Florida 2024 2024 Regular Session

Florida House Bill H0149 Comm Sub / Bill

Filed 01/11/2024

                       
 
CS/HB 149  	2024 
 
 
 
CODING: Words stricken are deletions; words underlined are additions. 
hb0149-01-c1 
Page 1 of 6 
F L O R I D A H O U S E O F R E P	R E S E N T A T I V E	S 
 
 
 
A bill to be entitled 1 
An act relating to continuing contracts; amending s. 2 
255.103, F.S.; revising the maximum estimated 3 
construction cost of construction projects for which a 4 
governmental entity may enter into a continuing 5 
contract; amending s. 287.055, F.S.; revising the 6 
definition of the term "continuing contract"; 7 
requiring the Department of Transportation to select a 8 
certain number of qualified firms and authorize work 9 
in a specified manner for certain continuing 10 
contracts; providing an effective date. 11 
 12 
Be It Enacted by the Legislature of the State of Florida: 13 
 14 
 Section 1.  Subsection (4) of section 255.103, Florida 15 
Statutes, is amended, and subsections (2) and (3) of that 16 
section are republished, to read: 17 
 255.103  Construction management or program management 18 
entities.β€” 19 
 (2)  A governmental entity may select a construction 20 
management entity, pursuant to the process provided by s. 21 
287.055, which is to be responsible fo r construction project 22 
scheduling and coordination in both preconstruction and 23 
construction phases and generally responsible for the 24 
successful, timely, and economical completion of the 25     
 
CS/HB 149  	2024 
 
 
 
CODING: Words stricken are deletions; words underlined are additions. 
hb0149-01-c1 
Page 2 of 6 
F L O R I D A H O U S E O F R E P	R E S E N T A T I V E	S 
 
 
 
construction project. The construction management entity must 26 
consist of or contract with licensed or registered professionals 27 
for the specific fields or areas of construction to be 28 
performed, as required by law. The construction management 29 
entity may retain necessary design professionals selected under 30 
the process provided in s. 287.055. At the option of the 31 
governmental entity, the construction management entity, after 32 
having been selected and after competitive negotiations, may be 33 
required to offer a guaranteed maximum price and a guaranteed 34 
completion date or a lump -sum price and a guaranteed completion 35 
date, in which case, the construction management entity must 36 
secure an appropriate surety bond pursuant to s. 255.05 and must 37 
hold construction subcontracts. If a project, as defined in s. 38 
287.055(2)(f), solicited by a gove rnmental entity under the 39 
process provided in s. 287.055 includes a grouping of 40 
substantially similar construction, rehabilitation, or 41 
renovation activities as permitted under s. 287.055(2)(f), the 42 
governmental entity, after competitive negotiations, may r equire 43 
the construction management entity to provide for a separate 44 
guaranteed maximum price or a separate lump -sum price and a 45 
separate guaranteed completion date for each grouping of 46 
substantially similar construction, rehabilitation, or 47 
renovation activities included within the project. 48 
 (3)  A governmental entity may select a program management 49 
entity, pursuant to the process provided by s. 287.055, which is 50     
 
CS/HB 149  	2024 
 
 
 
CODING: Words stricken are deletions; words underlined are additions. 
hb0149-01-c1 
Page 3 of 6 
F L O R I D A H O U S E O F R E P	R E S E N T A T I V E	S 
 
 
 
to be responsible for schedule control, cost control, and 51 
coordination in providing or procuring planning, design, and 52 
construction services. The program management entity must 53 
consist of or contract with licensed or registered professionals 54 
for the specific areas of design or construction to be performed 55 
as required by law. The program management en tity may retain 56 
necessary design professionals selected under the process 57 
provided in s. 287.055. At the option of the governmental 58 
entity, the program management entity, after having been 59 
selected and after competitive negotiations, may be required to 60 
offer a guaranteed maximum price and a guaranteed completion 61 
date or a lump-sum price and guaranteed completion date, in 62 
which case the program management entity must secure an 63 
appropriate surety bond pursuant to s. 255.05 and must hold 64 
design and constructio n subcontracts. If a project, as defined 65 
in s. 287.055(2)(f), solicited by a governmental entity under 66 
the process provided in s. 287.055 includes a grouping of 67 
substantially similar construction, rehabilitation, or 68 
renovation activities as permitted under s. 287.055(2)(f), the 69 
governmental entity, after competitive negotiations, may require 70 
the program management entity to provide for a separate 71 
guaranteed maximum price or a lump -sum price and a separate 72 
guaranteed completion date for each grouping of subs tantially 73 
similar construction, rehabilitation, or renovation activities 74 
included within the project. 75     
 
