to prevent flooding, protect wetlands and other 
surface waters, and protect water quality from stormwater pollution.
38
 DEP, the WMDs, and local 
governments implement the ERP program.
39
 
 
DEP and the WMDs may require ERPs and impose reasonable conditions to ensure that construction 
or alteration of stormwater management systems and related structures is consistent with applicable 
law and not harmful to water resources
40
 and is for the maintenance or operation of such structures.
41
  
 
DEP’s stormwater rules are technology-based effluent limitations, rather than water quality-based 
effluent limitations.
42
 This means that stormwater rules rely on design criteria for BMPs to achieve a 
performance standard for pollution reduction, rather than specifying the amount of a specific pollutant 
                                                
29
 DEP, TMDL Planning Units, https://geodata.dep.state.fl.us/datasets/c97e066f49044131a13a79f5beeeaf40_6/about (last visited Jan. 
28, 2022).  
30
 Id. 
31
 DEP and Water Management Districts, Environmental Resource Permit Applicant’s Handbook Volume I (General and 
Environmental), 2-10 (June 1, 2018), available at 
https://www.swfwmd.state.fl.us/sites/default/files/medias/documents/Appliicant_Hanbook_I_-_Combined.pd_0.pdf. (last visited Jan. 
28, 2022). 
32
 DEP, Stormwater Management, 1 (2016), available at https://floridadep.gov/sites/default/files/stormwater-management_0.pdf. (last 
visited Jan. 28, 2022). When rain falls on fields, forests, and other areas with naturally permeable surfaces the water not absorbed by 
plants filters through the soil and replenishes Florida’s groundwater supply. 
33
 DEP, Stormwater Support, https://floridadep.gov/water/engineering-hydrology-geology/content/stormwater-support (last visited 
Jan. 28, 2022); DEP, Nonpoint Source Program Update, 10 (2015), available at https://floridadep.gov/sites/default/files/NPS-
ManagementPlan2015.pdf. (last visited Jan. 28, 2022). 
34
 National Pollutant Discharge Elimination System (NPDES), 33 U.S.C. s. 1342 (2019); 40 C.F.R. pt. 122; Under the CWA, the EPA 
authorizes the NPEDS permit program to state, tribal, and territorial governments, enabling them to perform many of the permitting, 
administrative, and enforcement aspects of the program. EPA, About NPDES, https://www.epa.gov/npdes/about-npdes#overview (last 
visited Jan. 28, 2022). 
35
 Chapter 373, pt. IV, F.S.; Rule 62-330, F.A.C. 
36
 Stormwater can be either a point source or a nonpoint source of pollution. EPA, Monitoring and Evaluating Nonpoint Source 
Watershed Projects, 1-1, available at https://www.epa.gov/sites/production/files/2016-02/documents/chapter_1_draft_aug_2014.pdf; 
(Last visited Jan 28, 2022); DEP, Nonpoint Source Program Update, 9 (2015), available at 
https://floridadep.gov/sites/default/files/NPS-ManagementPlan2015.pdf (last visited Jan. 28, 2022); See generally EPA, NPDES 
Stormwater Program, https://www.epa.gov/npdes/npdes-stormwater-program (last visited Jan. 28, 2022). 
37
 DEP, DEP 101: Environmental Resource Permitting, https://floridadep.gov/comm/press-office/content/dep-101-environmental-
resource-permitting (last visited Jan. 26, 2022). 
38
 South Florida Water Management District, Environmental Resource Permits, https://www.sfwmd.gov/doing-business-with-
us/permits/environmental-resource-permits (last visited Jan. 26, 2022). 
39
 Rule 62-330.010(3), F.A.C. 
40
 Section 373.413, F.S.; see s. 403.814(12), F.S. 
41
 Section 373.416, F.S. 
42
 DEP, ERP Stormwater, https://floridadep.gov/water/submerged-lands-environmental-resources-coordination/content/erp-stormwater 
(last visited Jan. 28, 2022).  STORAGE NAME: h0965b.ANR 	PAGE: 6 
DATE: 2/11/2022 
  
that may be discharged to a waterbody and still ensure that the waterbody attains WQS.
43
 The rules 
contain minimum stormwater treatment performance standards, which require design and performance 
criteria for new stormwater management systems to achieve at least 80 percent reduction of the 
average annual load of pollutants that would cause or contribute to violations of state WQS.
44
  
