HLS 22RS-324 REENGROSSED 2022 Regular Session HOUSE BILL NO. 2 BY REPRESENTATIVE BISHOP CAPITAL OUTLAY: Provides for the comprehensive Capital Outlay budget 1 AN ACT 2To provide with respect to the capital outlay budget and the capital outlay program for state 3 government, state institutions, and other public entities; to provide for the 4 designation of projects and improvements; to provide for the financing thereof 5 making appropriations from certain sources; and to provide for related matters. 6Be it enacted by the Legislature of Louisiana: 7 Section 1. The following sums or so much thereof as may be necessary are hereby 8appropriated out of any monies in the state treasury from the sources specified, from federal 9funds and self-generated revenues belonging to the state of Louisiana and/or collected by 10boards, commissions, departments, and agencies thereof, all for making capital outlay and 11for the purposes and in the amounts specified herein for the Fiscal Year commencing July 121, 2022, and ending June 30, 2023, subject to the conditions thereafter provided: 13 A project with funding payable from General Obligation Bonds Priority 1 indicates 14that the funding for the project includes the reauthorization of funding which was previously 15granted as a line of credit by the State Bond Commission in Fiscal Year 2021-2022. As used 16in this Section, the term "general obligation bonds" means state general obligation bonds or 17other evidences of indebtedness payable from the Bond Security and Redemption Fund. The 18amount set forth in this Section opposite each project, or so much thereof as may be 19necessary, is hereby appropriated and payable from the source of funding indicated; 20provided, however, amounts appropriated and payable from federal funds may be 21encumbered or expended only to the extent such amounts shall have been committed or Page 1 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1received. Pursuant to the provisions of R.S. 39:82, funds for planning, acquisition, 2construction, and major repair projects appropriated by this Act may be retained until 3completion of the project, even if no bona fide liability exists on the last day of the fiscal 4year. 5 This Act shall constitute the comprehensive state capital outlay budget for the 2022- 62023 Fiscal Year. Projects set forth which are payable from the proceeds available from the 7sale of general obligation bonds shall have the priorities as indicated. The Request for Line 8of Credit form used by the attorney general and Bond Counsel in evaluating Louisiana 9Constitutional, Internal Revenue Code, and applicable income tax regulations shall be filed 10with the commissioner of administration, State Bond Commission, and state attorney 11general. No general obligation bond cash lines of credit shall be granted to fund any lower 12priority project prior to the granting of general obligation bond cash lines of credit to fund 13all higher priority projects (the "general rule"), except as hereinafter provided. This 14prohibition against funding a lower priority project shall not apply upon a showing of an 15impossibility or impracticality either to proceed with all unfunded higher priority projects 16or to proceed with the funding of such projects or any part thereof through the issuance of 17general obligation bonds for any reason. Such showing shall be stated in reasonable detail 18in a certificate or certificates signed by the state agency responsible for administering the 19funding, and filed with the commissioner of administration and the State Bond Commission 20(hereinafter referred to as "the Commission"). Upon a determination by the Commission 21that proceeding with such a project or the funding thereof through the issuance of general 22obligation bonds is impractical or impossible, the Commission may then proceed with the 23sale of general obligation bonds or the granting of cash lines of credit without regard to the 24priority of the unfunded projects determined to be impossible or impractical. 25 Upon recommendation by the state agency responsible for administering the funding, 26if it is determined at any time that proceeding with the project or with the funding thereof 27is no longer impossible or impractical, the State Bond Commission may rescind the 28certificate of impossibility or impracticality and may proceed with the project or with the 29issuance of general obligation bonds or the granting of cash lines of credit to fund the 30project. Alternatively, the Interim Emergency Board (hereinafter referred to as "the Board"), Page 2 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1upon reviewing certificates as described above and determining that proceeding with such 2projects or the funding thereof through the issuance of general obligation bonds is 3impossible or impractical, may designate a lower priority for such projects. The Board's 4determination and lower priority designation shall be submitted to the members of the 5legislature for their approval in accordance with the provisions of Chapter 3-B of Subtitle 6I of Title 39 of the Louisiana Revised Statutes of 1950. In accordance with the provisions 7of Chapter 3-B of Subtitle I of Title 39 of the Louisiana Revised Statutes of 1950, whenever 8at the written request of the appropriate legislators and agency, the Board determines that 9an adjustment to a project description originally set forth in such capital budget adopted by 10the legislature for a current fiscal year is necessary to correct a mistake in a project 11description, clarify a description, change the scope of a description, or make any other 12adjustment the Board deems necessary to implement the purpose of the project, such 13adjustment shall become effective only upon the approval by majority vote of the elected 14members of each house of the legislature in the manner provided for in Chapter 3-B of 15Subtitle I of Title 39 of the Louisiana Revised Statutes of 1950. 16 If such approval is granted, notification by the chair or secretary of the Board of the 17results of the balloting shall be transmitted to the State Bond Commission, which may then 18proceed with the sale of general obligation bonds or the granting of cash lines of credit for 19each change approved upon request of the commissioner of administration in accordance 20with the general rule. 21 With respect to Priorities 1 through 5, a lower priority project may be moved to a 22higher priority only upon a showing of an emergency or other cause not reasonably 23anticipated by the legislature, which shall be stated in reasonable detail in a certificate signed 24by the head of the appropriate department, political subdivision, or agency and filed with the 25commissioner of administration and the Board. Upon a determination by the Board that such 26project should be moved to a higher priority because of an emergency or other cause not 27reasonably anticipated by the legislature, the Board shall designate a higher priority to the 28project. The matter then shall be submitted to and be subject to the same approval by the 29members of the legislature in the manner previously indicated in this Section. If such 30approval is granted, notification by the chair or secretary of the board of the change of Page 3 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1priority shall be transmitted to the State Bond Commission, which then upon request of the 2commissioner of administration, may proceed with the sale of general obligation bonds or 3the granting of cash lines of credit in accordance with the general rule. As to projects within 4a priority, the State Bond Commission acting on requests submitted by the commissioner of 5administration shall determine when such project, or phases thereof, shall be funded. In 6making such determination, the State Bond Commission shall consider the amount of 7proceeds of general obligation bonds to be made available in light of money and capital 8market conditions; the expenditure requirements of the project; the time required for 9architectural plans and drawings, public bidding, and site acquisition and preparation; 10availability of receipt of federal monies; litigation affecting the undertaking or completion 11of a project; federal tax laws and regulations regarding the sale of municipal bonds; and 12other items of a similar nature bearing upon the possibility or the necessity to commence a 13project or any particular phase thereof. 14 Any other provision of this Act to the contrary notwithstanding, projects described 15in Priority 5 of this Act shall not be moved to a higher priority except upon one of the 16following conditions: (1) Funding is necessary to complete or additionally fund a project 17located elsewhere in the Capital Outlay Act. Determination of such condition shall be made 18by the head of the appropriate department or agency by means of a certificate to that effect 19filed with the Interim Emergency Board, who shall, by mail ballot, request approval of such 20change and if approved by a majority of each house of the legislature it shall be funded, or 21(2) unless required by an emergency or other cause not reasonably anticipated by the 22legislature, to be in accordance with procedures set forth in this Section. However, the State 23Bond Commission may authorize a non-cash line of credit for any project in Priority 5 which 24represents that portion of construction contracts which were let during a previous fiscal year, 25or construction contracts which will be let during the current fiscal year, but which will not 26require cash expenditures during the year. Such non-cash lines of credit, when combined 27with previously sold bonds or with higher priority bonds or lines of credit, or with funds 28appropriated from other sources, will provide sufficient appropriated funds to award 29equipment or construction contracts. Contracts shall not be awarded without approval of the 30division of administration. Page 4 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1 Upon approval by the State Bond Commission, and subject to compliance with its 2policies and procedures and the procedures set forth herein, a line of credit providing for the 3use of funds in anticipation of the sale of general obligation bonds may be granted to the 4appropriate administering agency or department from the Comprehensive Capital Outlay 5Escrow Account, or if there is not a sufficient amount available in such account, from other 6available state cash in the state treasury, for capital improvement projects for which bond 7proceeds are appropriated by a current capital budget, prior to the actual issuance of bonds 8for such projects, unless the attorney general advises that an impediment exists to the valid 9issuance of the bonds on the date such line of credit is granted. 10 All bonds that are to be repaid, in whole or in part, by revenues generated by the 11project shall be designated as "Reimbursement Bonds.” The State Bond Commission shall 12enter into such agreements as are necessary to provide that the agency or subdivision, whose 13project is reimbursable, shall pay the bond debt costs into the Bond Security and Redemption 14Fund. Such costs may be paid annually or at the end of the term of the bonds issued as 15determined by the State Bond Commission. 16 Priority 1 general obligation bond funding shall be limited to: 17 (1) Projects and amounts which were previously authorized by Act 485 of the 2021 18Regular Session of the Legislature; and which were granted cash lines of credit by the State 19Bond Commission. The bonds to fund these projects were not sold in Fiscal Year 2021- 202022. 21 (2) The reauthorization of the portion of the outstanding Fiscal Year 2021-2022 22Priority 5 Non-Cash Lines of Credit for projects which will require cash expenditures in 23Fiscal Year 2022-2023 and therefore must be converted to Cash Lines of Credit in Fiscal 24Year 2022-2023. 25 (3) Commitments made in the Higher Education Desegregation Settlement 26Agreement. 27 Priority 2 general obligation bond projects are for the completion of plans and 28specifications, land acquisition, site preparation, or for construction which will begin during 29the fiscal year. It is presently anticipated that the listed projects will require the sale of 30bonds or extension of lines of credit during the fiscal year after adoption of this Act. Page 5 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1 Priority 3 general obligation bond projects are for the preparation of plans and 2specifications, land acquisition, site preparation, or for construction and shall be limited to 3funding for the portion of construction contracts which will not require cash expenditures 4during the fiscal year. The projects in this category shall be considered future year projects 5in the state's five-year capital outlay plan. It is presently anticipated that the listed projects 6will not require the sale of bonds or extension of lines of credit during the fiscal year. 7 Priority 4 general obligation bond projects are for the preparation of plans and 8specifications, land acquisition, site preparation, or for construction and shall be limited to 9funding for the portion of construction contracts which will not require cash expenditures 10during the fiscal year. The projects in this category shall be considered future year projects 11in the state's five-year capital outlay plan. It is presently anticipated that the listed projects 12will not require the sale of bonds or extension of lines of credit during the fiscal year. 13 Priority 5 general obligation bond funding shall be limited to funding for the portion 14of construction contracts which will not require cash expenditures during the fiscal year. 15These funds, when combined with previously sold bonds or with higher priority bonds on 16lines of credit, or with funds appropriated from other sources, will provide sufficient 17appropriated funds to award contracts. Non-cash lines of credit shall be required prior to the 18award of these contracts. 19 In accordance with the cash management plan adopted pursuant to R.S. 48:251(D) 20and the provisions of Act 161 of the 1998 First Extraordinary Session, the Department of 21Transportation and Development is authorized to enter into contracts or agreements for 22projects approved pursuant to the Highway Priority Program, Airport Construction and 23Development Priority Program, Port Construction and Development Priority Program, and 24Statewide Flood Control Program for projects bid and awarded, authorized, or commenced 25during the fiscal year which do not require cash expenditures for the full contract or 26agreement amount. Page 6 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1 EXECUTIVE DEPARTMENT 201/107DIVISION OF ADMINISTRATION 3(465) State Office Buildings Major Repairs, Equipment 4 Replacement, and Renovations, Planning and 5 Construction 6 (Statewide) 7 Payable from General Obligation Bonds 8 Priority 1 $ 3,583,853 9 Priority 5 $12,110,000 10 Total $15,693,853 11(468) Exterior Waterproofing and Repairs, 12 Chief Justice Pascal F. Calogero, Jr. Courthouse, 13 Planning and Construction 14 (Orleans) 15 Payable from General Obligation Bonds 16 Priority 2 $ 1,000,000 17 Priority 5 $10,000,000 18 Total $11,000,000 19(696) Local Government Assistance Program 20 (Statewide) 21 Payable from the balance of State General Funds (Direct) 22 previously allocated under the authority of Act 29 of 2018 23 for St. Bernard Port, Harbor & Terminal District, 24 Rehabilitation of Chalmette Slip, Planning and 25 Construction (St. Bernard); and Act 29 of 2018 for 26 Bossier Parish, Acceleration Lane on US 71, Planning 27 and Construction (Bossier); and Act 29 of 2018 for 28 Calcasieu Parish, Gravity Sewer Trunk Mains and 29 Pumping Stations South Ward 3 and South Ward 4, 30 Planning and Construction (Calcasieu); and Act 23 of 31 2002 for Morehouse Parish, Industrial Park, Planning and 32 Construction ($15,000 Local Match) (Morehouse); and 33 Act 29 of 2018 for Richland Parish, Richland Parish 34 Courthouse Renovations (Richland); and Act 20 of 2019 35 for St. John the Baptist Parish, East Bank Courthouse, 36 Planning and Construction (St. John the Baptist); and Act 37 29 of 2018 for St. Mary Parish, Recreation and 38 Infrastructure Improvements at Centerville Park, Planning 39 and Construction (St. Mary); and Act 28 of 2007 for 40 Vernon Parish, Creation of Vernon Lake Cultural Center, 41 Recreation and Tourism Park, Planning and Construction 42 (Vernon); and Act 26 of 2005 for Vernon Parish, Visitor 43 Center, Planning and Construction (Vernon); and Act 29 44 of 1998 for Vernon Parish, Parish Historical Building on 45 3rd Street Renovation for Office Space (Vernon); and Act 46 28 of 2007 for Vernon Parish, Visitor Center, Planning 47 and Construction (Vernon); and Act 29 of 2018 for 48 Grayson, Streets and Drainage Improvements (Caldwell); 49 and Act 20 of 2019 for Hammond, Gateway to 50 Hammond, Phase I, Planning and Construction 51 (Tangipahoa); and Act 20 of 2019 for Jean Lafitte, Lafitte 52 Seafood Pavilion and Market, Planning and Construction 53 (Jefferson); and Act 485 of 2021 for New Orleans, 54 Algiers Playgrounds and Parks, Renovation of Restrooms, 55 Lighting, Fencing, and Playground Equipment (Orleans); 56 and Act 29 of 2018 for St. Joseph, Proposed City Page 7 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1 Hall/Convention Center, Planning and Construction 2 (Tensas); and Act 29 of 2018 for St. Martinville, Sewer 3 Lift Station Improvements (St. Martin); and Act 29 of 4 2018 for St. Martinville, Sewer and Water Updates, 5 Planning and Construction (St. Martin); and Act 29 of 6 2018 for Zwolle, Installation of 6" Waterline and Water 7 Well, Planning and Construction ($25,000 Local Match) 8 (Sabine); and Act 26 of 2005 for Canary Island 9 Descendent Association, Multi-Purpose Building, 10 Planning and Construction (Plaquemines); and Act 28 of 11 2007 for Opportunities Industrial Center of Ouachita, 12 New Vocational-Technical Center for Opportunities 13 Industrialization of Ouachita (Ouachita); and Act 28 of 14 2007 for Just Willing Foundation, Just Willing 15 Communications and Technology Center, Planning and 16 Construction (Orleans); and Act 29 of 2008 for St. Mary, 17 Building Improvements from Emergency Family Shelter 18 Facility, Chez Hope Domestic Violence Program (St. 19 Mary); and Act 29 of 2018 for Gretna, Gretna Police 20 Department, Construction of Armory, Elevation/Flood 21 Proofing/Wind Retrofit, Planning and Construction 22 (Jefferson); and Act 4 of 2017 SES for Junior League of 23 New Orleans, Incorporated, Renovate Annex Building 24 and Re-Purpose Space, Including Installation of Handicap 25 Accessibility Ramp and Bathrooms Upgrades, Planning 26 and Construction (Orleans) 27 Payable from General Obligation Bonds $ 1,043,384 28 Priority 5 $ 5,000,000 29 Total $ 6,043,384 30(697) Community Water Enrichment Program 31 (Statewide) 32 Payable from General Obligation Bonds 33 Priority 5 $ 5,000,000 34 Payable from the balance of general obligation bond 35 proceeds previously allocated under the authority of Act 36 29 of 2018 for Calcasieu Parish, Gravity Sewer Trunk 37 Mains And Pumping Stations South Ward 3 and South 38 Ward 4, Planning and Construction(Calcasieu); and Act 39 29 of 2018 for Gretna, Gretna Police Department, 40 Construction of Armory, Elevation/Flood Proofing/Wind 41 Retrofit, Planning and Construction(Jefferson); and Act 42 4 of 2017 for Junior League of New Orleans, 43 Incorporated, Renovate Annex Building and Re-Purpose 44 Space, Including Installation of Handicap Accessibility 45 Ramp and Bathrooms Upgrades, Planning and 46 Construction(Orleans); and Act 29 of 2018 for Hammond, 47 Gateway to Hammond, Phase I, Planning and 48 Construction(Tangipahoa) 49 $ 243,095 50 Total $ 5,243,095 51Provided, however, that all recipients comply with the applicable Department of Natural 52Resources rules and regulations, if any, regarding master meter installation. 53(1176)Americans with Disabilities Act Implementation for State 54 Facilities, Planning and Construction 55 (Statewide) 56 Payable from the balance of State General Fund (Direct) 57 previously allocated under the authority of Act 20 of 2009 Page 8 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1 for Division of Administration, State Emergency Shelters 2 (Statewide); and Act 20 of 2019 for Division Of 3 Administration, Outpatient Clinics In Rapides Parish, 4 Planning and Construction (Rapides); and Act 20 of 2019 5 for Office of State Museum, Old U. S. Mint Museum 6 Exhibit (Orleans); and Act 20 of 2009 for New Orleans 7 City Park, Construction of Maintenance Facility, City 8 Park, Planning and Construction (Cash and /or In-Kind 9 Match) (Orleans); and Act 29 of 2018 for Office of 10 Juvenile Justice, Major Repairs and Equipment 11 Replacement, Planning and Construction (Statewide); and 12 Act 16 of 2016 for Metropolitan Human Service District, 13 New Mental Health Center for Desire/Florida Mental 14 Health Clinic, Including the Purchase, Construction or 15 Renovation of a New Facility in New Orleans East, 16 Planning and Construction (Orleans); and Act 29 of 2018 17 for Office of Aging and Adult Services, Replace Fire 18 Alarm and Sprinkler System, Planning and Construction 19 (East Feliciana); and Act 23 of 2002 for Office of Public 20 Health, New Office of Public Health Central Laboratory 21 Facility, Planning and Construction (Orleans); and Act 23 22 of 2002 for Hammond Developmental Center, 23 Replacement of Underground High Temperature Hot 24 Water System, Planning and Construction (Tangipahoa); 25 and Act 29 of 2018 for Southern University - Baton 26 Rouge, Major Repairs to F. G. Clark Activity Center 27 (East Baton Rouge); and Act 20 of 2009 for LSU Baton 28 Rouge, Band Hall, Planning and Construction 29 ($5,000,000 Cash and/or In-Kind Match) (East Baton 30 Rouge); and Act 511 of 2008 for LSU Baton Rouge, 31 Choppin Hall Annex Chemistry Lab Building, Planning 32 and Construction (East Baton Rouge); and Act 203 of 33 2007 for LSU Health Sciences Center Shreveport, Feist- 34 Weiller Cancer Research Center Planning, Construction, 35 and Acquisitions (Caddo); and Act 20 of 2019 for LSU 36 Health Care Services Division, Emergency Room 37 Expansion, University Medical Center (Lafayette); and 38 Act 29 of 2018 for Southern University Baton Rouge, A. 39 W. Mumford, Americans with Disabilities Act 40 Compliance and Upgrades, Planning and Construction 41 (East Baton Rouge); and Act 29 of 2018 for McNeese 42 State University, Frazar Memorial Library Renovations 43 and Repairs, Planning and Construction (Calcasieu); and 44 Act 29 of 2018 for McNeese State University, Alpha Hall 45 Renovations, Planning and Construction (Calcasieu); and 46 Act 53 of 2011 for McNeese State University Alpha Hall 47 Renovations, Planning and Construction (Calcasieu); and 48 Act 29 of 2018 for McNeese State University, Campus- 49 Wide Elevator Repairs, Planning and Construction 50 (Calcasieu); and Act 23 of 2012 for University of 51 Louisiana - Lafayette, Fletcher Hall Exterior Repairs, 52 Planning and Construction (Lafayette); and Act 2 of 2020 53 for University of Louisiana - Lafayette, Fletcher Hall 54 Exterior Repairs, Planning and Construction (Lafayette); 55 and Act 29 of 2018 for New Orleans Center for the 56 Creative Arts, Replace HVAC System, Planning and 57 Construction 58 (Orleans) $ 4,841,646 Page 9 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(1177)Major Repairs, Equipment Replacement and 2 Renovations for State Buildings to Address Deferred 3 Maintenance Backlog and Infrastructure, Planning and 4 Construction 5 (Statewide) 6 Payable from General Obligation Bonds 7 Priority 1 $ 7,274,652 8 Payable from Interagency Transfers $ 8,000,000 9 Payable from the balance of general obligation bond 10 proceeds previously allocated under the authority of Act 11 29 of 2018 for Office of the Secretary, Atchafalaya Basin 12 Protection and Enhancement (Federal Match and 13 Local/Sponsor Match)(Assumption, Avoyelles, Iberia, 14 Iberville, Pointe Coupee, St. Landry, St. Martin, St. 15 Mary); and Act 16 of 2016 for Metropolitan Human 16 Service District, New Mental Health Center for 17 Desire/Florida Mental Health Clinic, Including the 18 Purchase, Construction or Renovation of a New Facility 19 in New Orleans East, Planning and 20 Construction(Orleans); and Act 29 of 2018 for Southern 21 university Baton Rouge, A. W. Mumford, Americans 22 with Disabilities Act Compliance and Upgrades, Planning 23 and Construction(East Baton Rouge); and Act 20 of 2019 24 for Division Of Administration, Outpatient Clinics In 25 Rapides Parish, Planning and Construction 26 (Rapides) $ 1,492,533 27 Total $16,767,185 28(1178)Mold Remediation and Indoor Air Quality, Planning 29 and Construction 30 (Statewide) 31 Payable from General Obligation Bonds 32 Priority 1 $ 197,500 33(1179)Outstanding Percent for Arts Projects 34 (Statewide) 35 Payable from General Obligation Bonds 36 Priority 1 $ 2,822,931 37 Priority 5 $ 4,000,000 38 Total $ 6,822,931 39(1180)Repair, Restoration and Replacement for Declared 40 Disasters, Planning, Construction, Renovation, and 41 Acquisition 42 (Statewide) 43 Payable from General Obligation Bonds 44 Priority 1 $45,285,237 45 Priority 5 $50,000,000 46 Payable from Federal Funds via Interagency Transfers $25,000,000 47 Payable from Fees and Self-Generated Revenues $ 5,000,000 48 Total $125,285,237 49(1181)Statewide Roofing Asset Management Program and 50 Waterproofing, Related Repairs and Equipment 51 Replacement Program 52 (Statewide) 53 Payable from General Obligation Bonds 54 Priority 5 $ 2,500,000 55 Payable from Interagency Transfers $ 2,500,000 56 Total $ 5,000,000 Page 10 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 101/109COASTAL PROTECTION AND RESTORATION AUTHORITY 2(914) Coastal Protection Projects, Planning and Construction 3 (Statewide) 4 Payable from General Obligation Bonds 5 Priority 5 $190,000,000 6 Payable from Interagency Transfers $ 500,000 7 Payable from Natural Resources Restoration 8 Trust Fund $866,405,382 9 Payable from Coastal Protection and 10 Restoration Fund $105,702,734 11 Payable from Federal Funds $116,217,498 12 Payable from State General Fund (Direct) Non-Recurring 13 Revenues $120,000,000 14 Total $1,398,825,614 15Provided, however that $10,000,000 of the amount appropriated from State General Fund 16(Direct) Non-Recurring Revenues shall be used for the Mississippi River Water 17Reintroduction into Bayou Lafourche, Pumping Capacity Improvements project for the 18Bayou Lafourche Freshwater District. 19Provided, however that $455,000 of the amount appropriated from State General Fund 20(Direct) Non-Recurring Revenues shall be used for the Little Valley Bayou Flood Protection 21project in Iberia Parish. 22Provided, however that $245,000 of the amount appropriated from State General Fund 23(Direct) Non-Recurring Revenues shall be used for the George Lancon Flood Protection 24project in Iberia Parish. 25Provided, however that $280,000 of the amount appropriated from State General Fund 26(Direct) Non-Recurring Revenues shall be used for the Rutton Rill Road Flood Protection 27project in Iberia Parish. 28Provided, however that $640,000 of the amount appropriated from State General Fund 29(Direct) Non-Recurring Revenues shall be used for the Stumpy Bayou Flood Protection 30project in Iberia Parish. 