HLS 23RS-378 RE-REENGROSSED 2023 Regular Session HOUSE BILL NO. 2 BY REPRESENTATIVE BISHOP CAPITAL OUTLAY: Provides for the comprehensive Capital Outlay budget 1 AN ACT 2To provide with respect to the capital outlay budget and the capital outlay program for state 3 government, state institutions, and other public entities; to provide for the 4 designation of projects and improvements; to provide for the financing thereof 5 making appropriations from certain sources; and to provide for related matters. 6Be it enacted by the Legislature of Louisiana: 7 Section 1. The following sums or so much thereof as may be necessary are 8hereby appropriated out of any monies in the state treasury from the sources specified, from 9federal funds and self-generated revenues belonging to the state of Louisiana and/or 10collected by boards, commissions, departments, and agencies thereof, all for making capital 11outlay and for the purposes and in the amounts specified herein for the Fiscal Year 12commencing July 1, 2023, and ending June 30, 2024, subject to the conditions thereafter 13provided: 14 A project with funding payable from General Obligation Bonds Priority 1 15indicates that the funding for the project includes the reauthorization of funding which was 16previously granted as a line of credit by the State Bond Commission in Fiscal Year 2022- 172023. As used in this Section, the term "general obligation bonds" means state general 18obligation bonds or other evidences of indebtedness payable from the Bond Security and 19Redemption Fund. The amount set forth in this Section opposite each project, or so much 20thereof as may be necessary, is hereby appropriated and payable from the source of funding 21indicated; provided, however, amounts appropriated and payable from federal funds may be Page 1 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1encumbered or expended only to the extent such amounts shall have been committed or 2received. Pursuant to the provisions of R.S. 39:82, funds for planning, acquisition, 3construction, and major repair projects appropriated by this Act may be retained until 4completion of the project, even if no bona fide liability exists on the last day of the fiscal 5year. 6 This Act shall constitute the comprehensive state capital outlay budget for the 72023-2024 Fiscal Year. Projects set forth which are payable from the proceeds available 8from the sale of general obligation bonds shall have the priorities as indicated. The Request 9for Line of Credit form used by the attorney general and Bond Counsel in evaluating 10Louisiana Constitutional, Internal Revenue Code, and applicable income tax regulations 11shall be filed with the commissioner of administration, State Bond Commission, and state 12attorney general. No general obligation bond cash lines of credit shall be granted to fund any 13lower priority project prior to the granting of general obligation bond cash lines of credit to 14fund all higher priority projects (the "general rule"), except as hereinafter provided. This 15prohibition against funding a lower priority project shall not apply upon a showing of an 16impossibility or impracticality either to proceed with all unfunded higher priority projects 17or to proceed with the funding of such projects or any part thereof through the issuance of 18general obligation bonds for any reason. Such showing shall be stated in reasonable detail 19in a certificate or certificates signed by the state agency responsible for administering the 20funding, and filed with the commissioner of administration and the State Bond Commission 21(hereinafter referred to as "the Commission"). Upon a determination by the Commission 22that proceeding with such a project or the funding thereof through the issuance of general 23obligation bonds is impractical or impossible, the Commission may then proceed with the 24sale of general obligation bonds or the granting of cash lines of credit without regard to the 25priority of the unfunded projects determined to be impossible or impractical. 26 Upon recommendation by the state agency responsible for administering the 27funding, if it is determined at any time that proceeding with the project or with the funding 28thereof is no longer impossible or impractical, the State Bond Commission may rescind the 29certificate of impossibility or impracticality and may proceed with the project or with the 30issuance of general obligation bonds or the granting of cash lines of credit to fund the Page 2 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1project. Alternatively, the Interim Emergency Board (hereinafter referred to as "the Board"), 2upon reviewing certificates as described above and determining that proceeding with such 3projects or the funding thereof through the issuance of general obligation bonds is 4impossible or impractical, may designate a lower priority for such projects. The Board's 5determination and lower priority designation shall be submitted to the members of the 6legislature for their approval in accordance with the provisions of Chapter 3-B of Subtitle 7I of Title 39 of the Louisiana Revised Statutes of 1950. In accordance with the provisions 8of Chapter 3-B of Subtitle I of Title 39 of the Louisiana Revised Statutes of 1950, whenever 9at the written request of the appropriate legislators and agency, the Board determines than 10an adjustment to a project description originally set forth in such capital budget adopted by 11the legislature for a current fiscal year is necessary to correct a mistake in a project 12description, clarify a description, change the scope of a description, or make any other 13adjustment the Board deems necessary to implement the purpose of the project, such 14adjustment shall become effective only upon the approval by majority vote of the elected 15members of each house of the legislature in the manner provided for in Chapter 3-B of 16Subtitle I of Title 39 of the Louisiana Revised Statutes of 1950. 17 If such approval is granted, notification by the chair or secretary of the Board of 18the results of the balloting shall be transmitted to the State Bond Commission, which may 19then proceed with the sale of general obligation bonds or the granting of cash lines of credit 20for each change approved upon request of the commissioner of administration in accordance 21with the general rule. 22 With respect to Priorities 1 through 5, a lower priority project may be moved to 23a higher priority only upon a showing of an emergency or other cause not reasonably 24anticipated by the legislature, which shall be stated in reasonable detail in a certificate signed 25by the head of the appropriate department, political subdivision, or agency and filed with the 26commissioner of administration and the Board. Upon a determination by the Board that such 27project should be moved to a higher priority because of an emergency or other cause not 28reasonably anticipated by the legislature, the Board shall designate a higher priority to the 29project. The matter then shall be submitted to and be subject to the same approval by the 30members of the legislature in the manner previously indicated in this Section. If such Page 3 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1approval is granted, notification by the chair or secretary of the board of the change of 2priority shall be transmitted to the State Bond Commission, which then upon request of the 3commissioner of administration, may proceed with the sale of general obligation bonds or 4the granting of cash lines of credit in accordance with the general rule. As to projects within 5a priority, the State Bond Commission acting on requests submitted by the commissioner of 6administration shall determine when such project, or phases thereof, shall be funded. In 7making such determination, the State Bond Commission shall consider the amount of 8proceeds of general obligation bonds to be made available in light of money and capital 9market conditions; the expenditure requirements of the project; the time required for 10architectural plans and drawings, public bidding, and site acquisition and preparation; 11availability of receipt of federal monies; litigation affecting the undertaking or completion 12of a project; federal tax laws and regulations regarding the sale of municipal bonds; and 13other items of a similar nature bearing upon the possibility or the necessity to commence a 14project or any particular phase thereof. 15 Any other provision of this Act to the contrary notwithstanding, projects 16described in Priority 5 of this Act shall not be moved to a higher priority except upon one 17of the following conditions: (1) Funding is necessary to complete or additionally fund a 18project located elsewhere in the Capital Outlay Act. Determination of such condition shall 19be made by the head of the appropriate department or agency by means of a certificate to 20that effect filed with the Interim Emergency Board, who shall, by mail ballot, request 21approval of such change and if approved by a majority of each house of the legislature it 22shall be funded, or (2) unless required by an emergency or other cause not reasonably 23anticipated by the legislature, to be in accordance with procedures set forth in this Section. 24However, the State Bond Commission may authorize a non-cash line of credit for any 25project in Priority 5 which represents that portion of construction contracts which were let 26during a previous fiscal year, or construction contracts which will be let during the current 27fiscal year, but which will not require cash expenditures during the year. Such non-cash 28lines of credit, when combined with previously sold bonds or with higher priority bonds or 29lines of credit, or with funds appropriated from other sources, will provide sufficient Page 4 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1appropriated funds to award equipment or construction contracts. Contracts shall not be 2awarded without approval of the division of administration. 3 Upon approval by the State Bond Commission, and subject to compliance with 4its policies and procedures and the procedures set forth herein, a line of credit providing for 5the use of funds in anticipation of the sale of general obligation bonds may be granted to the 6appropriate administering agency or department from the Comprehensive Capital Outlay 7Escrow Account, or if there is not a sufficient amount available in such account, from other 8available state cash in the state treasury, for capital improvement projects for which bond 9proceeds are appropriated by a current capital budget, prior to the actual issuance of bonds 10for such projects, unless the attorney general advises that an impediment exists to the valid 11issuance of the bonds on the date such line of credit is granted. 12 All bonds that are to be repaid, in whole or in part, by revenues generated by the 13project shall be designated as "Reimbursement Bonds.” The State Bond Commission shall 14enter into such agreements as are necessary to provide that the agency or subdivision, whose 15project is reimbursable, shall pay the bond debt costs into the Bond Security and Redemption 16Fund. Such costs may be paid annually or at the end of the term of the bonds issued as 17determined by the State Bond Commission. 18 Priority 1 general obligation bond funding shall be limited to: 19 (1) Projects and amounts which were previously authorized by Act 117 of the 202022 Regular Session of the Legislature; and which were granted cash lines of credit by the 21State Bond Commission. The bonds to fund these projects were not sold in Fiscal Year 222022-2023. 23 (2) The reauthorization of the portion of the outstanding Fiscal Year 2022-2023 24Priority 5 Non-Cash Lines of Credit for projects which will require cash expenditures in 25Fiscal Year 2023-2024 and therefore must be converted to Cash Lines of Credit in Fiscal 26Year 2023-2024. 27 (3) Commitments made in the Higher Education Desegregation Settlement 28Agreement. 29 Priority 2 general obligation bond projects are for the completion of plans and 30specifications, land acquisition, site preparation, or for construction which will begin during Page 5 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1the fiscal year. It is presently anticipated that the listed projects will require the sale of 2bonds or extension of lines of credit during the fiscal year after adoption of this Act. 3 Priority 3 general obligation bond projects are for the preparation of plans and 4specifications, land acquisition, site preparation, or for construction and shall be limited to 5funding for the portion of construction contracts which will not require cash expenditures 6during the fiscal year. The projects in this category shall be considered future year projects 7in the state's five-year capital outlay plan. It is presently anticipated that the listed projects 8will not require the sale of bonds or extension of lines of credit during the fiscal year. 9 Priority 4 general obligation bond projects are for the preparation of plans and 10specifications, land acquisition, site preparation, or for construction and shall be limited to 11funding for the portion of construction contracts which will not require cash expenditures 12during the fiscal year. The projects in this category shall be considered future year projects 13in the state's five-year capital outlay plan. It is presently anticipated that the listed projects 14will not require the sale of bonds or extension of lines of credit during the fiscal year. 15 Priority 5 general obligation bond funding shall be limited to funding for the 16portion of construction contracts which will not require cash expenditures during the fiscal 17year. These funds, when combined with previously sold bonds or with higher priority bonds 18on lines of credit, or with funds appropriated from other sources, will provide sufficient 19appropriated funds to award contracts. Non-cash lines of credit shall be required prior to the 20award of these contracts. 21 In accordance with the cash management plan adopted pursuant to R.S. 2248:251(D) and the provisions of Act 161 of the 1998 First Extraordinary Session, the 23Department of Transportation and Development is authorized to enter into contracts or 24agreements for projects approved pursuant to the Highway Priority Program, Airport 25Construction and Development Priority Program, Port Construction and Development 26Priority Program, and Statewide Flood Control Program for projects bid and awarded, 27authorized, or commenced during the fiscal year which do not require cash expenditures for 28the full contract or agreement amount. Page 6 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1 EXECUTIVE DEPARTMENT 201/107DIVISION OF ADMINISTRATION 3(103) Exterior Waterproofing at State Capitol Building, 4 Planning and Construction 5 (East Baton Rouge) 6 Payable from General Obligation Bonds 7 Priority 5 $115,500,000 8 Payable from State General Fund (Direct) Non-Recurring 9 Revenues $ 7,000,000 10 Total $122,500,000 11(310) State Office Buildings Major Repairs, Equipment 12 Replacement, and Renovations, Planning and 13 Construction 14 (Statewide) 15 Payable from General Obligation Bonds 16 Priority 1 $ 2,386,538 17 Priority 5 $12,110,000 18 Payable from State General Fund (Direct) Non-Recurring 19 Revenues $ 2,500,000 20 Total $16,996,538 21(925) Pentagon Barracks Repair/Restore/Replace Equipment, 22 Planning and Construction 23 (East Baton Rouge) 24 Payable from General Obligation Bonds 25 Priority 5 $ 6,000,000 26 Payable from State General Fund (Direct) Non-Recurring 27 Revenues $ 1,000,000 28 Total $ 7,000,000 29(926) Exterior Waterproofing and Repairs, Chief Justice 30 Pascal F. Calogero, Jr. Courthouse, Planning and 31 Construction 32 (Orleans) 33 Payable from General Obligation Bonds 34 Priority 5 $10,000,000 35 Payable from State General Fund (Direct) Non-Recurring 36 Revenues $ 1,000,000 37 Total $11,000,000 38(1542)State Capitol Repair/Replace East Plaza Deck/Roof, 39 Planning and Construction 40 (East Baton Rouge) 41 Payable from General Obligation Bonds 42 Priority 5 $27,500,000 43 Payable from State General Fund (Direct) Non-Recurring 44 Revenues $ 700,000 45 Total $28,200,000 46(1543)Pentagon Barracks Repair Brick Walls/Mitigate Rising 47 Damp, Planning and Construction 48 (East Baton Rouge) 49 Payable from General Obligation Bonds 50 Priority 5 $27,900,000 51 Payable from State General Fund (Direct) Non-Recurring 52 Revenues $ 1,500,000 53 Total $29,400,000 Page 7 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1580)Louisiana Governor's Mansion Renovations, 2 Additions, Planning, and Construction 3 (East Baton Rouge) 4 Payable from General Obligation Bonds 5 Priority 5 $ 1,000,000 6(1710)Community Water Enrichment Program 7 (Statewide) 8 Payable from General Obligation Bonds 9 Priority 5 $11,000,000 10 Payable from State General Fund (Direct) Non-Recurring 11 Revenues $ 4,000,000 12 Payable from the balance of State General Funds (Direct) 13 previously allocated under the authority of Act 2 of 2020 14 for New Orleans, Algiers Playgrounds and Parks, 15 Renovation of Restrooms, Lighting, Fencing, and 16 Playground Equipment (Orleans), Act 117 of 2022 for 17 New Orleans, Algiers Playgrounds and Parks, Renovation 18 of Restrooms, Lighting, Fencing, and Playground 19 Equipment (Orleans), Act 29 of 2018 for Rosepine, 20 Rehabilitation of Elevated Water Tank, Planning and 21 Construction (Vernon), Act 20 of 2019 for St. 22 Francisville, Burnet Road Bridge Replacement, Planning 23 and Construction (West Feliciana), Act 20 of 2019 for 24 Westlake, New Water Well, Planning and Construction 25 (Calcasieu), Act 27 of 2006 for Magnaville Louisiana, 26 USA, Inc., Multipurpose Evacuation Shelter/Community 27 Center in Simmesport, Acquisitions, Utilities, Planning 28 and Construction (Avoyelles), Act 2 of 2020 for 29 Cajundome, Cajundome Boiler Replacement (Lafayette), 30 Act 26 of 2005 for Catahoula Council on Aging, Inc., 31 Catahoula Council on Aging, Inc., 32 Planning and Construction (Catahoula) $ 450,809 33 Total $15,450,809 34(1711)Local Government Assistance Program 35 (Statewide) 36 Payable from General Obligation Bonds 37 Priority 5 $10,000,000 38 Payable from State General Fund (Direct) Non-Recurring 39 Revenues $ 5,000,000 40 Payable from the balance of State General Funds (Direct) 41 previously allocated under the authority of Act 29 of 2018 42 for Pointe Coupee Port, Harbor and Terminal District, 43 Pointe Coupee Parish Port Capital Improvements, 44 Planning and Construction (Pointe Coupee), Act 29 of 45 2018 for East Carroll Parish, Industrial Site Development 46 and Road Improvements (For Economic Development 47 Purposes, Including but not limited to an Ethanol Plant), 48 Planning and Construction (East Carroll), Act 20 of 2009 49 for Jefferson Parish, Jefferson Community Health Center 50 Expansion to the Existing Marrero Facility in Order to 51 Implement a Dental Program, Planning and Construction 52 (Jefferson), Act 29 of 2018 for St Helena Parish, Eddy 53 Road Improvements, Planning and Construction (St. 54 Helena), Act 485 of 2021 for St. Tammany Parish, LA 22 55 Extension and Improvements, LA 22 Roundabout, 56 Design, Engineering, Planning and Construction (St. 57 Tammany), Act 29 of 2018 for Hornbeck, Emergency Page 8 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1 Connection with West Vernon Waterworks District and 2 Inline Booster Station, Planning and Construction 3 (Vernon) $ 344,952 4 Payable from the balance of general obligation bond 5 proceeds previously allocated under the authority of Act 6 20 of 2019 for Berwick, Sewerage Collection System 7 Along Old Spanish Trail and LA 182, Planning and 8 Construction 9 (St. Mary) $ 108,986 10 Total $15,453,938 11(1712)Americans with Disabilities Act Implementation for 12 State Facilities, Planning and Construction 13 (Statewide) 14 Payable from State General Fund (Direct) Non-Recurring 15 Revenues $ 500,000 16 Payable from Interest Earnings $ 900,000 17 Total $ 1,400,000 18(1713)Statewide Roofing Asset Management Program and 19 Waterproofing, Related Repairs and Equipment 20 Replacement Program 21 (Statewide) 22 Payable from State General Fund (Direct) Non-Recurring 23 Revenues $ 2,500,000 24 Payable from Interagency Transfers $ 5,000,000 25 Payable from Fees and Self-Generated Revenues $ 3,000,000 26 Total $10,500,000 27(1714)Repair, Restoration and Replacement for Declared 28 Disasters, Planning, Construction, Renovation, and 29 Acquisition 30 (Statewide) 31 Payable from General Obligation Bonds 32 Priority 1 $55,285,237 33 Priority 5 $65,000,000 34 Payable from Federal Funds via Interagency Transfers $20,000,000 35 Total $140,285,237 36(1715)Outstanding Percent for Arts Projects 37 (Statewide) 38 Payable from General Obligation Bonds 39 Priority 1 $ 2,058,097 40 Priority 2 $ 250,000 41 Priority 5 $ 4,000,000 42 Payable from Interagency Transfers $ 3,000,000 43 Payable from Fees and Self-Generated Revenues $ 3,000,000 44 Total $12,308,097 45(1716)Mold Remediation and Indoor Air Quality, Planning 46 and Construction 47 (Statewide) 48 Payable from General Obligation Bonds 49 Priority 2 $ 500,000 Page 9 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1717)Major Repairs, Equipment Replacement and 2 Renovations for State Buildings to Address Deferred 3 Maintenance Backlog and Infrastructure, Planning and 4 Construction 5 (Statewide) 6 Payable from General Obligation Bonds 7 Priority 1 $ 5,555,169 8 Payable from Interagency Transfers $15,000,000 9 Payable from State General Fund (Direct) Non-Recurring 10 Revenues $ 7,308,229 11 Payable from Fees and Self-Generated Revenues $ 2,000,000 12 Payable from the balance of State General Funds (Direct) 13 previously allocated under the authority of Act 20 of 2019 14 for Office of Juvenile Justice, HVAC System 15 Replacement at Columbia, Planning and Construction 16 (Ouachita), Act 23 of 2002 for Hammond Development 17 Center, Replacement of Underground High Temperature 18 Hot Water System, Planning and Construction 19 (Tangipahoa), Act 2 of 2020 for Southern University 20 Baton Rouge, Southern University Laboratory School 21 Addition and Upgrades, Planning and Construction 22 (East Baton Rouge) $ 87,219 23 Payable from the balance of Interest Earnings previously 24 allocated under the authority of Act 53 of 2012 for 25 McNeese State University, Alpha Hall Renovations 26 Planning and Construction 27 (Calcasieu) $ 423 28 Payable from the balance of general obligation bond 29 proceeds previously allocated under the authority of 30 Act 29 of 2018 for Southern University Baton Rouge, 31 T.T. Allain Hall, Americans with Disabilities Act 32 Compliance and Upgrades, Planning and Construction 33 (East Baton Rouge), Act 29 of 2018 for Southern 34 University Baton Rouge, F.G. Clark Activity Center, 35 Americans with Disabilities Act Compliance and 36 Upgrades, Planning and Construction (East Baton 37 Rouge), Act 2 of 2020 for Louisiana School for Math, 38 Science, and the Arts, New Dormitory Building, 39 Planning and Construction 40 (Natchitoches) $ 2,691,477 41 Payable from Special Appropriations from FACS $ 156,093 42 Total $32,798,610 4301/109COASTAL PROTECTION AND RESTORATION AUTHORITY 44(320) Coastal Protection Projects, Planning and Construction 45 (Statewide) 46 Payable from General Obligation Bonds 47 Priority 1 $ 220,000 48 Priority 5 $ 214,500,000 49 Payable from State General Fund (Direct) Non-Recurring 50 Revenues $ 107,417,778 51 Payable from Interagency Transfers $ 500,000 52 Payable from Federal Funds $ 140,703,531 53 Payable from Natural Resources Restoration Trust Fund$ 444,000,000 54 Payable from Coastal Protection and Restoration Fund $ 117,401,878 55 Total $1,024,743,187 Page 10 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1Provided, however that $220,000 of the P1 appropriation, and $4,500,000 of the Priority 5 2appropriation from General Obligation Bonds be used for the South Slidell – Fritchie Coastal 3Resilience, Planning and Construction project in St. Tammany Parish. 4Provided, however that $4,500,000 of the Priority 5 appropriation from General Obligation 5Bonds be used for the Military Road Flood Risk Reduction, Planning and Construction 6project in St. Tammany Parish. 7Provided, however that $4,500,000 of the Priority 5 appropriation from General Obligation 8Bonds be used for the Eden Isle Roadway Infrastructure Flood Resilience, Planning and 9Construction project in St. Tammany Parish. 10Provided, however that $10,000,000 of the Priority 5 appropriation from General Obligation 11Bonds shall be used for the Bayou Lafourche Freshwater District for the Construction of the 12Pumping Capacity Improvements, Phase I project. 13Provided, however that $2,000,000 of the State General Fund (Direct) Non-Recurring 14Revenues appropriation be used for the Atchafalaya Basin Program Master Plan project. 15Provided, however that $2,000,000 of the State General Fund (Direct) Non-Recurring 16Revenues appropriation be used for the Vermilion Bay Shoreline Protection project. 17Provided, however that $300,000 of the State General Fund (Direct) Non-Recurring 18Revenues appropriation be used for the Atchafalaya National Estuarine Research Reserve 19Designation project. 20(890) Union Diversion Project, Planning and Construction 21 (Ascension, Livingston, St. James, St. John the Baptist) 22 Payable from General Obligation Bonds 23 Priority 1 $ 2,350,000 24 Priority 5 $ 20,000,000 25 Total $ 22,350,000 26(1298)Morganza to Gulf of Mexico Flood Control Feasibility 27 Study, Planning, Design, Right-of-Way and 28 Construction of Levees, Floodgates and Other Flood 29 Control Systems ($100,000,000 Local Match) 30 (Ascension, Assumption, Iberia, Iberville, Lafourche, Pointe 31 Coupee, St. Martin, St. Mary, Terrebonne, West Baton Rouge) 32 Payable from General Obligation Bonds 33 Priority 1 $ 7,500,000 34 Priority 5 $ 79,500,000 35 Total $ 87,000,000 36(1300)Atchafalaya Basin Protection and Enhancement 37 (Federal Match and Local/Sponsor Match) 38 (Assumption, Avoyelles, Iberia, Iberville, Pointe Coupee, 39 St. Landry, St. Martin, St. Mary) 40 Payable from General Obligation Bonds 41 Priority 5 $ 8,000,000 Page 11 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 101/112DEPARTMENT OF MILITARY AFFAIRS 2(28) Renovate-Upgrade Cadet Barracks Buildings 18, 21, 3 22, 23, and 24, Youth Challenge Program (YCP), 4 Carville, Louisiana 5 (Iberville) 6 Payable from General Obligation Bonds 7 Priority 1 $ 400,000 8 Payable from State General Fund (Direct) Non-Recurring 9 Revenues $ 1,000,000 10 Total $ 1,400,000 11(444) Louisiana National Guard Readiness Center 12 Replacement, Lafayette LA, Planning and Construction 13 (Lafayette) 14 Payable from General Obligation Bonds 15 Priority 1 $ 7,392,220 16 Priority 2 $ 1,400,000 17 Total $ 8,792,220 18(645) Gillis W. Long Center, Water, Fire, and Sewage Line 19 Upgrades, Carville, Louisiana 20 (Iberville) 21 Payable from General Obligation Bonds 22 Priority 1 $ 3,504,172 23 Payable from State General Fund (Direct) Non-Recurring 24 Revenues $ 3,514,200 25 Payable from Federal Funds $ 434,300 26 Total $ 7,452,672 27(656) Thibodaux Readiness Center Modernization 28 (Lafourche) 29 Payable from State General Fund (Direct) Non-Recurring 30 Revenues $ 59,000 31 Payable from Federal Funds $ 177,000 32 Total $ 236,000 33(849) Camp Beauregard Road Network Rehabilitation 34 (Rapides) 35 Payable from General Obligation Bonds 36 Priority 1 $ 1,550,000 37(918) Renovation Cadet Barracks Buildings 605, 606, 608, 38 Youth Challenge Program, Camp Beauregard, 39 Pineville, Louisiana 40 (Rapides) 41 Payable from General Obligation Bonds 42 Priority 5 $ 900,000 43 Payable from State General Fund (Direct) Non-Recurring 44 Revenues $ 1,040,000 45 Total $ 1,940,000 46(1270)Louisiana National Guard Readiness Center Complex, 47 Abbeville LA, Planning and Construction 48 (Vermilion) 49 Payable from General Obligation Bonds 50 Priority 1 $ 5,666,600 Page 12 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1331)Renovate-Upgrade Cadet Barracks Building 131, 132, 2 and 133, Youth Challenge Program, Camp Minden, 3 Minden, Louisiana 4 (Webster) 5 Payable from General Obligation Bonds 6 Priority 5 $ 700,000 7 Payable from State General Fund (Direct) Non-Recurring 8 Revenues $ 1,150,000 9 Total $ 1,850,000 10(1332)Renovation Building 129, Cadre Operations, Youth 11 Challenge Program, Camp Minden 12 (Webster) 13 Payable from State General Fund (Direct) Non-Recurring 14 Revenues $ 250,000 15(1475)Statewide Backlog of Maintenance and Repair 16 (BMAR), Phase 3, and Statewide Infrastructure 17 Rehabilitation, Phase 3 18 (Statewide) 19 Payable from State General Fund (Direct) Non-Recurring 20 Revenues $ 4,000,000 21 Payable from Federal Fund $ 19,000,000 22 Total $ 23,000,000 23(1691)Renovation Classroom Building 118, Youth Challenge 24 Program, Camp Minden 25 (Webster) 26 Payable from State General Fund (Direct) Non-Recurring 27 Revenues $ 1,350,000 2801/124LOUISIANA STADIUM AND EXP OSITION DISTRICT 29(813) Zephyr Field Improvements, Planning and Construction 30 (Jefferson) 31 Payable from General Obligation Bonds 32 Priority 5 $ 5,000,000 33(1223)Bayou Segnette Recreation Complex, Land 34 Acquisition, Planning and Construction 35 (Jefferson) 36 Payable from General Obligation Bonds 37 Priority 1 $ 25,402,961 38 Priority 2 $ 17,000,000 39 Total $ 42,402,961 40 DEPARTMENT OF VETERANS AFFAIRS 4103/130DEPARTMENT OF VETERANS AFFAIRS 42(168) Northeast Louisiana Veterans Cemetery Addition of 43 1,000 In-ground Burial Crypts and Other Improvements 44 (Richland) 45 Payable from Federal Funds via Interagency Transfers$ 1,331,000 46(786) Southeast Louisiana Veterans Cemetery Addition of 47 2,800 In-ground Burial Crypts and Other Improvements 48 (St. Tammany) 49 Payable from Federal Funds via Interagency Transfers$ 1,500,000 Page 13 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 103/136SOUTHEAST LOUISIANA WAR VETERANS HOME 2(593) Pond Restoration, Planning and Construction 3 (St. John the Baptist) 4 Payable from Federal Funds via Interagency Transfers$ 1,140,000 5 ELECTED OFFICIALS 604/139SECRETARY OF STATE 7(802) Old Governor's Mansion Repairs and Renovation 8 (East Baton Rouge) 9 Payable from General Obligation Bonds 10 Priority 1 $ 300,000 11 Payable from State General Fund (Direct) Non-Recurring 12 Revenues $ 1,000,000 13 Total $ 1,300,000 14(954) Old State Capitol Exterior Repairs, Planning and 15 Construction 16 (East Baton Rouge) 17 Payable from General Obligation Bonds 18 Priority 1 $ 3,000,000 19 Priority 5 $ 4,400,000 20 Payable from State General Fund (Direct) Non-Recurring 21 Revenues $ 1,000,000 22 Total $ 8,400,000 23 DEPARTMENT OF ECONOMIC DEVELOP MENT 2405/252OFFICE OF BUSINESS DEVELOPMENT 25(352) Economic Development Award Program for 26 Infrastructure Assistance 27 (Statewide) 28 Payable from General Obligation Bonds 29 Priority 5 $ 5,000,000 30 Payable from Interagency Transfers $ 10,000,000 31 Total $ 15,000,000 32(353) NIRC BSL-3 Lab and Animal Housing, Planning and 33 Construction 34 (Iberia) 35 Payable from General Obligation Bonds 36 Priority 1 $ 10,600,000 37 Priority 5 $ 10,000,000 38 Total $ 20,600,000 39(1169)NIRC Iberia BioInnovation Accelerator GMP CDMO 40 Planning and Construction 41 (Iberia) 42 Payable from General Obligation Bonds 43 Priority 1 $ 14,400,000 44 Priority 5 $ 39,000,000 45 Total $ 53,400,000 Page 14 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1 DEPARTMENT OF CULTURE, RECREATION AND TOURISM 206/263OFFICE OF STATE MUSEUM 3(755) Construction of Civil Rights Museum, Planning and 4 Construction 5 (Orleans) 6 Payable from General Obligation Bonds 7 Priority 1 $ 2,760,174 806/264OFFICE OF STATE PARKS 9(255) Poverty Point State Historic Site - Land Acquisition, 10 Design, Museum/Interpretive Center and Expansion 11 (West Carroll) 12 Payable from General Obligation Bonds 13 Priority 1 $ 1,494,713 14 Priority 5 $ 10,500,000 15 Total $ 11,994,713 16(461) Bogue Chitto State Park - Mountain Bike Trail Design, 17 Construction, Acquisition and Other Development 18 (Washington) 19 Payable from General Obligation Bonds 20 Priority 1 $ 938,762 21(1078)Tunica Hills State Preservation Area, Construction, 22 Development and Acquisition 23 (West Feliciana) 24 Payable from General Obligation Bonds 25 Priority 5 $ 20,000,000 26 Payable from Interagency Transfers $ 1,000,000 27 Total $ 21,000,000 28(1291)Preventive Maintenance/Major Repairs and 29 Improvements 30 (Statewide) 31 Payable from General Obligation Bonds 32 Priority 1 $ 574,825 33 Priority 5 $ 2,000,000 34 Payable from State General Fund (Direct) Non-Recurring 35 Revenues $ 3,000,000 36 Payable from Interagency Transfers $ 20,000,000 37 Payable from Federal Funds via Interagency Transfers$ 20,000,000 38 Total $ 45,574,825 39(1490)Bogue Chitto State Park Emergency Erosion, Planning, 40 Design, Construction and Other Development 41 (Washington) 42 Payable from General Obligation Bonds 43 Priority 1 $ 1,409,597 44 Priority 5 $ 840,000 45 Total $ 2,249,597 46(1491)Bayou Segnette State Park, Land Acquisition, 47 Additional Cabins, Planning and Construction 48 (Jefferson) 49 Payable from General Obligation Bonds 50 Priority 1 $ 432,875 Page 15 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 106/A20NEW ORLEANS CITY P ARK 2(1355)Repairs to