Florida 2024 2024 Regular Session

Florida House Bill H0267 Analysis / Analysis

Filed 02/17/2024

                    This docum ent does not reflect the intent or official position of the bill sponsor or House of Representatives. 
STORAGE NAME: h0267d.COM 
DATE: 2/17/2024 
 
HOUSE OF REPRESENTATIVES STAFF ANALYSIS  
 
BILL #: CS/CS/CS/HB 267    Building Regulations 
SPONSOR(S): Commerce Committee, Local Administration, Federal Affairs & Special Districts 
Subcommittee, Regulatory Reform & Economic Development Subcommittee, Esposito 
TIED BILLS:   IDEN./SIM. BILLS: SB 684 
 
REFERENCE 	ACTION ANALYST STAFF DIRECTOR or 
BUDGET/POLICY CHIEF 
1) Regulatory Reform & Economic Development 
Subcommittee 
9 Y, 6 N, As CS Wright Anstead 
2) Local Administration, Federal Affairs & Special 
Districts Subcommittee 
10 Y, 4 N, As CS Mwakyanjala Darden 
3) Commerce Committee 	16 Y, 2 N, As CS Wright Hamon 
SUMMARY ANALYSIS 
The Florida Building Code (Building Code) must be applied and enforced uniformly and consistently across the 
state. Local governments are required to enforce the Building Code and are responsible for issuing building permits. 
Current law provides standards and timeframes for local governments to follow for the issuance of building permits. 
 
The bill: 
 Requires the Florida Building Commission (Commission) to provide an exception relating to sealed 
drawings for replacement windows, doors, and garages for one-family and two-family homes. 
 Requires the Commission to use the 2020 definition of “windborne debris region” for residential use. 
 Requires a local government to: 
o Determine if a building permit application is complete within 5 business days of receiving the 
application, previously set at 10 days. 
o Determine if a building permit application is sufficient within 10 business days of receiving a 
completed application, previously set at 45 days. 
o Approve, approve with conditions, or deny a complete and sufficient permit application within the 
following timeframes: 
 30 business days for applicants using local government review, previously set at 120 days; 
 15 business days for applicants using a private provider, previously set at 120 days; and 
 10 business days for applicants for a permit under an already-approved master plan permit, 
previously set at 120 days. 
 60 business days for applicants for a multifamily project; previously set at 120 days. 
o Review an completed application for sufficiency within 10 business days. 
o Provide an opportunity for a virtual meeting, instead of just an in-person meeting, before a second 
request for additional information may be made. 
 Provides that a local government can request additional information from an applicant two times, unless the 
applicant agrees otherwise, previously set at three times.   
 Provides an exception to the fee reduction provision when a delay is caused by the applicant or by a force 
majeure or other extraordinary circumstance.  
 Provides that completing an internship program for residential building inspectors is a pathway for 
licensure as a residential building inspector. 
 Reduces the time frame that a local government has to issue a building permit to a private provider who 
is a licensed engineer or architect who seals the affidavit, to 10 days after application, from 20 days. 
 Provides that the Florida Building Commission must review certain standards for unvented attics before 
December 31, 2024, and that certain standards will be effective related to such attics on July 1, 2025. 
  
The bill may have an indeterminate fiscal impact on state and local government.   
 
The bill provides an effective date of January 1, 2025.   STORAGE NAME: h0267d.COM 	PAGE: 2 
DATE: 2/17/2024 
  
FULL ANALYSIS 
I.  SUBSTANTIVE ANALYSIS 
 
A. EFFECT OF PROPOSED CHANGES: 
Current Situation – Building Permits 
 
The Florida Building Code 
 
In 1974, Florida adopted legislation requiring all local governments to adopt and enforce a minimum 
building code that would ensure that Florida’s minimum standards were met. Local governments could 
choose from four separate model codes. The state’s role was limited to adopting all or relevant parts of 
new editions of the four model codes. Local governments could amend and enforce their local codes, 
as they desired.
1
  
 
In 1992, Hurricane Andrew demonstrated that Florida’s system of local codes did not work. Hurricane 
Andrew easily destroyed those structures that were allegedly built according to the strongest code. The 
Governor eventually appointed a study commission to review the system of local codes and make 
recommendations for modernizing the system. The 1998 Legislature adopted the study’s commission 
recommendations for a single state building code and enhanced the oversight role of the state over 
local code enforcement. The 2000 Legislature authorized implementation of the Florida Building Code 
(Building Code), and that first edition replaced all local codes on March 1, 2002.
2
 The current edition of 
the Building Code is the eighth edition, which is referred to as the 2023 Florida Building Code.
3
 
 
Chapter 553, part IV, F.S., is known as the “Florida Building Codes Act” (Act). The purpose and intent 
of the Act is to provide a mechanism for the uniform adoption, updating, interpretation, and 
enforcement of a single, unified state building code. The Building Code must be applied, administered, 
and enforced uniformly and consistently from jurisdiction to jurisdiction.
4
 
 
The Florida Building Commission (Commission) was created to implement the Building Code. The 
Commission, which is housed within the Department of Business and Professional Regulation (DBPR), 
is a 19-member technical body made up of design professionals, contractors, and government experts 
in various disciplines covered by the Building Code. The Commission reviews several International 
Codes published by the International Code Council,
5
 the National Electric Code, and other nationally 
adopted model codes to determine if the Building Code needs to be updated and adopts an updated 
Building Code every three years.
6
 
 
Use of Building Code Enforcement Fees 
 
A local government may charge reasonable fees as set forth in a schedule of fees adopted by the 
enforcing agency for the issuance of a building permit.
7
 Such fees shall be used solely for carrying out 
the local government’s responsibilities in enforcing the Building Code.
8
  Enforcing the Building Code 
includes the direct costs and reasonable indirect costs associated with training, review of building 
plans, building inspections, re-inspections, building permit processing, and fire inspections.
9
 Local 
governments must post all building permit and inspection fee schedules on their website.
10
  
                                                
1
 The Florida Building Commission Report to the 2006 Legislature, Florida Department of Community Affairs, p. 4, 
http://www.floridabuilding.org/fbc/publications/2006_Legislature_Rpt_rev2.pdf (last visited Jan. 28, 2024).   
2
 Id. 
3
 Florida Building Commission Homepage,  https://floridabuilding.org/c/default.aspx (last visited Jan. 28, 2024).   
4
 See s. 553.72(1), F.S. 
5
 The International Code Council (ICC) is an association that develops model codes and standards used in the design, building, and 
compliance process to “construct safe, sustainable, affordable and resilient structures.” International Code Council, About the ICC, 
https://www.iccsafe.org/about/who-we-are/ (last visited Jan. 28, 2024). 
6
 S. 553.73(7)(a), F.S. 
7
 S. 553.80 F.S.  
8
 Id. 
9
 S. 553.80(7)(a)1., F.S. 
10
 Ss.125.56 (4)(c) F.S., and 166.222(2), F.S.   STORAGE NAME: h0267d.COM 	PAGE: 3 
DATE: 2/17/2024 
  
 
Local governments are only allowed to collect building permit fees that are sufficient to cover their costs 
in enforcing the Building Code. When providing a schedule of reasonable fees, the total estimated 
annual revenue derived from fees, and the fines and investment earnings related to the fees, may not 
exceed the total estimated annual costs of allowable activities. Any unexpended balances must be 
carried forward to future years for allowable activities or must be refunded at the discretion of the local 
government. A local government may not carry forward an amount exceeding the average of its 
operating budget, not including reserve amounts, for enforcing the Building Code for the previous 4 
fiscal years.
11
 
 
DBPR Surcharges 
 
Current law requires all local governments to assess and collect a 1% surcharge on any building permit 
issued by their enforcement agency for the purpose of enforcing the Building Code. The local 
jurisdictions collect the assessment and remit the surcharge fees to DBPR to fund the activities of the 
Commission, DBPR’s Building Code Compliance and Mitigation Program, and the Florida Fire 
Prevention Code informal interpretations.
12
  
 
Current law also requires all local governments to assess and collect a separate 1.5% surcharge on 
any building permit issued by their enforcement agency for the purpose of enforcing the Building Code. 
The local governments collect the assessment and remit the surcharge fees to DBPR, where it is 
divided equally to fund the activities of the Building Code Administrators and Inspectors Board (BCAIB) 
and the Florida Homeowners’ Construction Recovery Fund.
13
 
 
Local government building departments are permitted to retain 10% of the amount of the surcharges 
they collect to fund participation by their agencies in the national and state building code adoption 
processes and to provide education related to enforcement of the Building Code.
14
 
 
 Building Permit Delays 
 
Any delays in obtaining a building permit can delay the completion of a construction project. Delays in 
the completion of a construction project may:
15
 
 Lead to increased costs for construction projects, which may be passed onto occupants of a 
completed project;  
 Discourage construction, which can reduce the total supply of buildings in a community and 
may lead to higher rents in the community; 
 Reduce property tax revenue to a local government and other taxing jurisdictions resulting from 
the delayed start and completion of a construction project; and 
 Result in delayed occupancy of a project, including single-family residences and multi-family 
residences. 
 
