Florida 2024 2024 Regular Session

Florida Senate Bill S0708 Analysis / Analysis

Filed 01/16/2024

                    The Florida Senate 
BILL ANALYSIS AND FISCAL IMPACT STATEMENT 
(This document is based on the provisions contained in the legislation as of the latest date listed below.) 
Prepared By: The Professional Staff of the Committee on Regulated Industries  
 
BILL: SB 708 
INTRODUCER:  Senator Burton 
SUBJECT:  Underground Facilities 
DATE: January 12, 2024 
 
 ANALYST STAFF DIRECTOR  REFERENCE  	ACTION 
1. Schrader Imhof RI Favorable 
2.     GO  
3.     RC  
 
I. Summary: 
SB 708 revises Florida’s Underground Facility Damage Prevention and Safety Act (ch. 556, 
F.S.), and underground excavation procedures under Sunshine State One-Call of Florida, Inc. 
(also known as Sunshine 811). The bill: 
 Revises the time period that excavators have to notify the Sunshine 811 system before 
beginning any excavation or demolition from two to three business days; 
 Revises the time period that persons who furnish or transport materials or services by means 
of an underground facility have to respond to Sunshine 811 system notifications from two to 
three business days; 
 Creates a new violation that is subject to enhanced civil penalties under s. 556.107(1)(a)2., 
F.S., for failure to notify of an excavation start date for a high-priority subsurface installation. 
 
The bill also reenacts certain portions of ch. 566, F.S., to implement revisions made by the bill, 
reorders certain sections, and makes technical changes. 
 
The bill has an effective date of October 1, 2024.  
II. Present Situation: 
Florida Underground Facility Damage Prevention and Safety Act 
Chapter 556, F.S., is Florida’s Underground Facility Damage Prevention and Safety Act (act).  
The purpose of the act is to: 
 Prevent injuries, property damage, and interruption of services that could result from damage 
to an underground facility
1
 caused by excavation or demolition operations; 
                                                
1
 Section 556.102(13), F.S., defines the term “underground facility” as “any public or private personal property which is 
buried, placed below ground, or submerged on any member operator’s right-of-way, easement, or permitted use which is 
being used or will be used in connection with the storage or conveyance of water; sewage; electronic, telephonic, or 
REVISED:   BILL: SB 708   	Page 2 
 
 Create a not-for-profit corporation comprised of operators of underground facilities in this 
state to administer the act; 
 Fund the cost of the administration of the corporation through contributions from member 
operators for services provided to member operators and from charges made to others for 
services requested and provided, such as record searches, education or training, and damage 
prevention activities; 
 Reserve to the state the power to regulate any subject matter specifically addressed in the 
act;
2
 
 Permit any local law enforcement officer, local government code inspector, or code 
enforcement officer to enforce the act without the need to incorporate the provisions of the 
act into any local code or ordinance; and 
 Foster the awareness of federal laws and regulations that promote safety with respect to 
underground facilities, including, but not limited to, the Federal Pipeline Safety Act of 1968, 
as amended, the Pipeline Safety Improvement Act of 2002, OSHA Standard 1926.651, and 
the National Electric Safety Code, ANSI C-2, by requiring and facilitating the advance notice 
of activities by those who engage in excavation or demolition operations.
3
 
 
Pipeline and Hazardous Materials Safety Administration 
The Pipeline and Hazardous Materials Safety Administration (PHMSA) is part of the United 
States Department of Transportation. PHMSA’s purpose is to protect the public and the 
environment by advancing safe transportation of energy and other essential potentially hazardous 
materials. PHMSA “establishes national policy, sets and enforces standards, educates, and 
conducts research to prevent incidents.” The agency is also involved in preparation of the public 
and first responders to deal with hazardous materials incidents.
4
 