Historic Structures, Planning and 3 Construction 4 (Orleans) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,089,307 7 Priority 5 $ 1,000,000 8 Total $ 2,089,307 906/A98LOUISIANA NAVAL WAR MEMORIAL COMMISSION 10(1371)Hull Repair & Reinforcement, Superstructure Repair, 11 Interior Restoration, & Painting of USS KIDD DD-661, 12 Docking Cradle Repairs & Upgrade, Planning, 13 Transport, Construction 14 (East Baton Rouge) 15 Payable from General Obligation Bonds 16 Priority 1 $ 1,600,000 17 Priority 5 $ 6,750,000 18 Total $ 8,350,000 19 DEPARTMENT OF TRANSPORTATION AND DEVELOP MENT 2007/270ADMINISTRATION 21(24) Overlay of U.S. 167 for 9.32 Miles, from Turkey Creek 22 North of I-49, Planning and Construction 23 (Evangeline) 24 Payable from General Obligation Bonds 25 Priority 1 $ 633,519 26(25) LA 91: Bayou Plaquemine Brule Bridge Replacement, 27 Planning and Construction 28 (Acadia) 29 Payable from General Obligation Bonds 30 Priority 1 $ 1,000,000 31 Priority 5 $ 5,200,000 32 Total $ 6,200,000 33(39) Beaver Creek, LA Highway 106, Planning and 34 Construction 35 (Evangeline) 36 Payable from General Obligation Bonds 37 Priority 5 $ 14,200,000 38(40) St. Landry, LA 106, Planning and Construction 39 (Evangeline) 40 Payable from General Obligation Bonds 41 Priority 5 $ 12,900,000 42(44) Highway 397 in Calcasieu Parish, North and South 43 Turning Lanes 44 (Calcasieu) 45 Payable from General Obligation Bonds 46 Priority 1 $ 2,000,000 47 Priority 2 $ 600,000 48 Total $ 2,600,000 Page 16 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(128) LA 22: North Hoover Road - Dunson Road 2 (Tangipahoa) 3 Payable from General Obligation Bonds 4 Priority 5 $ 12,600,000 5(133) LA 44 Widening, I-10 to LA 22, Planning, Utilities, 6 Right-of-Way and Construction 7 (Ascension) 8 Payable from General Obligation Bonds 9 Priority 1 $ 9,600,086 10 Priority 5 $ 9,000,000 11 Total $ 18,600,086 12(135) LA 173 (Ford Street) Overlay, 1.32 Miles, 13 Planning and Construction 14 (Caddo) 15 Payable from the Capital Outlay Savings Fund $ 750,000 16(239) US 190 (Vine Street) Reconstruction 17 (St. Landry) 18 Payable from General Obligation Bonds 19 Priority 1 $ 200,000 20 Priority 5 $ 19,200,000 21 Total $ 19,400,000 22(240) Jimmie Davis Bridge Rehabilitation and Lighting, or 23 Design, Engineering, Planning and Construction 24 (Bossier) 25 Payable from General Obligation Bonds 26 Priority 1 $ 3,260,334 27 Priority 5 $ 151,000,000 28 Total $ 154,260,334 29(248) LA 100: LA 97 - LA 91, Planning and Construction 30 (Acadia) 31 Payable from General Obligation Bonds 32 Priority 5 $ 7,400,000 33 Payable from State General Fund (Direct) Non-Recurring 34 Revenues $ 100,000 35 Total $ 7,500,000 36(341) LA 70: Sunshine Bridge - LA 22 37 (St. James) 38 Payable from General Obligation Bonds 39 Priority 5 $ 17,000,000 40(342) Pecue Lane/I-10 Interchange and I-10, Planning, 41 Design, Rights-of-Way, Utilities and Construction 42 (East Baton Rouge) 43 Payable from General Obligation Bonds 44 Priority 1 $ 14,000,000 45(360) LA 1 Improvements, Phase 2, Planning, Engineering, 46 Right-of-Way, Utilities and Construction 47 (Lafourche) 48 Payable from General Obligation Bonds 49 Priority 1 $ 9,985,898 50 Priority 5 $ 82,000,000 51 Total $ 91,985,898 Page 17 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(367) Roundabout at Intersection of LA 3125 and LA 3274 2 (St. James) 3 Payable from General Obligation Bonds 4 Priority 1 $ 2,355,572 5(373) LA Hwy. 64 Spur, Planning and Construction 6 (East Baton Rouge) 7 Payable from General Obligation Bonds 8 Priority 1 $ 1,000,000 9 Priority 5 $ 5,000,000 10 Total $ 6,000,000 11(374) Secretary’s Emergency Fund for Bridge Damages, 12 Other Reimbursements, Local Matching Dollars, 13 Federal Funds, and Opportunity Grants Subject to the 14 Provisions of R.S. 48:232 15 (Statewide) 16 Payable from Transportation Trust Fund - Federal 17 Receipts $ 25,000,000 18 Payable from Federal Funds $ 2,500,000 19 Payable from Interagency Transfers $ 10,000,000 20 Payable from Fees and Self-Generated Revenues $ 30,000,000 21 Total $ 67,500,000 22(445) Louisiana Highway 64 and Louisiana Highway 1019 23 Roundabout, Planning and Construction 24 (Livingston) 25 Payable from General Obligation Bonds 26 Priority 1 $ 175,000 27 Priority 5 $ 2,500,000 28 Total $ 2,675,000 29(455) LA 3277: LA 757 - LA 104, Planning and Construction 30 (St. Landry) 31 Payable from General Obligation Bonds 32 Priority 5 $ 6,900,000 33(456) LA 621 Realignment at LA 73, Planning and 34 Construction 35 (Ascension) 36 Payable from General Obligation Bonds 37 Priority 1 $ 3,949,375 38 Priority 5 $ 5,100,000 39 Total $ 9,049,375 40(457) Claiborne Corridor Rehabilitation 41 (Orleans) 42 Payable from General Obligation Bonds 43 Priority 5 $ 20,000,000 44(459) LA 429/I-10 Interchange, Planning and Construction 45 (Ascension) 46 Payable from General Obligation Bonds 47 Priority 5 $ 5,000,000 Page 18 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(548) LA 28 Widening (LA 3128 - LA 116) 2 (Rapides) 3 Payable from General Obligation Bonds 4 Priority 1 $ 2,700,000 5 Priority 5 $ 31,600,000 6 Total $ 34,300,000 7(551) LA 74/I-10 Interchange, Planning and Construction 8 (Ascension) 9 Payable from General Obligation Bonds 10 Priority 5 $ 5,000,000 11(567) LA 3241 (I-12 to Bush), Planning, Engineering, Right- 12 of-Way, Utilities and Construction 13 (St. Tammany) 14 Payable from General Obligation Bonds 15 Priority 5 $ 28,000,000 16(650) City of Gonzales - GO Program LA Highway 30 17 Corridor, Planning and Construction 18 (Ascension) 19 Payable from General Obligation Bonds 20 Priority 1 $ 8,320,100 21(651) Improvements on LA 3038, Including Patching, 22 Repairing and Overlaying of the Highway, Planning 23 and Construction 24 (Ascension) 25 Payable from General Obligation Bonds 26 Priority 1 $ 47,139 27(652) New Mississippi River Bridge 28 (Ascension, East Baton Rouge, Iberville, St. James, 29 West Baton Rouge) 30 Payable from General Obligation Bonds 31 Priority 1 $ 1,486,228 32 Priority 5 $ 3,000,000 33 Total $ 4,486,228 34(653) Turn Lanes on US 71 for Emergency Vehicle Staging 35 Area, Planning, Engineering, Right-of-Way, Utilities 36 and Construction 37 (Rapides) 38 Payable from General Obligation Bonds 39 Priority 1 $ 200,295 40(660) LA 13 (Crowley to Vermilion Parish Line) 41 (Acadia) 42 Payable from General Obligation Bonds 43 Priority 1 $ 1,200,000 44 Priority 5 $ 5,500,000 45 Total $ 6,700,000 Page 19 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(687) Highway Program (Up to $4,000,000 for Secretary's 2 Emergency Fund) 3 (Statewide) 4 Payable from General Obligation Bonds 5 Priority 1 $ 30,000,000 6 Priority 5 $ 115,750,000 7 Payable from State General Fund (Direct) 8 Non-Recurring Revenues $ 107,412,778 9 Payable from Transportation Trust Fund - Construction 10 Subfund $ 190,300,000 11 Payable from Transportation Trust Fund - Regular $ 367,000,000 12 Payable from Transportation Trust Fund - Federal 13 Receipts $ 959,550,550 14 Total $1,770,013,328 15Provided, however, that the Department of Transportation and Development is authorized 16to implement or commence projects approved in this program for Fiscal Year 2023-2024 17identified for phased funding pursuant to the cash management plan established pursuant to 18R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing 19unspent cash balances appropriated in prior years' programs, which funds when combined 20with current appropriations will provide sufficient appropriated funds to award contracts. 21Provided, however, that the Department of Transportation and Development shall use 22$107,412,778 of the appropriation from State General Fund (Direct) Non-Recurring for 23financial cost overruns in the Highway Priority Program, and out of the appropriations from 24Transportation Trust Fund - Regular, $75,000,000 for State match to the Federal Highway 25Administration Formula Program, $195,000,000 for ARPA project financial cost overruns 26$30,000,000 to meet Federal match obligations pursuant to competitive Federal grants, and 27$20,000,000 for State match pursuant to August Redistribution Funding provided through 28the Federal Highway Administration. 29Provided, however that the Department of Transportation and Development shall use 30$2,150,000 of the appropriation from the Transportation Trust Fund - Construction Subfund 31for the purchase or procurement of movable equipment dedicated for use in Highway 32District 03. 33(690) Hooper Road Extension and Widening, Environmental, 34 Planning, Engineering, Right-of-Way, Utilities and 35 Construction 36 (East Baton Rouge, Livingston) 37 Payable from General Obligation Bonds 38 Priority 1 $ 8,197,249 39(744) Florida Avenue Bridge, Planning and Construction 40 (Orleans) 41 Payable from General Obligation Bonds 42 Priority 5 $ 7,200,000 43(745) LA 964 (Groom Road - US 61) Highway Lighting 44 (East Baton Rouge) 45 Payable from General Obligation Bonds 46 Priority 1 $ 450,000 47 Priority 5 $ 1,950,000 48 Total $ 2,400,000 49(794) LA 117 Widening (LA 8 - LA 118) 50 (Natchitoches, Vernon) 51 Payable from General Obligation Bonds 52 Priority 1 $ 5,952,055 53 Priority 5 $ 30,000,000 54 Total $ 35,952,055 Page 20 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(856) Essen Lane Widening, I-10 to Perkins Road, Planning, 2 Utilities, Right-of-Way and Construction 3 (East Baton Rouge) 4 Payable from General Obligation Bonds 5 Priority 1 $ 481,358 6(857) Widening of Highway 447 and I-12 Overpass 7 Improvements, Environmental Phase Commencement, 8 Planning and Construction 9 (Livingston) 10 Payable from General Obligation Bonds 11 Priority 1 $ 1,719,800 12 Priority 5 $ 26,000,000 13 Total $ 27,719,800 14(858) Earhart/Causeway Interchange, Planning, Engineering, 15 Right-of-Way, Utilities and Construction 16 (Jefferson) 17 Payable from General Obligation Bonds 18 Priority 1 $ 4,755,588 19 Priority 5 $ 44,500,000 20 Total $ 49,255,588 21(868) LA 353: LA 94 to Cypress Island Hwy 22 (Lafayette, St. Martin) 23 Payable from General Obligation Bonds 24 Priority 5 $ 1,400,000 25(872) New Orleans International Airport Landside Access 26 Improvements 27 (Jefferson) 28 Payable from General Obligation Bonds 29 Priority 1 $ 8,300,000 30 Priority 5 $ 7,700,000 31 Total $ 16,000,000 32(951) LA 699: LA 35 - LA 343, Planning and Construction 33 (Vermilion) 34 Payable from General Obligation Bonds 35 Priority 5 $ 7,870,000 36 Payable from State General Fund (Direct) Non-Recurring 37 Revenues $ 200,000 38 Total $ 8,070,000 39(979) Roundabout on LA 447 and LA 1025, Planning and 40 Construction 41 (Livingston) 42 Payable from General Obligation Bonds 43 Priority 1 $ 500,000 44 Priority 5 $ 6,000,000 45 Total $ 6,500,000 46(992) Roundabout at LA 3211 and Yokley Road 47 (St. Mary) 48 Payable from General Obligation Bonds 49 Priority 5 $ 3,500,000 Page 21 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(998) I-610 and I-10 Fence Removal, Replacement, and 2 Repairs, due to Hurricane Ida Damage, Planning and 3 Construction 4 (Orleans) 5 Payable from General Obligation Bonds 6 Priority 1 $ 600,000 7(1061)Peters Road Bridge and Extension, Planning and 8 Construction 9 (Plaquemines) 10 Payable from General Obligation Bonds 11 Priority 1 $ 17,542,954 12 Priority 5 $ 7,000,000 13 Total $ 24,542,954 14(1062)Highway 30 Roundabout West of LA 44, Planning and 15 Construction 16 (Ascension) 17 Payable from General Obligation Bonds 18 Priority 1 $ 2,000,000 19 Priority 5 $ 2,500,000 20 Total $ 4,500,000 21(1069)LA 29 Improvements (LA 13 - LA 758) 22 (Evangeline, St. Landry) 23 Payable from General Obligation Bonds 24 Priority 1 $ 5,120,000 25 Priority 5 $ 1,600,000 26 Total $ 6,720,000 27(1070)LA 758: US 190 - LA 29, Planning and Construction 28 (Evangeline, St. Landry) 29 Payable from General Obligation Bonds 30 Priority 5 $ 4,400,000 31(1106)Hooper Road Widening and Sewer Improvements 32 (Blackwater Bayou to Sullivan Road) Planning, 33 Engineering, Utilities and Construction 34 (East Baton Rouge) 35 Payable from General Obligation Bonds 36 Priority 1 $ 12,265,000 37(1159)Relocate Hickory Avenue (LA Hwy. 48-11th Street) 38 (Mounes) (LA Hwy. 3154) Construction, Right of 39 Way, and Utilities 40 (Jefferson) 41 Payable from General Obligation Bonds 42 Priority 1 $ 1,000,000 43 Priority 5 $ 1,000,000 44 Total $ 2,000,000 Page 22 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1175)I-49 South from Lafayette to Westbank Expressway, 2 Planning, Engineering, Right-of-Way, Utilities and 3 Construction 4 (Iberia, Jefferson, Lafayette, Lafourche, St. Charles, 5 St. Martin, St. Mary, Terrebonne) 6 Payable from General Obligation Bonds 7 Priority 1 $ 1,830,089 8 Priority 5 $ 188,000,000 9 Payable from Megaproject Leverage Fund $ 100,000,000 10 Total $ 289,830,089 11(1187)Non-Federal Aid Eligible Highway Program 12 (Statewide) 13 Payable from State Highway Improvement Fund $ 33,400,000 14(1271)Intersection Improvements (Roundabouts), Planning 15 and Construction 16 (Lafayette) 17 Payable from General Obligation Bonds 18 Priority 1 $ 5,000,000 19 Priority 5 $ 5,000,000 20 Total $ 10,000,000 21(1279)LA 3227 - LA 157 Intersection Realignment, Planning 22 and Construction 23 (Bossier) 24 Payable from General Obligation Bonds 25 Priority 1 $ 4,500,000 26 Priority 2 $ 750,000 27 Total $ 5,250,000 28(1311)Loyola/I-10 Interchange Improvements, Feasibility 29 Study, Interchange Modification Report, Environmental 30 Assessment, Engineering, Right-of-Ways, Utilities and 31 Construction 32 (Jefferson, Orleans) 33 Payable from General Obligation Bonds 34 Priority 1 $ 2,974,700 35(1364)LA 95: LA 98 - Beginning of PCCP in Church Point, 36 Planning and Construction 37 (Acadia) 38 Payable from General Obligation Bonds 39 Priority 5 $ 5,800,000 40 Payable from State General Fund (Direct) Non-Recurring 41 Revenues $ 100,000 42 Total $ 5,900,000 43(1369)I-10 Calcasieu River Bridge, Environmental, Planning, 44 Engineering, Right-of-Way, Utilities, Demolition and 45 Construction 46 (Calcasieu) 47 Payable from General Obligation Bonds 48 Priority 1 $ 20,000,000 49 Priority 5 $ 80,000,000 50 Payable from Megaproject Leverage Fund $ 100,000,000 51 Total $ 200,000,000 Page 23 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1470)LA 3034 Improvements 2 (East Baton Rouge) 3 Payable from General Obligation Bonds 4 Priority 1 $ 15,379,082 5(1471)LA 42 (US 61 to LA 44) Widening, including a 6 Roundabout at Joe Sevario Road, Planning and 7 Construction 8 (Ascension) 9 Payable from General Obligation Bonds 10 Priority 1 $ 227,773 11(1485)LA 335: LA 35 - LA 14, Planning and Construction 12 (Vermilion) 13 Payable from General Obligation Bonds 14 Priority 5 $ 16,100,000 15 Payable from State General Fund (Direct) Non-Recurring 16 Revenues $ 200,000 17 Total $ 16,300,000 18(1486)LA 31: LA 182 - 0.15 Mi N of N LA 96 19 (St. Martin) 20 Payable from General Obligation Bonds 21 Priority 5 $ 9,600,000 22(1572)LA 92 - 1 (US 90 - LA 182), Planning and Construction 23 (St. Martin) 24 Payable from General Obligation Bonds 25 Priority 5 $ 4,600,000 26(1631)US 190 Widening: LA 25 - US 190 Bus 27 (St. Tammany) 28 Payable from General Obligation Bonds 29 Priority 1 $ 2,000,000 30 Priority 5 $ 3,100,000 31 Total $ 5,100,000 32(1694)LA 70 Resurfacing and Drainage Repairs 33 (St. Mary) 34 Payable from General Obligation Bonds 35 Priority 2 $ 250,000 36 Priority 5 $ 5,460,000 37 Total $ 5,710,000 38(1695)LA 182 Resurfacing 39 (St. Mary) 40 Payable from General Obligation Bonds 41 Priority 2 $ 200,000 42 Priority 5 $ 7,500,000 43 Total $ 7,700,000 44(1696)Interchange Improvements in Lafayette Parish, 45 Planning 46 and Construction 47 (Lafayette) 48 Payable from General Obligation Bonds 49 Priority 5 $ 10,000,000 Page 24 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1753)LA 22 Extension and Improvements, LA 22 2 Roundabout, Design, Engineering, Planning and 3 Construction 4 (St. Tammany) 5 Payable from General Obligation Bonds 6 Priority 1 $ 646,062 7 Priority 2 $ 200,000 8 Priority 5 $ 3,240,000 9 Total $ 4,086,062 10(1794)Roundabout at LA 3233 and I-49 Northbound Service Road, 11 Planning and Construction 12 (St. Landry) 13 Payable from General Obligation Bonds 14 Priority 5 $ 4,600,000 15Pending submittal of the capital outlay budget request pursuant to the provisions of R.S. 1639:112. 17( )LA 755: LA 368 - LA 91, Planning and Construction 18 (Acadia) 19 Payable from General Obligation Bonds 20 Priority 5 $ 5,576,000 21 Payable from State General Fund (Direct) Non-Recurring 22 Revenues $ 100,000 23 Total $ 5,676,000 24Pending submittal of the capital outlay budget request pursuant to the provisions of R.S. 2539:112. 26( )LA 1100: LA 98 - LA 95, Planning and Construction 27 (Acadia) 28 Payable from General Obligation Bonds 29 Priority 5 $ 3,150,000 30 Payable from State General Fund (Direct) Non-Recurring 31 Revenues $ 100,000 32 Total $ 3,250,000 33Pending submittal of the capital outlay budget request pursuant to the provisions of R.S. 3439:112. 35( )LA 343 (Bosco Hwy) LA 98 - LA 356, 36 Planning and Construction 37 (St. Landry) 38 Payable from General Obligation Bonds 39 Priority 5 $ 6,985,000 40 Payable from State General Fund (Direct) Non-Recurring 41 Revenues $ 100,000 42 Total $ 7,085,000 43Pending submittal of the capital outlay budget request pursuant to the provisions of R.S. 4439:112. Page 25 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1( ) LA 347: LA 678 - 0.6 Mile North of LA 355, 2 Planning and Construction 3 (St. Martin) 4 Payable from the Capital Outlay Savings Account $ 585,000 5Pending submittal of the capital outlay budget request pursuant to the provisions of R.S. 639:112. 707/274PUBLIC IMPROVEMENTS 8(22) Short Line Railroad Upgrades 9 (Statewide) 10 Payable from General Obligation Bonds 11 Priority 1 $ 6,000,000 12 Priority 5 $ 7,000,000 13 Total $ 13,000,000 14(126) Port Construction and Development Priority Program 15 (Statewide) 16 Payable from Transportation Trust Fund - Regular $ 39,400,000 17(236) Comite River Diversion Canal Planning, Right-of-Way, 18 Utilities and Construction 19 (Ascension, East Baton Rouge, Livingston) 20 Payable from General Obligation Bonds 21 Priority 1 $ 1,008,665 22(237) Bayou Dechene Reservoir, Planning, Land Acquisition 23 and Construction 24 (Caldwell) 25 Payable from General Obligation Bonds 26 Priority 1 $ 13,353,232 27 Priority 5 $ 11,000,000 28 Total $ 24,353,232 29(238) Houma Navigational Canal Deepening Project, 30 Planning, Design, Construction, Rights-of-Ways, 31 Relocations and Utilities 32 (Terrebonne) 33 Payable from General Obligation Bonds 34 Priority 1 $ 10,236,052 35 Priority 5 $ 30,500,000 36 Total $ 40,736,052 37(375) Statewide Flood Control Program 38 (Statewide) 39 Payable from Transportation Trust Fund - Regular $ 20,000,000 40(443) Acadiana Gulf of Mexico Access Channel (AGMAC), 41 Port of Iberia, Planning, Design, Construction, Rights- 42 of-Way, Relocations and Utilities 43 (Iberia, Vermilion) 44 Payable from General Obligation Bonds 45 Priority 1 $ 35,029,300 46 Priority 5 $ 5,000,000 47 Total $ 40,029,300 Page 26 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(646) Turkey Creek Lake Repairs, Planning and Construction 2 (Franklin) 3 Payable from General Obligation Bonds 4 Priority 1 $ 1,500,000 5 Priority 5 $ 3,686,560 6 Total $ 5,186,560 7(647) Ouachita River Bank Stabilization and Levee Repair 8 (Caldwell, Ouachita) 9 Payable from General Obligation Bonds 10 Priority 1 $ 5,135,000 11 Priority 5 $ 14,650,000 12 Total $ 19,785,000 13(648) Mississippi River Levee Raising, Arkansas to Old 14 River, Planning and Construction 15 (Avoyelles, Concordia, East Carroll, Madison, Pointe 16 Coupee, Tensas) 17 Payable from General Obligation Bonds 18 Priority 1 $ 9,897,522 19 Priority 5 $ 31,000,000 20 Total $ 40,897,522 21(854) Mississippi River Deepening, Phase 3, Planning, 22 Design, Construction, Rights-of-Way, Relocations and 23 Utilities 24 (Ascension, East Baton Rouge, Jefferson, Orleans, 25 Plaquemines, St. Bernard, St. Charles, St. James, 26 St. John the Baptist, West Baton Rouge) 27 Payable from General Obligation Bonds 28 Priority 1 $ 42,500,000 29 Priority 5 $ 28,000,000 30 Total $ 70,500,000 31(1058)J. Bennett Johnston (Red River) Deepening 32 (Avoyelles, Bossier, Caddo, Grant, Natchitoches, 33 Rapides, Red River) 34 Payable from General Obligation Bonds 35 Priority 1 $ 500,000 36 Priority 5 $ 1,000,000 37 Total $ 1,500,000 38(1059)Bundick Lake Level Control Structure, Planning and 39 Construction 40 (Beauregard) 41 Payable from General Obligation Bonds 42 Priority 1 $ 2,980,000 43(1269)New Orleans Rail Gateway Finalize EIS to Complete 44 Study 45 (Jefferson, Orleans) 46 Payable from General Obligation Bonds 47 Priority 1 $ 1,983,811 48(1467)Rehabilitation and Repair of State-Maintained 49 Reservoirs and Dams 50 (Statewide) 51 Payable from General Obligation Bonds 52 Priority 1 $ 3,912,702 53 Priority 5 $ 4,500,000 54 Total $ 8,412,702 Page 27 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1669)West of Atchafalaya Basin Feasibility Study 2 (Statewide) 3 Payable from General Obligation Bonds 4 Priority 5 $ 750,000 5( )Flood Control Reservoirs in the Amite River 6 Basin Watershed, Planning and Construction 7 (St. Helena) 8 Payable from General Obligation Bonds 9 Priority 5 $ 2,000,000 10Pending submittal of the capital outlay budget request pursuant to the provisions of R.S. 1139:112. 1207/276ENGINEERING AND OPERATIONS 13(980) Motor Vessel and Equipment Drydocking, Repairs, 14 Various Locations Statewide 15 (Statewide) 16 Payable from Transportation Trust Fund - Regular $ 1,500,000 17(1268)New Cameron Ferry 18 (Cameron) 19 Payable from General Obligation Bonds 20 Priority 1 $ 21,568,016 21(1665)Facilities Program Major Repairs, Renovations, 22 Additions, New Facilities, Equipment Replacement at 23 Various DOTD Sites, Planning and Construction 24 (Statewide) 25 Payable from Transportation Trust Fund - Regular $ 4,000,000 2607/277AVIATION IMPROVEMENTS 27(1188)State Aviation and Airport Improvement Program 28 (Statewide) 29 Payable from Transportation Trust Fund - Regular $ 27,974,794 30 Payable from Federal Funds $ 2,000,000 31 Total $ 29,974,794 32 DEPARTMENT OF PUBLIC SAFETY AND CORRECTIONS 3308/400DEPARTMENT OF CORRECTIONS 34(1505)HVAC Installation, Offender Housing, Planning and 35 Construction 36 (Statewide) 37 Payable from General Obligation Bonds 38 Priority 1 $ 550,000 3908/402LOUISIANA STATE PENITENTIARY 40(1472)Main Prison Shower and Cellblock Plumbing Upgrade, 41 Planning and Construction 42 (West Feliciana) 43 Payable from General Obligation Bonds 44 Priority 1 $ 250,000 45 Priority 5 $ 1,356,000 46 Total $ 1,606,000 Page 28 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1473)Electrical Distribution System Upgrade, Planning and 2 Construction 3 (West Feliciana) 4 Payable from General Obligation Bonds 5 Priority 1 $ 364,410 6 Priority 5 $ 4,194,000 7 Total $ 4,558,410 808/403OFFICE OF JUVENILE JUSTICE 9(84) Community Based Program, Juvenile Justice 10 Improvements, Planning, Construction, Renovation, 11 Acquisition, and Equipment 12 (Statewide) 13 Payable from General Obligation Bonds 14 Priority 1 $ 13,909,667 15 Priority 5 $ 58,500,000 16 Payable from Interagency Transfers $ 10,000,000 17 Payable from State General Fund (Direct) Non-Recurring 18 Revenues $ 4,500,000 19 Total $ 86,909,667 20(701) Swanson Center for Youth at Columbia - Emergency 21 Power Upgrades, Planning and Construction 22 (Ouachita) 23 Payable from Interagency Transfers $ 870,000 24(910) Bridge City Center for Youth - Replace Campus Storm 25 Drain System, Planning and Construction 26 (Jefferson) 27 Payable from Interagency Transfers $ 337,400 28(1407)Bridge City Center for Youth - New Recreational 29 Pavilion, Planning and Construction 30 (Jefferson) 31 Payable from Interagency Transfers $ 682,000 32(1527)Acadiana Center for Youth - Renovation to Create 33 Behavioral Intervention Rooms 34 (Avoyelles) 35 Payable from General Obligation Bonds 36 Priority 2 $ 400,000 37 Payable from Interagency Transfers $ 1,100,000 38 Total $ 1,500,000 3908/406LOUISIANA CORRECTIONAL INSTITUTE F OR WOMEN 40(1462)Rebuild and/or Replace Facility Due to Damage from 41 2016 Flood Event 42 (Iberville) 43 Payable from General Obligation Bonds 44 Priority 1 $ 16,600,000 45 Priority 5 $ 39,400,000 46 Total $ 56,000,000 Page 29 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 108/416RAYBURN CORRECTIONAL CENTER 2(1260)Security Perimeter Fence, Planning and Construction 3 (Washington) 4 Payable from General Obligation Bonds 5 Priority 1 $ 250,000 6 Priority 5 $ 1,845,000 7 Total $ 2,095,000 808/418PUBLIC SAFETY OFFICE OF MANAGEMENT AND FINANCE 9(1568)OMF/OMV Headquarters Office Renovation Project, 10 Planning and Construction 11 (East Baton Rouge) 12 Payable from General Obligation Bonds 13 Priority 2 $ 616,000 1408/419OFFICE OF STATE POLICE 15(1756)JESTC Training Facility Improvements, Planning and 16 Construction 17 (East Baton Rouge) 18 Payable from General Obligation Bonds 19 Priority 5 $ 3,750,000 20 Payable from Interagency Transfers $ 3,000,000 21 Payable from Federal Funds via Interagency Transfers$ 1,000,000 22 Total $ 7,750,000 23(1758)New Louisiana State Police Troop L Facility, Planning 24 and Construction 25 (St. Tammany) 26 Payable from General Obligation Bonds 27 Priority 2 $ 3,000,000 28 Priority 5 $ 27,000,000 29 Total $ 30,000,000 30 LOUISIANA DEPARTMENT OF HEALTH 3109/320OFFICE OF AGING AND ADULT SERVICES 32(71) Replace Roof and Storm Drains on all Patient 33 Buildings, Planning and Construction 34 (East Feliciana) 35 Payable from General Obligation Bonds 36 Priority 1 $ 71,547 37(72) Repair and Upgrade to Sewer System, Planning and 38 Construction 39 (East Feliciana) 40 Payable from General Obligation Bonds 41 Priority 1 $ 447,593 42 Priority 5 $ 6,170,000 43 Total $ 6,617,593 44(1788)Renovations of Multiple Buildings at Villa Feliciana 45 Medical Complex, Planning and Construction 46 (East Feliciana) 47 Payable from Interagency Transfers $ 8,000,000 Page 30 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 109/330OFFICE OF BEHAVIORAL HEALTH 2(75) Central Louisiana State Hospital Relocation to 3 Pinecrest, Planning and Construction 4 (Rapides) 5 Payable from General Obligation Bonds 6 Priority 1 $ 3,040,953 7(906) Center Building and Fire Alarm System Renovation 8 and Restoration, East Louisiana State Hospital, 9 Planning and Construction 10 (East Feliciana) 11 Payable from General Obligation Bonds 12 Priority 1 $ 323,183 13 Priority 5 $ 5,000,000 14 Total $ 5,323,183 15(1320)Fire Alarm System Replacement for Ten Buildings, 16 Planning and Construction 17 (East Feliciana) 18 Payable from General Obligation Bonds 19 Priority 5 $ 2,453,200 20(1722)Sewer Plant Upgrade, Planning and Construction 21 (East Feliciana) 22 Payable from the Capital Outlay Savings Fund $ 1,000,000 2309/340OFFICE FOR CITIZENS WITH DEVELOP MENTAL DISABILITIES 24(507) Plant Generator, Planning and Construction 25 (Rapides) 26 Payable from Interagency Transfers $ 1,000,000 27(1123)Global Infrastructure Improvements, Planning and 28 Construction 29 (Rapides) 30 Payable from Interagency Transfers $ 1,500,000 31 DEPARTMENT OF WILDLIFE AND FISHERIES 3216/512OFFICE OF THE SECRETARY 33(109) Wildlife and Fisheries Enforcement Training Academy 34 and Emergency Facility (Complex) 35 (East Baton Rouge) 36 Payable from General Obligation Bonds 37 Priority 1 $ 2,250,000 3816/513OFFICE OF WILDLIFE 39(519) Hammond Headquarters, Planning and Construction 40 (Tangipahoa) 41 Payable from General Obligation Bonds 42 Priority 5 $ 1,500,000 43(520) Region 5/Lake Charles Office 44 (Calcasieu) 45 Payable from General Obligation Bonds 46 Priority 5 $ 3,000,000 Page 31 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1341)Woodworth Central Office Complex and Pineville 2 Office/Region 3, Planning and Construction 3 (Rapides) 4 Payable from General Obligation Bonds 5 Priority 5 $ 6,300,000 6 DEPARTMENT OF EDUCATION 719/601LSU BATON ROUG E 8(17) Science - Strategic Capital Plan Repairs and Upgrades - 9 Food Science Renovation, New Science Building, 10 Infrastructure and Utilities, Planning and Construction 11 (East Baton Rouge) 12 Payable from General Obligation Bonds 13 Priority 1 $ 5,000,000 14 Priority 5 $ 89,175,000 15 Total $ 94,175,000 16Provided, however, that the $475,000 of the Priority 5 appropriation shall be used to fund 17the construction or addition of a Vivarium on the Louisiana State University – Shreveport 18campus. 