31(915) Morganza to Gulf of Mexico Flood Control Feasibility 32 Study, Planning, Design, Right-of-Way and 33 Construction of Levees, Floodgates and Other Flood 34 Control Systems ($100,000,000 Local Match) 35 (Ascension, Assumption, Iberia, Iberville, Lafourche, 36 Pointe Coupee, St. Martin, St. Mary, Terrebonne, West 37 Baton Rouge) 38 Payable from General Obligation Bonds 39 Priority 1 $15,000,000 40 Priority 5 $ 9,500,000 41 Total $24,500,000 42(923) Atchafalaya Basin Protection and Enhancement 43 (Federal Match and Local/Sponsor Match) 44 (Assumption, Avoyelles, Iberia, Iberville, Pointe Coupee, 45 St. Landry, St. Martin, St. Mary) 46 Payable from the balance of general obligation bond 47 proceeds previously allocated under the authority of 48 Act 20 of 2019 for Office of the Secretary, Atchafalaya 49 Basin Protection and Enhancement (Federal Match and 50 Local/Sponsor Match) 51 (Assumption, Avoyelles, Iberia, Iberville, Pointe Coupee, 52 St. Landry, St. Martin, St. Mary) $ 3,173,968 Page 11 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(929) Union Diversion Project, Planning and Construction 2 (Ascension, Livingston, St. James, St. John the Baptist) 3 Payable from General Obligation Bonds 4 Priority 1 $ 2,350,000 501/112DEPARTMENT OF MILITARY AFFAIRS 6(33) New Administration, Emergency Operations, and 7 Warehouse Building, Planning and Construction 8 (Rapides) 9 Payable from General Obligation Bonds 10 Priority 1 $ 3,660,000 11(122) Camp Minden, Infrastructure, Rehabilitation, Phase 2, 12 Planning and Construction 13 (Webster) 14 Payable from General Obligation Bonds 15 Priority 1 $ 710,000 16(127) Louisiana National Guard Readiness Center Replacement, 17 Lafayette LA, Planning and Construction 18 (Lafayette) 19 Payable from General Obligation Bonds 20 Priority 2 $ 616,000 21 Priority 5 $ 6,776,220 22 Payable from Federal Funds $ 1,848,080 23 Total $ 9,240,300 24(128) Louisiana National Guard Readiness Center Complex, 25 Abbeville LA, Planning and Construction 26 (Vermilion) 27 Payable from General Obligation Bonds 28 Priority 2 $ 472,000 29 Priority 5 $ 5,194,600 30 Payable from Federal Funds $ 1,416,900 31 Total $ 7,083,500 32(164) Gillis W. Long Center, Water, Fire, and Sewage Line 33 Upgrades, Carville, Louisiana 34 (Iberville) 35 Payable from General Obligation Bonds 36 Priority 1 $ 3,504,172 37(215) Statewide Backlog of Maintenance and Repair 38 (BMAR), Phase 3, and Statewide Infrastructure 39 Rehabilitation, Phase 3 40 (Statewide) 41 Payable from General Obligation Bonds 42 Priority 1 $ 2,500,000 43 Payable from Federal Funds $16,000,000 44 Total $18,500,000 45(216) Renovate-Upgrade Cadet Barracks Buildings 18, 21, 46 22, 23, and 24, Youth Challenge Program (YCP), 47 Carville, Louisiana 48 (Iberville) 49 Payable from General Obligation Bonds 50 Priority 1 $ 400,000 51 Priority 5 $ 800,000 52 Total $ 1,200,000 Page 12 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(217) Camp Beauregard Road Network Rehabilitation 2 (Rapides) 3 Payable from General Obligation Bonds 4 Priority 1 $ 1,550,000 501/124LOUISIANA STADIUM AND EXP OSITION DISTRICT 6(1404)Improvements to TPC Louisiana, Planning and 7 Construction 8 (Jefferson) 9 Payable from General Obligation Bonds 10 Priority 5 $ 3,000,000 11(1406)Improvements to the Superdome 12 (Orleans) 13 Payable from General Obligation Bonds 14 Priority 1 $26,992,326 15(1408)Bayou Segnette Recreation Complex, Land Acquisition, 16 Planning and Construction 17 (Jefferson) 18 Payable from General Obligation Bonds 19 Priority 1 $30,094,290 20 DEPARTMENT OF VETERANS AFFAIRS 2103/130DEPARTMENT OF VETERANS AFFAIRS 22(867) Southeast Louisiana Veterans Cemetery Addition of 23 2,800 In-ground Burial Crypts and Other Improvements 24 (St. Tammany) 25 Payable from General Obligation Bonds 26 Priority 2 $ 295,000 27 Payable from Federal Funds via Interagency Transfers $ 2,654,233 28 Total $ 2,949,233 29(869) Northeast Louisiana Veterans Cemetery Addition of 1,000 30 In-ground Burial Crypts and Other Improvements 31 (Richland) 32 Payable from General Obligation Bonds 33 Priority 2 $ 106,000 34 Payable from Federal Funds via Interagency Transfers $ 947,940 35 Total $ 1,053,940 3603/135NORTHWEST LOUISIANA WAR VETERANS HOME 37(1236)Replacement of Air Conditioners, Planning and 38 Construction 39 (Bossier) 40 Payable from Federal Funds via Interagency Transfers $ 600,000 4103/136SOUTHEAST LOUISIANA WAR VETERANS HOME 42(702) Chapel Expansion, Planning and Construction 43 (St. John the Baptist) 44 Payable from Federal Funds via Interagency Transfers $ 275,000 Page 13 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(698) Front Entrance Repair and Preservation, Planning and 2 Construction 3 (St. John the Baptist) 4 Payable from Federal Funds via Interagency Transfers $ 205,000 5(699) Pond Restoration, Planning and Construction 6 (St. John the Baptist) 7 Payable from Federal Funds via Interagency Transfers $ 225,000 8 ELECTED OFFICIALS 904/139SECRETARY OF STATE 10(665) Old State Capitol Exterior Repairs, Planning 11 and Construction 12 (East Baton Rouge) 13 Payable from General Obligation Bonds 14 Priority 5 $ 8,400,000 15(1507)Old Governor's Mansion Repairs and Renovation 16 (East Baton Rouge) 17 Payable from General Obligation Bonds 18 Priority 2 $ 300,000 19 Priority 5 $ 2,200,000 20 Total $ 2,500,000 21 DEPARTMENT OF ECONOMIC DEVELOP MENT 2205/252OFFICE OF BUSINESS DEVELOPMENT 23(844) Economic Development Award Program for 24 Infrastructure Assistance 25 (Statewide) 26 Payable from General Obligation Bonds 27 Priority 5 $ 5,000,000 28 DEPARTMENT OF CULTURE, RECREATION AND TOURISM 2906/263OFFICE OF STATE MUSEUM 30(789) Construction of Civil Rights Museum, Planning 31 and Construction 32 (Orleans) 33 Payable from General Obligation Bonds 34 Priority 1 $ 2,765,000 3506/264OFFICE OF STATE PARKS 36(643) Preventive Maintenance/Major Repairs 37 and Improvements 38 (Statewide) 39 Payable from General Obligation Bonds 40 Priority 1 $ 1,570,668 Page 14 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(646) Poverty Point State Historic Site - Land Acquisition, 2 Design, Museum/Interpretive Center and Expansion 3 (West Carroll) 4 Payable from General Obligation Bonds 5 Priority 2 $ 1,500,000 6 Priority 5 $10,500,000 7 Payable from Federal Funds via Interagency Transfers $ 4,000,000 8 Total $16,000,000 9(647) Bogue Chitto State Park - Mountain Bike Trail Design, 10 Construction, Acquisition and Other Development 11 (Washington) 12 Payable from General Obligation Bonds 13 Priority 1 $ 999,905 14(648) Bogue Chitto State Park Emergency Erosion, Planning, 15 Design, Construction and Other Development 16 (Washington) 17 Payable from General Obligation Bonds 18 Priority 1 $ 1,440,000 19 Priority 5 $ 840,000 20 Total $ 2,280,000 21(1185)Tunica Hills State Preservation Area, Construction, 22 Development and Acquisition 23 (West Feliciana) 24 Payable from General Obligation Bonds 25 Priority 5 $20,000,000 26 Payable from Federal Funds via Interagency Transfers $ 4,000,000 27 Total $24,000,000 28(1432)Bayou Segnette State Park, Land Acquisition, Additional 29 Cabins, Planning and Construction 30 (Jefferson) 31 Payable from General Obligation Bonds 32 Priority 1 $ 451,253 3306/A20NEW ORLEANS CITY P ARK 34(692) Repairs to Historic Structures, Planning and Construction 35 (Orleans) 36 Payable from General Obligation Bonds 37 Priority 1 $ 1,121,057 38(694) Tad Gormley Stadium Renovations, Planning 39 and Construction 40 (Orleans) 41 Payable from Fees and Self-Generated Revenues $ 350,000 42(1322)Covered Courts at Tennis Center, Planning 43 and Construction 44 (Orleans) 45 Payable from General Obligation Bonds 46 Priority 1 $ 145,000 47(1323)Splash Park, Planning and Construction 48 (Orleans) 49 Payable from General Obligation Bonds 50 Priority 1 $ 21,074 Page 15 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 106/A98LOUISIANA NAVAL WAR MEMORIAL COMMISSION 2(1196)Hull Repair & Reinforcement, Superstructure Repair, 3 Interior Restoration, & Painting of USS KIDD DD-661, 4 Docking Cradle Repairs & Upgrade, Planning, Transport, 5 Construction 6 (East Baton Rouge) 7 Payable from General Obligation Bonds 8 Priority 5 $ 3,600,000 9 DEPARTMENT OF TRANSPORTATION AND DEVELOP MENT 1007/270ADMINISTRATION 11(319) I-10 Calcasieu River Bridge, Environmental, Planning, 12 Engineering, Right-of-Way, Utilities, Demolition 13 and Construction 14 (Calcasieu) 15 Payable from General Obligation Bonds 16 Priority 1 $10,000,000 17 Priority 5 $75,000,000 18 Payable from Louisiana Rescue Plan Fund $100,000,000 19 Total $185,000,000 20(335) City of Gonzales - GO Program LA Highway 30 Corridor, 21 Planning and Construction 22 (Ascension) 23 Payable from General Obligation Bonds 24 Priority 1 $ 8,320,100 25(336) Essen Lane Widening, I-10 to Perkins Road, Planning, 26 Utilities, Right-of-Way and Construction 27 (East Baton Rouge) 28 Payable from General Obligation Bonds 29 Priority 1 $ 481,358 30(337) Evaluation of Regional Freeway System Expansion 31 (East Baton Rouge, West Baton Rouge) 32 Payable from General Obligation Bonds 33 Priority 1 $ 85 34(339) Improvements on LA 3038, Including Patching, Repairing 35 and Overlaying of the Highway, Planning and Construction 36 (Ascension) 37 Payable from General Obligation Bonds 38 Priority 1 $ 47,139 39(341) LA 3034 Improvements 40 (East Baton Rouge) 41 Payable from General Obligation Bonds 42 Priority 1 $15,619,300 43(342) LA 44 Widening, I-10 to LA 22, Planning, Utilities, 44 Right-of-Way and Construction 45 (Ascension) 46 Payable from General Obligation Bonds 47 Priority 1 $ 1,600,086 48 Priority 5 $ 8,000,000 49 Total $ 9,600,086 Page 16 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(373) Overlay of U.S. 167 for 9.32 Miles, from Turkey Creek 2 North of I-49, Planning and Construction 3 (Evangeline) 4 Payable from General Obligation Bonds 5 Priority 1 $ 5,987,500 6(413) Loyola/I-10 Interchange Improvements, Feasibility Study, 7 Interchange Modification Report, Environmental 8 Assessment, Engineering, Right-of-Ways, Utilities 9 and Construction 10 (Jefferson, Orleans) 11 Payable from General Obligation Bonds 12 Priority 1 $ 2,974,700 13(422) LA 91: Bayou Plaquemine Brule Bridge Replacement, 14 Planning and Construction 15 (Acadia) 16 Payable from General Obligation Bonds 17 Priority 1 $ 1,000,000 18 Priority 5 $ 3,200,000 19 Total $ 4,200,000 20(424) LA 42 (US 61 to LA 44) Widening, including a 21 Roundabout at Joe Sevario Road, Planning 22 and Construction 23 (Ascension) 24 Payable from General Obligation Bonds 25 Priority 1 $ 248,500 26 Priority 5 $ 2,500,000 27 Total $ 2,748,500 28(433) LA 3241 (I-12 to Bush), Planning, Engineering, Right- 29 of-Way, Utilities and Construction 30 (St. Tammany) 31 Payable from General Obligation Bonds 32 Priority 5 $28,000,000 33(434) Florida Avenue Bridge, Planning and Construction 34 (Orleans) 35 Payable from General Obligation Bonds 36 Priority 5 $ 7,200,000 37(453) LA 3227 - LA 157 Intersection Realignment, Planning 38 and Construction 39 (Bossier) 40 Payable from General Obligation Bonds 41 Priority 1 $ 4,500,000 42(483) LA 5 (Thomas Road to LA 3015), Planning 43 and Construction 44 (Statewide) 45 Payable from State General Fund (Direct) Non-Recurring 46 Revenues $ 8,000,000 47(806) LA Hwy. 64 Spur, Planning and Construction 48 (East Baton Rouge) 49 Payable from General Obligation Bonds 50 Priority 1 $ 1,000,000 51 Priority 5 $ 5,000,000 52 Total $ 6,000,000 Page 17 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(852) LA 117 Widening (LA 8 - LA 118) 2 (Natchitoches, Vernon) 3 Payable from General Obligation Bonds 4 Priority 1 $ 2,000,000 5 Priority 5 $28,000,000 6 Total $30,000,000 7(858) New Mississippi River Bridge 8 (Ascension, East Baton Rouge, Iberville, St. James, 9 West Baton Rouge) 10 Payable from General Obligation Bonds 11 Priority 1 $ 648,600 12 Priority 5 $ 4,000,000 13 Total $ 4,648,600 14(887) Highway Program (Up to $4,000,000 for Secretary's 15 Emergency Fund) 16 (Statewide) 17 Payable from General Obligation Bonds 18 Priority 1 $30,000,000 19 Priority 5 $102,000,000 20 Payable from Louisiana Rescue Plan Fund $37,500,000 21 Payable from State General Fund (Direct) Non-Recurring 22 Revenues $67,650,000 23 Payable from Transportation Trust Fund - Construction 24 Subfund $42,500,000 25 Payable from Transportation Trust Fund - Regular $23,400,000 26 Payable from Transportation Trust Fund - Federal 27 Receipts $959,550,550 28 Total $1,262,600,550 29Provided, however, that the Department of Transportation and Development is authorized 30to implement or commence projects approved in this program for Fiscal Year 2022-2023 31identified for phased funding pursuant to the cash management plan established pursuant to 32R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing 33unspent cash balances appropriated in prior years' programs, which funds when combined 34with current appropriations will provide sufficient appropriated funds to award contracts. 35Provided, however, that the Department of Transportation and Development shall use 36$12,500,000 of the appropriation from the Louisiana Rescue Plan Fund to finance the Baton 37Rouge/New Orleans Rail project and $25,000,000 of the appropriation from the Louisiana 38Rescue Plan Fund to meet federal match obligations pursuant to competitive federal grants 39and to meet financial cost overruns on active projects. 40(888) Secretary's Emergency Fund for Bridge Damages, 41 Other Reimbursements, Local Matching Dollars, 42 Federal Funds, and Opportunity Grants Subject to the 43 Provisions of R.S. 48:232 44 (Statewide) 45 Payable from Interagency Transfers $10,000,000 46 Payable from Fees and Self-Generated Revenues $30,000,000 47 Payable from Transportation Trust Fund - Federal 48 Receipts $25,000,000 49 Payable from Federal Funds $ 6,000,000 50 Total $71,000,000 51(893) Non-Federal Aid Eligible Highway Program 52 (Statewide) 53 Payable from State Highway Improvement Fund $35,800,000 Page 18 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(1004)Deepwater Horizon Economic Damages Proceeds 2 (Statewide) 3 Payable from Transportation Trust Fund - 4 Construction Subfund $195,800,000 5(1048)Widening of Highway 447 and I-12 Overpass 6 Improvements, Environmental Phase Commencement, 7 Planning and Construction 8 (Livingston) 9 Payable from General Obligation Bonds 10 Priority 1 $ 6,719,800 11 Priority 5 $21,000,000 12 Total $27,719,800 13(1050)Turn Lanes on US 71 for Emergency Vehicle Staging 14 Area, Planning, Engineering, Right-of-Way, Utilities 15 and Construction 16 (Rapides) 17 Payable from General Obligation Bonds 18 Priority 1 $ 1,000,000 19(1051)Intersection Improvements, Planning and 20 Construction 21 (Lafayette) 22 Payable from General Obligation Bonds 23 Priority 5 $ 5,000,000 24(1057)US 190 Widening: LA 25 - US 190 Bus 25 (St. Tammany) 26 Payable from General Obligation Bonds 27 Priority 1 $12,000,000 28 Priority 5 $ 2,000,000 29 Total $14,000,000 30(1086)Pecue Lane/I-10 Interchange, Planning, Design, 31 Rights-of-Way, Utilities and Construction 32 (East Baton Rouge) 33 Payable from General Obligation Bonds 34 Priority 1 $23,072,800 35 Priority 5 $14,000,000 36 Total $37,072,800 37(1090)Hooper Road Extension and Widening, Environmental, 38 Planning, Engineering, Right-of-Way, Utilities 39 and Construction 40 (East Baton Rouge, Livingston) 41 Payable from General Obligation Bonds 42 Priority 1 $ 8,398,500 43(1142)LA 1 Improvements, Phase 2, Planning, Engineering, 44 Right-of-Way, Utilities and Construction 45 (Lafourche) 46 Payable from General Obligation Bonds 47 Priority 1 $20,000,000 48 Priority 5 $72,000,000 49 Total $92,000,000 Page 19 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(1143)US 190 (Vine Street) Reconstruction 2 (St. Landry) 3 Payable from General Obligation Bonds 4 Priority 1 $ 200,000 5 Priority 5 $19,200,000 6 Total $19,400,000 7(1144)Peters Road Bridge and Extension, Planning and 8 Construction 9 (Plaquemines) 10 Payable from General Obligation Bonds 11 Priority 1 $17,546,300 12 Priority 5 $ 7,000,000 13 Total $24,546,300 14(1145)Jimmie Davis Bridge Rehabilitation and Lighting, 15 or Design, Engineering, Planning and Construction 16 (Bossier) 17 Payable from General Obligation Bonds 18 Priority 1 $ 3,844,600 19 Priority 5 $15,000,000 20 Total $18,844,600 21(1146)New Orleans International Airport Landside Access 22 Improvements 23 (Jefferson) 24 Payable from General Obligation Bonds 25 Priority 1 $ 8,300,000 26 Priority 5 $ 7,700,000 27 Total $16,000,000 28(1147)Highway 30 Roundabout West of LA 44, Planning 29 and Construction 30 (Ascension) 31 Payable from General Obligation Bonds 32 Priority 5 $ 4,500,000 33(1149)LA 100: LA 97 - LA 91, Planning and Construction 34 (Acadia) 35 Payable from General Obligation Bonds 36 Priority 2 $ 470,000 37 Priority 5 $ 4,230,000 38 Total $ 4,700,000 39(1153)LA 13 (Crowley to Vermilion Parish Line) 40 (Acadia) 41 Payable from General Obligation Bonds 42 Priority 1 $ 6,200,000 43(1154)LA 29 Improvements (LA 13 - LA 758) 44 (Evangeline, St. Landry) 45 Payable from General Obligation Bonds 46 Priority 1 $ 5,120,000 47(1155)LA 964 (Groom Road - US 61) Highway Lighting 48 (East Baton Rouge) 49 Payable from General Obligation Bonds 50 Priority 1 $ 450,000 51 Priority 5 $ 1,950,000 52 Total $ 2,400,000 Page 20 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(1158)Earhart/Causeway Interchange, Planning, Engineering, 2 Right-of-Way, Utilities and Construction 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 1 $ 4,841,700 6 Priority 5 $44,500,000 7 Total $49,341,700 8(1159)LA 35 Overlay (LA 98 - LA 365) 9 (Acadia) 10 Payable from General Obligation Bonds 11 Priority 5 $ 8,900,000 12(1160)Hooper Road Widening and Sewer Improvements 13 (Blackwater Bayou to Sullivan Road) Planning, 14 Engineering, Utilities and Construction 15 (East Baton Rouge) 16 Payable from General Obligation Bonds 17 Priority 1 $12,265,000 18(1161)LA 70: Sunshine Bridge - LA 22 19 (St. James) 20 Payable from General Obligation Bonds 21 Priority 5 $17,000,000 22(1162)Roundabout at Intersection of LA 3125 and LA 3274 23 (St. James) 24 Payable from General Obligation Bonds 25 Priority 1 $ 1,200,000 26 Priority 5 $ 1,200,000 27 Total $ 2,400,000 28(1163)Relocate Hickory Avenue (LA Hwy. 48-11th Street) 29 (Mounes) (LA Hwy. 3154) Construction, Right-of-Way, 30 and Utilities 31 (Jefferson) 32 Payable from General Obligation Bonds 33 Priority 1 $ 1,000,000 34 Priority 5 $ 1,000,000 35 Total $ 2,000,000 36(1164)LA 74/I-10 Interchange, Planning and Construction 37 (Ascension) 38 Payable from General Obligation Bonds 39 Priority 5 $ 4,600,000 40(1166)I-49 South from Lafayette to Westbank Expressway, 41 Planning, Engineering, Right-of-Way, Utilities 42 and Construction 43 (Iberia, Jefferson, Lafayette, Lafourche, St. Charles, 44 St. Martin, St. Mary, Terrebonne) 45 Payable from General Obligation Bonds 46 Priority 1 $ 2,461,000 47 Priority 5 $127,000,000 48 Payable from Louisiana Rescue Plan Fund $100,000,000 49 Total $229,461,000 Page 21 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(1167)Highway 397 in Calcasieu Parish, North and South 2 Turning Lanes 3 (Calcasieu) 4 Payable from General Obligation Bonds 5 Priority 1 $ 2,000,000 6(1168)LA 621 Realignment at LA 73, Planning 7 and Construction 8 (Ascension) 9 Payable from General Obligation Bonds 10 Priority 1 $ 4,500,000 11 Priority 5 $ 3,100,000 12 Total $ 7,600,000 13(1219)LA 3277: LA 757 - LA 104, Planning and Construction 14 (St. Landry) 15 Payable from General Obligation Bonds 16 Priority 5 $ 4,750,000 17(1220)LA 758: US 190 - LA 29, Planning and Construction 18 (Evangeline, St. Landry) 19 Payable from General Obligation Bonds 20 Priority 5 $ 3,000,000 21(1508)Roundabout at LA 3211 and Yokley Road 22 (St. Mary) 23 Payable from General Obligation Bonds 24 Priority 5 $ 3,500,000 25(1542)Claiborne Corridor Rehabilitation 26 (Orleans) 27 Payable from General Obligation Bonds 28 Priority 5 $20,000,000 29(1543)LA 28 Widening (LA 3128 – LA 116) 30 (Rapides) 31 Payable from General Obligation Bonds 32 Priority 5 $28,300,000 33(1544)LA 22: North Hoover Road – Dunson Road 34 (Tangipahoa) 35 Payable from General Obligation Bonds 36 Priority 2 $ 600,000 37 Priority 5 $12,000,000 38 Total $12,600,000 39(1545)LA 353: LA 94 to Cypress Island Hwy 40 (Lafayette, St. Martin) 41 Payable from General Obligation Bonds 42 Priority 5 $ 1,400,000 43(1546)LA 31: LA 182 - .15 Mi N of N LA 96 44 (St. Martin) 45 Payable from General Obligation Bonds 46 Priority 5 $ 9,600,000 Page 22 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1( )LA Highway 30 Roundabout, between St. 2 Elizabeth Hospital and LA Highway 44, 3 Planning and Construction 4 (Statewide) 5 Payable from State General Fund (Direct) Non-Recurring 6 Revenues $ 6,000,000 7Pending submittal of the capital outlay budget request pursuant to the provisions of R.S. 839:112. 907/274PUBLIC IMPROVEMENTS 10(183) Acadiana Gulf of Mexico Access Channel (AGMAC), 11 Port of Iberia, Planning, Design, Construction, 12 Rights-of-Way, Relocations and Utilities 13 (Iberia, Vermilion) 14 Payable from General Obligation Bonds 15 Priority 1 $18,029,300 16 Priority 5 $20,000,000 17 Total $38,029,300 18(184) Bayou Dechene Reservoir, Planning, Land Acquisition 19 and Construction 20 (Caldwell) 21 Payable from General Obligation Bonds 22 Priority 1 $ 8,441,700 23 Priority 5 $ 5,000,000 24 Total $13,441,700 25(185) Bundick Lake Level Control Structure, Planning 26 and Construction 27 (Beauregard) 28 Payable from General Obligation Bonds 29 Priority 1 $ 3,000,000 30(186) Comite River Diversion Canal Planning, Right-of-Way, 31 Utilities and Construction 32 (Ascension, East Baton Rouge, Livingston) 33 Payable from General Obligation Bonds 34 Priority 1 $ 1,052,445 35(187) Houma Navigational Canal Deepening Project, 36 Planning, Design, Construction, Rights-of-Ways, 37 Relocations and Utilities 38 (Terrebonne) 39 Payable from General Obligation Bonds 40 Priority 1 $ 675,400 41 Priority 5 $40,500,000 42 Payable from State General Fund (Direct) Non-Recurring 43 Revenues $10,000,000 44 Total $51,175,400 45(188) J. Bennett Johnston (Red River) Deepening 46 (Avoyelles, Bossier, Caddo, Grant, Natchitoches, 47 Rapides, Red River) 48 Payable from General Obligation Bonds 49 Priority 1 $ 500,000 50 Priority 5 $ 1,000,000 51 Total $ 1,500,000 Page 23 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(190) Mississippi River Deepening, Phase 3, Planning, Design, 2 Construction, Rights-of-Way, Relocations and Utilities 3 (Ascension, East Baton Rouge, Jefferson, Orleans, 4 Plaquemines, St. Bernard, St. Charles, St. James, St. John 5 the Baptist, West Baton Rouge) 6 Payable from General Obligation Bonds 7 Priority 1 $55,500,000 8 Priority 5 $28,000,000 9 Total $83,500,000 10(191) Mississippi River Levee Raising, Arkansas to Old River, 11 Planning and Construction 12 (Avoyelles, Concordia, East Carroll, Madison, 13 Pointe Coupee, Tensas) 14 Payable from General Obligation Bonds 15 Priority 1 $ 8,544,700 16 Priority 5 $34,000,000 17 Total $42,544,700 18(192) New Orleans Rail Gateway Finalize EIS to Complete Study 19 (Jefferson, Orleans) 20 Payable from General Obligation Bonds 21 Priority 1 $ 2,815,600 22(193) Ouachita River Bank Stabilization and Levee Repair 23 (Caldwell, Ouachita) 24 Payable from General Obligation Bonds 25 Priority 1 $10,135,000 26 Priority 5 $ 9,650,000 27 Total $19,785,000 28(196) Rehabilitation and Repair of State-Maintained Reservoirs 29 and Dams 30 (Statewide) 31 Payable from General Obligation Bonds 32 Priority 1 $ 1,965,000 33 Priority 5 $ 6,500,000 34 Total $ 8,465,000 35(197) Short Line Railroad Upgrades 36 (Statewide) 37 Payable from General Obligation Bonds 38 Priority 1 $ 3,000,000 39 Priority 5 $10,000,000 40 Total $13,000,000 41(198) Turkey Creek Lake Repairs, Planning and Construction 42 (Franklin) 43 Payable from General Obligation Bonds 44 Priority 1 $ 1,500,000 45 Priority 5 $ 3,686,560 46 Total $ 5,186,560 47(318) Port Construction and Development Priority Program 48 (Statewide) 49 Payable from Transportation Trust Fund - Regular $39,400,000 Page 24 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1Provided, however, that the Department of Transportation and Development is authorized 2to implement or commence projects approved in this program for Fiscal Year 2022-2023 3identified for phased funding pursuant to the cash management plan established pursuant to 4R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing 5unspent cash balances appropriated in prior years' programs, which funds when combined 6with current appropriations will provide sufficient appropriated funds to award contracts. 7(892) Statewide Flood Control Program 8 (Statewide) 9 Payable from Transportation Trust Fund - Regular $20,000,000 10Provided, however, that the Department of Transportation and Development is authorized 11to implement or commence projects approved in this program for Fiscal Year 2022-2023 12identified for phased funding pursuant to the cash management plan established pursuant to 13R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing 14unspent cash balances appropriated in prior years' programs, which funds when combined 15with current appropriations will provide sufficient appropriated funds to award contracts. 