 
PHMSA’s Office of Pipeline Safety “is responsible for carrying out a national program to ensure 
the safe, reliable, and environmentally-sound operation of the nation’s natural gas and hazardous 
liquid pipeline transportation system.” As part of this responsibility, the Office of Pipeline 
Safety: 
 Develops, proposes, and implements policy initiatives and regulations regarding operation of 
pipelines; 
 Directs education and outreach efforts to promote adoption and the increased use of pipeline 
safety programs by state and local governments, pipeline operators, and the public; and 
                                                
telegraphic communication; electric energy; oil; petroleum products; natural gas; optical signals; or other substances, and 
includes, but is not limited to, pipelines, pipes, sewers, conduits, cables, valves, and lines.” For purposes of the act, “a 
liquefied petroleum gas line regulated under chapter 527 is not an underground facility unless such line is subject to the 
requirements of Title 49 C.F.R. adopted by the Department of Agriculture and Consumer Services, provided there is no 
encroachment on any member operator’s right-of-way, easement, or permitted use.” Petroleum storage systems regulated 
under ch. 376, F.S., are also not considered underground facilities for the purposes of the act “unless the storage system is 
located on a member operator’s right-of-way or easement. Storm drainage systems are not considered underground facilities.” 
2
  Local governments may not adopt or enforce ordinances or rules that conflict with this chapter or that 1) require operators 
of underground facilities to obtain permits from local governments in order to identify underground facilities, 2) require 
premarking or marking, 3) specify the types of paint or other marking devices that are used to identify underground facilities, 
or 4) require removal of marks. Section 556.101(3)(d), F.S. 
3
 Section 556.101, F.S. 
4
 Pipeline and Hazardous Materials Safety Administration, About PHMSA, https://www.phmsa.dot.gov/about-phmsa/phmsas-
mission (last visited Jan. 4, 2024).  BILL: SB 708   	Page 3 
 
 Administers a national pipeline safety program to support compliance with Federal pipeline 
safety regulations.
5
 
 
Sunshine State One-Call of Florida 
The not-for-profit corporation created under ch. 556, F.S., is called Sunshine State One-Call of 
Florida, Inc. (also known as Sunshine 811).  Section 506.103, F.S., establishes Sunshine 811 
with the purpose to administer the act. Section 506.103(1), F.S., requires that each operator of an 
underground facility in Florida must be a member of Sunshine 811 (i.e. member operator)
6
 and 
must use and participate in the free-access notification system established by Sunshine 811 
(Sunshine 811 system).
7
  
 
Sunshine 811 Procedures 
Sunshine 811 is required to provide a single toll-free telephone number (811) within Florida 
which excavators can use to notify member operators of planned excavation or demolition 
activities.
8
 Excavators intending to conduct excavation or demolition must notify the Sunshine 
811 system not less than two full business days before beginning operations that are not beneath 
the waters of the state, and not less than 10 full business days if the operation is beneath the 
waters of the state, with certain exceptions.
9
 The excavator must also provide specified 
identification, location, and operational information, which remains valid for 30 calendar days.
10
 
Each notification is recorded to document compliance with the act.
11
 
 
Upon receipt of this notice, the Sunshine 811 system provides the notifying excavator with a list 
of the member operators who will be advised of the notification, along with a notification 
number to be provided to law enforcement upon request.
12
 The Sunshine 811 system in turn 
notifies the potentially affected member operators of the planned excavation or demolition 
activities.
13
 Within two full business days after the time the notification is received by the 
Sunshine 811 system (or 10 days if the proposed excavation is in proximity to facilities beneath 
state waters), potentially affected member operators must determine the location of their 
underground facilities in relation to the proposed excavation or demolition. If this cannot be done 
in this time period, the member operator must contact the person giving notice and negotiate a 
new schedule and time that is agreeable and does not unreasonably delay the excavator. If a 
member operator determines that a proposed excavation or demolition is in proximity to or 
                                                