19(437) Military and Security Sciences Renovations, 20 Planning and Construction 21 (East Baton Rouge) 22 Payable from General Obligation Bonds 23 Priority 1 $ 500,000 24 Priority 5 $ 21,500,000 25 Total $ 22,000,000 26(438) Veterinary Medicine Facilities Repairs/Addition 27 (East Baton Rouge) 28 Payable from General Obligation Bonds 29 Priority 1 $ 10,000,000 30 Priority 5 $ 8,000,000 31 Total $ 18,000,000 32(1049)Strategic Capital Plan - Deferred Maintenance for 33 Infrastructure, Renovations, and Streets 34 (East Baton Rouge) 35 Payable from General Obligation Bonds 36 Priority 1 $ 7,346,176 37 Priority 5 $ 31,700,000 38 Total $ 39,046,176 39(1258)Louisiana State University Library 40 (East Baton Rouge) 41 Payable from General Obligation Bonds 42 Priority 1 $ 3,254,349 43 Priority 5 $ 149,500,000 44 Total $ 152,754,349 Page 32 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 119/602LSU ALEXANDRIA 2(422) Student Success Center, Planning and Construction 3 (Rapides) 4 Payable from General Obligation Bonds 5 Priority 1 $ 8,000,000 6 Priority 5 $ 7,900,000 7 Total $ 15,900,000 8(1795)Downtown Health Services Center, Planning 9 and Construction 10 (Rapides) 11 Payable from General Obligation Bonds 12 Priority 2 $ 100,000 13 Priority 5 $ 32,085,000 14 Total $ 32,185,000 1519/603UNIVERSITY OF NEW ORLEANS 16(451) Hotel, Restaurant and Tourism Program Relocation 17 Buildout to North Central Plant Building - Phase 1, 18 Planning and Construction 19 (Orleans) 20 Payable from General Obligation Bonds 21 Priority 5 $ 5,800,000 22 Payable from State General Fund (Direct) Non-Recurring 23 Revenues $ 650,000 24 Total $ 6,450,000 25(1477)Miscellaneous Roof Replacements, Planning 26 and Construction 27 (Orleans) 28 Payable from General Obligation Bonds 29 Priority 5 $ 4,800,000 30 Payable from State General Fund (Direct) Non-Recurring 31 Revenues $ 550,000 32 Total $ 5,350,000 3319/604NLSU HEALTH SCIENCES CENTER - NEW ORLEANS 34(3) LSUHSC-NO Campus Stormwater Infrastructure 35 Upgrades, Planning and Construction 36 (Orleans) 37 Payable from General Obligation Bonds 38 Priority 5 $ 3,000,000 39(626) Health Science Center Facility Renovations – Dental 40 School 41 Simulation Facility, Planning and Construction 42 (Orleans) 43 Payable from Fees and Self-Generated Revenues $ 4,000,000 44(832) LSUHSC-NO Medical Education Building Laboratory 45 Renovation, Phase 1, Planning and Construction 46 (Orleans) 47 Payable from General Obligation Bonds 48 Priority 1 $ 5,000,000 49 Priority 5 $ 55,000,000 50 Total $ 60,000,000 Page 33 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1034)Center for Advanced Learning and Simulation 2 Infrastructure and Equipment, Planning and 3 Construction 4 (Orleans) 5 Payable from General Obligation Bonds 6 Priority 5 $ 2,800,000 719/604SLSU HEALTH SCIENCES CENTER - SHREVEP ORT 8(212) Center for Medical Education and Wellness, Planning 9 and Construction 10 (Caddo) 11 Payable from General Obligation Bonds 12 Priority 1 $ 9,400,000 13 Priority 5 $ 16,600,000 14 Total $ 26,000,000 15(423) Comprehensive Emergency Water Supply 16 Improvements, Planning and Construction 17 (Caddo) 18 Payable from General Obligation Bonds 19 Priority 1 $ 1,000,000 20 Priority 5 $ 6,501,650 21 Total $ 7,501,650 22(1035)Gross Anatomy Lab Expansion and Modernization, 23 Planning and Construction 24 (Caddo) 25 Payable from General Obligation Bonds 26 Priority 1 $ 2,120,052 27 Priority 2 $ 875,000 28 Total $ 2,995,052 29(1449)Stonewall Animal Research and Training Facility, 30 Planning and Construction 31 (DeSoto) 32 Payable from General Obligation Bonds 33 Priority 5 $ 5,000,000 34(1718)Capital Improvement Projects, Design and Engineering 35 (Caddo) 36 Payable from General Obligation Bonds 37 Priority 1 $ 2,007,423 38(1719)Medical School B-Building HVAC Replacement, 39 Planning and Construction 40 (Caddo) 41 Payable from General Obligation Bonds 42 Priority 1 $ 2,322,408 4319/605LSU EUNICE 44(1) STEAM Innovation Center, Phase 1, 45 Planning and Construction 46 (Acadia) 47 Payable from General Obligation Bonds 48 Priority 5 $ 27,900,000 49 Payable from the Capital Outlay Savings Fund $ 1,000,000 50 Total $ 28,900,000 Page 34 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(2) Athletic Complex Facility, Planning and Construction 2 (Acadia) 3 Payable from General Obligation Bonds 4 Priority 1 $ 6,000,000 5 Priority 5 $ 7,750,000 6 Payable from Fees and Self-Generated Revenues $ 1,000,000 7 Total $ 14,750,000 8(1720)Manuel Hall Exterior Wall and Roof Repair, Planning 9 and Construction 10 (Acadia) 11 Payable from General Obligation Bonds 12 Priority 1 $ 2,624,749 1319/606LSU SHREVEPORT 14(1448)Building Exterior Walls and Bridge Repair, Planning 15 and Construction 16 (Caddo) 17 Payable from General Obligation Bonds 18 Priority 1 $ 3,094,021 19 Priority 2 $ 410,000 20 Priority 5 $ 410,000 21 Total $ 3,914,021 2219/607LSU AGRICULTURAL CENTER 23(213) John M. Parker Agricultural Center & Livestock Show 24 Barn Renovations and Repairs 25 (East Baton Rouge) 26 Payable from General Obligation Bonds 27 Priority 5 $ 23,000,000 28(625) Animal and Food Science Facilities Renovations and 29 Modernizations, Phase II, Planning and Construction 30 (East Baton Rouge) 31 Payable from General Obligation Bonds 32 Priority 1 $ 346,950 33 Priority 5 $ 29,403,500 34 Total $ 29,750,450 35(628) Burden Wetlands and Trail Improvements, Planning 36 and Construction 37 (East Baton Rouge) 38 Payable from Fees and Self-Generated Revenues $ 10,000,000 39(833) Renewable and Natural Resources Building Repairs, 40 Planning and Construction 41 (East Baton Rouge) 42 Payable from General Obligation Bonds 43 Priority 1 $ 2,297,035 44 Payable from State General Fund (Direct) Non-Recurring 45 Revenues $ 4,000,000 46 Total $ 6,297,035 47(1036)Food Innovation Center, Planning and Construction 48 (East Baton Rouge) 49 Payable from General Obligation Bonds 50 Priority 5 $ 4,000,000 51 Payable from Fees and Self-Generated Revenues $ 500,000 52 Total $ 4,500,000 Page 35 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1060)Dean Lee Tornado Damage Building Repairs and 2 Reconstruction 3 (Rapides) 4 Payable from General Obligation Bonds 5 Priority 1 $ 1,499,630 6 Priority 2 $ 1,700,000 7 Total $ 3,199,630 819/612BATON ROUGE COMMUNITY COLLEG E 9(1547)Allied Health Facility and Other Campus Development, 10 with Equipment, Planning and Construction 11 (East Baton Rouge) 12 Payable from General Obligation Bonds 13 Priority 1 $ 13,500,000 14 Priority 5 $ 39,500,000 15 Total $ 53,000,000 16(1783)Campus Development, Planning and Construction 17 (Pointe Coupee) 18 Payable from General Obligation Bonds 19 Priority 5 $ 7,000,000 2019/614SOUTHERN UNIVERSITY LAW CENTER 21(18) Renovations and Addition to Existing Law Library, 22 Planning and Construction 23 (East Baton Rouge) 24 Payable from General Obligation Bonds 25 Priority 1 $ 5,614,030 26 Priority 5 $ 5,750,000 27 Total $ 11,364,030 28(1759)Career Learning Center, Planning and Construction 29 (East Baton Rouge) 30 Payable from General Obligation Bonds 31 Priority 5 $ 15,500,000 3219/616SOUTHERN UNIVERSITY - BATON ROUG E 33(19) Ravine, Bluff and Riverbank Stabilization Project, 34 Planning and Construction 35 (East Baton Rouge) 36 Payable from General Obligation Bonds 37 Priority 1 $ 1,000,000 38 Priority 5 $ 31,000,600 39 Total $ 32,000,600 40(441) New STEM Science Complex, Planning and 41 Construction 42 (East Baton Rouge) 43 Payable from General Obligation Bonds 44 Priority 1 $ 14,699,943 45 Priority 5 $ 51,800,000 46 Total $ 66,499,943 Page 36 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(442) School of Business/Professional Accountancy, Planning 2 and Construction 3 (East Baton Rouge) 4 Payable from General Obligation Bonds 5 Priority 1 $ 2,250,000 6 Priority 5 $ 42,250,000 7 Total $ 44,500,000 8(1789)J. K. Haynes Hall School of Nursing Renovation and 9 Addition, Planning and Construction 10 (East Baton Rouge) 11 Payable from General Obligation Bonds 12 Priority 2 $ 1,100,000 13 Priority 5 $ 10,300,000 14 Payable from Fees and Self-Generated Revenues $ 18,000,000 15 Total $ 29,400,000 16(859) Replace Chilled Water Lines, Planning and 17 Construction 18 (East Baton Rouge) 19 Payable from General Obligation Bonds 20 Priority 2 $ 2,000,000 21 Priority 5 $ 28,000,000 22 Total $ 30,000,000 23(1265)Stewart Hall - Wall Mount HVAC Units 1st, 2nd and 24 3rd Floors, Planning and Construction 25 (East Baton Rouge) 26 Payable from General Obligation Bonds 27 Priority 1 $ 1,729,068 28 Payable from State General Fund (Direct) Non-Recurring 29 Revenues $ 1,000,000 30 Total $ 2,729,068 31(1724)A.O. Williams Hall Renovations, 32 Planning and Construction 33 (East Baton Rouge) 34 Payable from General Obligation Bonds 35 Priority 1 $ 2,715,575 36(1760)New Southern University Laboratory School Complex, 37 Planning and Construction 38 (East Baton Rouge) 39 Payable from General Obligation Bonds 40 Priority 2 $ 2,000,000 41 Priority 5 $ 53,000,000 42 Total $ 55,000,000 43(1784)Global Innovation and Welcome Center, Phase II, 44 Planning and Construction 45 (East Baton Rouge) 46 Payable from Interagency Transfers $ 3,000,000 47 Payable from Fees and Self-Generated Revenues $ 3,000,000 48 Total $ 6,000,000 49(1785)Center for Innovation, Entrepreneurship and 50 Community Engagement, Planning and Construction 51 (East Baton Rouge) 52 Payable from Fees and Self-Generated Revenues $ 15,000,000 Page 37 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 119/617SOUTHERN UNIVERSITY- NEW ORLEANS 2(23) ADA Compliant Restrooms and Public 3 Accommodations in the Cafeteria, University Center, 4 Health & Physical Education, Library and 5 Administration Building, Planning and Construction 6 (Orleans) 7 Payable from General Obligation Bonds 8 Priority 1 $ 1,000,000 9 Priority 2 $ 2,650,000 10 Total $ 3,650,000 11(1468)Campus Exterior Lighting Upgrades, Planning and 12 Construction 13 (Orleans) 14 Payable from General Obligation Bonds 15 Priority 1 $ 1,000,000 16(1469)University Cafeteria, Planning and Construction 17 (Orleans) 18 Payable from General Obligation Bonds 19 Priority 1 $ 100,000 20 Priority 5 $ 9,900,000 21 Total $ 10,000,000 22(1761)General Classroom Building, Planning and 23 Construction 24 (Orleans) 25 Payable from General Obligation Bonds 26 Priority 5 $ 15,000,000 27(1786)Nursing and Allied Health Building, Planning and 28 Construction 29 (Orleans) 30 Payable from Fees and Self-Generated Revenues $ 20,000,000 3119/618SOUTHERN UNIVERSITY - SHREVEP ORT 32(488) Domestic Water Loop, Hot Water Loop and Drainage 33 Improvements, Planning and Construction 34 (Caddo) 35 Payable from General Obligation Bonds 36 Priority 2 $ 520,000 37 Priority 5 $ 7,480,000 38 Total $ 8,000,000 39(836) Louis Collier Hall Science Building Renovation, 40 Planning and Construction 41 (Caddo) 42 Payable from General Obligation Bonds 43 Priority 1 $ 654,083 44 Priority 5 $ 15,950,000 45 Total $ 16,604,083 46(1256)Gym Complex, Planning and Construction 47 (Caddo) 48 Payable from General Obligation Bonds 49 Priority 5 $ 7,500,000 Page 38 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1259)New Workforce Training and Technology Center, 2 Planning and Construction 3 (Caddo) 4 Payable from General Obligation Bonds 5 Priority 1 $ 1,675,947 6 Priority 5 $ 17,500,000 7 Total $ 19,175,947 8(1787)HVAC Renovations, Planning and Construction 9 (Caddo) 10 Payable from Fees and Self-Generated Revenues $ 10,000,000 1119/619SOUTHERN UNIVERSITY AGRICULTURAL RESEARCH AND 12 EXTENSION CENTER 13(1246)Disaster Relief Mega Shelter, Planning and 14 Construction 15 (East Baton Rouge) 16 Payable from General Obligation Bonds 17 Priority 1 $ 1,144,942 18 Priority 5 $ 9,200,000 19 Payable from Federal Funds via Interagency Transfers$ 18,000,000 20 Total $ 28,344,942 21(1762)High Tech Meat Processing Facility Expansion, 22 Planning and Construction 23 (East Baton Rouge) 24 Payable from Federal Funds via Interagency Transfers$ 3,500,000 2519/621NICHOLLS STATE UNIVERSITY 26(227) Coastal Center Facility, Planning and Construction 27 (Lafourche) 28 Payable from General Obligation Bonds 29 Priority 1 $ 10,905,088 30(229) New Nursing Building, Planning and Construction 31 (Lafourche) 32 Payable from General Obligation Bonds 33 Priority 1 $ 9,249,897 34 Priority 5 $ 10,750,000 35 Total $ 19,999,897 36(1460)Fieldhouse, Planning and Construction 37 (Lafourche) 38 Payable from General Obligation Bonds 39 Priority 5 $ 2,100,000 40 Payable from State General Fund (Direct) Non-Recurring 41 Revenues $ 1,500,000 42 Total $ 3,600,000 43(1816)Women's Student Athlete Performance Center, 44 Planning and Construction 45 (Lafourche) 46 Payable from General Obligation Bonds 47 Priority 5 $ 2,700,000 48 Payable from State General Fund (Direct) Non-Recurring 49 Revenues $ 4,300,000 50 Total $ 7,000,000 Page 39 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 119/623GRAMBLING STATE UNIVERSITY 2(713) Campus Utility Infrastructure Assessment Emergency 3 Repair/Replacement, Planning and Construction 4 (Lincoln) 5 Payable from General Obligation Bonds 6 Priority 1 $ 2,999,963 7 Priority 5 $ 5,000,000 8 Total $ 7,999,963 9(901) Reroof, Waterproof, Envelope Repairs for Various 10 Buildings, Planning and Construction 11 (Lincoln) 12 Payable from General Obligation Bonds 13 Priority 1 $ 1,000,000 14 Priority 5 $ 7,500,000 15 Total $ 8,500,000 16(1313)Criminal Justice Building Renovation 17 (Lincoln) 18 Payable from General Obligation Bonds 19 Priority 1 $ 799,968 20 Priority 5 $ 10,500,000 21 Total $ 11,299,968 22(1781)Computer Science and Cyber Security Building, 23 Planning, Construction, and Equipment 24 (Lincoln) 25 Payable from General Obligation Bonds 26 Priority 2 $ 800,000 27 Priority 5 $ 41,000,000 28 Total $ 41,800,000 2919/625LOUISIANA TECH UNIVERSITY 30(243) Renovation of George T. Madison Hall, Planning and 31 Construction 32 (Lincoln) 33 Payable from General Obligation Bonds 34 Priority 1 $ 2,399,937 35 Priority 2 $ 600,000 36 Priority 5 $ 35,000,000 37 Total $ 37,999,937 38(244) Agriculture and Forestry Wood Products Education and 39 Research Center, Planning and Construction 40 (Lincoln) 41 Payable from General Obligation Bonds 42 Priority 1 $ 999,937 43 Priority 5 $ 9,000,000 44 Total $ 9,999,937 45(1065)Athletic Academic Center, Planning and Construction 46 (Lincoln) 47 Payable from General Obligation Bonds 48 Priority 1 $ 499,937 49 Priority 5 $ 7,000,000 50 Total $ 7,499,937 Page 40 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1066)Central Steam Generator - Switch Gear, Planning and 2 Construction 3 (Lincoln) 4 Payable from General Obligation Bonds 5 Priority 1 $ 599,972 6 Priority 5 $ 2,900,000 7 Total $ 3,499,972 8(1823)Carson-Taylor Hall Renovation, 9 Planning and Construction 10 (Lincoln) 11 Payable from General Obligation Bonds 12 Priority 5 $ 26,000,000 13 Payable from State General Fund (Direct) Non-Recurring 14 Revenues $ 1,000,000 15 Total $ 27,000,000 1619/627MCNEESE STATE UNIVERSITY 17(228) Contraband Bayou Erosion Retaining Wall, Phase II, 18 Planning and Construction 19 (Calcasieu) 20 Payable from General Obligation Bonds 21 Priority 1 $ 728,313 22(436) Shearman Fine Arts Building Renovation and Addition, 23 Planning and Construction 24 (Calcasieu) 25 Payable from General Obligation Bonds 26 Priority 1 $ 3,024,937 27 Priority 5 $ 4,700,000 28 Total $ 7,724,937 29(1461)McNeese Disaster Recovery, Planning and 30 Construction 31 (Calcasieu) 32 Payable from General Obligation Bonds 33 Priority 1 $ 5,431,163 34 Priority 5 $ 4,500,000 35 Total $ 9,931,163 36( ) Locker Room/Weight Room Renovations, 37 Planning and Construction 38 (Calcasieu) 39 Payable from State General Fund (Direct) Non-Recurring 40 Revenues $ 1,500,000 41Pending submittal of the capital outlay budget request pursuant to the provisions of R.S. 4239:112. 4319/629UNIVERSITY OF LOUISIANA - MONROE 44(863) Health Science Complex Renovation, Sugar Hall and 45 Caldwell Hall, Planning and Construction 46 (Ouachita) 47 Payable from General Obligation Bonds 48 Priority 1 $ 16,322,729 49 Priority 5 $ 14,000,000 50 Total $ 30,322,729 Page 41 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1074)Human Development and Well-Being Multi-Purpose 2 Center, Planning and Construction 3 (Ouachita) 4 Payable from General Obligation Bonds 5 Priority 2 $ 1,500,000 6 Priority 5 $ 57,100,000 7 Total $ 58,600,000 819/631NORTHWESTERN STATE UNIVERSITY 9(440) Health Performance Center, Planning and Construction 10 (Natchitoches) 11 Payable from General Obligation Bonds 12 Priority 1 $ 5,000,000 13 Payable from Fees and Self-Generated Revenues $ 2,000,000 14 Total $ 7,000,000 15(869) Renovation of Nursing Education Center at Warrington 16 Place (Shreveport Campus), Planning and Construction 17 (Caddo) 18 Payable from General Obligation Bonds 19 Priority 2 $ 1,335,000 20 Priority 5 $ 12,100,000 21 Total $ 13,435,000 22(1264)Replacement of John S. Kyser Hall, Planning and 23 Construction 24 (Natchitoches) 25 Payable from General Obligation Bonds 26 Priority 1 $ 25,530,969 27 Priority 5 $ 18,195,000 28 Payable from Fees and Self-Generated Revenues $ 1,000,000 29 Total $ 44,725,969 3019/634SOUTHEASTERN LOUISIANA UNIVERSITY 31(424) D. Vickers Hall Renovation and Addition, Planning and 32 Construction 33 (Tangipahoa) 34 Payable from General Obligation Bonds 35 Priority 1 $ 20,038,373 36 Priority 5 $ 12,100,000 37 Total $ 32,138,373 38(1037)Academic Athletic Training and Ancillary Athletic 39 Facility, Planning and Construction 40 (Tangipahoa) 41 Payable from General Obligation Bonds 42 Priority 1 $ 782,460 43 Priority 5 $ 12,500,000 44 Total $ 13,282,460 45(1038)Nursing and Health Science Building, Planning and 46 Construction 47 (Tangipahoa) 48 Payable from General Obligation Bonds 49 Priority 1 $ 600,000 50 Priority 5 $ 31,300,000 51 Total $ 31,900,000 Page 42 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1243)Baton Rouge Nursing Center Renovation, Planning and 2 Construction 3 (East Baton Rouge, Tangipahoa) 4 Payable from General Obligation Bonds 5 Priority 1 $ 685,435 6 Priority 5 $ 9,220,000 7 Total $ 9,905,435 819/640UNIVERSITY OF LOUISIANA - LAFAYETTE 9(464) DeClouet Hall Renovation, Planning and Construction 10 (Lafayette) 11 Payable from General Obligation Bonds 12 Priority 1 $ 350,589 13 Priority 5 $ 4,500,000 14 Total $ 4,850,589 15(668) Foster Hall Renovation, Planning and Construction 16 (Lafayette) 17 Payable from General Obligation Bonds 18 Priority 1 $ 444,173 19 Priority 5 $ 4,000,000 20 Total $ 4,444,173 21(669) Madison Hall Renovation, Planning and Construction 22 (Lafayette) 23 Payable from General Obligation Bonds 24 Priority 1 $ 8,000,000 25 Priority 5 $ 14,000,000 26 Total $ 22,000,000 27(670) Engineering Classroom Building, Planning and 28 Construction 29 (Lafayette) 30 Payable from General Obligation Bonds 31 Priority 1 $ 7,084,465 32 Priority 5 $ 47,866,573 33 Total $ 54,951,038 34(877) Kinesiology, Hospitality Management, and Athletic 35 Administration Complex, Engineering, Stabilization, 36 Equipment, Planning and Construction 37 (Lafayette) 38 Payable from General Obligation Bonds 39 Priority 1 $ 15,000,000 40 Priority 5 $ 10,000,000 41 Total $ 25,000,000 42(1079)Health Care Education and Training Facility and 43 UL/LSU Health Science Education Collaboration 44 Building, Planning, and Construction 45 (Lafayette) 46 Payable from General Obligation Bonds 47 Priority 1 $ 13,249,968 48 Priority 5 $ 62,500,000 49 Total $ 75,749,968 Page 43 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1817)Sciences Lab/Classroom Building, 2 Planning and Construction 3 (Lafayette) 4 Payable from General Obligation Bonds 5 Priority 5 $ 47,750,000 6 Payable from the Capital Outlay Savings Fund $ 1,250,000 7 Total $ 49,000,000 8(1818)Billeaud Hall Renovation, 9 Planning and Construction 10 (Lafayette) 11 Payable from General Obligation Bonds 12 Priority 5 $ 29,500,000 13 Payable from the Capital Outlay Savings Fund $ 500,000 14 Total $ 30,000,000 15(1819)Montgomery Hall Renovation, 16 Planning and Construction 17 (Lafayette) 18 Payable from General Obligation Bonds 19 Priority 5 $ 21,500,000 20 Payable from the Capital Outlay Savings Fund $ 500,000 21 Total $ 22,000,000 22(1820)Learning Lab, Planning and Construction 23 (Lafayette) 24 Payable from General Obligation Bonds 25 Priority 5 $ 42,000,000 26 Payable from the Capital Outlay Savings Fund $ 2,000,000 27 Total $ 44,000,000 28(1821)Property Acquisition 29 (Lafayette) 30 Payable from the Capital Outlay Savings Fund $ 2,000,000 3119/644BOSSIER PARISH COMMUNITY COLLEG E 32(323) Land Acquisition, Purchase and Development Planning 33 and Construction 34 (Bossier) 35 Payable from General Obligation Bonds 36 Priority 1 $ 1,000,000 3719/646RIVER PARISHES COMMUNITY COLLEG E 38(1132)Donaldsonville Renovation Project, Planning and 39 Construction 40 (Ascension) 41 Payable from General Obligation Bonds 42 Priority 1 $ 1,100,000 4319/647LOUISIANA DELTA COMMUNITY COLLEG E 44(231) Campus Expansion for Louisiana Delta Community 45 College, Winnsboro, Planning and Construction 46 (Franklin) 47 Payable from General Obligation Bonds 48 Priority 1 $ 4,139,820 Page 44 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(232) Campus Development for Louisiana Delta Community 2 College Bastrop, Planning and Construction 3 (Morehouse) 4 Payable from General Obligation Bonds 5 Priority 1 $ 1,000,000 6 Priority 5 $ 7,000,000 7 Total $ 8,000,000 8(1052)Campus Development for Louisiana Delta Community 9 College, Planning and Construction 10 (Union) 11 Payable from General Obligation Bonds 12 Priority 1 $ 1,000,000 13 Priority 5 $ 16,500,000 14 Total $ 17,500,000 1519/649LOUISIANA COMMUNITY AND TECHNICAL COLLEG E SYSTEM 16(517) Resurface Campus Parking, Planning and Construction 17 (Calcasieu) 18 Payable from General Obligation Bonds 19 Priority 1 $ 149,963 20 Priority 5 $ 2,500,000 21 Total $ 2,649,963 22(1548)Maritime/Petroleum Workforce Training Academy, 23 Planning and Construction 24 (Terrebonne) 25 Payable from General Obligation Bonds 26 Priority 1 $ 9,334,817 2719/671BOARD OF REGENTS 28(412) Land Acquisition for Post Secondary Educational 29 Institutions 30 (Statewide) 31 Payable from General Obligation Bonds 32 Priority 1 $ 501,913 33(413) Major Repairs and Deferred Maintenance of Buildings 34 and Facilities, Planning and Construction 35 (Statewide) 36 Payable from General Obligation Bonds 37 Priority 5 $ 10,000,000 38 Payable from State General Fund (Direct) Non-Recurring 39 Revenues $ 25,000,000 40 Payable from Fees and Self-Generated Revenues $ 10,000,000 41 Payable from Federal Funds via Interagency Transfers$ 10,000,000 42 Total $ 55,000,000 43(1229)System-Wide Telecommunications Wiring and 44 Equipment, Planning and Construction 45 (Statewide) 46 Payable from General Obligation Bonds 47 Priority 1 $ 1,995,822 Page 45 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 119/674LOUISIANA UNIVERSITIES MARINE CONSORTIUM 2(870) Houma Marine Campus Phase 2, Planning and 3 Construction 4 (Terrebonne) 5 Payable from General Obligation Bonds 6 Priority 1 $ 11,488,262 7(1073)Research Vessel (R/V Pelican) Replacement 8 (Terrebonne) 9 Payable from General Obligation Bonds 10 Priority 1 $ 10,890,000 11 Priority 5 $ 31,000,000 12 Total $ 41,890,000 13(1725)LUMCON Houma Marine Campus, Planning and 14 Construction 15 (Terrebonne) 16 Payable from General Obligation Bonds 17 Priority 1 $ 3,839,806 1819/712LOUISIANA TECHNICAL COLLEG E-SULLIVAN CAMPUS 19(719) New Diesel Automotive Building, Northshore 20 Technical Community College - Sullivan Campus, 21 Planning and Construction 22 (Washington) 23 Payable from General Obligation Bonds 24 Priority 1 $ 3,000,000 25 Priority 5 $ 7,140,000 26 Total $ 10,140,000 2719/731FLETCHER TECHNICAL COMMUNITY COLLEG E 28(313) Precision Agriculture Training Facility, Planning and 29 Construction 30 (Terrebonne) 31 Payable from General Obligation Bonds 32 Priority 1 $ 5,498,000 33 Priority 5 $ 5,502,000 34 Total $ 11,000,000 3519/772NORTHWEST LA TECHNICAL COMMUNITY COLLEG E 36 MANSFIELD 37(1133)Campus Nursing Lab and Student Center, 38 Planning and Construction 39 (DeSoto) 40 Payable from State General Fund (Direct) Non-Recurring 41 Revenues $ 3,500,000 4219/788NORTHSHORE TECHNICAL COMMUNITY 43 COLLEGE 44(1340)New Hammond Area Campus, Planning and 45 Construction 46 (Tangipahoa) 47 Payable from General Obligation Bonds 48 Priority 2 $ 3,000,000 49 Priority 5 $ 37,675,000 50 Total $ 40,675,000 Page 46 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1763)Livingston Campus Expansion, Planning and 2 Construction 3 (Livingston) 4 Payable from General Obligation Bonds 5 Priority 2 $ 1,000,000 6 Priority 5 $ 9,000,000 7 Total $ 10,000,000 8 JUDICIAL EXPENSES 923/949LOUISIANA JUDICIARY 10(1050)Land Acquisition, Planning, and Construction of New 11 Courthouse for the Louisiana Court of Appeal, Third 12 Circuit 13 (Calcasieu) 14 Payable from General Obligation Bonds 15 Priority 1 $ 268,700 16 LEVEE DISTRICTS AND PORTS 1736/L13PONTCHARTRAIN LEVEE DISTRICT 18(170) Lake Pontchartrain West Shore Hurricane Protection 19 Project 20 (Ascension, St. Charles, St. James, St. John the Baptist) 21 Payable from General Obligation Bonds 22 Priority 1 $ 3,081,715 23 Priority 5 $ 5,170,000 24 Total $ 8,251,715 25(394) Amite River Diversion Canal Weir, Planning and 26 Construction 27 (Ascension, Livingston, St. James) 28 Payable from General Obligation Bonds 29 Priority 2 $ 5,000,000 3036/L15SQUIRREL RUN LEVEE DRAINAG E DISTRICT 31(1406)Maintenance of Levee and FEMA Certification 32 (Iberia) 33 Payable from General Obligation Bonds 34 Priority 1 $ 250,000 35 Priority 5 $ 200,000 36 Total $ 450,000 3736/L16SOUTH LAFOURCHE LEVEE DISTRICT 38(1324)Larose to Golden Meadow Hurricane Protection 39 System, Planning and Construction 40 (Lafourche) 41 Payable from General Obligation Bonds 42 Priority 5 $ 10,200,000 4336/L25GRAND ISLE INDEPENDENT LEVEE DISTRICT 44(812) Grand Isle Back Levee Flood Protection, Planning and 45 Construction 46 (Jefferson) 47 Payable from General Obligation Bonds 48 Priority 1 $ 1,500,000 Page 47 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1640)Breakwater Protection, Planning and Construction 2 (Jefferson) 3 Payable from General Obligation Bonds 4 Priority 1 $ 2,734,160 536/L26NATCHITOCHES LEVEE AND DRAINAG E DISTRICT 6(1592)Lower Cane River Area Flow Control Structure and 7 Levee Surface Restorations, Planning and Construction 8 (Natchitoches) 9 Payable from General Obligation Bonds 10 Priority 1 $ 125,087 1136/L27TERREBONNE LEVEE DISTRICT 12(560) Lower Dularge Flood Control, Planning and 13 Construction 14 (Terrebonne) 15 Payable from General Obligation Bonds 16 Priority 5 $ 5,000,000 1736/L34LAKEFRONT MANAG EMENT AUTHORITY 18(585) Planning, Designing and Constructing Public Use 19 Pavilions Inclusive of Benches and Tables along 5.2 20 Miles of Public Parks and Green Space along New 21 Orleans Lakeshore Drive 22 (Orleans) 23 Payable from General Obligation Bonds 24 Priority 5 $ 168,750 25(994) Seabrook Public Boat Launch Rehabilitation, Planning 26 and Construction 27 (Orleans) 28 Payable from General Obligation Bonds 29 Priority 1 $ 100,000 30 Priority 5 $ 1,780,000 31 Total $ 1,880,000 3236/L36LAFITTE AREA INDEPENDENT LEVEE DISTRICT 33(404) Lower Lafitte (Orange Street) Basin, Planning and 34 Construction 35 (Jefferson) 36 Payable from General Obligation Bonds 37 Priority 1 $ 8,500,000 38 Priority 5 $ 8,492,500 39 Total $ 16,992,500 40(1219)Goose Bayou/The Pen Levee Basin, Planning and 41 Construction 42 (Jefferson) 43 Payable from General Obligation Bonds 44 Priority 1 $ 3,000,000 45 Priority 5 $ 12,066,000 46 Total $ 15,066,000 Page 48 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 136/P05WEST CALCASIEU PORT 2(742) New Property Along Gulf Intracoastal Waterway, 3 Planning and Construction 4 (Calcasieu) 5 Payable from General Obligation Bonds 6 Priority 5 $ 2,000,000 736/P10GREATER LAFOURCHE PORT COMMISSION 8(1649)Fourchon Bridge and Connector Road, Planning and 9 Construction 10 (Lafourche) 11 Payable from General Obligation Bonds 12 Priority 1 $ 500,000 13 Priority 5 $ 4,910,000 14 Total $ 5,410,000 1536/P12LAKE PROVIDENCE PORT COMMISSION 16(392) Third Lane Addition, Planning and Construction 17 (East Carroll) 18 Payable from General Obligation Bonds 19 Priority 5 $ 1,800,000 2036/P17PORT OF NEW ORLEANS 21(130) Louisiana International Terminal Roadway and Rail 22 Improvements, Planning and Construction 23 (St. Bernard) 24 Payable from General Obligation Bonds 25 Priority 2 $ 2,000,000 26 Priority 5 $ 78,000,000 27 Total $ 80,000,000 28(1348)St. Bernard Transportation Corridor, Planning and 29 Construction 30 (St. Bernard) 31 Payable from General Obligation Bonds 32 Priority 1 $ 2,000,000 33 Priority 5 $ 48,000,000 34 Total $ 50,000,000 35(1721)Louisiana International Terminal Drainage, Site 36 Preparation and Mitigation, Planning and Construction 37 (St. Bernard) 38 Payable from General Obligation Bonds 39 Priority 2 $ 2,000,000 40 Priority 5 $ 48,000,000 41 Total $ 50,000,000 4236/P21PORT OF SOUTH LOUISIANA 43(112) Globalplex Road Improvements and Drainage Between 44 Globalplex Buildings 71 and 76, Planning and 45 Construction 46 (St. John the Baptist) 47 Payable from General Obligation Bonds 48 Priority 1 $ 500,000 Page 49 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(523) Globalplex Dock Access Bridge and Equipment 2 Replacement/Repair, Planning and Construction 3 (St. John the Baptist) 4 Payable from General Obligation Bonds 5 Priority 1 $ 10,800,750 6(524) Globalplex Roadway Improvements at Parking Area 7 Near Building 2, Planning and Construction 8 (St. John the Baptist) 9 Payable from General Obligation Bonds 10 Priority 1 $ 2,940,000 11(1346)Globalplex Terminal Building #71 and Other 12 Globalplex Terminal Building Upgrades, Planning and 13 Construction 14 (St. John the Baptist) 15 Payable from General Obligation Bonds 16 Priority 1 $ 567,361 17 Priority 5 $ 1,000,000 18 Total $ 1,567,361 19(1555)Globalplex Roadway Improvements: Parking Area 20 Near Building 60, Planning and Construction 21 (St. John the Baptist) 22 Payable from General Obligation Bonds 23 Priority 1 $ 1,290,000 2436/P23TERREBONNE PORT COMMISSION 25(87) Slip Dredging, Houma Navigation Canal Dredging, 26 Planning and Construction 27 (Terrebonne) 28 Payable from General Obligation Bonds 29 Priority 1 $ 5,061,923 30(1792)Maritime Manufacturing Facility, Planning and 31 Construction 32 (Terrebonne) 33 Payable from General Obligation Bonds 34 Priority 1 $ 4,000,000 35 Priority 5 $ 40,000,000 36 Total $ 44,000,000 3736/P26PORT OF LAKE CHARLES 38(618) Two Mobile Harbor Cranes for BT-1, Planning and 39 Construction 40 (Calcasieu) 41 Payable from General Obligation Bonds 42 Priority 1 $ 2,836,539 43(873) Berths 4, 5, & 6 Wharf and Shed Reconstruction at City 44 Docks, Planning and Construction 45 (Calcasieu) 46 Payable from General Obligation Bonds 47 Priority 1 $ 28,000,000 48 Priority 5 $ 68,400,000 49 Total $ 96,400,000 Page 50 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(987) Lake Charles Harbor and Terminal District Industrial 2 Canal Storage Facility, Planning and Construction 3 (Calcasieu) 4 Payable from General Obligation Bonds 5 Priority 2 $ 550,000 6 Priority 5 $ 4,500,000 7 Total $ 5,050,000 836/P34WEST ST. MARY PARISH PORT 9(920) Warehouse Facilities and Related Infrastructure 10 Improvements (Baldwin Campus), Planning and 11 Construction 12 (St. Mary) 13 Payable from General Obligation Bonds 14 Priority 5 $ 2,000,000 1536/P35MERMENTAU RIVER HARBOR AND TERMINAL DISTRICT 16(934) Land Acquisition for New Slip Construction 17 (Acadia) 18 Payable from General Obligation Bonds 19 Priority 5 $ 295,000 20(1141)Slip Improvements, Planning and Construction 21 (Acadia) 22 Payable from General Obligation Bonds 23 Priority 1 $ 925,000 2436/P36CENTRAL LOUISIANA REG IONAL PORT 25(948) CLRP High Water Hardstand and Access Road, 26 Construction and Planning 27 (Rapides) 28 Payable from General Obligation Bonds 29 Priority 1 $ 175,000 30 Priority 5 $ 1,800,000 31 Total $ 1,975,000 3236/P41JEFFERSON PARISH ECONOMIC DEVELOPMENT AND PORT 33 DISTRICT 34(287) Avondale Marine Facility Improvements, Planning and 35 Construction 36 (Jefferson) 37 Payable from General Obligation Bonds 38 Priority 1 $ 1,500,000 39(1105)Restore Rail Connection and Crossing to Avondale 40 Marine, Planning and Construction 41 (Jefferson) 42 Payable from General Obligation Bonds 43 Priority 1 $ 100,000 44 Priority 5 $ 3,700,000 45 Total $ 3,800,000 Page 51 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 136/P43COLUMBIA PORT COMMISSION 2(572) Railroad Spur, Planning and Construction 3 (Caldwell) 4 Payable from General Obligation Bonds 5 Priority 1 $ 117,846 6 Priority 5 $ 1,841,000 7 Total $ 1,958,846 836/P44AVOYELLES PORT COMMISSION 9(1726)Liquid Fertilizer Tank Terminal Expansion, Planning 10 and Construction 11 (Avoyelles) 12 Payable from General Obligation Bonds 13 Priority 1 $ 150,000 14 Priority 5 $ 600,000 15 Total $ 750,000 16 MISCELLANEOUS NON-STATE 1750/J01ACADIA PARISH 18(526) Remove and Replace the Vie Terre Beau Bridge, 19 Planning and Construction 20 (Acadia) 21 Payable from General Obligation Bonds 22 Priority 5 $ 1,715,000 23 Payable from State General Fund (Direct) Non-Recurring 24 Revenues $ 200,000 25 Total $ 1,915,000 26(725) Improvements to the Acadia Parish Courthouse Building 27 (Window Replacement), Planning and Construction 28 (Acadia) 29 Payable from State General Fund (Direct) Non-Recurring 30 Revenues $ 842,000 31(933) Ye Olde Country Road and Muskrat Road 32 Improvements, Planning and Construction 33 (Acadia) 34 Payable from General Obligation Bonds 35 Priority 5 $ 1,370,000 36 Payable from State General Fund (Direct) Non-Recurring 37 Revenues $ 150,000 38 Total $ 1,520,000 39(935) Rice Arena Improvements, Planning and Construction 40 (Acadia) 41 Payable from State General Fund (Direct) Non-Recurring 42 Revenues $ 495,000 43(1345)Old Spanish Trail Roadway Improvements to Provide 44 for Freight Traffic Bypass of Dangerous Railroad 45 Crossing, Planning and Construction 46 (Acadia) 47 Payable from General Obligation Bonds 48 Priority 1 $ 745,000 Page 52 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/J02ALLEN PARISH 2(343) Bridge Improvements, Planning and Construction 3 (Allen) 4 Payable from General Obligation Bonds 5 Priority 5 $ 3,050,000 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 250,000 8 Total $ 3,300,000 9(545) Road Rehabilitation, Planning and Construction 10 (Allen) 11 Payable from General Obligation Bonds 12 Priority 5 $ 1,550,000 13 Payable from State General Fund (Direct) Non-Recurring 14 Revenues $ 250,000 15 Total $ 1,800,000 1650/J03ASCENSION PARISH 17(145) LA 431 at LA 931 Roundabout, 18 Planning and Construction 19 (Ascension) 20 Payable from General Obligation Bonds 21 Priority 5 $ 2,160,000 22 Payable from the Capital Outlay Savings Fund $ 250,000 23 Total $ 2,410,000 24Pending approval of the capital outlay budget request pursuant to the provisions of R.S. 2539:112. 26(147) 4-Lane LA 73 from LA 429 Cornerview Road to LA 73 27 Roundabout at Bluff Connector, Planning and Construction 28 (Ascension) 29 Payable from State General Fund (Direct) Non-Recurring 30 Revenues $ 500,000 31(151) Donaldsonville Courthouse Restoration, Planning 32 and Construction 33 (Ascension) 34 Payable from State General Fund (Direct) Non-Recurring 35 Revenues $ 225,000 36(401) Early Childhood Education Project, 37 Planning and Construction 38 (Ascension) 39 Payable from General Obligation Bonds 40 Priority 5 $ 2,700,000 41 Payable from State General Fund (Direct) Non-Recurring 42 Revenues $ 300,000 43 Total $ 3,000,000 44(566) St. Amant Community Health and Wellness 45 Center, Planning and Construction 46 (Ascension) 47 Payable from General Obligation Bonds 48 Priority 5 $ 4,600,000 49Pending approval of the capital outlay budget request pursuant to the provisions of R.S. 5039:112. Page 53 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(783) Parish Utilities of Ascension Water Plant Feed 2 Tank, Planning and Construction 3 (Ascension) 4 Payable from General Obligation Bonds 5 Priority 5 $ 520,000 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 500,000 8 Total $ 1,020,000 9(988) Parish Utilities of Ascension Water Plant 10 Clarifiers, Planning and Construction 11 (Ascension) 12 Payable from General Obligation Bonds 13 Priority 5 $ 1,240,000 14 Payable from State General Fund (Direct) Non-Recurring 15 Revenues $ 200,000 16 Total $ 1,440,000 17(1381)LA 73 at LA 30 Roundabout, 18 Planning and Construction 19 (Ascension) 20 Payable from General Obligation Bonds 21 Priority 5 $ 3,600,000 22 Payable from State General Fund (Direct) Non-Recurring 23 Revenues $ 750,000 24 Total $ 4,350,000 25(1595)Donaldsonville National Guard Armory Health and 26 Wellness Center, Planning and Construction 27 (Ascension) 28 Payable from State General Fund (Direct) Non-Recurring 29 Revenues $ 1,000,000 30( )LA 3127 Connector from Hwy 70 to LA 1, 31 Planning and Construction 32 (Ascension) 33 Payable from General Obligation Bonds 34 Priority 5 $ 7,000,000 35 Payable from State General Fund (Direct) Non-Recurring 36 Revenues $ 1,000,000 37 Total $ 8,000,000 38Pending submittal and approval of the capital outlay budget request pursuant to the 39provisions of R.S. 39:112. 