HOUSE BILL NO. 2
BY REPRESENTATIVE ROBIDEAUX
CAPITAL OUTLAY:  Provides for the comprehensive Capital Outlay budget
AN ACT1
To provide with respect to the capital outlay budget and the capital outlay program for state2
government, state institutions, and other public entities; to provide for the3
designation of projects and improvements; to provide for the financing thereof4
making appropriations from certain sources; and to provide for related matters.5
Be it enacted by the Legislature of Louisiana:6
Section 1.  The following sums or so much thereof as may be necessary are hereby7
appropriated out of any monies in the state treasury from the sources specified, from federal8
funds and self-generated revenues belonging to the state of Louisiana and/or collected by9
boards, commissions, departments, and agencies thereof, all for making capital outlay and10
for the purposes and in the amounts specified herein for the Fiscal Year commencing July11
1, 2013, and ending June 30, 2014, subject to the conditions thereafter provided:12
A project with funding payable from General Obligation Bonds Priority 1 indicates13
that the funding for the project includes the reauthorization of funding which was previously14
on a line of credit granted by the State Bond Commission in Fiscal Year 2012-2013.  As15
used in this Section, the term "general obligation bonds" means state general obligation16
bonds or other evidences of indebtedness payable from the Bond Security and Redemption17 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 2 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Fund. The amount set forth in this Section opposite each project, or so much thereof as may1
be necessary, is hereby appropriated and payable from the proceeds available from the sale2
of general obligation bonds, unless a different source of funding is indicated. Where such3
a different source of funding is indicated, the corresponding amount set forth, or so much4
thereof as may be necessary, is hereby appropriated and payable from the source of funding5
indicated; provided, however, amounts appropriated and payable from federal funds may be6
encumbered or expended only to the extent such amounts shall have been committed or7
received.  Pursuant to the provisions of R.S. 39:82, funds for planning, acquisition,8
construction, and major repair projects appropriated by this act may be retained until9
completion of the project, even if no bona fide liability exists on the last day of the fiscal10
year. 11
This Act shall constitute the comprehensive state capital outlay budget for the 2013-12
2014 Fiscal Year. Projects set forth which are payable from the proceeds available from the13
sale of general obligation bonds shall have the priorities as indicated. The Request for Line14
of Credit form used by the Attorney General and Bond Counsel in evaluating Louisiana15
Constitutional, Internal Revenue Code, and applicable income tax regulations shall be filed16
with the Commissioner of Administration, State Bond Commission, and State Attorney17
General. No general obligation bonds shall be sold, nor cash lines of credit granted to fund18
any lower priority project prior to the sale of general obligation bonds or the granting of cash19
lines of credit to fund all higher priority projects (the "general rule"), except as hereinafter20
provided. This prohibition against funding a lower priority project shall not apply upon a21
showing of an impossibility or impracticality either to proceed with all unfunded higher22
priority projects or to proceed with the funding of such projects or any part thereof through23
the issuance of general obligation bonds for any reason. Such showing shall be stated in24
reasonable detail in a certificate or certificates signed by the state agency responsible for25
administering the funding, and filed with the Commissioner of Administration and the State26
Bond Commission (hereinafter referred to as "the Commission"). Upon a determination by27
the Commission that proceeding with such a project or the funding thereof through the28 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 3 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
issuance of general obligation bonds is impractical or impossible, the Commission may then1
proceed with the sale of general obligation bonds or the granting of cash lines of credit2
without regard to the priority of the unfunded projects determined to be impossible or3
impractical. 4
Upon recommendation by the state agency responsible for administering the funding,5
if it is determined at any time that proceeding with the project or with the funding thereof6
is no longer impossible or impractical, the State Bond Commission may rescind the7
certificate of impossibility or impracticality and may proceed with the project or with the8
issuance of general obligation bonds or the granting of cash lines of credit to fund the9
project. Alternatively, the Interim Emergency Board (hereinafter referred to as "the Board"),10
upon reviewing certificates as described above and determining that proceeding with such11
project or the funding thereof through the issuance of general obligation bonds is impossible12
or impractical, may designate a lower priority for such project.  The Board's determination13
and lower priority designation shall be submitted to the members of the Legislature for their14
approval in accordance with the provisions of Chapter 3-B of Subtitle I of Title 39 of the15
Louisiana Revised Statutes of 1950. In accordance with the provisions of Chapter 3-B of16
Subtitle I of Title 39 of the Louisiana Revised Statutes of 1950, whenever at the written17
request of the appropriate legislators and agency, the Board determines that an adjustment18
to a project description originally set forth in such capital budget adopted by the Legislature19
for a current fiscal year is necessary to correct a mistake in a project description, clarify a20
description, change the scope of a description, or make any other adjustment the Board21
deems necessary to implement the purpose of the project, such adjustment shall only become22
effective upon the approval by majority vote of the elected members of each house of the23
Legislature in the manner provided for in Chapter 3-B of Subtitle I of Title 39 of the24
Louisiana Revised Statutes of 1950. 25
If such approval is granted, notification by the chair or secretary of the Board of the26
results of the balloting shall be transmitted to the State Bond Commission, which may then27
proceed with the sale of general obligation bonds or the granting of cash lines of credit for28 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 4 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
each change approved upon request of the Commissioner of Administration in accordance1
with the general rule. 2
With respect to Priorities 1 through 5, a lower priority project may be moved to a3
higher priority only upon a showing of an emergency or other cause not reasonably4
anticipated by the Legislature, which shall be stated in reasonable detail in a certificate5
signed by the head of the appropriate department, political subdivision, or agency and filed6
with the Commissioner of Administration and the Board.  Upon a determination by the7
Board that such project should be moved to a higher priority because of an emergency or8
other cause not reasonably anticipated by the Legislature, the Board shall designate a higher9
priority to the project.  The matter then shall be submitted to and be subject to the same10
approval by the members of the Legislature in the manner previously indicated in this11
Section. If such approval is granted, notification by the chair or secretary of the board of the12
change of priority shall be transmitted to the State Bond Commission, which then upon13
request of the Commissioner of Administration, may proceed with the sale of general14
obligation bonds or the granting of cash lines of credit in accordance with the general rule.15
As to projects within a priority, the State Bond Commission acting on requests submitted by16
the Commissioner of Administration shall determine when such project, or phases thereof,17
shall be funded. In making such determination, the State Bond Commission shall consider18
the amount of proceeds of general obligation bonds to be made available in light of money19
and capital market conditions; the expenditure requirements of the project; the time required20
for architectural plans and drawings, public bidding, and site acquisition and preparation;21
availability of receipt of federal monies; litigation affecting the undertaking or completion22
of a project, federal tax laws and regulations regarding the sale of municipal bonds; and23
other items of a similar nature bearing upon the possibility or the necessity to commence a24
project or any particular phase thereof. 25
Any other provision of this Act to the contrary notwithstanding, projects described26
in Priority 5 of this Act shall not be moved to a higher priority except upon one of the27
following conditions: (1) Funding is necessary to complete or additionally fund a project28
located elsewhere in the capital outlay act. Determination of such condition shall be made29 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 5 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
by the head of the appropriate department or agency by means of a certificate to that effect1
filed with the Interim Emergency Board, who shall, by mail ballot, request approval of such2
change and if approved by a majority of each house of the Legislature it shall be funded, or3
(2) unless required by an emergency or other cause not reasonably anticipated by the4
Legislature, to be in accordance with procedures set forth in this Section. However, the State5
Bond Commission may authorize a non-cash line of credit for any project in Priority 5 which6
represents that portion of construction contracts which were let during a previous fiscal year,7
or construction contracts which will be let during the current fiscal year, but which will not8
require cash expenditures during the year.  Such non-cash lines of credit, when combined9
with previously sold bonds or with higher priority bonds or lines of credit, or with funds10
appropriated from other sources, will provide sufficient appropriated funds to award11
equipment or construction contracts. Contracts shall not be awarded without approval of the12
Division of Administration. 13
Upon approval by the State Bond Commission, and subject to compliance with its14
policies and procedures and the procedures set forth herein, a line of credit providing for the15
use of funds in anticipation of the sale of general obligation bonds may be granted to the16
appropriate administering agency or department from the Comprehensive Capital Outlay17
Escrow Account, or if there is not a sufficient amount available in such account, from other18
available state cash in the state treasury, for capital improvement projects for which bond19
proceeds are appropriated by a current capital budget, prior to the actual issuance of bonds20
for such projects, unless the attorney general advises that an impediment exists to the valid21
issuance of the bonds on the date such line of credit is granted. 22
All bonds that are to be repaid, in whole or in part, by revenues generated by the23
project shall be designated as "Reimbursement Bonds". The State Bond Commission shall24
enter into such agreements as are necessary to provide that the agency or subdivision, whose25
project is reimbursable, shall pay the bond debt costs into the Bond Security and Redemption26
Fund. Such costs may be paid annually or at the end of the term of the bonds issued as27
determined by the State Bond Commission. 28 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 6 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Priority 1 general obligation bond funding shall be limited to: 1
(1)  Projects and amounts which were previously authorized by Act 23 of the 20122
Regular Session of the Legislature; and which were granted cash lines of credit by the State3
Bond Commission. The bonds to fund these projects were not sold in Fiscal Year 2012-20134
(2) The reauthorization of the portion of the outstanding Fiscal Year 2012-20135
Priority 5 Non-Cash Lines of Credit for projects which will require cash expenditures in6
Fiscal Year 2013-2014 and therefore must be converted to Cash Lines of Credit in Fiscal7
Year 2013-2014.8
(3) Commitments made in the Higher Education Desegregation Settlement9
Agreement. 10
Priority 2 general obligation bond projects are for the completion of plans and11
specifications, land acquisition, site preparation, or for construction which will begin during12
the fiscal year.  It is presently anticipated that the listed projects will require the sale of13
bonds or extension of lines of credit during the fiscal year after adoption of this Act. 14
Priority 3 general obligation bond projects are for the preparation of plans and15
specifications, land acquisition, site preparation, or for construction and shall be limited to16
funding for the portion of construction contracts which will not require cash expenditures17
during the fiscal year. The projects in this category shall be considered future year projects18
in the State's five year capital outlay plan. It is presently anticipated that the listed projects19
will not require the sale of bonds or extension of lines of credit during the fiscal year. 20
Priority 4 general obligation bond projects are for the preparation of plans and21
specifications, land acquisition, site preparation, or for construction and shall be limited to22
funding for the portion of construction contracts which will not require cash expenditures23
during the fiscal year. The projects in this category shall be considered future year projects24
in the State's five year capital outlay plan. It is presently anticipated that the listed projects25
will not require the sale of bonds or extension of lines of credit during the fiscal year. 26 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 7 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Priority 5 general obligation bond funding shall be limited to funding for the portion1
of construction contracts which will not require cash expenditures during the fiscal year.2
These funds, when combined with previously sold bonds or with higher priority bonds on3
lines of credit, or with funds appropriated from other sources, will provide sufficient4
appropriated funds to award contracts. Non-cash lines of credit shall be required prior to the5
award of these contracts.6
In accordance with the cash management plan adopted pursuant to R.S. 48:251(D)7
and the provisions of Act 161 of the 1998 First Extraordinary Session, the Department of8
Transportation and Development is authorized to enter into contracts or agreements for9
projects approved pursuant to the Highway Priority Program, Airport Construction and10
Development Priority Program, Port Construction and Development Priority Program, and11
Statewide Flood Control Program for projects bid and awarded, authorized, or commenced12
during the fiscal year which do not require cash expenditures for the full contract or13
agreement amount. 14
EXECUTIVE DEPARTMENT15
01/107 DIVISION OF ADMINISTRATION16
(345) Local Government Assistance Program17
(Statewide)18
Payable from General Obligation Bonds19
Priority 1	$10,000,00020
Priority 2	$ 8,700,00021
Total	$18,700,00022
(346) Community Water Enrichment Program23
(Statewide)24
Payable from General Obligation Bonds25
Priority 1	$30,000,00026
Priority 5	$ 5,000,00027
Total	$35,000,00028
Provided, however, that all recipients comply with the applicable Department of Natural29
Resources rules and regulations, if any, on master meter installation.30
(948) Exterior Waterproofing at the State Capitol Building, 31
Planning and Construction32
(East Baton Rouge)33
Payable from General Obligation Bonds34
Priority 1	$ 360,00035
Priority 5	$ 3,800,00036
Total	$ 4,160,00037 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 8 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1335)Former McDonogh School Relocation, Renovations1
and Additions, Planning and Construction2
(Orleans)3
Payable from General Obligation Bonds4
Priority 2	$ 1,000,0005
Priority 5	$ 5,000,0006
Total	$ 6,000,0007
(1344)Old Governor's Mansion Exterior Waterproofing and 8
Plastering, Planning and Construction9
(East Baton Rouge)10
Payable from General Obligation Bonds11
Priority 1	$ 850,00012
(1345)Statewide Roofing, Waterproofing, and Related 13
Repairs and Equipment Replacement Program 14
(Statewide)15
Payable from General Obligation Bonds16
Priority 1	$14,940,00017
Priority 5	$33,000,00018
Total	$47,940,00019
(1346)Shreveport State Office Building Mechanical and 20
Electrical Renovations21
(Caddo)22
Payable from General Obligation Bonds23
Priority 1	$ 3,000,00024
Provided, however, the scope of this appropriation is deemed to also include a study of the25
feasibility of consolidating state office space in Shreveport into a central downtown location26
in accordance with HCR 202 of 2009, prior to proceeding with the mechanical and electrical27
renovations.28
(1347)Capitol Complex Acquisitions, Demolitions, Sitework, 29
Construction and Renovation of Facilities30
(East Baton Rouge)31
Payable from General Obligation Bonds32
Priority 5	$15,000,00033
(1348)DPS and ISB Data Centers, Planning, Construction 34
and Renovations35
(East Baton Rouge)36
Payable from General Obligation Bonds37
Priority 1	$ 2,795,00038
(1351)Repair, Restoration and Replacement for Hurricanes Katrina, 39
Rita, Gustav and Ike, Planning, Construction, Renovation,40
and Acquisition41
(Statewide)42
Payable from General Obligation Bonds43
Priority 1	$132,000,00044
Priority 2	$15,000,00045
Total	$147,000,00046 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 9 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1352)Louisiana Clerks of Court Data Networking System,1
Planning, Construction and Acquisition2
(Statewide)3
Payable from General Obligation Bonds4
Priority 5	$ 500,0005
(1353)Statewide Building Condition Assessments6
(Statewide)7
Payable from General Obligation Bonds8
Priority 1	$ 7,000,0009
(1354)State Office Buildings Major Repairs, Equipment 10
Replacement, and Renovations, Planning and Construction11
(Statewide)12
Payable from General Obligation Bonds13
Priority 1	$ 3,000,00014
Priority 5	$ 1,500,00015
Total	$ 4,500,00016
(1355)Statewide Replacement of Single Bottom Elevator Jacks 17
(Code Compliance), Planning and Construction18
(Statewide)19
Payable from General Obligation Bonds20
Priority 1	$ 765,00021
(1356)Americans With Disabilities Act Implementation for State 22
Facilities, Planning and Construction23
(Statewide)24
Payable from General Obligation Bonds25
Priority 5	$ 2,000,00026
(1357)Major Repairs for State Buildings Based on Statewide 27
Condition Assessment, and Infrastructure, Planning 28
and Construction29
(Statewide)30
Payable from General Obligation Bonds31
Priority 1	$49,505,00032
Priority 5	$79,145,00033
Payable from the balance of General Obligation Bond Proceeds previously34
allocated under the authority of Act 645 of 1993 for Education Elaine P. Nunez35
Community College, Planning for Construction of New Classroom Building and36
Expansion of Building "A" (St. Bernard); and Act 645 of 1993 for New Orleans,37
Planning, Design, Construction, Renovation, and Equipment for Alfred Lawless38
Senior High School Health Clinic (Orleans); and Act 45 of 1994 for Education39
Grambling State University, New Health, Physical Education and Recreation40
Building, Planning (Lincoln); and Act 1096 of 1995 for Natchitoches,41
Convention Center Acquisition of Land, Planning, Right of Way, and42
Construction (Natchitoches); and Act 20 of 1999 for Oak Grove, Building43
Expansion for Industrial Prospect, Planning and Construction ($1,200,000 In-44
Kind Local Match) (West Carroll); and Act 21 of 2000 for Department of45
Education Nunez Community College, New Library/Classrooms Building and46
Additions to Building A, Construction and Equipment (St. Bernard); and Act 2147
of 2000 for Evangeline Parish, Reconstruction of Parish Road 5-61 (Evangeline);48
and Act 22 of 2001 for Department of Public Safety and Corrections Allen49
Correctional Center, Door Locking System Replacement, Planning and50 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 10 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Construction (Allen); and Act 22 of 2001 for Caddo Parish, Community1
Women's Health Center (Northwest Louisiana Breast Cancer Detection Center),2
Land and Building Acquisition, Planning, Construction, Renovation, and3
Equipment (Caddo); and Act 22 of 2001 for St. Martin Parish, Bayou Portage4
Gas System, Planning and Construction (St. Martin); and Act 22 of 2001 for5
Natchitoches, Convention Center Complex Land Acquisition and Construction6
($525,000 Non-State Match) (Natchitoches); and Act 22 of 2001 for Grand Isle,7
Waterline, Planning and Construction ($7,000,000 Federal; $6,000,000 Local8
Match) (Jefferson); and Act 22 of 2001 for New Orleans, Behrman Park9
Improvements, Planning and Construction (Orleans); and Act 22 of 2001 for10
Hammond Downtown Development District, Columbia Theater Regional Arts11
Facility, Planning and Renovation (Tangipahoa); and Act 22 of 2001 for St.12
Tammany Parish Industrial District, Land and Building Acquisition, Planning13
and Construction, Equipment and Infrastructure for an Industrial Prospect14
($1,000,000 Federal and $3,000,000 Other Match) (St. Tammany); and Act 2315
of 2002 for Department of Culture, Recreation and Tourism Office of State16
Parks, South Toledo Bend State Park, Planning and Construction (Sabine); and17
Act 23 of 2002 for Department of Public Safety and Corrections Office of Youth18
Development, Jetson Correctional Center for Youth, Medical and Mental Health19
Services Renovation/Replacement, Planning and Construction (Supplemental)20
(East Baton Rouge); and Act 23 of 2002 for Department of Public Safety and21
Corrections Office of Youth Development, Jetson Correctional Center for Youth,22
Juvenile Justice Renovations, Planning and Construction (Supplemental) (East23
Baton Rouge); and Act 23 of 2002 for Education Louisiana State University24
Baton Rouge, Wetland Resources and Environmental Sciences Facilities,25
Planning and Construction (East Baton Rouge); and Act 23 of 2002 for Jean26
Lafitte, Concrete Repairs at Town Hall and Civic Center (Jefferson); and Act 2327
of 2002 for Rayne, Rayne RV Park Improvements, Planning and Construction28
(Acadia); and Act 23 of 2002 for Avoyelles Parish School Board, Louisiana High29
School for the Agricultural Sciences, Land Acquisition, Planning and30
Construction (Avoyelles); and Act 24 of 2003 for Education Nunez Community31
College, Site Development, Planning and Construction (St. Bernard); and Act 232
of 2004 for Department of Culture, Recreation and Tourism Office of State33
Parks, Longfellow Evangeline State Historic Site, Visitor Center/Farmstead,34
Planning and Construction (St. Martin); and Act 2 of 2004 for Education35
Louisiana State University Baton Rouge, Wetland Resources and Environmental36
Sciences Facilities, Planning and Construction (East Baton Rouge); and Act 2 of37
2004 for Education LA Health Sciences Center - Health Care Services Division,38
Master Planning for Charity Hospital (Orleans); and Act 2 of 2004 for Education39
Southern University Shreveport, Student Activity Center and Outdoor Facility40
Renovations and Addition, Planning and Construction (Caddo); and Act 2 of41
2004 for Education Nunez Community College, Site Development, Planning and42
Construction (St. Bernard); and Act 2 of 2004 for Education Louisiana Delta43
Community College, Campus Development, Planning and Construction44
(Ouachita); and Act 2 of 2004 for Concordia Parish, Concordia Parish Airport45
Overlay (Local Match Required) (Concordia); and Act 2 of 2004 for Iberia46
Parish, Acadiana Fairgrounds Conference Center, Fairgrounds, Sugarena RV47
Park, and Rally Park, Acquisitions, Infrastructure, Planning and Construction48
(Non-State Match Required) (Iberia); and Act 2 of 2004 for St. Mary Parish, St.49
Mary Community Action Agency Office Additions and Modifications, Planning50
and Construction ($200,000 Local Match) (St. Mary); and Act 2 of 2004 for51
Tensas Parish, Tensas Youth Agricultural Arena, Planning and Construction52
(Tensas); and Act 2 of 2004 for Alexandria, Implementation of Urban Master53
Plan, Acquisition, Parking and Streetscape ($2,000,000 Local Match) (Rapides);54
and Act 2 of 2004 for Natchitoches, Convention Center Complex, Land55
Acquisition, Planning and Construction ($3,155,000 Local Match)56
(Natchitoches); and Act 2 of 2004 for Crowley, Parkerson Avenue57
Redevelopment (LA Hwy. 13), Implementation of the Historic Parkerson Avenue58 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 11 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Master Plan Improvements to Sidewalks, Lighting, Streetscape and Property1
Acquisition (Acadia); and Act 2 of 2004 for Pineville, Susek Drive2
Reconstruction ($645,000 Local Match and $4,885,000 Federal Match)3
(Rapides); and Act 2 of 2004 for New Orleans City Park, Botanical Garden4
Conservatory Expansion, Planning and Construction ($750,000 Local Match)5
(Orleans); and Act 2 of 2004 for Le Petit Theatre Du Vieux Carre, Le Petit6
Theatre Du Vieux Carre, Capital Improvements, Planning and Construction7
(Supplemental Funding) ($250,000 Local Match) (Orleans); and Act 2 of 20048
for YWCA of Northeast Louisiana, YWCA of Northeast Louisiana Transitional9
Housing Project, Planning and Construction ($200,000 Local Match) (Ouachita);10
and Act 27 of 2006 for Executive Department Division of Administration, Old11
Governor's Mansion Exterior Waterproofing and Plaster Repairs, Planning and12
Construction (East Baton Rouge); and Act 27 of 2006 for Department of Culture,13
Recreation & Tourism Office of State Parks, State Parks Lead Paint Abatement14
and Repainting Historic Buildings, Planning and Construction (Statewide); and15
Act 27 of 2006 for Department of Culture, Recreation & Tourism Office of State16
Parks, Fontainebleau State Park, Land Acquisition, Planning and Construction17
(St. Tammany); and Act 27 of 2006 for Department of Education LSU Health18
Sciences Center Shreveport, Allied Health Facility, Planning, Construction and19
Equipment (Caddo); and Act 27 of 2006 for Department of Education Grambling20
State University, Health and Physical Education and Recreation Assembly21
Center, Planning, Construction, and Equipment (Lincoln); and Act 27 of 200622
for Plaquemines Parish, Plaquemines Drainage Pumping Station, Belle Chasse23
No. 1 Improvements, Planning and Construction (Plaquemines); and Act 27 of24
2006 for Rapides Parish, Dean Lee Research Station, Planning and Construction25
(Rapides); and Act 27 of 2006 for Jeanerette, Jeanerette Law Enforcement26
Center, Planning and Construction (Iberia); and Act 27 of 2006 for Urban27
Restoration Enhancement, Restoration Village, Planning and Construction of28
Community Center/Emergency Shelter, Improvements at Urban Meadows29
Apartments and Urban Villa Apartments (Housing Project) and Planning and30
Construction at Old Cohn Elementary Site (Supplemental Funding) (East Baton31
Rouge, West Baton Rouge); and Act 20 of 2009 for Elected Officials Secretary32
of State, Louisiana State Cotton Museum, Planning and Construction (East33
Carroll); and Act 20 of 2009 for Department of Culture, Recreation and Tourism34
Office of State Parks, Louisiana State Arboretum, Planning and Construction35
(Evangeline); and Act 20 of 2009 for Department of Public Safety and36
Corrections Public Safety - Office of Management & Finance, DPS Statewide37
Roofing Project, Planning and Construction (Statewide); and Act 21 of 2010 for38
Department of Culture, Recreation & Tourism Office of State Parks, Grand Isle39
State Park Erosion Controls, Planning and Construction (Jefferson); and Act 2140
of 2010 for Department of Health & Hospitals Southwest Developmental Center,41
HVAC Upgrade for Client Habilitation Services (2 Buildings) and42
Administrative Building (Acadia); and Act 21 of 2010 for Department of43
Education LSU Baton Rouge, Corporation Canal: Partial Enclosure44
(Supplemental Funding) (East Baton Rouge); and Act 21 of 2010 for Department45
of Education LSU Eunice, Cooling Tower Replacement (Acadia); and Act 21 of46
2010 for Department of Education Nicholls State University, Beauregard Hall47
Renovation, Planning and Construction (Lafourche); and Act 21 of 2010 for48
Department of Education Louisiana Tech University, Technology Transfer49
Center Foundation Repair, Planning and Construction (Caddo); and Act 21 of50
2010 for Haynesville, Wastewater Treatment Plant Improvements, Planning and51
Construction (Claiborne); and Act 21 of 2010 for Mandeville, Galvez Street, US52
190 Outfall, Drainage Improvements, Planning and Construction ($554,880 Non-53
State Match) (St. Tammany); and Act 21 of 2010 for Monroe, Civic Center Roof54
Restoration ($270,000 Local Match) (Ouachita); and Act 21 of 2010 for55
Northwest Louisiana Juvenile Detention Center, Ware Youth Center, Planning56 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 12 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
and Construction (Red River); and Act 22 of 2011 for Department of Health and1
Hospitals Southeast Louisiana Hospital, Replace Potable Water Distribution2
Lines (St. Tammany); and Act 22 of 2011 for Department of Health and3
Hospitals Southwest Developmental Center, Fire Alarm System Replacement,4
Planning and Construction (Acadia); and Act 22 of 2011 for Department of5
Education LSU Baton Rouge, Veterinary Medicine Roof Replacement and6
Facility Repairs (East Baton Rouge); and Act 22 of 2011 for Department of7
Education University of Louisiana - Lafayette, Burke Hawthorne Hall8
Renovation and Expansion, Planning and Construction (Lafayette); and Act 229
of 2011 for Allen Parish, Pawnee Road Improvement, Planning and Construction10
(Allen); and Act 22 of 2011 for Beauregard Parish, Longville Pentecostal Church11
Road Improvements (Beauregard); and Act 22 of 2011 for Bossier Parish, Moore12
Road Reconstruction, Planning and Construction (Bossier); and Act 22 of 201113
for Catahoula Parish, Vick Road Reconstruction, Planning and Construction14
(Catahoula); and Act 22 of 2011 for Concordia Parish, Old Courthouse Air15
Conditioner Replacement (Concordia); and Act 22 of 2011 for Morehouse16
Parish, Activity Center, Planning and Construction (Morehouse); and Act 22 of17
2011 for St. Helena Parish, Fire Station, Planning and Construction (St. Helena);18
and Act 22 of 2011 for Breaux Bridge, Breaux Bridge City Hall Improvements,19
Planning and Construction (St. Martin); and Act 22 of 2011 for Carencro, Sewer20
Manhole Repairs (Lafayette); and Act 22 of 2011 for Choudrant, Choudrant Fire21
Station 2 (Lincoln); and Act 22 of 2011 for Cullen, Water and Wastewater22
System Improvements, Planning and Construction ($200,000 Local Match)23
(Webster); and Act 22 of 2011 for Farmerville, Sewer System Improvements24
Dozier Creek Subdivision, Planning and Construction (Local Match $100,000)25
(Union); and Act 22 of 2011 for Gibsland, Distribution Improvements, Planning26
and Construction (Bienville); and Act 22 of 2011 for Iota, Water Treatment Plant27
Expansion, Planning and Construction (Acadia); and Act 22 of 2011 for Kaplan,28
Kaplan Water Treatment Plant, Lime Sludge Thickener, Planning, Acquisitions,29
Construction (Vermilion); and Act 22 of 2011 for Kaplan, Water Treatment Plant30
Generator, Planning and Construction (Vermilion); and Act 22 of 2011 for31
Mansura, Senior Citizen Center, Planning and Construction (Avoyelles); and Act32
22 of 2011 for Natchitoches, Industrial Park South, Sewer Improvements, Access33
Road, and Land Acquisition, Planning and Construction ($1,100,000 Local34
Match) (Natchitoches); and Act 22 of 2011 for Plain Dealing, Water System35
Improvements (Bossier); and Act 22 of 2011 for Sarepta, Wastewater Collection36
System Improvements, Acquisitions, Planning and Construction (Non-State37
Match Required) (Webster); and Act 22 of 2011 for Sikes, Water System38
Improvements (Winn); and Act 22 of 2011 for Tangipahoa African-American39
Heritage Museum and Black Veteran's Archives, Tangipahoa African-American40
Heritage Museum and Black Veterans Archives (Tangipahoa); and Act 22 of41
2011 for Treme Community Education Program, Leverette Senior House,42
Planning and Construction (Orleans); and Act 22 of 2011 for Treme Community43
Education Program, Program Operations, Planning, Acquisitions, Renovations44
and/or Construction (Orleans); and Act 22 of 2011 for Pleasant Hill-Crossroads45
Water System, Inc., Pleasant Hill Crossroads Water System, New Well46
Construction, Planning and Construction (Winn)$ 9,587,25247
Payable from the balance of State General Fund (Direct) previously allocated48
under the authority of Act 28 of 1997 for East Jefferson Levee District, Jefferson49
Lakefront Linear Park Improvements, Planning and Construction (Jefferson); and50
Act 28 of 1997 for New Orleans, Behrman Park Improvements, Planning and51
Construction (Orleans); and Act 28 of 1997 for New Orleans Business and52
Industrial District, Enterprise Park, Land Acquisition, Access Roads And53
Infrastructure Improvements, Renovations, Planning And Construction54
(Orleans); and Act 29 of 1998 for Morehouse Parish, Sheriff and Jail Complex,55
Planning, Renovation and Construction ($2,550,000 Local Match) (Morehouse);56 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 13 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
and Act 20 of 1999 for Tensas Parish, Development of the Old Tensas1
Rosenwald High School Site, Restoration of Gym into Civic-Recreation and2
Heritage Culture Center, Outdoor Recreation, and Renovation of Classroom3
Buildings to House Various Social and Community Service Agencies and4
Activities, Planning and Construction (Tensas); and Act 20 of 1999 for Norwood,5
Water Well Improvements, Planning and Construction (East Feliciana); and Act6
21 of 2000 for Department of Education LSU Alexandria, Central Utilities7
System Repair and Upgrade, Planning and Construction (Rapides); and Act 228
of 2001 for Jeanerette, Upgrade City Water System, Planning and Construction9
(Iberia); and Act 24 of 2003 for Morehouse Parish, Equine Center, Planning and10
Construction ($50,000 Local Match) (Morehouse); and Act 24 of 2003 for Pointe11
Coupee Parish, Continuation of the development of Multi-Use Facility, Planning12
and Construction ($110,000 Local Match) (Pointe Coupee); and Act 26 of 200513
for Iberia Parish, Weeks Park Open Air Pavillion, Planning and Construction14
(Iberia); and Act 26 of 2005 for Pearl River, Sewer Treatment Plant Upgrade,15
Planning and Construction (St. Tammany); and Act 27 of 2006 for Richland16
Parish, Kline Road Overlay, Widening and Other Improvements, Planning and17
Construction (Richland); and Act 27 of 2006 for Coordinating and Development18
Corporation, Sabine Parish Cooperative Extension and Workforce Investment19
Agency Office, Planning and Construction ($155,000 Local Match) (Sabine); and20
Act 27 of 2006 for Abita Springs, Abita Springs Trailhead, Planning and21
Construction (St. Tammany); and Act 28 of 2007 for Natchitoches Parish,22
Equipment Purchase (Pothole Patcher) for Road Improvements (Natchitoches);23
and Act 28 of 2007 for Natchitoches Parish, Overlaying of Industrial Avenue24
(Natchitoches); and Act 28 of 2007 for Ball, Townside Wastewater Pump Station25
Rehabilitation (Rapides); and Act 28 of 2007 for Bastrop, Central Fire Station26
Roofing and Repairs, Planning and Construction (Morehouse); and Act 28 of27
2007 for Franklin, Public Safety and Security Improvements and Acquisitions,28
Planning and Construction (St. Mary); and Act 511 of 2008 for Winn Parish,29
Jeld-Wen Road Planning, Improvements, and Construction (Winn); and Act 51130
of 2008 for St. Francisville, St. Francisville Drainage and Canal Improvements,31
Planning and Construction (West Feliciana); and Act 511 of 2008 for Winnfield,32
Winn Correctional Center Water Line Replacement, Planning and Construction33
(Winn); and Act 511 of 2008 for Bel Di Gil Water System, Inc., Bel Di Gil34
Water System Improvements (Caddo)	$ 793,41235
Payable from the balance of State General Fund Non-Recurring Revenues36
previously allocated under the authority of Act 20 of 1999 for St. Tammany37
Parish Industrial District, Land, Building Acquisition, and Infrastructure38
Improvement for an Industrial Prospect ($1,000,000 Federal and $500,000 Local39
Match) (St. Tammany); and Act 23 of 2002 for Executive Department Division40
of Administration, State Office Buildings Major Repairs - Baton Rouge State41
Office Building Renovations, Planning and Construction (East Baton Rouge);42
and Act 23 of 2002 for Education McNeese State University, Women's Sports43
Complex, including a Softball Facility, Planning and Construction (Supplemental44
Funding) (Calcasieu); and Act 23 of 2002 for Education Nunez Community45
College, Site Development, Planning and Construction (St. Bernard); and Act 2346
of 2002 for Morehouse Parish, Equine Center, Planning and Construction47
($50,000 Local Match) (Morehouse); and Act 23 of 2002 for Morgan City,48
Brashear Avenue and Highway 70 Drainage Improvements, Planning and49
Construction (St. Mary); and Act 23 of 2002 for New Orleans, Behrman Park50
Improvements, Planning and Construction (Orleans); and Act 23 of 2002 for51
Winnsboro, Museum Renovations, Planning and Construction (Local Match52
Required) (Franklin); and Act 23 of 2002 for Louisiana Leadership Institute,53
Multi-Purpose Enrichment and Sports Center, Acquisition, Planning and54
Construction (East Baton Rouge); and Act 2 of 2004 for Breaux Bridge, Water55
Line Extension, Planning and Construction (St. Martin); and Act 2 of 2004 for56 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 14 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Crowley, Historic Building Acquisition, Renovations and Construction for an1
Interpretive Rice Center, Music Recording Studio Museum and Administrative2
Offices ($312,500 Local Match) (Supplemental Funding) (Acadia); and Act 203
of 2009 for Iberia Parish, LeMaire Memorial Airport, T-Hangar Planning and4
Construction (Iberia); and Act 20 of 2009 for Patterson, Catherine Street Paving5
and Drainage, Engineering and Construction (St. Mary); and Act 20 of 2009 for6
St. Gabriel, Turn Lanes on Highway 30 (Iberville); and Act 21 of 2010 for Treme7
Community Education Program, Program Operations, Planning, Acquisitions,8
Renovations and/or Construction (Orleans) $ 916,8679
Payable from the balance of Interest Earnings previously allocated under the10
authority of the Joint Legislative Committee on the Budget in1999 for11
Department of Education Nunez Community College, New Classroom Building12
and Expansion of Building A (St. Bernard); and the Joint Legislative Committee13