1607/276ENGINEERING AND OPERATIONS 17(161) New Cameron Ferry 18 (Cameron) 19 Payable from General Obligation Bonds 20 Priority 1 $14,198,900 21 Priority 5 $ 8,000,000 22 Total $22,198,900 23(889) Motor Vessel and Equipment Drydocking, Repairs, 24 Various Locations 25 (Statewide) 26 Payable from Transportation Trust Fund - Regular $ 1,500,000 27(890) Facilities Program Major Repairs, Renovations, Additions, 28 New Facilities, Equipment Replacement at Various DOTD 29 Sites, Planning and Construction 30 (Statewide) 31 Payable from Transportation Trust Fund - Regular $ 4,000,000 3207/277AVIATION IMPROVEMENTS 33(891) State Aviation and Airport Improvement Program 34 (Statewide) 35 Payable from Transportation Trust Fund - Regular $28,306,689 36 DEPARTMENT OF PUBLIC SAFETY AND CORRECTIONS 3708/400DEPARTMENT OF CORRECTIONS 38(179) HVAC Installation, Offender Housing, Planning 39 and Construction 40 (Statewide) 41 Payable from General Obligation Bonds 42 Priority 1 $ 550,000 Page 25 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 108/402LOUISIANA STATE PENITENTIARY 2(177) Main Prison Shower and Cellblock Plumbing Upgrade, 3 Planning and Construction 4 (West Feliciana) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,606,000 7(178) Electrical Distribution System Upgrade, 8 Planning and Construction 9 (West Feliciana) 10 Payable from General Obligation Bonds 11 Priority 1 $ 4,594,000 1208/403OFFICE OF JUVENILE JUSTICE 13(584) Community Based Program, Juvenile Justice 14 Improvements, Planning, Construction, Renovation, 15 Acquisition, and Equipment 16 (Statewide) 17 Payable from General Obligation Bonds 18 Priority 1 $ 6,000,000 19 Priority 5 $66,500,000 20 Total $72,500,000 21(587) Acadiana Center for Youth - Renovation to Create 22 Behavioral Intervention Rooms 23 (Avoyelles) 24 Payable from Fees and Self-Generated Revenues $ 45,000 2508/406LOUISIANA CORRECTIONAL INSTITUTE F OR WOMEN 26(316) Rebuild and/or Replace Facility Due to 27 Damage from 2016 Flood Event, Planning 28 and Construction 29 (Rapides) 30 Payable from Federal Funds via Interagency Transfers $ 3,500,000 31(317) Louisiana Correctional Institute for Women/Jetson Center 32 for Youth Site: Repair, Equipment and Replacement 33 Planning and Construction 34 (East Baton Rouge) 35 Payable from General Obligation Bonds 36 Priority 1 $ 215,000 3708/416RAYBURN CORRECTIONAL CENTER 38(160) Security Perimeter Fence, Planning and Construction 39 (Washington) 40 Payable from General Obligation Bonds 41 Priority 1 $ 2,095,000 Page 26 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1 LOUISIANA DEPARTMENT OF HEALTH 209/320OFFICE OF AGING AND ADULT SERVICES 3(931) Repair and Upgrade to Sewer System, Planning 4 and Construction 5 (East Feliciana) 6 Payable from General Obligation Bonds 7 Priority 1 $ 485,842 8 Priority 5 $ 6,170,000 9 Total $ 6,655,842 10(932) Replace Roof and Storm Drains on all Patient Buildings, 11 Planning and Construction 12 (East Feliciana) 13 Payable from General Obligation Bonds 14 Priority 1 $ 274,496 1509/330OFFICE OF BEHAVIORAL HEALTH 16(242) Fire Alarm System Replacement for Ten Buildings, 17 Planning and Construction 18 (East Feliciana) 19 Payable from General Obligation Bonds 20 Priority 1 $ 95,600 21 Priority 5 $ 2,453,200 22 Total $ 2,548,800 23(243) Center Building and Fire Alarm System Renovation 24 and Restoration, East Louisiana State Hospital, Planning 25 and Construction 26 (East Feliciana) 27 Payable from General Obligation Bonds 28 Priority 1 $ 521,981 29 Priority 5 $ 5,000,000 30 Total $ 5,521,981 31(244) Central Louisiana State Hospital Relocation to Pinecrest, 32 Planning and Construction 33 (Rapides) 34 Payable from General Obligation Bonds 35 Priority 1 $13,336,500 36 DEPARTMENT OF WILDLIFE & FISHERIES 3716/512OFFICE OF THE SECRETARY 38(1292)Wildlife and Fisheries Enforcement Training Academy 39 and Emergency Facility (Complex) 40 (East Baton Rouge) 41 Payable from General Obligation Bonds 42 Priority 1 $ 2,250,000 4316/513OFFICE OF WILDLIFE 44(759) Wildlife Land Acquisition 45 (Statewide) 46 Payable from La. Wild Turkey Stamp Fund $ 800,000 Page 27 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(760) Hammond Headquarters, Planning and Construction 2 (Tangipahoa) 3 Payable from General Obligation Bonds 4 Priority 5 $ 4,476,000 5(765) Woodworth Central Office Complex and Pineville 6 Office/Region 3, Planning and Construction 7 (Rapides) 8 Payable from General Obligation Bonds 9 Priority 1 $ 1,983,168 10(766) White Lake WCA Unit 1 Guillotine Gate Replacement 11 (Vermilion) 12 Payable from White Lake Property Fund $ 325,000 13(767) White Lake WCA Unit 1 Florence Canal Water Control 14 Structure 15 (Vermilion) 16 Payable from White Lake Property Fund $ 750,000 17(768) White Lake WCA Unit 2 Water Control Improvement Project 18 (Vermilion) 19 Payable from White Lake Property Fund $ 3,000,000 20(779) Rockefeller Refuge Unit 10 Habitat Enhancement 21 (Cameron) 22 Payable from Rockefeller Wildlife Refuge & Game 23 Preserve Fund $ 960,000 24 DEPARTMENT OF EDUCATION 2519/601LSU BATON ROUG E 26(34) Science - Strategic Capital Plan Repairs and Upgrades - 27 Food Science Renovation, New Science Building, 28 Infrastructure and Utilities, Planning and Construction 29 (East Baton Rouge) 30 Payable from General Obligation Bonds 31 Priority 5 $47,175,000 32Provided, however, that $475,000 of the Priority 5 appropriation shall be used to fund the 33construction or addition of a Vivarium on the Louisiana State University - Shreveport 34campus. 35(36) Strategic Capital Plan - Deferred Maintenance for 36 Infrastructure, Renovations, and Streets 37 (East Baton Rouge) 38 Payable from General Obligation Bonds 39 Priority 1 $ 1,500,000 40 Priority 5 $13,500,000 41 Total $15,000,000 42(37) Louisiana State University Library 43 (East Baton Rouge) 44 Payable from General Obligation Bonds 45 Priority 1 $ 2,000,000 46 Priority 5 $49,500,000 47 Total $51,500,000 Page 28 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(39) Veterinary Medicine Facilities Repairs/Addition 2 (East Baton Rouge) 3 Payable from General Obligation Bonds 4 Priority 5 $18,000,000 5 Payable from Fees and Self-Generated Revenues $10,000,000 6 Payable from the Capital Outlay Savings Fund $ 2,000,000 7 Total $30,000,000 8(40) Student Health Center Renovation and Addition, 9 Planning and Construction 10 (East Baton Rouge) 11 Payable from Revenue Bonds $23,890,000 12Provided, however, that the Revenue Bonds in this appropriation are in lieu of Revenue 13Bonds appropriated in Act 29 of the 2018 Regular Session to LSU Baton Rouge for Student 14Health Center Renovation and Addition, Planning and Construction (East Baton Rouge). 15(614) Military and Security Sciences Renovations, Planning 16 and Construction 17 (East Baton Rouge) 18 Payable from General Obligation Bonds 19 Priority 5 $22,000,000 2019/602LSU ALEXANDRIA 21(26) Student Success Center, Planning and Construction 22 (Rapides) 23 Payable from General Obligation Bonds 24 Priority 1 $ 1,000,000 25 Priority 5 $11,900,000 26 Payable from Fees and Self-Generated Revenues $ 5,000,000 27 Total $17,900,000 2819/604NLSU HEALTH SCIENCES CENTER - NEW ORLEANS 29(16) LSUHSC-NO Medical Education Building Laboratory 30 Renovation, Phase 1, Planning and Construction 31 (Orleans) 32 Payable from General Obligation Bonds 33 Priority 5 $60,000,000 34 Payable from Fees and Self-Generated Revenues $14,000,000 35 Total $74,000,000 36(29) LSUHSC-NO Campus Stormwater Infrastructure 37 Upgrades, Planning and Construction 38 (Orleans) 39 Payable from General Obligation Bonds 40 Priority 5 $ 3,000,000 41 Payable from Fees and Self-Generated Revenues $ 1,000,000 42 Total $ 4,000,000 43(1522)Health Science Center Facility Renovations - 44 Dental School Simulation Facility 45 (Orleans) 46 Payable from General Obligation Bonds 47 Priority 1 $ 54,607 Page 29 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 119/604SLSU HEALTH SCIENCES CENTER - SHREVEP ORT 2(17) Gross Anatomy Lab Expansion and Modernization, 3 Planning and Construction 4 (Caddo) 5 Payable from General Obligation Bonds 6 Priority 1 $ 160,000 7 Priority 5 $ 1,965,000 8 Total $ 2,125,000 9(18) Center for Medical Education and Wellness, 10 Planning and Construction 11 (Caddo) 12 Payable from General Obligation Bonds 13 Priority 1 $18,750,000 14 Payable from Fees and Self-Generated Revenues $16,000,000 15 Total $34,750,000 16(1520)Capital Improvement Projects, Design and Engineering 17 (Caddo) 18 Payable from General Obligation Bonds 19 Priority 1 $ 2,019,423 20(1523)Medical School B-Building HVAC Replacement, 21 Planning and Construction 22 (Caddo) 23 Payable from General Obligation Bonds 24 Priority 1 $ 4,770,932 25(1534)Stonewall Animal Research and Training Facility, 26 Planning and Construction 27 (DeSoto) 28 Payable from General Obligation Bonds 29 Priority 5 $ 5,000,000 30 Payable from the Capital Outlay Savings Fund $ 500,000 31 Total $ 5,500,000 32(1539)Comprehensive Emergency Water Supply Improvements, 33 Planning and Construction 34 (Caddo) 35 Payable from General Obligation Bonds 36 Priority 5 $ 7,501,650 3719/605LSU EUNICE 38(132) Manuel Hall Exterior Wall and Roof Repair, 39 Planning and Construction 40 (Acadia) 41 Payable from General Obligation Bonds 42 Priority 1 $ 2,714,179 43(134) Athletic Complex Facility, Planning and Construction 44 (Acadia) 45 Payable from General Obligation Bonds 46 Priority 5 $ 9,750,000 47 Payable from State General Fund (Direct) Non-Recurring 48 Revenues $ 750,000 49 Total $10,500,000 Page 30 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 119/606LSU SHREVEPORT 2(30) Building Exterior Walls and Bridge Repair, Planning 3 and Construction 4 (Caddo) 5 Payable from General Obligation Bonds 6 Priority 1 $ 3,099,917 7(31) Boiler Installation Renovation (B&E, BH, 8 HP&E, TC, UC), Planning and Construction 9 (Caddo) 10 Payable from State General Fund (Direct) Non-Recurring 11 Revenues $ 410,000 1219/607LSU AGRICULTURAL CENTER 13(21) Animal and Food Science Facilities Renovations 14 and Modernizations, Phase II, Planning and Construction 15 (East Baton Rouge) 16 Payable from General Obligation Bonds 17 Priority 1 $ 600,000 18 Priority 5 $29,403,500 19 Total $30,003,500 20(22) Renewable and Natural Resources Building Repairs, 21 Planning and Construction 22 (East Baton Rouge) 23 Payable from General Obligation Bonds 24 Priority 1 $ 1,000,000 25(135) Dean Lee Tornado Damage Building Repairs 26 and Reconstruction 27 (Rapides) 28 Payable from General Obligation Bonds 29 Priority 1 $ 1,500,000 30(1540)John M. Parker Agricultural Center & Livestock Show 31 Barn Renovations and Repairs 32 (East Baton Rouge) 33 Payable from General Obligation Bonds 34 Priority 5 $23,000,000 35 Payable from Fees and Self-Generated Revenues $ 7,000,000 36 Total $30,000,000 3719/609PENNINGTON BIOMEDICAL RESEARCH CENTER 38(23) Pennington Biomedical Clinical Research Building 39 Imaging Center and High Tech Research 40 Instrumentation Equipment 41 (East Baton Rouge) 42 Payable from General Obligation Bonds 43 Priority 2 $ 50,000 44 Payable from State General Fund (Direct) Non-Recurring 45 Revenues $ 50,000 46 Total $ 100,000 Page 31 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 119/612BATON ROUGE COMMUNITY COLLEG E 2(252) Allied Health Facility and Other Campus Development, 3 with Equipment, Planning and Construction 4 (East Baton Rouge) 5 Payable from General Obligation Bonds 6 Priority 5 $35,000,000 719/614SOUTHERN UNIVERSITY LAW CENTER 8(695) Renovations and Addition to Existing Law Library, 9 Planning and Construction 10 (East Baton Rouge) 11 Payable from General Obligation Bonds 12 Priority 1 $ 650,000 13 Priority 5 $10,425,000 14 Total $11,075,000 15Pending approval of the Noncash Line of Credit by the State Bond Commission prior to June 1630, 2022. 1719/616SOUTHERN UNIVERSITY - BATON ROUG E 18(345) New STEM Science Complex, Planning and Construction 19 (East Baton Rouge) 20 Payable from General Obligation Bonds 21 Priority 1 $ 2,699,962 22 Priority 5 $63,800,000 23 Total $66,499,962 24(346) Stewart Hall - Wall Mount HVAC Units 1st, 2nd 25 and 3rd Floors, Planning and Construction 26 (East Baton Rouge) 27 Payable from General Obligation Bonds 28 Priority 1 $ 1,799,955 29(347) New Southern University Laboratory School 30 Classroom/Cafeteria/Gymnasium/Athletic Enhancement 31 Building, Planning and Construction 32 (East Baton Rouge) 33 Payable from General Obligation Bonds 34 Priority 1 $ 1,000,000 35 Priority 2 $ 1,000,000 36 Priority 5 $52,000,000 37 Total $54,000,000 38(348) Ravine, Bluff and Riverbank Stabilization Project, 39 Planning and Construction 40 (East Baton Rouge) 41 Payable from General Obligation Bonds 42 Priority 1 $ 1,000,000 43 Priority 5 $31,000,600 44 Total $32,000,600 Page 32 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(390) School of Business/Professional Accountancy, 2 Planning and Construction 3 (East Baton Rouge) 4 Payable from General Obligation Bonds 5 Priority 1 $ 1,250,000 6 Priority 5 $33,250,000 7 Total $34,500,000 8Pending approval of the Noncash Line of Credit by the State Bond Commission prior to June 930, 2022. 10(673) Renovation of Fisher Hall, Planning and Construction 11 (East Baton Rouge) 12 Payable from General Obligation Bonds 13 Priority 1 $ 3,315,889 14(1433)A.O. Williams Hall Renovations 15 (East Baton Rouge) 16 Payable from General Obligation Bonds 17 Priority 1 $ 4,251,149 1819/617SOUTHERN UNIVERSITY - NEW ORLEANS 19(1331)ADA Compliant Restrooms and Public Accommodations 20 in the Cafeteria, University Center, Health & Physical 21 Education, Library and Administration Building, 22 Planning and Construction 23 (Orleans) 24 Payable from General Obligation Bonds 25 Priority 1 $ 499,961 26 Priority 5 $ 1,150,000 27 Total $ 1,649,961 28(1444)Campus Exterior Lighting Upgrades, 29 Planning and Construction 30 (Orleans) 31 Payable from General Obligation Bonds 32 Priority 2 $ 1,000,000 3319/618SOUTHERN SHREVEP ORT 34(1330)Louis Collier Hall Science Building Renovation, 35 Planning and Construction 36 (Caddo) 37 Payable from General Obligation Bonds 38 Priority 1 $ 749,961 39 Priority 5 $ 3,255,000 40 Total $ 4,004,961 41(1521)New Workforce Training and Technology Center, 42 Planning and Construction 43 (Caddo) 44 Payable from General Obligation Bonds 45 Priority 1 $ 676,000 46 Priority 5 $18,500,000 47 Total $19,176,000 Page 33 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 119/619SOUTHERN UNIVERSITY AG RICULTURAL RESEARCH AND 2 EXTENSION CENTER 3(1337)Disaster Relief Mega Shelter, Planning and Construction 4 (East Baton Rouge) 5 Payable from General Obligation Bonds 6 Priority 1 $ 868,544 7 Priority 5 $ 9,650,000 8 Total $10,518,544 919/621NICHOLLS STATE UNIVERSITY 10(10) Coastal Center Facility, Planning and Construction 11 (Lafourche) 12 Payable from General Obligation Bonds 13 Priority 1 $11,250,000 14 Payable from State General Fund (Direct) Non-Recurring 15 Revenues $ 6,000,000 16 Total $17,250,000 17(13) Stopher Hall Restroom ADA Upgrade, 18 Planning and Construction 19 (Lafourche) 20 Payable from General Obligation Bonds 21 Priority 1 $ 1,058,995 2219/623GRAMBLING STATE UNIVERSITY 23(325) Criminal Justice Building Renovation 24 (Lincoln) 25 Payable from General Obligation Bonds 26 Priority 1 $ 800,000 27 Priority 5 $10,500,000 28 Total $11,300,000 29(326) Reroof, Waterproof, Envelope Repairs for Various 30 Buildings, Planning and Construction 31 (Lincoln) 32 Payable from General Obligation Bonds 33 Priority 2 $ 1,000,000 34 Priority 5 $ 7,500,000 35 Total $ 8,500,000 36(328) Campus Utility Infrastructure Assessment Emergency 37 Repair/Replacement, Planning and Construction 38 (Lincoln) 39 Payable from General Obligation Bonds 40 Priority 1 $ 3,000,000 41 Priority 5 $ 5,000,000 42 Total $ 8,000,000 4319/625LOUISIANA TECH UNIVERSITY 44(220) Renovation of George T. Madison Hall, 45 Planning and Construction 46 (Lincoln) 47 Payable from General Obligation Bonds 48 Priority 2 $ 2,000,000 49 Priority 5 $36,000,000 50 Total $38,000,000 Page 34 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(221) Comprehensive ADA Assessment/Remediation, 2 Planning and Construction 3 (Lincoln) 4 Payable from General Obligation Bonds 5 Priority 1 $ 28,762 6(1505)Central Steam Generator - Switch Gear, Planning 7 and Construction 8 (Lincoln) 9 Payable from General Obligation Bonds 10 Priority 2 $ 300,000 11 Priority 5 $ 3,200,000 12 Total $ 3,500,000 13(1509)Agriculture and Forestry Wood Products Education 14 and Research Center, Planning and Construction 15 (Lincoln) 16 Payable from General Obligation Bonds 17 Priority 2 $ 1,000,000 18 Priority 5 $ 9,000,000 19 Total $10,000,000 2019/627MCNEESE STATE UNIVERSITY 21(41) McNeese Disaster Recovery, Planning 22 and Construction 23 (Calcasieu) 24 Payable from General Obligation Bonds 25 Priority 1 $ 6,000,000 26 Priority 5 $ 4,000,000 27 Total $10,000,000 28(42) Contraband Bayou Erosion Retaining Wall, Phase II, 29 Planning and Construction 30 (Calcasieu) 31 Payable from General Obligation Bonds 32 Priority 1 $ 1,000,000 33(43) Shearman Fine Arts Building Renovation and Addition, 34 Planning and Construction 35 (Calcasieu) 36 Payable from General Obligation Bonds 37 Priority 1 $ 3,025,000 38 Priority 5 $ 4,700,000 39 Total $ 7,725,000 4019/629UNIVERSITY OF LOUISIANA - MONROE 41(210) Health Science Complex Renovation, Sugar Hall and 42 Caldwell Hall, Planning and Construction 43 (Ouachita) 44 Payable from General Obligation Bonds 45 Priority 1 $ 5,722,729 46 Priority 5 $ 6,600,000 47 Total $12,322,729 Page 35 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 119/631NORTHWESTERN STATE UNIVERSITY 2(259) Athletic Field House Improvements, Planning 3 and Construction 4 (Natchitoches) 5 Payable from State General Fund (Direct) Non-Recurring 6 Revenues $ 5,000,000 7(278) Renovation of Roy Hall, Planning and Construction 8 (Natchitoches) 9 Payable from General Obligation Bonds 10 Priority 2 $ 500,000 11 Priority 5 $ 9,265,000 12 Total $ 9,765,000 13(282) Replacement of John S. Kyser Hall, Planning 14 and Construction 15 (Natchitoches) 16 Payable from General Obligation Bonds 17 Priority 1 $ 4,907,680 18 Priority 5 $32,195,000 19 Total $37,102,680 2019/634SOUTHEASTERN LOUISIANA UNIVERSITY 21(1) D. Vickers Hall Renovation and Addition, Planning 22 and Construction 23 (Tangipahoa) 24 Payable from General Obligation Bonds 25 Priority 1 $15,920,000 26 Priority 5 $ 5,100,000 27 Total $21,020,000 28(2) Baton Rouge Nursing Center Renovation, Planning 29 and Construction 30 (Tangipahoa) 31 Payable from General Obligation Bonds 32 Priority 1 $ 780,000 33 Priority 5 $ 9,220,000 34 Total $10,000,000 35(3) Academic Athletic Training and Ancillary Athletic 36 Facility, Planning and Construction 37 (Tangipahoa) 38 Payable from General Obligation Bonds 39 Priority 1 $ 800,000 40 Priority 5 $12,500,000 41 Total $13,300,000 42(1518)Nursing and Health Science Building, Planning 43 and Construction 44 (Tangipahoa) 45 Payable from General Obligation Bonds 46 Priority 2 $ 600,000 47 Priority 5 $31,300,000 48 Total $31,900,000 Page 36 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 119/640UNIVERSITY OF LOUISIANA - LAFAYETTE 2(5) DeClouet Hall Renovation, Planning and Construction 3 (Lafayette) 4 Payable from General Obligation Bonds 5 Priority 1 $ 375,000 6(6) Foster Hall Renovation, Planning and Construction 7 (Lafayette) 8 Payable from General Obligation Bonds 9 Priority 1 $ 500,000 10 Priority 5 $ 3,290,000 11 Total $ 3,790,000 12(7) Madison Hall Renovation, Planning and Construction 13 (Lafayette) 14 Payable from General Obligation Bonds 15 Priority 5 $18,000,000 16(8) Health Care Education and Training Facility, Planning 17 and Construction 18 (Lafayette) 19 Payable from General Obligation Bonds 20 Priority 1 $ 5,749,968 21 Priority 5 $ 7,500,000 22 Payable from Fees and Self-Generated Revenues $10,000,000 23 Total $23,249,968 24(9) Engineering Classroom Building, Planning 25 and Construction 26 (Lafayette) 27 Payable from General Obligation Bonds 28 Priority 1 $13,733,427 29 Payable from Fees and Self-Generated Revenues $10,000,000 30 Total $23,733,427 31(1256)NIRC BSL-3 Lab and Animal Housing, 32 Planning and Construction 33 (Iberia) 34 Payable from General Obligation Bonds 35 Priority 5 $10,600,000 36 Payable from the Capital Outlay Savings Fund $10,000,000 37 Total $20,600,000 38(1279)NIRC Iberia BioInnovation Accelerator GMP CDMO, 39 Planning and Construction 40 (Iberia) 41 Payable from General Obligation Bonds 42 Priority 5 $15,400,000 43 Payable from the Capital Outlay Savings Fund $ 6,000,000 44 Total $21,400,000 Page 37 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 119/646RIVER PARISHES COMMUNITY COLLEG E 2(1446)Donaldsonville Renovation Project, Planning 3 and Construction 4 (Ascension) 5 Payable from General Obligation Bonds 6 Priority 1 $ 100,000 7 Priority 5 $ 1,000,000 8 Total $ 1,100,000 919/647LOUISIANA DELTA COMMUNITY COLLEG E 10(249) Campus Expansion for Louisiana Delta Community 11 College, Winnsboro, Planning and Construction 12 (Franklin) 13 Payable from General Obligation Bonds 14 Priority 1 $ 150,000 15 Priority 5 $ 3,000,000 16 Total $ 3,150,000 17(1431)Campus Development for Louisiana Delta Community 18 College Bastrop, Planning and Construction 19 (Morehouse) 20 Payable from General Obligation Bonds 21 Priority 5 $ 9,000,000 2219/649LOUISIANA COMMUNITY AND TECHNICAL 23 COLLEGE SYSTEM 24(251) Resurface Campus Parking, Planning and Construction 25 (Calcasieu) 26 Payable from General Obligation Bonds 27 Priority 1 $ 150,000 28 Priority 5 $ 2,500,000 29 Total $ 2,650,000 30(334) Maritime/Petroleum Workforce Training Academy, 31 Planning and Construction 32 (Terrebonne) 33 Payable from General Obligation Bonds 34 Priority 1 $ 9,416,441 3519/671BOARD OF REGENTS 36(1335)System-Wide Telecommunications Wiring and Equipment, 37 Planning and Construction 38 (Statewide) 39 Payable from General Obligation Bonds 40 Priority 1 $ 2,233,920 41(1336)Land Acquisition for Post Secondary Educational 42 Institutions 43 (Statewide) 44 Payable from General Obligation Bonds 45 Priority 1 $ 1,995,412 46 Priority 5 $ 2,000,000 47 Payable from the Capital Outlay Savings Fund $ 8,000,000 48 Total $11,995,412 Page 38 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1Provided that $8,000,000 of the amount appropriated from the Capital Outlay Savings Fund 2shall be used for the acquisition of the former Our Lady of Lourdes Hospital Facility. 3( )Major Repairs and Deferred Maintenance 4 of Buildings and Facilities, Planning and 5 Construction 6 (Statewide) 7 Payable from State General Fund (Direct) Non-Recurring 8 Revenues $50,000,000 9Pending submittal of the capital outlay budget request pursuant to the provisions of R.S. 1039:112. 1119/673NEW ORLEANS CENTER F OR THE CREATIVE ARTS 12(1212)Roof Replacement, Planning and Construction 13 (Orleans) 14 Payable from General Obligation Bonds 15 Priority 1 $ 453,206 1619/674LOUISIANA UNIVERSITIES MARINE CONSORTIUM 17(1333)Research Vessel (R/V Pelican) Replacement 18 (Terrebonne) 19 Payable from General Obligation Bonds 20 Priority 1 $10,890,000 21 Priority 5 $31,000,000 22 Total $41,890,000 23(1334)Houma Marine Campus Phase 2, Planning and Construction 24 (Terrebonne) 25 Payable from General Obligation Bonds 26 Priority 1 $11,996,174 27(1527)LUMCON Houma Marine Campus, Planning 28 and Construction 29 (Terrebonne) 30 Payable from General Obligation Bonds 31 Priority 1 $10,400,000 3219/712LOUISIANA TECHNICAL COLLEG E-SULLIVAN 33 CAMPUS 34(248) New Diesel Automotive Building, Northshore Technical 35 Community College - Sullivan Campus, Planning 36 and Construction 37 (Washington) 38 Payable from General Obligation Bonds 39 Priority 5 $ 9,140,000 4019/731FLETCHER TECHNICAL COMMUNITY COLLEG E 41(246) Precision Agriculture Training Facility, Planning 42 and Construction 43 (Terrebonne) 44 Payable from General Obligation Bonds 45 Priority 1 $ 5,498,000 46 Priority 5 $ 5,502,000 47 Total $11,000,000 Page 39 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1Pending approval of the Noncash Line of Credit by the State Bond Commission prior to June 230, 2022. 3 JUDICIAL EXPENSES 423/949LOUISIANA JUDICIARY 5(1528)Land Acquisition, Planning, and Construction of New 6 Courthouse for the Louisiana Court of Appeal, Third Circuit 7 (Calcasieu) 8 Payable from General Obligation Bonds 9 Priority 1 $ 268,700 10 LEVEE DISTRICTS & PORTS 1136/L13PONTCHARTRAIN LEVEE DISTRICT 12(1228)Lake Pontchartrain West Shore Hurricane Protection 13 Project 14 (Ascension, St. Charles, St. James, St. John the Baptist) 15 Payable from General Obligation Bonds 16 Priority 1 $ 3,327,000 17 Priority 5 $ 5,170,000 18 Total $ 8,497,000 19( )Amite River Diversion Canal Weir, 20 Planning and Construction 21 (Ascension, Livingston, St. James) 22 Payable from State General Fund (Direct) Non-Recurring 23 Revenues $ 5,000,000 24Pending submittal and late approval of the capital outlay budget request pursuant to the 25provisions of R.S. 39:112. 2636/L15SQUIRREL RUN LEVEE DRAINAG E DISTRICT 27(237) Maintenance of Levee and FEMA Certification 28 (Iberia) 29 Payable from General Obligation Bonds 30 Priority 1 $ 250,000 31 Priority 5 $ 200,000 32 Total $ 450,000 3336/L16SOUTH LAFOURCHE LEVEE DISTRICT 34(721) Larose to Golden Meadow Hurricane Protection System, 35 Planning and Construction 36 (Lafourche) 37 Payable from General Obligation Bonds 38 Priority 5 $10,200,000 Page 40 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 136/L24ST. TAMMANY LEVEE DRAINAG E AND 2 CONSERVATION DISTRICT 3(1121)South Slidell - Fritchie Coastal Resilience, Planning 4 and Construction 5 (St. Tammany) 6 Payable from General Obligation Bonds 7 Priority 1 $ 220,000 8 Priority 5 $ 4,500,000 9 Total $ 4,720,000 10(1123)Military Road Flood Risk Reduction, Planning 11 and Construction 12 (St. Tammany) 13 Payable from General Obligation Bonds 14 Priority 5 $ 4,500,000 15(1124)Eden Isle Roadway Infrastructure Flood Resilience, 16 Planning and Construction 17 (St. Tammany) 18 Payable from General Obligation Bonds 19 Priority 5 $ 4,500,000 2036/L25GRAND ISLE INDEPENDENT LEVEE DISTRICT 21(1389)Grand Isle Back Levee Flood Protection, Planning 22 and Construction 23 (Jefferson) 24 Payable from General Obligation Bonds 25 Priority 1 $ 1,500,000 26(1390)Breakwater Protection, Planning and Construction 27 (Jefferson) 28 Payable from General Obligation Bonds 29 Priority 1 $ 734,160 3036/L26NATCHITOCHES LEVEE AND DRAINAG E DISTRICT 31(438) Lower Cane River Area Flow Control Structure and 32 Levee Surface Restorations, Planning and Construction 33 (Natchitoches) 34 Payable from General Obligation Bonds 35 Priority 1 $ 143,250 36 Priority 5 $ 765,000 37 Total $ 908,250 3836/L34LAKEFRONT MANAG EMENT AUTHORITY 39(907) Seabrook Public Boat Launch Rehabilitation, Planning 40 and Construction 41 (Orleans) 42 Payable from General Obligation Bonds 43 Priority 1 $ 160,000 44 Priority 5 $ 1,780,000 45 Payable from State General Fund (Direct) Non-Recurring 46 Revenues $ 60,000 47 Total $ 2,000,000 Page 41 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(908) Planning, Designing and Constructing Public Use Pavilions 2 Inclusive of Benches and Tables along 5.2 Miles of Public 3 Parks and Green Space along New Orleans Lakeshore Drive 4 (Orleans) 5 Payable from General Obligation Bonds 6 Priority 5 $ 168,750 736/L36LAFITTE AREA INDEPENDENT LEVEE DISTRICT 8(1465)Lower Lafitte (Orange Street) Basin, Planning 9 and Construction 10 (Jefferson) 11 Payable from General Obligation Bonds 12 Priority 1 $ 2,500,000 13 Priority 5 $14,492,500 14 Total $16,992,500 15(1489)Goose Bayou/The Pen Levee Basin, Planning 16 and Construction 17 (Jefferson) 18 Payable from General Obligation Bonds 19 Priority 1 $ 1,000,000 20 Priority 5 $14,066,000 21 Total $15,066,000 2236/P10GREATER LAFOURCHE PORT COMMISSION 23(1388)Fourchon Bridge and Connector Road, Planning 24 and Construction 25 (Lafourche) 26 Payable from General Obligation Bonds 27 Priority 1 $ 500,000 28 Priority 5 $ 4,910,000 29 Payable from State General Fund (Direct) Non-Recurring 30 Revenues $ 500,000 31 Total $ 5,910,000 3236/P15MORGAN CITY HARBOR AND TERMINAL DISTRICT 33(604) Berwick Bay Dredge Material Beneficial Use Project, 34 Planning and Construction 35 (St. Mary) 36 Payable from General Obligation Bonds 37 Priority 5 $ 3,745,000 3836/P17PORT OF NEW ORLEANS 39(1039)Milan Upland Yard Improvements 40 (Orleans) 41 Payable from General Obligation Bonds 42 Priority 1 $ 606,200 43 Priority 5 $ 9,171,100 44 Total $ 9,777,300 45(1040)Jourdan Road Terminal Cold Storage Expansion 46 (Orleans) 47 Payable from General Obligation Bonds 48 Priority 1 $ 7,955,000 Page 42 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(1041)Napoleon Avenue Container Crane Expansion Project, 2 Planning and Construction 3 (Orleans) 4 Payable from General Obligation Bonds 5 Priority 1 $ 8,100,000 6(1042)Cruise Ship Terminal, Planning and Construction 7 (Orleans) 8 Payable from General Obligation Bonds 9 Priority 1 $ 197,200 10 Priority 5 $ 6,690,000 11 Total $ 6,887,200 12(1206)St. Bernard Transportation Corridor, Planning and Construction 13 (St. Bernard) 14 Payable from General Obligation Bonds 15 Priority 5 $50,000,000 16(1210)St. Claude Bridge Rehabilitation, Planning and Construction 17 (Orleans) 18 Payable from General Obligation Bonds 19 Priority 5 $30,500,000 2036/P21PORT OF SOUTH LOUISIANA 21(653) Globalplex Rail Siding ($5,577,932 22 Local/Federal/Other Match) 23 (St. John the Baptist) 24 Payable from General Obligation Bonds 25 Priority 1 $ 2,496,700 26 Priority 2 $ 2,150,000 27 Total $ 4,646,700 28(654) Globalplex Terminal Building #71 and Other 29 Globalplex Terminal Building Upgrades, Planning 30 and Construction 31 (St. John the Baptist) 32 Payable from General Obligation Bonds 33 Priority 1 $ 567,361 34 Priority 5 $ 1,000,000 35 Total $ 1,567,361 36(655) Globalplex Dock Access Bridge and Equipment 37 Replacement/Repair, Planning and Construction 38 (St. John the Baptist) 39 Payable from General Obligation Bonds 40 Priority 1 $ 967,687 41 Priority 5 $ 7,705,000 42 Total $ 8,672,687 4336/P23TERREBONNE PORT COMMISSION 44(583) Slip Dredging, Houma Navigation Canal Dredging, 45 Planning and Construction 46 (Terrebonne) 47 