 
DEP and the WMDs require applicants to provide reasonable assurance that state WQS will not be 
violated.
45
 If a stormwater management system is designed in accordance with the stormwater 
treatment requirements and criteria adopted by DEP or the WMDs, then the system design is presumed 
not to cause or contribute to violations of applicable state WQS.
46
 If a stormwater management system 
is constructed, operated, and maintained for stormwater treatment in accordance with a valid permit or 
exemption, then the stormwater discharged from the system is presumed not to cause or contribute to 
violations of applicable state WQS.
47
 If an applicant is unable to meet WQS because existing ambient 
water quality does not meet standards, DEP or a WMD must consider mitigation measures that cause a 
net improvement of the water quality in the waterbody that does not meet the standards.
48
 
 
Water Quality Credit Trading 
Water quality credit trading is a market-based approach that can be used to attain water quality 
improvements.
49
 Water quality trading allows one source of pollution to control a pollutant at levels 
greater than required and sell credits to another source, the buyer, which uses the credits to 
supplement their level of water treatment in order to comply with regulatory requirements.
50
 Pollutant 
reductions achieved through water quality trading must result in water quality that is as good as or 
better than what would be achieved through treatment.
51
 
 
DEP is the agency charged with regulating water quality credit trading in the state.
52
 Water quality 
credits
53
 can only be traded within the boundaries of a BMAP or RAP.
54
 Credits cannot be generated 
for a reduction in nutrient loading that is required under a regulatory program, including BMAPs or 
RAPs, but can be generated if reductions are made beyond what is required in the BMAP or RAP.
55
 
Additionally, credits cannot be generated from the implementation of BMPs that are required under a 
BMAP or RAP.
56
 An entity must fully comply with its baseline nutrient load to be eligible for credits 
resulting from management actions that reduce the nutrient load below the baseline.
57
 In the past, 
water quality credits have been traded in the state, however there are no water quality credits available 
for trade currently.
58
 
 
Graywater Incentives 
                                                
43
 See generally, EPA, National Pollutant Discharge Elimination System (NPDES), www.epa.gov/npdes/npdes-permit-limits (last 
visited Jan. 28, 2022). 
44
 Rule 62-40.432(2), F.A.C. 
45
 Section 373.414(1), F.S.; see s. 373.403(11), F.S.; see Rules Ch. 62-4, F.A.C., 62-302, F.A.C., 62-520 F.A.C., and 62-550 F.A.C. 
46
 Section 373.4131(3)(b), F.S., Rule 62-40.432(2), F.A.C.; see also DEP, ERP Stormwater, https://floridadep.gov/water/submerged-
lands-environmental-resources-coordination/content/erp-stormwater (last visited Jan. 28, 2022) stating that a key component of the 
stormwater rule is a “rebuttable presumption that discharges from a stormwater management system designed in accordance with the 
BMP design criteria will not cause harm to water resources.” 
47
 Section 373.4131(3)(c), F.S. 
48
 Section 373.414(1)(b)3., F.S. 
49
 EPA, Water Quality Trading, https://www.epa.gov/npdes/water-quality-trading (last visited Jan. 28, 2022).  
50
 Id. 
51
 Id. 
52
 Section 403.067(8), F.S.  
53
 Rule 62-306.200(3), F.A.C. defines “credit” to mean the amount of an entity’s nutrient load reduction below the baseline that will 
be available for trading purposes. Credits are in units of pounds per year or kilograms per year. 
54
 Rule 62-306.300(1), F.A.C. 
55
 Rule 62-306.400(2)(a), F.A.C. 
56
 Rule 62-306.400(2)(b), F.A.C. 
57
 Rule 62-306.400(4), F.A.C. 
58
 DEP, Florida Water Quality Credit Trading Registry, https://floridadep.gov/dear/water-quality-restoration/content/florida-water-
quality-credit-trading-registry (last visited Jan. 28, 2022); DEP, Credits Traded Document (Sept. 7, 2018) available at 
http://publicfiles.dep.state.fl.us/DEAR/DEARweb/BMAP/DEP%20W QCT%20Spreadsheet.pdf (last visited Jan. 28, 2022).   STORAGE NAME: h0965b.ANR 	PAGE: 7 
DATE: 2/11/2022 
  
