Louisiana 2022 2022 Regular Session

Louisiana House Bill HB2 Engrossed / Bill

                    HLS 22RS-324	ENGROSSED
2022 Regular Session
HOUSE BILL NO. 2
BY REPRESENTATIVE BISHOP
CAPITAL OUTLAY:  Provides for the comprehensive Capital Outlay budget
1	AN ACT
2To provide with respect to the capital outlay budget and the capital  outlay program for state
3 government,  state  institutions,  and  other  public  entities;  to  provide for  the
4 designation of projects and improvements; to provide for the financing thereof
5 making appropriations from certain sources; and to provide for related matters.
6Be it enacted by the Legislature of Louisiana:
7 Section 1.  The following sums or so much thereof as may be necessary are hereby
8appropriated out of any monies in the state treasury from the sources specified, from federal
9funds and self-generated revenues belonging to the state of Louisiana and/or collected by
10boards, commissions, departments, and agencies thereof, all for making capital outlay and
11for the purposes and in the amounts specified herein for the Fiscal Year commencing July
121, 2022, and ending June 30, 2023, subject to the conditions thereafter provided:           
13 A project with funding payable from General Obligation Bonds Priority 1 indicates
14that the funding for the project includes the reauthorization of funding which was previously
15granted as a line of credit by the State Bond Commission in Fiscal Year 2021-2022. As used
16in this Section, the term "general obligation bonds" means state general obligation bonds or
17other evidences of indebtedness payable from the Bond Security and Redemption Fund. The
18amount set forth in this Section opposite each project, or so much thereof as may be
19necessary, is hereby appropriated and payable from the source of funding indicated;
20provided,  however,  amounts  appropriated  and  payable  from  federal  funds  may  be
21encumbered or expended only to the extent such amounts shall have been committed or
Page 1 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1received.  Pursuant to the provisions of R.S. 39:82, funds for planning, acquisition,
2construction, and major repair projects appropriated by this Act may be retained until
3completion of the project, even if no bona fide liability exists on the last day of the fiscal
4year.
5 This Act shall constitute the comprehensive state capital outlay budget for the 2022-
62023 Fiscal Year. Projects set forth which are payable from the proceeds available from the
7sale of general obligation bonds shall have the priorities as indicated. The Request for Line
8of Credit form used by the attorney general and Bond Counsel in evaluating Louisiana
9Constitutional, Internal Revenue Code, and applicable income tax regulations shall be filed
10with the commissioner of administration, State Bond Commission, and state attorney
11general. No general obligation bond cash lines of credit shall be granted to fund any lower
12priority project prior to the granting of general obligation bond cash lines of credit to fund
13all higher priority projects (the "general rule"), except as hereinafter provided.   This
14prohibition against funding a lower priority project shall not apply upon a showing of an
15impossibility or impracticality either to proceed with all unfunded higher priority projects
16or to proceed with the funding of such projects or any part thereof through the issuance of
17general obligation bonds for any reason. Such showing shall be stated in reasonable detail
18in a certificate or certificates signed by the state agency responsible for administering the
19funding, and filed with the commissioner of administration and the State Bond Commission
20(hereinafter referred to as "the Commission").  Upon a determination by the Commission
21that proceeding with such a project or the funding thereof through the issuance of general
22obligation bonds is impractical or impossible, the Commission may then proceed with the
23sale of general obligation bonds or the granting of cash lines of credit without regard to the
24priority of the unfunded projects determined to be impossible or impractical.
25 Upon recommendation by the state agency responsible for administering the funding,
26if it is determined at any time that proceeding with the project or with the funding thereof
27is no longer impossible or impractical, the State Bond Commission may rescind the
28certificate of impossibility or impracticality and may proceed with the project or with the
29issuance of general obligation bonds or the granting of cash lines of credit to fund the
30project. Alternatively, the Interim Emergency Board (hereinafter referred to as "the Board"),
Page 2 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1upon reviewing certificates as described above and determining that proceeding with such
2projects  or  the  funding  thereof  through  the  issuance  of  general  obligation  bonds  is
3impossible or impractical, may designate a lower priority for such projects.  The Board's
4determination and lower priority designation shall be submitted to the members of the
5legislature for their approval in accordance with the provisions of Chapter 3-B of Subtitle
6I of Title 39 of the Louisiana Revised Statutes of 1950.  In accordance with the provisions
7of Chapter 3-B of Subtitle I of Title 39 of the Louisiana Revised Statutes of 1950, whenever
8at the written request of the appropriate legislators and agency, the Board determines that 
9an adjustment to a project description originally set forth in such capital budget adopted by
10the legislature for a current fiscal year is necessary to correct a mistake in a project
11description, clarify a description, change the scope of a description, or make any other
12adjustment the Board deems necessary to implement the purpose of the project, such
13adjustment shall become effective only upon the approval by majority vote of the elected
14members of each house of the legislature in the manner provided for in Chapter 3-B of
15Subtitle I of Title 39 of the Louisiana Revised Statutes of 1950.
16 If such approval is granted, notification by the chair or secretary of the Board of the
17results of the balloting shall be transmitted to the State Bond Commission, which may then
18proceed with the sale of general obligation bonds or the granting of cash lines of credit for
19each change approved upon request of the commissioner of administration in accordance
20with the general rule.
21 With respect to Priorities 1 through 5, a lower priority project may be moved to a
22higher priority only upon a showing of an emergency or other cause not reasonably
23anticipated by the legislature, which shall be stated in reasonable detail in a certificate signed
24by the head of the appropriate department, political subdivision, or agency and filed with the
25commissioner of administration and the Board. Upon a determination by the Board that such
26project should be moved to a higher priority because of an emergency or other cause not
27reasonably anticipated by the legislature, the Board shall designate a higher priority to the
28project.  The matter then shall be submitted to and be subject to the same approval by the
29members of the legislature in the manner previously indicated in this Section.   If such
30approval is granted, notification by the chair or secretary of the board of the change of
Page 3 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1priority shall be transmitted to the State Bond Commission, which then upon request of the
2commissioner of administration, may proceed with the sale of general obligation bonds or
3the granting of cash lines of credit in accordance with the general rule. As to projects within
4a priority, the State Bond Commission acting on requests submitted by the commissioner of
5administration shall determine when such project, or phases thereof, shall be funded.  In
6making such determination, the State Bond Commission shall consider the amount of
7proceeds of general obligation bonds to be made available in light of money and capital
8market conditions; the expenditure requirements of the project; the time required for
9architectural plans and drawings, public bidding, and site acquisition and preparation;
10availability of receipt of federal monies; litigation affecting the undertaking or completion
11of a project; federal tax laws and regulations regarding the sale of municipal bonds; and
12other items of a similar nature bearing upon the possibility or the necessity to commence a
13project or any particular phase thereof.
14 Any other provision of this Act to the contrary notwithstanding, projects described
15in Priority 5 of this Act shall not be moved to a higher priority except upon one of the
16following conditions: (1) Funding is necessary to complete or additionally fund a project
17located elsewhere in the Capital Outlay Act. Determination of such condition shall be made
18by the head of the appropriate department or agency by means of a certificate to that effect
19filed with the Interim Emergency Board, who shall, by mail ballot, request approval of such
20change and if approved by a majority of each house of the legislature it shall be funded, or
21(2) unless required by an emergency or other cause not reasonably anticipated by the
22legislature, to be in accordance with procedures set forth in this Section. However, the State
23Bond Commission may authorize a non-cash line of credit for any project in Priority 5 which
24represents that portion of construction contracts which were let during a previous fiscal year,
25or construction contracts which will be let during the current fiscal year, but which will not
26require cash expenditures during the year.  Such non-cash lines of credit, when combined
27with previously sold bonds or with higher priority bonds or lines of credit, or with funds
28appropriated from other sources, will provide sufficient appropriated funds to award
29equipment or construction contracts. Contracts shall not be awarded without approval of the
30division of administration.
Page 4 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1 Upon approval by the State Bond Commission, and subject to compliance with its
2policies and procedures and the procedures set forth herein, a line of credit providing for the
3use of funds in anticipation of the sale of general obligation bonds may be granted to the
4appropriate administering agency or department from the Comprehensive Capital Outlay
5Escrow Account, or if there is not a sufficient amount available in such account, from other
6available state cash in the state treasury, for capital improvement projects for which bond
7proceeds are appropriated by a current capital budget, prior to the actual issuance of bonds
8for such projects, unless the attorney general advises that an impediment exists to the valid
9issuance of the bonds on the date such line of credit is granted.
10 All bonds that are to be repaid, in whole or in part, by revenues generated by the
11project shall be designated as "Reimbursement Bonds.” The State Bond Commission shall
12enter into such agreements as are necessary to provide that the agency or subdivision, whose
13project is reimbursable, shall pay the bond debt costs into the Bond Security and Redemption
14Fund.  Such costs may be paid annually or at the end of the term of the bonds issued as
15determined by the State Bond Commission.
16 Priority 1 general obligation bond funding shall be limited to:
17 (1)  Projects and amounts which were previously authorized by Act 485 of the 2021
18Regular Session of the Legislature; and which were granted cash lines of credit by the State
19Bond Commission.  The bonds to fund these projects were not sold in Fiscal Year 2021-
202022.
21 (2)  The reauthorization of the portion of the outstanding Fiscal Year 2021-2022
22Priority 5 Non-Cash Lines of Credit for projects which will require cash expenditures in
23Fiscal Year 2022-2023 and therefore must be converted to Cash Lines of Credit in Fiscal
24Year 2022-2023.
25 (3)  Commitments  made  in  the  Higher  Education Desegregation  Settlement
26Agreement.
27 Priority 2 general obligation bond projects are for the completion of plans and
28specifications, land acquisition, site preparation, or for construction which will begin during
29the fiscal year.  It is presently anticipated that the listed projects will require the sale of
30bonds or extension of lines of credit during the fiscal year after adoption of this Act.
Page 5 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1 Priority 3 general obligation bond projects are for the preparation of plans and
2specifications, land acquisition, site preparation, or for construction and shall be limited to
3funding for the portion of construction contracts which will not require cash expenditures
4during the fiscal year. The projects in this category shall be considered future year projects
5in the state's five-year capital outlay plan. It is presently anticipated that the listed projects
6will not require the sale of bonds or extension of lines of credit during the fiscal year.
7 Priority 4 general obligation bond projects are for the preparation of plans and
8specifications, land acquisition, site preparation, or for construction and shall be limited to
9funding for the portion of construction contracts which will not require cash expenditures
10during the fiscal year. The projects in this category shall be considered future year projects
11in the state's five-year capital outlay plan. It is presently anticipated that the listed projects
12will not require the sale of bonds or extension of lines of credit during the fiscal year.
13 Priority 5 general obligation bond funding shall be limited to funding for the portion
14of construction contracts which will not require cash expenditures during the fiscal year.
15These funds, when combined with previously sold bonds or with higher priority bonds on
16lines of credit, or with funds appropriated from other sources, will provide sufficient
17appropriated funds to award contracts. Non-cash lines of credit shall be required prior to the
18award of these contracts.
19 In accordance with the cash management plan adopted pursuant to R.S. 48:251(D)
20and the provisions of Act 161 of the 1998 First Extraordinary Session, the Department of
21Transportation and Development is authorized to enter into contracts or agreements for
22projects approved pursuant to the Highway Priority Program, Airport Construction and
23Development Priority Program, Port Construction and Development Priority Program, and
24Statewide Flood Control Program for projects bid and awarded, authorized, or commenced
25during the fiscal year which do not require cash expenditures for the full contract or
26agreement amount.
Page 6 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1	EXECUTIVE DEPARTMENT
201/107DIVISION OF ADMINISTRATION
3(465) State Office Buildings Major Repairs, Equipment
4 Replacement, and Renovations, Planning and
5 Construction
6 (Statewide)
7 Payable from General Obligation Bonds
8	Priority 1	$ 3,583,853
9	Priority 5	$12,110,000
10 Total	$15,693,853
11(468) Exterior Waterproofing and Repairs, 
12 Chief Justice Pascal F. Calogero, Jr. Courthouse, 
13 Planning and Construction
14 (Orleans)
15 Payable from General Obligation Bonds
16	Priority 2	$ 1,000,000
17	Priority 5	$10,000,000
18 Total	$11,000,000
19(696) Local Government Assistance Program
20 (Statewide)
21 Payable from the balance of State General Funds (Direct)
22 previously allocated under the authority of Act 29 of 2018
23 for St. Bernard Port, Harbor & Terminal District,
24 Rehabilitation of Chalmette Slip, Planning and
25 Construction (St. Bernard); and Act 29 of 2018 for
26 Bossier Parish, Acceleration Lane on US 71, Planning
27 and Construction (Bossier); and Act 29 of 2018 for
28 Calcasieu Parish, Gravity Sewer Trunk Mains and
29 Pumping Stations South Ward 3 and South Ward 4,
30 Planning and Construction (Calcasieu); and Act 23 of
31 2002 for Morehouse Parish, Industrial Park, Planning and
32 Construction ($15,000 Local Match) (Morehouse); and
33 Act 29 of 2018 for Richland Parish, Richland Parish
34 Courthouse Renovations (Richland); and Act 20 of 2019
35 for St. John the Baptist Parish, East Bank Courthouse,
36 Planning and Construction (St. John the Baptist); and Act
37 29 of 2018 for St. Mary Parish, Recreation and
38 Infrastructure Improvements at Centerville Park, Planning
39 and Construction (St. Mary); and Act 28 of 2007 for
40 Vernon Parish, Creation of Vernon Lake Cultural Center,
41 Recreation and Tourism Park, Planning and Construction
42 (Vernon); and Act 26 of 2005 for Vernon Parish, Visitor
43 Center, Planning and Construction (Vernon); and Act 29
44 of 1998 for Vernon Parish, Parish Historical Building on
45 3rd Street Renovation for Office Space (Vernon); and Act
46 28 of 2007 for Vernon Parish, Visitor Center, Planning
47 and Construction (Vernon); and Act 29 of 2018 for
48 Grayson, Streets and Drainage Improvements (Caldwell);
49 and Act 20 of 2019 for Hammond, Gateway to
50 Hammond, Phase I, Planning and Construction
51 (Tangipahoa); and Act 20 of 2019 for Jean Lafitte, Lafitte
52 Seafood Pavilion and Market, Planning and Construction
53 (Jefferson); and Act 485 of 2021 for New Orleans,
54 Algiers Playgrounds and Parks, Renovation of Restrooms,
55 Lighting, Fencing, and Playground Equipment (Orleans);
56 and Act 29 of 2018 for St. Joseph, Proposed City
Page 7 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1 Hall/Convention Center, Planning and Construction
2 (Tensas); and Act 29 of 2018 for St. Martinville, Sewer
3 Lift Station Improvements (St. Martin); and Act 29 of
4 2018 for St. Martinville, Sewer and Water Updates,
5 Planning and Construction (St. Martin); and Act 29 of
6 2018 for Zwolle, Installation of 6" Waterline and Water
7 Well, Planning and Construction ($25,000 Local Match)
8 (Sabine); and Act 26 of 2005 for Canary Island
9 Descendent Association, Multi-Purpose Building,
10 Planning and Construction (Plaquemines); and Act 28 of
11 2007 for Opportunities Industrial Center of Ouachita,
12 New Vocational-Technical Center for Opportunities
13 Industrialization of Ouachita (Ouachita); and Act 28 of
14 2007 for Just Willing Foundation, Just Willing
15 Communications and Technology Center, Planning and
16 Construction (Orleans); and Act 29 of 2008 for St. Mary,
17 Building Improvements from Emergency Family Shelter
18 Facility, Chez Hope Domestic Violence Program (St.
19 Mary); and Act 29 of 2018 for Gretna, Gretna Police
20 Department, Construction of Armory, Elevation/Flood
21 Proofing/Wind Retrofit, Planning and Construction
22 (Jefferson); and Act 4 of 2017 SES for Junior League of
23 New Orleans, Incorporated, Renovate Annex Building
24 and Re-Purpose Space, Including Installation of Handicap
25 Accessibility Ramp and Bathrooms Upgrades, Planning
26 and Construction (Orleans) 
27 Payable from General Obligation Bonds	$ 1,043,384
28	Priority 5	$ 5,000,000
29 Total	$ 6,043,384
30(697) Community Water Enrichment Program
31 (Statewide)
32 Payable from General Obligation Bonds
33	Priority 5	$ 5,000,000
34 Payable from the balance of general obligation bond
35 proceeds previously allocated under the authority of Act
36 29 of 2018 for Calcasieu Parish, Gravity Sewer Trunk
37 Mains And Pumping Stations South Ward 3 and South
38 Ward 4, Planning and Construction(Calcasieu); and Act
39 29 of 2018 for Gretna, Gretna Police Department,
40 Construction of Armory, Elevation/Flood Proofing/Wind
41 Retrofit, Planning and Construction(Jefferson); and Act
42 4 of 2017 for Junior League of New Orleans,
43 Incorporated, Renovate Annex Building and Re-Purpose
44 Space, Including Installation of Handicap Accessibility
45 Ramp and Bathrooms Upgrades, Planning and
46 Construction(Orleans); and Act 29 of 2018 for Hammond,
47 Gateway to Hammond, Phase I, Planning and
48 Construction(Tangipahoa)
49	$ 243,095
50 Total	$ 5,243,095
51Provided, however, that all recipients comply with the applicable Department of Natural
52Resources rules and regulations, if any, regarding master meter installation.
53(1176)Americans with Disabilities Act Implementation for State
54 Facilities, Planning and Construction
55 (Statewide)
56 Payable from the balance of State General Fund (Direct)
57 previously allocated under the authority of Act 20 of 2009
Page 8 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1 for Division of Administration, State Emergency Shelters
2 (Statewide); and Act 20 of 2019 for Division Of
3 Administration, Outpatient Clinics In Rapides Parish,
4 Planning and Construction (Rapides); and Act 20 of 2019
5 for Office of State Museum, Old U. S. Mint Museum
6 Exhibit (Orleans); and Act 20 of 2009 for New Orleans
7 City Park, Construction of Maintenance Facility, City
8 Park, Planning and Construction (Cash and /or In-Kind
9 Match) (Orleans); and Act 29 of 2018 for Office of
10 Juvenile Justice, Major Repairs and Equipment
11 Replacement, Planning and Construction (Statewide); and
12 Act 16 of 2016 for Metropolitan Human Service District,
13 New Mental Health Center for Desire/Florida Mental
14 Health Clinic, Including the Purchase, Construction or
15 Renovation of a New Facility in New Orleans East,
16 Planning and Construction (Orleans); and Act 29 of 2018
17 for Office of Aging and Adult Services, Replace Fire
18 Alarm and Sprinkler System, Planning and Construction
19 (East Feliciana); and Act 23 of 2002 for Office of Public
20 Health, New Office of Public Health Central Laboratory
21 Facility, Planning and Construction (Orleans); and Act 23
22 of 2002 for Hammond Developmental Center,
23 Replacement of Underground High Temperature Hot
24 Water System, Planning and Construction (Tangipahoa);
25 and Act 29 of 2018 for Southern University - Baton
26 Rouge, Major Repairs to F. G. Clark Activity Center
27 (East Baton Rouge); and Act 20 of 2009 for LSU Baton
28 Rouge, Band Hall, Planning and Construction
29 ($5,000,000 Cash and/or In-Kind Match) (East Baton
30 Rouge); and Act 511 of 2008 for LSU Baton Rouge,
31 Choppin Hall Annex Chemistry Lab Building, Planning
32 and Construction (East Baton Rouge); and Act 203 of
33 2007 for LSU Health Sciences Center Shreveport, Feist-
34 Weiller Cancer Research Center Planning, Construction,
35 and Acquisitions (Caddo); and Act 20 of 2019 for LSU
36 Health Care Services Division, Emergency Room
37 Expansion, University Medical Center (Lafayette); and
38 Act 29 of 2018 for Southern University Baton Rouge, A.
39 W. Mumford, Americans with Disabilities Act
40 Compliance and Upgrades, Planning and Construction
41 (East Baton Rouge); and Act 29 of 2018 for McNeese
42 State University, Frazar Memorial Library Renovations
43 and Repairs, Planning and Construction (Calcasieu); and
44 Act 29 of 2018 for McNeese State University, Alpha Hall
45 Renovations, Planning and Construction (Calcasieu); and
46 Act 53 of 2011 for McNeese State University Alpha Hall
47 Renovations, Planning and Construction (Calcasieu); and
48 Act 29 of 2018 for McNeese State University, Campus-
49 Wide Elevator Repairs, Planning and Construction
50 (Calcasieu); and Act 23 of 2012 for University of
51 Louisiana - Lafayette, Fletcher Hall Exterior Repairs,
52 Planning and Construction (Lafayette); and Act 2 of 2020
53 for University of Louisiana - Lafayette, Fletcher Hall
54 Exterior Repairs, Planning and Construction (Lafayette);
55 and Act 29 of 2018 for New Orleans Center for the
56 Creative Arts, Replace HVAC System, Planning and
57 Construction 
58 (Orleans)	$ 4,841,646
Page 9 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(1177)Major Repairs, Equipment Replacement and
2 Renovations for State Buildings to Address Deferred
3 Maintenance Backlog and Infrastructure, Planning and
4 Construction
5 (Statewide)