Payable from General Obligation Bonds 48 Priority 1 $ 2,561,923 Page 43 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 136/P26PORT OF LAKE CHARLES 2(1019)Two Mobile Harbor Cranes for BT-1, Planning 3 and Construction 4 (Calcasieu) 5 Payable from General Obligation Bonds 6 Priority 1 $ 2,977,500 7(1501)Berths 4, 5, & 6 Wharf and Shed Reconstruction at 8 City Docks, Planning and Construction 9 (Calcasieu) 10 Payable from General Obligation Bonds 11 Priority 2 $13,000,000 12 Priority 5 $83,400,000 13 Total $96,400,000 1436/P35MERMENTAU RIVER HARBOR AND TERMINAL DISTRICT 15(984) Slip Improvements, Planning and Construction 16 (Acadia) 17 Payable from General Obligation Bonds 18 Priority 1 $ 925,000 1936/P36CENTRAL LOUISIANA REG IONAL PORT 20(1284)CLRP High Water Hardstand and Access Road, 21 Construction and Planning 22 (Rapides) 23 Payable from General Obligation Bonds 24 Priority 2 $ 175,000 25 Priority 5 $ 1,800,000 26 Total $ 1,975,000 2736/P41JEFFERSON PARISH PORT DISTRICT 28(731) Avondale Marine Facility Improvements, Planning 29 and Construction 30 (Jefferson) 31 Payable from General Obligation Bonds 32 Priority 1 $ 1,500,000 3336/P43COLUMBIA PORT COMMISSION 34(688) Railroad Spur, Planning and Construction 35 (Caldwell) 36 Payable from General Obligation Bonds 37 Priority 1 $ 155,000 38 Priority 5 $ 1,841,000 39 Total $ 1,996,000 4036/P44AVOYELLES PORT COMMISSION 41(304) Liquid Fertilizer Tank Terminal Expansion, Planning 42 and Construction 43 (Avoyelles) 44 Payable from General Obligation Bonds 45 Priority 1 $ 150,000 46 Priority 5 $ 600,000 47 Total $ 750,000 Page 44 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1 MISCELLANEOUS NON-STATE 250/J01ACADIA PARISH 3(963) Old Spanish Trail Roadway Improvements to Provide 4 for Freight Traffic Bypass of Dangerous Railroad 5 Crossing, Planning and Construction 6 (Acadia) 7 Payable from General Obligation Bonds 8 Priority 2 $ 460,000 9(964) Improvements to the Acadia Parish Courthouse Building 10 (Window Replacement), Planning and Construction 11 (Acadia) 12 Payable from General Obligation Bonds 13 Priority 5 $ 842,000 14 Payable from State General Fund (Direct) Non-Recurring 15 Revenues $ 102,000 16 Total $ 944,000 1750/J04ASSUMPTION PARISH 18(849) Assumption Parish Pumps and Drainage, Planning 19 and Construction 20 (Assumption) 21 Payable from General Obligation Bonds 22 Priority 1 $ 500,000 23(850) Plattenville Drainage Improvements, Planning 24 and Construction 25 (Assumption) 26 Payable from General Obligation Bonds 27 Priority 1 $ 1,800,000 28(851) Lee Drive Repaving, Planning and Construction 29 (Assumption) 30 Payable from General Obligation Bonds 31 Priority 1 $ 300,000 32 Priority 5 $ 1,428,000 33 Total $ 1,728,000 3450/J05AVOYELLES PARISH 35(1496)Parishwide Roadway Improvements, 36 Planning and Construction 37 (Avoyelles) 38 Payable from State General Fund (Direct) Non-Recurring 39 Revenues $ 525,000 4050/J06BEAUREGARD PARISH 41(391) Parish Line Road Improvements, Planning 42 and Construction 43 (Beauregard) 44 Payable from General Obligation Bonds 45 Priority 5 $ 312,000 Page 45 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(813) Camp Edgewood Road Improvements - Beauregard 2 Parish Police Jury 3 (Beauregard) 4 Payable from General Obligation Bonds 5 Priority 1 $ 750,000 650/J08BOSSIER PARISH 7(840) Improvements to LA Highway 3 (Benton Road) 8 and I-220 Interchange, Planning and Construction 9 (Bossier) 10 Payable from General Obligation Bonds 11 Priority 5 $ 3,000,000 1250/J11CALDWELL PARISH 13(679) Swim Lake Road, Planning and Reconstruction 14 (Caldwell) 15 Payable from General Obligation Bonds 16 Priority 2 $ 450,000 17(680) Wiles Road and Kountry Korner Road, 18 Planning and Reconstruction 19 (Caldwell) 20 Payable from General Obligation Bonds 21 Priority 2 $ 500,000 2250/J12CAMERON PARISH 23(1247)North Cameron Emergency Operations Center, 24 Planning and Construction 25 (Cameron) 26 Payable from General Obligation Bonds 27 Priority 5 $ 1,975,000 28 Payable from State General Fund (Direct) Non-Recurring 29 Revenues $ 125,000 30 Total $ 2,100,000 31(1300)Marshall Street Pumps, Planning and Construction 32 (Cameron) 33 Payable from State General Fund (Direct) Non-Recurring 34 Revenues $ 125,000 3550/J17EAST BATON ROUG E PARISH 36(46) East Baton Rouge Parish Flood Risk Reduction Project- 37 Expand, Repair, and Modify Drainage System throughout 38 East Baton Rouge Parish 39 (East Baton Rouge) 40 Payable from General Obligation Bonds 41 Priority 1 $10,451,787 42 Priority 5 $24,500,000 43 Total $34,951,787 Page 46 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/J18EAST CARROLL PARISH 2(1195)Spillway Structure Repairs for Lake Providence Lake 3 and Cleaning of Outfall Canal from the Lake Downstream, 4 Planning and Construction 5 (East Carroll) 6 Payable from General Obligation Bonds 7 Priority 1 $ 100,000 8 Priority 5 $ 300,000 9 Total $ 400,000 1050/J20EVANGELINE PARISH 11(546) Beaver Creek, LA Highway 106, Planning 12 and Construction 13 (Evangeline) 14 Payable from General Obligation Bonds 15 Priority 2 $ 800,000 16 Priority 5 $ 7,200,000 17 Total $ 8,000,000 18(547) St. Landry, LA 106, Planning and Construction 19 (Evangeline) 20 Payable from General Obligation Bonds 21 Priority 2 $ 600,000 22 Priority 5 $ 5,400,000 23 Total $ 6,000,000 2450/J21FRANKLIN PARISH 25(323) Franklin Parish Activity Center, Planning 26 and Construction 27 (Franklin) 28 Payable from General Obligation Bonds 29 Priority 1 $ 500,000 30(605) WPA Road Reconstruction for Economic 31 Development, Planning and Construction 32 (Franklin) 33 Payable from General Obligation Bonds 34 Priority 2 $ 500,000 35 Priority 5 $ 1,920,000 36 Total $ 2,420,000 37(606) Economic Development, Planning, and 38 Reconstruction of Dummy Line Road 39 (Franklin) 40 Payable from General Obligation Bonds 41 Priority 2 $ 380,000 42 Priority 5 $ 3,125,000 43 Total $ 3,505,000 44(609) Riley Road Improvements, Planning 45 and Construction 46 (Franklin) 47 Payable from State General Fund (Direct) Non-Recurring 48 Revenues $ 605,000 Page 47 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(667) LD Knox Road Reconstruction, Planning 2 and Construction 3 (Franklin) 4 Payable from General Obligation Bonds 5 Priority 5 $ 1,555,000 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 100,000 8 Total $ 1,655,000 950/J23IBERIA PARISH 10(225) Evacuation Center at Acadiana Fairgrounds, Planning 11 and Construction 12 (Iberia) 13 Payable from General Obligation Bonds 14 Priority 5 $ 8,000,000 15(234) LaSalle Street and Hanger Road Extensions, 16 Planning and Construction 17 (Iberia) 18 Payable from General Obligation Bonds 19 Priority 2 $ 400,000 20(1466)Sewer System Improvements, Planning 21 and Construction 22 (Iberia) 23 Payable from General Obligation Bonds 24 Priority 1 $ 187,812 25(1529)Courthouse Elevators, Planning and Construction 26 (Iberia) 27 Payable from General Obligation Bonds 28 Priority 1 $ 180,000 2950/J24IBERVILLE PARISH 30(1253)Manchac Roadway Improvements 31 (Iberville) 32 Payable from General Obligation Bonds 33 Priority 5 $ 2,400,000 3450/J26JEFFERSON PARISH 35(57) Lafreniere Park Family Recreation Complex, 36 Planning and Construction 37 (Jefferson) 38 Payable from General Obligation Bonds 39 Priority 5 $ 2,250,000 40(58) 4th Street Shared-Use Path (Barataria Blvd. to Gretna 41 City Limits), Planning and Construction 42 (Jefferson) 43 Payable from General Obligation Bonds 44 Priority 1 $ 175,000 45 Priority 5 $ 2,196,600 46 Total $ 2,371,600 Page 48 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(62) Woodmere Playground Improvements, Planning 2 and Construction 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 1 $ 970,000 6 Priority 5 $ 1,190,000 7 Payable from State General Fund (Direct) Non-Recurring 8 Revenues $ 750,000 9 Total $ 2,910,000 10(64) Woodlake Estates Drainage Improvements, Planning 11 and Construction 12 (Jefferson) 13 Payable from General Obligation Bonds 14 Priority 1 $ 150,000 15 Priority 5 $ 5,000,000 16 Payable from State General Fund (Direct) Non-Recurring 17 Revenues $ 350,000 18 Total $ 5,500,000 19(81) Hickory Avenue (LA 3154) Rehabilitation 20 (River Road to 10 th Street), Planning and Construction 21 (Jefferson) 22 Payable from General Obligation Bonds 23 Priority 2 $ 600,000 24 Priority 5 $ 6,270,000 25 Total $ 6,870,000 26(87) Canal #13 Concrete Lining (Loyola Drive to Butler Canal) 27 (Jefferson) 28 Payable from General Obligation Bonds 29 Priority 1 $ 250,000 30 Priority 5 $ 3,750,000 31 Total $ 4,000,000 32(93) Preservation and Restoration of Historic Structures for 33 Hope Haven/Madonna Manor Campus, Planning 34 and Construction 35 (Jefferson) 36 Payable from General Obligation Bonds 37 Priority 1 $ 6,358,247 38(94) Gretna Government Complex Parking Lot, Planning 39 and Construction 40 (Jefferson) 41 Payable from General Obligation Bonds 42 Priority 1 $ 99,600 43(96) West Esplanade Pump Station, Planning and Construction 44 (Jefferson) 45 Payable from General Obligation Bonds 46 Priority 1 $ 3,500,000 47(97) Riverside Senior Center, Planning and Construction 48 (Jefferson) 49 Payable from General Obligation Bonds 50 Priority 1 $ 948,000 51 Priority 5 $ 1,455,000 52 Total $ 2,403,000 Page 49 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(98) Rehabilitation of Alex Kornman Blvd. and Long Leaf 2 Lane, Planning and Construction 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 5 $ 3,000,000 6(99) New Access Road in the Churchill Technology and 7 Business Park for Delgado's Advanced Manufacturing 8 and River City Campus, Planning and Construction 9 (Jefferson) 10 Payable from General Obligation Bonds 11 Priority 1 $ 200,000 12 Priority 5 $ 1,350,000 13 Total $ 1,550,000 14(102) Woodmere Youth Center, Planning and Construction 15 (Jefferson) 16 Payable from General Obligation Bonds 17 Priority 1 $ 99,862 18(104) Sewer Lift Station Backup Generators - North, Planning 19 and Construction 20 (Jefferson) 21 Payable from General Obligation Bonds 22 Priority 1 $ 575,000 23(106) Bucktown Harbor Wave Attenuation Jetty, Planning 24 and Construction 25 (Jefferson) 26 Payable from General Obligation Bonds 27 Priority 1 $ 464,000 28(107) Brown Avenue Canal Improvements between the 29 Westbank Expressway and Harold Street, Planning 30 and Construction 31 (Jefferson) 32 Payable from General Obligation Bonds 33 Priority 1 $ 1,965,578 34 Priority 5 $ 1,500,000 35 Total $ 3,465,578 36(109) Airline Drive (US 61) at 17th Street Canal Drainage 37 Crossing and Railroad Bridge Replacement 38 (Jefferson) 39 Payable from General Obligation Bonds 40 Priority 1 $11,000,000 41 Priority 2 $ 1,000,000 42 Priority 5 $15,090,000 43 Total $27,090,000 44(110) 11th Street Roadway Replacement and Upgrade of 45 Subsurface Drainage System between Queens and 46 Manhattan Boulevard, Planning and Construction 47 (Jefferson) 48 Payable from General Obligation Bonds 49 Priority 1 $ 1,603,850 50 Priority 5 $ 9,175,000 51 Total $10,778,850 Page 50 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(111) Woodland West Drainage Improvements, Planning 2 and Construction 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 1 $ 1,618,000 6 Priority 5 $ 1,000,000 7 Total $ 2,618,000 8(114) East Bank Backup Generators East: Sewer Lift Station 9 Backup Generators (Clearview at W. Napoleon, Cleary at 10 W. Napoleon, Houma at W. Napoleon and Galleria 11 Sewer Station), Planning and Construction 12 (Jefferson) 13 Payable from General Obligation Bonds 14 Priority 5 $ 1,000,000 15(116) Bonnabel Canal Bank Stabilization (West Side) - 16 Veterans Blvd. to West Esplanade, 17 Planning and Construction 18 (Jefferson) 19 Payable from General Obligation Bonds 20 Priority 2 $ 100,000 21 Priority 5 $ 8,000,000 22 Total $ 8,100,000 23(118) Bainbridge Canal Closure from Veterans Boulevard 24 to Terminal Drive, Planning and Construction 25 (Jefferson) 26 Payable from General Obligation Bonds 27 Priority 1 $ 930,000 28 Priority 5 $13,800,000 29 Total $14,730,000 30(126) Bonnabel Blvd. Drainage Improvements 31 (Metairie Rd. to Veterans Blvd.), 32 Planning and Construction 33 (Jefferson) 34 Payable from General Obligation Bonds 35 Priority 2 $ 500,000 36 Priority 5 $19,300,000 37 Total $19,800,000 38(129) Shrewsbury Road at Jefferson Highway Culvert 39 Replacement, Planning and Construction 40 (Jefferson) 41 Payable from General Obligation Bonds 42 Priority 2 $ 450,000 4350/J28LAFAYETTE PARISH 44(167) Cypress Island Swamp Spoil Bank Removal, Planning 45 and Construction 46 (Lafayette, St. Martin) 47 Payable from General Obligation Bonds 48 Priority 1 $ 150,000 49 Priority 5 $ 1,600,000 50 Total $ 1,750,000 Page 51 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(168) Heymann Park Improvements Project, Planning 2 and Construction 3 (Lafayette) 4 Payable from General Obligation Bonds 5 Priority 1 $ 975,250 6(169) Parish Government Complex, Parish Courthouse, Planning 7 and Construction 8 (Lafayette) 9 Payable from General Obligation Bonds 10 Priority 1 $ 6,119,757 11(170) Kaliste Saloom Widening 12 (Lafayette) 13 Payable from General Obligation Bonds 14 Priority 1 $ 120,987 15(171) Bayou Vermilion Flood Control, Planning and 16 Construction 17 (Lafayette) 18 Payable from General Obligation Bonds 19 Priority 1 $ 3,000,000 20 Priority 2 $ 5,000,000 21 Priority 5 $12,000,000 22 Total $20,000,000 23(254) University Avenue Corridor Improvements, Planning, 24 Construction and Acquisition 25 (Lafayette) 26 Payable from General Obligation Bonds 27 Priority 1 $13,000,000 28(787) Performing Arts Center, Planning and Construction 29 (Lafayette) 30 Payable from General Obligation Bonds 31 Priority 2 $ 500,000 32 Priority 5 $ 1,000,000 33 Total $ 1,500,000 3450/J29LAFOURCHE PARISH 35(418) South Lafourche Airport Corridor Project 36 (Lafourche) 37 Payable from General Obligation Bonds 38 Priority 1 $ 4,449,990 39 Priority 5 $ 4,598,137 40 Total $ 9,048,127 41(485) Butch Hill Pump Station Replacement, Planning 42 and Construction 43 (Lafourche) 44 Payable from General Obligation Bonds 45 Priority 2 $ 500,000 46 Priority 5 $ 7,100,000 47 Total $ 7,600,000 Page 52 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/J31LINCOLN PARISH 2(1023)Bridge Replacements on Mitchell and Shady Grove Roads, 3 Planning and Construction 4 (Lincoln) 5 Payable from General Obligation Bonds 6 Priority 1 $ 380,000 750/J32LIVINGSTON PARISH 8(716) Cook Road Extension Economic Development 9 Corridor (Pete's Highway Frontage Road) 10 (Livingston) 11 Payable from General Obligation Bonds 12 Priority 1 $ 3,058,463 13(898) Juban Road North Extension between US 190 14 (Florida Blvd.) and LA 1026 (Lockhart Road), 15 Planning and Construction 16 (Livingston) 17 Payable from General Obligation Bonds 18 Priority 5 $ 6,505,000 19 Payable from State General Fund (Direct) Non-Recurring 20 Revenues $ 250,000 21 Total $ 6,755,000 22(899) Louisiana Highway 64 and Louisiana Highway 1019 23 Roundabout, Planning and Construction 24 (Livingston) 25 Payable from General Obligation Bonds 26 Priority 1 $ 175,000 27 Priority 5 $ 2,500,000 28 Total $ 2,675,000 2950/J34MOREHOUSE PARISH 30(740) Public Works Center, Planning 31 and Construction 32 (Morehouse) 33 Payable from General Obligation Bonds 34 Priority 1 $ 301,750 35(1113)Courthouse Roofing and Repairs, Planning 36 and Construction 37 (Morehouse) 38 Payable from State General Fund (Direct) Non-Recurring 39 Revenues $ 875,000 40(1139)Library Roofing and Repairs, Planning 41 and Construction 42 (Morehouse) 43 Payable from State General Fund (Direct) Non-Recurring 44 Revenues $ 500,000 Page 53 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/J35NATCHITOCHES P ARISH 2(305) Courthouse Security Improvements, Planning 3 and Construction 4 (Natchitoches) 5 Payable from General Obligation Bonds 6 Priority 1 $ 2,192,545 750/J37OUACHITA PARISH 8(219) Hannah's Run Control Structure, Planning 9 and Construction 10 (Ouachita) 11 Payable from General Obligation Bonds 12 Priority 1 $ 187,385 13 Priority 5 $ 200,000 14 Total $ 387,385 15(295) Steep Bayou Sewer - Phase 3, Planning, Construction 16 and Right-of-Way Acquisition 17 (Ouachita) 18 Payable from General Obligation Bonds 19 Priority 1 $ 384,137 20(296) Bayou Mouchoir Drainage Improvements 21 (Ouachita) 22 Payable from General Obligation Bonds 23 Priority 1 $ 500,000 24(298) Cheniere Lake Area 1 Improvements, 25 Planning and Construction 26 (Ouachita) 27 Payable from General Obligation Bonds 28 Priority 2 $ 1,080,000 2950/J38PLAQUEMINES PARISH 30(628) Empire Bridge Lighting, Planning 31 and Construction 32 (Plaquemines) 33 Payable from General Obligation Bonds 34 Priority 1 $ 197,000 3550/J39POINTE COUPEE PARISH 36(873) False River Ecosystem Restoration Project, Including 37 Bulkhead Replacement, Planning and Construction 38 (Pointe Coupee) 39 Payable from General Obligation Bonds 40 Priority 1 $ 2,400,000 41 Priority 5 $ 600,000 42 Total $ 3,000,000 43(1354)Pointe Coupee Parish Government Storage Facility, 44 Planning and Construction 45 (Pointe Coupee) 46 Payable from General Obligation Bonds 47 Priority 5 $ 500,000 Page 54 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(1514)Courthouse Restoration - Phase 2, Planning 2 and Construction 3 (Pointe Coupee) 4 Payable from General Obligation Bonds 5 Priority 1 $ 1,250,000 6 Priority 2 $ 1,750,000 7 Total $ 3,000,000 850/J40RAPIDES PARISH 9(1547)Gunter Road/Barron Chapel Road Street 10 Improvements, Planning and Construction 11 (Rapides) 12 Payable from General Obligation Bonds 13 Priority 2 $ 1,450,000 14(1548)Philadelphia Road Street Improvements, 15 Planning and Construction 16 (Rapides) 17 Payable from General Obligation Bonds 18 Priority 2 $ 500,000 19 Priority 5 $ 2,950,000 20 Total $ 3,450,000 2150/J43SABINE PARISH 22(399) Plainview Road Rehabilitation, Planning 23 and Construction 24 (Sabine) 25 Payable from General Obligation Bonds 26 Priority 1 $ 1,902,700 27 Priority 5 $ 2,433,600 28 Total $ 4,336,300 2950/J44ST. BERNARD PARISH 30(456) St. Bernard Parish Jail Renovations, Planning 31 and Construction 32 (St. Bernard) 33 Payable from General Obligation Bonds 34 Priority 1 $ 3,000,000 35 Priority 5 $ 6,565,000 36 Total $ 9,565,000 3750/J45ST. CHARLES PARISH 38(491) Fairfield and Oakland Pump Station Discharge 39 Improvements, Planning and Construction 40 (St. Charles) 41 Payable from General Obligation Bonds 42 Priority 1 $ 675,000 43 Priority 2 $ 150,000 44 Total $ 825,000 Page 55 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(492) Des Allemans Bulkhead - Phase 1, Planning and 2 Construction 3 (St. Charles) 4 Payable from General Obligation Bonds 5 Priority 1 $ 202,500 6 Priority 5 $ 622,500 7 Payable from State General Fund (Direct) Non-Recurring 8 Revenues $ 52,500 9 Total $ 877,500 10(493) Preston Hollow Subdivision Panel Replacement, 11 Planning and Construction 12 (St. Charles) 13 Payable from General Obligation Bonds 14 Priority 5 $ 2,250,000 15(637) Fifth Street Drainage Improvements, Planning 16 and Construction 17 (St. Charles) 18 Payable from General Obligation Bonds 19 Priority 1 $ 450,000 20 Priority 5 $ 450,000 21 Total $ 900,000 22(656) Paul Fredrick Street and Kinler Street Demolition 23 and Reconstruction 24 (St. Charles) 25 Payable from General Obligation Bonds 26 Priority 1 $ 175,000 27 Priority 5 $ 2,825,000 28 Total $ 3,000,000 2950/J46ST. HELENA PARISH 30(895) Audubon Library, Planning and Construction 31 (St. Helena) 32 Payable from General Obligation Bonds 33 Priority 1 $ 1,163,600 34(896) Leggett Road Rehabilitation, Planning and Construction 35 (St. Helena) 36 Payable from State General Fund (Direct) Non-Recurring 37 Revenues $ 420,000 3850/J47ST. JAMES PARISH 39(953) LA 3127 Widening (LA 20 to LA 3213), Planning 40 and Construction 41 (St. James) 42 Payable from General Obligation Bonds 43 Priority 1 $ 1,000,000 44 Priority 5 $ 7,900,000 45 Total $ 8,900,000 46(1184)West Shore Risk Reduction Connector Levee 47 (St. James) 48 Payable from General Obligation Bonds 49 Priority 2 $ 1,000,000 50 Priority 5 $12,850,000 51 Total $13,850,000 Page 56 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/J49ST. LANDRY PARISH 2(330) Courthouse Renovations, Planning and 3 Construction 4 (St. Landry) 5 Payable from General Obligation Bonds 6 Priority 2 $ 320,000 7(343) Parish Wide Drainage Project, Planning 8 and Construction 9 (St. Landry) 10 Payable from General Obligation Bonds 11 Priority 2 $ 200,000 12 Priority 5 $ 800,000 13 Total $ 1,000,000 14(624) Wastewater Treatment Facility - Central St. Landry 15 Economic Development District, Planning and Construction 16 (St. Landry) 17 Payable from General Obligation Bonds 18 Priority 1 $ 422,586 19(1374)State Government Roadway Reconstruction 20 in the Town of Krotz Springs, Planning and 21 Construction 22 (St. Landry) 23 Payable from General Obligation Bonds 24 Priority 2 $ 265,000 25 Priority 5 $ 2,375,000 26 Total $ 2,640,000 2750/J50ST. MARTIN PARISH 28(262) Spanish Trail Industrial Park Access Road, Planning 29 and Construction 30 (St. Martin) 31 Payable from General Obligation Bonds 32 Priority 5 $ 4,100,000 33(273) Road Improvements on Four-Mile Bayou Road 34 (St. Martin) 35 Payable from General Obligation Bonds 36 Priority 1 $ 105,308 37 Priority 5 $ 150,000 38 Total $ 255,308 39(274) Joe Daigre Canal Drainage Improvements, Planning 40 and Construction 41 (St. Martin) 42 Payable from General Obligation Bonds 43 Priority 1 $ 748,500 44 Priority 5 $ 550,000 45 Total $ 1,298,500 Page 57 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/J51ST. MARY PARISH 2(502) Infrastructure Improvements and Construction of 3 a Welding Training Center Facility at the Charenton 4 Canal Industrial Park 5 (St. Mary) 6 Payable from General Obligation Bonds 7 Priority 1 $ 119,426 8 Priority 5 $ 527,000 9 Total $ 646,426 10(503) Reconstruction of Martin Luther King Roadway in 11 Charenton for St. Mary Parish Government, within 12 Existing Right-of-Way, Planning and Construction 13 (St. Mary) 14 Payable from General Obligation Bonds 15 Priority 1 $ 743,250 16(505) Emergency Power Improvements at St. Mary Parish 17 Courthouse, Planning and Construction 18 (St. Mary) 19 Payable from General Obligation Bonds 20 Priority 1 $ 250,000 2150/J52ST. TAMMANY PARISH 22(426) University Square Learning Center Facilities, Planning 23 and Construction 24 (St. Tammany) 25 Payable from General Obligation Bonds 26 Priority 1 $ 208,740 27 Priority 5 $10,630,000 28 Total $10,838,740 29(427) St. Tammany Parish Fishing Pier, Planning 30 and Construction 31 (St. Tammany) 32 Payable from General Obligation Bonds 33 Priority 1 $ 28,802 34(428) Safe Haven Campus for Behavioral and Mental 35 Health, Planning, Construction and Renovation for Triage 36 (St. Tammany) 37 Payable from General Obligation Bonds 38 Priority 1 $ 2,681,237 39 Priority 2 $ 500,000 40 Priority 5 $ 8,800,000 41 Total $11,981,237 42(429) South Slidell Levee Protection Rehabilitation: (USACE 43 533d Report or Planning, Land Acquisition, and 44 Construction of Levees West and East of Interstate 10) 45 (St. Tammany) 46 Payable from General Obligation Bonds 47 Priority 1 $ 750,000 48 Priority 5 $ 9,108,000 49 Total $ 9,858,000 Page 58 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(430) LA 22 Extension and Improvements, LA 22 2 Roundabout, Design, Engineering, Planning 3 and Construction 4 (St. Tammany) 5 Payable from General Obligation Bonds 6 Priority 1 $ 650,000 7 Priority 5 $ 3,240,000 8 Payable from State General Fund (Direct) Non-Recurring 9 Revenues $ 500,000 10 Total $ 4,390,000 11(436) Harrison Avenue Widening, Planning and Construction 12 (St. Tammany) 13 Payable from General Obligation Bonds 14 Priority 5 $13,300,000 15(437) Ben Thomas - Stone Road to Powell Drive, 16 Design, Planning, and Construction 17 (St. Tammany) 18 Payable from General Obligation Bonds 19 Priority 2 $ 500,000 20 Priority 5 $ 3,200,000 21 Total $ 3,700,000 2250/J53TANGIPAHOA PARISH 23(462) North Hoover Road Improvements Phase 2, 24 Planning and Construction 25 (St. Tammany) 26 Payable from General Obligation Bonds 27 Priority 2 $ 500,000 28 Priority 5 $ 2,225,000 29 Total $ 2,725,000 30(464) Kentwood Library Construction, Planning 31 and Construction 32 (Tangipahoa) 33 Payable from General Obligation Bonds 34 Priority 1 $ 544,705 35(714) South Airport Road, North Hoover Road Improvements, 36 Planning and Construction 37 (Tangipahoa) 38 Payable from General Obligation Bonds 39 Priority 1 $ 2,431,985 40 Priority 5 $ 2,000,000 41 Total $ 4,431,985 4250/J54TENSAS PARISH 43(402) Recreation Facility, Planning and Construction 44 (Tensas) 45 Payable from General Obligation Bonds 46 Priority 1 $ 230,000 47 Priority 5 $ 5,278,000 48 Total $ 5,508,000 Page 59 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(403) Lide Road Improvements, Planning and Construction 2 (Tensas) 3 Payable from General Obligation Bonds 4 Priority 1 $ 827,500 5(405) Tensas Parish/Port Priority Site Plan, Planning 6 and Construction 7 (Tensas) 8 Payable from General Obligation Bonds 9 Priority 1 $ 214,800 1050/J55TERREBONNE PARISH 11(882) South Louisiana Wetland Discovery Center - 12 Phase 2 - Bayou Country Institute, Planning and 13 Construction 14 (Terrebonne) 15 Payable from General Obligation Bonds 16 Priority 1 $ 393,204 17(1083)Replacement of Brady Road Bridge, Planning 18 and Construction 19 (Terrebonne) 20 Payable from General Obligation Bonds 21 Priority 5 $ 5,885,000 22(1172)Replacement of D-18 Pump Station Falgout Canal, 23 Theriot, La., Planning and Construction 24 (Terrebonne) 25 Payable from State General Fund (Direct) Non-Recurring 26 Revenues $ 2,125,000 27(1186)Renovate the LePetit Terrebonne Theater Building, 28 Planning and Construction 29 (Terrebonne) 30 Payable from General Obligation Bonds 31 Priority 1 $ 679,000 32(1194)Terrebonne Sports Complex, Planning 33 and Construction 34 (Terrebonne) 35 Payable from General Obligation Bonds 36 Priority 1 $ 955,000 37 Priority 5 $ 984,000 38 Total $ 1,939,000 39(1198)Valhi Extension (Savanne to LA 311), Planning 40 and Construction 41 (Terrebonne) 42 Payable from General Obligation Bonds 43 Priority 5 $ 4,600,000 44(1200)Bayou LaCarpe Watershed Project, Location C, Design 45 and Construction 46 (Terrebonne) 47 Payable from General Obligation Bonds 48 Priority 1 $ 716,250 49 Priority 5 $ 1,000,000 50 Total $ 1,716,250 Page 60 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(1204)Westside/Alma Street Drainage, Planning 2 and Construction 3 (Terrebonne) 4 Payable from General Obligation Bonds 5 Priority 1 $ 792,850 650/J57VERMILION PARISH 7(1175)Parish Wide Road Improvements, Planning 8 and Construction 9 (Vermilion) 10 Payable from General Obligation Bonds 11 Priority 1 $ 680,000 1250/J58VERNON PARISH 13(998) Vernon/Fort Polk Thoroughfare Electrical 14 Power Extension, and Utilities Including Generators 15 (Vernon) 16 Payable from General Obligation Bonds 17 Priority 1 $ 468,000 1850/J59WASHINGTON PARISH 19(1257)Washington Parish Jail Renovations Including HVAC, 20 Security and ADA, Planning and Construction 21 (Washington) 22 Payable from General Obligation Bonds 23 Priority 1 $ 700,000 24 Priority 2 $ 300,000 25 Total $ 1,000,000 26(1258)Washington Parish Courthouse Renovation and HVAC, 27 Planning and Construction 28 (Washington) 29 Payable from General Obligation Bonds 30 Priority 1 $ 300,000 31 Priority 2 $ 100,000 32 Total $ 400,000 3350/J63WEST FELICIANA PARISH 34(288) West Feliciana Port Infrastructure, Planning, 35 Engineering, and Construction 36 (West Feliciana) 37 Payable from General Obligation Bonds 38 Priority 1 $ 736,563 39 Priority 5 $ 2,140,000 40 Total $ 2,876,563 4150/J64WINN PARISH 42(1027)Roadway Reconstruction, Mars Hill Church 43 Road, Planning and Construction 44 (Winn) 45 Payable from General Obligation Bonds 46 Priority 5 $ 765,000 Page 61 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(1028)Roadway Reconstruction, Williams Loop, Cole, 2 Oak Ridge and Pine Ridge Roadways, Planning 3 and Construction 4 (Winn) 5 Payable from General Obligation Bonds 6 Priority 1 $ 652,500 7(1327)Roadway Reconstruction, Welcome Home Road, 8 Planning and Construction 9 (Winn) 10 Payable from General Obligation Bonds 11 Priority 5 $ 360,000 12(1344)Roadway Reconstruction, Aunt Marie's Road, 13 Planning and Construction 14 (Winn) 15 Payable from General Obligation Bonds 16 Priority 5 $ 335,000 17(1346)Roadway Reconstruction, Bethleham Road, 18 Planning and Construction 19 (Winn) 20 Payable from General Obligation Bonds 21 Priority 5 $ 570,000 22(1348)Roadway Reconstruction, Blewer Road, 23 Planning and Construction 24 (Winn) 25 Payable from General Obligation Bonds 26 Priority 5 $ 562,000 27(1350)Roadway Reconstruction, Brownville Road, 28 Planning and Construction 29 (Winn) 30 Payable from General Obligation Bonds 31 Priority 2 $ 335,000 32(1352)Roadway Reconstruction, Eugene Garrett Road, 33 Planning and Construction 34 (Winn) 35 Payable from General Obligation Bonds 36 Priority 2 $ 385,000 37(1355)Roadway Reconstruction, Frank White Road, 38 Planning and Construction 39 (Winn) 40 Payable from General Obligation Bonds 41 Priority 2 $ 460,000 42(1356)Roadway Reconstruction, L. Sullivan Road, 43 Planning and Construction 44 (Winn) 45 Payable from General Obligation Bonds 46 Priority 5 $ 515,000 Page 62 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/M01ABBEVILLE 2(1205)Sidewalk and Street Improvements on Graceland Avenue, 3 Planning and Construction 4 (Vermilion) 5 Payable from State General Fund (Direct) Non-Recurring 6 Revenues $ 55,000 750/M05ALEXANDRIA 8(1275)Sugarhouse Road/Eddie Williams Boulevard to LA 9 Highway 1, Phase I and II, Planning and Construction 10 ($5,000,000 Local Match) 11 (Rapides) 12 Payable from General Obligation Bonds 13 Priority 1 $ 3,000,000 14 Priority 5 $ 4,620,000 15 Total $ 7,620,000 1650/M ALGIERS 17( ) Streetscape at the Newton Street Corridor, 18 Planning and Construction 19 (Jefferson) 20 Payable from General Obligation Bonds 21 Priority 2 $ 250,000 22Pending submittal and late approval of the capital outlay budget request pursuant to the 23provisions of R.S. 39:112. 