Streamlining the process to obtain a building permit can accelerate the completion of construction 
projects. The goal of streamlining is to remove overlap and duplication and create more efficient 
administrative procedures while not reducing a building department’s ability to enforce the applicable 
construction codes. Streamlining the building permit process may:
16
  
                                                
11
 S. 553.80(7)(a), F.S. 
12
 S. 553.721, F.S. 
13
 S. 468.631, F.S.; The Florida Homeowners’ Construction Recovery Fund is used to compensate homeowners who have suffered a 
covered financial loss at the hands of state-licensed general, building and residential contractors. Claims are filed with the DBPR, who 
reviews for completeness and statutory eligibility. The DBPR then presents the claim to the Construction Industry Licensing Board for 
review. s. 489.1401(2), F.S. 
14
 Ss. 468.631, and 553.721, F.S. 
15
 City of Austin Development Services Department, A Program for Expedited Permitting, http://austintexas.gov/sites/default/files/files/8-
9-2016_Report_on_Expedited_Permitting_Program.pdf (last visited Jan. 28, 2024); PricewaterhouseCoopers, The Economic Impact of 
Accelerating Permit Processes on Local Development and Government Revenues, (Dec. 7, 2005). 
16
 Id.; Institute for Market Transformation, Streamlining Compliance Processes, (Winter 2012) https://www.imt.org/wp-
content/uploads/2018/02/CaseStudy5.pdf (last visited Jan. 28, 2024).  STORAGE NAME: h0267d.COM 	PAGE: 4 
DATE: 2/17/2024 
  
 Increase local government revenues by accelerating completion of a project and thus 
accelerating property tax collection; 
 Create local construction jobs and other indirect jobs supported by local construction jobs, such 
as jobs at a material supplier, which may increase local tax revenue; and 
 Encourage economic development by having an efficient permit system.  
 
Building Permit Application Review  
 
Time-Period to Review  
 
Current law requires local governments to review certain building permit applications within a specific 
time-period of receiving the applications. Current law has established time-periods for local 
governments to review applications for the following building permits:
17
 
 Accessory structure;  
 Alarm permit;  
 Nonresidential buildings less than 25,000 square feet;  
 Electric;  
 Irrigation permit;  
 Landscaping;  
 Mechanical;  
 Plumbing;  
 Residential units other than a single-family unit;  
 Multifamily residential not exceeding 50 units;  
 Roofing;  
 Signs;  
 Site-plan approvals and subdivision plats not requiring public hearings or public notice; and 
 Lot grading and site alteration associated with the permit application. 
 
When a local government receives an application for one of the above building permits, it must:
18
 
 Complete Application – Inform the applicant within 10 days of receiving the application, what 
information, if any, is needed to complete the application. 
o If the local government fails to provide written notice to the applicant within the 10-day 
window, the application is deemed to be properly completed.  
 Sufficiency of Application – Notify the applicant within 45 days of the application being 
deemed complete, if additional information is necessary to determine the sufficiency of the 
application; 
o If additional information is needed the local government must specify what additional 
information is necessary.  
o The applicant may submit the additional information to the local government within 30 
days or request that the local government act on the application without the additional 
information.  
 Approve or Deny Application – Approve, approve with conditions, or deny the application 
within 120 days following receipt of the completed application. 
o This period is tolled during the time an applicant is responding to a request for additional 
information and may be extended by mutual consent of the parties. 
 
These time-periods do not apply when a law, agency rule, or local ordinance specify different 
timeframes for review of local building permit applications, for permits for wireless communication 
facilities, or when both parties agree to an extension.
19
 
 
Additional Information Standards
20
 
 
                                                
17
 S. 553.792(2), F.S. 
18
 S. 553.792(1), F.S. 
19
 S. 553.792(1)(a), F.S. 
20
 S. 553.792(1)(b), F.S.  STORAGE NAME: h0267d.COM 	PAGE: 5 
DATE: 2/17/2024 
  
A local government may only make three requests for additional information. However, an applicant 
may agree in writing to waive the limitation that local governments may only make three requests for 
additional information for such permits.  
 
If a local government makes a request for additional information from an applicant for one the above 
building permits, and the applicant provides the information within 30 days of receiving the request, the 
local government must
21
: 
 First Request – Review the additional information and determine the application is complete, 
approve the application, approve the application with conditions, deny the application, or specify 
the remaining deficiencies within 15 days of receiving the information from the applicant, if the 
request is the local government’s first request. 
 Second Request – Review the additional information and determine the application is 
complete, approve the application, approve the application with conditions, deny the application, 
or specify the remaining deficiencies within 10 days of receiving the information from the 
applicant, if the request is the local government’s second request. 
 Third Request – Deem the application complete and approve the application, approve the 
application with conditions, or deny the application within 10 days of receiving the information 
from the applicant, if the request is the local government’s third request. 
 
Prior to making a third request for information the local government must offer to meet with the permit 
applicant to attempt to resolve outstanding issues. 
 
If the applicant believes the request for additional information is not authorized by ordinance, rule, 
statute, or other legal authority, the local government, at the applicant’s request, shall proceed to 
process the application for approval, approval with conditions, or denial. 
 
Fee Reductions for Failure to Meet Timeframes  
 
If a local government fails to meet these deadlines it must reduce the building permit fee by 10% for 
each business day that it fails to meet the deadline. However, these time limitations do not apply when 
a law, agency rule, or local ordinance specifies different timeframes for review of local building permit 
applications, for permits for wireless communication facilities, or when both parties agree to an 
extension. 
 
If any permit fees are refunded because a local government fails to meet an established deadline for 
reviewing a building permit application, the Department of Business and Professional Regulation 
(DBPR) surcharges for funding the Commission, the Florida Building Code Administrators and 
Inspectors Board (BCAIB), and the Florida Homeowners’ Recovery Fund must be recalculated based 
on the amount of the permit fees after the refund.
22
 
 
Time-Period to Review Single-Family Residential Dwelling Building Permit Applications  
 
Single-family residential dwelling permits must be issued within: 
 30 business days of receiving the application, unless the application fails to satisfy the Building 
Code or the enforcing agency’s laws or ordinances, or unusual circumstances require a longer 
time-period for processing the application.
23
 
 If the local enforcing agency does not issue a building permit for a single-family residential 
dwelling, within 30 business days after receiving the permit application, it must reduce the 
building permit fee by 10% for each business day that it fails to meet the deadline. Each 10% 
reduction is based on the original amount of the building permit fee.  
 The enforcing agency does not have to reduce the building permit fee if it provides notice to the 
applicant, by e-mail or United States Postal Service, within 30 business days after receiving 
                                                
21
 Id. 
22
 S. 553.79(16)(d), F.S. 
23
 S. 553.79(16), F.S.  STORAGE NAME: h0267d.COM 	PAGE: 6 
DATE: 2/17/2024 
  
the permit application, that specifically states the reasons the permit application fails to satisfy 
the Building Code or the enforcing agency’s laws or ordinances.
24
 
 After receiving the written notice, the applicant has 10 business days to correct the 
specifications written by the local enforcing agency and submit revisions to correct the permit 
application.  
 If the applicant submits the revisions within 10 business days, the local enforcing agency has 10 
business days after receiving such revisions to approve or deny the building permit unless the 
applicant agrees to a longer permit in writing.
25
 
 
If a government entity fails to approve or deny the single-family residential dwelling building permit 
within 10 business days of receiving the applicant’s revisions, it must: 
26
 
 Reduce the permit fee by 20% of the original permit fee for the first business day that it fails to 
meet the deadline; and  
 An additional 10% of the original permit fee for each business day that it fails to meet the 
deadline, for up to five business days.  
 
A government entity does not have to reduce the fee for a single-family residential dwelling building 
permit, if: 
27
 
 It provides written notice to the applicant, by email or USPS mail within 30 business days of 
receiving the application; and 
 The written notice specifically states how the application fails to satisfy the Building Code or the 
government entity’s laws or ordinances, and that the applicant has 10 business days after 
receiving the notice to remedy the deficiencies in their application or it will be denied. 
 