6 Payable from General Obligation Bonds
7	Priority 1	$ 7,274,652
8 Payable from Interagency Transfers	$ 8,000,000
9 Payable from the balance of general obligation bond
10 proceeds previously allocated under the authority of Act
11 29 of 2018 for Office of the Secretary, Atchafalaya Basin
12 Protection and Enhancement (Federal Match and
13 Local/Sponsor Match)(Assumption, Avoyelles, Iberia,
14 Iberville, Pointe Coupee, St. Landry, St. Martin, St.
15 Mary); and Act 16 of 2016 for Metropolitan Human
16 Service District, New Mental Health Center for
17 Desire/Florida Mental Health Clinic, Including the
18 Purchase, Construction or Renovation of a New Facility
19 in New Orleans East, Planning and
20 Construction(Orleans); and Act 29 of 2018 for Southern
21 university Baton Rouge, A. W. Mumford, Americans
22 with Disabilities Act Compliance and Upgrades, Planning
23 and Construction(East Baton Rouge); and Act 20 of 2019
24 for Division Of Administration, Outpatient Clinics In
25 Rapides Parish, Planning and Construction
26 (Rapides)	$ 1,492,533
27 Total	$16,767,185
28(1178)Mold Remediation and Indoor Air Quality, Planning 
29 and Construction 
30 (Statewide)
31 Payable from General Obligation Bonds
32	Priority 1	$ 197,500
33(1179)Outstanding Percent for Arts Projects 
34 (Statewide)
35 Payable from General Obligation Bonds
36	Priority 1	$ 2,822,931
37	Priority 5	$ 4,000,000
38 Total	$ 6,822,931
39(1180)Repair, Restoration and Replacement for Declared 
40 Disasters, Planning, Construction, Renovation, and 
41 Acquisition 
42 (Statewide)
43 Payable from General Obligation Bonds
44	Priority 1	$45,285,237
45	Priority 5	$50,000,000
46 Payable from Federal Funds via Interagency Transfers $25,000,000
47 Payable from Fees and Self-Generated Revenues $ 5,000,000
48 Total	$125,285,237
49(1181)Statewide Roofing Asset Management Program and 
50 Waterproofing, Related Repairs and Equipment 
51 Replacement Program 
52 (Statewide)
53 Payable from General Obligation Bonds
54	Priority 5	$ 2,500,000
55 Payable from Interagency Transfers	$ 2,500,000
56 Total	$ 5,000,000
Page 10 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
101/109COASTAL PROTECTION AND RESTORATION AUTHORITY
2(914) Coastal Protection Projects, Planning and Construction
3 (Statewide)
4 Payable from General Obligation Bonds
5	Priority 5	$190,000,000
6 Payable from Interagency Transfers	$ 500,000
7 Payable from Natural Resources Restoration 
8 Trust Fund	$866,405,382
9 Payable from Coastal Protection and 
10 Restoration Fund	$105,702,734
11 Payable from Federal Funds	$116,217,498
12 Total	$1,278,825,614
13(915) Morganza to Gulf of Mexico Flood Control Feasibility 
14 Study, Planning, Design, Right-of-Way and 
15 Construction of Levees, Floodgates and Other Flood 
16 Control Systems ($100,000,000 Local Match)
17 (Ascension, Assumption, Iberia, Iberville, Lafourche, 
18 Pointe Coupee, St. Martin, St. Mary, Terrebonne, West 
19 Baton Rouge)
20 Payable from General Obligation Bonds
21	Priority 1	$15,000,000
22	Priority 5	$ 9,500,000
23 Total	$24,500,000
24(923) Atchafalaya Basin Protection and Enhancement 
25 (Federal Match and Local/Sponsor Match)
26 (Assumption, Avoyelles, Iberia, Iberville, Pointe Coupee,
27 St. Landry, St. Martin, St. Mary)
28 Payable from the balance of general obligation bond 
29 proceeds previously allocated under the authority of 
30 Act 20 of 2019 for Office of the Secretary, Atchafalaya 
31 Basin Protection and Enhancement (Federal Match and
32 Local/Sponsor Match) 
33 (Assumption, Avoyelles, Iberia, Iberville, Pointe Coupee, 
34 St. Landry, St. Martin, St. Mary)	$ 3,173,968
35(929) Union Diversion Project, Planning and Construction
36 (Ascension, Livingston, St. James, St. John the Baptist)
37 Payable from General Obligation Bonds
38	Priority 1	$ 2,350,000
3901/112DEPARTMENT OF MILITARY AFFAIRS
40(33) New Administration, Emergency Operations, and
41 Warehouse Building, Planning and Construction
42 (Rapides)
43 Payable from General Obligation Bonds
44	Priority 1	$ 3,660,000
45(122) Camp Minden, Infrastructure, Rehabilitation, Phase 2,
46 Planning and Construction
47 (Webster)
48 Payable from General Obligation Bonds
49	Priority 1	$ 710,000
Page 11 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(127) Louisiana National Guard Readiness Center Replacement, 
2 Lafayette LA, Planning and Construction 
3 (Lafayette)
4 Payable from General Obligation Bonds
5	Priority 2	$ 616,000
6	Priority 5	$ 6,776,220
7 Payable from Federal Funds	$ 1,848,080
8 Total	$ 9,240,300
9(128) Louisiana National Guard Readiness Center Complex, 
10 Abbeville LA, Planning and Construction 
11 (Vermilion)
12 Payable from General Obligation Bonds
13	Priority 2	$ 472,000
14	Priority 5	$ 5,194,600
15 Payable from Federal Funds	$ 1,416,900
16 Total	$ 7,083,500
17(164) Gillis W. Long Center, Water, Fire, and Sewage Line 
18 Upgrades, Carville, Louisiana
19 (Iberville)
20 Payable from General Obligation Bonds
21	Priority 1	$ 3,504,172
22(215) Statewide Backlog of Maintenance and Repair
23 (BMAR), Phase 3, and Statewide Infrastructure
24 Rehabilitation, Phase 3
25 (Statewide)
26 Payable from General Obligation Bonds
27	Priority 1	$ 2,500,000
28 Payable from Federal Funds	$16,000,000
29 Total	$18,500,000
30(216) Renovate-Upgrade Cadet Barracks Buildings 18, 21, 
31 22, 23, and 24, Youth Challenge Program (YCP), 
32 Carville, Louisiana 
33 (Iberville)
34 Payable from General Obligation Bonds
35	Priority 1	$ 400,000
36	Priority 5	$ 800,000
37 Total	$ 1,200,000
38(217) Camp Beauregard Road Network Rehabilitation
39 (Rapides)
40 Payable from General Obligation Bonds
41	Priority 1	$ 1,550,000
4201/124LOUISIANA STADIUM AND EXP OSITION DISTRICT
43(1404)Improvements to TPC Louisiana, Planning and 
44 Construction 
45 (Jefferson)
46 Payable from General Obligation Bonds
47	Priority 5	$ 3,000,000
Page 12 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(1406)Improvements to the Superdome 
2 (Orleans)
3 Payable from General Obligation Bonds
4	Priority 1	$26,992,326
5(1408)Bayou Segnette Recreation Complex, Land Acquisition, 
6 Planning and Construction 
7 (Jefferson)
8 Payable from General Obligation Bonds
9	Priority 1	$30,094,290
10	DEPARTMENT OF VETERANS AFFAIRS
1103/130DEPARTMENT OF VETERANS AFFAIRS
12(867) Southeast Louisiana Veterans Cemetery Addition of 
13 2,800 In-ground Burial Crypts and Other Improvements
14 (St. Tammany)
15 Payable from General Obligation Bonds
16	Priority 2	$ 295,000
17 Payable from Federal Funds via Interagency Transfers $ 2,654,233
18 Total	$ 2,949,233
19(869) Northeast Louisiana Veterans Cemetery Addition of 1,000 
20 In-ground Burial Crypts and Other Improvements
21 (Richland)
22 Payable from General Obligation Bonds
23	Priority 2	$ 106,000
24 Payable from Federal Funds via Interagency Transfers $ 947,940
25 Total	$ 1,053,940
2603/135NORTHWEST LOUISIANA WAR VETERANS HOME
27(1236)Replacement of Air Conditioners, Planning and 
28 Construction
29 (Bossier)
30 Payable from Federal Funds via Interagency Transfers $ 600,000
3103/136SOUTHEAST LOUISIANA WAR VETERANS HOME
32(702) Chapel Expansion, Planning and Construction
33 (St. John the Baptist)
34 Payable from Federal Funds via Interagency Transfers $ 275,000
35(698) Front Entrance Repair and Preservation, Planning and 
36 Construction
37 (St. John the Baptist)
38 Payable from Federal Funds via Interagency Transfers $ 205,000
39(699) Pond Restoration, Planning and Construction
40 (St. John the Baptist)
41 Payable from Federal Funds via Interagency Transfers $ 225,000
Page 13 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1	ELECTED OFFICIALS
204/139SECRETARY OF STATE
3(665) Old State Capitol Exterior Repairs, Planning 
4 and Construction
5 (East Baton Rouge)
6 Payable from General Obligation Bonds
7	Priority 5	$ 8,400,000
8(1507)Old Governor's Mansion Repairs and Renovation 
9 (East Baton Rouge)
10 Payable from General Obligation Bonds
11	Priority 2	$ 300,000
12	Priority 5	$ 2,200,000
13 Total	$ 2,500,000
14	DEPARTMENT OF ECONOMIC DEVELOP MENT
1505/252OFFICE OF BUSINESS DEVELOPMENT
16(844) Economic Development Award Program for 
17 Infrastructure Assistance 
18 (Statewide)
19 Payable from General Obligation Bonds
20	Priority 5	$ 5,000,000
21 DEPARTMENT OF CULTURE, RECREATION AND TOURISM
2206/263OFFICE OF STATE MUSEUM
23(789) Construction of Civil Rights Museum, Planning 
24 and Construction
25 (Orleans)
26 Payable from General Obligation Bonds
27	Priority 1	$ 2,765,000
2806/264OFFICE OF STATE PARKS
29(643) Preventive Maintenance/Major Repairs 
30 and Improvements
31 (Statewide)
32 Payable from General Obligation Bonds
33	Priority 1	$ 1,570,668
34(646) Poverty Point State Historic Site - Land Acquisition, 
35 Design, Museum/Interpretive Center and Expansion 
36 (West Carroll)
37 Payable from General Obligation Bonds
38	Priority 2	$ 1,500,000
39	Priority 5	$10,500,000
40 Payable from Federal Funds via Interagency Transfers $ 4,000,000
41 Total	$16,000,000
42(647) Bogue Chitto State Park - Mountain Bike Trail Design, 
43 Construction, Acquisition and Other Development 
44 (Washington)
45 Payable from General Obligation Bonds
46	Priority 1	$ 999,905
Page 14 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(648) Bogue Chitto State Park Emergency Erosion, Planning, 
2 Design, Construction and Other Development
3 (Washington)
4 Payable from General Obligation Bonds
5	Priority 1	$ 1,440,000
6	Priority 5	$ 840,000
7 Total	$ 2,280,000
8(1185)Tunica Hills State Preservation Area, Construction, 
9 Development and Acquisition
10 (West Feliciana)
11 Payable from General Obligation Bonds
12	Priority 5	$20,000,000
13 Payable from Federal Funds via Interagency Transfers $ 4,000,000
14 Total	$24,000,000
15(1432)Bayou Segnette State Park, Land Acquisition, Additional 
16 Cabins, Planning and Construction
17 (Jefferson)
18 Payable from General Obligation Bonds
19	Priority 1	$ 451,253
2006/A20NEW ORLEANS CITY P ARK
21(692) Repairs to Historic Structures, Planning and Construction
22 (Orleans)
23 Payable from General Obligation Bonds
24	Priority 1	$ 1,121,057
25(694) Tad Gormley Stadium Renovations, Planning 
26 and Construction
27 (Orleans)
28 Payable from Fees and Self-Generated Revenues $ 350,000
29(1322)Covered Courts at Tennis Center, Planning 
30 and Construction
31 (Orleans)
32 Payable from General Obligation Bonds
33	Priority 1	$ 145,000
34(1323)Splash Park, Planning and Construction
35 (Orleans)
36 Payable from General Obligation Bonds
37	Priority 1	$ 21,074
3806/A98LOUISIANA NAVAL WAR MEMORIAL COMMISSION
39(1196)Hull Repair & Reinforcement, Superstructure Repair, 
40 Interior Restoration, & Painting of USS KIDD DD-661, 
41 Docking Cradle Repairs & Upgrade, Planning, Transport, 
42 Construction 
43 (East Baton Rouge)
44 Payable from General Obligation Bonds
45	Priority 5	$ 3,600,000
Page 15 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1 DEPARTMENT OF TRANSPORTATION AND DEVELOP MENT
207/270ADMINISTRATION
3(319) I-10 Calcasieu River Bridge, Environmental, Planning, 
4 Engineering, Right-of-Way, Utilities, Demolition 
5 and Construction
6 (Calcasieu)
7 Payable from General Obligation Bonds
8	Priority 1	$10,000,000
9	Priority 5	$75,000,000
10 Total	$85,000,000
11(335) City of Gonzales - GO Program LA Highway 30 Corridor, 
12 Planning and Construction 
13 (Ascension)
14 Payable from General Obligation Bonds
15	Priority 1	$ 8,320,100
16(336) Essen Lane Widening, I-10 to Perkins Road, Planning, 
17 Utilities, Right-of-Way and Construction
18 (East Baton Rouge)
19 Payable from General Obligation Bonds
20	Priority 1	$ 481,358
21(337) Evaluation of Regional Freeway System Expansion
22 (East Baton Rouge, West Baton Rouge)
23 Payable from General Obligation Bonds
24	Priority 1	$ 85
25(339) Improvements on LA 3038, Including Patching, Repairing 
26 and Overlaying of the Highway, Planning and Construction 
27 (Ascension)
28 Payable from General Obligation Bonds
29	Priority 1	$ 47,139
30(341) LA 3034 Improvements 
31 (East Baton Rouge)
32 Payable from General Obligation Bonds
33	Priority 1	$15,619,300
34(342) LA 44 Widening, I-10 to LA 22, Planning, Utilities, 
35 Right-of-Way and Construction
36 (Ascension)
37 Payable from General Obligation Bonds
38	Priority 1	$ 1,600,086
39	Priority 5	$ 8,000,000
40 Total	$ 9,600,086
41(373) Overlay of U.S. 167 for 9.32 Miles, from Turkey Creek 
42 North of I-49, Planning and Construction
43 (Evangeline)
44 Payable from General Obligation Bonds
45	Priority 1	$ 5,987,500
Page 16 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(413) Loyola/I-10 Interchange Improvements, Feasibility Study, 
2 Interchange Modification Report, Environmental 
3 Assessment, Engineering, Right-of-Ways, Utilities 
4 and Construction
5 (Jefferson, Orleans)
6 Payable from General Obligation Bonds
7	Priority 1	$ 2,974,700
8(422) LA 91: Bayou Plaquemine Brule Bridge Replacement, 
9 Planning and Construction 
10 (Acadia)
11 Payable from General Obligation Bonds
12	Priority 1	$ 1,000,000
13	Priority 5	$ 3,200,000
14 Total	$ 4,200,000
15(424) LA 42 (US 61 to LA 44) Widening, including a 
16 Roundabout at Joe Sevario Road, Planning 
17 and Construction 
18 (Ascension)
19 Payable from General Obligation Bonds
20	Priority 1	$ 248,500
21	Priority 5	$ 2,500,000
22 Total	$ 2,748,500
23(433) LA 3241 (I-12 to Bush), Planning, Engineering, Right-
24 of-Way, Utilities and Construction
25 (St. Tammany)
26 Payable from General Obligation Bonds
27	Priority 5	$28,000,000
28(434) Florida Avenue Bridge, Planning and Construction
29 (Orleans)
30 Payable from General Obligation Bonds
31	Priority 5	$ 7,200,000
32(453) LA 3227 - LA 157 Intersection Realignment, Planning 
33 and Construction 
34 (Bossier)
35 Payable from General Obligation Bonds
36	Priority 1	$ 4,500,000
37(806) LA Hwy. 64 Spur, Planning and Construction 
38 (East Baton Rouge)
39 Payable from General Obligation Bonds
40	Priority 1	$ 1,000,000
41	Priority 5	$ 5,000,000
42 Total	$ 6,000,000
43(852) LA 117 Widening (LA 8 - LA 118) 
44 (Natchitoches, Vernon)
45 Payable from General Obligation Bonds
46	Priority 1	$ 2,000,000
47	Priority 5	$28,000,000
48 Total	$30,000,000
Page 17 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(858) New Mississippi River Bridge 
2 (Ascension, East Baton Rouge, Iberville, St. James, 
3 West Baton Rouge)
4 Payable from General Obligation Bonds
5	Priority 1	$ 648,600
6	Priority 5	$ 4,000,000
7 Total	$ 4,648,600
8(887) Highway Program (Up to $4,000,000 for Secretary's 
9 Emergency Fund)
10 (Statewide)
11 Payable from General Obligation Bonds
12	Priority 1	$30,000,000
13	Priority 5	$102,000,000
14 Payable from Transportation Trust Fund - Regular $23,400,000
15 Payable from Transportation Trust Fund - Federal
16 Receipts	$959,550,550
17 Total	$1,114,950,550
18Provided, however, that the Department of Transportation and Development is authorized
19to implement or commence projects approved in this program for Fiscal Year 2022-2023
20identified for phased funding pursuant to the cash management plan established pursuant to
21R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing
22unspent cash balances appropriated in prior years' programs, which funds when combined
23with current appropriations will provide sufficient appropriated funds to award contracts.
24(888) Secretary's Emergency Fund for Bridge Damages,
25 Other Reimbursements, Local Matching Dollars,
26 Federal Funds, and Opportunity Grants Subject to the
27 Provisions of R.S. 48:232
28 (Statewide)
29 Payable from Interagency Transfers	$10,000,000
30 Payable from Fees and Self-Generated Revenues $30,000,000
31 Payable from Transportation Trust Fund - Federal
32 Receipts	$25,000,000
33 Payable from Federal Funds	$ 6,000,000
34 Total	$71,000,000
35(893) Non-Federal Aid Eligible Highway Program 
36 (Statewide)
37 Payable from State Highway Improvement Fund $35,800,000
38(1004)Deepwater Horizon Economic Damages Proceeds 
39 (Statewide)
40 Payable from Transportation Trust Fund - 
41 Construction Subfund	$195,800,000
42(1048)Widening of Highway 447 and I-12 Overpass 
43 Improvements, Environmental Phase Commencement, 
44 Planning and Construction 
45 (Livingston)
46 Payable from General Obligation Bonds
47	Priority 1	$ 6,719,800
48	Priority 5	$21,000,000
49 Total	$27,719,800
Page 18 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(1050)Turn Lanes on US 71 for Emergency Vehicle Staging 
2 Area, Planning, Engineering, Right-of-Way, Utilities 
3 and Construction
4 (Rapides)
5 Payable from General Obligation Bonds
6	Priority 1	$ 1,000,000
7(1051)Intersection Improvements, Planning and 
8 Construction 
9 (Lafayette)
10 Payable from General Obligation Bonds
11	Priority 5	$ 5,000,000
12(1057)US 190 Widening: LA 25 - US 190 Bus
13 (St. Tammany)
14 Payable from General Obligation Bonds
15	Priority 1	$12,000,000
16	Priority 5	$ 2,000,000
17 Total	$14,000,000
18(1086)Pecue Lane/I-10 Interchange, Planning, Design, 
19 Rights-of-Way, Utilities and Construction
20 (East Baton Rouge)
21 Payable from General Obligation Bonds
22	Priority 1	$23,072,800
23	Priority 5	$14,000,000
24 Total	$37,072,800
25(1090)Hooper Road Extension and Widening, Environmental,
26 Planning, Engineering, Right-of-Way, Utilities 
27 and Construction
28 (East Baton Rouge, Livingston)
29 Payable from General Obligation Bonds
30	Priority 1	$ 8,398,500
31(1142)LA 1 Improvements, Phase 2, Planning, Engineering, 
32 Right-of-Way, Utilities and Construction
33 (Lafourche)
34 Payable from General Obligation Bonds
35	Priority 1	$20,000,000
36	Priority 5	$72,000,000
37 Total	$92,000,000
38(1143)US 190 (Vine Street) Reconstruction 
39 (St. Landry)
40 Payable from General Obligation Bonds
41	Priority 1	$ 200,000
42	Priority 5	$19,200,000
43 Total	$19,400,000
44(1144)Peters Road Bridge and Extension, Planning and 
45 Construction 
46 (Plaquemines)
47 Payable from General Obligation Bonds
48	Priority 1	$17,546,300
49	Priority 5	$ 7,000,000
50 Total	$24,546,300
Page 19 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(1145)Jimmie Davis Bridge Rehabilitation and Lighting, 
2 or Design, Engineering, Planning and Construction 
3 (Bossier)
4 Payable from General Obligation Bonds
5	Priority 1	$ 3,844,600
6	Priority 5	$15,000,000
7 Total	$18,844,600
8(1146)New Orleans International Airport Landside Access 
9 Improvements 
10 (Jefferson)
11 Payable from General Obligation Bonds
12	Priority 1	$ 8,300,000
13	Priority 5	$ 7,700,000
14 Total	$16,000,000
15(1147)Highway 30 Roundabout West of LA 44, Planning 
16 and Construction 
17 (Ascension)
18 Payable from General Obligation Bonds
19	Priority 5	$ 4,500,000
20(1149)LA 100: LA 97 - LA 91, Planning and Construction
21 (Acadia)
22 Payable from General Obligation Bonds
23	Priority 2	$ 470,000
24	Priority 5	$ 4,230,000
25 Total	$ 4,700,000
26(1153)LA 13 (Crowley to Vermilion Parish Line) 
27 (Acadia)
28 Payable from General Obligation Bonds
29	Priority 1	$ 6,200,000
30(1154)LA 29 Improvements (LA 13 - LA 758) 
31 (Evangeline, St. Landry)
32 Payable from General Obligation Bonds
33	Priority 1	$ 5,120,000
34(1155)LA 964 (Groom Road - US 61) Highway Lighting 
35 (East Baton Rouge)
36 Payable from General Obligation Bonds
37	Priority 1	$ 450,000
38	Priority 5	$ 1,950,000
39 Total	$ 2,400,000
40(1158)Earhart/Causeway Interchange, Planning, Engineering, 
41 Right-of-Way, Utilities and Construction
42 (Jefferson)
43 Payable from General Obligation Bonds
44	Priority 1	$ 4,841,700
45	Priority 5	$44,500,000
46 Total	$49,341,700
47(1159)LA 35 Overlay (LA 98 - LA 365) 
48 (Acadia)
49 Payable from General Obligation Bonds
50	Priority 5	$ 8,900,000
Page 20 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(1160)Hooper Road Widening and Sewer Improvements 
2 (Blackwater Bayou to Sullivan Road) Planning, 
3 Engineering, Utilities and Construction 
4 (East Baton Rouge)
5 Payable from General Obligation Bonds
6	Priority 1	$12,265,000
7(1161)LA 70: Sunshine Bridge - LA 22 
8 (St. James)
9 Payable from General Obligation Bonds
10	Priority 5	$17,000,000
11(1162)Roundabout at Intersection of LA 3125 and LA 3274 
12 (St. James)
13 Payable from General Obligation Bonds
14	Priority 1	$ 1,200,000
15	Priority 5	$ 1,200,000
16 Total	$ 2,400,000
17(1163)Relocate Hickory Avenue (LA Hwy. 48-11th Street) 
18 (Mounes) (LA Hwy. 3154) Construction, Right-of-Way, 
19 and Utilities
20 (Jefferson)
21 Payable from General Obligation Bonds
22	Priority 1	$ 1,000,000
23	Priority 5	$ 1,000,000
24 Total	$ 2,000,000
25(1164)LA 74/I-10 Interchange, Planning and Construction
26 (Ascension)
27 Payable from General Obligation Bonds
28	Priority 5	$ 4,600,000
29(1166)I-49 South from Lafayette to Westbank Expressway, 
30 Planning, Engineering, Right-of-Way, Utilities 
31 and Construction
32 (Iberia, Jefferson, Lafayette, Lafourche, St. Charles, 
33 St. Martin, St. Mary, Terrebonne)
34 Payable from General Obligation Bonds
35	Priority 1	$ 2,461,000
36	Priority 5	$127,000,000
37 Total	$129,461,000
38(1167)Highway 397 in Calcasieu Parish, North and South 
39 Turning Lanes 
40 (Calcasieu)
41 Payable from General Obligation Bonds
42	Priority 1	$ 2,000,000
43(1168)LA 621 Realignment at LA 73, Planning 
44 and Construction 
45 (Ascension)
46 Payable from General Obligation Bonds
47	Priority 1	$ 4,500,000
48	Priority 5	$ 3,100,000
49 Total	$ 7,600,000
Page 21 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(1219)LA 3277: LA 757 - LA 104, Planning and Construction
2 (St. Landry)
3 Payable from General Obligation Bonds
4	Priority 5	$ 4,750,000
5(1220)LA 758: US 190 - LA 29, Planning and Construction
6 (Evangeline, St. Landry)
7 Payable from General Obligation Bonds
8	Priority 5	$ 3,000,000
9(1508)Roundabout at LA 3211 and Yokley Road 
10 (St. Mary)
11 Payable from General Obligation Bonds
12	Priority 5	$ 3,500,000
13(1542)Claiborne Corridor Rehabilitation
14 (Orleans)
15 Payable from General Obligation Bonds
16	Priority 5	$20,000,000
17(1543)LA 28 Widening (LA 3128 – LA 116) 
18 (Rapides)
19 Payable from General Obligation Bonds
20	Priority 5	$28,300,000
21(1544)LA 22: North Hoover Road – Dunson Road 
22 (Tangipahoa)
23 Payable from General Obligation Bonds
24	Priority 2	$ 600,000
25	Priority 5	$12,000,000
26 Total	$12,600,000
27(1545)LA 353: LA 94 to Cypress Island Hwy
28 (Lafayette, St. Martin)
29 Payable from General Obligation Bonds
30	Priority 5	$ 1,400,000
31(1546)LA 31: LA 182 - .15 Mi N of N LA 96 
32 (St. Martin)
33 Payable from General Obligation Bonds
34	Priority 5	$ 9,600,000
3507/274PUBLIC IMPROVEMENTS
36(183) Acadiana Gulf of Mexico Access Channel (AGMAC), 
37 Port of Iberia, Planning, Design, Construction, 
38 Rights-of-Way, Relocations and Utilities 
39 (Iberia, Vermilion)
40 Payable from General Obligation Bonds
41	Priority 1	$18,029,300
42	Priority 5	$20,000,000
43 Total	$38,029,300
44(184) Bayou Dechene Reservoir, Planning, Land Acquisition 
45 and Construction 
46 (Caldwell)
47 Payable from General Obligation Bonds
48	Priority 1	$ 8,441,700
49	Priority 5	$ 5,000,000
50 Total	$13,441,700
Page 22 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(185) Bundick Lake Level Control Structure, Planning 
2 and Construction 
3 (Beauregard)
4 Payable from General Obligation Bonds
5	Priority 1	$ 3,000,000
6(186) Comite River Diversion Canal Planning, Right-of-Way, 
7 Utilities and Construction
8 (Ascension, East Baton Rouge, Livingston)
9 Payable from General Obligation Bonds
10	Priority 1	$ 1,052,445
11(187) Houma Navigational Canal Deepening Project, 
12 Planning, Design, Construction, Rights-of-Ways, 
13 Relocations and Utilities 
14 (Terrebonne)
15 Payable from General Obligation Bonds
16	Priority 1	$ 675,400
17	Priority 5	$40,500,000
18 Total	$41,175,400
19(188) J. Bennett Johnston (Red River) Deepening 
20 (Avoyelles, Bossier, Caddo, Grant, Natchitoches, 
21 Rapides, Red River)
22 Payable from General Obligation Bonds
23	Priority 1	$ 500,000
24	Priority 5	$ 1,000,000
25 Total	$ 1,500,000
26(190) Mississippi River Deepening, Phase 3, Planning, Design, 
27 Construction, Rights-of-Way, Relocations and Utilities 
28 (Ascension, East Baton Rouge, Jefferson, Orleans, 
29 Plaquemines, St. Bernard, St. Charles, St. James, St. John 
30 the Baptist, West Baton Rouge)
31 Payable from General Obligation Bonds
32	Priority 1	$55,500,000
33	Priority 5	$28,000,000
34 Total	$83,500,000
35(191) Mississippi River Levee Raising, Arkansas to Old River, 
36 Planning and Construction 
37 (Avoyelles, Concordia, East Carroll, Madison, 
38 Pointe Coupee, Tensas)
39 Payable from General Obligation Bonds
40	Priority 1	$ 8,544,700
41	Priority 5	$34,000,000
42 Total	$42,544,700
43(192) New Orleans Rail Gateway Finalize EIS to Complete Study 
44 (Jefferson, Orleans)
45 Payable from General Obligation Bonds
46	Priority 1	$ 2,815,600
47(193) Ouachita River Bank Stabilization and Levee Repair 
48 (Caldwell, Ouachita)
49 Payable from General Obligation Bonds
50	Priority 1	$10,135,000
51	Priority 5	$ 9,650,000
52 Total	$19,785,000
Page 23 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(196) Rehabilitation and Repair of State-Maintained Reservoirs 
2 and Dams 
3 (Statewide)
4 Payable from General Obligation Bonds
5	Priority 1	$ 1,965,000
6	Priority 5	$ 6,500,000
7 Total	$ 8,465,000
8(197) Short Line Railroad Upgrades 
9 (Statewide)
10 Payable from General Obligation Bonds
11	Priority 1	$ 3,000,000
12	Priority 5	$10,000,000
13 Total	$13,000,000
14(198) Turkey Creek Lake Repairs, Planning and Construction 
15 (Franklin)
16 Payable from General Obligation Bonds
17	Priority 1	$ 1,500,000
18	Priority 5	$ 3,686,560
19 Total	$ 5,186,560
20(318) Port Construction and Development Priority Program
21 (Statewide)
22 Payable from Transportation Trust Fund - Regular $39,400,000
23Provided, however, that the Department of Transportation and Development is authorized
24to implement or commence projects approved in this program for Fiscal Year 2022-2023
25identified for phased funding pursuant to the cash management plan established pursuant to
26R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing
27unspent cash balances appropriated in prior years' programs, which funds when combined
28with current appropriations will provide sufficient appropriated funds to award contracts.
29(892) Statewide Flood Control Program
30 (Statewide)
31 Payable from Transportation Trust Fund - Regular $20,000,000
32Provided, however, that the Department of Transportation and Development is authorized
33to implement or commence projects approved in this program for Fiscal Year 2022-2023
34identified for phased funding pursuant to the cash management plan established pursuant to
35R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing
36unspent cash balances appropriated in prior years' programs, which funds when combined
37with current appropriations will provide sufficient appropriated funds to award contracts.
