HLS 23RS-378 ENGROSSED 2023 Regular Session HOUSE BILL NO. 2 BY REPRESENTATIVE BISHOP CAPITAL OUTLAY: Provides for the comprehensive Capital Outlay budget 1 AN ACT 2To provide with respect to the capital outlay budget and the capital outlay program for state 3 government, state institutions, and other public entities; to provide for the 4 designation of projects and improvements; to provide for the financing thereof 5 making appropriations from certain sources; and to provide for related matters. 6Be it enacted by the Legislature of Louisiana: 7 Section 1. The following sums or so much thereof as may be necessary are 8hereby appropriated out of any monies in the state treasury from the sources specified, from 9federal funds and self-generated revenues belonging to the state of Louisiana and/or 10collected by boards, commissions, departments, and agencies thereof, all for making capital 11outlay and for the purposes and in the amounts specified herein for the Fiscal Year 12commencing July 1, 2023, and ending June 30, 2024, subject to the conditions thereafter 13provided: 14 A project with funding payable from General Obligation Bonds Priority 1 15indicates that the funding for the project includes the reauthorization of funding which was 16previously granted as a line of credit by the State Bond Commission in Fiscal Year 2022- 172023. As used in this Section, the term "general obligation bonds" means state general 18obligation bonds or other evidences of indebtedness payable from the Bond Security and 19Redemption Fund. The amount set forth in this Section opposite each project, or so much 20thereof as may be necessary, is hereby appropriated and payable from the source of funding 21indicated; provided, however, amounts appropriated and payable from federal funds may be Page 1 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1encumbered or expended only to the extent such amounts shall have been committed or 2received. Pursuant to the provisions of R.S. 39:82, funds for planning, acquisition, 3construction, and major repair projects appropriated by this Act may be retained until 4completion of the project, even if no bona fide liability exists on the last day of the fiscal 5year. 6 This Act shall constitute the comprehensive state capital outlay budget for the 72023-2024 Fiscal Year. Projects set forth which are payable from the proceeds available 8from the sale of general obligation bonds shall have the priorities as indicated. The Request 9for Line of Credit form used by the attorney general and Bond Counsel in evaluating 10Louisiana Constitutional, Internal Revenue Code, and applicable income tax regulations 11shall be filed with the commissioner of administration, State Bond Commission, and state 12attorney general. No general obligation bond cash lines of credit shall be granted to fund any 13lower priority project prior to the granting of general obligation bond cash lines of credit to 14fund all higher priority projects (the "general rule"), except as hereinafter provided. This 15prohibition against funding a lower priority project shall not apply upon a showing of an 16impossibility or impracticality either to proceed with all unfunded higher priority projects 17or to proceed with the funding of such projects or any part thereof through the issuance of 18general obligation bonds for any reason. Such showing shall be stated in reasonable detail 19in a certificate or certificates signed by the state agency responsible for administering the 20funding, and filed with the commissioner of administration and the State Bond Commission 21(hereinafter referred to as "the Commission"). Upon a determination by the Commission 22that proceeding with such a project or the funding thereof through the issuance of general 23obligation bonds is impractical or impossible, the Commission may then proceed with the 24sale of general obligation bonds or the granting of cash lines of credit without regard to the 25priority of the unfunded projects determined to be impossible or impractical. 26 Upon recommendation by the state agency responsible for administering the 27funding, if it is determined at any time that proceeding with the project or with the funding 28thereof is no longer impossible or impractical, the State Bond Commission may rescind the 29certificate of impossibility or impracticality and may proceed with the project or with the 30issuance of general obligation bonds or the granting of cash lines of credit to fund the Page 2 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1project. Alternatively, the Interim Emergency Board (hereinafter referred to as "the Board"), 2upon reviewing certificates as described above and determining that proceeding with such 3projects or the funding thereof through the issuance of general obligation bonds is 4impossible or impractical, may designate a lower priority for such projects. The Board's 5determination and lower priority designation shall be submitted to the members of the 6legislature for their approval in accordance with the provisions of Chapter 3-B of Subtitle 7I of Title 39 of the Louisiana Revised Statutes of 1950. In accordance with the provisions 8of Chapter 3-B of Subtitle I of Title 39 of the Louisiana Revised Statutes of 1950, whenever 9at the written request of the appropriate legislators and agency, the Board determines than 10an adjustment to a project description originally set forth in such capital budget adopted by 11the legislature for a current fiscal year is necessary to correct a mistake in a project 12description, clarify a description, change the scope of a description, or make any other 13adjustment the Board deems necessary to implement the purpose of the project, such 14adjustment shall become effective only upon the approval by majority vote of the elected 15members of each house of the legislature in the manner provided for in Chapter 3-B of 16Subtitle I of Title 39 of the Louisiana Revised Statutes of 1950. 17 If such approval is granted, notification by the chair or secretary of the Board of 18the results of the balloting shall be transmitted to the State Bond Commission, which may 19then proceed with the sale of general obligation bonds or the granting of cash lines of credit 20for each change approved upon request of the commissioner of administration in accordance 21with the general rule. 22 With respect to Priorities 1 through 5, a lower priority project may be moved to 23a higher priority only upon a showing of an emergency or other cause not reasonably 24anticipated by the legislature, which shall be stated in reasonable detail in a certificate signed 25by the head of the appropriate department, political subdivision, or agency and filed with the 26commissioner of administration and the Board. Upon a determination by the Board that such 27project should be moved to a higher priority because of an emergency or other cause not 28reasonably anticipated by the legislature, the Board shall designate a higher priority to the 29project. The matter then shall be submitted to and be subject to the same approval by the 30members of the legislature in the manner previously indicated in this Section. If such Page 3 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1approval is granted, notification by the chair or secretary of the board of the change of 2priority shall be transmitted to the State Bond Commission, which then upon request of the 3commissioner of administration, may proceed with the sale of general obligation bonds or 4the granting of cash lines of credit in accordance with the general rule. As to projects within 5a priority, the State Bond Commission acting on requests submitted by the commissioner of 6administration shall determine when such project, or phases thereof, shall be funded. In 7making such determination, the State Bond Commission shall consider the amount of 8proceeds of general obligation bonds to be made available in light of money and capital 9market conditions; the expenditure requirements of the project; the time required for 10architectural plans and drawings, public bidding, and site acquisition and preparation; 11availability of receipt of federal monies; litigation affecting the undertaking or completion 12of a project; federal tax laws and regulations regarding the sale of municipal bonds; and 13other items of a similar nature bearing upon the possibility or the necessity to commence a 14project or any particular phase thereof. 15 Any other provision of this Act to the contrary notwithstanding, projects 16described in Priority 5 of this Act shall not be moved to a higher priority except upon one 17of the following conditions: (1) Funding is necessary to complete or additionally fund a 18project located elsewhere in the Capital Outlay Act. Determination of such condition shall 19be made by the head of the appropriate department or agency by means of a certificate to 20that effect filed with the Interim Emergency Board, who shall, by mail ballot, request 21approval of such change and if approved by a majority of each house of the legislature it 22shall be funded, or (2) unless required by an emergency or other cause not reasonably 23anticipated by the legislature, to be in accordance with procedures set forth in this Section. 24However, the State Bond Commission may authorize a non-cash line of credit for any 25project in Priority 5 which represents that portion of construction contracts which were let 26during a previous fiscal year, or construction contracts which will be let during the current 27fiscal year, but which will not require cash expenditures during the year. Such non-cash 28lines of credit, when combined with previously sold bonds or with higher priority bonds or 29lines of credit, or with funds appropriated from other sources, will provide sufficient Page 4 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1appropriated funds to award equipment or construction contracts. Contracts shall not be 2awarded without approval of the division of administration. 3 Upon approval by the State Bond Commission, and subject to compliance with 4its policies and procedures and the procedures set forth herein, a line of credit providing for 5the use of funds in anticipation of the sale of general obligation bonds may be granted to the 6appropriate administering agency or department from the Comprehensive Capital Outlay 7Escrow Account, or if there is not a sufficient amount available in such account, from other 8available state cash in the state treasury, for capital improvement projects for which bond 9proceeds are appropriated by a current capital budget, prior to the actual issuance of bonds 10for such projects, unless the attorney general advises that an impediment exists to the valid 11issuance of the bonds on the date such line of credit is granted. 12 All bonds that are to be repaid, in whole or in part, by revenues generated by the 13project shall be designated as "Reimbursement Bonds.” The State Bond Commission shall 14enter into such agreements as are necessary to provide that the agency or subdivision, whose 15project is reimbursable, shall pay the bond debt costs into the Bond Security and Redemption 16Fund. Such costs may be paid annually or at the end of the term of the bonds issued as 17determined by the State Bond Commission. 18 Priority 1 general obligation bond funding shall be limited to: 19 (1) Projects and amounts which were previously authorized by Act 117 of the 202022 Regular Session of the Legislature; and which were granted cash lines of credit by the 21State Bond Commission. The bonds to fund these projects were not sold in Fiscal Year 222022-2023. 23 (2) The reauthorization of the portion of the outstanding Fiscal Year 2022-2023 24Priority 5 Non-Cash Lines of Credit for projects which will require cash expenditures in 25Fiscal Year 2023-2024 and therefore must be converted to Cash Lines of Credit in Fiscal 26Year 2023-2024. 27 (3) Commitments made in the Higher Education Desegregation Settlement 28Agreement. 29 Priority 2 general obligation bond projects are for the completion of plans and 30specifications, land acquisition, site preparation, or for construction which will begin during Page 5 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1the fiscal year. It is presently anticipated that the listed projects will require the sale of 2bonds or extension of lines of credit during the fiscal year after adoption of this Act. 3 Priority 3 general obligation bond projects are for the preparation of plans and 4specifications, land acquisition, site preparation, or for construction and shall be limited to 5funding for the portion of construction contracts which will not require cash expenditures 6during the fiscal year. The projects in this category shall be considered future year projects 7in the state's five-year capital outlay plan. It is presently anticipated that the listed projects 8will not require the sale of bonds or extension of lines of credit during the fiscal year. 9 Priority 4 general obligation bond projects are for the preparation of plans and 10specifications, land acquisition, site preparation, or for construction and shall be limited to 11funding for the portion of construction contracts which will not require cash expenditures 12during the fiscal year. The projects in this category shall be considered future year projects 13in the state's five-year capital outlay plan. It is presently anticipated that the listed projects 14will not require the sale of bonds or extension of lines of credit during the fiscal year. 15 Priority 5 general obligation bond funding shall be limited to funding for the 16portion of construction contracts which will not require cash expenditures during the fiscal 17year. These funds, when combined with previously sold bonds or with higher priority bonds 18on lines of credit, or with funds appropriated from other sources, will provide sufficient 19appropriated funds to award contracts. Non-cash lines of credit shall be required prior to the 20award of these contracts. 21 In accordance with the cash management plan adopted pursuant to R.S. 2248:251(D) and the provisions of Act 161 of the 1998 First Extraordinary Session, the 23Department of Transportation and Development is authorized to enter into contracts or 24agreements for projects approved pursuant to the Highway Priority Program, Airport 25Construction and Development Priority Program, Port Construction and Development 26Priority Program, and Statewide Flood Control Program for projects bid and awarded, 27authorized, or commenced during the fiscal year which do not require cash expenditures for 28the full contract or agreement amount. Page 6 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1 EXECUTIVE DEPARTMENT 201/107DIVISION OF ADMINISTRATION 3(103) Exterior Waterproofing at State Capitol Building, 4 Planning and Construction 5 (East Baton Rouge) 6 Payable from General Obligation Bonds 7 Priority 5 $115,500,000 8 Payable from State General Fund (Direct) Non-Recurring 9 Revenues $ 7,000,000 10 Total $122,500,000 11(310) State Office Buildings Major Repairs, Equipment 12 Replacement, and Renovations, Planning and 13 Construction 14 (Statewide) 15 Payable from General Obligation Bonds 16 Priority 1 $ 2,386,538 17 Priority 5 $12,110,000 18 Payable from State General Fund (Direct) Non-Recurring 19 Revenues $ 2,500,000 20 Total $16,996,538 21(925) Pentagon Barracks Repair/Restore/Replace Equipment, 22 Planning and Construction 23 (East Baton Rouge) 24 Payable from General Obligation Bonds 25 Priority 5 $ 6,000,000 26 Payable from State General Fund (Direct) Non-Recurring 27 Revenues $ 1,000,000 28 Total $ 7,000,000 29(926) Exterior Waterproofing and Repairs, Chief Justice 30 Pascal F. Calogero, Jr. Courthouse, Planning and 31 Construction 32 (Orleans) 33 Payable from General Obligation Bonds 34 Priority 5 $10,000,000 35 Payable from State General Fund (Direct) Non-Recurring 36 Revenues $11,000,000 37 Total $21,000,000 38(1542)State Capitol Repair/Replace East Plaza Deck/Roof, 39 Planning and Construction 40 (East Baton Rouge) 41 Payable from General Obligation Bonds 42 Priority 5 $27,500,000 43 Payable from State General Fund (Direct) Non-Recurring 44 Revenues $ 700,000 45 Total $28,200,000 46(1543)Pentagon Barracks Repair Brick Walls/Mitigate Rising 47 Damp, Planning and Construction 48 (East Baton Rouge) 49 Payable from General Obligation Bonds 50 Priority 5 $27,900,000 51 Payable from State General Fund (Direct) Non-Recurring 52 Revenues $ 1,500,000 53 Total $29,400,000 Page 7 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1580)Louisiana Governor's Mansion Renovations, 2 Additions, Planning, and Construction 3 (East Baton Rouge) 4 Payable from General Obligation Bonds 5 Priority 5 $ 1,000,000 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 1,000,000 8 Total $ 2,000,000 9(1710)Community Water Enrichment Program 10 (Statewide) 11 Payable from General Obligation Bonds 12 Priority 5 $11,000,000 13 Payable from State General Fund (Direct) Non-Recurring 14 Revenues $ 5,000,000 15 Payable from the balance of State General Funds (Direct) 16 previously allocated under the authority of Act 2 of 2020 17 for New Orleans, Algiers Playgrounds and Parks, 18 Renovation of Restrooms, Lighting, Fencing, and 19 Playground Equipment (Orleans), Act 117 of 2022 for 20 New Orleans, Algiers Playgrounds and Parks, Renovation 21 of Restrooms, Lighting, Fencing, and Playground 22 Equipment (Orleans), Act 29 of 2018 for Rosepine, 23 Rehabilitation of Elevated Water Tank, Planning and 24 Construction (Vernon), Act 20 of 2019 for St. 25 Francisville, Burnet Road Bridge Replacement, Planning 26 and Construction (West Feliciana), Act 20 of 2019 for 27 Westlake, New Water Well, Planning and Construction 28 (Calcasieu), Act 27 of 2006 for Magnaville Louisiana, 29 USA, Inc., Multipurpose Evacuation Shelter/Community 30 Center in Simmesport, Acquisitions, Utilities, Planning 31 and Construction (Avoyelles), Act 2 of 2020 for 32 Cajundome, Cajundome Boiler Replacement (Lafayette), 33 Act 26 of 2005 for Catahoula Council on Aging, Inc., 34 Catahoula Council on Aging, Inc., 35 Planning and Construction (Catahoula) $ 450,809 36 Total $16,450,809 37(1711)Local Government Assistance Program 38 (Statewide) 39 Payable from General Obligation Bonds 40 Priority 5 $10,000,000 41 Payable from State General Fund (Direct) Non-Recurring 42 Revenues $ 5,000,000 43 Payable from the balance of State General Funds (Direct) 44 previously allocated under the authority of Act 29 of 2018 45 for Pointe Coupee Port, Harbor and Terminal District, 46 Pointe Coupee Parish Port Capital Improvements, 47 Planning and Construction (Pointe Coupee), Act 29 of 48 2018 for East Carroll Parish, Industrial Site Development 49 and Road Improvements (For Economic Development 50 Purposes, Including but not limited to an Ethanol Plant), 51 Planning and Construction (East Carroll), Act 20 of 2009 52 for Jefferson Parish, Jefferson Community Health Center 53 Expansion to the Existing Marrero Facility in Order to 54 Implement a Dental Program, Planning and Construction 55 (Jefferson), Act 29 of 2018 for St Helena Parish, Eddy 56 Road Improvements, Planning and Construction (St. 57 Helena), Act 485 of 2021 for St. Tammany Parish, LA 22 Page 8 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1 Extension and Improvements, LA 22 Roundabout, 2 Design, Engineering, Planning and Construction (St. 3 Tammany), Act 29 of 2018 for Hornbeck, Emergency 4 Connection with West Vernon Waterworks District and 5 Inline Booster Station, Planning and Construction 6 (Vernon) $ 344,952 7 Payable from the balance of general obligation bond 8 proceeds previously allocated under the authority of Act 9 20 of 2019 for Berwick, Sewerage Collection System 10 Along Old Spanish Trail and LA 182, Planning and 11 Construction 12 (St. Mary) $ 108,986 13 Total $15,453,938 14(1712)Americans with Disabilities Act Implementation for 15 State Facilities, Planning and Construction 16 (Statewide) 17 Payable from State General Fund (Direct) Non-Recurring 18 Revenues $ 500,000 19 Payable from Interest Earnings $ 900,000 20 Total $ 1,400,000 21(1713)Statewide Roofing Asset Management Program and 22 Waterproofing, Related Repairs and Equipment 23 Replacement Program 24 (Statewide) 25 Payable from State General Fund (Direct) Non-Recurring 26 Revenues $ 2,500,000 27 Payable from Interagency Transfers $ 5,000,000 28 Payable from Fees and Self-Generated Revenues $ 3,000,000 29 Total $10,500,000 30(1714)Repair, Restoration and Replacement for Declared 31 Disasters, Planning, Construction, Renovation, and 32 Acquisition 33 (Statewide) 34 Payable from General Obligation Bonds 35 Priority 1 $55,285,237 36 Priority 5 $65,000,000 37 Payable from Federal Funds via Interagency Transfers $20,000,000 38 Total $140,285,237 39(1715)Outstanding Percent for Arts Projects 40 (Statewide) 41 Payable from General Obligation Bonds 42 Priority 1 $ 2,058,097 43 Priority 2 $ 250,000 44 Priority 5 $ 4,000,000 45 Payable from Interagency Transfers $ 3,000,000 46 Payable from Fees and Self-Generated Revenues $ 3,000,000 47 Total $12,308,097 48(1716)Mold Remediation and Indoor Air Quality, Planning 49 and Construction 50 (Statewide) 51 Payable from General Obligation Bonds 52 Priority 2 $ 500,000 Page 9 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1717)Major Repairs, Equipment Replacement and 2 Renovations for State Buildings to Address Deferred 3 Maintenance Backlog and Infrastructure, Planning and 4 Construction 5 (Statewide) 6 Payable from General Obligation Bonds 7 Priority 1 $ 5,555,169 8 Payable from Interagency Transfers $15,000,000 9 Payable from State General Fund (Direct) Non-Recurring 10 Revenues $ 7,308,229 11 Payable from Fees and Self-Generated Revenues $ 2,000,000 12 Payable from the balance of State General Funds (Direct) 13 previously allocated under the authority of Act 20 of 2019 14 for Office of Juvenile Justice, HVAC System 15 Replacement at Columbia, Planning and Construction 16 (Ouachita), Act 23 of 2002 for Hammond Development 17 Center, Replacement of Underground High Temperature 18 Hot Water System, Planning and Construction 19 (Tangipahoa), Act 2 of 2020 for Southern University 20 Baton Rouge, Southern University Laboratory School 21 Addition and Upgrades, Planning and Construction 22 (East Baton Rouge) $ 87,219 23 Payable from the balance of Interest Earnings previously 24 allocated under the authority of Act 53 of 2012 for 25 McNeese State University, Alpha Hall Renovations 26 Planning and Construction 27 (Calcasieu) $ 423 28 Payable from the balance of general obligation bond 29 proceeds previously allocated under the authority of 30 Act 29 of 2018 for Southern University Baton Rouge, 31 T.T. Allain Hall, Americans with Disabilities Act 32 Compliance and Upgrades, Planning and Construction 33 (East Baton Rouge), Act 29 of 2018 for Southern 34 University Baton Rouge, F.G. Clark Activity Center, 35 Americans with Disabilities Act Compliance and 36 Upgrades, Planning and Construction (East Baton 37 Rouge), Act 2 of 2020 for Louisiana School for Math, 38 Science, and the Arts, New Dormitory Building, 39 Planning and Construction 40 (Natchitoches) $ 2,691,477 41 Payable from Special Appropriations from FACS $ 156,093 42 Total $32,798,610 4301/109COASTAL PROTECTION AND RESTORATION AUTHORITY 44(320) Coastal Protection Projects, Planning and Construction 45 (Statewide) 46 Payable from General Obligation Bonds 47 Priority 1 $ 220,000 48 Priority 5 $214,500,000 49 Payable from State General Fund (Direct) Non-Recurring 50 Revenues $157,417,778 51 Payable from Interagency Transfers $ 500,000 52 Payable from Federal Funds $140,703,531 53 Payable from Natural Resources Restoration Trust Fund $444,000,000 54 Payable from Coastal Protection and Restoration Fund $117,401,878 55 Total $1,074,743,187 Page 10 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1Provided, however that $220,000 of the P1 appropriation, and $4,500,000 of the Priority 5 2appropriation from General Obligation Bonds be used for the South Slidell – Fritchie Coastal 3Resilience, Planning and Construction project in St. Tammany Parish. 4Provided, however that $4,500,000 of the Priority 5 appropriation from General Obligation 5Bonds be used for the Military Road Flood Risk Reduction, Planning and Construction 6project in St. Tammany Parish. 7Provided, however that $4,500,000 of the Priority 5 appropriation from General Obligation 8Bonds be used for the Eden Isle Roadway Infrastructure Flood Resilience, Planning and 9Construction project in St. Tammany Parish. 10Provided, however that $10,000,000 of the Priority 5 appropriation from General Obligation 11Bonds shall be used for the Bayou Lafourche Freshwater District for the Construction of the 12Pumping Capacity Improvements, Phase I project. 13(890) Union Diversion Project, Planning and Construction 14 (Ascension, Livingston, St. James, St. John the Baptist) 15 Payable from General Obligation Bonds 16 Priority 1 $ 2,350,000 17 Priority 5 $20,000,000 18 Total $22,350,000 19(1298)Morganza to Gulf of Mexico Flood Control Feasibility 20 Study, Planning, Design, Right-of-Way and 21 Construction of Levees, Floodgates and Other Flood 22 Control Systems ($100,000,000 Local Match) 23 (Ascension, Assumption, Iberia, Iberville, Lafourche, Pointe 24 Coupee, St. Martin, St. Mary, Terrebonne, West Baton Rouge) 25 Payable from General Obligation Bonds 26 Priority 1 $ 7,500,000 27 Priority 5 $79,500,000 28 Total $87,000,000 29(1300)Atchafalaya Basin Protection and Enhancement 30 (Federal Match and Local/Sponsor Match) 31 (Assumption, Avoyelles, Iberia, Iberville, Pointe Coupee, 32 St. Landry, St. Martin, St. Mary) 33 Payable from General Obligation Bonds 34 Priority 5 $ 8,000,000 3501/112DEPARTMENT OF MILITARY AFFAIRS 36(28) Renovate-Upgrade Cadet Barracks Buildings 18, 21, 37 22, 23, and 24, Youth Challenge Program (YCP), 38 Carville, Louisiana 39 (Iberville) 40 Payable from General Obligation Bonds 41 Priority 1 $ 400,000 42 Payable from State General Fund (Direct) Non-Recurring 43 Revenues $ 1,000,000 44 Total $ 1,400,000 45(444) Louisiana National Guard Readiness Center 46 Replacement, Lafayette LA, Planning and Construction 47 (Lafayette) 48 Payable from General Obligation Bonds 49 Priority 1 $ 7,392,220 50 Priority 2 $ 1,400,000 51 Total $ 8,792,220 Page 11 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(645) Gillis W. Long Center, Water, Fire, and Sewage Line 2 Upgrades, Carville, Louisiana 3 (Iberville) 4 Payable from General Obligation Bonds 5 Priority 1 $ 3,504,172 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 3,514,200 8 Payable from Federal Funds $ 434,300 9 Total $ 7,452,672 10(656) Thibodaux Readiness Center Modernization 11 (Lafourche) 12 Payable from State General Fund (Direct) Non-Recurring 13 Revenues $ 59,000 14 Payable from Federal Funds $ 177,000 15 Total $ 236,000 16(849) Camp Beauregard Road Network Rehabilitation 17 (Rapides) 18 Payable from General Obligation Bonds 19 Priority 1 $ 1,550,000 20(918) Renovation Cadet Barracks Buildings 605, 606, 608, 21 Youth Challenge Program, Camp Beauregard, 22 Pineville, Louisiana 23 (Rapides) 24 Payable from General Obligation Bonds 25 Priority 5 $ 900,000 26 Payable from State General Fund (Direct) Non-Recurring 27 Revenues $ 1,040,000 28 Total $ 1,940,000 29(1270)Louisiana National Guard Readiness Center Complex, 30 Abbeville LA, Planning and Construction 31 (Vermilion) 32 Payable from General Obligation Bonds 33 Priority 1 $ 5,666,600 34(1331)Renovate-Upgrade Cadet Barracks Building 131, 132, 35 and 133, Youth Challenge Program, Camp Minden, 36 Minden, Louisiana 37 (Webster) 38 Payable from General Obligation Bonds 39 Priority 5 $ 700,000 40 Payable from State General Fund (Direct) Non-Recurring 41 Revenues $ 1,150,000 42 Total $ 1,850,000 43(1332)Renovation Building 129, Cadre Operations, Youth 44 Challenge Program, Camp Minden 45 (Webster) 46 Payable from State General Fund (Direct) Non-Recurring 47 Revenues $ 250,000 Page 12 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1475)Statewide Backlog of Maintenance and Repair 2 (BMAR), Phase 3, and Statewide Infrastructure 3 Rehabilitation, Phase 3 4 (Statewide) 5 Payable from State General Fund (Direct) Non-Recurring 6 Revenues $ 4,000,000 7 Payable from Federal Fund $19,000,000 8 Total $23,000,000 9(1691)Renovation Classroom Building 118, Youth Challenge 10 Program, Camp Minden 11 (Webster) 12 Payable from State General Fund (Direct) Non-Recurring 13 Revenues $ 1,350,000 1401/124LOUISIANA STADIUM AND EXP OSITION DISTRICT 15(813) Zephyr Field Improvements, Planning and Construction 16 (Jefferson) 17 Payable from General Obligation Bonds 18 Priority 5 $ 5,000,000 19(1223)Bayou Segnette Recreation Complex, Land 20 Acquisition, Planning and Construction 21 (Jefferson) 22 Payable from General Obligation Bonds 23 Priority 1 $25,402,961 24 Priority 2 $17,000,000 25 Total $42,402,961 26 DEPARTMENT OF VETERANS AFFAIRS 2703/130DEPARTMENT OF VETERANS AFFAIRS 28(168) Northeast Louisiana Veterans Cemetery Addition of 29 1,000 In-ground Burial Crypts and Other Improvements 30 (Richland) 31 Payable from Federal Funds via Interagency Transfers $ 1,331,000 32(786) Southeast Louisiana Veterans Cemetery Addition of 33 2,800 In-ground Burial Crypts and Other Improvements 34 (St. Tammany) 35 Payable from Federal Funds via Interagency Transfers $ 1,500,000 3603/136SOUTHEAST LOUISIANA WAR VETERANS HOME 37(593) Pond Restoration, Planning and Construction 38 (St. John the Baptist) 39 Payable from Federal Funds via Interagency Transfers $ 1,140,000 Page 13 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1 ELECTED OFFICIALS 204/139SECRETARY OF STATE 3(802) Old Governor's Mansion Repairs and Renovation 4 (East Baton Rouge) 5 Payable from General Obligation Bonds 6 Priority 1 $ 300,000 7 Payable from State General Fund (Direct) Non-Recurring 8 Revenues $ 1,000,000 9 Total $ 1,300,000 10(954) Old