A building permit for a single-family residential dwelling applied for by a contractor licensed in this state 
on behalf of a property owner who participates in a Community Development Block Grant-Disaster 
Recovery program administered by the Department of Economic Opportunity must be issued within 15 
business days after receipt of the application unless the permit application fails to satisfy the Building 
Code or the enforcing agency's laws or ordinances.
28
 
 
Construction Documents 
 
Professional Engineers  
 
Professional engineers and related qualified business organizations are regulated by Ch. 471, F.S., 
and by the Florida Board of Professional Engineers under DBPR.
29
  
 
“Engineering” includes the term “professional engineering” and means any service or creative work, the 
adequate performance of which requires engineering education, training, and experience in the 
application of special knowledge of the mathematical, physical, and engineering sciences to such 
services or creative work as consultation, investigation, evaluation, planning, and design of engineering 
works and systems, planning the use of land and water, teaching of the principles and methods of 
engineering design, engineering surveys, and the inspection of construction for the purpose of 
determining in general if the work is proceeding in compliance with drawings and specifications, any of 
which embraces such services or work, either public or private, in connection with any utilities, 
structures, buildings, machines, equipment, processes, work systems, projects, and industrial or 
consumer products or equipment of a mechanical, electrical, hydraulic, pneumatic, or thermal nature, 
insofar as they involve safeguarding life, health, or property; and includes such other professional 
services as may be necessary to the planning, progress, and completion of any engineering 
services….”
30
 
                                                
24
 S. 553.79(16)(a)-(b), F.S. 
25
 S. 553.79(16)(c), F.S. 
26
 S. 553.79(16)(c), F.S. 
27
 S. 553.79(16)(b), F.S. 
28
 S. 553.79(16)(e), F.S. 
29
 S. 20.165(4)(a)11., F.S. 
30
 S. 471.005(7), F.S.  STORAGE NAME: h0267d.COM 	PAGE: 7 
DATE: 2/17/2024 
  
 
All final drawings, specifications, plans, reports, or documents prepared or issued by the professional 
engineer and being filed for public record, including for a building permit, and all final documents 
provided to the owner or the owner’s representative must be signed by the licensee, dated, and sealed 
with said seal. Such signature, date, and seal shall be evidence of the authenticity of that to which they 
are affixed.
31
 
 
Architects  
 
Architects and related qualified business organizations in the state are regulated by part I of Ch. 481, 
F.S., and by the Board of Architecture and Interior Design under DBPR. 
 
“Architecture services” means the rendering or offering to render services in connection with the design 
and construction of a structure or group of structures which have as their principal purpose human 
habitation or use, and the utilization of space within and surrounding such structures. These services 
include planning, providing preliminary study designs, drawings and specifications, job-site inspection, 
and administration of construction contracts.
32
 
 
All final construction documents and instruments of service which include drawings, plans, 
specifications, or reports prepared or issued by the registered architect or qualified architecture 
business and being filed for public record, including for a building permit, must bear the signature and 
seal of the registered architect who prepared or approved the document and the date on which they 
were sealed. The signature, date, and seal shall be evidence of the authenticity of that to which they 
are affixed.
33
  
 
Building Code Requirements 
 
The Building Code, Building, requires applicants for a permit to submit construction documents, a 
statement of special inspections, a geotechnical report, and other data in two or more sets with each 
permit application. The construction documents must be prepared by a registered design professional
34
 
where required by Ch. 471, F.S., or Ch. 481, F.S.
35
  
 
Where special conditions exist, the building official is authorized to require additional construction 
documents to be prepared by a registered design professional. However, the building official may waive 
the submission of construction documents and other data not required to be prepared by a registered 
                                                
31
 S. 471.025(1), F.S. 
32
 S. 481.206(6), F.S.  
33
 Ss. 481.219(4) and 481.221(2), F.S. 
34
 The Building Code, Building, defines “registered design professional” as an individual who is registered or licensed to practice their 
respective design profession as defined by the statutory requirements of the professional registration laws of the state or jurisdiction in 
which the project is to be constructed. This includes any registered design professional so long as they are practicing within the scope 
of their license, which includes those licensed under Chs. 471 (professional engineers) and 481, F.S. (architects, interior designers, and 
landscape architects). S. 202, FBS, Building (8th Ed. 2023).  
35
 S. 553.71(12), F.S.; S. 107.1, FBC, Building (8th Ed. 2023).  STORAGE NAME: h0267d.COM 	PAGE: 8 
DATE: 2/17/2024 
  
design professional if it is found that the nature of the work applied for is such that review of 
construction documents is not necessary to obtain compliance with the Building Code.
36
 
 
Threshold Buildings 
 
A “threshold building” is a building that is greater than 3 stories or 50 feet in height, or that has an 
assembly occupancy classification that exceeds 5,000 square feet in area and an occupant content of 
greater than 500 persons.
37
 
 
A “special inspector” is a licensed architect or engineer who is certified under Ch. 471, F.S., or Ch. 481, 
F.S. to conduct inspections of threshold buildings.
38
 
 
During new construction or during repair or restoration projects in which the structural system or 
structural loading of a threshold building is being modified, including windows and doors, the enforcing 
agency must require a special inspector to perform structural inspections on a threshold building 
pursuant to a structural inspection plan prepared by the engineer or architect of record.
39
  
 
The structural inspection plan must be submitted to the enforcing agency prior to the issuance of a 
building permit for the construction of a threshold building.  
 
The purpose of the structural inspection plans is to provide specific inspection procedures and 
schedules so that the building can be adequately inspected for compliance with the permitted 
documents.
40
 
 
Residential Windborne Debris Region Requirements 
 
Exposure D 
 
The American Society of Civil Engineers (ASCE) and Structural Engineering Institute (SEI) developed 
and published the Minimum Design Loads and Associated Criteria for Buildings and Other Structures 
(commonly referred to as ASCE 7-22), which is the primary reference standard for structural loads in 
the 2024 International Building Code, 2024 International Residential Code, and the 2023 Florida 
Building Code. The standard specifies minimum structural design loads and other criteria for the design 
of buildings and other structures for dead, live, soil, flood, tsunami, snow, rain, atmospheric ice, 
earthquake, wind, and tornado loads. It also provides criteria on how to assess load combinations.
41
 
 
ASCE 7-22 describes the process to which wind speed is converted into wind pressure used to design 
structures. The formula is based on many variables, one of which is called “Exposure Category”, which 
is a category of wind exposure and reflects the characteristics of ground surface irregularities at a site 
which the building or structure is to be constructed. The rougher the surface, the lower the multiplier 
                                                
36
 Id. 
37
 S. 202, FBS, Building (8th Ed. 2023). 
38
 S. 553.71(9), F.S. 
39
 553.79(5)(a), F.S.; s. 110.8.1, FBC, Building (8th Ed. 2023). 
40
 Id. 
41
 Federal Emergency Management Agency, FEMA Fact Sheet- Highlights of Significant Changes to the Wind Load Provisions of 
ASCE 7-22, Aug. 2022, https://www.fema.gov/sites/default/files/documents/fema_asce-7-22-wind-highlights_fact-sheet_2022.pdf (last 
visited Feb. 13, 2024).  STORAGE NAME: h0267d.COM 	PAGE: 9 
DATE: 2/17/2024 
  
that converts wind speed to pressure.
42
 “Exposure D” is the largest multiplier when converting wind 
velocity to wind pressure, representing coastal areas and the ‘smoothness’ of water relative to wind.  
 
The 2023 Building Code, Residential provides that Exposure D applies:
43
 
 Where the ground surface roughness in flat, unobstructed areas and water surfaces, prevails in 
the upwind direction for a distance of at least 5,000 feet (1524 m) or 20 times the height of the 
building, whichever is greater.  
 Where the ground surface roughness immediately upwind of the site is Exposure B or C, and 
the site is within a distance of 600 feet (183 m) or 20 times the building height, whichever is 
greater, from an Exposure D condition. 
 
Windborne Debris Region Definition Change  
 
The Building Code requires certain increased building protections for homes in a windborne debris 
region, such as the requirement for impact windows.
44
  
 
The Building Code, Residential, 8
th
 edition, 2023, currently defines “windborne debris” as areas within 
hurricane-prone regions located in accordance with one of the following:
45
 
 Within 1 mile (1.61 km) of the mean high water line where an Exposure D condition exists 
upwind at the waterline and the ultimate design wind speed, Vult, is 130 mph (58 m/s) or 
greater. 
 In areas where the ultimate design wind speed, Vult, is 140 mph (63.6 m/s) or greater; or 
Hawaii. 
 