on the Budget in 2000 for Executive Department Division of Administration,14
Insurance Building Replacement (East Baton Rouge); and the Joint Legislative15
Committee on the Budget in 2002 for Department of Education River Parishes16
Technical College, Purchase of Property (St. John the Baptist); and the Joint17
Legislative Committee on the Budget in 2003 for Department of Education18
Nunez Community College, Site Development, Planning and Construction (St.19
Bernard); and the Joint Legislative Committee on the Budget in 2007 for20
Department of Education Southern University Shreveport, Renovation and21
Addition to Student Activity Center and Outdoor Facility (Caddo); and the Joint22
Legislative Committee on the Budget in 2008 for Department of Education23
Grambling State University, Dunbar Hall Replacement (Lincoln); and Act 51124
of 2008 for Pinecrest Developmental Center, Hospital Air Conditioning System25
Repairs (Rapides)	$ 134,34826
Total	$140,081,87927
(1358)Hazardous Material Abatement Projects 28
(Statewide)29
Payable from General Obligation Bonds30
Priority 5	$ 2,000,00031
(1359)Mold Remediation and Indoor Air Quality, Planning 32
and Construction 33
(Statewide)34
Payable from General Obligation Bonds35
Priority 1	$ 2,000,00036
Priority 5	$ 1,000,00037
Total	$ 3,000,00038
(1363)Technical Colleges Campus Buildings Major Repairs, 39
Equipment Replacement and Site Work, Planning 40
and Construction41
(Statewide)42
Payable from General Obligation Bonds43
Priority 5	$ 50,00044
01/109OFFICE COASTAL PROTECTION AND RESTORATION45
(261) Westbank Hurricane Protection Project, Planning, Construction, 46
Right of Way and Utilities ($199,000,000 Federal Match and 47
$52,800,000 Local Match)48
(Jefferson, Orleans, Plaquemines)49
Payable from General Obligation Bonds50
Priority 1	$ 5,095,00051 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 15 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(262) Morganza to Gulf of Mexico Flood Control Feasibility Study, 1
Planning, Design, Right of Way and Construction of Levees, 2
Floodgates and Other Flood Control Systems ($100,000,000 3
Local Match; $25,000,000 Local In-Kind Match; $442,000,000 4
Federal Match)5
(Ascension, Assumption, Iberia, Iberville, Lafourche, Pointe6
 Coupee, St. Martin, St. Mary, Terrebonne, West Baton Rouge)7
Payable from General Obligation Bonds8
Priority 1	$16,240,0009
Priority 5	$25,000,00010
Total	$41,240,00011
(1364)Donaldsonville to the Gulf of Mexico Flood Study 12
($1,100,000 Local Match; $3,500,000 Federal Match)13
(Ascension, Assumption, Jefferson, Lafourche, St. Charles, 14
St. James, St. John the Baptist)15
Payable from General Obligation Bonds16
Priority 1	$ 100,00017
01/111HOMELAND SECURITY AND EMERGENCY PREPAREDNESS18
(1365)GOHSEP Building Expansion, Planning and Construction19
(East Baton Rouge)20
Payable from General Obligation Bonds21
Priority 1	$ 4,000,00022
Priority 5	$ 1,720,00023
Total	$ 5,720,00024
01/112DEPARTMENT OF MILITARY AFFAIRS25
(300) Multi-Purpose Machine Gun Range at Camp Beauregard,26
Planning and Construction27
(Rapides)28
Payable from Federal Funds	$ 500,00029
(302) Camp Minden, Infrastructure, Rehabilitation, Phase 2, 30
Planning and Construction31
(Webster)32
Payable from General Obligation Bonds33
Priority 1	$ 2,865,00034
Priority 5	$ 4,485,00035
Payable from Federal Funds	$ 689,00036
Total	$ 8,039,00037
(303) Statewide Backlog of Maintenance and Repair (BMAR), 38
Phase 3, and Statewide Infrastructure Rehabilitation, Phase 339
(Statewide)40
Payable from General Obligation Bonds41
Priority 1	$ 1,500,00042
Priority 5	$ 1,400,00043
Payable from Federal Funds	$ 6,700,00044
Total	$ 9,600,00045
(1366)State Emergency Warehouse at Camp Villere, Planning 46
and Construction47
(St. Tammany)48
Payable from General Obligation Bonds49
Priority 1	$ 3,400,00050 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 16 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
01/124LOUISIANA STADIUM AND EXPOSITION DISTRICT1
(1329)Bayou Segnette Sports Complex Improvements, 2
Including Hall B Expansion, Planning and Construction 3
(Jefferson)4
Payable from General Obligation Bonds5
Priority 1	$11,195,0006
Priority 5	$ 1,500,0007
Total	$12,695,0008
(1342)Bayou Segnette Festival Park, Land Acquisition, 9
Planning and Construction10
(Jefferson)11
Payable from General Obligation Bonds12
Priority 1	$13,000,00013
Priority 2	$ 4,500,00014
Priority 5	$ 4,100,00015
Payable from the balance of State General Fund 16
Non-Recurring Revenues previously allocated 17
under the authority of Act 20 of 2009 for 18
Jefferson Parish, Bayou Segnette Festival Park, 19
Land Acquisition, Planning and Construction 20
(Jefferson)	$ 976,40021
Total	$22,576,40022
(1367)Zephyrs Baseball Facilities Repair, Renovation and Improvement 23
(Jefferson)24
Payable from General Obligation Bonds25
Priority 1	$ 1,970,00026
Priority 5	$ 1,000,00027
Total	$ 2,970,00028
(1368)Professional Sports Facilities, Planning and Construction29
and Lease Hold Improvements30
(Jefferson, Orleans)31
Payable from General Obligation Bonds32
Priority 1	$27,500,00033
Provided that $8,500,000 in expenditures from this appropriation shall be consistent with the34
deliverables as enumerated in the Arena Use Agreement and Project Development35
Agreement.36
(1369)New Orleans Sports Arena Improvements, Planning and 37
Construction38
(Orleans)39
Payable from General Obligation Bonds40
Priority 1	$41,500,00041
Expenditures from this appropriation shall be consistent with the deliverables as enumerated42
in the Arena Use Agreement and Project Development Agreement.43 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 17 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
DEPARTMENT OF VETERANS AFFAIRS1
03/130VETERANS AFFAIRS2
(718) Northeast Louisiana State Cemetery, 3
Planning and Construction4
(Ouachita)5
Payable from General Obligation Bonds6
Priority 2	$ 800,0007
Payable from Federal Funds	$ 5,821,3388
Total	$ 6,621,3389
(1004)Fire Alarm/Call System, Planning and Construction10
(East Feliciana)11
Payable from General Obligation Bonds12
Priority 1	$ 180,00013
(1370)Southeast Louisiana State Cemetery, 14
Planning and Construction15
(St. Tammany)16
Payable from General Obligation Bonds17
Priority 1	$ 800,00018
03/134SOUTHWEST LOUISIANA WAR VETERANS HOME19
(1100)Chapel Expansion, Planning and Construction20
(Jefferson Davis)21
Payable from Fees and Self-Generated Revenues $ 97,76722
Payable from Federal Funds	$ 228,12423
Total	$ 325,89124
ELECTED OFFICIALS25
04/139SECRETARY OF STATE26
(1089)Old State Capitol Environmental Control Systems, 27
Planning and Construction28
(East Baton Rouge)29
Payable from General Obligation Bonds30
Priority 1	$ 845,00031
Priority 5	$ 500,00032
Total	$ 1,345,00033
(1090)Louisiana State Exhibit Museum, Planning and Construction34
(Caddo)35
Payable from General Obligation Bonds36
Priority 1	$ 200,00037
Priority 5	$ 2,250,00038
Total	$ 2,450,00039
(1371)Eddie Robinson Museum, Main Exhibit, Planning 40
and Construction41
(Lincoln)42
Payable from General Obligation Bonds43
Priority 1	$ 300,00044 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 18 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1374)State Archives HVAC Upgrades, Planning and Construction1
(East Baton Rouge)2
Payable from General Obligation Bonds3
Priority 1	$ 775,0004
(1375)Chennault Aviation and Military Museum Hangar Building 5
and Equipment, Planning and Construction6
(Ouachita)7
Payable from General Obligation Bonds8
Priority 1	$ 260,0009
04/160AGRICULTURE AND FORESTRY10
(1376)Louisiana Animal Disease Diagnostic Laboratory, 11
Planning and Construction12
(East Baton Rouge)13
Payable from General Obligation Bonds14
Priority 1	$28,490,00015
DEPARTMENT OF ECONOMIC DEVELOPMENT16
05/252OFFICE OF BUSINESS DEVELOPMENT17
(1006)Economic Development Award Program For 18
Infrastructure Assistance (Supplemental Funding)19
(Statewide)20
Payable from General Obligation Bonds21
Priority 1	$27,200,00022
Priority 2	$ 5,000,00023
Priority 5	$ 5,000,00024
Total	$37,200,00025
(1323)Mega-Project Site Preparation, Planning and Construction26
(Statewide)27
Payable from General Obligation Bonds28
Priority 1	$40,000,00029
Priority 5	$10,000,00030
Total	$50,000,00031
(1377)Homeland Security and Environmental Technical Center, 32
Acquisition and Renovation, Planning and Construction 33
(East Baton Rouge)34
Payable from General Obligation Bonds35
Priority 1	$ 600,00036
(1378)Louisiana Gene Therapy Research Consortium, Inc., 37
SPECT/CT and microPET System for LSUHSC-Shreveport38
(Caddo)39
Payable from General Obligation Bonds40
Priority 1	$ 500,00041
(1379)Wet-Lab Business Incubators, Planning and Construction42
(Caddo, East Baton Rouge, Orleans)43
Payable from General Obligation Bonds44
Priority 1	$ 7,740,00045
Priority 5	$ 6,000,00046
Total	$13,740,00047
48 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 19 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1380)Louisiana Gene Therapy Research Consortium, Inc., 1
Renovation, Equipment, Planning and Construction2
(Caddo, Orleans, St. Tammany)3
Payable from General Obligation Bonds4
Priority 1	$ 2,275,0005
(1381)Dock Improvements, Office Space, and Housing 6
Project, Planning and Construction ($29,850,000 In-Kind 7
Local Match)8
(Calcasieu, East Baton Rouge, Iberia, Jefferson, Lafourche, 9
Orleans, St. Charles, St. James, St. John the Baptist, St. Mary, 10
Terrebonne, West Baton Rouge)11
Payable from General Obligation Bonds12
Priority 1	$17,850,00013
(1382)Hwy. 19 Turn Lanes, Planning and Construction14
(East Baton Rouge)15
Payable from General Obligation Bonds16
Priority 1	$ 200,00017
(1383)Aerospace Manufacturing Infrastructure 18
(Orleans)19
Payable from General Obligation Bonds20
Priority 1	$15,015,00021
(1384)Louisiana Gene Therapy Research Consortium, Inc., 22
Multi-Photon Microscope for LSUHSC-New Orleans23
(Orleans)24
Payable from General Obligation Bonds25
Priority 1	$ 700,00026
(1385)Equipment for Louisiana Immersive Technologies 27
Enterprise (LITE)28
(Lafayette)29
Payable from General Obligation Bonds30
Priority 1	$ 500,00031
(1386)Louisiana Cancer Research Center in New Orleans, 32
Planning, Construction, and Equipment33
(Orleans)34
Payable from General Obligation Bonds35
Priority 1	$ 7,900,00036
Priority 5	$ 9,000,00037
Total	$16,900,00038
(1387)Cold Storage Processing Facility39
(Orleans)40
Payable from General Obligation Bonds41
Priority 1	$ 150,00042
(1388)Louisiana Digital Computer Facility, Planning 43
and Construction 44
(East Baton Rouge)45
Payable from General Obligation Bonds46
Priority 1	$ 6,820,00047 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 20 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1389)Bulk Grain Elevator, Rail Spur and Other Related 1
Infrastructure, Planning and Construction2
(Calcasieu)3
Payable from General Obligation Bonds4
Priority 1	$ 5,000,0005
DEPARTMENT OF CULTURE, RECREATION AND TOURISM6
06/263OFFICE OF STATE MUSEUM7
(488) Old U. S. Mint Museum Exhibit8
(Orleans)9
Payable from General Obligation Bonds10
Priority 1	$ 600,00011
Priority 5	$ 3,400,00012
Total	$ 4,000,00013
(515) Construction of Civil Rights Museum, Planning 14
and Construction15
(Orleans)16
Payable from General Obligation Bonds17
Priority 1	$ 500,00018
Priority 2	$ 250,00019
Priority 5	$ 400,00020
Total	$ 1,150,00021
(1317)Presbytere Exterior Restoration and Repair,22
Planning and Construction23
(Orleans)24
Payable from General Obligation Bonds25
Priority 2	$ 1,200,00026
(1318)Cabildo Exterior Restoration and Repair,27
Planning and Construction28
(Orleans)29
Payable from General Obligation Bonds30
Priority 2	$ 1,395,00031
(1390)E.D. White Historic Site and Site Improvements32
(Lafourche)33
Payable from General Obligation Bonds34
Priority 1	$ 75,00035
(2027)Louisiana Sports Hall of Fame and Natchitoches 36
State Museum of North Louisiana, Planning and Construction37
(Natchitoches)38
Payable from General Obligation Bonds39
Priority 1	$ 8,500,00040
06/264OFFICE OF STATE PARKS41
(361) Bayou Segnette State Park, Land Acquisition, 42
Additional Cabins, Planning and Construction43
(Jefferson)44
Payable from General Obligation Bonds45
Priority 1	$ 8,635,00046
Priority 5	$ 4,200,00047
Total	$12,835,00048 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 21 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(379) Chemin-a-Haut State Park Acquisition, Planning and 1
Construction of New Group Camp, Vacation Cabins, 2
Visitor Center and Restrooms3
(Morehouse)4
Payable from General Obligation Bonds5
Priority 1	$ 270,0006
(380) Fort DeRussy State Historic Site, Planning, Development 7
and Acquisitions8
(Avoyelles)9
Payable from General Obligation Bonds10
Priority 1	$ 330,00011
12
(383) Tunica Hills State Preservation Area, Acquisition, 13
Planning and Construction14
(West Feliciana)15
Payable from General Obligation Bonds16
Priority 1	$ 95,00017
Priority 5	$10,595,00018
Total	$10,690,00019
(384) South Toledo Bend State Park Emergency Erosion 20
Controls, Planning and Construction21
(Sabine)22
Payable from General Obligation Bonds23
Priority 1	$ 1,380,00024
(385) Preventive Maintenance/Major Repairs and 25
Improvements - Act 729 26
(Statewide)27
Payable from General Obligation Bonds28
Priority 2	$ 6,300,00029
(1392)Bogue Chitto State Park, Land Acquisition, Planning 30
and Construction31
(Washington)32
Payable from General Obligation Bonds33
Priority 1	$ 1,485,00034
(1393)Poverty Point Reservoir State Park Group Camp, 35
Conference Center, Site Amenities, Acquisition, 36
Planning and Construction37
(Richland)38
Payable from General Obligation Bonds39
Priority 1	$ 500,00040
Priority 5	$ 5,800,00041
Total	$ 6,300,00042
(1394)St. Bernard State Park, Planning and Construction - 43
Supplemental44
(St. Bernard)45
Payable from General Obligation Bonds46
Priority 1	$ 20,00047 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 22 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
06/267OFFICE OF TOURISM1
(1398)I-10 Vinton Welcome Center2
(Calcasieu)3
Payable from General Obligation Bonds4
Priority 1	$ 235,0005
Priority 5	$ 2,565,0006
Total	$ 2,800,0007
06/A20NEW ORLEANS CITY PARK8
(310) City Park Maintenance Complex Improvements,9
Planning and Construction10
(Orleans)11
Payable from General Obligation Bonds12
Priority 1	$ 100,00013
Priority 5	$ 2,550,00014
Total	$ 2,650,00015
(1399)Splash Park, Planning and Construction16
(Orleans)17
Payable from General Obligation Bonds18
Priority 1	$ 500,00019
Priority 5	$ 4,500,00020
Total	$ 5,000,00021
(1400)City Park Golf Complex Improvements, Planning 22
and Construction23
(Orleans)24
Payable from General Obligation Bonds25
Priority 1	$ 6,600,00026
Priority 5	$ 3,300,00027
Total	$ 9,900,00028
(1401)Improvements to Amusement Area 29
at New Orleans City Park 30
(Orleans)31
Payable from General Obligation Bonds32
Priority 1	$ 2,000,00033
(1403)New Tennis Center Improvements,34
Planning and Construction35
(Orleans)36
Payable from General Obligation Bonds37
Priority 1	$ 50,00038
DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT39
07/270ADMINISTRATION40
(248) Essen Lane Widening, I-10 to Perkins Road, Planning,41
Utilities, Right of Way and Construction42
(East Baton Rouge)43
Payable from General Obligation Bonds44
Priority 1	$12,000,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 23 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(882) State Streets, Algiers, Planning and Construction1
(Orleans)2
Payable from General Obligation Bonds3
Priority 1	$ 1,400,0004
Priority 5	$ 1,000,0005
Total	$ 2,400,0006
(883) LA 64 Widening from LA 16 to Magnolia Bridge,7
Planning and Construction8
(Livingston)9
Payable from General Obligation Bonds10
Priority 1	$ 400,00011
(884) Jimmie Davis Bridge Rehabilitation,12
Planning and Construction13
(Bossier, Caddo)14
Payable from General Obligation Bonds15
Priority 1	$ 1,300,00016
Priority 5	$ 9,200,00017
Total	$10,500,00018
(885) Tarbutton Road I-20 Interchange, Engineering,19
Right of Way, Utilities and Construction20
(Lincoln)21
Payable from General Obligation Bonds22
Priority 2	$ 600,00023
(886) Port of Lake Charles Access Road, Planning and Construction 24
($3,500,000 Local Match, $17,500,000 Federal Match)25
(Calcasieu)26
Payable from General Obligation Bonds27
Priority 1	$ 1,000,00028
Priority 5	$ 8,500,00029
Total	$ 9,500,00030
(887) LA 42 (US 61 to LA 44) Widening31
(Ascension)32
Payable from General Obligation Bonds33
Priority 1	$12,700,00034
Priority 2	$10,000,00035
Priority 5	$27,000,00036
Total	$49,700,00037
(893) LA 112 (E. Davis Road to Union Hill)38
Rehabilitation, Planning and Construction 39
(Rapides)40
Payable from General Obligation Bonds41
Priority 2	$ 50,00042
(895) LA 1 Improvements, Phase 2, Planning, Engineering,43
Right of Way, Utilities and Construction44
(Lafourche)45
Payable from General Obligation Bonds46
Priority 5	$40,000,00047 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 24 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(902) El Camino Corridor Commission, El Camino East 1
West Corridor, Planning and Construction2
(Catahoula, Concordia, La Salle, Natchitoches, Sabine, 3
Winn)4
Payable from General Obligation Bonds5
Priority 1	$ 1,500,0006
(904) Secretary's Emergency Fund for Bridge Damages, 7
Other Reimbursements, Local Matching Dollars, 8
Federal Funds, and Opportunity Grants Subject to the 9
Provisions of R.S. 48:23210
(Statewide)11
Payable from General Obligation Bonds12
Priority 1	$ 2,500,00013
Payable from Interagency Transfers	$12,500,00014
Payable from Fees and Self Generated Revenues $15,000,00015
Payable from Transportation Trust Fund - Federal $25,000,00016
Payable from Federal Funds	$ 5,000,00017
Total	$60,000,00018
(905) Highway Program 19
(Up to $4,000,000 for Secretary’s Emergency Fund) 20
(Statewide)21
Payable from General Obligation Bonds22
Priority 2	$ 2,260,00023
Payable from Transportation Trust Fund - Federal $686,133,00024
Payable from Transportation Trust Fund - Regular $72,600,00025
Payable from the balance of General Obligation Bond proceeds previously26
allocated under the authority of Act 22 of 2001 for Department of Transportation27
and Development Public Improvements, Reservoir Embankment/Structures28
Rehabilitation, Planning, Right of Way, Utilities and Construction (Statewide);29
and Act 22 of 2001 for Natchitoches Parish Port, Relocation of LA Highway 48630
at the Natchitoches Parish Port Near Its Intersection with LA Highway 6 (0.831
Miles) ($225,000 Local Match) (Natchitoches); and Act 22 of 2001 for Monroe,32
North 18th Street Extension, Construction (Ouachita); and Act 22 of 2001 for33
Natchitoches Parish, La 480 Four-Laning in the Vicinity of Willamette Industries34
and Dobson Chip Plants (Natchitoches); and Act 22 of 2001 for Pollock, Access35
Road for U.S. Federal Correctional Complex, Land Acquisition, Planning and36
Construction (Grant); and Act 23 of 2002 for Department of Transportation and37
Development Public Improvements, Vermilion River Flood Study and38
Construction (Lafayette, St. Martin); and Act 23 of 2002 for Pollock, Access39
Road for U.S. Federal Correction Complex, Land Acquisition, Planning and40
Construction (Grant)	$ 740,88741
Payable from the balance of State General Fund Non-Recurring Revenues42
previously allocated under the authority of Act 20 of 2009 for Department of43
Transportation and Development Administration, Common Street (Airport44
Service Road - Petro Point Drive), Construction, Right of Way, and Utilities45
(Calcasieu); and Act 20 of 2009 for Department of Transportation and46
Development Administration, Homer Bypass, LA 2, Construction (Claiborne);47
and Act 20 of 2009 for Department of Transportation and Development48
Administration, Turn Lanes on LA 3125 at LA 3274 (St. James); and Act 20 of49
2009 for Department of Transportation of Development Administration, US 37150
Improvements (Passing Lanes), Planning and Construction51
(Webster)	$ 3,747,23152
Total	$765,481,11853 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 25 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Provided, however, that the Department of Transportation and Development is authorized1
to implement or commence projects approved in this program for Fiscal Year 2013-20142
identified for phased funding pursuant to the cash management plan established pursuant to3
R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing4
unspent cash balances appropriated in prior years’ programs, which funds when combined5
with current appropriations will provide sufficient appropriated funds to award contracts.6
Provided, however, that the Department of Transportation and Development shall use the7
re-allocated General Obligation Bond proceeds and Priority 2 General Obligation Bonds to8
administer the Off-System Roads and Bridges Match Program.9
(906) Hazard Elimination Projects 10
(Statewide)11
Payable from Interagency Transfers	$11,000,00012
(907) Non-Federal Aid Eligible Highway Program 13
(Statewide)14
Payable from General Obligation Bonds15
Priority 1	$ 1,000,00016
Payable from State Highway Improvement Fund	$48,000,00017
Total	$49,000,00018
Provided, however, that monies herein appropriated from the State Highway Improvement19
Fund may be used to pay the costs of issuance in the event that bonds are sold during Fiscal20
Year 2013-2014.21
(909) Relocate Hickory Avenue (LA Hwy. 48-11th Street) 22
(Mounes) (LA Hwy. 3154) Construction, Right of Way, 23
and Utilities24
(Jefferson)25
Payable from General Obligation Bonds26
Priority 1	$ 4,650,00027
(910) US 167 Corridor Study28
(Evangeline, St. Landry)29
Payable from General Obligation Bonds30
Priority 1	$ 100,00031
(911) I-20 Interchange Improvement and Kansas-Garrett 32
Connector, Planning, Engineering, Environmental, 33
and Right of Way Acquisition ($500,000 Local Match; 34
$1,000,000 Federal Match)35
(Ouachita)36
Payable from General Obligation Bonds37
Priority 1	$ 250,00038
(913) Cove Lane Interchange and Improvements,39
Planning and Construction40
(Calcasieu)41
Payable from General Obligation Bonds42
Priority 5	$20,000,00043 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 26 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(919) Intersection Improvement Program, Real Estate 1
Acquisition, Planning and Construction2
(Ascension)3
Payable from General Obligation Bonds4
Priority 1	$ 2,700,0005
Priority 5	$ 1,000,0006
Total	$ 3,700,0007
(923) Juban Road (LA 1026) Widening (I-12 to US 190) 8
(Livingston)9
Payable from General Obligation Bonds10
Priority 1	$ 5,800,00011
Priority 5	$12,400,00012
Total	$18,200,00013
(924) I-12 O'Neal Lane to Walker/Satsuma Widening, 14
Planning and Construction (Supplemental)15
(East Baton Rouge, Livingston)16
Payable from General Obligation Bonds17
Priority 1	$48,000,00018
(1105)Pecue Lane/I-10 Interchange, Planning, Design, 19
Rights of Way, Utilities and Construction20
(East Baton Rouge)21
Payable from General Obligation Bonds22
Priority 5	$11,000,00023
(1106)Verot School Road, Construction24
(Lafayette)25
Payable from General Obligation Bonds26
Priority 1	$ 500,00027
Priority 5	$24,000,00028
Total	$24,500,00029
(1109)Globalplex Intermodal Access Road30
(St. John the Baptist)31
Payable from General Obligation Bonds32
Priority 1	$ 1,200,00033
Priority 5	$ 5,100,00034
Total	$ 6,300,00035
(1111)LA Hwy 616 (Caldwell Road to LA Hwy 143), 36
Planning and Construction37
(Ouachita)38
Payable from General Obligation Bonds39
Priority 1	$ 150,00040
Priority 2	$ 2,000,00041
Priority 5	$ 9,600,00042
Total	$11,750,00043
(1153)Highway 23 Elevation for Three Miles of Emergency 44
Route Flood Protection, Planning and Construction45
(Plaquemines)46
Payable from General Obligation Bonds47
Priority 1	$ 6,000,00048 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 27 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1154)Louisiana Highway 1 Resurfacing - Plaquemine to1
White Castle, Planning and Construction2
(Iberville)3
Payable from General Obligation Bonds4
Priority 1	$ 1,000,0005
Priority 5	$ 9,100,0006
Total	$10,100,0007
(1405)Safety Improvements Hwy 15 between 8
US 80 and LA 616, Planning and Construction9
(Ouachita)10
Payable from General Obligation Bonds11
Priority 1	$ 225,00012
(1406)I-49 from I-220 in the City of Shreveport to Arkansas13
Line, Lafayette to the Westbank Expressway, 14
Construction,  Right of Way and Utilities15
(Caddo, Iberia, Jefferson, Lafayette, Lafourche, 16
St. Charles, St. Martin, St. Mary, Terrebonne)17
Payable from General Obligation Bonds18
Priority 1	$ 7,300,00019
Payable from the Unclaimed Property Leverage Fund	$15,000,00020
Total	$22,300,00021
Provided, however, that fifty percent of these funds are to be used for I-49 from I-220 in the22
city of Shreveport to the Arkansas line and fifty percent of these funds are to be used for I-4923
from Lafayette to the Westbank Expressway.24
Provided, however, that monies herein appropriated from the Unclaimed Property Leverage25
Fund may be used to pay the costs of issuance in the event that bonds are sold during Fiscal26
Year 2013-2014.27
(1407)Hooper Road Extension Study 28
(East Baton Rouge, Livingston)29
Payable from General Obligation Bonds30
Priority 1	$ 1,000,00031
(1408)Vermilion LA Hwy 335 Road Improvements, Construction32
(Vermilion)33
Payable from General Obligation Bonds34
Priority 1	$ 2,020,00035
(1409)LA 3276 (Stonewall to I-49), Planning, Real Estate 36
Acquisition, Relocation of Utilities, and Construction37
(De Soto)38
Payable from General Obligation Bonds39
Priority 1	$ 3,000,00040
(1410)Common Street (Airport Service Road - Petro Point Drive), 41
Construction, Right of Way, and Utilities42
(Calcasieu)43
Payable from General Obligation Bonds44
Priority 1	$13,655,00045
(1411)Homer Bypass, LA 2, Construction46
(Claiborne)47
Payable from General Obligation Bonds48
Priority 1	$10,500,00049 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 28 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1412)LA 3034 Improvements1
(East Baton Rouge)2
Payable from General Obligation Bonds3
Priority 1	$ 3,590,0004
Priority 5	$ 1,500,0005
Total	$ 5,090,0006
(1413)LA 820 Improvements from LA 145 to LA 821, 7
Planning and Construction ($1,800,000 Match Required)8
(Lincoln)9
Payable from General Obligation Bonds10
Priority 1	$ 640,00011
(1414)Range Road Corridor Development12
(Livingston)13
Payable from General Obligation Bonds14
Priority 1	$ 6,285,00015
(1416)LA 118 Bridge, Planning and Construction16
(Sabine)17
Payable from General Obligation Bonds18
Priority 1	$ 500,00019
(1417)Turn Lanes on LA 3125 at LA 327420
(St. James)21
Payable from General Obligation Bonds22
Priority 1	$ 100,00023
(1418)Junction LA Hwy. 3127 - Gramercy Bridge West Approach 24
(LA 3213) Construction, Right of Way and Utilities25
(St. John the Baptist)26
Payable from General Obligation Bonds27
Priority 1	$11,970,00028
(1419)LA 377 Improvements, Planning and Construction29
(Vernon)30
Payable from General Obligation Bonds31
Priority 1	$ 800,00032
(1420)US 371 Improvements (Passing Lanes), Planning 33
and Construction34
(Webster)35
Payable from General Obligation Bonds36
Priority 1	$ 330,00037
(1421)I-49 from I-220 in the City of Shreveport to Arkansas State38
Line, Construction, Right of Way and Utilities39
(Caddo)40
Payable from General Obligation Bonds41
Priority 1	$56,500,00042
Priority 5	$53,000,00043
Total	$109,500,00044
(1422)LA 42 Rehabilitation (3R) (LA 16 to LA 63)45
(Livingston)46
Payable from General Obligation Bonds47
Priority 1	$ 3,750,00048 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 29 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1423)LA 444 Rehabilitation (3R) (LA 16 to LA 63)1
(Livingston)2
Payable from General Obligation Bonds3
Priority 1	$ 260,0004
(1424)Island Road (LA 413) Reconstruction from LA 414 5
South to LA 414 North6
(Pointe Coupee)7
Payable from General Obligation Bonds8
Priority 1	$ 6,500,0009
(1425)Peters Road On and Off Ramps Phase 1, Planning 10
and Construction11
(Jefferson, Orleans)12
Payable from General Obligation Bonds13
Priority 1	$ 300,00014
(1426)LA 930 Reconstruction15
(Ascension)16
Payable from General Obligation Bonds17
Priority 1	$ 2,750,00018
Priority 2	$ 200,00019
Priority 5	$ 7,750,00020
Total	$10,700,00021
(1427)Peters Road Bridge and Extension, Phase 1, 22
Planning and Construction23
(Jefferson, Plaquemines)24
Payable from General Obligation Bonds25
Priority 1	$ 8,000,00026
(1428)Hooper Road Extension (LA 37 to LA 16), 27
Environmental, Planning, Engineering, 28
Right of Way, Utilities and Construction29
(East Baton Rouge, Livingston)30
Payable from General Obligation Bonds31
Priority 1	$ 2,700,00032
07/274PUBLIC IMPROVEMENTS33
(254) Comite River Diversion Canal, Planning and Construction 34
($135,000,000 Federal Match and $33,790,000 Local Match)35
(Ascension, East Baton Rouge, Livingston)36
Payable from General Obligation Bonds37
Priority 1	$13,500,00038
(255) Mississippi River Levee Raising, Arkansas to Old River, 39
Planning and Construction40
(Avoyelles, Concordia, East Carroll, 41
Madison, Pointe Coupee, Tensas)42
Payable from General Obligation Bonds43
Priority 1	$ 4,000,00044
Priority 5	$ 500,00045
Total	$ 4,500,00046 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 30 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(284) Port Construction and Development Priority Program 1
(Statewide)2
Payable from General Obligation Bonds3
Priority 2	$ 3,600,0004
Payable from Transportation Trust Fund - Regular $16,100,0005
Total	$19,700,0006
Provided, however, that the Department of Transportation and Development is authorized7
to implement or commence projects approved in this program for Fiscal Year 2013-20148
identified for phased funding pursuant to the cash management plan established pursuant to9
R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing10
unspent cash balances appropriated in prior years’ programs, which funds when combined11
with current appropriations will provide sufficient appropriated funds to award contracts.12
(306) Statewide Flood Control Program13
(Statewide)14
Payable from Transportation Trust Fund - Regular $ 8,910,00015
Provided, however, that the Department of Transportation and Development is authorized16
to implement or commence projects approved in this program for Fiscal Year 2013-201417
identified for phased funding pursuant to the cash management plan established pursuant to18
R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing19
unspent cash balances appropriated in prior years’ programs, which funds when combined20
with current appropriations will provide sufficient appropriated funds to award contracts.21
(338) Baptiste Collette Deepening Project, Planning, 22
Construction, Rights-of-Way, Relocations and Utilities23
(Plaquemines)24
Payable from General Obligation Bonds25
Priority 1	$ 3,750,00026
(393) Ouachita Water Supply Reservoir27
(Ouachita)28
Payable from General Obligation Bonds29
Priority 1	$ 400,00030
(394) Castor Creek - Little River Reservoir 31
(Local Match Required)32
(La Salle)33
Payable from General Obligation Bonds34
Priority 1	$ 100,00035
(397) Water Resources Management Program, Studies, 36
Planning and Construction 37
(Statewide)38
Payable from General Obligation Bonds39
Priority 1	$ 1,000,00040
Priority 5	$ 1,000,00041
Total	$ 2,000,00042
Provided, however, that the Department of Transportation and Development prepare and43
maintain a Water Resources Management Master Plan along with an annual Program of44
projects to support implementation of the Master Plan. The Department of Transportation45
and Development shall adopt the necessary rules for proper management of the Master Plan46
and Program, with the intended rules subject to the approval of the Joint Legislative47
Committee on the Budget prior to adoption. The Master Plan and Program, and any revisions48
thereto, are subject to approval of the Joint Legislative Committee on the Budget.49 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 31 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(400) Bundicks Lake Level Control Structure, Planning 1
and Construction 2
(Beauregard)3
Payable from General Obligation Bonds4
Priority 1	$ 400,0005
(401) Rehabilitation and Repair of State Owned Reservoirs and Dams6
(Statewide)7
Payable from General Obligation Bonds8
Priority 1	$ 2,000,0009
(402) Washington Parish Reservoir Commission Feasibility Study, 10
Planning and Construction ($50,000 Local Match)11
(Washington)12
Payable from General Obligation Bonds13
Priority 1	$ 2,625,00014
(509) Lake D'Arbonne Alternative Spillway, Planning, 15
Construction and Repairs16
(Lincoln, Union)17
Payable from General Obligation Bonds18
Priority 1	$ 9,700,00019
Priority 5	$ 1,250,00020
Total	$10,950,00021
(521) Lake Bistineau Erosion Remediation, Planning 22
and Construction23
(Bienville, Bossier)24
Payable from General Obligation Bonds25
Priority 1	$ 1,500,00026
Priority 5	$ 1,700,00027
Total	$ 3,200,00028
(1197)Alexandria to the Gulf of Mexico Flood Study 29
($50,000 Local Match; $3,650,000 Federal Match)30
(Rapides)31
Payable from General Obligation Bonds32
Priority 1	$ 500,00033
(1429)Bayou Dechene Reservoir, Planning, Land Acquisition 34
and Construction35
(Caldwell)36
Payable from General Obligation Bonds37
Priority 1	$ 7,415,00038
Priority 5	$12,000,00039
Total	$19,415,00040
(1431)LA 18 (4th Street) Highway Drainage, 41
Planning and Construction42
(Jefferson)43
Payable from General Obligation Bonds44
Priority 1	$ 700,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 32 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1432)Morganza to Gulf of Mexico Flood Control 1
Feasibility Study, Planning, Design, Right of Way 2
and Construction of Levees, Floodgates 3
and Other Flood Control Systems 4
($100,000,000 Local Match; $25,000,000 Local 5
In-Kind Match; $442,000,000 Federal Match)6
(Ascension, Assumption, Iberia, Iberville, Lafourche, 7
Pointe Coupee, St. Martin, St. Mary, Terrebonne, 8
West Baton Rouge)9
Payable from General Obligation Bonds10
Priority 1	$19,515,00011
(1433)Donaldsonville to the Gulf of Mexico Flood Study 12
($1,100,000 Local Match; $3,500,000 Federal Match)13
(Ascension, Assumption, Jefferson, Lafourche, 14
St. Charles, St. James, St. John the Baptist)15
Payable from General Obligation Bonds16
Priority 1	$ 2,300,00017
(1434)Westbank Hurricane Protection Project, Planning, 18
Construction, Right of Way and Utilities ($199,000,000 19
Federal Match and $52,800,000 Local Match)20
(Jefferson, Orleans, Plaquemines)21
Payable from General Obligation Bonds22
Priority 1	$ 905,00023
(1435)Houma Navigational Canal Deepening Feasibility Study 24
($1,000,000 Federal Match)25
(Terrebonne)26
Payable from General Obligation Bonds27
Priority 1	$ 1,000,00028
(1436)Acadiana Gulf of Mexico Access Channel, 29
Port of Iberia, Planning, Construction, 30
Right of Way, Relocations and Utilities31
(Iberia, Vermilion)32
Payable from General Obligation Bonds33
Priority 1	$15,455,00034
(1437)Allen Parish Reservoir, Land Acquisition, Planning, 35
Right of Way, Utilities, Equipment and Construction36
(Allen)37
Payable from General Obligation Bonds38
Priority 1	$ 800,00039
(1438)Poverty Point Reservoir, Real Estate Acquisition, 40
Planning, Equipment, Right of Way, Utilities, 41
Acquisition, Facilities, Construction and Maintenance42
(Richland)43
Payable from General Obligation Bonds44
Priority 1	$ 1,700,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 33 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(    )Boat Launch Rehabilitation (LA Hwy 42 at Amite River),1
Planning and Construction2
(Ascension)3
Payable from General Obligation Bonds4
Priority 2	$ 800,0005
Pending submittal and approval of a capital outlay budget request pursuant to the provisions6
of R.S. 39:112.7
07/276ENGINEERING AND OPERATIONS8
(1046)Facilities Program Major Repairs, Renovations, Additions, 9
New Facilities, Equipment Replacement at Various DOTD 10
Sites, Planning and Construction11
(Statewide)12
Payable from Transportation Trust Fund - Regular $ 1,500,00013
(1047)Motor Vessel and Equipment Drydocking, Repairs, 14
Various Locations15
(Statewide)16
Payable from Transportation Trust Fund - Regular $ 2,000,00017
07/277AVIATION IMPROVEMENTS18
(1041)State Aviation and Airport Improvement Program 19
(Statewide)20
Payable from Transportation Trust Fund - Regular $28,462,19021
DEPARTMENT OF PUBLIC SAFETY AND CORRECTIONS22
08/400ADMINISTRATION23
(216) Statewide Fencing Project, Planning and Construction 24
(Statewide)25
Payable from General Obligation Bonds26
Priority 1	$ 600,00027
Priority 5	$ 9,400,00028
Total	$10,000,00029
08/402LOUISIANA STATE PENITENTIARY30
(223) Main Prison Shower and Cellblock Plumbing Upgrade, 31
Planning and Construction32
(West Feliciana)33
Payable from General Obligation Bonds34
Priority 1	$ 165,00035
Priority 5	$ 1,000,00036
Total	$ 1,165,00037
(226) Emergency Water Well Replacement, 38
Planning and Construction39
(West Feliciana)40
Payable from General Obligation Bonds41
Priority 1	$ 420,00042 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 34 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(257) Emergency Water Filter System Replacement,1
Planning and Construction2
(West Feliciana)3
Payable from General Obligation Bonds4
Priority 2	$ 170,0005
Priority 5	$ 1,850,0006
Total	$ 2,020,0007
(258) Electrical Distribution System Upgrade, 8
Planning and Construction9
(West Feliciana)10
Payable from General Obligation Bonds11
Priority 1	$ 300,00012
Priority 5	$ 2,680,00013
Total	$ 2,980,00014
(1439)Fire Marshal, Health Department Violations, 15
Supplemental, Planning and Construction16
(West Feliciana)17
Payable from General Obligation Bonds18
Priority 1	$ 2,500,00019
Priority 5	$ 2,000,00020
Total	$ 4,500,00021
08/403OFFICE OF JUVENILE JUSTICE22
(1340)Bridge City Center for Youth - Replace Main 23
Electrical Switchboard, Planning and Construction24
(Jefferson)25
Payable from General Obligation Bonds26
Priority 2	$ 180,00027
(1440)Remedial Actions for State Fire Marshal Citations, 28
Planning and Construction29
(East Baton Rouge)30
Payable from General Obligation Bonds31
Priority 1	$ 310,00032
(1441)Community Based Program, Juvenile Justice 33
Improvements, Planning, Construction, Renovation, 34
Acquisition, and Equipment35
(Statewide)36
Payable from General Obligation Bonds37
Priority 1	$ 6,000,00038
Priority 5	$14,000,00039
Total	$20,000,00040
(1442)Bridge City Center for Youth, Sewer System Renovation, 41
Planning and Construction42
(Jefferson)43
Payable from General Obligation Bonds44
Priority 1	$ 470,00045
(1443)Vocational Education Center, Planning and Construction46
(Ouachita)47
Payable from General Obligation Bonds48
Priority 1	$ 1,150,00049 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 35 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1444)Replace Existing Fire Alarm System and Install New Fire 1
Suppression System for Dormitories2
(Ouachita)3
Payable from General Obligation Bonds4
Priority 1	$ 1,300,0005
(1445)Bank Springs Group Home, Planning and Construction6
(Caldwell)7
Payable from General Obligation Bonds8
Priority 1	$ 1,400,0009
08/406LOUISIANA CORRECTIONAL INSTITUTE FOR WOMEN10
(157) Air Handler Units for Pisces and Gemini Dormitories,11
Planning and Construction12
(Iberville)13