State Capitol Exterior Repairs, Planning and 11 Construction 12 (East Baton Rouge) 13 Payable from General Obligation Bonds 14 Priority 1 $ 3,000,000 15 Priority 5 $ 4,400,000 16 Payable from State General Fund (Direct) Non-Recurring 17 Revenues $ 1,000,000 18 Total $ 8,400,000 19 DEPARTMENT OF ECONOMIC DEVELOP MENT 2005/252OFFICE OF BUSINESS DEVELOPMENT 21(352) Economic Development Award Program for 22 Infrastructure Assistance 23 (Statewide) 24 Payable from General Obligation Bonds 25 Priority 5 $ 5,000,000 26 Payable via Interagency Transfers $10,000,000 27 Total $15,000,000 28(353) NIRC BSL-3 Lab and Animal Housing, Planning and 29 Construction 30 (Iberia) 31 Payable from General Obligation Bonds 32 Priority 1 $10,600,000 33 Priority 5 $10,000,000 34 Total $20,600,000 35(1169)NIRC Iberia BioInnovation Accelerator GMP CDMO 36 Planning and Construction 37 (Iberia) 38 Payable from General Obligation Bonds 39 Priority 1 $14,400,000 40 Priority 5 $39,000,000 41 Total $53,400,000 42 DEPARTMENT OF CULTURE, RECREATION AND TOURISM 4306/263OFFICE OF STATE MUSEUM 44(755) Construction of Civil Rights Museum, Planning and 45 Construction 46 (Orleans) 47 Payable from General Obligation Bonds 48 Priority 1 $ 2,760,174 Page 14 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 106/264OFFICE OF STATE PARKS 2(255) Poverty Point State Historic Site - Land Acquisition, 3 Design, Museum/Interpretive Center and Expansion 4 (West Carroll) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,494,713 7 Priority 5 $10,500,000 8 Total $11,994,713 9(461) Bogue Chitto State Park - Mountain Bike Trail Design, 10 Construction, Acquisition and Other Development 11 (Washington) 12 Payable from General Obligation Bonds 13 Priority 1 $ 938,762 14(1078)Tunica Hills State Preservation Area, Construction, 15 Development and Acquisition 16 (West Feliciana) 17 Payable from General Obligation Bonds 18 Priority 5 $20,000,000 19 Payable from Interagency Transfers $ 1,000,000 20 Total $21,000,000 21(1291)Preventive Maintenance/Major Repairs and 22 Improvements 23 (Statewide) 24 Payable from General Obligation Bonds 25 Priority 1 $ 574,825 26 Priority 5 $ 2,000,000 27 Payable from State General Fund (Direct) Non-Recurring 28 Revenues $ 5,000,000 29 Payable from Interagency Transfers $20,000,000 30 Payable from Federal Funds via Interagency Transfers $20,000,000 31 Total $47,574,825 32(1490)Bogue Chitto State Park Emergency Erosion, Planning, 33 Design, Construction and Other Development 34 (Washington) 35 Payable from General Obligation Bonds 36 Priority 1 $ 1,409,597 37 Priority 5 $ 840,000 38 Total $ 2,249,597 39(1491)Bayou Segnette State Park, Land Acquisition, 40 Additional Cabins, Planning and Construction 41 (Jefferson) 42 Payable from General Obligation Bonds 43 Priority 1 $ 432,875 4406/A20NEW ORLEANS CITY P ARK 45(1355)Repairs to Historic Structures, Planning and 46 Construction 47 (Orleans) 48 Payable from General Obligation Bonds 49 Priority 1 $ 1,089,307 50 Priority 5 $ 1,000,000 51 Payable from State General Fund (Direct) Non-Recurring 52 Revenues $ 1,000,000 53 Total $ 3,089,307 Page 15 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 106/A98LOUISIANA NAVAL WAR MEMORIAL COMMISSION 2(1371)Hull Repair & Reinforcement, Superstructure Repair, 3 Interior Restoration, & Painting of USS KIDD DD-661, 4 Docking Cradle Repairs & Upgrade, Planning, 5 Transport, Construction 6 (East Baton Rouge) 7 Payable from General Obligation Bonds 8 Priority 1 $ 1,600,000 9 Priority 5 $ 6,750,000 10 Total $ 8,350,000 11 DEPARTMENT OF TRANSPORTATION AND DEVELOP MENT 1207/270ADMINISTRATION 13(24) Overlay of U.S. 167 for 9.32 Miles, from Turkey Creek 14 North of I-49, Planning and Construction 15 (Evangeline) 16 Payable from General Obligation Bonds 17 Priority 1 $ 633,519 18(25) LA 91: Bayou Plaquemine Brule Bridge Replacement, 19 Planning and Construction 20 (Acadia) 21 Payable from General Obligation Bonds 22 Priority 1 $ 1,000,000 23 Priority 5 $ 5,200,000 24 Total $ 6,200,000 25(39) Beaver Creek, LA Highway 106, Planning and 26 Construction 27 (Evangeline) 28 Payable from General Obligation Bonds 29 Priority 5 $14,200,000 30(40) St. Landry, LA 106, Planning and Construction 31 (Evangeline) 32 Payable from General Obligation Bonds 33 Priority 5 $12,900,000 34(44) Highway 397 in Calcasieu Parish, North and South 35 Turning Lanes 36 (Calcasieu) 37 Payable from General Obligation Bonds 38 Priority 2 $ 600,000 39 Priority 5 $ 2,000,000 40 Total $ 2,600,000 41(128) LA 22: North Hoover Road - Dunson Road 42 (Tangipahoa) 43 Payable from General Obligation Bonds 44 Priority 5 $12,600,000 Page 16 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(133) LA 44 Widening, I-10 to LA 22, Planning, Utilities, 2 Right-of-Way and Construction 3 (Ascension) 4 Payable from General Obligation Bonds 5 Priority 1 $ 9,600,086 6 Priority 5 $ 9,000,000 7 Total $18,600,086 8(239) US 190 (Vine Street) Reconstruction 9 (St. Landry) 10 Payable from General Obligation Bonds 11 Priority 1 $ 200,000 12 Priority 5 $19,200,000 13 Total $19,400,000 14(240) Jimmie Davis Bridge Rehabilitation and Lighting, or 15 Design, Engineering, Planning and Construction 16 (Bossier) 17 Payable from General Obligation Bonds 18 Priority 1 $ 3,260,334 19 Priority 5 $151,000,000 20 Total $154,260,334 21(248) LA 100: LA 97 - LA 91, Planning and Construction 22 (Acadia) 23 Payable from General Obligation Bonds 24 Priority 5 $ 7,400,000 25(341) LA 70: Sunshine Bridge - LA 22 26 (St. James) 27 Payable from General Obligation Bonds 28 Priority 5 $17,000,000 29(342) Pecue Lane/I-10 Interchange and I-10, Planning, 30 Design, Rights-of-Way, Utilities and Construction 31 (East Baton Rouge) 32 Payable from General Obligation Bonds 33 Priority 1 $14,000,000 34(360) LA 1 Improvements, Phase 2, Planning, Engineering, 35 Right-of-Way, Utilities and Construction 36 (Lafourche) 37 Payable from General Obligation Bonds 38 Priority 1 $ 9,985,898 39 Priority 5 $82,000,000 40 Total $91,985,898 41(367) Roundabout at Intersection of LA 3125 and LA 3274 42 (St. James) 43 Payable from General Obligation Bonds 44 Priority 1 $ 2,355,572 45(373) LA Hwy. 64 Spur, Planning and Construction 46 (East Baton Rouge) 47 Payable from General Obligation Bonds 48 Priority 1 $ 1,000,000 49 Priority 5 $ 5,000,000 50 Total $ 6,000,000 Page 17 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(374) Secretary’s Emergency Fund for Bridge Damages, 2 Other Reimbursements, Local Matching Dollars, 3 Federal Funds, and Opportunity Grants Subject to the 4 Provisions of R.S. 48:232 5 (Statewide) 6 Payable from Fees and Self-Generated Revenues $30,000,000 7(445) Louisiana Highway 64 and Louisiana Highway 1019 8 Roundabout, Planning and Construction 9 (Livingston) 10 Payable from General Obligation Bonds 11 Priority 1 $ 175,000 12 Priority 5 $ 2,500,000 13 Total $ 2,675,000 14(455) LA 3277: LA 757 - LA 104, Planning and Construction 15 (St. Landry) 16 Payable from General Obligation Bonds 17 Priority 1 $ 4,750,000 18 Priority 5 $ 2,150,000 19 Total $ 6,900,000 20(456) LA 621 Realignment at LA 73, Planning and 21 Construction 22 (Ascension) 23 Payable from General Obligation Bonds 24 Priority 1 $ 3,949,375 25 Priority 5 $ 5,100,000 26 Total $ 9,049,375 27(457) Claiborne Corridor Rehabilitation 28 (Orleans) 29 Payable from General Obligation Bonds 30 Priority 5 $20,000,000 31(459) LA 429/I-10 Interchange, Planning and Construction 32 (Ascension) 33 Payable from General Obligation Bonds 34 Priority 5 $ 5,000,000 35(548) LA 28 Widening (LA 3128 - LA 116) 36 (Rapides) 37 Payable from General Obligation Bonds 38 Priority 1 $ 2,700,000 39 Priority 5 $31,600,000 40 Total $34,300,000 41(551) LA 74/I-10 Interchange, Planning and Construction 42 (Ascension) 43 Payable from General Obligation Bonds 44 Priority 5 $ 5,000,000 45(567) LA 3241 (I-12 to Bush), Planning, Engineering, Right- 46 of-Way, Utilities and Construction 47 (St. Tammany) 48 Payable from General Obligation Bonds 49 Priority 5 $28,000,000 Page 18 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(650) City of Gonzales - GO Program LA Highway 30 2 Corridor, Planning and Construction 3 (Ascension) 4 Payable from General Obligation Bonds 5 Priority 1 $ 8,320,100 6(651) Improvements on LA 3038, Including Patching, 7 Repairing and Overlaying of the Highway, Planning 8 and Construction 9 (Ascension) 10 Payable from General Obligation Bonds 11 Priority 1 $ 47,139 12(652) New Mississippi River Bridge 13 (Ascension, East Baton Rouge, Iberville, St. James, 14 West Baton Rouge) 15 Payable from General Obligation Bonds 16 Priority 1 $ 1,486,228 17 Priority 5 $ 3,000,000 18 Total $ 4,486,228 19(653) Turn Lanes on US 71 for Emergency Vehicle Staging 20 Area, Planning, Engineering, Right-of-Way, Utilities 21 and Construction 22 (Rapides) 23 Payable from General Obligation Bonds 24 Priority 1 $ 200,295 25(660) LA 13 (Crowley to Vermilion Parish Line) 26 (Acadia) 27 Payable from General Obligation Bonds 28 Priority 1 $ 1,200,000 29 Priority 5 $ 5,500,000 30 Total $ 6,700,000 31(687) Highway Program (Up to $4,000,000 for Secretary's 32 Emergency Fund) 33 (Statewide) 34 Payable from General Obligation Bonds 35 Priority 1 $30,000,000 36 Priority 5 $115,750,000 37 Payable from State General Fund (Direct) $340,000,000 38 Payable from State General Fund (Direct) Non-Recurring 39 Revenues $157,412,778 40 Payable from Transportation Trust Fund - Construction 41 Subfund $150,000,000 42 Total $793,162,778 43Provided, however, that the Department of Transportation and Development is authorized 44to implement or commence projects approved in this program for Fiscal Year 2023-2024 45identified for phased funding pursuant to the cash management plan established pursuant to 46R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing 47unspent cash balances appropriated in prior years' programs, which funds when combined 48with current appropriations will provide sufficient appropriated funds to award contracts. 49Provided, however, that the Department of Transportation and Development shall use 50$157,400,000 of the appropriation from State General Fund (Direct) Non-Recurring for 51financial cost overruns in the Highway Priority Program, $95,000,000 of the State General 52Fund (Direct) for State match to the Federal Highway Administration Formula Program, 53$195,000,000 of the State General Fund (Direct) for ARPA project financial cost overruns 54$30,000,000 to meet Federal match obligations pursuant to competitive Federal grants and Page 19 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1$20,000,000 for State match pursuant to August Redistribution Funding provided through 2the Federal Highway Administration. 3(690) Hooper Road Extension and Widening, Environmental, 4 Planning, Engineering, Right-of-Way, Utilities and 5 Construction 6 (East Baton Rouge, Livingston) 7 Payable from General Obligation Bonds 8 Priority 1 $ 8,197,249 9(744) Florida Avenue Bridge, Planning and Construction 10 (Orleans) 11 Payable from General Obligation Bonds 12 Priority 5 $ 7,200,000 13(745) LA 964 (Groom Road - US 61) Highway Lighting 14 (East Baton Rouge) 15 Payable from General Obligation Bonds 16 Priority 1 $ 450,000 17 Priority 5 $ 1,950,000 18 Total $ 2,400,000 19(794) LA 117 Widening (LA 8 - LA 118) 20 (Natchitoches, Vernon) 21 Payable from General Obligation Bonds 22 Priority 1 $ 5,952,055 23 Priority 5 $30,000,000 24 Total $35,952,055 25(856) Essen Lane Widening, I-10 to Perkins Road, Planning, 26 Utilities, Right-of-Way and Construction 27 (East Baton Rouge) 28 Payable from General Obligation Bonds 29 Priority 1 $ 481,358 30(857) Widening of Highway 447 and I-12 Overpass 31 Improvements, Environmental Phase Commencement, 32 Planning and Construction 33 (Livingston) 34 Payable from General Obligation Bonds 35 Priority 1 $ 1,719,800 36 Priority 5 $26,000,000 37 Total $27,719,800 38(858) Earhart/Causeway Interchange, Planning, Engineering, 39 Right-of-Way, Utilities and Construction 40 (Jefferson) 41 Payable from General Obligation Bonds 42 Priority 1 $ 4,755,588 43 Priority 5 $44,500,000 44 Total $49,255,588 45(868) LA 353: LA 94 to Cypress Island Hwy 46 (Lafayette, St. Martin) 47 Payable from General Obligation Bonds 48 Priority 5 $ 1,400,000 Page 20 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(872) New Orleans International Airport Landside Access 2 Improvements 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 1 $ 8,300,000 6 Priority 5 $ 7,700,000 7 Total $16,000,000 8(951) LA 699: LA 35 - LA 343, Planning and Construction 9 (Vermilion) 10 Payable from General Obligation Bonds 11 Priority 5 $ 7,870,000 12(979) Roundabout on LA 447 and LA 1025, Planning and 13 Construction 14 (Livingston) 15 Payable from General Obligation Bonds 16 Priority 1 $ 500,000 17 Priority 5 $ 6,000,000 18 Total $ 6,500,000 19(992) Roundabout at LA 3211 and Yokley Road 20 (St. Mary) 21 Payable from General Obligation Bonds 22 Priority 5 $ 3,500,000 23(998) I-610 and I-10 Fence Removal, Replacement, and 24 Repairs, due to Hurricane Ida Damage, Planning and 25 Construction 26 (Orleans) 27 Payable from General Obligation Bonds 28 Priority 1 $ 600,000 29(1061)Peters Road Bridge and Extension, Planning and 30 Construction 31 (Plaquemines) 32 Payable from General Obligation Bonds 33 Priority 1 $17,542,954 34 Priority 5 $ 7,000,000 35 Total $24,542,954 36(1062)Highway 30 Roundabout West of LA 44, Planning and 37 Construction 38 (Ascension) 39 Payable from General Obligation Bonds 40 Priority 1 $ 2,000,000 41 Priority 5 $ 2,500,000 42 Total $ 4,500,000 43(1069)LA 29 Improvements (LA 13 - LA 758) 44 (Evangeline, St. Landry) 45 Payable from General Obligation Bonds 46 Priority 1 $ 5,120,000 47 Priority 5 $ 1,600,000 48 Total $ 6,720,000 Page 21 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1070)LA 758: US 190 - LA 29, Planning and Construction 2 (Evangeline, St. Landry) 3 Payable from General Obligation Bonds 4 Priority 1 $ 3,000,000 5 Priority 5 $ 1,400,000 6 Total $ 4,400,000 7(1106)Hooper Road Widening and Sewer Improvements 8 (Blackwater Bayou to Sullivan Road) Planning, 9 Engineering, Utilities and Construction 10 (East Baton Rouge) 11 Payable from General Obligation Bonds 12 Priority 1 $12,265,000 13(1159)Relocate Hickory Avenue (LA Hwy. 48-11th Street) 14 (Mounes) (LA Hwy. 3154) Construction, Right of 15 Way, and Utilities 16 (Jefferson) 17 Payable from General Obligation Bonds 18 Priority 1 $ 1,000,000 19 Priority 5 $ 1,000,000 20 Total $ 2,000,000 21(1175)I-49 South from Lafayette to Westbank Expressway, 22 Planning, Engineering, Right-of-Way, Utilities and 23 Construction 24 (Iberia, Jefferson, Lafayette, Lafourche, St. Charles, 25 St. Martin, St. Mary, Terrebonne) 26 Payable from General Obligation Bonds 27 Priority 1 $ 1,830,089 28 Priority 5 $188,000,000 29 Payable from Megaproject Leverage Fund $100,000,000 30 Total $289,830,089 31(1271)Intersection Improvements (Roundabouts), Planning 32 and Construction 33 (Lafayette) 34 Payable from General Obligation Bonds 35 Priority 1 $ 5,000,000 36 Priority 5 $ 5,000,000 37 Total $10,000,000 38(1279)LA 3227 - LA 157 Intersection Realignment, Planning 39 and Construction 40 (Bossier) 41 Payable from General Obligation Bonds 42 Priority 1 $ 4,500,000 43 Priority 2 $ 750,000 44 Total $ 5,250,000 45(1311)Loyola/I-10 Interchange Improvements, Feasibility 46 Study, Interchange Modification Report, Environmental 47 Assessment, Engineering, Right-of-Ways, Utilities and 48 Construction 49 (Jefferson, Orleans) 50 Payable from General Obligation Bonds 51 Priority 1 $ 2,974,700 Page 22 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1364)LA 95: LA 98 - Beginning of PCCP in Church Point, 2 Planning and Construction 3 (Acadia) 4 Payable from General Obligation Bonds 5 Priority 5 $ 5,800,000 6(1369)I-10 Calcasieu River Bridge, Environmental, Planning, 7 Engineering, Right-of-Way, Utilities, Demolition and 8 Construction 9 (Calcasieu) 10 Payable from General Obligation Bonds 11 Priority 1 $20,000,000 12 Priority 5 $80,000,000 13 Payable from Megaproject Leverage Fund $100,000,000 14 Total $200,000,000 15(1470)LA 3034 Improvements 16 (East Baton Rouge) 17 Payable from General Obligation Bonds 18 Priority 1 $15,379,082 19(1471)LA 42 (US 61 to LA 44) Widening, including a 20 Roundabout at Joe Sevario Road, Planning and 21 Construction 22 (Ascension) 23 Payable from General Obligation Bonds 24 Priority 1 $ 227,773 25(1485)LA 335: LA 35 - LA 14, Planning and Construction 26 (Vermilion) 27 Payable from General Obligation Bonds 28 Priority 5 $16,100,000 29(1486)LA 31: LA 182 - 0.15 Mi N of N LA 96 30 (St. Martin) 31 Payable from General Obligation Bonds 32 Priority 5 $ 9,600,000 33(1572)LA 92 - 1 (US 90 - LA 182), Planning and Construction 34 (St. Martin) 35 Payable from General Obligation Bonds 36 Priority 5 $ 4,600,000 37(1631)US 190 Widening: LA 25 - US 190 Bus 38 (St. Tammany) 39 Payable from General Obligation Bonds 40 Priority 1 $ 2,000,000 41 Priority 5 $ 3,100,000 42 Total $ 5,100,000 43(1694)LA 70 Resurfacing and Drainage Repairs 44 (St. Mary) 45 Payable from General Obligation Bonds 46 Priority 2 $ 250,000 47 Priority 5 $ 5,460,000 48 Total $ 5,710,000 Page 23 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1695)LA 182 Resurfacing 2 (St. Mary) 3 Payable from General Obligation Bonds 4 Priority 2 $ 200,000 5 Priority 5 $ 7,500,000 6 Total $ 7,700,000 7(1696)Interchange Improvements in Lafayette Parish, 8 Planning 9 and Construction 10 (Lafayette) 11 Payable from General Obligation Bonds 12 Priority 5 $10,000,000 13(1753)LA 22 Extension and Improvements, LA 22 14 Roundabout, Design, Engineering, Planning and 15 Construction 16 (St. Tammany) 17 Payable from General Obligation Bonds 18 Priority 1 $ 646,062 19 Priority 2 $ 200,000 20 Priority 5 $ 3,240,000 21 Total $ 4,086,062 22(1794)Roundabout at LA 3233 and I-49 Northbound Service Road, 23 Planning and Construction 24 (St. Landry) 25 Payable from General Obligation Bonds 26 Priority 5 $ 4,600,000 27Pending submittal of the capital outlay budget request pursuant to the provisions of R.S. 2839:112. 29( )LA 755: LA 368 - LA 91, Planning and Construction 30 (Acadia) 31 Payable from General Obligation Bonds 32 Priority 5 $ 5,576,000 33Pending submittal of the capital outlay budget request pursuant to the provisions of R.S. 3439:112. 35( )LA 1100: LA 98 - LA 95, Planning and Construction 36 (Acadia) 37 Payable from General Obligation Bonds 38 Priority 5 $ 3,150,000 39Pending submittal of the capital outlay budget request pursuant to the provisions of R.S. 4039:112. 41( )LA 343 (Bosco Hwy) LA 98 - LA 356, 42 Planning and Construction 43 (St. Landry) 44 Payable from General Obligation Bonds 45 Priority 5 $ 6,985,000 46Pending submittal of the capital outlay budget request pursuant to the provisions of R.S. 4739:112. Page 24 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1( )Darlington Reservoir, Planning and 2 Construction 3 (St. Helena) 4 Payable from General Obligation Bonds 5 Priority 5 $ 2,000,000 6Pending submittal of the capital outlay budget request pursuant to the provisions of R.S. 739:112. 807/274PUBLIC IMPROVEMENTS 9(22) Short Line Railroad Upgrades 10 (Statewide) 11 Payable from General Obligation Bonds 12 Priority 1 $ 6,000,000 13 Priority 5 $ 7,000,000 14 Total $13,000,000 15(236) Comite River Diversion Canal Planning, Right-of-Way, 16 Utilities and Construction 17 (Ascension, East Baton Rouge, Livingston) 18 Payable from General Obligation Bonds 19 Priority 1 $ 1,008,665 20(237) Bayou Dechene Reservoir, Planning, Land Acquisition 21 and Construction 22 (Caldwell) 23 Payable from General Obligation Bonds 24 Priority 1 $13,353,232 25 Priority 5 $11,000,000 26 Total $24,353,232 27(238) Houma Navigational Canal Deepening Project, 28 Planning, Design, Construction, Rights-of-Ways, 29 Relocations and Utilities 30 (Terrebonne) 31 Payable from General Obligation Bonds 32 Priority 1 $10,236,052 33 Priority 5 $30,500,000 34 Total $40,736,052 35(443) Acadiana Gulf of Mexico Access Channel (AGMAC), 36 Port of Iberia, Planning, Design, Construction, Rights- 37 of-Way, Relocations and Utilities 38 (Iberia, Vermilion) 39 Payable from General Obligation Bonds 40 Priority 1 $15,029,300 41 Priority 5 $25,000,000 42 Total $40,029,300 43(646) Turkey Creek Lake Repairs, Planning and Construction 44 (Franklin) 45 Payable from General Obligation Bonds 46 Priority 1 $ 1,500,000 47 Priority 5 $ 3,686,560 48 Total $ 5,186,560 Page 25 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(647) Ouachita River Bank Stabilization and Levee Repair 2 (Caldwell, Ouachita) 3 Payable from General Obligation Bonds 4 Priority 1 $ 5,135,000 5 Priority 5 $14,650,000 6 Total $19,785,000 7(648) Mississippi River Levee Raising, Arkansas to Old 8 River, Planning and Construction 9 (Avoyelles, Concordia, East Carroll, Madison, Pointe 10 Coupee, Tensas) 11 Payable from General Obligation Bonds 12 Priority 1 $ 9,897,522 13 Priority 5 $31,000,000 14 Total $40,897,522 15(854) Mississippi River Deepening, Phase 3, Planning, 16 Design, Construction, Rights-of-Way, Relocations and 17 Utilities 18 (Ascension, East Baton Rouge, Jefferson, Orleans, 19 Plaquemines, St. Bernard, St. Charles, St. James, 20 St. John the Baptist, West Baton Rouge) 21 Payable from General Obligation Bonds 22 Priority 1 $42,500,000 23 Priority 5 $28,000,000 24 Total $70,500,000 25(1058)J. Bennett Johnston (Red River) Deepening 26 (Avoyelles, Bossier, Caddo, Grant, Natchitoches, 27 Rapides, Red River) 28 Payable from General Obligation Bonds 29 Priority 1 $ 500,000 30 Priority 5 $ 1,000,000 31 Total $ 1,500,000 32(1059)Bundick Lake Level Control Structure, Planning and 33 Construction 34 (Beauregard) 35 Payable from General Obligation Bonds 36 Priority 1 $ 2,980,000 37(1269)New Orleans Rail Gateway Finalize EIS to Complete 38 Study 39 (Jefferson, Orleans) 40 Payable from General Obligation Bonds 41 Priority 1 $ 1,983,811 42(1467)Rehabilitation and Repair of State-Maintained 43 Reservoirs and Dams 44 (Statewide) 45 Payable from General Obligation Bonds 46 Priority 1 $ 3,912,702 47 Priority 5 $ 4,500,000 48 Total $ 8,412,702 49(1699)West of Atchafalaya Basin Feasibility Study 50 (Statewide) 51 Payable from General Obligation Bonds 52 Priority 5 $ 750,000 Page 26 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 107/276ENGINEERING AND OPERATIONS 2(1268)New Cameron Ferry 3 (Cameron) 4 Payable from General Obligation Bonds 5 Priority 1 $21,568,016 6(1665)Facilities Program Major Repairs, Renovations, 7 Additions, New Facilities, Equipment Replacement at 8 Various DOTD Sites, Planning and Construction 9 (Statewide) 10 Payable from Transportation Trust Fund - Regular $ 4,000,000 1107/277AVIATION IMPROVEMENTS 12(1188)State Aviation and Airport Improvement Program 13 (Statewide) 14 Payable from Transportation Trust Fund - Regular $27,974,794 15 DEPARTMENT OF PUBLIC SAFETY AND CORRECTIONS 1608/400DEPARTMENT OF CORRECTIONS 17(1505)HVAC Installation, Offender Housing, Planning and 18 Construction 19 (Statewide) 20 Payable from General Obligation Bonds 21 Priority 1 $ 550,000 2208/402LOUISIANA STATE PENITENTIARY 23(1472)Main Prison Shower and Cellblock Plumbing Upgrade, 24 Planning and Construction 25 (West Feliciana) 26 Payable from General Obligation Bonds 27 Priority 1 $ 250,000 28 Priority 5 $ 1,356,000 29 Total $ 1,606,000 30(1473)Electrical Distribution System Upgrade, Planning and 31 Construction 32 (West Feliciana) 33 Payable from General Obligation Bonds 34 Priority 1 $ 364,410 35 Priority 5 $ 4,194,000 36 Total $ 4,558,410 3708/403OFFICE OF JUVENILE JUSTICE 38(84) Community Based Program, Juvenile Justice 39 Improvements, Planning, Construction, Renovation, 40 Acquisition, and Equipment 41 (Statewide) 42 Payable from General Obligation Bonds 43 Priority 1 $13,909,667 44 Priority 5 $58,500,000 45 Payable from Interagency Transfers $10,000,000 46 Payable from State General Fund (Direct) Non-Recurring 47 Revenues $ 4,500,000 48 Total $86,909,667 Page 27 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(701) Swanson Center for Youth at Columbia - Emergency 2 Power Upgrades, Planning and Construction 3 (Ouachita) 4 Payable from Interagency Transfers $ 870,000 5(910) Bridge City Center for Youth - Replace Campus Storm 6 Drain System, Planning and Construction 7 (Jefferson) 8 Payable from Interagency Transfers $ 337,400 9(1407)Bridge City Center for Youth - New Recreational 10 Pavilion, Planning and Construction 11 (Jefferson) 12 Payable from Interagency Transfers $ 682,000 13(1527)Acadiana Center for Youth - Renovation to Create 14 Behavioral Intervention Rooms 15 (Avoyelles) 16 Payable from General Obligation Bonds 17 Priority 2 $ 400,000 18 Payable from Interagency Transfers $ 1,100,000 19 Total $ 1,500,000 2008/406LOUISIANA CORRECTIONAL INSTITUTE F OR WOMEN 21(1462)Rebuild and/or Replace Facility Due to Damage from 22 2016 Flood Event 23 (Iberville) 24 Payable from General Obligation Bonds 25 Priority 1 $16,600,000 26 Priority 5 $39,400,000 27 Total $56,000,000 2808/416RAYBURN CORRECTIONAL CENTER 29(1260)Security Perimeter Fence, Planning and Construction 30 (Washington) 31 Payable from General Obligation Bonds 32 Priority 1 $ 250,000 33 Priority 5 $ 1,845,000 34 Total $ 2,095,000 3508/418PUBLIC SAFETY OFFICE OF MANAGEMENT AND FINANCE 36(1568)OMF/OMV Headquarters Office Renovation Project, 37 Planning and Construction 38 (East Baton Rouge) 39 Payable from General Obligation Bonds 40 Priority 2 $ 616,000 4108/419OFFICE OF STATE POLICE 42(1756)JESTC Training Facility Improvements, Planning and 43 Construction 44 (East Baton Rouge) 45 Payable from General Obligation Bonds 46 Priority 5 $ 3,750,000 47 Payable from Interagency Transfers $ 3,000,000 48 Payable from Federal Funds via Interagency Transfers $ 1,000,000 49 Total $ 7,750,000 Page 28 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1758)New Louisiana State Police Troop L Facility, Planning 2 and Construction 3 (St. Tammany) 4 Payable from General Obligation Bonds 5 Priority 2 $ 3,000,000 6 Priority 5 $27,000,000 7 Total $30,000,000 8 LOUISIANA DEPARTMENT OF HEALTH 909/320OFFICE OF AGING AND ADULT SERVICES 10(71) Replace Roof and Storm Drains on all Patient 11 Buildings, Planning and Construction 12 (East Feliciana) 13 Payable from General Obligation Bonds 14 Priority 1 $ 71,547 15(72) Repair and Upgrade to Sewer System, Planning and 16 Construction 17 (East Feliciana) 18 Payable from General Obligation Bonds 19 Priority 1 $ 447,593 20 Priority 5 $ 6,170,000 21 Total $ 6,617,593 22(1788)Renovations of Multiple Buildings at Villa Feliciana 23 Medical Complex, Planning and Construction 24 (East Feliciana) 25 Payable from Interagency Transfers $ 8,000,000 2609/330OFFICE OF BEHAVIORAL HEALTH 27(75) Central Louisiana State Hospital Relocation to 28 Pinecrest, Planning and Construction 29 (Rapides) 30 Payable from General Obligation Bonds 31 Priority 1 $ 3,040,953 32(906) Center Building and Fire Alarm System Renovation 33 and Restoration, East Louisiana State Hospital, 34 Planning and Construction 35 (East Feliciana) 36 Payable from General Obligation Bonds 37 Priority 1 $ 323,183 38 Priority 5 $ 5,000,000 39 Total $ 5,323,183 40(1320)Fire Alarm System Replacement for Ten Buildings, 41 Planning and Construction 42 (East Feliciana) 43 Payable from General Obligation Bonds 44 Priority 5 $ 2,453,200 45(1722)Sewer Plant Upgrade, Planning and Construction 46 (East Feliciana) 47 Payable from State General Fund (Direct) Non-Recurring 48 Revenues $ 1,000,000 Page 29 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 109/340OFFICE FOR CITIZENS WITH DEVELOP MENTAL DISABILITIES 2(507) Plant Generator, Planning and Construction 3 (Rapides) 4 Payable from Interagency Transfers $ 1,000,000 5(1123)Global Infrastructure Improvements, Planning and 6 Construction 7 (Rapides) 8 Payable from Interagency Transfers $ 1,500,000 9 DEPARTMENT OF WILDLIFE AND FISHERIES 1016/512OFFICE OF THE SECRETARY 11(109) Wildlife and Fisheries Enforcement Training Academy 12 and Emergency Facility (Complex) 13 (East Baton Rouge) 14 Payable from General Obligation Bonds 15 Priority 1 $ 2,250,000 1616/513OFFICE OF WILDLIFE 17(519) Hammond Headquarters, Planning and Construction 18 (Tangipahoa) 19 Payable from General Obligation Bonds 20 Priority 5 $ 1,500,000 21(520) Region 5/Lake Charles Office 22 (Calcasieu) 23 Payable from General Obligation Bonds 24 Priority 5 $ 3,000,000 25(1341)Woodworth Central Office Complex and Pineville 26 Office/Region 3, Planning and Construction 27 (Rapides) 28 Payable from General Obligation Bonds 29 Priority 5 $ 6,300,000 30 DEPARTMENT OF EDUCATION 3119/601LSU BATON ROUG E 32(17) Science - Strategic Capital Plan Repairs and Upgrades - 33 Food Science Renovation, New Science Building, 34 Infrastructure and Utilities, Planning and Construction 35 (East Baton Rouge) 36 Payable from General Obligation Bonds 37 Priority 1 $ 5,000,000 38 Priority 5 $89,175,000 39 Total $94,175,000 40Provided, however, that the $475,000 of the Priority 5 appropriation shall be used to fund 41the construction or addition of a Vivarium on the Louisiana State University – Shreveport 42campus. Page 30 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(437) Military and Security Sciences Renovations, Planning and Construction 2 (East Baton Rouge) 3 Payable from General Obligation Bonds 4 Priority 1 $ 500,000 5 Priority 5 $21,500,000 6 Total $22,000,000 7(438) Veterinary Medicine Facilities Repairs/Addition 8 (East Baton Rouge) 9 Payable from General Obligation Bonds 10 Priority 1 $10,000,000 11 Priority 5 $ 8,000,000 12 Total $18,000,000 13(1049)Strategic Capital Plan - Deferred Maintenance for 14 Infrastructure, Renovations, and Streets 15 (East Baton Rouge) 16 Payable from General Obligation Bonds 17 Priority 1 $ 7,346,176 18 Priority 5 $31,700,000 19 Total $39,046,176 20(1258)Louisiana State University Library 21 (East Baton Rouge) 22 Payable from General Obligation Bonds 23 Priority 1 $ 3,254,349 24 Priority 5 $149,500,000 25 Total $152,754,349 2619/602LSU ALEXANDRIA 27(422) Student Success