3807/276ENGINEERING AND OPERATIONS
39(161) New Cameron Ferry 
40 (Cameron)
41 Payable from General Obligation Bonds
42	Priority 1	$14,198,900
43	Priority 5	$ 8,000,000
44 Total	$22,198,900
45(889) Motor Vessel and Equipment Drydocking, Repairs, 
46 Various Locations
47 (Statewide)
48 Payable from Transportation Trust Fund - Regular $ 1,500,000
Page 24 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(890) Facilities Program Major Repairs, Renovations, Additions, 
2 New Facilities, Equipment Replacement at Various DOTD 
3 Sites, Planning and Construction
4 (Statewide)
5 Payable from Transportation Trust Fund - Regular $ 4,000,000
607/277AVIATION IMPROVEMENTS
7(891) State Aviation and Airport Improvement Program
8 (Statewide)
9 Payable from Transportation Trust Fund - Regular $28,041,133
10 DEPARTMENT OF PUBLIC SAFETY AND CORRECTIONS
1108/400DEPARTMENT OF CORRECTIONS
12(179) HVAC Installation, Offender Housing, Planning 
13 and Construction
14 (Statewide)
15 Payable from General Obligation Bonds
16	Priority 1	$ 550,000
1708/402LOUISIANA STATE PENITENTIARY
18(177) Main Prison Shower and Cellblock Plumbing Upgrade, 
19 Planning and Construction
20 (West Feliciana)
21 Payable from General Obligation Bonds
22	Priority 1	$ 1,606,000
23(178) Electrical Distribution System Upgrade, 
24 Planning and Construction
25 (West Feliciana)
26 Payable from General Obligation Bonds
27	Priority 1	$ 4,594,000
2808/403OFFICE OF JUVENILE JUSTICE
29(584) Community Based Program, Juvenile Justice 
30 Improvements, Planning, Construction, Renovation, 
31 Acquisition, and Equipment
32 (Statewide)
33 Payable from General Obligation Bonds
34	Priority 1	$ 6,000,000
35	Priority 5	$66,500,000
36 Total	$72,500,000
37(587) Acadiana Center for Youth - Renovation to Create 
38 Behavioral Intervention Rooms 
39 (Avoyelles)
40 Payable from Fees and Self-Generated Revenues $ 45,000
4108/406LOUISIANA CORRECTIONAL INSTITUTE F OR WOMEN
42(317) Louisiana Correctional Institute for Women/Jetson Center
43 for Youth Site: Repair, Equipment and Replacement
44 Planning and Construction
45 (East Baton Rouge)
46 Payable from General Obligation Bonds
47	Priority 1	$ 215,000
Page 25 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
108/416RAYBURN CORRECTIONAL CENTER
2(160) Security Perimeter Fence, Planning and Construction
3 (Washington)
4 Payable from General Obligation Bonds
5	Priority 1	$ 2,095,000
6	LOUISIANA DEPARTMENT OF HEALTH
709/320OFFICE OF AGING AND ADULT SERVICES
8(931) Repair and Upgrade to Sewer System, Planning 
9 and Construction
10 (East Feliciana)
11 Payable from General Obligation Bonds
12	Priority 1	$ 485,842
13	Priority 5	$ 6,170,000
14 Total	$ 6,655,842
15(932) Replace Roof and Storm Drains on all Patient Buildings, 
16 Planning and Construction
17 (East Feliciana)
18 Payable from General Obligation Bonds
19	Priority 1	$ 274,496
2009/330OFFICE OF BEHAVIORAL HEALTH
21(242) Fire Alarm System Replacement for Ten Buildings,
22 Planning and Construction
23 (East Feliciana)
24 Payable from General Obligation Bonds
25	Priority 1	$ 95,600
26	Priority 5	$ 2,453,200
27 Total	$ 2,548,800
28(243) Center Building and Fire Alarm System Renovation 
29 and Restoration, East Louisiana State Hospital, Planning 
30 and Construction
31 (East Feliciana)
32 Payable from General Obligation Bonds
33	Priority 1	$ 521,981
34	Priority 5	$ 5,000,000
35 Total	$ 5,521,981
36(244) Central Louisiana State Hospital Relocation to Pinecrest, 
37 Planning and Construction 
38 (Rapides)
39 Payable from General Obligation Bonds
40	Priority 1	$13,336,500
41	DEPARTMENT OF WILDLIFE & FISHERIES
4216/512OFFICE OF THE SECRETARY
43(1292)Wildlife and Fisheries Enforcement Training Academy 
44 and Emergency Facility (Complex) 
45 (East Baton Rouge)
46 Payable from General Obligation Bonds
47	Priority 1	$ 2,250,000
Page 26 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
116/513OFFICE OF WILDLIFE
2(759) Wildlife Land Acquisition 
3 (Statewide)
4 Payable from La. Wild Turkey Stamp Fund	$ 800,000
5(760) Hammond Headquarters, Planning and Construction
6 (Tangipahoa)
7 Payable from General Obligation Bonds
8	Priority 5	$ 4,476,000
9(765) Woodworth Central Office Complex and Pineville 
10 Office/Region 3, Planning and Construction
11 (Rapides)
12 Payable from General Obligation Bonds
13	Priority 1	$ 1,983,168
14(766) White Lake WCA Unit 1 Guillotine Gate Replacement 
15 (Vermilion)
16 Payable from White Lake Property Fund	$ 325,000
17(767) White Lake WCA Unit 1 Florence Canal Water Control 
18 Structure 
19 (Vermilion)
20 Payable from White Lake Property Fund	$ 750,000
21(768) White Lake WCA Unit 2 Water Control Improvement Project 
22 (Vermilion)
23 Payable from White Lake Property Fund	$ 3,000,000
24(779) Rockefeller Refuge Unit 10 Habitat Enhancement 
25 (Cameron)
26 Payable from Rockefeller Wildlife Refuge & Game
27 Preserve Fund	$ 960,000
28	DEPARTMENT OF EDUCATION
2919/601LSU BATON ROUG E
30(34) Science - Strategic Capital Plan Repairs and Upgrades - 
31 Food Science Renovation, New Science Building, 
32 Infrastructure and Utilities, Planning and Construction 
33 (East Baton Rouge)
34 Payable from General Obligation Bonds
35	Priority 5	$47,175,000
36Provided, however, that $475,000 of the Priority 5 appropriation shall be used to fund the
37construction or addition of a Vivarium on the Louisiana State University - Shreveport
38campus.
39(36) Strategic Capital Plan - Deferred Maintenance for 
40 Infrastructure, Renovations, and Streets
41 (East Baton Rouge)
42 Payable from General Obligation Bonds
43	Priority 1	$ 1,500,000
44	Priority 5	$13,500,000
45 Total	$15,000,000
Page 27 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(37) Louisiana State University Library
2 (East Baton Rouge)
3 Payable from General Obligation Bonds
4	Priority 1	$ 2,000,000
5	Priority 5	$49,500,000
6 Total	$51,500,000
7(39) Veterinary Medicine Facilities Repairs/Addition
8 (East Baton Rouge)
9 Payable from General Obligation Bonds
10	Priority 5	$18,000,000
11 Payable from Fees and Self-Generated Revenues $10,000,000
12 Total	$28,000,000
13(40) Student Health Center Renovation and Addition, 
14 Planning and Construction
15 (East Baton Rouge)
16 Payable from Revenue Bonds	$23,890,000
17Provided, however, that the Revenue Bonds in this appropriation are in lieu of Revenue
18Bonds appropriated in Act 29 of the 2018 Regular Session to LSU Baton Rouge for Student
19Health Center Renovation and Addition, Planning and Construction (East Baton Rouge).
20(614) Military and Security Sciences Renovations, Planning 
21 and Construction
22 (East Baton Rouge)
23 Payable from General Obligation Bonds
24	Priority 5	$22,000,000
2519/602LSU ALEXANDRIA
26(26) Student Success Center, Planning and Construction
27 (Rapides)
28 Payable from General Obligation Bonds
29	Priority 1	$ 1,000,000
30	Priority 5	$11,900,000
31 Payable from Fees and Self-Generated Revenues $ 5,000,000
32 Total	$17,900,000
3319/604NLSU HEALTH SCIENCES CENTER - NEW ORLEANS
34(16) LSUHSC-NO Medical Education Building Laboratory 
35 Renovation, Phase 1, Planning and Construction
36 (Orleans)
37 Payable from General Obligation Bonds
38	Priority 5	$60,000,000
39 Payable from Fees and Self-Generated Revenues $14,000,000
40 Total	$74,000,000
41(29) LSUHSC-NO Campus Stormwater Infrastructure 
42 Upgrades, Planning and Construction
43 (Orleans)
44 Payable from General Obligation Bonds
45	Priority 5	$ 3,000,000
46 Payable from Fees and Self-Generated Revenues $ 1,000,000
47 Total	$ 4,000,000
Page 28 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(1522)Health Science Center Facility Renovations - 
2 Dental School Simulation Facility
3 (Orleans)
4 Payable from General Obligation Bonds
5	Priority 1	$ 54,607
619/604SLSU HEALTH SCIENCES CENTER - SHREVEP ORT
7(17) Gross Anatomy Lab Expansion and Modernization, 
8 Planning and Construction
9 (Caddo)
10 Payable from General Obligation Bonds
11	Priority 1	$ 160,000
12	Priority 5	$ 1,965,000
13 Total	$ 2,125,000
14(18) Center for Medical Education and Wellness, 
15 Planning and Construction
16 (Caddo)
17 Payable from General Obligation Bonds
18	Priority 1	$18,750,000
19 Payable from Fees and Self-Generated Revenues $16,000,000
20 Total	$34,750,000
21(1520)Capital Improvement Projects, Design and Engineering
22 (Caddo)
23 Payable from General Obligation Bonds
24	Priority 1	$ 2,019,423
25(1523)Medical School B-Building HVAC Replacement,
26 Planning and Construction
27 (Caddo)
28 Payable from General Obligation Bonds
29	Priority 1	$ 4,770,932
30(1534)Stonewall Animal Research and Training Facility,
31 Planning and Construction
32 (DeSoto)
33 Payable from General Obligation Bonds
34	Priority 5	$ 5,000,000
35(1539)Comprehensive Emergency Water Supply Improvements, 
36 Planning and Construction
37 (Caddo)
38 Payable from General Obligation Bonds
39	Priority 5	$ 7,501,650
4019/605LSU EUNICE
41(132) Manuel Hall Exterior Wall and Roof Repair,
42 Planning and Construction
43 (Acadia)
44 Payable from General Obligation Bonds
45	Priority 1	$ 2,714,179
46(134) Athletic Complex Facility, Planning and Construction
47 (Acadia)
48 Payable from General Obligation Bonds
49	Priority 5	$ 9,750,000
Page 29 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
119/606LSU SHREVEPORT
2(30) Building Exterior Walls and Bridge Repair, Planning 
3 and Construction
4 (Caddo)
5 Payable from General Obligation Bonds
6	Priority 1	$ 3,099,917
719/607LSU AGRICULTURAL CENTER
8(21) Animal and Food Science Facilities Renovations 
9 and Modernizations, Phase II, Planning and Construction
10 (East Baton Rouge)
11 Payable from General Obligation Bonds
12	Priority 1	$ 600,000
13	Priority 5	$29,403,500
14 Total	$30,003,500
15(22) Renewable and Natural Resources Building Repairs, 
16 Planning and Construction
17 (East Baton Rouge)
18 Payable from General Obligation Bonds
19	Priority 1	$ 1,000,000
20(135) Dean Lee Tornado Damage Building Repairs 
21 and Reconstruction 
22 (Rapides)
23 Payable from General Obligation Bonds
24	Priority 1	$ 1,500,000
25(1540)John M. Parker Agricultural Center & Livestock Show 
26 Barn Renovations and Repairs 
27 (East Baton Rouge)
28 Payable from General Obligation Bonds
29	Priority 5	$23,000,000
30 Payable from Fees and Self-Generated Revenues $ 7,000,000
31 Total	$30,000,000
3219/609PENNINGTON BIOMEDICAL RESEARCH CENTER
33(23) Pennington Biomedical Clinical Research Building
34 Imaging Center and High Tech Research 
35 Instrumentation Equipment
36 (East Baton Rouge)
37 Payable from General Obligation Bonds
38	Priority 2	$ 50,000
3919/612BATON ROUGE COMMUNITY COLLEG E
40(252) Allied Health Facility and Other Campus Development, 
41 with Equipment, Planning and Construction
42 (East Baton Rouge)
43 Payable from General Obligation Bonds
44	Priority 5	$35,000,000
Page 30 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
119/614SOUTHERN UNIVERSITY LAW CENTER
2(695) Renovations and Addition to Existing Law Library, 
3 Planning and Construction
4 (East Baton Rouge)
5 Payable from General Obligation Bonds
6	Priority 1	$ 650,000
7	Priority 5	$10,425,000
8 Total	$11,075,000
9Pending approval of the Noncash Line of Credit by the State Bond Commission prior to June
1030, 2022.
1119/616SOUTHERN UNIVERSITY - BATON ROUG E
12(345) New STEM Science Complex, Planning and Construction
13 (East Baton Rouge)
14 Payable from General Obligation Bonds
15	Priority 1	$ 2,699,962
16	Priority 5	$63,800,000
17 Total	$66,499,962
18(346) Stewart Hall - Wall Mount HVAC Units 1st, 2nd 
19 and 3rd Floors, Planning and Construction
20 (East Baton Rouge)
21 Payable from General Obligation Bonds
22	Priority 1	$ 1,799,955
23(347) New Southern University Laboratory School
24 Classroom/Cafeteria/Gymnasium/Athletic Enhancement 
25 Building, Planning and Construction
26 (East Baton Rouge)
27 Payable from General Obligation Bonds
28	Priority 1	$ 1,000,000
29	Priority 2	$ 1,000,000
30	Priority 5	$52,000,000
31 Total	$54,000,000
32(348) Ravine, Bluff and Riverbank Stabilization Project, 
33 Planning and Construction
34 (East Baton Rouge)
35 Payable from General Obligation Bonds
36	Priority 1	$ 1,000,000
37	Priority 5	$31,000,600
38 Total	$32,000,600
39(390) School of Business/Professional Accountancy, 
40 Planning and Construction
41 (East Baton Rouge)
42 Payable from General Obligation Bonds
43	Priority 1	$ 1,250,000
44	Priority 5	$33,250,000
45 Total	$34,500,000
46Pending approval of the Noncash Line of Credit by the State Bond Commission prior to June
4730, 2022.
Page 31 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(673) Renovation of Fisher Hall, Planning and Construction
2 (East Baton Rouge)
3 Payable from General Obligation Bonds
4	Priority 1	$ 3,315,889
5(1433)A.O. Williams Hall Renovations
6 (East Baton Rouge)
7 Payable from General Obligation Bonds
8	Priority 1	$ 4,251,149
919/617SOUTHERN UNIVERSITY - NEW ORLEANS
10(1331)ADA Compliant Restrooms and Public Accommodations
11 in the Cafeteria, University Center, Health & Physical
12 Education, Library and Administration Building,
13 Planning and Construction
14 (Orleans)
15 Payable from General Obligation Bonds
16	Priority 1	$ 499,961
17	Priority 5	$ 1,150,000
18 Total	$ 1,649,961
19(1444)Campus Exterior Lighting Upgrades, 
20 Planning and Construction
21 (Orleans)
22 Payable from General Obligation Bonds
23	Priority 2	$ 1,000,000
2419/618SOUTHERN SHREVEP ORT
25(1330)Louis Collier Hall Science Building Renovation, 
26 Planning and Construction
27 (Caddo)
28 Payable from General Obligation Bonds
29	Priority 1	$ 749,961
30	Priority 5	$ 3,255,000
31 Total	$ 4,004,961
32(1521)New Workforce Training and Technology Center, 
33 Planning and Construction
34 (Caddo)
35 Payable from General Obligation Bonds
36	Priority 1	$ 676,000
37	Priority 5	$18,500,000
38 Total	$19,176,000
3919/619SOUTHERN UNIVERSITY AG RICULTURAL RESEARCH AND 
40 EXTENSION CENTER
41(1337)Disaster Relief Mega Shelter, Planning and Construction
42 (East Baton Rouge)
43 Payable from General Obligation Bonds
44	Priority 1	$ 868,544
45	Priority 5	$ 9,650,000
46 Total	$10,518,544
Page 32 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
119/621NICHOLLS STATE UNIVERSITY
2(10) Coastal Center Facility, Planning and Construction
3 (Lafourche)
4 Payable from General Obligation Bonds
5	Priority 1	$11,250,000
6(13) Stopher Hall Restroom ADA Upgrade, 
7 Planning and Construction
8 (Lafourche)
9 Payable from General Obligation Bonds
10	Priority 1	$ 1,058,995
1119/623GRAMBLING STATE UNIVERSITY
12(325) Criminal Justice Building Renovation 
13 (Lincoln)
14 Payable from General Obligation Bonds
15	Priority 1	$ 800,000
16	Priority 5	$10,500,000
17 Total	$11,300,000
18(326) Reroof, Waterproof, Envelope Repairs for Various
19 Buildings, Planning and Construction
20 (Lincoln)
21 Payable from General Obligation Bonds
22	Priority 2	$ 1,000,000
23	Priority 5	$ 7,500,000
24 Total	$ 8,500,000
25(328) Campus Utility Infrastructure Assessment Emergency 
26 Repair/Replacement, Planning and Construction
27 (Lincoln)
28 Payable from General Obligation Bonds
29	Priority 1	$ 3,000,000
30	Priority 5	$ 5,000,000
31 Total	$ 8,000,000
3219/625LOUISIANA TECH UNIVERSITY
33(220) Renovation of George T. Madison Hall, 
34 Planning and Construction
35 (Lincoln)
36 Payable from General Obligation Bonds
37	Priority 2	$ 2,000,000
38	Priority 5	$36,000,000
39 Total	$38,000,000
40(221) Comprehensive ADA Assessment/Remediation,
41 Planning and Construction
42 (Lincoln)
43 Payable from General Obligation Bonds
44	Priority 1	$ 28,762
Page 33 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(1505)Central Steam Generator - Switch Gear, Planning 
2 and Construction
3 (Lincoln)
4 Payable from General Obligation Bonds
5	Priority 2	$ 300,000
6	Priority 5	$ 3,200,000
7 Total	$ 3,500,000
8(1509)Agriculture and Forestry Wood Products Education 
9 and Research Center, Planning and Construction
10 (Lincoln)
11 Payable from General Obligation Bonds
12	Priority 2	$ 1,000,000
13	Priority 5	$ 9,000,000
14 Total	$10,000,000
1519/627MCNEESE STATE UNIVERSITY
16(41) McNeese Disaster Recovery, Planning 
17 and Construction
18 (Calcasieu)
19 Payable from General Obligation Bonds
20	Priority 1	$ 6,000,000
21	Priority 5	$ 4,000,000
22 Total	$10,000,000
23(42) Contraband Bayou Erosion Retaining Wall, Phase II, 
24 Planning and Construction
25 (Calcasieu)
26 Payable from General Obligation Bonds
27	Priority 1	$ 1,000,000
28(43) Shearman Fine Arts Building Renovation and Addition, 
29 Planning and Construction
30 (Calcasieu)
31 Payable from General Obligation Bonds
32	Priority 1	$ 3,025,000
33	Priority 5	$ 4,700,000
34 Total	$ 7,725,000
3519/629UNIVERSITY OF LOUISIANA - MONROE
36(210) Health Science Complex Renovation, Sugar Hall and 
37 Caldwell Hall, Planning and Construction
38 (Ouachita)
39 Payable from General Obligation Bonds
40	Priority 1	$ 5,722,729
41	Priority 5	$ 6,600,000
42 Total	$12,322,729
4319/631NORTHWESTERN STATE UNIVERSITY
44(278) Renovation of Roy Hall, Planning and Construction
45 (Natchitoches)
46 Payable from General Obligation Bonds
47	Priority 2	$ 500,000
48	Priority 5	$ 9,265,000
49 Total	$ 9,765,000
Page 34 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(282) Replacement of John S. Kyser Hall, Planning 
2 and Construction
3 (Natchitoches)
4 Payable from General Obligation Bonds
5	Priority 1	$ 4,907,680
6	Priority 5	$32,195,000
7 Total	$37,102,680
819/634SOUTHEASTERN LOUISIANA UNIVERSITY
9(1) D. Vickers Hall Renovation and Addition, Planning 
10 and Construction
11 (Tangipahoa)
12 Payable from General Obligation Bonds
13	Priority 1	$15,920,000
14	Priority 5	$ 5,100,000
15 Total	$21,020,000
16(2) Baton Rouge Nursing Center Renovation, Planning 
17 and Construction 
18 (Tangipahoa)
19 Payable from General Obligation Bonds
20	Priority 1	$ 780,000
21	Priority 5	$ 9,220,000
22 Total	$10,000,000
23(3) Academic Athletic Training and Ancillary Athletic 
24 Facility, Planning and Construction
25 (Tangipahoa)
26 Payable from General Obligation Bonds
27	Priority 1	$ 800,000
28	Priority 5	$12,500,000
29 Total	$13,300,000
30(1518)Nursing and Health Science Building, Planning 
31 and Construction
32 (Tangipahoa)
33 Payable from General Obligation Bonds
34	Priority 2	$ 600,000
35	Priority 5	$31,300,000
36 Total	$31,900,000
3719/640UNIVERSITY OF LOUISIANA - LAFAYETTE
38(5) DeClouet Hall Renovation, Planning and Construction
39 (Lafayette)
40 Payable from General Obligation Bonds
41	Priority 1	$ 375,000
42(6) Foster Hall Renovation, Planning and Construction
43 (Lafayette)
44 Payable from General Obligation Bonds
45	Priority 1	$ 500,000
46	Priority 5	$ 3,290,000
47 Total	$ 3,790,000
Page 35 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(7) Madison Hall Renovation, Planning and Construction
2 (Lafayette)
3 Payable from General Obligation Bonds
4	Priority 5	$18,000,000
5(8) Health Care Education and Training Facility, Planning 
6 and Construction
7 (Lafayette)
8 Payable from General Obligation Bonds
9	Priority 1	$ 5,749,968
10	Priority 5	$ 7,500,000
11 Total	$13,249,968
12(9) Engineering Classroom Building, Planning 
13 and Construction
14 (Lafayette)
15 Payable from General Obligation Bonds
16	Priority 1	$13,733,427
17(1256)NIRC BSL-3 Lab and Animal Housing,
18 Planning and Construction
19 (Iberia)
20 Payable from General Obligation Bonds
21	Priority 5	$10,600,000
22(1279)NIRC Iberia BioInnovation Accelerator GMP CDMO,
23 Planning and Construction
24 (Iberia)
25 Payable from General Obligation Bonds
26	Priority 5	$15,400,000
2719/646RIVER PARISHES COMMUNITY COLLEG E
28(1446)Donaldsonville Renovation Project, Planning 
29 and Construction
30 (Ascension)
31 Payable from General Obligation Bonds
32	Priority 1	$ 100,000
33	Priority 5	$ 1,000,000
34 Total	$ 1,100,000
3519/647LOUISIANA DELTA COMMUNITY COLLEG E
36(249) Campus Expansion for Louisiana Delta Community 
37 College, Winnsboro, Planning and Construction
38 (Franklin)
39 Payable from General Obligation Bonds
40	Priority 1	$ 150,000
41	Priority 5	$ 3,000,000
42 Total	$ 3,150,000
43(1431)Campus Development for Louisiana Delta Community 
44 College Bastrop, Planning and Construction
45 (Morehouse)
46 Payable from General Obligation Bonds
47	Priority 5	$ 9,000,000
Page 36 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
119/649LOUISIANA COMMUNITY AND TECHNICAL 
2 COLLEGE SYSTEM
3(251) Resurface Campus Parking, Planning and Construction
4 (Calcasieu)
5 Payable from General Obligation Bonds
6	Priority 1	$ 150,000
7	Priority 5	$ 2,500,000
8 Total	$ 2,650,000
9(334) Maritime/Petroleum Workforce Training Academy, 
10 Planning and Construction
11 (Terrebonne)
12 Payable from General Obligation Bonds
13	Priority 1	$ 9,416,441
1419/671BOARD OF REGENTS
15(1335)System-Wide Telecommunications Wiring and Equipment, 
16 Planning and Construction
17 (Statewide)
18 Payable from General Obligation Bonds
19	Priority 1	$ 2,233,920
20(1336)Land Acquisition for Post Secondary Educational
21 Institutions 
22 (Statewide)
23 Payable from General Obligation Bonds
24	Priority 1	$ 1,995,412
25	Priority 5	$ 2,000,000
26 Total	$ 3,995,412
27Provided that $4,500,000 of this appropriation shall be used for the acquisition of the former
28Our Lady of Lourdes Hospital Facility.
2919/673NEW ORLEANS CENTER F OR THE CREATIVE ARTS
30(1212)Roof Replacement, Planning and Construction
31 (Orleans)
32 Payable from General Obligation Bonds
33	Priority 1	$ 453,206
3419/674LOUISIANA UNIVERSITIES MARINE CONSORTIUM
35(1333)Research Vessel (R/V Pelican) Replacement
36 (Terrebonne)
37 Payable from General Obligation Bonds
38	Priority 1	$10,890,000
39	Priority 5	$31,000,000
40 Total	$41,890,000
41(1334)Houma Marine Campus Phase 2, Planning and Construction
42 (Terrebonne)
43 Payable from General Obligation Bonds
44	Priority 1	$11,996,174
Page 37 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(1527)LUMCON Houma Marine Campus, Planning 
2 and Construction
3 (Terrebonne)
4 Payable from General Obligation Bonds
5	Priority 1	$10,400,000
619/712LOUISIANA TECHNICAL COLLEG E-SULLIVAN 
7 CAMPUS
8(248) New Diesel Automotive Building, Northshore Technical 
9 Community College - Sullivan Campus, Planning 
10 and Construction
11 (Washington)
12 Payable from General Obligation Bonds
13	Priority 5	$ 9,140,000
1419/731FLETCHER TECHNICAL COMMUNITY COLLEG E
15(246) Precision Agriculture Training Facility, Planning 
16 and Construction
17 (Terrebonne)
18 Payable from General Obligation Bonds
19	Priority 1	$ 5,498,000
20	Priority 5	$ 5,502,000
21 Total	$11,000,000
22Pending approval of the Noncash Line of Credit by the State Bond Commission prior to June
2330, 2022.