Payable from General Obligation Bonds14
Priority 2	$ 900,00015
08/407WINN CORRECTIONAL CENTER16
(572) Improvements to Sewerage Ponds and Wastewater System, 17
Supplemental18
(Winn)19
Payable from General Obligation Bonds20
Priority 1	$ 105,00021
(1446)Sanitation Code Violations, Planning and Construction22
(Winn)23
Payable from General Obligation Bonds24
Priority 1	$ 660,00025
08/408ALLEN CORRECTIONAL CENTER26
(1447)Sanitation Code Violations, Repair and Upgrade27
(Allen)28
Payable from General Obligation Bonds29
Priority 1	$ 600,00030
08/409DIXON CORRECTIONAL INSTITUTE31
(217) Emergency Generators, Planning and Construction32
(East Feliciana)33
Payable from General Obligation Bonds34
Priority 2	$ 720,00035
(240) Roof Replacement of Vocational Technical School, 36
Planning and Construction37
(East Feliciana)38
Payable from General Obligation Bonds39
Priority 2	$ 135,00040
08/414DAVID WADE CORRECTIONAL CENTER41
(1326)Fire Alarm System Renovations, Planning and Construction42
(Claiborne)43
Payable from General Obligation Bonds44
Priority 1	$ 300,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 36 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
08/416RAYBURN CORRECTIONAL CENTER1
(250) Security Perimeter Fence, Planning and Construction 2
(Washington)3
Payable from General Obligation Bonds4
Priority 1	$ 200,0005
Priority 5	$ 2,000,0006
Total	$ 2,200,0007
08/419OFFICE OF STATE POLICE8
(1034)State Police, Troop L and Bureau of Investigations, 9
Planning and Construction10
(St. Tammany)11
Payable from General Obligation Bonds12
Priority 1	$ 100,00013
(1448)Renovate Training Academy, Planning and Construction14
(East Baton Rouge)15
Payable from General Obligation Bonds16
Priority 1	$ 900,00017
Priority 5	$16,100,00018
Total	$17,000,00019
08/420OFFICE OF MOTOR VEHICLES20
(1449)Parking and Utility Tie-In for OMV Veteran's, 21
Planning and Construction22
(Orleans)23
Payable from General Obligation Bonds24
Priority 1	$ 660,00025
DEPARTMENT OF HEALTH AND HOSPITALS26
09/304METROPOLITAN HUMAN SERVICE DISTRICT27
(783) New Mental Health Center for Desire/Florida Mental28
Health Clinic, Including the Purchase, Construction or 29
Renovation of a New Facility in New Orleans East, 30
Planning and Construction31
(Orleans)32
Payable from General Obligation Bonds33
Priority 1	$ 2,040,00034
Priority 2	$ 25,00035
Total	$ 2,065,00036
37
(1450)New Mental Health Clinic for New Orleans Behavior, 38
Social, and Medical Support Detox Clinic, Including 39
Expansion and Renovation of the Existing Facility, 40
Planning and Construction41
(Orleans)42
Payable from General Obligation Bonds43
Priority 1	$ 4,415,00044
Priority 5	$ 2,500,00045
Total	$ 6,915,00046 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 37 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
09/319VILLA FELICIANA MEDICAL COMPLEX1
(1451)Replace HVAC Systems in Three Patient Buildings, 2
Planning and Construction3
(East Feliciana)4
Payable from General Obligation Bonds5
Priority 1	$ 6,500,0006
09/320OFFICE OF AGING AND ADULT SERVICES7
(1021)Water Tower Repairs and Improvements, 8
Planning and Construction9
(East Feliciana)10
Payable from General Obligation Bonds11
Priority 2	$ 160,00012
(1023)Replace Fire Alarm and Sprinkler System, Planning 13
and Construction14
(East Feliciana)15
Payable from General Obligation Bonds16
Priority 1	$ 220,00017
(1025)Replace Roof and Storm Drains on all Patient Buildings, 18
Planning and Construction19
(East Feliciana)20
Payable from General Obligation Bonds21
Priority 1	$ 2,200,00022
09/326OFFICE OF PUBLIC HEALTH23
(1452)New Office of Public Health Central Laboratory Facility, 24
Planning and Construction25
(Orleans)26
Payable from General Obligation Bonds27
Priority 1	$11,600,00028
Priority 5	$ 1,000,00029
Total	$12,600,00030
09/330OFFICE OF MENTAL HEALTH31
(1453)Regional Pharmacies Emergency Power and Backup HVAC 32
Units to Protect Drug Supplies, Planning and Construction33
(Orleans)34
Payable from General Obligation Bonds35
Priority 1	$ 1,100,00036
(1454)Roof Replacement - Tyler Mental Health Center, 37
Planning and Construction38
(Lafayette)39
Payable from General Obligation Bonds40
Priority 1	$ 1,180,00041
(1455)Emergency Generator for ASSA Forensic Campus, 42
Planning and Construction43
(East Feliciana)44
Payable from General Obligation Bonds45
Priority 1	$ 750,00046 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 38 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1456)Emergency Generators for Greenwell Springs Campus, 1
Planning and Construction2
(East Baton Rouge)3
Payable from General Obligation Bonds4
Priority 5	$ 1,200,0005
09/331CENTRAL LOUISIANA STATE HOSPITAL6
(528) Electrical System Sub-Station Upgrade7
(Rapides)8
Payable from General Obligation Bonds9
Priority 1	$ 200,00010
Priority 5	$ 2,300,00011
Total	$ 2,500,00012
1457) HVAC System Replacement Shreveport Mental Health Center13
(Caddo)14
Payable from General Obligation Bonds15
Priority 1	$ 1,000,00016
(1458)Expansion of Shreveport Mental Health Center, 17
Planning and Construction18
(Caddo)19
Payable from General Obligation Bonds20
Priority 1	$ 100,00021
(1459)Temperature Control and Sprinkler System for Food 22
Warehouse, Planning and Construction23
(Rapides)24
Payable from General Obligation Bonds25
Priority 1	$ 200,00026
09/332EASTERN LOUISIANA MENTAL HEALTH SYSTEM27
(1461)Center Building and Fire Alarm System Renovation and 28
Restoration, East Louisiana State Hospital, Planning 29
and Construction30
(East Feliciana)31
Payable from General Obligation Bonds32
Priority 1	$ 3,305,00033
Priority 5	$ 5,300,00034
Total	$ 8,605,00035
(1462)Replace Existing Air Conditioning/Heating System and 36
Cleaning of Vents at Dr. Joseph Henry Tyler Mental 37
Health Center38
(Lafayette)39
Payable from General Obligation Bonds40
Priority 1	$ 2,500,00041
(1463)Oakcrest Sprinkler System 42
(East Feliciana)43
Payable from General Obligation Bonds44
Priority 1	$ 500,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 39 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1464)Central Air Conditioning and Heating of ITU 1
(Pinel House), Planning and Construction2
(East Feliciana)3
Payable from General Obligation Bonds4
Priority 1	$ 10,0005
09/333SOUTHEAST LOUISIANA HOSPITAL6
(1465)Emergency Generator for Children's Complex, SELH, 7
Planning and Construction8
(St. Tammany)9
Payable from General Obligation Bonds10
Priority 1	$ 290,00011
(1466)Renovate Terrebonne Mental Health Center, Planning12
and Construction13
(Terrebonne)14
Payable from General Obligation Bonds15
Priority 1	$ 25,00016
(1467)New South Louisiana Human Services Authority 17
Administrative Building, Land Acquisition, Planning18
and Construction19
(Terrebonne)20
Payable from General Obligation Bonds21
Priority 1	$ 985,00022
09/340OFFICE OF DEVELOPMENTAL DISABILITIES23
(1339)Central Louisiana State Hospital Relocation to Pinecrest,24
Planning and Construction25
(Rapides)26
Payable from General Obligation Bonds27
Priority 1	$ 2,000,00028
Priority 5	$24,000,00029
Total	$26,000,00030
09/342GREATER NEW ORLEANS SUPPORTS AND 31
SERVICES CENTER32
(1468)Repair Utility Sewerage Connections and Fill Large 33
Cavities Under Campus Buildings, Planning and 34
Construction35
(Plaquemines)36
Payable from General Obligation Bonds37
Priority 1	$ 335,00038
09/344NORTH LAKE SUPPORTS AND SERVICES CENTER39
(1469)Replace Rooftop Air Conditioning Units on Residential 40
Homes, Planning and Construction41
(Tangipahoa)42
Payable from General Obligation Bonds43
Priority 1	$ 2,320,00044
(1470)Replace Cooling Tower, Planning and Construction45
(Tangipahoa)46
Payable from General Obligation Bonds47
Priority 1	$ 340,00048 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 40 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1471)Replacement of Underground High Temperature Hot Water 1
System, Planning and Construction2
(Tangipahoa)3
Payable from General Obligation Bonds4
Priority 1	$ 1,800,0005
6
(1472)Installation of Sprinkler Systems/Protection of Beams 7
(Tangipahoa)8
Payable from General Obligation Bonds9
Priority 1	$ 500,00010
(1473)Repairs and Renovation at the North Lake Supports 11
and Services Center, Planning and Construction12
(Tangipahoa)13
Payable from General Obligation Bonds14
Priority 1	$ 500,00015
09/347PINECREST SUPPORTS AND SERVICES CENTER16
(282) Sprinkler Systems for Residences, Porches and Walkways,17
Planning and Construction 18
(Rapides)19
Payable from General Obligation Bonds20
Priority 2	$ 60,00021
(1474)Emergency Generators for Homes and Medical Complex 22
(Rapides)23
Payable from General Obligation Bonds24
Priority 1	$ 2,200,00025
DEPARTMENT OF NATURAL RESOURCES26
11/431OFFICE OF THE SECRETARY27
(960) Atchafalaya Basin Protection and Enhancement28
(Federal Match and Local/Sponsor Match)29
(Assumption, Avoyelles, Iberia, Iberville, Pointe Coupee, 30
St. Landry, St. Martin, St. Mary)31
Payable from General Obligation Bonds32
Priority 1	$15,480,00033
Priority 2	$ 200,00034
Priority 5	$ 4,000,00035
Total	$19,680,00036
Provided, however, that $50,000 of this appropriation will be used to fund House Concurrent37
Resolution No. 168 of 2011.38
LOUISIANA WORKFORCE COMMISSION39
14/474OFFICE OF WORKFORCE DEVELOPMENT40
(1343)Renovations to Louisiana Workforce Commission’s 41
Administrative Headquarters, Planning and Construction42
(East Baton Rouge)43
Payable from General Obligation Bonds44
Priority 2	$ 2,700,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 41 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
DEPARTMENT OF WILDLIFE AND FISHERIES1
16/512OFFICE OF THE SECRETARY2
(2030)Wildlife and Fisheries Enforcement Training Academy 3
and Emergency Facility, Planning and Construction4
(East Baton Rouge)5
Payable from Federal Funds	$ 300,0006
16/513OFFICE OF WILDLIFE7
(940) Region 5/Lake Charles Office, Planning and Construction8
(Calcasieu)9
Payable from General Obligation Bonds10
Priority 1	$ 900,00011
Priority 5	$ 8,100,00012
Total	$ 9,000,00013
(1220)Rockefeller Refuge Marsh Terraces, 14
Planning and Construction 15
(Cameron)16
Payable from the Rockefeller Wildlife Refuge Trust 17
and Game Preserve Fund	$ 600,00018
(1239)Rockefeller Refuge Water Control Structure 19
Replacements, Planning and Construction 20
(Cameron)21
Payable from the Rockefeller Wildlife Refuge Trust 22
and Game Preserve Fund	$ 1,880,00023
(1243)Rockefeller Refuge LSU Water Control 24
Replacement, Planning and Construction 25
(Cameron)26
Payable from the Rockefeller Wildlife Refuge Trust 27
and Game Preserve Fund	$ 1,000,00028
29
16/514OFFICE OF FISHERIES30
(984) Booker Fowler Fish Hatchery Renovations,31
Planning and Construction32
(Rapides)33
Payable from Federal Funds	$ 1,200,00034
Payable from the Conservation Fund	$ 49,00035
Total	$ 1,249,00036
(1185)Rosedale Warehouse Construction 37
(Iberville)38
Payable from the Conservation Fund	$ 732,40039
40
DEPARTMENT OF EDUCATION41
19/600LSU BOARD OF SUPERVISORS42
(1477)Major Repairs and Reroofing for Campus43
Buildings, Planning and Construction44
(Acadia, Caddo, East Baton Rouge45
Orleans, Rapides)46
Payable from General Obligation Bonds47
Priority 5	$ 55,00048 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 42 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
19/601LSU BATON ROUGE1
(7) Kirby Smith Hall Upgrades, Planning and Construction2
(East Baton Rouge)3
Payable from Fees and Self Generated Revenues $ 6,500,0004
(8) New Greek House, Planning and Construction5
(East Baton Rouge)6
Payable from Fees and Self Generated Revenues $ 500,0007
Payable from Revenue Bonds	$ 6,000,0008
Total	$ 6,500,0009
(9) New Gymnastics Facility, Planning and Construction10
(East Baton Rouge)11
Payable from Fees and Self Generated Revenues $20,000,00012
(10) New Tennis Facility, Planning and Construction13
(East Baton Rouge)14
Payable from Fees and Self Generated Revenues $15,000,00015
(11) South Campus, Land Acquisition16
(East Baton Rouge)17
Payable from General Obligation Bonds18
Priority 1	$ 5,725,00019
Priority 5	$ 4,375,00020
Total	$10,100,00021
(12) Patrick F. Taylor Hall Renovations,22
Planning and Construction23
(East Baton Rouge)24
Payable from General Obligation Bonds25
Priority 5	$50,000,00026
(1478)French House Renovation, Acquisition, 27
Planning and Construction28
(East Baton Rouge)29
Payable from General Obligation Bonds30
Priority 1	$ 2,000,00031
Priority 5	$ 3,325,00032
Total	$ 5,325,00033
(1479)Renovate Old Engineering Shops for Art Department, 34
Planning and Construction35
(East Baton Rouge)36
Payable from General Obligation Bonds37
Priority 1	$ 2,300,00038
Priority 5	$13,000,00039
Total	$15,300,00040
(1480)Mechanical Plant, Planning and Construction41
(East Baton Rouge)42
Payable from General Obligation Bonds43
Priority 1	$ 2,320,00044
(1481)French House Roof Replacement and Exterior 45
Waterproofing, Planning and Construction46
(East Baton Rouge)47
Payable from General Obligation Bonds48
Priority 1	$ 1,300,00049 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 43 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1482)Choppin Hall Annex Chemistry Lab Building, 1
Planning and Construction2
(East Baton Rouge)3
Payable from General Obligation Bonds4
Priority 1	$ 3,750,0005
(1483)LSU Fire and Emergency Training Institute, New Dormitory 6
(East Baton Rouge)7
Payable from General Obligation Bonds8
Priority 1	$ 100,0009
(1484)Music and Dramatic Arts Facilities Renovation 10
and Addition, Planning and Construction11
(East Baton Rouge)12
Payable from General Obligation Bonds13
Priority 1	$ 5,00014
(2042)Nicholson Gateway: Infrastructure Improvements,15
Planning and Construction16
(East Baton Rouge)17
Payable from General Obligation Bonds18
Priority 2	$ 2,500,00019
Priority 5	$22,500,00020
Total	$25,000,00021
19/602LSU ALEXANDRIA22
(1485)Multi-Purpose Academic Center, Planning and Construction23
(Rapides)24
Payable from General Obligation Bonds25
Priority 1	$ 500,00026
Priority 5	$ 2,000,00027
Total	$ 2,500,00028
(1486)Alexandria Central Utilities Systems Repair29
and Upgrade, Planning and Construction30
(Rapides)31
Payable from General Obligation Bonds32
Priority 5	$ 60,00033
19/603UNIVERSITY OF NEW ORLEANS34
(1487)Human Performance Center Renovations for Fine Arts 35
and Music Departments, Planning and Construction36
(Orleans)37
Payable from General Obligation Bonds38
Priority 1	$ 500,00039
Priority 5	$ 5,600,00040
Total	$ 6,100,00041
(1488)Library Fourth Floor Completion Information Resource Center42
(Orleans)43
Payable from General Obligation Bonds44
Priority 1	$ 560,00045
Priority 5	$ 5,420,00046
Total	$ 5,980,00047 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 44 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1489)Science Building Mechanical Renovations, 1
Planning and Construction2
(Orleans)3
Payable from General Obligation Bonds4
Priority 5	$ 3,275,0005
19/604NLSU HEALTH SCIENCES CENTER NEW ORLEANS6
(1490)Human Development Center, Planning and Construction7
(Orleans)8
Payable from General Obligation Bonds9
Priority 1	$10,095,00010
19/604SLSU HEALTH SCIENCES CENTER SHREVEPORT11
(54) Patient Care HVAC Replacement, Planning 12
and Construction13
(Caddo)14
Payable from General Obligation Bonds15
Priority 1	$ 3,000,00016
(55) High Voltage Electrical Distribution System Upgrade,17
Planning and Construction18
(Caddo)19
Payable from General Obligation Bonds20
Priority 1	$ 350,00021
Priority 5	$ 5,050,00022
Total	$ 5,400,00023
(1491)Children's Hospital, Renovation and Expansion,24
Planning and Construction25
(Caddo)26
Payable from General Obligation Bonds27
Priority 1	$ 1,000,00028
Priority 5	$ 9,000,00029
Total	$10,000,00030
(2038)Feist-Weiller Cancer Research Center, Planning, 31
Construction and Acquisitions32
(Caddo)33
Payable from General Obligation Bonds34
Priority 5	$ 540,00035
19/605LSU EUNICE36
(41) Replacement of Science Laboratory Fume Hoods,37
Planning and Construction38
(Acadia)39
Payable from General Obligation Bonds40
Priority 2	$ 1,670,00041
(1493)Classroom Community Education Building, 42
Planning, Acquisitions, and Construction43
(Acadia)44
Payable from General Obligation Bonds45
Priority 1	$ 1,150,00046 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 45 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
19/607LSU AGRICULTURAL CENTER1
(1494)Animal and Food Science Facilities Renovations and 2
Modernizations, Phase II, Planning and Construction3
(East Baton Rouge)4
Payable from General Obligation Bonds5
Priority 1	$16,270,0006
(1495)Livestock Education Facility, Planning and Construction7
(East Baton Rouge)8
Payable from General Obligation Bonds9
Priority 1	$ 5,000,00010
19/609PENNINGTON BIOMEDICAL RESEARCH CENTER11
(1496)Pennington Biomedical Clinical Research Building, Imaging 12
Center and High Tech Research Instrumentation Equipment13
(East Baton Rouge)14
Payable from General Obligation Bonds15
Priority 1	$ 5,000,00016
Priority 5	$ 1,000,00017
Total	$ 6,000,00018
19/610LSU HEALTH SCIENCES CENTER HEALTH CARE SERVICES19
DIVISION20
(1497)New Emergency Generator and Chillers, UMC, Planning 21
and Construction22
(Lafayette)23
Payable from General Obligation Bonds24
Priority 1	$ 3,200,00025
(1498)University Medical Center in New Orleans 26
(Orleans)27
Payable from General Obligation Bonds28
Priority 1	$205,500,00029
(1499)Replacement of Air Handlers and Chillers, WO Moss, 30
Planning and Construction31
(Calcasieu)32
Payable from General Obligation Bonds33
Priority 1	$ 175,00034
Priority 5	$ 1,740,00035
Total	$ 1,915,00036
(1500)Mechanical Equipment Repairs (Compliance)37
(Lafayette)38
Payable from General Obligation Bonds39
Priority 1	$ 1,300,00040
(1501)Urgent Care Clinic, Planning and Construction41
(East Baton Rouge)42
Payable from General Obligation Bonds43
Priority 1	$ 2,000,00044 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 46 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1502)Air Handler Replacement, Planning and Construction1
(Lafayette)2
Payable from General Obligation Bonds3
Priority 1	$ 200,0004
Priority 5	$ 1,780,0005
Total	$ 1,980,0006
(1503)University Medical Center in Baton Rouge 7
(East Baton Rouge)8
Payable from General Obligation Bonds9
Priority 1	$ 5,000,00010
(1504)Land Acquisition and Parking Adjacent to N. Baton 11
Rouge Clinic, Planning and Construction12
(East Baton Rouge)13
Payable from General Obligation Bonds14
Priority 1	$ 650,00015
(1505)Emergency Room Expansion, University Medical 16
Center, Planning and Construction17
(Lafayette)18
Payable from General Obligation Bonds19
Priority 1	$ 2,045,00020
Priority 5	$ 2,800,00021
Total	$ 4,845,00022
(1506)Construction of Levee Around the Chabert 23
Medical Center, Planning and Construction24
(Terrebonne)25
Payable from General Obligation Bonds26
Priority 1	$ 250,00027
(1507)Elevator Upgrades (Chabert)28
(Terrebonne)29
Payable from General Obligation Bonds30
Priority 1	$ 570,00031
(1508)Renovations and Repairs to LSU Surgical Center, 32
Planning and Construction33
(East Baton Rouge)34
Payable from General Obligation Bonds35
Priority 1	$ 2,000,00036
(1509)Air Handling Unit Replacement, Chabert, 37
Planning and Construction38
(Terrebonne)39
Payable from General Obligation Bonds40
Priority 1	$ 500,00041
(1510)Refurbish Elevators, UMC, Planning and Construction42
(Lafayette)43
Payable from General Obligation Bonds44
Priority 1	$ 1,490,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 47 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(    )University Medical Center in New Orleans, 1
New Ambulatory Care Building, Planning and 2
Construction3
(Orleans)4
Payable from General Obligation Bonds5
Priority 2	$10,000,0006
Priority 5	$ 9,000,0007
Total	$19,000,0008
Pending submittal and approval of capital outlay budget request pursuant to the provisions9
of R.S. 39:112.10
19/612BATON ROUGE COMMUNITY COLLEGE11
(1511)Office of Motor Vehicle Building and Campus 12
Renovation, Demolition and Improvements,13
Planning and Construction14
(East Baton Rouge)15
Payable from General Obligation Bonds16
Priority 5	$ 585,00017
19/615SOUTHERN UNIVERSITY BOARD OF SUPERVISORS18
(1512)Major Repairs and Reroofing, ADA Compliance and19
Life Safety Code Corrections to Campus Buildings, 20
Planning and Construction21
(Caddo, East Baton Rouge, Orleans)22
Payable from General Obligation Bonds23
Priority 1	$ 850,00024
(1513)Major Repairs and Reroofing for Campus Buildings,25
Planning and Construction26
(Caddo, East Baton Rouge, Orleans)27
Payable from General Obligation Bonds28
Priority 5	$ 60,00029
19/616SOUTHERN UNIVERSITY BATON ROUGE30
(492) A. W. Mumford Stadium Parking and Intramural 31
Complex, Planning and Construction 32
(East Baton Rouge)33
Payable from Fees and Self-Generated Revenues $ 600,00034
(644) Sewer and Street Improvements near Intersection35
of Jesse Stone Avenue and E. C. Harrison Drive,36
Planning and Construction37
(East Baton Rouge)38
Payable from General Obligation Bonds39
Priority 2	$ 350,00040
(1066)F.G. Clark Activity Center Roof Replacement,41
Planning and Construction42
(East Baton Rouge)43
Payable from General Obligation Bonds44
Priority 2	$ 1,250,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 48 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1514)Southern University Laboratory School Addition1
and Upgrades, Planning and Construction2
(East Baton Rouge)3
Payable from General Obligation Bonds4
Priority 1	$ 1,200,0005
(1515)Repair/Replacement of Hot Water Pipes for Heating6
(East Baton Rouge)7
Payable from General Obligation Bonds8
Priority 2	$ 2,250,0009
(1516)Major Repairs to F. G. Clark Activity Center10
(East Baton Rouge)11
Payable from General Obligation Bonds12
Priority 5	$ 20,00013
19/617SOUTHERN UNIVERSITY NEW ORLEANS14
(318) Replace Chilled Water and High Temperature Water Lines15
(Orleans)16
Payable from General Obligation Bonds17
Priority 1	$ 150,00018
(1517)College of Business and Social Work Building, 19
Renovation/Demolition/Construction, 20
Planning and Construction21
(Orleans)22
Payable from General Obligation Bonds23
Priority 1	$ 205,00024
19/618SOUTHERN UNIVERSITY SHREVEPORT25
(231) Renovations of Allen Building, Planning26
and Construction27
(Caddo)28
Payable from General Obligation Bonds29
Priority 2	$ 200,00030
(232) New Classroom Building, Southern University - Shreveport, 31
Planning and Construction32
(Caddo)33
Payable from General Obligation Bonds34
Priority 1	$ 5,850,00035
Priority 5	$ 1,650,00036
Total	$ 7,500,00037
(234) Child Care Development Center, Planning and Construction38
(Caddo)39
Payable from Fees and Self Generated Revenues $ 30,58940
(1519)Site Improvement, Drainage and Security Lights, 41
Planning and Construction42
(Caddo)43
Payable from General Obligation Bonds44
Priority 1	$ 15,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 49 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1520)Building Acquisitions and Renovations School of Nursing1
(Caddo)2
Payable from General Obligation Bonds3
Priority 5	$ 2,585,0004
19/620UNIVERSITY OF LOUISIANA SYSTEM5
(1521)Major Repairs and Reroofing, ADA Compliance 6
and Life Safety Code Corrections to Campus Building, 7
Planning and Construction8
(Calcasieu, East Baton Rouge, Lafayette, Lafourche, 9
Lincoln, Natchitoches, Ouachita, Tangipahoa)10
Payable from General Obligation Bonds11
Priority 1	$ 85,00012
(1522)Major Repairs and Reroofing for Campus Buildings, 13
Planning and Construction 14
(Calcasieu, Lafayette, Lafourche, Lincoln, Natchitoches, 15
Orleans, Ouachita, St. Bernard, Tangipahoa)16
Payable from General Obligation Bonds17
Priority 5	$ 265,00018
(1523)Life Safety Code Corrections, Planning and Construction19
(Ascension, Bossier, Calcasieu, Iberia, Lafayette,20
Lafourche, Lincoln, Natchitoches, Orleans,21
Ouachita, St. Bernard, Tangipahoa)22
Payable from General Obligation Bonds23
Priority 5	$ 185,00024
19/621NICHOLLS STATE UNIVERSITY25
(38) Electrical Upgrade, Phase 3, Planning and Construction26
(Lafourche)27
Payable from General Obligation Bonds28
Priority 1	$ 260,00029
(1524)Culinary Arts Instruction Building, 30
Planning and Construction31
(Lafourche)32
Payable from General Obligation Bonds33
Priority 1	$ 8,100,00034
(1525)Athletic Facilities, Renovation, Planning and Construction35
(Lafourche)36
Payable from General Obligation Bonds37
Priority 1	$ 200,00038
(2031)Talbot Hall Renovation and Roof Replacement,39
Planning and Construction40
(Lafourche)41
Payable from General Obligation Bonds42
Priority 2	$ 425,00043
Priority 5	$ 3,975,00044
Total	$ 4,400,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 50 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
19/623GRAMBLING STATE UNIVERSITY1
(176) Roof Replacement for Identified Campus Buildings,2
Planning and Construction3
(Lincoln)4
Payable from General Obligation Bonds5
Priority 2	$ 2,250,0006
(184) Campus Utility Infrastructure Assessment, Planning 7
and Emergency Repairs and/or Replacement, 8
Planning and Construction9
(Lincoln)10
Payable from General Obligation Bonds11
Priority 1	$ 1,575,00012
Priority 5	$ 925,00013
Total	$ 2,500,00014
(1527)Long-Jones Hall Renovation, Planning and Construction15
(Lincoln)16
Payable from General Obligation Bonds17
Priority 1	$ 3,715,00018
Priority 5	$ 1,000,00019
Total	$ 4,715,00020
(1528)Dunbar Hall Replacement, Planning and Construction21
(Lincoln)22
Payable from General Obligation Bonds23
Priority 1	$ 3,085,00024
Priority 5	$ 175,00025
Total	$ 3,260,00026
(1529)Library Deficiencies, Planning and Construction27
(Lincoln)28
Payable from General Obligation Bonds29
Priority 1	$ 2,800,00030
31
19/625LOUISIANA TECH UNIVERSITY32
(158) Bogard Hall Roof Replacement and Waterproofing,33
Planning and Construction34
(Lincoln)35
Payable from General Obligation Bonds36
Priority 2	$ 950,00037
Priority 5	$ 950,00038
Total	$1,900,000039
(159) Water Distribution System Repairs and Improvements40
(Lincoln)41
Payable from General Obligation Bonds42
Priority 1	$ 1,300,00043
Priority 5	$ 1,650,00044
Total	$ 2,950,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 51 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(163) Louisiana Tech Research Park, Real Estate Acquisition,1
Planning and Construction2
(Lincoln)3
Payable from General Obligation Bonds4
Priority 1	$ 3,000,0005
Priority 5	$ 4,000,0006
Total	$ 7,000,0007
(1530)Business Building Replacement, Planning and Construction8
(Lincoln)9
Payable from General Obligation Bonds10
Priority 1	$ 9,320,00011
Priority 5	$ 1,680,00012
Total	$11,000,00013
(1531)Visual Arts Building Renovation for Business,14
Planning and Construction15
(Lincoln)16
Payable from General Obligation Bonds17
Priority 1	$ 500,00018
19/627MCNEESE STATE UNIVERSITY19
(42) Health/Human Performance Education Complex,20
Planning and Construction21
(Calcasieu)22
Payable from General Obligation Bonds23
Priority 1	$ 1,000,00024
Priority 2	$ 2,500,00025
Priority 5	$20,885,00026
Total	$24,385,00027
(43) Alpha Hall Renovations, Planning and Construction28
(Calcasieu)29
Payable from General Obligation Bonds30
Priority 1	$ 1,500,00031
(44) Shearman Fine Arts Building - Renovation of Existing32
Space, Planning and Construction33
(Calcasieu)34
Payable from General Obligation Bonds35
Priority 1	$ 3,340,00036
Priority 5	$ 1,060,00037
Total	$ 4,400,00038
(45) Frazar Memorial Library Renovation and Repairs, 39
Planning and Construction40
(Calcasieu)41
Payable from General Obligation Bonds42
Priority 1	$ 8,215,00043
(151) ADA Upgrades Campus-Wide, Planning and Construction44
(Calcasieu)45
Payable from General Obligation Bonds46
Priority 1	$ 5,000,00047
Priority 5	$ 1,000,00048
Total	$ 6,000,00049 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 52 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1532)Campus-Wide Elevator Repairs, Planning and 1
Construction2
(Calcasieu)3
Payable from General Obligation Bonds4
Priority 1	$ 750,0005
(1533)Fieldhouse Renovations and Addition6
(Calcasieu)7
Payable from General Obligation Bonds8
Priority 1	$ 50,0009
(2028)Contraband Bayou Erosion Retaining Wall10
Phase II, Planning and Construction11
(Calcasieu)12
Payable from General Obligation Bonds13
Priority 1	$ 350,00014
Priority 5	$ 3,875,00015
Total	$ 4,225,00016
19/629UNIVERSITY OF LOUISIANA - MONROE17
(31) Stubbs Hall Reroofing, Planning and Construction18
(Ouachita)19
Payable from General Obligation Bonds20
Priority 1	$ 635,00021
(32) Underground Electrical Distribution System,22
Planning and Construction23
(Ouachita)24
Payable from General Obligation Bonds25
Priority 2	$ 360,00026
Priority 5	$ 3,240,00027
Total	$ 3,600,00028
(34) Sandel Hall Renovation, Planning and Construction29
(Ouachita)30
Payable from General Obligation Bonds31
Priority 1	$ 9,100,00032
Priority 5	$ 8,000,00033
Total	$17,100,00034
(1536)Chemistry and Natural Science Building HVAC 35
Renovation36
(Ouachita)37
Payable from General Obligation Bonds38
Priority 1	$ 3,900,00039
19/631NORTHWESTERN STATE UNIVERSITY40
(1537)East Caspari Hall Renovation and West Caspari Hall 41
Replacement for Student Services42
(Natchitoches)43
Payable from General Obligation Bonds44
Priority 1	$ 2,675,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 53 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
19/634SOUTHEASTERN LOUISIANA UNIVERSITY1
(17) Computer Science and Technology Facility Improvements 2
and Expansion,  Planning and Construction3
(Tangipahoa)4
Payable from General Obligation Bonds5
Priority 1	$ 3,100,0006
Priority 5	$17,000,0007
Total	$20,100,0008
(1538)Department of Kinesiology, Health Studies and 9
College of Nursing Program, Renovation and 10
Conversion, Planning, Construction and Equipment11
(Tangipahoa)12
Payable from General Obligation Bonds13
Priority 1	$ 250,00014
19/640UNIVERSITY OF LOUISIANA - LAFAYETTE15
(1539)Burke Hawthorne Hall Renovation and Expansion,16
Planning and Construction17
(Lafayette)18
Payable from General Obligation Bonds19
Priority 1	$ 5,350,00020
(174) Fletcher Hall Exterior Repairs, Planning and 21
Construction22
(Lafayette)23
Payable from General Obligation Bonds24
Priority 1	$ 650,00025
Priority 5	$ 2,850,00026
Payable from Fees and Self Generated Revenues $ 2,205,13327
Total	$ 5,705,13328
19/641DELGADO COMMUNITY COLLEGE29
(1542)Facilities Improvement for Economic Development, 30
Planning and Construction31
(Orleans)32
Payable from General Obligation Bonds33
Priority 1	$ 40,00034
(1543)Nursing/Allied Health Facility, Planning and 35
Feasibility Study36
(Orleans)37
Payable from General Obligation Bonds38
Priority 1	$ 200,00039
19/649LOUISIANA COMMUNITY AND TECHNICAL COLLEGE SYSTEM40
(551) Winnsboro Campus of Delta Community College,41
Acquisition, Planning, and Construction42
(Franklin)43
Payable from General Obligation Bonds44
Priority 5	$ 900,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 54 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(809) Automotive Training Facility, Planning and Construction1
(East Baton Rouge)2
Payable from General Obligation Bonds3
Priority 1	$ 2,400,0004
Priority 5	$22,750,0005
Total	$25,150,0006
19/651LOUISIANA SCHOOL FOR THE VISUALLY IMPAIRED7
(1544)Replace Existing Air Conditioning Systems 8
in Auditorium and Administration Offices9
(East Baton Rouge)10
Payable from General Obligation Bonds11
Priority 1	$ 200,00012
(1545)Removal of Existing Modular Building 13
and Replacement Modular Building14
(East Baton Rouge)15
Payable from General Obligation Bonds16
Priority 1	$ 20,00017
19/653LOUISIANA SCHOOL FOR THE DEAF18
(1546)Replacement of Fire Alarm System 19
(East Baton Rouge)20
Payable from General Obligation Bonds21
Priority 1	$ 500,00022
19/655LOUISIANA SPECIAL EDUCATION CENTER23
(1093)Vehicular Cover and Storage Unit,24
Planning and Construction25
(Rapides)26
Payable from Interagency Transfers	$ 542,28427
(1094)Demolition and Reconstruction of Residence No. 1,28
Planning and Construction 29
(Rapides)30
Payable from Interagency Transfers	$ 555,44031
(1116)Replacement of Transition Center and Education 32
Buildings, Planning and Construction33
(Rapides)34
Payable from Interagency Transfers	$ 750,00035
19/657LOUISIANA SCHOOL FOR MATH, SCIENCE AND THE ARTS36
(969) HVAC Issues in Caddo Hall, Planning and Construction 37
(Natchitoches)38
Payable from General Obligation Bonds39
Priority 1	$ 600,00040
(970) Stair Railings - Addressing Code Violations, 41
Planning and Construction42
(Natchitoches)43
Payable from General Obligation Bonds44
Priority 1	$ 70,00045
Priority 2	$ 70,00046
Total	$ 140,00047 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 55 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(971) New Dormitory Building, Planning and Construction1
(Natchitoches)2
Payable from General Obligation Bonds3
Priority 2	$ 1,850,0004
Priority 5	$22,150,0005
Total	$24,000,0006
19/662LOUISIANA EDUCATIONAL TELEVISION AUTHORITY7
(232) Tower Repair 8
(Statewide)9
Payable from General Obligation Bonds10
Priority 1	$ 800,00011
19/671BOARD OF REGENTS12
(1289)Land Acquisition for Post Secondary Educational 13
Institutions 14
(Statewide)15
Payable from General Obligation Bonds16
Priority 1	$ 5,000,00017
18
Provided that $5,000,000 of this appropriation shall be used for the acquisition of the former19
Our Lady of Lourdes Hospital facility.20
(1548)Jefferson West Learning Center, Land Acquisition, 21
Planning and Construction22
(Jefferson)23
Payable from General Obligation Bonds24
Priority 1	$ 500,00025
(1549)System-Wide Telecommunications Wiring 26
and Equipment, Planning and Construction27
(Statewide)28
Payable from General Obligation Bonds29
Priority 5	$ 1,500,00030
(1550)Feasibility Study for New Campus for Northwest 31
Campus of the Louisiana Technical College, 32
Planning and Construction33
(Webster)34
Payable from General Obligation Bonds35
Priority 1	$ 100,00036
(1555)Library, Instructional and Scientific Equipment37
Acquisitions for Higher Education Institutions38
(Statewide)39
Payable from General Obligation Bonds40
Priority 5	$ 1,870,00041
(1556)Technical Colleges Campuses Equipment Acquisitions42
(Statewide)43
Payable from General Obligation Bonds44
Priority 5	$ 105,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 56 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
19/673NEW ORLEANS CENTER FOR THE CREATIVE ARTS1
(1027)Replace HVAC System, Planning and Construction2
(Orleans)3
Payable from General Obligation Bonds4
Priority 1	$ 750,0005
(1028)Press Street Studios, Furniture/Fixtures/Equipment,6
Planning and Construction7
(Orleans)8
Payable from General Obligation Bonds9
Priority 5	$ 900,00010
19/731L.E. FLETCHER TECHNICAL COMMUNITY COLLEGE11
(549) Integrated Petroleum Technologies Program (IPT) 12
Lab and Classroom Building, Planning and Construction13
(Terrebonne)14
Payable from General Obligation Bonds15
Priority 1	$ 4,000,00016
(1557)Diesel Marine, Welding and Transportation Building 17
for Fletcher Technical Community College18
(Terrebonne)19
Payable from General Obligation Bonds20
Priority 1	$ 870,00021
Priority 2	$ 200,00022
Total	$ 1,070,00023
19/741LOUISIANA TECHNICAL COLLEGE - LAFAYETTE CAMPUS24
(1558)LTC Lafayette Campus - HVAC Replacement, 25
Planning and Construction26
(Lafayette)27
Payable from General Obligation Bonds28
Priority 1	$ 2,610,00029
19/752LOUISIANA TECHNICAL COLLEGE - MORGAN SMITH CAMPUS30
(803) New Construction or Renovations to Morgan 31
Smith Campus, Planning and Construction32
(Jefferson Davis)33
Payable from General Obligation Bonds34
Priority 2	$ 500,00035
Priority 5	$ 9,500,00036
Total	$10,000,00037
JUDICIAL EXPENSES38
23/949LOUISIANA JUDICIARY39
(1327)Land Acquisition, Planning, and Construction 40
of  New Courthouse for the Louisiana Court 41
of Appeal, Third Circuit 42
(Calcasieu)43
Payable from General Obligation Bonds44
Priority 1	$ 1,250,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 57 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
LEGISLATIVE EXPENSES1
24/960LEGISLATIVE BUDGETARY CONTROL COUNCIL2
(1559)State Capitol HVAC Replacement and Renovations3
(East Baton Rouge)4
Payable from General Obligation Bonds5
Priority 1	$ 7,000,0006
Priority 5	$ 4,000,0007
Total	$11,000,0008
LEVEE DISTRICTS AND PORTS9
36/L08LAKE BORGNE BASIN LEVEE DISTRICT10
(766) Drainage Improvements to LA 46 Roadway Drainage 11
Improvement Project Between Parish Road and Webster 12
Road, Planning and Construction 13
(St. Bernard)14
Payable from General Obligation Bonds15
Priority 1	$ 320,00016
Priority 5	$ 1,200,00017
Total	$ 1,520,00018
19
(768) Drainage Pump Stations and Channel Improvements, 20
Land Acquisitions, Planning and Construction21
(St. Bernard)22
Payable from General Obligation Bonds23
Priority 1	$ 20,00024
36/L10ORLEANS LEVEE DISTRICT25
(805) Southeast Louisiana Flood Protection Authority - 26
East for Bayou St. John, Maintenance and Improvements, 27
Perimeter Elevation, Hydrology Study, Planning 28
and Construction29
(Orleans)30
Payable from General Obligation Bonds31
Priority 1	$ 250,00032
36/L13PONTCHARTRAIN LEVEE DISTRICT33
(1560)Lake Pontchartrain West Shore Hurricane Protection Project34
(Ascension, St. Charles, St. James, St. John the Baptist)35
Payable from General Obligation Bonds36
Priority 1	$ 2,330,00037
Priority 5	$ 8,500,00038
Total	$10,830,00039
(1561)Mississippi River Levee Multi-Use Trail40
(Ascension, East Baton Rouge, Iberville, 41
St. Charles, St. James, St. John the Baptist)42
Payable from General Obligation Bonds43
Priority 1	$ 100,00044 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 58 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1562)East St. Charles Urban Flood Control Project, 1
Planning and Construction2
(St. Charles)3
Payable from General Obligation Bonds4
Priority 1	$ 1,500,0005
Priority 5	$ 500,0006
Total	$ 2,000,0007
36/L25GRAND ISLE INDEPENDENT LEVEE DISTRICT8
(1278)Breakwater Protection, Planning and Construction 9
(Jefferson)10
Payable from General Obligation Bonds11
Priority 1	$ 100,00012
Priority 2	$ 1,000,00013
Total	$ 1,100,00014
36/L26NATCHITOCHES LEVEE AND DRAINAGE DISTRICT15
(1563)Lower Cane River Area Flood Gates Replacement Program 16
(Natchitoches)17
Payable from General Obligation Bonds18
Priority 1	$ 1,000,00019
36/L29BOSSIER LEVEE DISTRICT20
(1564)Flat River Bank Stabilization, Planning and Construction21
(Bossier)22
Payable from General Obligation Bonds23
Priority 1	$ 950,00024
Priority 5	$ 1,100,00025
Total	$ 2,050,00026
36/L35ST MARY PARISH LEVEE DISTRICT27
(1565)Franklin Canal Levee and Floodgate Project, 28
Planning and Construction29
(St. Mary)30
Payable from General Obligation Bonds31
Priority 1	$ 640,00032
36/L37IBERIA PARISH LEVEE HURRICANE AND33
CONSERVATION DISTRICT34
(665) Planning, Permitting, Engineering and Right of Way35
Acquisition for the Iberia Hurricane Protection Master Plan36
(Iberia)37
Payable from General Obligation Bonds38
Priority 1	$ 250,00039
36/P01ABBEVILLE HARBOR AND TERMINAL DISTRICT40
(1072)Bulkheading and Dredging at Port Vermilion 41
($1,000,000 Cash and/or In Kind Match)42
(Vermilion)43
Payable from General Obligation Bonds44
Priority 5	$ 680,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 59 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
36/P03GREATER BATON ROUGE PORT COMMISSION1
(807) Inland River Marine Terminal Dock and Access Roadway2
Construction Project, Planning and Construction3
(West Baton Rouge)4
Payable from General Obligation Bonds5
Priority 1	$ 1,000,0006
Priority 5	$ 2,200,0007
Total	$ 3,200,0008
36/P05WEST CALCASIEU PORT9