Center, Planning and Construction 28 (Rapides) 29 Payable from General Obligation Bonds 30 Priority 1 $ 8,000,000 31 Priority 5 $ 7,900,000 32 Total $15,900,000 33(1795)Downtown Health Services Center, Planning 34 and Construction 35 (Rapides) 36 Payable from General Obligation Bonds 37 Priority 2 $ 100,000 38 Priority 5 $32,085,000 39 Total $32,185,000 4019/603UNIVERSITY OF NEW ORLEANS 41(451) Hotel, Restaurant and Tourism Program Relocation 42 Buildout to North Central Plant Building - Phase 1, 43 Planning and Construction 44 (Orleans) 45 Payable from General Obligation Bonds 46 Priority 5 $ 5,800,000 47(1477)Miscellaneous Roof Replacements, Planning 48 and Construction 49 (Orleans) 50 Payable from General Obligation Bonds 51 Priority 5 $ 4,800,000 Page 31 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 119/604NLSU HEALTH SCIENCES CENTER - NEW ORLEANS 2(3) LSUHSC-NO Campus Stormwater Infrastructure 3 Upgrades, Planning and Construction 4 (Orleans) 5 Payable from General Obligation Bonds 6 Priority 5 $ 3,000,000 7(626) Health Science Center Facility Renovations – Dental 8 School 9 Simulation Facility, Planning and Construction 10 (Orleans) 11 Payable from Fees and Self-Generated Revenues $ 4,000,000 12(832) LSUHSC-NO Medical Education Building Laboratory 13 Renovation, Phase 1, Planning and Construction 14 (Orleans) 15 Payable from General Obligation Bonds 16 Priority 1 $ 5,000,000 17 Priority 5 $55,000,000 18 Total $60,000,000 19(1034)Center for Advanced Learning and Simulation 20 Infrastructure and Equipment, Planning and 21 Construction 22 (Orleans) 23 Payable from General Obligation Bonds 24 Priority 5 $ 2,800,000 25 Payable from State General Fund (Direct) Non-Recurring 26 Revenues $ 2,800,000 27 Total $ 5,600,000 2819/604SLSU HEALTH SCIENCES CENTER - SHREVEP ORT 29(212) Center for Medical Education and Wellness, Planning 30 and Construction 31 (Caddo) 32 Payable from General Obligation Bonds 33 Priority 1 $ 9,400,000 34 Priority 5 $16,600,000 35 Total $26,000,000 36(423) Comprehensive Emergency Water Supply 37 Improvements, Planning and Construction 38 (Caddo) 39 Payable from General Obligation Bonds 40 Priority 1 $ 1,000,000 41 Priority 5 $ 6,501,650 42 Total $ 7,501,650 43(1035)Gross Anatomy Lab Expansion and Modernization, 44 Planning and Construction 45 (Caddo) 46 Payable from General Obligation Bonds 47 Priority 1 $ 2,120,052 48 Priority 2 $ 875,000 49 Total $ 2,995,052 Page 32 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1449)Stonewall Animal Research and Training Facility, 2 Planning and Construction 3 (DeSoto) 4 Payable from General Obligation Bonds 5 Priority 5 $ 5,000,000 6(1718)Capital Improvement Projects, Design and Engineering 7 (Caddo) 8 Payable from General Obligation Bonds 9 Priority 1 $ 2,007,423 10(1719)Medical School B-Building HVAC Replacement, 11 Planning and Construction 12 (Caddo) 13 Payable from General Obligation Bonds 14 Priority 1 $ 2,322,408 1519/605LSU EUNICE 16(1) STEAM Innovation Center, Phase 1, 17 Planning and Construction 18 (Acadia) 19 Payable from General Obligation Bonds 20 Priority 5 $27,900,000 21(2) Athletic Complex Facility, Planning and Construction 22 (Acadia) 23 Payable from General Obligation Bonds 24 Priority 1 $ 6,000,000 25 Priority 5 $ 7,750,000 26 Total $13,750,000 27(1720)Manuel Hall Exterior Wall and Roof Repair, Planning 28 and Construction 29 (Acadia) 30 Payable from General Obligation Bonds 31 Priority 1 $ 2,624,749 3219/606LSU SHREVEPORT 33(1448)Building Exterior Walls and Bridge Repair, Planning 34 and Construction 35 (Caddo) 36 Payable from General Obligation Bonds 37 Priority 1 $ 3,094,021 38 Priority 2 $ 410,000 39 Priority 5 $ 410,000 40 Total $ 3,914,021 4119/607LSU AGRICULTURAL CENTER 42(213) John M. Parker Agricultural Center & Livestock Show 43 Barn Renovations and Repairs 44 (East Baton Rouge) 45 Payable from General Obligation Bonds 46 Priority 5 $23,000,000 Page 33 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(625) Animal and Food Science Facilities Renovations and 2 Modernizations, Phase II, Planning and Construction 3 (East Baton Rouge) 4 Payable from General Obligation Bonds 5 Priority 1 $ 346,950 6 Priority 5 $29,403,500 7 Total $29,750,450 8(628) Burden Wetlands and Trail Improvements, Planning 9 and Construction 10 (East Baton Rouge) 11 Payable from Fees and Self-Generated Revenues $10,000,000 12(833) Renewable and Natural Resources Building Repairs, 13 Planning and Construction 14 (East Baton Rouge) 15 Payable from General Obligation Bonds 16 Priority 1 $ 2,297,035 17 Payable from State General Fund (Direct) Non-Recurring 18 Revenues $ 4,000,000 19 Total $ 6,297,035 20(1036)Food Innovation Center, Planning and Construction 21 (East Baton Rouge) 22 Payable from General Obligation Bonds 23 Priority 5 $ 4,000,000 24 Payable from Fees and Self-Generated Revenues $ 500,000 25 Total $ 4,500,000 26(1060)Dean Lee Tornado Damage Building Repairs and 27 Reconstruction 28 (Rapides) 29 Payable from General Obligation Bonds 30 Priority 1 $ 1,499,630 31 Priority 2 $ 1,700,000 32 Total $ 3,199,630 3319/612BATON ROUGE COMMUNITY COLLEG E 34(1547)Allied Health Facility and Other Campus Development, 35 with Equipment, Planning and Construction 36 (East Baton Rouge) 37 Payable from General Obligation Bonds 38 Priority 1 $13,500,000 39 Priority 5 $39,500,000 40 Total $53,000,000 41(1783)Campus Development, Planning and Construction 42 (Pointe Coupee) 43 Payable from General Obligation Bonds 44 Priority 5 $ 7,000,000 4519/614SOUTHERN UNIVERSITY LAW CENTER 46(18) Renovations and Addition to Existing Law Library, 47 Planning and Construction 48 (East Baton Rouge) 49 Payable from General Obligation Bonds 50 Priority 1 $ 5,614,030 51 Priority 5 $ 5,750,000 52 Total $11,364,030 Page 34 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1759)Career Learning Center, Planning and Construction 2 (East Baton Rouge) 3 Payable from General Obligation Bonds 4 Priority 5 $15,500,000 519/616SOUTHERN UNIVERSITY - BATON ROUG E 6(19) Ravine, Bluff and Riverbank Stabilization Project, 7 Planning and Construction 8 (East Baton Rouge) 9 Payable from General Obligation Bonds 10 Priority 1 $ 1,000,000 11 Priority 5 $31,000,600 12 Total $32,000,600 13(441) New STEM Science Complex, Planning and 14 Construction 15 (East Baton Rouge) 16 Payable from General Obligation Bonds 17 Priority 1 $14,699,943 18 Priority 5 $51,800,000 19 Total $66,499,943 20(442) School of Business/Professional Accountancy, Planning 21 and Construction 22 (East Baton Rouge) 23 Payable from General Obligation Bonds 24 Priority 1 $ 2,250,000 25 Priority 5 $42,250,000 26 Total $44,500,000 27(1789)J. K. Haynes Hall School of Nursing Renovation and 28 Addition, Planning and Construction 29 (East Baton Rouge) 30 Payable from General Obligation Bonds 31 Priority 2 $ 1,100,000 32 Priority 5 $10,300,000 33 Payable from Fees and Self-Generated Revenues $18,000,000 34 Total $29,400,000 35(859) Replace Chilled Water Lines, Planning and 36 Construction 37 (East Baton Rouge) 38 Payable from General Obligation Bonds 39 Priority 2 $ 2,000,000 40 Priority 5 $28,000,000 41 Total $30,000,000 42(1265)Stewart Hall - Wall Mount HVAC Units 1st, 2nd and 43 3rd Floors, Planning and Construction 44 (East Baton Rouge) 45 Payable from General Obligation Bonds 46 Priority 1 $ 1,729,068 47 Payable from State General Fund (Direct) Non-Recurring 48 Revenues $ 1,000,000 49 Total $ 2,729,068 Page 35 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1724)A.O. Williams Hall Renovations, 2 Planning and Construction 3 (East Baton Rouge) 4 Payable from General Obligation Bonds 5 Priority 1 $ 2,715,575 6(1760)New Southern University Laboratory School Complex, 7 Planning and Construction 8 (East Baton Rouge) 9 Payable from General Obligation Bonds 10 Priority 2 $ 2,000,000 11 Priority 5 $53,000,000 12 Total $55,000,000 13(1784)Global Innovation and Welcome Center, Phase II, 14 Planning and Construction 15 (East Baton Rouge) 16 Payable from Interagency Transfers $ 3,000,000 17 Payable from Fees and Self-Generated Revenues $ 3,000,000 18 Total $ 6,000,000 19(1785)Center for Innovation, Entrepreneurship and 20 Community Engagement, Planning and Construction 21 (East Baton Rouge) 22 Payable from Fees and Self-Generated Revenues $15,000,000 2319/617SOUTHERN UNIVERSITY- NEW ORLEANS 24(23) ADA Compliant Restrooms and Public 25 Accommodations in the Cafeteria, University Center, 26 Health & Physical Education, Library and 27 Administration Building, Planning and Construction 28 (Orleans) 29 Payable from General Obligation Bonds 30 Priority 1 $ 1,000,000 31 Priority 2 $ 2,650,000 32 Total $ 3,650,000 33(1468)Campus Exterior Lighting Upgrades, Planning and 34 Construction 35 (Orleans) 36 Payable from General Obligation Bonds 37 Priority 1 $ 1,000,000 38(1469)University Cafeteria, Planning and Construction 39 (Orleans) 40 Payable from General Obligation Bonds 41 Priority 1 $ 100,000 42 Priority 5 $ 9,900,000 43 Total $10,000,000 44(1761)General Classroom Building, Planning and 45 Construction 46 (Orleans) 47 Payable from General Obligation Bonds 48 Priority 5 $15,000,000 Page 36 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1786)Nursing and Allied Health Building, Planning and 2 Construction 3 (Orleans) 4 Payable from Fees and Self-Generated Revenues $20,000,000 519/618SOUTHERN UNIVERSITY - SHREVEP ORT 6(488) Domestic Water Loop, Hot Water Loop and Drainage 7 Improvements, Planning and Construction 8 (Caddo) 9 Payable from General Obligation Bonds 10 Priority 2 $ 520,000 11 Priority 5 $ 7,480,000 12 Total $ 8,000,000 13(836) Louis Collier Hall Science Building Renovation, 14 Planning and Construction 15 (Caddo) 16 Payable from General Obligation Bonds 17 Priority 1 $ 654,083 18 Priority 5 $15,950,000 19 Total $16,604,083 20(1256)Gym Complex, Planning and Construction 21 (Caddo) 22 Payable from General Obligation Bonds 23 Priority 5 $ 7,500,000 24(1259)New Workforce Training and Technology Center, 25 Planning and Construction 26 (Caddo) 27 Payable from General Obligation Bonds 28 Priority 1 $ 1,675,947 29 Priority 5 $17,500,000 30 Total $19,175,947 31(1787)HVAC Renovations, Planning and Construction 32 (Caddo) 33 Payable from Fees and Self-Generated Revenues $10,000,000 3419/619SOUTHERN UNIVERSITY AG RICULTURAL RESEARCH AND 35 EXTENSION CENTER 36(1246)Disaster Relief Mega Shelter, Planning and 37 Construction 38 (East Baton Rouge) 39 Payable from General Obligation Bonds 40 Priority 1 $ 1,144,942 41 Priority 5 $ 9,200,000 42 Payable from Federal Funds via Interagency Transfers $18,000,000 43 Total $28,344,942 44(1762)High Tech Meat Processing Facility Expansion, 45 Planning and Construction 46 (East Baton Rouge) 47 Payable from Federal Funds via Interagency Transfers $ 3,500,000 Page 37 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 119/621NICHOLLS STATE UNIVERSITY 2(227) Coastal Center Facility, Planning and Construction 3 (Lafourche) 4 Payable from General Obligation Bonds 5 Priority 1 $10,905,088 6(229) New Nursing Building, Planning and Construction 7 (Lafourche) 8 Payable from General Obligation Bonds 9 Priority 1 $ 9,249,897 10 Priority 5 $10,750,000 11 Total $19,999,897 12(1460)Fieldhouse, Planning and Construction 13 (Lafourche) 14 Payable from General Obligation Bonds 15 Priority 5 $ 2,800,000 16(1816)Women's Student Athlete Performance Center, 17 Planning and Construction 18 (Lafourche) 19 Payable from General Obligation Bonds 20 Priority 5 $ 2,000,000 2119/623GRAMBLING STATE UNIVERSITY 22(713) Campus Utility Infrastructure Assessment Emergency 23 Repair/Replacement, Planning and Construction 24 (Lincoln) 25 Payable from General Obligation Bonds 26 Priority 1 $ 2,999,963 27 Priority 5 $ 5,000,000 28 Total $ 7,999,963 29(901) Reroof, Waterproof, Envelope Repairs for Various 30 Buildings, Planning and Construction 31 (Lincoln) 32 Payable from General Obligation Bonds 33 Priority 1 $ 1,000,000 34 Priority 5 $ 7,500,000 35 Total $ 8,500,000 36(1313)Criminal Justice Building Renovation 37 (Lincoln) 38 Payable from General Obligation Bonds 39 Priority 1 $ 799,968 40 Priority 5 $10,500,000 41 Total $11,299,968 42(1781)Computer Science and Cyber Security Building, 43 Planning, Construction, and Equipment 44 (Lincoln) 45 Payable from General Obligation Bonds 46 Priority 2 $ 800,000 47 Priority 5 $41,000,000 48 Total $41,800,000 Page 38 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 119/625LOUISIANA TECH UNIVERSITY 2(243) Renovation of George T. Madison Hall, Planning and 3 Construction 4 (Lincoln) 5 Payable from General Obligation Bonds 6 Priority 1 $ 2,399,937 7 Priority 2 $ 600,000 8 Priority 5 $35,000,000 9 Total $37,999,937 10(244) Agriculture and Forestry Wood Products Education and 11 Research Center, Planning and Construction 12 (Lincoln) 13 Payable from General Obligation Bonds 14 Priority 1 $ 999,937 15 Priority 5 $ 9,000,000 16 Total $ 9,999,937 17(1065)Athletic Academic Center, Planning and Construction 18 (Lincoln) 19 Payable from General Obligation Bonds 20 Priority 1 $ 499,937 21 Priority 5 $ 7,000,000 22 Total $ 7,499,937 23(1066)Central Steam Generator - Switch Gear, Planning and 24 Construction 25 (Lincoln) 26 Payable from General Obligation Bonds 27 Priority 1 $ 599,972 28 Priority 5 $ 2,900,000 29 Total $ 3,499,972 30(1823)Carson-Taylor Hall Renovation, 31 Planning and Construction 32 (Lincoln) 33 Payable from General Obligation Bonds 34 Priority 5 $26,000,000 3519/627MCNEESE STATE UNIVERSITY 36(228) Contraband Bayou Erosion Retaining Wall, Phase II, 37 Planning and Construction 38 (Calcasieu) 39 Payable from General Obligation Bonds 40 Priority 1 $ 728,313 41(436) Shearman Fine Arts Building Renovation and Addition, 42 Planning and Construction 43 (Calcasieu) 44 Payable from General Obligation Bonds 45 Priority 1 $ 3,024,937 46 Priority 5 $ 4,700,000 47 Total $ 7,724,937 Page 39 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1461)McNeese Disaster Recovery, Planning and 2 Construction 3 (Calcasieu) 4 Payable from General Obligation Bonds 5 Priority 1 $ 5,431,163 6 Priority 5 $ 4,500,000 7 Total $ 9,931,163 819/629UNIVERSITY OF LOUISIANA - MONROE 9(863) Health Science Complex Renovation, Sugar Hall and 10 Caldwell Hall, Planning and Construction 11 (Ouachita) 12 Payable from General Obligation Bonds 13 Priority 1 $16,322,729 14 Priority 5 $14,000,000 15 Total $30,322,729 16(1074)Human Development and Well-Being Multi-Purpose 17 Center, Planning and Construction 18 (Ouachita) 19 Payable from General Obligation Bonds 20 Priority 2 $ 1,500,000 21 Priority 5 $57,100,000 22 Total $58,600,000 2319/631NORTHWESTERN STATE UNIVERSITY 24(440) Health Performance Center, Planning and Construction 25 (Natchitoches) 26 Payable from General Obligation Bonds 27 Priority 1 $ 5,000,000 28 Payable from Fees and Self-Generated Revenues $ 2,000,000 29 Total $ 7,000,000 30(869) Renovation of Nursing Education Center at Warrington 31 Place (Shreveport Campus), Planning and Construction 32 (Caddo) 33 Payable from General Obligation Bonds 34 Priority 2 $ 1,335,000 35 Priority 5 $12,100,000 36 Total $13,435,000 37(1264)Replacement of John S. Kyser Hall, Planning and 38 Construction 39 (Natchitoches) 40 Payable from General Obligation Bonds 41 Priority 1 $25,530,969 42 Priority 5 $18,195,000 43 Payable from Fees and Self-Generated Revenues $ 1,000,000 44 Total $44,725,969 4519/634SOUTHEASTERN LOUISIANA UNIVERSITY 46(424) D. Vickers Hall Renovation and Addition, Planning and 47 Construction 48 (Tangipahoa) 49 Payable from General Obligation Bonds 50 Priority 1 $20,038,373 51 Priority 5 $12,100,000 52 Total $32,138,373 Page 40 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1037)Academic Athletic Training and Ancillary Athletic 2 Facility, Planning and Construction 3 (Tangipahoa) 4 Payable from General Obligation Bonds 5 Priority 1 $ 782,460 6 Priority 5 $12,500,000 7 Total $13,282,460 8(1038)Nursing and Health Science Building, Planning and 9 Construction 10 (Tangipahoa) 11 Payable from General Obligation Bonds 12 Priority 1 $ 600,000 13 Priority 5 $31,300,000 14 Total $31,900,000 15(1243)Baton Rouge Nursing Center Renovation, Planning and 16 Construction 17 (East Baton Rouge, Tangipahoa) 18 Payable from General Obligation Bonds 19 Priority 1 $ 685,435 20 Priority 5 $ 9,220,000 21 Total $ 9,905,435 2219/640UNIVERSITY OF LOUISIANA - LAFAYETTE 23(464) DeClouet Hall Renovation, Planning and Construction 24 (Lafayette) 25 Payable from General Obligation Bonds 26 Priority 1 $ 350,589 27 Priority 5 $ 4,500,000 28 Total $ 4,850,589 29(668) Foster Hall Renovation, Planning and Construction 30 (Lafayette) 31 Payable from General Obligation Bonds 32 Priority 1 $ 444,173 33 Priority 5 $ 4,000,000 34 Total $ 4,444,173 35(669) Madison Hall Renovation, Planning and Construction 36 (Lafayette) 37 Payable from General Obligation Bonds 38 Priority 1 $ 6,000,000 39 Priority 5 $12,000,000 40 Total $18,000,000 41(670) Engineering Classroom Building, Planning and 42 Construction 43 (Lafayette) 44 Payable from General Obligation Bonds 45 Priority 1 $ 7,084,465 46 Priority 5 $ 7,866,573 47 Total $14,951,038 Page 41 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(877) Kinesiology, Hospitality Management, and Athletic 2 Administration Complex, Engineering, Stabilization, 3 Equipment, Planning and Construction 4 (Lafayette) 5 Payable from General Obligation Bonds 6 Priority 1 $15,000,000 7 Priority 5 $10,000,000 8 Total $25,000,000 9(1079)Health Care Education and Training Facility and 10 UL/LSU Health Science Education Collaboration 11 Building, Planning, and Construction 12 (Lafayette) 13 Payable from General Obligation Bonds 14 Priority 1 $13,249,968 15 Priority 5 $53,000,000 16 Total $66,249,968 17(1817)Sciences Lab/Classroom Building, 18 Planning and Construction 19 (Lafayette) 20 Payable from General Obligation Bonds 21 Priority 5 $47,750,000 22(1818)Billeaud Hall Renovation, 23 Planning and Construction 24 (Lafayette) 25 Payable from General Obligation Bonds 26 Priority 5 $29,500,000 27(1819)Montgomery Hall Renovation, 28 Planning and Construction 29 (Lafayette) 30 Payable from General Obligation Bonds 31 Priority 5 $21,500,000 32(1820)Learning Lab, Planning and Construction 33 (Lafayette) 34 Payable from General Obligation Bonds 35 Priority 5 $42,000,000 3619/644BOSSIER PARISH COMMUNITY COLLEG E 37(323) Land Acquisition, Purchase and Development Planning 38 and Construction 39 (Bossier) 40 Payable from General Obligation Bonds 41 Priority 1 $ 1,000,000 4219/646RIVER PARISHES COMMUNITY COLLEG E 43(1132)Donaldsonville Renovation Project, Planning and 44 Construction 45 (Ascension) 46 Payable from General Obligation Bonds 47 Priority 1 $ 1,100,000 Page 42 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 119/647LOUISIANA DELTA COMMUNITY COLLEG E 2(231) Campus Expansion for Louisiana Delta Community 3 College, Winnsboro, Planning and Construction 4 (Franklin) 5 Payable from General Obligation Bonds 6 Priority 1 $ 4,139,820 7(232) Campus Development for Louisiana Delta Community 8 College Bastrop, Planning and Construction 9 (Morehouse) 10 Payable from General Obligation Bonds 11 Priority 1 $ 1,000,000 12 Priority 5 $ 7,000,000 13 Total $ 8,000,000 14(1052)Campus Development for Louisiana Delta Community 15 College, Planning and Construction 16 (Union) 17 Payable from General Obligation Bonds 18 Priority 1 $ 1,000,000 19 Priority 5 $16,500,000 20 Total $17,500,000 2119/649LOUISIANA COMMUNITY AND TECHNICAL COLLEG E SYSTEM 22(517) Resurface Campus Parking, Planning and Construction 23 (Calcasieu) 24 Payable from General Obligation Bonds 25 Priority 1 $ 149,963 26 Priority 5 $ 2,500,000 27 Total $ 2,649,963 28(1548)Maritime/Petroleum Workforce Training Academy, 29 Planning and Construction 30 (Terrebonne) 31 Payable from General Obligation Bonds 32 Priority 1 $ 9,334,817 3319/671BOARD OF REGENTS 34(412) Land Acquisition for Post Secondary Educational 35 Institutions 36 (Statewide) 37 Payable from General Obligation Bonds 38 Priority 1 $ 501,913 39(413) Major Repairs and Deferred Maintenance of Buildings 40 and Facilities, Planning and Construction 41 (Statewide) 42 Payable from General Obligation Bonds 43 Priority 5 $10,000,000 44 Payable from State General Fund (Direct) Non-Recurring 45 Revenues $35,000,000 46 Payable from Fees and Self-Generated Revenues $10,000,000 47 Payable from Federal Funds via Interagency Transfers $10,000,000 48 Total $65,000,000 Page 43 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1229)System-Wide Telecommunications Wiring and 2 Equipment, Planning and Construction 3 (Statewide) 4 Payable from General Obligation Bonds 5 Priority 1 $ 1,995,822 619/674LOUISIANA UNIVERSITIES MARINE CONSORTIUM 7(870) Houma Marine Campus Phase 2, Planning and 8 Construction 9 (Terrebonne) 10 Payable from General Obligation Bonds 11 Priority 1 $11,488,262 12(1073)Research Vessel (R/V Pelican) Replacement 13 (Terrebonne) 14 Payable from General Obligation Bonds 15 Priority 1 $10,890,000 16 Priority 5 $31,000,000 17 Total $41,890,000 18(1725)LUMCON Houma Marine Campus, Planning and 19 Construction 20 (Terrebonne) 21 Payable from General Obligation Bonds 22 Priority 1 $ 3,839,806 2319/712LOUISIANA TECHNICAL COLLEG E-SULLIVAN CAMPUS 24(719) New Diesel Automotive Building, Northshore 25 Technical Community College - Sullivan Campus, 26 Planning and Construction 27 (Washington) 28 Payable from General Obligation Bonds 29 Priority 1 $ 3,000,000 30 Priority 5 $ 7,140,000 31 Total $10,140,000 3219/731FLETCHER TECHNICAL COMMUNITY COLLEG E 33(313) Precision Agriculture Training Facility, Planning and 34 Construction 35 (Terrebonne) 36 Payable from General Obligation Bonds 37 Priority 1 $ 5,498,000 38 Priority 5 $ 5,502,000 39 Total $11,000,000 4019/788NORTHSHORE TECHNICAL COMMUNITY 41 COLLEGE 42(1340)New Hammond Area Campus, Planning and 43 Construction 44 (Tangipahoa) 45 Payable from General Obligation Bonds 46 Priority 2 $ 3,000,000 47 Priority 5 $37,675,000 48 Total $40,675,000 Page 44 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1763)Livingston Campus Expansion, Planning and 2 Construction 3 (Livingston) 4 Payable from General Obligation Bonds 5 Priority 2 $ 1,000,000 6 Priority 5 $ 9,000,000 7 Total $10,000,000 8 JUDICIAL EXPENSES 923/949LOUISIANA JUDICIARY 10(1050)Land Acquisition, Planning, and Construction of New 11 Courthouse for the Louisiana Court of Appeal, Third 12 Circuit 13 (Calcasieu) 14 Payable from General Obligation Bonds 15 Priority 1 $ 268,700 16 LEVEE DISTRICTS AND PORTS 1736/L13PONTCHARTRAIN LEVEE DISTRICT 18(170) Lake Pontchartrain West Shore Hurricane Protection 19 Project 20 (Ascension, St. Charles, St. James, St. John the Baptist) 21 Payable from General Obligation Bonds 22 Priority 1 $ 3,081,715 23 Priority 5 $ 5,170,000 24 Total $ 8,251,715 25(394) Amite River Diversion Canal Weir, Planning and 26 Construction 27 (Ascension, Livingston, St. James) 28 Payable from General Obligation Bonds 29 Priority 2 $ 5,000,000 3036/L15SQUIRREL RUN LEVEE DRAINAG E DISTRICT 31(1406)Maintenance of Levee and FEMA Certification 32 (Iberia) 33 Payable from General Obligation Bonds 34 Priority 1 $ 250,000 35 Priority 5 $ 200,000 36 Total $ 450,000 3736/L16SOUTH LAFOURCHE LEVEE DISTRICT 38(1324)Larose to Golden Meadow Hurricane Protection 39 System, Planning and Construction 40 (Lafourche) 41 Payable from General Obligation Bonds 42 Priority 5 $10,200,000 4336/L25GRAND ISLE INDEPENDENT LEVEE DISTRICT 44(812) Grand Isle Back Levee Flood Protection, Planning and 45 Construction 46 (Jefferson) 47 Payable from General Obligation Bonds 48 Priority 1 $ 1,500,000 Page 45 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1640)Breakwater Protection, Planning and Construction 2 (Jefferson) 3 Payable from General Obligation Bonds 4 Priority 1 $ 2,734,160 536/L26NATCHITOCHES LEVEE AND DRAINAG E DISTRICT 6(1592)Lower Cane River Area Flow Control Structure and 7 Levee Surface Restorations, Planning and Construction 8 (Natchitoches) 9 Payable from General Obligation Bonds 10 Priority 1 $ 125,087 1136/L27TERREBONNE LEVEE DISTRICT 12(560) Lower Dularge Flood Control, Planning and 13 Construction 14 (Terrebonne) 15 Payable from General Obligation Bonds 16 Priority 5 $ 5,000,000 1736/L34LAKEFRONT MANAG EMENT AUTHORITY 18(585) Planning, Designing and Constructing Public Use 19 Pavilions Inclusive of Benches and Tables along 5.2 20 Miles of Public Parks and Green Space along New 21 Orleans Lakeshore Drive 22 (Orleans) 23 Payable from General Obligation Bonds 24 Priority 5 $ 168,750 25(994) Seabrook Public Boat Launch Rehabilitation, Planning 26 and Construction 27 (Orleans) 28 Payable from General Obligation Bonds 29 Priority 1 $ 100,000 30 Priority 5 $ 1,780,000 31 Total $ 1,880,000 3236/L36LAFITTE AREA INDEPENDENT LEVEE DISTRICT 33(404) Lower Lafitte (Orange Street) Basin, Planning and 34 Construction 35 (Jefferson) 36 Payable from General Obligation Bonds 37 Priority 1 $ 8,500,000 38 Priority 5 $ 8,492,500 39 Total $16,992,500 40(1219)Goose Bayou/The Pen Levee Basin, Planning and 41 Construction 42 (Jefferson) 43 Payable from General Obligation Bonds 44 Priority 1 $ 3,000,000 45 Priority 5 $12,066,000 46 Total $15,066,000 Page 46 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 136/P05WEST CALCASIEU PORT 2(742) New Property Along Gulf Intracoastal Waterway, 3 Planning and Construction 4 (Calcasieu) 5 Payable from General Obligation Bonds 6 Priority 5 $ 2,000,000 736/P10GREATER LAFOURCHE PORT COMMISSION 8(1649)Fourchon Bridge and Connector Road, Planning and 9 Construction 10 (Lafourche) 11 Payable from General Obligation Bonds 12 Priority 1 $ 500,000 13 Priority 5 $ 4,910,000 14 Total $ 5,410,000 1536/P12LAKE PROVIDENCE PORT COMMISSION 16(392) Third Lane Addition, Planning and Construction 17 (East Carroll) 18 Payable from General Obligation Bonds 19 Priority 5 $ 1,800,000 2036/P17PORT OF NEW ORLEANS 21(130) Louisiana International Terminal Roadway and Rail 22 Improvements, Planning and Construction 23 (St. Bernard) 24 Payable from General Obligation Bonds 25 Priority 2 $ 2,000,000 26 Priority 5 $78,000,000 27 Total $80,000,000 28(1348)St. Bernard Transportation Corridor, Planning and 29 Construction 30 (St. Bernard) 31 Payable from General Obligation Bonds 32 Priority 1 $ 2,000,000 33 Priority 5 $48,000,000 34 Total $50,000,000 35(1721)Louisiana International Terminal Drainage, Site 36 Preparation and Mitigation, Planning and Construction 37 (St. Bernard) 38 Payable from General Obligation Bonds 39 Priority 2 $ 2,000,000 40 Priority 5 $48,000,000 41 Total $50,000,000 4236/P21PORT OF SOUTH LOUISIANA 43(112) Globalplex Road Improvements and Drainage Between 44 Globalplex Buildings 71 and 76, Planning and 45 Construction 46 (St. John the Baptist) 47 Payable from General Obligation Bonds 48 Priority 1 $ 500,000 Page 47 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(523) Globalplex Dock Access Bridge and Equipment 2 Replacement/Repair, Planning and Construction 3 (St. John the Baptist) 4 Payable from General Obligation Bonds 5 Priority 1 $10,800,750 6(524) Globalplex Roadway Improvements at Parking Area 7 Near Building 2, Planning and Construction 8 (St. John the Baptist) 9 Payable from General Obligation Bonds 10 Priority 1 $ 2,940,000 11(1346)Globalplex Terminal Building #71 and Other 12 Globalplex Terminal Building Upgrades, Planning and 13 Construction 14 (St. John the Baptist) 15 Payable from General Obligation Bonds 16 Priority 1 $ 567,361 17 Priority 5 $ 1,000,000 18 Total $ 1,567,361 19(1555)Globalplex Roadway Improvements: Parking Area 20 Near Building 60, Planning and Construction 21 (St. John the Baptist) 22 Payable from General Obligation Bonds 23 Priority 1 $ 1,290,000 2436/P23TERREBONNE PORT COMMISSION 25(87) Slip Dredging, Houma Navigation Canal Dredging, 26 Planning and Construction 27 (Terrebonne) 28 Payable from General Obligation Bonds 29 Priority 1 $ 5,061,923 30(1792)Maritime Manufacturing Facility, Planning and 31 Construction 32 (Terrebonne) 33 Payable from General Obligation Bonds 34 Priority 1 $ 4,000,000 35 Priority 5 $40,000,000 36 Total $44,000,000 3736/P26PORT OF LAKE CHARLES 38(618) Two Mobile Harbor Cranes for BT-1, Planning and 39 Construction 40 (Calcasieu) 41 Payable from General Obligation Bonds 42 Priority 1 $ 2,836,539 43(873) Berths 4, 5, & 6 Wharf and Shed Reconstruction at City 44 Docks, Planning and Construction 45 (Calcasieu) 46 Payable from General Obligation Bonds 47 Priority 1 $23,000,000 48 Priority 5 $73,400,000 49 Total $96,400,000 Page 48 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(987) Lake Charles Harbor and Terminal District Industrial 2 Canal Storage Facility, Planning and Construction 3 (Calcasieu) 4 Payable from General Obligation Bonds 5 Priority 2 $ 550,000 6 Priority 5 $ 4,500,000 7 Total $ 5,050,000 836/P34WEST ST. MARY PARISH PORT 9(920) Warehouse Facilities and Related Infrastructure 10 Improvements (Baldwin Campus), Planning and 11 Construction 12 (St. Mary) 13 Payable from General Obligation Bonds 14 Priority 5 $ 2,000,000 1536/P35MERMENTAU RIVER HARBOR AND TERMINAL DISTRICT 16(934) Land Acquisition for New Slip Construction 17 (Acadia) 18 Payable from General Obligation Bonds 19 Priority 5 $ 295,000 20(1141)Slip Improvements, Planning and Construction 21 (Acadia) 22 Payable from General Obligation Bonds 23 Priority 1 $ 925,000 2436/P36CENTRAL LOUISIANA REG IONAL PORT 25(948) CLRP High Water Hardstand and Access Road, 26 Construction and Planning 27 (Rapides) 28 Payable from General Obligation Bonds 29 Priority 1 $ 175,000 30 Priority 5 $ 1,800,000 31 Total $ 1,975,000 3236/P41JEFFERSON PARISH ECONOMIC DEVELOP MENT AND PORT 33 DISTRICT 34(287) Avondale Marine Facility Improvements, Planning and 35 Construction 36 (Jefferson) 37 Payable from General Obligation Bonds 38 Priority 1 $ 1,500,000 39(1105)Restore Rail Connection and Crossing to Avondale 40 Marine, Planning and Construction 41 (Jefferson) 42 Payable from General Obligation Bonds 43 Priority 1 $ 100,000 44 Priority 5 $ 3,700,000 45 Total $ 3,800,000 Page 49 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 136/P43COLUMBIA PORT COMMISSION 2(572) Railroad Spur, Planning and Construction 3 (Caldwell) 4 Payable from General Obligation Bonds 5 Priority 1 $ 117,846 6 Priority 5 $ 1,841,000 7 Total $ 1,958,846 836/P44AVOYELLES PORT COMMISSION 9(1726)Liquid Fertilizer Tank Terminal Expansion, Planning 10 and Construction 11 (Avoyelles) 12 Payable from General Obligation Bonds 13 Priority 1 $ 150,000 14 Priority 5 $ 600,000 15 Total $ 750,000 16 MISCELLANEOUS NON-STATE 1750/J01ACADIA PARISH 18(526) Remove and Replace the Vie Terre Beau Bridge, 19 Planning and Construction 20 (Acadia) 21 Payable from General Obligation Bonds 22 Priority 5 $ 1,715,000 23(933) Ye Old Country Road and Muskrat Road 24 Improvements, Planning and Construction 25 (Acadia) 26 Payable from General Obligation Bonds 27 Priority 5 $ 1,370,000 28(1345)Old Spanish Trail Roadway Improvements to Provide 29 for Freight Traffic Bypass of Dangerous Railroad 30 Crossing, Planning and Construction 31 (Acadia) 32 Payable from General Obligation Bonds 33 Priority 1 $ 745,000 3450/J02ALLEN PARISH 35(343) Bridge Improvements, Planning and Construction 36 (Allen) 37 Payable from General Obligation Bonds 38 Priority 5 $ 3,050,000 39(545) Road Rehabilitation, Planning and Construction 40 (Allen) 41 Payable from General Obligation Bonds 42 Priority 5 $ 1,550,000 4350/J03ASCENSION PARISH 44(145) LA 431 at LA 931 Roundabout, 45 Planning and Construction 46 (Ascension) 47 Payable from General Obligation Bonds 48 Priority 5 $ 2,160,000 Page 50 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1Pending approval of the capital outlay budget request pursuant to the provisions of R.S. 239:112. 