4050/J04ASSUMPTION PARISH 41(619) Assumption Parish Pumps and Drainage, Planning and 42 Construction 43 (Assumption) 44 Payable from General Obligation Bonds 45 Priority 1 $ 500,000 46(1024)Plattenville Drainage Improvements, Planning and 47 Construction 48 (Assumption) 49 Payable from General Obligation Bonds 50 Priority 1 $ 1,800,000 Page 54 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1736)Lee Drive Repaving, Planning and Construction 2 (Assumption) 3 Payable from General Obligation Bonds 4 Priority 1 $ 300,000 5 Priority 5 $ 1,428,000 6 Total $ 1,728,000 750/J05AVOYELLES PARISH 8(1164)Parishwide Roadway Improvements, Planning 9 and Construction 10 (Avoyelles) 11 Payable from General Obligation Bonds 12 Priority 2 $ 1,000,000 13 Priority 5 $ 1,000,000 14 Total $ 2,000,000 15(1385)Parish Recreation and Education Complex, 16 Planning and Construction 17 (Avoyelles) 18 Payable from State General Fund (Direct) Non-Recurring 19 Revenues $ 2,000,000 2050/J06BEAUREGARD PARISH 21(60) Longview Road Improvements, Beauregard Parish 22 Police Jury, Planning and Construction 23 (Beauregard) 24 Payable from General Obligation Bonds 25 Priority 5 $ 360,000 26(1233)Camp Edgewood Road Improvements - Beauregard 27 Parish Police Jury 28 (Beauregard) 29 Payable from General Obligation Bonds 30 Priority 1 $ 750,000 3150/J08BOSSIER PARISH 32(750) Improvements to Highway 157, LA Highway 3227 33 to US Highway 80, Planning and Construction 34 (Bossier) 35 Payable from General Obligation Bonds 36 Priority 2 $ 3,000,000 37 Priority 5 $ 10,200,000 38 Total $ 13,200,000 39(956) Improvements to LA Highway 3 (Benton Road) and 40 I-220 Interchange, Planning and Construction 41 (Bossier) 42 Payable from General Obligation Bonds 43 Priority 5 $ 3,000,000 Page 55 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/J10CALCASIEU PARISH 2(55) Calcasieu Police Jury Gravity Sewer Trunk Mains & 3 Pumping Station South Ward 3 and South Ward 4, 4 Planning and Construction 5 (Calcasieu) 6 Payable from General Obligation Bonds 7 Priority 1 $ 2,000,000 8 Priority 5 $ 12,000,000 9 Total $ 14,000,000 1050/J11CALDWELL PARISH 11(365) Swim Lake Road, Planning and Reconstruction 12 (Caldwell) 13 Payable from General Obligation Bonds 14 Priority 1 $ 450,000 15(563) Wiles Road and Kountry Korner Road, Planning and 16 Reconstruction 17 (Caldwell) 18 Payable from General Obligation Bonds 19 Priority 1 $ 500,000 2050/J12CAMERON PARISH 21(402) Shoreline Stabilization, Planning and Construction 22 (Cameron) 23 Payable from State General Fund (Direct) Non-Recurring 24 Revenues $ 200,000 25(1216)North Cameron Emergency Operations Center, 26 Planning and Construction 27 (Cameron) 28 Payable from the Capital Outlay Savings Fund $ 1,975,000 29(1425)Marshall Street Pumps, Planning and Construction 30 (Cameron) 31 Payable from State General Fund (Direct) Non-Recurring 32 Revenues $ 200,000 3350/J17EAST BATON ROUG E PARISH 34(490) East Baton Rouge Parish Flood Risk Reduction Project- 35 Expand, Repair, and Modify Drainage System 36 throughout East Baton Rouge Parish 37 (East Baton Rouge) 38 Payable from General Obligation Bonds 39 Priority 1 $ 12,951,787 40 Priority 5 $ 22,000,000 41 Total $ 34,951,787 Page 56 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/J18EAST CARROLL PARISH 2(411) Spillway Structure Repairs for Lake Providence Lake 3 and Cleaning of Outfall Canal from the Lake 4 Downstream, Planning and Construction 5 (East Carroll) 6 Payable from General Obligation Bonds 7 Priority 1 $ 100,000 8 Priority 5 $ 300,000 9 Total $ 400,000 1050/J20EVANGELINE PARISH 11(714) Courthouse Improvements and Refurbishment, Planning, 12 Construction, Equipment, and Parking 13 (Evangeline) 14 Payable from State General Fund (Direct) Non-Recurring 15 Revenues $ 1,150,000 1650/J21FRANKLIN PARISH 17(292) Erosion Control and Bank Stabilization at Big Creek 18 Bridge and Looney Canal, Planning and Construction 19 (Franklin) 20 Payable from General Obligation Bonds 21 Priority 5 $ 600,000 22(612) Franklin Parish Activity Center, Planning and 23 Construction 24 (Franklin) 25 Payable from General Obligation Bonds 26 Priority 1 $ 435,000 27 Priority 5 $ 1,500,000 28 Total $ 1,935,000 29(697) Riley Road Improvements, Planning and Construction 30 (Franklin) 31 Payable from General Obligation Bonds 32 Priority 1 $ 1,000,000 33(1224)Franklin Medical Center Improvements, 34 Planning and Construction 35 (Franklin) 36 Payable from State General Fund (Direct) Non-Recurring 37 Revenues $ 2,000,000 38(1317)Dr. Rogers Road Improvements, Planning and 39 Construction 40 (Franklin) 41 Payable from General Obligation Bonds 42 Priority 5 $ 600,000 43(1321)LD Knox Road Reconstruction, Planning and 44 Construction 45 (Franklin) 46 Payable from General Obligation Bonds 47 Priority 5 $ 1,555,000 Page 57 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/J23IBERIA PARISH 2(415) Courthouse Elevators, Planning and Construction 3 (Iberia) 4 Payable from General Obligation Bonds 5 Priority 1 $ 171,900 6(666) Evacuation Center at Acadiana Fairgrounds, Planning 7 and Construction 8 (Iberia) 9 Payable from General Obligation Bonds 10 Priority 5 $ 8,000,000 11(667) LaSalle Street and Hanger Road Extensions, Planning 12 and Construction 13 (Iberia) 14 Payable from General Obligation Bonds 15 Priority 1 $ 400,000 16(875) Parish Jail Improvements, Planning and Construction 17 (Iberia) 18 Payable from General Obligation Bonds 19 Priority 5 $ 840,000 2050/J24IBERVILLE PARISH 21(169) St. Gabriel Area Water Transmission Main Land 22 Acquisition, Planning and Construction 23 (Iberville) 24 Payable from State General Fund (Direct) Non-Recurring 25 Revenues $ 1,579,350 26(691) Manchac Roadway Improvements 27 (Iberville) 28 Payable from General Obligation Bonds 29 Priority 1 $ 400,000 30 Priority 5 $ 2,000,000 31 Total $ 2,400,000 3250/J25JACKSON PARISH 33(1740)Lakeshore Drive Rehabilitation and Improvements, 34 Planning and Construction 35 (Jackson) 36 Payable from General Obligation Bonds 37 Priority 1 $ 315,000 38 Priority 5 $ 1,674,000 39 Total $ 1,989,000 4050/J26JEFFERSON PARISH 41(8) Bucktown Harbor Wave Attenuation Jetty, Planning 42 and Construction 43 (Jefferson) 44 Payable from General Obligation Bonds 45 Priority 1 $ 464,000 Page 58 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(13) Riverside Senior Center, Planning and Construction 2 (Jefferson) 3 Payable from General Obligation Bonds 4 Priority 1 $ 948,000 5 Priority 5 $ 1,455,000 6 Total $ 2,403,000 7(218) Bainbridge Canal Closure from Veterans Boulevard to 8 Terminal Drive, Planning and Construction 9 (Jefferson) 10 Payable from General Obligation Bonds 11 Priority 1 $ 930,000 12 Priority 5 $ 13,800,000 13 Total $ 14,730,000 14(221) East Bank Backup Generators West: Sewer Lift 15 Station Backup Generators (Camp Plauche, 16 Transcontinental at West Metairie, and 17 Transcontinental at Vineland) 18 (Jefferson) 19 Payable from General Obligation Bonds 20 Priority 2 $ 1,550,000 21 Priority 5 $ 2,000,000 22 Payable from State General Fund (Direct) Non-Recurring 23 Revenues $ 500,000 24 Total $ 4,050,000 25(426) Bonnabel Canal Bank Stabilization (West Side) - 26 Veterans Blvd. to West Esplanade, Planning and 27 Construction 28 (Jefferson) 29 Payable from General Obligation Bonds 30 Priority 1 $ 600,000 31 Priority 5 $ 8,000,000 32 Total $ 8,600,000 33(428) Canal #13 Concrete Lining (Loyola Drive to Butler Canal) 34 (Jefferson) 35 Payable from General Obligation Bonds 36 Priority 1 $ 250,000 37 Priority 5 $ 3,750,000 38 Total $ 4,000,000 39(431) Preservation and Restoration of Historic Structures for 40 Hope Haven/Madonna Manor Campus, Planning and 41 Construction 42 (Jefferson) 43 Payable from General Obligation Bonds 44 Priority 1 $ 7,277,147 45(538) Barataria Blvd. (LA 45) Drainage Improvements 46 (Merlin Lane to Pritchard Road), Planning 47 and Construction 48 (Jefferson) 49 Payable from General Obligation Bonds 50 Priority 5 $ 6,500,000 51 Payable from State General Fund (Direct) Non-Recurring 52 Revenues $ 1,000,000 53 Total $ 7,500,000 Page 59 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(629) 4th Street Shared-Use Path (Barataria Blvd. to Gretna 2 City Limits), Planning and Construction 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 1 $ 225,000 6 Priority 5 $ 4,146,600 7 Total $ 4,371,600 8(632) Hickory Avenue (LA 3154) Rehabilitation (River Road 9 to 10th Street), Planning and Construction 10 (Jefferson) 11 Payable from General Obligation Bonds 12 Priority 1 $ 600,000 13 Priority 5 $ 6,270,000 14 Total $ 6,870,000 15(633) Jefferson Park Sport Field Renovation, Planning and 16 Construction 17 (Jefferson) 18 Payable from General Obligation Bonds 19 Priority 5 $ 6,840,000 20(636) Woodlake Estates Drainage Improvements, Planning and 21 Construction 22 (Jefferson) 23 Payable from General Obligation Bonds 24 Priority 1 $ 150,000 25 Priority 5 $ 5,000,000 26 Total $ 5,150,000 27(637) Woodmere Playground Improvements, Planning and 28 Construction 29 (Jefferson) 30 Payable from General Obligation Bonds 31 Priority 1 $ 2,084,163 32(837) 11th Street Roadway Replacement and Upgrade of 33 Subsurface Drainage System between Queens and 34 Manhattan Boulevard, Planning and Construction 35 (Jefferson) 36 Payable from General Obligation Bonds 37 Priority 1 $ 369,192 38 Priority 5 $ 9,175,000 39 Total $ 9,544,192 40(838) Bucktown Harbor Boardwalk and Kayak Launch, 41 Planning and Construction 42 (Jefferson) 43 Payable from General Obligation Bonds 44 Priority 5 $ 1,575,000 45(1790)Gretna Government Complex Parking Lot, Planning 46 and Construction 47 (Jefferson) 48 Payable from General Obligation Bonds 49 Priority 1 $ 428,000 50 Priority 5 $ 10,171,600 51 Payable from the Capital Outlay Savings Fund $ 1,000,000 52 Total $ 11,599,600 Page 60 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(843) Sewer Lift Station Backup Generators - North, 2 Planning and Construction 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 1 $ 575,000 6(1041)East Bank Backup Generators East: Sewer Lift Station 7 Backup Generators (Clearview at W. Napoleon, Cleary 8 at W. Napoleon, Houma at W. Napoleon and Galleria 9 Sewer Station), Planning and Construction 10 (Jefferson) 11 Payable from General Obligation Bonds 12 Priority 1 $ 500,000 13 Priority 5 $ 1,250,000 14 Total $ 1,750,000 15(1044)New Access Road in the Churchill Technology and 16 Business Park for Delgado's Advanced Manufacturing 17 and River City Campus, Planning and Construction 18 (Jefferson) 19 Payable from General Obligation Bonds 20 Priority 1 $ 200,000 21 Priority 5 $ 1,350,000 22 Total $ 1,550,000 23(1046)West Esplanade Pump Station, Planning and 24 Construction 25 (Jefferson) 26 Payable from General Obligation Bonds 27 Priority 1 $ 3,500,000 28 Priority 2 $ 1,000,000 29 Priority 5 $ 1,000,000 30 Total $ 5,500,000 31(1247)Airline Drive (US 61) at 17th Street Canal Drainage 32 Crossing and Railroad Bridge Replacement 33 (Jefferson) 34 Payable from General Obligation Bonds 35 Priority 1 $ 10,991,250 36 Priority 5 $ 16,090,000 37 Total $ 27,081,250 38(1248)Brown Avenue Canal Improvements between the 39 Westbank Expressway and Harold Street, Planning and 40 Construction 41 (Jefferson) 42 Payable from General Obligation Bonds 43 Priority 1 $ 2,205,920 44 Priority 5 $ 1,000,000 45 Total $ 3,205,920 46(1254)Woodland West Drainage Improvements, Planning and 47 Construction 48 (Jefferson) 49 Payable from General Obligation Bonds 50 Priority 1 $ 799,116 51 Priority 5 $ 1,000,000 52 Total $ 1,799,116 Page 61 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1255)Shrewsbury Road at Jefferson Highway Culvert 2 Replacement, Planning and Construction 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 1 $ 450,000 6(1459)Woodmere Youth Center, Planning and Construction 7 (Jefferson) 8 Payable from General Obligation Bonds 9 Priority 1 $ 99,862 10(1798)Vietnamese American Cultural and Service Center, 11 Planning and Construction 12 (Jefferson) 13 Payable from General Obligation Bonds 14 Priority 5 $ 3,550,000 15 Payable from State General Fund (Direct) Non-Recurring 16 Revenues $ 1,005,000 17 Total $ 4,555,000 18Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 1939:112. 2050/J28LAFAYETTE PARISH 21(20) Parish Government Complex, Jail, New Design, 22 Planning, and Construction 23 (Lafayette) 24 Payable from General Obligation Bonds 25 Priority 5 $ 17,500,000 26 Payable from the Capital Outlay Savings Fund $ 8,750,000 27 Total $ 26,250,000 28(21) Ingress and Egress Interchange Improvements, 29 Planning and Construction 30 (Lafayette) 31 Payable from General Obligation Bonds 32 Priority 5 $ 5,000,000 33 Payable from State General Fund (Direct) Non-Recurring 34 Revenues $ 500,000 35 Total $ 5,500,000 36(233) State Interchange Improvements, Planning 37 and Construction 38 (Lafayette) 39 Payable from General Obligation Bonds 40 Priority 5 $ 6,325,000 41 Payable from the Capital Outlay Savings Fund $ 500,000 42 Total $ 6,825,000 43(234) Isaac Verot Coulee - Main Channel Hardening, 44 Planning and Construction 45 (Lafayette) 46 Payable from General Obligation Bonds 47 Priority 5 $ 11,000,000 48 Payable from the Capital Outlay Savings Fund $ 1,000,000 49 Total $ 12,000,000 Page 62 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(235) E Broussard Roundabout, Planning and Construction 2 (Lafayette) 3 Payable from General Obligation Bonds 4 Priority 5 $ 2,000,000 5 Payable from State General Fund (Direct) Non-Recurring 6 Revenues $ 500,000 7 Total $ 2,500,000 8(502) Milton Volunteer Fire Department, 9 Planning and Construction 10 (Lafayette) 11 Payable from the Capital Outlay Savings Fund $ 250,000 12(642) Performing Arts Center, Planning and Construction 13 (Lafayette) 14 Payable from General Obligation Bonds 15 Priority 1 $ 1,000,000 16 Priority 5 $ 23,000,000 17 Total $ 24,000,000 18(643) Rue Du Belier Widening, Planning and Construction 19 (Lafayette) 20 Payable from General Obligation Bonds 21 Priority 5 $ 7,000,000 22 Payable from State General Fund (Direct) Non-Recurring 23 Revenues $ 500,000 24 Total $ 7,500,000 25(820) Kaliste Saloom Widening 26 (Lafayette) 27 Payable from General Obligation Bonds 28 Priority 1 $ 53,461 29(852) Parish Government Complex, Parish Courthouse, 30 Planning and Construction 31 (Lafayette) 32 Payable from General Obligation Bonds 33 Priority 1 $ 6,054,757 34(1026)University Avenue Corridor Improvements, Planning, 35 Construction and Acquisition 36 (Lafayette) 37 Payable from General Obligation Bonds 38 Priority 1 $ 13,000,000 39(1054)Bayou Vermilion Flood Control, Planning and 40 Construction 41 (Lafayette) 42 Payable from General Obligation Bonds 43 Priority 1 $ 3,000,000 44 Priority 5 $ 10,000,000 45 Total $ 13,000,000 46(1055)Interchange Improvements on Louisiana 47 Highways, Planning and Construction 48 (Lafayette) 49 Payable from General Obligation Bonds 50 Priority 5 $ 12,500,000 Page 63 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1056)Lake Farm to Verot School Road Extension, 2 Planning and Construction 3 (Lafayette) 4 Payable from General Obligation Bonds 5 Priority 5 $ 2,500,000 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 500,000 8 Total $ 3,000,000 9(1057)Cue Road Extension, Planning and Construction 10 (Lafayette) 11 Payable from General Obligation Bonds 12 Priority 5 $ 3,500,000 13 Payable from State General Fund (Direct) Non-Recurring 14 Revenues $ 500,000 15 Total $ 4,000,000 16(1266)Vermilion River Erosion Control, Planning 17 and Construction 18 (Lafayette) 19 Payable from General Obligation Bonds 20 Priority 5 $ 3,750,000 21 Payable from State General Fund (Direct) Non-Recurring 22 Revenues $ 500,000 23 Total $ 4,250,000 24(1267)Parish Road Overlay, Planning and Construction 25 (Lafayette) 26 Payable from General Obligation Bonds 27 Priority 5 $ 7,000,000 28 Payable from State General Fund (Direct) Non-Recurring 29 Revenues $ 500,000 30 Total $ 7,500,000 31(1463)Heymann Park Improvements Project, Planning and 32 Construction 33 (Lafayette) 34 Payable from General Obligation Bonds 35 Priority 1 $ 1,955,000 36(1765)Cypress Island Swamp Spoil Bank Removal, Planning 37 and Construction 38 (Lafayette, St. Martin) 39 Payable from General Obligation Bonds 40 Priority 1 $ 150,000 41 Priority 5 $ 1,600,000 42 Total $ 1,750,000 4350/J29LAFOURCHE PARISH 44(762) Butch Hill Pump Station Replacement, Planning and 45 Construction 46 (Lafourche) 47 Payable from General Obligation Bonds 48 Priority 1 $ 646,000 49 Priority 2 $ 3,854,000 50 Priority 5 $ 3,100,000 51 Total $ 7,600,000 Page 64 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1176)South Lafourche Airport Corridor Project 2 (Lafourche) 3 Payable from General Obligation Bonds 4 Priority 1 $ 2,789,545 5 Priority 5 $ 4,598,137 6 Total $ 7,387,682 750/J31LINCOLN PARISH 8(379) Bridge Replacements on Mitchell and Shady Grove 9 Roads, Planning and Construction 10 (Lincoln) 11 Payable from General Obligation Bonds 12 Priority 1 $ 380,000 1350/J32LIVINGSTON PARISH 14(120) Cook Road Extension Economic Development Corridor 15 (Pete's Highway Frontage Road) 16 (Livingston) 17 Payable from General Obligation Bonds 18 Priority 1 $ 3,018,975 19(1561)Juban Road North Extension between US 190 (Florida 20 Blvd.) and LA 1026 (Lockhart Road), Planning and 21 Construction 22 (Livingston) 23 Payable from General Obligation Bonds 24 Priority 5 $ 6,005,000 2550/J34MOREHOUSE PARISH 26(291) Public Works Center, Planning and Construction 27 (Morehouse) 28 Payable from General Obligation Bonds 29 Priority 1 $ 301,750 30(1127)Grabault Road, Higginbotham Road, and 31 Horseshoe Lake Road Rehabilitation, 32 Planning and Construction 33 (Morehouse) 34 Payable from State General Fund (Direct) Non-Recurring 35 Revenues $ 820,000 3650/J35NATCHITOCHES P ARISH 37(821) Courthouse Security Improvements, Planning and 38 Construction 39 (Natchitoches) 40 Payable from General Obligation Bonds 41 Priority 1 $ 2,192,545 4250/J37OUACHITA PARISH 43(728) Steep Bayou Sewer - Phase 3, Planning, Construction 44 and Right-of-Way Acquisition 45 (Ouachita) 46 Payable from General Obligation Bonds 47 Priority 1 $ 1,854,137 48 Priority 5 $ 2,080,000 49 Total $ 3,934,137 Page 65 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(739) Highland Road Improvements, Planning, 2 Right-of-Way, and Construction 3 (Ouachita) 4 Payable from General Obligation Bonds 5 Priority 5 $ 1,040,000 6(937) Cheniere Lake Area 1 Improvements, Planning and 7 Construction 8 (Ouachita) 9 Payable from General Obligation Bonds 10 Priority 1 $ 1,080,000 11(1349)Bayou Mouchoir Drainage Improvements 12 (Ouachita) 13 Payable from General Obligation Bonds 14 Priority 1 $ 477,500 15(1732)Hannah's Run Control Structure, Planning and 16 Construction 17 (Ouachita) 18 Payable from General Obligation Bonds 19 Priority 1 $ 187,385 20 Priority 5 $ 200,000 21 Total $ 387,385 2250/J38PLAQUEMINES PARISH 23(245) Empire Bridge Lighting, Planning and Construction 24 (Plaquemines) 25 Payable from General Obligation Bonds 26 Priority 1 $ 197,000 2750/J39POINTE COUPEE PARISH 28(154) Ventress Road Drainage Outfall Project, 29 Planning and Construction 30 (Pointe Coupee) 31 Payable from the Capital Outlay Savings Fund $ 300,000 32(204) Courthouse Restoration - Phase 2, Planning and 33 Construction 34 (Pointe Coupee) 35 Payable from General Obligation Bonds 36 Priority 1 $ 2,988,750 37(351) False River Ecosystem Restoration Project, Including 38 Bulkhead Replacement, Planning and Construction 39 (Pointe Coupee) 40 Payable from General Obligation Bonds 41 Priority 1 $ 2,400,000 42 Priority 5 $ 5,600,000 43 Total $ 8,000,000 44(752) Portage Canal Drainage Project, Planning and 45 Construction 46 (Pointe Coupee) 47 Payable from General Obligation Bonds 48 Priority 1 $ 2,000,000 Page 66 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(753) Watershed Drainage Improvements Bayou Grosse Tete, 2 Bayou Cholpe, Bayou Choctaw, False River Outfall 3 Channel, and Johnson Bayou, Planning and 4 Construction 5 (Pointe Coupee) 6 Payable from General Obligation Bonds 7 Priority 1 $ 2,000,000 850/J40RAPIDES PARISH 9(528) Gunter Road/Barron Chapel Road Street 10 Improvements, Planning and Construction 11 (Rapides) 12 Payable from General Obligation Bonds 13 Priority 1 $ 1,450,000 14(938) Philadelphia Road Street Improvements, Planning and 15 Construction 16 (Rapides) 17 Payable from General Obligation Bonds 18 Priority 1 $ 500,000 19 Priority 5 $ 2,950,000 20 Total $ 3,450,000 21(1799)New Fire Station at LSU Alexandria Serving 22 Rapides Parish – Fire District 18, Planning 23 and Construction 24 (Rapides) 25 Payable from General Obligation Bonds 26 Priority 5 $ 1,300,000 27 Payable from the Capital Outlay Savings Fund $ 100,000 28 Total $ 1,400,000 29Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 3039:112. 3150/J43SABINE PARISH 32(211) Plainview Road Rehabilitation, Planning and 33 Construction 34 (Sabine) 35 Payable from General Obligation Bonds 36 Priority 1 $ 1,837,720 37 Priority 5 $ 2,433,600 38 Total $ 4,271,320 3950/J44ST. BERNARD PARISH 40(923) St. Bernard Parish Jail Renovations, Planning and 41 Construction 42 (St. Bernard) 43 Payable from General Obligation Bonds 44 Priority 1 $ 3,000,000 45 Priority 5 $ 5,000,000 46 Total $ 8,000,000 Page 67 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/J45ST. CHARLES PARISH 2(311) Des Allemans Bulkhead - Phase 1, Planning and 3 Construction 4 (St. Charles) 5 Payable from General Obligation Bonds 6 Priority 1 $ 150,000 7 Priority 5 $ 622,500 8 Total $ 772,500 9(388) Fairfield and Oakland Pump Station Discharge 10 Improvements, Planning and Construction 11 (St. Charles) 12 Payable from General Obligation Bonds 13 Priority 1 $ 825,000 14(565) Paul Fredrick Street and Kinler Street Demolition and 15 Reconstruction 16 (St. Charles) 17 Payable from General Obligation Bonds 18 Priority 1 $ 175,000 19 Priority 5 $ 2,825,000 20 Total $ 3,000,000 21(1698)Fifth Street Drainage Improvements, Planning and 22 Construction 23 (St. Charles) 24 Payable from General Obligation Bonds 25 Priority 1 $ 429,750 26 Priority 5 $ 450,000 27 Total $ 879,750 2850/J46ST. HELENA PARISH 29(1545)Audubon Library, Planning and Construction 30 (St. Helena) 31 Payable from General Obligation Bonds 32 Priority 1 $ 1,163,600 3350/J47ST. JAMES PARISH 34(282) Storm Damage Repair to Dock on Blind River, 35 Planning and Construction 36 (St. James) 37 Payable from State General Fund (Direct) Non-Recurring 38 Revenues $ 1,000,000 39(546) Parishwide Road Rehabilitation, Planning 40 and Construction 41 (St. James) 42 Payable from General Obligation Bonds 43 Priority 5 $ 1,000,000 44 Payable from State General Fund (Direct) Non-Recurring 45 Revenues $ 230,000 46 Total $ 1,230,000 Page 68 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1099)West Shore Risk Reduction Connector Levee 2 (St. James) 3 Payable from General Obligation Bonds 4 Priority 1 $ 3,650,000 5 Priority 5 $ 10,200,000 6 Total $ 13,850,000 7(1100)LA 3127 Widening (LA 20 to LA 3213), Planning and 8 Construction 9 (St. James) 10 Payable from General Obligation Bonds 11 Priority 1 $ 1,190,393 12 Priority 5 $ 7,400,000 13 Total $ 8,590,393 1450/J49ST. LANDRY PARISH 15(98) Parish Wide Road Program, Planning and Construction 16 (St. Landry) 17 Payable from General Obligation Bonds 18 Priority 5 $ 5,000,000 19 Payable from State General Fund (Direct) Non-Recurring 20 Revenues $ 1,000,000 21 Total $ 6,000,000 22(199) Parish Wide Drainage Project, Planning and 23 Construction 24 (St. Landry) 25 Payable from General Obligation Bonds 26 Priority 1 $ 1,000,000 27(1645)Courthouse Renovations, Planning and Construction 28 (St. Landry) 29 Payable from General Obligation Bonds 30 Priority 1 $ 320,000 31 Payable from State General Fund (Direct) Non-Recurring 32 Revenues $ 680,000 33 Total $ 1,000,000 3450/J50ST. MARTIN PARISH 35(253) Road Improvements on Four-Mile Bayou Road 36 (St. Martin) 37 Payable from General Obligation Bonds 38 Priority 1 $ 78,233 39 Priority 5 $ 500,000 40 Total $ 578,233 41(254) Expansion and Renovation of Central Office 42 Complex, Planning and Construction 43 (St. Martin) 44 Payable from the Capital Outlay Savings Fund $ 1,000,000 45Pending approval of the capital outlay budget request pursuant to the provisions of R.S. 4639:112. Page 69 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(922) I-10 Frontage Road, LA 328 to LA 347, 2 Planning and Construction 3 (St. Martin) 4 Payable from General Obligation Bonds 5 Priority 5 $ 1,000,000 6 Payable from the Capital Outlay Savings Fund $ 2,000,000 7 Total $ 3,000,000 8(1077)Joe Daigre Canal Drainage Improvements, Planning 9 and Construction 10 (St. Martin) 11 Payable from General Obligation Bonds 12 Priority 1 $ 711,858 13 Priority 5 $ 550,000 14 Total $ 1,261,858 15(1285)Spanish Trail Industrial Park Access Road, Planning 16 and Construction 17 (St. Martin) 18 Payable from General Obligation Bonds 19 Priority 1 $ 4,100,000 2050/J51ST. MARY PARISH 21(1189)Emergency Power and Facility Improvements at the 22 Office of Homeland Security and Emergency 23 Preparedness Warehouse, Planning and Construction 24 (St. Mary) 25 Payable from the Capital Outlay Savings Fund $ 235,000 26(1481)Infrastructure Improvements and Construction of a 27 Welding Training Center Facility at the Charenton 28 Canal Industrial Park 29 (St. Mary) 30 Payable from General Obligation Bonds 31 Priority 5 $ 527,000 32(1482)Reconstruction of Martin Luther King Roadway in 33 Charenton for St. Mary Parish Government, within 34 Existing Right-of-Way, Planning and Construction 35 (St. Mary) 36 Payable from General Obligation Bonds 37 Priority 1 $ 407,020 38(1500)Emergency Power Improvements at St. Mary Parish 39 Courthouse, Planning and Construction 40 (St. Mary) 41 Payable from General Obligation Bonds 42 Priority 1 $ 250,000 4350/J52ST. TAMMANY PARISH 44(354) LA 1077 Widening, Design, Right of Way, Planning 45 and Construction 46 (St. Tammany) 47 Payable from General Obligation Bonds 48 Priority 1 $ 20,000 49 Priority 5 $ 20,000,000 50 Total $ 20,020,000 Page 70 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(355) Sharp Road Improvements and Sidewalk, Planning and 2 Construction 3 (St. Tammany) 4 Payable from General Obligation Bonds 5 Priority 5 $ 6,125,000 6(357) Emerald Forrest Boulevard to LA 59, Design, Planning 7 and Construction 8 (St. Tammany) 9 Payable from General Obligation Bonds 10 Priority 5 $ 13,000,000 11(552) Ben Thomas - Stone Road to Powell Drive, Design, 12 Planning, and Construction 13 (St. Tammany) 14 Payable from General Obligation Bonds 15 Priority 1 $ 500,000 16 Priority 5 $ 3,200,000 17 Total $ 3,700,000 18(553) South Slidell Levee Protection Rehabilitation: (USACE 19 533d Report or Planning, Land Acquisition, and 20 Construction of Levees West and East of Interstate 10) 21 (St. Tammany) 22 Payable from General Obligation Bonds 23 Priority 1 $ 750,000 24 Priority 5 $ 9,108,000 25 Total $ 9,858,000 26(756) University Square Learning Center Facilities, Planning 27 and Construction 28 (St. Tammany) 29 Payable from General Obligation Bonds 30 Priority 1 $ 208,740 31 Priority 5 $ 10,630,000 32 Total $ 10,838,740 33(964) Fabourg Coquille Water Quality Improvements, 34 Planning and Construction 35 (St. Tammany) 36 Payable from General Obligation Bonds 37 Priority 5 $ 6,050,000 38 Payable from State General Fund (Direct) Non-Recurring 39 Revenues $ 550,000 40 Total $ 6,600,000 41(1171)Safe Haven Campus for Behavioral and Mental Health, 42 Planning, Construction and Renovation for Triage 43 (St. Tammany) 44 Payable from General Obligation Bonds 45 Priority 1 $ 3,154,543 46 Priority 5 $ 8,350,000 47 Total $ 11,504,543 48(1582)Harrison Avenue Widening, Planning and Construction 49 (St. Tammany) 50 Payable from General Obligation Bonds 51 Priority 5 $ 13,300,000 Page 71 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/J53TANGIPAHOA PARISH 2(300) North Hoover Road Improvements Phase 2, Planning 3 and Construction 4 (Tangipahoa) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,000,000 7 Priority 5 $ 1,725,000 8 Total $ 2,725,000 9(474) South Airport Road, North Hoover Road 10 Improvements, Planning and Construction 11 (Tangipahoa) 12 Payable from General Obligation Bonds 13 Priority 1 $ 2,430,785 14 Priority 5 $ 2,000,000 15 Total $ 4,430,785 16(503) Region 9 Emergency Distribution Center and Public 17 Works, Planning and Construction 18 (Tangipahoa) 19 Payable from General Obligation Bonds 20 Priority 5 $ 6,000,000 2150/J54TENSAS PARISH 22(43) Lide Road Improvements, Planning and Construction 23 (Tensas) 24 Payable from General Obligation Bonds 25 Priority 1 $ 776,277 26(458) Tensas Parish/Port Priority Site Plan, Planning and 27 Construction 28 (Tensas) 29 Payable from General Obligation Bonds 30 Priority 1 $ 214,800 31(975) Recreation Facility, Planning and Construction 32 (Tensas) 33 Payable from General Obligation Bonds 34 Priority 1 $ 230,000 35 Priority 5 $ 786,000 36 Total $ 1,016,000 3750/J55TERREBONNE PARISH 38(184) Bayou LaCarpe Watershed Project, Location C, Design 39 and Construction 40 (Terrebonne) 41 Payable from General Obligation Bonds 42 Priority 1 $ 1,675,000 43 Priority 5 $ 4,000,000 44 Total $ 5,675,000 45(185) Valhi Extension (Savanne to LA 311), Planning and 46 Construction 47 (Terrebonne) 48 Payable from General Obligation Bonds 49 Priority 1 $ 2,000,000 50 Priority 5 $ 30,000,000 51 Total $ 32,000,000 Page 72 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(340) South Louisiana Wetland Discovery Center - Phase 2 - 2 Bayou Country Institute, Planning and Construction 3 (Terrebonne) 4 Payable from General Obligation Bonds 5 Priority 1 $ 473,615 6(363) Replacement of D-18 Pump Station Falgout Canal, 7 Theriot, La., Planning and Construction 8 (Terrebonne) 9 Payable from General Obligation Bonds 10 Priority 1 $ 1,075,000 11 Priority 5 $ 1,050,000 12 Total $ 2,125,000 13(562) Westside/Alma Street Drainage, Planning and 14 Construction 15 (Terrebonne) 16 Payable from General Obligation Bonds 17 Priority 1 $ 783,850 18(1180)Terrebonne Sports Complex, Planning and 19 Construction 20 (Terrebonne) 21 Payable from General Obligation Bonds 22 Priority 1 $ 1,939,000 23(1590)Replacement of Brady Road Bridge, Planning and 24 Construction 25 (Terrebonne) 26 Payable from General Obligation Bonds 27 Priority 1 $ 5,885,000 28(1632)Terrebonne Basin Watershed (HNC at Bayou 29 Grand Caillou) Pump Station, Phase 1 and 2, 30 Planning and Construction 31 (Terrebonne) 32 Payable from General Obligation Bonds 33 Priority 2 $ 3,000,000 34(1850)Hollywood/Valhi Roundabout, Planning 35 and Construction 36 (Terrebonne) 37 Payable from State General Fund (Direct) Non-Recurring 38 Revenues $ 1,900,000 39Pending approval of the capital outlay budget request pursuant to the provisions of R.S. 4039:112. 4150/J57VERMILION PARISH 42(1591)Parishwide Road Improvements, Planning 43 and Construction 44 (Vermilion) 45 Payable from State General Fund (Direct) Non-Recurring 46 Revenues $ 800,000 Page 73 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/J58VERNON PARISH 2(468) Vernon/Fort Polk Thoroughfare Electrical Power 3 Extension, and Utilities Including Generators 4 (Vernon) 5 Payable from General Obligation Bonds 6 Priority 1 $ 468,000 750/J59WASHINGTON PARISH 8(801) Pearl River Navigational Canal, Planning, 9 Construction, and Acquisition 10 (Washington) 11 Payable from General Obligation Bonds 12 Priority 1 $ 500,000 13(1004)Washington Parish Jail Renovations Including HVAC, 14 Security and ADA, Planning and Construction 15 (Washington) 16 Payable from General Obligation Bonds 17 Priority 1 $ 968,500 18(1629)Washington Parish Courthouse Renovation and HVAC, 19 Planning and Construction 20 (Washington) 21 Payable from General Obligation Bonds 22 Priority 1 $ 386,500 2350/J63WEST FELICIANA PARISH 24(247) West Feliciana Port Infrastructure, Planning, 25 Engineering, and Construction 26 (West Feliciana) 27 Payable from General Obligation Bonds 28 Priority 1 $ 736,563 29 Priority 5 $ 2,140,000 30 Total $ 2,876,563 3150/J64WINN PARISH 32(160) Roadway Reconstruction, L. Sullivan Road, 33 Planning and Construction 34 (Winn) 35 Payable from State General Fund (Direct) Non-Recurring 36 Revenues $ 675,000 37(378) Roadway Reconstruction, Eugene Garrett Road, 38 Planning and Construction 39 (Winn) 40 Payable from General Obligation Bonds 41 Priority 1 $ 385,000 42(779) Roadway Reconstruction, Brownville Road, Planning 43 and Construction 44 (Winn) 45 Payable from General Obligation Bonds 46 Priority 1 $ 335,000 Page 74 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1192)Roadway Reconstruction, Frank White Road, Planning 2 and Construction 3 (Winn) 4 Payable from General Obligation Bonds 5 Priority 1 $ 460,000 6(1396)Roadway Reconstruction, Williams Loop, Cole, Oak 7 Ridge and Pine Ridge Roadways, Planning and 8 Construction 9 (Winn) 10 Payable from General Obligation Bonds 11 Priority 1 $ 652,500 12(1607)Roadway Reconstruction, Aunt Marie's Road, 13 Planning and Construction 14 (Winn) 15 Payable from State General Fund (Direct) Non-Recurring 16 Revenues $ 445,000 1750/M01ABBEVILLE 18(1661)Abbeville Water Treatment Plant - Backwash & 19 Miscellaneous Updates to Water Treatment System 20 (Vermilion) 21 Payable from General Obligation Bonds 22 Priority 5 $ 1,000,000 23 Payable from State General Fund (Direct) Non-Recurring 24 Revenues $ 760,000 25 Total $ 1,760,000 26Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 2739:112. 2850/M05ALEXANDRIA 29(1386)Sugarhouse Road/Eddie Williams Boulevard to LA 30 Highway 1, Phase I and II, Planning and Construction 31 ($5,000,000 Local Match) 32 (Rapides) 33 Payable from General Obligation Bonds 34 Priority 1 $ 2,972,100 35 Priority 5 $ 4,620,000 36 Total $ 7,592,100 3750/M06AMITE 38(1690)Regional Wastewater Treatment and Transmission 39 Facilities, Planning and Construction 40 (Tangipahoa) 41 Payable from General Obligation Bonds 42 Priority 5 $ 34,000,000 43Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 4439:112. Page 75 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1739)Amite Governmental Complex, Planning and 2 Construction 3 (Tangipahoa) 4 Payable from General Obligation Bonds 5 Priority 1 $ 310,000 6 Priority 5 $ 2,600,000 7 Total $ 2,910,000 850/M07ANACOCO 9(1230)Street Rehabilitation - Ross Road, Lula Street, and 10 Loop Drive, Planning and Construction 11 (Vernon) 12 Payable from General Obligation Bonds 13 Priority 1 $ 240,000 1450/M10ARNAUDVILLE 15(1822)Water System - Automated Meter Reading System, 16 Planning and Construction 17 (St. Landry) 18 Payable from the Capital Outlay Savings Fund $ 395,000 19Pending approval of the capital outlay budget request pursuant to the provisions of R.S. 2039:112. 