(857) Land Acquisition and Rehabilitation of Existing Bulkhead, 10
Planning and Construction ($1,305,000 Local Match)11
(Calcasieu)12
Payable from General Obligation Bonds13
Priority 2	$ 1,305,00014
36/P12LAKE PROVIDENCE PORT COMMISSION15
(1566)Coal Pad Repair 16
(East Carroll)17
Payable from General Obligation Bonds18
Priority 1	$ 10,00019
(1567)Succinic Acid Biorefinery, Planning and Construction20
(East Carroll)21
Payable from General Obligation Bonds22
Priority 1	$ 1,010,00023
36/P14MADISON PARISH PORT24
(1568)Railroad Rehabilitation/Improvement and New Rail 25
Spur for Avondale Facility, and Improvements Required26
for Levee Raising Including Raise Rail, Road and Utilities27
($221,000 Local Match)28
(Madison)29
Payable from General Obligation Bonds30
Priority 1	$ 710,00031
(1569)Improvements to Madison Parish Port 32
Northrop Grumman Shipbuilding Expansion33
(Madison)34
Payable from General Obligation Bonds35
Priority 1	$ 20,00036
(1570)Complex Chemical Entrance Road, Planning 37
and Construction38
(Madison)39
Payable from General Obligation Bonds40
Priority 1	$ 500,00041 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 60 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
36/P17PORT OF NEW ORLEANS1
(1571)Cruise Ship Terminal, Planning and Construction2
(Orleans)3
Payable from General Obligation Bonds4
Priority 1	$ 1,500,0005
Priority 5	$ 6,000,0006
Total	$ 7,500,0007
(1572)Milan Upland Yard Improvements, 8
Planning and Construction9
(Orleans)10
Payable from General Obligation Bonds11
Priority 1	$ 1,000,00012
Priority 5	$ 9,165,00013
Total	$10,165,00014
36/P20ST BERNARD PORT15
(1573)Terminal Improvements, Planning and Construction16
(St. Bernard)17
Payable from General Obligation Bonds18
Priority 1	$ 20,00019
(1574)Rehabilitation of Dock #1 Section A Seawall, 20
Planning and Construction21
(St. Bernard)22
Payable from General Obligation Bonds23
Priority 1	$ 3,800,00024
36/P21PORT OF SOUTH LOUISIANA25
(950) Globalplex Rail Siding 26
($5,577,932 Local/Federal/Other Match)27
(St. John the Baptist)28
Payable from General Obligation Bonds29
Priority 1	$ 3,000,00030
31
(954) Globalplex Terminal Building #71 and Other 32
Globalplex Terminal Building Upgrades, 33
Planning and Construction34
(St. John the Baptist)35
Payable from General Obligation Bonds36
Priority 1	$ 2,850,00037
(1005)Warehouse, Planning and Construction38
(St. John the Baptist)39
Payable from General Obligation Bonds40
Priority 1	$ 100,00041
42
(1575)St. John the Baptist Parish Airport Expansion, 43
Land Acquisition, Wetland Mitigation, and 44
Avionics Shop, Planning and Construction45
(St. John the Baptist)46
Payable from General Obligation Bonds47
Priority 1	$ 575,00048 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 61 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1576)Dock, Planning and Construction1
(St. John the Baptist)2
Payable from General Obligation Bonds3
Priority 1	$ 500,0004
36/P23TERREBONNE PORT COMMISSION5
(1578)Slip Dredging and Improvements for Terrebonne6
Port Commission Government Multi-Use Complex 7
(Terrebonne)8
Payable from General Obligation Bonds9
Priority 1	$ 710,00010
11
36/P26PORT OF LAKE CHARLES12
(475) Relocation of Railroad Tracks along Sallier Street,13
Planning and Construction ($3,000,000 Local Match)14
(Calcasieu)15
Payable from General Obligation Bonds16
Priority 2	$ 1,000,00017
(476) Dredging of Berth 8 at City Docks, Planning 18
and Construction ($1,000,000 Local Match)19
(Calcasieu)20
Payable from General Obligation Bonds21
Priority 2	$ 250,00022
(477) New Administration Building, Planning and Construction23
($1,500,000 Local Match)24
(Calcasieu)25
Payable from General Obligation Bonds26
Priority 2	$ 500,00027
(961) Industrial Canal Dockside Monopile Improvements28
(LEEVAC), Planning and Construction29
(Calcasieu)30
Payable from General Obligation Bonds31
Priority 1	$ 195,00032
(962) Command and Control Center at City Docks,33
Planning and Construction 34
($1,125,000 Federal and/or Local Match)35
(Calcasieu)36
Payable from General Obligation Bonds37
Priority 1	$ 300,00038
36/P33SOUTH TANGIPAHOA PARISH PORT COMMISSION39
(1579)Port Manchac Terminal Improvements,40
Planning and Construction41
(Tangipahoa)42
Payable from General Obligation Bonds43
Priority 1	$ 470,00044 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 62 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
36/P35MERMENTAU RIVER HARBOR AND TERMINAL DISTRICT1
(736) Land Acquisition for New Slip Construction 2
(Mermentau River Harbor Terminal District), 3
Planning and Construction4
(Acadia)5
Payable from General Obligation Bonds6
Priority 1	$ 225,0007
36/P36ALEXANDRIA PORT AUTHORITY8
(1580)Bulkhead Dock and Operations Center, Planning9
and Construction ($411,500 Local Match)10
(Rapides)11
Payable from General Obligation Bonds12
Priority 1	$ 10,00013
36/P40GRAND ISLE PORT COMMISSION14
(1287)Port Access Road and New Commercial Boat Slip Facility15
(Jefferson)16
Payable from General Obligation Bonds17
Priority 1	$ 95,00018
Priority 5	$ 1,000,00019
Total	$ 1,095,00020
36/P41JEFFERSON PARISH PORT DISTRICT21
(1581)Jefferson Parish Business Park: Science and Technology 22
Academy and Conference Center23
(Jefferson)24
Payable from General Obligation Bonds25
Priority 1	$23,250,00026
Priority 5	$ 5,500,00027
Total	$28,750,00028
36/P43COLUMBIA PORT COMMISSION29
(560) Railroad Spur, Planning and Construction30
(Caldwell)31
Payable from General Obligation Bonds32
Priority 1	$ 670,00033
Priority 5	$ 1,340,00034
Total	$ 2,010,00035
36/P47GREATER OUACHITA PORT COMMISSION36
(1582)Rail Extension, Planning and Construction37
(Ouachita)38
Payable from General Obligation Bonds39
Priority 1	$ 1,500,00040 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 63 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
36/P49POINTE COUPEE PORT COMMISSION1
(1130)Pointe Coupee Parish Port Capital Improvements,2
Planning and Construction3
(Pointe Coupee)4
Payable from General Obligation Bonds5
Priority 1	$ 300,0006
Priority 5	$ 500,0007
Total	$ 800,0008
MISCELLANEOUS NON-STATE9
50/C03OFFICE FACILITIES CORPORATION10
(1334)Capital Repairs and Improvements, 11
Planning and Construction12
(Statewide)13
Payable from General Obligation Bonds14
Priority 2	$ 3,000,00015
Priority 5	$12,000,00016
Total	$15,000,00017
50/J03ASCENSION PARISH18
(1583)Oak Grove Community and Recreational Center, 19
Planning and Construction 20
(Ascension)21
Payable from General Obligation Bonds22
Priority 1	$ 245,00023
(1584)Lamar Dixon Development, Purchase and Land Acquisition24
(Ascension)25
Payable from General Obligation Bonds26
Priority 1	$ 380,00027
(1585)Ascension-Livingston Parkway Feasibility Study 28
(Ascension)29
Payable from General Obligation Bonds30
Priority 1	$ 150,00031
50/J04ASSUMPTION PARISH32
(1586)Overlay of Bayou Drive, Planning and Construction33
(Assumption)34
Payable from General Obligation Bonds35
Priority 1	$ 125,00036
50/J05AVOYELLES PARISH37
(1587)Multipurpose Evacuation Shelter/Community Center 38
and Training Facility in Moreauville, Renovations, 39
Acquisitions, Utilities, Planning and Construction40
(Avoyelles)41
Payable from General Obligation Bonds42
Priority 1	$ 450,00043 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 64 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1588)Avoyelles Parish Police Jury Cooperative Extension 1
Building, Acquisitions, Planning and Construction 2
($50,000 Non-State Match)3
(Avoyelles)4
Payable from General Obligation Bonds5
Priority 1	$ 1,570,0006
50/J06BEAUREGARD PARISH7
(708) Lumas Road, Planning and Construction8
(Beauregard)9
Payable from General Obligation Bonds10
Priority 1	$ 400,00011
(1589)Overlay a Portion of Gaytine Road in Ward 6, 12
Planning and Construction13
(Beauregard)14
Payable from General Obligation Bonds15
Priority 1	$ 275,00016
(1590)Talbert Cemetery Road Construction Project, 17
Planning and Construction18
(Beauregard)19
Payable from General Obligation Bonds20
Priority 1	$ 20,00021
50/J07BIENVILLE PARISH22
(1591)Blue Ridge Water System 23
(Bienville)24
Payable from General Obligation Bonds25
Priority 1	$ 500,00026
(1592)Bienville Parish Jail 27
($5,034,000 Cash and/or In-Kind Match)28
(Bienville)29
Payable from General Obligation Bonds30
Priority 1	$ 50,00031
(1593)Courthouse Improvements in Arcadia, Planning 32
and Construction ($115,000 Non-State Match)33
(Bienville)34
Payable from General Obligation Bonds35
Priority 1	$ 115,00036
50/J08BOSSIER PARISH37
(656) Sewerage District 1 of the Parish of Bossier, Planning 38
and Construction ($28,000,000 Local Match)39
(Bossier)40
Payable from General Obligation Bonds41
Priority 1	$15,235,00042
Priority 5	$ 255,00043
Total	$15,490,00044 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 65 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(661) Extension of Crouch Road to Swan Lake Road/1
Reconstruction of Swan Lake Road To I-220, 2
Planning and Construction (Local Match Required)3
(Bossier)4
Payable from General Obligation Bonds5
Priority 1	$ 600,0006
(1291)Cotton Valley Road Reconstruction, Planning and 7
Construction8
(Bossier)9
Payable from General Obligation Bonds10
Priority 1	$ 95,00011
Priority 5	$ 255,00012
Total	$ 350,00013
(1594)Princeton Sports Complex – Fencing and Lighting at 14
New Ball Fields, Planning and Construction15
(Bossier)16
Payable from General Obligation Bonds17
Priority 1	$ 200,00018
50/J09CADDO PARISH19
(544) Caddo Parish Fire District No. 3, Station #4 Addition20
Planning and Construction21
(Caddo)22
Payable from General Obligation Bonds23
Priority 1	$ 165,00024
50/J10CALCASIEU PARISH25
(798) Gravity Sewer Trunk Mains and Pumping Stations, 26
South Ward 3 and South Ward 4, Planning and Construction27
(Calcasieu)28
Payable from General Obligation Bonds29
Priority 1	$ 3,900,00030
Priority 5	$ 6,900,00031
Total	$10,800,00032
(1596)Burton Memorial Coliseum Complex - Arena 33
Reconstruction and Coliseum Renovation, 34
Planning and Construction35
(Calcasieu)36
Payable from General Obligation Bonds37
Priority 1	$ 395,00038
(1597)Mossville Sewer Collection System, Planning and 39
Construction ($1,000,000 Non-State Match)40
(Calcasieu)41
Payable from General Obligation Bonds42
Priority 1	$ 260,00043 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 66 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/J11CALDWELL PARISH1
(1148)Wiles Road Reconstruction, Planning 2
and Construction3
(Caldwell)4
Payable from General Obligation Bonds5
Priority 1	$ 80,0006
Priority 2	$ 430,0007
Total	$ 510,0008
(1149)Parish Detention Facility, Planning and Construction9
(Caldwell)10
Payable from General Obligation Bonds11
Priority 1	$ 250,00012
Priority 5	$ 1,370,00013
Total	$ 1,620,00014
50/J12CAMERON PARISH15
(1598)Holly Beach Sewer, Planning and Construction16
(Cameron)17
Payable from General Obligation Bonds18
Priority 1	$ 5,100,00019
50/J14CLAIBORNE PARISH20
(1599)Street and Road Improvements, Planning and Construction21
(Claiborne)22
Payable from General Obligation Bonds23
Priority 1	$ 395,00024
50/J16DE SOTO PARISH25
(1600)Overlay of Linwood Road, Planning and Construction26
($45,500 Matching Funds)27
(De Soto)28
Payable from General Obligation Bonds29
Priority 1	$ 75,00030
(1601)Airport Industrial Park, Planning and Construction 31
($811,300 Federal Match and $50,000 Local Match)32
(De Soto)33
Payable from General Obligation Bonds34
Priority 1	$ 300,00035
50/J18EAST CARROLL PARISH36
(1602)Industrial Site Development and Road Improvements 37
(For Economic Development Purposes, Including but not 38
Limited to an Ethanol Plant), Planning and Construction39
(East Carroll)40
Payable from General Obligation Bonds41
Priority 1	$ 1,020,00042
(1603)East Carroll Parish Health Unit, Planning and Construction 43
(Local Match Required)44
(East Carroll)45
Payable from General Obligation Bonds46
Priority 1	$ 20,00047 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 67 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1604)Courthouse and Jail Renovations1
(East Carroll)2
Payable from General Obligation Bonds3
Priority 1	$ 565,0004
50/J19EAST FELICIANA PARISH5
(1605)Courthouse Improvements, Planning, 6
Acquisitions, Renovations and Construction 7
($1,000,000 Cash and/or In-Kind Match)8
(East Feliciana)9
Payable from General Obligation Bonds10
Priority 1	$ 2,750,00011
Priority 5	$ 2,700,00012
Total	$ 5,450,00013
50/J20EVANGELINE PARISH14
(1606)New Industrial Facility and Related Infrastructure 15
(Construction or Acquisition)16
(Evangeline)17
Payable from General Obligation Bonds18
Priority 1	$ 500,00019
50/J21FRANKLIN PARISH20
(1088)Franklin Parish Activity Center, Planning21
and Construction ($250,000 Local Match)22
(Franklin)23
Payable from General Obligation Bonds24
Priority 1	$ 1,325,00025
Priority 5	$ 70,00026
Total	$ 1,395,00027
(1328)Courthouse Renovations, Planning and Construction28
(Franklin)29
Payable from General Obligation Bonds30
Priority 1	$ 50,00031
(1607)Union Church Road Improvements, Planning 32
and Construction33
(Franklin)34
Payable from General Obligation Bonds35
Priority 1	$ 45,00036
(1608)Raspberry Bridge Repairs, Planning and Construction37
(Franklin)38
Payable from General Obligation Bonds39
Priority 1	$ 150,00040
50/J22GRANT PARISH41
(862) Compressed Natural Gas Project, Acquisition42
and Development43
(Grant)44
Payable from General Obligation Bonds45
Priority 1	$ 50,00046 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 68 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1609)Southern Grant Sewerage System Improvements, 1
Study and Design2
(Grant)3
Payable from General Obligation Bonds4
Priority 1	$ 730,0005
Priority 5	$ 730,0006
Total	$ 1,460,0007
(1610)Regional Economic Development Building,8
Rehabilitation, Planning and Construction9
(Grant)10
Payable from General Obligation Bonds11
Priority 1	$ 300,00012
50/J23IBERIA PARISH13
(1611)Walking Track - Rynella Park, Planning and14
Construction15
(Iberia)16
Payable from General Obligation Bonds17
Priority 1	$ 70,00018
(1612)Wastewater System Improvements for the Acadiana 19
Regional Airport ($667,000 Non-State Match)20
(Iberia)21
Payable from General Obligation Bonds22
Priority 1	$ 635,00023
(1613)Sugar Cane Festival Building Improvements, 24
Planning and Construction25
(Iberia)26
Payable from General Obligation Bonds27
Priority 1	$ 25,00028
(1614)Loreauville Multi-Purpose Community Center, 29
Planning and Construction (Local Match Required)30
(Iberia)31
Payable from General Obligation Bonds32
Priority 1	$ 220,00033
(1615)LeMarie Memorial Airport, T-Hangar34
Planning and Construction35
(Iberia)36
Payable from General Obligation Bonds37
Priority 1	$ 150,00038
(1616)Five Lane Road Extension from Highway 675 39
to Highway 3212, Planning and Construction40
(Iberia)41
Payable from General Obligation Bonds42
Priority 1	$ 1,070,00043
Priority 2	$ 200,00044
Priority 5	$ 1,600,00045
Total	$ 2,870,00046 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 69 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1617)Recreational Complex, Sports Including Baseball, 1
Planning and Construction (Supplemental Funding)2
(Iberia)3
Payable from General Obligation Bonds4
Priority 1	$ 185,0005
Priority 2	$ 150,0006
Total	$ 335,0007
(1618)Road Extension from Sidney Blanchard Road to Ed Broussard8
Road, Planning and Construction9
(Iberia)10
Payable from General Obligation Bonds11
Priority 1	$ 150,00012
50/J24IBERVILLE PARISH13
(1007)New Iberville Parish Hospital - Acquisition14
of Property, Planning and Construction15
(Iberville)16
Payable from General Obligation Bonds17
Priority 1	$ 3,000,00018
(1619)North Iberville Community Center, Planning and 19
Construction ($200,000 Cash and/or In-Kind Match)20
(Iberville)21
Payable from General Obligation Bonds22
Priority 1	$ 2,025,00023
50/J26JEFFERSON PARISH24
(62) 18th Street Drainage Improvements, Edenborn Avenue25
Phase 2 (18th Street to West Esplanade Avenue Canal)26
(Jefferson)27
Payable from General Obligation Bonds28
Priority 1	$ 100,00029
(65) Airline Drive (US61) At 17th Street Canal30
Drainage Crossing and Railroad Bridge 31
Replacement, Planning and Construction32
(Jefferson)33
Payable from General Obligation Bonds34
Priority 1	$ 2,000,00035
(66) Ames Boulevard Widening from Two Lanes to Three Lanes 36
Between Barataria Boulevard and Bayou Boeuf 37
(2.0 miles) with Installation of Subsurface Drainage 38
(Jefferson)39
Payable from General Obligation Bonds40
Priority 1	$ 1,500,00041
Priority 5	$ 3,340,00042
Total	$ 4,840,00043
(73) Bike Path along Leo Kerner Parkway (Barataria Blvd. to 44
Parc des Familles Entrance, Planning and Construction45
(Jefferson)46
Payable from General Obligation Bonds47
Priority 1	$ 65,00048 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 70 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(75) Bonnabel Canal Rehabilitation and Bank Stabilization1
(Veterans Boulevard to West Esplanade), Planning2
and Construction3
(Jefferson)4
Payable from General Obligation Bonds5
Priority 1	$ 2,150,0006
Priority 5	$ 2,200,0007
Total	$ 4,350,0008
(76) Breaux Ditch Improvements (U-Channel Installation 9
from East Ames to Lafitte Larose Highway), Planning 10
and Construction 11
(Jefferson)12
Payable from General Obligation Bonds13
Priority 1	$ 125,00014
Priority 5	$ 1,225,00015
Total	$ 1,350,00016
(79) Canal 10 Concrete Lining and Widening between 17
Canal 7 and West Esplanade Avenue, Planning and 18
Construction19
(Jefferson)20
Payable from General Obligation Bonds21
Priority 2	$ 40,00022
(80) Canal Street Roadway Reconstruction and Installation 23
of Subsurface Drainage between I-10 and Lake Avenue 24
(Jefferson)25
Payable from General Obligation Bonds26
Priority 1	$ 25,00027
(81) Carol Sue Avenue Drainage Improvements, 28
Planning and Construction29
(Jefferson)30
Payable from General Obligation Bonds31
Priority 1	$ 1,600,00032
(85) Codifer Boulevard, Homestead Avenue, and 33
Brockenbraugh Court Subsurface Drainage34
Improvements, Planning and Construction 35
(Jefferson)36
Payable from General Obligation Bonds37
Priority 1	$ 200,00038
(91) East Jefferson Drainage Relief: Subsurface Drainage 39
Improvements to Garden Road, Tallulah, Sauve Road, 40
and Midway Drive, and Replacement of the Citrus and 41
Sauve Bridges over Soniat Canal42
(Jefferson)43
Payable from General Obligation Bonds44
Priority 1	$ 100,00045
(96) Jefferson Community Health Center Expansion to the 46
Existing River Ridge Facility in order to Implement a 47
Dental Program, Planning and Construction48
(Jefferson)49
Payable from General Obligation Bonds50
Priority 1	$ 50,00051 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 71 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(99) Jefferson Parish Housing Authority Street Lighting and 1
Security Upgrades (Between Betty and Julie Street in the 2
East-West Direction and Acre and Lapalco in the North-3
South Direction), Planning and Construction4
(Jefferson)5
Payable from General Obligation Bonds6
Priority 1	$ 300,0007
Priority 5	$ 25,0008
Total	$ 325,0009
(106) Livingston Place (Metairie Road to Loumor Avenue)10
(Jefferson)11
Payable from General Obligation Bonds12
Priority 1	$ 3,740,00013
(109) Manson Ditch Subsurface Drainage Installation14
from the ICC Railroad Ditch to the West Metairie15
Canal, Planning and Construction16
(Jefferson)17
Payable from General Obligation Bonds18
Priority 2	$ 200,00019
(111) Martin Luther King Playground Improvements,20
Planning and Construction21
(Jefferson)22
Payable from General Obligation Bonds23
Priority 1	$ 100,00024
(114) Multi-Purpose Recreational and Achievement Center 25
(Jefferson)26
Payable from General Obligation Bonds27
Priority 1	$ 5,210,00028
(118) Parc des Familles, Construction of Utilities, Restrooms, 29
Pavilions and Roadways in Raw Undeveloped Wooded 30
Area in order to Initiate Construction of Regional Park, 31
Planning and Construction32
(Jefferson)33
Payable from General Obligation Bonds34
Priority 1	$ 535,00035
Priority 5	$ 3,000,00036
Total	$ 3,535,00037
(121) Performing Arts Center Modifications 38
(Jefferson)39
Payable from General Obligation Bonds40
Priority 1	$ 3,350,00041
Priority 5	$ 3,400,00042
Total	$ 6,750,00043
(122) Performing Arts Center, Planning and Construction 44
($1,250,000 Local Match) 45
(Jefferson)46
Payable from General Obligation Bonds47
Priority 1	$ 9,155,00048 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 72 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(131) South Kenner Road Rehabilitation from Live Oak 1
Boulevard to River Road, Planning and Construction2
(Jefferson)3
Payable from General Obligation Bonds4
Priority 1	$ 300,0005
Priority 5	$ 3,700,0006
Total	$ 4,000,0007
(133) Terry Parkway Drainage Between Carol Sue Drive8
and Industry Canal, Planning and Construction9
($500,000 Local Match)10
(Jefferson)11
Payable from General Obligation Bonds12
Priority 1	$ 5,000,00013
Priority 5	$ 3,000,00014
Total	$ 8,000,00015
(135) Upper Kraak Ditch Drainage, Pump Station Pump 16
Replacement and Generator Installation17
(Jefferson)18
Payable from General Obligation Bonds19
Priority 1	$ 1,650,00020
(136) Upper Kraak Ditch Subsurface Drainage Improvement 21
(Upper Kraak Drainage Pump Station to Earhart 22
Expressway), Planning and Construction23
(Jefferson)24
Payable from General Obligation Bonds25
Priority 1	$ 250,00026
(139) Waggaman Subsurface Drainage Improvements,27
Planning and Construction28
(Jefferson)29
Payable from General Obligation Bonds30
Priority 1	$ 740,00031
(140) Walkertown Bus Terminal, Planning and Construction32
(Jefferson)33
Payable from General Obligation Bonds34
Priority 1	$ 100,00035
(142) Improvements to Wally Pontiff Jr. Facility36
(Jefferson)37
Payable from General Obligation Bonds38
Priority 1	$ 100,00039
(147) Woodland West Drainage Improvements 40
(Jefferson)41
Payable from General Obligation Bonds42
Priority 1	$ 150,00043
(148) Woodmere Community Center, Real Estate Acquisition, 44
Planning, and Construction ($15,000 Match)45
(Jefferson)46
Payable from General Obligation Bonds47
Priority 1	$ 735,00048 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 73 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(215) Canal 10 Concrete Lining and Box Culvert 1
Installation at Vintage Drive, Planning and 2
Construction3
(Jefferson)4
Payable from General Obligation Bonds5
Priority 2	$ 40,0006
(1620)Causeway Boulevard and Veterans Boulevard 7
Intersection Improvements ($5,250,000 Non-State Match)8
(Jefferson)9
Payable from General Obligation Bonds10
Priority 1	$ 265,00011
(1621)Canal 10 Concrete Lining Widening Between Canal 7 12
and West Esplanade Avenue, Planning and Construction13
(Jefferson)14
Payable from General Obligation Bonds15
Priority 1	$ 50,00016
(2032)Canal 10 Concrete Lining and Box Culvert Installation17
at Vintage Drive, Planning and Construction18
(Jefferson)19
Payable from General Obligation Bonds20
Priority 1	$ 100,00021
50/J27JEFFERSON DAVIS PARISH22
(1177)Regional Consolidated Jail Facility,23
Planning and Construction24
(Jefferson Davis)25
Payable from General Obligation Bonds26
Priority 2	$ 835,00027
Priority 5	$ 9,165,00028
Total	$10,000,00029
(1623)Rail Loading Facility at The Agri-Industrial Park 30
at Lacassine, Planning and Construction31
(Jefferson Davis)32
Payable from General Obligation Bonds33
Priority 1	$ 2,300,00034
(1624)Janise Road Bridge Repair, Planning and Construction35
(Jefferson Davis)36
Payable from General Obligation Bonds37
Priority 1	$ 65,00038
(1625)Third Street West Bridge Repair, 39
Planning and Construction40
(Jefferson Davis)41
Payable from General Obligation Bonds42
Priority 1	$ 140,00043 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 74 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/J28LAFAYETTE PARISH1
(153) Kaliste Saloom Widening2
(Lafayette)3
Payable from General Obligation Bonds4
Priority 1	$ 3,955,0005
Priority 5	$ 5,945,0006
Total	$ 9,900,0007
(154) Governmental Complex, Jail Physical Plant Upgrade, 8
Planning and Construction ($4,980,000 Non-State Match)9
(Lafayette)10
Payable from General Obligation Bonds11
Priority 5	$ 2,000,00012
50/J29LAFOURCHE PARISH13
(1627)Company Canal Pump Station, Planning and Construction 14
($283,236 Cash and/or In-Kind Match)15
(Lafourche)16
Payable from General Obligation Bonds17
Priority 1	$ 1,000,00018
50/J30LASALLE PARISH 19
(558) Pine Hill Road Improvements, Planning and Construction20
(LaSalle)21
Payable from General Obligation Bonds22
Priority 1	$ 665,00023
50/J32LIVINGSTON PARISH24
(227) Cook Road Extension Economic Development Corridor 25
(Pete's Highway Frontage Road) 26
(Livingston)27
Payable from General Obligation Bonds28
Priority 1	$ 1,000,00029
Priority 5	$ 4,000,00030
Total	$ 5,000,00031
(928) Livingston Parish Regional Airport, Planning and32
Construction ($900,000 Federal Funds)33
(Livingston)34
Payable from General Obligation Bonds35
Priority 1	$ 50,00036
37
(1628)Livingston Parish Animal Shelter 38
(Livingston)39
Payable from General Obligation Bonds40
Priority 1	$ 200,00041
Priority 2	$ 50,00042
Total	$ 250,00043
(1629)Livingston Parish Recreation District 2 Equipment44
(Livingston)45
Payable from General Obligation Bonds46
Priority 1	$ 25,00047 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 75 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1630)Twenty-First Judicial District Complex1
(Livingston)2
Payable from General Obligation Bonds3
Priority 1	$ 1,700,0004
(1631)Gravity Drainage District 2 Equipment5
(Livingston)6
Payable from General Obligation Bonds7
Priority 1	$ 40,0008
(    )District 9 Fire Station, Planning and Construction9
(Livingston)10
Payable from General Obligation Bonds11
Priority 2	$ 100,00012
Pending submittal and approval of a capital outlay budget request pursuant to the provisions13
of R.S. 39:112.14
50/J33MADISON PARISH15
(1632)Courthouse Renovations, Planning and Construction 16
(Madison)17
Payable from General Obligation Bonds18
Priority 1	$ 85,00019
(1633)Health Unit, Planning and Construction 20
($200,000 Cash or In-Kind Match Required)21
(Madison)22
Payable from General Obligation Bonds23
Priority 1	$ 845,00024
Priority 5	$ 405,00025
Total	$ 1,250,00026
(1634)Charles Brown Road (Tendal Road) Repairs, 27
Planning and Construction28
(Madison)29
Payable from General Obligation Bonds30
Priority 1	$ 200,00031
(1635)Sharkey Road and Hunter's Bend Road Repairs, 32
Planning and Construction33
(Madison)34
Payable from General Obligation Bonds35
Priority 1	$ 160,00036
(1636)Bear Lake Road Repairs, Planning and Construction37
(Madison)38
Payable from General Obligation Bonds39
Priority 1	$ 200,00040
50/J35NATCHITOCHES PARISH41
(777) Natchitoches Parish Police Jury Office of 42
Community Services, Addition and Renovation43
(Natchitoches)44
Payable from General Obligation Bonds45
Priority 1	$ 50,00046 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 76 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1321)Old River Bridge, Planning and Construction1
(Natchitoches)2
Payable from General Obligation Bonds3
Priority 1	$ 535,0004
50/J37OUACHITA PARISH5
(1637)Bayou DeSiard Ecosystem Restoration 6
($1,915,368 Federal Match)7
(Ouachita)8
Payable from General Obligation Bonds9
Priority 1	$ 890,00010
(1638)Extension of Interstate 20 Frontage Road East, Including11
a Bridge across Bennett Bayou, Acquisitions, Planning 12
and Construction ($1,114,000 Cash and/or In-Kind Match, 13
of which no more than $250,000 will be Expended in Year 1)14
(Ouachita)15
Payable from General Obligation Bonds16
Priority 1	$ 1,115,00017
50/J38PLAQUEMINES PARISH18
(606) Peters Road Bridge and Extension, 19
Planning and Construction 20
(Jefferson, Plaquemines)21
Payable from General Obligation Bonds22
Priority 1	$ 4,400,00023
Priority 5	$51,800,00024
Total	$56,200,00025
(607) Emergency Evacuation Complex, 26
Planning and Construction27
(Plaquemines)28
Payable from General Obligation Bonds29
Priority 1	$ 500,00030
Priority 5	$ 1,750,00031
Total	$ 2,250,00032
(1640)Belle Chasse Parks, Planning and Construction33
(Plaquemines)34
Payable from General Obligation Bonds35
Priority 1	$ 100,00036
(1641)Belle Chasse Water Tower, Planning and Construction37
(Plaquemines)38
Payable from General Obligation Bonds39
Priority 5	$ 20,00040
50/J39POINTE COUPEE PARISH41
(1144)False River Ecosystem Restoration Project,42
Planning and Construction43
(Pointe Coupee)44
Payable from General Obligation Bonds45
Priority 1	$ 1,500,00046
Priority 5	$ 1,200,00047
Total	$ 2,700,00048 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 77 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(    )Regional Fence Line Monitoring,1
Planning and Equipment2
(Pointe Coupee)3
Payable from General Obligation Bonds4
Priority 2	$ 200,0005
Pending submittal and approval of a capital outlay budget request pursuant to the provisions6
of R.S. 39:112.7
50/J40RAPIDES PARISH8
(1642)Cotile Outflow Gate Repair and Replacement, 9
Planning and Construction ($50,000 Local Match)10
(Rapides)11
Payable from General Obligation Bonds12
Priority 1	$ 45,00013
(1643)Dean Lee Research Station, Planning and Construction14
(Rapides)15
Payable from General Obligation Bonds16
Priority 1	$ 500,00017
(1644)Cotile Indian Creek and Kincaid Outflow Gate 18
Repair/Replacement (Cash and/or In-Kind Match Required)19
(Rapides)20
Payable from General Obligation Bonds21
Priority 1	$ 205,00022
50/J41RED RIVER PARISH23
(614) Health Unit and Administrative Offices, 24
Planning and Construction25
(Red River)26
Payable from General Obligation Bonds27
Priority 1	$ 240,00028
50/J42RICHLAND PARISH29
(580) Richland Parish Courthouse Renovations 30
(Richland)31
Payable from General Obligation Bonds32
Priority 1	$ 35,00033
(1213)Sapa Drive Improvements, Planning and Construction34
(Richland)35
Payable from General Obligation Bonds36
Priority 1	$ 250,00037
50/J43SABINE PARISH38
(801) Plainview Road Rehabilitation, Planning and Construction39
(Sabine)40
Payable from General Obligation Bonds41
Priority 1	$ 2,890,00042
Priority 5	$ 3,000,00043
Total	$ 5,890,00044 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 78 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/J44ST. BERNARD PARISH1
(1645)Judicial Government Complex Renovation 2
and Expansion, Planning and Construction 3
(St. Bernard)4
Payable from General Obligation Bonds5
Priority 1	$ 500,0006
(1646)St. Bernard Parish Tourist Commission, 7
Planning and Construction 8
(St. Bernard)9
Payable from General Obligation Bonds10
Priority 1	$ 25,00011
(1647)New Hospital and Medical Office Building, Real 12
Estate Acquisition, Planning and Construction13
(St. Bernard)14
Payable from General Obligation Bonds15
Priority 1	$17,000,00016
50/J45ST. CHARLES PARISH17
(654) West Bank Hurricane Protection Levee18
(St. Charles)19
Payable from General Obligation Bonds20
Priority 1	$ 1,025,00021
(1648)East Bank Clarifier, Planning and Construction22
(St. Charles)23
Payable from General Obligation Bonds24
Priority 1	$ 140,00025
(1649)St. Charles West Bank Ground Storage Tank 26
(St. Charles)27
Payable from General Obligation Bonds28
Priority 1	$ 175,00029
(1650)East Bank Ground Storage Tanks, 30
Planning and Construction31
(St. Charles)32
Payable from General Obligation Bonds33
Priority 1	$ 3,040,00034
(1651)St. Charles Emergency Operations Center 35
(St. Charles)36
Payable from General Obligation Bonds37
Priority 1	$ 540,00038
50/J46ST. HELENA PARISH39
(1151)Emergency ADA and Life Safety Renovations 40
to the Court House, Planning and Construction 41
($2,680,000 Federal Funds)42
(St. Helena)43
Payable from General Obligation Bonds44
Priority 1	$ 400,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 79 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1652)Eddy Road Improvements, Planning and Construction1
(St. Helena)2
Payable from General Obligation Bonds3
Priority 1	$ 50,0004
50/J47ST. JAMES PARISH5
(316) St. James Parish Land Acquisition, 6
Planning and Construction 7
(St. James)8
Payable from General Obligation Bonds9
Priority 1	$ 9,100,00010
Priority 5	$ 6,000,00011
Total	$15,100,00012
50/J48ST. JOHN THE BAPTIST PARISH13
(1653)Woodland Road between Cambridge and Belle Terre, 14
LA Hwy 3188 15
(St. John the Baptist)16
Payable from General Obligation Bonds17
Priority 1	$ 100,00018
50/J49ST. LANDRY PARISH 19
(1654)Hurricane Evacuations and Homeland 20
Security Coordination and Related 21
Renovations, Planning and Construction22
(St. Landry)23
Payable from General Obligation Bonds24
Priority 1	$ 195,00025
50/J50ST. MARTIN PARISH26
(447) Road Improvements on the Four-Mile Bayou Road,27
Planning and Construction28
(St. Martin)29
Payable from General Obligation Bonds30
Priority 1	$ 200,00031
(456) I-10 Frontage Road, LA 328 to LA 347, Planning 32
and Construction33
(St. Martin)34
Payable from General Obligation Bonds35
Priority 5	$ 4,550,00036
(457) T-Bayou Drainage Improvements (Local Match Required)37
(St. Martin)38
Payable from General Obligation Bonds39
Priority 1	$ 100,00040
(1655)Council on Aging New Senior Citizen Activity Building, 41
Acquisition, Planning and Construction42
(St. Martin)43
Payable from General Obligation Bonds44
Priority 1	$ 45,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 80 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1656)Courthouse Expansion and Renovations, 1
Planning and Construction2
(St. Martin)3
Payable from General Obligation Bonds4
Priority 1	$ 3,400,0005
(1657)Coteau Holmes Civic Center, Planning and Construction6
(St. Martin)7
Payable from General Obligation Bonds8
Priority 1	$ 220,0009
50/J51ST. MARY PARISH10
(529) Infrastructure Improvements at the Charenton Canal 11
Industrial Park12
(St. Mary)13
Payable from General Obligation Bonds14
Priority 1	$ 2,350,00015
(531) Reconstruction of Charenton Beach Road from LA 87 16
to the West Atchafalaya Basin Protection Levee, 17
Planning and Construction18
(St. Mary)19
Payable from General Obligation Bonds20
Priority 2	$ 500,00021
(532) Installation of Culverts and Associated Infrastructure22
in Middle Road Drainage Canal - Bayou Vista La. for23
Sub-Gravity Drainage District #1 of St. Mary Parish24
Gravity Drainage District #2, Planning and Construction25
(St. Mary)26
Payable from General Obligation Bonds27
Priority 1	$ 460,00028
(536) Recreation and Infrastructure Improvements29
at Centerville Park, Planning and Construction30
(St. Mary)31
Payable from General Obligation Bonds32
Priority 2	$ 75,00033
(1658)Recreational Improvements at Kemper Williams Park, 34
Acquisitions, Installation, Planning and Construction 35
($50,000 Local Match)36
(St. Mary)37
Payable from General Obligation Bonds38
Priority 1	$ 300,00039
(1659)St. Mary Parish Sewage District #5 Sewer Lift 40
Station Improvements41
(St. Mary)42
Payable from General Obligation Bonds43
Priority 1	$ 100,00044
(1660)DeGravelle Access Road to Duhon Bi-Pass Road in Amelia,45
Planning and Construction46
(St. Mary)47
Payable from General Obligation Bonds48
Priority 1	$ 180,00049 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 81 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1661)Drainage Improvements in Columbia Subdivision 1
near Franklin, Planning and Construction2
($39,960 Non-State Match)3
(St. Mary)4
Payable from General Obligation Bonds5
Priority 1	$ 125,0006
(1662)Plantation Pump Station Replacement for Sub-Gravity 7
Drainage District #1 of St. Mary Parish Gravity Drainage 8
District #2, Planning and Construction9
(St. Mary)10
Payable from General Obligation Bonds11
Priority 1	$ 1,925,00012
(1663)Cajun Coast Welcome Center and Tower Overlook 13
for the Tourist Commission dba Cajun Coast Visitors 14
and Convention Bureau, Planning and Construction 15
($2,121,324 Local Funds)16
(St. Mary)17
Payable from General Obligation Bonds18
Priority 1	$ 125,00019
Priority 5	$ 1,000,00020
Total	$ 1,125,00021
(1664)Access Road from Baker Hughes to Port Road 22
in Morgan City, Planning and Construction 23
($200,000 Local Match)24
(St. Mary)25
Payable from General Obligation Bonds26
Priority 1	$ 820,00027
50/J52ST. TAMMANY PARISH28
(675) South Slidell Levee Protection Rehabilitation 29
(USACE 533d Report for Levees West and East of I-10)30
Planning and Construction31
(St. Tammany)32
Payable from General Obligation Bonds33
Priority 1	$ 4,000,00034
Priority 2	$ 4,130,00035
Priority 5	$ 4,130,00036
Total	$12,260,00037
(677) St. Tammany Parish Fishing Pier, 38
Planning and Construction39
(St. Tammany)40
Payable from General Obligation Bonds41
Priority 1	$ 400,00042
Priority 2	$ 935,00043
Priority 5	$ 535,00044
Total	$ 1,870,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 82 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(678) University Square Learning Center Facilities,1
Planning and Construction 2
(St. Tammany)3
Payable from General Obligation Bonds4
Priority 1	$ 150,0005
Priority 2	$ 1,275,0006
Priority 5	$ 1,275,0007
Total	$ 2,700,0008
(1665)Camp Salmen Acquisition and Improvements, Planning 9
and Construction ($449,000 Non-State Match)10
(St. Tammany)11
Payable from General Obligation Bonds12
Priority 1	$ 230,00013
(1666)UNO Technology Park Drainage Sewer and Water 14
Extensions and Road15
(St. Tammany)16
Payable from General Obligation Bonds17
Priority 1	$ 45,00018
(1667)Slidell Levee Project, Planning and Construction 19
(St. Tammany)20
Payable from General Obligation Bonds21
Priority 1	$ 25,00022
(1669)Covington Emergency Shelter, Community Health23
Center and Livestock Facility Addition,24
Planning and Construction25
(St. Tammany)26
Payable from General Obligation Bonds27
Priority 1	$ 980,00028
Priority 2	$ 185,00029
Total	$ 1,165,00030
50/J53TANGIPAHOA PARISH31
(191) Courthouse and Courthouse Annex Renovations 32
and Expansions, Acquisitions, Planning and Construction33
($500,000 Local Match)34
(Tangipahoa)35
Payable from General Obligation Bonds36
Priority 1	$ 515,00037
Priority 2	$ 200,00038
Total	$ 715,00039
50/J54TENSAS PARISH40
(1671)Multi-Purpose Community Facility and Tensas Parish 41
Hospital Renovations, Planning and Construction 42
($35,000 Local Match)43
(Tensas)44
Payable from General Obligation Bonds45
Priority 1	$ 210,00046 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 83 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1672)Tensas Parish Port/Port Priority Site Plan, 1
Planning and Construction2
(Tensas)3
Payable from General Obligation Bonds4
Priority 1	$ 15,0005
50/J55TERREBONNE PARISH6
(695) Bayou Terrebonne Boardwalk, Planning and Construction 7
($1,000,000 Cash and/or In-Kind Match)8
(Terrebonne)9
Payable from General Obligation Bonds10
Priority 1	$ 845,00011
Priority 2	$ 200,00012
Total	$ 1,045,00013
(698) Thompson Road Extension, Land Acquisition, 14
Planning and Construction ($2,000,000 Local Match)15
(Terrebonne)16
Payable from General Obligation Bonds17
Priority 1	$ 250,00018
(1674)Terrebonne Parish Consolidated Government, Upper 19
Bayou Dularge Pump Station, Planning and Construction20
(Terrebonne)21
Payable from General Obligation Bonds22
Priority 1	$ 200,00023
50/J57VERMILION PARISH24
(1675)Vermilion Parish Road Improvements 25
(Vermilion)26
Payable from General Obligation Bonds27
Priority 5	$ 320,00028
(1676)Truck Bypass Route Improvements in the Gueydan Area, 29
Planning and Construction30
(Vermilion)31
Payable from General Obligation Bonds32
Priority 1	$ 250,00033
50/J58VERNON PARISH34
(516) Extension of Potable Water Line to Hutton,35