3(401) Early Childhood Education Project, 4 Planning and Construction 5 (Ascension) 6 Payable from General Obligation Bonds 7 Priority 5 $ 2,700,000 8(566) St. Amant Community Health and Wellness 9 Center, Planning and Construction 10 (Ascension) 11 Payable from General Obligation Bonds 12 Priority 5 $ 4,600,000 13Pending approval of the capital outlay budget request pursuant to the provisions of R.S. 1439:112. 15(783) Parish Utilities of Ascension Water Plant Feed 16 Tank, Planning and Construction 17 (Ascension) 18 Payable from General Obligation Bonds 19 Priority 5 $ 520,000 20(988) Parish Utilities of Ascension Water Plant 21 Clarifiers, Planning and Construction 22 (Ascension) 23 Payable from General Obligation Bonds 24 Priority 5 $ 1,240,000 25(1381)LA 73 at LA 30 Roundabout, 26 Planning and Construction 27 (Ascension) 28 Payable from General Obligation Bonds 29 Priority 5 $ 3,600,000 30( )LA 3127 Connector from Hwy 70 to LA 1, 31 Planning and Construction 32 (Ascension) 33 Payable from General Obligation Bonds 34 Priority 5 $ 7,000,000 35Pending submittal and approval of the capital outlay budget request pursuant to the 36provisions of R.S. 39:112. 3750/J04ASSUMPTION PARISH 38(619) Assumption Parish Pumps and Drainage, Planning and 39 Construction 40 (Assumption) 41 Payable from General Obligation Bonds 42 Priority 1 $ 500,000 43(1024)Plattenville Drainage Improvements, Planning and 44 Construction 45 (Assumption) 46 Payable from General Obligation Bonds 47 Priority 1 $ 1,800,000 Page 51 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1736)Lee Drive Repaving, Planning and Construction 2 (Assumption) 3 Payable from General Obligation Bonds 4 Priority 1 $ 300,000 5 Priority 5 $ 1,428,000 6 Total $ 1,728,000 750/J05AVOYELLES PARISH 8(1164)Parishwide Roadway Improvements, Planning 9 and Construction 10 (Avoyelles) 11 Payable from General Obligation Bonds 12 Priority 2 $ 1,000,000 13 Priority 5 $ 1,000,000 14 Total $ 2,000,000 1550/J06BEAUREGARD PARISH 16(60) Longview Road Improvements, Beauregard Parish 17 Police Jury, Planning and Construction 18 (Beauregard) 19 Payable from General Obligation Bonds 20 Priority 5 $ 360,000 21(1233)Camp Edgewood Road Improvements - Beauregard 22 Parish Police Jury 23 (Beauregard) 24 Payable from General Obligation Bonds 25 Priority 1 $ 750,000 2650/J08BOSSIER PARISH 27(750) Improvements to Highway 157, LA Highway 3227 28 to US Highway 80, Planning and Construction 29 (Bossier) 30 Payable from General Obligation Bonds 31 Priority 2 $ 3,000,000 32 Priority 5 $10,200,000 33 Total $13,200,000 34(956) Improvements to LA Highway 3 (Benton Road) and I- 35 220 Interchange, Planning and Construction 36 (Bossier) 37 Payable from General Obligation Bonds 38 Priority 5 $ 3,000,000 3950/J10CALCASIEU PARISH 40(55) Calcasieu Police Jury Gravity Sewer Trunk Mains & 41 Pumping Station South Ward 3 and South Ward 4, 42 Planning and Construction 43 (Calcasieu) 44 Payable from General Obligation Bonds 45 Priority 1 $ 2,000,000 46 Priority 5 $12,000,000 47 Total $14,000,000 Page 52 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/J11CALDWELL PARISH 2(365) Swim Lake Road, Planning and Reconstruction 3 (Caldwell) 4 Payable from General Obligation Bonds 5 Priority 1 $ 450,000 6(563) Wiles Road and Kountry Korner Road, Planning and 7 Reconstruction 8 (Caldwell) 9 Payable from General Obligation Bonds 10 Priority 1 $ 500,000 1150/J17EAST BATON ROUG E PARISH 12(490) East Baton Rouge Parish Flood Risk Reduction Project- 13 Expand, Repair, and Modify Drainage System 14 throughout East Baton Rouge Parish 15 (East Baton Rouge) 16 Payable from General Obligation Bonds 17 Priority 1 $12,951,787 18 Priority 5 $22,000,000 19 Total $34,951,787 2050/J18EAST CARROLL PARISH 21(411) Spillway Structure Repairs for Lake Providence Lake 22 and Cleaning of Outfall Canal from the Lake 23 Downstream, Planning and Construction 24 (East Carroll) 25 Payable from General Obligation Bonds 26 Priority 1 $ 100,000 27 Priority 5 $ 300,000 28 Total $ 400,000 2950/J21FRANKLIN PARISH 30(292) Erosion Control and Bank Stabilization at Big Creek 31 Bridge and Looney Canal, Planning and Construction 32 (Franklin) 33 Payable from General Obligation Bonds 34 Priority 5 $ 600,000 35(612) Franklin Parish Activity Center, Planning and 36 Construction 37 (Franklin) 38 Payable from General Obligation Bonds 39 Priority 1 $ 435,000 40 Priority 5 $ 1,500,000 41 Total $ 1,935,000 42(697) Riley Road Improvements, Planning and Construction 43 (Franklin) 44 Payable from General Obligation Bonds 45 Priority 1 $ 1,000,000 Page 53 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1317)Dr. Rogers Road Improvements, Planning and 2 Construction 3 (Franklin) 4 Payable from General Obligation Bonds 5 Priority 5 $ 600,000 6(1321)LD Knox Road Reconstruction, Planning and 7 Construction 8 (Franklin) 9 Payable from General Obligation Bonds 10 Priority 5 $ 1,555,000 1150/J23IBERIA PARISH 12(415) Courthouse Elevators, Planning and Construction 13 (Iberia) 14 Payable from General Obligation Bonds 15 Priority 1 $ 171,900 16(666) Evacuation Center at Acadiana Fairgrounds, Planning 17 and Construction 18 (Iberia) 19 Payable from General Obligation Bonds 20 Priority 5 $ 8,000,000 21(667) LaSalle Street and Hanger Road Extensions, Planning 22 and Construction 23 (Iberia) 24 Payable from General Obligation Bonds 25 Priority 1 $ 400,000 26(875) Parish Jail Improvements, Planning and Construction 27 (Iberia) 28 Payable from General Obligation Bonds 29 Priority 5 $ 840,000 3050/J24IBERVILLE PARISH 31(169) St. Gabriel Area Water Transmission Main Land 32 Acquisition, Planning and Construction 33 (Iberville) 34 Payable from State General Fund (Direct) Non-Recurring 35 Revenues $ 1,579,350 36(691) Manchac Roadway Improvements 37 (Iberville) 38 Payable from General Obligation Bonds 39 Priority 1 $ 400,000 40 Priority 5 $ 2,000,000 41 Total $ 2,400,000 4250/J25JACKSON PARISH 43(1740)Lakeshore Drive Rehabilitation and Improvements, 44 Planning and Construction 45 (Jackson) 46 Payable from General Obligation Bonds 47 Priority 1 $ 315,000 48 Priority 5 $ 1,674,000 49 Total $ 1,989,000 Page 54 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/J26JEFFERSON PARISH 2(8) Bucktown Harbor Wave Attenuation Jetty, Planning 3 and Construction 4 (Jefferson) 5 Payable from General Obligation Bonds 6 Priority 1 $ 464,000 7(13) Riverside Senior Center, Planning and Construction 8 (Jefferson) 9 Payable from General Obligation Bonds 10 Priority 1 $ 948,000 11 Priority 5 $ 1,455,000 12 Total $ 2,403,000 13(218) Bainbridge Canal Closure from Veterans Boulevard to 14 Terminal Drive, Planning and Construction 15 (Jefferson) 16 Payable from General Obligation Bonds 17 Priority 1 $ 930,000 18 Priority 5 $13,800,000 19 Total $14,730,000 20(221) East Bank Backup Generators West: Sewer Lift 21 Station Backup Generators (Camp Plauche, 22 Transcontinental at West Metairie, and 23 Transcontinental at Vineland) 24 (Jefferson) 25 Payable from General Obligation Bonds 26 Priority 2 $ 1,550,000 27 Priority 5 $ 2,000,000 28 Total $ 3,550,000 29(426) Bonnabel Canal Bank Stabilization (West Side) - 30 Veterans Blvd. to West Esplanade, Planning and 31 Construction 32 (Jefferson) 33 Payable from General Obligation Bonds 34 Priority 1 $ 600,000 35 Priority 5 $ 8,000,000 36 Total $ 8,600,000 37(428) Canal #13 Concrete Lining (Loyola Drive to Butler Canal) 38 (Jefferson) 39 Payable from General Obligation Bonds 40 Priority 1 $ 250,000 41 Priority 5 $ 3,750,000 42 Total $ 4,000,000 43(431) Preservation and Restoration of Historic Structures for 44 Hope Haven/Madonna Manor Campus, Planning and 45 Construction 46 (Jefferson) 47 Payable from General Obligation Bonds 48 Priority 1 $ 7,277,147 Page 55 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(538) Barataria Blvd. (LA 45) Drainage Improvements 2 (Merlin Lane to Pritchard Road), Planning 3 and Construction 4 (Jefferson) 5 Payable from General Obligation Bonds 6 Priority 5 $ 6,500,000 7(629) 4th Street Shared-Use Path (Barataria Blvd. to Gretna 8 City Limits), Planning and Construction 9 (Jefferson) 10 Payable from General Obligation Bonds 11 Priority 1 $ 225,000 12 Priority 5 $ 4,146,600 13 Total $ 4,371,600 14(632) Hickory Avenue (LA 3154) Rehabilitation (River Road 15 to 10th Street), Planning and Construction 16 (Jefferson) 17 Payable from General Obligation Bonds 18 Priority 1 $ 600,000 19 Priority 5 $ 6,270,000 20 Total $ 6,870,000 21(633) Jefferson Park Sport Field Renovation, Planning and 22 Construction 23 (Jefferson) 24 Payable from General Obligation Bonds 25 Priority 5 $ 6,840,000 26(636) Woodlake Estates Drainage Improvements, Planning 27 and Construction 28 (Jefferson) 29 Payable from General Obligation Bonds 30 Priority 1 $ 150,000 31 Priority 5 $ 5,000,000 32 Total $ 5,150,000 33(637) Woodmere Playground Improvements, Planning and 34 Construction 35 (Jefferson) 36 Payable from General Obligation Bonds 37 Priority 1 $ 2,084,163 38(837) 11th Street Roadway Replacement and Upgrade of 39 Subsurface Drainage System between Queens and 40 Manhattan Boulevard, Planning and Construction 41 (Jefferson) 42 Payable from General Obligation Bonds 43 Priority 1 $ 369,192 44 Priority 5 $ 9,175,000 45 Total $ 9,544,192 46(838) Bucktown Harbor Boardwalk and Kayak Launch, 47 Planning and Construction 48 (Jefferson) 49 Payable from General Obligation Bonds 50 Priority 5 $ 1,575,000 Page 56 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1790)Gretna Government Complex Parking Lot, Planning 2 and Construction 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 1 $ 428,000 6 Priority 5 $10,171,600 7 Total $10,599,600 8Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 939:112. 10(843) Sewer Lift Station Backup Generators - North, 11 Planning and Construction 12 (Jefferson) 13 Payable from General Obligation Bonds 14 Priority 1 $ 575,000 15(1041)East Bank Backup Generators East: Sewer Lift Station 16 Backup Generators (Clearview at W. Napoleon, Cleary 17 at W. Napoleon, Houma at W. Napoleon and Galleria 18 Sewer Station), Planning and Construction 19 (Jefferson) 20 Payable from General Obligation Bonds 21 Priority 1 $ 500,000 22 Priority 5 $ 1,250,000 23 Total $ 1,750,000 24(1044)New Access Road in the Churchill Technology and 25 Business Park for Delgado's Advanced Manufacturing 26 and River City Campus, Planning and Construction 27 (Jefferson) 28 Payable from General Obligation Bonds 29 Priority 1 $ 200,000 30 Priority 5 $ 1,350,000 31 Total $ 1,550,000 32(1046)West Esplanade Pump Station, Planning and 33 Construction 34 (Jefferson) 35 Payable from General Obligation Bonds 36 Priority 1 $ 3,500,000 37 Priority 2 $ 1,000,000 38 Priority 5 $ 1,000,000 39 Total $ 5,500,000 40(1247)Airline Drive (US 61) at 17th Street Canal Drainage 41 Crossing and Railroad Bridge Replacement 42 (Jefferson) 43 Payable from General Obligation Bonds 44 Priority 1 $10,991,250 45 Priority 5 $16,090,000 46 Total $27,081,250 47(1248)Brown Avenue Canal Improvements between the 48 Westbank Expressway and Harold Street, Planning and 49 Construction 50 (Jefferson) 51 Payable from General Obligation Bonds 52 Priority 1 $ 2,205,920 53 Priority 5 $ 1,000,000 54 Total $ 3,205,920 Page 57 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1254)Woodland West Drainage Improvements, Planning and 2 Construction 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 1 $ 799,116 6 Priority 5 $ 1,000,000 7 Total $ 1,799,116 8(1255)Shrewsbury Road at Jefferson Highway Culvert 9 Replacement, Planning and Construction 10 (Jefferson) 11 Payable from General Obligation Bonds 12 Priority 1 $ 450,000 13(1459)Woodmere Youth Center, Planning and Construction 14 (Jefferson) 15 Payable from General Obligation Bonds 16 Priority 1 $ 99,862 17(1798)Vietnamese American Cultural and Service Center, 18 Planning and Construction 19 (Jefferson) 20 Payable from General Obligation Bonds 21 Priority 5 $ 3,550,000 22Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 2339:112. 2450/J28LAFAYETTE PARISH 25(20) Parish Government Complex, Jail, New Design, 26 Planning, and Construction 27 (Lafayette) 28 Payable from General Obligation Bonds 29 Priority 5 $17,500,000 30(21) Ingress and Egress Interchange Improvements, 31 Planning and Construction 32 (Lafayette) 33 Payable from General Obligation Bonds 34 Priority 5 $ 5,000,000 35(235) E Broussard Roundabout, Planning and Construction 36 (Lafayette) 37 Payable from General Obligation Bonds 38 Priority 5 $ 2,000,000 39(642) Performing Arts Center, Planning and Construction 40 (Lafayette) 41 Payable from General Obligation Bonds 42 Priority 1 $ 1,000,000 43 Priority 5 $23,000,000 44 Total $24,000,000 45(643) Rue Du Belier Widening, Planning and Construction 46 (Lafayette) 47 Payable from General Obligation Bonds 48 Priority 5 $ 7,000,000 Page 58 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(820) Kaliste Saloom Widening 2 (Lafayette) 3 Payable from General Obligation Bonds 4 Priority 1 $ 53,461 5(852) Parish Government Complex, Parish Courthouse, 6 Planning and Construction 7 (Lafayette) 8 Payable from General Obligation Bonds 9 Priority 1 $ 6,054,757 10(1026)University Avenue Corridor Improvements, Planning, 11 Construction and Acquisition 12 (Lafayette) 13 Payable from General Obligation Bonds 14 Priority 1 $13,000,000 15(1054)Bayou Vermilion Flood Control, Planning and 16 Construction 17 (Lafayette) 18 Payable from General Obligation Bonds 19 Priority 1 $ 3,000,000 20 Priority 5 $10,000,000 21 Total $13,000,000 22(1056)Lake Farm to Verot School Road Extension, 23 Planning and Construction 24 (Lafayette) 25 Payable from General Obligation Bonds 26 Priority 5 $ 2,500,000 27(1057)Cue Road Extension, Planning and Construction 28 (Lafayette) 29 Payable from General Obligation Bonds 30 Priority 5 $ 3,500,000 31(1267)Parish Road Overlay, Planning and Construction 32 (Lafayette) 33 Payable from General Obligation Bonds 34 Priority 5 $ 7,000,000 35(1463)Heymann Park Improvements Project, Planning and 36 Construction 37 (Lafayette) 38 Payable from General Obligation Bonds 39 Priority 1 $ 1,955,000 40(1765)Cypress Island Swamp Spoil Bank Removal, Planning 41 and Construction 42 (Lafayette, St. Martin) 43 Payable from General Obligation Bonds 44 Priority 1 $ 150,000 45 Priority 5 $ 1,600,000 46 Total $ 1,750,000 Page 59 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/J29LAFOURCHE PARISH 2(762) Butch Hill Pump Station Replacement, Planning and 3 Construction 4 (Lafourche) 5 Payable from General Obligation Bonds 6 Priority 1 $ 646,000 7 Priority 2 $ 3,854,000 8 Priority 5 $ 3,100,000 9 Total $ 7,600,000 10(1176)South Lafourche Airport Corridor Project 11 (Lafourche) 12 Payable from General Obligation Bonds 13 Priority 1 $ 2,789,545 14 Priority 5 $ 4,598,137 15 Total $ 7,387,682 1650/J31LINCOLN PARISH 17(379) Bridge Replacements on Mitchell and Shady Grove 18 Roads, Planning and Construction 19 (Lincoln) 20 Payable from General Obligation Bonds 21 Priority 1 $ 380,000 2250/J32LIVINGSTON PARISH 23(120) Cook Road Extension Economic Development Corridor 24 (Pete's Highway Frontage Road) 25 (Livingston) 26 Payable from General Obligation Bonds 27 Priority 1 $ 3,018,975 28(1561)Juban Road North Extension between US 190 (Florida 29 Blvd.) and LA 1026 (Lockhart Road), Planning and 30 Construction 31 (Livingston) 32 Payable from General Obligation Bonds 33 Priority 5 $ 6,005,000 3450/J34MOREHOUSE PARISH 35(291) Public Works Center, Planning and Construction 36 (Morehouse) 37 Payable from General Obligation Bonds 38 Priority 1 $ 301,750 3950/J35NATCHITOCHES P ARISH 40(821) Courthouse Security Improvements, Planning and 41 Construction 42 (Natchitoches) 43 Payable from General Obligation Bonds 44 Priority 1 $ 2,192,545 Page 60 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/J37OUACHITA PARISH 2(728) Steep Bayou Sewer - Phase 3, Planning, Construction 3 and Right-of-Way Acquisition 4 (Ouachita) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,854,137 7 Priority 5 $ 2,080,000 8 Total $ 3,934,137 9(739) Highland Road Improvements, Planning, 10 Right-of-Way, and Construction 11 (Ouachita) 12 Payable from General Obligation Bonds 13 Priority 5 $ 1,040,000 14(937) Cheniere Lake Area 1 Improvements, Planning and 15 Construction 16 (Ouachita) 17 Payable from General Obligation Bonds 18 Priority 1 $ 1,080,000 19(1349)Bayou Mouchoir Drainage Improvements 20 (Ouachita) 21 Payable from General Obligation Bonds 22 Priority 1 $ 477,500 23(1732)Hannah's Run Control Structure, Planning and 24 Construction 25 (Ouachita) 26 Payable from General Obligation Bonds 27 Priority 1 $ 187,385 28 Priority 5 $ 200,000 29 Total $ 387,385 3050/J38PLAQUEMINES PARISH 31(245) Empire Bridge Lighting, Planning and Construction 32 (Plaquemines) 33 Payable from General Obligation Bonds 34 Priority 1 $ 197,000 3550/J39POINTE COUPEE PARISH 36(204) Courthouse Restoration - Phase 2, Planning and 37 Construction 38 (Pointe Coupee) 39 Payable from General Obligation Bonds 40 Priority 1 $ 2,988,750 41(351) False River Ecosystem Restoration Project, Including 42 Bulkhead Replacement, Planning and Construction 43 (Pointe Coupee) 44 Payable from General Obligation Bonds 45 Priority 1 $ 2,400,000 46 Priority 5 $ 600,000 47 Total $ 3,000,000 Page 61 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(752) Portage Canal Drainage Project, Planning and 2 Construction 3 (Pointe Coupee) 4 Payable from General Obligation Bonds 5 Priority 5 $ 2,000,000 6(753) Watershed Drainage Improvements Bayou Grosse Tete, 7 Bayou Cholpe, Bayou Choctaw, False River Outfall 8 Channel, and Johnson Bayou, Planning and 9 Construction 10 (Pointe Coupee) 11 Payable from General Obligation Bonds 12 Priority 1 $ 2,000,000 1350/J40RAPIDES PARISH 14(528) Gunter Road/Barron Chapel Road Street 15 Improvements, Planning and Construction 16 (Rapides) 17 Payable from General Obligation Bonds 18 Priority 1 $ 1,450,000 19(938) Philadelphia Road Street Improvements, Planning and 20 Construction 21 (Rapides) 22 Payable from General Obligation Bonds 23 Priority 1 $ 500,000 24 Priority 5 $ 2,950,000 25 Total $ 3,450,000 26(1799)New Fire Station at LSU Alexandria Serving 27 Rapides Parish – Fire District 18, Planning 28 and Construction 29 (Rapides) 30 Payable from General Obligation Bonds 31 Priority 5 $ 1,300,000 32Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 3339:112. 3450/J43SABINE PARISH 35(211) Plainview Road Rehabilitation, Planning and 36 Construction 37 (Sabine) 38 Payable from General Obligation Bonds 39 Priority 1 $ 1,837,720 40 Priority 5 $ 2,433,600 41 Total $ 4,271,320 4250/J44ST. BERNARD PARISH 43(923) St. Bernard Parish Jail Renovations, Planning and 44 Construction 45 (St. Bernard) 46 Payable from General Obligation Bonds 47 Priority 1 $ 3,000,000 48 Priority 5 $ 5,000,000 49 Total $ 8,000,000 Page 62 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/J45ST. CHARLES PARISH 2(311) Des Allemans Bulkhead - Phase 1, Planning and 3 Construction 4 (St. Charles) 5 Payable from General Obligation Bonds 6 Priority 1 $ 150,000 7 Priority 5 $ 622,500 8 Total $ 772,500 9(388) Fairfield and Oakland Pump Station Discharge 10 Improvements, Planning and Construction 11 (St. Charles) 12 Payable from General Obligation Bonds 13 Priority 1 $ 825,000 14(565) Paul Fredrick Street and Kinler Street Demolition and 15 Reconstruction 16 (St. Charles) 17 Payable from General Obligation Bonds 18 Priority 1 $ 175,000 19 Priority 5 $ 2,825,000 20 Total $ 3,000,000 21(1698)Fifth Street Drainage Improvements, Planning and 22 Construction 23 (St. Charles) 24 Payable from General Obligation Bonds 25 Priority 1 $ 429,750 26 Priority 5 $ 450,000 27 Total $ 879,750 2850/J46ST. HELENA PARISH 29(1545)Audubon Library, Planning and Construction 30 (St. Helena) 31 Payable from General Obligation Bonds 32 Priority 1 $ 1,163,600 3350/J47ST. JAMES PARISH 34(546) Parishwide Road Rehabilitation, Planning 35 and Construction 36 (St. James) 37 Payable from General Obligation Bonds 38 Priority 5 $ 1,000,000 39(1099)West Shore Risk Reduction Connector Levee 40 (St. James) 41 Payable from General Obligation Bonds 42 Priority 1 $ 3,650,000 43 Priority 5 $10,200,000 44 Total $13,850,000 45(1100)LA 3127 Widening (LA 20 to LA 3213), Planning and 46 Construction 47 (St. James) 48 Payable from General Obligation Bonds 49 Priority 1 $ 1,190,393 50 Priority 5 $ 7,400,000 51 Total $ 8,590,393 Page 63 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/J49ST. LANDRY PARISH 2(98) Parish Wide Road Program, Planning and Construction 3 (St. Landry) 4 Payable from General Obligation Bonds 5 Priority 5 $ 5,000,000 6(199) Parish Wide Drainage Project, Planning and 7 Construction 8 (St. Landry) 9 Payable from General Obligation Bonds 10 Priority 1 $ 1,000,000 11(1645)Courthouse Renovations, Planning and Construction 12 (St. Landry) 13 Payable from General Obligation Bonds 14 Priority 1 $ 320,000 1550/J50ST. MARTIN PARISH 16(253) Road Improvements on Four-Mile Bayou Road 17 (St. Martin) 18 Payable from General Obligation Bonds 19 Priority 1 $ 78,233 20 Priority 5 $ 500,000 21 Total $ 578,233 22(922) I-10 Frontage Road, LA 328 to LA 347, 23 Planning and Construction 24 (St. Martin) 25 Payable from General Obligation Bonds 26 Priority 5 $ 1,000,000 27(1077)Joe Daigre Canal Drainage Improvements, Planning 28 and Construction 29 (St. Martin) 30 Payable from General Obligation Bonds 31 Priority 1 $ 711,858 32 Priority 5 $ 550,000 33 Total $ 1,261,858 34(1285)Spanish Trail Industrial Park Access Road, Planning 35 and Construction 36 (St. Martin) 37 Payable from General Obligation Bonds 38 Priority 1 $ 4,100,000 3950/J51ST. MARY PARISH 40(1481)Infrastructure Improvements and Construction of a 41 Welding Training Center Facility at the Charenton 42 Canal Industrial Park 43 (St. Mary) 44 Payable from General Obligation Bonds 45 Priority 5 $ 527,000 Page 64 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1482)Reconstruction of Martin Luther King Roadway in 2 Charenton for St. Mary Parish Government, within 3 Existing Right-of-Way, Planning and Construction 4 (St. Mary) 5 Payable from General Obligation Bonds 6 Priority 1 $ 407,020 7(1500)Emergency Power Improvements at St. Mary Parish 8 Courthouse, Planning and Construction 9 (St. Mary) 10 Payable from General Obligation Bonds 11 Priority 1 $ 250,000 1250/J52ST. TAMMANY PARISH 13(354) LA 1077 Widening, Design, Right of Way, Planning 14 and Construction 15 (St. Tammany) 16 Payable from General Obligation Bonds 17 Priority 1 $ 20,000 18 Priority 5 $20,000,000 19 Total $20,020,000 20(355) Sharp Road Improvements and Sidewalk, Planning and 21 Construction 22 (St. Tammany) 23 Payable from General Obligation Bonds 24 Priority 5 $ 6,125,000 25(357) Emerald Forrest Boulevard to LA 59, Design, Planning 26 and Construction 27 (St. Tammany) 28 Payable from General Obligation Bonds 29 Priority 5 $13,000,000 30(552) Ben Thomas - Stone Road to Powell Drive, Design, 31 Planning, and Construction 32 (St. Tammany) 33 Payable from General Obligation Bonds 34 Priority 1 $ 500,000 35 Priority 5 $ 3,200,000 36 Total $ 3,700,000 37(553) South Slidell Levee Protection Rehabilitation: (USACE 38 533d Report or Planning, Land Acquisition, and 39 Construction of Levees West and East of Interstate 10) 40 (St. Tammany) 41 Payable from General Obligation Bonds 42 Priority 1 $ 750,000 43 Priority 5 $ 9,108,000 44 Total $ 9,858,000 45(756) University Square Learning Center Facilities, Planning 46 and Construction 47 (St. Tammany) 48 Payable from General Obligation Bonds 49 Priority 1 $ 208,740 50 Priority 5 $10,630,000 51 Total $10,838,740 Page 65 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(964) Fabourg Coquille Water Quality Improvements, 2 Planning and Construction 3 (St. Tammany) 4 Payable from General Obligation Bonds 5 Priority 5 $ 6,050,000 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 550,000 8 Total $ 6,600,000 9(1171)Safe Haven Campus for Behavioral and Mental Health, 10 Planning, Construction and Renovation for Triage 11 (St. Tammany) 12 Payable from General Obligation Bonds 13 Priority 1 $ 3,154,543 14 Priority 5 $ 8,350,000 15 Total $11,504,543 16(1582)Harrison Avenue Widening, Planning and Construction 17 (St. Tammany) 18 Payable from General Obligation Bonds 19 Priority 5 $13,300,000 2050/J53TANGIPAHOA PARISH 21(300) North Hoover Road Improvements Phase 2, Planning 22 and Construction 23 (Tangipahoa) 24 Payable from General Obligation Bonds 25 Priority 1 $ 1,000,000 26 Priority 5 $ 1,725,000 27 Total $ 2,725,000 28(474) South Airport Road, North Hoover Road 29 Improvements, Planning and Construction 30 (Tangipahoa) 31 Payable from General Obligation Bonds 32 Priority 1 $ 2,430,785 33 Priority 5 $ 2,000,000 34 Total $ 4,430,785 35(503) Region 9 Emergency Distribution Center and Public 36 Works, Planning and Construction 37 (Tangipahoa) 38 Payable from General Obligation Bonds 39 Priority 5 $ 6,000,000 4050/J54TENSAS PARISH 41(43) Lide Road Improvements, Planning and Construction 42 (Tensas) 43 Payable from General Obligation Bonds 44 Priority 1 $ 776,277 45(458) Tensas Parish/Port Priority Site Plan, Planning and 46 Construction 47 (Tensas) 48 Payable from General Obligation Bonds 49 Priority 1 $ 214,800 Page 66 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(975) Recreation Facility, Planning and Construction 2 (Tensas) 3 Payable from General Obligation Bonds 4 Priority 1 $ 230,000 5 Priority 5 $ 786,000 6 Total $ 1,016,000 750/J55TERREBONNE PARISH 8(184) Bayou LaCarpe Watershed Project, Location C, Design 9 and Construction 10 (Terrebonne) 11 Payable from General Obligation Bonds 12 Priority 1 $ 1,675,000 13 Priority 5 $ 4,000,000 14 Total $ 5,675,000 15(185) Valhi Extension (Savanne to LA 311), Planning and 16 Construction 17 (Terrebonne) 18 Payable from General Obligation Bonds 19 Priority 1 $ 1,000,000 20 Priority 5 $ 3,000,000 21 Total $ 4,000,000 22(340) South Louisiana Wetland Discovery Center - Phase 2 - 23 Bayou Country Institute, Planning and Construction 24 (Terrebonne) 25 Payable from General Obligation Bonds 26 Priority 1 $ 473,615 27(363) Replacement of D-18 Pump Station Falgout Canal, 28 Theriot, La., Planning and Construction 29 (Terrebonne) 30 Payable from General Obligation Bonds 31 Priority 1 $ 1,075,000 32 Priority 5 $ 1,050,000 33 Total $ 2,125,000 34(562) Westside/Alma Street Drainage, Planning and 35 Construction 36 (Terrebonne) 37 Payable from General Obligation Bonds 38 Priority 1 $ 783,850 39(1180)Terrebonne Sports Complex, Planning and 40 Construction 41 (Terrebonne) 42 Payable from General Obligation Bonds 43 Priority 1 $ 1,939,000 44(1590)Replacement of Brady Road Bridge, Planning and 45 Construction 46 (Terrebonne) 47 Payable from General Obligation Bonds 48 Priority 1 $ 5,885,000 Page 67 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1632)Terrebonne Basin Watershed (HNC at Bayou 2 Grand Caillou) Pump Station, Phase 1 and 2, 3 Planning and Construction 4 (Terrebonne) 5 Payable from General Obligation Bonds 6 Priority 2 $ 3,000,000 750/J58VERNON PARISH 8(468) Vernon/Fort Polk Thoroughfare Electrical Power 9 Extension, and Utilities Including Generators 10 (Vernon) 11 Payable from General Obligation Bonds 12 Priority 1 $ 468,000 1350/J59WASHINGTON PARISH 14(801) Pearl River Navigational Canal, Planning, 15 Construction, and Acquisition 16 (Washington) 17 Payable from General Obligation Bonds 18 Priority 1 $ 500,000 19(1004)Washington Parish Jail Renovations Including HVAC, 20 Security and ADA, Planning and Construction 21 (Washington) 22 Payable from General Obligation Bonds 23 Priority 1 $ 968,500 24(1629)Washington Parish Courthouse Renovation and HVAC, 25 Planning and Construction 26 (Washington) 27 Payable from General Obligation Bonds 28 Priority 1 $ 386,500 2950/J63WEST FELICIANA PARISH 30(247) West Feliciana Port Infrastructure, Planning, 31 Engineering, and Construction 32 (West Feliciana) 33 Payable from General Obligation Bonds 34 Priority 1 $ 736,563 35 Priority 5 $ 2,140,000 36 Total $ 2,876,563 3750/J64WINN PARISH 38(378) Roadway Reconstruction, Eugene Garrett Road, 39 Planning and Construction 40 (Winn) 41 Payable from General Obligation Bonds 42 Priority 1 $ 385,000 43(779) Roadway Reconstruction, Brownville Road, Planning 44 and Construction 45 (Winn) 46 Payable from General Obligation Bonds 47 Priority 1 $ 335,000 Page 68 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1192)Roadway Reconstruction, Frank White Road, Planning 2 and Construction 3 (Winn) 4 Payable from General Obligation Bonds 5 Priority 1 $ 460,000 6(1396)Roadway Reconstruction, Williams Loop, Cole, Oak 7 Ridge and Pine Ridge Roadways, Planning and 8 Construction 9 (Winn) 10 Payable from General Obligation Bonds 11 Priority 1 $ 652,500 1250/M01ABBEVILLE 13(1661)Abbeville Water Treatment Plant - Backwash & 14 Miscellaneous Updates to Water Treatment System 15 (Vermilion) 16 Payable from General Obligation Bonds 17 Priority 5 $ 1,000,000 18 Payable from State General Fund (Direct) Non-Recurring 19 Revenues $ 1,760,000 20 Total $ 2,760,000 21Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 2239:112. 