24	JUDICIAL EXPENSES
2523/949LOUISIANA JUDICIARY
26(1528)Land Acquisition, Planning, and Construction of New 
27 Courthouse for the Louisiana Court of Appeal, Third Circuit
28 (Calcasieu)
29 Payable from General Obligation Bonds
30	Priority 1	$ 268,700
31	LEVEE DISTRICTS & PORTS
3236/L13PONTCHARTRAIN LEVEE DISTRICT
33(1228)Lake Pontchartrain West Shore Hurricane Protection 
34 Project
35 (Ascension, St. Charles, St. James, St. John the Baptist)
36 Payable from General Obligation Bonds
37	Priority 1	$ 3,327,000
38	Priority 5	$ 5,170,000
39 Total	$ 8,497,000
4036/L15SQUIRREL RUN LEVEE DRAINAG E DISTRICT
41(237) Maintenance of Levee and FEMA Certification 
42 (Iberia)
43 Payable from General Obligation Bonds
44	Priority 1	$ 250,000
45	Priority 5	$ 200,000
46 Total	$ 450,000
Page 38 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
136/L16SOUTH LAFOURCHE LEVEE DISTRICT
2(721) Larose to Golden Meadow Hurricane Protection System, 
3 Planning and Construction
4 (Lafourche)
5 Payable from General Obligation Bonds
6	Priority 5	$10,200,000
736/L24ST. TAMMANY LEVEE DRAINAG E AND 
8 CONSERVATION DISTRICT
9(1121)South Slidell - Fritchie Coastal Resilience, Planning 
10 and Construction
11 (St. Tammany)
12 Payable from General Obligation Bonds
13	Priority 1	$ 220,000
14	Priority 5	$ 4,500,000
15 Total	$ 4,720,000
16(1123)Military Road Flood Risk Reduction, Planning 
17 and Construction
18 (St. Tammany)
19 Payable from General Obligation Bonds
20	Priority 5	$ 4,500,000
21(1124)Eden Isle Roadway Infrastructure Flood Resilience, 
22 Planning and Construction
23 (St. Tammany)
24 Payable from General Obligation Bonds
25	Priority 5	$ 4,500,000
2636/L25GRAND ISLE INDEPENDENT LEVEE DISTRICT
27(1389)Grand Isle Back Levee Flood Protection, Planning 
28 and Construction
29 (Jefferson)
30 Payable from General Obligation Bonds
31	Priority 1	$ 1,500,000
32(1390)Breakwater Protection, Planning and Construction 
33 (Jefferson)
34 Payable from General Obligation Bonds
35	Priority 1	$ 734,160
3636/L26NATCHITOCHES LEVEE AND DRAINAG E DISTRICT
37(438) Lower Cane River Area Flow Control Structure and 
38 Levee Surface Restorations, Planning and Construction
39 (Natchitoches)
40 Payable from General Obligation Bonds
41	Priority 1	$ 143,250
42	Priority 5	$ 765,000
43 Total	$ 908,250
Page 39 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
136/L34LAKEFRONT MANAG EMENT AUTHORITY
2(907) Seabrook Public Boat Launch Rehabilitation, Planning 
3 and Construction
4 (Orleans)
5 Payable from General Obligation Bonds
6	Priority 1	$ 160,000
7	Priority 5	$ 1,780,000
8 Total	$ 1,940,000
9(908) Planning, Designing and Constructing Public Use Pavilions 
10 Inclusive of Benches and Tables along 5.2 Miles of Public 
11 Parks and Green Space along New Orleans Lakeshore Drive
12 (Orleans)
13 Payable from General Obligation Bonds
14	Priority 5	$ 168,750
1536/L36LAFITTE AREA INDEPENDENT LEVEE DISTRICT
16(1465)Lower Lafitte (Orange Street) Basin, Planning 
17 and Construction
18 (Jefferson)
19 Payable from General Obligation Bonds
20	Priority 1	$ 2,500,000
21	Priority 5	$14,492,500
22 Total	$16,992,500
23(1489)Goose Bayou/The Pen Levee Basin, Planning 
24 and Construction
25 (Jefferson)
26 Payable from General Obligation Bonds
27	Priority 1	$ 1,000,000
28	Priority 5	$14,066,000
29 Total	$15,066,000
3036/P10GREATER LAFOURCHE PORT COMMISSION
31(1388)Fourchon Bridge and Connector Road, Planning 
32 and Construction
33 (Lafourche)
34 Payable from General Obligation Bonds
35	Priority 1	$ 500,000
36	Priority 5	$ 4,910,000
37 Total	$ 5,410,000
3836/P15MORGAN CITY HARBOR AND TERMINAL DISTRICT
39(604) Berwick Bay Dredge Material Beneficial Use Project,
40 Planning and Construction
41 (St. Mary)
42 Payable from General Obligation Bonds
43	Priority 5	$ 3,745,000
Page 40 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
136/P17PORT OF NEW ORLEANS
2(1039)Milan Upland Yard Improvements 
3 (Orleans)
4 Payable from General Obligation Bonds
5	Priority 1	$ 606,200
6	Priority 5	$ 9,171,100
7 Total	$ 9,777,300
8(1040)Jourdan Road Terminal Cold Storage Expansion 
9 (Orleans)
10 Payable from General Obligation Bonds
11	Priority 1	$ 7,955,000
12(1041)Napoleon Avenue Container Crane Expansion Project, 
13 Planning and Construction
14 (Orleans)
15 Payable from General Obligation Bonds
16	Priority 1	$ 8,100,000
17(1042)Cruise Ship Terminal, Planning and Construction
18 (Orleans)
19 Payable from General Obligation Bonds
20	Priority 1	$ 197,200
21	Priority 5	$ 6,690,000
22 Total	$ 6,887,200
23(1206)St. Bernard Transportation Corridor, Planning and Construction
24 (St. Bernard)
25 Payable from General Obligation Bonds
26	Priority 5	$50,000,000
27(1210)St. Claude Bridge Rehabilitation, Planning and Construction
28 (Orleans)
29 Payable from General Obligation Bonds
30	Priority 5	$30,500,000
3136/P21PORT OF SOUTH LOUISIANA
32(653) Globalplex Rail Siding ($5,577,932 
33 Local/Federal/Other Match)
34 (St. John the Baptist)
35 Payable from General Obligation Bonds
36	Priority 1	$ 2,496,700
37	Priority 2	$ 2,150,000
38 Total	$ 4,646,700
39(654) Globalplex Terminal Building #71 and Other 
40 Globalplex Terminal Building Upgrades, Planning 
41 and Construction
42 (St. John the Baptist)
43 Payable from General Obligation Bonds
44	Priority 1	$ 567,361
45	Priority 5	$ 1,000,000
46 Total	$ 1,567,361
Page 41 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(655) Globalplex Dock Access Bridge and Equipment 
2 Replacement/Repair, Planning and Construction
3 (St. John the Baptist)
4 Payable from General Obligation Bonds
5	Priority 1	$ 967,687
6	Priority 5	$ 7,705,000
7 Total	$ 8,672,687
836/P23TERREBONNE PORT COMMISSION
9(583) Slip Dredging, Houma Navigation Canal Dredging, 
10 Planning and Construction
11 (Terrebonne)
12 Payable from General Obligation Bonds
13	Priority 1	$ 2,561,923
1436/P26PORT OF LAKE CHARLES
15(1019)Two Mobile Harbor Cranes for BT-1, Planning 
16 and Construction
17 (Calcasieu)
18 Payable from General Obligation Bonds
19	Priority 1	$ 2,977,500
20(1501)Berths 4, 5, & 6 Wharf and Shed Reconstruction at 
21 City Docks, Planning and Construction
22 (Calcasieu)
23 Payable from General Obligation Bonds
24	Priority 2	$13,000,000
25	Priority 5	$83,400,000
26 Total	$96,400,000
2736/P35MERMENTAU RIVER HARBOR AND TERMINAL DISTRICT
28(984) Slip Improvements, Planning and Construction
29 (Acadia)
30 Payable from General Obligation Bonds
31	Priority 1	$ 925,000
3236/P36CENTRAL LOUISIANA REG IONAL PORT
33(1284)CLRP High Water Hardstand and Access Road, 
34 Construction and Planning 
35 (Rapides)
36 Payable from General Obligation Bonds
37	Priority 2	$ 175,000
38	Priority 5	$ 1,800,000
39 Total	$ 1,975,000
4036/P41JEFFERSON PARISH PORT DISTRICT
41(731) Avondale Marine Facility Improvements, Planning 
42 and Construction 
43 (Jefferson)
44 Payable from General Obligation Bonds
45	Priority 1	$ 1,500,000
Page 42 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
136/P43COLUMBIA PORT COMMISSION
2(688) Railroad Spur, Planning and Construction
3 (Caldwell)
4 Payable from General Obligation Bonds
5	Priority 1	$ 155,000
6	Priority 5	$ 1,841,000
7 Total	$ 1,996,000
836/P44AVOYELLES PORT COMMISSION
9(304) Liquid Fertilizer Tank Terminal Expansion, Planning 
10 and Construction
11 (Avoyelles)
12 Payable from General Obligation Bonds
13	Priority 1	$ 150,000
14	Priority 5	$ 600,000
15 Total	$ 750,000
16	MISCELLANEOUS NON-STATE
1750/J01ACADIA PARISH
18(963) Old Spanish Trail Roadway Improvements to Provide 
19 for Freight Traffic Bypass of Dangerous Railroad 
20 Crossing, Planning and Construction 
21 (Acadia)
22 Payable from General Obligation Bonds
23	Priority 2	$ 460,000
24(964) Improvements to the Acadia Parish Courthouse Building 
25 (Window Replacement), Planning and Construction 
26 (Acadia)
27 Payable from General Obligation Bonds
28	Priority 5	$ 842,000
2950/J04ASSUMPTION PARISH
30(849) Assumption Parish Pumps and Drainage, Planning 
31 and Construction
32 (Assumption)
33 Payable from General Obligation Bonds
34	Priority 1	$ 500,000
35(850) Plattenville Drainage Improvements, Planning 
36 and Construction
37 (Assumption)
38 Payable from General Obligation Bonds
39	Priority 1	$ 1,800,000
40(851) Lee Drive Repaving, Planning and Construction
41 (Assumption)
42 Payable from General Obligation Bonds
43	Priority 1	$ 300,000
44	Priority 5	$ 1,428,000
45 Total	$ 1,728,000
Page 43 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/J06BEAUREGARD PARISH
2(391) Parish Line Road Improvements, Planning 
3 and Construction
4 (Beauregard)
5 Payable from General Obligation Bonds
6	Priority 5	$ 312,000
7(813) Camp Edgewood Road Improvements - Beauregard 
8 Parish Police Jury
9 (Beauregard)
10 Payable from General Obligation Bonds
11	Priority 1	$ 750,000
1250/J08BOSSIER PARISH
13(840) Improvements to LA Highway 3 (Benton Road) 
14 and I-220 Interchange, Planning and Construction
15 (Bossier)
16 Payable from General Obligation Bonds
17	Priority 5	$ 3,000,000
1850/J11CALDWELL PARISH
19(679) Swim Lake Road, Planning and Reconstruction
20 (Caldwell)
21 Payable from General Obligation Bonds
22	Priority 2	$ 450,000
23(680) Wiles Road and Kountry Korner Road,
24 Planning and Reconstruction
25 (Caldwell)
26 Payable from General Obligation Bonds
27	Priority 2	$ 500,000
2850/J12CAMERON PARISH
29(1247)North Cameron Emergency Operations Center, 
30 Planning and Construction 
31 (Cameron)
32 Payable from General Obligation Bonds
33	Priority 5	$ 1,975,000
3450/J17EAST BATON ROUG E PARISH
35(46) East Baton Rouge Parish Flood Risk Reduction Project- 
36 Expand, Repair, and Modify Drainage System throughout 
37 East Baton Rouge Parish 
38 (East Baton Rouge)
39 Payable from General Obligation Bonds
40	Priority 1	$10,451,787
41	Priority 5	$24,500,000
42 Total	$34,951,787
Page 44 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/J18EAST CARROLL PARISH
2(1195)Spillway Structure Repairs for Lake Providence Lake 
3 and Cleaning of Outfall Canal from the Lake Downstream, 
4 Planning and Construction
5 (East Carroll)
6 Payable from General Obligation Bonds
7	Priority 1	$ 100,000
8	Priority 5	$ 300,000
9 Total	$ 400,000
1050/J20EVANGELINE PARISH
11(546) Beaver Creek, LA Highway 106, Planning
12 and Construction
13 (Evangeline)
14 Payable from General Obligation Bonds
15	Priority 2	$ 800,000
16	Priority 5	$ 7,200,000
17 Total	$ 8,000,000
18(547) St. Landry, LA 106, Planning and Construction
19 (Evangeline)
20 Payable from General Obligation Bonds
21	Priority 2	$ 600,000
22	Priority 5	$ 5,400,000
23 Total	$ 6,000,000
2450/J21FRANKLIN PARISH
25(323) Franklin Parish Activity Center, Planning 
26 and Construction
27 (Franklin)
28 Payable from General Obligation Bonds
29	Priority 1	$ 500,000
30(605) WPA Road Reconstruction for Economic 
31 Development, Planning and Construction
32 (Franklin)
33 Payable from General Obligation Bonds
34	Priority 2	$ 500,000
35	Priority 5	$ 1,920,000
36 Total	$ 2,420,000
37(606) Economic Development, Planning, and 
38 Reconstruction of Dummy Line Road
39 (Franklin)
40 Payable from General Obligation Bonds
41	Priority 2	$ 380,000
42	Priority 5	$ 3,125,000
43 Total	$ 3,505,000
44(667) LD Knox Road Reconstruction, Planning 
45 and Construction
46 (Franklin)
47 Payable from General Obligation Bonds
48	Priority 5	$ 1,555,000
Page 45 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/J23IBERIA PARISH
2(225) Evacuation Center at Acadiana Fairgrounds, Planning 
3 and Construction
4 (Iberia)
5 Payable from General Obligation Bonds
6	Priority 5	$ 8,000,000
7(234) LaSalle Street and Hanger Road Extensions,
8 Planning and Construction
9 (Iberia)
10 Payable from General Obligation Bonds
11	Priority 2	$ 400,000
12(1466)Sewer System Improvements, Planning 
13 and Construction
14 (Iberia)
15 Payable from General Obligation Bonds
16	Priority 1	$ 187,812
17(1529)Courthouse Elevators, Planning and Construction
18 (Iberia)
19 Payable from General Obligation Bonds
20	Priority 1	$ 180,000
2150/J24IBERVILLE PARISH
22(1253)Manchac Roadway Improvements 
23 (Iberville)
24 Payable from General Obligation Bonds
25	Priority 5	$ 2,400,000
2650/J26JEFFERSON PARISH
27(57) Lafreniere Park Family Recreation Complex, 
28 Planning and Construction
29 (Jefferson)
30 Payable from General Obligation Bonds
31	Priority 5	$ 2,250,000
32(58) 4th Street Shared-Use Path (Barataria Blvd. to Gretna 
33 City Limits), Planning and Construction
34 (Jefferson)
35 Payable from General Obligation Bonds
36	Priority 1	$ 175,000
37	Priority 5	$ 2,196,600
38 Total	$ 2,371,600
39(62) Woodmere Playground Improvements, Planning 
40 and Construction
41 (Jefferson)
42 Payable from General Obligation Bonds
43	Priority 1	$ 970,000
44	Priority 5	$ 1,190,000
45 Total	$ 2,160,000
Page 46 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(64) Woodlake Estates Drainage Improvements, Planning 
2 and Construction
3 (Jefferson)
4 Payable from General Obligation Bonds
5	Priority 1	$ 150,000
6	Priority 5	$ 5,000,000
7 Total	$ 5,150,000
8(81) Hickory Avenue (LA 3154) Rehabilitation
9 (River Road to 10
th
 Street), Planning and Construction
10 (Jefferson)
11 Payable from General Obligation Bonds
12	Priority 2	$ 600,000
13	Priority 5	$ 6,270,000
14 Total	$ 6,870,000
15(87) Canal #13 Concrete Lining (Loyola Drive to Butler Canal) 
16 (Jefferson)
17 Payable from General Obligation Bonds
18	Priority 1	$ 250,000
19	Priority 5	$ 3,750,000
20 Total	$ 4,000,000
21(93) Preservation and Restoration of Historic Structures for 
22 Hope Haven/Madonna Manor Campus, Planning 
23 and Construction
24 (Jefferson)
25 Payable from General Obligation Bonds
26	Priority 1	$ 6,358,247
27(94) Gretna Government Complex Parking Lot, Planning 
28 and Construction
29 (Jefferson)
30 Payable from General Obligation Bonds
31	Priority 1	$ 99,600
32(96) West Esplanade Pump Station, Planning and Construction
33 (Jefferson)
34 Payable from General Obligation Bonds
35	Priority 1	$ 3,500,000
36(97) Riverside Senior Center, Planning and Construction
37 (Jefferson)
38 Payable from General Obligation Bonds
39	Priority 1	$ 948,000
40	Priority 5	$ 1,455,000
41 Total	$ 2,403,000
42(98) Rehabilitation of Alex Kornman Blvd. and Long Leaf 
43 Lane, Planning and Construction
44 (Jefferson)
45 Payable from General Obligation Bonds
46	Priority 5	$ 3,000,000
Page 47 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(99) New Access Road in the Churchill Technology and 
2 Business Park for Delgado's Advanced Manufacturing 
3 and River City Campus, Planning and Construction
4 (Jefferson)
5 Payable from General Obligation Bonds
6	Priority 1	$ 200,000
7	Priority 5	$ 1,350,000
8 Total	$ 1,550,000
9(102) Woodmere Youth Center, Planning and Construction
10 (Jefferson)
11 Payable from General Obligation Bonds
12	Priority 1	$ 99,862
13(104) Sewer Lift Station Backup Generators - North, Planning 
14 and Construction
15 (Jefferson)
16 Payable from General Obligation Bonds
17	Priority 1	$ 575,000
18(106) Bucktown Harbor Wave Attenuation Jetty, Planning 
19 and Construction
20 (Jefferson)
21 Payable from General Obligation Bonds
22	Priority 1	$ 464,000
23(107) Brown Avenue Canal Improvements between the 
24 Westbank Expressway and Harold Street, Planning 
25 and Construction
26 (Jefferson)
27 Payable from General Obligation Bonds
28	Priority 1	$ 1,965,578
29	Priority 5	$ 1,500,000
30 Total	$ 3,465,578
31(109) Airline Drive (US 61) at 17th Street Canal Drainage 
32 Crossing and Railroad Bridge Replacement
33 (Jefferson)
34 Payable from General Obligation Bonds
35	Priority 1	$11,000,000
36	Priority 2	$ 1,000,000
37	Priority 5	$15,090,000
38 Total	$27,090,000
39(110) 11th Street Roadway Replacement and Upgrade of 
40 Subsurface Drainage System between Queens and 
41 Manhattan Boulevard, Planning and Construction
42 (Jefferson)
43 Payable from General Obligation Bonds
44	Priority 1	$ 1,603,850
45	Priority 5	$ 9,175,000
46 Total	$10,778,850
47(111) Woodland West Drainage Improvements, Planning 
48 and Construction
49 (Jefferson)
50 Payable from General Obligation Bonds
51	Priority 1	$ 1,618,000
52	Priority 5	$ 1,000,000
53 Total	$ 2,618,000
Page 48 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(114) East Bank Backup Generators East: Sewer Lift Station
2 Backup Generators (Clearview at W. Napoleon, Cleary at
3 W. Napoleon, Houma at W. Napoleon and Galleria 
4 Sewer Station), Planning and Construction
5 (Jefferson)
6 Payable from General Obligation Bonds
7	Priority 5	$ 1,000,000
8(116) Bonnabel Canal Bank Stabilization (West Side) - 
9 Veterans Blvd. to West Esplanade, 
10 Planning and Construction
11 (Jefferson)
12 Payable from General Obligation Bonds
13	Priority 2	$ 100,000
14	Priority 5	$ 8,000,000
15 Total	$ 8,100,000
16(118) Bainbridge Canal Closure from Veterans Boulevard 
17 to Terminal Drive, Planning and Construction
18 (Jefferson)
19 Payable from General Obligation Bonds
20	Priority 1	$ 930,000
21	Priority 5	$13,800,000
22 Total	$14,730,000
23(126) Bonnabel Blvd. Drainage Improvements 
24 (Metairie Rd. to Veterans Blvd.), 
25 Planning and Construction
26 (Jefferson)
27 Payable from General Obligation Bonds
28	Priority 2	$ 500,000
29	Priority 5	$19,300,000
30 Total	$19,800,000
31(129) Shrewsbury Road at Jefferson Highway Culvert
32 Replacement, Planning and Construction
33 (Jefferson)
34 Payable from General Obligation Bonds
35	Priority 2	$ 450,000
3650/J28LAFAYETTE PARISH
37(167) Cypress Island Swamp Spoil Bank Removal, Planning 
38 and Construction
39 (Lafayette, St. Martin)
40 Payable from General Obligation Bonds
41	Priority 1	$ 150,000
42	Priority 5	$ 1,600,000
43 Total	$ 1,750,000
44(168) Heymann Park Improvements Project, Planning 
45 and Construction
46 (Lafayette)
47 Payable from General Obligation Bonds
48	Priority 1	$ 975,250
Page 49 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(169) Parish Government Complex, Parish Courthouse, Planning 
2 and Construction
3 (Lafayette)
4 Payable from General Obligation Bonds
5	Priority 1	$ 6,119,757
6(170) Kaliste Saloom Widening
7 (Lafayette)
8 Payable from General Obligation Bonds
9	Priority 1	$ 120,987
10(171) Bayou Vermilion Flood Control, Planning and 
11 Construction
12 (Lafayette)
13 Payable from General Obligation Bonds
14	Priority 1	$ 3,000,000
15	Priority 2	$ 5,000,000
16	Priority 5	$12,000,000
17 Total	$20,000,000
18(254) University Avenue Corridor Improvements, Planning, 
19 Construction and Acquisition 
20 (Lafayette)
21 Payable from General Obligation Bonds
22	Priority 1	$13,000,000
23(787) Performing Arts Center, Planning and Construction
24 (Lafayette)
25 Payable from General Obligation Bonds
26	Priority 2	$ 500,000
27	Priority 5	$ 1,000,000
28 Total	$ 1,500,000
2950/J29LAFOURCHE PARISH
30(418) South Lafourche Airport Corridor Project 
31 (Lafourche)
32 Payable from General Obligation Bonds
33	Priority 1	$ 4,449,990
34	Priority 5	$ 4,598,137
35 Total	$ 9,048,127
36(485) Butch Hill Pump Station Replacement, Planning 
37 and Construction
38 (Lafourche)
39 Payable from General Obligation Bonds
40	Priority 2	$ 500,000
41	Priority 5	$ 7,100,000
42 Total	$ 7,600,000
4350/J31LINCOLN PARISH
44(1023)Bridge Replacements on Mitchell and Shady Grove Roads, 
45 Planning and Construction
46 (Lincoln)
47 Payable from General Obligation Bonds
48	Priority 1	$ 380,000
Page 50 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/J32LIVINGSTON PARISH
2(716) Cook Road Extension Economic Development 
3 Corridor (Pete's Highway Frontage Road) 
4 (Livingston)
5 Payable from General Obligation Bonds
6	Priority 1	$ 3,058,463
7(898) Juban Road North Extension between US 190 
8 (Florida Blvd.) and LA 1026 (Lockhart Road),
9 Planning and Construction
10 (Livingston)
11 Payable from General Obligation Bonds
12	Priority 5	$ 6,505,000
13(899) Louisiana Highway 64 and Louisiana Highway 1019 
14 Roundabout, Planning and Construction
15 (Livingston)
16 Payable from General Obligation Bonds
17	Priority 1	$ 175,000
18	Priority 5	$ 2,500,000
19 Total	$ 2,675,000
2050/J34MOREHOUSE PARISH
21(740) Public Works Center, Planning 
22 and Construction
23 (Morehouse)
24 Payable from General Obligation Bonds
25	Priority 1	$ 301,750
2650/J35NATCHITOCHES P ARISH
27(305) Courthouse Security Improvements, Planning 
28 and Construction
29 (Natchitoches)
30 Payable from General Obligation Bonds
31	Priority 1	$ 2,192,545
3250/J37OUACHITA PARISH
33(219) Hannah's Run Control Structure, Planning 
34 and Construction
35 (Ouachita)
36 Payable from General Obligation Bonds
37	Priority 1	$ 187,385
38	Priority 5	$ 200,000
39 Total	$ 387,385
40(295) Steep Bayou Sewer - Phase 3, Planning, Construction 
41 and Right-of-Way Acquisition
42 (Ouachita)
43 Payable from General Obligation Bonds
44	Priority 1	$ 384,137
45(296) Bayou Mouchoir Drainage Improvements
46 (Ouachita)
47 Payable from General Obligation Bonds
48	Priority 1	$ 500,000
Page 51 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(298) Cheniere Lake Area 1 Improvements,
2 Planning and Construction
3 (Ouachita)
4 Payable from General Obligation Bonds
5	Priority 2	$ 1,080,000
650/J38PLAQUEMINES PARISH
7(628) Empire Bridge Lighting, Planning 
8 and Construction 
9 (Plaquemines)
10 Payable from General Obligation Bonds
11	Priority 1	$ 197,000
1250/J39POINTE COUPEE PARISH
13(873) False River Ecosystem Restoration Project, Including 
14 Bulkhead Replacement, Planning and Construction
15 (Pointe Coupee)
16 Payable from General Obligation Bonds
17	Priority 1	$ 2,400,000
18	Priority 5	$ 600,000
19 Total	$ 3,000,000
20(1354)Pointe Coupee Parish Government Storage Facility,
21 Planning and Construction
22 (Pointe Coupee)
23 Payable from General Obligation Bonds
24	Priority 5	$ 500,000
25(1514)Courthouse Restoration - Phase 2, Planning 
26 and Construction
27 (Pointe Coupee)
28 Payable from General Obligation Bonds
29	Priority 1	$ 1,250,000
30	Priority 2	$ 1,750,000
31 Total	$ 3,000,000
3250/J40RAPIDES PARISH
33(1547)Gunter Road/Barron Chapel Road Street
34 Improvements, Planning and Construction
35 (Rapides)
36 Payable from General Obligation Bonds
37	Priority 2	$ 1,450,000
38(1548)Philadelphia Road Street Improvements,
39 Planning and Construction
40 (Rapides)
41 Payable from General Obligation Bonds
42	Priority 2	$ 500,000
43	Priority 5	$ 2,950,000
44 Total	$ 3,450,000
Page 52 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/J43SABINE PARISH
2(399) Plainview Road Rehabilitation, Planning 
3 and Construction
4 (Sabine)
5 Payable from General Obligation Bonds
6	Priority 1	$ 1,902,700
7	Priority 5	$ 2,433,600
8 Total	$ 4,336,300
950/J44ST. BERNARD PARISH
10(456) St. Bernard Parish Jail Renovations, Planning 
11 and Construction
12 (St. Bernard)
13 Payable from General Obligation Bonds
14	Priority 1	$ 3,000,000
15	Priority 5	$ 6,565,000
16 Total	$ 9,565,000
1750/J45ST. CHARLES PARISH
18(491) Fairfield and Oakland Pump Station Discharge 
19 Improvements, Planning and Construction
20 (St. Charles)
21 Payable from General Obligation Bonds
22	Priority 1	$ 675,000
23	Priority 2	$ 150,000
24 Total	$ 825,000
25(492) Des Allemans Bulkhead - Phase 1, Planning and 
26 Construction
27 (St. Charles)
28 Payable from General Obligation Bonds
29	Priority 1	$ 202,500
30	Priority 5	$ 622,500
31 Total	$ 825,000
32(493) Preston Hollow Subdivision Panel Replacement,
33 Planning and Construction 
34 (St. Charles)
35 Payable from General Obligation Bonds
36	Priority 5	$ 2,250,000
37(637) Fifth Street Drainage Improvements, Planning 
38 and Construction
39 (St. Charles)
40 Payable from General Obligation Bonds
41	Priority 1	$ 450,000
42	Priority 5	$ 450,000
43 Total	$ 900,000
44(656) Paul Fredrick Street and Kinler Street Demolition 
45 and Reconstruction
46 (St. Charles)
47 Payable from General Obligation Bonds
48	Priority 1	$ 175,000
49	Priority 5	$ 2,825,000
50 Total	$ 3,000,000
Page 53 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/J46ST. HELENA PARISH
2(895) Audubon Library, Planning and Construction
3 (St. Helena)