However, in the previous edition of the Building Code, Residential, 7
th
 edition, 2020, defined “windborne 
debris” as areas within hurricane-prone regions located in accordance with one of the following:
46
                 
 Within 1 mile (1.61 km) of the coastal mean high water line where the ultimate design wind 
speed, Vult, is 130 mph (58 m/s) or greater 
 In areas where the ultimate design wind speed, Vult, is 140 mph (63.6 m/s) or greater; or 
Hawaii. 
 
The ASCE 7-22 updated the definition of “windborne debris region” because the term “coastal mean 
high-water line” is not a defined term, and its interpretation has varied across jurisdictions in the 
hurricane-prone region due to confusion about the intent. The new criteria in ASCE 7-22 deletes the 
word “coastal” and adds language to require that an Exposure D condition exist upwind of the water 
line.
47
  
 
This trigger now applies to locations that are within a mile of any body of water (located in hurricane-
prone regions where the basic wind speed is equal to or greater than 130 mph and less than 140 mph) 
and an Exposure D condition exists upwind of the water line. For example, the impact of this change is 
                                                
42
 Engineering Express, ASCE 7 WIND EXPOSURE CATEGORIES AND HOW EXPOSURE ‘D’ WORKS, 
https://www.engineeringexpress.com/wiki/asce-7-exposure-d-work/ (last visited Feb. 13, 2024). 
43
 S. R301.2.1.4.3, FBC, Residential (8th Ed. 2023). 
44
 S. R301.2.1.2, FBC, Residential (8th Ed. 2023). 
45
 S. R202, FBC, Residential (8th Ed. 2023). 
46
 S. R202, FBC, Residential (7th Ed. 2020). 
47
 FEMA, supra note 41.  STORAGE NAME: h0267d.COM 	PAGE: 10 
DATE: 2/17/2024 
  
illustrated in the figure below for Panama City where the basic wind speed ranges from 130 mph to 140 
mph. 
 
 
 
For the area on the left, buildings within 1 mile of the mean high-water line of the Gulf of Mexico where 
the basic wind speed is equal to or greater than 130 mph are within the windborne debris region. 
However, for the area on the right, the initial point to measure “1 mile from the coastal mean high-water 
line” was not clear under earlier definitions. In ASCE 7-22, this ambiguity has been removed and any 
building located within 1 mile of the mean high-water line of the bay that has exposure to a water 
surface that prevails for at least 5000 feet from the shoreline will be in the windborne debris region.
48
 
 
Additionally, the new definition may include homes near certain inland lakes in a wind zone of at least 
130 mph. 
 
Unvented Attic Requirements  
 
Building Thermal Envelope 
 
The Florida Building Code, Energy Conservation (EC Code), regulates the design and construction of 
buildings for the effective use and conservation of energy over the useful life of each building. The EC 
Code is intended to provide flexibility to permit the use of innovative approaches and techniques to 
achieve this objective.
49
 
 
The EC Code defines:
50
 
 “Building thermal envelope” as the basement walls, exterior walls, floors, ceilings, roofs and any 
other building element assemblies that enclose conditioned space or provide a boundary 
between conditioned space and exempt or unconditioned space. 
 “Conditioned space” as an area, room or space that is enclosed within the building thermal 
envelope and that is directly or indirectly heated or cooled. Spaces are indirectly heated or 
cooled where they communicate through openings with conditioned spaces; where they are 
separated from conditioned spaces by uninsulated walls, floors or ceilings; or where they 
contain uninsulated ducts, piping or other sources of heating or cooling.  
 
                                                
48
 Id. 
49
 S. R101.1-101.3. FBC, Energy Conservation (8th Ed. 2023). 
50
 S. R202, FBC, Energy Conservation (8th Ed. 2023).  STORAGE NAME: h0267d.COM 	PAGE: 11 
DATE: 2/17/2024 
  
The building thermal envelope for residential buildings must meet the requirements of ss. R402.1.1 
through R402.1.5 of the EC Code, except the following low-energy buildings, or portions thereof, 
separated from the remainder of the building by EC Code-compliant building thermal envelope 
assemblies:
51
 
 Those with a peak design rate of energy usage less than 3.4 Btu/h · ft2 (10.7 W/m2) or 1.0 
watt/ft2 of floor area for space-conditioning purposes. 
 Those that do not contain conditioned space. 
 Log homes designed in accordance with ICC-400. 
 
Parts of a Roof 
 
In general, a roof is composed of the following structures:
52
 
 
 
 
Roof sheathing, also called roof decking, are the wooden boards that make up the framing of a roof 
system. These boards are what shingles and other roofing components are installed directly on.
53
 
 
Roof rafters are structural components of a roof on a building. Traditional rafters frame out the roof and 
connect to the exterior walls, and land on a ridge board, which runs across the length of the building. 
The result is a vaulted ceiling that can be filled with insulation and drywall to finish the space or be left 
as open space in an attic.
54
 
 
Unvented Attics  
 
Residences may be constructed with either a:
55
 
 Vented attic: With openings for outside air to ventilate the space underneath the roof with 
insulation above the ceiling finish.  
 Unvented attic: Without any opening underneath the roof–creating an unvented attic space with 
insulation at the roof deck. The unvented attic is completely within the building thermal 
envelope. 
 
                                                
51
 S. R402.1, FBC, Energy Conservation (8th Ed. 2023). 
52
 Kimberly Magerl, 21 Different Parts of a Roof, Roof Gnome, Oct. 9, 2023, https://roofgnome.com/blog/roofing/different-parts-of-a-roof/ 
(last visited Feb. 4, 2024).  
53
 Bill Ragan, What is Roof Sheathing? (What You Need to Know About It), Bill Ragan Roofing Company, Aug. 31, 2022, 
https://www.billraganroofing.com/blog/what-roof-sheathing (last visited Feb. 4, 2024).  
54
 MT Copeland, What Are Rafters?, Dec. 22, 2021, https://mtcopeland.com/blog/what-are-rafters/ (last visited Feb. 4, 2024). 
55
 University of Central Florida, Florida Solar Energy Center, Attic Insulation and Ventilation, 
https://energyresearch.ucf.edu/research/buildings-research/roof-assembly/attic-insulation-ventilation/ (last visited Feb. 4, 2024).  STORAGE NAME: h0267d.COM 	PAGE: 12 
DATE: 2/17/2024 
  
Unvented roof assemblies, such as conditioned attics and unvented cathedral ceilings, are created by 
eliminating ventilation openings and moving the thermal (or insulation), moisture, and air control 
boundaries to the plane of the roof deck.
56
 Unvented attics are also typically built with the HVAC 
system completely within the building thermal envelope. Insulation is usually a spray foam product that 
also provides air sealing to create a semi-conditioned space.
57
  
 
Although the rationale for attic ventilation is for moisture control, this was historically based on needs in 
cold climates and to prevent ice dams. However, vented attics can introduce additional moisture loads 
into Florida homes by allowing moisture laden air in the attic that may come indoors. Unvented attics 
can help to reduce moisture condensation on attic mounted ducts and air handlers by reducing the 
moisture level of the air around the ducts and on the back side of ceiling drywall when low thermostat 
set points are used.  
 
Unvented attics offer the following potential advantages over vented attics:
58
 
 Energy Savings - An unvented attic is warmer in winter and cooler in summer, reducing the 
HVAC load. The equipment will be more durable and more efficient, especially if ductwork is in 
the attic. 
 Moisture Resistance - The attic will stay dry, avoiding problems with mold and wood rot, and 
thus can serve as living or storage space. 
 Disaster Resistance - Roofs over unvented attics are less likely to be blown off in high winds 
because the wind cannot readily enter the attic. In addition, a house in wildfire zones is less 
likely to catch fire from floating embers since there are no soffit vents for the embers to enter. In 
coastal areas, an unvented roof keeps out wind-driven rain and better protects metal connectors 
in the roof assembly against salt spray and corrosion. 
 