2350/M05ALEXANDRIA 24(1386)Sugarhouse Road/Eddie Williams Boulevard to LA 25 Highway 1, Phase I and II, Planning and Construction 26 ($5,000,000 Local Match) 27 (Rapides) 28 Payable from General Obligation Bonds 29 Priority 1 $ 2,972,100 30 Priority 5 $ 4,620,000 31 Total $ 7,592,100 3250/M06AMITE 33(1690)Regional Wastewater Treatment and Transmission 34 Facilities, Planning and Construction 35 (Tangipahoa) 36 Payable from General Obligation Bonds 37 Priority 5 $34,000,000 38 Payable from State General Fund (Direct) Non-Recurring 39 Revenues $ 5,000,000 40 Total $39,000,000 41Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 4239:112. 43(1739)Amite Governmental Complex, Planning and 44 Construction 45 (Tangipahoa) 46 Payable from General Obligation Bonds 47 Priority 1 $ 310,000 48 Priority 5 $ 2,600,000 49 Total $ 2,910,000 Page 69 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/M07ANACOCO 2(1230)Street Rehabilitation - Ross Road, Lula Street, and 3 Loop Drive, Planning and Construction 4 (Vernon) 5 Payable from General Obligation Bonds 6 Priority 1 $ 240,000 750/M14BAKER 8(417) Drainage Improvements and Upgrades, Planning and 9 Construction 10 (East Baton Rouge) 11 Payable from General Obligation Bonds 12 Priority 5 $ 2,600,000 13(620) Sidewalk Construction for Underdeveloped Streets and 14 Culverts, Planning and Construction 15 (East Baton Rouge) 16 Payable from General Obligation Bonds 17 Priority 5 $ 1,875,000 1850/M15BALDWIN 19(1766)Potable Water System Improvements, Planning and 20 Construction 21 (St. Mary) 22 Payable from General Obligation Bonds 23 Priority 1 $ 156,822 24 Priority 5 $ 700,000 25 Payable from State General Fund (Direct) Non-Recurring 26 Revenues $ 700,000 27 Total $ 1,556,822 2850/M19BASTROP 29(1436)City Hall - Roof Replacement, Planning and 30 Construction 31 (Morehouse) 32 Payable from General Obligation Bonds 33 Priority 1 $ 347,150 3450/M20BATON ROUGE 35(73) Old Hammond Hwy. (LA 426) Roadway Improvements 36 from Blvd. De Province to Millerville Road, Planning 37 and Construction 38 (East Baton Rouge) 39 Payable from General Obligation Bonds 40 Priority 1 $ 450,000 41 Priority 5 $ 9,250,000 42 Total $ 9,700,000 43(491) Chaneyville Fire District No. 7 Reames Road Fire 44 Station, Planning and Construction 45 (East Baton Rouge) 46 Payable from General Obligation Bonds 47 Priority 5 $ 300,000 Page 70 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1518)Hooper Road Widening and Sewer Improvements 2 (Blackwater Bayou to Sullivan Road) Planning, 3 Engineering, Utilities and Construction 4 (East Baton Rouge) 5 Payable from General Obligation Bonds 6 Priority 5 $ 9,500,000 750/M22BENTON 8(51) Water Transmission Main, Planning and Construction 9 (Bossier) 10 Payable from General Obligation Bonds 11 Priority 2 $ 1,200,000 12 Priority 5 $ 1,200,000 13 Total $ 2,400,000 1450/M26BLANCHARD 15(1492)Water Treatment Plant Improvements, Planning and 16 Construction 17 (Caddo) 18 Payable from General Obligation Bonds 19 Priority 2 $ 630,000 2050/M27BOGALUSA 21(479) Community Center and Emergency Shelter, Planning 22 and Construction 23 (Washington) 24 Payable from General Obligation Bonds 25 Priority 1 $ 500,000 26 Priority 5 $10,500,000 27 Total $11,000,000 28(480) Emergency Sewer System Evaluation and 29 Repairs, Planning and Construction 30 (Washington) 31 Payable from General Obligation Bonds 32 Priority 2 $ 4,450,000 33(894) City Hall Renovations 34 (Washington) 35 Payable from General Obligation Bonds 36 Priority 1 $ 210,000 37(1447)Davenport Avenue Bridge, Servitude Street Emergency 38 Replacement and Repair, Planning and Construction 39 (Washington) 40 Payable from General Obligation Bonds 41 Priority 5 $ 565,000 4250/M28BONITA 43(773) Municipal Complex, Planning and Construction 44 (Morehouse) 45 Payable from General Obligation Bonds 46 Priority 1 $ 400,000 47 Priority 5 $ 1,850,000 48 Total $ 2,250,000 Page 71 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/M31BREAUX BRIDGE 2(1021)Water Treatment Plant Improvements, Planning and 3 Construction 4 (St. Martin) 5 Payable from General Obligation Bonds 6 Priority 1 $ 35,500 750/M32BROUSSARD 8(584) Water System Groundwater Storage Tank, 9 Planning and Construction 10 (Lafayette) 11 Payable from General Obligation Bonds 12 Priority 2 $ 45,000 13 Priority 5 $ 405,000 14 Total $ 450,000 15(817) Reconstruct South Bernard Road from LA Hwy 182 to 16 US Hwy 90, Planning and Construction 17 (Lafayette) 18 Payable from General Obligation Bonds 19 Priority 1 $ 4,430,490 20(1126)Marteau Road Water Well, Planning and Construction 21 (Lafayette) 22 Payable from General Obligation Bonds 23 Priority 2 $ 376,000 24 Priority 5 $ 3,350,000 25 Total $ 3,726,000 26(1514)Highway 89 Improvements, Planning and Construction 27 (Lafayette) 28 Payable from General Obligation Bonds 29 Priority 1 $ 4,842,500 30(1674)Lake Talon Road Sewer Improvements, 31 Planning and Construction 32 (Lafayette) 33 Payable from General Obligation Bonds 34 Priority 2 $ 1,315,000 35(1747)Albertson Parkway Water Well and Ground 36 Storage Tank, Planning and Construction 37 (Lafayette) 38 Priority 2 $ 234,000 39 Priority 5 $ 2,106,000 40 Total $ 2,340,000 41Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 4239:112. 4350/M39CARENCRO 44(414) I-49 to Gloria Switch Coulee Project, Planning and 45 Construction 46 (Lafayette) 47 Payable from General Obligation Bonds 48 Priority 1 $ 419,972 Page 72 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(685) Citywide Water Main Rehabilitation Project, 2 Planning and Construction 3 (Lafayette) 4 Payable from General Obligation Bonds 5 Priority 5 $ 5,150,000 6(895) Water and Sewer Infrastructure Improvement 7 Project, Planning and Construction 8 (Lafayette) 9 Payable from General Obligation Bonds 10 Priority 5 $ 2,350,000 11(1097)Teema Road Sidewalks and Drainage, 12 Planning and Construction 13 (Lafayette) 14 Payable from General Obligation Bonds 15 Priority 5 $ 630,000 16(1231)Arceneaux Road Drainage Improvements and Utility 17 Relocations, Planning and Construction 18 (Lafayette) 19 Payable from General Obligation Bonds 20 Priority 1 $ 175,815 21(1232)Wastewater and City Infrastructure Flood Damages, 22 Planning and Construction 23 (Lafayette) 24 Payable from General Obligation Bonds 25 Priority 1 $ 2,252,600 2650/M44CHOUDRANT 27(1200)New Town Hall, Planning and Construction 28 (Lincoln) 29 Payable from General Obligation Bonds 30 Priority 1 $ 150,000 31 Priority 5 $ 1,096,586 32 Total $ 1,246,586 3350/M45CHURCH POINT 34(1023)Sewer System Improvements, Planning and 35 Construction 36 (Acadia) 37 Payable from General Obligation Bonds 38 Priority 1 $ 54,341 39(1071)Street and Drainage Improvements, Planning 40 and Construction 41 (Acadia) 42 Payable from General Obligation Bonds 43 Priority 5 $ 548,000 4450/M50COLFAX 45(765) Street Improvements, Planning and Construction 46 (Grant) 47 Payable from General Obligation Bonds 48 Priority 1 $ 762,000 49 Priority 5 $ 1,250,000 50 Total $ 2,012,000 Page 73 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/M54COTTON VALLEY 2(486) Sewerage System Improvements, Planning and 3 Construction 4 (Webster) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,189,000 750/M57COVINGTON 8(335) Covington Wastewater Treatment Plant, Planning and 9 Construction 10 (St. Tammany) 11 Payable from General Obligation Bonds 12 Priority 1 $ 83,250 13(1579)Downtown Historic District Overlays, Planning and 14 Construction 15 (St. Tammany) 16 Payable from General Obligation Bonds 17 Priority 1 $ 80,000 18 Priority 5 $ 640,000 19 Total $ 720,000 20(1675)Ozone Sewer Repairs, Planning and Construction 21 (St. Tammany) 22 Payable from State General Fund (Direct) Non-Recurring 23 Revenues $ 3,000,000 2450/M58CROWLEY 25(724) Renovation and Repairs to Rice Festival Building, 26 Including the Repair or Replacement of the Roof, 27 Planning and Construction 28 (Acadia) 29 Payable from General Obligation Bonds 30 Priority 1 $ 230,000 31(1553)Installation of Comminutor for the City of Crowley 32 Main Sewerage Pump Station, Planning and 33 Construction 34 (Acadia) 35 Payable from General Obligation Bonds 36 Priority 1 $ 386,775 3750/M61DELHI 38(942) Sapa Drive Extension, Planning and Construction 39 (Richland) 40 Payable from General Obligation Bonds 41 Priority 1 $ 943,300 4250/M63DENHAM SPRINGS 43(579) Cook Road Extension (DEMCO Road) / Rushing 44 Road Connector, Planning and Construction 45 (Livingston) 46 Payable from General Obligation Bonds 47 Priority 2 $ 450,000 48 Priority 5 $ 7,800,000 49 Total $ 8,250,000 Page 74 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/M65DERIDDER 2(265) Education and Job Training Center, Planning and 3 Construction 4 (Beauregard) 5 Payable from General Obligation Bonds 6 Priority 1 $ 203,462 7 Priority 5 $ 2,500,000 8 Total $ 2,703,462 9(1027)Ellis Road and Branch Street Drainage Improvements, 10 Planning and Construction 11 (Beauregard) 12 Payable from General Obligation Bonds 13 Priority 1 $ 150,000 1450/M68DONALDSONVILLE 15(370) Natural Gas System Infrastructure Improvement Phase 16 III, Planning and Construction 17 (Ascension) 18 Payable from General Obligation Bonds 19 Priority 1 $ 100,000 20 Priority 5 $ 1,000,000 21 Total $ 1,100,000 22(1389)Natural Gas System Infrastructure Improvements, 23 Phase II, Planning and Construction 24 (Ascension) 25 Payable from General Obligation Bonds 26 Priority 1 $ 242,987 27(1598)Lala Regira Field Renovations, Planning and 28 Construction 29 (Ascension) 30 Payable from General Obligation Bonds 31 Priority 1 $ 300,000 3250/M70DOYLINE 33(1727)Village of Doyline Wastewater Treatment Facility 34 Upgrades 35 (Webster) 36 Payable from General Obligation Bonds 37 Priority 1 $ 13,000 3850/M74DUSON 39(914) LA Highway 95 Roundabout, Planning and 40 Construction 41 (Acadia) 42 Payable from General Obligation Bonds 43 Priority 1 $ 2,601,934 4450/M84EVERGREEN 45(1525)Evergreen Water System Improvements 46 (Avoyelles) 47 Payable from General Obligation Bonds 48 Priority 1 $ 897,470 Page 75 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/M85FARMERVILLE 2(1195)Lake D'Arbonne Mega Ramp, Planning and 3 Construction 4 (Union) 5 Payable from General Obligation Bonds 6 Priority 5 $ 4,185,000 750/M87FERRIDAY 8(201) Water Renovations, Planning and Construction 9 (Concordia) 10 Payable from General Obligation Bonds 11 Priority 1 $ 298,987 12 Priority 5 $ 1,000,000 13 Total $ 1,298,987 14(202) Town of Ferriday Auditorium, Planning and 15 Construction 16 (Concordia) 17 Payable from General Obligation Bonds 18 Priority 1 $ 700,000 19 Priority 5 $18,800,000 20 Total $19,500,000 2150/M89FLORIEN 22(1309)Village of Florien Town Hall, Planning and 23 Construction 24 (Sabine) 25 Payable from General Obligation Bonds 26 Priority 1 $ 385,505 2750/M91FORDOCHE 28(1604)Water Storage Improvements, Planning and 29 Construction 30 (Pointe Coupee) 31 Payable from General Obligation Bonds 32 Priority 1 $ 755,000 33 Priority 5 $ 780,000 34 Total $ 1,535,000 35(1605)Water Distribution System Improvements, Planning 36 and Construction 37 (Pointe Coupee) 38 Payable from General Obligation Bonds 39 Priority 1 $ 623,170 40 Priority 5 $ 2,935,000 41 Total $ 3,558,170 4250/M94FRANKLIN 43(121) Renovation of Old Crowell Elementary Building, 44 Planning and Construction 45 (St. Mary) 46 Payable from General Obligation Bonds 47 Priority 1 $ 20,374 48 Priority 5 $ 321,000 49 Total $ 341,374 Page 76 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1565)Cayce Street Repairs, Planning and Construction 2 (St. Mary) 3 Payable from General Obligation Bonds 4 Priority 1 $ 2,309,235 5(1699)Water Treatment Facility, Booster Pump Station, and 6 Distribution System Improvements, Planning and 7 Construction 8 (St. Mary) 9 Payable from State General Fund (Direct) Non-Recurring 10 Revenues $ 2,400,000 1150/MA3GOLDEN MEADOW 12(1399)Upgrade to North Sewerage Treatment Plant, Planning 13 and Construction 14 (Lafourche) 15 Payable from General Obligation Bonds 16 Priority 1 $ 163,940 1750/MA5GONZALES 18(1372)Connector Road for City of Gonzales Hospital District, 19 Construction and Planning 20 (Ascension) 21 Payable from General Obligation Bonds 22 Priority 1 $ 1,200,000 23 Priority 5 $ 2,705,000 24 Total $ 3,905,000 25(1653)Veteran's Ave. to Commerce Ave. Connector Road, 26 Planning and Construction 27 (Ascension) 28 Payable from General Obligation Bonds 29 Priority 1 $ 30,942 3050/MA6GRAMBLING 31(384) Community Center Expansion, Planning and 32 Construction 33 (Lincoln) 34 Payable from General Obligation Bonds 35 Priority 1 $ 300,000 3650/MB1GRAND ISLE 37(1793)Historic Recreation Center/Community Center, 38 Planning and Construction 39 (Jefferson) 40 Payable from General Obligation Bonds 41 Priority 1 $ 17,000 4250/MB4GREENWOOD 43(1512)New Municipal Complex, Planning and Construction 44 (Caddo) 45 Payable from General Obligation Bonds 46 Priority 5 $ 1,470,000 Page 77 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/MB5GRETNA 2(800) City Hall Exterior and Interior Renovation 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 1 $ 1,300,000 6 Priority 5 $ 1,500,000 7 Total $ 2,800,000 850/MB9HAMMOND 9(1442)Roadside Drainage Improvements, Planning and 10 Construction 11 (Tangipahoa) 12 Payable from General Obligation Bonds 13 Priority 1 $ 225,000 1450/MC1HARAHAN 15(1663)Emergency Sewer Collection and Treatment System 16 Overhaul, Planning and Construction 17 (Jefferson) 18 Payable from General Obligation Bonds 19 Priority 5 $ 1,000,000 20 Payable from State General Fund (Direct) Non-Recurring 21 Revenues $ 3,500,000 22 Total $ 4,500,000 23Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 2439:112. 2550/MC3HAUGHTON 26(330) Additional Water Supply Wells and Elevated Tank, 27 Planning and Construction 28 (Bossier) 29 Payable from General Obligation Bonds 30 Priority 1 $ 120,000 31 Priority 5 $ 2,150,000 32 Total $ 2,270,000 3350/MC4HAYNESVILLE 34(467) Town of Haynesville Street Improvements, Planning 35 and Construction 36 (Claiborne) 37 Payable from General Obligation Bonds 38 Priority 1 $ 50,000 39 Priority 5 $ 300,000 40 Total $ 350,000 4150/MC9HOMER 42(100) Street Improvement Project, Planning and Construction 43 (Claiborne) 44 Payable from General Obligation Bonds 45 Priority 1 $ 600,000 Page 78 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(101) Town Hall Renovations, Planning and Construction 2 (Claiborne) 3 Payable from General Obligation Bonds 4 Priority 1 $ 818,904 550/MD1HORNBECK 6(622) West Side Water System Expansion, Planning and 7 Construction 8 (Sabine, Vernon) 9 Payable from General Obligation Bonds 10 Priority 1 $ 105,465 1150/MD4IDA 12(1655)Water System Improvements, Water Wells, Tanks, and 13 Booster Stations Construction, Planning and 14 Construction 15 (Caddo) 16 Payable from General Obligation Bonds 17 Priority 1 $ 42,435 1850/MD8JACKSON 19(939) New Roofs for Four Town of Jackson Buildings, 20 Planning and Construction 21 (East Feliciana) 22 Payable from General Obligation Bonds 23 Priority 5 $ 300,000 2450/ME1JEAN LAFITTE 25(607) Lafitte Wetlands Museum Addition, including Exhibits, 26 Planning and Construction 27 (Jefferson) 28 Payable from General Obligation Bonds 29 Priority 1 $ 823,981 3050/ME2JEANERETTE 31(337) Sewer System Improvements, Planning and 32 Construction 33 (Iberia) 34 Payable from General Obligation Bonds 35 Priority 5 $ 3,320,000 36 Payable from State General Fund (Direct) Non-Recurring 37 Revenues $ 4,320,000 38 Total $ 7,640,000 39(740) City Hall Renovations, Planning and Construction 40 (Iberia) 41 Payable from General Obligation Bonds 42 Priority 5 $ 370,000 Page 79 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1161)Water System Improvements, Planning and 2 Construction 3 (Iberia) 4 Payable from General Obligation Bonds 5 Priority 5 $ 575,000 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 1,575,000 8 Total $ 2,150,000 950/ME6JONESVILLE 10(1228)Glenn Ditch Pump Station, Planning and Construction 11 (Catahoula) 12 Payable from General Obligation Bonds 13 Priority 1 $ 80,000 14 Priority 5 $ 1,485,000 15 Total $ 1,565,000 1650/MF1KENNER 17(703) Pump to the River Pump Station Phase I, Planning and 18 Construction 19 (Jefferson) 20 Payable from General Obligation Bonds 21 Priority 1 $ 1,000,000 22 Priority 5 $ 9,050,000 23 Total $10,050,000 24(913) Lincoln Manor Drainage Phase 2, Planning and 25 Construction 26 (Jefferson) 27 Payable from General Obligation Bonds 28 Priority 1 $ 500,000 29(1117)Lincoln Manor Subdivision Drainage Improvement, 30 including 30 th Street Roadway and Drainage 31 Improvements from Loyola Drive to Ohio Street, 32 Planning and Construction 33 (Jefferson) 34 Payable from General Obligation Bonds 35 Priority 1 $ 155,000 3650/MF8LAKE ARTHUR 37(1666)Wastewater Treatment Facility Improvements, 38 Planning and Construction 39 (Jefferson Davis) 40 Payable from General Obligation Bonds 41 Priority 5 $ 1,050,000 42Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 4339:112. 44(1667)Wastewater Collection System Improvements, 45 Planning and Construction 46 (Jefferson Davis) 47 Payable from General Obligation Bonds 48 Priority 5 $ 990,000 49Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 5039:112. Page 80 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1668)Water System Improvements, Planning and Construction 2 (Jefferson Davis) 3 Payable from General Obligation Bonds 4 Priority 5 $ 990,000 5Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 639:112. 750/MF9LAKE CHARLES 8(275) Lakefront Development 9 (Calcasieu) 10 Payable from General Obligation Bonds 11 Priority 1 $ 1,955,000 12(477) Enterprise Boulevard Extension, Planning and 13 Construction 14 (Calcasieu) 15 Payable from General Obligation Bonds 16 Priority 1 $ 3,500,000 17(1093)Relocation of Public Works Campus, Planning and 18 Construction 19 (Calcasieu) 20 Payable from General Obligation Bonds 21 Priority 1 $ 5,000,000 22 Priority 5 $ 4,000,000 23 Total $ 9,000,000 2450/MG3LEESVILLE 25(266) City of Leesville, Sanitary Sewer Extension for Fort 26 Polk Entrance Road, Planning and Construction 27 (Vernon) 28 Payable from General Obligation Bonds 29 Priority 1 $ 2,395,701 30 Priority 5 $ 4,000,000 31 Total $ 6,395,701 32(884) Street Rehabilitation and Extension, Planning and 33 Construction 34 (Vernon) 35 Payable from General Obligation Bonds 36 Priority 1 $ 80,319 37 Priority 5 $ 250,000 38 Total $ 330,319 3950/MG8LIVONIA 40(1104)Water Well, Planning and Construction 41 (Pointe Coupee) 42 Payable from General Obligation Bonds 43 Priority 2 $ 600,000 44 Priority 5 $ 1,035,000 45 Total $ 1,635,000 Page 81 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/MH1LOGANSPORT 2(257) Recreational Improvements, Planning and Construction 3 (DeSoto) 4 Payable from General Obligation Bonds 5 Priority 1 $ 150,000 6 Priority 5 $ 1,150,000 7 Total $ 1,300,000 850/MH9MANGHAM 9(1319)Mangham Recreation Complex, Planning and 10 Construction 11 (Richland) 12 Payable from General Obligation Bonds 13 Priority 1 $ 767,411 1450/MI3MANY 15(676) Water Treatment Plant Improvements, Acquisition, 16 Planning and Construction 17 (Sabine) 18 Payable from General Obligation Bonds 19 Priority 5 $ 1,500,000 20 Payable from State General Fund (Direct) Non-Recurring 21 Revenues $ 4,500,000 22 Total $ 6,000,000 2350/MI8MAURICE 24(705) New Village Hall, Planning and Construction 25 (Vermilion) 26 Payable from General Obligation Bonds 27 Priority 1 $ 365,000 28 Priority 5 $ 1,000,000 29 Total $ 1,365,000 30(1806)City Park Drainage Improvements, Planning and 31 Construction 32 (Vermilion) 33 Payable from General Obligation Bonds 34 Priority 2 $ 450,000 35Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 3639:112. 37(1807)New Fire Department Facility, Planning 38 and Construction 39 (Vermilion) 40 Payable from General Obligation Bonds 41 Priority 5 $ 415,000 42Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 4339:112. Page 82 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1808)US 167 Street and Access Improvements, 2 Planning and Construction 3 (Vermilion) 4 Payable from General Obligation Bonds 5 Priority 5 $ 540,000 6Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 739:112. 850/MJ5MINDEN 9(604) Potable Water Ground Storage Tank, Planning and 10 Construction 11 (Webster) 12 Payable from General Obligation Bonds 13 Priority 1 $ 645,100 14 Priority 5 $ 2,800,000 15 Total $ 3,445,100 1650/MJ6MONROE 17(216) I-20 Interchange Improvement and Kansas Garrett 18 Connector, Kansas Lane Connector, Planning and 19 Construction ($1,000,000 Local and $6,000,000 Federal 20 Match) 21 (Ouachita) 22 Payable from General Obligation Bonds 23 Priority 1 $26,794,872 24 Priority 5 $11,600,000 25 Total $38,394,872 26(217) Georgia Street Pump Station, Including Generator and 27 Auxiliary Pumps, Planning, Engineering, Right-of- 28 Way, Utilities and Construction 29 (Ouachita) 30 Payable from General Obligation Bonds 31 Priority 1 $ 2,000,000 32(627) Youngs Bayou Enhancement of Channel Capacity, 33 Planning and Construction 34 (Ouachita) 35 Payable from General Obligation Bonds 36 Priority 1 $ 500,000 37 Priority 5 $10,900,000 38 Total $11,400,000 39(834) US Highway 165 South; US Highway 165 Business 40 Route Connector Phase I, Planning and Construction 41 (Ouachita) 42 Payable from General Obligation Bonds 43 Priority 2 $ 2,550,000 44(835) I-20 South Frontage Road Drainage Improvements, 45 Planning, Design, Rights-of-Ways, Utilities, and 46 Construction 47 (Ouachita) 48 Payable from General Obligation Bonds 49 Priority 5 $ 5,000,000 Page 83 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1039)Calypso Street Pump Station Rehabilitation, Planning, 2 Engineering, Design, Right-of-Way, Utilities, and 3 Construction 4 (Ouachita) 5 Payable from General Obligation Bonds 6 Priority 1 $ 30,000 7 Priority 5 $ 1,770,000 8 Total $ 1,800,000 9(1245)River Pump Station Water Treatment Plant, Planning 10 and Construction 11 (Ouachita) 12 Payable from General Obligation Bonds 13 Priority 1 $ 300,000 1450/MK2MORGAN CITY 15(1709)Sewer Rehabilitation, Planning and Construction 16 (St. Mary) 17 Payable from General Obligation Bonds 18 Priority 5 $ 3,725,000 19 Payable from State General Fund (Direct) Non-Recurring 20 Revenues $ 4,725,000 21 Total $ 8,450,000 22Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 2339:112. 2450/MK4MORSE 25(321) Wastewater Treatment Facility, Planning 26 and Construction 27 (Acadia) 28 Payable from General Obligation Bonds 29 Priority 5 $ 1,350,000 30(723) Water Tower Improvements, Planning and 31 Construction 32 (Acadia) 33 Payable from General Obligation Bonds 34 Priority 1 $ 55,703 3550/MK9NATCHITOCHES 36(1147)Texas Street Corridor Improvements, Planning and 37 Construction 38 (Natchitoches) 39 Payable from General Obligation Bonds 40 Priority 5 $ 435,000 4150/ML1NEW IBERIA 42(252) Ann Street Park, Planning and Construction 43 (Iberia) 44 Payable from General Obligation Bonds 45 Priority 1 $ 300,000 Page 84 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(664) City Park and West End Community Centers 2 Improvements, Planning and Construction 3 (Iberia) 4 Payable from General Obligation Bonds 5 Priority 1 $ 577,317 6(1028)Bayou Teche Museum Expansion and George Rodrigue 7 Park 8 (Iberia) 9 Payable from General Obligation Bonds 10 Priority 1 $ 1,354,112 1150/ML3NEW ORLEANS 12(78) West Bank Ferry Terminal Renovations, Planning and 13 Construction 14 (Orleans) 15 Payable from General Obligation Bonds 16 Priority 1 $ 300,000 17 Priority 5 $ 300,000 18 Total $ 600,000 19(79) Richard Lee Playground, Planning and Construction 20 (Orleans) 21 Payable from General Obligation Bonds 22 Priority 1 $ 200,000 23 Priority 5 $ 3,000,000 24 Total $ 3,200,000 25(289) West Bank Park Improvements Including New Soccer 26 and Recreational Facilities, Planning and Construction 27 (Orleans) 28 Payable from General Obligation Bonds 29 Priority 1 $ 1,880,413 30 Priority 5 $11,225,400 31 Total $13,105,813 32Provided, however, that $450,000 of the Priority 1 appropriation shall be used to fund the 33George W. Carver Playground Renovations project, and $200,000 of the Priority 1 34appropriation shall be used to fund the Skateboard Park at the West Bank Park project. 35(1107)New Sewerage and Water Board Power Plant, Planning 36 and Construction 37 (Orleans) 38 Payable from General Obligation Bonds 39 Priority 1 $42,700,000 40 Priority 5 $29,000,000 41 Total $71,700,000 42(1108)Old New Orleans VA Building Rehabilitation 43 (Orleans) 44 Payable from General Obligation Bonds 45 Priority 1 $ 1,981,250 46 Priority 5 $ 8,000,000 47 Total $ 9,981,250 Page 85 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1452)Monticello Canal Culverts at Airline Highway 2 (Orleans) 3 Payable from General Obligation Bonds 4 Priority 1 $ 750,000 5 Priority 5 $ 8,250,000 6 Total $ 9,000,000 7(1522)Lower Ninth Ward Green Infrastructure Project, 8 Planning and Construction 9 (Orleans) 10 Payable from General Obligation Bonds 11 Priority 1 $ 250,000 12 Priority 5 $ 2,650,000 13 Total $ 2,900,000 1450/ML4NEW ROADS 15(623) Industrial Park Development Project, Including 16 Underground Electrical System Upgrades, Planning 17 and Construction 18 (Pointe Coupee) 19 Payable from General Obligation Bonds 20 Priority 1 $ 988,000 2150/ML8NORWOOD 22(1301)Sewer Collection and Treatment System 23 Improvements, Planning and Construction 24 (East Feliciana) 25 Payable from General Obligation Bonds 26 Priority 5 $ 1,080,000 2750/MM2OAKDALE 28(418) Oakdale City Hall Renovations, Roof, and 29 Reconstruction 30 (Allen) 31 Payable from General Obligation Bonds 32 Priority 1 $ 35,000 3350/MM4OIL CITY 34(882) Water Treatment Plant, Transmission Main, and 35 Distribution System Improvements, Planning and 36 Construction 37 (Caddo) 38 Payable from General Obligation Bonds 39 Priority 1 $ 223,608 40 Priority 5 $ 500,000 41 Total $ 723,608 4250/MM6OPELOUSAS 43(1237)Water Meter Replacement and Upgrades, Planning and 44 Construction 45 (St. Landry) 46 Payable from General Obligation Bonds 47 Priority 1 $ 1,014,305 48 Priority 2 $ 500,000 49 Total $ 1,514,305 Page 86 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1510)Opelousas Street and Drainage Improvements 2 (St. Landry) 3 Payable from General Obligation Bonds 4 Priority 1 $ 2,250,000 5 Priority 5 $ 1,000,000 6 Total $ 3,250,000 750/MM8PARKS 8(1560)Parks Water System Improvements, Planning and 9 Construction 10 (St. Martin) 11 Payable from State General Fund (Direct) Non-Recurring 12 Revenues $ 500,000 1350/MM9PATTERSON 14(1409)Replacement of Water and Gas Meters in Patterson, 15 Planning and Construction 16 (St. Mary) 17 Payable from General Obligation Bonds 18 Priority 1 $ 451,000 19(1440)Water Plant Improvements, Planning and Construction 20 (St. Mary) 21 Payable from State General Fund (Direct) Non-Recurring 22 Revenues $ 5,000,000 23(1774)Rehabilitation of Nine Sewer Lift Stations, Planning 24 and Construction 25 (St. Mary) 26 Payable from State General Fund (Direct) Non-Recurring 27 Revenues $ 2,395,000 2850/MN3PINEVILLE 29(1557)Consolidated Municipal and Court Complex, Planning 30 and Construction 31 (Rapides) 32 Payable from General Obligation Bonds 33 Priority 5 $11,090,000 34(1558)Cedar Lake Pump Station Reconstruction, Design, 35 Planning and Construction 36 (Rapides) 37 Payable from General Obligation Bonds 38 Priority 5 $ 585,000 3950/MO1PONCHATOULA 40(1751)Fire Station Complex US 51 - Veterans Avenue, Land 41 Acquisition, Planning and Construction 42 (Tangipahoa) 43 Payable from General Obligation Bonds 44 Priority 1 $ 1,075,000 45 Priority 5 $ 800,000 46 Total $ 1,875,000 Page 87 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/MO2PORT ALLEN 2(1648)Street and Drainage Improvements, Planning and 3 Construction 4 (West Baton Rouge) 5 Payable from General Obligation Bonds 6 Priority 1 $ 80,000 7 Priority 5 $ 3,520,000 8 Total $ 3,600,000 950/MO6PROVENCAL 10(1701)New Water Well and Emergency Water Connection, 11 Planning and Construction 12 (Natchitoches) 13 Payable from General Obligation Bonds 14 Priority 5 $ 600,000 15 Payable from State General Fund (Direct) Non-Recurring 16 Revenues $ 1,600,000 17 Total $ 2,200,000 18Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 1939:112. 2050/MO8RAYNE 21(825) Martin Luther King Community Center Improvements, 22 Planning and Construction 23 (Acadia) 24 Payable from General Obligation Bonds 25 Priority 1 $ 39,402 2650/MO9RAYVILLE 27(495) Wastewater Transport and Treatment Facilities for 28 Economic Development 29 (Richland) 30 Payable from General Obligation Bonds 31 Priority 1 $ 26,887 32 Priority 5 $ 3,500,000 33 Total $ 3,526,887 34Provided, however, that this appropriation is used for the extension of sewer lines south 35along Highway 425. 