In 2021, the Legislature passed SB 64,
59
 which required counties, municipalities, and special districts to 
provide a 25 percent density or intensity bonus to a developer or homebuilder if at least 75 percent of a 
proposed or existing development will have a graywater system installed or a 35 percent bonus if 100 
percent of a proposed or existing development will have a graywater system installed.
60
 To qualify for 
these incentives, a developer or homeowner must make certain assurances to the applicable 
governmental entity.
61
 
 
Mitigation Banking 
Mitigation banking is a practice in which an environmental enhancement and preservation project is 
conducted by a public agency or private entity (banker) to provide mitigation for unavoidable 
environmental impacts within a defined region referred to as a mitigation service area. A mitigation 
bank consists of a wetland, stream, or other aquatic resource area that has been restored, established, 
or preserved to offset such environmental impacts. The bank is the site itself, and the currency sold by 
the banker to the ERP applicant is a credit. The number of potential credits permitted for the bank and 
the credit required for ERPs are determined by DEP or a WMD. Mitigation banks are authorized by a 
state permit, which is issued by either a WMD or DEP depending on the location of the bank and the 
activity it mitigates, and by the United States Army Corps of Engineers.
62
 
 
A banker applying for a permit to establish a mitigation bank must provide documentation of financial 
responsibility and financial assurance mechanisms for the construction and implementation of the bank, 
and the perpetual management and maintenance of the bank.
63
 This can be achieved by obtaining a 
surety or performance bond, irrevocable letter of credit, or insurance policy. The banker may also 
create an escrow account, standby escrow account, trust fund, or standby trust fund to fulfill this 
requirement. Fiscal responsibility mechanisms can be paid to a DEP designee, standby trust, or 
standby escrow.
64
 The banker is required to demonstrate continuous fiscal responsibility until all of the 
permit conditions are completely satisfied and approved for release by DEP.
65
 Further, the financial 
responsibility mechanisms must guarantee that the banker will perform all of its obligations under the 
permit.
66
  
 
Effect of the Bill  
 
Water Quality Enhancement Areas 
The bill authorizes the creation of water quality enhancement areas (WQEAs), which are defined as 
natural systems constructed, operated, managed, and maintained under an ERP permit for the purpose 
of providing offsite, compensatory regional treatment within an identified enhancement service area for 
which enhancement credits may be provided. The bill defines an “enhancement credit” to mean a 
standard unit of measure that represents a quantity of pollutant removed. The bill specifies that such 
credits may only be sold to governmental entities.  
 
The bill requires the construction, operation, management, and maintenance of a WQEA to be 
approved through an ERP permit and specifies that DEP rules relating to ERPs must apply to WQEAs 
and enhancement credits. The bill requires a WQEA to address the contributions of pollutants in an 
enhancement service area that does not meet state WQS. An “enhancement service area” is defined 
as the geographic area in which the WQEA can reasonably be expected to offset adverse water quality 
impacts. Additionally, a WQEA must use, create, or improve natural systems in order to improve water 
quality. 
 
                                                
59
 Ch. 2021-168, Laws of Fla. 
60
 Section 403.892(2)(b), F.S. 
61
 Section 403.892(3), F.S. 
62
 DEP, Mitigation and Mitigation Banking, https://floridadep.gov/water/submerged-lands-environmental-resources-
coordination/content/mitigation-and-mitigation-banking (last visited Nov. 19, 2021). 
63
 Rule 62-340.700, F.A.C. 
64
 Id. 
65
 Id.  
66
 Id.   STORAGE NAME: h0965b.ANR 	PAGE: 8 
DATE: 2/11/2022 
  
The bill authorizes a governmental entity to use a WQEA for its own water quality needs, but prohibits 
such entities from acting as a sponsor to construct, operate, manage, or maintain a WQEA or from 
marketing enhancement credits to third parties. 
 
The bill prohibits a local government from requiring a permit or otherwise imposing regulations 
governing the operation of a WQEA.  
 