Planning and Construction36
(Vernon)37
Payable from General Obligation Bonds38
Priority 2	$ 745,00039
(1056)Vernon/Fort Polk Thoroughfare, Planning and Construction40
(Vernon)41
Payable from General Obligation Bonds42
Priority 1	$ 9,375,00043 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 84 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1678)Creation of Vernon Lake Cultural Center, Recreation 1
and Tourism Park, Planning and Construction2
(Vernon)3
Payable from General Obligation Bonds4
Priority 1	$ 210,0005
Priority 5	$ 300,0006
Total	$ 510,0007
(1679)Hard Surface Talbert Cemetery Road and Victor Martin 8
Road, Planning and Construction9
(Vernon)10
Payable from General Obligation Bonds11
Priority 1	$ 15,00012
(1680)Anacoco Recreation Complex Building Restroom, Office, 13
Concession Stand, and Press Box, Planning and Construction14
(Vernon)15
Payable from General Obligation Bonds16
Priority 1	$ 180,00017
(1681)Extension of Pavilion, Sidewalk Awning, Wastewater Line 18
Extension, Storm Drainage Relocation, Foundations, and 19
other Associated Infrastructure at Rodeo Arena, Planning 20
and Construction21
(Vernon)22
Payable from General Obligation Bonds23
Priority 1	$ 180,00024
(1682)Visitor Center, Planning and Construction25
(Vernon)26
Payable from General Obligation Bonds27
Priority 1	$ 550,00028
Priority 5	$ 700,00029
Total	$ 1,250,00030
(1683)Pitkin Branch of Vernon Parish Library System, 31
Equipment and Repair32
(Vernon)33
Payable from General Obligation Bonds34
Priority 1	$ 5,00035
(1684)Plainview Road Improvements, Planning and Construction36
(Vernon)37
Payable from General Obligation Bonds38
Priority 1	$ 1,860,00039
50/J59WASHINGTON PARISH40
(993) Emergency Operations, 911 and Multi-Agency 41
Communications Center, Real Estate, Planning 42
and Construction ($125,000 Local Match)43
(Washington)44
Payable from General Obligation Bonds45
Priority 1	$ 700,00046 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 85 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1249)Washington Parish Bridges - Reconstruction, 1
Planning and Construction2
(Washington)3
Payable from General Obligation Bonds4
Priority 2	$ 70,0005
The capital outlay budget request for this project was submitted after the November 1st6
deadline, but it has been approved by the Joint Legislative Committee on Capital Outlay7
pursuant to the provisions of R.S. 39:112.8
(1685)Recreation Area at or on the Pearl River Canal, 9
Planning and Construction10
(Washington)11
Payable from General Obligation Bonds12
Priority 1	$ 280,00013
(1686)Animal Shelter, Planning and Construction14
(Washington)15
Payable from General Obligation Bonds16
Priority 1	$ 85,00017
50/J60WEBSTER PARISH18
(1687)Union Grove Water System 19
(Webster)20
Payable from General Obligation Bonds21
Priority 1	$ 15,00022
(1688)Webster Parish Health Unit Springhill Branch, 23
Renovations, Planning and Construction24
(Webster)25
Payable from General Obligation Bonds26
Priority 1	$ 375,00027
50/J61WEST BATON ROUGE PARISH28
(1689)Water Distribution Improvements, Install Additional 29
Hydraulic Loop, Planning and/or Construction30
(West Baton Rouge)31
Payable from General Obligation Bonds32
Priority 1	$ 70,00033
(1690)Regional Sewer System Located South of the 34
Intra-Coastal Waterway and North of Brusly35
(West Baton Rouge)36
Payable from General Obligation Bonds37
Priority 1	$ 75,00038
(1691)LA 415 Bridge at Intracoastal Canal,39
Planning and Construction40
(West Baton Rouge)41
Payable from General Obligation Bonds42
Priority 1	$ 1,000,00043 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 86 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/J62WEST CARROLL PARISH1
(1226)Chip and Seal Road Repair2
(West Carroll)3
Payable from General Obligation Bonds4
Priority 1	$ 100,0005
Priority 2	$ 160,0006
Total	$ 260,0007
(1692)West Carroll Parish Governmental Office, 8
Planning and Construction9
(West Carroll)10
Payable from General Obligation Bonds11
Priority 1	$ 180,00012
(1693)Building Acquisition, Planning and Construction13
(West Carroll)14
Payable from General Obligation Bonds15
Priority 1	$ 140,00016
50/J64WINN PARISH17
(1694)Country Club Road, Planning and Construction18
(Winn)19
Payable from General Obligation Bonds20
Priority 1	$ 920,00021
50/M01ABBEVILLE22
(1695)City of Abbeville Emergency Operations Center 23
Roof Repairs, Planning and Construction24
(Vermilion)25
Payable from General Obligation Bonds26
Priority 1	$ 300,00027
50/M02ABITA SPRINGS28
(1696)Water Lines and Sewer Lines, Extensions 29
and Upgrades, Planning and Construction 30
(Cash and/or In-Kind Match Required)31
(St. Tammany)32
Payable from General Obligation Bonds33
Priority 1	$ 15,00034
Priority 2	$ 15,00035
Total	$ 30,00036
50/M05ALEXANDRIA37
(543) Sugarhouse Road/Eddie Williams Blvd. to LA Hwy. 1, 38
Phase I and Phase II, Planning and Construction 39
($5,000,000 Local Match)40
(Rapides)41
Payable from General Obligation Bonds42
Priority 1	$ 500,00043
Priority 2	$ 200,00044
Priority 5	$ 6,700,00045
Total	$ 7,400,00046 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 87 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/M09ARCADIA1
(706) Multi-Purpose Community Center, Planning 2
and Construction ($350,000 Local Match)3
(Bienville)4
Payable from General Obligation Bonds5
Priority 1	$ 2,320,0006
50/M10ARNAUDVILLE7
(1697)Multipurpose Aquatic Recreational Facility8
(St. Landry)9
Payable from General Obligation Bonds10
Priority 1	$ 270,00011
50/M14BAKER12
(1698)New Fire Station, Planning and Construction 13
($75,000 Local Match)14
(East Baton Rouge)15
Payable from General Obligation Bonds16
Priority 1	$ 320,00017
50/M15BALDWIN18
(1699)Fire Station and Public Service Center, 19
Planning and Construction20
(St. Mary)21
Payable from General Obligation Bonds22
Priority 1	$ 1,030,00023
50/M16BALL24
(840) Sewer Extensions in the Springhill Road Area,25
Planning and Construction26
(Rapides)27
Payable from General Obligation Bonds28
Priority 2	$ 50,00029
(1700)Sewer Extensions in the Springhill Road Area 30
(Rapides)31
Payable from General Obligation Bonds32
Priority 1	$ 150,00033
(1701)Hamack Lane Area and South Ball in the Vicinity 34
of US 165, Sanitary Sewer System Extensions 35
and Improvements, Planning and Construction36
(Rapides)37
Payable from General Obligation Bonds38
Priority 1	$ 150,00039 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 88 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/M19BASTROP1
(1702)Bastrop Central Fire Station, Replace Driveway City2
Hall, Roof Construction, Planning and Construction3
(Morehouse)4
Payable from General Obligation Bonds5
Priority 1	$ 200,0006
Priority 5	$ 250,0007
Total	$ 450,0008
50/M20BATON ROUGE9
(1703)Drainage Improvements in Old Goodwood Area, 10
Planning and Construction11
(East Baton Rouge)12
Payable from General Obligation Bonds13
Priority 1	$ 170,00014
(1704)River Center Arena and Theatre Renovation, 15
Exhibition Center Expansion, Parking Facilities 16
and Street Realignment, Planning and Construction 17
($28,500,000 Local Match)18
(East Baton Rouge)19
Payable from General Obligation Bonds20
Priority 1	$ 4,600,00021
(1705)Hooper Road Sewer Improvements 22
($1,200,000 Local Match)23
(East Baton Rouge)24
Payable from General Obligation Bonds25
Priority 1	$ 1,300,00026
(1706)Jefferson Highway Signal Improvements, Government27
Street to Drusilla Lane, Planning and Construction 28
($150,000 Local Match)29
(East Baton Rouge)30
Payable from General Obligation Bonds31
Priority 1	$ 1,725,00032
(1707)Stanford Avenue Improvements, Sidewalk Widening, 33
Planning and Construction 34
(East Baton Rouge)35
Payable from General Obligation Bonds36
Priority 1	$ 75,00037
(1708)New Facility for Pride Volunteer Fire Department, 38
Planning and Construction39
(East Baton Rouge)40
Payable from General Obligation Bonds41
Priority 1	$ 100,00042
(1709)Baseball Stadium Improvements 43
(East Baton Rouge)44
Payable from General Obligation Bonds45
Priority 1	$ 1,400,00046 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 89 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1710)Extension of Stumberg Lane from Jefferson Hwy. 1
to Airline Hwy., Planning and Construction2
(East Baton Rouge)3
Payable from General Obligation Bonds4
Priority 1	$ 1,000,0005
(    )Hooper Road Widening to Four Lanes6
(Blackwater Bayou to Sullivan Road), Planning, 7
Engineering, Utilities and Construction8
(East Baton Rouge)9
Payable from General Obligation Bonds10
Priority 2	$ 2,000,00011
Priority 5	$ 8,000,00012
Total	$10,000,00013
Pending submittal and approval of a capital outlay budget request pursuant to the provisions14
of R.S. 39:112.15
50/M22BENTON16
(762) Town of Benton Wastewater Collection System17
Improvements, Planning and Construction18
(Bossier)19
Payable from General Obligation Bonds20
Priority 2	$ 200,00021
(1711)Wastewater System Improvements, Collection System, 22
Planning and Construction ($73,000 Local Match)23
(Bossier)24
Payable from General Obligation Bonds25
Priority 1	$ 700,00026
50/M24BERWICK27
(1712)Sewer Rehabilitation on Third and Fourth28
Streets and Sinclair Alley, Planning 29
and Construction30
(St. Mary)31
Payable from General Obligation Bonds32
Priority 5	$ 45,00033
50/M27BOGALUSA34
(466) Extension of Willis Avenue to Highway 21,35
Planning and Construction36
(Washington)37
Payable from General Obligation Bonds38
Priority 2	$ 70,00039
(1713)Construction of Two Fire Stations, Planning and Construction40
(Washington)41
Payable from General Obligation Bonds42
Priority 1	$ 10,00043 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 90 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1714)City Hall Restoration and Renovations, Planning 1
and Construction ($98,768 Federal Match)2
(Washington)3
Payable from General Obligation Bonds4
Priority 1	$ 300,0005
(1715)Emergency Sewer Collection System Evaluation6
and Repairs, Planning and Construction7
(Washington )8
Payable from General Obligation Bonds9
Priority 1	$ 440,00010
50/M29BOSSIER CITY11
(307) Center for Creative Digital Media (CCDM)12
(Bossier)13
Payable from General Obligation Bonds14
Priority 1	$ 500,00015
(886) Hwy. 71 Street Lighting Project from LA 303216
(Westgate Drive) to LA 511 (Jimmie Davis Hwy),17
Planning and Construction18
(Bossier)19
Payable from General Obligation Bonds20
Priority 1	$ 780,00021
50/M32BROUSSARD22
(719) Rehabilitate LA Hwy 182 from US 9023
to LA Hwy 89, Planning and Construction24
(Lafayette)25
Payable from General Obligation Bonds26
Priority 1	$ 250,00027
(720) Three Lane LA Hwy 182 in the City of Broussard,28
Planning and Construction ($750,000 Local Match)29
(Lafayette)30
Payable from General Obligation Bonds31
Priority 1	$ 1,650,00032
Priority 5	$ 600,00033
Total	$ 2,250,00034
(721) South Bernard from Ambassador Caffery to LA Hwy 182,35
Planning and Construction,36
(Lafayette)37
Payable from General Obligation Bonds38
Priority 2	$ 705,00039
(722) Reconstruct South Bernard Road from LA Hwy 18240
to US Hwy 90, Planning and Construction41
(Lafayette)42
Payable from General Obligation Bonds43
Priority 1	$ 150,00044
Priority 2	$ 500,00045
Total	$ 650,00046 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 91 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1716)U.S. Highway 90 Intersection Improvements 1
at Bercegeay Road, Planning and Construction2
(Lafayette)3
Payable from General Obligation Bonds4
Priority 1	$ 15,0005
50/M33BRUSLY6
(1294)New Police Department Headquarters, Maintenance,7
Material Storage and Annex Buildings8
(West Baton Rouge)9
Payable from General Obligation Bonds10
Priority 1	$ 2,530,00011
50/M35BUNKIE12
(1717)Water System Improvements, Water Main Replacement 13
Along US 71 Main Street, Planning and Construction 14
($500,000 Local Match)15
(Avoyelles)16
Payable from General Obligation Bonds17
Priority 1	$ 340,00018
50/M36CALVIN19
(1718)Water System Expansion, Including In-Line Booster 20
System Facility, Planning and Construction21
(Winn)22
Payable from General Obligation Bonds23
Priority 1	$ 875,00024
50/M37CAMPTI25
(1719)Town of Campti Multi-Purpose Community Center, 26
Planning and Construction27
(Natchitoches)28
Payable from General Obligation Bonds29
Priority 1	$ 250,00030
Priority 5	$ 50,00031
Total	$ 300,00032
50/M39CARENCRO33
(631) Wastewater and City Infrastructure Flood Damages,34
Planning and Construction35
(Lafayette)36
Payable from General Obligation Bonds37
Priority 1	$ 1,200,00038
Priority 5	$ 4,770,00039
Total	$ 5,970,00040
(867) Arceneaux Road Drainage Improvements, 41
Site Work and Culverting, Planning and Construction 42
(50% Local Match)43
(Lafayette)44
Payable from General Obligation Bonds45
Priority 2	$ 205,00046 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 92 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(873) Gaston Coulee Cleaning, Planning and Improvements1
(Lafayette)2
Payable from General Obligation Bonds3
Priority 2	$ 160,0004
50/M40CASTOR5
(1299)New Water Well and Related System Improvements,6
Planning and Construction7
(Bienville)8
Payable from General Obligation Bonds9
Priority 2	$ 310,00010
50/M44CHOUDRANT11
(1721)Village of Choudrant Town Hall 12
(Lincoln)13
Payable from General Obligation Bonds14
Priority 1	$ 100,00015
50/M46CLARENCE16
(615) Clarence, Wastewater System Improvements, 17
Planning and Construction18
(Natchitoches)19
Payable from General Obligation Bonds20
Priority 1	$ 50,00021
50/M48CLAYTON22
(1722)Clayton School Gymnasium, Planning and Construction23
(Concordia)24
Payable from General Obligation Bonds25
Priority 5	$ 100,00026
50/M52COLUMBIA27
(1723)Repair of Existing Water Well, Planning and Construction28
(Caldwell)29
Payable from General Obligation Bonds30
Priority 1	$ 90,00031
50/M54COTTON VALLEY32
(1724)Cotton Valley Sewerage System Improvements, 33
Planning and Construction34
(Webster)35
Payable from General Obligation Bonds36
Priority 5	$ 300,00037
50/M58CROWLEY38
(1725)Wastewater Treatment Facility Improvements 39
($250,000 Local Match)40
(Acadia)41
Payable from General Obligation Bonds42
Priority 1	$ 210,00043 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 93 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1726)South Avenue H at Bayou Blanc, Bridge Replacement, 1
Planning and Construction2
(Acadia)3
Payable from General Obligation Bonds4
Priority 1	$ 965,0005
50/M59CULLEN6
(1727)Potable Water and Distribution System Improvements, 7
Planning and Construction8
(Webster)9
Payable from General Obligation Bonds10
Priority 1	$ 85,00011
Priority 5	$ 250,00012
Total	$ 335,00013
(1728)Refurbish Water Storage Tank and Equipment (Truck) 14
Acquisitions, Planning and Construction 15
(Non-State Match Required)16
(Webster)17
Payable from General Obligation Bonds18
Priority 1	$ 180,00019
50/M60DELCAMBRE20
(556) Water Distribution and Storage System Improvements,21
Planning and Construction22
(Vermilion)23
Payable from General Obligation Bonds24
Priority 1	$ 450,00025
(1729)Renovation/Conversion of Old Town Hall 26
to the Delcambre Police Station, Planning, 27
Acquisition, Renovation and Construction28
(Vermilion)29
Payable from General Obligation Bonds30
Priority 1	$ 120,00031
(1730)Delcambre Shrimp Festival Pavilion, Planning32
and Construction33
(Iberia)34
Payable from General Obligation Bonds35
Priority 1	$ 150,00036
50/M61DELHI37
(680) Richland Parish Recreational and Learning Center, 38
Planning and Construction39
(Richland)40
Payable from General Obligation Bonds41
Priority 1	$ 800,00042
50/M64DEQUINCY43
(649) New City Hall, Planning and Construction44
(Calcasieu)45
Payable from General Obligation Bonds46
Priority 5	$ 1,050,00047 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 94 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1731)Buxton Creek Improvements, Planning and Construction1
(Calcasieu)2
Payable from General Obligation Bonds3
Priority 1	$ 475,0004
(1732)Sewer Rehabilitation of 8" Sewer on Holly 5
and North Division Streets and 18" Sewer 6
on William Still Road - City of Dequincy7
(Calcasieu)8
Payable from General Obligation Bonds9
Priority 1	$ 500,00010
Priority 5	$ 50,00011
Total	$ 550,00012
50/M65DERIDDER13
(1733)Community Recreational Building and Shelter, 14
Planning and Construction and/or Acquisition 15
and Rehabilitation of the Existing Facility 16
($1,500,000 Local Match)17
(Beauregard)18
Payable from General Obligation Bonds19
Priority 1	$ 1,250,00020
Priority 5	$ 1,975,00021
Total	$ 3,225,00022
50/M68DONALDSONVILLE23
(1734)Riverfront Development, Planning and Construction24
(Ascension)25
Payable from General Obligation Bonds26
Priority 1	$ 780,00027
50/M69DOWNSVILLE28
(1735)Water Treatment Plant Compliance Upgrade, 29
Planning, Construction, Equipment and Furnishings 30
($10,000 Local Match)31
(Lincoln)32
Payable from General Obligation Bonds33
Priority 1	$ 310,00034
(1736)Downsville Recreational Facility Improvements,35
Planning and Construction36
(Lincoln)37
Payable from General Obligation Bonds38
Priority 1	$ 145,00039
50/M75EAST HODGE40
(1279)Village Hall Improvements, Planning and Construction41
(Jackson)42
Payable from General Obligation Bonds43
Priority 2	$ 250,00044
Pending approval of the capital outlay budget request pursuant to the provisions of R.S.45
39:112.46 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 95 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/M80ERATH1
(1737)Wastewater Treatment Plant Improvement, 2
Planning and Construction3
(Vermilion)4
Payable from General Obligation Bonds5
Priority 1	$ 140,0006
(1738)Public Works Facility, Planning and Construction7
(Vermilion)8
Payable from General Obligation Bonds9
Priority 1	$ 450,00010
50/M85FARMERVILLE11
(1739)Sewage, Water, Lift Station, and Other Infrastructure, 12
Planning and Construction13
(Union)14
Payable from General Obligation Bonds15
Priority 1	$ 1,300,00016
(1740)Union Village Fire Station, Acquisitions, 17
Planning and Construction18
(Union)19
Payable from General Obligation Bonds20
Priority 1	$ 100,00021
22
50/M87FERRIDAY23
(1741)Downtown Revitalization, Planning and Construction 24
($253,750 In-Kind Local Match)25
(Concordia)26
Payable from General Obligation Bonds27
Priority 1	$ 1,395,00028
29
50/M89FLORIEN30
(1742)Water Facility Improvements, Planning and Construction31
(Sabine)32
Payable from General Obligation Bonds33
Priority 1	$ 465,00034
50/M90FOLSOM35
(1743)Road and Street Repairs, Planning and Construction 36
(Cash and/or In-Kind Match Required)37
(St. Tammany)38
Payable from General Obligation Bonds39
Priority 1	$ 30,00040
Priority 5	$ 20,00041
Total	$ 50,00042 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 96 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/M93FOREST HILL1
(658) Renovation of Community Facilities, Planning 2
and Construction ($375,000 Local Match)3
(Rapides)4
Payable from General Obligation Bonds5
Priority 1	$ 330,0006
Priority 2	$ 50,0007
Priority 5	$ 620,0008
Total	$ 1,000,0009
50/M95FRANKLINTON10
(817) Industrial Park Property and Acquisition and Development11
(Washington)12
Payable from General Obligation Bonds13
Priority 1	$ 115,00014
Priority 2	$ 60,00015
Total	$ 175,00016
50/MA5GONZALES17
(1330)Improvements on LA 3038, Including Patching, Repairing, 18
and Overlaying of the Highway, Planning and Construction19
(Ascension)20
Payable from General Obligation Bonds21
Priority 1	$ 800,00022
50/MA6GRAMBLING23
(1744)Water Distribution System Rehabilitation, 24
Planning and Construction25
(Lincoln)26
Payable from General Obligation Bonds27
Priority 1	$ 70,00028
(1745)Wastewater System Expansion 29
(Lincoln)30
Payable from General Obligation Bonds31
Priority 1	$ 295,00032
(1746)Sewer Line Extension for South Pine Tree Road 33
and Area North of I-20, Planning and Construction34
(Lincoln)35
Payable from General Obligation Bonds36
Priority 1	$ 175,00037
50/MA9GRAND COTEAU38
(1747)Fire Truck and Fire Station Upgrades 39
(St. Landry)40
Payable from General Obligation Bonds41
Priority 1	$ 10,00042 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 97 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1748)Police and Utility Departments Roof, Air 1
Conditioning Unit for Town Hall, Handheld 2
Meter Reader, Abandon and Plug Water Well3
(St. Landry)4
Payable from General Obligation Bonds5
Priority 1	$ 60,0006
50/MB1GRAND ISLE7
(713) Historic Recreation Center/Community Center, 8
Planning and Construction9
(Jefferson)10
Payable from General Obligation Bonds11
Priority 1	$ 100,00012
Priority 2	$ 465,00013
Total	$ 565,00014
50/MB2GRAYSON15
(1749)Infrastructure Improvements, Planning and Construction16
(Caldwell)17
Payable from General Obligation Bonds18
Priority 1	$ 85,00019
(1750)Children's Playground and Pavilion, Planning and 20
Construction (Cash and/or In-Kind Match Required)21
(Caldwell)22
Payable from General Obligation Bonds23
Priority 1	$ 60,00024
50/MB4GREENWOOD25
(501) Multipurpose Community Center, Planning 26
and Construction ($200,000 Local Match)27
(Caddo)28
Payable from General Obligation Bonds29
Priority 1	$ 200,00030
50/MB5GRETNA31
(618) McDonoghville Fire Station, Land Acquisition,32
Planning and Construction33
(Jefferson)34
Payable from General Obligation Bonds35
Priority 1	$ 1,000,00036
1751) Gretna Water Tower, Planning and Construction37
(Jefferson)38
Payable from General Obligation Bonds39
Priority 1	$ 200,00040
(1752)Cultural Center for the Arts, Planning and Construction 41
($300,000 Local Match, $500,000 Parish Match)42
(Jefferson)43
Payable from General Obligation Bonds44
Priority 1	$ 1,600,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 98 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1753)New Garden Park Street Lighting, Planning and Construction1
(Jefferson)2
Payable from General Obligation Bonds3
Priority 1	$ 530,0004
(1754)Mel Ott Multipurpose Center, Planning and Construction 5
($150,000 Cash and/or In-Kind Local Match)6
(Jefferson)7
Payable from General Obligation Bonds8
Priority 1	$ 250,0009
(1755)Jefferson Parish Courthouse Drainage Project, 10
Planning and Construction 11
(Jefferson)12
Payable from General Obligation Bonds13
Priority 1	$ 3,700,00014
(1756)Sewer Plant Primary Clarifier, Planning and Construction15
(Jefferson)16
Payable from General Obligation Bonds17
Priority 1	$ 200,00018
(1757)Mel Ott Exterior Lighting and Improvements19
(Jefferson)20
Payable from General Obligation Bonds21
Priority 1	$ 225,00022
(1758)Hancock Street Canal Improvements (Kepler Street 23
- Virgil Street), Planning and Construction24
(Jefferson)25
Payable from General Obligation Bonds26
Priority 1	$ 250,00027
Priority 5	$ 1,700,00028
Total	$ 1,950,00029
50/MB6GROSSE TETE30
(1759)Wastewater Treatment Facility Upgrade, 31
Planning and Construction32
(Iberville)33
Payable from General Obligation Bonds34
Priority 1	$ 10,00035
(1760)Sewer System Improvements, Planning and Construction36
(Iberville)37
Payable from General Obligation Bonds38
Priority 1	$ 1,050,00039
(1761)Road Rehabilitation and Improvement Program40
(Iberville)41
Payable from General Obligation Bonds42
Priority 1	$ 350,00043 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 99 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MB7GUEYDAN1
(1762)Street Improvements, Planning and Construction 2
($112,000 Local Match)3
(Vermilion)4
Payable from General Obligation Bonds5
Priority 1	$ 300,0006
50/MB9HAMMOND7
(478) Pine Hill Sewer System Improvements and Municipal8
Tie-In, Planning and Construction9
(Tangipahoa)10
Payable from General Obligation Bonds11
Priority 2	$ 300,00012
(479) Sewer System Improvements, Oxidation Ditch13
Conversion, Sequencing Batch Reactor and 14
Pump Station, Planning and Construction15
(Tangipahoa)16
Payable from General Obligation Bonds17
Priority 2	$ 100,00018
Priority 5	$ 650,00019
Total	$ 750,00020
(626) Police Station, Acquisition and Renovation,21
Planning and Construction22
(Tangipahoa)23
Payable from General Obligation Bonds24
Priority 1	$ 600,00025
(627) Air Traffic Control Tower, Planning and Construction26
($450,000 Local Match)27
(Tangipahoa)28
Payable from General Obligation Bonds29
Priority 1	$ 750,00030
(1763)Community Center Annex Parking Lot 31
(Tangipahoa)32
Payable from General Obligation Bonds33
Priority 1	$ 25,00034
50/MC1HARAHAN35
(1764)Magnolia Boulevard Drainage - West Magnolia36
to Jefferson Highway, Planning and Construction37
(Jefferson)38
Payable from General Obligation Bonds39
Priority 1	$ 45,00040
(1765)Penfold Place Drainage, Planning and Construction41
(Jefferson)42
Payable from General Obligation Bonds43
Priority 1	$ 50,00044 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 100 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MC3HAUGHTON1
(1766)Additional Water Supply Wells, Planning and Construction2
(Bossier)3
Payable from General Obligation Bonds4
Priority 1	$ 325,0005
50/MC5HEFLIN6
(1283)Conversion of Gym into Multipurpose Facility, 7
Planning and Construction8
(Webster)9
Payable from General Obligation Bonds10
Priority 1	$ 150,00011
Priority 5	$ 335,00012
Total	$ 485,00013
50/MC9HOMER14
(460) Town of Homer, Town Hall Renovations, 15
Planning and Construction16
(Claiborne)17
Payable from General Obligation Bonds18
Priority 1	$ 150,00019
Priority 2	$ 225,00020
Total	$ 375,00021
50/MD1HORNBECK22
(415) Emergency Connection with Anacoco Water System,23
Planning and Construction24
(Vernon)25
Payable from General Obligation Bonds26
Priority 1	$ 300,00027
Priority 2	$ 200,00028
Total	$ 500,00029
(599) Rehabilitation of Elevated Water Tank,30
Planning and Construction31
(Vernon)32
Payable from General Obligation Bonds33
Priority 2	$ 180,00034
(1767)New City Hall, Planning and Construction35
(Vernon)36
Payable from General Obligation Bonds37
Priority 1	$ 550,00038
(1768)Emergency Connection with West Vernon 39
Waterworks District and Inline Booster Station, 40
Planning and Construction41
(Vernon)42
Payable from General Obligation Bonds43
Priority 1	$ 300,00044
Priority 5	$ 600,00045
Total	$ 900,00046 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 101 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MD5INDEPENDENCE1
(304) Independence Area Community Pavilion,2
Planning and Construction3
(Tangipahoa)4
Payable from General Obligation Bonds5
Priority 1	$ 155,0006
(1769)Sewerage Improvements, Planning and Construction7
(Tangipahoa)8
Payable from General Obligation Bonds9
Priority 1	$ 100,00010
(1770)Sewerage Treatment and Sewer/Water Lines 11
Repairs, Planning and Construction 12
(Cash and/or In-Kind Match Required)13
(Tangipahoa)14
Payable from General Obligation Bonds15
Priority 1	$ 50,00016
50/MD7IOWA17
(1771)Iowa Downtown Water System Improvements, 18
Real Estate, Planning and Construction19
(Calcasieu)20
Payable from General Obligation Bonds21
Priority 1	$ 250,00022
50/ME1JEAN LAFITTE23
(1772)Lafitte Seafood Pavilion, Planning and Construction 24
(Jefferson)25
Payable from General Obligation Bonds26
Priority 1	$ 1,235,00027
Priority 2	$ 100,00028
Total	$ 1,325,00029
(1773)Lafitte Street Drainage, Planning and Construction 30
(Non-State Match Required)31
(Jefferson)32
Payable from General Obligation Bonds33
Priority 1	$ 175,00034
(1774)Hurricane Safehouse and Storage Facility, Planning and 35
Construction (In-Kind Non-State Match Required)36
(Jefferson)37
Payable from General Obligation Bonds38
Priority 1	$ 45,00039
50/ME2JEANERETTE40
(559) Sewer Treatment Facility Upgrade, Planning and 41
Construction ($912,500 Federal and/or Local Match)42
(Iberia)43
Payable from General Obligation Bonds44
Priority 2	$ 190,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 102 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1775)City Park Improvements1
(Iberia)2
Payable from General Obligation Bonds3
Priority 1	$ 120,0004
(1776)Police Building Improvements, Planning and Construction5
(Iberia)6
Payable from General Obligation Bonds7
Priority 1	$ 105,0008
50/ME6JONESVILLE9
(1189)Drainage Improvements, Planning and Construction10
(Catahoula)11
Payable from General Obligation Bonds12
Priority 2	$ 1,580,00013
(1777)Pumping Station Upgrade, Planning and Construction14
(Catahoula)15
Payable from General Obligation Bonds16
Priority 1	$ 60,00017
50/ME8KAPLAN18
(1778)Public Safety Complex, Planning and Construction19
(Vermilion)20
Payable from General Obligation Bonds21
Priority 1	$ 300,00022
50/MF1KENNER23
(972) Kenner City Park, Phase 2, Planning and 24
Construction25
(Jefferson)26
Payable from General Obligation Bonds27
Priority 2	$ 40,00028
(973) Railroad Crossing Signal at Taylor and Kenner 29
Avenue, Planning and Construction 30
(Jefferson)31
Payable from General Obligation Bonds32
Priority 2	$ 100,00033
(977) Third Street Corridor Improvements - South 34
Kenner (includes Rivertown and Armstrong 35
Airport Buyout Property)36
(Jefferson)37
Payable from General Obligation Bonds38
Priority 2	$ 25,00039
(979) City of Kenner Emergency Operations 40
Center, Planning and Construction41
(Jefferson)42
Payable from General Obligation Bonds43
Priority 2	$ 25,00044 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 103 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(980) Wastewater System Corrective Measures 1
(Jefferson)2
Payable from General Obligation Bonds3
Priority 1	$ 525,0004
Priority 2	$ 65,0005
Total	$ 590,0006
(981) Drainage Improvements Along Idaho Avenue, 26th Street7
to West Napoleon Canal, Planning and Construction8
(Jefferson)9
Payable from General Obligation Bonds10
Priority 1	$ 150,00011
Priority 2	$ 25,00012
Total	$ 175,00013
(986) Lake Trail Drainage Improvement, Planning 14
and Construction15
(Jefferson)16
Payable from General Obligation Bonds17
Priority 2	$ 40,00018
50/MF2KENTWOOD19
(434) Recreational Facility Property Acquisition, Planning, 20
Site Preparation, Master Recreation Plan and Construction21
(Tangipahoa)22
Payable from General Obligation Bonds23
Priority 1	$ 375,00024
50/MF9LAKE CHARLES25
(436) National Hurricane Museum and Science Center, 26
Planning and Construction27
(Calcasieu)28
Payable from General Obligation Bonds29
Priority 1	$ 300,00030
(439) Riverside Park Improvements, Planning31
and Construction ($750,000 Local Match)32
(Calcasieu)33
Payable from General Obligation Bonds34
Priority 2	$ 100,00035
Priority 5	$ 650,00036
Total	$ 750,00037
(584) Infrastructure Improvements for Economic Development, 38
Planning and Construction ($3,000,000 Local Match)39
(Calcasieu)40
Payable from General Obligation Bonds41
Priority 2	$ 1,000,00042
Priority 5	$ 6,000,00043
Total	$ 7,000,00044 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 104 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1030)Wastewater Treatment Plant B/C Force Main1
Segment No. 2, Planning and Construction2
($4,195,000 Local Match)3
(Calcasieu)4
Payable from General Obligation Bonds5
Priority 2	$ 1,000,0006
Priority 5	$ 8,530,0007
Total	$ 9,530,0008
(1779)Relocation of Lakeshore Drive, to Include Eastbound9
and Westbound I-10 Ramps to Ryan Street, 10
Planning and Construction11
(Calcasieu)12
Payable from General Obligation Bonds13
Priority 1	$ 400,00014
50/MG1LAKE PROVIDENCE15
(1780)Lake Providence Industrial Park and Equipment, 16
Infrastructure Improvements, Planning, Land 17
Acquisition, Equipment and Construction 18
(Non-State Match Required)19
(East Carroll)20
Payable from General Obligation Bonds21
Priority 1	$ 50,00022
50/MG3LEESVILLE23
(603) Rehabilitation and/or Replacement of Lift Stations24
and Equipment, Planning and Construction25
(Vernon)26
Payable from General Obligation Bonds27
Priority 2	$ 600,00028
(1781)University Parkway Sewer System, 29
Planning and Construction30
(Vernon)31
Payable from General Obligation Bonds32
Priority 1	$ 3,190,00033
(1782)Highway 28 and 171 Sewer and Water Extension34
(Vernon)35
Payable from General Obligation Bonds36
Priority 1	$ 795,00037
(1783)Recreational Complex Renovations and Improvements, 38
Including New Swimming Facility, Planning and Construction39
 ($500,000 Local Match and $150,000 Federal Match)40
(Vernon)41
Payable from General Obligation Bonds42
Priority 1	$ 155,00043
50/MG8LIVONIA44
(833) Purchase and Installation of Law Enforcement 45
Surveillance System, Planning and Construction46
(Pointe Coupee)47
Payable from General Obligation Bonds48
Priority 2	$ 120,00049 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 105 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1784)Glaser St. Drainage Relief Project 1
(Pointe Coupee)2
Payable from General Obligation Bonds3
Priority 1	$ 100,0004
50/MG9LOCKPORT5
(1785)Emergency Generator for Lockport Wastewater 6
Treatment Plant, Planning, Acquisition, and Installation7
(Lafourche)8
Payable from General Obligation Bonds9
Priority 1	$ 100,00010
50/MH1LOGANSPORT11
(1786)Wastewater System Improvements, Planning and 12
Construction ($150,000 Cash and/or In-Kind Match)13
(De Soto)14
Payable from General Obligation Bonds15
Priority 1	$ 100,00016
(1787)Logansport Industrial Buildings, Planning and Construction17
(De Soto)18
Payable from General Obligation Bonds19
Priority 1	$ 50,00020
50/MH3LOREAUVILLE21
(568) Loreauville Water Tower Improvements, Planning 22
and Construction23
(Iberia)24
Payable from General Obligation Bonds25
Priority 1	$ 75,00026
Priority 2	$ 50,00027
Total	$ 125,00028
(1788)Loreauville Wastewater Treatment Plant Improvements 29
and Demolition Project, Planning and Construction30
(Iberia)31
Payable from General Obligation Bonds32
Priority 1	$ 265,00033
50/MH6MADISONVILLE34
(1789)Emergency Facilities, Renovations, 35
Planning and Construction36
(St. Tammany)37
Payable from General Obligation Bonds38
Priority 1	$ 70,00039
(1790)Madisonville Bulkhead 40
(St. Tammany)41
Payable from General Obligation Bonds42
Priority 1	$ 100,00043 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 106 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MH8MANDEVILLE1
(1331)Mandeville Trailhead Property Acquisition,2
Planning and Construction3
(St. Tammany)4
Payable from General Obligation Bonds5
Priority 1	$ 400,0006
(1791)Water Tower, Construction7
(St. Tammany)8
Payable from General Obligation Bonds9
Priority 1	$ 2,200,00010
(2046)Mandeville Police Surveillance Cameras11
(St. Tammany)12
Payable from General Obligation Bonds13
Priority 2	$ 200,00014
50/MI1MANSFIELD15
(1792)Turn Lane US Highway 84 (McArthur Drive) 16
and Highway 175 (The Lake Road)17
(De Soto)18
Payable from General Obligation Bonds19
Priority 1	$ 240,00020
50/MI4MARINGOUIN21
(243) Governmental/Multi-Purpose Facility, Planning 22
and Construction23
(Iberville)24
Payable from General Obligation Bonds25
Priority 2	$ 80,00026
50/MI6MARKSVILLE27
(703) Mary Bethune Community Center, previously 28
known as D.A. Jordan Community Center, for 29
the City of Marksville, Planning and 30
Construction31
(Avoyelles)32
Payable from General Obligation Bonds33
Priority 2	$ 200,00034
(1793)Sanitary Sewer Aeration Basin Improvements for 35
City of Marksville, Planning and Construction36
(Avoyelles)37
Payable from General Obligation Bonds38
Priority 1	$ 130,00039
50/MI8MAURICE40
(1794)Civic Center - Post Hurricane Shelter 41
($400,000 Local Match)42
(Vermilion)43
Payable from General Obligation Bonds44
Priority 1	$ 250,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 107 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1795)Wastewater Treatment Facility and Collection System 1
Upgrade ($1,792,800 Federal Match)2
(Vermilion)3
Payable from General Obligation Bonds4
Priority 1	$ 600,0005
50/MJ1MELVILLE6
(409) Multi-Purpose Community Center, 7
Planning and Construction 8
(St. Landry)9
Payable from General Obligation Bonds10
Priority 1	$ 50,00011
50/MJ3MER ROUGE12
(1796)Boutz Lane Renovations13
(Morehouse)14
Payable from General Obligation Bonds 15
Priority 1	$ 500,00016
50/MJ4MERRYVILLE17
(519) Sewerage Pump Station and Aeration System 18
Improvements, Planning and Construction19
(Beauregard)20
Payable from General Obligation Bonds21
Priority 2	$ 225,00022
50/MJ5MINDEN23
(1102)Potable Water Ground Storage Tank, 24
Planning and Construction25
(Webster)26
Payable from General Obligation Bonds27
Priority 1	$ 215,00028
Priority 5	$ 320,00029
Total	$ 535,00030
(1797)Emergency Generator, Minden Water Treatment Plant, 31
Planning and Construction ($62,500 Local Match)32
(Webster)33
Payable from General Obligation Bonds34
Priority 1	$ 190,00035
50/MJ6MONROE36
(1215)I-20 Interchange Improvement and Kansas Garrett Connector, 37
Kansas Lane Connector, Planning and Construction 38
($1,000,000 Local and $6,000,000 Federal Match)39
(Ouachita)40
Payable from General Obligation Bonds41
Priority 1	$ 3,850,00042
(1217)Monroe Regional Airport Terminal, Planning and43
Construction ($40,500,000 Federal and/or Local Match)44
(Ouachita)45
Payable from General Obligation Bonds46
Priority 2	$ 2,000,00047 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 108 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1798)Downtown Development District Facilities and Infrastructure 1
for River Front, Design and Construction 2
(Ouachita)3
Payable from General Obligation Bonds4
Priority 5	$ 250,0005
(1799)US Highway 165 South, US Highway 165 Business 6
Route Connector ($450,000 Local Match)7
(Ouachita)8
Payable from General Obligation Bonds9
Priority 1	$ 3,125,00010
50/MJ8MONTPELIER11
(1332)Administration Building, Acquisition, 12
Planning and Construction13
(St. Helena)14
Payable from General Obligation Bonds15
Priority 1	$ 190,00016
50/MK2MORGAN CITY17
(1169)Lake End Parkway Cabins, Planning and Construction18
(St. Mary)19
Payable from General Obligation Bonds20
Priority 1	$ 1,000,00021
(1173)LA Hwy. 70 Drainage Improvements,22
Planning and Construction23
(St. Mary)24
Payable from General Obligation Bonds25
Priority 2	$ 1,470,00026
(1174)Brashear Avenue Drainage Canal Conversion to 27
Subsurface Drainage, Planning and Construction28
(St. Mary)29
Payable from General Obligation Bonds30
Priority 1	$ 3,590,00031
(1800)Martin Luther King Jr. Boulevard Reconstruction 32
(St. Mary)33
Payable from General Obligation Bonds34
Priority 1	$ 500,00035
Priority 5	$ 500,00036
Total	$ 1,000,00037
(1801)Docking Facility on Lake Palourde, Planning and38
Construction ($20,000 Cash and/or In-Kind Match)39
(St. Mary)40
Payable from General Obligation Bonds41
Priority 1	$ 300,00042
50/MK7NAPOLEONVILLE43
(1802)Community Center Improvements44
(Assumption)45
Payable from General Obligation Bonds46
Priority 5	$ 25,00047 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 109 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MK9NATCHITOCHES1
(1122)Texas and Pacific Railway Natchitoches Depot2
Redevelopment 3
(Natchitoches)4
Payable from General Obligation Bonds5
Priority 1	$ 200,0006
(1124)East Natchitoches By-Pass Project - Phase I 7
(LA Hwy 6 East to LA Hwy 1226/Williams Avenue), 8
Planning and Construction9
(Natchitoches)10
Payable from General Obligation Bonds11
Priority 1	$ 250,00012
Priority 5	$ 5,400,00013
Total	$ 5,650,00014
(1803)Industrial Park South, Sewer Improvements, Access Road, 15
and Land Acquisition, Planning and Construction 16
($1,100,000 Local Match)17
(Natchitoches)18
Payable from General Obligation Bonds19
Priority 1	$ 625,00020
(1804)South Natchitoches Drainage Improvements, including 21
Adjacent Roadwork, Planning and Construction22
(Natchitoches)23
Payable from General Obligation Bonds24
Priority 1	$ 50,00025
Priority 5	$ 1,475,00026
Total	$ 1,525,00027
50/ML1NEW IBERIA28
(1805)Frontage Road Improvements, Real Estate, 29