2450/M07ANACOCO 25(1122)Street Rehabilitation - Ross Road, Lula Street, and Loop 26 Drive, Planning and Construction 27 (Vernon) 28 Payable from General Obligation Bonds 29 Priority 1 $ 240,000 3050/M AVONDALE 31( ) Restore Rail Connection and Crossings to 32 Avondale Marine, Planning and Construction 33 (Jefferson) 34 Payable from General Obligation Bonds 35 Priority 2 $ 100,000 36 Priority 5 $ 3,700,000 37 Total $ 3,800,000 38Pending submittal and late approval of the capital outlay budget request pursuant to the 39provisions of R.S. 39:112. 4050/M15BALDWIN 41(1470)Potable Water System Improvements, Planning 42 and Construction 43 (St. Mary) 44 Payable from General Obligation Bonds 45 Priority 1 $ 186,500 46 Priority 5 $ 700,000 47 Total $ 886,500 Page 63 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/M19BASTROP 2(1282)City Hall - Roof Replacement, Planning 3 and Construction 4 (Morehouse) 5 Payable from General Obligation Bonds 6 Priority 1 $ 380,000 7 Payable from State General Fund (Direct) Non-Recurring 8 Revenues $ 350,000 9 Total $ 730,000 1050/M20BATON ROUGE 11(47) Hooper Road Widening and Sewer Improvements 12 (Blackwater Bayou to Sullivan Road) Planning, 13 Engineering, Utilities and Construction 14 (East Baton Rouge) 15 Payable from General Obligation Bonds 16 Priority 2 $ 4,000,000 17 Priority 5 $ 9,500,000 18 Total $13,500,000 19(48) Old Hammond Hwy. (LA 426) Roadway Improvements 20 from Blvd. De Province to Millerville Road, Planning 21 and Construction 22 (East Baton Rouge) 23 Payable from General Obligation Bonds 24 Priority 1 $ 450,000 25 Priority 5 $ 9,250,000 26 Total $ 9,700,000 2750/M27BOGALUSA 28(577) City Hall Renovations 29 (Washington) 30 Payable from General Obligation Bonds 31 Priority 2 $ 210,000 32(578) Community Center and Emergency Shelter, Planning 33 and Construction 34 (Washington) 35 Payable from General Obligation Bonds 36 Priority 2 $ 500,000 37 Priority 5 $10,500,000 38 Total $11,000,000 39(581) Davenport Avenue Bridge, Servitude Street 40 Emergency Replacement and Repair, 41 Planning and Construction 42 (Washington) 43 Payable from General Obligation Bonds 44 Priority 5 $ 565,000 45 Payable from State General Fund (Direct) Non-Recurring 46 Revenues $ 500,000 47 Total $ 1,065,000 Page 64 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/M28BONITA 2(1207)Municipal Complex, Planning and Construction 3 (Morehouse) 4 Payable from General Obligation Bonds 5 Priority 2 $ 400,000 6 Priority 5 $ 1,850,000 7 Total $ 2,250,000 850/M31BREAUX BRIDGE 9(1462)Water Treatment Plant Improvements, Planning 10 and Construction 11 (St. Martin) 12 Payable from General Obligation Bonds 13 Priority 1 $ 35,500 1450/M32BROUSSARD 15(201) Highway 89 Improvements, Planning 16 and Construction 17 (Lafayette) 18 Payable from General Obligation Bonds 19 Priority 1 $ 1,500,000 20 Priority 5 $ 3,410,000 21 Total $ 4,910,000 22(1471)Reconstruct South Bernard Road from LA Hwy 182 23 to US Hwy 90, Planning and Construction 24 (Lafayette) 25 Payable from General Obligation Bonds 26 Priority 1 $ 4,430,490 2750/M39CARENCRO 28(285) Arceneaux Road Drainage Improvements and Utility 29 Relocations, Planning and Construction 30 (Lafayette) 31 Payable from General Obligation Bonds 32 Priority 1 $ 676,194 33(291) I-49 to Gloria Switch Coulee Project, Planning 34 and Construction 35 (Lafayette) 36 Payable from General Obligation Bonds 37 Priority 1 $ 439,761 38(292) Wastewater and City Infrastructure Flood Damages, 39 Planning and Construction 40 (Lafayette) 41 Payable from General Obligation Bonds 42 Priority 1 $ 4,612,476 Page 65 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/M44CHOUDRANT 2(1230)New Town Hall, Planning and Construction 3 (Lincoln) 4 Payable from General Obligation Bonds 5 Priority 1 $ 150,000 6 Priority 5 $ 1,096,586 7 Total $ 1,246,586 850/M45CHURCH POINT 9(283) Street and Drainage Improvements, Planning 10 and Construction 11 (Acadia) 12 Payable from State General Fund (Direct) Non-Recurring 13 Revenues $ 450,000 14(1485)Sewer System Improvements, Planning 15 and Construction 16 (Acadia) 17 Payable from General Obligation Bonds 18 Priority 1 $ 291,000 1950/M50COLFAX 20(619) Street Improvements, Planning and Construction 21 (Grant) 22 Payable from General Obligation Bonds 23 Priority 2 $ 385,000 24 Priority 5 $ 377,000 25 Total $ 762,000 2650/M54COTTON VALLEY 27(363) Sewerage System Improvements, Planning 28 and Construction 29 (Webster) 30 Payable from General Obligation Bonds 31 Priority 1 $ 1,189,000 3250/M56COUSHATTA 33(1455)Overlay of Streets in Town of Coushatta, Planning, 34 Land Acquisition, and Construction 35 (Red River) 36 Payable from General Obligation Bonds 37 Priority 5 $ 4,185,000 3850/M57COVINGTON 39(1298)Downtown Historic District Overlays, Planning 40 and Construction 41 (St. Tammany) 42 Payable from General Obligation Bonds 43 Priority 1 $ 80,000 44 Priority 5 $ 640,000 45 Payable from State General Fund (Direct) Non-Recurring 46 Revenues $ 1,000,000 47 Total $ 1,720,000 Page 66 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(1301)Covington Wastewater Treatment Plant, Planning 2 and Construction 3 (St. Tammany) 4 Payable from General Obligation Bonds 5 Priority 1 $ 104,500 650/M58CROWLEY 7(973) Renovation and Repairs to Rice Festival Building, 8 Including the Repair or Replacement of the Roof, 9 Planning and Construction 10 (Acadia) 11 Payable from General Obligation Bonds 12 Priority 2 $ 230,000 13(975) Installation of Comminutor for the City of Crowley 14 Main Sewerage Pump Station, Planning and Construction 15 (Acadia) 16 Payable from General Obligation Bonds 17 Priority 1 $ 405,000 18(976) Pavilion, Planning and Construction 19 (Acadia) 20 Payable from State General Fund (Direct) Non-Recurring 21 Revenues $ 100,000 2250/M61DELHI 23(615) Sapa Drive Extension, Planning and Construction 24 (Richland) 25 Payable from General Obligation Bonds 26 Priority 1 $ 460,250 27 Priority 5 $ 500,000 28 Total $ 960,250 2950/M DELTA 30( ) Road Repairs: St. Martin, St. Landry, St. Bernard, 31 Janie Avenue, 3 rd Street, Wall Street, and Part of Old 32 Highway 80, Planning and Construction 33 (Madison) 34 Payable from General Obligation Bonds 35 Priority 5 $ 460,000 36Pending submittal and late approval of the capital outlay budget request pursuant to the 37provisions of R.S. 39:112. 3850/M64DEQUINCY 39(381) Wastewater Treatment Plant Improvements, 40 Planning and Construction 41 (Calcasieu) 42 Payable from General Obligation Bonds 43 Priority 5 $ 810,000 44(382) Sanitary Sewer Lift Station, Planning 45 and Construction 46 (Calcasieu) 47 Payable from General Obligation Bonds 48 Priority 5 $ 900,000 Page 67 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(522) DeQuincy Industrial Airpark T-Hangars and Taxi Lane, 2 Planning and Construction 3 (Calcasieu) 4 Payable from General Obligation Bonds 5 Priority 5 $ 500,000 650/M65DERIDDER 7(725) Education and Job Training Center, Planning 8 and Construction 9 (Beauregard) 10 Payable from General Obligation Bonds 11 Priority 1 $ 203,462 12 Priority 5 $ 1,000,000 13 Total $ 1,203,462 14(727) Ellis Road and Branch Street Drainage Improvements, 15 Planning and Construction 16 (Beauregard) 17 Payable from General Obligation Bonds 18 Priority 1 $ 150,000 1950/M68DONALDSONVILLE 20(1059)Natural Gas System Infrastructure Improvement Phase III, 21 Planning and Construction 22 (Ascension) 23 Payable from General Obligation Bonds 24 Priority 1 $ 100,000 25 Priority 5 $ 1,000,000 26 Total $ 1,100,000 27(1530)Natural Gas System Infrastructure Improvements, 28 Phase II, Planning and Construction 29 (Ascension) 30 Payable from General Obligation Bonds 31 Priority 1 $ 850,925 3250/M70DOYLINE 33(1151)Village of Doyline Wastewater Treatment 34 Facility Upgrades 35 (Webster) 36 Payable from General Obligation Bonds 37 Priority 1 $ 13,000 3850/M74DUSON 39(329) LA Highway 95 Roundabout, Planning 40 and Construction 41 (Acadia) 42 Payable from General Obligation Bonds 43 Priority 1 $ 2,615,816 4450/M78ELTON 45(1215)Street Improvements, Planning and Construction 46 (Jefferson Davis) 47 Payable from State General Fund (Direct) Non-Recurring 48 Revenues $ 400,000 Page 68 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/M83EUNICE 2(1095)Library Renovations, Planning 3 and Construction 4 (St. Landry) 5 Payable from General Obligation Bonds 6 Priority 5 $ 350,000 7 Payable from State General Fund (Direct) Non-Recurring 8 Revenues $ 310,000 9 Total $ 660,000 10(1353)Street Improvements, Planning and Construction 11 (St. Landry) 12 Payable from State General Fund (Direct) Non-Recurring 13 Revenues $ 100,000 1450/M84EVERGREEN 15(623) Evergreen Water System Improvements 16 (Avoyelles) 17 Payable from General Obligation Bonds 18 Priority 1 $ 1,000,000 1950/M86FENTON 20(332) New Road Construction, Planning and Construction 21 (Jefferson Davis) 22 Payable from State General Fund (Direct) Non-Recurring 23 Revenues $ 350,000 2450/M87FERRIDAY 25(1209)Water Renovations, Planning and Construction 26 (Concordia) 27 Payable from General Obligation Bonds 28 Priority 1 $ 327,263 29 Priority 5 $ 1,000,000 30 Total $ 1,327,263 31(1246)Town of Ferriday Auditorium, Planning 32 and Construction 33 (Concordia) 34 Payable from General Obligation Bonds 35 Priority 2 $ 700,000 36 Priority 5 $ 6,000,000 37 Total $ 6,700,000 3850/M89FLORIEN 39(365) Village of Florien Town Hall, Planning 40 and Construction 41 (Sabine) 42 Payable from General Obligation Bonds 43 Priority 1 $ 385,505 Page 69 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/M91FORDOCHE 2(748) Water Storage Improvements, Planning 3 and Construction 4 (Pointe Coupee) 5 Payable from General Obligation Bonds 6 Priority 1 $ 755,000 7(749) Water Distribution System Improvements, Planning 8 and Construction 9 (Pointe Coupee) 10 Payable from General Obligation Bonds 11 Priority 1 $ 631,000 1250/M94FRANKLIN 13(670) Renovation of Old Crowell Elementary Building, 14 Planning and Construction 15 (St. Mary) 16 Payable from General Obligation Bonds 17 Priority 1 $ 413,914 18 Priority 5 $ 321,000 19 Total $ 734,914 20(671) Cayce Street Repairs, Planning and Construction 21 (St. Mary) 22 Payable from General Obligation Bonds 23 Priority 1 $ 2,319,000 2450/M GARYVILLE 25( )Garyville Timbermill Museum Storm Damage Repairs 26 and Renovation, Planning and Construction 27 (St. John the Baptist) 28 Payable from State General Fund (Direct) Non-Recurring 29 Revenues $ 3,000,000 30Pending submittal and late approval of the capital outlay budget request pursuant to the 31provisions of R.S. 39:112. 3250/MA3GOLDEN MEADOW 33(1060)Upgrade to North Sewerage Treatment Plant, Planning 34 and Construction 35 (Lafourche) 36 Payable from General Obligation Bonds 37 Priority 1 $ 163,940 3850/MA5GONZALES 39(868) Connector Road for City of Gonzales Hospital District, 40 Construction and Planning 41 (Ascension) 42 Payable from General Obligation Bonds 43 Priority 5 $ 3,905,000 Page 70 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(886) CARE Center Construction (Community Activities, 2 Recreation and Education), Planning and Construction 3 (Ascension) 4 Payable from General Obligation Bonds 5 Priority 5 $ 500,000 6(1472)Veteran's Ave to Commerce Ave Connector Road, 7 Planning and Construction 8 (Ascension) 9 Payable from General Obligation Bonds 10 Priority 1 $ 309,420 1150/MA6GRAMBLING 12(1026)Community Center Expansion, Planning 13 and Construction 14 (Lincoln) 15 Payable from General Obligation Bonds 16 Priority 2 $ 300,000 1750/MB1GRAND ISLE 18(1463)Historic Recreation Center/Community Center, 19 Planning and Construction 20 (Jefferson) 21 Payable from General Obligation Bonds 22 Priority 1 $ 17,000 2350/MB5GRETNA 24(1135)City Hall Exterior and Interior Renovation 25 (Jefferson) 26 Payable from General Obligation Bonds 27 Priority 2 $ 300,000 28 Priority 5 $ 2,700,000 29 Total $ 3,000,000 3050/MB7GUEYDAN 31(856) Sewer Plant Improvements, Planning and Construction 32 (Vermilion) 33 Payable from State General Fund (Direct) Non-Recurring 34 Revenues $ 95,000 3550/MB9HAMMOND 36(1079)Roadside Drainage Improvements, Planning 37 and Construction 38 (Tangipahoa) 39 Payable from General Obligation Bonds 40 Priority 1 $ 225,000 4150/MC3HAUGHTON 42(1053)Additional Water Supply Wells and Elevated Tank, 43 Planning and Construction 44 (Bossier) 45 Payable from General Obligation Bonds 46 Priority 5 $ 120,000 Page 71 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/MC4HAYNESVILLE 2(980) Town of Haynesville Street Improvements, Planning 3 and Construction 4 (Claiborne) 5 Payable from General Obligation Bonds 6 Priority 1 $ 50,000 7 Priority 5 $ 300,000 8 Total $ 350,000 950/MC9HOMER 10(878) Street Improvement Project, Planning 11 and Construction 12 (Claiborne) 13 Payable from General Obligation Bonds 14 Priority 1 $ 513,000 15 Priority 5 $ 87,000 16 Total $ 600,000 17(880) Town Hall Renovations, Planning and Construction 18 (Claiborne) 19 Payable from General Obligation Bonds 20 Priority 1 $ 557,904 21 Priority 2 $ 261,000 22 Total $ 818,904 2350/MD1HORNBECK 24(383) West Side Water System Expansion, Planning 25 and Construction 26 (Sabine, Vernon) 27 Payable from General Obligation Bonds 28 Priority 1 $ 105,465 29 Priority 5 $ 1,000,000 30 Total $ 1,105,465 3150/MD4IDA 32(1150)Water System Improvements, Water Wells, Tanks, 33 and Booster Stations Construction, Planning 34 and Construction 35 (Caddo) 36 Payable from General Obligation Bonds 37 Priority 1 $ 60,000 3850/MD6IOTA 39(1052)Street Improvements, Planning and Construction 40 (Acadia) 41 Payable from State General Fund (Direct) Non-Recurring 42 Revenues $ 200,000 4350/ME1JEAN LAFITTE 44(1396)Seafood Pavilion Addition - Gazebo, Boardwalk, 45 and Dock, Planning and Construction 46 (Jefferson) 47 Payable from State General Fund (Direct) Non-Recurring 48 Revenues $ 355,000 Page 72 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(1398)Lafitte Wetlands Museum Addition, including Exhibits, Planning 2 and Construction 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 1 $ 679,000 6 Priority 5 $ 1,000,000 7 Total $ 1,679,000 8(1451)Lafitte Amphitheater Stage, Planning and Construction 9 (Jefferson) 10 Payable from State General Fund (Direct) Non-Recurring 11 Revenues $ 715,000 1250/ME6JONESVILLE 13(1448)Glenn Ditch Pump Station, Planning 14 and Construction 15 (Catahoula) 16 Payable from General Obligation Bonds 17 Priority 1 $ 80,000 18 Priority 5 $ 1,485,000 19 Total $ 1,565,000 2050/ME8KAPLAN 21(255) Street and Drainage Improvements 22 (Vermilion) 23 Payable from General Obligation Bonds 24 Priority 5 $ 315,000 25 Payable from State General Fund (Direct) Non-Recurring 26 Revenues $ 100,000 27 Total $ 415,000 2850/MF1KENNER 29(941) Pump to the River Pump Station Phase I, 30 Planning and Construction 31 (Jefferson) 32 Payable from General Obligation Bonds 33 Priority 2 $ 1,000,000 34 Priority 5 $ 9,050,000 35 Total $10,050,000 36(942) Lincoln Manor Drainage Phase 2, Planning 37 and Construction 38 (Jefferson) 39 Payable from General Obligation Bonds 40 Priority 5 $ 500,000 41(946) Lincoln Manor Subdivision Drainage Improvement, 42 Planning and Construction 43 (Jefferson) 44 Payable from General Obligation Bonds 45 Priority 1 $ 155,000 Page 73 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/MF6KROTZ SPRINGS 2(1119)Lift Station Upgrade and Rehabilitation, Planning 3 and Construction 4 (St. Landry) 5 Payable from State General Fund (Direct) Non-Recurring 6 Revenues $ 180,000 750/MF9LAKE CHARLES 8(151) Infrastructure Improvements for Economic Development, 9 Planning and Construction 10 ($2,000,000 Local Match) 11 (Calcasieu) 12 Payable from General Obligation Bonds 13 Priority 5 $ 4,000,000 14(153) Lakefront Development 15 (Calcasieu) 16 Payable from General Obligation Bonds 17 Priority 1 $ 1,955,000 18(156) Sallier Street Rehabilitation, Planning 19 and Construction 20 (Calcasieu) 21 Payable from General Obligation Bonds 22 Priority 5 $ 2,300,000 23(157) Enterprise Boulevard Extension, Planning 24 and Construction 25 (Calcasieu) 26 Payable from General Obligation Bonds 27 Priority 1 $ 500,000 28 Priority 2 $ 500,000 29 Priority 5 $ 3,000,000 30 Total $ 4,000,000 31Pending approval of the Noncash Line of Credit by the State Bond Commission prior to June 3230, 2022. 33(1498)New Chennault Water Plant, Planning 34 and Construction 35 (Calcasieu) 36 Payable from General Obligation Bonds 37 Priority 2 $ 3,000,000 38 Priority 5 $ 7,500,000 39 Total $10,500,000 40(1500)Relocation of Lake Charles Public Works Campus, 41 Planning and Construction 42 (Calcasieu) 43 Payable from General Obligation Bonds 44 Priority 2 $ 3,000,000 45 Priority 5 $ 9,000,000 46 Total $12,000,000 Page 74 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/MG3LEESVILLE 2(378) City of Leesville, Sanitary Sewer Extension for 3 Fort Polk Entrance Road, Planning and Construction 4 (Vernon) 5 Payable from General Obligation Bonds 6 Priority 1 $ 2,477,500 7(379) Street Rehabilitation and Extension, Planning 8 and Construction 9 (Vernon) 10 Payable from General Obligation Bonds 11 Priority 1 $ 250,000 12 Priority 5 $ 250,000 13 Total $ 500,000 1450/MG4LEONVILLE 15(263) Street and Drainage Improvements, Planning 16 and Construction 17 (St. Landry) 18 Payable from State General Fund (Direct) Non-Recurring 19 Revenues $ 300,000 2050/MH1LOGANSPORT 21(354) Recreational Improvements, Planning 22 and Construction 23 (DeSoto) 24 Payable from General Obligation Bonds 25 Priority 1 $ 150,000 26 Priority 5 $ 1,150,000 27 Total $ 1,300,000 2850/MH3LOREAUVILLE 29(854) New Fire Station, Planning and Construction 30 (Iberia) 31 Payable from General Obligation Bonds 32 Priority 1 $ 120,453 3350/MH8MANDEVILLE 34(747) LA 22 Drainage Improvements, Planning 35 and Construction 36 (St. Tammany) 37 Payable from General Obligation Bonds 38 Priority 5 $ 2,925,000 3950/MH9MANGHAM 40(661) Mangham Recreation Complex, Planning 41 and Construction 42 (Richland) 43 Payable from General Obligation Bonds 44 Priority 1 $ 1,036,400 45 Priority 5 $ 520,000 46 Total $ 1,556,400 Page 75 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/MI1MANSFIELD 2(353) Fire Apparatus Improvements 3 (DeSoto) 4 Payable from General Obligation Bonds 5 Priority 5 $ 50,000 650/MI8MAURICE 7(1076)New Village Hall, Planning and Construction 8 (Vermilion) 9 Payable from General Obligation Bonds 10 Priority 2 $ 165,000 11 Priority 5 $ 1,200,000 12 Total $ 1,365,000 1350/MJ5MINDEN 14(736) Potable Water Ground Storage Tank, 15 Planning and Construction 16 (Webster) 17 Payable from General Obligation Bonds 18 Priority 1 $ 145,100 1950/MJ6MONROE 20(264) I-20 Interchange Improvement and Kansas Garrett 21 Connector, Kansas Lane Connector, Planning and 22 Construction 23 ($1,000,000 Local and $6,000,000 Federal Match) 24 (Ouachita) 25 Payable from General Obligation Bonds 26 Priority 1 $ 9,369,600 27 Priority 2 $10,000,000 28 Priority 5 $19,100,000 29 Total $38,469,600 30(265) Calypso Street Pump Station Rehabilitation, Planning, 31 Engineering, Design, Right-of-Way, Utilities, 32 and Construction 33 (Ouachita) 34 Payable from General Obligation Bonds 35 Priority 1 $ 30,000 36 Priority 5 $ 1,770,000 37 Total $ 1,800,000 38(266) Georgia Street Pump Station, Including Generator 39 and Auxiliary Pumps, Planning, Engineering, 40 Right-of-Way, Utilities and Construction 41 (Ouachita) 42 Payable from General Obligation Bonds 43 Priority 1 $ 2,000,000 44(268) River Pump Station Water Treatment Plant, Planning 45 and Construction 46 (Ouachita) 47 Payable from General Obligation Bonds 48 Priority 5 $ 300,000 Page 76 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(281) Youngs Bayou Enhancement of Channel 2 Capacity, Planning and Construction 3 (Ouachita) 4 Payable from General Obligation Bonds 5 Priority 2 $ 500,000 6 Priority 5 $10,900,000 7 Total $11,400,000 850/MK4MORSE 9(968) Water Tower Improvements, Planning 10 and Construction 11 (Acadia) 12 Payable from General Obligation Bonds 13 Priority 1 $ 227,000 14 Payable from State General Fund (Direct) Non-Recurring 15 Revenues $ 120,000 16 Total $ 347,000 1750/MK9NATCHITOCHES 18(754) Texas Street Corridor Improvements, Planning 19 and Construction 20 (Natchitoches) 21 Payable from General Obligation Bonds 22 Priority 5 $ 435,000 23(755) South Natchitoches Drainage Improvements, Including 24 Adjacent Road Work, Planning and Construction 25 (Natchitoches) 26 Payable from General Obligation Bonds 27 Priority 5 $ 250,000 2850/ML1NEW IBERIA 29(256) Bayou Teche Museum Expansion and George 30 Rodrigue Park 31 (Iberia) 32 Payable from General Obligation Bonds 33 Priority 1 $ 1,845,965 34(257) West End Park Improvements, Planning 35 and Construction 36 (Iberia) 37 Payable from General Obligation Bonds 38 Priority 5 $ 250,000 39(550) Bank Street Park Improvements, Planning 40 and Construction 41 (Iberia) 42 Payable from General Obligation Bonds 43 Priority 5 $ 375,000 44(551) Ann Street Park, Planning and Construction 45 (Iberia) 46 Payable from General Obligation Bonds 47 Priority 5 $ 300,000 Page 77 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(552) Lil' Brooklyn Park, Planning and Construction 2 (Iberia) 3 Payable from General Obligation Bonds 4 Priority 2 $ 340,000 5(1461)City Park and West End Community Centers 6 Improvements, Planning and Construction 7 (Iberia) 8 Payable from General Obligation Bonds 9 Priority 1 $ 500,000 10 Priority 2 $ 250,000 11 Total $ 750,000 1250/ML3NEW ORLEANS 13(532) Richard Lee Playground, Planning and Construction 14 (Orleans) 15 Payable from General Obligation Bonds 16 Priority 1 $ 200,000 17 Priority 5 $ 3,000,000 18 Total $ 3,200,000 19(534) Lower Ninth Ward Green Infrastructure Project, 20 Planning and Construction 21 (Orleans) 22 Payable from General Obligation Bonds 23 Priority 1 $ 150,000 24 Priority 5 $ 2,750,000 25 Total $ 2,900,000 26(535) West Bank Ferry Terminal Renovations, Planning 27 and Construction 28 (Orleans) 29 Payable from General Obligation Bonds 30 Priority 1 $ 300,000 31 Priority 5 $ 300,000 32 Total $ 600,000 33(536) Old New Orleans VA Building Rehabilitation 34 (Orleans) 35 Payable from General Obligation Bonds 36 Priority 1 $ 2,000,000 37 Priority 5 $ 8,000,000 38 Total $10,000,000 39(538) New Sewerage and Water Board Power Plant, 40 Planning and Construction 41 (Orleans) 42 Payable from General Obligation Bonds 43 Priority 1 $32,700,000 44 Priority 5 $39,000,000 45 Total $71,700,000 Page 78 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(540) West Bank Park Improvements Including New Soccer 2 and Recreational Facilities, Planning and Construction 3 (Orleans) 4 Payable from General Obligation Bonds 5 Priority 1 $ 999,913 6 Priority 5 $12,225,400 7 Total $13,225,313 8Provided, however, that $550,000 of the Priority 1 appropriation shall be used to fund the 9George W. Carver Playground Renovations project, and $200,000 of the Priority 1 10appropriation shall be used to fund the Skateboard Park at the West Bank Park project. 11(543) Landside Roadways - Louis Armstrong International 12 North Terminal Project, Planning and Construction 13 (Jefferson) 14 Payable from General Obligation Bonds 15 Priority 5 $20,000,000 16(564) Lincoln Beach, Planning and Construction 17 (Orleans) 18 Payable from State General Fund (Direct) Non-Recurring 19 Revenues $ 500,000 20(1055)Monticello Canal Culverts at Airline Highway 21 (Orleans) 22 Payable from General Obligation Bonds 23 Priority 2 $ 750,000 24 Priority 5 $ 8,250,000 25 Total $ 9,000,000 2650/ML4NEW ROADS 27(1306)Industrial Park Development Project, Planning 28 and Construction 29 (Pointe Coupee) 30 Payable from General Obligation Bonds 31 Priority 1 $ 988,000 3250/ML8NORWOOD 33(1515)Town Hall Renovations, Planning 34 and Construction 35 (East Feliciana) 36 Payable from General Obligation Bonds 37 Priority 1 $ 35,000 38 Priority 5 $ 200,000 39 Total $ 235,000 4050/MM2OAKDALE 41(1270)Oakdale City Hall Renovations, Roof, 42 and Reconstruction 43 (Allen) 44 Payable from General Obligation Bonds 45 Priority 1 $ 35,000 Page 79 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/MM3OBERLIN 2(881) Street Improvements, Phase 1, Planning and Construction 3 (Allen) 4 Payable from State General Fund (Direct) Non-Recurring 5 Revenues $ 485,000 650/MM4OIL CITY 7(349) Water Treatment Plant, Transmission Main, and 8 Distribution System Improvements, Planning 9 and Construction 10 (Caddo) 11 Payable from General Obligation Bonds 12 Priority 1 $ 1,773,500 13 Priority 5 $ 500,000 14 Total $ 2,273,500 1550/MM6OPELOUSAS 16(260) Opelousas Street and Drainage Improvements 17 (St. Landry) 18 Payable from General Obligation Bonds 19 Priority 1 $ 3,582,282 20(261) Water Meter Replacement and Upgrades, 21 Planning and Construction 22 (St. Landry) 23 Payable from General Obligation Bonds 24 Priority 1 $ 1,130,768 2550/MM9PATTERSON 26(664) Replacement of Water and Gas Meters in Patterson, 27 Planning and Construction 28 (St. Mary) 29 Payable from General Obligation Bonds 30 Priority 1 $ 191,000 31 Priority 5 $ 260,000 32 Total $ 451,000 3350/MN3PINEVILLE 34(636) Cedar Lake Pump Station Reconstruction, Design, 35 Planning and Construction 36 (Rapides) 37 Payable from General Obligation Bonds 38 Priority 5 $ 585,000 3950/MO1PONCHATOULA 40(1116)Fire Station Complex US 51 - Veterans Avenue, 41 Land Acquisition, Planning and Construction 42 (Tangipahoa) 43 Payable from General Obligation Bonds 44 Priority 1 $ 75,000 45 Priority 5 $ 1,800,000 46 Total $ 1,875,000 Page 80 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/MO2PORT ALLEN 2(1316)Street and Drainage Improvements, Planning 3 and Construction 4 (West Baton Rouge) 5 Payable from General Obligation Bonds 6 Priority 1 $ 80,000 7 Priority 5 $ 3,520,000 8 Total $ 3,600,000 950/MO8RAYNE 10(969) Martin Luther King Community Center Improvements, 11 Planning and Construction 12 (Acadia) 13 Payable from General Obligation Bonds 14 Priority 1 $ 200,217 1550/MO9RAYVILLE 16(827) Wastewater Transport and Treatment Facilities for 17 Economic Development 18 (Richland) 19 Payable from General Obligation Bonds 20 Priority 1 $ 334,196 21 Priority 5 $ 3,400,000 22 Total $ 3,734,196 23Provided, however, that this appropriation is used for the extension of sewer lines south 24along Highway 425. 