36(586) Water Service Facilities for Economic Development, 37 Planning and Construction 38 (Richland) 39 Payable from General Obligation Bonds 40 Priority 1 $ 894,570 41 Priority 5 $ 7,522,300 42 Total $ 8,416,870 4350/MP3RICHWOOD 44(1768)Municipal Complex, Planning and Construction 45 (Ouachita) 46 Payable from General Obligation Bonds 47 Priority 1 $ 150,000 48 Priority 5 $ 3,400,000 49 Total $ 3,550,000 Page 88 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/MP8ROSEDALE 2(1238)New Rosedale Fire Station, Planning and Construction 3 (Iberville) 4 Payable from General Obligation Bonds 5 Priority 1 $ 338,521 650/MQ1ROSEPINE 7(677) Rosepine Wastewater Treatment Plant Improvement, 8 Planning and Construction 9 (Vernon) 10 Payable from General Obligation Bonds 11 Priority 2 $ 465,000 1250/MQ2RUSTON 13(156) New Road from Highway 150 to I-20 South Frontage 14 Road, Planning and Construction 15 (Lincoln) 16 Payable from General Obligation Bonds 17 Priority 1 $ 815,718 18 Priority 5 $ 1,000,000 19 Total $ 1,815,718 20(1393)East Kentucky/Cedar Creek Road Intersection 21 Improvements, Planning and Construction 22 (Lincoln) 23 Payable from General Obligation Bonds 24 Priority 1 $ 200,000 25 Priority 5 $ 1,060,000 26 Total $ 1,260,000 2750/MQ3ST. FRANCISVILLE 28(1092)Emergency Erosion Repairs, Planning and Construction 29 (West Feliciana) 30 Payable from General Obligation Bonds 31 Priority 1 $ 50,000 32 Priority 5 $ 2,102,000 33 Total $ 2,152,000 3450/MQ4ST. JOSEPH 35(1772)St. Joseph's Community House, Planning and 36 Construction 37 (Tensas) 38 Payable from General Obligation Bonds 39 Priority 5 $ 690,000 4050/MQ5ST. MARTINVILLE 41(823) Water Drainage Project, Planning and Construction 42 (St. Martin) 43 Payable from General Obligation Bonds 44 Priority 1 $ 200,000 Page 89 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1639)Main Street Enhancement Project, Planning and 2 Construction 3 (St. Martin) 4 Payable from General Obligation Bonds 5 Priority 5 $ 1,450,000 650/MQ8SCOTT 7(941) Roundabout at LA 93 and Renaud Drive, 8 Planning, Construction, and Land Acquisition 9 (Lafayette) 10 Payable from General Obligation Bonds 11 Priority 5 $ 2,270,000 12(1353)LA 93 Roadway Improvements- I-10 Ramp to Renaud 13 Drive, Planning, Construction, and Land Acquisition 14 (Lafayette) 15 Payable from General Obligation Bonds 16 Priority 1 $ 1,000,000 17 Priority 5 $ 2,373,650 18 Total $ 3,373,650 19(1559)Eraste Landry Road Extension, Planning and 20 Construction 21 (Lafayette) 22 Payable from General Obligation Bonds 23 Priority 1 $ 415,000 24 Priority 5 $ 3,750,000 25 Total $ 4,165,000 26(1773)Water and Sewer Line Installation along Apollo Road 27 Extension, Planning and Construction 28 (Lafayette) 29 Payable from General Obligation Bonds 30 Priority 1 $ 2,513,750 3150/MR1SHREVEPORT 32(166) University Park Subdivision Improvements, 33 Planning and Construction 34 (Caddo) 35 Payable from General Obligation Bonds 36 Priority 5 $ 7,625,000 37(661) Greenwood Road Extension, (Greenwood Industrial 38 Park Road - Asphalt Road), Planning and Construction 39 (Caddo) 40 Payable from General Obligation Bonds 41 Priority 1 $ 120,000 42 Priority 5 $ 2,000,000 43 Total $ 2,120,000 44(662) C.C. Antoine Museum and Arts Center, Planning and 45 Construction ($64,000 Local Match) 46 (Caddo) 47 Payable from General Obligation Bonds 48 Priority 1 $ 425,000 49 Priority 5 $ 100,000 50 Total $ 525,000 Page 90 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1072)C.C. Antoine Park, Planning and Construction 2 (Caddo) 3 Payable from General Obligation Bonds 4 Priority 1 $ 1,742,810 5 Priority 5 $ 500,000 6 Total $ 2,242,810 7(1281)Valencia Park Spray Park, Planning and Construction 8 (Caddo) 9 Payable from General Obligation Bonds 10 Priority 1 $ 75,000 11(1809)Amtrak Platform and Facility, Planning 12 and Construction 13 (Caddo) 14 Payable from General Obligation Bonds 15 Priority 5 $10,000,000 16Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 1739:112. 18(1810)State Fairgrounds Access Improvements, 19 Planning and Construction 20 (Caddo) 21 Payable from General Obligation Bonds 22 Priority 5 $ 2,100,000 23Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 2439:112. 2550/MR6SIMPSON 26(1029)Rehabilitation of Various Roads, Planning and 27 Construction 28 (Vernon) 29 Payable from General Obligation Bonds 30 Priority 1 $ 35,000 3150/MS4SPRINGFIELD 32(58) Water System Improvements and Upgrades, Planning 33 and Construction 34 (Livingston) 35 Payable from General Obligation Bonds 36 Priority 2 $ 141,000 37 Priority 5 $ 1,547,400 38 Total $ 1,688,400 3950/MS5SPRINGHILL 40(674) Wastewater Treatment Plant Rehabilitation, 41 Planning and Construction 42 (Webster) 43 Payable from General Obligation Bonds 44 Priority 5 $ 1,200,000 45(881) Water System Improvements - Phase 3, 46 Planning and Construction 47 (Webster) 48 Payable from General Obligation Bonds 49 Priority 5 $ 5,700,000 Page 91 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/MS9SULPHUR 2(80) Maplewood Drive Rehabilitation 3 (Calcasieu) 4 Payable from General Obligation Bonds 5 Priority 1 $ 7,155,323 6 Priority 5 $ 5,137,500 7 Total $12,292,823 8(1524)Maplewood Pump Station, Planning and Construction 9 (Calcasieu) 10 Payable from General Obligation Bonds 11 Priority 5 $ 1,075,000 1250/MT1SUN 13(1638)Roof Replacement of Town Hall Building 14 (St. Tammany) 15 Payable from General Obligation Bonds 16 Priority 1 $ 200,000 1750/MT2SUNSET 18(97) Sunset Police and Fire Emergency Facility, Planning 19 and Construction 20 (St. Landry) 21 Payable from General Obligation Bonds 22 Priority 5 $ 400,000 2350/MT3TALLULAH 24(983) Emergency Water Production, Transmission and 25 Treatment, Acquisition, Planning and Construction 26 (Madison) 27 Payable from General Obligation Bonds 28 Priority 1 $ 366,045 2950/MT5THIBODAUX 30(301) Replacement of Canal Boulevard Bridges and 31 Construction of Menard Pedestrian Bike Trail, Planning 32 and Construction 33 (Lafourche) 34 Payable from General Obligation Bonds 35 Priority 1 $4,650,000 36 Priority 5 $1,750,000 37 Total $6,400,000 3850/MU2VIDALIA 39(1282)Development of a Slackwater Port on the Mississippi 40 River, Planning and Construction 41 (Concordia) 42 Payable from General Obligation Bonds 43 Priority 1 $4,229,044 Page 92 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1596)Utility System Upgrade, Planning, Acquisition, 2 Construction and Equipment 3 (Concordia) 4 Payable from General Obligation Bonds 5 Priority 1 $2,955,000 6 Priority 5 $14,000,000 7 Total $16,955,000 850/MU4VILLE PLATTE 9(49) New Fire Station, Planning and Construction 10 (Evangeline) 11 Payable from General Obligation Bonds 12 Priority 5 $ 2,320,000 13(1013)Infrastructure Improvements, Planning and 14 Construction 15 (Evangeline) 16 Payable from General Obligation Bonds 17 Priority 1 $ 186,413 18(1731)Ville Platte Evangeline Recreational District 19 (Evangeline) 20 Payable from General Obligation Bonds 21 Priority 1 $ 855,000 22 Priority 5 $ 885,000 23 Total $ 1,740,000 2450/MU6VIVIAN 25(1288)Water and Wastewater System Improvements and 26 Extension, Planning and Construction 27 (Caddo) 28 Payable from General Obligation Bonds 29 Priority 1 $ 240,164 3050/MV1WELSH 31(678) Frontage Road Extension, Planning and Construction 32 (Jefferson Davis) 33 Payable from General Obligation Bonds 34 Priority 1 $ 500,000 35 Priority 5 $ 1,645,000 36 Total $ 2,145,000 3750/MV2WEST MONROE 38(911) Cotton Street Improvements and Sidewalks, 39 Planning and Construction 40 (Ouachita) 41 Payable from General Obligation Bonds 42 Priority 5 $ 1,350,000 43(1681)Mid-City Drainage Improvements, Planning and 44 Construction 45 (Ouachita) 46 Payable from General Obligation Bonds 47 Priority 1 $ 1,000,000 48 Priority 5 $ 4,000,000 49 Total $ 5,000,000 Page 93 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1682)Sunshine Heights Drainage Improvements, Planning 2 and Construction 3 (Ouachita) 4 Payable from General Obligation Bonds 5 Priority 1 $ 1,375,000 6(1685)West Monroe Greenway, Planning and 7 Construction 8 (Ouachita) 9 Payable from General Obligation Bonds 10 Priority 5 $ 1,315,000 11(1686)New Drago Street Sanitary Sewer Lift Station, Planning 12 and Construction 13 (Ouachita) 14 Payable from General Obligation Bonds 15 Priority 5 $ 1,213,614 1650/MV3WESTLAKE 17(267) Sewer Transport System Improvements, 18 Planning and Construction 19 (Calcasieu) 20 Payable from General Obligation Bonds 21 Priority 5 $ 2,000,000 22(885) Compressed Natural Gas Fueling Station, Planning and 23 Construction 24 (Calcasieu) 25 Payable from General Obligation Bonds 26 Priority 1 $ 470,000 27 Priority 5 $ 1,600,000 28 Total $ 2,070,000 2950/MV4WESTWEGO 30(92) The WHARF, Planning, Construction, and Site 31 Preparation 32 (Jefferson) 33 Payable from General Obligation Bonds 34 Priority 1 $ 4,401,859 35 Priority 5 $ 2,200,000 36 Total $ 6,601,859 37(302) Park Land and Improvements, Including Improvements 38 to Existing Parks and Land Acquisition, Planning and 39 Construction 40 (Jefferson) 41 Payable from General Obligation Bonds 42 Priority 1 $ 498,305 43(303) Riverboat Landing Phase III, Planning 44 and Construction 45 (Jefferson) 46 Payable from General Obligation Bonds 47 Priority 5 $ 1,205,000 Page 94 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(504) Water Tower, Line and Improvements, Water Meter 2 Replacement, Planning and Construction 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 1 $ 47,568 6(505) Emergency Preparedness Building, Planning and 7 Construction 8 (Jefferson) 9 Payable from General Obligation Bonds 10 Priority 1 $ 83,851 11(1120)Fire Station, Planning and Construction 12 (Jefferson) 13 Payable from General Obligation Bonds 14 Priority 1 $ 136,400 15 Priority 5 $ 300,000 16 Total $ 436,400 17(1121)Sala Avenue Street and Infrastructure Improvements 18 (Jefferson) 19 Payable from General Obligation Bonds 20 Priority 1 $ 208,300 21 Priority 5 $ 850,000 22 Total $ 1,058,300 23(1775)Wastewater Treatment Plant Improvements, Planning 24 and Construction 25 (Jefferson) 26 Payable from General Obligation Bonds 27 Priority 5 $ 4,503,500 28 Payable from State General Fund (Direct) Non-Recurring 29 Revenues $ 400,000 30 Total $ 4,903,500 31(1776)Water Distribution System Improvements, Planning 32 and Construction 33 (Jefferson) 34 Payable from General Obligation Bonds 35 Priority 5 $ 2,551,000 36 Payable from State General Fund (Direct) Non-Recurring 37 Revenues $ 232,000 38 Total $ 2,783,000 3950/MV6WILSON 40(1702)Sanitary Sewer System Improvements, Planning and 41 Construction 42 (East Feliciana) 43 Payable from General Obligation Bonds 44 Priority 2 $ 792,000 4550/MV7WINNFIELD 46(1620)South Winnfield Drainage Improvements - Phase 1, 47 Planning and Construction 48 (Winn) 49 Payable from General Obligation Bonds 50 Priority 1 $ 75,000 51 Priority 5 $ 600,000 52 Total $ 675,000 Page 95 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/MW2YOUNGSVILLE 2(37) Chemin Metairie Parkway Widening, Planning and 3 Construction 4 (Lafayette) 5 Payable from General Obligation Bonds 6 Priority 5 $ 3,880,000 7(45) New Fire Station, Planning and Construction 8 (Lafayette) 9 Payable from General Obligation Bonds 10 Priority 5 $ 3,250,000 11(658) Highway 89 Improvements, Planning and Construction 12 (Lafayette) 13 Payable from General Obligation Bonds 14 Priority 1 $ 8,955,000 15 Priority 5 $13,590,000 16 Total $22,545,000 17(659) Highway 92 Improvements, Planning and Construction 18 (Lafayette) 19 Payable from General Obligation Bonds 20 Priority 1 $ 880,000 21 Priority 5 $ 4,525,000 22 Total $ 5,405,000 23(866) Fortune Road Extension, Planning and Construction 24 (Lafayette) 25 Payable from General Obligation Bonds 26 Priority 1 $ 3,885,000 27(867) Wastewater System Improvements, Planning 28 and Construction 29 (Lafayette) 30 Payable from General Obligation Bonds 31 Priority 5 $ 4,500,000 32(1202)Highway 92/Prescott Boulevard Roundabout, 33 Design, Planning, and Construction 34 (Lafayette) 35 Payable from General Obligation Bonds 36 Priority 5 $ 2,614,000 37(1277)Langlinais Road Extension, Planning and Construction 38 (Lafayette) 39 Payable from General Obligation Bonds 40 Priority 5 $ 5,580,000 4150/MW6ST. GABRIEL 42(609) City Council Chambers - New Construction 43 (Iberville) 44 Payable from General Obligation Bonds 45 Priority 1 $ 1,440,000 Page 96 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1733)City Council Chambers Phase 2, Planning and 2 Construction 3 (Iberville) 4 Payable from General Obligation Bonds 5 Priority 1 $ 2,000,000 6 Priority 5 $ 700,000 7 Total $ 2,700,000 850/MW8CENTRAL 9(1206)Administration Building 10 (East Baton Rouge) 11 Payable from General Obligation Bonds 12 Priority 1 $ 16,943 1350/N03AUDUBON NATURE INSTITUTE, INC. 14(1397)Audubon Facility Renovations and Improvements: 15 Audubon Zoo, Planning and Construction 16 (Orleans) 17 Payable from General Obligation Bonds 18 Priority 1 $ 9,500,000 19 Priority 5 $ 9,500,000 20 Total $19,000,000 2150/N05NEW ORLEANS EXHIBITION HALL AUTHORITY 22(190) Property Development Project 23 (Orleans) 24 Payable from General Obligation Bonds 25 Priority 1 $ 500,000 26 Priority 5 $25,000,000 27 Total $25,500,000 2850/N06STATE FAIR OF LOUISIANA 29(293) Hirsch Memorial Coliseum and Louisiana State 30 Fairgrounds Improvements Project 31 (Caddo) 32 Payable from General Obligation Bonds 33 Priority 1 $ 273,295 34 Priority 5 $ 3,280,000 35 Total $ 3,553,295 3650/N13CHENNAULT INTERNATIONAL AIRP ORT AUTHORITY 37(1791)Firewater Pumphouse #3 and Infrastructure, Planning 38 and Construction 39 (Calcasieu) 40 Payable from General Obligation Bonds 41 Priority 5 $ 4,000,000 4250/N17NEW ORLEANS CAREER CENTER 43(1741)Expanding High Wage, High Demand Career and 44 Technical Training, Planning and Construction 45 (Orleans) 46 Payable from General Obligation Bonds 47 Priority 1 $ 1,000,000 48 Priority 5 $ 2,000,000 49 Total $ 3,000,000 Page 97 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/N18IBERIA PARISH AIRPORT AUTHORITY 2(242) Rehabilitation of Hangar #88 and Associated 3 Parking Lot, Planning and Construction 4 (Iberia) 5 Payable from General Obligation Bonds 6 Priority 5 $ 900,000 7Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 839:112. 9(274) Acadiana Regional Airport Improvements, Planning 10 and Construction 11 (Iberia) 12 Payable from General Obligation Bonds 13 Priority 1 $ 500,000 14 Priority 2 $ 3,000,000 15 Priority 5 $36,650,000 16 Total $40,150,000 1750/N19PAUL S. MORTON SCHOLARSHIP FOUNDATION 18(616) Paul S. Morton Scholarship Foundation Greater Works 19 Family Life Center, Planning and Construction 20 (Orleans) 21 Payable from General Obligation Bonds 22 Priority 5 $ 6,200,000 2350/N33ENGLAND ECONOMIC & INDUSTRIAL DEVELOP MENT 24 DISTRICT 25(116) High Bay Aircraft Maintenance Hangar, Planning and 26 Construction 27 (Rapides) 28 Payable from General Obligation Bonds 29 Priority 1 $ 1,713,915 30 Priority 5 $15,425,000 31 Total $17,138,915 32(1797)Regional Warehouse and Distribution 33 Complex, Planning and Construction 34 (Rapides) 35 Payable from General Obligation Bonds 36 Priority 5 $ 7,200,000 37Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 3839:112. 3950/N34ODYSSEY HOUSE LOUISIANA, INC. 40(928) Odyssey House Louisiana Gambling Treatment Center, 41 Planning and Construction 42 (Orleans) 43 Payable from General Obligation Bonds 44 Priority 5 $ 5,000,000 Page 98 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1546)Odyssey House Louisiana Renovation Project, Planning 2 and Construction 3 (Orleans) 4 Payable from General Obligation Bonds 5 Priority 1 $ 3,614,300 6 Priority 5 $ 3,000,000 7 Total $ 6,614,300 850/N36WALKER COMMUNITY RESOURCE AND RECREATION 9 CENTER 10(1693)Walker Community Resource and Recreation Center, 11 Planning and Construction 12 (Lafayette) 13 Payable from General Obligation Bonds 14 Priority 5 $ 750,000 1550/N40LAFAYETTE ECONOMIC DEVELOP MENT AUTHORITY 16(771) Lafayette Innovation Center, Planning and Construction 17 (Lafayette) 18 Payable from General Obligation Bonds 19 Priority 1 $ 5,497,881 2050/N41BATON ROUGE METROPOLITAN AIRPORT 21(1335)Airport Aviation Business Park, Planning and 22 Construction 23 (East Baton Rouge) 24 Payable from General Obligation Bonds 25 Priority 1 $ 2,661,361 26 Priority 5 $ 4,750,000 27 Total $ 7,411,361 2850/N47ST. MARTIN ECONOMIC DEVELOP MENT 29 AUTHORITY 30(1769)North Business Park, Planning and Construction 31 (St. Martin) 32 Payable from General Obligation Bonds 33 Priority 5 $ 2,100,000 3450/N52LAFAYETTE PARISH SHERIFF’S OFFICE 35(449) Crime Scene and Evidence Storage, Planning and 36 Construction 37 (Lafayette) 38 Payable from General Obligation Bonds 39 Priority 1 $ 2,485,000 40(450) Fitness Center, Planning and Construction 41 (Lafayette) 42 Payable from General Obligation Bonds 43 Priority 1 $ 2,010,000 44(860) Range Upgrades, Planning and Construction 45 (Lafayette) 46 Payable from General Obligation Bonds 47 Priority 1 $ 2,565,000 Page 99 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1673)Law Enforcement Center, Planning 2 and Construction 3 (Lafayette) 4 Payable from General Obligation Bonds 5 Priority 5 $46,500,000 6Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 739:112. 850/N53ORLEANS PARISH COMMUNICATIONS DISTRICT 9(534) Orleans Parish Communications District Expansion 10 Project, Planning and Construction 11 (Orleans) 12 Payable from General Obligation Bonds 13 Priority 5 $33,600,000 1450/N71NORTH LAFOURCHE CONSERVATION, LEVEE 15 AND DRAINAGE DISTRICT 16(766) Raceland Prairie Levee Improvements, Planning and 17 Construction 18 (Lafourche) 19 Payable from General Obligation Bonds 20 Priority 1 $ 1,225,000 21 Priority 5 $ 2,750,000 22 Total $ 3,975,000 2350/N74NATIONAL WORLD WAR II MUSEUM, INC. 24(506) Eight Projects Under FP&C Management Plus 25 Liberation Pavilion: Bricks and Mortar, Exhibit 26 Fabrication, Media Production, Planning and 27 Construction 28 (Orleans) 29 Payable from General Obligation Bonds 30 Priority 1 $12,500,000 31 Priority 5 $12,300,000 32 Total $24,800,000 3350/N79TANGIPAHOA PARISH FIRE DISTRICT 1 34(1351)Bruce Cutrer Regional Fire Training Facility of 35 Tangipahoa Parish, Planning and Construction 36 (Tangipahoa) 37 Payable from General Obligation Bonds 38 Priority 1 $ 225,000 39 Priority 5 $ 2,000,000 40 Total $ 2,225,000 4150/NA2LAFAYETTE AIRPORT COMMISSION 42(610) Construction of a New Passenger Facility Terminal and 43 Associated Infrastructure at Lafayette Regional Airport 44 (Lafayette) 45 Payable from General Obligation Bonds 46 Priority 1 $ 673,815 Page 100 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/NAAPOINTE COUPEE COUNCIL ON AGING 2(1290)Senior Center, Planning and Construction 3 (Pointe Coupee) 4 Payable from General Obligation Bonds 5 Priority 1 $ 395,400 6 Priority 5 $ 1,920,000 7 Total $ 2,315,400 850/NADMU ZETA FOUNDATION, INC. 9(1738)Expansion Project, Planning and Construction 10 (East Baton Rouge) 11 Payable from General Obligation Bonds 12 Priority 1 $ 29,765 13 Priority 5 $ 150,000 14 Total $ 179,765 1550/NAJEFFORTS OF GRACE, INC. 16(1770)Ashe Too, Planning and Construction 17 (Orleans) 18 Payable from General Obligation Bonds 19 Priority 5 $ 1,000,000 2050/NAZHOSPICE OF ACADIANA FOUNDATION, INC. 21(1730)Calcutta House, Planning and Construction 22 (Lafayette) 23 Payable from General Obligation Bonds 24 Priority 1 $ 249,795 25 Priority 5 $ 600,000 26 Total $ 849,795 2750/NB1CENTER FOR INNOVATIVE TRAINING OF YOUTH 28(815) STEM NOLA's Innovation Hub, Planning 29 and Construction 30 (Orleans) 31 Payable from General Obligation Bonds 32 Priority 5 $ 8,600,000 3350/NBCCAPITOL CITY FAMILY HEALTH CENTER, INC. 34(1734)Care South Medical and Dental Expansion, Planning 35 and Construction 36 (East Baton Rouge) 37 Payable from General Obligation Bonds 38 Priority 1 $ 704,765 39 Priority 5 $ 550,000 40 Total $ 1,254,765 Page 101 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/NBFCOMMUNITY RECEIVING HOME, INC. 2(409) Renaissance Home for Youth, New Administrative 3 Building, Renovation of Existing Administrative 4 Building, Roads and Parking Areas, Planning and 5 Construction 6 (Rapides) 7 Payable from General Obligation Bonds 8 Priority 1 $ 395,920 9(1350)Rapides Parish Juvenile Justice Complex, Planning and 10 Construction 11 (Rapides) 12 Payable from General Obligation Bonds 13 Priority 2 $ 1,300,000 14 Priority 5 $25,300,000 15 Total $26,600,000 1650/NBJJONESVILLE FIRE DISTRICT 17(115) New Fire Station at U.S. Hwy. 84 and 3rd Street, 18 Planning and Construction 19 (Catahoula) 20 Payable from General Obligation Bonds 21 Priority 5 $ 800,000 2250/NBVCAPITAL AREA GROUND WATER 23 CONSERVATION DISTRICT 24(558) Water Monitoring System, Planning and Construction 25 (Ascension, East Baton Rouge, East Feliciana, Pointe Coupee, 26 West Baton Rouge, West Feliciana) 27 Payable from General Obligation Bonds 28 Priority 1 $ 1,000,000 29 Priority 5 $ 1,800,000 30 Total $ 2,800,000 3150/NC2BATON ROUGE RECREATION AND PARKS 32 COMMISSION 33(398) Baker Youth Tournament Ball Fields, Planning and 34 Construction 35 (East Baton Rouge) 36 Payable from General Obligation Bonds 37 Priority 1 $ 65,000 38(803) Cadillac Street Park Site Improvements, Planning and 39 Construction 40 (East Baton Rouge) 41 Payable from General Obligation Bonds 42 Priority 1 $ 71,625 43(1212)Central Community Sports Park, Planning and 44 Construction 45 (East Baton Rouge) 46 Payable from General Obligation Bonds 47 Priority 1 $ 26,671 Page 102 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1(1420)J.S. Clark Golf Course Renovation in Greenwood 2 Community Park, Planning and Construction 3 (East Baton Rouge) 4 Payable from General Obligation Bonds 5 Priority 1 $ 50,000 6 Priority 5 $ 800,000 7 Total $ 850,000 8(1429)The Inspiration Center - Howell Community Park, 9 Planning and Construction 10 (East Baton Rouge) 11 Payable from General Obligation Bonds 12 Priority 2 $ 5,000,000 1350/NCMFIFTH WARD RECREATION DISTRICT OF 14 ST. HELENA PARISH 15(828) Recreation District Baseball Fields, Planning and 16 Construction 17 (St. Helena) 18 Payable from General Obligation Bonds 19 Priority 1 $ 950,417 2050/NCNSOUTH TOLEDO BEND WATERWORK S DISTRICT 21(1294)Vaco Road, Prospect Road, and Firesheets Lane, 22 Planning and Construction 23 (Sabine) 24 Payable from General Obligation Bonds 25 Priority 1 $ 25,000 26 Priority 5 $ 200,000 27 Total $ 225,000 2850/NCRLAFAYETTE PARISH WATERWORK S DISTRICT 29 NORTH 30(1536)Electronic Meter Program, Planning and Construction 31 (Lafayette) 32 Payable from General Obligation Bonds 33 Priority 5 $ 600,000 3450/ND5LAFOURCHE PARISH WATER DISTRICT 35(1002)Kraemer Water Line Upgrades, Planning and 36 Construction 37 (Lafourche) 38 Payable from General Obligation Bonds 39 Priority 1 $ 100,000 40 Priority 5 $ 1,500,000 41 Total $ 1,600,000 4250/ND9NORTHEAST LOUISIANA CHILDREN'S MUSEUM 43(1151)Northeast Louisiana Children's Museum Relocation, 44 Planning and Construction 45 (Ouachita) 46 Payable from General Obligation Bonds 47 Priority 1 $ 500,000 48 Priority 5 $ 9,500,000 49 Total $10,000,000 Page 103 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/NDNOPPORTUNITIES INDUSTRIALIZ ATION CENTER 2 INCORPORATED OF OUACHITA 3(403) New Education Building, Planning and Construction 4 (Ouachita) 5 Payable from General Obligation Bonds 6 Priority 1 $ 386,775 7 Priority 5 $ 1,845,000 8 Total $ 2,231,775 950/NDQTANGIPAHOA AFRICAN AMERICAN HERITAG E 10 MUSEUM AND VETERANS' ARCHIVES 11(421) Tangipahoa African American Heritage Museum Roof 12 Replacement, Planning and Construction 13 (Tangipahoa) 14 Payable from General Obligation Bonds 15 Priority 5 $ 540,000 1650/NDXNEW ORLEANS COUNCIL ON AG ING, INC. 17(494) New Orleans Council on Aging Office and Senior 18 Community Center, Planning, Purchase, and 19 Renovation of a Building and/or Acquire Land and 20 Construct a New Building 21 (Orleans) 22 Payable from General Obligation Bonds 23 Priority 1 $ 1,248,358 24 Priority 5 $ 3,750,000 25 Total $ 4,998,358 2650/NDYJEFFERSON DAVIS WATER AND SEWER DISTRICT 27 COMMISSION #1 28(1014)Water System Improvements, Planning 29 and Construction 30 (Jefferson Davis) 31 Payable from General Obligation Bonds 32 Priority 5 $ 5,200,000 3350/NEEBIOMEDICAL RESEARCH AND INNOVATION P ARK 34(1517)Biomedical Research and Innovation Park Building, 35 Planning and Construction 36 (Ouachita) 37 Payable from General Obligation Bonds 38 Priority 1 $ 8,600,000 39 Priority 5 $14,900,000 40 Total $23,500,000 4150/NERST. HELENA PARISH HOSPITAL SERVICE 42 DISTRICT NO. 1 43(1225)Hospital Renovation, Expansion, and Equipment 44 Replacement, Planning and Construction 45 (St. Helena) 46 Payable from General Obligation Bonds 47 Priority 1 $ 4,181,045 Page 104 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/NEYORLEANS PARISH HOSPITAL SERVICE 2 DISTRICT A 3(819) Parish Hospital Service District for the Parish of 4 Orleans - District A- Obstetrics Service Line Expansion 5 Level 2 Unit, Planning and Construction 6 (Orleans) 7 Payable from General Obligation Bonds 8 Priority 1 $ 3,200,000 950/NF6ST. MARTIN PARISH SHERIFF'S OFFICE 10(1660)Regional Law Enforcement Training Academy, 11 Planning and Construction 12 (St. Martin) 13 Payable from General Obligation Bonds 14 Priority 5 $ 900,000 1550/NF8CENTRAL LOUISIANA DETENTION CENTER 16 AUTHORITY 17(862) Central Louisiana Juvenile Detention Center, Planning 18 and Construction 19 (Grant) 20 Payable from General Obligation Bonds 21 Priority 1 $ 2,000,000 22 Priority 5 $ 8,700,000 23 Total $10,700,000 2450/NFECAJUNDOME 25(369) Cajundome and Convention Center Indoor Air Quality 26 Improvements, Planning and Construction 27 (Lafayette) 28 Payable from General Obligation Bonds 29 Priority 5 $ 6,364,182 3050/NFXTHE O.W. DILLON TRAINING AND COMMUNITY 31 DEVELOPMENT CENTER, INC. 32(1435)The O.W. Dillon Training and Community 33 Development Center Building, Planning and 34 Construction 35 (Tangipahoa) 36 Payable from General Obligation Bonds 37 Priority 1 $ 1,500,000 38 Priority 5 $ 4,500,000 39 Total $ 6,000,000 4050/NG6THE LOUISIANA BLACK HISTORY HALL OF FAME 41(209) Museum and Cultural Center, Planning and 42 Construction 43 (East Baton Rouge) 44 Payable from General Obligation Bonds 45 Priority 1 $ 2,089,802 Page 105 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/NGALINCOLN PARISH FIRE PROTECTION DISTRICT #1 2(186) Renovations to Existing Facility and Additional 3 Buildings, Acquisition, Planning and Construction 4 (Lincoln) 5 Payable from General Obligation Bonds 6 Priority 1 $ 120,000 7 Priority 5 $ 765,000 8 Total $ 885,000 950/NGMNEW ORLEANS AF RICAN AMERICAN 10 MUSEUM OF ART, CULTURE AND HISTORY 11(1676)New Orleans African American Museum of Art, 12 Culture and History: Renovation and New Construction 13 (Orleans) 14 Payable from General Obligation Bonds 15 Priority 1 $ 374,765 16 Priority 5 $ 4,000,000 17 Total $ 4,374,765 1850/NGNLOUISIANA CHAMBER OF COMMERCE 19 FOUNDATION, INC. 20(1405)Louisiana Chamber of Commerce's Business 21 Innovation Center, Planning and Construction 22 (Calcasieu) 23 Payable from General Obligation Bonds 24 Priority 5 $ 1,645,000 2550/NGQTHE STRAND THEATRE OF SHREVEPORT 26 CORPORATION 27(1318)Repair and Renovation to the Strand Theatre of 28 Shreveport 29 (Caddo) 30 Payable from General Obligation Bonds 31 Priority 1 $ 71,694 32 Priority 5 $ 984,000 33 Total $ 1,055,694 3450/NH7CEMETERY MAINTENANCE Z ACHARY 35(1771)Public Cemetery Maintenance, Planning and 36 Construction 37 (East Baton Rouge) 38 Payable from General Obligation Bonds 39 Priority 5 $ 3,750,000 4050/NHEST. JAMES PARISH HOSPITAL 41(1008)West Bank Health Clinic, Planning and Construction 42 (St. James) 43 Payable from General Obligation Bonds 44 Priority 1 $ 1,790,795 45 Priority 5 $ 3,500,000 46 Total $ 5,290,795 Page 106 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/NHGLAFAYETTE CENTRE DEVELOP MENT DISTRICT 2(1677)Downtown Lafayette Public Infrastructure 3 Improvements and Upgrades, Planning and 4 Construction 5 (Lafayette) 6 Payable from General Obligation Bonds 7 Priority 1 $ 500,000 850/NHUSOUTH GRANT WATER CORP ORATION 9(181) Water Production System Improvements, 10 East Well #2, Planning and Construction 11 (Grant) 12 Payable from General Obligation Bonds 13 Priority 5 $ 390,000 1450/NI7HOSPITAL SERVICE DISTRICT 1 IBERIA PARISH DBA 15 IBERIA MEDICAL CENTER 16(542) Addition of Medical, Surgical, and Psychiatric 17 Inpatient Rooms, Planning, Construction, and 18 Equipment 19 (Iberia) 20 Payable from General Obligation Bonds 21 Priority 2 $ 1,500,000 22 Priority 5 $ 7,175,000 23 Total $ 8,675,000 2450/NI9ASCENSION-ST. JAMES AIRPORT AND 25 TRANSPORTATION AUTHORITY 26(798) Drinking Water, Fire Suppression, and ADA 27 Compliance - Louisiana Regional Airport, Gonzales, 28 LA, Planning and Construction 29 (Ascension) 30 Payable from General Obligation Bonds 31 Priority 1 $ 190,000 32(1416)Commercial Hangar Complex - Louisiana Regional 33 Airport, Gonzales, LA, Planning and Construction 34 (Ascension) 35 Payable from General Obligation Bonds 36 Priority 1 $ 500,000 37 Priority 5 $ 500,000 38 Total $ 1,000,000 3950/NJACECILIA WATER CORP ORATION 40(1654)Water System Improvements, Planning and 41 Construction 42 (St. Martin) 43 Payable from General Obligation Bonds 44 Priority 5 $ 495,000 Page 107 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/NJLBASTION COMMUNITY OF RESILIENCE 2(1526)Veterans Wellness Facility in New Orleans, Planning 3 and Construction 4 (Orleans) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,900,000 750/NKQTHIBODAUX REG IONAL HEALTH SYSTEM 8(1084)Emergency Power System Replacement and 9 Upgrade, Planning and Construction 10 (Lafourche) 11 Payable from General Obligation Bonds 12 Priority 5 $15,800,000 1350/NLMFOUNDATION FOR SCIENCE AND MATHEMATICS 14 EDUCATION, INC. 15(48) A Model for a 21st Century Workforce Development 16 Urban High School - New Orleans Science and 17 Mathematics High School 18 (Orleans) 19 Payable from General Obligation Bonds 20 Priority 1 $ 814,846 21 Priority 5 $ 1,000,000 22 Total $ 1,814,846 2350/NLOOUR LADY OF THE ANGELS HOSPITAL 24(382) Medical Office Building, Planning and Construction 25 (Washington) 26 Payable from General Obligation Bonds 27 Priority 5 $ 4,400,000 2850/NMBCALCASIEU PARISH WATERWORK S 29 DISTRICT 1, WARD 1 30(469) New Water Treatment Plant C, Planning and 31 Construction 32 (Calcasieu) 33 Payable from General Obligation Bonds 34 Priority 5 $ 4,750,000 3550/NMDBELMONT WATERWORK S, INC. 36(57) Water System Improvements, Planning and 37 Construction 38 (Sabine) 39 Payable from General Obligation Bonds 40 Priority 1 $ 150,882 Page 108 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/NP1ACADIANA CRIMINALISTICS LABORATORY 2 DISTRICT 3(327) New Crime Laboratory, Planning, Design, 4 Construction, and Equipment 5 (Iberia) 6 Payable from General Obligation Bonds 7 Priority 1 $ 4,686,399 8 Priority 5 $13,800,000 9 Total $18,486,399 1050/NP3BAYOU LAFOURCHE FRESH WATER DISTRICT 11(611) Donaldsonville Flood Control, Planning and 12 Construction 13 (Ascension, Assumption, Lafourche, Terrebonne) 14 Payable from General Obligation Bonds 15 Priority 1 $ 753,000 1650/NPDIBERIA ECONOMIC DEVELOP MENT AUTHORITY 17(465) Progress Point Business Park and Airport Gateway, 18 Land Acquisition, Planning and Construction 19 (Iberia) 20 Payable from General Obligation Bonds 21 Priority 1 $ 1,337,444 2250/NPZMARTIN LUTHER K ING NEIGHBORHOOD ASSOCIATION 23(1012)Community Center Renovation and 24 Improvement Project, Planning and Construction 25 (Caddo) 26 Payable from General Obligation Bonds 27 Priority 5 $ 1,300,000 2850/NQ2GRAVITY DRAINAGE DISTRICT 6 29 CALCASIEU PARISH 30(886) Buxton Creek Drainage Improvements, Planning and 31 Construction 32 (Calcasieu) 33 Payable from General Obligation Bonds 34 Priority 1 $ 4,100,000 3550/NQGLAFAYETTE METROP OLITAN EXPRESSWAY 36 COMMISSION 37(1400)Lafayette Loop Project, Planning and Construction 38 (Lafayette) 39 Payable from General Obligation Bonds 40 Priority 1 $ 4,000,000 41 Priority 5 $ 2,500,000 42 Total $ 6,500,000 Page 109 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/NQNLSU REAL ESTATE AND FACILITIES 2 FOUNDATION 3(141) University Lakes Restoration Project to Address Flood 4 Control, Environmental, Safety, Health and Other 5 Issues (Matching Funds) 6 (East Baton Rouge) 7 Payable from General Obligation Bonds 8 Priority 1 $26,000,000 9Notwithstanding any other provision of law to the contrary, the appropriation for the LSU 10Real Estate and Facilities Foundation, University Lakes Restoration Project to Address 11Flood Control, Environmental, Safety, Health and Other Issues is conditioned upon the 12contracts for the project containing a provision that any sinker cypress or other natural 13resource recovered from the lakes is public property, and shall be sold at public auction with 14the proceeds of the sale to be used for the project. 