However, an unvented attic system can be more expensive than a vented attic, as it requires more 
spray foam insulation, which means more cost.
59
 
 
An example of an unvented attic is pictured below:
60
 
 
 
                                                
56
 U.S. Department of Energy, Unvented, Conditioned Attics, https://www.energy.gov/eere/buildings/articles/unvented-conditioned-
attics-building-america-top-
innovation#:~:text=Insulating%20and%20air%20sealing%20along,insulating%20along%20the%20ceiling%20deck%3A&text=Energy%
20Savings%20%2D%20An%20unvented%20attic,the%20attic%20(Rudd%202005) . (last visited Feb. 4, 2024 
57
 UCF, supra note 14. 
58
 US Dept. of Energy, supra note 15. 
59
 Amanda Ringler, Vented vs. Unvented Attic: Which is Better?, RetroFoam of Michigan Inc., July 13, 2020, 
https://www.retrofoamofmichigan.com/blog/vented-vs-unvented-attic-which-is-better (last visited Feb. 4, 2024). 
60
 U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, Unvented Attic Insulation, 
https://basc.pnnl.gov/resource-guides/unvented-attic-insulation#edit-group-description (last visited Feb. 4, 2024).  STORAGE NAME: h0267d.COM 	PAGE: 13 
DATE: 2/17/2024 
  
 
 
Air-impermeable Insulation  
 
Permeable and impermeable air barrier membranes differ in their ability to block moisture:
61
   
 Impermeable air barriers block water vapor and air.  
 Permeable air barriers block air but allow water vapor to move through the membrane, 
promoting diffusion out of the wall system. Permeable air barriers offer varying permeability 
rates and come as either sheet or fluid-applied membranes. 
 
Air-impermeable insulation that is installed to the underside of the roof sheathing of an unvented roof is 
typically spray foam. Air-impermeable spray foam insulation for unvented attics applied under the 
sheathing is typically installed as follows:
62
 
 
 
 
Florida generally requires insulation to be installed under the roof sheathing,
63
 but elsewhere, air-
impermeable insulating sheathing applied over the roof deck may be used for unvented attics, and is 
typically installed as follows:
64
  
 
                                                
61
 Cory Bendokas, Impermeable vs. Permeable Air Barriers: Main Differences, Build Meets World by Tremco CPG Inc., 
https://blog.buildmeetsworld.com/impermeable-vs-permeable-air-barriers (last visited Feb. 4, 2024).  
62
 US Dept. of Energy, supra note 19. 
63
 S. R806.5, FBC, Residential (8th Ed. 2023). 
64
 To meet durability goals in most applications, the airtightness must be provided by a continuous membrane—preferably adhered to 
the top surface of the structural roof deck and under rigid insulation that provides condensation control. Id.  STORAGE NAME: h0267d.COM 	PAGE: 14 
DATE: 2/17/2024 
  
 
 
 
R-Value 
 
R-value is a measure of how much resistance insulation has to heat flow. The higher the R-value, the 
more the resistance and the better the material is at insulating a home. Generally, insulation materials 
with higher R-values cost more when compared to those with lower R-values.
65
 
 
Blower Door Tests 
 
Blower door tests determine to what degree a home is airtight. A temporary “blower door” equipped 
with a powerful fan is fitted into the frame of an existing front or back door, and when the fan is turned 
on, it sucks the air out of the house and blows it outside. Digital gauges compare the difference in air 
pressure between the inside air and the outside air to determine how much air is leaking into the 
house.
66
 
 
The standard way to determine air tightness of a building is to measure air leakage at 50 Pascals 
(ACH50) to the conditioned volume of the building. Air Change per Hour at 50 Pa (ACH50) is calculated 
by dividing air flow per hour by the volume of the building. ACH50 tells us how many times per hour the 
entire volume of air in the building is replaced when the building envelope is subjected to a 50 Pascal 
pressure. The airtightness of existing homes can vary dramatically based on the construction style, age 
and region.
67
  
 
Proper, tight air sealing of unvented attics is important for proper function.
68
 Whole-house mechanical 
ventilation is required for homes with a high air-tightness.
69
  
 
The chart below shows the relative tightness of homes based on the ACH50:
70
 
 
                                                
65
 Emily Glover and Samantha Allen, What Is Insulation R Value? Everything You Need To Know, Forbes, Jan, 20, 2022, 
https://www.forbes.com/home-improvement/home/what-is-insulation-r-value/ (last visited Feb. 4, 2024). 
66
 Glenda Taylor and Bob Vila, All You Need to Know About Blower Door Tests, BobVila.com, Oct. 23, 2020, 
https://www.bobvila.com/articles/blower-door-tests/ (last visited Feb. 4, 2024); Tyler Vanzo, Air Changes Per Hour (ACH): What is it & 
How to Calculate it, SmartAir, Jan. 16, 2024, https://smartairfilters.com/en/blog/what-is-air-changes-per-hour-ach-how-to-calculate/ (last 
visited Feb. 4, 2024).  
67
 The Energy Conservatory, TEST RESULTS AND SAMPLE TEST FORMS, https://energyconservatory.com/wp-
content/uploads/2017/08/Test-Results-and-Sample-Test-Forms-Guide-.pdf (last visited Feb. 4, 2024). 
68
 UCF, supra note 14. 
69
 Eric Martin and Charles Withers, Jr., Survey of Unvented Attics in Climate Zone 2A, University of Central Florida, Florida Solar 
Energy Center, Mar. 17, 2021, https://publications.energyresearch.ucf.edu/wp-content/uploads/2021/02/FSEC-CR-2106-21.pdf (last 
visited Feb. 4, 2024). 
70
 UCF, supra note 14.  STORAGE NAME: h0267d.COM 	PAGE: 15 
DATE: 2/17/2024 
  
0 - 1.5 ACH 	Very tight 
1.5 - 3 ACH 	Tight 
3 - 5 ACH 	Moderately tight 
5 - 7 ACH 	Loose 
7 - 10 ACH 	Very loose 
10 + ACH 	Extremely loose 
 
Unvented Attics and Unvented Enclosed Roof Framing Assemblies 
 
Section 806.5, Florida Building Code, Residential, for residential buildings, requires that unvented attics 
and unvented enclosed roof framing assemblies created by ceilings that are applied directly to the 
underside of the roof framing members and structural roof sheathing applied directly to the top of the 
roof framing members or rafters, must be allowed if certain conditions are met, including:
71
 
 The unvented attic space is completely within the building thermal envelope. 
 No interior Class I vapor retarders are installed on the ceiling side (attic floor) of the unvented 
attic assembly or on the ceiling side of the unvented enclosed roof framing assembly. 
 Insulation must comply with Item 5.1 and Item 5.3. As an alternative, where air-permeable 
insulation is located on top of the attic floor or on top of the attic ceiling, insulation must comply 
with Item 5.3 and Item 5.2. 
 
Item 5.1. provides requirements insulation depending on the air permeability of the insulation directly 
under the structural roof sheathing. The following requirements are applicable to air-impermeable 
insulation:  
 Where only air-impermeable insulation is provided, it must be applied in direct contact with 
the underside of the structural roof sheathing. 
 Alternatively, sufficient rigid board or sheet insulation must be installed directly above the 
structural roof sheathing to maintain the monthly average temperature of the underside of the 
structural roof sheathing above 45°F (7°C). For calculation purposes, an interior air temperature 
of 68°F (20°C) is assumed and the exterior air temperature is assumed to be the monthly 
average outside air temperature of the three coldest months. 
 
Item 5.2. provides requirements for air-permeable insulation, and Item 5.3.requires, where preformed 
insulation board is used as the air-impermeable insulation layer, it must be sealed at the perimeter of 
each individual sheet interior surface to form a continuous layer. 
 
Section R402 of the EC Code  
 
Insulation Requirements 
 
In general, the EC Code requires residential ceilings, including ceilings with attics, to be built using R-
30 insulation in Climate Zone 1, and R-38 insulation in Climate Zone 2.
72
  
 
However, s. R402.1.2 of the EC Code, where R-38 insulation is required in the ceiling or attic, allows 
installing R-30 over 100 percent of the ceiling or attic area requiring insulation to satisfy the requirement 
for R-38 insulation wherever the full height of uncompressed R-30 insulation extends over the wall top 
plate at the eaves.  
 
Mechanical Requirements  
 
Section R402 requires that a mechanical system of a residential building or dwelling unit must be 
blower door tested in accordance with ANSI/RESNET/ICC 380, reported at a pressure of 50 pascals, 
and verified as having an air leakage rate not exceeding seven air changes per hour (7 ACH50) in 
Climate Zones 1 and 2.  
 
