Illinois 2023 2023-2024 Regular Session

Illinois Senate Bill SB2603 Introduced / Bill

Filed 10/18/2023

                    103RD GENERAL ASSEMBLY State of Illinois 2023 and 2024 SB2603 Introduced 10/18/2023, by Sen. Jason Plummer SYNOPSIS AS INTRODUCED:  220 ILCS 5/17-1000 new  Amends the Electric Cooperatives And Municipal Systems Article of the Public Utilities Act. Allows an electric cooperative organized to provided rural electric power to provide broadband service by using an easement owned, held, or used by the electric cooperative. Requires the electric cooperative to provide notice to the property owner on which the easement is located 3 months prior to beginning construction on the easement that the electric cooperative intends to use the easement for broadband purposes.  LRB103 33306 LNS 63116 b   A BILL FOR 103RD GENERAL ASSEMBLY State of Illinois 2023 and 2024 SB2603 Introduced 10/18/2023, by Sen. Jason Plummer SYNOPSIS AS INTRODUCED:  220 ILCS 5/17-1000 new 220 ILCS 5/17-1000 new  Amends the Electric Cooperatives And Municipal Systems Article of the Public Utilities Act. Allows an electric cooperative organized to provided rural electric power to provide broadband service by using an easement owned, held, or used by the electric cooperative. Requires the electric cooperative to provide notice to the property owner on which the easement is located 3 months prior to beginning construction on the easement that the electric cooperative intends to use the easement for broadband purposes.  LRB103 33306 LNS 63116 b     LRB103 33306 LNS 63116 b   A BILL FOR
103RD GENERAL ASSEMBLY State of Illinois 2023 and 2024 SB2603 Introduced 10/18/2023, by Sen. Jason Plummer SYNOPSIS AS INTRODUCED:
220 ILCS 5/17-1000 new 220 ILCS 5/17-1000 new
220 ILCS 5/17-1000 new
Amends the Electric Cooperatives And Municipal Systems Article of the Public Utilities Act. Allows an electric cooperative organized to provided rural electric power to provide broadband service by using an easement owned, held, or used by the electric cooperative. Requires the electric cooperative to provide notice to the property owner on which the easement is located 3 months prior to beginning construction on the easement that the electric cooperative intends to use the easement for broadband purposes.
LRB103 33306 LNS 63116 b     LRB103 33306 LNS 63116 b
    LRB103 33306 LNS 63116 b
A BILL FOR
SB2603LRB103 33306 LNS 63116 b   SB2603  LRB103 33306 LNS 63116 b
  SB2603  LRB103 33306 LNS 63116 b
1  AN ACT concerning regulation.
2  Be it enacted by the People of the State of Illinois,
3  represented in the General Assembly:
4  Section 5. The Public Utilities Act is amended by adding
5  Section 17-1000 as follows:
6  (220 ILCS 5/17-1000 new)
7  Sec. 17-1000. Rural electric cooperatives providing
8  broadband services using easements.
9  (a) The General Assembly finds that:
10  (1) a goal of the State is to make available to its
11  citizens affordable, reliable, and state-of-the-art
12  Internet communications through the expansion, extension,
13  and general availability of broadband services and
14  technology, and to encourage the adoption of broadband by
15  all citizens;
16  (2) although broadband access has been extended to
17  many urban areas of the State, many rural areas remain
18  unserved; and
19  (3) fair and equitable access to 21st century
20  technology is essential to job retention and economic
21  growth opportunities.
22  (b) As used in this Section:
23  "Broadband infrastructure" means networks of deployed

 

103RD GENERAL ASSEMBLY State of Illinois 2023 and 2024 SB2603 Introduced 10/18/2023, by Sen. Jason Plummer SYNOPSIS AS INTRODUCED:
220 ILCS 5/17-1000 new 220 ILCS 5/17-1000 new
220 ILCS 5/17-1000 new
Amends the Electric Cooperatives And Municipal Systems Article of the Public Utilities Act. Allows an electric cooperative organized to provided rural electric power to provide broadband service by using an easement owned, held, or used by the electric cooperative. Requires the electric cooperative to provide notice to the property owner on which the easement is located 3 months prior to beginning construction on the easement that the electric cooperative intends to use the easement for broadband purposes.
LRB103 33306 LNS 63116 b     LRB103 33306 LNS 63116 b
    LRB103 33306 LNS 63116 b
A BILL FOR

 

 

220 ILCS 5/17-1000 new



    LRB103 33306 LNS 63116 b

 

 



 

  SB2603  LRB103 33306 LNS 63116 b


SB2603- 2 -LRB103 33306 LNS 63116 b   SB2603 - 2 - LRB103 33306 LNS 63116 b
  SB2603 - 2 - LRB103 33306 LNS 63116 b
1  telecommunications equipment and technologies necessary to
2  provide high-speed Internet access and other advanced
3  telecommunications services for end users.
4  "Broadband service" means any service that provides
5  advanced telecommunications capability and Internet access.
6  (c) An electric cooperative organized to provide rural
7  electric power may, on behalf of itself, its subsidiary, or a
8  business partner, provide broadband service by using an
9  easement owned, held, or used by the electric cooperative. An
10  existing easement does not limit the type, size, or amount of
11  broadband infrastructure that may be used to provide broadband
12  services, nor is an electric cooperative required to obtain
13  additional easements or pay additional compensation to a
14  property owner who is a party to an existing easement
15  agreement in order to provide broadband services.
16  (d) To exercise the rights granted under this Section, the
17  electric cooperative must provide notice to the property owner
18  on which the easement is located 3 months prior to beginning
19  construction on the easement that the electric cooperative
20  intends to use the easement for broadband purposes. The notice
21  must be sent by certified mail to the last known address of the
22  property owner of the property on which the easement is
23  located. The notice must include:
24  (1) the name and mailing address of the electric
25  cooperative;
26  (2) a narrative describing the nature and purpose of

 

 

  SB2603 - 2 - LRB103 33306 LNS 63116 b


SB2603- 3 -LRB103 33306 LNS 63116 b   SB2603 - 3 - LRB103 33306 LNS 63116 b
  SB2603 - 3 - LRB103 33306 LNS 63116 b
1  the intended easement use;
2  (3) a description of any trenching or other
3  underground work expected to result from the intended use,
4  including the anticipated time frame for the work; and
5  (4) a telephone number of an electric cooperative
6  employee to contact regarding the easement.

 

 

  SB2603 - 3 - LRB103 33306 LNS 63116 b