4 Payable from General Obligation Bonds
5	Priority 1	$ 1,163,600
650/J47ST. JAMES PARISH
7(953) LA 3127 Widening (LA 20 to LA 3213), Planning 
8 and Construction
9 (St. James)
10 Payable from General Obligation Bonds
11	Priority 1	$ 1,000,000
12	Priority 5	$ 7,900,000
13 Total	$ 8,900,000
14(1184)West Shore Risk Reduction Connector Levee 
15 (St. James)
16 Payable from General Obligation Bonds
17	Priority 2	$ 1,000,000
18	Priority 5	$12,850,000
19 Total	$13,850,000
2050/J49ST. LANDRY PARISH
21(330) Courthouse Renovations, Planning and
22 Construction
23 (St. Landry)
24 Payable from General Obligation Bonds
25	Priority 2	$ 320,000
26(343) Parish Wide Drainage Project, Planning
27 and Construction
28 (St. Landry)
29 Payable from General Obligation Bonds
30	Priority 2	$ 200,000
31	Priority 5	$ 800,000
32 Total	$ 1,000,000
33(624) Wastewater Treatment Facility - Central St. Landry 
34 Economic Development District, Planning and Construction
35 (St. Landry)
36 Payable from General Obligation Bonds
37	Priority 1	$ 422,586
38(1374)State Government Roadway Reconstruction
39 in the Town of Krotz Springs, Planning and
40 Construction
41 (St. Landry)
42 Payable from General Obligation Bonds
43	Priority 2	$ 265,000
44	Priority 5	$ 2,375,000
45 Total	$ 2,640,000
Page 54 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/J50ST. MARTIN PARISH
2(262) Spanish Trail Industrial Park Access Road, Planning 
3 and Construction
4 (St. Martin)
5 Payable from General Obligation Bonds
6	Priority 5	$ 4,100,000
7(273) Road Improvements on Four-Mile Bayou Road
8 (St. Martin)
9 Payable from General Obligation Bonds
10	Priority 1	$ 105,308
11	Priority 5	$ 150,000
12 Total	$ 255,308
13(274) Joe Daigre Canal Drainage Improvements, Planning 
14 and Construction
15 (St. Martin)
16 Payable from General Obligation Bonds
17	Priority 1	$ 748,500
18	Priority 5	$ 550,000
19 Total	$ 1,298,500
2050/J51ST. MARY PARISH
21(502) Infrastructure Improvements and Construction of 
22 a Welding Training Center Facility at the Charenton 
23 Canal Industrial Park
24 (St. Mary)
25 Payable from General Obligation Bonds
26	Priority 1	$ 119,426
27	Priority 5	$ 527,000
28 Total	$ 646,426
29(503) Reconstruction of Martin Luther King Roadway in 
30 Charenton for St. Mary Parish Government, within 
31 Existing Right-of-Way, Planning and Construction
32 (St. Mary)
33 Payable from General Obligation Bonds
34	Priority 1	$ 743,250
35(505) Emergency Power Improvements at St. Mary Parish 
36 Courthouse, Planning and Construction
37 (St. Mary)
38 Payable from General Obligation Bonds
39	Priority 1	$ 250,000
4050/J52ST. TAMMANY PARISH
41(426) University Square Learning Center Facilities, Planning 
42 and Construction
43 (St. Tammany)
44 Payable from General Obligation Bonds
45	Priority 1	$ 208,740
46	Priority 5	$10,630,000
47 Total	$10,838,740
Page 55 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(427) St. Tammany Parish Fishing Pier, Planning
2 and Construction
3 (St. Tammany)
4 Payable from General Obligation Bonds
5	Priority 1	$ 28,802
6(428) Safe Haven Campus for Behavioral and Mental 
7 Health, Planning, Construction and Renovation for Triage
8 (St. Tammany)
9 Payable from General Obligation Bonds
10	Priority 1	$ 2,681,237
11	Priority 2	$ 500,000
12	Priority 5	$ 8,800,000
13 Total	$11,981,237
14(429) South Slidell Levee Protection Rehabilitation: (USACE 
15 533d Report or Planning, Land Acquisition, and 
16 Construction of Levees West and East of Interstate 10)
17 (St. Tammany)
18 Payable from General Obligation Bonds
19	Priority 1	$ 750,000
20	Priority 5	$ 9,108,000
21 Total	$ 9,858,000
22(430) LA 22 Extension and Improvements, LA 22 
23 Roundabout, Design, Engineering, Planning 
24 and Construction
25 (St. Tammany)
26 Payable from General Obligation Bonds
27	Priority 1	$ 650,000
28	Priority 5	$ 3,240,000
29 Total	$ 3,890,000
30(436) Harrison Avenue Widening, Planning and Construction
31 (St. Tammany)
32 Payable from General Obligation Bonds
33	Priority 5	$13,300,000
34(437) Ben Thomas - Stone Road to Powell Drive,
35 Design, Planning, and Construction
36 (St. Tammany)
37 Payable from General Obligation Bonds
38	Priority 2	$ 500,000
39	Priority 5	$ 3,200,000
40 Total	$ 3,700,000
4150/J53TANGIPAHOA PARISH
42(462) North Hoover Road Improvements Phase 2,
43 Planning and Construction
44 (St. Tammany)
45 Payable from General Obligation Bonds
46	Priority 2	$ 500,000
47	Priority 5	$ 2,225,000
48 Total	$ 2,725,000
Page 56 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(464) Kentwood Library Construction, Planning 
2 and Construction
3 (Tangipahoa)
4 Payable from General Obligation Bonds
5	Priority 1	$ 544,705
6(714) South Airport Road, North Hoover Road Improvements, 
7 Planning and Construction
8 (Tangipahoa)
9 Payable from General Obligation Bonds
10	Priority 1	$ 2,431,985
11	Priority 5	$ 2,000,000
12 Total	$ 4,431,985
1350/J54TENSAS PARISH
14(402) Recreation Facility, Planning and Construction
15 (Tensas)
16 Payable from General Obligation Bonds
17	Priority 1	$ 230,000
18	Priority 5	$ 5,278,000
19 Total	$ 5,508,000
20(403) Lide Road Improvements, Planning and Construction
21 (Tensas)
22 Payable from General Obligation Bonds
23	Priority 1	$ 827,500
24(405) Tensas Parish/Port Priority Site Plan, Planning 
25 and Construction
26 (Tensas)
27 Payable from General Obligation Bonds
28	Priority 1	$ 214,800
2950/J55TERREBONNE PARISH
30(882) South Louisiana Wetland Discovery Center - 
31 Phase 2 - Bayou Country Institute, Planning and 
32 Construction
33 (Terrebonne)
34 Payable from General Obligation Bonds
35	Priority 1	$ 393,204
36(1083)Replacement of Brady Road Bridge, Planning 
37 and Construction
38 (Terrebonne)
39 Payable from General Obligation Bonds
40	Priority 5	$ 5,885,000
41(1186)Renovate the LePetit Terrebonne Theater Building, 
42 Planning and Construction
43 (Terrebonne)
44 Payable from General Obligation Bonds
45	Priority 1	$ 679,000
Page 57 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(1194)Terrebonne Sports Complex, Planning 
2 and Construction
3 (Terrebonne)
4 Payable from General Obligation Bonds
5	Priority 1	$ 955,000
6	Priority 5	$ 984,000
7 Total	$ 1,939,000
8(1198)Valhi Extension (Savanne to LA 311), Planning 
9 and Construction
10 (Terrebonne)
11 Payable from General Obligation Bonds
12	Priority 5	$ 4,600,000
13(1200)Bayou LaCarpe Watershed Project, Location C, Design 
14 and Construction
15 (Terrebonne)
16 Payable from General Obligation Bonds
17	Priority 1	$ 716,250
18	Priority 5	$ 1,000,000
19 Total	$ 1,716,250
20(1204)Westside/Alma Street Drainage, Planning 
21 and Construction
22 (Terrebonne)
23 Payable from General Obligation Bonds
24	Priority 1	$ 792,850
2550/J57VERMILION PARISH
26(1175)Parish Wide Road Improvements, Planning 
27 and Construction
28 (Vermilion)
29 Payable from General Obligation Bonds
30	Priority 1	$ 680,000
3150/J58VERNON PARISH
32(998) Vernon/Fort Polk Thoroughfare Electrical 
33 Power Extension, and Utilities Including Generators
34 (Vernon)
35 Payable from General Obligation Bonds
36	Priority 1	$ 468,000
3750/J59WASHINGTON PARISH
38(1257)Washington Parish Jail Renovations Including HVAC, 
39 Security and ADA, Planning and Construction
40 (Washington)
41 Payable from General Obligation Bonds
42	Priority 1	$ 700,000
43	Priority 2	$ 300,000
44 Total	$ 1,000,000
Page 58 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(1258)Washington Parish Courthouse Renovation and HVAC, 
2 Planning and Construction
3 (Washington)
4 Payable from General Obligation Bonds
5	Priority 1	$ 300,000
6	Priority 2	$ 100,000
7 Total	$ 400,000
850/J63WEST FELICIANA PARISH
9(288) West Feliciana Port Infrastructure, Planning, 
10 Engineering, and Construction 
11 (West Feliciana)
12 Payable from General Obligation Bonds
13	Priority 1	$ 736,563
14	Priority 5	$ 2,140,000
15 Total	$ 2,876,563
1650/J64WINN PARISH
17(1027)Roadway Reconstruction, Mars Hill Church
18 Road, Planning and Construction
19 (Winn)
20 Payable from General Obligation Bonds
21	Priority 5	$ 765,000
22(1028)Roadway Reconstruction, Williams Loop, Cole, 
23 Oak Ridge and Pine Ridge Roadways, Planning 
24 and Construction
25 (Winn)
26 Payable from General Obligation Bonds
27	Priority 1	$ 652,500
28(1327)Roadway Reconstruction, Welcome Home Road,
29 Planning and Construction
30 (Winn)
31 Payable from General Obligation Bonds
32	Priority 5	$ 360,000
33(1344)Roadway Reconstruction, Aunt Marie's Road,
34 Planning and Construction
35 (Winn)
36 Payable from General Obligation Bonds
37	Priority 5	$ 335,000
38(1346)Roadway Reconstruction, Bethleham Road,
39 Planning and Construction
40 (Winn)
41 Payable from General Obligation Bonds
42	Priority 5	$ 570,000
43(1348)Roadway Reconstruction, Blewer Road,
44 Planning and Construction
45 (Winn)
46 Payable from General Obligation Bonds
47	Priority 5	$ 562,000
Page 59 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(1350)Roadway Reconstruction, Brownville Road,
2 Planning and Construction
3 (Winn)
4 Payable from General Obligation Bonds
5	Priority 2	$ 335,000
6(1352)Roadway Reconstruction, Eugene Garrett Road,
7 Planning and Construction
8 (Winn)
9 Payable from General Obligation Bonds
10	Priority 2	$ 385,000
11(1355)Roadway Reconstruction, Frank White Road,
12 Planning and Construction
13 (Winn)
14 Payable from General Obligation Bonds
15	Priority 2	$ 460,000
16(1356)Roadway Reconstruction, L. Sullivan Road,
17 Planning and Construction
18 (Winn)
19 Payable from General Obligation Bonds
20	Priority 5	$ 515,000
2150/M05ALEXANDRIA
22(1275)Sugarhouse Road/Eddie Williams Boulevard to LA 
23 Highway 1, Phase I and II, Planning and Construction 
24 ($5,000,000 Local Match) 
25 (Rapides)
26 Payable from General Obligation Bonds
27	Priority 1	$ 3,000,000
28	Priority 5	$ 4,620,000
29 Total	$ 7,620,000
3050/M ALGIERS
31(   ) Streetscape at the Newton Street Corridor,
32 Planning and Construction
33 (Jefferson)
34 Payable from General Obligation Bonds
35	Priority 2	$ 250,000
36Pending submittal and late approval of the capital outlay budget request pursuant to the
37provisions of R.S. 39:112.
3850/M07ANACOCO
39(1122)Street Rehabilitation - Ross Road, Lula Street, and Loop 
40 Drive, Planning and Construction
41 (Vernon)
42 Payable from General Obligation Bonds
43	Priority 1	$ 240,000
Page 60 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/M AVONDALE
2(   ) Restore Rail Connection and Crossings to
3 Avondale Marine, Planning and Construction
4 (Jefferson)
5 Payable from General Obligation Bonds
6	Priority 2	$ 100,000
7	Priority 5	$ 3,700,000
8 Total	$ 3,800,000
9Pending submittal and late approval of the capital outlay budget request pursuant to the
10provisions of R.S. 39:112.
1150/M15BALDWIN
12(1470)Potable Water System Improvements, Planning 
13 and Construction
14 (St. Mary)
15 Payable from General Obligation Bonds
16	Priority 1	$ 186,500
17	Priority 5	$ 700,000
18 Total	$ 886,500
1950/M19BASTROP
20(1282)City Hall - Roof Replacement, Planning 
21 and Construction
22 (Morehouse)
23 Payable from General Obligation Bonds
24	Priority 1	$ 380,000
2550/M20BATON ROUGE
26(47) Hooper Road Widening and Sewer Improvements 
27 (Blackwater Bayou to Sullivan Road) Planning, 
28 Engineering, Utilities and Construction 
29 (East Baton Rouge)
30 Payable from General Obligation Bonds
31	Priority 2	$ 4,000,000
32	Priority 5	$ 9,500,000
33 Total	$13,500,000
34(48) Old Hammond Hwy. (LA 426) Roadway Improvements 
35 from Blvd. De Province to Millerville Road, Planning 
36 and Construction
37 (East Baton Rouge)
38 Payable from General Obligation Bonds
39	Priority 1	$ 450,000
40	Priority 5	$ 9,250,000
41 Total	$ 9,700,000
4250/M27BOGALUSA
43(577) City Hall Renovations
44 (Washington)
45 Payable from General Obligation Bonds
46	Priority 2	$ 210,000
Page 61 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(578) Community Center and Emergency Shelter, Planning 
2 and Construction
3 (Washington)
4 Payable from General Obligation Bonds
5	Priority 2	$ 500,000
6	Priority 5	$10,500,000
7 Total	$11,000,000
8(581) Davenport Avenue Bridge, Servitude Street
9 Emergency Replacement and Repair,
10 Planning and Construction
11 (Washington)
12	Priority 5	$ 565,000
1350/M28BONITA
14(1207)Municipal Complex, Planning and Construction
15 (Morehouse)
16 Payable from General Obligation Bonds
17	Priority 2	$ 400,000
18	Priority 5	$ 1,850,000
19 Total	$ 2,250,000
2050/M31BREAUX BRIDGE
21(1462)Water Treatment Plant Improvements, Planning 
22 and Construction
23 (St. Martin)
24 Payable from General Obligation Bonds
25	Priority 1	$ 35,500
2650/M32BROUSSARD
27(201) Highway 89 Improvements, Planning 
28 and Construction
29 (Lafayette)
30 Payable from General Obligation Bonds
31	Priority 1	$ 1,500,000
32	Priority 5	$ 3,410,000
33 Total	$ 4,910,000
34(1471)Reconstruct South Bernard Road from LA Hwy 182 
35 to US Hwy 90, Planning and Construction
36 (Lafayette)
37 Payable from General Obligation Bonds
38	Priority 1	$ 4,430,490
3950/M39CARENCRO
40(285) Arceneaux Road Drainage Improvements and Utility 
41 Relocations, Planning and Construction
42 (Lafayette)
43 Payable from General Obligation Bonds
44	Priority 1	$ 676,194
45(291) I-49 to Gloria Switch Coulee Project, Planning 
46 and Construction
47 (Lafayette)
48 Payable from General Obligation Bonds
49	Priority 1	$ 439,761
Page 62 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(292) Wastewater and City Infrastructure Flood Damages, 
2 Planning and Construction
3 (Lafayette)
4 Payable from General Obligation Bonds
5	Priority 1	$ 4,612,476
650/M44CHOUDRANT
7(1230)New Town Hall, Planning and Construction
8 (Lincoln)
9 Payable from General Obligation Bonds
10	Priority 1	$ 150,000
11	Priority 5	$ 1,096,586
12 Total	$ 1,246,586
1350/M45CHURCH POINT
14(1485)Sewer System Improvements, Planning 
15 and Construction
16 (Acadia)
17 Payable from General Obligation Bonds
18	Priority 1	$ 291,000
1950/M50COLFAX
20(619) Street Improvements, Planning and Construction
21 (Grant)
22 Payable from General Obligation Bonds
23	Priority 2	$ 385,000
24	Priority 5	$ 377,000
25 Total	$ 762,000
2650/M54COTTON VALLEY
27(363) Sewerage System Improvements, Planning 
28 and Construction
29 (Webster)
30 Payable from General Obligation Bonds
31	Priority 1	$ 1,189,000
3250/M56COUSHATTA
33(1455)Overlay of Streets in Town of Coushatta, Planning, 
34 Land Acquisition, and Construction
35 (Red River)
36 Payable from General Obligation Bonds
37	Priority 5	$ 4,185,000
3850/M57COVINGTON
39(1298)Downtown Historic District Overlays, Planning 
40 and Construction
41 (St. Tammany)
42 Payable from General Obligation Bonds
43	Priority 1	$ 80,000
44	Priority 5	$ 640,000
45 Total	$ 720,000
Page 63 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(1301)Covington Wastewater Treatment Plant, Planning 
2 and Construction
3 (St. Tammany)
4 Payable from General Obligation Bonds
5	Priority 1	$ 104,500
650/M58CROWLEY
7(973) Renovation and Repairs to Rice Festival Building,
8 Including the Repair or Replacement of the Roof,
9 Planning and Construction
10 (Acadia)
11 Payable from General Obligation Bonds
12	Priority 2	$ 230,000
13(975) Installation of Comminutor for the City of Crowley 
14 Main Sewerage Pump Station, Planning and Construction
15 (Acadia)
16 Payable from General Obligation Bonds
17	Priority 1	$ 405,000
1850/M61DELHI
19(615) Sapa Drive Extension, Planning and Construction
20 (Richland)
21 Payable from General Obligation Bonds
22	Priority 1	$ 460,250
23	Priority 5	$ 500,000
24 Total	$ 960,250
2550/M DELTA
26(   ) Road Repairs:  St. Martin, St. Landry, St. Bernard,
27 Janie Avenue, 3
rd
 Street, Wall Street, and Part of Old
28 Highway 80, Planning and Construction
29 (Madison)
30 Payable from General Obligation Bonds
31	Priority 5	$ 460,000
32Pending submittal and late approval of the capital outlay budget request pursuant to the
33provisions of R.S. 39:112.
3450/M64DEQUINCY
35(381) Wastewater Treatment Plant Improvements,
36 Planning and Construction
37 (Calcasieu)
38 Payable from General Obligation Bonds
39	Priority 5	$ 810,000
40(382) Sanitary Sewer Lift Station, Planning 
41 and Construction
42 (Calcasieu)
43 Payable from General Obligation Bonds
44	Priority 5	$ 900,000
Page 64 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(522) DeQuincy Industrial Airpark T-Hangars and Taxi Lane, 
2 Planning and Construction
3 (Calcasieu)
4 Payable from General Obligation Bonds
5	Priority 5	$ 500,000
650/M65DERIDDER
7(725) Education and Job Training Center, Planning 
8 and Construction
9 (Beauregard)
10 Payable from General Obligation Bonds
11	Priority 1	$ 203,462
12	Priority 5	$ 1,000,000
13 Total	$ 1,203,462
14(727) Ellis Road and Branch Street Drainage Improvements, 
15 Planning and Construction
16 (Beauregard)
17 Payable from General Obligation Bonds
18	Priority 1	$ 150,000
1950/M68DONALDSONVILLE
20(1059)Natural Gas System Infrastructure Improvement Phase III, 
21 Planning and Construction
22 (Ascension)
23 Payable from General Obligation Bonds
24	Priority 1	$ 100,000
25	Priority 5	$ 1,000,000
26 Total	$ 1,100,000
27(1530)Natural Gas System Infrastructure Improvements, 
28 Phase II, Planning and Construction
29 (Ascension)
30 Payable from General Obligation Bonds
31	Priority 1	$ 850,925
3250/M70DOYLINE
33(1151)Village of Doyline Wastewater Treatment 
34 Facility Upgrades 
35 (Webster)
36 Payable from General Obligation Bonds
37	Priority 1	$ 13,000
3850/M74DUSON
39(329) LA Highway 95 Roundabout, Planning 
40 and Construction
41 (Acadia)
42 Payable from General Obligation Bonds
43	Priority 1	$ 2,615,816
Page 65 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/M83EUNICE
2(1095)Library Renovations, Planning 
3 and Construction
4 (St. Landry)
5 Payable from General Obligation Bonds
6	Priority 5	$ 350,000
750/M84EVERGREEN
8(623) Evergreen Water System Improvements 
9 (Avoyelles)
10 Payable from General Obligation Bonds
11	Priority 1	$ 1,000,000
1250/M87FERRIDAY
13(1209)Water Renovations, Planning and Construction
14 (Concordia)
15 Payable from General Obligation Bonds
16	Priority 1	$ 327,263
17	Priority 5	$ 1,000,000
18 Total	$ 1,327,263
19(1246)Town of Ferriday Auditorium, Planning 
20 and Construction
21 (Concordia)
22 Payable from General Obligation Bonds
23	Priority 2	$ 700,000
24	Priority 5	$ 6,000,000
25 Total	$ 6,700,000
2650/M89FLORIEN
27(365) Village of Florien Town Hall, Planning 
28 and Construction
29 (Sabine)
30 Payable from General Obligation Bonds
31	Priority 1	$ 385,505
3250/M91FORDOCHE
33(748) Water Storage Improvements, Planning 
34 and Construction
35 (Pointe Coupee)
36 Payable from General Obligation Bonds
37	Priority 1	$ 755,000
38(749) Water Distribution System Improvements, Planning 
39 and Construction
40 (Pointe Coupee)
41 Payable from General Obligation Bonds
42	Priority 1	$ 631,000
Page 66 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/M94FRANKLIN
2(670) Renovation of Old Crowell Elementary Building, 
3 Planning and Construction
4 (St. Mary)
5 Payable from General Obligation Bonds
6	Priority 1	$ 413,914
7	Priority 5	$ 321,000
8 Total	$ 734,914
9(671) Cayce Street Repairs, Planning and Construction
10 (St. Mary)
11 Payable from General Obligation Bonds
12	Priority 1	$ 2,319,000
1350/MA3GOLDEN MEADOW
14(1060)Upgrade to North Sewerage Treatment Plant, Planning 
15 and Construction
16 (Lafourche)
17 Payable from General Obligation Bonds
18	Priority 1	$ 163,940
1950/MA5GONZALES
20(868) Connector Road for City of Gonzales Hospital District, 
21 Construction and Planning
22 (Ascension)
23 Payable from General Obligation Bonds
24	Priority 5	$ 3,905,000
25(886) CARE Center Construction (Community Activities,
26 Recreation and Education), Planning and Construction
27 (Ascension)
28 Payable from General Obligation Bonds
29	Priority 5	$ 500,000
30(1472)Veteran's Ave to Commerce Ave Connector Road, 
31 Planning and Construction
32 (Ascension)
33 Payable from General Obligation Bonds
34	Priority 1	$ 309,420
3550/MA6GRAMBLING
36(1026)Community Center Expansion, Planning 
37 and Construction 
38 (Lincoln)
39 Payable from General Obligation Bonds
40	Priority 2	$ 300,000
4150/MB1GRAND ISLE
42(1463)Historic Recreation Center/Community Center, 
43 Planning and Construction
44 (Jefferson)
45 Payable from General Obligation Bonds
46	Priority 1	$ 17,000
Page 67 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/MB5GRETNA
2(1135)City Hall Exterior and Interior Renovation 
3 (Jefferson)
4 Payable from General Obligation Bonds
5	Priority 2	$ 300,000
6	Priority 5	$ 2,700,000
7 Total	$ 3,000,000
850/MB9HAMMOND
9(1079)Roadside Drainage Improvements, Planning 
10 and Construction
11 (Tangipahoa)
12 Payable from General Obligation Bonds
13	Priority 1	$ 225,000
1450/MC3HAUGHTON
15(1053)Additional Water Supply Wells and Elevated Tank, 
16 Planning and Construction 
17 (Bossier)
18 Payable from General Obligation Bonds
19	Priority 5	$ 120,000
2050/MC4HAYNESVILLE
21(980) Town of Haynesville Street Improvements, Planning 
22 and Construction
23 (Claiborne)
24 Payable from General Obligation Bonds
25	Priority 1	$ 50,000
26	Priority 5	$ 300,000
27 Total	$ 350,000
2850/MC9HOMER
29(878) Street Improvement Project, Planning 
30 and Construction
31 (Claiborne)
32 Payable from General Obligation Bonds
33	Priority 1	$ 513,000
34	Priority 5	$ 87,000
35 Total	$ 600,000
36(880) Town Hall Renovations, Planning and Construction
37 (Claiborne)
38 Payable from General Obligation Bonds
39	Priority 1	$ 557,904
40	Priority 2	$ 261,000
41 Total	$ 818,904
Page 68 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/MD1HORNBECK
2(383) West Side Water System Expansion, Planning 
3 and Construction
4 (Sabine, Vernon)
5 Payable from General Obligation Bonds
6	Priority 1	$ 105,465
7	Priority 5	$ 1,000,000
8 Total	$ 1,105,465
950/MD4IDA
10(1150)Water System Improvements, Water Wells, Tanks, 
11 and Booster Stations Construction, Planning 
12 and Construction
13 (Caddo)
14 Payable from General Obligation Bonds
15	Priority 1	$ 60,000
1650/ME1JEAN LAFITTE
17(1398)Lafitte Wetlands Museum Addition, Planning 
18 and Construction
19 (Jefferson)
20 Payable from General Obligation Bonds
21	Priority 1	$ 679,000
22	Priority 5	$ 1,000,000
23 Total	$ 1,679,000
2450/ME6JONESVILLE
25(1448)Glenn Ditch Pump Station, Planning 
26 and Construction
27 (Catahoula)
28 Payable from General Obligation Bonds
29	Priority 1	$ 80,000
30	Priority 5	$ 1,485,000
31 Total	$ 1,565,000
3250/ME8KAPLAN
33(255) Street and Drainage Improvements
34 (Vermilion)
35 Payable from General Obligation Bonds
36	Priority 5	$ 315,000
3750/MF1KENNER
38(941) Pump to the River Pump Station Phase I, 
39 Planning and Construction 
40 (Jefferson)
41 Payable from General Obligation Bonds
42	Priority 2	$ 1,000,000
43	Priority 5	$ 9,050,000
44 Total	$10,050,000
Page 69 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(942) Lincoln Manor Drainage Phase 2, Planning 
2 and Construction
3 (Jefferson)
4 Payable from General Obligation Bonds
5	Priority 5	$ 500,000
6(946) Lincoln Manor Subdivision Drainage Improvement, 
7 Planning and Construction
8 (Jefferson)
9 Payable from General Obligation Bonds
10	Priority 1	$ 155,000
1150/MF9LAKE CHARLES
12(151) Infrastructure Improvements for Economic Development, 
13 Planning and Construction 
14 ($2,000,000 Local Match) 
15 (Calcasieu)
16 Payable from General Obligation Bonds
17	Priority 5	$ 4,000,000
18(153) Lakefront Development 
19 (Calcasieu)
20 Payable from General Obligation Bonds
21	Priority 1	$ 1,955,000
22(156) Sallier Street Rehabilitation, Planning 
23 and Construction
24 (Calcasieu)
25 Payable from General Obligation Bonds
26	Priority 5	$ 2,300,000
27(157) Enterprise Boulevard Extension, Planning 
28 and Construction
29 (Calcasieu)
30 Payable from General Obligation Bonds
31	Priority 1	$ 500,000
32	Priority 2	$ 500,000
33	Priority 5	$ 3,000,000
34 Total	$ 4,000,000
35Pending approval of the Noncash Line of Credit by the State Bond Commission prior to June
3630, 2022.