CS/HB 149  	2024 
 
 
 
CODING: Words stricken are deletions; words underlined are additions. 
hb0149-01-c1 
Page 4 of 6 
F L O R I D A H O U S E O F R E P	R E S E N T A T I V E	S 
 
 
 
 (4)  A governmental entity's authority under subsections 76 
(2) and (3) includes entering into a continuing contract for 77 
construction projects, pursuant to the process provided in s. 78 
287.055, in which the estimated construction cost of each 79 
individual project under the contract does not exceed $7.5 $4 80 
million plus an annual percentage increase based on the Annual 81 
Consumer Price Index compiled by the United St ates Department of 82 
Labor, beginning with the Annual Consumer Price Index announced 83 
by the United States Department of Labor for the year 2026 . For 84 
purposes of this subsection, the term "continuing contract" 85 
means a contract with a construction management o r program 86 
management entity for work during a defined period on 87 
construction projects described by type which may or may not be 88 
identified at the time of entering into the contract. 89 
 Section 2.  Subsections (10) and (11) of section 287.055, 90 
Florida Statutes, are renumbered as subsections (11) and (12), 91 
respectively, paragraph (g) of subsection (2) is amended, and a 92 
new subsection (10) is added to that section, to read: 93 
 287.055  Acquisition of professional architectural, 94 
engineering, landscape architectur al, or surveying and mapping 95 
services; definitions; procedures; contingent fees prohibited; 96 
penalties.β€” 97 
 (2)  DEFINITIONS.β€”For purposes of this section: 98 
 (g)  A "continuing contract" is a contract for professional 99 
services entered into in accordance with a ll the procedures of 100     
 
CS/HB 149  	2024 
 
 
 
CODING: Words stricken are deletions; words underlined are additions. 
hb0149-01-c1 
Page 5 of 6 
F L O R I D A H O U S E O F R E P	R E S E N T A T I V E	S 
 
 
 
this act between an agency and a firm whereby the firm provides 101 
professional services to the agency for projects in which the 102 
estimated construction cost of each individual project under the 103 
contract does not exceed $7.5 $4 million plus an annual 104 
percentage increase based on the Annual Consumer Price Index 105 
compiled by the United States Department of Labor, beginning 106 
with the Annual Consumer Price Index announced by the United 107 
States Department of Labor for the year 2026; , for study 108 
activity if the fee for professional services for each 109 
individual study under the contract does not exceed $500,000 ;, 110 
or for work of a specified nature as outlined in the contract 111 
required by the agency, with the contract being for a fixed term 112 
or with no time limitation except that the contract must provide 113 
a termination clause. Firms providing professional services 114 
under continuing contracts shall not be required to bid against 115 
one another. 116 
 (10)  APPLICABILITY TO DEPARTMENT OF TRANSPORTATION. β€”117 
Notwithstanding any other provision of this section to the 118 
contrary, for a geotechnical and materials testing continuing 119 
contract, the Department of Transportation must select at least 120 
three qualified firms and award work under the contract to the 121 
selected firms on a seq uential, rotating basis with the goal of 122 
equally distributing the work amongst the selected firms, 123 
provided such distribution is not detrimental to the interests 124 
of the state. If a project is not awarded on a sequential, 125     
 
CS/HB 149  	2024 
 
 
 
CODING: Words stricken are deletions; words underlined are additions. 
hb0149-01-c1 
Page 6 of 6 
F L O R I D A H O U S E O F R E P	R E S E N T A T I V E	S 
 
 
 
rotating basis, at the time the pro ject is awarded the 126 
department shall certify in writing the reasons for awarding the 127 
project out-of-sequence, publish the certification on the 128 
department's website for at least 30 days, and provide a copy to 129 
each of the selected firms under the contract. 130 
 Section 3.  This act shall take effect July 1, 2024. 131