25(1190)Water Service Facilities for Economic Development, 26 Planning and Construction 27 (Richland) 28 Payable from General Obligation Bonds 29 Priority 1 $ 394,570 30 Priority 5 $ 8,022,300 31 Total $ 8,416,870 3250/MP1REEVES 33(1289)New Town Hall/Police Station, Planning and Construction 34 (Allen) 35 Payable from State General Fund (Direct) Non-Recurring 36 Revenues $ 800,000 3750/MP3RICHWOOD 38(685) Municipal Complex, Planning and Construction 39 (Ouachita) 40 Payable from General Obligation Bonds 41 Priority 1 $ 150,000 42 Priority 5 $ 3,400,000 43 Total $ 3,550,000 Page 81 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/MP8ROSEDALE 2(1313)New Rosedale Fire Station, Planning 3 and Construction 4 (Iberville) 5 Payable from General Obligation Bonds 6 Priority 1 $ 725,800 750/MQ1ROSEPINE 8(389) Rosepine Wastewater Treatment Plant Improvement, 9 Planning and Construction 10 (Vernon) 11 Payable from General Obligation Bonds 12 Priority 1 $ 647,267 1350/MQ2RUSTON 14(1016)New Road from Highway 150 to I-20 South Frontage 15 Road, Planning and Construction 16 (Lincoln) 17 Payable from General Obligation Bonds 18 Priority 1 $ 821,343 19 Priority 5 $ 1,000,000 20 Total $ 1,821,343 2150/MQ3ST. FRANCISVILLE 22(497) Emergency Erosion Repairs, Planning and Construction 23 (West Feliciana) 24 Payable from General Obligation Bonds 25 Priority 1 $ 50,000 26 Priority 5 $ 438,000 27 Total $ 488,000 2850/MQ5ST. MARTINVILLE 29(803) St. Martinville Electrical System Improvements, 30 Planning and Construction 31 (St. Martin) 32 Payable from General Obligation Bonds 33 Priority 5 $ 630,000 34(1474)Water Drainage Project, Planning and Construction 35 (St. Martin) 36 Payable from General Obligation Bonds 37 Priority 1 $ 200,000 3850/MQ8SCOTT 39(320) Water and Sewer Line Installation Along Apollo Road 40 Extension, Planning and Construction 41 (Lafayette) 42 Payable from General Obligation Bonds 43 Priority 1 $ 250,000 44 Priority 5 $ 2,000,000 45 Total $ 2,250,000 Page 82 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(1223)LA 93 Roadway Improvements- I-10 Ramp 2 to Renaud Drive, Planning, Construction, 3 and Land Acquisition 4 (Lafayette) 5 Payable from General Obligation Bonds 6 Priority 2 $ 200,000 7 Priority 5 $ 1,770,000 8 Total $ 1,970,000 9(1494)Eraste Landry Road Extension, Planning 10 and Construction 11 (Lafayette) 12 Payable from General Obligation Bonds 13 Priority 2 $ 415,000 14 Priority 5 $ 3,750,000 15 Total $ 4,165,000 1650/MR1SHREVEPORT 17(1005)Greenwood Road Extension, (Greenwood Industrial 18 Park Road - Asphalt Road), Planning and Construction 19 (Caddo) 20 Payable from General Obligation Bonds 21 Priority 1 $ 120,000 22 Priority 5 $ 2,000,000 23 Total $ 2,120,000 24(1007)Valencia Park Spray Park, Planning and Construction 25 (Caddo) 26 Payable from General Obligation Bonds 27 Priority 1 $ 75,000 28(1008)C.C. Antoine Museum and Arts Center, Planning 29 and Construction ($64,000 Local Match) 30 (Caddo) 31 Payable from General Obligation Bonds 32 Priority 1 $ 425,000 33 Priority 5 $ 100,000 34 Total $ 525,000 35(1009)C.C. Antoine Park, Planning and Construction 36 (Caddo) 37 Payable from General Obligation Bonds 38 Priority 1 $ 770,110 39 Priority 5 $ 972,700 40 Total $ 1,742,810 41( ) LA 173 (Ford Street) Overlay, 1.32 Miles, 42 Planning and Construction 43 (Caddo) 44 Payable from General Obligation Bonds 45 Priority 5 $ 795,000 46Pending submittal and late approval of the capital outlay budget request pursuant to the 47provisions of R.S. 39:112. Page 83 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/MR6SIMPSON 2(838) Rehabilitation of Various Roads, Planning 3 and Construction 4 (Vernon) 5 Payable from General Obligation Bonds 6 Priority 1 $ 35,000 750/MS4SPRINGFIELD 8( )Town Hall Storm Drainage Repairs and Renovation, 9 Planning and Construction 10 (Livingston) 11 Payable from State General Fund (Direct) Non-Recurring 12 Revenues $ 350,000 13Pending submittal and late approval of the capital outlay budget request pursuant to the 14provisions of R.S. 39:112. 1550/MS9SULPHUR 16(883) Maplewood Pump Station, Planning 17 and Construction 18 (Calcasieu) 19 Payable from General Obligation Bonds 20 Priority 5 $ 1,075,000 21 Payable from State General Fund (Direct) Non-Recurring 22 Revenues $ 500,000 23 Total $ 1,575,000 24(884) Maplewood Drive Rehabilitation 25 (Calcasieu) 26 Payable from General Obligation Bonds 27 Priority 1 $ 6,425,000 28 Priority 2 $ 500,000 29 Priority 5 $ 3,250,000 30 Total $10,175,000 31(1524)Upgrade Regional Sewerage Pumping Stations 32 (Arizona and Highway 108), Planning and 33 Construction 34 (Calcasieu) 35 Payable from General Obligation Bonds 36 Priority 1 $ 14,015 3750/MT1SUN 38(1373)Roof Replacement of Town Hall Building 39 (St. Tammany) 40 Payable from General Obligation Bonds 41 Priority 2 $ 200,000 4250/MT2SUNSET 43(375) City Wide Sidewalk Project, Phase 1, Planning 44 and Construction 45 (St. Landry) 46 Payable from State General Fund (Direct) Non-Recurring 47 Revenues $ 100,000 Page 84 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/MT3TALLULAH 2(1156)Emergency Water Production, Transmission and 3 Treatment, Acquisition, Planning and Construction 4 (Madison) 5 Payable from General Obligation Bonds 6 Priority 1 $ 444,270 7 Priority 5 $ 75,000 8 Total $ 519,270 950/MT5THIBODAUX 10(690) Replacement of Canal Boulevard Bridges 11 and Construction of Menard Pedestrian Bike Trail, 12 Planning and Construction 13 (Lafourche) 14 Payable from General Obligation Bonds 15 Priority 1 $ 1,500,000 16 Priority 5 $ 3,150,000 17 Total $ 4,650,000 18(986) LA 648/Acadia Road Intersection Improvements, 19 Planning and Construction 20 (Lafourche) 21 Payable from State General Fund (Direct) Non-Recurring 22 Revenues $ 500,000 2350/MT6TICKFAW 24(1222)Street Access Improvements, Planning and Construction 25 (Tangipahoa) 26 Payable from State General Fund (Direct) Non-Recurring 27 Revenues $ 220,000 2850/MU2VIDALIA 29(400) Development of a Slackwater Port on the Mississippi River, 30 Planning and Construction 31 (Concordia) 32 Payable from General Obligation Bonds 33 Priority 1 $ 4,229,044 34(404) Utility System Upgrade, Planning, Acquisition, 35 Construction and Equipment 36 (Concordia) 37 Payable from General Obligation Bonds 38 Priority 1 $ 955,000 39 Priority 5 $ 9,000,000 40 Total $ 9,955,000 4150/MU4VILLE PLATTE 42(1464)Infrastructure Improvements, Planning 43 and Construction 44 (Evangeline) 45 Payable from General Obligation Bonds 46 Priority 1 $ 886,580 Page 85 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(1475)Ville Platte Evangeline Recreational District 2 (Evangeline) 3 Payable from General Obligation Bonds 4 Priority 1 $ 855,000 5 Priority 5 $ 885,000 6 Total $ 1,740,000 750/MU6VIVIAN 8(1476)Water and Wastewater System Improvements and 9 Extension, Planning and Construction 10 (Caddo) 11 Payable from General Obligation Bonds 12 Priority 1 $ 253,766 1350/MV1WELSH 14(549) Frontage Road Extension, Planning and 15 Construction 16 (Jefferson Davis) 17 Payable from General Obligation Bonds 18 Priority 2 $ 500,000 1950/MV3WESTLAKE 20(445) Compressed Natural Gas Fueling Station, Planning 21 and Construction 22 (Calcasieu) 23 Payable from General Obligation Bonds 24 Priority 1 $ 470,000 25 Priority 5 $ 1,600,000 26 Total $ 2,070,000 2750/MV4WESTWEGO 28(138) Water Tower, Line and Improvements, Water Meter 29 Replacement, Planning and Construction 30 (Jefferson) 31 Payable from General Obligation Bonds 32 Priority 1 $ 112,644 33(139) The WHARF, Planning, Construction, and Site Preparation 34 (Jefferson) 35 Payable from General Obligation Bonds 36 Priority 1 $ 5,136,536 37 Priority 5 $ 2,200,000 38 Total $ 7,336,536 39(143) Park Land and Improvements, Including Improvements 40 to Existing Parks and Land Acquisition, Planning 41 and Construction 42 (Jefferson) 43 Payable from General Obligation Bonds 44 Priority 1 $ 525,796 Page 86 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(144) Sala Avenue Street and Infrastructure Improvements 2 (Jefferson) 3 Payable from General Obligation Bonds 4 Priority 1 $ 208,300 5 Priority 5 $ 850,000 6 Total $ 1,058,300 7(145) Emergency Preparedness Building, Planning and Construction 8 (Jefferson) 9 Payable from General Obligation Bonds 10 Priority 1 $ 110,821 11(146) Fire Station, Planning and Construction 12 (Jefferson) 13 Payable from General Obligation Bonds 14 Priority 1 $ 136,400 15 Priority 5 $ 300,000 16 Total $ 436,400 17(148) Riverboat Landing Phase III, Planning 18 and Construction 19 (Jefferson) 20 Payable from General Obligation Bonds 21 Priority 2 $ 605,000 22 Priority 5 $ 600,000 23 Total $ 1,205,000 2450/MV7WINNFIELD 25(1035)South Winnfield Drainage Improvements - Phase 1, 26 Planning and Construction 27 (Winn) 28 Payable from General Obligation Bonds 29 Priority 1 $ 75,000 30 Priority 5 $ 600,000 31 Total $ 675,000 3250/MW2YOUNGSVILLE 33(207) Highway 89 Improvements, Planning and Construction 34 (Lafayette) 35 Payable from General Obligation Bonds 36 Priority 1 $ 5,644,485 37(208) Fortune Road Extension, Planning and Construction 38 (Lafayette) 39 Payable from General Obligation Bonds 40 Priority 1 $ 350,000 41 Priority 5 $ 3,535,000 42 Total $ 3,885,000 4350/MW6ST. GABRIEL 44(1401)City Council Chambers Phase 2, Planning 45 and Construction 46 (Iberville) 47 Payable from General Obligation Bonds 48 Priority 1 $ 2,700,000 Page 87 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1Pending approval of the Noncash Line of Credit by the State Bond Commission prior to June 230, 2022. 3(1402)City Council Chambers - New Construction 4 (Iberville) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,440,000 750/MW8CENTRAL 8(1435)Administration Building 9 (East Baton Rouge) 10 Payable from General Obligation Bonds 11 Priority 1 $ 16,943 1250/N05NEW ORLEANS EXHIBITION HALL AUTHORITY 13(799) Property Development Project 14 (Orleans) 15 Payable from General Obligation Bonds 16 Priority 5 $25,000,000 1750/N06STATE FAIR OF LOUISIANA 18(859) Hirsch Memorial Coliseum and Louisiana State 19 Fairgrounds Improvements Project 20 (Caddo) 21 Payable from General Obligation Bonds 22 Priority 1 $ 477,295 23 Priority 5 $ 3,280,000 24 Total $ 3,757,295 2550/N13CHENNAULT INTERNATIONAL AIRP ORT AUTHORITY 26(1093)New Air Cargo Facility, Planning and Construction 27 ($1,100,000 Local Match) 28 (Calcasieu) 29 Payable from General Obligation Bonds 30 Priority 1 $ 2,366,451 3150/N17NEW ORLEANS CAREER CENTER 32(1413)Expanding High Wage, High Demand Career 33 and Technical Training, Planning and Construction 34 (Orleans) 35 Payable from General Obligation Bonds 36 Priority 1 $ 1,000,000 37 Priority 5 $ 2,000,000 38 Total $ 3,000,000 39Pending approval of the Noncash Line of Credit by the State Bond Commission prior to June 4030, 2022. Page 88 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/N18IBERIA PARISH AIRPORT AUTHORITY 2(723) Acadiana Regional Airport Improvements, 3 Planning and Construction 4 (Iberia) 5 Payable from General Obligation Bonds 6 Priority 2 $ 500,000 7 Priority 5 $ 2,650,000 8 Total $ 3,150,000 950/N19PAUL S. MORTON SCHOLARSHIP FOUNDATION 10(1383)Paul S. Morton Scholarship Foundation Greater Works 11 Family Life Center, Planning and Construction 12 (Orleans) 13 Payable from General Obligation Bonds 14 Priority 5 $ 6,200,000 1550/N25GREATER NEW ORLEANS EDUCATIONAL TELEVISION 16 FOUNDATION 17(181) WYES ATSC 3.0 Transmission Equipment, Planning 18 and Construction 19 (Orleans) 20 Payable from General Obligation Bonds 21 Priority 5 $ 2,000,000 2250/N33ENGLAND ECONOMIC & INDUSTRIAL DEVELOP MENT 23 DISTRICT 24(621) High Bay Aircraft Maintenance Hangar, Planning 25 and Construction 26 (Rapides) 27 Payable from General Obligation Bonds 28 Priority 1 $ 1,713,915 2950/N34ODYSSEY HOUSE LOUISIANA, INC. 30(611) Odyssey House Louisiana Renovation Project, 31 Planning and Construction 32 (Orleans) 33 Payable from General Obligation Bonds 34 Priority 1 $ 3,677,300 35 Priority 5 $ 3,000,000 36 Total $ 6,677,300 37(1541)Odyssey House Louisiana Gambling Treatment Center 38 (Orleans) 39 Payable from General Obligation Bonds 40 Priority 2 $ 2,000,000 41 Priority 5 $ 5,000,000 42 Total $ 7,000,000 4350/N40LAFAYETTE ECONOMIC DEVELOP MENT 44 AUTHORITY 45(753) Lafayette Innovation Center, Planning and Construction 46 (Lafayette) 47 Payable from General Obligation Bonds 48 Priority 1 $ 6,809,803 Page 89 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/N41BATON ROUGE METROPOLITAN AIRPORT 2(386) Airport Aviation Business Park, Planning 3 and Construction 4 (East Baton Rouge) 5 Payable from General Obligation Bonds 6 Priority 1 $ 2,661,361 7 Priority 5 $ 4,750,000 8 Total $ 7,411,361 950/N47ST. MARTIN ECONOMIC DEVELOP MENT 10 AUTHORITY 11(1307)North Business Park, Planning and Construction 12 (St. Martin) 13 Payable from General Obligation Bonds 14 Priority 5 $ 2,100,000 1550/N53ORLEANS PARISH COMMUNICATIONS DISTRICT 16(417) Orleans Parish Communications District Expansion 17 Project, Planning and Construction 18 (Orleans) 19 Payable from General Obligation Bonds 20 Priority 5 $18,485,000 2150/N67FALSE RIVER REGIONAL AIRPORT 22(165) False River Regional Airport, General Aviation 23 Hangars and Taxi Lane, Planning and Construction 24 (Pointe Coupee) 25 Payable from General Obligation Bonds 26 Priority 5 $ 600,000 2750/N70REGIONAL TRANSIT AUTHORITY 28(1363)Replacement of Two Maintenance Barges 29 Located at the Lower Algiers Maintenance Facility 30 (Orleans) 31 Payable from General Obligation Bonds 32 Priority 2 $ 1,000,000 33 Priority 5 $ 9,620,000 34 Total $10,620,000 3550/N71NORTH LAFOURCHE CONSERVATION, LEVEE AND 36 DRAINAGE DISTRICT 37(830) Raceland Prairie Levee Improvements, Planning 38 and Construction 39 (Lafourche) 40 Payable from General Obligation Bonds 41 Priority 1 $ 225,000 42 Priority 5 $ 3,750,000 43 Total $ 3,975,000 Page 90 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/N74NATIONAL WORLD WAR II MUSEUM, INC. 2(455) Eight Projects Under FP&C Management Plus Liberation 3 Pavilion: Bricks and Mortar, Exhibit Fabrication, Media 4 Production, Planning and Construction 5 (Orleans) 6 Payable from General Obligation Bonds 7 Priority 1 $ 2,500,000 8 Priority 2 $ 5,000,000 9 Priority 5 $ 5,000,000 10 Total $12,500,000 1150/N79TANGIPAHOA PARISH FIRE DISTRICT 1 12(1266)Bruce Cutrer Regional Fire Training Facility 13 of Tangipahoa 14 Parish, Planning and Construction 15 (Tangipahoa) 16 Payable from General Obligation Bonds 17 Priority 2 $ 225,000 18 Priority 5 $ 2,000,000 19 Total $ 2,225,000 2050/NA2LAFAYETTE AIRPORT COMMISSION 21(1477)Construction of a New Passenger Facility Terminal 22 and Associated Infrastructure at Lafayette 23 Regional Airport 24 (Lafayette) 25 Payable from General Obligation Bonds 26 Priority 1 $ 1,863,897 2750/NADMU ZETA FOUNDATION, INC. 28(1318)Expansion Project, Planning and Construction 29 (East Baton Rouge) 30 Payable from General Obligation Bonds 31 Priority 1 $ 30,000 32 Priority 5 $ 150,000 33 Total $ 180,000 3450/NAGRECREATION DISTRICT 6 ALLEN P ARISH 35(488) Recreation Complex, Final Phase, Planning 36 and Construction 37 (Allen) 38 Payable from State General Fund (Direct) Non-Recurring 39 Revenues $ 350,000 4050/NAJEFFORTS OF GRACE, INC. 41(1412)Ashe Too, Planning and Construction 42 (Orleans) 43 Payable from General Obligation Bonds 44 Priority 5 $ 1,000,000 Page 91 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/NAZHOSPICE OF ACADIANA FOUNDATION, INC. 2(1531)Calcutta House, Planning and Construction 3 (Lafayette) 4 Payable from General Obligation Bonds 5 Priority 1 $ 250,000 6 Priority 5 $ 600,000 7 Total $ 850,000 850/NBCCAPITOL CITY FAMILY HEALTH CENTER, INC. 9(877) Care South Medical and Dental Expansion, Planning 10 and Construction 11 (East Baton Rouge) 12 Payable from General Obligation Bonds 13 Priority 1 $ 727,265 14 Priority 5 $ 550,000 15 Total $ 1,277,265 1650/NBFCOMMUNITY RECEIVING HOME, INC. 17(843) Renaissance Home for Youth, New Administrative 18 Building, Renovation of Existing Administrative Building, 19 Roads and Parking Areas, Planning and Construction 20 (Rapides) 21 Payable from General Obligation Bonds 22 Priority 1 $ 885,686 2350/NBVCAPITAL AREA GROUND WATER 24 CONSERVATION DISTRICT 25(809) Water Monitoring System, Planning and Construction 26 (Ascension, East Baton Rouge, East Feliciana, Pointe 27 Coupee, West Baton Rouge, West Feliciana) 28 Payable from General Obligation Bonds 29 Priority 1 $ 400,000 30 Priority 5 $ 1,200,000 31 Total $ 1,600,000 3250/NC2BATON ROUGE RECREATION AND PARKS 33 COMMISSION 34(1415)Cadillac Street Park Site Improvements, Planning 35 and Construction 36 (East Baton Rouge) 37 Payable from General Obligation Bonds 38 Priority 1 $ 75,000 39(1416)J.S. Clark Golf Course Renovation in Greenwood 40 Community Park, Planning and Construction 41 (East Baton Rouge) 42 Payable from General Obligation Bonds 43 Priority 1 $ 50,000 44 Priority 5 $ 800,000 45 Total $ 850,000 Page 92 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1(1419)Baker Youth Tournament Ball Fields, Planning 2 and Construction 3 (East Baton Rouge) 4 Payable from General Obligation Bonds 5 Priority 1 $ 65,000 6(1420)Central Community Sports Park, Planning and Construction 7 (East Baton Rouge) 8 Payable from General Obligation Bonds 9 Priority 1 $ 186,389 1050/NCMFIFTH WARD RECREATION DISTRICT OF 11 ST. HELENA PARISH 12(1261)Recreation District Baseball Fields, Planning 13 and Construction 14 (St. Helena) 15 Payable from General Obligation Bonds 16 Priority 1 $ 978,392 1750/NCNSOUTH TOLEDO BEND WATERWORK S DISTRICT 18(480) Vaco Road, Prospect Road, and Firesheets Lane, 19 Planning and Construction 20 (Sabine) 21 Payable from General Obligation Bonds 22 Priority 1 $ 25,000 23 Priority 5 $ 200,000 24 Total $ 225,000 2550/ND5LAFOURCHE PARISH WATER DISTRICT 26(1069)Kraemer Water Line Upgrades, Planning 27 and Construction 28 (Lafourche) 29 Payable from General Obligation Bonds 30 Priority 1 $ 100,000 31 Priority 5 $ 1,500,000 32 Total $ 1,600,000 3350/NDFLOUISIANA BLACK FARMERS CANNABIS 34 & HEMP ASSOCIATION 35(705) Construction of an Industrial Hemp Processing Plant 36 and Associated Equipment for the Acadiana Region 37 (Lafayette) 38 Payable from General Obligation Bonds 39 Priority 5 $ 395,000 4050/NDNOPPORTUNITIES INDUSTRIALIZ ATION CENTER 41 INCORPORATED OF OUACHITA 42(876) New Education Building, Planning and Construction 43 (Ouachita) 44 Payable from General Obligation Bonds 45 Priority 1 $ 386,775 46 Priority 5 $ 1,845,000 47 Total $ 2,231,775 Page 93 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/NDQTANGIPAHOA AFRICAN AMERICAN HERITAG E 2 MUSEUM AND VETERANS' ARCHIVES 3(1343)Tangipahoa African American Heritage Museum Roof 4 Replacement, Planning and Construction 5 (Tangipahoa) 6 Payable from General Obligation Bonds 7 Priority 5 $ 540,000 850/NDXNEW ORLEANS COUNCIL ON AG ING, INC. 9(800) New Orleans Council on Aging Office and Senior 10 Community Center - Planning, Land Acquisition, 11 Construction, and Initial Equipment and Furnishings 12 for New Building 13 (Orleans) 14 Payable from General Obligation Bonds 15 Priority 1 $ 1,250,000 16 Priority 5 $ 3,750,000 17 Total $ 5,000,000 18Pending approval of the Noncash Line of Credit by the State Bond Commission prior to June 1930, 2022. 2050/NEEBIOMEDICAL RESEARCH AND INNOVATION P ARK 21(1049)Biomedical Research and Innovation Park Building, 22 Planning and Construction 23 (Ouachita) 24 Payable from General Obligation Bonds 25 Priority 5 $19,500,000 2650/NERST. HELENA PARISH HOSPITAL SERVICE DISTRICT NO. 1 27(677) Hospital Renovation, Expansion, and Equipment 28 Replacement, Planning and Construction 29 (St. Helena) 30 Payable from General Obligation Bonds 31 Priority 1 $ 4,200,000 3250/NEYORLEANS PARISH HOSPITAL SERVICE DISTRICT A 33(1428)Parish Hospital Service District for the Parish of Orleans - 34 District A- Obstetrics Service Line Expansion Level 2 Unit, 35 Planning and Construction 36 (Orleans) 37 Payable from General Obligation Bonds 38 Priority 1 $ 200,000 39Pending approval of the Noncash Line of Credit by the State Bond Commission prior to June 4030, 2022. Page 94 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/NF8CENTRAL LOUISIANA DETENTION CENTER AUTHORITY 2(407) Central Louisiana Juvenile Detention Center, 3 Planning and Construction 4 (Grant) 5 Payable from General Obligation Bonds 6 Priority 5 $10,700,000 7 Payable from State General Fund (Direct) Non-Recurring 8 Revenues $ 1,000,000 9 Total $11,700,000 1050/NFJHIV/AIDS ALLIANCE FOR REGION TWO 11(1549)Open Health Care Clinic Purchase of Farm Bureau 12 Building for New Main Clinic Location 13 (East Baton Rouge) 14 Payable from General Obligation Bonds 15 Priority 2 $ 1,000,000 1650/NFL YOUNG MEN'S CHRISTIAN ASSOCIATION OF BOGALUSA 17(857) Renovation and Repairs to the Bogalusa YMCA, 18 Planning and Construction 19 (Washington) 20 Payable from State General Fund (Direct) Non-Recurring 21 Revenues $ 175,000 2250/NFXTHE O.W. DILLON TRAINING AND COMMUNITY 23 DEVELOPMENT CENTER, INC. 24(1240)The O.W. Dillon Training and Community 25 Development Center Building, Planning and 26 Construction 27 (Tangipahoa) 28 Payable from General Obligation Bonds 29 Priority 5 $ 6,000,000 3050/NG6THE LOUISIANA BLACK HISTORY HALL OF FAME 31(1497)Museum and Cultural Center, Planning and Construction 32 (East Baton Rouge) 33 Payable from General Obligation Bonds 34 Priority 1 $ 2,191,547 3550/NGALINCOLN PARISH FIRE PROTECTION DISTRICT #1 36(1260)Renovations to Existing Facility and Additional Buildings, 37 Acquisition, Planning and Construction 38 (Lincoln) 39 Payable from General Obligation Bonds 40 Priority 1 $ 120,000 41 Priority 5 $ 765,000 42 Total $ 885,000 Page 95 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/NGMNEW ORLEANS AF RICAN AMERICAN MUSEUM OF ART, 2 CULTURE AND HISTORY 3(1532)New Orleans African American Museum of Art, Culture 4 and History: Renovation and New Construction 5 (Orleans) 6 Payable from General Obligation Bonds 7 Priority 1 $ 375,000 8 Priority 5 $ 4,000,000 9 Total $ 4,375,000 1050/NGNLOUISIANA CHAMBER OF COMMERCE F OUNDATION, INC. 11(1268)Louisiana Chamber of Commerce's Business 12 Innovation Center, Planning and Construction 13 (Calcasieu) 14 Payable from General Obligation Bonds 15 Priority 5 $ 1,645,000 1650/NGQTHE STRAND THEATRE OF SHREVEPORT CORPORATION 17(385) Repair and Renovation to the Strand Theatre of Shreveport 18 (Caddo) 19 Payable from General Obligation Bonds 20 Priority 1 $ 75,000 21 Priority 5 $ 984,000 22 Total $ 1,059,000 2350/NHEST. JAMES PARISH HOSPITAL 24(1271)West Bank Health Clinic, Planning and Construction 25 (St. James) 26 Payable from General Obligation Bonds 27 Priority 1 $ 399,795 28 Priority 5 $ 2,900,000 29 Total $ 3,299,795 3050/NHGLAFAYETTE CENTRE DEVELOP MENT DISTRICT 31(1403)Downtown Lafayette Public Infrastructure Improvements 32 and Upgrades, Planning and Construction 33 (Lafayette) 34 Payable from General Obligation Bonds 35 Priority 2 $ 500,000 3650/NHPBATON ROUGE AFRICAN AMERICAN MUSEUM 37(1449)Baton Rouge African American Museum, 38 Planning and Construction 39 (East Baton Rouge) 40 Payable from General Obligation Bonds 41 Priority 5 $ 500,000 4250/NHZACADIA POST NO. 15 AMERICAN LEGION 43(284) Acadia Post 15 American Legion Renovation, 44 Planning and Construction 45 (Acadia) 46 Payable from State General Fund (Direct) Non-Recurring 47 Revenues $ 225,000 Page 96 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/NI9ASCENSION-ST. JAMES AIRPORT AND 2 TRANSPORTATION AUTHORITY 3(414) Drinking Water, Fire Suppression, and ADA Compliance - 4 Louisiana Regional Airport, Gonzales, LA, Planning 5 and Construction 6 (Ascension) 7 Payable from General Obligation Bonds 8 Priority 1 $ 190,000 9(415) Commercial Hangar Complex - Louisiana Regional Airport, 10 Gonzales, LA, Planning and Construction 11 (Ascension) 12 Payable from General Obligation Bonds 13 Priority 5 $ 1,000,000 1450/NJ9DRYADES YOUNG MEN'S CHRISTIAN ASSOCIATION 15(1486)Technical Training Center, Acquisition and Renovation 16 (Orleans) 17 Payable from General Obligation Bonds 18 Priority 1 $ 1,690,218 19 Priority 5 $ 1,000,000 20 Total $ 2,690,218 2150/NL6EAST RICHLAND WATERWORK S DISTRICT 22(1234)Poverty Point Parkway Water Main, Planning 23 and Construction 24 (Richland) 25 Payable from State General Fund (Direct) Non-Recurring 26 Revenues $ 625,000 2750/NLMFOUNDATION FOR SCIENCE AND MATHEMATICS 28 EDUCATION, INC. 29(412) A Model for a 21st Century Workforce Development Urban 30 High School - New Orleans Science and Mathematics 31 High School 32 (Orleans) 33 Payable from General Obligation Bonds 34 Priority 1 $ 1,717,963 35 Priority 5 $ 1,000,000 36 Total $ 2,717,963 3750/NMDBELMONT WATERWORK S, INC. 38(737) Water System Improvements, Planning and Construction 39 (Sabine) 40 Payable from General Obligation Bonds 41 Priority 1 $ 257,488 Page 97 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/NP1ACADIANA CRIMINALISTICS LABORATORY DISTRICT 2(638) New Crime Laboratory, Planning, Design, Construction, 3 and Equipment 4 (Iberia) 5 Payable from General Obligation Bonds 6 Priority 1 $ 3,851,833 7 Priority 5 $10,800,000 8 Total $14,651,833 950/NP3BAYOU LAFOURCHE FRESH WATER DISTRICT 10(1235)Donaldsonville Flood Control, Planning and Construction 11 (Ascension, Assumption, Lafourche, Terrebonne) 12 Payable from General Obligation Bonds 13 Priority 1 $ 753,000 1450/NPDIBERIA ECONOMIC DEVELOP MENT AUTHORITY 15(672) Progress Point Business Park and Airport Gateway, 16 Land Acquisition, Planning and Construction 17 (Iberia) 18 Payable from General Obligation Bonds 19 Priority 1 $ 2,105,793 2050/NQ2GRAVITY DRAINAGE DISTRICT 6 CALCASIEU PARISH 21(452) Buxton Creek Drainage Improvements, Planning 22 and Construction 23 (Calcasieu) 24 Payable from General Obligation Bonds 25 Priority 1 $ 100,000 26 Priority 5 $ 2,000,000 27 Total $ 2,100,000 2850/NQGLAFAYETTE METROP OLITAN EXPRESSWAY 29 COMMISSION 30(826) Lafayette Loop Project Planning and Construction 31 (Lafayette) 32 Payable from General Obligation Bonds 33 Priority 1 $ 4,000,000 34 Priority 5 $ 2,500,000 35 Total $ 6,500,000 3650/NQNLSU REAL ESTATE AND FACILITIES FOUNDATION 37(1217)University Lakes Restoration Project to Address 38 Flood Control, Environmental, Safety, Health and 39 Other Issues (Matching Funds) 40 (East Baton Rouge) 41 Payable from General Obligation Bonds 42 Priority 1 $ 6,000,000 43Notwithstanding any other provision of law to the contrary, the appropriation for the LSU 44Real Estate and Facilities Foundation, University Lakes Restoration Project to Address 45Flood Control, Environmental, Safety, Health and Other Issues is conditioned upon the 46contracts for the project containing a provision that any sinker cypress or other natural 47resource recovered from the lakes is public property, and shall be sold at public auction with 48the proceeds of the sale to be used for the project. Page 98 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/NQVBEAUREGARD WATERWORK S DISTRICT #6 2(450) Water System Improvements, Planning and Construction 3 (Beauregard) 4 Payable from General Obligation Bonds 5 Priority 1 $ 626,013 650/NSPEDEN HOUSE 7(613) New Orleans Emergency Shelter, Planning 8 and Construction 9 (Orleans) 10 Payable from General Obligation Bonds 11 Priority 1 $ 850,000 1250/NTKTHE UNION LINCOLN REG IONAL WATER SUPPLY 13 INITIATIVE 14(1479)Development of Alternative Water Supply from Lake 15 D'Arbonne for Lincoln and Union Parishes 16 (Lincoln, Union) 17 Payable from General Obligation Bonds 18 Priority 1 $ 1,397,200 19 Priority 5 $ 2,400,000 20 Total $ 3,797,200 2150/NU99TH WARD STADIUM, INC. 22(1046)Multi-Sport Venue in Eastern New Orleans and Lower 23 Ninth Ward, Planning and Construction 24 (Orleans) 25 Payable from General Obligation Bonds 26 Priority 1 $ 3,450,000 27Pending approval of the Noncash Line of Credit by the State Bond Commission prior to June 2830, 2022. 