37(1498)New Chennault Water Plant, Planning
38 and Construction
39 (Calcasieu)
40 Payable from General Obligation Bonds
41	Priority 2	$ 3,000,000
42	Priority 5	$ 7,500,000
43 Total	$10,500,000
44(1500)Relocation of Lake Charles Public Works Campus, 
45 Planning and Construction
46 (Calcasieu)
47 Payable from General Obligation Bonds
48	Priority 2	$ 3,000,000
49	Priority 5	$ 9,000,000
50 Total	$12,000,000
Page 70 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/MG3LEESVILLE
2(378) City of Leesville, Sanitary Sewer Extension for 
3 Fort Polk Entrance Road, Planning and Construction
4 (Vernon)
5 Payable from General Obligation Bonds
6	Priority 1	$ 2,477,500
7(379) Street Rehabilitation and Extension, Planning 
8 and Construction
9 (Vernon)
10 Payable from General Obligation Bonds
11	Priority 1	$ 250,000
12	Priority 5	$ 250,000
13 Total	$ 500,000
1450/MH1LOGANSPORT
15(354) Recreational Improvements, Planning 
16 and Construction
17 (DeSoto)
18 Payable from General Obligation Bonds
19	Priority 1	$ 150,000
20	Priority 5	$ 1,150,000
21 Total	$ 1,300,000
2250/MH3LOREAUVILLE
23(854) New Fire Station, Planning and Construction
24 (Iberia)
25 Payable from General Obligation Bonds
26	Priority 1	$ 120,453
2750/MH8MANDEVILLE
28(747) LA 22 Drainage Improvements, Planning 
29 and Construction
30 (St. Tammany)
31 Payable from General Obligation Bonds
32	Priority 5	$ 2,925,000
3350/MH9MANGHAM
34(661) Mangham Recreation Complex, Planning 
35 and Construction
36 (Richland)
37 Payable from General Obligation Bonds
38	Priority 1	$ 1,036,400
39	Priority 5	$ 520,000
40 Total	$ 1,556,400
4150/MI1MANSFIELD
42(353) Fire Apparatus Improvements
43 (DeSoto)
44 Payable from General Obligation Bonds
45	Priority 5	$ 50,000
Page 71 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/MI8MAURICE
2(1076)New Village Hall, Planning and Construction
3 (Vermilion)
4 Payable from General Obligation Bonds
5	Priority 2	$ 165,000
6	Priority 5	$ 1,200,000
7 Total	$ 1,365,000
850/MJ5MINDEN
9(736) Potable Water Ground Storage Tank, 
10 Planning and Construction
11 (Webster)
12 Payable from General Obligation Bonds
13	Priority 1	$ 145,100
1450/MJ6MONROE
15(264) I-20 Interchange Improvement and Kansas Garrett 
16 Connector, Kansas Lane Connector, Planning and 
17 Construction 
18 ($1,000,000 Local and $6,000,000 Federal Match)
19 (Ouachita)
20 Payable from General Obligation Bonds
21	Priority 1	$ 9,369,600
22	Priority 2	$10,000,000
23	Priority 5	$19,100,000
24 Total	$38,469,600
25(265) Calypso Street Pump Station Rehabilitation, Planning, 
26 Engineering, Design, Right-of-Way, Utilities, 
27 and Construction
28 (Ouachita)
29 Payable from General Obligation Bonds
30	Priority 1	$ 30,000
31	Priority 5	$ 1,770,000
32 Total	$ 1,800,000
33(266) Georgia Street Pump Station, Including Generator 
34 and Auxiliary Pumps, Planning, Engineering, 
35 Right-of-Way, Utilities and Construction
36 (Ouachita)
37 Payable from General Obligation Bonds
38	Priority 1	$ 2,000,000
39(268) River Pump Station Water Treatment Plant, Planning 
40 and Construction
41 (Ouachita)
42 Payable from General Obligation Bonds
43	Priority 5	$ 300,000
44(281) Youngs Bayou Enhancement of Channel
45 Capacity, Planning and Construction
46 (Ouachita)
47 Payable from General Obligation Bonds
48	Priority 2	$ 500,000
49	Priority 5	$10,900,000
50 Total	$11,400,000
Page 72 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/MK4MORSE
2(968) Water Tower Improvements, Planning 
3 and Construction
4 (Acadia)
5 Payable from General Obligation Bonds
6	Priority 1	$ 227,000
750/MK9NATCHITOCHES
8(754) Texas Street Corridor Improvements, Planning 
9 and Construction
10 (Natchitoches)
11 Payable from General Obligation Bonds
12	Priority 5	$ 435,000
13(755) South Natchitoches Drainage Improvements, Including 
14 Adjacent Road Work, Planning and Construction
15 (Natchitoches)
16 Payable from General Obligation Bonds
17	Priority 5	$ 250,000
1850/ML1NEW IBERIA
19(256) Bayou Teche Museum Expansion and George 
20 Rodrigue Park 
21 (Iberia)
22 Payable from General Obligation Bonds
23	Priority 1	$ 1,845,965
24(257) West End Park Improvements, Planning 
25 and Construction
26 (Iberia)
27 Payable from General Obligation Bonds
28	Priority 5	$ 250,000
29(550) Bank Street Park Improvements, Planning 
30 and Construction
31 (Iberia)
32 Payable from General Obligation Bonds
33	Priority 5	$ 375,000
34(551) Ann Street Park, Planning and Construction
35 (Iberia)
36 Payable from General Obligation Bonds
37	Priority 5	$ 300,000
38(552) Lil' Brooklyn Park, Planning and Construction
39 (Iberia)
40 Payable from General Obligation Bonds
41	Priority 2	$ 340,000
42(1461)City Park and West End Community Centers 
43 Improvements, Planning and Construction
44 (Iberia)
45 Payable from General Obligation Bonds
46	Priority 1	$ 500,000
47	Priority 2	$ 250,000
48 Total	$ 750,000
Page 73 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/ML3NEW ORLEANS
2(532) Richard Lee Playground, Planning and Construction
3 (Orleans)
4 Payable from General Obligation Bonds
5	Priority 1	$ 200,000
6	Priority 5	$ 3,000,000
7 Total	$ 3,200,000
8(534) Lower Ninth Ward Green Infrastructure Project, 
9 Planning and Construction
10 (Orleans)
11 Payable from General Obligation Bonds
12	Priority 1	$ 150,000
13	Priority 5	$ 2,750,000
14 Total	$ 2,900,000
15(535) West Bank Ferry Terminal Renovations, Planning 
16 and Construction
17 (Orleans)
18 Payable from General Obligation Bonds
19	Priority 1	$ 300,000
20	Priority 5	$ 300,000
21 Total	$ 600,000
22(536) Old New Orleans VA Building Rehabilitation 
23 (Orleans)
24 Payable from General Obligation Bonds
25	Priority 1	$ 2,000,000
26	Priority 5	$ 8,000,000
27 Total	$10,000,000
28(538) New Sewerage and Water Board Power Plant, 
29 Planning and Construction
30 (Orleans)
31 Payable from General Obligation Bonds
32	Priority 1	$32,700,000
33	Priority 5	$39,000,000
34 Total	$71,700,000
35(540) West Bank Park Improvements Including New Soccer 
36 and Recreational Facilities, Planning and Construction
37 (Orleans)
38 Payable from General Obligation Bonds
39	Priority 1	$ 999,913
40	Priority 5	$12,225,400
41 Total	$13,225,313
42Provided, however, that $550,000 of the Priority 1 appropriation shall be used to fund the
43George W. Carver Playground Renovations project, and $200,000 of the Priority 1
44appropriation shall be used to fund the Skateboard Park at the West Bank Park project.
45(543) Landside Roadways - Louis Armstrong International 
46 North Terminal Project, Planning and Construction
47 (Jefferson)
48 Payable from General Obligation Bonds
49	Priority 5	$20,000,000
Page 74 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(1055)Monticello Canal Culverts at Airline Highway 
2 (Orleans)
3 Payable from General Obligation Bonds
4	Priority 2	$ 750,000
5	Priority 5	$ 8,250,000
6 Total	$ 9,000,000
750/ML4NEW ROADS
8(1306)Industrial Park Development Project, Planning 
9 and Construction
10 (Pointe Coupee)
11 Payable from General Obligation Bonds
12	Priority 1	$ 988,000
1350/ML8NORWOOD
14(1515)Town Hall Renovations, Planning 
15 and Construction 
16 (East Feliciana)
17 Payable from General Obligation Bonds
18	Priority 1	$ 35,000
19	Priority 5	$ 200,000
20 Total	$ 235,000
2150/MM2OAKDALE
22(1270)Oakdale City Hall Renovations, Roof, 
23 and Reconstruction 
24 (Allen)
25 Payable from General Obligation Bonds
26	Priority 1	$ 35,000
2750/MM4OIL CITY
28(349) Water Treatment Plant, Transmission Main, and 
29 Distribution System Improvements, Planning 
30 and Construction
31 (Caddo)
32 Payable from General Obligation Bonds
33	Priority 1	$ 1,773,500
34	Priority 5	$ 500,000
35 Total	$ 2,273,500
3650/MM6OPELOUSAS
37(260) Opelousas Street and Drainage Improvements
38 (St. Landry)
39 Payable from General Obligation Bonds
40	Priority 1	$ 3,582,282
41(261) Water Meter Replacement and Upgrades, 
42 Planning and Construction
43 (St. Landry)
44 Payable from General Obligation Bonds
45	Priority 1	$ 1,130,768
Page 75 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/MM9PATTERSON
2(664) Replacement of Water and Gas Meters in Patterson, 
3 Planning and Construction
4 (St. Mary)
5 Payable from General Obligation Bonds
6	Priority 1	$ 191,000
7	Priority 5	$ 260,000
8 Total	$ 451,000
950/MN3PINEVILLE
10(636) Cedar Lake Pump Station Reconstruction, Design, 
11 Planning and Construction
12 (Rapides)
13 Payable from General Obligation Bonds
14	Priority 5	$ 585,000
1550/MO1PONCHATOULA
16(1116)Fire Station Complex US 51 - Veterans Avenue, 
17 Land Acquisition, Planning and Construction
18 (Tangipahoa)
19 Payable from General Obligation Bonds
20	Priority 1	$ 75,000
21	Priority 5	$ 1,800,000
22 Total	$ 1,875,000
2350/MO2PORT ALLEN
24(1316)Street and Drainage Improvements, Planning 
25 and Construction
26 (West Baton Rouge)
27 Payable from General Obligation Bonds
28	Priority 1	$ 80,000
29	Priority 5	$ 3,520,000
30 Total	$ 3,600,000
3150/MO8RAYNE
32(969) Martin Luther King Community Center Improvements, 
33 Planning and Construction
34 (Acadia)
35 Payable from General Obligation Bonds
36	Priority 1	$ 200,217
3750/MO9RAYVILLE
38(827) Wastewater Transport and Treatment Facilities for 
39 Economic Development
40 (Richland)
41 Payable from General Obligation Bonds
42	Priority 1	$ 334,196
43	Priority 5	$ 3,400,000
44 Total	$ 3,734,196
45Provided, however, that this appropriation is used for the extension of sewer lines south
46along Highway 425.
Page 76 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(1190)Water Service Facilities for Economic Development, 
2 Planning and Construction
3 (Richland)
4 Payable from General Obligation Bonds
5	Priority 1	$ 394,570
6	Priority 5	$ 8,022,300
7 Total	$ 8,416,870
850/MP3RICHWOOD
9(685) Municipal Complex, Planning and Construction
10 (Ouachita)
11 Payable from General Obligation Bonds
12	Priority 1	$ 150,000
13	Priority 5	$ 3,400,000
14 Total	$ 3,550,000
1550/MP8ROSEDALE
16(1313)New Rosedale Fire Station, Planning 
17 and Construction
18 (Iberville)
19 Payable from General Obligation Bonds
20	Priority 1	$ 725,800
2150/MQ1ROSEPINE
22(389) Rosepine Wastewater Treatment Plant Improvement, 
23 Planning and Construction
24 (Vernon)
25 Payable from General Obligation Bonds
26	Priority 1	$ 647,267
2750/MQ2RUSTON
28(1016)New Road from Highway 150 to I-20 South Frontage 
29 Road, Planning and Construction
30 (Lincoln)
31 Payable from General Obligation Bonds
32	Priority 1	$ 821,343
33	Priority 5	$ 1,000,000
34 Total	$ 1,821,343
3550/MQ3ST. FRANCISVILLE
36(497) Emergency Erosion Repairs, Planning and Construction 
37 (West Feliciana)
38 Payable from General Obligation Bonds
39	Priority 1	$ 50,000
40	Priority 5	$ 438,000
41 Total	$ 488,000
4250/MQ5ST. MARTINVILLE
43(803) St. Martinville Electrical System Improvements, 
44 Planning and Construction
45 (St. Martin)
46 Payable from General Obligation Bonds
47	Priority 5	$ 630,000
Page 77 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(1474)Water Drainage Project, Planning and Construction
2 (St. Martin)
3 Payable from General Obligation Bonds
4	Priority 1	$ 200,000
550/MQ8SCOTT
6(320) Water and Sewer Line Installation Along Apollo Road 
7 Extension, Planning and Construction
8 (Lafayette)
9 Payable from General Obligation Bonds
10	Priority 1	$ 250,000
11	Priority 5	$ 2,000,000
12 Total	$ 2,250,000
13(1223)LA 93 Roadway Improvements- I-10 Ramp
14 to Renaud Drive, Planning, Construction,
15 and Land Acquisition
16 (Lafayette)
17 Payable from General Obligation Bonds
18	Priority 2	$ 200,000
19	Priority 5	$ 1,770,000
20 Total	$ 1,970,000
21(1494)Eraste Landry Road Extension, Planning
22 and Construction
23 (Lafayette)
24 Payable from General Obligation Bonds
25	Priority 2	$ 415,000
26	Priority 5	$ 3,750,000
27 Total	$ 4,165,000
2850/MR1SHREVEPORT
29(1005)Greenwood Road Extension, (Greenwood Industrial 
30 Park Road - Asphalt Road), Planning and Construction
31 (Caddo)
32 Payable from General Obligation Bonds
33	Priority 1	$ 120,000
34	Priority 5	$ 2,000,000
35 Total	$ 2,120,000
36(1007)Valencia Park Spray Park, Planning and Construction
37 (Caddo)
38 Payable from General Obligation Bonds
39	Priority 1	$ 75,000
40(1008)C.C. Antoine Museum and Arts Center, Planning 
41 and Construction ($64,000 Local Match)
42 (Caddo)
43 Payable from General Obligation Bonds
44	Priority 1	$ 425,000
45	Priority 5	$ 100,000
46 Total	$ 525,000
Page 78 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(1009)C.C. Antoine Park, Planning and Construction
2 (Caddo)
3 Payable from General Obligation Bonds
4	Priority 1	$ 770,110
5	Priority 5	$ 972,700
6 Total	$ 1,742,810
7(   ) LA 173 (Ford Street) Overlay, 1.32 Miles,
8 Planning and Construction
9 (Caddo)
10 Payable from General Obligation Bonds
11	Priority 5	$ 795,000
12Pending submittal and late approval of the capital outlay budget request pursuant to the
13provisions of R.S. 39:112.
1450/MR6SIMPSON
15(838) Rehabilitation of Various Roads, Planning 
16 and Construction
17 (Vernon)
18 Payable from General Obligation Bonds
19	Priority 1	$ 35,000
2050/MS9SULPHUR
21(883) Maplewood Pump Station, Planning
22 and Construction
23 (Calcasieu)
24 Payable from General Obligation Bonds
25	Priority 5	$ 1,075,000
26(884) Maplewood Drive Rehabilitation
27 (Calcasieu)
28 Payable from General Obligation Bonds
29	Priority 1	$ 6,425,000
30	Priority 2	$ 500,000
31	Priority 5	$ 3,250,000
32 Total	$10,175,000
33(1524)Upgrade Regional Sewerage Pumping Stations
34 (Arizona and Highway 108), Planning and
35 Construction
36 (Calcasieu)
37 Payable from General Obligation Bonds
38	Priority 1	$ 14,015
3950/MT1SUN
40(1373)Roof Replacement of Town Hall Building
41 (St. Tammany)
42 Payable from General Obligation Bonds
43	Priority 2	$ 200,000
Page 79 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/MT3TALLULAH
2(1156)Emergency Water Production, Transmission and 
3 Treatment, Acquisition, Planning and Construction
4 (Madison)
5 Payable from General Obligation Bonds
6	Priority 1	$ 444,270
7	Priority 5	$ 75,000
8 Total	$ 519,270
950/MT5THIBODAUX
10(690) Replacement of Canal Boulevard Bridges 
11 and Construction of Menard Pedestrian Bike Trail, 
12 Planning and Construction
13 (Lafourche)
14 Payable from General Obligation Bonds
15	Priority 1	$ 1,500,000
16	Priority 5	$ 3,150,000
17 Total	$ 4,650,000
1850/MU2VIDALIA
19(400) Development of a Slackwater Port on the Mississippi River, 
20 Planning and Construction
21 (Concordia)
22 Payable from General Obligation Bonds
23	Priority 1	$ 4,229,044
24(404) Utility System Upgrade, Planning, Acquisition, 
25 Construction and Equipment
26 (Concordia)
27 Payable from General Obligation Bonds
28	Priority 1	$ 955,000
29	Priority 5	$ 9,000,000
30 Total	$ 9,955,000
3150/MU4VILLE PLATTE
32(1464)Infrastructure Improvements, Planning 
33 and Construction
34 (Evangeline)
35 Payable from General Obligation Bonds
36	Priority 1	$ 886,580
37(1475)Ville Platte Evangeline Recreational District
38 (Evangeline)
39 Payable from General Obligation Bonds
40	Priority 1	$ 855,000
41	Priority 5	$ 885,000
42 Total	$ 1,740,000
4350/MU6VIVIAN
44(1476)Water and Wastewater System Improvements and 
45 Extension, Planning and Construction
46 (Caddo)
47 Payable from General Obligation Bonds
48	Priority 1	$ 253,766
Page 80 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/MV1WELSH
2(549) Frontage Road Extension, Planning and
3 Construction
4 (Jefferson Davis)
5 Payable from General Obligation Bonds
6	Priority 2	$ 500,000
750/MV3WESTLAKE
8(445) Compressed Natural Gas Fueling Station, Planning 
9 and Construction
10 (Calcasieu)
11 Payable from General Obligation Bonds
12	Priority 1	$ 470,000
13	Priority 5	$ 1,600,000
14 Total	$ 2,070,000
1550/MV4WESTWEGO
16(138) Water Tower, Line and Improvements, Water Meter 
17 Replacement, Planning and Construction
18 (Jefferson)
19 Payable from General Obligation Bonds
20	Priority 1	$ 112,644
21(139) The WHARF, Planning, Construction, and Site Preparation
22 (Jefferson)
23 Payable from General Obligation Bonds
24	Priority 1	$ 5,136,536
25	Priority 5	$ 2,200,000
26 Total	$ 7,336,536
27(143) Park Land and Improvements, Including Improvements 
28 to Existing Parks and Land Acquisition, Planning 
29 and Construction
30 (Jefferson)
31 Payable from General Obligation Bonds
32	Priority 1	$ 525,796
33(144) Sala Avenue Street and Infrastructure Improvements 
34 (Jefferson)
35 Payable from General Obligation Bonds
36	Priority 1	$ 208,300
37	Priority 5	$ 850,000
38 Total	$ 1,058,300
39(145) Emergency Preparedness Building, Planning and Construction
40 (Jefferson)
41 Payable from General Obligation Bonds
42	Priority 1	$ 110,821
43(146) Fire Station, Planning and Construction
44 (Jefferson)
45 Payable from General Obligation Bonds
46	Priority 1	$ 136,400
47	Priority 5	$ 300,000
48 Total	$ 436,400
Page 81 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1(148) Riverboat Landing Phase III, Planning 
2 and Construction 
3 (Jefferson)
4 Payable from General Obligation Bonds
5	Priority 2	$ 605,000
6	Priority 5	$ 600,000
7 Total	$ 1,205,000
850/MV7WINNFIELD
9(1035)South Winnfield Drainage Improvements - Phase 1, 
10 Planning and Construction
11 (Winn)
12 Payable from General Obligation Bonds
13	Priority 1	$ 75,000
14	Priority 5	$ 600,000
15 Total	$ 675,000
1650/MW2YOUNGSVILLE
17(207) Highway 89 Improvements, Planning and Construction
18 (Lafayette)
19 Payable from General Obligation Bonds
20	Priority 1	$ 5,644,485
21(208) Fortune Road Extension, Planning and Construction
22 (Lafayette)
23 Payable from General Obligation Bonds
24	Priority 1	$ 350,000
25	Priority 5	$ 3,535,000
26 Total	$ 3,885,000
2750/MW6ST. GABRIEL
28(1401)City Council Chambers Phase 2, Planning 
29 and Construction
30 (Iberville)
31 Payable from General Obligation Bonds
32	Priority 1	$ 2,700,000
33Pending approval of the Noncash Line of Credit by the State Bond Commission prior to June
3430, 2022.
35(1402)City Council Chambers - New Construction
36 (Iberville)
37 Payable from General Obligation Bonds
38	Priority 1	$ 1,440,000
3950/MW8CENTRAL
40(1435)Administration Building
41 (East Baton Rouge)
42 Payable from General Obligation Bonds
43	Priority 1	$ 16,943
Page 82 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/N05NEW ORLEANS EXHIBITION HALL AUTHORITY
2(799) Property Development Project
3 (Orleans)
4 Payable from General Obligation Bonds
5	Priority 5	$25,000,000
650/N06STATE FAIR OF LOUISIANA
7(859) Hirsch Memorial Coliseum and Louisiana State 
8 Fairgrounds Improvements Project
9 (Caddo)
10 Payable from General Obligation Bonds
11	Priority 1	$ 477,295
12	Priority 5	$ 3,280,000
13 Total	$ 3,757,295
1450/N13CHENNAULT INTERNATIONAL AIRP ORT AUTHORITY
15(1093)New Air Cargo Facility, Planning and Construction
16 ($1,100,000 Local Match)
17 (Calcasieu)
18 Payable from General Obligation Bonds
19	Priority 1	$ 2,366,451
2050/N17NEW ORLEANS CAREER CENTER
21(1413)Expanding High Wage, High Demand Career 
22 and Technical Training, Planning and Construction
23 (Orleans)
24 Payable from General Obligation Bonds
25	Priority 1	$ 1,000,000
26	Priority 5	$ 2,000,000
27 Total	$ 3,000,000
28Pending approval of the Noncash Line of Credit by the State Bond Commission prior to June
2930, 2022.
3050/N18IBERIA PARISH AIRPORT AUTHORITY
31(723) Acadiana Regional Airport Improvements,
32 Planning and Construction
33 (Iberia)
34 Payable from General Obligation Bonds
35	Priority 2	$ 500,000
36	Priority 5	$ 2,650,000
37 Total	$ 3,150,000
3850/N19PAUL S. MORTON SCHOLARSHIP FOUNDATION
39(1383)Paul S. Morton Scholarship Foundation Greater Works 
40 Family Life Center, Planning and Construction
41 (Orleans)
42 Payable from General Obligation Bonds
43	Priority 5	$ 6,200,000
Page 83 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/N25GREATER NEW ORLEANS EDUCATIONAL TELEVISION
2 FOUNDATION
3(181) WYES ATSC 3.0 Transmission Equipment, Planning 
4 and Construction
5 (Orleans)
6 Payable from General Obligation Bonds
7	Priority 5	$ 2,000,000
850/N33ENGLAND ECONOMIC & INDUSTRIAL DEVELOP MENT 
9 DISTRICT
10(621) High Bay Aircraft Maintenance Hangar, Planning 
11 and Construction
12 (Rapides)
13 Payable from General Obligation Bonds
14	Priority 1	$ 1,713,915
1550/N34ODYSSEY HOUSE LOUISIANA, INC.
16(611) Odyssey House Louisiana Renovation Project, 
17 Planning and Construction 
18 (Orleans)
19 Payable from General Obligation Bonds
20	Priority 1	$ 3,677,300
21	Priority 5	$ 3,000,000
22 Total	$ 6,677,300
23(1541)Odyssey House Louisiana Gambling Treatment Center 
24 (Orleans)
25 Payable from General Obligation Bonds
26	Priority 2	$ 2,000,000
27	Priority 5	$ 5,000,000
28 Total	$ 7,000,000
2950/N40LAFAYETTE ECONOMIC DEVELOP MENT 
30 AUTHORITY
31(753) Lafayette Innovation Center, Planning and Construction 
32 (Lafayette)
33 Payable from General Obligation Bonds
34	Priority 1	$ 6,809,803
3550/N41BATON ROUGE METROPOLITAN AIRPORT
36(386) Airport Aviation Business Park, Planning 
37 and Construction
38 (East Baton Rouge)
39 Payable from General Obligation Bonds
40	Priority 1	$ 2,661,361
41	Priority 5	$ 4,750,000
42 Total	$ 7,411,361
4350/N47ST. MARTIN ECONOMIC DEVELOP MENT 
44 AUTHORITY
45(1307)North Business Park, Planning and Construction
46 (St. Martin)
47 Payable from General Obligation Bonds
48	Priority 5	$ 2,100,000
Page 84 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/N53ORLEANS PARISH COMMUNICATIONS DISTRICT
2(417) Orleans Parish Communications District Expansion
3 Project, Planning and Construction
4 (Orleans)
5 Payable from General Obligation Bonds
6	Priority 5	$18,485,000
750/N67FALSE RIVER REGIONAL AIRPORT
8(165) False River Regional Airport, General Aviation 
9 Hangars and Taxi Lane, Planning and Construction
10 (Pointe Coupee)
11 Payable from General Obligation Bonds
12	Priority 5	$ 600,000
1350/N70REGIONAL TRANSIT AUTHORITY
14(1363)Replacement of Two Maintenance Barges
15 Located at the Lower Algiers Maintenance Facility
16 (Orleans)
17 Payable from General Obligation Bonds
18	Priority 2	$ 1,000,000
19	Priority 5	$ 9,620,000
20 Total	$10,620,000
2150/N71NORTH LAFOURCHE CONSERVATION, LEVEE AND 
22 DRAINAGE DISTRICT
23(830) Raceland Prairie Levee Improvements, Planning 
24 and Construction
25 (Lafourche)
26 Payable from General Obligation Bonds
27	Priority 1	$ 225,000
28	Priority 5	$ 3,750,000
29 Total	$ 3,975,000
3050/N74NATIONAL WORLD WAR II MUSEUM, INC.
31(455) Eight Projects Under FP&C Management Plus Liberation 
32 Pavilion: Bricks and Mortar, Exhibit Fabrication, Media 
33 Production, Planning and Construction
34 (Orleans)
35 Payable from General Obligation Bonds
36	Priority 1	$ 2,500,000
37	Priority 2	$ 5,000,000
38	Priority 5	$ 5,000,000
39 Total	$12,500,000
4050/N79TANGIPAHOA PARISH FIRE DISTRICT 1
41(1266)Bruce Cutrer Regional Fire Training Facility 
42 of Tangipahoa 
43 Parish, Planning and Construction
44 (Tangipahoa)
45 Payable from General Obligation Bonds
46	Priority 2	$ 225,000
47	Priority 5	$ 2,000,000
48 Total	$ 2,225,000
Page 85 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/NA2LAFAYETTE AIRPORT COMMISSION
2(1477)Construction of a New Passenger Facility Terminal 
3 and Associated Infrastructure at Lafayette 
4 Regional Airport
5 (Lafayette)
6 Payable from General Obligation Bonds
7	Priority 1	$ 1,863,897
850/NADMU ZETA FOUNDATION, INC.
9(1318)Expansion Project, Planning and Construction
10 (East Baton Rouge)
11 Payable from General Obligation Bonds
12	Priority 1	$ 30,000
13	Priority 5	$ 150,000
14 Total	$ 180,000
1550/NAJEFFORTS OF GRACE, INC.
16(1412)Ashe Too, Planning and Construction
17 (Orleans)
18 Payable from General Obligation Bonds
19	Priority 5	$ 1,000,000
2050/NAZHOSPICE OF ACADIANA FOUNDATION, INC.
21(1531)Calcutta House, Planning and Construction
22 (Lafayette)
23 Payable from General Obligation Bonds
24	Priority 1	$ 250,000
25	Priority 5	$ 600,000
26 Total	$ 850,000
2750/NBCCAPITOL CITY FAMILY HEALTH CENTER, INC.
28(877) Care South Medical and Dental Expansion, Planning 
29 and Construction
30 (East Baton Rouge)
31 Payable from General Obligation Bonds
32	Priority 1	$ 727,265
33	Priority 5	$ 550,000
34 Total	$ 1,277,265
3550/NBFCOMMUNITY RECEIVING HOME, INC.