1550/NQVBEAUREGARD WATERWORK S DISTRICT #6 16(470) Water System Improvements, Planning and 17 Construction 18 (Beauregard) 19 Payable from General Obligation Bonds 20 Priority 1 $ 116,125 2150/NRUEAST BATON ROUG E COUNCIL ON AGING 22(578) Lotus Village at the Lakes Senior Community, 23 Planning, Development and Construction 24 (East Baton Rouge) 25 Payable from General Obligation Bonds 26 Priority 1 $ 1,000,000 27 Priority 5 $ 6,184,000 28 Total $ 7,184,000 2950/NSPEDEN HOUSE 30(806) New Orleans Emergency Shelter, Planning and 31 Construction 32 (Orleans) 33 Payable from General Obligation Bonds 34 Priority 1 $ 850,000 3550/NT7CITIZENS MEDICAL CENTER 36(1053)Expansion of Emergency Department, ICU, 37 and Imaging, Planning, Design, and Construction 38 (Caldwell) 39 Payable from General Obligation Bonds 40 Priority 5 $ 8,000,000 4150/NTAEAST CARROLL PARISH SHERRIFF'S OFFICE 42(1723)Training and Recreation Center, Planning and 43 Construction 44 (East Carroll) 45 Payable from General Obligation Bonds 46 Priority 5 $ 3,000,000 Page 110 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/NTKTHE UNION LINCOLN REG IONAL WATER SUPPLY 2 INITIATIVE 3(1735)Development of Alternative Water Supply from Lake 4 D'Arbonne for Lincoln and Union Parishes 5 (Lincoln, Union) 6 Payable from General Obligation Bonds 7 Priority 1 $ 1,397,200 8 Priority 5 $ 2,400,000 9 Total $ 3,797,200 1050/NU99TH WARD STADIUM, INC. 11(874) Multi-Sport Venue in Eastern New Orleans and Lower 12 Ninth Ward, Planning and Construction 13 (Orleans) 14 Payable from General Obligation Bonds 15 Priority 1 $ 3,449,765 1650/NUQLOUISIANA HIBERNIAN CHARITY 17(1658)Four Acre Irish Heritage Park in the Lakeview 18 Neighborhood, Planning and Construction 19 (Orleans) 20 Payable from General Obligation Bonds 21 Priority 1 $ 250,000 2250/NVYWASHINGTON PARISH HOSPITAL SERVICE 23 DISTRICT NO. 1 24(1742)Emergency Upgrades including Power Generation 25 System Upgrade, Mechanical Systems, and Roofing, 26 Planning and Construction 27 (Washington) 28 Payable from General Obligation Bonds 29 Priority 1 $ 650,000 30 Priority 5 $ 4,650,000 31 Total $ 5,300,000 3250/NWGCHILDREN'S ADVOCACY NETWORK , INC. 33(1796)Children's Advocacy Network Campus, 34 Planning and Construction 35 (Rapides) 36 Payable from General Obligation Bonds 37 Priority 5 $ 2,000,000 38Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 3939:112. 4050/NWOAIRPORT DISTRICT 1 OF CALCASIEU PARISH 41(1314)Airport Entrance and Access Road Improvements and 42 Marquee, Planning and Construction 43 (Calcasieu) 44 Payable from General Obligation Bonds 45 Priority 1 $ 1,000,000 Page 111 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/NWRLOUISIANA SWAMP BASE, INC. 2(460) Camp Atchafalaya Swamp Base, Planning, Design, and 3 Construction 4 (St. Martin) 5 Payable from General Obligation Bonds 6 Priority 1 $ 645,000 7 Priority 5 $ 8,850,000 8 Total $ 9,495,000 950/NWSLAFAYETTE CENTRAL P ARK, INC. 10(1283)Lafayette Central Park Improvements, Planning and 11 Construction 12 (Lafayette) 13 Payable from General Obligation Bonds 14 Priority 1 $ 7,834,500 15 Priority 5 $11,000,000 16 Total $18,834,500 1750/NXCLIVINGSTON PARISH SHERIFF'S OFFICE 18(408) Livingston Parish Emergency Response and Evacuation 19 Center, Planning and Construction 20 (Livingston) 21 Payable from General Obligation Bonds 22 Priority 1 $11,000,000 23 Priority 5 $33,920,000 24 Total $44,920,000 2550/NXIHEBERT WATER SYSTEM, INC. 26(493) Water System Improvements, Planning and 27 Construction 28 (Caldwell) 29 Payable from General Obligation Bonds 30 Priority 1 $ 213,583 31 Priority 5 $ 1,000,000 32 Total $ 1,213,583 3350/NXYCONCORDIA PARISH HOSPITAL SERVICE 34 DISTRICT #1 35(113) Construction of Turn Lane on U.S. 84/425 36 (Concordia) 37 Payable from General Obligation Bonds 38 Priority 1 $ 225,000 3950/NYJALLEN PARISH HOSPITAL 40(1646)New Hospital Equipment, Planning and 41 Construction 42 (Allen) 43 Payable from General Obligation Bonds 44 Priority 2 $ 1,000,000 Page 112 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/NYNOPELOUSAS HEIGHTS, INC. 2(624) Opelousas Heights Proposed Subdivision, Planning and 3 Construction 4 (St. Landry) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,184,790 750/NYPSECOND HARVEST F OOD BANK OF GREATER 8 NEW ORLEANS AND ACADIANA 9(368) Roof Replacement and HVAC Installation, Planning 10 and Construction 11 (Jefferson) 12 Payable from General Obligation Bonds 13 Priority 1 $ 1,006,031 1450/NYSHOLY ROSARY REDEVELOP MENT 15(175) Holy Rosary Institute, Planning, Construction, and 16 Restoration 17 (Lafayette) 18 Payable from General Obligation Bonds 19 Priority 1 $ 4,422,825 20 Priority 5 $ 3,200,000 21 Total $ 7,622,825 2250/NYVNOTRE DAME HEALTH SYSTEM 23(1437)Wynhoven Health Care Expansion, including St. 24 Andrew's Village, Planning and Construction 25 (Jefferson) 26 Payable from General Obligation Bonds 27 Priority 1 $ 3,561,859 28 Priority 5 $ 1,999,750 29 Total $ 5,561,609 3050/NZ3BEAUREGARD MEMORIAL HOSP ITAL 31(1183)Emergency Department Addition and Renovation 32 and Women's Center Renovation, Planning and 33 Construction 34 (Beauregard) 35 Payable from General Obligation Bonds 36 Priority 5 $ 4,900,000 3750/NZBLIVINGSTON PARISH AIRPORT DISTRICT 38(348) Livingston Executive Airport, Planning and 39 Construction 40 (Livingston) 41 Payable from General Obligation Bonds 42 Priority 1 $ 1,161,233 43 Priority 5 $ 485,000 44 Total $ 1,646,233 Page 113 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/NZDHOSPITAL SERVICE DISTRICT NO. 1, 2 PARISH OF ST. MARY 3(127) Franklin Foundation Hospital Wellness Center 4 (St. Mary) 5 Payable from General Obligation Bonds 6 Priority 1 $ 2,000,000 750/NZKTHE ROBERT A. BOGAN BATON ROUGE FIRE MUSEUM 8(208) Museum Restoration, Planning and Construction 9 (East Baton Rouge) 10 Payable from General Obligation Bonds 11 Priority 5 $ 3,165,000 1250/NZXWEST CALCASIEU CAMERON HOSP ITAL 13(1401)West Calcasieu Cameron Hospital Medical Office 14 Building, Planning and Construction 15 (Calcasieu) 16 Payable from General Obligation Bonds 17 Priority 1 $ 1,328,000 18 Priority 5 $ 3,022,000 19 Total $ 4,350,000 2050/S10CALCASIEU PARISH SCHOOL BOARD 21(1728)Renovations to Lake Charles Boston Stadium, Planning 22 and Construction 23 (Calcasieu) 24 Payable from General Obligation Bonds 25 Priority 1 $ 167,000 26 Priority 5 $ 823,000 27 Total $ 990,000 2850/S32LIVINGSTON PARISH SCHOOL BOARD 29(1445)Widening and Turn Lane Construction for LA Hwy 16 30 as Part of the New Southside Elementary and Jr. High 31 Schools 32 (Livingston) 33 Payable from General Obligation Bonds 34 Priority 1 $ 543,297 3550/S39POINTE COUPEE PARISH SCHOOL BOARD 36(1737)Pointe Coupee Parish School Board Office Relocation, 37 to be Located at 8777 Morganza Highway, Formerly 38 Labarre Elementary School Site, Due to Flooding 39 Caused by Hurricane Gustav, Planning and 40 Construction 41 (Pointe Coupee) 42 Payable from General Obligation Bonds 43 Priority 1 $ 2,468,060 44 Priority 5 $ 1,900,000 45 Total $ 4,368,060 Page 114 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 150/S63WEST FELICIANA PARISH SCHOOL BOARD 2(657) Julius Freyhan Cultural/Conference Center, Planning 3 and Construction 4 (West Feliciana) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,497,000 750/S67CENTRAL COMMUNITY SCHOOL SYSTEM 8(1009)Central Community School System Multi-Use Activity 9 Center, Planning and Construction 10 (East Baton Rouge) 11 Payable from General Obligation Bonds 12 Priority 1 $ 1,200,000 13 Priority 5 $ 9,800,000 14 Total $11,000,000 15 Section 1.(A) Appropriated Debt Projects. The projects listed in this section are 16to be funded through the sale bonds and secured by or payable from state appropriation. 1708/419OFFICE OF STATE POLICE 18(743) Crime Laboratory, Planning and Construction 19 (East Baton Rouge) 20 Payable from Revenue Bonds $45,278,000 21 Notwithstanding anything contained in this Capital Outlay Act, or any previous 22Capital Outlay Act to the contrary, or any other provision of law, the Office of State Police 23may finance the design, construction, furnishing and equipping of facilities through the 24issuance of revenue bonds by the Louisiana Public Facilities Authority to be secured by and 25 payable from State appropriations. The issuance of such revenue bonds shall require the 26approval of the State Bond Commission. 2701/107DIVISION OF ADMINISTRATION 28(541) Northwest Louisiana State Office Building Renovations, 29 Phase II, Planning and Construction 30 (Caddo) 31 Payable from Revenue Bonds $75,000,000 32 Notwithstanding anything contained in this Capital Outlay Act, or any previous 33Capital Outlay Act to the contrary, or any other provision of law, the Division of 34Administration may finance the design, construction, furnishing and equipping of facilities 35through the issuance of revenue bonds by the Office Facilities Corporation to be secured by 36and payable from State appropriations. The issuance of such revenue bonds shall require the 37approval of the State Bond Commission. Page 115 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1 Section 2.(A) The expenditure of funds appropriated in this Act shall be in 2conformity to all existing statutes relative to public bidding, contractual review, and R.S. 339:101 through 128 and any other statutes affecting the capital outlay program for state 4government, state institutions, and political entities. 5 (B) Notwithstanding the provisions of R.S. 39:101, 102, and 112(C), projects 6included in Section 1 of this Act which did not submit a capital outlay application by 7November 1, 2022, in compliance with the provisions of R.S. 39:101 and 102 and which 8have not received late approval as required by R.S. 39:112(C) are hereby deemed to have 9until June 15, 2023, to submit a capital outlay budget request application pursuant to R.S. 1039:101(A), and if the application is submitted by that date, the project is deemed to have 11complied with the late approval requirements of R.S. 39:112(C). Additionally, the capital 12outlay budget requests together with supporting information and documents for these 13projects shall constitute the feasibility study required by Article VII, Section 11(C) of the 14Constitution of Louisiana. 15 Section 3. Payment for projects specified in this Act must be made by warrant 16submitted to the division of administration, Department of Transportation and Development, 17the state treasurer or other administering agency as provided in Section 8, whichever is 18appropriate, only to the extent of funds required for immediate payment. Copies of invoices 19or other supporting documentation shall be submitted with warrants. In the event that any 20equipment included in this Act, is procured pursuant to the provisions of the State Lease- 21Purchase Act, R.S. 39:1761 et seq., the amounts included in this Act for each such piece of 22equipment shall not be appropriated. The provisions of R.S. 39:1771 which require 23equipment to be leased under the State Lease-Purchase Act to be included in the executive 24budget and approved by the legislature through inclusion in the General Appropriation Act 25shall be considered waived upon the inclusion of such equipment in this Act. Projects 26contained in this Act may, at the direction of the division of administration and with the 27approval of the State Bond Commission, alternatively be funded through financing programs 28heretofore or hereafter provided by a public trust and public corporation duly organized 29pursuant to R.S. 9:2341 et seq., having for its beneficiary the state and the Louisiana Local 30Government Environmental Facilities and Community Development Authority, pursuant to 31R.S. 33:4548.1 et seq. Page 116 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1 Section 4. If at any time during the Fiscal Year 2023-2024, the governor should 2find, or the Joint Legislative Committee on the Budget or the commissioner of 3administration should report to the governor, that the receipts of the treasury are falling short 4or appear likely to fall short of the revenue estimates for the fiscal year and that a cash 5deficit is likely to be incurred, the governor shall take such steps as deemed necessary to 6prevent the occurrence of a cash deficit. In the event that a capital outlay project funded in 7this Act falls under an agency which is abolished or for which funds are not appropriated in 8the 2023-2024 General Appropriation Act, then the funds appropriated in this Act for such 9capital outlay projects shall not be expended unless deemed necessary by the governor to 10protect life or property. In the event that legislation is enacted which transfers facilities or 11programs for which projects are funded in this Act, on behalf of one agency, institution, 12department, or management board to another agency, institution, department, or management 13board, then the projects in this Act shall be deemed transferred also. 14 Section 5. All monies appropriated by this Act and any applicable funds of a prior 15capital outlay budget act adopted by the legislature shall be deposited by the state treasurer 16in the Comprehensive Capital Outlay Escrow Account, established by this Section, in the 17state treasury. In accordance with R.S. 36:764, no later than sixty days following the end of 18each quarter, the state treasurer shall report to the Joint Legislative Committee on the Budget 19and the commissioner of administration, all funds contained in the Miscellaneous Fund of 20the Comprehensive Capital Outlay Escrow Account. Notwithstanding any provisions 21contained herein or other law to the contrary, any original issue premium or accrued interest 22proceeds received pursuant to the sale of general obligation bonds shall remain on deposit 23to the credit of the Bond Security and Redemption Fund until such time as they may be 24utilized in accordance with U.S. Department of the Treasury Regulations promulgated 25pursuant to the Internal Revenue Code of 1986. All such monies shall be administered 26according to the particular act pertaining to the fiscal year in which such monies were 27appropriated. If it is determined by the director of the office of facility planning and control, 28division of administration, that the funds appropriated by this Act or any prior capital outlay 29budget Act are not sufficient to complete the projects contained in any capital outlay budget 30Act, through unavoidable deficiencies in appropriation, including administrative and legal 31requirements, the commissioner of administration, subject to approval of the Joint Page 117 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1Legislative Committee on the Budget, may direct the use of interest earned from the 2investment of general obligation bond or note proceeds in the Comprehensive Capital Outlay 3Escrow Account, not to exceed an aggregate of five million dollars in any one fiscal year, 4for the purpose of completing the projects contained in any capital outlay budget Act and 5such money shall be deemed appropriated in specific amounts necessary for such purpose. 6All appropriations in this Act which are made as additions to funds for previously authorized 7projects shall be included, for accounting purposes, in the account of the previously 8authorized projects. If it is determined by the director of the office of facility planning and 9control, division of administration, that it is cost effective and practical to combine 10individual appropriations, the commissioner of administration, subject to the approval of the 11Joint Legislative Committee on the Budget, may direct that two or more appropriations or 12parts thereof may be combined into a single project for accounting and audit purposes. The 13commissioner of administration may direct that funding in the various statewide and/or 14multiple parish projects for improvements for state facilities may be transferred to any 15project, in this Act or any previous Capital Outlay Act, which require supplemental funding 16for improvements for state facilities which qualify for funding through the various statewide 17and/or multiple parish projects for improvements for state facilities. The office of facility 18planning and control, division of administration is authorized to receive settlements and 19vendor rebates and to add a portion or all of these receipts to the existing project funds 20relating to the settlement and/or vendor rebates and appropriated in this Act or any previous 21Capital Outlay Act including those previously appropriated funds that become unavailable. 22Approval of the Joint Legislative Committee on the Budget will be obtained if the settlement 23and/or vendor rebates will be added to any projects in this Act or any previous Capital 24Outlay Act which are unrelated to the project from which the settlement and/or vendor 25rebates were received. The office of facility planning and control, division of administration 26is authorized to receive insurance payments and are hereby authorized to immediately repair 27facilities that suffer insurance losses without those projects being included in the Act and 28shall report to the Joint Legislative Committee on the Budget any expenditures from 29insurance funds received pursuant to this section. A portion, as determined by the 30commissioner of administration and not to exceed one percent (1%), of the funding for 31projects which qualify for the Percent for Art Program and not to exceed $450,000 for an Page 118 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1individual, qualifying project, may be transferred from the qualifying project budgets, to the 2Department of Culture, Recreation and Tourism for costs of acquiring art and administering 3the program. For all Percent for Art Program projects in this or any previous capital outlay, 4up to ten percent (10%) of the aforementioned one percent (1%) may be used for the costs 5of administering the projects. 6 Section 6. No later than February 1, 2024, agencies administering capital outlay 7projects will submit reports identifying completed projects and cash balances to the Joint 8Legislative Committee on Capital Outlay pursuant to the reporting requirements of R.S. 939:105 and R.S. 39:116. 10 Section 7. The commissioner of administration, with the approval of the Joint 11Legislative Committee on the Budget, is authorized to supplement or substitute the 12appropriations specified in this or previous capital outlay acts with any federal or other funds 13which are or may become available and such funds shall be deemed appropriated in specific 14amounts necessary for the purposes of this Act. Any funds received by the State Bond 15Commission as a result of a prepayment of reimbursement contracts as authorized by law 16and the policy and procedure for reimbursement contracts of the Department of Treasury, 17office of State Bond Commission, shall be deposited as set forth in such policy and 18procedure and shall be deemed available and appropriated in specific amounts necessary for 19the purposes of this Act pursuant to the procedure set forth in this section. 20 Section 8.(A) All projects herein authorized and funded shall be subject to the 21provisions of R.S. 39:101 through 128. With the exception of appropriations made to the 22Department of Military Affairs, the Legislature, the Louisiana Stadium and Exposition 23District, the Department of Economic Development, the Coastal Protection and Restoration 24Authority, the Division of Administration for Supplemental State Funds for Local 25Government Assistance Program, the Division of Administration for the Community Water 26Enrichment Program or the Department of Transportation and Development, all funds herein 27appropriated shall be considered as having been appropriated directly to the Office of 28Facility Planning and Control, Division of Administration. All cooperative endeavor 29agreements for non-state entities shall be prepared by the appropriate administering agency 30and submitted to the office of State Procurement for review and approval. As part of its Page 119 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1review, the office of State Procurement shall consult with bond counsel to the State relative 2to any federal tax issues. 3 (1) Notwithstanding anything contained in this act to the contrary or any other 4provision of law, the appropriations made for the Louisiana Stadium and Exposition District 5shall be appropriated directly to the Louisiana Stadium and Exposition District, and are 6public purposes pursuant to the provisions of Article VII, Section 14 of the Constitution of 7Louisiana primarily for economic development, including the generation of tax revenue, 8creation of jobs, and the generation of tourism, and may be used to reimburse any 9expenditure made prior to the granting of a line of credit or the sale of bonds by the State 10Bond Commission, determination by the State Treasurer that cash funding has been 11deposited in the Comprehensive Capital Outlay Escrow Account for the project. 12 (2) Further, with respect to appropriations to the Louisiana Stadium and 13Exposition District for the TPC Louisiana, Planning and Construction project, the Louisiana 14Stadium and Exposition District shall be permitted to use alternative competitive 15procurement and delivery methods for the award of any contracts to be funded through such 16appropriation. 17 (3) The Louisiana Stadium and Exposition District shall have the authority to 18directly appoint a design professional from a list of a minimum of three architectural firms 19or joint ventures with professional sports facility design experience acceptable to the 20Commissioner of Administration and shall be exempt from other state requirements for 21selection of designers. The design professional fee shall be in accordance with state 22guidelines administered by the Office of Facility Planning and Control, Division of 23Administration. 24 (B)(1)(a) Funds appropriated in the Capital Outlay Act under the name of non- 25state entities shall be administered by the Office of Facility Planning and Control, Division 26of Administration under cooperative endeavor agreements; however, projects involving state 27or federal highways may be administered by the Department of Transportation and 28Development, if appropriate. Except as provided in Section 8(A), cooperative endeavor 29agreements entered into pursuant to appropriations in this Act shall not be required to be 30submitted to the Division of Administration, Office of State Procurement. Page 120 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1 (b) Further, for all projects in the Capital Outlay Act or a previous Capital Outlay 2Act which are appropriated to the Office of Facility Planning and Control, Division of 3Administration, including those administered by cooperative endeavor agreements, up to six 4percent of each line-item may be used for costs of administering the projects. 5 (c) For all projects in Capital Outlay Act or a previous Capital Outlay Act 6appropriated to the Department of Transportation and Development, up to six percent of 7each line-item may be used for costs of administering the projects, or for field 8engineering/construction supervision. 9 (2) Notwithstanding anything in this Act, or a previous Capital Outlay Act, the 10Office of Facility Planning and Control may enter into a cooperative endeavor agreement 11with the Archdiocese of New Orleans and Jefferson Parish for the Preservation and 12Restoration of Historic Structure for Hope Haven/Madonna Manor Campus, Planning and 13Construction project. 14 (C) Line-item general obligation bond projects appropriated to the Department 15of Transportation and Development in the Capital Outlay Act or a previous Capital Outlay 16Act shall be authorized to draw Transportation Trust Funds from the Highway Program 17appropriation, for supplemental funding on overruns in excess of the original estimated 18project cost as determined by the Department of Transportation and Development, provided 19however that said projects are in the state or federal highway system and in the priority 20program, and the overrun is less than $50,000. Any such overrun of $50,000 or more must 21be approved by the Joint Legislative Committee on the Budget. 22 (D) All ports, levee districts and other non-state entities must follow the 23provisions of R.S. 39:122. 24 (E) Pursuant to R.S. 39:122(B)(2), funds to be reimbursed by the state which a 25non-state entity attempts to obligate prior to the receipt of funding shall not be eligible for 26reimbursement or payment by the state; however, 27 (1) Notwithstanding anything in this Act or any previous Capital Outlay Acts to 28the contrary, contracts may be entered into for the Lafayette Economic Development 29Authority, Lafayette Innovation Center (Lafayette) prior to the receipt of funding and the 30State is authorized to financially participate in obligations created by such contracts. Page 121 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1 (2) Notwithstanding anything in this Act or the capital outlay act to the contrary, 2contracts may be entered into for the City of Broussard, Lake Talon Road Sewer 3Improvements, Planning and Construction project prior to receipt of funding and the State 4is authorized to financially participate in obligations created by such contracts. 5 (F) Pursuant to R.S. 39:112(E)(2), non-state entity projects shall require a match 6for each appropriation in this act ; however, 7 (G) Notwithstanding anything contained in this Act or the Capital Outlay Act to 8the contrary or any other Act or provision of law, the appropriations made for the Executive 9Department for facilities which promote economic development included in the Repair, 10Restoration, and Replacement for Declared Disasters, Planning, Construction, Renovation, 11and Acquisition project, and the Department of Economic Development projects are for 12public purposes pursuant to the provisions of Article VII, Section 14 of the Constitution of 13Louisiana primarily for economic development, including the generation of tax revenues, 14creation of jobs, promotion of tourism, and creation of facilities for charitable, cultural, 15artistic, educational, social, civic, research, service, economic development activities, or 16provide facilities for professional golf events, pursuant to the terms of cooperative endeavor 17agreements, including leases and all expenditures of these appropriations and may be 18exempted, by the Commissioner of Administration, from all statutes relative to public 19bidding, contractual review and the provisions of R.S. 33:9029.2(D) and in lieu thereof be 20allowed to use alternative competitive contracting arrangements where the appropriate 21administering entity submits documentation to the Commissioner of Administration 22substantiating that it is in the best interest of the citizens of the state, due to economic and/or 23operational benefits, and the necessity to complete the projects in a timely manner; and, the 24appropriate administering entity shall have the authority to directly appoint the design 25professional from a list of a minimum of three design firms or joint ventures with the 26appropriate specialized facility design experience submitted to and acceptable to the 27Commissioner of Administration and shall be exempt from other state requirements for 28selection of designers, and may include expenditures for computers, fixtures, furniture, and 29other equipment as such is deemed to be capital outlay in nature, and unless the 30Commissioner of Administration is advised by bond counsel to the State that such may Page 122 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1violate federal tax law, may be used to reimburse any expenditure made prior to the granting 2of a line of credit or the sale of bonds by the State Bond Commission, determination by the 3State Treasurer that cash funding has been deposited in the Comprehensive Capital Outlay 4Escrow Account for the project or the execution of a cooperative endeavor agreement from 5the Office of Facility Planning and Control, and may be used to acquire land or real property, 6the title to which is held in the name of an entity exempt from taxation under the provisions 7of 26 U.S.C. 501(c)(3). 