2950/NUQLOUISIANA HIBERNIAN CHARITY 30(1265)Four Acre Irish Heritage Park in the Lakeview 31 Neighborhood, Planning and Construction 32 (Orleans) 33 Payable from General Obligation Bonds 34 Priority 1 $ 250,000 3550/NVYWASHINGTON PARISH HOSPITAL SERVICE 36 DISTRICT NO. 1 37(1480)Emergency Upgrades including Power Generation System 38 Upgrade, Mechanical Systems, and Roofing, Planning 39 and Construction 40 (Washington) 41 Payable from General Obligation Bonds 42 Priority 1 $ 650,000 43 Priority 5 $ 4,650,000 44 Total $ 5,300,000 Page 99 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/NWOAIRPORT DISTRICT 1 OF CALCASIEU PARISH 2(1037)Airport Entrance and Access Road Improvements and 3 Marquee, Planning and Construction 4 (Calcasieu) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,000,000 750/NWRLOUISIANA SWAMP BASE, INC. 8(410) Camp Atchafalaya Swamp Base, Planning, Design, 9 and Construction 10 (St. Martin) 11 Payable from General Obligation Bonds 12 Priority 1 $ 500,000 13 Priority 5 $ 2,000,000 14 Total $ 2,500,000 1550/NWSLAFAYETTE CENTRAL P ARK, INC. 16(409) Lafayette Central Park Improvements, Planning 17 and Construction 18 (Lafayette) 19 Payable from General Obligation Bonds 20 Priority 1 $ 3,293,936 21 Priority 5 $ 4,637,000 22 Total $ 7,930,936 2350/NXCLIVINGSTON PARISH SHERIFF'S OFFICE 24(1328)Livingston Parish Emergency Response and 25 Evacuation Center, Planning and Construction 26 (Livingston) 27 Payable from General Obligation Bonds 28 Priority 2 $ 1,000,000 29 Priority 5 $32,620,000 30 Total $33,620,000 3150/NXIHEBERT WATER SYSTEM, INC. 32(708) Water System Improvements, Planning 33 and Construction 34 (Caldwell) 35 Payable from General Obligation Bonds 36 Priority 1 $ 272,695 3750/NXNLOUISIANA CHILDREN'S MEDICAL CENTER 38(1117)Children's Hospital New Orleans Behavioral Health 39 Hospital, Planning and Construction 40 (Orleans) 41 Payable from General Obligation Bonds 42 Priority 1 $ 830,903 4350/NXSBATON ROUGE GENERAL MEDICAL CENTER 44(1481)Regional Burn Center Expansion 45 (East Baton Rouge) 46 Payable from General Obligation Bonds 47 Priority 1 $ 1,279,460 Page 100 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/NXYCONCORDIA PARISH HOSPITAL SERVICE 2 DISTRICT #1 3(836) Construction of Turn Lane on U.S. 84/425 4 (Concordia) 5 Payable from General Obligation Bonds 6 Priority 2 $ 225,000 750/NYNOPELOUSAS HEIGHTS, INC. 8(1482)Opelousas Heights Proposed Subdivision, Planning 9 and Construction 10 (St. Landry) 11 Payable from General Obligation Bonds 12 Priority 1 $ 1,184,790 1350/NYPSECOND HARVEST F OOD BANK OF GREATER 14 NEW ORLEANS AND ACADIANA 15(1483)Roof Replacement and HVAC Installation, 16 Planning and Construction 17 (Jefferson) 18 Payable from General Obligation Bonds 19 Priority 1 $ 1,006,031 2050/NYSHOLY ROSARY REDEVELOP MENT 21(1278)Holy Rosary Institute, Planning, Construction, 22 and Restoration 23 (Lafayette) 24 Payable from General Obligation Bonds 25 Priority 1 $ 4,500,000 26 Priority 5 $ 1,500,000 27 Total $ 6,000,000 2850/NYVCHATEAU DE NOTRE DAME F ACILITIES CORPORATION 29(811) Wynhoven Health Care Expansion, including St. Andrew's 30 Village Planning and Construction 31 (Jefferson) 32 Payable from General Obligation Bonds 33 Priority 1 $ 3,561,859 34 Priority 5 $ 1,999,750 35 Total $ 5,561,609 3650/NZ7ASSOCIATION FOR THE LIBERTY THEATRE 37(1368)Liberty Theatre Restoration and Preservation Project, 38 HVAC Replacement and Mold Remediation, Planning 39 and Construction 40 (St. Landry) 41 Payable from State General Fund (Direct) Non-Recurring 42 Revenues $ 340,000 Page 101 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/NZBLIVINGSTON PARISH AIRPORT DISTRICT 2(523) Livingston Executive Airport, Planning and Construction 3 (Livingston) 4 Payable from General Obligation Bonds 5 Priority 1 $ 1,336,741 6 Priority 5 $ 485,000 7 Total $ 1,821,741 850/NZDHOSPITAL SERVICE DISTRICT NO. 1, PARISH OF 9 ST. MARY 10(395) Franklin Foundation Hospital Wellness Center 11 (St. Mary) 12 Payable from General Obligation Bonds 13 Priority 1 $ 1,986,500 14 Priority 5 $ 1,000,000 15 Total $ 2,986,500 1650/NZKTHE ROBERT A. BOGAN BATON ROUGE FIRE MUSEUM 17(1303)Museum Restoration, Planning and Construction 18 (East Baton Rouge) 19 Payable from General Obligation Bonds 20 Priority 5 $ 3,165,000 2150/NZXWEST CALCASIEU CAMERON HOSP ITAL 22(1288)West Calcasieu Cameron Hospital Medical Office Building, 23 Planning and Construction 24 (Calcasieu) 25 Payable from General Obligation Bonds 26 Priority 1 $ 328,000 27 Priority 5 $ 4,022,000 28 Total $ 4,350,000 29Pending approval of the Noncash Line of Credit by the State Bond Commission prior to June 3030, 2022. 3150/N YOUNG WOMEN'S CHRISTIAN ASSOCIATION 32( ) Domestic Violence Shelter/Program, 33 Planning and Construction 34 (East Baton Rouge) 35 Payable from General Obligation Bonds 36 Priority 5 $ 500,000 37Pending submittal and late approval of the capital outlay budget request pursuant to the 38provisions of R.S. 39:112. 3950/S10CALCASIEU PARISH SCHOOL BOARD 40(1484)Renovations to Lake Charles Boston Stadium, Planning 41 and Construction 42 (Calcasieu) 43 Payable from General Obligation Bonds 44 Priority 1 $ 167,000 45 Priority 5 $ 823,000 46 Total $ 990,000 Page 102 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 150/S32LIVINGSTON PARISH SCHOOL BOARD 2(956) Widening and Turn Lane Construction for LA Hwy 16 3 as Part of the New Southside Elementary and Jr. High Schools 4 (Livingston) 5 Payable from General Obligation Bonds 6 Priority 1 $ 989,875 750/S39POINTE COUPEE PARISH SCHOOL BOARD 8(901) Pointe Coupee Parish School Board Office Relocation, to 9 be Located at 8777 Morganza Highway, Formerly Labarre 10 Elementary School Site, Due to Flooding Caused by 11 Hurricane Gustav, Planning and Construction 12 (Pointe Coupee) 13 Payable from General Obligation Bonds 14 Priority 1 $ 2,500,000 15 Priority 5 $ 1,900,000 16 Total $ 4,400,000 1750/S63WEST FELICIANA PARISH SCHOOL BOARD 18(408) Julius Freyhan Cultural/Conference Center, Planning 19 and Construction 20 (West Feliciana) 21 Payable from General Obligation Bonds 22 Priority 1 $ 997,000 23 Priority 5 $ 500,000 24 Total $ 1,497,000 2550/S67CENTRAL COMMUNITY SCHOOL SYSTEM 26(1267)Central City Community Sports Complex, Infrastructure 27 and Overlay Projects, Planning and Construction 28 (East Baton Rouge) 29 Payable from General Obligation Bonds 30 Priority 1 $ 700,000 31 Section 1.(A) Appropriated Debt Projects. The projects listed in this Section are 32to be funded through the sale bonds and secured by or payable from state appropriation. 3308/406LOUISIANA CORRECTIONAL INSTITUTE F OR WOMEN 34(316) Rebuild and/or Replace Facility Due to Damage 35 from 2016 Flood Event 36 (Iberville) 37 Payable from General Obligation Bonds 38 Priority 5 $23,000,000 39 Payable from Interagency Transfers $16,871,000 40 Payable from Revenue Bonds $46,000,000 41 Payable from Federal Funds $40,446,819 42 Total $126,317,819 43Notwithstanding anything contained in this Capital Outlay Act, or any previous Capital 44Outlay Act to the contrary, or any other provision of law, the Department of Public Safety 45and Corrections may finance the design, construction, furnishing and equipping of 46replacement facilities through the issuance of revenue bonds by the Louisiana Correctional 47Facilities Corporation to be secured by and payable from State appropriations. The issuance 48of such revenue bonds shall require the approval of the State Bond Commission. Page 103 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1 (B) The following revisions are hereby made to Act 485 of the 2021 Regular 2Session of the Louisiana Legislature for the purpose of making supplemental capital outlay 3appropriations for Fiscal Year 2021-2022. Provided, however, that the provisions of 4Sections 2 through 18, inclusive of Act 485 of the 2021 Regular Session of the Legislature 5are adopted and incorporated by reference for the appropriations contained in this Section 6and Section 1(C). 7 (1) Notwithstanding any provision of law to the contrary, including the 8provisions of this or any other Capital Outlay Act, the appropriation to 07/270 9DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT for the Highway 10Program (Up to $4,000,000 for Secretary's Emergency Fund) (Statewide) project is hereby 11amended and reenacted as follows: 12On page 15, delete lines 3 through 7 in their entirety and insert the following: 13 "Payable from Transportation Trust Fund - Regular $30,500,000 14 Payable from Transportation Trust Fund - Federal $657,920,224 15 Payable from Transportation Trust Fund - Construction 16 Subfund $566,000,000 17 Total $1,516,570,224" 18 (2) Notwithstanding any provision of law to the contrary, including the 19provisions of this Capital Outlay Act, the appropriation to the 19/604N DEPARTMENT OF 20EDUCATION, LSU HEALTH SCIENCE CENTER - NEW ORLEANS for the Interim 21Hospital Repurposing, Construction (Orleans) project is hereby amended and reenacted to 22include an appropriation made out of the interest earnings from the investment of general 23obligation bond or note proceeds in the Comprehensive Capital Outlay Escrow Account: 24On page 109, delete lines 3 and 4 in their entirety and insert the following: 25 "Payable from Interest Earnings $ 4,765,000 26 Total $23,765,000" 27 (3) Notwithstanding any provision of law to the contrary, including the 28provisions of this Capital Outlay Act, the appropriation to the 16/513 DEPARTMENT OF 29WILDLIFE AND FISHERIES, OFFICE OF WILDLIFE for the Woodworth Central Office 30Complex and Pineville Office/Region 3, Planning and Construction (Rapides) project is 31hereby amended and reenacted to include an appropriation made out of the interest earnings Page 104 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1from the investment of general obligation bond or note proceeds in the Comprehensive 2Capital Outlay Escrow Account: 3On page 26, delete lines 13 and 14 in their entirety and insert the following: 4 "Priority 5 $ 1,500,000 5 Payable from Interest Earnings $ 1,500,000 6 Total $5,108,900" 7 (C) Notwithstanding any provision of law to the contrary, including the 8provisions of the Capital Outlay Act, the appropriation to 01/112 DEPARTMENT OF 9MILITARY AFFAIRS for the Louisiana National Guard Readiness Center, Building 801 10Replacement, Camp Beauregard, Planning and Construction (Statewide) approved by the 11Joint Legislative Committee on the Budget on September 13, 2019, is hereby amended to 12include an appropriation made out of the interest earnings from the investment of general 13obligation bond or note proceeds in the Comprehensive Capital Outlay Escrow Account: 14 "Payable from Federal Funds $17,950,000 15 Payable from Interest Earnings $ 1,735,000 16 Total $19,685,000" 17 Section 2.(A) Except as provided for in Subsection (B) of this Section, the 18expenditure of funds appropriated in this Act, except appropriations made to nonprofit 19economic development corporations, shall be in conformity to all existing statutes relative 20to public bidding, contractual review, and R.S. 39:101 through 128 and any other statutes 21affecting the capital outlay program for state government, state institutions, and political 22entities. No contract shall be awarded for any project prior to the granting of a line of credit 23or the sale of bonds by the State Bond Commission, determination by the state treasurer that 24cash funding is available in the Comprehensive Capital Outlay Escrow Account for the 25project, or delivery of revenue bonds whose issuance is authorized in Section 1 or Section 261.(A) of this Act. 27 (B). Notwithstanding the provisions of R.S. 39:101, 102, and 112(C), projects 28included in Section 1 of this Act which did not submit a capital outlay application by 29November 1, 2021, in compliance with the provisions of R.S. 39:101 and 102 and which 30have not received late approval as required by R.S. 39:112(C) are hereby deemed to have 31until May 20, 2022, to submit a capital outlay budget request application pursuant to R.S. 3239:101(A), and if the application is submitted by that date, the project is deemed to have Page 105 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1complied with the late approval requirements of R.S. 39:112(C). Additionally, the capital 2outlay budget requests together with supporting information and documents for these 3projects shall constitute the feasibility study required by Article VII, Section 11(C) of the 4Constitution of Louisiana. 5 Section 3. Payment for projects specified in this Act must be made by warrant 6submitted to the division of administration, Department of Transportation and Development, 7the state treasurer or other administering agency as provided in Section 8, whichever is 8appropriate, only to the extent of funds required for immediate payment. Copies of invoices 9or other supporting documentation shall be submitted with warrants. In the event that any 10equipment included in this Act, is procured pursuant to the provisions of the State Lease- 11Purchase Act, R.S. 39:1761 et seq., the amounts included in this Act for each such piece of 12equipment shall not be appropriated. The provisions of R.S. 39:1771 which require 13equipment to be leased under the State Lease-Purchase Act to be included in the executive 14budget and approved by the legislature through inclusion in the General Appropriation Act 15shall be considered waived upon the inclusion of such equipment in this Act. Projects 16contained in this Act may, at the direction of the division of administration and with the 17approval of the State Bond Commission, alternatively be funded through financing programs 18heretofore or hereafter provided by a public trust and public corporation duly organized 19pursuant to R.S. 9:2341 et seq., having for its beneficiary the state and the Louisiana Local 20Government Environmental Facilities and Community Development Authority, pursuant to 21R.S. 33:4548.1 et seq. 22 Section 4. If at any time during the Fiscal Year 2022-2023, the governor should 23find, or the Joint Legislative Committee on the Budget or the commissioner of 24administration should report to the governor, that the receipts of the treasury are falling short 25or appear likely to fall short of the revenue estimates for the fiscal year and that a cash 26deficit is likely to be incurred, the governor shall take such steps as deemed necessary to 27prevent the occurrence of a cash deficit. In the event that a capital outlay project funded in 28this Act falls under an agency which is abolished or for which funds are not appropriated in 29the 2022-2023 General Appropriation Act, then the funds appropriated in this Act for such 30capital outlay projects shall not be expended unless deemed necessary by the governor to Page 106 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1protect life or property. In the event that legislation is enacted which transfers facilities or 2programs for which projects are funded in this Act, on behalf of one agency, institution, 3department, or management board to another agency, institution, department, or management 4board, then the projects in this Act shall be deemed transferred also. 5 Section 5. All monies appropriated by this Act and any applicable funds of a 6prior capital outlay budget act adopted by the legislature shall be deposited by the state 7treasurer in the Comprehensive Capital Outlay Escrow Account, established by this Section, 8in the state treasury. In accordance with R.S. 36:764, no later than sixty days following the 9end of each quarter, the state treasurer shall report to the Joint Legislative Committee on the 10Budget and the commissioner of administration, all funds contained in the Miscellaneous 11Fund of the Comprehensive Capital Outlay Escrow Account. Notwithstanding any 12provisions contained herein or other law to the contrary, any original issue premium or 13accrued interest proceeds received pursuant to the sale of general obligation bonds shall 14remain on deposit to the credit of the Bond Security and Redemption Fund until such time 15as they may be utilized in accordance with U.S. Department of the Treasury Regulations 16promulgated pursuant to the Internal Revenue Code of 1986. All such monies shall be 17administered according to the particular Act pertaining to the fiscal year in which such 18monies were appropriated. If it is determined by the director of the office of facility 19planning and control, division of administration, that the funds appropriated by this Act or 20any prior capital outlay budget Act are not sufficient to complete the projects contained in 21any capital outlay budget Act, through unavoidable deficiencies in appropriation, including 22administrative and legal requirements, the commissioner of administration, subject to 23approval of the Joint Legislative Committee on the Budget, may direct the use of interest 24earned from the investment of general obligation bond or note proceeds in the 25Comprehensive Capital Outlay Escrow Account, not to exceed an aggregate of five million 26dollars in any one fiscal year, for the purpose of completing the projects contained in any 27capital outlay budget Act and such money shall be deemed appropriated in specific amounts 28necessary for such purpose. All appropriations in this Act which are made as additions to 29funds for previously authorized projects shall be included, for accounting purposes, in the 30account of the previously authorized projects. If it is determined by the director of the office Page 107 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1of facility planning and control, division of administration, that it is cost effective and 2practical to combine individual appropriations, the commissioner of administration, subject 3to the approval of the Joint Legislative Committee on the Budget, may direct that two or 4more appropriations or parts thereof may be combined into a single project for accounting 5and audit purposes. The commissioner of administration may direct that funding in the 6various statewide and/or multiple parish projects for improvements for state facilities may 7be transferred to any project, in this Act or any previous Capital Outlay Act, which require 8supplemental funding for improvements for state facilities which qualify for funding through 9the various statewide and/or multiple parish projects for improvements for state facilities. 10The office of facility planning and control, division of administration is authorized to receive 11settlements and vendor rebates and to add a portion or all of these receipts to the existing 12project funds relating to the settlement and/or vendor rebates and appropriated in this Act 13or any previous Capital Outlay Act including those previously appropriated funds that 14become unavailable. Approval by the Joint Legislative Committee on the Budget will be 15obtained if the settlement and/or vendor rebates will be added to any projects in this Act or 16any previous Capital Outlay Act which are unrelated to the project from which the settlement 17and/or vendor rebates were received. The office of facility planning and control, division 18of administration is authorized to receive insurance payments and are hereby authorized to 19immediately repair facilities that suffer insurance losses without those projects being 20included in the Act and shall report to the Joint Legislative Committee on the Budget any 21expenditures from insurance funds received pursuant to this Section. A portion, as 22determined by the commissioner of administration and not to exceed one percent (1%), of 23the funding for projects which qualify for the Percent for Art Program and not to exceed 24$450,000 for an individual, qualifying project, may be transferred from the qualifying 25project budgets, to the Department of Culture, Recreation and Tourism for costs of acquiring 26art and administering the program. For all Percent for Art Program projects in this or any 27previous capital outlay act, up to ten percent (10%) of the aforementioned one percent (1%) 28may be used for the costs of administering the projects. 29 Section 6. No later than February 1, 2023, agencies administering capital outlay 30projects will submit reports identifying completed projects and cash balances to the Joint Page 108 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1Legislative Committee on Capital Outlay pursuant to the reporting requirements of R.S. 239:105 and R.S. 39:116. 3 Section 7. The commissioner of administration, with the approval of the Joint 4Legislative Committee on the Budget, is authorized to supplement or substitute the 5appropriations specified in this or previous capital outlay acts with any federal or other funds 6which are or may become available and such funds shall be deemed appropriated in specific 7amounts necessary for the purposes of this Act. Any funds received by the State Bond 8Commission as a result of a prepayment of reimbursement contracts as authorized by law 9and the policy and procedure for reimbursement contracts of the Department of Treasury, 10office of State Bond Commission, shall be deposited as set forth in such policy and 11procedure and shall be deemed available and appropriated in specific amounts necessary for 12the purposes of this Act pursuant to the procedure set forth in this section. 13 Section 8.(A) All projects herein authorized and funded shall be subject to the 14provisions of R.S. 39:101 through 128. With the exception of appropriations made to the 15Department of Military Affairs, the Legislature, the Louisiana Stadium and Exposition 16District, the Department of Economic Development, the Coastal Protection and Restoration 17Authority, the Division of Administration for Supplemental State Funds for Local 18Government Assistance Program, the Division of Administration for the Community Water 19Enrichment Program or the Department of Transportation and Development, all funds herein 20appropriated shall be considered as having been appropriated directly to the Office of 21Facility Planning and Control, Division of Administration. All cooperative endeavor 22agreements for non-state entities shall be prepared by the appropriate administering agency 23and submitted to the office of State Procurement for review and approval. As part of its 24review, the office of State Procurement shall consult with bond counsel to the State relative 25to any federal tax issues. 26 (1) Notwithstanding anything contained in this act to the contrary or any other 27provision of law, the appropriations made for the Louisiana Stadium and Exposition District 28shall be appropriated directly to the Louisiana Stadium and Exposition District, and are 29public purposes pursuant to the provisions of Article VII, Section 14 of the Constitution of 30Louisiana primarily for economic development, including the generation of tax revenue, Page 109 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1creation of jobs, and the generation of tourism, and may be used to reimburse any 2expenditure made prior to the granting of a line of credit or the sale of bonds by the State 3Bond Commission, determination by the State Treasurer that cash funding has been 4deposited in the Comprehensive Capital Outlay Escrow Account for the project. 5 (2) Further, with respect to appropriations to the Louisiana Stadium and 6Exposition District for the TPC Louisiana, Planning and Construction project, the Louisiana 7Stadium and Exposition District shall be permitted to use alternative competitive 8procurement and delivery methods for the award of any contracts to be funded through such 9appropriation. 10 (3) The Louisiana Stadium and Exposition District shall have the authority to 11directly appoint a design professional from a list of a minimum of three architectural firms 12or joint ventures with professional sports facility design experience acceptable to the 13Commissioner of Administration and shall be exempt from other state requirements for 14selection of designers. The design professional fee shall be in accordance with state 15guidelines administered by the Office of Facility Planning and Control, Division of 16Administration. 17 (B)(1)(a) Funds appropriated in the Capital Outlay Act under the name of non- 18state entities shall be administered by the Office of Facility Planning and Control, Division 19of Administration under cooperative endeavor agreements; however, projects involving state 20or federal highways may be administered by the Department of Transportation and 21Development, if appropriate. Except as provided in Section 8(A), cooperative endeavor 22agreements entered into pursuant to appropriations in this Act shall not be required to be 23submitted to the Division of Administration, Office of State Procurement. 24 (b) Further, for all projects in the Capital Outlay Act or a previous Capital Outlay 25Act which are appropriated to the Office of Facility Planning and Control, Division of 26Administration, including those administered by cooperative endeavor agreements, up to six 27percent of each line-item may be used for costs of administering the projects. 28 (c) For all projects in Capital Outlay Act or a previous Capital Outlay Act 29appropriated to the Department of Transportation and Development, up to six percent of Page 110 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1each line-item may be used for costs of administering the projects, or for field 2engineering/construction supervision. 3 (2) Notwithstanding anything in this Act, or a previous Capital Outlay Act, the 4Office of Facility Planning and Control may enter into a cooperative endeavor agreement 5with the Archdiocese of New Orleans and Jefferson Parish for the Preservation and 6Restoration of Historic Structure for Hope Haven/Madonna Manor Campus, Planning and 7Construction project. 8 (C) Line-item general obligation bond projects appropriated to the Department 9of Transportation and Development in the Capital Outlay Act or a previous Capital Outlay 10Act shall be authorized to draw Transportation Trust Funds from the Highway Program 11appropriation, for supplemental funding on overruns in excess of the original estimated 12project cost as determined by the Department of Transportation and Development, provided 13however that said projects are in the state or federal highway system and in the priority 14program, and the overrun is less than $50,000. Any such overrun of $50,000 or more must 15be approved by the Joint Legislative Committee on the Budget. 