5
 Pipeline and Hazardous Materials Safety Administration, Office of Pipeline Safety, https://www.phmsa.dot.gov/about-
phmsa/offices/office-pipeline-safety (last visited Jan. 4, 2024). 
6
 Section 556.102, F.S., defines “member operator” as “any person who furnishes or transports materials or services by means 
of an underground facility.”  
7
 See s. 556.102, F.S., which defines “system” for ch. 556, F.S. 
8
 Section 556.104, F.S. 
9
 Section 556.105(1)(a), F.S. Member operators with state-owned underground facilities located within the right-of-way of a 
state highway need not be notified of excavation or demolition activities and are under no obligation to mark or locate 
facilities. Section 556.105(5), F.S. 
10
 Section 556.105(1)(a)-(d), F.S. 
11
 Section 556.105(2), F.S. 
12
 Section 556.105(3) and (4), F.S. 
13
 Section 556.105(5), F.S.   BILL: SB 708   	Page 4 
 
conflicts with an underground facility, the member operator must identify the horizontal route of 
the facility in a specified manner.
14
 
 
An excavator is required to delay excavations until the first of the following events occurs: 
 Each member operator’s underground facilities have been marked and located; 
 The excavator has been notified that no member operator has underground facilities in the 
area described in the notice; or 
 Expiration of the time allowed for markings. 
 
If a member operator has not located and marked its underground facilities within the time 
allowed for marking, the excavator may proceed with the excavation, provided that the excavator 
does so with reasonable care and that detection equipment or other acceptable means to locate 
underground facilities are used. An excavator may not conduct demolition in an area until all 
member operators’ underground facilities have been marked and located or removed.
15
 
 
Violations of Sunshine 811 Requirements 
Section 556.107, F.S., provides that certain violations of the act are noncriminal infractions 
enforceable by citations issued by the State Fire Marshal or his or her agents as provided in 
ss. 633.114 and 633.116, F.S.; the fire chief of a special district, municipality, or county; or any 
local or state law enforcement officer, government code inspector, or code enforcement officer. 
The issuer of a citation may also require an excavator to cease work on any excavation or not 
start a proposed excavation until such excavator comes into compliance with the act.
16
 
 
Section 556.107(1)(a), F.S., provides two tiers of noncriminal infraction penalties. Excavators 
and member operators who violate any of the following provisions of the act may be required to 
pay a civil penalty of $500 plus court costs for each infraction:
17
 
 Section 556.105(1), F.S., relating to excavators providing required information through the 
Sunshine 811 system. 
 Section 556.105(5)(c), F.S., relating to increased cautionary practices required to be taken 
during excavation in tolerance zones.
18
 
 Section 556.105(6), F.S., relating to the avoidance of excavation during time allotted to 
member operators for the marking or location of underground facilities. 
 Section 556.105(11), F.S., relating to the need to stop excavation or demolition because 
marks are no longer visible, or, in the case of underwater facilities, are inadequately 
documented. 
 Section 556.105(12), F.S., relating to the need to cease excavation or demolition activities 
because of contact or damage to an underground facility. 
 Section 556.105(5)(a) and (b), F.S., relating to the requirement to identify underground 
facilities, if a member operator does not mark an underground facility. The penalty does not 
apply, however, if a member operator marks an underground facility incorrectly. 
                                                
14
 Id.  
15
 Section 556.105(6), F.S. 
16
 Section 556.107(1)(b), F.S. 
17
 Section 556.107(1)(c)1., F.S. 
18
 Section 556.102(15), F.S., defines “tolerance zone” as being 24 inches from the outer edge of either side of the exterior 
surface of a marked underground facility.  BILL: SB 708   	Page 5 
 
 Section 556.109(2), F.S., relating to falsely notifying the Sunshine 811 system of an 
emergency situation or condition. 
 Section 556.114(1), (2), (3), and (4), F.S., relating to a failure to follow low-impact marking 
practices, as defined in those subsections.
19
 
 
Section 556.107(1)(a)2., F.S., provides enhanced penalties if an excavator or member operator 
violates the provisions of ss. 556.105(1), 556.105(5)(c), 556.105(6), 556.105(11), and 
556.105(12), F.S., as identified above, involving an underground facility transporting hazardous 
materials that are regulated by the PHMSA. Such violators may be required to pay an enhanced 
civil penalty of $2,500 plus court costs for each infraction.
20
 