Planning and Construction30
(Iberia)31
Payable from General Obligation Bonds32
Priority 1	$ 150,00033
(1806)Sewer System Upgrade Area D Tributary, Planning 34
and Construction ($360,000 Local Match)35
(Iberia)36
Payable from General Obligation Bonds37
Priority 1	$ 1,080,00038
Priority 2	$ 350,00039
Total	$ 1,430,00040
(1807)Armenco Branch Canal Drainage Improvements 41
(Non-State Match Required)42
(Iberia)43
Payable from General Obligation Bonds44
Priority 1	$ 2,250,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 110 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/ML2NEW LLANO1
(1808)Expansion of Wastewater System South of Fort Polk2
Entrance Road, Real Estate, Acquisition, Planning3
and Construction4
(Vernon)5
Payable from General Obligation Bonds6
Priority 1	$ 1,650,0007
(1809)Water System Improvements, Construction 8
($800,000 Local Match)9
(Vernon)10
Payable from General Obligation Bonds11
Priority 1	$ 1,500,00012
(1810)Street Improvements, Planning and Construction13
(Vernon)14
Payable from General Obligation Bonds15
Priority 1	$ 75,00016
50/ML3NEW ORLEANS17
(189) Behrman Park Improvements - New Soccer Facility, 18
Planning and Construction, Master Planning19
(Orleans)20
Payable from General Obligation Bonds21
Priority 1	$12,000,00022
(444) Eastern New Orleans Hospital, Planning, 23
Design, and Construction 24
(Orleans)25
Payable from General Obligation Bonds26
Priority 1	$15,130,00027
(462) Old Charity Hospital Adaptive Re-Use,28
Planning and Construction29
(Orleans)30
Payable from the balance of the State General Fund by 31
Statutory Dedications out of the 2004 Overcollections 32
Fund previously allocated under the authority of Act 203 33
of 2007 for Higher Education, LSU Health Sciences 34
Center - Health Care Services Division, Medical Center 35
of Louisiana at New Orleans Planning, Land Acquisition 36
and Construction37
(Orleans)	$13,000,00038
Provided, however, that this appropriation is contingent upon the obligation of39
an equal amount of funding from the Hazard Mitigation Grant Program by the40
Federal Emergency Management Agency for the University Medical Center in41
New Orleans project.42 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 111 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(934) George W. Carver Playground, Renovations and 1
Upgrades, Including Repair and Renovation of 2
Basketball Courts and Pavilion, Renovations to 3
Bathrooms and Concession Building, Demolition 4
of Existing Playground and Installation of New 5
Play Equipment, Planning and Construction6
(Orleans)7
Payable from General Obligation Bonds8
Priority 1	$ 450,0009
(935) Taylor Pool and Playground, Renovations and Upgrades,10
Including Repair and Renovation of Basketball Courts11
and Pavilion, Replacing Perimeter Fencing, Installation12
of New Water Fountains, and Re-Grade Fields, Planning13
and Construction14
(Orleans)15
Payable from General Obligation Bonds16
Priority 1	$ 250,00017
(1811)Construction of Opelousas Street Extension from 18
Behrman Avenue to Obannon Street and Construction19
of Patterson Drive Extension from Hendee Street to 20
Obannon Street, Planning and Construction21
(Orleans)22
Payable from General Obligation Bonds23
Priority 1	$ 3,325,00024
(1812)Norman Playground Basketball Gym, 25
Planning and Construction26
(Orleans)27
Payable from General Obligation Bonds28
Priority 1	$ 1,980,00029
Priority 5	$ 1,000,00030
Total	$ 2,980,00031
(1813)Holiday Drive Roadway Construction 32
(Gen. MacArthur to Behrman) 33
(Orleans)34
Payable from General Obligation Bonds35
Priority 1	$ 1,300,00036
(1814)New Multi-Department Facility, Planning and Construction37
(Orleans)38
Payable from General Obligation Bonds39
Priority 1	$ 200,00040
(1815)Treme Center Improvements, Planning and Construction41
(Orleans)42
Payable from General Obligation Bonds43
Priority 1	$ 200,00044
(1816)Rosenwald Community Center, Planning and Construction45
(Orleans)46
Payable from General Obligation Bonds47
Priority 1	$ 400,00048 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 112 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1817)Fourth District Police Station, Planning and Construction1
(Orleans)2
Payable from General Obligation Bonds3
Priority 1	$ 300,0004
(1818)Algiers Playgrounds, Renovation of Restrooms,5
Lighting, Fencing, and Playground Equipment6
(Orleans)7
Payable from General Obligation Bonds8
Priority 1	$ 225,0009
(1819)Algiers Fire Station, Planning and Construction 10
(Orleans)11
Payable from General Obligation Bonds12
Priority 1	$ 150,00013
(1820)Historic Algiers Courthouse Renovation, Planning 14
and Construction (Cash and/or In- Kind Match Required)15
(Orleans)16
Payable from General Obligation Bonds17
Priority 5	$ 50,00018
50/ML4NEW ROADS19
(1191)Community Park Redevelopment, 20
Planning and Construction21
(Pointe Coupee)22
Payable from General Obligation Bonds23
Priority 2	$ 260,00024
(1821)Railroad Avenue Sewer Lift Station, 25
Planning and Construction26
(Pointe Coupee)27
Payable from General Obligation Bonds28
Priority 1	$ 150,00029
50/MM2OAKDALE30
(1822)Sewer Extensions, Planning and Construction31
(Allen)32
Payable from General Obligation Bonds33
Priority 1	$ 175,00034
50/MM4OIL CITY35
(1823)Highway 538 Water Line Extension, 36
Planning and Construction37
(Caddo)38
Payable from General Obligation Bonds39
Priority 1	$ 425,00040
50/MM6OPELOUSAS41
(1824)Tourism Center and South Park Project42
(St. Landry)43
Payable from General Obligation Bonds44
Priority 1	$ 140,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 113 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MM8PARKS1
(422) Municipal Complex, Planning and Construction2
(St. Martin)3
Payable from General Obligation Bonds4
Priority 1	$ 150,0005
Priority 2	$ 250,0006
Total	$ 400,0007
50/MM9PATTERSON8
(1826)Catherine Street Paving and Drainage, Engineering 9
and Construction10
(St. Mary)11
Payable from General Obligation Bonds12
Priority 1	$ 100,00013
50/MN1PEARL RIVER14
(1827)Sewer Treatment Plant Upgrade, Planning 15
and Construction (Supplemental Funding)16
(St. Tammany)17
Payable from General Obligation Bonds18
Priority 1	$ 250,00019
(1828)River Dredging, Planning and Construction20
(St. Tammany)21
Payable from General Obligation Bonds22
Priority 1	$ 420,00023
(1829)Pearl River Museum, Planning and Construction 24
(St. Tammany)25
Payable from General Obligation Bonds26
Priority 1	$ 5,00027
50/MN3PINEVILLE28
(1830)Pinecrest Roadway/Sidewalk Improvements,29
Planning and Construction30
(Rapides)31
Payable from General Obligation Bonds32
Priority 1	$ 305,00033
50/MN5PLAIN DEALING34
(484) Wastewater Treatment Plant Improvements,35
Planning and Construction36
(Bossier)37
Payable from General Obligation Bonds38
Priority 1	$ 160,00039
Priority 5	$ 160,00040
Total	$ 320,00041
50/MN6PLAQUEMINE42
(1831)Municipal Joint Field Operations Office 43
(Iberville)44
Payable from General Obligation Bonds45
Priority 1	$ 150,00046 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 114 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MN8PLEASANT HILL1
(1832)Street Reconstruction and Overlay, Planning 2
and Construction3
(Sabine)4
Payable from General Obligation Bonds5
Priority 1	$ 140,0006
(1833)Rehabilitate Two Elevated Water Tanks and 7
Rehabilitate Water Well, Planning and Construction8
(Sabine)9
Payable from General Obligation Bonds10
Priority 1	$ 160,00011
50/MO1PONCHATOULA12
(871) Consolidated Law Enforcement Complex,13
Acquisition, Planning and Construction14
(Tangipahoa)15
Payable from General Obligation Bonds16
Priority 5	$ 1,250,00017
(1187)Downtown Parking Lot, Acquisition,18
Planning and Construction19
(Tangipahoa)20
Payable from General Obligation Bonds21
Priority 5	$ 500,00022
50/MO2PORT ALLEN23
(1834)New Water Well at Avenue D24
(West Baton Rouge)25
Payable from General Obligation Bonds26
Priority 1	$ 10,00027
50/MO7QUITMAN28
(1835)Repair of Wastewater Treatment Facility29
(Jackson)30
Payable from General Obligation Bonds31
Priority 1	$ 120,00032
50/MO9RAYVILLE33
(1306)Railroad Spur, Planning and Construction34
(Richland)35
Payable from General Obligation Bonds36
Priority 1	$ 250,00037
38
(1836)Frontage Road, North Side Loop, West Leg, for the Town 39
of Rayville (Non-State Match), Planning and Construction40
(Richland)41
Payable from General Obligation Bonds42
Priority 1	$ 175,00043 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 115 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1837)Hangar, T-Hangar, Paved Areas and Utilities for Rayville 1
Airport, Town of Rayville, Planning and Construction2
(Richland)3
Payable from General Obligation Bonds4
Priority 1	$ 300,0005
50/MP3RICHWOOD6
(1082)Richwood Municipal Complex, Planning, Construction, 7
and Land Acquisition (Local Match Required)8
(Ouachita)9
Payable from General Obligation Bonds10
Priority 1	$ 270,00011
50/MP5RINGGOLD12
(763) Town Hall/Civic Center Renovations, and Remodeling, 13
Planning and Construction14
(Bienville)15
Payable from General Obligation Bonds16
Priority 1	$ 100,00017
50/MQ1ROSEPINE18
(522) Water System Improvements, Town of Rosepine,19
Planning and Construction20
(Vernon)21
Payable from General Obligation Bonds22
Priority 1	$ 200,00023
(523) Rehabilitation of Elevated Water Tank, 24
Planning and Construction25
(Vernon)26
Payable from General Obligation Bonds27
Priority 2	$ 245,00028
(561) Rosepine Wastewater Treatment Plant Improvements,29
Planning and Construction30
(Vernon)31
Payable from General Obligation Bonds32
Priority 1	$ 550,00033
Priority 5	$ 1,070,00034
Total	$ 1,620,00035
(1839)Municipal Complex Including City Hall, Detention36
Center, Emergency Response, and Judicial Center37
(Vernon)38
Payable from General Obligation Bonds39
Priority 1	$ 175,00040
(1840)Rosepine Recreational Ball Park Acquisition, Planning 41
and Construction 42
(Vernon)43
Payable from General Obligation Bonds44
Priority 1	$ 75,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 116 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MQ2RUSTON1
(1841)Goodwin Road Reconstruction, Planning and Construction 2
($350,000 Local Match)3
(Lincoln)4
Payable from General Obligation Bonds5
Priority 1	$ 100,0006
50/MQ3ST. FRANCISVILLE7
(474) Natural Gas Distribution System Rehabilitation 8
and Improvement, Planning and Construction9
(West Feliciana)10
Payable from General Obligation Bonds11
Priority 1	$ 305,00012
(1842)Sewer System Rehabilitation and Improvement, 13
Planning and Construction 14
(West Feliciana)15
Payable from General Obligation Bonds16
Priority 1	$ 395,00017
50/MQ4ST. JOSEPH18
(1843)Proposed City Hall/Convention Center, 19
Planning and Construction20
(Tensas)21
Payable from General Obligation Bonds22
Priority 1	$ 250,00023
50/MQ5ST. MARTINVILLE24
(1844)Sewer Upgrade, Planning and Construction25
(St. Martin)26
Payable from General Obligation Bonds27
Priority 1	$ 350,00028
(1845)Sewer Lift Station Improvements 29
(St. Martin)30
Payable from General Obligation Bonds31
Priority 1	$ 205,00032
(1846)Upgrade Wastewater Treatment Plant 33
and Wastewater Pre-Treatment System34
(St. Martin)35
Payable from General Obligation Bonds36
Priority 1	$ 900,00037
50/MQ6SALINE38
(1847)Water Tower Repairs, Planning and Construction 39
(Non-State Match Required)40
(Bienville)41
Payable from General Obligation Bonds42
Priority 1	$ 15,00043 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 117 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MQ7SAREPTA1
(1281)Wastewater Collection System Improvements, 2
Acquisitions, Planning and Construction 3
(Non-State Match Required)4
(Webster)5
Payable from General Obligation Bonds6
Priority 1	$ 300,0007
50/MQ8SCOTT8
(751) Apollo Road Extension (Rue Du Belier and Dulles Drive9
Intersection to Old Spanish Trail and Apollo Road10
Intersection), Planning, Construction, and Land Acquisition11
(Lafayette)12
Payable from General Obligation Bonds13
Priority 1	$ 2,500,00014
Priority 5	$12,500,00015
Total	$15,000,00016
(753) Scott Events Center, Planning and Construction17
(Lafayette)18
Payable from General Obligation Bonds19
Priority 1	$ 60,00020
(754) I-10 North Frontage Road, Planning and Construction21
(Lafayette)22
Payable from General Obligation Bonds23
Priority 1	$ 990,00024
(1296)Water and Sewer Line Installation along Apollo Road25
Extension, Planning and Construction26
(Lafayette)27
Payable from General Obligation Bonds28
Priority 2	$ 375,00029
(1848)I-10 North Frontage Road Sewer and Water, 30
Planning and Construction31
(Lafayette)32
Payable from General Obligation Bonds33
Priority 1	$ 900,00034
(1849)Frontage Road Along Interstate 10, 35
Planning and Construction 36
(Non-State Match Required)37
(Lafayette)38
Payable from General Obligation Bonds39
Priority 1	$ 720,00040
50/MR1SHREVEPORT41
(635) Junior Golf Training Facilities (The First Tee) for 42
Jerry Tim Brooks Lakeside Golf Course, Planning 43
and Construction44
(Caddo)45
Payable from General Obligation Bonds46
Priority 1	$ 200,00047 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 118 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(636) ARTSPACE at the West Edge - Downtown Shreveport, 1
Planning and Construction2
(Caddo)3
Payable from General Obligation Bonds4
Priority 1	$ 700,0005
(1850)Shreveport Arts Center Replacement, Planning, Construction 6
and Equipment 7
(Caddo)8
Payable from General Obligation Bonds9
Priority 1	$ 505,00010
Priority 5	$ 255,00011
Total	$ 760,00012
(1851)Convention Center Complex, Planning and Construction 13
($85,000,000 Local Funds)14
(Caddo)15
Payable from General Obligation Bonds16
Priority 1	$12,000,00017
(1852)Renovation of Former Hendrix Elementary School into 18
Allendale Community Facility, Planning and Construction19
(Caddo)20
Payable from General Obligation Bonds21
Priority 1	$ 5,00022
50/MR2SIBLEY23
(662) Wastewater Collection Improvements, Planning 24
and Construction25
(Webster)26
Payable from General Obligation Bonds27
Priority 1	$ 100,00028
Priority 5	$ 365,00029
Total	$ 465,00030
(663) Wastewater Treatment Facilities Improvements31
(Webster)32
Payable from General Obligation Bonds33
Priority 1	$ 110,00034
(1853)Water Wells and Distribution System, Land Acquisition, 35
Planning and Construction36
(Webster)37
Payable from General Obligation Bonds38
Priority 1	$ 550,00039
50/MR4SIKES40
(997) Village of Sikes Water System Extensions and41
Improvements, Planning and Construction42
(Winn)43
Payable from General Obligation Bonds44
 Priority 1	$ 1,700,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 119 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MR5SIMMESPORT1
(1855)Multipurpose Evacuation Shelter/Community Center in 2
Simmesport, Acquisitions, Utilities, Planning 3
and Construction4
(Avoyelles)5
Payable from General Obligation Bonds6
Priority 1	$ 400,0007
50/MR7SIMSBORO8
(1856)Water Well and Water Main9
(Lincoln)10
Payable from General Obligation Bonds11
Priority 1	$ 150,00012
(1857)Village of Simsboro, Extend Sewer Line/New Subdivision13
(Lincoln)14
Payable from General Obligation Bonds15
Priority 1	$ 130,00016
(1858)Village of Simsboro Renovate "Old" Fire Station 17
into Town Hall, Planning and Construction18
(Lincoln)19
Payable from General Obligation Bonds20
Priority 1	$ 100,00021
50/MR9SLIDELL22
(1859)W-14 Culverting Project23
(St. Tammany)24
Payable from General Obligation Bonds25
Priority 1	$ 2,000,00026
(1860)City Barn Flood Gates, Planning and Construction27
(St. Tammany)28
Payable from General Obligation Bonds29
Priority 1	$ 25,00030
50/MS4SPRINGFIELD31
(470) Water System Planning and Construction32
(Livingston)33
Payable from General Obligation Bonds34
Priority 1	$ 800,00035
Priority 5	$ 400,00036
Total 	$ 1,200,00037
50/MS5SPRINGHILL38
(1861)Wastewater Collection System Improvements, 39
Planning and Construction40
(Webster)41
Payable from General Obligation Bonds42
Priority 1	$ 75,00043 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 120 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MS7STERLINGTON1
(1146)Service Road, Planning and Construction2
(Ouachita)3
Payable from General Obligation Bonds4
Priority 1	$ 120,0005
(1156)Wastewater Treatment Improvements - Headworks 6
Structure, Planning and Construction7
(Ouachita)8
Payable from General Obligation Bonds9
Priority 1	$ 50,00010
(1862)Sanitary Sewer Collection System Along US 165 Corridor, 11
and Sewer Treatment Facility Upgrade/Improvements, 12
Planning, Construction, Land Acquisition ($1,000,000 13
Local Match)14
(Ouachita)15
Payable from General Obligation Bonds16
Priority 1	$ 900,00017
50/MS8STONEWALL18
(1863)Street Improvements, Planning and Construction 19
($125,000 Local Match)20
(De Soto)21
Payable from General Obligation Bonds22
Priority 1	$ 245,00023
50/MS9SULPHUR24
(1058)City of Sulphur, East Mimosa Street, Planning 25
and Construction26
(Calcasieu)27
Payable from General Obligation Bonds28
Priority 2	$ 200,00029
(1864)Regional Wastewater Treatment Facility 30
Sludge Belt Press and Conveyor System 31
(Calcasieu)32
Payable from General Obligation Bonds33
Priority 1	$ 240,00034
(1865)Northside Industrial Park Rail Spur Extension, Planning 35
($692,960 Cash and/or In-Kind Match)36
(Calcasieu)37
Payable from General Obligation Bonds38
Priority 1	$ 2,210,00039
50/MT1SUN40
(1866)Town Hall Renovations, Planning and Construction41
(St. Tammany)42
Payable from General Obligation Bonds43
Priority 1	$ 100,00044
Priority 5	$ 20,00045
Total	$ 120,00046 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 121 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MT2SUNSET1
(1867)Sunset Municipal Complex 2
(St. Landry)3
Payable from General Obligation Bonds4
Priority 1	$ 120,0005
50/MT3TALLULAH6
(1868)Improvements to Sewer System, Planning and Construction7
(Madison)8
Payable from General Obligation Bonds9
Priority 1	$ 180,00010
(1869)Sewer Treatment Plant Improvements City of Tallulah 11
(Madison)12
Payable from General Obligation Bonds13
Priority 1	$ 120,00014
(1870)Lift Station Improvements, Planning and Construction15
(Madison)16
Payable from General Obligation Bonds17
Priority 1	$ 90,00018
(1871)Industrial Park Development, Planning and Construction19
(Non-State Match Required)20
(Madison)21
Payable from General Obligation Bonds22
Priority 1	$ 5,00023
(1872)City Hall Repairs and Renovation24
(Madison)25
Payable from General Obligation Bonds26
Priority 1	$ 70,00027
50/MT5THIBODAUX28
(612) LA Hwy 20 (N. Canal Blvd.) Widening, 29
Planning and Construction30
(Lafourche)31
Payable from General Obligation Bonds32
Priority 1	$ 1,400,00033
Priority 2	$ 250,00034
Priority 5	$ 540,00035
Total	$ 2,190,00036
(1873)Tiger Drive Bridge Replacement, Planning and 37
Construction ($1,742,200 Local Match)38
(Lafourche)39
Payable from General Obligation Bonds40
Priority 1	$ 250,00041
50/MT6TICKFAW42
(1874)Drainage Improvements on Highway 442 East 43
and West, Planning and Construction44
(Tangipahoa)45
Payable from General Obligation Bonds46
Priority 1	$ 115,00047 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 122 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MU2VIDALIA1
(469) Development of a Slackwater Port on the Mississippi2
River, Planning and Construction3
(Concordia)4
Payable from General Obligation Bonds5
Priority 1	$ 2,000,0006
Priority 5	$ 8,000,0007
Total	$10,000,0008
(1875)Vidalia River Front Development, Design, Planning 9
and Construction of Emergency Shelter10
(Concordia)11
Payable from General Obligation Bonds12
Priority 1	$ 1,100,00013
(1877)Vidalia Industrial Park Development, Planning and 14
Construction ($16,710,800 Local, Federal, Other and 15
In-Kind Match to be Provided in Phases as Indicated in 16
the Capital Outlay Request)17
(Concordia)18
Payable from General Obligation Bonds19
Priority 1	$ 750,00020
50/MU5VINTON21
(689) Town of Vinton, Vinton Street Improvements22
(Calcasieu)23
Payable from General Obligation Bonds24
Priority 1	$ 200,00025
(1878)Sidewalk and Drainage Improvements on Horridge 26
Street (Main Street) ($50,000 Local Match)27
(Calcasieu)28
Payable from General Obligation Bonds29
Priority 1	$ 50,00030
(1879)Extension of Loree Street Bridge and Entrance Road 31
Economic Development Project, Planning and 32
Construction33
(Calcasieu)34
Payable from General Obligation Bonds35
Priority 1	$ 300,00036
(1880)Water Treatment Plant Improvements, 37
Including Rehabilitation of Elevated Water 38
Storage Tank, Site and Electrical Improvements, 39
Planning and Construction40
(Calcasieu)41
Payable from General Obligation Bonds42
Priority 1	$ 250,00043
50/MU6VIVIAN44
(486) Town of Vivian, Street Improvements, Planning 45
and Construction46
(Caddo)47
Payable from General Obligation Bonds48
Priority 1	$ 400,00049 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 123 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(500) Water and Wastewater System Improvements 1
and Extension, Planning and Construction2
(Caddo)3
Payable from General Obligation Bonds4
Priority 1	$ 250,0005
Priority 5	$ 1,000,0006
Total	$ 1,250,0007
50/MU7WALKER8
(150) Widening of Highway 447 and I-12 Overpass9
 Improvements, Environmental Phase 10
Commencement, Planning and Construction11
(Livingston)12
Payable from General Obligation Bonds13
Priority 1	$ 300,00014
50/MV2WEST MONROE15
(1127)West Ouachita Senior Center Facility - ADA, 16
Federal Confidentiality Requirements, and 17
Building Code Improvement Project, 18
Planning and Construction19
(Ouachita)20
Payable from General Obligation Bonds21
Priority 1	$ 150,00022
(1128)Creation of a Hurricane/Disaster Shelter by 23
Expanding the West Ouachita Senior Center, 24
Planning and Construction25
(Ouachita)26
Payable from General Obligation Bonds27
Priority 1	$ 530,00028
Priority 5	$ 700,00029
Total	$ 1,230,00030
(1881)Sparta Reuse Demonstration Project 31
($4,000,000 Local Match) 32
(Ouachita)33
Payable from General Obligation Bonds34
Priority 1	$ 320,00035
50/MV3WESTLAKE36
(344) New Water Well, Planning and Construction37
(Calcasieu)38
Payable from General Obligation Bonds39
Priority 2	$ 425,00040
(648) Ellis and Linda Drive Improvements, City of Westlake, 41
Planning and Construction42
(Calcasieu)43
Payable from General Obligation Bonds44
Priority 1	$ 1,000,00045
Priority 5	$ 1,125,00046
Total	$ 2,125,00047 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 124 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(827) Police and Emergency Response Facility, 1
Planning and Construction ($800,000 Local Match)2
(Calcasieu)3
Payable from General Obligation Bonds4
Priority 2	$ 150,0005
Priority 5	$ 850,0006
Total	$ 1,000,0007
(1883)Golf Course Development, Planning and Development 8
($5,000,000 Local/Other Match Consisting of Cash 9
and/or In-Kind, with First Year not to Exceed $200,000)10
(Calcasieu)11
Payable from General Obligation Bonds12
Priority 1	$ 4,175,00013
50/MV4WESTWEGO14
(741) Sala Avenue Street and Infrastructure Improvements 15
(Jefferson)16
Payable from General Obligation Bonds17
Priority 1	$ 850,00018
(743) Water Plant Improvements, Planning and 19
Construction (50% Local Match)20
(Jefferson)21
Payable from General Obligation Bonds22
Priority 1	$ 1,000,00023
24
(747) Drainage Improvements, Phase I25
(Jefferson)26
Payable from General Obligation Bonds27
Priority 1	$ 500,00028
(1884)Emergency Preparedness Building, 29
Planning and Construction30
(Jefferson)31
Payable from General Obligation Bonds32
Priority 1	$ 1,250,00033
(1885)Farmers/Fisheries Market, Planning and Construction 34
(Supplemental Funding)35
(Jefferson)36
Payable from General Obligation Bonds37
Priority 1	$ 1,410,00038
(1887)Performing Arts Center/Community Center 39
Phase III, IV, and Equipment40
(Jefferson)41
Payable from General Obligation Bonds42
Priority 1	$ 250,00043
(1888)Park Land and Improvements, Including 44
Improvements to Existing Parks and Land 45
Acquisition, Planning and Construction46
(Jefferson)47
Payable from General Obligation Bonds48
Priority 1	$ 1,850,00049 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 125 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(2040)Riverboat Landing Phase IV, Planning and Construction 1
($200,000 Local Match)2
(Jefferson)3
Payable from General Obligation Bonds4
Priority 1	$ 150,0005
50/MV7WINNFIELD6
(1889)Winn Correctional Center Water Line Replacement, 7
Planning and Construction8
(Winn)9
Payable from General Obligation Bonds10
Priority 1	$ 200,00011
50/MV8WINNSBORO12
(1890)Winnsboro Farmer's Market, Planning and 13
Construction14
(Franklin)15
Payable from General Obligation Bonds16
Priority 1	$ 220,00017
(1891)Community Center, Renovations, Planning and Construction18
(Franklin)19
Payable from General Obligation Bonds20
Priority 1	$ 215,00021
(1892)Winnsboro Industrial Park Street Reconstruction, Planning 22
and Construction23
(Franklin)24
Payable from General Obligation Bonds25
Priority 1	$ 320,00026
50/MW2YOUNGSVILLE27
(421) Community Center, Planning and Construction28
(Lafayette)29
Payable from General Obligation Bonds30
Priority 1	$ 3,000,00031
(1893)Highway 92 Realignment Near Youngsville, 32
Construction, Right of Way, and Utilities33
(Lafayette)34
Payable from General Obligation Bonds35
Priority 1	$ 700,00036
(1894)Youngsville Parkway Road Project, Including37
Waterline Improvement and Roadway Lighting, 38
Planning and Construction39
(Lafayette)40
Payable from General Obligation Bonds41
Priority 1	$ 7,150,00042
(1895)Beltway Road Project, Planning and Construction 43
(Local Match Required)44
(Lafayette)45
Payable from General Obligation Bonds46
Priority 1	$ 5,785,00047 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 126 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/MW3ZACHARY1
(468) Natural Gas Distribution System Improvements,2
Planning and Construction3
(East Baton Rouge)4
Payable from General Obligation Bonds5
Priority 1	$ 100,0006
(1896)Annison Plantation Renovation 7
(East Baton Rouge)8
Payable from General Obligation Bonds9
Priority 1	$ 140,00010
(1897)Sewer Testing and Rehabilitation, Planning and Construction11
(East Baton Rouge)12
Payable from General Obligation Bonds13
Priority 1	$ 2,275,00014
50/MW4ZWOLLE15
(1285)Installation of New 6" Waterline and Water Well, 16
Planning and Construction ($25,000 Local Match)17
(Sabine)18
Payable from General Obligation Bonds19
Priority 1	$ 395,00020
50/MW8CENTRAL21
(412) Administration Building22
(East Baton Rouge)23
Payable from General Obligation Bonds24
Priority 1	$ 200,00025
Priority 5	$ 1,715,00026
Total	$ 1,915,00027
(413) Expand, Repair, and Modify City of Central 28
Drainage System, Planning and Construction29
(East Baton Rouge)30
Payable from General Obligation Bonds31
Priority 1	$ 100,00032
Priority 2	$ 200,00033
Total	$ 300,00034
50/N03AUDUBON NATURE INSTITUTE, INC.35
(1898)Audubon 2020 Exhibits (50% Local Match)36
(Orleans)37
Payable from General Obligation Bonds38
Priority 1	$10,000,00039
(1899)Audubon 2000 Renovations, Planning and Construction 40
($25,300,000 Local Match) 41
(Orleans)42
Payable from General Obligation Bonds43
Priority 1	$ 3,410,00044 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 127 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/N05NEW ORLEANS EXHIBITION HALL AUTHORITY1
(403) Hall A Renovation, Planning and Construction2
(Orleans)3
Payable from General Obligation Bonds4
Priority 1	$20,000,0005
50/N06STATE FAIR OF LOUISIANA6
(286) Hirsch Memorial Coliseum/Evacuation Shelter 7
Rehabilitation, Planning and Construction8
(Caddo)9
Payable from General Obligation Bonds10
Priority 1	$ 100,00011
50/N07ST. BERNARD PARISH SHERIFF12
(1901)Arabi Sub-Station, Planning and Construction13
(St. Bernard)14
Payable from General Obligation Bonds15
Priority 1	$ 20,00016
50/N12LOUISIANA CHILDREN'S MUSEUM17
(1902)Louisiana Children's Museum Early Learning Village, 18
Planning and Design19
(Orleans)20
Payable from General Obligation Bonds21
Priority 1	$ 1,285,00022
Priority 5	$ 2,415,00023
Total	$ 3,700,00024
50/N13CHENNAULT INDUSTRIAL AIRPARK AUTHORITY 25
(230) New Air Cargo Facility, Planning and Construction26
($1,100,000 Local Match)27
(Calcasieu)28
Payable from General Obligation Bonds29
Priority 2	$ 350,00030
Priority 5	$ 2,750,00031
Total	$ 3,100,00032
(411) New Aviation Hangar and Ground Support 33
Equipment Facility, Planning and Construction 34
($1,000,000 Local Match)35
(Calcasieu)36
Payable from General Obligation Bonds37
Priority 2	$ 260,00038
Priority 5	$ 1,825,00039
Total	$ 2,085,00040
(1903)Multi Purpose Building, Planning and Construction 41
($1,825,000 Local Match)42
(Calcasieu)43
Payable from General Obligation Bonds44
Priority 1	$ 725,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 128 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1904)New Hangar, Planning and Construction1
(Calcasieu)2
Payable from General Obligation Bonds3
Priority 1	$ 3,100,0004
50/N21BIOMEDICAL RESEARCH FOUNDATION5
(821) P.E.T. Clinical and Research Imaging Equipment6
(Caddo)7
Payable from General Obligation Bonds8
Priority 2	$ 4,800,0009
50/N25WYES TV NEW ORLEANS10
(214) WYES Katrina Rebuilding/Equipment Project,11
Planning and Construction12
(Orleans)13
Payable from General Obligation Bonds14
Priority 1	$ 1,000,00015
Priority 5	$ 2,000,00016
Total	$ 3,000,00017
50/N38NEW ORLEANS REGIONAL BUSINESS PARK18
(1905)Multi-Purpose Athletic Complex, Planning and Construction19
(Orleans)20
Payable from General Obligation Bonds21
Priority 1	$ 100,00022
50/N41BATON ROUGE METRO AIRPORT23
(929) Airport Aviation Business Park, 24
Planning and Construction25
(East Baton Rouge)26
Payable from General Obligation Bonds27
Priority 2	$ 200,00028
50/N49ST. HELENA SHERIFF’S OFFICE29
(566) Renovation of Sheriff’s Office Administration Building30
in Greensburg, Planning and Construction31
(St. Helena)32
Payable from General Obligation Bonds33
Priority 2	$ 190,00034
50/N51NEW ORLEANS JAZZ & HERITAGE FOUNDATION35
(256) The Jazz & Heritage Center Renovation and Addition,36
1225 North Rampart, Planning and Construction37
(Orleans)38
Payable from General Obligation Bonds39
Priority 1	$ 75,00040
50/N62PLAQUEMINES PARISH LAW ENFORCEMENT DISTRICT41
(1266)Sheriff's Training Center, Planning and Construction42
(Plaquemines)43
Payable from General Obligation Bonds44
Priority 1	$ 1,875,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 129 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/N70REGIONAL TRANSIT AUTHORITY1
(1907)Airport to CBD Regional Rail Line 2
($5,000,000 Local and $10,000,000 Federal Match)3
(Orleans)4
Payable from General Obligation Bonds5
Priority 1	$ 500,0006
Priority 5	$ 4,500,0007
Total	$ 5,000,0008
50/N74NATIONAL WORLD WAR II MUSEUM9
(790) Capital Expansion Project, Including Parking10
Structure, Skybridge, Andrew Higgins Plaza, 11
Train Station Experience and Canopy,12
Planning and Construction13
(Orleans)14
Payable from General Obligation Bonds15
Priority 1	$ 2,000,00016
Priority 5	$15,000,00017
Total	$17,000,00018
(1908)National D-Day Museum Expansion, Design, 19
Planning, Acquisition, and Construction 20
($2,000,000 Federal/Local Match) 21
(Orleans)22
Payable from General Obligation Bonds23
Priority 1	$11,520,00024
50/N98KINGSLEY HOUSE25
(1305)Kingsley House Acquisition, Renovations, 26
New Construction and Major Repairs 27
(Orleans)28
Payable from General Obligation Bonds29
Priority 1	$ 115,00030
Priority 2	$ 200,00031
Priority 5	$ 3,965,00032
Total	$ 4,280,00033
50/NA2LAFAYETTE AIRPORT COMMISSION34
(605) Construction of Cargo Facilities, 35
Planning and Construction36
(Lafayette)37
Payable from General Obligation Bonds38
Priority 1	$ 5,000,00039
50/NA7NORTHEAST LOUISIANA DELTA AFRICAN AMERICAN MUSEUM40
(1911)Northeast Louisiana Delta African American Museum, 41
Planning and Construction42
(Ouachita)43
Payable from General Obligation Bonds44
Priority 1	$ 75,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 130 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NACWARD 9 RECREATION DISTRICT RAPIDES1
(1912)Hard Surfaced Parking Lot Improvements, 2
Planning and Construction3
(Rapides)4
Payable from General Obligation Bonds5
Priority 1	$ 425,0006
50/NAHWEST CARROLL PARISH SHERIFF7
(1913)West Carroll Parish Jail Education and Visitation Room, 8
Planning and Construction9
(West Carroll)10
Payable from General Obligation Bonds11
Priority 1	$ 20,00012
50/NAJEFFORTS OF GRACE, INC.13
(1914)Ashe Too, Planning and Construction14
(Orleans)15
Payable from General Obligation Bonds16
Priority 1	$ 910,00017
50/NAYOGDEN MUSEUM OF SOUTHERN ART 18
(1228)Ogden Museum/Taylor Library Renovation,19
Planning and Construction20
(Orleans)21
Payable from General Obligation Bonds22
Priority 1	$ 265,00023
Priority 5	$ 1,000,00024
Total	$ 1,265,00025
50/NB3MCKINLEY HIGH SCHOOL ALUMNI26
(1915)Equipment and Renovations, Planning and Construction27
(East Baton Rouge)28
Payable from General Obligation Bonds29
Priority 1	$ 155,00030
50/NBBLIGHTHOUSE FOR THE BLIND31
(2039)Economic Development Project, 32
Planning and Construction33
(Orleans)34
Payable from General Obligation Bonds35
Priority 1	$ 2,850,00036
Priority 5	$ 1,450,00037
Total	$ 4,300,00038
50/NBCCAPITOL CITY FAMILY HEALTH CENTER39
(1916)New Federally Qualified Health Center, Acquisitions, 40
Planning and Construction ($71,000 Federal Match) 41
(Supplemental Funding)42
(Ascension, East Baton Rouge)43
Payable from General Obligation Bonds44
Priority 1	$ 4,250,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 131 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NBGSOUTH LOUISIANA DEVELOPMENT COUNCIL1
(834) Additions/Modifications to the Center for Economic2
Growth and Technology, Planning and Construction3
(Assumption, Lafourche, St. Charles, St. James,4
St. John the Baptist, St. Mary, Terrebonne)5
Payable from General Obligation Bonds6
Priority 2	$ 260,0007
(1096)SLEC/Nicholls Field and Drainage Improvements,8
Planning and Construction9
(Lafourche)10
Payable from General Obligation Bonds11
Priority 2	$ 1,000,00012
(1917)Center for Economic Growth and Technology13
(Lafourche)14
Payable from General Obligation Bonds15
Priority 1	$ 375,00016
50/NBMBLACK RIVER LAKE COMMISSION17
(1918)Black River Lake Drainage Structure Installation, 18
Studies, Permits, Planning and Construction19
(Concordia)20
Payable from General Obligation Bonds21
Priority 1	$ 1,000,00022
Priority 5	$ 2,500,00023
Total	$ 3,500,00024
50/NBTDISTRICT 2 ENHANCEMENT CORPORATION25
(1138)St. Claude Community Development and 26
Beautification Project, Planning and Construction27
(Orleans)28
Payable from General Obligation Bonds29
Priority 1	$ 35,00030
(1139)New Orleans East Walking and Bike Trail, 31
Planning and Construction32
(Orleans)33
Payable from General Obligation Bonds34
Priority 1	$ 45,00035
(1141)Eastern New Orleans Senior Center,36
Planning and Construction37
(Orleans)38
Payable from General Obligation Bonds39
Priority 2	$ 25,00040
Pending approval of capital outlay budget request pursuant to the provisions of R.S. 39:112.41
50/NC2BATON ROUGE RECREATION AND PARKS COMMISSION42
(671) Central Community Sports Park, 43
Planning and Construction44
(East Baton Rouge)45
Payable from General Obligation Bonds46
Priority 1	$ 1,050,00047 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 132 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1131)Anna T. Jordan Site and Facility Improvements 1
(Non-State Match Required)2
(East Baton Rouge)3
Payable from General Obligation Bonds4
Priority 1	$ 480,0005
Priority 5	$ 965,0006
Total	$ 1,445,0007
(1135)Bluebonnet Swamp Nature Center Education 8
Building /Conference Center, Planning and Construction9
(East Baton Rouge)10
Payable from General Obligation Bonds11
Priority 1	$ 660,00012
Priority 5	$ 500,00013
Total	$ 1,160,00014
(1919)Children's Museum, Planning and Construction 15
($5,000,000 Local Match)16
(East Baton Rouge)17
Payable from General Obligation Bonds18
Priority 1	$ 425,00019
Priority 5	$ 600,00020
Total	$ 1,025,00021
(1921)Pete Goldsby Field Renovations 22
(Non-State Cash and/or In-Kind Match Required)23
(East Baton Rouge)24
Payable from General Obligation Bonds25
Priority 1	$ 50,00026
(1922)Rollins Road Park Basketball Court Cover 27
(East Baton Rouge)28
Payable from General Obligation Bonds29
Priority 1	$ 100,00030
50/NCHARC OF NORTH WEBSTER31
(1923)New Roof Construction and Existing Building 32
Modifications, Planning and Construction33
(Webster)34
Payable from General Obligation Bonds35
Priority 1	$ 150,00036
50/NCJWATER WORKS DISTRICT 14 CALCASIEU 37
(1924)Complete New Water System Water Works District 14, 38
Ward 5, Calcasieu Parish39
(Calcasieu)40
Payable from General Obligation Bonds41
Priority 1	$ 250,00042
50/NCNSOUTH TOLEDO BEND WATERWORKS DISTRICT43
(1925)Water Treatment and Booster Plant Expansion, 44
Planning and Construction and/or Water Plant 45
Rehabilitation46
(Sabine)47
Payable from General Obligation Bonds48
Priority 1	$ 260,00049 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 133 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1926)Esto Booster Station Discharge and Supply Line 1
Replacement2
(Sabine)3
Payable from General Obligation Bonds4
Priority 1	$ 125,0005
Priority 5	$ 510,0006
Total	$ 635,0007
50/NCYRECONCILE NEW ORLEANS, INC.8
(1927)Reconcile New Orleans, Renovation and Expansion Project, 9
Central City New Orleans, Planning and Construction10
(Orleans)11
Payable from General Obligation Bonds12
Priority 1	$ 625,00013
50/NCZLOUISIANA ASSOCIATION FOR THE BLIND14
(1928)Louisiana Association for the Blind Safety Walk 15
Manufacturing Facility, Planning and Construction16
(Caddo)17
Payable from General Obligation Bonds18
Priority 1	$ 250,00019
50/ND3ORLEANS PARISH SHERIFF20
(793) Mental Health Facility, Planning and Construction21
(Orleans)22
Payable from General Obligation Bonds23
Priority 1	$ 100,00024
Priority 5	$ 2,400,00025
Total	$ 2,500,00026
50/NDCPOINTE COUPEE PARISH LIBRARY27
(1929)Innis Library Emergency Center Construction 28
(Pointe Coupee)29
Payable from General Obligation Bonds30
Priority 1	$ 1,830,00031
50/NDXNEW ORLEANS COUNCIL ON AGING32
(985) Office and Senior Community Center, 33
Planning, Land Acquisition, and Construction34
(Orleans)35
Payable from General Obligation Bonds36
Priority 1	$ 125,00037
50/NE7WEST CALCASIEU COMMUNITY CENTER38
(1930)Community Center - Phase 2, Event Center, Planning 39
and Construction40
(Calcasieu)41
Payable from General Obligation Bonds42
Priority 1	$ 5,500,00043 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 134 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NEBLIVINGSTON PARISH FAIRGROUND AUTHORITY1
(1931)Livingston Parish Fairgrounds, Livestock Exhibition 2
Building, Planning and Construction3
(Livingston)4
Payable from General Obligation Bonds5
Priority 1	$ 250,0006
50/NERST. HELENA HOSPITAL SERVICE DISTRICT #17
(1932)Drainage and Parking Improvements, 8
Planning and Construction 9
(St. Helena)10
Payable from General Obligation Bonds11
Priority 1	$ 200,00012
50/NESOPTIONS, INC.13
(1933)Safe Haven Multi-Purpose Vocational Center 14
and Shelter, Planning and Construction15
(Tangipahoa)16
Payable from General Obligation Bonds17
Priority 1	$ 20,00018
50/NEWEAST CARROLL COUNCIL ON AGING19
(1934)East Carroll Voluntary Council on Aging Renovation, 20
Planning and Construction21
(East Carroll)22
Payable from General Obligation Bonds23
Priority 1	$ 50,00024
50/NEZLOUISIANA ALLIANCE OF BOYS AND GIRLS CLUB25
(1935)Louisiana Alliance of Boys and Girls Club, Inc., 26