To obtain a WQEA permit, the bill requires the applicant to provide reasonable assurances that the 
proposed WQEA will:  
 Meet the requirements for issuance of an ERP; 
 Benefit water quality in the enhancement service area; 
 Achieve defined performance or success criteria for the reduction of pollutants or other 
constituents that prevent receiving waters from meeting state WQS; 
 Ensure long-term pollutant reduction through effective operation and maintenance in perpetuity 
by designation of a responsible long-term maintenance entity supported by an endowment or 
other long-term financial assurance sufficient to ensure perpetual operation and maintenance; 
 Demonstrate sufficient legal or equitable interest in the property to ensure access and perpetual 
protection and management of the land within the WQEA; and 
 Provide for permanent preservation of the WQEA. 
 
The bill requires the WQEA permit to provide for the assessment, valuation, and award of credits based 
on units of pollutants removed. To assist DEP in determining enhancement credits, the bill requires a 
WQEA applicant to include the following in its application:  
 Rainfall data over the longest period of record available from the closest site to the proposed 
WQEA, preferably within the same drainage basin; 
 Anticipated average annual water quality and quantity inflows to the proposed WQEA, based on 
published local data collected over a period of record that most closely matches the rainfall data 
provided above. 
 Site-specific conditions affecting the anticipated performance of the proposed WQEA, including 
the proposed treatment type and the anticipated associated reduction rates, as demonstrated by 
the performance of other areas where the treatment type has been established and operating 
over a minimum of two consecutive wet and dry seasons. 
 Data from collection stations, approved in advance by DEP, in sites that it deems sufficient to 
determine flows and local water quality conditions. 
 
The bill specifies that the issuance of a WQEA permit does not preclude the responsibility of an 
applicant to obtain other applicable federal, state, and local permits for construction activities 
associated with the WQEA.  
 
The bill requires an enhancement service area to be based on a BMAP or RAP boundary adopted by 
DEP. If DEP does not adopt a BMAP or RAP boundary, the enhancement service area must be the 
planning unit.  
 
The bill specifies that a WQEA may only provide enhancement credits in an enhancement service area, 
except for projects with adverse impacts located partially within the enhancement service area and 
linear projects, such as roadways, transmission lines, distribution lines, pipelines, railways, or seaports. 
 
Once an enhancement service area has been established by DEP, the bill requires the enhancement 
service area to be accepted by all WMDs and local governments. 
 
The bill requires DEP or the WMDs to authorize the sale and use of enhancement credits to 
governmental entities to offset adverse water quality impacts of permitted activities or to assist 
governmental entities seeking to meet an assigned BMAP allocation or RAP.  
 
The bill specifies that water quality improvement projects using natural systems or land use 
modifications, including, but not limited to, constructed wetlands or minor impoundments that reduce  STORAGE NAME: h0965b.ANR 	PAGE: 9 
DATE: 2/11/2022 
  
pollutants to a receiving water body, may be used by an applicant to generate enhancement credits if 
approved by DEP. 
 
The bill requires DEP to provide and maintain a ledger that tracks the award, release, and use of 
enhancement credits. The bill requires the operator of a WQEA to notify DEP of the amount of 
enhancement credits sold or used within 30 days after the date the enhancement credit transaction is 
completed. A WMD that authorizes applicants seeking permits to use enhancement credits to offset 
water quality impacts must report to DEP the amount of enhancement credits used by the applicant.  
 
The bill specifies that reductions in pollutant loading required under any state regulatory program are 
not eligible to be considered as enhancement credits.  
 
The bill prohibits enhancement credits from being used by point source dischargers to satisfy regulatory 
requirements other than those necessary to obtain an ERP for construction and operation of the 
surface water management system of the site.  
 
The bill specifies that the use of enhancement credits made available by a WQEA is voluntary.  
 
The bill specifies that any landowner, discharger, or other responsible person that is implementing 
applicable management strategies specified in an adopted BMAP or RAP may not be required by any 
permit or other enforcement action to use enhancement credits to reduce pollutant loads to achieve the 
established pollutant reductions. 
 
The bill prohibits a local government from denying the use of enhancement credits due to the location 
of the WQEA outside the jurisdiction of the local government.  
 