16 (D) All ports, levee districts and other non-state entities must have a fully 17executed cooperative endeavor agreement, from the administering agency or the State 18Treasurer, whichever is appropriate, before entering into any contracts which obligate state 19funding and must follow all laws pertaining to public bidding. If a port, levee district or other 20non-state entity enters into a contract prior to receipt of funding, or prior to execution of a 21cooperative endeavor agreement, then payments under such contracts are prohibited from 22capital outlay appropriations, and are the sole responsibility of the port, levee district, or 23other non-state entity. 24 (E) Pursuant to R.S. 39:122(B)(2), funds to be reimbursed by the state which a 25non-state entity attempts to obligate prior to the receipt of funding shall not be eligible for 26reimbursement or payment by the state; however, notwithstanding anything in this Act or 27any previous Capital Outlay Acts to the contrary, contracts may be entered into for the 28Lafayette Economic Development Authority, Lafayette Innovation Center (Lafayette) prior 29to the receipt of funding and the State is authorized to financially participate in obligations 30created by such contracts. Page 111 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1 (F) Pursuant to R.S. 39:112(E)(2), non-state entity projects shall require a match 2of not less than twenty-five percent of the total requested amount of funding. 3 (G) Notwithstanding anything contained in this Act or the Capital Outlay Act 4to the contrary or any other Act or provision of law, the appropriations made for the 5Executive Department for facilities which promote economic development included in the 6Repair, Restoration, and Replacement for Declared Disasters, Planning, Construction, 7Renovation, and Acquisition project, and the Department of Economic Development projects 8are for public purposes pursuant to the provisions of Article VII, Section 14 of the 9Constitution of Louisiana primarily for economic development, including the generation of 10tax revenues, creation of jobs, promotion of tourism, and creation of facilities for charitable, 11cultural, artistic, educational, social, civic, research, service, economic development 12activities, or provide facilities for professional golf events, pursuant to the terms of 13cooperative endeavor agreements, including leases and all expenditures of these 14appropriations and may be exempted, by the Commissioner of Administration, from all 15statutes relative to public bidding, contractual review and the provisions of R.S. 1633:9029.2(D) and in lieu thereof be allowed to use alternative competitive contracting 17arrangements where the appropriate administering entity submits documentation to the 18Commissioner of Administration substantiating that it is in the best interest of the citizens 19of the state, due to economic and/or operational benefits, and the necessity to complete the 20projects in a timely manner; and, the appropriate administering entity shall have the 21authority to directly appoint the design professional from a list of a minimum of three design 22firms or joint ventures with the appropriate specialized facility design experience submitted 23to and acceptable to the Commissioner of Administration and shall be exempt from other 24state requirements for selection of designers, and may include expenditures for computers, 25fixtures, furniture, and other equipment as such is deemed to be capital outlay in 26nature, and unless the Commissioner of Administration is advised by bond counsel to the 27State that such may violate federal tax law, may be used to reimburse any expenditure made 28prior to the granting of a line of credit or the sale of bonds by the State Bond Commission, 29determination by the State Treasurer that cash funding has been deposited in the 30Comprehensive Capital Outlay Escrow Account for the project or the execution of a Page 112 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1cooperative endeavor agreement from the Office of Facility Planning and Control, and may 2be used to acquire land or real property, the title to which is held in the name of an entity 3exempt from taxation under the provisions of 26 U.S.C. 501(c)(3). 4 (H) Notwithstanding any other provision of this Act or the Capital Outlay Act 5or any other provision of law to the contrary, all of the funds herein appropriated to the 6Department of Economic Development in connection with projects or programs for 7which the Department of Economic Development utilizes a cooperative endeavor agreement 8to further economic development as permitted under Article VII, Section 14 of the 9Louisiana Constitution, including the generation of tax revenues and creation of jobs, shall 10be considered as having been appropriated to the Department of Economic Development, 11may be used to reimburse any expenditure made prior to the granting of a line of credit and 12made prior to the execution of a cooperative endeavor agreement and shall be administered 13solely by the Department of Economic Development pursuant to, in compliance with, and 14on the terms contained in such cooperative endeavor agreements without compliance with 15anyother law, including, but not limited to, the provisions of R.S. 39:101 through 128. 16Additionally, all expenditures of these appropriations may be exempted by the 17Commissioner of Administration, from all statutes relative to public bidding, contractual 18review and the provisions of R.S. 33:9029.2(D). 19 (I)(1) Notwithstanding any other provision of this Act or the Capital Outlay Act 20or any other provision of law to the contrary, funds appropriated for the Economic 21Development Award Program project for the Office of Business Development are to be used 22solely for capital and infrastructure improvements subject to verification by the Division of 23Administration, Office of Facility Planning and Control. 24 (2) Eligible expenses for Economic Development Award Program funds may 25include documented project expenses beginning on the date of LEDC Board approval of the 26project and may be reimbursed upon execution of the cooperative endeavor agreement for 27the project. 28 (J)(1) Due to the state's current investment in TPC Louisiana and the financial 29support it provides to the PGA TOUR event currently played at said facility, said PGA 30TOUR event shall not be played at New Orleans City Park Golf Complex without the prior Page 113 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1agreement of the Commissioner of Administration and the Chairman of the Jefferson Parish 2Council. 3 (2) Notwithstanding the foregoing, the City Park Golf Complex may host any 4other golf tournament or event, including but not limited to any other PGA-affiliated or 5sponsored tournament or event. 6 (K)(1) For all projects administered by the Office of Facility Planning and 7Control and payable from proceeds of self-generated revenues, funds shall be remitted to the 8Office of Facility Planning and Control for deposit in the state treasury at such time as may 9be deemed necessary by the Office of Facility Planning and Control in order to cover the 10amount of contracts or other project expenses. 11 (2) Notwithstanding any provisions contained herein or any other law to the 12contrary, for projects with other means of financing provided to the administering agency 13by interagency transfer, the authority to draw these funds shall remain with the user agency. 14 (3) Any revenue bonds appropriated in Section 1 or Section 1.(A) of the Capital 15Outlay Act shall not be secured by the full faith and credit of the state. 16 (4) The State Treasurer shall refund to the appropriate source any surplus self- 17generated funds, advanced insurance funds received by the Office of Facility Planning and 18Control as Interagency Transfer from Office of Risk Management associated with hurricane 19damage recovery, and interest earned on these funds provided the Treasurer's Office is 20notified, when these funds are deposited in the state treasury, that the user agency or Office 21of Risk Management intends to request a refund of this interest. 22 (L) Notwithstanding any provisions contained in this Act, the Capital Outlay 23Act, or any other provision of law to the contrary, any funds expended by the parish of St. 24Mary for the purpose of securing a federal grant, for the Infrastructure Improvements and 25Construction of a Welding Training Center Facility at the Charenton Canal Industrial Park, 26shall be eligible for reimbursement from any cash line of credit approved for the project. 27 (M) Notwithstanding anything contained in this Act to the contrary or any other 28provision of law, the resolution adopted by the Joint Legislative Committee on the Budget 29(the committee) on March 19, 2019 approving State of Louisiana Grant Anticipation 30Revenue Bonds, in one or more series, not exceeding $650,000,000, and approving the Page 114 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1related projects and providing for other matters in connection therewith, contains the 2following approvals: 3 (1) The first series of bonds in the original principal amount of not exceeding 4$185,000,000 in order to fund the following projects in the following estimated amounts: 5Barksdale Project ($61,600,000) and portions of the Loyola Project ($77,600,000) and the 6I-10 Project ($30,601,000) with the understanding that the Department has the ability to 7manage the actual application of bond proceeds in order to appropriately fund the Projects 8and meet expenditure requirements of the Internal Revenue Service. 9 (2) The second series of bonds for the express purpose of granting the required 10contracts in the principal amount of approximately $142,000,000 in order to fund the 11following projects in the following estimated amounts: the balance of the Barksdale Project 12($16,518,000), the balance of the Loyola Project ($87,500,000), portions of the I-10 Project 13($37,982,000) and the Belle Chasse Project ($12,500,000) with the understanding that the 14Department has the ability to manage the actual application of Bond proceeds in order to 15appropriately fund the Projects and meet expenditure requirements of the Internal Revenue 16Service provided, however, the Department of Transportation and Development seeks 17approval from the committee for the issuance of the second series of bonds and all 18subsequent series of bonds. 19 (N) Notwithstanding anything contained in this Act to the contrary or any other 20provision of law, the Research Vessel (R/V) Pelican Replacement is deemed to be a capital 21asset and the appropriation to Louisiana Universities Marine Consortium (LUMCON) to 22replace the R/V Pelican is for a public purpose and has a significant economic impact 23providing a variety of oceanographic research missions. Further, LUMCON shall be 24permitted to use an alternative delivery method to award contracts for design of the proposed 25replacement vessel. LUMCON shall have the authority to select the design professional 26from a list of a minimum of two engineering firms or joint ventures with ship design 27experience acceptable to the Commissioner of Administration and the selection shall be 28exempt from other state requirements for the selection of designers. The design professional 29fee shall be in accordance with state guidelines administered by the Office of Facility Page 115 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1Planning and Control, Division of Administration. LUMCON shall follow the public bid 2law for the procurement of the replacement vessel. 3 (O) Notwithstanding anything contained in this Act to the contrary or any other 4provision of law, the appropriations for Major Repairs for Higher Education Facilities – 5Infrastructure, and Buildings Based on Statewide Condition Assessment, Planning and 6Construction, in Act 7 of 2008 identifying specific projects for higher education is deemed 7to be complete, and any remaining residual funds are hereby authorized to be combined and 8accumulated to accomplish additional major repair projects within the higher education 9systems, as deemed necessary and approved by the Board of Regents and Facility Planning 10and Control. At the completion of the program, Facility Planning and Control shall submit 11a report to the Joint Legislative Committee on the Budget concerning the use of the 12remaining residual funds. 13 (P) Notwithstanding anything contained in this Act or any other provision of law, 14LSU Real Estate and Facilities Foundation (LRFF) is authorized to execute contracts for the 15University Lakes Restoration Project to Address Flood Control, Environmental, Safety, 16Health and Other Issues project prior to execution of a cooperative endeavor agreement, the 17granting of a line of credit or the sale of bonds. The appropriation for this project may be 18used to pay any obligation incurred or to reimburse any expenditure made pursuant to such 19contracts unless the Commissioner of Administration is advised by bond counsel to the state 20that such may violate federal tax law, after execution of a cooperative endeavor agreement. 21The Office of Facility Planning and Control shall consult with bond counsel to the State 22relative to any federal tax issues. Further, LRFF may use alternative competitive contracting 23arrangements with the prior approval of the Commissioner of Administration. 24 (Q) Pursuant to R.S. 39:102, each capital outlay budget request submitted as 25required by R.S. 39:101 shall include a detailed project description and justification for each 26new project requested; however: 27 (1) Notwithstanding anything contained in this Act or the Capital Outlay Act to 28the contrary or any other provision of law, the scope of the appropriations made in this or 29any other Capital Outlay Act for the New Orleans West Bank Park Improvements, New Page 116 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1Soccer and Recreational Facilities project shall be deemed to include the George W. Carver 2Playground, Renovations and Upgrades project for the West Bank Park project. 3 (2) Notwithstanding anything contained in this Act or the Capital Outlay Act to 4the contrary or any other provision of law, the scope of the appropriations made in this or 5any other Capital Outlay Act for the Pointe Coupee Parish School Board Office Relocation, 6Due to Flooding Caused by Hurricane Gustav, Planning and Construction project shall be 7deemed to include that the School Board Office is to be Located at 8777 Morganza 8Highway. 9 (3) Notwithstanding anything in this Act, any previous capital outlay act, or other 10provision of law to the contrary, the scope of the appropriation for the Port of South 11Louisiana Globalplex Terminal Building #71 Upgrade project shall be deemed to also 12include similar upgrades for other Globalplex Terminal Buildings and a Heavy Load 13Capacity Foundation or Floor. 14 (4) Notwithstanding anything in this Act, any previous capital outlay Act, or 15other provision of law to the contrary, monies appropriated herein for the Port of South 16Louisiana Globalplex Terminal Building #71 and Other Globalplex Terminal Building 17Upgrades, Planning and Construction may be expended for design fees related to the 18conveyor system and ancillary equipment that exceed the customary ten percent limitation 19on design fee costs. 20 (5) Notwithstanding anything in this Act, any previous capital outlay act, or other 21provision of law to the contrary, the scope of the appropriation for the Port of South 22Louisiana Globalplex Dock Access Bridge and Equipment Replacement/Repair project shall 23be deemed to also include an Access Road. 24 (6) Notwithstanding anything in this Act, any previous capital outlay act, or other 25provision of law to the contrary, the scope of the appropriation for the Port of South 26Louisiana Globalplex Rail Siding project shall be deemed to also include a Rail Spur. 27 (7) Notwithstanding anything contained in this Act or the Capital Outlay Act to 28the contrary or any other provision of law, the scope of the appropriations made in this or 29any other Capital Outlay Act for the Pontchartrain Levee District Lake Pontchartrain West Page 117 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1Shore Hurricane Protection, Planning and Construction project shall be deemed to include 2Ascension Parish. 3 (8) Notwithstanding anything contained in this Act or the Capital Act to the 4contrary or any other provision of law, the scope of the appropriation made in this or any 5other Capital Outlay Act for the Statewide Roofing Asset Management Program and 6Waterproofing, Related Repairs and Equipment Replacement Program project shall be 7deemed to include Peltier Hall at Nicholls State University. 8 (9) Notwithstanding anything contained in this Act, any previous Capital Outlay 9Act, or other provision of law to the contrary, the scope of the appropriation for Coastal 10Protection Projects for the Coastal Protection and Restoration Authority, specifically the East 11Rainey Marsh Creation and the LaBranche Shoreline Protection project, shall be deemed to 12also include construction. 13 (R) Notwithstanding anything contained in this Act or any other provision of 14law, all non-state projects that include water systems in the scope of work shall also be 15required to include a rate study as part of the project. 16 (S) Notwithstanding anything contained in this Act, any previous Capital Outlay 17Act, or other provision of law to the contrary, the monies spent by the Pointe Coupee Parish 18School Board to retrofit an existing building to make it functional in conjunction with the 19Office Relocation, to be Located at 8777 Morganza Highway, Formerly Labarre Elementary 20School Site, Due to Flooding Caused by Hurricane Gustav project for the Pointe Coupee 21Parish School Board project shall be deemed to satisfy the local match requirements of R.S. 2239:112(E)(2). 23 Section 9. Notwithstanding any provisions contained herein or any other law to 24the contrary, the provisions of Chapter 16 of Subtitle III of Title 39 of the Louisiana Revised 25Statutes of 1950 as amended, shall not apply to architectural and engineering contracts, 26administered by the office of facility planning and control, division of administration 27pursuant to this or any other capital outlay Act. 28 Section 10. All funds appropriated herein to agencies administering capital 29outlay projects, on behalf of non-state entities, by cooperative endeavor agreements pursuant 30to this Act shall be expended within two (2) years from the date of the issuance of the bonds. Page 118 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1Agencies administering capital outlay projects pursuant to a cooperative endeavor agreement 2shall notify the non-state entity of the date the bonds are issued within three (3) months from 3the issuance thereof. If the funds appropriated herein and administered under cooperative 4endeavor agreements pursuant to this Act are not totally expended within two (2) years from 5the issuance of the bonds, the administering agency can close the project and recommend 6that the reallocation of any unexpended proceeds to any project contained in this Act or any 7previous Capital Outlay Acts. 8 Section 11. Notwithstanding any provisions contained herein or law to the 9contrary, the proceeds of revenue bonds to be utilized to fund certain projects authorized in 10Section 1. and Section 1.(A) hereof may, in accordance with Article VII, Section 9 of the 11Louisiana Constitution of 1974, be deposited in special accounts held outside the state 12treasury in accordance with the provisions of any bond resolution, indenture, reimbursement 13contract, or other bond or financing covenant which provides for the pledge of such funds 14in connection with the issuance of revenue bonds. For all projects administered by the office 15of facility planning and control, division of administration, authorized in Section 1. and 16Section 1.(A) hereof which are payable from the proceeds of revenue bonds, only the office 17of facility planning and control, division of administration, will be authorized to requisition 18funds from the special accounts described immediately above, at such time or times as may 19be deemed necessary by the office of facility planning and control, division of 20administration, in order to cover contract amounts or other project expenses. 21 Section 12. The governor shall have the power to veto any line-item in this Act. 22 Section 13. Except as otherwise provided herein, no funds shall be expended on 23any highway projects on highways within the state highway system as established in R.S. 2448:191 under the jurisdiction of the Department of Transportation and Development unless 25and until such project is in the Highway Program, R.S. 48:228 through 232, approved by the 26Joint Legislative Committee on Transportation, Highways and Public Works. Pursuant to 27R.S. 49:214.6.2(B), no integrated coastal protection construction project shall be undertaken 28with funds included in this bill except those included in an annual plan finally approved by 29the legislature in accordance with the provisions of R.S. 49:214.5.3. No funds appropriated 30to the Coastal Protection and Restoration Authority in this Act as a contribution for a project Page 119 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1cost-share or otherwise, for the national economic development and national ecosystem 2restoration components of the Southwest Coastal Louisiana Study shall be used or provided 3for the expropriation of property or use of eminent domain, except where such funds are to 4be used to obtain property voluntarily offered for project purposes, where at least seventy- 5five percent of the owners have voluntarily offered the property, or where the record or 6apparent owners have voluntarily offered the property but do not have clear title. 7 Section 14. The word "statewide" used in place of the specific parish designation 8for projects contained in this Act indicates that the project or program is applicable to all 9sixty-four parishes in the state. The description of any project in this Act shall be deemed 10to include planning, design, master planning, studies, permits, surveys, testing, construction, 11land and/or building/improvement acquisition, reconstruction, renovation, repair, right-of- 12way and utilities, site and other improvements, miscellaneous/contingencies, lease hold 13improvements ultimately owned by the state or a political subdivision of the state, equipment 14and other acquisitions, and any other component of the project if such are included or 15indicated in the capital outlay request for such projects required by R.S. 39:101 subject to 16the provisions of Title 39 of the Louisiana Revised Statutes of 1950. For new construction 17or renovation projects, equipment or other acquisitions, which can reasonably be considered 18necessary for the facility to be functional, may be deemed to be included in the project, even 19if such equipment or other acquisitions are not included or indicated in the project name or 20the capital outlay request. When local or federal match is referenced in a project title, but 21only a portion of the state appropriation is granted a line of credit or otherwise funded, then 22the amount of local or federal match, required to be made available, may be prorated relative 23to the amount of state appropriation made available through lines of credit. 24 Section 15. The provisions, items, and projects contained in this Act are severable 25and if any provision, item, or project contained herein, or the application of any such 26provision, item, or project, is held invalid, such invalidity shall not affect other provisions, 27items, projects, or applications of the Act which can be given effect without the invalid 28provision, project, item, or application. Page 120 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 1 Section 16. Notwithstanding any other provisions of law to the contrary, the state 2shall not grant cash lines of credit, or authorize or issue general obligation bonds in a 3principal amount in excess of $1,236,476,643 for Fiscal Year 2022-2023. 4 Section 17. Notwithstanding any contrary provision of this Act or any contrary 5provision of law, no funds appropriated by this Act shall be released or provided to any 6recipient of an appropriation made in this Act if, when, and for as long as, the recipient fails 7or refuses to comply with the provisions of R.S. 24:513. No recipient shall be considered 8to fail or refuse to comply with the provisions of R.S. 24:513 pursuant to this Section during 9any extension of time granted by the legislative auditor to the recipient to comply. 10 Section 18. This Act shall become effective upon signature by the governor or, 11if not signed by the governor, upon expiration of the time for bills to become law without 12signature by the governor, as provided in Article III, Section 18 of the Constitution of 13Louisiana. If vetoed by the governor and subsequently approved by the legislature, this Act 14shall become effective on the day following such approval. DIGEST The digest printed below was prepared by House Legislative Services. It constitutes no part of the legislative instrument. The keyword, one-liner, abstract, and digest do not constitute part of the law or proof or indicia of legislative intent. [R.S. 1:13(B) and 24:177(E)] HB 2 Reengrossed 2022 Regular Session Bishop Provides for the capital outlay budget and program for FY 2022-2023; provides for the funding of the capital outlays from the specified sources of monies in the specified amounts as follows: Federal Funds $181,929,297 Federal Funds via Interagency Transfer $41,407,173 Coastal Protection and Restoration Fund $105,702,734 Natural Resources Restoration Trust Fund $866,405,382 Transportation Trust Fund (TTF) - Federal $984,550,550 Transportation Trust Fund (TTF) - Regular $116,606,689 Transportation Trust Fund (TTF) - Construction Subfund $238,300,000 Interagency Transfers $37,871,000 Misc. Statutory Dedications $41,635,000 Fees and Self-Generated Revenues $108,395,000 Re-appropriated Cash $10,794,626 Revenue Bonds $69,890,000 State General Fund (Direct) Non- Recurring Revenues $301,674,500 Page 121 of 122 HLS 22RS-324 REENGROSSED HB NO. 2 Capital Outlay Savings Fund $26,500,000 Louisiana Rescue Plan Fund $237,500,000 TOTAL CASH PORTION $3,369,161,951 Authorizes the funding of certain capital outlay projects from the sale of general obligation bonds for the projects delineated as follows: Priority 1 $1,104,534,536 Priority 2 $91,680,000 Priority 5 $3,337,881,253 TOTAL GENERAL OBLIGATIONS BONDS $4,534,095,789 GRAND TOTAL ALL MEANS OF FINANCING $7,903,257,740 Summary of Amendments Adopted by House The Committee Amendments Proposed by House Committee on Ways and Means to the original bill: 1. Changes General Obligation Bond funding as follows: Priority 1 $ 24,801,371 Priority 2 $ (23,913,000) Priority 5 $ 271,159,200 The Committee Amendments Proposed by House Committee on Appropriations to the engrossed bill: 1. Changes the cash portion of funding as follows: State General Fund (Direct) Non-Recurring $ 301,674,500 Capital Outlay Savings Fund $ 26,500,000 Louisiana Rescue Plan Fund $ 237,500,000 Federal Funds via Interagency Transfer $ 3,500,000 Transportation Trust Fund (TTF) - Construction Subfund$ 42,500,000 Transportation Trust Fund (TTF) - Regular $ 265,556 Page 122 of 122