Planning, Acquisitions, and Construction27
(Statewide)28
Payable from General Obligation Bonds29
Priority 1	$ 35,00030
Priority 5	$ 150,00031
Total	$ 185,00032
50/NF8CENTRAL LOUISIANA DETENTION CENTER AUTHORITY33
(430) Central Louisiana Juvenile Detention Center, 34
Planning and Construction35
(Grant)36
Payable from General Obligation Bonds37
Priority 1	$ 1,000,00038
50/NFECAJUNDOME39
(1936)Cajundome Improvements, Planning and Construction40
(Lafayette)41
Payable from General Obligation Bonds42
Priority 1	$ 750,00043 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 135 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NFLBOGALUSA YMCA1
(1937)Bogalusa YMCA, Master Planning, Design, 2
Construction, Renovations and Equipment Acquisitions3
(Washington)4
Payable from General Obligation Bonds5
Priority 1	$ 85,0006
50/NFNDOC-DHL, INC7
(1938)Cohn Senior High Renovation, Planning and Construction8
(West Baton Rouge)9
Payable from General Obligation Bonds10
Priority 5	$ 400,00011
50/NFQALGIERS DEVELOPMENT DISTRICT12
(1166)Algiers Levee Bike-Hike Trail, Planning13
and Construction14
(Orleans)15
Payable from General Obligation Bonds16
Priority 2	$ 200,00017
(1939)New Westbank YMCA18
(Orleans)19
Payable from General Obligation Bonds20
Priority 1	$ 3,865,00021
50/NFSSHREVEPORT-RUSTON METHODIST CAMP22
(1940)Caney Conference Center Remodel Project, 23
Planning and Construction24
(Webster)25
Payable from General Obligation Bonds26
Priority 1	$ 1,750,00027
50/NG2NORTHSHORE HARBOR CENTER28
(1941)Northshore Harbor Center Purchase of Additional Equipment29
(St. Tammany)30
Payable from General Obligation Bonds31
Priority 1	$ 200,00032
50/NG6LOUISIANA BLACK HISTORY HALL OF FAME33
(1179)Museum and Cultural Center, Land Acquisition, 34
Planning and Construction35
($100,000 Cash and/or In-Kind Match)36
(East Baton Rouge)37
Payable from General Obligation Bonds38
Priority 1	$ 350,00039
Priority 5	$ 1,090,00040
Total	$ 1,440,00041 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 136 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NG8TREME COMMUNITY EDUCATION PROGRAM1
(1942)Leverette Senior House, Planning and Construction2
(Orleans)3
Payable from General Obligation Bonds4
Priority 1	$ 120,0005
50/NGALINCOLN PARISH FIRE PROTECTION DISTRICT #16
(1943)Renovations to Existing Facility and Additional Buildings, 7
Acquisition, Planning and Construction8
(Lincoln)9
Payable from General Obligation Bonds10
Priority 1	$ 885,00011
50/NGCRAGLEY HISTORICAL SOCIETY12
(1944)Open Pavilion and Restrooms, Planning and Construction13
(Beauregard)14
Payable from General Obligation Bonds15
Priority 1	$ 25,00016
50/NGEWEST VERNON WATERWORKS DISTRICT17
(1945)Expansion of Water Distribution System 18
and Booster Station West Vernon Waterworks 19
District, Planning and Construction20
(Vernon)21
Payable from General Obligation Bonds22
Priority 1	$ 900,00023
50/NGFFAMILY CENTER OF LIFE, INC24
(1946)Family Center of Hope Community Center 25
in New Orleans, Planning and Construction 26
($600,000 Local Match)27
(Orleans)28
Payable from General Obligation Bonds29
Priority 1	$ 100,00030
50/NGIARC OF GREATER NEW ORLEANS31
(1947)Restoration of the Fontana Center of the ARC 32
of Greater New Orleans in Metairie, 33
Planning and Construction34
(Jefferson)35
Payable from General Obligation Bonds36
Priority 1	$ 150,00037
50/NGQSTRAND THEATRE OF SHREVEPORT38
(822) Repair and Renovation to the Strand Theatre of Shreveport39
(Caddo)40
Payable from General Obligation Bonds41
Priority 5	$ 950,00042 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 137 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NGSRURAL FRANKLINTON WATER CORPORATION1
(1948)Black Jack Road Water Well 2
(Washington)3
Payable from General Obligation Bonds4
Priority 1	$ 25,0005
50/NGXCANE RIVER WATERWAY COMMISSION6
(480) Cane River Lake Drainage Study 7
(Natchitoches)8
Payable from General Obligation Bonds9
Priority 1	$ 75,00010
50/NGYLINCOLN PARISH SHERIFF’S OFFICE11
(1949)Public Safety Complex, Planning and Construction12
(Lincoln)13
Payable from General Obligation Bonds14
Priority 1	$ 5,050,00015
50/NHAWASHINGTON PARISH FAIR ASSOCIATION16
(1950)Replacement of and Repairs and Additions to Buildings 17
on Fairgrounds and Renovations and Repairs to Historic 18
Buildings at Mile Branch Settlement and Improvements 19
at Fairgrounds, Planning and Conservation20
(Washington)21
Payable from General Obligation Bonds22
Priority 1	$ 150,00023
50/NHCARC OF OUACHITA24
(1951)Emergency Shelter and Therapeutic Center for the 25
Developmentally Disabled, Acquisition, Planning, 26
Construction and Renovation27
(Ouachita)28
Payable from General Obligation Bonds29
Priority 1	$ 100,00030
Priority 5	$ 900,00031
Total	$ 1,000,00032
50/NHFNEW ORLEANS NEIGHBORHOOD DEVELOPMENT33
(2029)NDF Homeownership Center, Planning and Construction34
(Orleans)35
Payable from General Obligation Bonds36
Priority 5	$ 230,00037
50/NHHCHRISTUS COUSHATTA HEALTH CENTER38
(1952)CHRISTUS Coushatta - Facility Roof and Parking Lot 39
Repair Project, Planning and Construction40
(Red River)41
Payable from General Obligation Bonds42
Priority 1	$ 90,00043 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 138 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NHLBOGALUSA COMMUNITY MEDICAL CENTER FOUNDATION1
(1953)Capital Improvements at Washington St. Tammany 2
Regional Medical Center3
(St. Tammany, Washington)4
Payable from General Obligation Bonds5
Priority 1	$ 3,000,0006
Priority 5	$ 3,500,0007
Total	$ 6,500,0008
50/NHMTRINITY CHRISTIAN COMMUNITY9
(1954)Carrollton Community Center Renovations, 10
Land Acquisition, Site Work, Planning and Construction11
(Orleans)12
Payable from General Obligation Bonds13
Priority 1	$ 1,385,00014
50/NHNNEW ORLEANS MUSIC HALL OF FAME15
16
(709) South Rampart Street Historic Development Project, 17
Planning and Construction, ($300,000 Non-State Match)18
(Orleans)19
Payable from General Obligation Bonds20
Priority 1	$ 800,00021
50/NHSPLEASANT HILL-CROSSROADS WATER SYSTEM, INC.22
(1955)Pleasant Hill/Crossroads Water System, Repairs 23
and Extension, Planning and Construction24
(Winn)25
Payable from General Obligation Bonds26
Priority 1	$ 140,00027
50/NI9 ASCENSION - ST. JAMES AIRPORT28
(856) Automobile Parking Lot Improvements 29
for the Louisiana Regional Airport30
(Ascension)31
Payable from General Obligation Bonds32
Priority 1	$ 50,00033
50/NICTRIUMPH OF SPECIAL PEOPLE, INC.34
(1956)Housing for Disabled Recipients of Waiver Services, 35
Acquisition, Planning and Construction36
(Jefferson)37
Payable from General Obligation Bonds38
Priority 1	$ 370,00039
50/NIGPECAN ISLAND WATERWORKS DISTRICT #340
(1957)Pecan Island Waterworks, District No. 3 Water System 41
Improvements, Including Automatic Read Meters for 42
Entire System43
(Vermilion)44
Payable from General Obligation Bonds45
Priority 1	$ 600,00046 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 139 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NIKLOUISIANA 4-H FOUNDATION1
(1958)Louisiana 4-H Foundation Youth Educational 2
Development Center, Camp Windy Wood Property,3
Including Multipurpose Educational Building, 4
Planning, Construction and Acquisition5
(Grant)6
Payable from General Obligation Bonds7
Priority 1	$ 400,0008
50/NIQWEST CARROLL PARISH AIRPORT AUTHORITY9
(1959)T-Hangars at Kelly Airport Authority, Planning 10
and Construction11
(West Carroll)12
Payable from General Obligation Bonds13
Priority 1	$ 400,00014
50/NIXBELLWOOD WATER SYSTEM, INC.15
(1960)Bellwood Water System, Planning and Construction16
(Natchitoches)17
Payable from General Obligation Bonds18
Priority 1	$ 50,00019
(1961)Bellwood Water System Generator, Back-up Power 20
Source, Planning and Construction21
(Natchitoches)22
Payable from General Obligation Bonds23
Priority 1	$ 35,00024
50/NJ2CONTEMPORARY ARTS CENTER25
(1962)Contemporary Arts Center Renovation, Planning 26
and Construction ($6,131,272 Local Match)27
(Orleans)28
Payable from General Obligation Bonds29
Priority 1	$ 300,00030
Priority 5	$ 300,00031
Total	$ 600,00032
50/NJ8NORTH LOUISIANA CRIMINALISTICS LAB33
(1963)Replacement of Shreveport Facility, 34
Planning and Construction35
(Caddo)36
Payable from General Obligation Bonds37
Priority 1	$18,875,00038
Priority 5	$ 5,125,00039
Total	$24,000,00040
50/NJ9DRYADES YMCA41
(1964)Technical Training Center, Planning and Construction42
(Orleans)43
Payable from General Obligation Bonds44
Priority 1	$ 1,300,00045
Priority 5	$ 3,700,00046
Total	$ 5,000,00047 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 140 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(1965)Dryades YMCA Reconstruction, Planning and Construction1
(Orleans)2
Payable from General Obligation Bonds3
Priority 1	$ 1,500,0004
50/NJACECILIA WATER CORPORATION5
(1966)Water System Improvements6
(St. Martin)7
Payable from General Obligation Bonds8
Priority 1	$ 45,0009
50/NJPWATERWORKS DISTRICT #1 DESOTO PARISH10
(965) Water System Improvements and Extension,11
Planning and Construction ($1,977,300 Local Match)12
(DeSoto)13
Payable from General Obligation Bonds14
Priority 1	$ 100,00015
Priority 5	$ 965,00016
Total	$ 1,065,00017
50/NJURED HILL WATERWORKS18
(816) Replacement Water Well, Connections and Equipment,19
Planning and Construction20
(Winn)21
Payable from General Obligation Bonds22
Priority 2	$ 315,00023
50/NJVHARVEY-STEVENS MEMORIAL FOUNDATION24
(1967)Tutorial and Learning Resource Center Renovations, 25
Planning and Construction 26
(St. Landry)27
Payable from General Obligation Bonds28
Priority 1	$ 70,00029
50/NJYEAST COLUMBIA WATER DISTRICT30
(1968)East Columbia Water System Improvements, 31
Planning and Construction 32
(Caldwell)33
Payable from General Obligation Bonds34
Priority 1	$ 685,00035
50/NK2COMMUNITY OUTREACH PROGRAMS36
(1969)Willow Glen River Road Senior Resource Center, 37
Planning, Construction and Equipment38
(Rapides)39
Payable from General Obligation Bonds40
Priority 1	$ 1,270,00041 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 141 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NK8FRANKLIN MEDICAL CENTER1
(1970)Franklin Medical Center Renovations, Planning 2
and Construction3
(Franklin)4
Payable from General Obligation Bonds5
Priority 1	$ 100,0006
50/NKCWEBSTER PARISH COUNCIL ON AGING7
(1971)New Building for Webster Parish Council on8
Aging, Planning and Construction9
(Webster)10
Payable from General Obligation Bonds11
Priority 1	$ 1,500,00012
50/NKHALLUME SOCIETY13
(1972)Frank's Theatre Restoration, Planning, 14
Acquisition, Renovation, and Construction 15
($100,000 Cash and/or In-Kind Match)16
(Vermilion)17
Payable from General Obligation Bonds18
Priority 1	$ 200,00019
50/NKYHOLUM WATER SYSTEM, INC.20
(1973)Holum Water System Improvements Including New 21
Water Well, Planning and Construction22
(Caldwell)23
Payable from General Obligation Bonds24
Priority 1	$ 300,00025
50/NLACENTENARY COLLEGE OF LOUISIANA26
(1974)Science Building, Planning and Construction27
(Caddo)28
Payable from General Obligation Bonds29
Priority 1	$ 900,00030
50/NLBCADDO PARISH SHERIFF’S OFFICE31
(1975)Law Enforcement Center, Planning and Construction32
(Caddo)33
Payable from General Obligation Bonds34
Priority 1	$ 50,00035
50/NLLCHEZ HOPE, INC.36
(1976)Building Improvements from Emergency Family 37
Shelter Facility, Chez Hope Domestic Violence Program38
(St. Mary)39
Payable from General Obligation Bonds40
Priority 1	$ 100,00041 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 142 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NLMFOUNDATION FOR SCIENCE AND MATH EDUCATION1
(1977)A Model for a 21st Century Workforce Development 2
Urban High School - New Orleans Science and 3
Mathematics High School, Planning and Construction4
and Land Acquisition5
(Orleans)6
Payable from General Obligation Bonds7
Priority 1	$ 200,0008
50/NLNMIDWAY WATERWORKS, INC.9
(1978)Midway Water System, Planning and Construction10
(Webster)11
Payable from General Obligation Bonds12
Priority 1	$ 100,00013
Priority 5	$ 505,00014
Total	$ 605,00015
50/NLQSAREPTA WATER WORKS DISTRICT16
(1979)Sarepta Water Works 17
(Webster)18
Payable from General Obligation Bonds19
Priority 5	$ 715,00020
50/NLRHORSESHOE ROAD WATER SYSTEM, INC.21
(1980)Horseshoe Water System, Planning and Construction22
(Webster)23
Payable from General Obligation Bonds24
Priority 1	$ 150,00025
Priority 5	$ 80,00026
Total	$ 230,00027
50/NLYWEST OUACHITA YOUTH SPORTS ASSOCIATION28
(1981)West Ouachita Youth Sports Association Site 29
Renovations, Planning and Construction30
(Ouachita)31
Payable from General Obligation Bonds32
Priority 1	$ 125,00033
50/NM1RAPIDES WATER WORKS DISTRICT NO. 334
(659) Color Removal from Well No. 2 and Well No. 7 at35
LA Army National Guard, Camp Beauregard,36
Pineville, LA, Planning and Construction37
(Rapides)38
Payable from General Obligation Bonds39
Priority 2	$ 50,00040
50/NM3NATCHITOCHES COUNCIL ON AGING41
(1982)Reconstruct Natchitoches Parish Council on Aging42
Activities Building, Planning and Construction43
(Natchitoches)44
Payable from General Obligation Bonds45
Priority 1	$ 875,00046 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 143 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NM6CENTRAL WATER SYSTEM1
(1983)Central Water System, Planning and Construction2
(Webster)3
Payable from General Obligation Bonds4
Priority 1	$ 50,0005
50/NMAST. CHARLES COMMUNITY HEALTH CENTER6
(1984)Public Health Facility - Norco (Federal Funds $150,000)7
(St. Charles)8
Payable from General Obligation Bonds9
Priority 1	$ 500,00010
50/NMDBELMONT WATERWORKS11
(1985)Water System Improvements, Planning and Construction 12
(Sabine)13
Payable from General Obligation Bonds14
Priority 1	$ 1,455,00015
50/NMGLIVINGSTON ASSOCIATION FOR RETARDED CHILDREN, INC.16
(1986)New Facility for Livingston Association for Retarded 17
Children, Inc. Planning and Construction18
(Livingston)19
Payable from General Obligation Bonds20
Priority 1	$ 415,00021
50/NMLGRETNA POLICE DEPARTMENT22
(1987)Gretna Police Department Critical Radio 23
Infrastructure Digital Bridging24
(Jefferson)25
Payable from General Obligation Bonds26
Priority 1	$ 75,00027
(1988)Gretna Police Department License Plate 28
Recognition System29
(Jefferson)30
Payable from General Obligation Bonds31
Priority 1	$ 50,00032
(1989)Gretna Police Department Crime Cameras33
(Jefferson)34
Payable from General Obligation Bonds35
Priority 1	$ 50,00036
(1990)Gretna Police Department, Construction of Armory,37
Elevation/Flood Proofing/Wind Retrofit, Planning38
and Construction39
(Jefferson)40
Payable from General Obligation Bonds41
Priority 1	$ 940,00042 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 144 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NNLHUNGARIAN SETTLEMENT HISTORICAL SOCIETY1
(1991)Hungarian Settlement Historical Museum, 2
Planning and Construction3
(Livingston)4
Payable from General Obligation Bonds5
Priority 1	$ 170,0006
50/NNOGRANT PARISH FIRE DISTRICT #77
(1992)New Fire Station in Verda8
(Grant)9
Payable from General Obligation Bonds10
Priority 1	$ 90,00011
Priority 5	$ 480,00012
Total	$ 570,00013
50/NNRWASHINGTON PARISH RECREATION DISTRICT #114
(1993)Multi-Purpose Recreation Facility, Land Acquisition, 15
Master Planning, Design and Construction16
(Washington)17
Payable from General Obligation Bonds18
Priority 1	$ 75,00019
50/NNSBROADMOOR IMPROVEMENT ASSOCIATION20
(247) Community Art and Wellness Center in 21
New Orleans, Planning, Construction and 22
Equipment23
(Orleans)24
Payable from General Obligation Bonds25
Priority 2	$ 200,00026
50/NPDIBERIA ECONOMIC DEVELOPMENT AUTHORITY27
(629) Progress Point Business Park and Airport Gateway,28
Land Acquisition29
(Iberia)30
Payable from General Obligation Bonds31
Priority 1	$ 1,575,00032
50/NPGLIVINGSTON ECONOMIC DEVELOPMENT COUNCIL, INC.33
(229) Buildings and Parking, The Livingston Parish34
Literacy and Technology Center (LPLTC) Site,35
Planning and Construction36
(Livingston)37
Payable from General Obligation Bonds38
Priority 2	$ 200,00039
50/NPPALLEN PARISH FIRE DISTRICT #340
(1994)Station Expansion, Planning and Construction41
(Allen)42
Payable from General Obligation Bonds43
Priority 1	$ 150,00044 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 145 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NPWAVONDALE BOOSTER CLUB1
(1995)Avondale Booster Club and Playground Upgrades,2
Planning and Construction3
(Jefferson)4
Payable from General Obligation Bonds5
Priority 1	$ 400,0006
50/NQ2GRAVITY DRAINAGE DISTRICT #6 CALCASIEU PARISH7
(1996)Drainage Improvement and Infrastructure Development 8
in High Hope Area, Planning and Construction 9
($263,000 Non-State Match)10
(Calcasieu)11
Payable from General Obligation Bonds12
Priority 1	$ 325,00013
50/NQ3NIBLETTS BLUFF PARK COMMISSION14
(1997)Bulkhead Along Sabine River, Planning and 15
Construction ($50,000 Non-State Match)16
(Calcasieu)17
Payable from General Obligation Bonds18
Priority 1	$ 100,00019
50/NQ5SCHEPIS FOUNDATION, INC.20
(1998)Schepis Building Renovations, Planning and 21
Construction (Supplemental Funding)22
(Caldwell)23
Payable from General Obligation Bonds24
Priority 1	$ 10,00025
50/NQ6BAYOU PIERRE WATER SYSTEM, INC.26
(1286)Water Distribution System Upgrades, 27
Planning and Construction28
(Red River)29
Payable from General Obligation Bonds30
Priority 1	$ 300,00031
50/NQEFREED MEN, INC.32
(330) Freed Men, Inc., Planning and Construction33
(Ouachita)34
Payable from General Obligation Bonds35
Priority 2	$ 80,00036
(1999)Freed Men Housing Renovations, 37
Planning and Construction38
(Ouachita)39
Payable from General Obligation Bonds40
Priority 1	$ 50,00041 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 146 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NQFGENTILLY DEVELOPMENT DISTRICT1
(2000)Milne Boys Home, Planning and Construction2
(Orleans)3
Payable from General Obligation Bonds4
Priority 1	$ 600,0005
50/NQGLAFAYETTE METROPOLITAN EXPRESSWAY COMMISSION6
(2001)Lafayette Loop Project, Planning and Construction7
(Lafayette)8
Payable from General Obligation Bonds9
Priority 5	$ 1,000,00010
50/NQQACADIA PARISH TOURIST COMMISSION11
(2002)Acadia Parish Convention and Visitors Commission 12
Regional Conference Center, Planning and Construction13
(Acadia)14
Payable from General Obligation Bonds15
Priority 1	$ 260,00016
Priority 5	$ 1,920,00017
Total	$ 2,180,00018
50/NQVBEAUREGARD PARISH WATERWORKS DISTRICT #619
(332) Water System Improvements, Planning and Construction20
(Beauregard)21
Payable from General Obligation Bonds22
Priority 1	$ 25,00023
Priority 2	$ 375,00024
Priority 5	$ 1,100,00025
Total	$ 1,500,00026
50/NQWCALCASIEU PARISH WATERWORKS DISTRICT #1027
(711) New Water System, Planning and Construction28
(Calcasieu)29
Payable from General Obligation Bonds30
Priority 1	$ 250,00031
Priority 5	$ 2,000,00032
Total	$ 2,250,00033
50/NQYWESTON WATER SYSTEM, INC.34
(755) Water Mains Extensions with Connections, Booster35
Station and Emergency Power Improvements,36
Planning and Construction37
(Jackson)38
Payable from General Obligation Bonds39
Priority 2	$ 660,00040
(2003)Water Distribution System Enhancements, 41
Weston/ Ebeneezer Connection, Planning and 42
Construction43
(Jackson)44
Payable from General Obligation Bonds45
Priority 1	$ 540,00046 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 147 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NR9LONGUE VUE HOUSE AND GARDENS1
(2004)Restoration and Master Site Planning 2
($498,760 Non-State Match)3
(Orleans)4
Payable from General Obligation Bonds5
Priority 1	$ 100,0006
50/NRDSOUTH BEAUREGARD PARISH RECREATION DISTRICT #27
(2005)Multipurpose Recreational Facility, Planning 8
and Construction9
(Beauregard)10
Payable from General Obligation Bonds11
Priority 1	$ 250,00012
Priority 5	$ 465,00013
Total	$ 715,00014
50/NRJKINGWOOD HOMEOWNERS’ ASSOCIATION15
(2006)New Fence Kingwood Subdivision, Planning and Construction16
(Orleans)17
Payable from General Obligation Bonds18
Priority 1	$ 140,00019
50/NRLLOUISIANA ARTIST GUILD20
(2007)Louisiana Artist Guild Arts Incubator, Planning 21
and Construction ($6,321,375 Local Match)22
(Orleans)23
Payable from General Obligation Bonds24
Priority 1	$ 4,675,00025
50/NRONATCHITOCHES COMMUNICATIONS DISTRICT26
(2008)Natchitoches Parish Emergency Communications District,27
Planning and Construction28
(Natchitoches)29
Payable from General Obligation Bonds30
Priority 1	$ 500,00031
Priority 5	$ 2,400,00032
Total	$ 2,900,00033
50/NRSNORTH DESOTO WATER SYSTEM INC34
(643) Land Acquisition, Expansion and Improvements35
to the Water System, Planning and36
Construction37
(De Soto)38
Payable from General Obligation Bonds39
Priority 2	$ 200,00040
(2009)Expansion and Improvements to the Water System,41
Planning and Construction42
(DeSoto)43
Payable from General Obligation Bonds44
Priority 1	$ 100,00045 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 148 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NSIWALKER COMMUNITY WATER SYSTEM, INC.1
(2010)Water Distribution System Expansion, LA 810 Extension,2
Planning and Construction3
(Jackson)4
Payable from General Obligation Bonds5
Priority 1	$ 800,0006
50/NSKRAYS OF SONSHINE7
(1229)Project Elevate!, Planning and Construction8
(Ouachita)9
Payable from General Obligation Bonds10
Priority 2	$ 35,00011
50/NSMNATCHITOCHES VETERANS MEMORIAL PARK COMMISSION12
(2011)Natchitoches Veterans and Memorial Park, 13
Planning and Construction14
(Natchitoches)15
Payable from General Obligation Bonds16
Priority 1	$ 50,00017
50/NSNLOUISIANA COALITION FOR ACCESSIBLE AND18
SUSTAINABLE HEALTHCARE19
(2012)Town of Stonewall, Rural Medical Facility, 20
Planning and Construction21
(De Soto)22
Payable from General Obligation Bonds23
Priority 1	$ 150,00024
50/NSRJUNIOR LEAGUE OF GREATER NEW ORLEANS25
(1223)Renovate Thrift Shop and Annex, Including 26
Parking Lot, Planning and Construction27
(Orleans)28
Payable from General Obligation Bonds29
Priority 1	$ 135,00030
(1224)Renovate Annex Building and Re-Purpose Space,31
Including Installation of Handicap Accessibility32
Ramp and Bathroom Upgrades, Planning and Construction33
(Orleans)34
Payable from General Obligation Bonds35
Priority 1	$ 200,00036
(1225)Renovate Headquarters Building, Including 37
HVAC System, Planning and Construction38
(Orleans)39
Payable from General Obligation Bonds40
Priority 1	$ 65,00041 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 149 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NSSLOUISIANA EMERGENCY MEDICAL UNIT1
(1194)Louisiana Emergency Medical Unit Storage Facility,2
Planning and Construction3
(Lafayette)4
Payable from General Obligation Bonds5
Priority 1	$ 125,0006
50/NSTDOWNTOWN DEVELOPMENT DISTRICT OF NEW ORLEANS7
(633) Improvements to Girod Street, Planning and Construction8
(Orleans)9
Payable from General Obligation Bonds10
Priority 1	$ 300,00011
50/NSUBAYOU CIVIC CLUB12
(2013)Facilities Upgrade / Roof and Kitchen 13
Planning and Construction14
(Lafourche)15
Payable from General Obligation Bonds16
Priority 1	$ 135,00017
50/NSXMOREHOUSE PARISH SHERIFF18
(58) Operations Center Relocation, Site Development,19
Renovations and Improvements, Planning and20
Construction ($130,000 Local Match)21
(Morehouse)22
Payable from General Obligation Bonds23
Priority 2	$ 180,00024
50/NT2MERCY ENDEAVORS25
(2014)Irish Channel St. Andrew Street Elderly Resource Center,26
Planning and Construction27
(Orleans)28
Payable from General Obligation Bonds29
Priority 1	$ 75,00030
Priority 2	$ 250,00031
Total	$ 325,00032
50/NT8CYPRESS BLACK BAYOU RECREATION 33
AND WATER CONSERVATION DISTRICT 34
(2015)Cypress Black Bayou Roads, Planning and 35
Construction (Local Match Required)36
(Bossier)37
Payable from General Obligation Bonds38
Priority 1	$ 50,00039 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 150 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NTB CALCASIEU WATERWORKS DISTRICT 12 WARD 31
(868) Waterworks District 12, Ward 3 - Water System2
Improvements, Planning and Construction3
(Calcasieu)4
Payable from General Obligation Bonds5
Priority 2	$ 315,0006
Priority 5	$ 1,665,0007
Total	$ 1,980,0008
50/NTCFAUBOURG ST. ROCH IMPROVEMENT ASSOCIATION9
(548) Natatorium at St. Roch, Planning and10
Construction11
(Orleans)12
Payable from General Obligation Bonds13
Priority 2	$ 25,00014
Pending approval of capital outlay budget request pursuant to the provisions of R.S. 39:112.15
50/NTEBATON ROUGE AREA ALCOHOL AND DRUG CENTER16
(666) Baton Rouge Area Alcohol and Drug Center, Inc.,17
Expansion Project, Planning and Construction18
(East Baton Rouge)19
Payable from General Obligation Bonds20
Priority 2	$ 50,00021
The capital outlay budget request for this project was submitted after the November 1st22
deadline, but it has been approved by the Joint Legislative Committee on Capital Outlay23
pursuant to the provisions of R.S. 39:112.24
50/NTJCADEVILLE WATER DISTRICT25
(724) Site No. 4 Water System Renovations and Improvements,26
Planning and Construction (50% Local Match)27
(Ouachita)28
Payable from General Obligation Bonds29
Priority 2	$ 200,00030
50/NTSSOUTHERN UNITED NEIGHBORHOOD31
(1247)Lower 9th Ward Walking Trail and Community 32
Health Project, Planning and Construction33
(Orleans)34
Payable from General Obligation Bonds35
Priority 2	$ 25,00036
50/NTTHOMER MEMORIAL HOSPITAL37
(1267)Digital Mammography Machine,38
Acquisition and Installation39
(Claiborne)40
Payable from General Obligation Bonds41
Priority 2	$ 200,00042
Pending approval of the capital outlay budget request pursuant to the provisions of R.S.43
39:112.44 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 151 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NTULAKE FOREST ELEMENTARY CHARTER SCHOOL1
(1260)Lake Forest Elementary Charter School,2
Planning and Construction3
(Orleans)4
Payable from General Obligation Bonds5
Priority 2	$ 100,0006
50/NTVSEEKER SPRINGS MINISTRY7
(1276)Seeker Springs Renovation, Planning and8
Construction9
(Ouachita)10
Payable from General Obligation Bonds11
Priority 2	$ 85,00012
50/NTWWARD 3 RECREATION DISTRICT OF CALCASIEU PARISH13
(1297)Renovations to Lake Charles Boston Stadium,14
Planning and Construction15
(Calcasieu)16
Payable from General Obligation Bonds17
Priority 2	$ 400,00018
50/NTYNEW ORLEANS JAZZ ORCHESTRA19
(2043)The New Orleans Jazz Market: A Home for the 20
New Orleans Jazz Orchestra at 1436 Oretha 21
Castle Haley, Planning and Construction22
(Orleans)23
Payable from General Obligation Bonds24
Priority 2	$ 1,000,00025
Pending approval of capital outlay budget request pursuant to the provisions of R.S. 39:112.26
50/NU4RED RIVER REVEL ARTS FESTIVAL27
(2016)Covered Pavilion #2 for Shreveport Festival Plaza, 28
Planning and Construction29
(Caddo)30
Payable from General Obligation Bonds31
Priority 1	$ 250,00032
50/NU8MULTICULTURAL TOURISM COMMISSION33
(2017)C.C. Antoine Museum and Arts Center, 34
Planning and Construction ($64,000 Local Match)35
(Caddo)36
Payable from General Obligation Bonds37
Priority 1	$ 335,00038
50/NV1POLLOCK AREA WATER SYSTEM, INC.39
(2018)Water System Improvement, Planning and 40
Construction (Non-State Match Required)41
(Grant)42
Payable from General Obligation Bonds43
Priority 1	$ 175,00044 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 152 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/NV5SOUTHWEST LOUISIANA CENTER HEALTH SERVICES1
(2019)SWLA Center for Health Services - Healing Center, 2
Planning and Construction3
(Calcasieu)4
Payable from General Obligation Bonds5
Priority 1	$ 365,0006
50/NV6EAST CARROLL PARISH HOSPITAL7
(2020)East Carroll Parish Hospital Capital Improvement,8
Emergency Repairs, Planning and Construction9
(East Carroll)10
Payable from General Obligation Bonds11
Priority 1	$ 685,00012
50/NV9ALEXANDRIA CENTRAL ECONOMIC DEVELOPMENT DISTRICT13
(2021)Alexandria Riverfront Development, Phase 1, Technical 14
Planning and Construction ($250,000 Local Match)15
(Rapides)16
Payable from General Obligation Bonds17
Priority 1	$ 170,00018
50/NW1UNION PARISH LAW ENFORCEMENT DISTRICT19
(1070)New Law Enforcement/Services/Training/Emergency 20
Shelter Complex, Planning and Construction 21
($500,000 Local In-Kind Match; $1,100,000 22
Federal Match)23
(Union)24
Payable from General Obligation Bonds25
Priority 1	$ 2,450,00026
50/NW9RED RIVER FILM SOCIETY27
(2022)The Robinson Film Center (Formerly Known as 28
Red River Art Film Theater), Planning and Construction29
(Caddo)30
Payable from General Obligation Bonds31
Priority 1	$ 1,800,00032
50/NX9PROGRESS 63, INC.33
(2023)Progress 63 Center Providing Senior Center Services, 34
Veteran's Services, and Tutoring Services, Building 35
Acquisition, Planning and Construction36
(East Baton Rouge)37
Payable from General Obligation Bonds38
Priority 1	$ 90,00039 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 153 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/S17EAST BATON ROUGE PARISH SCHOOL BOARD1
(    )School Improvements and Infrastructure, 2
Planning and Construction3
(East Baton Rouge)4
Payable from General Obligation Bonds5
Priority 2	$ 125,0006
Pending submittal and approval of capital outlay budget request pursuant to the provisions7
of R.S. 39:112.8
50/S26JEFFERSON PARISH SCHOOL SYSTEM9
(2024)Multipurpose Fine Arts Building Renovation 10
(Jefferson)11
Payable from General Obligation Bonds12
Priority 1	$ 100,00013
50/S39POINTE COUPEE PARISH SCHOOL BOARD14
(1333)Pointe Coupee Parish School Board Central Office 15
Relocation, Renovation and Rebuilding Due to Flooding 16
Caused By Hurricane Gustav17
(Pointe Coupee)18
Payable from General Obligation Bonds19
Priority 1	$ 100,00020
Priority 5	$ 3,225,00021
Total	$ 3,325,00022
50/S42RICHLAND PARISH SCHOOL BOARD23
(2025)Archibald Alternative Center Improvements 24
(Richland)25
Payable from General Obligation Bonds26
Priority 1	$ 25,00027
50/S58VERNON PARISH SCHOOL BOARD28
(2026)Renovations to South Polk Elementary School29
(Vernon)30
Payable from General Obligation Bonds31
Priority 1	$ 1,000,00032
50/S61WEST BATON ROUGE PARISH SCHOOL BOARD33
(    )School Improvements and Infrastructure, 34
Planning and Construction35
(West Baton Rouge)36
Payable from General Obligation Bonds37
Priority 2	$ 25,00038
Pending submittal and approval of capital outlay budget request pursuant to the provisions39
of R.S. 39:112.40 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 154 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
50/S63WEST FELICIANA PARISH SCHOOL BOARD1
(420) Julius Freyhan Cultural/Conference Center,2
Planning and Construction3
(West Feliciana)4
Payable from General Obligation Bonds5
Priority 2	$ 360,0006
Priority 5	$ 2,890,0007
Total	$ 3,250,0008
Section 1A. Notwithstanding any other provision of this Act or any other provision9
of law to the contrary, one million, one hundred eighty-one thousand, one hundred and forty-10
seven dollars of the appropriation from State General Fund (Direct) for Department of11
Economic Development, Office of Business Development, Port of Terrebonne Bulkhead,12
Land Improvements, Bank Stabilization, Navigational Improvements, Dredging, Drainage,13
Sewerage, Slip for Dry-Dock, and Other Related Infrastructure Improvements, Planning and14
Construction (Terrebonne) contained in Act 7 of the 2008 Second Extraordinary Session is15
hereby rescinded. Notwithstanding any other provision of this Act or any other provision16
of law to the contrary, one million, fifty thousand dollars of the appropriation from the17
Penalty and Interest Account for Louisiana Workforce Commission, Office of Workforce18
Development, Renovations to Louisiana Workforce Commission’s Administrative19
Headquarters, Planning and Construction (East Baton Rouge) contained in Act 21 of the20
2010 Regular Session is hereby rescinded contingent upon action by the State Bond21
Commission granting the project a cash line of credit for Priority 2 General Obligation22
Bonds. Notwithstanding any other provision of this Act on any other provision of law to the23
contrary, one million dollars of the appropriation from the Penalty and Interest Account for24
Louisiana Workforce Commission, Office of Workforce Development, Renovations to25
Louisiana Workforce Commission’s Administrative Headquarters, Planning and26
Construction (East Baton Rouge) by letter of the Joint Legislative Committee on the Budget27
approved September 21, 2012 is hereby rescinded contingent upon action by the State Bond28
Commission granting this project a cash line of credit for Priority 2 General Obligation29
Bonds. Notwithstanding any other provision of this Act or any other provision of law to the30
contrary, six hundred and fifty thousand dollars of the appropriation from the Penalty and31
Interest Account for Louisiana Workforce Commission, Office of Workforce Development,32 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 155 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Renovations to Louisiana Workforce Commission’s Administrative Headquarters, Planning1
and Construction (East Baton Rouge) by letter of the Joint Legislative Committee on the2
Budget approved December 20, 2012 is hereby rescinded contingent upon action by the State3
Bond Commission granting this project a cash line of credit for Priority 2 General Obligation4
Bonds.5
Section 2. The expenditure of funds appropriated in this Act, except appropriations6
made to non-profit economic development corporations, shall be in conformity to all existing7
statutes relative to public bidding, contractual review, and R.S. 39:101 through 128 and any8
other statutes affecting the capital outlay program for state government, state institutions,9
and political entities. No contract shall be awarded for any project prior to the granting of10
a line of credit or the sale of bonds by the State Bond Commission, determination by the11
State Treasurer that cash funding is available in the Comprehensive Capital Outlay Escrow12
Account for the project, or delivery of revenue bonds whose issuance is authorized in13
Section 1 of this Act. 14
Section 3.  Payment for projects specified in this Act must be made by warrant15
submitted to the Division of Administration, Department of Transportation and16
Development, the State Treasurer or other administering agency as provided in Section 8,17
whichever is appropriate, only to the extent of funds required for immediate payment.18
Copies of invoices or other supporting documentation shall be submitted with warrants. In19
the event that any equipment included in this Act, is procured pursuant to the provisions of20
the State Lease Purchase Act, R. S. 39:1761 et seq., the amounts included in this Act for21
each such piece of equipment shall not be appropriated.  The provisions of R.S. 39:177122
which require equipment to be leased under the State Lease Purchase Act to be included in23
the executive budget and approved by the Legislature through inclusion in the General24
Appropriation Act shall be considered waived upon the inclusion of such equipment in this25
Act.  Projects contained in this Act may, at the direction of the Division of Administration26
and with the approval of the State Bond Commission, alternatively be funded through27
financing programs heretofore or hereafter provided by a public trust and public corporation28
duly organized pursuant to R.S. 9:2341 et seq., having for its beneficiary the State and the29 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 156 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Louisiana Local Government Environmental Facilities and Community Development1
Authority, pursuant to R.S. 33:4548.1 et seq. 2
Section 4.  If at any time during the Fiscal Year 2013-2014, the Governor should3
find, or the Joint Legislative Committee on the Budget or the Commissioner of4
Administration should report to the Governor, that the receipts of the treasury are falling5
short or appear likely to fall short of the revenue estimates for the fiscal year and that a cash6
deficit is likely to be incurred, the Governor shall take such steps as deemed necessary to7
prevent the occurrence of a cash deficit. In the event that a capital outlay project funded in8
this Act falls under an agency which is abolished or for which funds are not appropriated in9
the 2013-2014 General Appropriation Act, then the funds appropriated in this Act for such10
capital outlay projects shall not be expended unless deemed necessary by the Governor to11
protect life or property.  In the event that legislation is enacted which transfers facilities or12
programs for which projects are funded in this Act, on behalf of one agency, institution,13
department, or management board to another agency, institution, department, or management14
board, then the projects in this Act shall be deemed transferred also.15
Section 5.  All monies appropriated by this Act and any applicable funds of a prior16
capital outlay budget act adopted by the Legislature shall be deposited by the State Treasurer17
in the Comprehensive Capital Outlay Escrow Account, established by this Section, in the18
state treasury.  In accordance with R.S. 36:768, no later than 60 days following the end of19
each quarter, the state treasurer shall report to the Joint Legislative Committee on the Budget20
and the Commissioner of Administration, all funds contained in the Miscellaneous Fund of21
the Comprehensive Capital Outlay Escrow Account. Notwithstanding any provisions22
contained herein or other law to the contrary, any original issue premium or accrued interest23
proceeds received pursuant to the sale of general obligation bonds shall remain on deposit24
to the credit of the Bond Security and Redemption Fund until such time as they may be25
utilized in accordance with U.S. Department of Treasury Regulations promulgated pursuant26
to the Internal Revenue Code of 1986. All such monies shall be administered according to27
the particular act pertaining to the fiscal year in which such monies were appropriated.  If28
it is determined by the Director of the Office of Facility Planning and Control, Division of29 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 157 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Administration, that the funds appropriated by this Act or any prior capital outlay budget act1
are not sufficient to complete the projects contained in any capital outlay budget act, through2
unavoidable deficiencies in appropriation, including administrative and legal requirements,3
the Commissioner of Administration, subject to approval of the Joint Legislative Committee4
on the Budget, may direct the use of interest earned from the investment of general5
obligation bond or note proceeds in the Comprehensive Capital Outlay Escrow Account, not6
to exceed an aggregate of five million dollars in any one fiscal year, for the purpose of7
completing the projects contained in any capital outlay budget act and such money shall be8
deemed appropriated in specific amounts necessary for such purpose. All appropriations in9
this Act which are made as additions to funds for previously authorized projects shall be10
included, for accounting purposes, in the account of said previously authorized projects. If11
it is determined by the Director of the Office of Facility Planning and Control, Division of12
Administration, that it is cost effective and practical to combine individual appropriations,13