                                                
71
 S. R806.5, FBC, Residential (8th Ed. 2023). 
72
 Table R402.1.2, FBC, Energy Conservation (8th Ed. 2023).  STORAGE NAME: h0267d.COM 	PAGE: 16 
DATE: 2/17/2024 
  
Homes with an air leakage rate less than three air changes per hour (3 ACH50) must be provided with 
whole-house mechanical ventilation.
73
 All counties In Florida are either Climate Zone 1 or 2.
74
 
 
Types of Whole-house Ventilation Systems 
 
Whole-house mechanical ventilation is the intentional exchange of indoor air with fresh outdoor air at a 
controlled rate using fans. The purpose of whole-house mechanical ventilation is to improve indoor air 
quality. Historically, mechanical ventilation was limited to local-exhaust (kitchen and bath exhaust fans) 
for spot control of moisture and odors. Houses commonly had enough natural ventilation, through leaky 
building enclosures, that whole-house mechanical ventilation was not necessary. Houses have become 
significantly tighter during the past 15-20 years as a result of changing codes, energy efficiency 
programs, and an overall desire to reduce energy use. Above-code programs and more recently the 
building codes have generally made controlled whole-house mechanical ventilation a requirement.
75
 
 
Balanced 
 
The exhaust-only ventilation method is when a fan, commonly an efficient bath fan, exhausts indoor air, 
and outdoor makeup air is drawn into the house through leaks in the building enclosure. The supply-
only ventilation method is when a fan draws outdoor air into the house, and indoor air escapes through 
the building enclosure and exhaust fan ducts.
76
  
 
A balanced whole-house mechanical ventilation system is a combination of exhaust and supply 
methods providing approximately equal indoor exhaust and outdoor supply air flows, e.g., an exhaust 
fan combined with a supply fan or passive inlet vents. A balanced system may include a heat recovery 
ventilator (HRV) or an energy recovery ventilator (ERV).
77
 
 
Hybrid 
 
A hybrid ventilation whole-house mechanical ventilation system is a recent concept that consists in 
using the components and sizing of natural ventilation ducts coupled with non-constant low-pressure 
mechanical assistance. Mechanical assistance is only used to supplement natural forces when 
necessary. Natural forces means three different kinds of natural phenomena that cause air to move:
78
 
 Wind that can penetrate the dwelling through entrances and exists. 
 Thermal draught where the airflow is produced by the density difference between the hot air and 
the cold air, where the less dense hot air tends to rise and the denser cold air tends to go down. 
 Aeraulic draught caused by the pressure difference linked to height, where the lower upright 
pression creates a depression that enables the air to circulate in the dwelling. 
 
The hybrid ventilation start is automatic; it can be activated by a temperature sensor, a wind vane or a 
pressure switch. Fresh air is admitted through the humidity-controlled air inlets located in the dry rooms 
(e.g., bedrooms and living room), and stale air is evacuated through the wet rooms (e.g., bathrooms 
and kitchen) by humidity-controlled extraction grilles linked to the ventilation duct connected to the 
fan.
79
 
 
Positive Input 
 
A positive input ventilation system generally addresses ventilation issues in existing properties, such as 
condensation, damp and mold. Positive input ventilation pumps and circulates fresh filtered air into a 
                                                
73
 S. R402.4.1.2, FBC, Energy Conservation (8th Ed. 2023). 
74
 Table R301.1, FBC, Energy Conservation (8th Ed. 2023). 
75
 Home Innovation Research Labs, Whole-House Mechanical Ventilation Code: Safety and Performance Considerations, International 
Code Council and National Association of Home Builders, October 2013, https://www.iccsafe.org/wp-
content/uploads/proclamations/TN01-Whole-House-Ventilation_pdf.pdf (last visited Feb. 3, 2024). 
76
 Id. 
77
 Id. 
78
 Aereco, How does hybrid ventilation work?, https://www.aereco.com/ventilation/ventilation-systems/hybrid-ventilation/ (last visited 
Feb. 3, 2024). 
79
 Id.  STORAGE NAME: h0267d.COM 	PAGE: 17 
DATE: 2/17/2024 
  
house, forcing stale air out of the gaps and cracks in the fabric of the building. The unit is installed in 
the loft area, and a distribution diffuser is mounted in the ceiling in the room below. The continual 
supply and slight positive pressure result in the air in the property being continually diluted, displaced 
and replaced to create a healthier indoor air quality.
80
 
 
Elevator Rails 
 
Chapter 399, F.S., regulates elevator safety procedures, and is enforced by the Division of Hotels and 
Restaurants (H&R) at DBPR. H&R issues the following:
81
 
 Permits to install, relocate, or alter elevators, 
 Certificates of operation for elevators, and 
 Licenses for: 
o Elevator companies, 
o Elevator technicians, and 
o Elevator inspectors. 
 
Each elevator car interior, to be made accessible to physically handicapped persons, must have a 
support rail on at least one wall. Support rails must be continuous and a minimum length of 42 inches 
overall.  
 
All support rails must be smooth, have no sharp edges, and must not be more than 1 1/2 inches thick or 
2 1/2 inches in diameter. The inside surface of support rails must be 1 1/2 inches clear of the car wall. 
The distance from the top of the support rail to the finished car floor must be at least 31 inches and not 
more than 33 inches.
82
 
 
Building Officials, Inspectors, Plans Examiners  
 
Building officials, inspectors, and plans examiners are regulated by the BCAIB within DBPR.
83
 
 
A building code administrator, otherwise known as a building official, is a local government employee or 
a person contracted by a local government who supervises building code activities, including plans 
review, enforcement, and inspection.
84
  
 
A building code inspector (inspector) inspects construction that requires permits to determine 
compliance with the Building Code and state accessibility laws. Inspectors are divided into several 
different categories. An inspector’s ability to practice is limited to the category or categories under 
which the inspector has been licensed. The inspector categories are:
85
 
 Building inspector 
 Coastal construction inspector 
 Commercial electrical inspector 
 Residential electrical inspector 
 Mechanical inspector 
 Plumbing inspector 
 Residential inspector 
 Electrical inspector 
 
A plans examiner reviews plans submitted for building permits to determine design compliance with 
construction codes. The term includes a residential plans examiner who is qualified to determine that 
plans submitted for building permits comply with the applicable residential building, plumbing, 
mechanical, electrical, gas, energy, accessibility, and other applicable construction codes. A plans 
                                                
80
 Hugh Metcalf, Positive Input Ventilation Explained: Pros, Cons, Costs and More, Homebuilding & Renovating, Sep. 9, 2021, 
https://www.homebuilding.co.uk/advice/positive-input-ventilation (last visited Feb. 3, 2024). 
81
 S. 399.01, F.S. 
82
 S. 399.035(1)(b), F.S. 
83
 S. 468.605, F.S. 
84
 S. 468.603(2), F.S. 
85
 See s. 468.603(5), F.S.  STORAGE NAME: h0267d.COM 	PAGE: 18 
DATE: 2/17/2024 
  
examiner’s ability to practice is limited to the category or categories under which the plans examiner 
has been licensed. The plans examiner categories are:
86
 
 Building plans examiner 
 Plumbing plans examiner 
 Mechanical plans examiner 
 Electrical plans examiner 
 
Residential Inspector Licensing 
 
In order to sit for the plans examiner or inspector exam a person must be at least 18 years of age, be of 
good moral character, and meet one of the following eligibility requirements:
87
 
 Have 4 years of combined relevant experience; 
 Have 3 years of combined postsecondary education and relevant experience; 
 Have 3 years of combined technical education and relevant experience; 
 Complete an approved cross-training program and have at least 2 years of experience; 
 Hold a standard certificate issued by the BCAIB or a firesafety inspector license; and 
o Have at least 4 years of relevant experience as an inspector or plans examiner; 
o Have a minimum of 3 years of experience in firesafety inspection or firesafety plan 
review and have completed a training program of not less than 100 hours in the new 
category sought;  
o Complete an approved training program of not less than 200 hours in inspection or plans 
review except for residential training programs, which may not be less than 500 hours; or 
 Complete a 4-year internship certification program. 
 
A person who is qualified to sit for the building official, plans examiner, or inspector exam but has not  
taken the exam may be granted a provisional license by the BCAIB. A provisional license allows a  
person to engage in the duties of a building official, inspector, or plans examiner.
88
  
 
Provisional licenses are valid for two years, but may be renewed by the BCAIB for just cause. A 
provisional license is not valid for more than three years. However, an applicant who is obtaining 
licensure as an inspector or plans examiner through an internship may apply to the BCAIB for a 
provisional license that is valid for the duration of the internship.
89
 
 
Currently, residential inspector applicants may not use an internship program as a basis for eligibility to 
take the licensing examination.
90
 
 
Private Providers  
 
In 2002, s. 553.791, F.S., was created to allow property owners and contractors to hire licensed 
building code officials, engineers, and architects, referred to as private providers, to review building 
plans, perform building inspections, and prepare certificates of completion.  
 
Private providers and their duly authorized representatives are able to approve building plans and 
perform building code inspections as long as the plans approval and building inspections are within the 
scope of the provider’s or representative’s license.  
 