2150/M14BAKER 22(417) Drainage Improvements and Upgrades, Planning and 23 Construction 24 (East Baton Rouge) 25 Payable from General Obligation Bonds 26 Priority 5 $ 2,600,000 27(620) Sidewalk Construction for Underdeveloped Streets and 28 Culverts, Planning and Construction 29 (East Baton Rouge) 30 Payable from General Obligation Bonds 31 Priority 5 $ 1,875,000 32(1236)Energy and Power - Upgrade Gas Pipes: 33 PVC and Steel to Polyethylene, Planning 34 and Construction 35 (East Baton Rouge) 36 Payable from State General Fund (Direct) Non-Recurring 37 Revenues $ 500,000 3850/M15BALDWIN 39(1766)Potable Water System Improvements, Planning and 40 Construction 41 (St. Mary) 42 Payable from General Obligation Bonds 43 Priority 1 $ 156,822 44 Priority 5 $ 700,000 45 Payable from State General Fund (Direct) Non-Recurring 46 Revenues $ 700,000 47 Total $ 1,556,822 Page 76 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/M17BASILE 2(792) Street Improvements, Planning and Construction 3 (Evangeline) 4 Payable from State General Fund (Direct) Non-Recurring 5 Revenues $ 125,000 650/M19BASTROP 7(1436)City Hall - Roof Replacement, Planning and 8 Construction 9 (Morehouse) 10 Payable from General Obligation Bonds 11 Priority 1 $ 347,150 1250/M20BATON ROUGE 13(73) Old Hammond Hwy. (LA 426) Roadway Improvements 14 from Blvd. De Province to Millerville Road, Planning 15 and Construction 16 (East Baton Rouge) 17 Payable from General Obligation Bonds 18 Priority 1 $ 450,000 19 Priority 5 $ 9,250,000 20 Total $ 9,700,000 21(491) Chaneyville Fire District No. 7 Reames Road Fire 22 Station, Planning and Construction 23 (East Baton Rouge) 24 Payable from General Obligation Bonds 25 Priority 5 $ 300,000 26(1518)Hooper Road Widening and Sewer Improvements 27 (Blackwater Bayou to Sullivan Road) Planning, 28 Engineering, Utilities and Construction 29 (East Baton Rouge) 30 Payable from General Obligation Bonds 31 Priority 5 $ 9,500,000 3250/M22BENTON 33(51) Water Transmission Main, Planning and Construction 34 (Bossier) 35 Payable from General Obligation Bonds 36 Priority 2 $ 1,200,000 37 Priority 5 $ 1,200,000 38 Total $ 2,400,000 3950/M26BLANCHARD 40(1492)Water Treatment Plant Improvements, Planning and 41 Construction 42 (Caddo) 43 Payable from General Obligation Bonds 44 Priority 2 $ 630,000 Page 77 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/M27BOGALUSA 2(479) Community Center and Emergency Shelter, Planning 3 and Construction 4 (Washington) 5 Payable from General Obligation Bonds 6 Priority 1 $ 500,000 7 Priority 5 $ 10,500,000 8 Total $ 11,000,000 9(480) Emergency Sewer System Evaluation and 10 Repairs, Planning and Construction 11 (Washington) 12 Payable from General Obligation Bonds 13 Priority 2 $ 4,450,000 14 Payable from the Capital Outlay Savings Fund $ 500,000 15 Total $ 4,950,000 16(894) City Hall Renovations 17 (Washington) 18 Payable from General Obligation Bonds 19 Priority 1 $ 210,000 20(1447)Davenport Avenue Bridge, Servitude Street Emergency 21 Replacement and Repair, Planning and Construction 22 (Washington) 23 Payable from General Obligation Bonds 24 Priority 5 $ 565,000 2550/M28BONITA 26(773) Municipal Complex, Planning and Construction 27 (Morehouse) 28 Payable from General Obligation Bonds 29 Priority 1 $ 400,000 30 Priority 5 $ 1,850,000 31 Total $ 2,250,000 3250/M31BREAUX BRIDGE 33(1021)Water Treatment Plant Improvements, Planning and 34 Construction 35 (St. Martin) 36 Payable from General Obligation Bonds 37 Priority 1 $ 35,500 3850/M32BROUSSARD 39(584) Water System Groundwater Storage Tank, 40 Planning and Construction 41 (Lafayette) 42 Payable from General Obligation Bonds 43 Priority 2 $ 45,000 44 Priority 5 $ 405,000 45 Total $ 450,000 46(817) Reconstruct South Bernard Road from LA Hwy 182 to 47 US Hwy 90, Planning and Construction 48 (Lafayette) 49 Payable from General Obligation Bonds 50 Priority 1 $ 4,430,490 Page 78 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1126)Marteau Road Water Well, Planning and Construction 2 (Lafayette) 3 Payable from General Obligation Bonds 4 Priority 2 $ 376,000 5 Priority 5 $ 3,350,000 6 Total $ 3,726,000 7(1514)Highway 89 Improvements, Planning and Construction 8 (Lafayette) 9 Payable from General Obligation Bonds 10 Priority 1 $ 4,842,500 11(1674)Lake Talon Road Sewer Improvements, 12 Planning and Construction 13 (Lafayette) 14 Payable from General Obligation Bonds 15 Priority 2 $ 1,315,000 16(1746)Highway 90 Service Road, Planning 17 and Construction 18 (Lafayette) 19 Payable from State General Fund (Direct) Non-Recurring 20 Revenues $ 810,000 21Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 2239:112. 23(1747)Albertson Parkway Water Well and Ground 24 Storage Tank, Planning and Construction 25 (Lafayette) 26 Priority 2 $ 234,000 27 Priority 5 $ 2,106,000 28 Total $ 2,340,000 29Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 3039:112. 3150/M38CANKTON 32(46) Street and Drainage Improvements, Planning 33 and Construction 34 (St. Landry) 35 Payable from State General Fund (Direct) Non-Recurring 36 Revenues $ 90,000 3750/M39CARENCRO 38(414) I-49 to Gloria Switch Coulee Project, Planning and 39 Construction 40 (Lafayette) 41 Payable from General Obligation Bonds 42 Priority 1 $ 419,972 43(685) Citywide Water Main Rehabilitation Project, 44 Planning and Construction 45 (Lafayette) 46 Payable from General Obligation Bonds 47 Priority 5 $ 5,150,000 48 Payable from State General Fund (Direct) Non-Recurring 49 Revenues $ 250,000 50 Total $ 5,400,000 Page 79 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(895) Water and Sewer Infrastructure Improvement 2 Project, Planning and Construction 3 (Lafayette) 4 Payable from General Obligation Bonds 5 Priority 5 $ 2,350,000 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 250,000 8 Total $ 2,600,000 9(1097)Teema Road Sidewalks and Drainage, 10 Planning and Construction 11 (Lafayette) 12 Payable from General Obligation Bonds 13 Priority 5 $ 630,000 14 Payable from State General Fund (Direct) Non-Recurring 15 Revenues $ 250,000 16 Total $ 880,000 17(1231)Arceneaux Road Drainage Improvements and Utility 18 Relocations, Planning and Construction 19 (Lafayette) 20 Payable from General Obligation Bonds 21 Priority 1 $ 175,815 22(1232)Wastewater and City Infrastructure Flood Damages, 23 Planning and Construction 24 (Lafayette) 25 Payable from General Obligation Bonds 26 Priority 1 $ 2,252,600 2750/M44CHOUDRANT 28(1200)New Town Hall, Planning and Construction 29 (Lincoln) 30 Payable from General Obligation Bonds 31 Priority 1 $ 150,000 32 Priority 5 $ 1,096,586 33 Total $ 1,246,586 3450/M45CHURCH POINT 35(1023)Sewer System Improvements, Planning and 36 Construction 37 (Acadia) 38 Payable from General Obligation Bonds 39 Priority 1 $ 54,341 40(1071)Street and Drainage Improvements, Planning 41 and Construction 42 (Acadia) 43 Payable from General Obligation Bonds 44 Priority 5 $ 548,000 45 Payable from State General Fund (Direct) Non-Recurring 46 Revenues $ 100,000 47 Total $ 648,000 Page 80 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/M50COLFAX 2(765) Street Improvements, Planning and Construction 3 (Grant) 4 Payable from General Obligation Bonds 5 Priority 1 $ 762,000 6 Priority 5 $ 1,250,000 7 Total $ 2,012,000 850/M54COTTON VALLEY 9(486) Sewerage System Improvements, Planning and 10 Construction 11 (Webster) 12 Payable from General Obligation Bonds 13 Priority 1 $ 1,189,000 1450/M57COVINGTON 15(335) Covington Wastewater Treatment Plant, Planning and 16 Construction 17 (St. Tammany) 18 Payable from General Obligation Bonds 19 Priority 1 $ 83,250 20(1579)Downtown Historic District Overlays, Planning and 21 Construction 22 (St. Tammany) 23 Payable from General Obligation Bonds 24 Priority 1 $ 80,000 25 Priority 5 $ 640,000 26 Total $ 720,000 27(1675)Ozone Sewer Repairs, Planning and Construction 28 (St. Tammany) 29 Payable from State General Fund (Direct) Non-Recurring 30 Revenues $ 3,000,000 3150/M58CROWLEY 32(724) Renovation and Repairs to Rice Festival Building, 33 Including the Repair or Replacement of the Roof, 34 Planning and Construction 35 (Acadia) 36 Payable from General Obligation Bonds 37 Priority 1 $ 230,000 38(1553)Installation of Comminutor for the City of Crowley 39 Main Sewerage Pump Station, Planning and 40 Construction 41 (Acadia) 42 Payable from General Obligation Bonds 43 Priority 1 $ 386,775 44(1554)Pavilion, Planning and Construction 45 (Acadia) 46 Payable from State General Fund (Direct) Non-Recurring 47 Revenues $ 1,640,000 Page 81 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/M61DELHI 2(942) Sapa Drive Extension, Planning and Construction 3 (Richland) 4 Payable from General Obligation Bonds 5 Priority 1 $ 943,300 650/M63DENHAM SPRINGS 7(579) Cook Road Extension (DEMCO Road) / Rushing 8 Road Connector, Planning and Construction 9 (Livingston) 10 Payable from General Obligation Bonds 11 Priority 2 $ 450,000 12 Priority 5 $ 7,800,000 13 Total $ 8,250,000 1450/M65DERIDDER 15(265) Education and Job Training Center, Planning and 16 Construction 17 (Beauregard) 18 Payable from General Obligation Bonds 19 Priority 1 $ 203,462 20 Priority 5 $ 2,500,000 21 Total $ 2,703,462 22(1027)Ellis Road and Branch Street Drainage Improvements, 23 Planning and Construction 24 (Beauregard) 25 Payable from General Obligation Bonds 26 Priority 1 $ 150,000 2750/M68DONALDSONVILLE 28(370) Natural Gas System Infrastructure Improvement Phase 29 III, Planning and Construction 30 (Ascension) 31 Payable from General Obligation Bonds 32 Priority 1 $ 100,000 33 Priority 5 $ 1,000,000 34 Total $ 1,100,000 35(1389)Natural Gas System Infrastructure Improvements, 36 Phase II, Planning and Construction 37 (Ascension) 38 Payable from General Obligation Bonds 39 Priority 1 $ 242,987 40(1598)Lala Regira Field Renovations, Planning and 41 Construction 42 (Ascension) 43 Payable from General Obligation Bonds 44 Priority 1 $ 300,000 45 Payable from the Capital Outlay Savings Fund $ 1,000,000 46 Total $ 1,300,000 Page 82 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/M70DOYLINE 2(1727)Village of Doyline Wastewater Treatment Facility 3 Upgrades 4 (Webster) 5 Payable from General Obligation Bonds 6 Priority 1 $ 13,000 750/M74DUSON 8(914) LA Highway 95 Roundabout, Planning and 9 Construction 10 (Acadia) 11 Payable from General Obligation Bonds 12 Priority 1 $ 2,601,934 1350/M83EUNICE 14(1767)Library Renovations, Planning and Construction 15 (St. Landry) 16 Payable from State General Fund (Direct) Non-Recurring 17 Revenues $ 350,000 1850/M84EVERGREEN 19(1525)Evergreen Water System Improvements 20 (Avoyelles) 21 Payable from General Obligation Bonds 22 Priority 1 $ 897,470 2350/M85FARMERVILLE 24(1195)Lake D'Arbonne Mega Ramp, Planning and 25 Construction 26 (Union) 27 Payable from General Obligation Bonds 28 Priority 5 $ 4,185,000 29 Payable from State General Fund (Direct) Non-Recurring 30 Revenues $ 1,000,000 31 Total $ 5,185,000 3250/M87FERRIDAY 33(201) Water Renovations, Planning and Construction 34 (Concordia) 35 Payable from General Obligation Bonds 36 Priority 1 $ 298,987 37 Priority 5 $ 1,000,000 38 Total $ 1,298,987 39(202) Town of Ferriday Auditorium, Planning and 40 Construction 41 (Concordia) 42 Payable from General Obligation Bonds 43 Priority 1 $ 700,000 44 Priority 5 $ 18,800,000 45 Total $ 19,500,000 Page 83 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/M89FLORIEN 2(1309)Village of Florien Town Hall, Planning and 3 Construction 4 (Sabine) 5 Payable from General Obligation Bonds 6 Priority 1 $ 385,505 750/M91FORDOCHE 8(1604)Water Storage Improvements, Planning and 9 Construction 10 (Pointe Coupee) 11 Payable from General Obligation Bonds 12 Priority 1 $ 755,000 13 Priority 5 $ 780,000 14 Total $ 1,535,000 15(1605)Water Distribution System Improvements, Planning 16 and Construction 17 (Pointe Coupee) 18 Payable from General Obligation Bonds 19 Priority 1 $ 623,170 20 Priority 5 $ 2,935,000 21 Total $ 3,558,170 2250/M94FRANKLIN 23(121) Renovation of Old Crowell Elementary Building, 24 Planning and Construction 25 (St. Mary) 26 Payable from General Obligation Bonds 27 Priority 1 $ 20,374 28 Priority 5 $ 321,000 29 Total $ 341,374 30(1565)Cayce Street Repairs, Planning and Construction 31 (St. Mary) 32 Payable from General Obligation Bonds 33 Priority 1 $ 2,309,235 34(1699)Water Treatment Facility, Booster Pump Station, and 35 Distribution System Improvements, Planning and 36 Construction 37 (St. Mary) 38 Payable from State General Fund (Direct) Non-Recurring 39 Revenues $ 2,400,000 4050/MA3GOLDEN MEADOW 41(163) Armand/Alcide Area Drainage, Planning 42 and Construction 43 (Lafourche) 44 Payable from State General Fund (Direct) Non-Recurring 45 Revenues $ 610,000 Page 84 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1399)Upgrade to North Sewerage Treatment Plant, Planning 2 and Construction 3 (Lafourche) 4 Payable from General Obligation Bonds 5 Priority 1 $ 163,940 650/MA5GONZALES 7(1372)Connector Road for City of Gonzales Hospital District, 8 Construction and Planning 9 (Ascension) 10 Payable from General Obligation Bonds 11 Priority 1 $ 1,200,000 12 Priority 5 $ 2,705,000 13 Total $ 3,905,000 14(1653)Veteran's Ave. to Commerce Ave. Connector Road, 15 Planning and Construction 16 (Ascension) 17 Payable from General Obligation Bonds 18 Priority 1 $ 30,942 1950/MA6GRAMBLING 20(384) Community Center Expansion, Planning and 21 Construction 22 (Lincoln) 23 Payable from General Obligation Bonds 24 Priority 1 $ 300,000 2550/MA7GRAMERCY 26(533) Major Drainage Canals, Planning 27 and Construction 28 (St. James) 29 Payable from State General Fund (Direct) Non-Recurring 30 Revenues $ 360,000 3150/MB1GRAND ISLE 32(1793)Historic Recreation Center/Community Center, 33 Planning and Construction 34 (Jefferson) 35 Payable from General Obligation Bonds 36 Priority 1 $ 17,000 3750/MB4GREENWOOD 38(1512)New Municipal Complex, Planning and Construction 39 (Caddo) 40 Payable from General Obligation Bonds 41 Priority 5 $ 1,470,000 4250/MB5GRETNA 43(800) City Hall Exterior and Interior Renovation 44 (Jefferson) 45 Payable from General Obligation Bonds 46 Priority 1 $ 1,300,000 47 Priority 5 $ 1,500,000 48 Total $ 2,800,000 Page 85 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/MB6GROSSE TETE 2(1617)LA Hwy 77 Realignment Improvements Multi-Phased, 3 Acquisition, Planning, and Construction 4 (Iberville) 5 Payable from State General Fund (Direct) Non-Recurring 6 Revenues $ 1,137,750 750/MB9HAMMOND 8(1442)Roadside Drainage Improvements, Planning and 9 Construction 10 (Tangipahoa) 11 Payable from General Obligation Bonds 12 Priority 1 $ 225,000 1350/MC1HARAHAN 14(1663)Emergency Sewer Collection and Treatment System 15 Overhaul, Planning and Construction 16 (Jefferson) 17 Payable from General Obligation Bonds 18 Priority 5 $ 1,000,000 19 Payable from State General Fund (Direct) Non-Recurring 20 Revenues $ 2,500,000 21 Total $ 3,500,000 22Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 2339:112. 2450/MC3HAUGHTON 25(330) Additional Water Supply Wells and Elevated Tank, 26 Planning and Construction 27 (Bossier) 28 Payable from General Obligation Bonds 29 Priority 1 $ 120,000 30 Priority 5 $ 2,150,000 31 Total $ 2,270,000 3250/MC4HAYNESVILLE 33(466) Water Distribution System Improvements, 34 Planning and Construction 35 (Claiborne) 36 Payable from General Obligation Bonds 37 Priority 5 $ 855,000 38(467) Town of Haynesville Street Improvements, Planning 39 and Construction 40 (Claiborne) 41 Payable from General Obligation Bonds 42 Priority 1 $ 50,000 43 Priority 5 $ 300,000 44 Total $ 350,000 Page 86 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/MC9HOMER 2(100) Street Improvement Project, Planning and Construction 3 (Claiborne) 4 Payable from General Obligation Bonds 5 Priority 1 $ 600,000 6(101) Town Hall Renovations, Planning and Construction 7 (Claiborne) 8 Payable from General Obligation Bonds 9 Priority 1 $ 818,904 1050/MD1HORNBECK 11(622) West Side Water System Expansion, Planning and 12 Construction 13 (Sabine, Vernon) 14 Payable from General Obligation Bonds 15 Priority 1 $ 105,465 1650/MD4IDA 17(1655)Water System Improvements, Water Wells, Tanks, and 18 Booster Stations Construction, Planning and 19 Construction 20 (Caddo) 21 Payable from General Obligation Bonds 22 Priority 1 $ 42,435 2350/MD6IOTA 24(1344)Street Improvements, Planning and Construction 25 (Acadia) 26 Payable from State General Fund (Direct) Non-Recurring 27 Revenues $ 225,000 2850/MD8JACKSON 29(939) New Roofs for Four Town of Jackson Buildings, 30 Planning and Construction 31 (East Feliciana) 32 Payable from General Obligation Bonds 33 Priority 5 $ 300,000 3450/ME1JEAN LAFITTE 35(607) Lafitte Wetlands Museum Addition, including Exhibits, 36 Planning and Construction 37 (Jefferson) 38 Payable from General Obligation Bonds 39 Priority 1 $ 823,981 40 Payable from the Capital Outlay Savings Fund $ 1,800,000 41 Total $ 2,623,981 42(1016)Manila Village, Planning and Construction 43 (Jefferson) 44 Payable from State General Fund (Direct) Non-Recurring 45 Revenues $ 1,260,000 Page 87 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1642)Amphitheater Stage, Planning 2 and Construction 3 (Jefferson) 4 Payable from State General Fund (Direct) Non-Recurring 5 Revenues $ 400,000 650/ME2JEANERETTE 7(337) Sewer System Improvements, Planning and 8 Construction 9 (Iberia) 10 Payable from General Obligation Bonds 11 Priority 5 $ 3,320,000 12 Payable from State General Fund (Direct) Non-Recurring 13 Revenues $ 1,000,000 14 Total $ 4,320,000 15(740) City Hall Renovations, Planning and Construction 16 (Iberia) 17 Payable from General Obligation Bonds 18 Priority 5 $ 370,000 19 Payable from State General Fund (Direct) Non-Recurring 20 Revenues $ 375,000 21 Total $ 745,000 22(1161)Water System Improvements, Planning and 23 Construction 24 (Iberia) 25 Payable from General Obligation Bonds 26 Priority 5 $ 575,000 27 Payable from State General Fund (Direct) Non-Recurring 28 Revenues $ 1,000,000 29 Total $ 1,575,000 3050/ME6JONESVILLE 31(1228)Glenn Ditch Pump Station, Planning and Construction 32 (Catahoula) 33 Payable from General Obligation Bonds 34 Priority 1 $ 80,000 35 Priority 5 $ 1,485,000 36 Total $ 1,565,000 3750/ME8KAPLAN 38(1483)Street and Drainage Improvements, 39 Planning and Construction 40 (Vermilion) 41 Payable from State General Fund (Direct) Non-Recurring 42 Revenues $ 315,000 4350/MF1KENNER 44(307) Roosevelt Boulevard Improvements, Planning 45 and Construction 46 (Jefferson) 47 Payable from State General Fund (Direct) Non-Recurring 48 Revenues $ 1,650,000 Page 88 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(703) Pump to the River Pump Station Phase I, Planning and 2 Construction 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 1 $ 1,000,000 6 Priority 5 $ 9,050,000 7 Total $ 10,050,000 8(913) Lincoln Manor Drainage Phase 2, Planning and 9 Construction 10 (Jefferson) 11 Payable from General Obligation Bonds 12 Priority 1 $ 500,000 13(949) Loyola Drive Roadway Striping 14 (Jefferson) 15 Payable from State General Fund (Direct) Non-Recurring 16 Revenues $ 68,000 17(1117)Lincoln Manor Subdivision Drainage Improvement, 18 including 30 th Street Roadway and Drainage 19 Improvements from Loyola Drive to Ohio Street, 20 Planning and Construction 21 (Jefferson) 22 Payable from General Obligation Bonds 23 Priority 1 $ 155,000 2450/MF8LAKE ARTHUR 25(1666)Wastewater Treatment Facility Improvements, 26 Planning and Construction 27 (Jefferson Davis) 28 Payable from General Obligation Bonds 29 Priority 5 $ 1,050,000 30Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 3139:112. 32(1667)Wastewater Collection System Improvements, 33 Planning and Construction 34 (Jefferson Davis) 35 Payable from General Obligation Bonds 36 Priority 5 $ 990,000 37Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 3839:112. 39(1668)Water System Improvements, Planning and Construction 40 (Jefferson Davis) 41 Payable from General Obligation Bonds 42 Priority 5 $ 990,000 43Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 4439:112. 4550/MF9LAKE CHARLES 46(275) Lakefront Development 47 (Calcasieu) 48 Payable from General Obligation Bonds 49 Priority 1 $ 1,955,000 Page 89 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(477) Enterprise Boulevard Extension, Planning and 2 Construction 3 (Calcasieu) 4 Payable from General Obligation Bonds 5 Priority 1 $ 3,500,000 6(1093)Relocation of Public Works Campus, Planning and 7 Construction 8 (Calcasieu) 9 Payable from General Obligation Bonds 10 Priority 1 $ 5,000,000 11 Priority 5 $ 4,000,000 12 Total $ 9,000,000 1350/MG3LEESVILLE 14(266) City of Leesville, Sanitary Sewer Extension for Fort 15 Polk Entrance Road, Planning and Construction 16 (Vernon) 17 Payable from General Obligation Bonds 18 Priority 1 $ 2,395,701 19 Priority 5 $ 4,000,000 20 Total $ 6,395,701 21(884) Street Rehabilitation and Extension, Planning and 22 Construction 23 (Vernon) 24 Payable from General Obligation Bonds 25 Priority 1 $ 80,319 26 Priority 5 $ 250,000 27 Total $ 330,319 2850/MG4LEONVILLE 29(308) Street and Drainage Improvements, Planning 30 and Construction 31 (St. Landry) 32 Payable from State General Fund (Direct) Non-Recurring 33 Revenues $ 300,000 3450/MG8LIVONIA 35(1104)Water Well, Planning and Construction 36 (Pointe Coupee) 37 Payable from General Obligation Bonds 38 Priority 2 $ 600,000 39 Priority 5 $ 1,035,000 40 Total $ 1,635,000 4150/MH1LOGANSPORT 42(257) Recreational Improvements, Planning and Construction 43 (DeSoto) 44 Payable from General Obligation Bonds 45 Priority 1 $ 150,000 46 Priority 5 $ 1,150,000 47 Total $ 1,300,000 Page 90 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/MH9MANGHAM 2(1319)Mangham Recreation Complex, Planning and 3 Construction 4 (Richland) 5 Payable from General Obligation Bonds 6 Priority 1 $ 767,411 750/MI3MANY 8(676) Water Treatment Plant Improvements, Acquisition, 9 Planning and Construction 10 (Sabine) 11 Payable from General Obligation Bonds 12 Priority 5 $ 1,500,000 13 Payable from State General Fund (Direct) Non-Recurring 14 Revenues $ 3,000,000 15 Total $ 4,500,000 1650/MI8MAURICE 17(705) New Village Hall, Planning and Construction 18 (Vermilion) 19 Payable from General Obligation Bonds 20 Priority 1 $ 365,000 21 Priority 5 $ 1,000,000 22 Total $ 1,365,000 23(1806)City Park Drainage Improvements, Planning and 24 Construction 25 (Vermilion) 26 Payable from General Obligation Bonds 27 Priority 2 $ 450,000 28Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 2939:112. 30(1807)New Fire Department Facility, Planning 31 and Construction 32 (Vermilion) 33 Payable from General Obligation Bonds 34 Priority 5 $ 415,000 35Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 3639:112. 37(1808)US 167 Street and Access Improvements, 38 Planning and Construction 39 (Vermilion) 40 Payable from General Obligation Bonds 41 Priority 5 $ 540,000 42Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 4339:112. Page 91 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/MJ5MINDEN 2(604) Potable Water Ground Storage Tank, Planning and 3 Construction 4 (Webster) 5 Payable from General Obligation Bonds 6 Priority 1 $ 645,100 7 Priority 5 $ 2,800,000 8 Total $ 3,445,100 950/MJ6MONROE 10(216) I-20 Interchange Improvement and Kansas Garrett 11 Connector, Kansas Lane Connector, Planning and 12 Construction ($1,000,000 Local and $6,000,000 Federal 13 Match) 14 (Ouachita) 15 Payable from General Obligation Bonds 16 Priority 1 $ 26,794,872 17 Priority 5 $ 11,600,000 18 Total $ 38,394,872 19(217) Georgia Street Pump Station, Including Generator and 20 Auxiliary Pumps, Planning, Engineering, Right-of- 21 Way, Utilities and Construction 22 (Ouachita) 23 Payable from General Obligation Bonds 24 Priority 1 $ 2,000,000 25(627) Youngs Bayou Enhancement of Channel Capacity, 26 Planning and Construction 27 (Ouachita) 28 Payable from General Obligation Bonds 29 Priority 1 $ 500,000 30 Priority 5 $ 10,900,000 31 Total $ 11,400,000 32(834) US Highway 165 South; US Highway 165 Business 33 Route Connector Phase I, Planning and Construction 34 (Ouachita) 35 Payable from General Obligation Bonds 36 Priority 2 $ 2,550,000 37(835) I-20 South Frontage Road Drainage Improvements, 38 Planning, Design, Rights-of-Ways, Utilities, and 39 Construction 40 (Ouachita) 41 Payable from General Obligation Bonds 42 Priority 5 $ 5,000,000 43(1039)Calypso Street Pump Station Rehabilitation, Planning, 44 Engineering, Design, Right-of-Way, Utilities, and 45 Construction 46 (Ouachita) 47 Payable from General Obligation Bonds 48 Priority 1 $ 30,000 49 Priority 5 $ 1,770,000 50 Total $ 1,800,000 Page 92 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1245)River Pump Station Water Treatment Plant, Planning 2 and Construction 3 (Ouachita) 4 Payable from General Obligation Bonds 5 Priority 1 $ 300,000 650/MK2MORGAN CITY 7(1709)Sewer Rehabilitation, Planning and Construction 8 (St. Mary) 9 Payable from General Obligation Bonds 10 Priority 5 $ 3,725,000 11 Payable from the Capital Outlay Savings Fund $ 1,000,000 12 Total $ 4,725,000 13Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 1439:112. 1550/MK3MORGANZA 16(1700)Pump Station, Sewer Collection System, and 17 Wastewater Treatment Pond Rehabilitation, 18 Planning and Construction 19 (Pointe Coupee) 20 Payable from State General Fund (Direct) Non-Recurring 21 Revenues $ 1,000,000 2250/MK4MORSE 23(321) Wastewater Treatment Facility, Planning 24 and Construction 25 (Acadia) 26 Payable from General Obligation Bonds 27 Priority 5 $ 1,350,000 28 Payable from State General Fund (Direct) Non-Recurring 29 Revenues $ 150,000 30 Total $ 1,500,000 31(723) Water Tower Improvements, Planning and 32 Construction 33 (Acadia) 34 Payable from General Obligation Bonds 35 Priority 1 $ 55,703 3650/MK9NATCHITOCHES 37(1147)Texas Street Corridor Improvements, Planning and 38 Construction 39 (Natchitoches) 40 Payable from State General Fund (Direct) Non-Recurring 41 Revenues $ 435,000 4250/ML1NEW IBERIA 43(252) Ann Street Park, Planning and Construction 44 (Iberia) 45 Payable from General Obligation Bonds 46 Priority 1 $ 300,000 Page 93 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(664) City Park and West End Community Centers 2 Improvements, Planning and Construction 3 (Iberia) 4 Payable from General Obligation Bonds 5 Priority 1 $ 577,317 6(1028)Bayou Teche Museum Expansion and George Rodrigue 7 Park 8 (Iberia) 9 Payable from General Obligation Bonds 10 Priority 1 $ 1,354,112 1150/ML3NEW ORLEANS 12(78) West Bank Ferry Terminal Renovations, Planning and 13 Construction 14 (Orleans) 15 Payable from General Obligation Bonds 16 Priority 1 $ 300,000 17 Priority 5 $ 300,000 18 Total $ 600,000 19(79) Richard Lee Playground, Planning and Construction 20 (Orleans) 21 Payable from General Obligation Bonds 22 Priority 1 $ 200,000 23 Priority 5 $ 3,000,000 24 Total $ 3,200,000 25(289) West Bank Park Improvements Including New Soccer 26 and Recreational Facilities, Planning and Construction 27 (Orleans) 28 Payable from General Obligation Bonds 29 Priority 1 $ 1,880,413 30 Priority 5 $ 11,225,400 31 Total $ 13,105,813 32Provided, however, that $450,000 of the Priority 1 appropriation shall be used to fund the 33George W. Carver Playground Renovations project, and $200,000 of the Priority 1 34appropriation shall be used to fund the Skateboard Park at the West Bank Park project. 35(1107)New Sewerage and Water Board Power Plant, Planning 36 and Construction 37 (Orleans) 38 Payable from General Obligation Bonds 39 Priority 1 $ 42,700,000 40 Priority 5 $ 29,000,000 41 Total $ 71,700,000 42(1108)Old New Orleans VA Building Rehabilitation 43 (Orleans) 44 Payable from General Obligation Bonds 45 Priority 1 $ 1,981,250 46 Priority 5 $ 8,000,000 47 Total $ 9,981,250 48(1452)Monticello Canal Culverts at Airline Highway 49 (Orleans) 50 Payable from General Obligation Bonds 51 Priority 1 $ 750,000 52 Priority 5 $ 8,250,000 53 Total $ 9,000,000 Page 94 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1522)Lower Ninth Ward Green Infrastructure Project, 2 Planning and Construction 3 (Orleans) 4 Payable from General Obligation Bonds 5 Priority 1 $ 250,000 6 Priority 5 $ 2,650,000 7 Total $ 2,900,000 850/ML4NEW ROADS 9(623) Industrial Park Development Project, Including 10 Underground Electrical System Upgrades, Planning 11 and Construction 12 (Pointe Coupee) 13 Payable from General Obligation Bonds 14 Priority 1 $ 988,000 1550/ML8NORWOOD 16(1301)Sewer Collection and Treatment System 17 Improvements, Planning and Construction 18 (East Feliciana) 19 Payable from General Obligation Bonds 20 Priority 5 $ 1,080,000 2150/MM2OAKDALE 22(418) Oakdale City Hall Renovations, Roof, and 23 Reconstruction 24 (Allen) 25 Payable from General Obligation Bonds 26 Priority 1 $ 35,000 2750/MM4OIL CITY 28(882) Water Treatment Plant, Transmission Main, and 29 Distribution System Improvements, Planning and 30 Construction 31 (Caddo) 32 Payable from General Obligation Bonds 33 Priority 1 $ 223,608 34 Priority 5 $ 500,000 35 Total $ 723,608 3650/MM5OLLA 37(985) Roadway Reconstruction, Church Street, 38 Planning and Construction 39 (LaSalle) 40 Payable from State General Fund (Direct) Non-Recurring 41 Revenues $ 300,000 4250/MM6OPELOUSAS 43(1237)Water Meter Replacement and Upgrades, Planning and 44 Construction 45 (St. Landry) 46 Payable from General Obligation Bonds 47 Priority 1 $ 1,014,305 48 Priority 2 $ 500,000 49 Total $ 1,514,305 Page 95 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1510)Opelousas Street and Drainage Improvements 2 (St. Landry) 3 Payable from General Obligation Bonds 4 Priority 1 $ 2,250,000 5 Priority 5 $ 1,000,000 6 Total $ 3,250,000 7(1511)Bridge Replacements and Upgrades, 8 Planning and Construction 9 (St. Landry) 10 Payable from State General Fund (Direct) Non-Recurring 11 Revenues $ 2,100,000 1250/MM8PARKS 13(1560)Parks Water System Improvements, Planning and 14 Construction 15 (St. Martin) 16 Payable from State General Fund (Direct) Non-Recurring 17 Revenues $ 500,000 1850/MM9PATTERSON 19(1409)Replacement of Water and Gas Meters in Patterson, 20 Planning and Construction 21 (St. Mary) 22 Payable from General Obligation Bonds 23 Priority 1 $ 451,000 24(1440)Water Plant Improvements, Planning and Construction 25 (St. Mary) 26 Payable from State General Fund (Direct) Non-Recurring 27 Revenues $ 5,000,000 28(1774)Rehabilitation of Nine Sewer Lift Stations, Planning 29 and Construction 30 (St. Mary) 31 Payable from State General Fund (Direct) Non-Recurring 32 Revenues $ 2,395,000 3350/MN3PINEVILLE 34(1557)Consolidated Municipal and Court Complex, Planning 35 and Construction 36 (Rapides) 37 Payable from General Obligation Bonds 38 Priority 5 $ 11,090,000 39(1558)Cedar Lake Pump Station Reconstruction, Design, 40 Planning and Construction 41 (Rapides) 42 Payable from General Obligation Bonds 43 Priority 5 $ 585,000 Page 96 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/MO1PONCHATOULA 2(1751)Fire Station Complex US 51 - Veterans Avenue, Land 3 Acquisition, Planning and Construction 4 (Tangipahoa) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,075,000 7 Priority 5 $ 800,000 8 Total $ 1,875,000 950/MO2PORT ALLEN 10(1648)Street and Drainage Improvements, Planning and 11 Construction 12 (West Baton Rouge) 13 Payable from General Obligation Bonds 14 Priority 1 $ 80,000 15 Priority 5 $ 3,520,000 16 Total $ 3,600,000 1750/MO6PROVENCAL 18(1701)New Water Well and Emergency Water Connection, 19 Planning and Construction 20 (Natchitoches) 21 Payable from General Obligation Bonds 22 Priority 5 $ 600,000 23 Payable from State General Fund (Direct) Non-Recurring 24 Revenues $ 1,000,000 25 Total $ 1,600,000 26Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 2739:112. 