the Commissioner of Administration, subject to the approval of the Joint Legislative14
Committee on the Budget, may direct that two or more appropriations or parts thereof may15
be combined into a single project for accounting and audit purposes. The Commissioner of16
Administration may direct that funding in the various statewide and/or multiple parish17
projects for improvements for state facilities may be transferred to any project, in this Act18
or any previous Capital Outlay Act, which require supplemental funding for improvements19
for state facilities which qualify for funding through the various statewide and/or multiple20
parish projects for improvements for state facilities.  The Office of Facility Planning and21
Control, Division of Administration is authorized to receive settlements and vendor rebates22
not in excess of $50,000 unless approved by the Joint Legislative Committee on the Budget,23
and to add those receipts to the funding for projects in this Act or any previous Capital24
Outlay Act for which project funds are received.  The Office of Facility Planning and25
Control, Division of Administration is authorized to receive insurance payments and are26
hereby authorized to immediately repair facilities that suffer insurance losses without those27
projects being included in the Act and shall report to the Joint Legislative Committee on the28
Budget any expenditures from insurance funds received pursuant to this section. A portion,29 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 158 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
as determined by the Commissioner of Administration and not to exceed one percent (1%),1
of the funding for projects which qualify for the Percent for Art Program, may be transferred2
from the qualifying project budgets, to the Department of Culture, Recreation and Tourism3
for costs of acquiring art and administering the program. For all Percent for Art Program4
projects in this or any previous capital outlay, up to ten percent (10%) of the aforementioned5
one percent (1%) may be used for the costs of administering the projects.  6
Section 6. Prior to March 1, 2014, the Commissioner of Administration shall submit7
to the Legislature a list of projects that are completed and the cash balances remaining in8
each project. 9
Section 7. The Commissioner of Administration, with the approval of the Joint10
Legislative Committee on the Budget, is authorized to supplement or substitute the11
appropriations specified in this or previous capital outlay acts with any federal or other funds12
which are or may become available and such funds shall be deemed appropriated in specific13
amounts necessary for the purposes of this Act.  Any funds received by the State Bond14
Commission as a result of a prepayment of reimbursement contracts as authorized by law15
and the Policy and Procedure for Reimbursement Contracts of the Department of Treasury,16
Office of State Bond Commission, shall be deposited as set forth in such Policy and17
Procedure and shall be deemed available and appropriated in specific amounts necessary for18
the purposes of this Act pursuant to the procedure set forth in this section.19
Section 8. All of the funds herein appropriated, except for appropriations made to20
the Department of Military Affairs, the Legislature, the Louisiana Stadium and Exposition21
District, the Department of Economic Development prior to the 2004 Regular Legislative22
Session, the Office of Coastal Protection and Restoration, the Department of Economic23
Development for the Aerospace Manufacturing Infrastructure appropriation, the Department24
of Economic Development for the LITE Equipment appropriation, the Department of25
Economic Development for the Louisiana Gene Therapy Consortium appropriations, the26
Department of Economic Development for the Economic Development Award Program, the27
Department of Economic Development for the Bulk Grain Elevator, Rail Spur, and Other28
Related Infrastructure appropriation, the Department of Economic Development for the29 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 159 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Louisiana Digital Computer Facility, the Division of Administration for Supplemental State1
Funds for Local Government Assistance Program, the Division of Administration for the2
Community Water Enrichment Program or the Department of Transportation and3
Development, shall be considered as having been appropriated directly to the Office of4
Facility Planning and Control, Division of Administration, and all projects herein authorized5
and funded shall be subject to the provisions of R.S. 39:101 through 128.  All of the funds6
herein appropriated under the name of non-state entities, shall be considered as having been7
appropriated directly to the Office of Facility Planning and Control, Division of8
Administration, and shall be administered by the Office of Facility Planning and Control,9
Division of Administration, under cooperative endeavor agreements.  All cooperative10
endeavor agreements for non-state entities shall be prepared by the Office of Facility11
Planning and Control and the Commissioner of Administration is hereby authorized and12
directed to effectuate any necessary transfer of funds from the Department of Justice to the13
Office of Facility Planning and Control in order to accomplish this purpose. However, all14
cooperative endeavor agreements between the Department of Transportation and15
Development and non-state entities entered into prior to the passage of this Act shall16
continue to be administered by the Department of Transportation and Development.17
Cooperative endeavor agreements entered into pursuant to this Act, and approved by the18
Commissioner of Administration or his designee, or the Secretary of the Department of19
Transportation and Development for projects appropriated to or administered by the20
Department of Transportation and Development, shall not be required to be submitted to the21
Division of Administration, Office of Contractual Review. For all projects in this or any22
previous Capital Outlay Act appropriated to the Office of Facility Planning and Control,23
Division of Administration, including those administered by cooperative endeavor24
agreements, up to six percent of each line-item may be used for costs of administering the25
projects.  For all projects in this or any previous Capital Outlay Act appropriated to the26
Department of Transportation and Development, up to six percent of each line-item may be27
used for costs of administering the projects, or for field engineering/construction28
supervision. Line-item general obligation bond projects appropriated to the Department of29 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 160 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Transportation and Development in this or any previous Capital Outlay Act shall be1
authorized to draw Transportation Trust Funds from the Highway Program appropriation,2
for supplemental funding on overruns in excess of the original estimated project cost as3
determined by the Department of Transportation and Development, provided however that4
said projects are in the state or federal highway system and in the priority program, and the5
overrun is less than $50,000.  Any such overrun of $50,000 or more must be approved by6
the Joint Legislative Committee on the Budget.  Furthermore, all ports, levee districts and7
other non-state entities must have a fully executed cooperative endeavor agreement, from8
the Office of Facility Planning and Control, Department of Transportation and Development,9
or the State Treasurer, whichever is appropriate, before entering into any contracts which10
obligate state funding; and must follow all laws pertaining to public bidding. If a port, levee11
district or other non-state entity enters into a contract prior to receipt of funding, or prior to12
execution of a cooperative endeavor agreement, then payments under such contracts are13
prohibited from capital outlay appropriations, and are the sole responsibility of the port,14
levee district, or other non-state entity.  Notwithstanding the provisions of this Section or any15
other capital outlay act, contracts may be entered into for the Atchafalaya Basin Protection16
and Enhancement Kemper Williams project in St. Mary Parish prior to a cooperative17
endeavor agreement being entered into with the state. Notwithstanding anything contained18
in this or any other capital outlay act, contracts may be entered into for the Louisiana Artist19
Guild project prior to receipt of funding. Notwithstanding anything contained in this or any20
other capital outlay act, contracts may be entered into for the Natchitoches Industrial Park21
South project prior to receipt of funding and prior to execution of a cooperative endeavor22
agreement. Notwithstanding anything contained in this Act to the contrary or any other23
provision of law, contracts may be entered into for the Livingston Parish Twenty-First24
District Complex prior to receipt of funding and prior to execution of the cooperative25
endeavor agreement. Notwithstanding R.S. 39:112.A, subject to all other applicable statutes,26
the Department of Transportation and Development may execute a contractual instrument27
for the I-12 O’Neal Lane to Walker Widening project prior to receipt of a line of credit.28
Notwithstanding anything contained in this Act to the contrary or any other provision of law,29 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 161 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
the scope of the appropriations made in this or any other Capital Outlay Act for the St. Mary1
Parish Plantation Pump Station Replacement project shall be deemed to include repair,2
equipment, rehabilitation and infrastructure improvements at the existing Plantation Pump3
Station. Notwithstanding anything contained in this Act to the contrary or any other4
provision of law, the scope of the appropriations made in this or any other Capital Outlay5
Act for the Louisiana 4-H Foundation, Youth Education Development Camp Windy Wood6
project, shall be deemed to include planning, construction, and acquisition. Notwithstanding7
any other provision of this Act or any other provision of law to the contrary, the scope of the8
appropriation made for the Foundation for Science and Math Education shall be deemed to9
include land acquisition. Notwithstanding anything contained in this Act to the contrary or10
any other provision of law, the scope of the appropriations made in this or any other Capital11
Outlay Act for the Youngsville Parkway Road project shall be deemed to include waterline12
improvements and roadway lighting. Notwithstanding anything contained in this Act to the13
contrary or any other provision of law, the scope of the appropriations made in this or any14
other Capital Outlay Act for the West Baton Rouge Parish Water Distribution Improvements15
project shall be deemed to include the planning and/or construction of installation of an16
additional hydraulic loop. Notwithstanding anything contained in this Act to the contrary17
or any other provision of law, the scope of the appropriations made in this or any other18
Capital Outlay Act for the Village of Calvin, Water System Expansion, Planning and19
Construction project shall be deemed to include an In-Line Booster System Facility.20
Notwithstanding anything contained in this Act to the contrary or any other provision of law,21
the scope of the appropriations made in this or any other Capital Outlay Act for the New22
Mental Health Clinic for New Orleans Behavior, Social, and Medical Support Detox Clinic23
project for the Metropolitan Human Service District shall be deemed to include the24
expansion and renovation of the existing facility. Notwithstanding anything contained in this25
Act to the contrary or any other provision of law, the scope of the appropriations made in26
this or any other Capital Outlay Act for the New Mental Health Center for Desire/Florida27
Mental Health Clinic project for the Metropolitan Human Service District shall be deemed28
to include the purchase, construction, or renovation of a new facility in New Orleans East.29 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 162 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Notwithstanding anything contained in this Act to the contrary, or any other provision of1
law, the scope of the appropriations made in this or any other Capital Outlay Act for the City2
of New Orleans, Eastern New Orleans Hospital and Medical Office Building, Real Estate3
Acquisition, Planning, Design, Construction, Renovation and Equipment, project, the City4
of New Orleans may make such capital outlay funds available to the Parish Hospital Service5
District of the Parish of Orleans District "A" in furtherance of the District's planning, design,6
acquisition, development, renovation, construction, equipment and operation of a hospital7
and medical office building in Eastern New Orleans. Notwithstanding anything contained8
herein, or in any cooperative endeavor agreement between the Office of Facility Planning9
and Control and the City of New Orleans or the Hospital Service District to the contrary, the10
Hospital Service District may mortgage or otherwise encumber any and all land, real11
property, including buildings and equipment, and appurtenances acquired, in whole or part,12
with state capital outlay funds provided that bond counsel to the state opines that such13
mortgage shall not affect the tax-exempt status of the bonds to be issued by the state for the14
project. Notwithstanding anything in this Act to the contrary, contracts may be entered into15
for the City of New Orleans, Eastern New Orleans Hospital and Medical Office Building,16
Real Estate Acquisition, Planning, Design, Construction, Renovation and Equipment project17
prior to receipt of funding and prior to execution of the cooperative endeavor agreement.18
Notwithstanding anything contained in this Act to the contrary or any other provision of law,19
the scope of the appropriations made in this or any other Capital Outlay Act for the20
Vermilion Parish Pecan Island Waterworks District No. 3 Water System Improvements21
project shall be deemed to include automatic read meters for the entire system.22
Notwithstanding anything contained in this Act to the contrary or any other provision of law,23
the scope of the appropriations made in this or any other Capital Outlay Act for the24
Louisiana Technical College New Construction or Renovations to Morgan Smith Campus,25
Planning and Construction project shall be used for new construction or renovations to26
Morgan Smith Campus. Notwithstanding anything contained in this Act to the contrary or27
any other provision of law, the scope of the appropriations made in this or any other Capital28
Outlay Act for the Jefferson Parish Bonnabel Canal Rehabilitation and Bank Stabilization29 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 163 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
(Veterans Boulevard to West Esplanade), Planning and Construction project shall be deemed1
to include steel sheet pile bulkhead, and/or bank excavation and reshaping, bridge2
replacement, property acquisition, demolition and improvements needed to stabilize the3
canal bank along the Bonnabel Drainage Canal in order to address canal bank failures4
between Veterans Boulevard and West Esplanade Avenue.  Notwithstanding anything5
contained in this Act to the contrary or any other provision of law, the scope of the6
appropriations made in this or any other Capital Outlay Act for the City of Broussard7
Rehabilitate LA Hwy 182 from US 90 to LA Hwy 89, Planning and Construction project8
shall be deemed to include deleting four thousand two hundred feet of two-lane9
rehabilitation in downtown Broussard and widening from two lanes to three lanes, the10
section of roadway from the western terminus of the City of Broussard Three-lane LA Hwy11
182 in the city of Broussard, Planning and Construction ($750,000 Local Match) project in12
downtown Broussard to South Broussard Road. Notwithstanding anything contained in this13
Act to the contrary or any other provision of law, the scope of the appropriations made in14
this or any other Capital Outlay Act for the St. Martin Parish I-10 Frontage Road Project15
shall be deemed to include the planning, designing, and construction of public infrastructure16
improvements, including but not limited to roadways, water, sewer, lighting, and drainage17
improvements, adjacent to said frontage roads for the purposes of economic development18
and job creation as certified and audited by the St. Martin Economic Development19
Authority. Notwithstanding anything contained in this act to the contrary or any other Act20
or provision of law, the appropriations made for the Executive Department for facilities21
which promote economic development included in the Repair, Restoration, and Replacement22
for Hurricanes Katrina and Rita project, and the Department of Economic Development23
projects are for public purposes pursuant to the provisions of Article VII, Section 14 of the24
Constitution of Louisiana primarily for economic development, including the generation of25
tax revenues, creation of jobs, promotion of tourism, and creation of facilities for charitable,26
cultural, artistic, educational, social, civic, research, service, economic development27
activities, or provide facilities for professional golf events, pursuant to the terms of28
cooperative endeavor agreements, including leases and all expenditures of these29 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 164 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
appropriations and may be exempted, by the Commissioner of Administration, from all1
statutes relative to public bidding, contractual review and the provisions of R.S.2
33:9029.2(D) and in lieu thereof be allowed to use alternative competitive contracting3
arrangements where the appropriate administering entity submits documentation to the4
Commissioner of Administration substantiating that it is in the best interest of the citizens5
of the state, due to economic and/or operational benefits, and the necessity to complete the6
projects in a timely manner; and, the appropriate administering entity shall have the7
authority to directly appoint the design professional from a list of a minimum of three design8
firms or joint ventures with the appropriate specialized facility design experience submitted9
to and acceptable to the Commissioner of Administration and shall be exempt from other10
state requirements for selection of designers, and may include expenditures for computers,11
fixtures, furniture, and other equipment as such is deemed to be capital outlay in nature, and12
unless the Commissioner of Administration is advised by bond counsel to the State that such13
may violate federal tax law, may be used to reimburse any expenditure made prior to the14
granting of a line of credit or the sale of bonds by the State Bond Commission, determination15
by the State Treasurer that cash funding has been deposited in the Comprehensive Capital16
Outlay Escrow Account for the project or the execution of a cooperative agreement from the17
Office of Facility Planning and Control, and may be used to acquire land or real property,18
the title to which is held in the name of an entity exempt from taxation under the provisions19
of Title 26, Section 501(c)(3) of the United States Code. Notwithstanding any provision of20
law to the contrary, the Commissioner of Administration is hereby authorized to take such21
actions as are necessary, including using such funds as may be available including those22
appropriated and available under this Act for professional sports facilities through the23
Louisiana Stadium and Exposition District and that are otherwise available, executing on24
behalf of the State such documents as are necessary in order to terminate the ground lease25
between the State and the PGA and thereby acquiring all leasehold improvements for the26
State, extending the management agreement between the State and the PGA, and extending27
the sponsorship and presence of the Zurich Classic in the Greater New Orleans area.28
Notwithstanding anything contained in this or any other capital outlay act, contracts may be29 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 165 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
entered into for the Tulane National Primate Research Center prior to receipt of funding and1
prior to execution of a cooperative endeavor agreement and the project is exempted from all2
statutes relative to public bidding and contractual review and in lieu thereof the appropriate3
administering entity shall have the authority to directly appoint design professionals and4
construction managers in accordance with National Institute of Health Design and5
Construction Guidelines.  Notwithstanding anything contained in this or any other capital6
outlay act, contracts may be entered into for Grosse Tete, Sewer System Improvements,7
Planning and Construction project prior to receipt of funding and prior to execution of a8
cooperative endeavor agreement.  Notwithstanding anything contained in this or any other9
capital outlay act, contracts may be entered into for the Port of South Louisiana, St. John the10
Baptist Parish Airport Expansion, Land Acquisition, Wetland Mitigation, and Avionics11
Shop, Planning and Construction; Land Acquisition, Planning, Engineering, Infrastructure12
Construction and Development of Public Port/Industrial Park Facilities; Installation of New13
Dock/Building/Equipment and Land Acquisition; Dock, Planning and Construction;14
Globalplex Rail Siding; Liquid Petroleum Dock Facility in St.  James Parish; Globalplex15
Terminal Building #71 Upgrade, Planning and Construction; Globalplex Dock Access16
Bridge and Equipment Replacement /Repair; Warehouse Planning and Construction;17
Globalplex Intermodal Access Road and Railsiding prior to receipt of funding and prior to18
execution of a cooperative endeavor agreement. Notwithstanding anything in this Act, any19
previous capital outlay act, or other provision of law to the contrary, the scope of the20
appropriation for the Port of South Louisiana Globalplex Terminal Building #71 Upgrade21
project shall be deemed to also include similar upgrades for other Globalplex Terminal22
Buildings. Notwithstanding the provisions of this Act or any other capital outlay act,23
contracts may be entered into for the Iberville Parish North Iberville Community Center,24
Planning and Construction project prior to receipt of funding and prior to execution of a25
cooperative endeavor agreement. Notwithstanding anything in this Act to the contrary or26
any other provision of law, contracts may be entered into for the Jefferson Parish Performing27
Arts project prior to receipt of funding, and the State is authorized to financially participate28
in change orders approved by the Parish. Notwithstanding anything contained in this act to29 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 166 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
the contrary or any other provision of law, the appropriations made for the Louisiana1
Stadium and Exposition District shall be appropriated directly to the Louisiana Stadium and2
Exposition District, and are public purposes pursuant to the provisions of Article VII,3
Section 14 of the Constitution of Louisiana primarily for economic development, including4
the generation of tax revenue, creation of jobs, and the generation of tourism, and may be5
used to reimburse any expenditure made prior to the granting of a line of credit or the sale6
of bonds by the State Bond Commission, determination by the State Treasurer that cash7
funding has been deposited in the Comprehensive Capital Outlay Escrow Account for the8
project. The Louisiana Stadium and Exposition District may apply up to $10,000,000 to9
reimburse the New Orleans Hornets NBA, LLC for costs incurred in constructing a new10
training facility as contemplated by the Amended and Restated Arena Use Agreement dated11
July, 1 2012; but, otherwise, contracts for projects funded through this appropriation shall12
be awarded utilizing the public bid and contractual review process set forth in Chapter 1013
of Title 38 and Chapter 16 of Title 39 of the Louisiana Revised Statutes of 1950, except with14
respect to time requirements, or, in order to encourage competition for the projects funded15
through this appropriation and to complete the projects in a timely manner, the Louisiana16
Stadium and Exposition District shall have the authority to select a general contractor17
through an RFP process whereby general contractors will bid general conditions and18
contractor's fee based on the direct construction budget. The alternative time requirements19
shall be approved by the Commissioner of Administration before the awarding of any such20
contracts. The Louisiana Stadium and Exposition District shall have the authority to directly21
appoint the design professional from a list of a minimum of three architectural firms or joint22
ventures with professional sports facility design experience acceptable to the Commissioner23
of Administration and shall be exempt from other state requirements for selection of24
designers.  The design professional fee shall be in accordance with state guidelines25
administered by the Office of Facility Planning and Control, Division of Administration.26
Eligible expenses for Economic Development Award Program funds may include27
documented project expenses beginning on the date of LEDC Board approval of the project28
and may be reimbursed upon execution of the cooperative endeavor agreement for the29 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 167 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
project. The new University Medical Center in New Orleans project in Orleans Parish shall1
be exempt from the state's requirements for selection of designers and the Commissioner of2
Administration shall have the authority to approve a design professional selection process.3
The design professional fee shall be in accordance with state guidelines administered by the4
Office of Facility Planning and Control, Division of Administration.  The Division of5
Administration, Office of Facility Planning and Control, with approval of the Commissioner6
of Administration and the Joint Legislative Committee on the Budget, is authorized to use7
alternative delivery strategies in implementing the University Medical Center in New8
Orleans project, hurricane damage repairs to Southern University at New Orleans,9
Hazardous Material Abatement Projects, the City Park Golf Complex Improvements project,10
the Oakcrest Sprinkler System project, the Sprinkler Systems for Residences, Porches and11
Walkways project, and the Patrick Taylor Hall Renovation and Expansion project.  For all12
projects administered by the Office of Facility Planning and Control and payable from13
proceeds of self-generated revenues, funds shall be remitted to the Office of Facility14
Planning and Control for deposit in the state treasury at such time as may be deemed15
necessary by the Office of Facility Planning and Control in order to cover the amount of16
contracts or other project expenses. Notwithstanding anything contained in this or any other17
capital outlay act to the contrary, for projects administered by the Office of Facility Planning18
and Control which are payable from the proceeds of self-generated revenues and other19
means of finance, the Office of Facility Planning and Control shall consider expenditures20
to be paid first from sources other than self-generated revenues and then to self-generated21
revenues. The State Treasurer shall refund to the appropriate source any surplus self-22
generated funds, advanced insurance funds received by the Office of Facility Planning and23
Control as Interagency Transfer from Office of Risk Management associated with hurricane24
damage recovery, and interest earned on these funds, provided the Treasurer's Office is25
notified, when these funds are deposited in the state treasury, that the user agency or Office26
of Risk Management intends to request a refund of this interest.  Any revenue bonds27
appropriated in Section 1 of this Act shall not be secured by the full faith and credit of the28
state. Notwithstanding anything in this Act to the contrary or any other provision of law,29 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 168 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
contracts may be entered into for the Mississippi River Levee Raising, Arkansas to Old1
River project prior to receipt of funding, and the State is authorized to financially participate2
in obligations created by such contracts. Notwithstanding anything in this Act to the contrary3
or any other provisions of law, contracts may be entered into for the Ernest N. Morial New4
Orleans Exhibition Hall Authority, Hall A Renovation, Planning and Construction project5
prior to receipt of funding and prior to execution of the cooperative endeavor agreement.6
Notwithstanding anything in this Act to the contrary or any other provision of law, contracts7
may be entered into for the Rehabilitation of Dock #1 Section A Seawall project for the St.8
Bernard Port prior to receipt of funding, and the State is authorized to financially participate9
in obligations created by such contracts. Notwithstanding any contrary provision of Act 2710
of the 2006 Regular Session or any other capital outlay act, the appropriation from the State11
General Fund (Direct) in the amount of $300,000 contained in the 2006 Act under Schedule12
50/NET NIA Foundation for the project designated (1415) Multi-Purpose Center and Youth13
Facility, Planning and Construction (East Baton Rouge Parish) shall be null, void and of no14
effect on the effective date of this Act.  Notwithstanding any contrary provision of Act 2815
of the 2007 Regular Session or any other capital outlay act, the appropriation from the State16
General Fund (Direct) contained in the 2007 Act under Schedule 50/NET NIA Foundation17
for the project designated (1689) NIA Foundation Multi-Purpose Facility, Planning and18
Construction (East Baton Rouge Parish) is hereby reduced by $342,500. The appropriation19
from the State General Fund (Direct) for that project is and shall be deemed to be $0.20
Section 9. Notwithstanding any provisions contained herein or any other law to the21
contrary, the provisions of Chapter 16 of Subtitle III of Title 39 of the Louisiana Revised22
Statutes of 1950 as amended, shall not apply to architectural and engineering contracts,23
administered by the Office of Facility Planning and Control, Division of Administration24
pursuant to this or any other capital outlay act.25
Section 10.  All funds appropriated herein to the Office of Facility Planning and26
Control, Division of Administration, on behalf of non-state entities, and administered by27
cooperative endeavor agreements pursuant to this Act shall be expended within two (2) years28
from the date of the issuance of the bonds. The Office of Facility Planning and Control,29 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 169 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Division of Administration, agrees that it will notify the non-state entity of the date the1
bonds are issued within three (3) months from the issuance thereof. The non-state entity2
understands and agrees that if the funds appropriated herein and administered under3
cooperative endeavor agreements pursuant to this Act are not totally expended within two4
(2) years from the issuance of the bonds, the Office of Facility Planning and Control,5
Division of Administration, can close the project and recommend that the Legislature6
reallocate any unexpended proceeds to other projects. 7
Section 11. Notwithstanding any provisions contained herein or law to the contrary,8
the proceeds of revenue bonds to be utilized to fund certain projects authorized in Section9
1 hereof may, in accordance with Article VII, Section 9 of the Louisiana Constitution of10
1974, be deposited in special accounts held outside the state treasury in accordance with the11
provisions of any bond resolution, indenture, reimbursement contract, or other bond or12
financing covenant which provides for the pledge of such funds in connection with the13
issuance of revenue bonds. For all projects administered by the Office of Facility Planning14
and Control, Division of Administration, authorized in Section 1 hereof which are payable15
from the proceeds of revenue bonds, only the Office of Facility Planning and Control,16
Division of Administration, will be authorized to requisition funds from the special accounts17
described immediately above, at such time or times as may be deemed necessary by the18
Office of Facility Planning and Control, Division of Administration, in order to cover19
contract amounts or other project expenses. 20
Section 12.  The Governor shall have the power to veto any line-item in this Act. 21
Section 13. Except as otherwise provided herein, no funds shall be expended on any22
highway projects on highways within the state highway system as defined in R.S. 48:19123
under the jurisdiction of the Department of Transportation and Development unless and until24
such project is in the Highway Program, R.S. 48:228 through 232, approved by the Joint25
Legislative Committee on Transportation, Highways and Public Works.26
Section 14. The word "statewide" used in place of the specific parish designation for27
projects contained in this Act indicates that the project or program is applicable to all sixty28
four parishes in the state. The description of any project in this Act shall be deemed to29 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 170 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
include planning, design, master planning, studies, permits, surveys, testing, construction,1
land and/or building/improvement acquisition, reconstruction, renovation, repair, right of2
way and utilities, site and other improvements, miscellaneous/contingencies, lease hold3
improvements ultimately owned by the State or a political subdivision of the State,4
equipment and other acquisitions, and any other component of the project if such are5
included or indicated in the capital outlay request for such projects required by R. S. 39:1016
subject to the provisions of Title 39 of the Louisiana Revised Statutes. For new construction7
or renovation projects, equipment or other acquisitions, which can reasonably be considered8
necessary for the facility to be functional, may be deemed to be included in the project, even9
if such equipment or other acquisitions are not included or indicated in the project name or10
the capital outlay request. When local or federal match is referenced in a project title, but11
only a portion of the state appropriation is granted a line of credit or otherwise funded, then12
the amount of local or federal match, required to be made available, may be prorated relative13
to the amount of state appropriation made available through lines of credit. 14
Section 15.  The provisions, items, and projects contained in this Act are severable15
and if any provision, item, or project contained herein, or the application of any such16
provision, item, or project, is held invalid, such invalidity shall not affect other provisions,17
items, projects, or applications of the Act which can be given effect without the invalid18
provision, project, item, or application. 19
Section 16. Notwithstanding any other provisions of law to the contrary, the State20
shall not grant cash lines of credit, or authorize or issue general obligation bonds in a21
principal amount in excess of $2,046,475,000 for Fiscal Year 2013-2014. 22
Section 17. Notwithstanding the provisions of Act 422 of 1988, which mandates that23
high rise state buildings must have sprinklers by January of 1999, the deadline is hereby24
extended until December 31, 2014, to allow the completion of ongoing capital outlay25
sprinkler installation projects.26
Section 18. Notwithstanding any contrary provision of this Act or any contrary27
provision of law, no funds appropriated by this Act shall be released or provided to any28
recipient of an appropriation made in this Act if, when, and for as long as, the recipient fails29 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 171 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
or refuses to comply with the provisions of R.S. 24:513.  No recipient shall be considered1
to fail or refuse to comply with the provisions of R.S. 24:513 pursuant to this Section during2
any extension of time granted by the Legislative Auditor to the recipient to comply.  The3
Legislative Auditor is authorized to grant an extension of time to comply with the provisions4
of R.S. 24:513 for recipient entities of an appropriation contained in this Act.5
Section 19. This Act shall become effective upon signature by the Governor or, if6
not signed by the Governor, upon expiration of the time for bills to become law without7
signature by the Governor, as provided in Article III, Section 18 of the Constitution of8
Louisiana. If vetoed by the Governor and subsequently approved by the Legislature, this Act9
shall become effective on the day following such approval.10
DIGEST
The digest printed below was prepared by House Legislative Services. It constitutes no part
of the legislative instrument. The keyword, one-liner, abstract, and digest do not constitute
part of the law or proof or indicia of legislative intent.  [R.S. 1:13(B) and 24:177(E)]
Robideaux	HB No. 2
Abstract: Provides for the capital outlay budget and program for FY 2013-2014; provides
for the funding of the capital outlays from the specified sources of monies in the
specified amounts as follows:
Federal Funds	$ 20,438,462
Federal Funds - TTF	$ 711,133,000
Transportation Trust Fund (TTF) - Regular $ 129,572,190
Interagency Transfers	$ 25,347,724
Misc. Statutory Dedications	$ 67,261,400
Fees and Self-Generated Revenues $ 59,933,489
Reappropriated Cash	$ 19,568,258
Revenue Bonds	$ 6,000,000
TOTAL CASH PORTION	$1,039,254,523
Authorizes the funding of certain capital outlay projects from the sale of general obligation
bonds for the projects delineated as follows:
Priority 1	$1,991,750,000
Priority 2	$ 145,130,000
Priority 5	$1,235,500,000
TOTAL GENERAL OBLIGATIONS BONDS	$3,372,380,000
BONDS NRP/RBP	$ 10,328,139
GRAND TOTAL ALL MEANS OF FINANCING	$4,421,962,662 HLS 13RS-548	ENGROSSED
HB NO. 2
Page 172 of 172
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
Summary of Amendments Adopted by House
Committee Amendments Proposed by House Committee on Ways and Means to the
original bill.
1. Changes General Obligation Bond funding as follows:
Priority 1	$ 9,295,000
Priority 2	$ 21,420,000
Priority 5	$(78,285,000)