 
Eighty percent of these civil penalties are distributed to the government entity whose employee 
issued the citation, with 20 percent of the penalty retained by the clerk of the court to cover 
administrative costs.
21
 
 
Section 556.107, F.S., also provides for criminal penalties for certain violations, specifying that 
all of the following are misdemeanors of the second degree:
22
 
 Failure to properly respond to the noncriminal infractions specified in s. 556.107(1)(a), F.S., 
issued pursuant to s. 556.107(1)(b), F.S.;
23
 
 Knowingly and willfully removing or otherwise destroying the valid stakes or other valid 
physical markings used to mark the horizontal route of an underground facility;
24
 and 
 Knowingly and willfully removing or damaging a permanent marker placed to identify the 
approximate location of an underground facility.
25
 
 
High-Priority Subsurface Installations 
Section 556.102, F.S., defines a “high-priority subsurface installation” as “an underground gas 
transmission or gas distribution pipeline, or an underground pipeline used to transport gasoline, 
jet fuel, or any other refined petroleum product or hazardous or highly volatile liquid, such as 
anhydrous ammonia or carbon dioxide, if the pipeline is deemed to be critical by the operator of 
the pipeline and is identified as a high-priority subsurface installation to an excavator who has 
provided a notice of intent to excavate under s. 556.105(1), F.S., or would have been identified 
as a high-priority subsurface installation except for the excavator’s failure to give proper notice 
of intent to excavate.” 
 
Regarding high-priority subsurface installations, s. 556.116(1), F.S., requires that: 
 When an excavator proposes to excavate or demolish within 15 feet of the horizontal route of 
an underground facility that has been identified as a high-priority subsurface installation by 
the member operator of such a facility, the operator must, in addition to the identification 
                                                
19
 Section 556.107(1)(a)1., F.S. 
20
 Section 556.107(1)(c)2., F.S. 
21
 Section 556.107(1)(c), F.S. 
22
 Section 775.082(4)(b), F.S., provides that a misdemeanor of the second degree is punishable by a term of imprisonment not 
to exceed 60 days. Section 775.083(1)(e), F.S., provides that a misdemeanor of the second degree is punishable by a fine not 
to exceed $500. 
23
 Section 556.107(1)(c)3., F.S. 
24
 Section 556.107(3), F.S. 
25
 Id.  BILL: SB 708   	Page 6 
 
requirements in s. 556.105(5)(a) and (b), F.S., notify the excavator that the facility is a high-
priority subsurface installation. This must be done within the time period required in 
s. 556.105(9)(a), F.S; 
 Upon the provision of such notice by the member operator, an excavator must notify the 
member operator of the planned excavation start date and time before beginning excavation; 
and 
 If the member operator fails to timely provide such notice, the excavator may proceed to 
excavate without notifying the member operator of the excavation start date and time. 
 
According to Sunshine 811, owners of high-priority subsurface installations have notified 
Sunshine 811 that “there is a significant problem with excavators failing to provide the date and 
start time of excavation.”
26
 Currently, violations of this provision of s. 556.116(1), F.S., are not 
violations for which a civil penalty may be issued under s. 556.107, F.S. 
 
Increase in Sunshine 811 Locate Requests 
With the continuing substantial growth Florida has had over the past 10 years, the Sunshine 811 
system has seen an increase from 1.4 million locate request tickets in the 2014-2015 fiscal year 
to 2.2 million locate request tickets in the 2022-2023 fiscal year (a 57 percent increase).
27
 
According to Sunshine 811, this growth “has made it difficult for the utilities to fulfill all of the 
locate requests within 2 days.  Sunshine 811’s data shows that approximately 16 [percent] of 
locate requests are not fulfilled within 2 days, putting underground facilities, public safety and 
the environment at risk.”
28
 
III. Effect of Proposed Changes: 
Section 1 of the bill revises s. 556.105(1)(a), F.S., to increase the number of full business days, 
from two to three, before beginning any excavation or demolition that is not beneath the waters 
of the state that an excavator must provide information to the Sunshine 811 system. 
 