                                                
86
 See s. 468.603(8), F.S. 
87
 S. 468.609(2), F.S. 
88
 S. 468.609(7) and (10), F.S. 
89
 Id. 
90
 R. 61G19-6.017, F.A.C.; DBPR BCAIB 7 - Application for Internship Certification Training Program Approval/Renewal and Provider, 
available at 
http://www.myfloridalicense.com/dbpr/pro/build/documents/BCAIB7_Application_Internship_Certification_Training_Program_Approval_
Renewal_and_Provider.pdf (last visited Feb. 16, 2024).  STORAGE NAME: h0267d.COM 	PAGE: 19 
DATE: 2/17/2024 
  
Current law defines “private provider” as person licensed as a building official, engineer, or architect. 
Licensed building inspectors and plans examiners may perform inspections for additions and alterations 
that are limited to 1,000 square feet or less in residential buildings.
91
 
 
If an owner or contractor opts to use a private provider, the local government must calculate the cost 
savings to its building department and reduce the building permit fees accordingly.
92
  
 
A local government may not charge a fee for building inspections when an owner or contractor uses a 
private provider but may charge a “reasonable administrative fee.”
93
 A “reasonable administrative fee” 
must be based on the cost that is actually incurred by the local government, including the labor cost of 
the personnel providing the service, or the cost attributable to the local government for the clerical and 
supervisory assistance required, or both. 
 
A building official may audit a private provider to ensure the private provider and their duly authorized 
agent has reviewed the building plans and is performing the required inspections. A building official 
may deny a building permit or a request for a certificate of completion if the building construction or 
plans do not comply with the Building Code. A building official may also issue a stop work order at any 
time if he or she determines any condition of the construction poses an immediate threat to public 
safety and welfare.
94
 
 
A private provider who approves building plans must sign a sworn affidavit that the plans comply with 
the Building Code. The private provider or their duly authorized representative is authorized to review 
the plans.
95
 Upon receipt of a building permit application from a private provider, a building official has 
20 business days to grant the permit or provide a written notice to the permit applicant identifying the 
specific plan features that do not comply with the applicable codes.
96
 If the local building official 
provides a written notice of plan deficiencies to the permit applicant within the prescribed 20-day period, 
the 20-day period is tolled pending resolution of the matter.
97
 
 
If the permit applicant submits revisions, the local building official has the remainder of the tolled 20-day 
period plus 5 business days from the date of resubmittal to issue the requested permit or to provide a 
second written notice to the permit applicant stating which of the previously identified plan features 
remain in noncompliance with the applicable codes, with specific reference to the relevant code 
chapters and sections. Any subsequent review by the local building official is limited to the deficiencies 
cited in the written notice. If the local building official does not provide the second written notice within 
the prescribed time period, the permit shall be deemed approved as a matter of law, and the local 
building official must issue the permit on the next business day.
98
 
 
For all revisions submitted after the first revision, the local building official has an additional 5 business 
days from the date of resubmittal to issue the requested permit or to provide a written notice to the 
permit applicant stating which of the previously identified plan features remain in noncompliance with 
the applicable codes.
99
 
 
Effect of the Bill  
 
Building Permit Application Review  
 
The bill removes a provision in Ch. 533, the Building Code, which requires single-family residential 
dwelling permits to be issued within 30 days unless the application does not conform to the Building 
                                                
91
 S. 553.791(1)(n) and (3), F.S. 
92
 S. 553.791(2)(b), F.S. 
93
 Id. 
94
 S. 553.791(1), (14), and (19), F.S. 
95
 S. 553.791(6), F.S. 
96
 S. 553.791(7)(a), F.S. 
97
 S. 553.791(7)(b), F.S. 
98
 S. 553.791(7)(c), F.S. 
99
 S. 553.791(7)(d), F.S.  STORAGE NAME: h0267d.COM 	PAGE: 20 
DATE: 2/17/2024 
  
Code or local laws or ordinances. However, the bill incorporates the time period to review single-family 
residential dwellings into the general section related to building permit applications.
100
 
 
The bill reduces current timelines and revises procedures for applying for and obtaining a building 
permit. The new procedures set out below apply to the following building permit applications:  
 Accessory structure;  
 Alarm permit;  
 Nonresidential buildings less than 25,000 square feet;  
 Electric;  
 Irrigation;  
 Landscaping;  
 Mechanical;  
 Plumbing;  
 Residential units including a single-family residential unit or a single-family residential 
dwelling; 
 Multifamily residential not exceeding 50 units;  
 Roofing;  
 Signs;  
 Site-plan approvals and subdivision plats not requiring public hearings or public notice; and  
 Lot grading and site alteration associated with a permit application set forth above.  
 
Timelines to Approve or Deny a Completed and Sufficient Building Permit Application 
 
The bill reduces the time that a local government has to approve, approve with conditions, or deny a 
building permit application following receipt of a completed and sufficient application to the following 
timelines, unless the applicant waives such limitation in writing: 
 For an applicant using local government plans review to obtain a building permit: 
o Within 30 business days after receiving a complete and sufficient application (currently 
120 days, or 30 days for single-family residential dwellings). 
 For an applicant using a private provider to obtain a building permit: 
o Within 15 business days after receiving a complete and sufficient application (currently 
120 days, or 30 days for single-family residential dwellings). 
 For an applicant for a master plan permit: 
o Within 10 business days after receiving a complete and sufficient application (current 
timeframe is dependent on the local program, or 30 days for single-family 
residential dwellings). 
 For an applicant for a single-family residential dwelling applied for by a contractor licensed in 
this state on behalf of a property owner who participates in a Community Development Block 
Grant–Disaster Recovery program administered by the Department of Economic Opportunity: 
o Within 10 business days after receipt of the application, unless the permit application 
fails to satisfy the Building Code or the enforcing agency's laws or ordinances (currently 
15 days). 
 For an applicant for multifamily residential units: 
o Within 60 business days after receiving a complete and sufficient application. 
 
If the local government does not approve, approve with conditions, or deny the completed and sufficient 
application within the required timeframes, the application is deemed or determined to be approved.  
 
The bill provides that a local government may not require a waiver of the timeframes in this section as a 
condition to review an application for a building permit.  
 
The bill requires a local government to maintain a policy on its website containing procedures and 
expectations for processing of any building permits and development orders required by law to be 
expedited. 
                                                
100
 See, s. 553.792, F.S.  STORAGE NAME: h0267d.COM 	PAGE: 21 
DATE: 2/17/2024 
  
 
Timelines to Determine a Complete and Sufficient Application  
 
The bill reduces the time that a local government has to provide timely written notice to the applicant 
about what information, if any, is needed before the application is deemed or determined to be: 
 Completed:  
o Local government has 5 business days to review an application and determine if it has 
been properly completed (from 10 days). 
 Sufficient:  
o Local government has 10 business days to review a completed application to determine 
whether more information is needed or whether the application is sufficient (from 45 
days). 
 
The bill reduces the amount of times that a local government may request additional information from 
the applicant when reviewing an application for sufficiency for a building permit, to two times, from 
three times.  
 
If the local government requests additional information for a second time, such request must be within 
10 business days of receiving additional information after the first request, and the local government 
must determine the sufficiency of the application within 10 business days of receiving the requested 
additional information.  
 
The bill allows a local government to offer to meet virtually, instead of only in person, with the 
applicant to attempt to resolve outstanding issues before a second request for additional information is 
made.  
 
If the applicant believes a request for additional information is not authorized by ordinance, rule, statute, 
or other legal authority, the bill requires the local government, at the applicant's written request, to 
approve the application, approve the application with conditions, or deny the application within 10 
business days after receipt of such. The local government must provide the applicant with sufficient 
reason for a denial. 
 
The bill provides exceptions for local governments who fail to meet deadlines if: 
 The parties involved agreed, in writing, to a reasonable extension of time. 
 The delay is caused by the applicant. 
 The delay is caused by a force majeure or other extraordinary circumstance. 
 
Use of Building Code Enforcement Fees  
 
The bill clarifies that local governments may use fees, and any related fines or investment earnings, 
they have collected for enforcing the Building Code to upgrade technology hardware and software 
systems used to enforce the Building Code. 
  STORAGE NAME: h0267d.COM 	PAGE: 22 
DATE: 2/17/2024 
  
Hurricane Building Requirements 
 
The bill requires the Commission to modify the Building Code to provide that sealed drawings by a 
design professional will not be required for the replacement of windows, doors, or garage doors in an 
existing one-family or two-family dwelling or townhouse if all of the following conditions are met: 
 The replacement windows, doors, or garage doors are installed in accordance with the 
manufacturer's instructions for the appropriate wind zone. 
 The replacement windows, doors, or garage doors meet the design pressure requirements in 
the most recent version of the Florida Building Code, Residential. 
 A copy of the manufacturer's instructions is submitted with the permit application in a printed or 
digital format. 
 The replacement windows, doors, or garage doors are the same size and are installed in the 
same opening as the existing windows, doors, or garage doors. 
 