2850/MO8RAYNE 29(825) Martin Luther King Community Center Improvements, 30 Planning and Construction 31 (Acadia) 32 Payable from General Obligation Bonds 33 Priority 1 $ 39,402 3450/MO9RAYVILLE 35(495) Wastewater Transport and Treatment Facilities for 36 Economic Development 37 (Richland) 38 Payable from General Obligation Bonds 39 Priority 1 $ 26,887 40 Priority 5 $ 3,500,000 41 Total $ 3,526,887 42Provided, however, that this appropriation is used for the extension of sewer lines south 43along Highway 425. Page 97 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(586) Water Service Facilities for Economic Development, 2 Planning and Construction 3 (Richland) 4 Payable from General Obligation Bonds 5 Priority 1 $ 894,570 6 Priority 5 $ 7,522,300 7 Total $ 8,416,870 850/MP3RICHWOOD 9(1768)Municipal Complex, Planning and Construction 10 (Ouachita) 11 Payable from General Obligation Bonds 12 Priority 1 $ 150,000 13 Priority 5 $ 3,400,000 14 Total $ 3,550,000 1550/MP8ROSEDALE 16(1238)New Rosedale Fire Station, Planning and Construction 17 (Iberville) 18 Payable from General Obligation Bonds 19 Priority 1 $ 338,521 2050/MQ1ROSEPINE 21(677) Rosepine Wastewater Treatment Plant Improvement, 22 Planning and Construction 23 (Vernon) 24 Payable from General Obligation Bonds 25 Priority 2 $ 465,000 2650/MQ2RUSTON 27(156) New Road from Highway 150 to I-20 South Frontage 28 Road, Planning and Construction 29 (Lincoln) 30 Payable from General Obligation Bonds 31 Priority 1 $ 815,718 32 Priority 5 $ 1,000,000 33 Total $ 1,815,718 34(1393)East Kentucky/Cedar Creek Road Intersection 35 Improvements, Planning and Construction 36 (Lincoln) 37 Payable from General Obligation Bonds 38 Priority 1 $ 200,000 39 Priority 5 $ 1,060,000 40 Total $ 1,260,000 4150/MQ3ST. FRANCISVILLE 42(1092)Emergency Erosion Repairs, Planning and Construction 43 (West Feliciana) 44 Payable from General Obligation Bonds 45 Priority 1 $ 50,000 46 Priority 5 $ 2,102,000 47 Total $ 2,152,000 Page 98 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/MQ4ST. JOSEPH 2(1772)St. Joseph's Community House, Planning and 3 Construction 4 (Tensas) 5 Payable from General Obligation Bonds 6 Priority 5 $ 690,000 750/MQ5ST. MARTINVILLE 8(823) Water Drainage Project, Planning and Construction 9 (St. Martin) 10 Payable from General Obligation Bonds 11 Priority 1 $ 200,000 12(1639)Main Street Enhancement Project, Planning and 13 Construction 14 (St. Martin) 15 Payable from General Obligation Bonds 16 Priority 5 $ 1,450,000 17 Payable from the Capital Outlay Savings Fund $ 135,000 18 Total $ 1,585,000 1950/MQ8SCOTT 20(941) Roundabout at LA 93 and Renaud Drive, 21 Planning, Construction, and Land Acquisition 22 (Lafayette) 23 Payable from General Obligation Bonds 24 Priority 5 $ 2,270,000 25 Payable from State General Fund (Direct) Non-Recurring 26 Revenues $ 455,000 27 Total $ 2,725,000 28(1353)LA 93 Roadway Improvements- I-10 Ramp to Renaud 29 Drive, Planning, Construction, and Land Acquisition 30 (Lafayette) 31 Payable from General Obligation Bonds 32 Priority 1 $ 1,000,000 33 Priority 5 $ 2,373,650 34 Total $ 3,373,650 35(1559)Eraste Landry Road Extension, Planning and 36 Construction 37 (Lafayette) 38 Payable from General Obligation Bonds 39 Priority 1 $ 415,000 40 Priority 5 $ 3,750,000 41 Total $ 4,165,000 42(1773)Water and Sewer Line Installation along Apollo Road 43 Extension, Planning and Construction 44 (Lafayette) 45 Payable from General Obligation Bonds 46 Priority 1 $ 2,513,750 Page 99 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/MR1SHREVEPORT 2(166) University Park Subdivision Improvements, 3 Planning and Construction 4 (Caddo) 5 Payable from General Obligation Bonds 6 Priority 5 $ 7,625,000 7 Payable from State General Fund (Direct) Non-Recurring 8 Revenues $ 750,000 9 Total $ 8,375,000 10(661) Greenwood Road Extension, (Greenwood Industrial 11 Park Road - Asphalt Road), Planning and Construction 12 (Caddo) 13 Payable from General Obligation Bonds 14 Priority 1 $ 120,000 15 Priority 5 $ 2,000,000 16 Total $ 2,120,000 17(662) C.C. Antoine Museum and Arts Center, Planning and 18 Construction ($64,000 Local Match) 19 (Caddo) 20 Payable from General Obligation Bonds 21 Priority 1 $ 425,000 22 Priority 5 $ 100,000 23 Total $ 525,000 24(1072)C.C. Antoine Park, Planning and Construction 25 (Caddo) 26 Payable from General Obligation Bonds 27 Priority 1 $ 1,742,810 28 Priority 5 $ 500,000 29 Total $ 2,242,810 30(1281)Valencia Park Spray Park, Planning and Construction 31 (Caddo) 32 Payable from General Obligation Bonds 33 Priority 1 $ 75,000 34(1487)District 3 Road Rehabilitation, Planning 35 and Construction 36 (Caddo) 37 Payable from State General Fund (Direct) Non-Recurring 38 Revenues $ 310,000 39(1809)Amtrak Platform and Facility, Planning 40 and Construction 41 (Caddo) 42 Payable from General Obligation Bonds 43 Priority 5 $ 10,000,000 44 Payable from the Capital Outlay Savings Fund $ 1,250,000 45 Total $ 11,250,000 46Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 4739:112. Page 100 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1810)State Fairgrounds Access Improvements, 2 Planning and Construction 3 (Caddo) 4 Payable from General Obligation Bonds 5 Priority 5 $ 2,100,000 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 240,000 8 Total $ 2,340,000 9Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 1039:112. 1150/MR2SIBLEY 12(982) Street Improvements, Planning and 13 Construction 14 (Webster) 15 Payable from State General Fund (Direct) Non-Recurring 16 Revenues $ 900,000 1750/MR6SIMPSON 18(1029)Rehabilitation of Various Roads, Planning and 19 Construction 20 (Vernon) 21 Payable from General Obligation Bonds 22 Priority 1 $ 35,000 2350/MS4SPRINGFIELD 24(58) Water System Improvements and Upgrades, Planning 25 and Construction 26 (Livingston) 27 Payable from General Obligation Bonds 28 Priority 2 $ 141,000 29 Priority 5 $ 1,547,400 30 Payable from State General Fund (Direct) Non-Recurring 31 Revenues $ 250,000 32 Total $ 1,938,400 33(1688)Roadway Rehabilitation, Planning and 34 Construction 35 (Livingston) 36 Payable from State General Fund (Direct) Non-Recurring 37 Revenues $ 655,000 3850/MS5SPRINGHILL 39(674) Wastewater Treatment Plant Rehabilitation, 40 Planning and Construction 41 (Webster) 42 Payable from General Obligation Bonds 43 Priority 5 $ 1,200,000 44 Payable from State General Fund (Direct) Non-Recurring 45 Revenues $ 1,000,000 46 Total $ 2,200,000 Page 101 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(881) Water System Improvements - Phase 3, 2 Planning and Construction 3 (Webster) 4 Payable from General Obligation Bonds 5 Priority 5 $ 5,700,000 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 500,000 8 Total $ 6,200,000 950/MS9SULPHUR 10(80) Maplewood Drive Rehabilitation 11 (Calcasieu) 12 Payable from General Obligation Bonds 13 Priority 1 $ 7,155,323 14 Priority 5 $ 5,137,500 15 Total $ 12,292,823 16(1524)Maplewood Pump Station, Planning and Construction 17 (Calcasieu) 18 Payable from General Obligation Bonds 19 Priority 5 $ 1,075,000 2050/MT1SUN 21(1638)Roof Replacement of Town Hall Building 22 (St. Tammany) 23 Payable from General Obligation Bonds 24 Priority 1 $ 200,000 2550/MT2SUNSET 26(97) Sunset Police and Fire Emergency Facility, Planning 27 and Construction 28 (St. Landry) 29 Payable from General Obligation Bonds 30 Priority 5 $ 400,000 31(1832)Sewer Plant Upgrade, Planning and Construction 32 (St. Landry) 33 Payable from State General Fund (Direct) Non-Recurring 34 Revenues $ 1,400,000 35Pending approval of the capital outlay budget request pursuant to the provisions of R.S. 3639:112. 3750/MT3TALLULAH 38(983) Emergency Water Production, Transmission and 39 Treatment, Acquisition, Planning and Construction 40 (Madison) 41 Payable from General Obligation Bonds 42 Priority 1 $ 366,045 Page 102 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/MT5THIBODAUX 2(301) Replacement of Canal Boulevard Bridges and 3 Construction of Menard Pedestrian Bike Trail, Planning 4 and Construction 5 (Lafourche) 6 Payable from General Obligation Bonds 7 Priority 1 $ 4,650,000 8 Priority 5 $ 1,750,000 9 Total $ 6,400,000 1050/MU2VIDALIA 11(1282)Development of a Slackwater Port on the Mississippi 12 River, Planning and Construction 13 (Concordia) 14 Payable from General Obligation Bonds 15 Priority 1 $ 4,229,044 16(1596)Utility System Upgrade, Planning, Acquisition, 17 Construction and Equipment 18 (Concordia) 19 Payable from General Obligation Bonds 20 Priority 1 $ 2,955,000 21 Priority 5 $ 14,000,000 22 Total $ 16,955,000 2350/MU4VILLE PLATTE 24(49) New Fire Station, Planning and Construction 25 (Evangeline) 26 Payable from General Obligation Bonds 27 Priority 5 $ 2,320,000 28 Payable from State General Fund (Direct) Non-Recurring 29 Revenues $ 500,000 30 Total $ 2,820,000 31(1013)Infrastructure Improvements, Planning and 32 Construction 33 (Evangeline) 34 Payable from General Obligation Bonds 35 Priority 1 $ 186,413 36(1731)Ville Platte Evangeline Recreational District 37 (Evangeline) 38 Payable from General Obligation Bonds 39 Priority 1 $ 855,000 40 Priority 5 $ 885,000 41 Total $ 1,740,000 4250/MU6VIVIAN 43(1288)Water and Wastewater System Improvements and 44 Extension, Planning and Construction 45 (Caddo) 46 Payable from General Obligation Bonds 47 Priority 1 $ 240,164 Page 103 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/MU8WASHINGTON 2(570) Water and Gas Meter Upgrade/Replacement, 3 Planning and Construction 4 (St. Landry) 5 Payable from State General Fund (Direct) Non-Recurring 6 Revenues $ 500,000 750/MV1WELSH 8(678) Frontage Road Extension, Planning and Construction 9 (Jefferson Davis) 10 Payable from General Obligation Bonds 11 Priority 1 $ 500,000 12 Priority 5 $ 1,645,000 13 Total $ 2,145,000 1450/MV2WEST MONROE 15(501) North 3 rd Street Improvements, Planning 16 and Construction 17 (Ouachita) 18 Payable from State General Fund (Direct) Non-Recurring 19 Revenues $ 480,000 20(911) Cotton Street Improvements and Sidewalks, 21 Planning and Construction 22 (Ouachita) 23 Payable from General Obligation Bonds 24 Priority 5 $ 1,350,000 25(1681)Mid-City Drainage Improvements, Planning and 26 Construction 27 (Ouachita) 28 Payable from General Obligation Bonds 29 Priority 1 $ 1,000,000 30 Priority 5 $ 4,000,000 31 Total $ 5,000,000 32(1682)Sunshine Heights Drainage Improvements, Planning 33 and Construction 34 (Ouachita) 35 Payable from General Obligation Bonds 36 Priority 1 $ 1,375,000 37(1685)West Monroe Greenway, Planning and 38 Construction 39 (Ouachita) 40 Payable from General Obligation Bonds 41 Priority 5 $ 1,315,000 42(1686)New Drago Street Sanitary Sewer Lift Station, Planning 43 and Construction 44 (Ouachita) 45 Payable from General Obligation Bonds 46 Priority 5 $ 1,213,614 Page 104 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/MV3WESTLAKE 2(267) Sewer Transport System Improvements, 3 Planning and Construction 4 (Calcasieu) 5 Payable from General Obligation Bonds 6 Priority 5 $ 2,000,000 7(885) Compressed Natural Gas Fueling Station, Planning and 8 Construction 9 (Calcasieu) 10 Payable from General Obligation Bonds 11 Priority 1 $ 470,000 12 Priority 5 $ 1,600,000 13 Total $ 2,070,000 1450/MV4WESTWEGO 15(92) The WHARF, Planning, Construction, and Site 16 Preparation 17 (Jefferson) 18 Payable from General Obligation Bonds 19 Priority 1 $ 4,401,859 20 Priority 5 $ 2,200,000 21 Total $ 6,601,859 22(302) Park Land and Improvements, Including Improvements 23 to Existing Parks and Land Acquisition, Planning and 24 Construction 25 (Jefferson) 26 Payable from General Obligation Bonds 27 Priority 1 $ 498,305 28(303) Riverboat Landing Phase III, Planning 29 and Construction 30 (Jefferson) 31 Payable from General Obligation Bonds 32 Priority 5 $ 1,205,000 33(504) Water Tower, Line and Improvements, Water Meter 34 Replacement, Planning and Construction 35 (Jefferson) 36 Payable from General Obligation Bonds 37 Priority 1 $ 47,568 38(505) Emergency Preparedness Building, Planning and 39 Construction 40 (Jefferson) 41 Payable from General Obligation Bonds 42 Priority 1 $ 83,851 43 Payable from State General Fund (Direct) Non-Recurring 44 Revenues $ 465,000 45 Total $ 548,851 46(916) Farmer Fisheries Market, Planning and Construction 47 (Jefferson) 48 Payable from State General Fund (Direct) Non-Recurring 49 Revenues $ 270,000 Page 105 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1120)Fire Station, Planning and Construction 2 (Jefferson) 3 Payable from General Obligation Bonds 4 Priority 1 $ 136,400 5 Priority 5 $ 300,000 6 Total $ 436,400 7(1121)Sala Avenue Street and Infrastructure Improvements 8 (Jefferson) 9 Payable from General Obligation Bonds 10 Priority 1 $ 208,300 11 Priority 5 $ 850,000 12 Total $ 1,058,300 13(1775)Wastewater Treatment Plant Improvements, Planning 14 and Construction 15 (Jefferson) 16 Payable from General Obligation Bonds 17 Priority 5 $ 4,503,500 18 Payable from State General Fund (Direct) Non-Recurring 19 Revenues $ 400,000 20 Total $ 4,903,500 21(1776)Water Distribution System Improvements, Planning 22 and Construction 23 (Jefferson) 24 Payable from General Obligation Bonds 25 Priority 5 $ 2,551,000 26 Payable from State General Fund (Direct) Non-Recurring 27 Revenues $ 500,000 28 Total $ 3,051,000 2950/MV6WILSON 30(1702)Sanitary Sewer System Improvements, Planning and 31 Construction 32 (East Feliciana) 33 Payable from General Obligation Bonds 34 Priority 2 $ 792,000 3550/MV7WINNFIELD 36(1620)South Winnfield Drainage Improvements - Phase 1, 37 Planning and Construction 38 (Winn) 39 Payable from General Obligation Bonds 40 Priority 1 $ 75,000 41 Priority 5 $ 600,000 42 Total $ 675,000 4350/MW2YOUNGSVILLE 44(37) Chemin Metairie Parkway Widening, Planning and 45 Construction 46 (Lafayette) 47 Payable from General Obligation Bonds 48 Priority 5 $ 3,880,000 49 Payable from State General Fund (Direct) Non-Recurring 50 Revenues $ 600,000 51 Total $ 4,480,000 Page 106 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(45) New Fire Station, Planning and Construction 2 (Lafayette) 3 Payable from General Obligation Bonds 4 Priority 5 $ 3,250,000 5 Payable from State General Fund (Direct) Non-Recurring 6 Revenues $ 500,000 7 Total $ 3,750,000 8(658) Highway 89 Improvements, Planning and Construction 9 (Lafayette) 10 Payable from General Obligation Bonds 11 Priority 1 $ 8,955,000 12 Priority 5 $ 13,590,000 13 Total $ 22,545,000 14(659) Highway 92 Improvements, Planning and Construction 15 (Lafayette) 16 Payable from General Obligation Bonds 17 Priority 1 $ 880,000 18 Priority 5 $ 4,525,000 19 Total $ 5,405,000 20(866) Fortune Road Extension, Planning and Construction 21 (Lafayette) 22 Payable from General Obligation Bonds 23 Priority 1 $ 3,885,000 24(867) Wastewater System Improvements, Planning 25 and Construction 26 (Lafayette) 27 Payable from General Obligation Bonds 28 Priority 5 $ 4,500,000 29 Payable from State General Fund (Direct) Non-Recurring 30 Revenues $ 500,000 31 Total $ 5,000,000 32(1202)Highway 92/Prescott Boulevard Roundabout, 33 Design, Planning, and Construction 34 (Lafayette) 35 Payable from General Obligation Bonds 36 Priority 5 $ 2,614,000 37 Payable from State General Fund (Direct) Non-Recurring 38 Revenues $ 500,000 39 Total $ 3,114,000 40(1277)Langlinais Road Extension, Planning and Construction 41 (Lafayette) 42 Payable from General Obligation Bonds 43 Priority 5 $ 5,580,000 44 Payable from State General Fund (Direct) Non-Recurring 45 Revenues $ 860,000 46 Total $ 6,440,000 4750/MW6ST. GABRIEL 48(609) City Council Chambers - New Construction 49 (Iberville) 50 Payable from General Obligation Bonds 51 Priority 1 $ 1,440,000 Page 107 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1733)City Council Chambers Phase 2, Planning and 2 Construction 3 (Iberville) 4 Payable from General Obligation Bonds 5 Priority 1 $ 2,000,000 6 Priority 5 $ 700,000 7 Total $ 2,700,000 850/MW8CENTRAL 9(1206)Administration Building 10 (East Baton Rouge) 11 Payable from General Obligation Bonds 12 Priority 1 $ 16,943 1350/N03AUDUBON NATURE INSTITUTE, INC. 14(1397)Audubon Facility Renovations and Improvements: 15 Audubon Zoo, Planning and Construction 16 (Orleans) 17 Payable from General Obligation Bonds 18 Priority 1 $ 9,500,000 19 Priority 5 $ 9,500,000 20 Total $ 19,000,000 2150/N05NEW ORLEANS EXHIBITION HALL AUTHORITY 22(190) Property Development Project 23 (Orleans) 24 Payable from General Obligation Bonds 25 Priority 1 $ 500,000 26 Priority 5 $ 25,000,000 27 Total $ 25,500,000 2850/N06STATE FAIR OF LOUISIANA 29(293) Hirsch Memorial Coliseum and Louisiana State 30 Fairgrounds Improvements Project 31 (Caddo) 32 Payable from General Obligation Bonds 33 Priority 1 $ 273,295 34 Priority 5 $ 3,280,000 35 Total $ 3,553,295 3650/N13CHENNAULT INTERNATIONAL AIRP ORT AUTHORITY 37(1791)Firewater Pumphouse #3 and Infrastructure, Planning 38 and Construction 39 (Calcasieu) 40 Payable from General Obligation Bonds 41 Priority 5 $ 4,000,000 4250/N17NEW ORLEANS CAREER CENTER 43(1741)Expanding High Wage, High Demand Career and 44 Technical Training, Planning and Construction 45 (Orleans) 46 Payable from General Obligation Bonds 47 Priority 1 $ 1,000,000 48 Priority 5 $ 2,000,000 49 Total $ 3,000,000 Page 108 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/N18IBERIA PARISH AIRPORT AUTHORITY 2(242) Rehabilitation of Hangar #88 and Associated 3 Parking Lot, Planning and Construction 4 (Iberia) 5 Payable from General Obligation Bonds 6 Priority 5 $ 900,000 7 Payable from State General Fund (Direct) Non-Recurring 8 Revenues $ 500,000 9 Total $ 1,400,000 10Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 1139:112. 12(274) Acadiana Regional Airport Improvements, Planning 13 and Construction 14 (Iberia) 15 Payable from General Obligation Bonds 16 Priority 1 $ 500,000 17 Priority 2 $ 3,000,000 18 Priority 5 $ 36,650,000 19 Total $ 40,150,000 2050/N19PAUL S. MORTON SCHOLARSHIP FOUNDATION 21(616) Paul S. Morton Scholarship Foundation Greater Works 22 Family Life Center, Planning and Construction 23 (Orleans) 24 Payable from General Obligation Bonds 25 Priority 5 $ 6,200,000 2650/N33ENGLAND ECONOMIC & INDUSTRIAL DEVELOP MENT 27 DISTRICT 28(116) High Bay Aircraft Maintenance Hangar, Planning and 29 Construction 30 (Rapides) 31 Payable from General Obligation Bonds 32 Priority 1 $ 1,713,915 33 Priority 5 $ 15,425,000 34 Total $ 17,138,915 35(1797)Regional Warehouse and Distribution 36 Complex, Planning and Construction 37 (Rapides) 38 Payable from General Obligation Bonds 39 Priority 5 $ 7,200,000 40Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 4139:112. 4250/N34ODYSSEY HOUSE LOUISIANA, INC. 43(928) Odyssey House Louisiana Gambling Treatment Center, 44 Planning and Construction 45 (Orleans) 46 Payable from General Obligation Bonds 47 Priority 5 $ 5,000,000 Page 109 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1546)Odyssey House Louisiana Renovation Project, Planning 2 and Construction 3 (Orleans) 4 Payable from General Obligation Bonds 5 Priority 1 $ 3,614,300 6 Priority 5 $ 3,000,000 7 Total $ 6,614,300 850/N36WALKER COMMUNITY RESOURCE AND RECREATION 9 CENTER 10(1693)Walker Community Resource and Recreation Center, 11 Planning and Construction 12 (Lafayette) 13 Payable from General Obligation Bonds 14 Priority 5 $ 750,000 15 Payable from State General Fund (Direct) Non-Recurring 16 Revenues $ 250,000 17 Total $ 1,000,000 1850/N40LAFAYETTE ECONOMIC DEVELOP MENT AUTHORITY 19(771) Lafayette Innovation Center, Planning and Construction 20 (Lafayette) 21 Payable from General Obligation Bonds 22 Priority 1 $ 5,497,881 2350/N41BATON ROUGE METROPOLITAN AIRPORT 24(1335)Airport Aviation Business Park, Planning and 25 Construction 26 (East Baton Rouge) 27 Payable from General Obligation Bonds 28 Priority 1 $ 2,661,361 29 Priority 5 $ 4,750,000 30 Total $ 7,411,361 3150/N47ST. MARTIN ECONOMIC DEVELOP MENT 32 AUTHORITY 33(1769)North Business Park, Planning and Construction 34 (St. Martin) 35 Payable from General Obligation Bonds 36 Priority 5 $ 2,100,000 3750/N52LAFAYETTE PARISH SHERIFF’S OFFICE 38(449) Crime Scene and Evidence Storage, Planning and 39 Construction 40 (Lafayette) 41 Payable from General Obligation Bonds 42 Priority 1 $ 2,485,000 43 Payable from State General Fund (Direct) Non-Recurring 44 Revenues $ 350,000 45 Total $ 2,835,000 Page 110 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(450) Fitness Center, Planning and Construction 2 (Lafayette) 3 Payable from General Obligation Bonds 4 Priority 1 $ 2,010,000 5 Payable from State General Fund (Direct) Non-Recurring 6 Revenues $ 220,000 7 Total $ 2,230,000 8(860) Range Upgrades, Planning and Construction 9 (Lafayette) 10 Payable from General Obligation Bonds 11 Priority 1 $ 2,565,000 12 Payable from State General Fund (Direct) Non-Recurring 13 Revenues $ 300,000 14 Total $ 2,865,000 15(1673)Law Enforcement Center, Planning 16 and Construction 17 (Lafayette) 18 Payable from General Obligation Bonds 19 Priority 5 $ 46,500,000 20 Payable from the Capital Outlay Savings Fund $ 3,900,000 21 Total $ 50,400,000 22Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 2339:112. 2450/N53ORLEANS PARISH COMMUNICATIONS DISTRICT 25(534) Orleans Parish Communications District Expansion 26 Project, Planning and Construction 27 (Orleans) 28 Payable from General Obligation Bonds 29 Priority 5 $ 33,600,000 30 Payable from State General Fund (Direct) Non-Recurring 31 Revenues $ 5,000,000 32 Total $ 38,600,000 3350/N71NORTH LAFOURCHE CONSERVATION, LEVEE 34 AND DRAINAGE DISTRICT 35(766) Raceland Prairie Levee Improvements, Planning and 36 Construction 37 (Lafourche) 38 Payable from General Obligation Bonds 39 Priority 1 $ 1,225,000 40 Priority 5 $ 2,750,000 41 Total $ 3,975,000 4250/N74NATIONAL WORLD WAR II MUSEUM, INC. 43(506) Eight Projects Under FP&C Management Plus 44 Liberation Pavilion: Bricks and Mortar, Exhibit 45 Fabrication, Media Production, Planning and 46 Construction 47 (Orleans) 48 Payable from General Obligation Bonds 49 Priority 1 $ 12,500,000 50 Priority 5 $ 12,300,000 51 Payable from State General Fund (Direct) Non-Recurring 52 Revenues $ 3,000,000 53 Total $ 27,800,000 Page 111 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/N79TANGIPAHOA PARISH FIRE DISTRICT 1 2(1351)Bruce Cutrer Regional Fire Training Facility of 3 Tangipahoa Parish, Planning and Construction 4 (Tangipahoa) 5 Payable from General Obligation Bonds 6 Priority 1 $ 225,000 7 Priority 5 $ 2,000,000 8 Total $ 2,225,000 950/N90NORTH OF CROWLEY WATER CORP ORATION 10(1812)Water System Improvements, Planning 11 and Construction 12 (Acadia) 13 Payable from the Capital Outlay Savings Fund $ 810,000 14Pending approval of the capital outlay budget request pursuant to the provisions of R.S. 1539:112. 1650/NA2LAFAYETTE AIRPORT COMMISSION 17(610) Construction of a New Passenger Facility Terminal and 18 Associated Infrastructure at Lafayette Regional Airport 19 (Lafayette) 20 Payable from General Obligation Bonds 21 Priority 1 $ 673,815 2250/NAAPOINTE COUPEE COUNCIL ON AGING 23(1290)Senior Center, Planning and Construction 24 (Pointe Coupee) 25 Payable from General Obligation Bonds 26 Priority 1 $ 395,400 27 Priority 5 $ 1,920,000 28 Total $ 2,315,400 2950/NADMU ZETA FOUNDATION, INC. 30(1738)Expansion Project, Planning and Construction 31 (East Baton Rouge) 32 Payable from General Obligation Bonds 33 Priority 1 $ 29,765 34 Priority 5 $ 150,000 35 Total $ 179,765 3650/NAJEFFORTS OF GRACE, INC. 37(1770)Ashe Too, Planning and Construction 38 (Orleans) 39 Payable from General Obligation Bonds 40 Priority 5 $ 1,000,000 4150/NAZHOSPICE OF ACADIANA FOUNDATION, INC. 42(1730)Calcutta House, Planning and Construction 43 (Lafayette) 44 Payable from General Obligation Bonds 45 Priority 1 $ 249,795 46 Priority 5 $ 600,000 47 Total $ 849,795 Page 112 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/NB1CENTER FOR INNOVATIVE TRAINING OF YOUTH 2(815) STEM NOLA's Innovation Hub, Planning 3 and Construction 4 (Orleans) 5 Payable from General Obligation Bonds 6 Priority 5 $ 8,600,000 7 Payable from the Capital Outlay Savings Fund $ 2,000,000 8 Total $ 10,600,000 950/NBCCAPITOL CITY FAMILY HEALTH CENTER, INC. 10(1734)Care South Medical and Dental Expansion, Planning 11 and Construction 12 (East Baton Rouge) 13 Payable from General Obligation Bonds 14 Priority 1 $ 704,765 15 Priority 5 $ 550,000 16 Total $ 1,254,765 1750/NBFCOMMUNITY RECEIVING HOME, INC. 18(409) Renaissance Home for Youth, New Administrative 19 Building, Renovation of Existing Administrative 20 Building, Roads and Parking Areas, Planning and 21 Construction 22 (Rapides) 23 Payable from General Obligation Bonds 24 Priority 1 $ 395,920 25(1350)Rapides Parish Juvenile Justice Complex, Planning and 26 Construction 27 (Rapides) 28 Payable from General Obligation Bonds 29 Priority 2 $ 1,300,000 30 Priority 5 $ 25,300,000 31 Total $ 26,600,000 3250/NBJJONESVILLE FIRE DISTRICT 33(115) New Fire Station at U.S. Hwy. 84 and 3rd Street, 34 Planning and Construction 35 (Catahoula) 36 Payable from General Obligation Bonds 37 Priority 5 $ 800,000 3850/NBVCAPITAL AREA GROUND WATER 39 CONSERVATION DISTRICT 40(558) Water Monitoring System, Planning and Construction 41 (Ascension, East Baton Rouge, East Feliciana, Pointe Coupee, 42 West Baton Rouge, West Feliciana) 43 Payable from General Obligation Bonds 44 Priority 1 $ 1,000,000 45 Priority 5 $ 1,800,000 46 Total $ 2,800,000 Page 113 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/NC2BATON ROUGE RECREATION AND PARKS 2 COMMISSION 3(398) Baker Youth Tournament Ball Fields, Planning and 4 Construction 5 (East Baton Rouge) 6 Payable from General Obligation Bonds 7 Priority 1 $ 65,000 8(803) Cadillac Street Park Site Improvements, Planning and 9 Construction 10 (East Baton Rouge) 11 Payable from General Obligation Bonds 12 Priority 1 $ 71,625 13(1212)Central Community Sports Park, Planning and 14 Construction 15 (East Baton Rouge) 16 Payable from General Obligation Bonds 17 Priority 1 $ 26,671 18(1420)J.S. Clark Golf Course Renovation in Greenwood 19 Community Park, Planning and Construction 20 (East Baton Rouge) 21 Payable from General Obligation Bonds 22 Priority 1 $ 50,000 23 Priority 5 $ 800,000 24 Total $ 850,000 2550/NCMFIFTH WARD RECREATION DISTRICT OF 26 ST. HELENA PARISH 27(828) Recreation District Baseball Fields, Planning and 28 Construction 29 (St. Helena) 30 Payable from General Obligation Bonds 31 Priority 1 $ 950,417 3250/NCNSOUTH TOLEDO BEND WATERWORK S DISTRICT 33(1294)Vaco Road, Prospect Road, and Firesheets Lane, 34 Planning and Construction 35 (Sabine) 36 Payable from General Obligation Bonds 37 Priority 1 $ 25,000 38 Priority 5 $ 200,000 39 Total $ 225,000 4050/NCRLAFAYETTE PARISH WATERWORK S DISTRICT 41 NORTH 42(1536)Electronic Meter Program, Planning and Construction 43 (Lafayette) 44 Payable from General Obligation Bonds 45 Priority 5 $ 600,000 Page 114 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1(1833)Filtration Plant Upgrade and Repair, 2 Planning and Construction 3 (Lafayette) 4 Payable from State General Fund (Direct) Non-Recurring 5 Revenues $ 1,100,000 6Pending approval of the capital outlay budget request pursuant to the provisions of R.S. 739:112. 850/ND5LAFOURCHE PARISH WATER DISTRICT 9(1002)Kraemer Water Line Upgrades, Planning and 10 Construction 11 (Lafourche) 12 Payable from General Obligation Bonds 13 Priority 1 $ 100,000 14 Priority 5 $ 1,500,000 15 Total $ 1,600,000 1650/ND8BOSSIER PARISH SHERIFF 17(1339)Criminal Operations Building, Planning 18 and Construction 19 (Bossier) 20 Payable from State General Fund (Direct) Non-Recurring 21 Revenues $ 1,000,000 2250/ND9NORTHEAST LOUISIANA CHILDREN'S MUSEUM 23(1151)Northeast Louisiana Children's Museum Relocation, 24 Planning and Construction 25 (Ouachita) 26 Payable from General Obligation Bonds 27 Priority 1 $ 500,000 28 Priority 5 $ 9,500,000 29 Total $ 10,000,000 3050/NDNOPPORTUNITIES INDUSTRIALIZ ATION CENTER 31 INCORPORATED OF OUACHITA 32(403) New Education Building, Planning and Construction 33 (Ouachita) 34 Payable from General Obligation Bonds 35 Priority 1 $ 386,775 36 Priority 5 $ 1,845,000 37 Total $ 2,231,775 3850/NDQTANGIPAHOA AFRICAN AMERICAN HERITAG E 39 MUSEUM AND VETERANS' ARCHIVES 40(421) Tangipahoa African American Heritage Museum Roof 41 Replacement, Planning and Construction 42 (Tangipahoa) 43 Payable from General Obligation Bonds 44 Priority 5 $ 540,000 Page 115 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/NDXNEW ORLEANS COUNCIL ON AG ING, INC. 2(494) New Orleans Council on Aging Office and Senior 3 Community Center, Planning, Purchase, and 4 Renovation of a Building and/or Acquire Land and 5 Construct a New Building 6 (Orleans) 7 Payable from General Obligation Bonds 8 Priority 1 $ 1,248,358 9 Priority 5 $ 3,750,000 10 Total $ 4,998,358 1150/NDYJEFFERSON DAVIS WATER AND SEWER DISTRICT 12 COMMISSION #1 13(1014)Water System Improvements, Planning 14 and Construction 15 (Jefferson Davis) 16 Payable from General Obligation Bonds 17 Priority 5 $ 5,200,000 1850/NEEBIOMEDICAL RESEARCH AND INNOVATION P ARK 19(1517)Biomedical Research and Innovation Park Building, 20 Planning and Construction 21 (Ouachita) 22 Payable from General Obligation Bonds 23 Priority 1 $ 8,600,000 24 Priority 5 $ 14,900,000 25 Total $ 23,500,000 2650/NERST. HELENA PARISH HOSPITAL SERVICE 27 DISTRICT NO. 1 28(1225)Hospital Renovation, Expansion, and Equipment 29 Replacement, Planning and Construction 30 (St. Helena) 31 Payable from General Obligation Bonds 32 Priority 1 $ 4,181,045 3350/NEYORLEANS PARISH HOSPITAL SERVICE 34 DISTRICT A 35(819) Parish Hospital Service District for the Parish of 36 Orleans - District A- Obstetrics Service Line Expansion 37 Level 2 Unit, Planning and Construction 38 (Orleans) 39 Payable from General Obligation Bonds 40 Priority 1 $ 3,200,000 41 Payable from the Capital Outlay Savings Fund $ 1,000,000 42 Total $ 4,200,000 4350/NF6ST. MARTIN PARISH SHERIFF'S OFFICE 44(1660)Regional Law Enforcement Training Academy, 45 Planning and Construction 46 (St. Martin) 47 Payable from General Obligation Bonds 48 Priority 5 $ 900,000 49 Payable from the Capital Outlay Savings Fund $ 1,500,000 50 Total $ 2,400,000 Page 116 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/NF8CENTRAL LOUISIANA DETENTION CENTER 2 AUTHORITY 3(862) Central Louisiana Juvenile Detention Center, Planning 4 and Construction 5 (Grant) 6 Payable from General Obligation Bonds 7 Priority 1 $ 2,000,000 8 Priority 5 $ 8,700,000 9 Payable from State General Fund (Direct) Non-Recurring 10 Revenues $ 1,000,000 11 Total $ 11,700,000 1250/NFECAJUNDOME 13(369) Cajundome and Convention Center Indoor Air Quality 14 Improvements, Planning and Construction 15 (Lafayette) 16 Payable from General Obligation Bonds 17 Priority 5 $ 6,364,182 1850/NFXTHE O.W. DILLON TRAINING AND COMMUNITY 19 DEVELOPMENT CENTER, INC. 20(1435)The O.W. Dillon Training and Community 21 Development Center Building, Planning and 22 Construction 23 (Tangipahoa) 24 Payable from General Obligation Bonds 25 Priority 1 $ 1,500,000 26 Priority 5 $ 4,500,000 27 Total $ 6,000,000 2850/NG6THE LOUISIANA BLACK HISTORY HALL OF FAME 29(209) Museum and Cultural Center, Planning and 30 Construction 31 (East Baton Rouge) 32 Payable from General Obligation Bonds 33 Priority 1 $ 2,089,802 3450/NGALINCOLN PARISH FIRE PROTECTION DISTRICT #1 35(186) Renovations to Existing Facility and Additional 36 Buildings, Acquisition, Planning and Construction 37 (Lincoln) 38 Payable from General Obligation Bonds 39 Priority 1 $ 120,000 40 Priority 5 $ 765,000 41 Total $ 885,000 4250/NGMNEW ORLEANS AF RICAN AMERICAN 43 MUSEUM OF ART, CULTURE AND HISTORY 44(1676)New Orleans African American Museum of Art, 45 Culture and History: Renovation and New Construction 46 (Orleans) 47 Payable from General Obligation Bonds 48 Priority 1 $ 374,765 49 Priority 5 $ 4,000,000 50 Total $ 4,374,765 Page 117 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/NGNLOUISIANA CHAMBER OF COMMERCE 2 FOUNDATION, INC. 3(1405)Louisiana Chamber of Commerce's Business 4 Innovation Center, Planning and Construction 5 (Calcasieu) 6 Payable from General Obligation Bonds 7 Priority 5 $ 1,645,000 850/NGQTHE STRAND THEATRE OF SHREVEPORT 9 CORPORATION 10(1318)Repair and Renovation to the Strand Theatre of 11 Shreveport 12 (Caddo) 13 Payable from General Obligation Bonds 14 Priority 1 $ 71,694 15 Priority 5 $ 984,000 16 Total $ 1,055,694 1750/NH7CEMETERY MAINTENANCE Z ACHARY 18(1771)Public Cemetery Maintenance, Planning and 19 Construction 20 (East Baton Rouge) 21 Payable from General Obligation Bonds 22 Priority 5 $ 3,750,000 2350/NHEST. JAMES PARISH HOSPITAL 24(1008)West Bank Health Clinic, Planning and Construction 25 (St. James) 26 Payable from General Obligation Bonds 27 Priority 1 $ 1,790,795 28 Priority 5 $ 3,500,000 29 Total $ 5,290,795 3050/NHGLAFAYETTE CENTRE DEVELOP MENT DISTRICT 31(1677)Downtown Lafayette Public Infrastructure 32 Improvements and Upgrades, Planning and 33 Construction 34 (Lafayette) 35 Payable from General Obligation Bonds 36 Priority 1 $ 500,000 3750/NHUSOUTH GRANT WATER CORP ORATION 38(181) Water Production System Improvements, 39 East Well #2, Planning and Construction 40 (Grant) 41 Payable from General Obligation Bonds 42 Priority 5 $ 390,000 Page 118 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/NI7HOSPITAL SERVICE DISTRICT 1 IBERIA PARISH DBA 2 IBERIA MEDICAL CENTER 3(542) Addition of Medical, Surgical, and Psychiatric 4 Inpatient Rooms, Planning, Construction, and 5 Equipment 6 (Iberia) 7 Payable from General Obligation Bonds 8 Priority 2 $ 1,500,000 9 Priority 5 $ 7,175,000 10 Total $ 8,675,000 1150/NI9ASCENSION-ST. JAMES AIRPORT AND 12 TRANSPORTATION AUTHORITY 13(798) Drinking Water, Fire Suppression, and ADA 14 Compliance - Louisiana Regional Airport, Gonzales, 15 LA, Planning and Construction 16 (Ascension) 17 Payable from General Obligation Bonds 18 Priority 1 $ 190,000 19(1416)Commercial Hangar Complex - Louisiana Regional 20 Airport, Gonzales, LA, Planning and Construction 21 (Ascension) 22 Payable from General Obligation Bonds 23 Priority 1 $ 500,000 24 Priority 5 $ 500,000 25 Total $ 1,000,000 2650/NIWLIONS CLUB OF ALEXANDRIA 27(1306)Pool Replacement, Planning and Construction 28 (Vernon) 29 Payable from State General Fund (Direct) Non-Recurring 30 Revenues $ 400,000 3150/NJACECILIA WATER CORP ORATION 32(1654)Water System Improvements, Planning and 33 Construction 34 (St. Martin) 35 Payable from General Obligation Bonds 36 Priority 5 $ 495,000 3750/NJLBASTION COMMUNITY OF RESILIENCE 38(1526)Veterans Wellness Facility in New Orleans, Planning 39 and Construction 40 (Orleans) 41 Payable from General Obligation Bonds 42 Priority 1 $ 1,900,000 4350/NJSASCENSION PARISH TOURIST COMMISSION 44(59) Ascension Parish Visitor Center, Planning 45 and Construction 46 (Ascension) 47 Payable from the Capital Outlay Savings Fund $ 810,000 Page 119 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/NJTCARE/HELP OF SULPHUR, INC. 2(540) New Assistance Facility, Planning 3 and Construction 4 (Calcasieu) 5 Payable from State General Fund (Direct) Non-Recurring 6 Revenues $ 800,000 750/NKQTHIBODAUX REG IONAL HEALTH SYSTEM 8(1084)Emergency Power System Replacement and 9 Upgrade, Planning and Construction 10 (Lafourche) 11 Payable from General Obligation Bonds 12 Priority 5 $ 15,800,000 13 Payable from State General Fund (Direct) Non-Recurring 14 Revenues $ 3,500,000 15 Total $ 19,300,000 1650/NLMFOUNDATION FOR SCIENCE AND MATHEMATICS 17 EDUCATION, INC. 18(48) A Model for a 21st Century Workforce Development 19 Urban High School - New Orleans Science and 20 Mathematics High School 21 (Orleans) 22 Payable from General Obligation Bonds 23 Priority 1 $ 814,846 24 Priority 5 $ 1,000,000 25 Total $ 1,814,846 2650/NLOOUR LADY OF THE ANGELS HOSPITAL 27(382) Medical Office Building, Planning and Construction 28 (Washington) 29 Payable from General Obligation Bonds 30 Priority 5 $ 4,400,000 31 Payable from State General Fund (Direct) Non-Recurring 32 Revenues $ 3,000,000 33 Total $ 7,400,000 3450/NLSTRUE FRIENDS SOCIETY OF LAFAYETTE 35(1208)Maison Creole de Freetown African 36 American History Museum, Planning 37 and Construction 38 (Lafayette) 39 Payable from State General Fund (Direct) Non-Recurring 40 Revenues $ 325,000 4150/NMBCALCASIEU PARISH WATERWORK S 42 DISTRICT 1, WARD 1 43(469) New Water Treatment Plant C, Planning and 44 Construction 45 (Calcasieu) 46 Payable from General Obligation Bonds 47 Priority 5 $ 4,750,000 Page 120 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/NMDBELMONT WATERWORK S, INC. 2(57) Water System Improvements, Planning and 3 Construction 4 (Sabine) 5 Payable from General Obligation Bonds 6 Priority 1 $ 150,882 750/NP1ACADIANA CRIMINALISTICS LABORATORY 8 DISTRICT 9(327) New Crime Laboratory, Planning, Design, 10 Construction, and Equipment 11 (Iberia) 12 Payable from General Obligation Bonds 13 Priority 1 $ 4,686,399 14 Priority 5 $ 13,800,000 15 Total $ 18,486,399 1650/NP2EAST DESOTO WATER SYSTEM, INC. 17(1194)Emergency Power Systems, Planning 18 and Construction 19 (DeSoto) 20 Payable from State General Fund (Direct) Non-Recurring 21 Revenues $ 360,000 2250/NP3BAYOU LAFOURCHE FRESH WATER DISTRICT 23(611) Donaldsonville Flood Control, Planning and 24 Construction 25 (Ascension, Assumption, Lafourche, Terrebonne) 26 Payable from General Obligation Bonds 27 Priority 1 $ 753,000 2850/NPBFRIENDS OF CROWVILLE 29(385) Community Center Improvement, 30 Planning and Construction 31 (Franklin) 32 Payable from State General Fund (Direct) Non-Recurring 33 Revenues $ 860,000 3450/NPDIBERIA ECONOMIC DEVELOP MENT AUTHORITY 35(465) Progress Point Business Park and Airport Gateway, 36 Land Acquisition, Planning and Construction 37 (Iberia) 38 Payable from General Obligation Bonds 39 Priority 1 $ 1,337,444 4050/NPZMARTIN LUTHER K ING NEIGHBORHOOD ASSOCIATION 41(1012)Community Center Renovation and 42 Improvement Project, Planning and Construction 43 (Caddo) 44 Payable from General Obligation Bonds 45 Priority 5 $ 1,300,000 Page 121 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/NQ2GRAVITY DRAINAGE DISTRICT 6 2 CALCASIEU PARISH 3(886) Buxton Creek Drainage Improvements, Planning and 4 Construction 5 (Calcasieu) 6 Payable from General Obligation Bonds 7 Priority 1 $ 4,100,000 850/NQGLAFAYETTE METROP OLITAN EXPRESSWAY 9 COMMISSION 10(1400)Lafayette Loop Project, Planning and Construction 11 (Lafayette) 12 Payable from General Obligation Bonds 13 Priority 1 $ 4,000,000 14 Priority 5 $ 2,500,000 15 Total $ 6,500,000 1650/NQNLSU REAL ESTATE AND FACILITIES 17 FOUNDATION 18(141) University Lakes Restoration Project to Address Flood 19 Control, Environmental, Safety, Health and Other 20 Issues (Matching Funds) 21 (East Baton Rouge) 22 Payable from General Obligation Bonds 23 Priority 1 $ 26,000,000 24Notwithstanding any other provision of law to the contrary, the appropriation for the LSU 25Real Estate and Facilities Foundation, University Lakes Restoration Project to Address 26Flood Control, Environmental, Safety, Health and Other Issues is conditioned upon the 27contracts for the project containing a provision that any sinker cypress or other natural 28resource recovered from the lakes is public property, and shall be sold at public auction with 29the proceeds of the sale to be used for the project. 