36(843) Renaissance Home for Youth, New Administrative 
37 Building, Renovation of Existing Administrative Building, 
38 Roads and Parking Areas, Planning and Construction
39 (Rapides)
40 Payable from General Obligation Bonds
41	Priority 1	$ 885,686
Page 86 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/NBVCAPITAL AREA GROUND WATER 
2 CONSERVATION DISTRICT
3(809) Water Monitoring System, Planning and Construction 
4 (Ascension, East Baton Rouge, East Feliciana, Pointe 
5 Coupee, West Baton Rouge, West Feliciana)
6 Payable from General Obligation Bonds
7	Priority 1	$ 400,000
8	Priority 5	$ 1,200,000
9 Total	$ 1,600,000
1050/NC2BATON ROUGE RECREATION AND PARKS 
11 COMMISSION
12(1415)Cadillac Street Park Site Improvements, Planning 
13 and Construction
14 (East Baton Rouge)
15 Payable from General Obligation Bonds
16	Priority 1	$ 75,000
17(1416)J.S. Clark Golf Course Renovation in Greenwood 
18 Community Park, Planning and Construction
19 (East Baton Rouge)
20 Payable from General Obligation Bonds
21	Priority 1	$ 50,000
22	Priority 5	$ 800,000
23 Total	$ 850,000
24(1419)Baker Youth Tournament Ball Fields, Planning
25 and Construction
26 (East Baton Rouge)
27 Payable from General Obligation Bonds
28	Priority 1	$ 65,000
29(1420)Central Community Sports Park, Planning and Construction
30 (East Baton Rouge)
31 Payable from General Obligation Bonds
32	Priority 1	$ 186,389
3350/NCMFIFTH WARD RECREATION DISTRICT OF 
34 ST. HELENA PARISH
35(1261)Recreation District Baseball Fields, Planning 
36 and Construction
37 (St. Helena)
38 Payable from General Obligation Bonds
39	Priority 1	$ 978,392
4050/NCNSOUTH TOLEDO BEND WATERWORK S DISTRICT
41(480) Vaco Road, Prospect Road, and Firesheets Lane, 
42 Planning and Construction
43 (Sabine)
44 Payable from General Obligation Bonds
45	Priority 1	$ 25,000
46	Priority 5	$ 200,000
47 Total	$ 225,000
Page 87 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/ND5LAFOURCHE PARISH WATER DISTRICT
2(1069)Kraemer Water Line Upgrades, Planning 
3 and Construction
4 (Lafourche)
5 Payable from General Obligation Bonds
6	Priority 1	$ 100,000
7	Priority 5	$ 1,500,000
8 Total	$ 1,600,000
950/NDFLOUISIANA BLACK FARMERS CANNABIS 
10 & HEMP ASSOCIATION
11(705) Construction of an Industrial Hemp Processing Plant 
12 and Associated Equipment for the Acadiana Region 
13 (Lafayette)
14 Payable from General Obligation Bonds
15	Priority 5	$ 395,000
1650/NDNOPPORTUNITIES INDUSTRIALIZ ATION CENTER
17 INCORPORATED OF OUACHITA
18(876) New Education Building, Planning and Construction
19 (Ouachita)
20 Payable from General Obligation Bonds
21	Priority 1	$ 386,775
22	Priority 5	$ 1,845,000
23 Total	$ 2,231,775
2450/NDQTANGIPAHOA AFRICAN AMERICAN HERITAG E 
25 MUSEUM AND VETERANS' ARCHIVES
26(1343)Tangipahoa African American Heritage Museum Roof 
27 Replacement, Planning and Construction
28 (Tangipahoa)
29 Payable from General Obligation Bonds
30	Priority 5	$ 540,000
3150/NDXNEW ORLEANS COUNCIL ON AG ING, INC.
32(800) New Orleans Council on Aging Office and Senior 
33 Community Center - Planning, Land Acquisition, 
34 Construction, and Initial Equipment and Furnishings 
35 for New Building 
36 (Orleans)
37 Payable from General Obligation Bonds
38	Priority 1	$ 1,250,000
39	Priority 5	$ 3,750,000
40 Total	$ 5,000,000
41Pending approval of the Noncash Line of Credit by the State Bond Commission prior to June
4230, 2022.
4350/NEEBIOMEDICAL RESEARCH AND INNOVATION P ARK
44(1049)Biomedical Research and Innovation Park Building, 
45 Planning and Construction
46 (Ouachita)
47 Payable from General Obligation Bonds
48	Priority 5	$19,500,000
Page 88 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/NERST. HELENA PARISH HOSPITAL SERVICE DISTRICT NO. 1
2(677) Hospital Renovation, Expansion, and Equipment 
3 Replacement, Planning and Construction
4 (St. Helena)
5 Payable from General Obligation Bonds
6	Priority 1	$ 4,200,000
750/NEYORLEANS PARISH HOSPITAL SERVICE DISTRICT A
8(1428)Parish Hospital Service District for the Parish of Orleans - 
9 District A- Obstetrics Service Line Expansion Level 2 Unit, 
10 Planning and Construction
11 (Orleans)
12 Payable from General Obligation Bonds
13	Priority 1	$ 200,000
14Pending approval of the Noncash Line of Credit by the State Bond Commission prior to June
1530, 2022.
1650/NF8CENTRAL LOUISIANA DETENTION CENTER AUTHORITY
17(407) Central Louisiana Juvenile Detention Center,
18 Planning and Construction
19 (Grant)
20 Payable from General Obligation Bonds
21	Priority 5	$10,700,000
2250/NFJHIV/AIDS ALLIANCE FOR REGION TWO
23(1549)Open Health Care Clinic Purchase of Farm Bureau
24 Building for New Main Clinic Location
25 (East Baton Rouge)
26 Payable from General Obligation Bonds
27	Priority 2	$ 1,000,000
2850/NFXTHE O.W. DILLON TRAINING AND COMMUNITY
29 DEVELOPMENT CENTER, INC.
30(1240)The O.W. Dillon Training and Community
31 Development Center Building, Planning and
32 Construction
33 (Tangipahoa)
34 Payable from General Obligation Bonds
35	Priority 5	$ 6,000,000
3650/NG6THE LOUISIANA BLACK HISTORY HALL OF FAME
37(1497)Museum and Cultural Center, Planning and Construction
38 (East Baton Rouge)
39 Payable from General Obligation Bonds
40	Priority 1	$ 2,191,547
Page 89 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/NGALINCOLN PARISH FIRE PROTECTION DISTRICT #1
2(1260)Renovations to Existing Facility and Additional Buildings, 
3 Acquisition, Planning and Construction
4 (Lincoln)
5 Payable from General Obligation Bonds
6	Priority 1	$ 120,000
7	Priority 5	$ 765,000
8 Total	$ 885,000
950/NGMNEW ORLEANS AF RICAN AMERICAN MUSEUM OF ART,
10 CULTURE AND HISTORY
11(1532)New Orleans African American Museum of Art, Culture 
12 and History: Renovation and New Construction
13 (Orleans)
14 Payable from General Obligation Bonds
15	Priority 1	$ 375,000
16	Priority 5	$ 4,000,000
17 Total	$ 4,375,000
1850/NGNLOUISIANA CHAMBER OF COMMERCE F OUNDATION, INC.
19(1268)Louisiana Chamber of Commerce's Business
20 Innovation Center, Planning and Construction
21 (Calcasieu)
22 Payable from General Obligation Bonds
23	Priority 5	$ 1,645,000
2450/NGQTHE STRAND THEATRE OF SHREVEPORT CORPORATION
25(385) Repair and Renovation to the Strand Theatre of Shreveport
26 (Caddo)
27 Payable from General Obligation Bonds
28	Priority 1	$ 75,000
29	Priority 5	$ 984,000
30 Total	$ 1,059,000
3150/NHEST. JAMES PARISH HOSPITAL
32(1271)West Bank Health Clinic, Planning and Construction
33 (St. James)
34 Payable from General Obligation Bonds
35	Priority 1	$ 399,795
36	Priority 5	$ 2,900,000
37 Total	$ 3,299,795
3850/NHGLAFAYETTE CENTRE DEVELOP MENT DISTRICT
39(1403)Downtown Lafayette Public Infrastructure Improvements
40 and Upgrades, Planning and Construction
41 (Lafayette)
42 Payable from General Obligation Bonds
43	Priority 2	$ 500,000
Page 90 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/NHPBATON ROUGE AFRICAN AMERICAN MUSEUM
2(1449)Baton Rouge African American Museum,
3 Planning and Construction
4 (East Baton Rouge)
5 Payable from General Obligation Bonds
6	Priority 5	$ 500,000
750/NI9ASCENSION-ST. JAMES AIRPORT AND 
8 TRANSPORTATION AUTHORITY
9(414) Drinking Water, Fire Suppression, and ADA Compliance - 
10 Louisiana Regional Airport, Gonzales, LA, Planning 
11 and Construction
12 (Ascension)
13 Payable from General Obligation Bonds
14	Priority 1	$ 190,000
15(415) Commercial Hangar Complex - Louisiana Regional Airport, 
16 Gonzales, LA, Planning and Construction
17 (Ascension)
18 Payable from General Obligation Bonds
19	Priority 5	$ 1,000,000
2050/NJ9DRYADES YOUNG MEN'S CHRISTIAN ASSOCIATION
21(1486)Technical Training Center, Acquisition and Renovation
22 (Orleans)
23 Payable from General Obligation Bonds
24	Priority 1	$ 1,690,218
25	Priority 5	$ 1,000,000
26 Total	$ 2,690,218
2750/NLMFOUNDATION FOR SCIENCE AND MATHEMATICS 
28 EDUCATION, INC.
29(412) A Model for a 21st Century Workforce Development Urban 
30 High School - New Orleans Science and Mathematics 
31 High School
32 (Orleans)
33 Payable from General Obligation Bonds
34	Priority 1	$ 1,717,963
35	Priority 5	$ 1,000,000
36 Total	$ 2,717,963
3750/NMDBELMONT WATERWORK S, INC.
38(737) Water System Improvements, Planning and Construction 
39 (Sabine)
40 Payable from General Obligation Bonds
41	Priority 1	$ 257,488
Page 91 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/NP1ACADIANA CRIMINALISTICS LABORATORY DISTRICT
2(638) New Crime Laboratory, Planning, Design, Construction, 
3 and Equipment
4 (Iberia)
5 Payable from General Obligation Bonds
6	Priority 1	$ 3,851,833
7	Priority 5	$10,800,000
8 Total	$14,651,833
950/NP3BAYOU LAFOURCHE FRESH WATER DISTRICT
10(1235)Donaldsonville Flood Control, Planning and Construction
11 (Ascension, Assumption, Lafourche, Terrebonne)
12 Payable from General Obligation Bonds
13	Priority 1	$ 753,000
1450/NPDIBERIA ECONOMIC DEVELOP MENT AUTHORITY
15(672) Progress Point Business Park and Airport Gateway, 
16 Land Acquisition, Planning and Construction
17 (Iberia)
18 Payable from General Obligation Bonds
19	Priority 1	$ 2,105,793
2050/NQ2GRAVITY DRAINAGE DISTRICT 6 CALCASIEU PARISH
21(452) Buxton Creek Drainage Improvements, Planning 
22 and Construction 
23 (Calcasieu)
24 Payable from General Obligation Bonds
25	Priority 1	$ 100,000
26	Priority 5	$ 2,000,000
27 Total	$ 2,100,000
2850/NQGLAFAYETTE METROP OLITAN EXPRESSWAY 
29 COMMISSION
30(826) Lafayette Loop Project Planning and Construction 
31 (Lafayette)
32 Payable from General Obligation Bonds
33	Priority 1	$ 4,000,000
34	Priority 5	$ 2,500,000
35 Total	$ 6,500,000
3650/NQNLSU REAL ESTATE AND FACILITIES FOUNDATION
37(1217)University Lakes Restoration Project to Address 
38 Flood Control, Environmental, Safety, Health and 
39 Other Issues (Matching Funds)
40 (East Baton Rouge)
41 Payable from General Obligation Bonds
42	Priority 1	$ 6,000,000
43Notwithstanding any other provision of law to the contrary, the appropriation for the LSU
44Real Estate and Facilities Foundation, University Lakes Restoration Project to Address
45Flood Control, Environmental, Safety, Health and Other Issues is conditioned upon the
46contracts for the project containing a provision that any sinker cypress or other natural
47resource recovered from the lakes is public property, and shall be sold at public auction with
48the proceeds of the sale to be used for the project.
Page 92 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/NQVBEAUREGARD WATERWORK S DISTRICT #6
2(450) Water System Improvements, Planning and Construction
3 (Beauregard)
4 Payable from General Obligation Bonds
5	Priority 1	$ 626,013
650/NSPEDEN HOUSE
7(613) New Orleans Emergency Shelter, Planning 
8 and Construction
9 (Orleans)
10 Payable from General Obligation Bonds
11	Priority 1	$ 850,000
1250/NTKTHE UNION LINCOLN REG IONAL WATER SUPPLY 
13 INITIATIVE
14(1479)Development of Alternative Water Supply from Lake 
15 D'Arbonne for Lincoln and Union Parishes
16 (Lincoln, Union)
17 Payable from General Obligation Bonds
18	Priority 1	$ 1,397,200
19	Priority 5	$ 2,400,000
20 Total	$ 3,797,200
2150/NU99TH WARD STADIUM, INC.
22(1046)Multi-Sport Venue in Eastern New Orleans and Lower 
23 Ninth Ward, Planning and Construction
24 (Orleans)
25 Payable from General Obligation Bonds
26	Priority 1	$ 3,450,000
27Pending approval of the Noncash Line of Credit by the State Bond Commission prior to June
2830, 2022.
2950/NUQLOUISIANA HIBERNIAN CHARITY
30(1265)Four Acre Irish Heritage Park in the Lakeview 
31 Neighborhood, Planning and Construction
32 (Orleans)
33 Payable from General Obligation Bonds
34	Priority 1	$ 250,000
3550/NVYWASHINGTON PARISH HOSPITAL SERVICE 
36 DISTRICT NO. 1
37(1480)Emergency Upgrades including Power Generation System 
38 Upgrade, Mechanical Systems, and Roofing, Planning 
39 and Construction
40 (Washington)
41 Payable from General Obligation Bonds
42	Priority 1	$ 650,000
43	Priority 5	$ 4,650,000
44 Total	$ 5,300,000
Page 93 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/NWOAIRPORT DISTRICT 1 OF CALCASIEU PARISH
2(1037)Airport Entrance and Access Road Improvements and 
3 Marquee, Planning and Construction
4 (Calcasieu)
5 Payable from General Obligation Bonds
6	Priority 1	$ 1,000,000
750/NWRLOUISIANA SWAMP BASE, INC.
8(410) Camp Atchafalaya Swamp Base, Planning, Design, 
9 and Construction
10 (St. Martin)
11 Payable from General Obligation Bonds
12	Priority 1	$ 500,000
13	Priority 5	$ 2,000,000
14 Total	$ 2,500,000
1550/NWSLAFAYETTE CENTRAL P ARK, INC.
16(409) Lafayette Central Park Improvements, Planning 
17 and Construction
18 (Lafayette)
19 Payable from General Obligation Bonds
20	Priority 1	$ 3,293,936
21	Priority 5	$ 4,637,000
22 Total	$ 7,930,936
2350/NXCLIVINGSTON PARISH SHERIFF'S OFFICE
24(1328)Livingston Parish Emergency Response and
25 Evacuation Center, Planning and Construction
26 (Livingston)
27 Payable from General Obligation Bonds
28	Priority 2	$ 1,000,000
29	Priority 5	$32,620,000
30 Total	$33,620,000
3150/NXIHEBERT WATER SYSTEM, INC.
32(708) Water System Improvements, Planning 
33 and Construction
34 (Caldwell)
35 Payable from General Obligation Bonds
36	Priority 1	$ 272,695
3750/NXNLOUISIANA CHILDREN'S MEDICAL CENTER
38(1117)Children's Hospital New Orleans Behavioral Health 
39 Hospital, Planning and Construction
40 (Orleans)
41 Payable from General Obligation Bonds
42	Priority 1	$ 830,903
4350/NXSBATON ROUGE GENERAL MEDICAL CENTER
44(1481)Regional Burn Center Expansion
45 (East Baton Rouge)
46 Payable from General Obligation Bonds
47	Priority 1	$ 1,279,460
Page 94 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/NXYCONCORDIA PARISH HOSPITAL SERVICE 
2 DISTRICT #1
3(836) Construction of Turn Lane on U.S. 84/425
4 (Concordia)
5 Payable from General Obligation Bonds
6	Priority 2	$ 225,000
750/NYNOPELOUSAS HEIGHTS, INC.
8(1482)Opelousas Heights Proposed Subdivision, Planning 
9 and Construction
10 (St. Landry)
11 Payable from General Obligation Bonds
12	Priority 1	$ 1,184,790
1350/NYPSECOND HARVEST F OOD BANK OF GREATER 
14 NEW ORLEANS AND ACADIANA
15(1483)Roof Replacement and HVAC Installation, 
16 Planning and Construction
17 (Jefferson)
18 Payable from General Obligation Bonds
19	Priority 1	$ 1,006,031
2050/NYSHOLY ROSARY REDEVELOP MENT
21(1278)Holy Rosary Institute, Planning, Construction, 
22 and Restoration
23 (Lafayette)
24 Payable from General Obligation Bonds
25	Priority 1	$ 4,500,000
26	Priority 5	$ 1,500,000
27 Total	$ 6,000,000
2850/NYVCHATEAU DE NOTRE DAME F ACILITIES CORPORATION
29(811) Wynhoven Health Care Expansion, including St. Andrew's 
30 Village Planning and Construction 
31 (Jefferson)
32 Payable from General Obligation Bonds
33	Priority 1	$ 3,561,859
34	Priority 5	$ 1,999,750
35 Total	$ 5,561,609
3650/NZBLIVINGSTON PARISH AIRPORT DISTRICT
37(523) Livingston Executive Airport, Planning and Construction
38 (Livingston)
39 Payable from General Obligation Bonds
40	Priority 1	$ 1,336,741
41	Priority 5	$ 485,000
42 Total	$ 1,821,741
Page 95 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/NZDHOSPITAL SERVICE DISTRICT NO. 1, PARISH OF 
2 ST. MARY
3(395) Franklin Foundation Hospital Wellness Center
4 (St. Mary)
5 Payable from General Obligation Bonds
6	Priority 1	$ 1,986,500
7	Priority 5	$ 1,000,000
8 Total	$ 2,986,500
950/NZKTHE ROBERT A. BOGAN BATON ROUGE FIRE MUSEUM
10(1303)Museum Restoration, Planning and Construction
11 (East Baton Rouge)
12 Payable from General Obligation Bonds
13	Priority 5	$ 3,165,000
1450/NZXWEST CALCASIEU CAMERON HOSP ITAL
15(1288)West Calcasieu Cameron Hospital Medical Office Building, 
16 Planning and Construction
17 (Calcasieu)
18 Payable from General Obligation Bonds
19	Priority 1	$ 328,000
20	Priority 5	$ 4,022,000
21 Total	$ 4,350,000
22Pending approval of the Noncash Line of Credit by the State Bond Commission prior to June
2330, 2022.
2450/N YOUNG WOMEN'S CHRISTIAN ASSOCIATION
25(   ) Domestic Violence Shelter/Program,
26 Planning and Construction
27 (East Baton Rouge)
28 Payable from General Obligation Bonds
29	Priority 5	$ 500,000
30Pending submittal and late approval of the capital outlay budget request pursuant to the
31provisions of R.S. 39:112.
3250/S10CALCASIEU PARISH SCHOOL BOARD
33(1484)Renovations to Lake Charles Boston Stadium, Planning 
34 and Construction
35 (Calcasieu)
36 Payable from General Obligation Bonds
37	Priority 1	$ 167,000
38	Priority 5	$ 823,000
39 Total	$ 990,000
4050/S32LIVINGSTON PARISH SCHOOL BOARD
41(956) Widening and Turn Lane Construction for LA Hwy 16 
42 as Part of the New Southside Elementary and Jr. High Schools
43 (Livingston)
44 Payable from General Obligation Bonds
45	Priority 1	$ 989,875
Page 96 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
150/S39POINTE COUPEE PARISH SCHOOL BOARD
2(901) Pointe Coupee Parish School Board Office Relocation, to 
3 be Located at 8777 Morganza Highway, Formerly Labarre 
4 Elementary School Site, Due to Flooding Caused by 
5 Hurricane Gustav, Planning and Construction
6 (Pointe Coupee)
7 Payable from General Obligation Bonds
8	Priority 1	$ 2,500,000
9	Priority 5	$ 1,900,000
10 Total	$ 4,400,000
1150/S63WEST FELICIANA PARISH SCHOOL BOARD
12(408) Julius Freyhan Cultural/Conference Center, Planning 
13 and Construction
14 (West Feliciana)
15 Payable from General Obligation Bonds
16	Priority 1	$ 997,000
17	Priority 5	$ 500,000
18 Total	$ 1,497,000
1950/S67CENTRAL COMMUNITY SCHOOL SYSTEM
20(1267)Central City Community Sports Complex, Infrastructure 
21 and Overlay Projects, Planning and Construction
22 (East Baton Rouge)
23 Payable from General Obligation Bonds
24	Priority 1	$ 700,000
25 Section 1.(A) Appropriated Debt Projects. The projects listed in this Section are
26to be funded through the sale bonds and secured by or payable from state appropriation.
2708/406LOUISIANA CORRECTIONAL INSTITUTE F OR WOMEN
28(316) Rebuild and/or Replace Facility Due to Damage 
29 from 2016 Flood Event
30 (Iberville)
31 Payable from General Obligation Bonds
32	Priority 5	$23,000,000
33 Payable from Interagency Transfers	$16,871,000
34 Payable from Revenue Bonds	$46,000,000
35 Payable from Federal Funds	$40,446,819
36 Total	$126,317,819
37Notwithstanding anything contained in this Capital Outlay Act, or any previous Capital
38Outlay Act to the contrary, or any other provision of law, the Department of Public Safety
39and  Corrections  may  finance  the  design,  construction,  furnishing  and  equipping  of
40replacement facilities through the issuance of revenue bonds by the Louisiana Correctional
41Facilities Corporation to be secured by and payable from State appropriations. The issuance
42of such revenue bonds shall require the approval of the State Bond Commission.
43 Section 2.(A)  Except as provided for in Subsection (B) of this Section, the
44expenditure of funds appropriated in this Act, except appropriations made to nonprofit
45economic development corporations, shall be in conformity to all existing statutes relative
46to public bidding, contractual review, and R.S. 39:101 through 128 and any other statutes
Page 97 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1affecting the capital outlay program for state government, state institutions, and political
2entities.  No contract shall be awarded for any project prior to the granting of a line of credit
3or the sale of bonds by the State Bond Commission, determination by the state treasurer that
4cash funding is available in the Comprehensive Capital Outlay Escrow Account for the
5project, or delivery of revenue bonds whose issuance is authorized in Section 1 or Section
61.(A) of this Act.
7 (B).  Notwithstanding the provisions of R.S. 39:101, 102, and 112(C), projects
8included in Section 1 of this Act which did not submit a capital outlay application by
9November 1, 2021, in compliance with the provisions of R.S. 39:101 and 102 and which
10have not received late approval as required by R.S. 39:112(C) are hereby deemed to have
11until May 20, 2022, to submit a capital outlay budget request application pursuant to R.S.
1239:101(A), and if the application is submitted by that date, the project is deemed to have
13complied with the late approval requirements of R.S. 39:112(C).  Additionally, the capital
14outlay budget requests together with supporting information and documents for these
15projects shall constitute the feasibility study required by Article VII, Section 11(C) of the
16Constitution of Louisiana.
17 Section 3.  Payment for projects specified in this Act must be made by warrant
18submitted to the division of administration, Department of Transportation and Development,
19the state treasurer or other administering agency as provided in Section 8, whichever is
20appropriate, only to the extent of funds required for immediate payment. Copies of invoices
21or other supporting documentation shall be submitted with warrants.  In the event that any
22equipment included in this Act, is procured pursuant to the provisions of the State Lease-
23Purchase Act, R.S. 39:1761 et seq., the amounts included in this Act for each such piece of
24equipment shall not be appropriated.  The provisions of R.S. 39:1771 which require
25equipment to be leased under the State Lease-Purchase Act to be included in the executive
26budget and approved by the legislature through inclusion in the General Appropriation Act
27shall be considered waived upon the inclusion of such equipment in this Act.  Projects
28contained in this Act may, at the direction of the division of administration and with the
29approval of the State Bond Commission, alternatively be funded through financing programs
30heretofore or hereafter provided by a public trust and public corporation duly organized
Page 98 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1pursuant to R.S. 9:2341 et seq., having for its beneficiary the state and the Louisiana Local
2Government Environmental Facilities and Community Development Authority, pursuant to
3R.S. 33:4548.1 et seq.
4 Section 4.  If at any time during the Fiscal Year 2022-2023, the governor should
5find, or the Joint Legislative Committee on the Budget or the commissioner of
6administration should report to the governor, that the receipts of the treasury are falling short
7or appear likely to fall short of the revenue estimates for the fiscal year and that a cash
8deficit is likely to be incurred, the governor shall take such steps as deemed necessary to
9prevent the occurrence of a cash deficit.  In the event that a capital outlay project funded in
10this Act falls under an agency which is abolished or for which funds are not appropriated in
11the 2022-2023 General Appropriation Act, then the funds appropriated in this Act for such
12capital outlay projects shall not be expended unless deemed necessary by the governor to
13protect life or property.  In the event that legislation is enacted which transfers facilities or
14programs for which projects are funded in this Act, on behalf of one agency, institution,
15department, or management board to another agency, institution, department, or management
16board, then the projects in this Act shall be deemed transferred also.
17 Section 5.  All monies appropriated by this Act and any applicable funds of a
18prior capital outlay budget act adopted by the legislature shall be deposited by the state
19treasurer in the Comprehensive Capital Outlay Escrow Account, established by this Section,
20in the state treasury.  In accordance with R.S. 36:764, no later than sixty days following the
21end of each quarter, the state treasurer shall report to the Joint Legislative Committee on the
22Budget and the commissioner of administration, all funds contained in the Miscellaneous
23Fund  of  the  Comprehensive  Capital  Outlay Escrow  Account.    Notwithstanding  any
24provisions contained herein or other law to the contrary, any original issue premium or
25accrued interest proceeds received pursuant to the sale of general obligation bonds shall
26remain on deposit to the credit of the Bond Security and Redemption Fund until such time
27as they may be utilized in accordance with U.S. Department of the Treasury Regulations
28promulgated pursuant to the Internal Revenue Code of 1986.  All such monies shall be
29administered according to the particular Act pertaining to the fiscal year in which such
30monies were appropriated.   If it is determined by the director of the office of facility
Page 99 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1planning and control, division of administration, that the funds appropriated by this Act or
2any prior capital outlay budget Act are not sufficient to complete the projects contained in
3any capital outlay budget Act, through unavoidable deficiencies in appropriation, including
4administrative and legal requirements, the commissioner of administration, subject to
5approval of the Joint Legislative Committee on the Budget, may direct the use of interest
6earned  from  the  investment  of  general  obligation  bond  or  note  proceeds  in  the
7Comprehensive Capital Outlay Escrow Account, not to exceed an aggregate of five million
8dollars in any one fiscal year, for the purpose of completing the projects contained in any
9capital outlay budget Act and such money shall be deemed appropriated in specific amounts
10necessary for such purpose.  All appropriations in this Act which are made as additions to
11funds for previously authorized projects shall be included, for accounting purposes, in the
12account of the previously authorized projects.  If it is determined by the director of the office
13of facility planning and control, division of administration, that it is cost effective and
14practical to combine individual appropriations, the commissioner of administration, subject
15to the approval of the Joint Legislative Committee on the Budget, may direct that two or
16more appropriations or parts thereof may be combined into a single project for accounting
17and audit purposes.  The commissioner of administration may direct that funding in the
18various statewide and/or multiple parish projects for improvements for state facilities may
19be transferred to any project, in this Act or any previous Capital Outlay Act, which require
20supplemental funding for improvements for state facilities which qualify for funding through
21the various statewide and/or multiple parish projects for improvements for state facilities.
22The office of facility planning and control, division of administration is authorized to receive
23settlements and vendor rebates and to add a portion or all of these receipts to the existing
24project funds relating to the settlement and/or vendor rebates and appropriated in this Act
25or any previous Capital Outlay Act including those previously appropriated funds that
26become unavailable.  Approval by the Joint Legislative Committee on the Budget will be
27obtained if the settlement and/or vendor rebates will be added to any projects in this Act or
28any previous Capital Outlay Act which are unrelated to the project from which the settlement
29and/or vendor rebates were received.   The office of facility planning and control, division
30of administration is authorized to receive insurance payments and are hereby authorized to
Page 100 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1immediately repair facilities that suffer insurance losses without those projects being
2included in the Act and shall report to the Joint Legislative Committee on the Budget any
3expenditures from insurance funds received pursuant to this Section. A portion, as
4determined by the commissioner of administration and not to exceed one percent (1%), of
5the funding for projects which qualify for the Percent for Art Program and not to exceed
6$450,000 for an individual, qualifying project, may be transferred from the qualifying
7project budgets, to the Department of Culture, Recreation and Tourism for costs of acquiring
8art and administering the program.  For all Percent for Art Program projects in this or any
9previous capital outlay act, up to ten percent (10%) of the aforementioned one percent (1%)
10may be used for the costs of administering the projects.