The bill specifies that the authority granted to DEP in the bill is supplemental to the authority granted 
under the current water quality credit trading program. 
 
The bill authorizes DEP to adopt rules related to implementing WQEAs and credits. Additionally, the bill 
requires DEP to adopt and modify rules related to ERPs and mitigation banking to ensure that required 
financial assurances are equivalent and sufficient to provide for the long-term management of 
mitigation permitted under the ERP program and mitigation regulations. The bill requires DEP, in 
consultation with the WMDs, to include the rulemaking required by the bill in existing active rulemaking 
or to complete rule development by June 30, 2023.  
 
Graywater Incentives  
The bill specifies that whether a dwelling is owner occupied is not an eligibility criterion for a developer 
or homebuilder to receive density or intensity bonuses for implementing graywater technologies.  
 
B. SECTION DIRECTORY: 
Section 1. Creates s. 373.4134, F.S., related to WQEAs. 
 
Section 2. Amends s. 403.892, F.S., related to incentives for graywater technologies.  
 
Section 3. Directs DEP to adopt and modify rules adopted pursuant to ss. 373.4136, F.S., and 
373.414, F.S.   
 
Section 4. Provides an effective date of July 1, 2022.    
 
II.  FISCAL ANALYSIS & ECONOMIC IMPACT STATEMENT 
 
A. FISCAL IMPACT ON STATE GOVERNMENT: 
 
1. Revenues:  STORAGE NAME: h0965b.ANR 	PAGE: 10 
DATE: 2/11/2022 
  
None. 
 
2. Expenditures: 
The bill may have a significant negative fiscal impact on DEP related to the costs associated with 
permitting WQEAs and the rulemaking requirements. DEP would need nine full-time equivalent 
positions (one Environmental Administrator, one Environmental Consultant, four Engineering 
Specialist IVs, two Environmental Specialist IIIs, and one Administrative Assistant) and $878,275 in 
recurring funds to establish and implement a new statewide regulatory program for WQEAs. It is 
anticipated that routine travel would be necessary during the permit review process and to perform 
extensive post-construction monitoring inspections. Routine water quality analysis would also likely 
be required at the time of application review.   
 
B. FISCAL IMPACT ON LOCAL GOVERNMENTS: 
 
1. Revenues: 
None. 
 
2. Expenditures: 
None. 
 
C. DIRECT ECONOMIC IMPACT ON PRIVATE SECTOR: 
The bill may have an indeterminate positive fiscal impact on entities that establish WQEAs and sell 
water quality enhancement credits.  
 
D. FISCAL COMMENTS: 
None. 
III.  COMMENTS 
 
A. CONSTITUTIONAL ISSUES: 
 
 1. Applicability of Municipality/County Mandates Provision: 
Not applicable. This bill does not appear to require counties or municipalities to spend funds or take 
action requiring the expenditure of funds; reduce the authority that counties or municipalities have to 
raise revenues in the aggregate; or reduce the percentage of state tax shared with counties or 
municipalities. 
 
 2. Other: 
None. 
 
B. RULE-MAKING AUTHORITY: 
The bill requires DEP to adopt rules related to implementing WQEAs and credits. Additionally, the bill 
requires DEP to adopt and modify rules related to ERPs and mitigation banking. 
 
C. DRAFTING ISSUES OR OTHER COMMENTS: 
None. 
IV.  AMENDMENTS/COMMITTEE SUBSTITUTE CHANGES 
On February 3, 2022, the Environment, Agriculture & Flooding Subcommittee adopted a strike-all 
amendment and reported the bill favorably as a committee substitute. The amendment:  
 Specified enhancement credits may only be sold to governmental entities;  
 Removed provisions related to expediting permits under the ERP program and State 404 Program 
and removed the associated appropriation;  STORAGE NAME: h0965b.ANR 	PAGE: 11 
DATE: 2/11/2022 
  
 Added a provision revising the criteria for developers and homebuilders to receive graywater 
technology incentives; and  
 Required DEP to engage in rulemaking to ensure financial assurances are equivalent and sufficient 
to provide for long-term mitigation.  
 
This analysis is drafted to the committee substitute as approved by the Environment, Agriculture & 
Flooding Subcommittee.