3050/NQSKORAN POST 388 AMERICAN LEGION 31(824) Bossier City Veteran Memorial Concrete 32 Pad Expansion by Women Veterans 33 of the Ark-La-Tex, Planning and Construction 34 (Bossier) 35 Payable from State General Fund (Direct) Non-Recurring 36 Revenues $ 4,000 37(1656)Koran American Legion Post Construction 38 and Renovation, Planning and Construction 39 (Bossier) 40 Payable from State General Fund (Direct) Non-Recurring 41 Revenues $ 112,000 4250/NQVBEAUREGARD WATERWORK S DISTRICT #6 43(470) Water System Improvements, Planning and 44 Construction 45 (Beauregard) 46 Payable from General Obligation Bonds 47 Priority 1 $ 116,125 Page 122 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/NRPFIRST GRACE UNITED METHODIST 2(591) Hagar's House Major Renovations, 3 Planning and Construction 4 (Orleans) 5 Payable from State General Fund (Direct) Non-Recurring 6 Revenues $ 115,000 750/NRUEAST BATON ROUG E COUNCIL ON AGING 8(578) Lotus Village at the Lakes Senior Community, 9 Planning, Development and Construction 10 (East Baton Rouge) 11 Payable from General Obligation Bonds 12 Priority 1 $ 1,000,000 13 Priority 5 $ 6,184,000 14 Total $ 7,184,000 1550/NSPEDEN HOUSE 16(806) New Orleans Emergency Shelter, Planning and 17 Construction 18 (Orleans) 19 Payable from General Obligation Bonds 20 Priority 1 $ 850,000 2150/NT5FRIENDS OF CHENNAULT AVIATION AND MILITARY 22 MUSEUM 23(261) Chennault Aviation and Military 24 Museum Preservation, Restoration, 25 Fire Suppression, Planning, and Construction 26 (Ouachita) 27 Payable from State General Fund (Direct) Non-Recurring 28 Revenues $ 315,000 29(1443)Chennault Aviation and Military 30 Museum Floor Preservation Project, 31 Planning and Construction 32 (Ouachita) 33 Payable from State General Fund (Direct) Non-Recurring 34 Revenues $ 115,000 3550/NT7CITIZENS MEDICAL CENTER 36(1053)Expansion of Emergency Department, ICU, 37 and Imaging, Planning, Design, and Construction 38 (Caldwell) 39 Payable from General Obligation Bonds 40 Priority 5 $ 8,000,000 41 Payable from State General Fund (Direct) Non-Recurring 42 Revenues $ 2,000,000 43 Total $ 10,000,000 Page 123 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/NTAEAST CARROLL PARISH SHERRIFF'S OFFICE 2(1723)Training and Recreation Center, Planning and 3 Construction 4 (East Carroll) 5 Payable from General Obligation Bonds 6 Priority 5 $ 3,000,000 750/NTKTHE UNION LINCOLN REG IONAL WATER SUPPLY 8 INITIATIVE 9(1735)Development of Alternative Water Supply from Lake 10 D'Arbonne for Lincoln and Union Parishes 11 (Lincoln, Union) 12 Payable from General Obligation Bonds 13 Priority 1 $ 1,397,200 14 Priority 5 $ 2,400,000 15 Total $ 3,797,200 1650/NU99TH WARD STADIUM, INC. 17(874) Multi-Sport Venue in Eastern New Orleans and Lower 18 Ninth Ward, Planning and Construction 19 (Orleans) 20 Payable from General Obligation Bonds 21 Priority 1 $ 3,449,765 2250/NUQLOUISIANA HIBERNIAN CHARITY 23(1658)Four Acre Irish Heritage Park in the Lakeview 24 Neighborhood, Planning and Construction 25 (Orleans) 26 Payable from General Obligation Bonds 27 Priority 1 $ 250,000 2850/NUTCATHOLIC CHARITIES OF ACADIANA 29(1678)Disaster Response Center of Acadiana, 30 Planning and Construction 31 (Lafayette) 32 Payable from the Capital Outlay Savings Fund $ 917,000 33(1679)St. Joseph Diner and FoodNet Program for 34 Acadiana, Planning and Construction 35 (Lafayette) 36 Payable from General Obligation Bonds 37 Priority 2 $ 2,510,000 38 Payable from the Capital Outlay Savings Fund $ 1,000,000 39 Total $ 3,510,000 40Pending approval of the capital outlay budget request pursuant to the provisions of R.S. 4139:112. 42(1680)Emergency Housing of Acadiana for Disaster 43 Volunteers, Planning and Construction 44 (Lafayette) 45 Payable from the Capital Outlay Savings Fund $ 365,000 Page 124 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/NVYWASHINGTON PARISH HOSPITAL SERVICE 2 DISTRICT NO. 1 3(1742)Emergency Upgrades including Power Generation 4 System Upgrade, Mechanical Systems, and Roofing, 5 Planning and Construction 6 (Washington) 7 Payable from General Obligation Bonds 8 Priority 1 $ 650,000 9 Priority 5 $ 4,650,000 10 Total $ 5,300,000 1150/NWGCHILDREN'S ADVOCACY NETWORK , INC. 12(1796)Children's Advocacy Network Campus, 13 Planning and Construction 14 (Rapides) 15 Payable from General Obligation Bonds 16 Priority 5 $ 2,000,000 17Pending late approval of the capital outlay budget request pursuant to the provisions of R.S. 1839:112. 1950/NWOAIRPORT DISTRICT 1 OF CALCASIEU PARISH 20(1314)Airport Entrance and Access Road Improvements and 21 Marquee, Planning and Construction 22 (Calcasieu) 23 Payable from General Obligation Bonds 24 Priority 1 $ 1,000,000 2550/NWRLOUISIANA SWAMP BASE, INC. 26(460) Camp Atchafalaya Swamp Base, Planning, Design, and 27 Construction 28 (St. Martin) 29 Payable from General Obligation Bonds 30 Priority 1 $ 645,000 31 Priority 5 $ 8,850,000 32 Total $ 9,495,000 3350/NWSLAFAYETTE CENTRAL P ARK, INC. 34(1283)Lafayette Central Park Improvements, Planning and 35 Construction 36 (Lafayette) 37 Payable from General Obligation Bonds 38 Priority 1 $ 7,834,500 39 Priority 5 $ 1,000,000 40 Total $ 8,834,500 4150/NXCLIVINGSTON PARISH SHERIFF'S OFFICE 42(408) Livingston Parish Emergency Response and Evacuation 43 Center, Planning and Construction 44 (Livingston) 45 Payable from General Obligation Bonds 46 Priority 1 $ 11,000,000 47 Priority 5 $ 33,920,000 48 Total $ 44,920,000 Page 125 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/NXIHEBERT WATER SYSTEM, INC. 2(493) Water System Improvements, Planning and 3 Construction 4 (Caldwell) 5 Payable from General Obligation Bonds 6 Priority 1 $ 213,583 7 Priority 5 $ 1,000,000 8 Payable from State General Fund (Direct) Non-Recurring 9 Revenues $ 1,000,000 10 Total $ 2,213,583 1150/NXSBATON ROUGE GENERAL MEDICAL CENTER 12(1662)Secure Backup Power Generators 13 for Baton Rouge General Hospital, 14 Planning and Construction 15 (East Baton Rouge) 16 Payable from the Capital Outlay Savings Fund $ 4,500,000 1750/NXYCONCORDIA PARISH HOSPITAL SERVICE 18 DISTRICT #1 19(113) Construction of Turn Lane on U.S. 84/425 20 (Concordia) 21 Payable from General Obligation Bonds 22 Priority 1 $ 225,000 2350/NYJALLEN PARISH HOSPITAL 24(1646)New Hospital Equipment, Planning and 25 Construction 26 (Allen) 27 Payable from General Obligation Bonds 28 Priority 2 $ 1,000,000 2950/NYNOPELOUSAS HEIGHTS, INC. 30(624) Opelousas Heights Proposed Subdivision, Planning and 31 Construction 32 (St. Landry) 33 Payable from General Obligation Bonds 34 Priority 1 $ 1,184,790 3550/NYPSECOND HARVEST F OOD BANK OF GREATER 36 NEW ORLEANS AND ACADIANA 37(368) Roof Replacement and HVAC Installation, Planning 38 and Construction 39 (Jefferson) 40 Payable from General Obligation Bonds 41 Priority 1 $ 1,006,031 4250/NYQYMCA OF NORTHWEST LOUISIANA 43(447) Youth Sports Construction, Planning 44 and Construction 45 (Bossier, Caddo) 46 Payable from State General Fund (Direct) Non-Recurring 47 Revenues $ 1,000,000 Page 126 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1Pending approval of the capital outlay budget request pursuant to the provisions of R.S. 239:112. 350/NYSHOLY ROSARY REDEVELOP MENT 4(175) Holy Rosary Institute, Planning, Construction, and 5 Restoration 6 (Lafayette) 7 Payable from General Obligation Bonds 8 Priority 1 $ 4,422,825 9 Priority 5 $ 3,200,000 10 Total $ 7,622,825 1150/NYVNOTRE DAME HEALTH SYSTEM 12(1437)Wynhoven Health Care Expansion, including St. 13 Andrew's Village, Planning and Construction 14 (Jefferson) 15 Payable from General Obligation Bonds 16 Priority 1 $ 3,561,859 17 Priority 5 $ 1,999,750 18 Total $ 5,561,609 1950/NZ3BEAUREGARD MEMORIAL HOSP ITAL 20(1183)Emergency Department Addition and Renovation 21 and Women's Center Renovation, Planning and 22 Construction 23 (Beauregard) 24 Payable from General Obligation Bonds 25 Priority 5 $ 4,900,000 26 Payable from the Capital Outlay Savings Fund $ 100,000 27 Total $ 5,000,000 2850/NZ7ASSOCIATION FOR THE LIBERTY THEATRE 29(1664)Liberty Theatre Restoration and Preservation Project, 30 HVAC Replacement and Mold Remediation, 31 Planning and Construction 32 (St. Landry) 33 Payable from State General Fund (Direct) Non-Recurring 34 Revenues $ 680,000 3550/NZBLIVINGSTON PARISH AIRPORT DISTRICT 36(348) Livingston Executive Airport, Planning and 37 Construction 38 (Livingston) 39 Payable from General Obligation Bonds 40 Priority 1 $ 1,161,233 41 Priority 5 $ 485,000 42 Payable from State General Fund (Direct) Non-Recurring 43 Revenues $ 1,000,000 44 Total $ 2,646,233 Page 127 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/NZDHOSPITAL SERVICE DISTRICT NO. 1, 2 PARISH OF ST. MARY 3(127) Franklin Foundation Hospital Wellness Center 4 (St. Mary) 5 Payable from General Obligation Bonds 6 Priority 1 $ 2,000,000 750/NZKTHE ROBERT A. BOGAN BATON ROUGE FIRE MUSEUM 8(208) Museum Restoration, Planning and Construction 9 (East Baton Rouge) 10 Payable from General Obligation Bonds 11 Priority 5 $ 3,165,000 1250/NZXWEST CALCASIEU CAMERON HOSP ITAL 13(1401)West Calcasieu Cameron Hospital Medical Office 14 Building, Planning and Construction 15 (Calcasieu) 16 Payable from General Obligation Bonds 17 Priority 1 $ 1,328,000 18 Priority 5 $ 3,022,000 19 Total $ 4,350,000 2050/NZWYWCA OF GREATER BATON ROUG E 21(543) Early Childhood Education Project, 22 Planning and Construction 23 (East Baton Rouge) 24 Payable from General Obligation Bonds 25 Priority 5 $ 5,000,000 2650/S10CALCASIEU PARISH SCHOOL BOARD 27(1728)Renovations to Lake Charles Boston Stadium, Planning 28 and Construction 29 (Calcasieu) 30 Payable from General Obligation Bonds 31 Priority 1 $ 167,000 32 Priority 5 $ 823,000 33 Total $ 990,000 3450/S32LIVINGSTON PARISH SCHOOL BOARD 35(1445)Widening and Turn Lane Construction for LA Hwy 16 36 as Part of the New Southside Elementary and Jr. High 37 Schools 38 (Livingston) 39 Payable from General Obligation Bonds 40 Priority 1 $ 543,297 Page 128 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 150/S39POINTE COUPEE PARISH SCHOOL BOARD 2(1737)Pointe Coupee Parish School Board Office Relocation, 3 to be Located at 8777 Morganza Highway, Formerly 4 Labarre Elementary School Site, Due to Flooding 5 Caused by Hurricane Gustav, Planning and 6 Construction 7 (Pointe Coupee) 8 Payable from General Obligation Bonds 9 Priority 1 $ 2,468,060 10 Priority 5 $ 1,900,000 11 Total $ 4,368,060 1250/S63WEST FELICIANA PARISH SCHOOL BOARD 13(657) Julius Freyhan Cultural/Conference Center, Planning 14 and Construction 15 (West Feliciana) 16 Payable from General Obligation Bonds 17 Priority 1 $ 1,497,000 1850/S67CENTRAL COMMUNITY SCHOOL SYSTEM 19(1009)Central Community School System Multi-Use Activity 20 Center, Planning and Construction 21 (East Baton Rouge) 22 Payable from General Obligation Bonds 23 Priority 1 $ 1,200,000 24 Priority 5 $ 9,800,000 25 Total $ 11,000,000 26 Section 1.(A) Appropriated Debt Projects. The projects listed in this section are 27to be funded through the sale bonds and secured by or payable from state appropriation. 2808/419OFFICE OF STATE POLICE 29(743) Crime Laboratory, Planning and Construction 30 (East Baton Rouge) 31 Payable from Revenue Bonds $ 130,000,000 32 Notwithstanding anything contained in this Capital Outlay Act, or any previous 33Capital Outlay Act to the contrary, or any other provision of law, the Office of State Police 34may finance the design, construction, furnishing and equipping of facilities through the 35issuance of revenue bonds by the Louisiana Public Facilities Authority to be secured by and 36 payable from State appropriations. The issuance of such revenue bonds shall require the 37approval of the State Bond Commission. 3801/107DIVISION OF ADMINISTRATION 39(541) Northwest Louisiana State Office Building Renovations, 40 Phase II, Planning and Construction 41 (Caddo) 42 Payable from Revenue Bonds $75,000,000 Page 129 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1 Notwithstanding anything contained in this Capital Outlay Act, or any previous 2Capital Outlay Act to the contrary, or any other provision of law, the Division of 3Administration may finance the design, construction, furnishing and equipping of facilities 4through the issuance of revenue bonds by the Office Facilities Corporation to be secured by 5and payable from State appropriations. The issuance of such revenue bonds shall require the 6approval of the State Bond Commission. 7 Section 2.(A) The expenditure of funds appropriated in this Act shall be in 8conformity to all existing statutes relative to public bidding, contractual review, and R.S. 939:101 through 128 and any other statutes affecting the capital outlay program for state 10government, state institutions, and political entities. 11 (B) Notwithstanding the provisions of R.S. 39:101, 102, and 112(C), projects 12included in Section 1 of this Act which did not submit a capital outlay application by 13November 1, 2022, in compliance with the provisions of R.S. 39:101 and 102 and which 14have not received late approval as required by R.S. 39:112(C) are hereby deemed to have 15until June 15, 2023, to submit a capital outlay budget request application pursuant to R.S. 1639:101(A), and if the application is submitted by that date, the project is deemed to have 17complied with the late approval requirements of R.S. 39:112(C). Additionally, the capital 18outlay budget requests together with supporting information and documents for these 19projects shall constitute the feasibility study required by Article VII, Section 11(C) of the 20Constitution of Louisiana. 21 Section 3. Payment for projects specified in this Act must be made by warrant 22submitted to the division of administration, Department of Transportation and Development, 23the state treasurer or other administering agency as provided in Section 8, whichever is 24appropriate, only to the extent of funds required for immediate payment. Copies of invoices 25or other supporting documentation shall be submitted with warrants. In the event that any 26equipment included in this Act, is procured pursuant to the provisions of the State Lease- 27Purchase Act, R.S. 39:1761 et seq., the amounts included in this Act for each such piece of 28equipment shall not be appropriated. The provisions of R.S. 39:1771 which require 29equipment to be leased under the State Lease-Purchase Act to be included in the executive 30budget and approved by the legislature through inclusion in the General Appropriation Act 31shall be considered waived upon the inclusion of such equipment in this Act. Projects Page 130 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1contained in this Act may, at the direction of the division of administration and with the 2approval of the State Bond Commission, alternatively be funded through financing programs 3heretofore or hereafter provided by a public trust and public corporation duly organized 4pursuant to R.S. 9:2341 et seq., having for its beneficiary the state and the Louisiana Local 5Government Environmental Facilities and Community Development Authority, pursuant to 6R.S. 33:4548.1 et seq. 7 Section 4. If at any time during the Fiscal Year 2023-2024, the governor should 8find, or the Joint Legislative Committee on the Budget or the commissioner of 9administration should report to the governor, that the receipts of the treasury are falling short 10or appear likely to fall short of the revenue estimates for the fiscal year and that a cash 11deficit is likely to be incurred, the governor shall take such steps as deemed necessary to 12prevent the occurrence of a cash deficit. In the event that a capital outlay project funded in 13this Act falls under an agency which is abolished or for which funds are not appropriated in 14the 2023-2024 General Appropriation Act, then the funds appropriated in this Act for such 15capital outlay projects shall not be expended unless deemed necessary by the governor to 16protect life or property. In the event that legislation is enacted which transfers facilities or 17programs for which projects are funded in this Act, on behalf of one agency, institution, 18department, or management board to another agency, institution, department, or management 19board, then the projects in this Act shall be deemed transferred also. 20 Section 5. All monies appropriated by this Act and any applicable funds of a prior 21capital outlay budget act adopted by the legislature shall be deposited by the state treasurer 22in the Comprehensive Capital Outlay Escrow Account, established by this Section, in the 23state treasury. In accordance with R.S. 36:764, no later than sixty days following the end of 24each quarter, the state treasurer shall report to the Joint Legislative Committee on the Budget 25and the commissioner of administration, all funds contained in the Miscellaneous Fund of 26the Comprehensive Capital Outlay Escrow Account. Notwithstanding any provisions 27contained herein or other law to the contrary, any original issue premium or accrued interest 28proceeds received pursuant to the sale of general obligation bonds shall remain on deposit 29to the credit of the Bond Security and Redemption Fund until such time as they may be 30utilized in accordance with U.S. Department of the Treasury Regulations promulgated 31pursuant to the Internal Revenue Code of 1986. All such monies shall be administered Page 131 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1according to the particular act pertaining to the fiscal year in which such monies were 2appropriated. If it is determined by the director of the office of facility planning and control, 3division of administration, that the funds appropriated by this Act or any prior capital outlay 4budget Act are not sufficient to complete the projects contained in any capital outlay budget 5Act, through unavoidable deficiencies in appropriation, including administrative and legal 6requirements, the commissioner of administration, subject to approval of the Joint 7Legislative Committee on the Budget, may direct the use of interest earned from the 8investment of general obligation bond or note proceeds in the Comprehensive Capital Outlay 9Escrow Account, not to exceed an aggregate of five million dollars in any one fiscal year, 10for the purpose of completing the projects contained in any capital outlay budget Act and 11such money shall be deemed appropriated in specific amounts necessary for such purpose. 12All appropriations in this Act which are made as additions to funds for previously authorized 13projects shall be included, for accounting purposes, in the account of the previously 14authorized projects. If it is determined by the director of the office of facility planning and 15control, division of administration, that it is cost effective and practical to combine 16individual appropriations, the commissioner of administration, subject to the approval of the 17Joint Legislative Committee on the Budget, may direct that two or more appropriations or 18parts thereof may be combined into a single project for accounting and audit purposes. The 19commissioner of administration may direct that funding in the various statewide and/or 20multiple parish projects for improvements for state facilities may be transferred to any 21project, in this Act or any previous Capital Outlay Act, which require supplemental funding 22for improvements for state facilities which qualify for funding through the various statewide 23and/or multiple parish projects for improvements for state facilities. The office of facility 24planning and control, division of administration is authorized to receive settlements and 25vendor rebates and to add a portion or all of these receipts to the existing project funds 26relating to the settlement and/or vendor rebates and appropriated in this Act or any previous 27Capital Outlay Act including those previously appropriated funds that become unavailable. 28Approval of the Joint Legislative Committee on the Budget will be obtained if the settlement 29and/or vendor rebates will be added to any projects in this Act or any previous Capital 30Outlay Act which are unrelated to the project from which the settlement and/or vendor 31rebates were received. The office of facility planning and control, division of administration Page 132 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1is authorized to receive insurance payments and are hereby authorized to immediately repair 2facilities that suffer insurance losses without those projects being included in the Act and 3shall report to the Joint Legislative Committee on the Budget any expenditures from 4insurance funds received pursuant to this section. A portion, as determined by the 5commissioner of administration and not to exceed one percent (1%), of the funding for 6projects which qualify for the Percent for Art Program and not to exceed $450,000 for an 7individual, qualifying project, may be transferred from the qualifying project budgets, to the 8Department of Culture, Recreation and Tourism for costs of acquiring art and administering 9the program. For all Percent for Art Program projects in this or any previous capital outlay, 10up to ten percent (10%) of the aforementioned one percent (1%) may be used for the costs 11of administering the projects. 12 Section 6. No later than February 1, 2024, agencies administering capital outlay 13projects will submit reports identifying completed projects and cash balances to the Joint 14Legislative Committee on Capital Outlay pursuant to the reporting requirements of R.S. 1539:105 and R.S. 39:116. 16 Section 7. The commissioner of administration, with the approval of the Joint 17Legislative Committee on the Budget, is authorized to supplement or substitute the 18appropriations specified in this or previous capital outlay acts with any federal or other funds 19which are or may become available and such funds shall be deemed appropriated in specific 20amounts necessary for the purposes of this Act. Any funds received by the State Bond 21Commission as a result of a prepayment of reimbursement contracts as authorized by law 22and the policy and procedure for reimbursement contracts of the Department of Treasury, 23office of State Bond Commission, shall be deposited as set forth in such policy and 24procedure and shall be deemed available and appropriated in specific amounts necessary for 25the purposes of this Act pursuant to the procedure set forth in this section. 26 Section 8.(A) All projects herein authorized and funded shall be subject to the 27provisions of R.S. 39:101 through 128. With the exception of appropriations made to the 28Department of Military Affairs, the Legislature, the Louisiana Stadium and Exposition 29District, the Department of Economic Development, the Coastal Protection and Restoration 30Authority, the Division of Administration for Supplemental State Funds for Local Page 133 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1Government Assistance Program, the Division of Administration for the Community Water 2Enrichment Program or the Department of Transportation and Development, all funds herein 3appropriated shall be considered as having been appropriated directly to the Office of 4Facility Planning and Control, Division of Administration. All cooperative endeavor 5agreements for non-state entities shall be prepared by the appropriate administering agency 6and submitted to the office of State Procurement for review and approval. As part of its 7review, the office of State Procurement shall consult with bond counsel to the State relative 8to any federal tax issues. 9 (1) Notwithstanding anything contained in this act to the contrary or any other 10provision of law, the appropriations made for the Louisiana Stadium and Exposition District 11shall be appropriated directly to the Louisiana Stadium and Exposition District, and are 12public purposes pursuant to the provisions of Article VII, Section 14 of the Constitution of 13Louisiana primarily for economic development, including the generation of tax revenue, 14creation of jobs, and the generation of tourism, and may be used to reimburse any 15expenditure made prior to the granting of a line of credit or the sale of bonds by the State 16Bond Commission, determination by the State Treasurer that cash funding has been 17deposited in the Comprehensive Capital Outlay Escrow Account for the project. 18 (2) Further, with respect to appropriations to the Louisiana Stadium and 19Exposition District for the TPC Louisiana, Planning and Construction project, the Louisiana 20Stadium and Exposition District shall be permitted to use alternative competitive 21procurement and delivery methods for the award of any contracts to be funded through such 22appropriation. 23 (3) The Louisiana Stadium and Exposition District shall have the authority to 24directly appoint a design professional from a list of a minimum of three architectural firms 25or joint ventures with professional sports facility design experience acceptable to the 26Commissioner of Administration and shall be exempt from other state requirements for 27selection of designers. The design professional fee shall be in accordance with state 28guidelines administered by the Office of Facility Planning and Control, Division of 29Administration. Page 134 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1 (B)(1)(a) Funds appropriated in the Capital Outlay Act under the name of non- 2state entities shall be administered by the Office of Facility Planning and Control, Division 3of Administration under cooperative endeavor agreements; however, projects involving state 4or federal highways may be administered by the Department of Transportation and 5Development, if appropriate. Except as provided in Section 8(A), cooperative endeavor 6agreements entered into pursuant to appropriations in this Act shall not be required to be 7submitted to the Division of Administration, Office of State Procurement. 8 (b) Further, for all projects in the Capital Outlay Act or a previous Capital Outlay 9Act which are appropriated to the Office of Facility Planning and Control, Division of 10Administration, including those administered by cooperative endeavor agreements, up to six 11percent of each line-item may be used for costs of administering the projects. 12 (c) For all projects in Capital Outlay Act or a previous Capital Outlay Act 13appropriated to the Department of Transportation and Development, up to six percent of 14each line-item may be used for costs of administering the projects, or for field 15engineering/construction supervision. 16 (2) Notwithstanding anything in this Act, or a previous Capital Outlay Act, the 17Office of Facility Planning and Control may enter into a cooperative endeavor agreement 18with the Archdiocese of New Orleans and Jefferson Parish for the Preservation and 19Restoration of Historic Structure for Hope Haven/Madonna Manor Campus, Planning and 20Construction project. 21 (C) Line-item general obligation bond projects appropriated to the Department 22of Transportation and Development in the Capital Outlay Act or a previous Capital Outlay 23Act shall be authorized to draw Transportation Trust Funds from the Highway Program 24appropriation, for supplemental funding on overruns in excess of the original estimated 25project cost as determined by the Department of Transportation and Development, provided 26however that said projects are in the state or federal highway system and in the priority 27program, and the overrun is less than $50,000. Any such overrun of $50,000 or more must 28be approved by the Joint Legislative Committee on the Budget. 29 (D) All ports, levee districts and other non-state entities must follow the 30provisions of R.S. 39:122. Page 135 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1 (E) Pursuant to R.S. 39:122(B)(2), funds to be reimbursed by the state which a 2non-state entity attempts to obligate prior to the receipt of funding shall not be eligible for 3reimbursement or payment by the state; however, 4 (1) Notwithstanding anything in this Act or any previous Capital Outlay Acts to 5the contrary, contracts may be entered into for the Lafayette Economic Development 6Authority, Lafayette Innovation Center (Lafayette) prior to the receipt of funding and the 7State is authorized to financially participate in obligations created by such contracts. 8 (2) Notwithstanding anything in this Act or the capital outlay act to the contrary, 9contracts may be entered into for the City of Broussard, Lake Talon Road Sewer 10Improvements, Planning and Construction project prior to receipt of funding and the State 11is authorized to financially participate in obligations created by such contracts. 