The bill provides that the definition of “windborne debris region” is the same as defined in the 7th edition 
of the Building Code, Residential, until the adoption of the 9th Building Code in 2026, which has a 
practical effect of replacing the new definition in the 8th edition with the previous version. 
 
Unvented Attic Requirements 
 
The bill provides thermal efficiency standards for unvented attic and unvented enclosed rafter 
assemblies. 
 
The bill provides that, effective July 1, 2025, unvented attic and unvented enclosed rafter assemblies 
that are insulated and air sealed with a minimum of R-20 air-impermeable insulation
101
 meet the 
requirements of sections R402 of the Florida Building Code, 8th Edition (2023), Energy Conservation, if 
all of the following apply: 
 The building has a blower door test result of less than 3 ACH50. 
 The building has a positive input ventilation system or a balanced or hybrid whole-house 
mechanical ventilation system. 
 If the insulation is installed below the roof deck and the exposed portion of roof rafters is not 
already covered by the R-20 air-impermeable insulation, the exposed portion of the roof 
rafters is insulated by a minimum of R-3 air-impermeable insulation unless directly covered by 
a finished ceiling. Roof rafters are not required to be covered by a minimum of R-3 air-
impermeable insulation if continuous insulation is installed above the roof deck. 
 All indoor heating, cooling, and ventilation equipment and ductwork is inside the building 
thermal envelope. 
 
The bill requires the Commission to review and consider these requirements and any needed technical 
changes, and report such findings to the Legislature by December 31, 2024. 
 
Elevator Rails 
 
The bill provides that at least one support rail must be continuous and a minimum length of 42 inches 
overall, instead of all support rails.  
 
Residential Inspector Licensing 
 
The bill allows a residential inspector applicant to use an internship program as a basis for eligibility to 
take the licensing examination.  
 
Private Providers  
 
The bill shortens the timeframe that a local government has to issue a permit or notify the applicant of 
the specific plan features that do not comply with the Building Code to 10 business days, from 20 
                                                
101
 Current law requires R-30 or R-38, depending on Climate Zone.  STORAGE NAME: h0267d.COM 	PAGE: 23 
DATE: 2/17/2024 
  
business days, if the private provider is a person licensed as a professional engineer or an architect 
and affixes his or her industry seal to the affidavit certifying that the plans comply with the Building 
Code and the private provider or their duly authorized representative is authorized to review the plans. 
 
The bill provides that if the local building official does not provide specific written notice to the permit 
applicant within the 10-day period, the permit application is deemed approved as a matter of law, and 
the local building official must issue the permit on the next business day. 
 
The process for tolling time for responding to additional requests for information from the local 
government remains current law.  
 
The bill has an effective date of January 1, 2025, except as otherwise stated.  
 
B. SECTION DIRECTORY: 
Section 1:  Amends s. 399.035, F.S.; relating to elevator support rails.  
Section 2: Amends s. 468.609, F.S.; relating to a residential inspector license pathway. 
Section 3: Amends s. 553.73, F.S., relating to the Florida Building Code. 
Section 4: Amends s. 553.79, F.S., relating to single-family residential permits. 
Section 5: Amends s. 553.791, F.S.; relating to private providers.  
Section 6: Amends s. 553.792, F.S., relating to building permit application processes. 
Section 7:  Amends s. 553.80, F.S.; relating to acceptable uses of local government Building Code 
enforcement fees. 
Section 8: Creates s. 553.9065, F.S.; relating to standards for unvented attic and rafter assemblies. 
Section 9: Amends s. 440.103, F.S., conforming a cross-reference. 
Section 10: Provides an effective date. 
 
II.  FISCAL ANALYSIS & ECONOMIC IMPACT STATEMENT 
 
A. FISCAL IMPACT ON STATE GOVERNMENT: 
 
1. Revenues: 
For a similar bill in 2023, DBPR stated that surcharge collections pursuant to s. 553.791, F.S., and 
s. 468.631, F.S., could be impacted by the bill.
102
 
 
2. Expenditures: 
None. 
 
B. FISCAL IMPACT ON LOCAL GOVERNMENTS: 
 
1. Revenues: 
For a similar bill in 2023, DBPR stated that this bill may reduce the amount of permit fees that could 
be collected by local governments in certain circumstances.
103
 
 
2. Expenditures: 
This bill may impact local governments because they may have to hire more employees to meet the 
prescribed timeframes. 
 
C. DIRECT ECONOMIC IMPACT ON PRIVATE SECTOR: 
For a similar bill in 2023, DBPR stated that the bill may reduce the cost of permit fees paid by the 
private sector to local governments based on the local governments failure to meet time 
                                                
102
 Department of Business & Professional Regulation, Agency Analysis of 2023 Senate Bill 682, p. 4 (February 14, 2023). 
103
 Id., at 5.  STORAGE NAME: h0267d.COM 	PAGE: 24 
DATE: 2/17/2024 
  
requirements.
104
 On the other hand, the local jurisdiction may raise permit fees so that they can hire 
employees to meet the time requirements in the bill.   
 
The streamlined permitting processes in the bill may expedite development across the state. 
 
D. FISCAL COMMENTS: 
None. 
 
III.  COMMENTS 
 
A. CONSTITUTIONAL ISSUES: 
 
1. Applicability of Municipality/County Mandates Provision: 
 
Not applicable. This bill does not appear to require counties or municipalities to spend funds or take 
action requiring the expenditures of funds; reduce the authority that counties or municipalities have 
to raise revenues in the aggregate; or reduce the percentage of state tax shared with counties or 
municipalities. 
 
 2. Other: 
None. 
 
B. RULE-MAKING AUTHORITY: 
The bill would require the Florida Building Commission to amend the Building Code to reflect some of 
the bill’s changes to building permit application processing requirements.
105
 
 
C. DRAFTING ISSUES OR OTHER COMMENTS: 
None. 
 
IV.  AMENDMENTS/COMMITTEE SUBSTITUTE CHANGES 
On December 12, 2024, the Regulatory Reform & Economic Development Subcommittee adopted a proposed 
committee substitute and reported the bill favorably as a committee substitute. The committee substitute: 
 Provides that vested rights in a preliminary plat are formed if an applicant commences developing the 
property based on an approval of such preliminary plat by a local government. 
 Requires an applicant for a residential building permit pursuant to a preliminary plat to indemnify and 
hold harmless the local government from damages directly related to the issuance of such building 
permit before the approval of the final plat. 
 Clarifies that timeframes in the updated permitting procedures are calculated using business days.  
 Clarifies that if a local government fails to timely notify an applicant of what is needed to determine a 
sufficient application, such application will be automatically determined to be sufficient.  
 Corrects a scrivener’s error. 
 
On January 31, 2024, the Local Administration, Federal Affairs & Special Districts Subcommittee adopted a 
strike-all amendment and reported the bill favorably as a committee substitute. The amendment: 
 Removes provisions of the bill relating to platting. 
 Requires the Commission to provide an exception in the Building Code relating to sealed drawings by a 
design professional. 
 Requires local governments to approve applications for multifamily projects within 60 business days. 
 Requires local governments to review completed applications for sufficiency within 10 business days. 
                                                
104
 Id. 
105
 See rule impacted, r. 61G20-1.001, F.A.C.  STORAGE NAME: h0267d.COM 	PAGE: 25 
DATE: 2/17/2024 
  
 Provides an exception for the fee reduction provision. 
 Changes the effective date of the bill to January 1, 2025. 
 
On February 15, 2024, the Commerce Committee adopted three amendments and reported the bill favorably 
as a committee substitute. The amendments: 
 Provide that only one support rail in an elevator needs to be continuous and be at least 42 inches. 
 Provide that completing an internship program for residential building inspectors is a pathway for 
licensure as a residential building inspector. 
 Clarify that not requiring sealed plans for window and door replacement is only applicable to existing 
one- or two-family dwellings or townhouses. 
 Reduce the time frame that a local government has to issue a building permit to a private provider who 
seals the plans, to 10 days after receipt of the application, from 20 days. 
 Provide that a local government may not require a waiver of permit approval timeframes as a condition 
to review an application for a building permit. 
 Provides that the Florida Building Commission must review certain standards for unvented attics before 
December 31, 2024, and that certain standards will be effective related to such attics on July 1, 2025. 
 
This analysis is drafted to the committee substitute as passed by the Commerce Committee.