8 (H) Notwithstanding any other provision of this Act or the Capital Outlay Act or 9any other provision of law to the contrary, all of the funds herein appropriated to the 10Department of Economic Development in connection with projects or programs for which 11the Department of Economic Development utilizes a cooperative endeavor agreement to 12further economic development as permitted under Article VII, Section 14 of the Louisiana 13Constitution, including the generation of tax revenues and creation of jobs, shall be 14considered as having been appropriated to the Department of Economic Development, may 15be used to reimburse any expenditure made prior to the granting of a line of credit and made 16prior to the execution of a cooperative endeavor agreement and shall be administered solely 17by the Department of Economic Development pursuant to, in compliance with, and on the 18terms contained in such cooperative endeavor agreements without compliance with any other 19law, including, but not limited to, the provisions of R.S. 39:101 through 128. Additionally, 20all expenditures of these appropriations may be exempted by the Commissioner of 21Administration, from all statutes relative to public bidding, contractual review and the 22provisions of R.S. 33:9029.2(D). 23 (I)(1) Notwithstanding any other provision of this Act or the Capital Outlay Act 24or any other provision of law to the contrary, funds appropriated for the Economic 25Development Award Program project for the Office of Business Development are to be used 26solely for capital and infrastructure improvements subject to verification by the Division of 27Administration, Office of Facility Planning and Control. 28 (2) Eligible expenses for Economic Development Award Program funds may 29include documented project expenses beginning on the date of LEDC Board approval of the Page 123 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1project and may be reimbursed upon execution of the cooperative endeavor agreement for 2the project. 3 (J)(1) Due to the state's current investment in TPC Louisiana and the financial 4support it provides to the PGA TOUR event currently played at said facility, said PGA 5TOUR event shall not be played at New Orleans City Park Golf Complex without the prior 6agreement of the Commissioner of Administration and the Chairman of the Jefferson Parish 7Council. 8 (2) Notwithstanding the foregoing, the City Park Golf Complex may host any 9other golf tournament or event, including but not limited to any other PGA-affiliated or 10sponsored tournament or event. 11 (K)(1) For all projects administered by the Office of Facility Planning and 12Control and payable from proceeds of self-generated revenues, funds shall be remitted to the 13Office of Facility Planning and Control for deposit in the state treasury at such time as may 14be deemed necessary by the Office of Facility Planning and Control in order to cover the 15amount of contracts or other project expenses. 16 (2) Notwithstanding any provisions contained herein or any other law to the 17contrary, for projects with other means of financing provided to the administering agency 18by interagency transfer, the authority to draw these funds shall remain with the user agency. 19 (3) Any revenue bonds appropriated in Section 1 or Section 1.(A) of the Capital 20Outlay Act shall not be secured by the full faith and credit of the state. 21 (4) The State Treasurer shall refund to the appropriate source any surplus self- 22generated funds, advanced insurance funds received by the Office of Facility Planning and 23Control as Interagency Transfer from Office of Risk Management associated with hurricane 24damage recovery, and interest earned on these funds, provided the Treasurer's Office is 25notified, when these funds are deposited in the state treasury, that the user agency or Office 26of Risk Management intends to request a refund of this interest. 27 (L) Notwithstanding any provisions contained in this Act, the Capital Outlay Act, 28or any other provision of law to the contrary, any funds expended by the parish of St. Mary 29for the purpose of securing a federal grant, for the Infrastructure Improvements and Page 124 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1Construction of a Welding Training Center Facility at the Charenton Canal Industrial Park, 2shall be eligible for reimbursement from any cash line of credit approved for the project. 3 (M) Notwithstanding anything contained in this Act to the contrary or any other 4provision of law, the resolution adopted by the Joint Legislative Committee on the Budget 5(the committee) on March 19, 2019 approving State of Louisiana Grant Anticipation 6Revenue Bonds, in one or more series, not exceeding $650,000,000, and approving the 7related projects and providing for other matters in connection therewith, contains the 8following approvals: 9 (1) The first series of bonds in the original principal amount of not exceeding 10$185,000,000 in order to fund the following projects in the following estimated amounts: 11Barksdale Project ($61,600,000) and portions of the Loyola Project ($77,600,000) and the 12I-10 Project ($30,601,000) with the understanding that the Department has the ability to 13manage the actual application of bond proceeds in order to appropriately fund the Projects 14and meet expenditure requirements of the Internal Revenue Service. 15 (2) The second series of bonds for the express purpose of granting the required 16contracts in the principal amount of approximately $142,000,000 in order to fund the 17following projects in the following estimated amounts: the balance of the Barksdale Project 18($16,518,000), the balance of the Loyola Project ($87,500,000), portions of the I-10 Project 19($37,982,000) and the Belle Chasse Project ($12,500,000) with the understanding that the 20Department has the ability to manage the actual application of Bond proceeds in order to 21appropriately fund the Projects and meet expenditure requirements of the Internal Revenue 22Service provided, however, the Department of Transportation and Development seeks 23approval from the Committee for the issuance of the second series of bonds and all 24subsequent series of bonds. 25 (N) Notwithstanding anything contained in this Act to the contrary or any other 26provision of law, the Research Vessel (R/V) Pelican Replacement is deemed to be a capital 27asset and the appropriation to Louisiana Universities Marine Consortium (LUMCON) to 28replace the R/V Pelican is for a public purpose and has a significant economic impact 29providing a variety of oceanographic research missions. Further, LUMCON shall be 30permitted to use an alternative delivery method to award contracts for design of the proposed Page 125 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1replacement vessel. LUMCON shall have the authority to select the design professional from 2a list of a minimum of two engineering firms or joint ventures with ship design experience 3acceptable to the Commissioner of Administration and the selection shall be exempt from 4other state requirements for the selection of designers. The design professional fee shall be 5in accordance with state guidelines administered by the Office of Facility Planning and 6Control, Division of Administration. LUMCON shall further be permitted to use an 7alternative delivery method to award contracts for the construction of the proposed 8replacement vessel. LUMCON shall have the authority to select the contractor from a list 9of a minimum of three highly qualified ship builders/shipyards with relevant vessel 10construction experience acceptable to the Commissioner of Administration and the selection 11shall be exempt from other state requirements for the selection of contractors. The 12construction contract shall be administered by the Office of Facility Planning and Control, 13Division of Administration in accordance with state guidelines. 14 (O) Notwithstanding anything contained in this Act to the contrary or any other 15provision of law, the appropriations for Major Repairs for Higher Education Facilities – 16Infrastructure, and Buildings Based on Statewide Condition Assessment, Planning and 17Construction, in Act 7 of 2008 identifying specific projects for higher education is deemed 18to be complete, and any remaining residual funds are hereby authorized to be combined and 19accumulated to accomplish additional major repair projects within the higher education 20systems, as deemed necessary and approved by the Board of Regents and Facility Planning 21and Control. At the completion of the program, Facility Planning and Control shall submit 22a report to the Joint Legislative Committee on the Budget concerning the use of the 23remaining residual funds. 24 (P) Notwithstanding anything contained in this Act or any other provision of law, 25LSU Real Estate and Facilities Foundation (LRFF) is authorized to execute contracts for the 26University Lakes Restoration Project to Address Flood Control, Environmental, Safety, 27Health and Other Issues project prior to execution of a cooperative endeavor agreement, the 28granting of a line of credit or the sale of bonds. The appropriation for this project may be 29used to pay any obligation incurred or to reimburse any expenditure made pursuant to such 30contracts unless the Commissioner of Administration is advised by bond counsel to the state Page 126 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1that such may violate federal tax law, after execution of a cooperative endeavor agreement. 2The Office of Facility Planning and Control shall consult with bond counsel to the State 3relative to any federal tax issues. Further, LRFF may use alternative competitive contracting 4arrangements with the prior approval of the Commissioner of Administration. 5 (Q) Notwithstanding anything contained in this Act to the contrary or any other 6provision of law, the USS KIDD DD-661, a World War II era Fletcher class destroyer and 7National Historic Landmark, is deemed to be a capital asset and the appropriation to the 8Louisiana Naval War Memorial Commission for Hull Repair & Reinforcement, 9Superstructure Repair, Interior Restoration & Painting and Docking Cradle Repairs & 10Upgrade is for a public purpose and will allow the vessel to continue to serve the citizens of 11Louisiana as a proven highly successful tourist attraction, educational institution, military 12memorial, patriotic ceremonial platform and documentary/theatrical film set. Further, the 13USS KIDD DD-661 the only surviving Fletcher class destroyer in her original WW2 14configuration and the restoration project requires special consideration in the selection of a 15restoration contractor and in the location and complete identification of the repairs to be 16performed. Therefore, the Louisiana Naval War Memorial Commission, through the Office 17of Culture, Recreation & Tourism, shall be permitted to use an alternative delivery method 18to award construction contract(s) for the proposed repairs and renovations to the USS KIDD 19and its cradle. The Louisiana Naval War Memorial Commission, through the Office of 20Culture, Recreation & Tourism, shall have the authority to select the contractor(s) from a list 21of a minimum of three highly qualified ship builders/shipyards with relevant restoration 22experience acceptable to the Commissioner of Administration and the selection shall be 23exempt from other state requirements for the selection of contractors. The construction 24contract(s) shall be administered by the Office of Facility Planning and Control, Division 25of Administration in accordance with state guidelines and all restoration and repairs shall 26adhere to the U.S. Department of Interiors’ Standards for Historic Ship Preservation 27Projects. 28 (R) Pursuant to R.S. 39:102, each capital outlay budget request submitted as 29required by R.S. 39:101 shall include a detailed project description and justification for each 30new project requested; however, Page 127 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1 (1) Notwithstanding anything contained in this Act or the Capital Outlay Act to 2the contrary or any other provision of law, the scope of the appropriations made in this or 3any other Capital Outlay Act for the New Orleans West Bank Park Improvements, New 4Soccer and Recreational Facilities project shall be deemed to include the George W. Carver 5Playground, Renovations and Upgrades project for the West Bank Park project. 6 (2) Notwithstanding anything contained in this Act or the Capital Outlay Act to 7the contrary or any other provision of law, the scope of the appropriations made in this or 8any other Capital Outlay Act for the Pointe Coupee Parish School Board Office Relocation, 9Due to Flooding Caused by Hurricane Gustav, Planning and Construction project shall be 10deemed to include that the School Board Office is to be Located at 8777 Morganza 11Highway. 12 (3) Notwithstanding anything in this Act, any previous capital outlay act, or other 13provision of law to the contrary, the scope of the appropriation for the Port of South 14Louisiana Globalplex Terminal Building #71 Upgrade project shall be deemed to also 15include similar upgrades for other Globalplex Terminal Buildings and a Heavy Load 16Capacity Foundation or Floor. 17 (4) Notwithstanding anything in this Act, any previous capital outlay act, or other 18provision of law to the contrary, monies appropriated herein for the Port of South Louisiana 19Globalplex Terminal Building #71 and Other Globalplex Terminal Building Upgrades, 20Planning and Construction may be expended for design fees related to the conveyor system 21and ancillary equipment that exceed the customary ten percent limitation on design fee costs. 22 (5) Notwithstanding anything in this Act, any previous capital outlay act, or other 23provision of law to the contrary, the scope of the appropriation for the Port of South 24Louisiana Globalplex Dock Access Bridge and Equipment Replacement/Repair project shall 25be deemed to also include an Access Road. 26 (6) Notwithstanding anything in this Act, any previous capital outlay act, or other 27provision of law to the contrary, the scope of the appropriation for the Port of South 28Louisiana Globalplex Rail Siding project shall be deemed to also include a Rail Spur. 29 (7) Notwithstanding anything contained in this Act or the Capital Outlay Act to 30the contrary or any other provision of law, the scope of the appropriations made in this or Page 128 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1any other Capital Outlay Act for the Pontchartrain Levee District Lake Pontchartrain West 2Shore Hurricane Protection, Planning and Construction project shall be deemed to include 3Ascension Parish. 4 (8) Notwithstanding anything contained in this Act or the Capital Act to the 5contrary or any other provision of law, the scope of the appropriation made in this or any 6other Capital Outlay Act for the Statewide Roofing Asset Management Program and 7Waterproofing, Related Repairs and Equipment Replacement Program project shall be 8deemed to include Peltier Hall at Nicholls State University. 9 (9) Notwithstanding anything contained in this Act or the Capital Act to the 10contrary or any other provision of law, the scope of the appropriation made in this or any 11other Capital Outlay Act for the Longview Road Improvements, Beauregard Parish Police 12Jury project shall be deemed to include Longville Road Improvements for the Beauregard 13Parish Police Jury . 14 (10) Notwithstanding anything contained in this Act to the contrary or any other 15provision of law, the capital outlay request with an appropriation for the Water Treatment 16Facility, Booster Pump Station, and Distribution System Improvements project for the City 17of Franklin shall be deemed to be submitted timely and is otherwise compliant with the 18provisions of R.S. 39:101 and R.S. 39:102 as the project was originally submitted on time, 19by August 31, 2022, for the Water Sector Program and such request together with supporting 20information and documents shall constitute the feasibility study required by Article VI, 21Section 11(C) of the Constitution of Louisiana. 22 (11) Notwithstanding anything contained in this Act to the contrary or any other 23provision of law, the capital outlay request with an appropriation for the Sewer 24Rehabilitation project for the City of Morgan City shall be deemed to be submitted timely 25and is otherwise compliant with the provisions of R.S. 39:101 and R.S. 39:102 as the project 26was originally submitted on time, by August 31, 2022, for the Water Sector Program and 27such request together with supporting information and documents shall constitute the 28feasibility study required by Article VI, Section 11(C) of the Constitution of Louisiana. 29 (12) Notwithstanding anything contained in this Act to the contrary or any other 30provision of law, the capital outlay request with an appropriation for the Rehabilitation of Page 129 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1Nine Sewer Lift Stations project for the City of Patterson shall be deemed to be submitted 2timely and is otherwise compliant with the provisions of R.S. 39:101 and R.S. 39:102 as the 3project was originally submitted on time, by August 31, 2022, for the Water Sector Program 4and such request together with supporting information and documents shall constitute the 5feasibility study required by Article VI, Section 11(C) of the Constitution of Louisiana. 6 (13) Notwithstanding anything contained in this Act to the contrary or any other 7provision of law, the capital outlay request with an appropriation for the Wastewater 8Treatment Plant Improvements project for the City of Westwego shall be deemed to be 9submitted timely and is otherwise compliant with the provisions of R.S. 39:101 and R.S. 1039:102 as the project was originally submitted on time, by August 31, 2022, for the Water 11Sector Program and such request together with supporting information and documents shall 12constitute the feasibility study required by Article VI, Section 11(C) of the Constitution of 13Louisiana. 14 (14) Notwithstanding anything contained in this Act to the contrary or any other 15provision of law, the capital outlay request with an appropriation for the Water Distribution 16System Improvements project for the City of Westwego shall be deemed to be submitted 17timely and is otherwise compliant with the provisions of R.S. 39:101 and R.S. 39:102 as the 18project was originally submitted on time, by August 31, 2022, for the Water Sector Program 19and such request together with supporting information and documents shall constitute the 20feasibility study required by Article VI, Section 11(C) of the Constitution of Louisiana. 21 (15) Notwithstanding anything contained in this Act or the Capital Act to the 22contrary or any other provision of law, the scope of the appropriation made in this or any 23other Capital Outlay Act for the JESTC Training Facility Improvements project shall be 24deemed to include facilities at JESTC to accommodate a less than lethal training program 25utilizing mobile virtual training. 26 (16) Notwithstanding anything contained in this Act, any previous capital outlay 27act to the contrary, or any other provision of law, the scope of the appropriations made in 28this or any other capital outlay act for the Industrial Park Development project for New 29Roads shall be deemed to include underground electrical system upgrades. Page 130 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1 (17) Notwithstanding anything contained in this Act, any previous capital outlay 2act to the contrary, or any other provision of law, the scope of the appropriations made in 3this or any other capital outlay act for the Lincoln Manner Subdivision Drainage project for 4Kenner shall be deemed to include 30 th Street Roadway and Drainage Improvements from 5Loyola Drive to Ohio Street. 6 (S) Notwithstanding anything contained in this Act to the contrary or any other 7provision of law, all non-state projects that include water systems in the scope of work shall 8also be required to include a rate study as part of the project. 9 Section 9. Notwithstanding any provisions contained herein or any other law to 10the contrary, the provisions of Chapter 16 of Subtitle III of Title 39 of the Louisiana Revised 11Statutes of 1950 as amended, shall not apply to architectural and engineering contracts, 12administered by the office of facility planning and control, division of administration 13pursuant to this or any other capital outlay act. 14 Section 10. All funds appropriated herein to agencies administering capital outlay 15projects, on behalf of non-state entities, by cooperative endeavor agreements pursuant to this 16Act shall be expended within two (2) years from the date of the issuance of the bonds. 17Agencies administering capital outlay projects pursuant to a cooperative endeavor agreement 18shall notify the non-state entity of the date the bonds are issued within three (3) months from 19the issuance thereof. If the funds appropriated herein and administered under cooperative 20endeavor agreements pursuant to this Act are not totally expended within two (2) years from 21the issuance of the bonds, the administering agency can close the project and recommend 22that the reallocation of any unexpended proceeds to any project contained in this Act or any 23previous Capital Outlay Acts. 24 Section 11. Notwithstanding any provisions contained herein or law to the 25contrary, the proceeds of revenue bonds to be utilized to fund certain projects authorized in 26Section 1. and Section 1.(A) hereof may, in accordance with Article VII, Section 9 of the 27Louisiana Constitution of 1974, be deposited in special accounts held outside the state 28treasury in accordance with the provisions of any bond resolution, indenture, reimbursement 29contract, or other bond or financing covenant which provides for the pledge of such funds 30in connection with the issuance of revenue bonds. For all projects administered by the office Page 131 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1of facility planning and control, division of administration, authorized in Section 1. And 2Section 1.(A) hereof which are payable from the proceeds of revenue bonds, only the office 3of facility planning and control, division of administration, will be authorized to requisition 4funds from the special accounts described immediately above, at such time or times as may 5be deemed necessary by the office of facility planning and control, division of 6administration, in order to cover contract amounts or other project expenses. 7 Section 12. The governor shall have the power to veto any line-item in this Act. 8 Section 13. Except as otherwise provided herein, no funds shall be expended on 9any highway projects on highways within the state highway system as established in R.S. 1048:191 under the jurisdiction of the Department of Transportation and Development unless 11and until such project is in the Highway Program, R.S. 48:228 through 232, approved by the 12Joint Legislative Committee on Transportation, Highways and Public Works. Pursuant to 13R.S. 49:214.6.2(B), no integrated coastal protection construction project shall be undertaken 14with funds included in this bill except those included in an annual plan finally approved by 15the legislature in accordance with the provisions of R.S. 49:214.5.3. No funds appropriated 16to the Coastal Protection and Restoration Authority in this Act as a contribution for a project 17cost-share or otherwise, for the national economic development and national ecosystem 18restoration components of the Southwest Coastal Louisiana Study shall be used or provided 19for the expropriation of property or use of eminent domain, except where such funds are to 20be used to obtain property voluntarily offered for project purposes, where at least seventy- 21five percent of the owners have voluntarily offered the property, or where the record or 22apparent owners have voluntarily offered the property but do not have clear title. 23 Section 14. The word "statewide" used in place of the specific parish designation 24for projects contained in this Act indicates that the project or program is applicable to all 25sixty- four parishes in the state. The description of any project in this Act shall be deemed 26to include planning, design, master planning, studies, permits, surveys, testing, construction, 27land and/or building/improvement acquisition, reconstruction, renovation, repair, right-of- 28way and utilities, site and other improvements, miscellaneous/contingencies, lease hold 29improvements ultimately owned by the state or a political subdivision of the state, equipment 30and other acquisitions, and any other component of the project if such are included or Page 132 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED 1indicated in the capital outlay request for such projects required by R. S. 39:101 subject to 2the provisions of Title 39 of the Louisiana Revised Statutes of 1950. For new construction 3or renovation projects, equipment or other acquisitions, which can reasonably be considered 4necessary for the facility to be functional, may be deemed to be included in the project, even 5if such equipment or other acquisitions are not included or indicated in the project name or 6the capital outlay request. When local or federal match is referenced in a project title, but 7only a portion of the state appropriation is granted a line of credit or otherwise funded, then 8the amount of local or federal match, required to be made available, may be prorated relative 9to the amount of state appropriation made available through lines of credit. 10 Section 15. The provisions, items, and projects contained in this Act are severable 11and if any provision, item, or project contained herein, or the application of any such 12provision, item, or project, is held invalid, such invalidity shall not affect other provisions, 13items, projects, or applications of the Act which can be given effect without the invalid 14provision, project, item, or application. 15 Section 16. Notwithstanding any other provisions of law to the contrary, the state 16shall not grant cash lines of credit, or authorize or issue general obligation bonds in a 17principal amount in excess of $1,451,887,938 for Fiscal Year 2023-2024. 18 Section 17. Notwithstanding any contrary provision of this Act or any contrary 19provision of law, no funds appropriated by this Act shall be released or provided to any 20recipient of an appropriation made in this Act if, when, and for as long as, the recipient fails 21or refuses to comply with the provisions of R.S. 24:513. No recipient shall be considered to 22fail or refuse to comply with the provisions of R.S. 24:513 pursuant to this Section during 23any extension of time granted by the legislative auditor to the recipient to comply. 24 Section 18. This Act shall become effective upon signature by the governor or, 25if not signed by the governor, upon expiration of the time for bills to become law without 26signature by the governor, as provided in Article III, Section 18 of the Constitution of 27Louisiana. If vetoed by the governor and subsequently approved by the legislature, this Act 28shall become effective on the day following such approval. Page 133 of 134 HB NO. 2 HLS 23RS-378 ENGROSSED Federal Funds $160,314,831 Federal Funds via Interagency Transfer $76,471,000 Coastal Protection and Restoration Fund $117,401,878 Natural Resources Restoration Trust Fund $444,000,000 Transportation Trust Fund (TTF) - Regular $31,974,794 Transportation Trust Fund (TTF) - Construction Subfund $150,000,000 Megaprojects Leverage Fund $200,000,000 Interagency Transfers $83,989,400 Fees and Self-Generated Revenues $131,500,000 Re-appropriated Cash $1,039,496 Revenue Bonds $120,278,000 Interest Earnings $900,000 State General Fund (Direct) $340,000,000 State General Fund (Direct) Non-Recurring Revenues $472,238,335 TOTAL CASH PORTION $2,330,107,734 DIGEST The digest printed below was prepared by House Legislative Services. It constitutes no part of the legislative instrument. The keyword, one-liner, abstract, and digest do not constitute part of the law or proof or indicia of legislative intent. [R.S. 1:13(B) and 24:177(E)] HB 2 Engrossed 2023 Regular Session Bishop Provides for the capital outlay budget and program for FY 2023-2024; provides for the funding of the capital outlays from the specified sources of monies in the specified amounts as follows: Authorizes the funding of certain capital outlay projects from the sale of general obligation bonds for the projects delineated as follows: Priority 1 $1,467,597,071 Priority 2 $93,708,000 Priority 5 $5,457,269,652 TOTAL GENERAL OBLIGATION BONDS $7,018,574,723 BONDS NRP $2,800,463 GRAND TOTAL OF ALL MEANS OF FINANCING $9,351,482,920 Effective upon signature of the governor or lapse of time for gubernatorial action. Summary of Amendments Adopted by House The Committee Amendments Proposed by House Committee on Ways and Means to the original bill: 1. Change General Obligation Bond funding as follows: Priority 1 $ 85,733,315 Priority 2 $ 24,055,000 Priority 5 $ 1,105,239,965 Page 134 of 134