12 (F) Pursuant to R.S. 39:112(E)(2), non-state entity projects shall require a match 13for each appropriation in this act ; however, 14 (G) Notwithstanding anything contained in this Act or the Capital Outlay Act to 15the contrary or any other Act or provision of law, the appropriations made for the Executive 16Department for facilities which promote economic development included in the Repair, 17Restoration, and Replacement for Declared Disasters, Planning, Construction, Renovation, 18and Acquisition project, and the Department of Economic Development projects are for 19public purposes pursuant to the provisions of Article VII, Section 14 of the Constitution of 20Louisiana primarily for economic development, including the generation of tax revenues, 21creation of jobs, promotion of tourism, and creation of facilities for charitable, cultural, 22artistic, educational, social, civic, research, service, economic development activities, or 23provide facilities for professional golf events, pursuant to the terms of cooperative endeavor 24agreements, including leases and all expenditures of these appropriations and may be 25exempted, by the Commissioner of Administration, from all statutes relative to public 26bidding, contractual review and the provisions of R.S. 33:9029.2(D) and in lieu thereof be 27allowed to use alternative competitive contracting arrangements where the appropriate 28administering entity submits documentation to the Commissioner of Administration 29substantiating that it is in the best interest of the citizens of the state, due to economic and/or 30operational benefits, and the necessity to complete the projects in a timely manner; and, the Page 136 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1appropriate administering entity shall have the authority to directly appoint the design 2professional from a list of a minimum of three design firms or joint ventures with the 3appropriate specialized facility design experience submitted to and acceptable to the 4Commissioner of Administration and shall be exempt from other state requirements for 5selection of designers, and may include expenditures for computers, fixtures, furniture, and 6other equipment as such is deemed to be capital outlay in nature, and unless the 7Commissioner of Administration is advised by bond counsel to the State that such may 8violate federal tax law, may be used to reimburse any expenditure made prior to the granting 9of a line of credit or the sale of bonds by the State Bond Commission, determination by the 10State Treasurer that cash funding has been deposited in the Comprehensive Capital Outlay 11Escrow Account for the project or the execution of a cooperative endeavor agreement from 12the Office of Facility Planning and Control, and may be used to acquire land or real property, 13the title to which is held in the name of an entity exempt from taxation under the provisions 14of 26 U.S.C. 501(c)(3). 15 (H) Notwithstanding any other provision of this Act or the Capital Outlay Act or 16any other provision of law to the contrary, all of the funds herein appropriated to the 17Department of Economic Development in connection with projects or programs for which 18the Department of Economic Development utilizes a cooperative endeavor agreement to 19further economic development as permitted under Article VII, Section 14 of the Louisiana 20Constitution, including the generation of tax revenues and creation of jobs, shall be 21considered as having been appropriated to the Department of Economic Development, may 22be used to reimburse any expenditure made prior to the granting of a line of credit and made 23prior to the execution of a cooperative endeavor agreement and shall be administered solely 24by the Department of Economic Development pursuant to, in compliance with, and on the 25terms contained in such cooperative endeavor agreements without compliance with any other 26law, including, but not limited to, the provisions of R.S. 39:101 through 128. Additionally, 27all expenditures of these appropriations may be exempted by the Commissioner of 28Administration, from all statutes relative to public bidding, contractual review and the 29provisions of R.S. 33:9029.2(D). Page 137 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1 (I)(1) Notwithstanding any other provision of this Act or the Capital Outlay Act 2or any other provision of law to the contrary, funds appropriated for the Economic 3Development Award Program project for the Office of Business Development are to be used 4solely for capital and infrastructure improvements subject to verification by the Division of 5Administration, Office of Facility Planning and Control. 6 (2) Eligible expenses for Economic Development Award Program funds may 7include documented project expenses beginning on the date of LEDC Board approval of the 8project and may be reimbursed upon execution of the cooperative endeavor agreement for 9the project. 10 (J)(1) Due to the state's current investment in TPC Louisiana and the financial 11support it provides to the PGA TOUR event currently played at said facility, said PGA 12TOUR event shall not be played at New Orleans City Park Golf Complex without the prior 13agreement of the Commissioner of Administration and the Chairman of the Jefferson Parish 14Council. 15 (2) Notwithstanding the foregoing, the City Park Golf Complex may host any 16other golf tournament or event, including but not limited to any other PGA-affiliated or 17sponsored tournament or event. 18 (K)(1) For all projects administered by the Office of Facility Planning and 19Control and payable from proceeds of self-generated revenues, funds shall be remitted to the 20Office of Facility Planning and Control for deposit in the state treasury at such time as may 21be deemed necessary by the Office of Facility Planning and Control in order to cover the 22amount of contracts or other project expenses. 23 (2) Notwithstanding any provisions contained herein or any other law to the 24contrary, for projects with other means of financing provided to the administering agency 25by interagency transfer, the authority to draw these funds shall remain with the user agency. 26 (3) Any revenue bonds appropriated in Section 1 or Section 1.(A) of the Capital 27Outlay Act shall not be secured by the full faith and credit of the state. 28 (4) The State Treasurer shall refund to the appropriate source any surplus self- 29generated funds, advanced insurance funds received by the Office of Facility Planning and 30Control as Interagency Transfer from Office of Risk Management associated with hurricane Page 138 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1damage recovery, and interest earned on these funds, provided the Treasurer's Office is 2notified, when these funds are deposited in the state treasury, that the user agency or Office 3of Risk Management intends to request a refund of this interest. 4 (L) Notwithstanding any provisions contained in this Act, the Capital Outlay Act, 5or any other provision of law to the contrary, any funds expended by the parish of St. Mary 6for the purpose of securing a federal grant, for the Infrastructure Improvements and 7Construction of a Welding Training Center Facility at the Charenton Canal Industrial Park, 8shall be eligible for reimbursement from any cash line of credit approved for the project. 9 (M) Notwithstanding anything contained in this Act to the contrary or any other 10provision of law, the resolution adopted by the Joint Legislative Committee on the Budget 11(the committee) on March 19, 2019 approving State of Louisiana Grant Anticipation 12Revenue Bonds, in one or more series, not exceeding $650,000,000, and approving the 13related projects and providing for other matters in connection therewith, contains the 14following approvals: 15 (1) The first series of bonds in the original principal amount of not exceeding 16$185,000,000 in order to fund the following projects in the following estimated amounts: 17Barksdale Project ($61,600,000) and portions of the Loyola Project ($77,600,000) and the 18I-10 Project ($30,601,000) with the understanding that the Department has the ability to 19manage the actual application of bond proceeds in order to appropriately fund the Projects 20and meet expenditure requirements of the Internal Revenue Service. 21 (2) The second series of bonds for the express purpose of granting the required 22contracts in the principal amount of approximately $142,000,000 in order to fund the 23following projects in the following estimated amounts: the balance of the Barksdale Project 24($16,518,000), the balance of the Loyola Project ($87,500,000), portions of the I-10 Project 25($37,982,000) and the Belle Chasse Project ($12,500,000) with the understanding that the 26Department has the ability to manage the actual application of Bond proceeds in order to 27appropriately fund the Projects and meet expenditure requirements of the Internal Revenue 28Service provided, however, the Department of Transportation and Development seeks 29approval from the Committee for the issuance of the second series of bonds and all 30subsequent series of bonds. Page 139 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1 (N) Notwithstanding anything contained in this Act to the contrary or any other 2provision of law, the Research Vessel (R/V) Pelican Replacement is deemed to be a capital 3asset and the appropriation to Louisiana Universities Marine Consortium (LUMCON) to 4replace the R/V Pelican is for a public purpose and has a significant economic impact 5providing a variety of oceanographic research missions. Further, LUMCON shall be 6permitted to use an alternative delivery method to award contracts for design of the proposed 7replacement vessel. LUMCON shall have the authority to select the design professional from 8a list of a minimum of two engineering firms or joint ventures with ship design experience 9acceptable to the Commissioner of Administration and the selection shall be exempt from 10other state requirements for the selection of designers. The design professional fee shall be 11in accordance with state guidelines administered by the Office of Facility Planning and 12Control, Division of Administration. LUMCON shall further be permitted to use an 13alternative delivery method to award contracts for the construction of the proposed 14replacement vessel. LUMCON shall have the authority to select the contractor from a list 15of a minimum of three highly qualified ship builders/shipyards with relevant vessel 16construction experience acceptable to the Commissioner of Administration and the selection 17shall be exempt from other state requirements for the selection of contractors. The 18construction contract shall be administered by the Office of Facility Planning and Control, 19Division of Administration in accordance with state guidelines. 20 (O) Notwithstanding anything contained in this Act to the contrary or any other 21provision of law, the appropriations for Major Repairs for Higher Education Facilities – 22Infrastructure, and Buildings Based on Statewide Condition Assessment, Planning and 23Construction, in Act 7 of 2008 identifying specific projects for higher education is deemed 24to be complete, and any remaining residual funds are hereby authorized to be combined and 25accumulated to accomplish additional major repair projects within the higher education 26systems, as deemed necessary and approved by the Board of Regents and Facility Planning 27and Control. At the completion of the program, Facility Planning and Control shall submit 28a report to the Joint Legislative Committee on the Budget concerning the use of the 29remaining residual funds. Page 140 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1 (P) Notwithstanding anything contained in this Act or any other provision of law, 2LSU Real Estate and Facilities Foundation (LRFF) is authorized to execute contracts for the 3University Lakes Restoration Project to Address Flood Control, Environmental, Safety, 4Health and Other Issues project prior to execution of a cooperative endeavor agreement, the 5granting of a line of credit or the sale of bonds. The appropriation for this project may be 6used to pay any obligation incurred or to reimburse any expenditure made pursuant to such 7contracts unless the Commissioner of Administration is advised by bond counsel to the state 8that such may violate federal tax law, after execution of a cooperative endeavor agreement. 9The Office of Facility Planning and Control shall consult with bond counsel to the State 10relative to any federal tax issues. Further, LRFF may use alternative competitive contracting 11arrangements with the prior approval of the Commissioner of Administration. 12 (Q) Notwithstanding anything contained in this Act to the contrary or any other 13provision of law, the USS KIDD DD-661, a World War II era Fletcher class destroyer and 14National Historic Landmark, is deemed to be a capital asset and the appropriation to the 15Louisiana Naval War Memorial Commission for Hull Repair & Reinforcement, 16Superstructure Repair, Interior Restoration & Painting and Docking Cradle Repairs & 17Upgrade is for a public purpose and will allow the vessel to continue to serve the citizens of 18Louisiana as a proven highly successful tourist attraction, educational institution, military 19memorial, patriotic ceremonial platform and documentary/theatrical film set. Further, the 20USS KIDD DD-661 the only surviving Fletcher class destroyer in her original WW2 21configuration and the restoration project requires special consideration in the selection of a 22restoration contractor and in the location and complete identification of the repairs to be 23performed. Therefore, the Louisiana Naval War Memorial Commission, through the Office 24of Culture, Recreation & Tourism, shall be permitted to use an alternative delivery method 25to award construction contract(s) for the proposed repairs and renovations to the USS KIDD 26and its cradle. The Louisiana Naval War Memorial Commission, through the Office of 27Culture, Recreation & Tourism, shall have the authority to select the contractor(s) from a list 28of a minimum of three highly qualified ship builders/shipyards with relevant restoration 29experience acceptable to the Commissioner of Administration and the selection shall be 30exempt from other state requirements for the selection of contractors. The construction Page 141 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1contract(s) shall be administered by the Office of Facility Planning and Control, Division 2of Administration in accordance with state guidelines and all restoration and repairs shall 3adhere to the U.S. Department of Interiors’ Standards for Historic Ship Preservation 4Projects. 5 (R) Pursuant to R.S. 39:102, each capital outlay budget request submitted as 6required by R.S. 39:101 shall include a detailed project description and justification for each 7new project requested; however, 8 (1) Notwithstanding anything contained in this Act or the Capital Outlay Act to 9the contrary or any other provision of law, the scope of the appropriations made in this or 10any other Capital Outlay Act for the New Orleans West Bank Park Improvements, New 11Soccer and Recreational Facilities project shall be deemed to include the George W. Carver 12Playground, Renovations and Upgrades project for the West Bank Park project. 13 (2) Notwithstanding anything contained in this Act or the Capital Outlay Act to 14the contrary or any other provision of law, the scope of the appropriations made in this or 15any other Capital Outlay Act for the Pointe Coupee Parish School Board Office Relocation, 16Due to Flooding Caused by Hurricane Gustav, Planning and Construction project shall be 17deemed to include that the School Board Office is to be Located at 8777 Morganza 18Highway. 19 (3) Notwithstanding anything in this Act, any previous capital outlay act, or other 20provision of law to the contrary, the scope of the appropriation for the Port of South 21Louisiana Globalplex Terminal Building #71 Upgrade project shall be deemed to also 22include similar upgrades for other Globalplex Terminal Buildings and a Heavy Load 23Capacity Foundation or Floor. 24 (4) Notwithstanding anything in this Act, any previous capital outlay act, or other 25provision of law to the contrary, monies appropriated herein for the Port of South Louisiana 26Globalplex Terminal Building #71 and Other Globalplex Terminal Building Upgrades, 27Planning and Construction may be expended for design fees related to the conveyor system 28and ancillary equipment that exceed the customary ten percent limitation on design fee costs. 29 (5) Notwithstanding anything in this Act, any previous capital outlay act, or other 30provision of law to the contrary, the scope of the appropriation for the Port of South Page 142 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1Louisiana Globalplex Dock Access Bridge and Equipment Replacement/Repair project shall 2be deemed to also include an Access Road. 3 (6) Notwithstanding anything in this Act, any previous capital outlay act, or other 4provision of law to the contrary, the scope of the appropriation for the Port of South 5Louisiana Globalplex Rail Siding project shall be deemed to also include a Rail Spur. 6 (7) Notwithstanding anything contained in this Act or the Capital Outlay Act to 7the contrary or any other provision of law, the scope of the appropriations made in this or 8any other Capital Outlay Act for the Pontchartrain Levee District Lake Pontchartrain West 9Shore Hurricane Protection, Planning and Construction project shall be deemed to include 10Ascension Parish. 11 (8) Notwithstanding anything contained in this Act or the Capital Act to the 12contrary or any other provision of law, the scope of the appropriation made in this or any 13other Capital Outlay Act for the Statewide Roofing Asset Management Program and 14Waterproofing, Related Repairs and Equipment Replacement Program project shall be 15deemed to include Peltier Hall at Nicholls State University. 16 (9) Notwithstanding anything contained in this Act or the Capital Act to the 17contrary or any other provision of law, the scope of the appropriation made in this or any 18other Capital Outlay Act for the Longview Road Improvements, Beauregard Parish Police 19Jury project shall be deemed to include Longville Road Improvements for the Beauregard 20Parish Police Jury. 21 (10) Notwithstanding anything contained in this Act to the contrary or any other 22provision of law, the capital outlay request with an appropriation for the Water Treatment 23Facility, Booster Pump Station, and Distribution System Improvements project for the City 24of Franklin shall be deemed to be submitted timely and is otherwise compliant with the 25provisions of R.S. 39:101 and R.S. 39:102 as the project was originally submitted on time, 26by August 31, 2022, for the Water Sector Program and such request together with supporting 27information and documents shall constitute the feasibility study required by Article VI, 28Section 11(C) of the Constitution of Louisiana. 29 (11) Notwithstanding anything contained in this Act to the contrary or any other 30provision of law, the capital outlay request with an appropriation for the Sewer Page 143 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1Rehabilitation project for the City of Morgan City shall be deemed to be submitted timely 2and is otherwise compliant with the provisions of R.S. 39:101 and R.S. 39:102 as the project 3was originally submitted on time, by August 31, 2022, for the Water Sector Program and 4such request together with supporting information and documents shall constitute the 5feasibility study required by Article VI, Section 11(C) of the Constitution of Louisiana. 6 (12) Notwithstanding anything contained in this Act to the contrary or any other 7provision of law, the capital outlay request with an appropriation for the Rehabilitation of 8Nine Sewer Lift Stations project for the City of Patterson shall be deemed to be submitted 9timely and is otherwise compliant with the provisions of R.S. 39:101 and R.S. 39:102 as the 10project was originally submitted on time, by August 31, 2022, for the Water Sector Program 11and such request together with supporting information and documents shall constitute the 12feasibility study required by Article VI, Section 11(C) of the Constitution of Louisiana. 13 (13) Notwithstanding anything contained in this Act to the contrary or any other 14provision of law, the capital outlay request with an appropriation for the Wastewater 15Treatment Plant Improvements project for the City of Westwego shall be deemed to be 16submitted timely and is otherwise compliant with the provisions of R.S. 39:101 and R.S. 1739:102 as the project was originally submitted on time, by August 31, 2022, for the Water 18Sector Program and such request together with supporting information and documents shall 19constitute the feasibility study required by Article VI, Section 11(C) of the Constitution of 20Louisiana. 21 (14) Notwithstanding anything contained in this Act to the contrary or any other 22provision of law, the capital outlay request with an appropriation for the Water Distribution 23System Improvements project for the City of Westwego shall be deemed to be submitted 24timely and is otherwise compliant with the provisions of R.S. 39:101 and R.S. 39:102 as the 25project was originally submitted on time, by August 31, 2022, for the Water Sector Program 26and such request together with supporting information and documents shall constitute the 27feasibility study required by Article VI, Section 11(C) of the Constitution of Louisiana. 28 (15) Notwithstanding anything contained in this Act or the Capital Act to the 29contrary or any other provision of law, the scope of the appropriation made in this or any 30other Capital Outlay Act for the JESTC Training Facility Improvements project shall be Page 144 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1deemed to include facilities at JESTC to accommodate a less than lethal training program 2utilizing mobile virtual training. 3 (16) Notwithstanding anything contained in this Act, any previous capital outlay 4act to the contrary, or any other provision of law, the scope of the appropriations made in 5this or any other capital outlay act for the Industrial Park Development project for New 6Roads shall be deemed to include underground electrical system upgrades. 7 (17) Notwithstanding anything contained in this Act, any previous capital outlay 8act to the contrary, or any other provision of law, the scope of the appropriations made in 9this or any other capital outlay act for the Lincoln Manner Subdivision Drainage project for 10Kenner shall be deemed to include 30 th Street Roadway and Drainage Improvements from 11Loyola Drive to Ohio Street. 12 (S) Notwithstanding anything contained in this Act to the contrary or any other 13provision of law, all non-state projects that include water systems in the scope of work shall 14also be required to include a rate study as part of the project. 15 (T) Notwithstanding anything contained in this Act or any other provision of law, 16the appropriations included herein identified as "Payable from State General Fund (Direct) 17Non-Recurring Revenues" are appropriated for the purpose of making supplemental capital 18outlay appropriations for Fiscal Year 2022-2023. 19 Section 9. Notwithstanding any provisions contained herein or any other law to 20the contrary, the provisions of Chapter 16 of Subtitle III of Title 39 of the Louisiana Revised 21Statutes of 1950 as amended, shall not apply to architectural and engineering contracts, 22administered by the office of facility planning and control, division of administration 23pursuant to this or any other capital outlay act. 24 Section 10. All funds appropriated herein to agencies administering capital outlay 25projects, on behalf of non-state entities, by cooperative endeavor agreements pursuant to this 26Act shall be expended within two (2) years from the date of the issuance of the bonds. 27Agencies administering capital outlay projects pursuant to a cooperative endeavor agreement 28shall notify the non-state entity of the date the bonds are issued within three (3) months from 29the issuance thereof. If the funds appropriated herein and administered under cooperative 30endeavor agreements pursuant to this Act are not totally expended within two (2) years from Page 145 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1the issuance of the bonds, the administering agency can close the project and recommend 2that the reallocation of any unexpended proceeds to any project contained in this Act or any 3previous Capital Outlay Acts. 4 Section 11. Notwithstanding any provisions contained herein or law to the 5contrary, the proceeds of revenue bonds to be utilized to fund certain projects authorized in 6Section 1. and Section 1.(A) hereof may, in accordance with Article VII, Section 9 of the 7Louisiana Constitution of 1974, be deposited in special accounts held outside the state 8treasury in accordance with the provisions of any bond resolution, indenture, reimbursement 9contract, or other bond or financing covenant which provides for the pledge of such funds 10in connection with the issuance of revenue bonds. For all projects administered by the office 11of facility planning and control, division of administration, authorized in Section 1. And 12Section 1.(A) hereof which are payable from the proceeds of revenue bonds, only the office 13of facility planning and control, division of administration, will be authorized to requisition 14funds from the special accounts described immediately above, at such time or times as may 15be deemed necessary by the office of facility planning and control, division of 16administration, in order to cover contract amounts or other project expenses. 17 Section 12. The governor shall have the power to veto any line-item in this Act. 18 Section 13. Except as otherwise provided herein, no funds shall be expended on 19any highway projects on highways within the state highway system as established in R.S. 2048:191 under the jurisdiction of the Department of Transportation and Development unless 21and until such project is in the Highway Program, R.S. 48:228 through 232, approved by the 22Joint Legislative Committee on Transportation, Highways and Public Works. Pursuant to 23R.S. 49:214.6.2(B), no integrated coastal protection construction project shall be undertaken 24with funds included in this bill except those included in an annual plan finally approved by 25the legislature in accordance with the provisions of R.S. 49:214.5.3. No funds appropriated 26to the Coastal Protection and Restoration Authority in this Act as a contribution for a project 27cost-share or otherwise, for the national economic development and national ecosystem 28restoration components of the Southwest Coastal Louisiana Study shall be used or provided 29for the expropriation of property or use of eminent domain, except where such funds are to 30be used to obtain property voluntarily offered for project purposes, where at least seventy- Page 146 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 1five percent of the owners have voluntarily offered the property, or where the record or 2apparent owners have voluntarily offered the property but do not have clear title. 3 Section 14. The word "statewide" used in place of the specific parish designation 4for projects contained in this Act indicates that the project or program is applicable to all 5sixty- four parishes in the state. The description of any project in this Act shall be deemed 6to include planning, design, master planning, studies, permits, surveys, testing, construction, 7land and/or building/improvement acquisition, reconstruction, renovation, repair, right-of- 8way and utilities, site and other improvements, miscellaneous/contingencies, lease hold 9improvements ultimately owned by the state or a political subdivision of the state, equipment 10and other acquisitions, and any other component of the project if such are included or 11indicated in the capital outlay request for such projects required by R. S. 39:101 subject to 12the provisions of Title 39 of the Louisiana Revised Statutes of 1950. For new construction 13or renovation projects, equipment or other acquisitions, which can reasonably be considered 14necessary for the facility to be functional, may be deemed to be included in the project, even 15if such equipment or other acquisitions are not included or indicated in the project name or 16the capital outlay request. When local or federal match is referenced in a project title, but 17only a portion of the state appropriation is granted a line of credit or otherwise funded, then 18the amount of local or federal match, required to be made available, may be prorated relative 19to the amount of state appropriation made available through lines of credit. 20 Section 15. The provisions, items, and projects contained in this Act are severable 21and if any provision, item, or project contained herein, or the application of any such 22provision, item, or project, is held invalid, such invalidity shall not affect other provisions, 23items, projects, or applications of the Act which can be given effect without the invalid 24provision, project, item, or application. 25 Section 16. Notwithstanding any other provisions of law to the contrary, the state 26shall not grant cash lines of credit, or authorize or issue general obligation bonds in a 27principal amount in excess of $1,451,887,938 for Fiscal Year 2023-2024. 28 Section 17. Notwithstanding any contrary provision of this Act or any contrary 29provision of law, no funds appropriated by this Act shall be released or provided to any 30recipient of an appropriation made in this Act if, when, and for as long as, the recipient fails Page 147 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 Federal Funds $164,814,831 Federal Funds via Interagency Transfer $76,471,000 Coastal Protection and Restoration Fund $117,401,878 Natural Resources Restoration Trust Fund $444,000,000 Transportation Trust Fund (TTF) - Regular $459,874,794 Transportation Trust Fund (TTF) - Federal $984,550,550 Transportation Trust Fund (TTF) - Construction Subfund $190,300,000 Megaprojects Leverage Fund $200,000,000 State Highway Improvement Fund $33,400,000 Capital Outlay Savings Fund $49,927,000 Interagency Transfers $93,989,400 Fees and Self-Generated Revenues $132,500,000 Re-appropriated Cash $1,039,496 Revenue Bonds $205,000,000 Interest Earnings $900,000 State General Fund (Direct) Non-Recurring Revenues $421,645,085 TOTAL CASH PORTION $3,575,814,034 1or refuses to comply with the provisions of R.S. 24:513. No recipient shall be considered to 2fail or refuse to comply with the provisions of R.S. 24:513 pursuant to this Section during 3any extension of time granted by the legislative auditor to the recipient to comply. 4 Section 18. This Act shall become effective upon signature by the governor or, 5if not signed by the governor, upon expiration of the time for bills to become law without 6signature by the governor, as provided in Article III, Section 18 of the Constitution of 7Louisiana. If vetoed by the governor and subsequently approved by the legislature, this Act 8shall become effective on the day following such approval. DIGEST The digest printed below was prepared by House Legislative Services. It constitutes no part of the legislative instrument. The keyword, one-liner, abstract, and digest do not constitute part of the law or proof or indicia of legislative intent. [R.S. 1:13(B) and 24:177(E)] HB 2 Re-Reengrossed 2023 Regular Session Bishop Provides for the capital outlay budget and program for FY 2023-2024; provides for the funding of the capital outlays from the specified sources of monies in the specified amounts as follows: Authorizes the funding of certain capital outlay projects from the sale of general obligation bonds for the projects delineated as follows: Priority 1 $1,491,847,071 Priority 2 $91,218,000 Priority 5 $5,548,377,652 TOTAL GENERAL OBLIGATION BONDS $7,131,442,723 Page 148 of 149 HLS 23RS-378 RE-REENGROSSED HB NO. 2 BONDS NRP $2,800,463 GRAND TOTAL OF ALL MEANS OF FINANCING $10,710,057,220 Effective upon signature of the governor or lapse of time for gubernatorial action. Summary of Amendments Adopted by House The Committee Amendments Proposed by House Committee on Ways and Means to the original bill: 1. Change General Obligation Bond funding as follows: Priority 1 $ 85,733,315 Priority 2 $ 24,055,000 Priority 5 $ 1,105,239,965 The Committee Amendments Proposed by House Committee on Appropriations to the engrossed bill: 1. Change the cash portion as follows: State General Fund (Direct) Non-Recurring Revenues $ 50,833,250 State General Fund (Direct) $ (340,000,000) Capital Outlay Savings Fund $ 42,535,000 Fees and Self-Generated Revenues $ 1,000,000 Interagency Transfers $ 10,000,000 Transportation Trust Fund (TTF) - Regular $ 427,900,000 Transportation Trust Fund (TTF) - Federal $ 984,550,550 Transportation Trust Fund (TTF) - Construction Subfund$ 40,300,000 Federal Funds $ 4,500,000 State Highway Improvement Fund $ 33,400,000 The House Floor Amendments to the reengrossed bill: 1. Change General Obligation Bond funding as follows: Priority 1 $ 24,250,000 Priority 2 $ (2,490,000) Priority 5 $ 95,745,000 2. Change the cash portion as follows: State General Fund (Direct) Non-Recurring Revenues $ 240,000 Capital Outlay Savings Fund $ 7,392,000 Revenue Bonds $ 84,722,000 Page 149 of 149