11 Section 6.  No later than February 1, 2023, agencies administering capital outlay
12projects will submit reports identifying completed projects and cash balances to the Joint
13Legislative Committee on Capital Outlay pursuant to the reporting requirements of R.S. 
1439:105 and R.S. 39:116.
15 Section 7.  The commissioner of administration, with the approval of the Joint
16Legislative  Committee  on  the  Budget,  is  authorized  to  supplement  or  substitute  the
17appropriations specified in this or previous capital outlay acts with any federal or other funds
18which are or may become available and such funds shall be deemed appropriated in specific
19amounts necessary for the purposes of this Act.  Any funds received by the State Bond
20Commission as a result of a prepayment of reimbursement contracts as authorized by law
21and the policy and procedure for reimbursement contracts of the Department of Treasury,
22office of State Bond Commission, shall be deposited as set forth in such policy and
23procedure and shall be deemed available and appropriated in specific amounts necessary for
24the purposes of this Act pursuant to the procedure set forth in this section.
25 Section 8.(A)  All projects herein authorized and funded shall be subject to the
26provisions of R.S. 39:101 through 128.  With the exception of appropriations made to the
27Department of Military Affairs, the Legislature, the Louisiana Stadium and Exposition
28District, the Department of Economic Development, the Coastal Protection and Restoration
29Authority,  the  Division  of  Administration  for  Supplemental  State  Funds  for  Local
30Government Assistance Program, the Division of Administration for the Community Water
Page 101 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1Enrichment Program or the Department of Transportation and Development, all funds herein
2appropriated shall be considered as having been appropriated directly to the Office of
3Facility Planning and Control, Division  of Administration. All cooperative endeavor
4agreements for non-state entities shall be prepared by the appropriate administering agency
5and submitted to the office of State Procurement for review and approval. As part of its
6review, the office of State Procurement shall consult with bond counsel to the State relative
7to any federal tax issues.
8 (1)  Notwithstanding anything contained in this act to the contrary or any other
9provision of law, the appropriations made for the Louisiana Stadium and Exposition District
10shall be appropriated directly to the Louisiana Stadium and Exposition District, and are
11public purposes pursuant to the provisions of Article VII, Section 14 of the Constitution of
12Louisiana primarily for economic development, including the generation of tax revenue,
13creation of jobs, and the generation of tourism, and may be  used  to  reimburse any
14expenditure made prior to the granting of a line of credit or the sale of bonds by the State
15Bond Commission, determination by the State Treasurer that cash funding has been
16deposited in the Comprehensive Capital Outlay Escrow Account for the project.
17 (2)  Further, with respect to appropriations to the Louisiana Stadium and
18Exposition District for the TPC Louisiana, Planning and Construction project, the Louisiana
19Stadium and Exposition District shall be permitted to use alternative competitive
20procurement and delivery methods for the award of any contracts to be funded through such
21appropriation.
22 (3)  The Louisiana Stadium and Exposition District shall have the authority to
23directly appoint a design professional from a list of a minimum of three architectural firms
24or joint ventures with professional sports facility design experience acceptable to the
25Commissioner of Administration and shall be exempt from other state requirements for
26selection of designers.  The design professional fee shall be in accordance with state
27guidelines  administered by the Office of Facility Planning and Control, Division  of
28Administration.
29 (B)(1)(a)  Funds appropriated in the Capital Outlay Act under the name of non-
30state entities shall be administered by the Office of Facility Planning and Control, Division
Page 102 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1of Administration under cooperative endeavor agreements; however, projects involving state
2or  federal  highways  may be  administered  by the  Department  of  Transportation  and
3Development, if appropriate.  Except as provided in Section 8(A), cooperative endeavor
4agreements entered into pursuant to appropriations in this Act shall not be required to be
5submitted to the Division of Administration, Office of State Procurement.
6 (b)  Further, for all projects in the Capital Outlay Act or a previous Capital Outlay
7Act which are appropriated to the Office of Facility Planning and Control, Division of
8Administration, including those administered by cooperative endeavor agreements, up to six
9percent of each line-item may be used for costs of administering the projects.
10 (c)  For all projects in  Capital  Outlay Act or a previous Capital Outlay Act
11appropriated to the Department of Transportation and Development, up to six percent of
12each  line-item  may  be  used  for  costs  of  administering  the  projects,  or  for  field
13engineering/construction supervision.
14 (2)  Notwithstanding anything in this Act, or a previous Capital Outlay Act, the
15Office of Facility Planning and Control may enter into a cooperative endeavor agreement
16with the Archdiocese of New Orleans and Jefferson Parish for the Preservation and
17Restoration of Historic Structure for Hope Haven/Madonna Manor Campus, Planning and
18Construction project.
19 (C)  Line-item general obligation bond projects appropriated to the Department
20of Transportation and Development in the Capital Outlay Act or a previous Capital Outlay
21Act shall be authorized to draw Transportation Trust Funds from the Highway Program
22appropriation, for supplemental funding on overruns in excess of the original estimated
23project cost as determined by the Department of Transportation and Development, provided
24however that said projects are in the state or federal highway system and in the priority
25program, and the overrun is less than $50,000. Any such overrun of $50,000 or more must
26be approved by the Joint Legislative Committee on the Budget.
27 (D)  All ports, levee districts and other non-state entities must have a fully
28executed cooperative endeavor agreement, from the administering agency or the State
29Treasurer, whichever is appropriate, before entering into any contracts which obligate state
30funding and must follow all laws pertaining to public bidding. If a port, levee district or other
Page 103 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1non-state entity enters into a contract prior to receipt of funding, or prior to execution of a
2cooperative endeavor agreement, then payments under such contracts are prohibited from
3capital outlay appropriations, and are the sole responsibility of the port, levee district, or
4other non-state entity.
5 (E)  Pursuant to R.S. 39:122(B)(2), funds to be reimbursed by the state which a
6non-state entity attempts to obligate prior to the receipt of funding shall not be eligible for
7reimbursement or payment by the state; however, notwithstanding anything in this Act or
8any previous Capital Outlay Acts to the contrary, contracts may be entered into for the
9Lafayette Economic Development Authority, Lafayette Innovation Center (Lafayette) prior
10to the receipt of funding and the State is authorized to financially participate in obligations
11created by such contracts.
12 (F)  Pursuant to R.S. 39:112(E)(2), non-state entity projects shall require a match
13of not less than twenty-five percent of the total requested amount of funding.
14 (G)  Notwithstanding anything contained in this Act or the Capital Outlay Act
15to the contrary or any other Act or provision of law, the appropriations made for the
16Executive Department for facilities which promote economic development included in the
17Repair, Restoration, and Replacement for Declared Disasters, Planning, Construction,
18Renovation, and Acquisition project, and the Department of Economic Development projects
19are for public purposes pursuant to the provisions of Article VII, Section 14 of the
20Constitution of Louisiana primarily for economic development, including the generation of
21tax revenues, creation of jobs, promotion of tourism, and creation of facilities for charitable,
22cultural, artistic, educational, social, civic, research, service, economic development
23activities, or provide facilities for professional golf events, pursuant to the terms of
24cooperative endeavor agreements, including leases and all expenditures of these
25appropriations and may be exempted, by the Commissioner of Administration, from all
26statutes relative to public bidding, contractual review and the provisions of R.S.
2733:9029.2(D) and in lieu thereof be allowed to use alternative competitive contracting
28arrangements where the appropriate administering  entity  submits  documentation  to  the 
29Commissioner  of  Administration substantiating that it is in the best interest of the citizens
30of the state, due to economic and/or operational benefits, and the necessity to complete the
Page 104 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1projects in a timely manner; and, the appropriate administering entity shall have the
2authority to directly appoint the design professional from a list of a minimum of three design
3firms or joint ventures with the appropriate specialized facility design experience submitted
4to and acceptable to the Commissioner of Administration and shall be exempt from other
5state requirements for selection of designers, and may include expenditures for computers,
6fixtures, furniture, and other  equipment  as  such  is  deemed  to  be  capital  outlay  in 
7nature,  and  unless  the Commissioner of Administration is advised by bond counsel to the
8State that such may violate federal tax law, may be used to reimburse any expenditure made
9prior to the granting of a line of credit or the sale of bonds by the State Bond Commission,
10determination by the State Treasurer that cash funding has been deposited in the
11Comprehensive Capital Outlay Escrow Account for the project or the execution of a
12cooperative endeavor agreement from the Office of Facility Planning and Control, and may
13be used to acquire land or real property, the title to which is held in the name of an entity
14exempt from taxation under the provisions of 26 U.S.C. 501(c)(3).
15 (H)  Notwithstanding any other provision of this Act or the Capital Outlay Act
16or any other provision of law to the contrary, all of the funds herein appropriated to the
17Department of  Economic  Development  in  connection  with  projects  or  programs  for 
18which  the Department of Economic Development utilizes a cooperative endeavor agreement
19to further economic  development  as  permitted  under  Article  VII,  Section  14  of  the 
20Louisiana Constitution, including the generation of tax revenues and creation of jobs, shall
21be considered as having been appropriated to the Department of Economic Development,
22may be used to reimburse any expenditure made prior to the granting of a line of credit and
23made prior to the execution of a cooperative endeavor agreement and shall be administered
24solely by the Department of Economic Development pursuant to, in compliance with, and
25on the terms contained in such cooperative endeavor agreements without compliance with
26anyother law, including, but not limited to, the provisions of R.S. 39:101 through 128.
27Additionally, all expenditures  of  these  appropriations  may be  exempted  by  the 
28Commissioner  of Administration, from all statutes relative to public bidding, contractual
29review and the provisions of R.S. 33:9029.2(D).
Page 105 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1 (I)(1)  Notwithstanding any other provision of this Act or the Capital Outlay Act
2or any other  provision  of  law  to  the  contrary,  funds  appropriated  for  the  Economic
3Development Award Program project for the Office of Business Development are to be used
4solely for capital and infrastructure improvements subject to verification by the Division of
5Administration, Office of Facility Planning and Control.
6 (2)  Eligible expenses for Economic Development Award Program funds may
7include documented project expenses beginning on the date of LEDC Board approval of the
8project and may be reimbursed upon execution of the cooperative endeavor agreement for
9the project.
10 (J)(1)  Due to the state's current investment in TPC Louisiana and the financial
11support it provides to the PGA TOUR event currently played at said facility, said PGA
12TOUR event shall not be played at New Orleans City Park Golf Complex without the prior
13agreement of the Commissioner of Administration and the Chairman of the Jefferson Parish
14Council.
15 (2)  Notwithstanding the foregoing, the City Park Golf Complex may host any
16other golf tournament or event, including but not limited to any other PGA-affiliated or
17sponsored tournament or event.
18 (K)(1)  For all projects administered by the Office of Facility Planning and
19Control and payable from proceeds of self-generated revenues, funds shall be remitted to the
20Office of Facility Planning and Control for deposit in the state treasury at such time as may
21be deemed necessary by the Office of Facility Planning and Control in order to cover the
22amount of contracts or other project expenses.
23 (2)  Notwithstanding any provisions contained herein or any other law to the
24contrary, for projects with other means of financing provided to the administering agency
25by interagency transfer, the authority to draw these funds shall remain with the user agency.
26 (3)  Any revenue bonds appropriated in Section 1 or Section 1.(A) of the Capital
27Outlay Act shall not be secured by the full faith and credit of the state.
28 (4)  The State Treasurer shall refund to the appropriate source any surplus self-
29generated funds, advanced insurance funds received by the Office of Facility Planning and
30Control as Interagency Transfer from Office of Risk Management associated with hurricane
Page 106 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1damage recovery, and interest earned on these funds provided the Treasurer's Office is
2notified, when these funds are deposited in the state treasury, that the user agency or Office
3of Risk Management intends to request a refund of this interest.
4 (L)  Notwithstanding any provisions contained in this Act, the Capital Outlay
5Act, or any other provision of law to the contrary, any funds expended by the parish of St.
6Mary for the purpose of securing a federal grant, for the Infrastructure Improvements and
7Construction of a Welding Training Center Facility at the Charenton Canal Industrial Park,
8shall be eligible for reimbursement from any cash line of credit approved for the project.
9 (M)  Notwithstanding anything contained in this Act to the contrary or any other
10provision of law, the resolution adopted by the Joint Legislative Committee on the Budget
11(the committee) on March 19, 2019 approving State of Louisiana Grant Anticipation
12Revenue Bonds, in one or more series, not exceeding $650,000,000, and approving the
13related projects and providing for other matters in connection therewith, contains the
14following approvals:
15 (1)  The first series of bonds in the original principal amount of not exceeding
16$185,000,000 in order to fund the following projects in the following estimated amounts:
17Barksdale Project ($61,600,000) and portions of the Loyola Project ($77,600,000) and the
18I-10 Project ($30,601,000) with the understanding that the Department has the ability to 
19manage the actual application of bond proceeds in order to appropriately fund the Projects
20and meet expenditure requirements of the Internal Revenue Service.
21 (2)  The second series of bonds for the express purpose of granting the required
22contracts in the principal amount of approximately $142,000,000 in order to fund the
23following projects in the following estimated amounts: the balance of the Barksdale Project
24($16,518,000), the balance of the Loyola Project ($87,500,000), portions of the I-10 Project
25($37,982,000) and the Belle Chasse Project ($12,500,000) with the understanding that the
26Department has the ability to manage the actual application of Bond proceeds in order to
27appropriately fund the Projects and meet expenditure requirements of the Internal Revenue
28Service provided, however, the Department of Transportation and Development seeks
29approval from the committee for the issuance of the second series of bonds and all
30subsequent series of bonds.
Page 107 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1 (N)  Notwithstanding anything contained in this Act to the contrary or any other
2provision of law, the Research Vessel (R/V) Pelican Replacement is deemed to be a capital
3asset and the appropriation to Louisiana Universities Marine Consortium (LUMCON) to
4replace the R/V Pelican is for a public purpose and has a significant economic impact
5providing a variety of oceanographic research missions.   Further, LUMCON shall be
6permitted to use an alternative delivery method to award contracts for design of the proposed
7replacement vessel.  LUMCON shall have the authority to select the design professional
8from a list of a minimum of two engineering firms or joint ventures with ship design
9experience acceptable to the Commissioner of Administration and the selection shall be
10exempt from other state requirements for the selection of designers. The design professional
11fee shall be in accordance with state guidelines administered by the Office of Facility
12Planning and Control, Division of Administration.  LUMCON shall follow the public bid
13law for the procurement of the replacement vessel.
14 (O)  Notwithstanding anything contained in this Act to the contrary or any other
15provision of law, the appropriations for Major Repairs for Higher Education Facilities –
16Infrastructure, and Buildings Based on Statewide Condition Assessment, Planning and
17Construction, in Act 7 of 2008 identifying specific projects for higher education is deemed
18to be complete, and any remaining residual funds are hereby authorized to be combined and
19accumulated to accomplish additional major repair projects within the higher education
20systems, as deemed necessary and approved by the Board of Regents and Facility Planning
21and Control.   At the completion of the program, Facility Planning and Control shall submit
22a report to the Joint Legislative Committee on the Budget concerning the use of the
23remaining residual funds.
24 (P)  Notwithstanding anything contained in this Act or any other provision of law,
25LSU Real Estate and Facilities Foundation (LRFF) is authorized to execute contracts for the
26University Lakes Restoration Project to Address Flood Control, Environmental, Safety,
27Health and Other Issues project prior to execution of a cooperative endeavor agreement, the
28granting of a line of credit or the sale of bonds.  The appropriation for this project may be
29used to pay any obligation incurred or to reimburse any expenditure made pursuant to such
30contracts unless the Commissioner of Administration is advised by bond counsel to the state
Page 108 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1that such may violate federal tax law, after execution of a cooperative endeavor agreement.
2The Office of Facility Planning and Control shall consult with bond counsel to the State
3relative to any federal tax issues. Further, LRFF may use alternative competitive contracting
4arrangements with the prior approval of the Commissioner of Administration.
5 (Q) Pursuant to R.S. 39:102, each capital outlay budget request submitted as
6required by R.S. 39:101 shall include a detailed project description and justification for each
7new project requested;  however:
8 (1) Notwithstanding anything contained in this Act or the Capital Outlay Act to
9the contrary or any other provision of law, the scope of the appropriations made in this or
10any other Capital Outlay Act for the New Orleans West Bank Park Improvements, New
11Soccer and Recreational Facilities project shall be deemed to include the George W. Carver
12Playground, Renovations and Upgrades project for the West Bank Park project.
13 (2) Notwithstanding anything contained in this Act or the Capital Outlay Act to
14the contrary or any other provision of law, the scope of the appropriations made in this or
15any other Capital Outlay Act for the Pointe Coupee Parish School Board Office Relocation,
16Due to Flooding Caused by Hurricane Gustav, Planning and Construction project shall be
17deemed to include that the School Board Office is to be Located at 8777 Morganza
18Highway.
19 (3) Notwithstanding anything in this Act, any previous capital outlay act, or other
20provision of law to the contrary, the scope of the appropriation for the Port of South
21Louisiana Globalplex Terminal Building #71 Upgrade project shall be deemed to also
22include similar upgrades for other Globalplex Terminal Buildings and a Heavy Load
23Capacity Foundation or Floor.
24 (4) Notwithstanding anything in this Act, any previous capital outlay Act, or
25other provision of law to the contrary, monies appropriated herein for the Port of South
26Louisiana Globalplex Terminal Building #71 and Other Globalplex Terminal Building
27Upgrades, Planning and Construction may be expended for design fees related to the
28conveyor system and ancillary equipment that exceed the customary ten percent limitation
29on design fee costs.
Page 109 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1 (5) Notwithstanding anything in this Act, any previous capital outlay act, or other
2provision of law to the contrary, the scope of the appropriation for the Port of South
3Louisiana Globalplex Dock Access Bridge and Equipment Replacement/Repair project shall
4be deemed to also include an Access Road.
5 (6) Notwithstanding anything in this Act, any previous capital outlay act, or other
6provision of law to the contrary, the scope of the appropriation for the Port of South
7Louisiana Globalplex Rail Siding project shall be deemed to also include a Rail Spur.
8 (7) Notwithstanding anything contained in this Act or the Capital Outlay Act to
9the contrary or any other provision of law, the scope of the appropriations made in this or
10any other Capital Outlay Act for the Pontchartrain Levee District Lake Pontchartrain West
11Shore Hurricane  Protection, Planning and Construction  project shall be deemed to  include
12Ascension Parish.
13 (8) Notwithstanding anything contained in this Act or the Capital Act to the
14contrary or any other provision of law, the scope of the appropriation made in this or any
15other Capital  Outlay  Act  for  the  Statewide  Roofing  Asset  Management  Program  and
16Waterproofing, Related Repairs and Equipment Replacement Program project shall be
17deemed to include Peltier Hall at Nicholls State University.
18 (9)  Notwithstanding anything contained in this Act, any previous Capital Outlay
19Act, or other provision of law to the contrary, the scope of the appropriation for Coastal
20Protection Projects for the Coastal Protection and Restoration Authority, specifically the East
21Rainey Marsh Creation and the LaBranche Shoreline Protection project, shall be deemed to
22also include construction.
23 (R)  Notwithstanding anything contained in this Act or any other provision of
24law, all non-state projects that include water systems in the scope of work shall also be
25required to include a rate study as part of the project.
26 (S)  Notwithstanding anything contained in this Act, any previous Capital Outlay
27Act, or other provision of law to the contrary, the monies spent by the Pointe Coupee Parish
28School Board to retrofit an existing building to make it functional in conjunction with the
29Office Relocation, to be Located at 8777 Morganza Highway, Formerly Labarre Elementary
30School Site, Due to Flooding Caused by Hurricane Gustav project for the Pointe Coupee
Page 110 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1Parish School Board project shall be deemed to satisfy the local match requirements of R.S.
239:112(E)(2).
3 Section 9. Notwithstanding any provisions contained herein or any other law to
4the contrary, the provisions of Chapter 16 of Subtitle III of Title 39 of the Louisiana Revised
5Statutes of 1950 as amended, shall not apply to architectural and engineering contracts,
6administered by the office of facility planning and control, division of administration
7pursuant to this or any other capital outlay Act.
8 Section 10.  All funds appropriated herein to agencies administering capital
9outlay projects, on behalf of non-state entities, by cooperative endeavor agreements pursuant
10to this Act shall be expended within two (2) years from the date of the issuance of the bonds.
11Agencies administering capital outlay projects pursuant to a cooperative endeavor agreement
12shall notify the non-state entity of the date the bonds are issued within three (3) months from
13the issuance thereof.  If the funds appropriated herein and administered under cooperative
14endeavor agreements pursuant to this Act are not totally expended within two (2) years from
15the issuance of the bonds, the administering agency can close the project and recommend
16that the reallocation of any unexpended proceeds to any project contained in this Act or any
17previous Capital Outlay Acts.
18 Section 11. Notwithstanding any provisions contained herein or law to the
19contrary, the proceeds of revenue bonds to be utilized to fund certain projects authorized in
20Section 1. and Section 1.(A) hereof may, in accordance with Article VII, Section 9 of the
21Louisiana Constitution of 1974, be deposited in special accounts held outside the state
22treasury in accordance with the provisions of any bond resolution, indenture, reimbursement
23contract, or other bond or financing covenant which provides for the pledge of such funds
24in connection with the issuance of revenue bonds.  For all projects administered by the office
25of facility planning and control, division of administration, authorized in Section 1. and
26Section 1.(A) hereof which are payable from the proceeds of revenue bonds, only the office
27of facility planning and control, division of administration, will be authorized to requisition
28funds from the special accounts described immediately above, at such time or times as may
29be  deemed  necessary  by  the  office  of  facility  planning  and  control,  division  of
30administration, in order to cover contract amounts or other project expenses.
Page 111 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1 Section 12.   The governor shall have the power to veto any line-item in this Act.
2 Section 13.  Except as otherwise provided herein, no funds shall be expended on
3any highway projects on highways within the state highway system as established in R.S.
448:191 under the jurisdiction of the Department of Transportation and Development unless
5and until such project is in the Highway Program, R.S. 48:228 through 232, approved by the
6Joint Legislative Committee on Transportation, Highways and Public Works.  Pursuant to
7R.S. 49:214.6.2(B), no integrated coastal protection construction project shall be undertaken
8with funds included in this bill except those included in an annual plan finally approved by
9the legislature in accordance with the provisions of R.S. 49:214.5.3. No funds appropriated
10to the Coastal Protection and Restoration Authority in this Act as a contribution for a project
11cost-share or otherwise, for the national economic development and national ecosystem
12restoration components of the Southwest Coastal Louisiana Study shall be used or provided
13for the expropriation of property or use of eminent domain, except where such funds are to
14be used to obtain property voluntarily offered for project purposes, where at least seventy-
15five percent of the owners have voluntarily offered the property, or where the record or
16apparent owners have voluntarily offered the property but do not have clear title.
17 Section 14.  The word "statewide" used in place of the specific parish designation
18for projects contained in this Act indicates that the project or program is applicable to all
19sixty-four parishes in the state.  The description of any project in this Act shall be deemed
20to include planning, design, master planning, studies, permits, surveys, testing, construction,
21land and/or building/improvement acquisition, reconstruction, renovation, repair, right-of-
22way and utilities, site and other improvements, miscellaneous/contingencies, lease hold
23improvements ultimately owned by the state or a political subdivision of the state, equipment
24and other acquisitions, and any other component of the project if such are included or
25indicated in the capital outlay request for such projects required by R.S. 39:101 subject to
26the provisions of Title 39 of the Louisiana Revised Statutes of 1950. For new construction
27or renovation projects, equipment or other acquisitions, which can reasonably be considered
28necessary for the facility to be functional, may be deemed to be included in the project, even
29if such equipment or other acquisitions are not included or indicated in the project name or
30the capital outlay request.  When local or federal match is referenced in a project title, but
Page 112 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
1only a portion of the state appropriation is granted a line of credit or otherwise funded, then
2the amount of local or federal match, required to be made available, may be prorated relative
3to the amount of state appropriation made available through lines of credit.
4 Section 15. The provisions, items, and projects contained in this Act are severable
5and if any provision, item, or project contained herein, or the application of any such
6provision, item, or project, is held invalid, such invalidity shall not affect other provisions,
7items, projects, or applications of the Act which can be given effect without the invalid
8provision, project, item, or application.
9 Section 16.  Notwithstanding any other provisions of law to the contrary, the state
10shall not grant cash lines of credit, or authorize or issue general obligation bonds in a
11principal amount in excess of $1,236,476,643 for Fiscal Year 2022-2023.
12 Section 17.  Notwithstanding any contrary provision of this Act or any contrary
13provision of law, no funds appropriated by this Act shall be released or provided to any
14recipient of an appropriation made in this Act if, when, and for as long as, the recipient fails
15or refuses to comply with the provisions of R.S. 24:513.  No recipient shall be considered
16to fail or refuse to comply with the provisions of R.S. 24:513 pursuant to this Section during
17any extension of time granted by the legislative auditor to the recipient to comply.
18 Section 18. This Act shall become effective upon signature by the governor or,
19if not signed by the governor, upon expiration of the time for bills to become law without
20signature by the governor, as provided in Article III, Section 18 of the Constitution of
21Louisiana.  If vetoed by the governor and subsequently approved by the legislature, this Act
22shall become effective on the day following such approval.
DIGEST
The digest printed below was prepared by House Legislative Services.  It constitutes no part
of the legislative instrument.  The keyword, one-liner, abstract, and digest do not constitute
part of the law or proof or indicia of legislative intent.  [R.S. 1:13(B) and 24:177(E)]
HB 2 Engrossed 2022 Regular Session	Bishop
Provides for the capital outlay budget and program for FY 2022-2023; provides for the
funding of the capital outlays from the specified sources of monies in the specified amounts
as follows:
Page 113 of 114 HLS 22RS-324	ENGROSSED
HB NO. 2
Federal Funds	$181,929,297
Federal Funds via Interagency Transfer	$37,907,173
Coastal Protection and Restoration Fund	$105,702,734
Natural Resources Restoration Trust Fund $866,405,382
Transportation Trust Fund (TTF) - Federal $984,550,550
Transportation Trust Fund (TTF) - Regular $116,341,133
Transportation Trust Fund (TTF) -
Construction Subfund
$195,800,000
Interagency Transfers	$37,871,000
Misc. Statutory Dedications	$41,635,000
Fees and Self-Generated Revenues	$88,395,000
Re-appropriated Cash	$10,794,626
Revenue Bonds	$69,890,000
TOTAL CASH PORTION	$2,737,221,895
Authorizes the funding of certain capital outlay projects from the sale of general obligation
bonds for the projects delineated as follows:
Priority 1	$1,104,534,536
Priority 2	$91,680,000
Priority 5	$3,337,881,253
TOTAL GENERAL OBLIGATIONS
BONDS	$4,534,095,789
GRAND TOTAL ALL MEANS OF
FINANCING	$7,271,317,684
Summary of Amendments Adopted by House
The Committee Amendments Proposed by House Committee on Ways and Means to the
original bill:
1. Changes General Obligation Bond funding as follows:
Priority 1	$ 24,801,371
Priority 2	$        (23,913,000)
Priority 5	$        271,159,200
Page 114 of 114