The bill section also revises s. 556.105(9)(a), F.S., to increase the number of full business days, 
from two to three days, that member operators have to respond to notifications from the Sunshine 
811 system for excavations or demolitions that are not beneath the waters of the state. 
 
Section 2 of the bill revises s. 556.107(1)(a)2., F.S., to add the failure to notify of the planned 
excavation start date and time before beginning excavation, if the member operator provides 
timely notice of the existence of a high-priority subsurface installation, to the list of violations 
subject to enhanced penalties under s. 556.107(1)(a)2., F.S.
29
 The bill also reenacts s. 556.107(3), 
F.S., relating to misdemeanor violations, to incorporate amendments made by the bill. 
 
                                                
26
 Email from Chris Lyon, Attorney, Lewis, Longman & Walker, P.A. representing Sunshine 811, to Senate Regulated 
Industries Staff regarding SB 708 (Dec. 18, 2023)(on file with the Senate Regulated Industries Committee). 
27
 Compare Sunshine 881, 2014-15 Annual Report, 3, available at: https://www.sunshine811.com/annual-reports (1.4 million 
tickets), with Sunshine 881, 2022-23 Annual Report, 3, available at: https://www.sunshine811.com/annual-reports (2.2 
million tickets) (last visited Jan. 10, 2024). 
28
 Lyon, supra note 26. 
29
 If such violation involves an underground facility transporting hazardous materials that are regulated by PHMSA.  BILL: SB 708   	Page 7 
 
Sections 3, 4, 5, and 6 reenact ss. 556.102(8), 556.108, 556.114(1)-(4), and 556.116(1) and 
(2)(a)-(d), F.S., relating to the definition of “high-priority subsurface installation,” exemptions 
from notification requirements, low-impact marking practices, and special procedures for high-
priority marking practices, respectively. 
 
Section 7 provides an effective date of October 1, 2024.  
IV. Constitutional Issues: 
A. Municipality/County Mandates Restrictions: 
None. 
B. Public Records/Open Meetings Issues: 
None. 
C. Trust Funds Restrictions: 
None. 
D. State Tax or Fee Increases: 
None. 
E. Other Constitutional Issues: 
None. 
V. Fiscal Impact Statement: 
A. Tax/Fee Issues: 
None. 
B. Private Sector Impact: 
Member operators and excavators that violate the requirements for high-priority 
subsurface installations under s. 556.116(1), F.S., may have a negative financial impact 
from the new penalty provisions provided in the bill. 
C. Government Sector Impact: 
The bill may have an indeterminate, positive impact on state and local government 
revenues for the new penalty provisions provided for violations of s. 556.116(1), F.S. As 
provided under s. 556.107(1)(c), F.S., civil penalties collected pursuant to s. 556.107, 
F.S., are distributed 80 percent to the government entity whose employee issued the 
citation, with 20 percent of the penalty retained by the clerk of the court to cover 
administrative costs. Citations may be issued by the State Fire Marshal or his or her  BILL: SB 708   	Page 8 
 
agents as provided in ss. 633.114 and 633.116, F.S.; the fire chief of a special district, 
municipality, or county; or any local or state law enforcement officer, government code 
inspector, or code enforcement officer.
30
 
VI. Technical Deficiencies: 
None. 
VII. Related Issues: 
None. 
VIII. Statutes Affected: 
This bill substantially amends the following sections of the Florida Statutes: 556.105 and 
556.107.  
 
This bill reenacts the following sections of the Florida Statutes: 556.102, 556.107, 556.108, 
556.114, and 556.116.  
IX. Additional Information: 
A. Committee Substitute – Statement of Changes: 
(Summarizing differences between the Committee Substitute and the prior version of the bill.) 
None. 
B. Amendments: 
None. 
This Senate Bill Analysis does not reflect the intent or official position of the bill’s introducer or the Florida Senate. 
                                                
30
 Section 556.107,(1)(b), F.S.