Louisiana 2024 2024 Regular Session

Louisiana House Bill HB2 Engrossed / Bill

                    HLS 24RS-411	ENGROSSED
2024 Regular Session
HOUSE BILL NO. 2
BY REPRESENTATIVE EMERSON
CAPITAL OUTLAY:  Provides for the comprehensive Capital Outlay budget
1	AN ACT
2To provide with respect to the capital outlay budget and the capital outlay program for state
3 government, state institutions, and other public entities; to provide for the
4 designation of projects and improvements; to provide for the financing thereof
5 making appropriations from certain sources; and to provide for related matters.
6Be it enacted by the Legislature of Louisiana:
7 Section 1.  The following sums or so much thereof as may be necessary are
8hereby appropriated out of any monies in the state treasury from the sources specified, from
9federal funds and self-generated revenues belonging to the state of Louisiana and/or
10collected by boards, commissions, departments, and agencies thereof, all for making capital
11outlay and for the purposes and in the amounts specified herein for the Fiscal Year
12commencing July 1, 2024, and ending June 30, 2025, subject to the conditions thereafter
13provided:
14 A project with funding payable from General Obligation Bonds Priority 1
15indicates that the funding for the project includes the reauthorization of funding which was
16previously granted as a line of credit by the State Bond Commission in Fiscal Year 2023-
172024. As used in this Section, the term "general obligation bonds" means state general
18obligation bonds or other evidences of indebtedness payable from the Bond Security and
19Redemption Fund. The amount set forth in this Section opposite each project, or so much
20thereof as may be necessary, is hereby appropriated and payable from the source of funding
21indicated; provided, however, amounts appropriated and payable from federal funds may be
Page 1 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1encumbered or expended only to the extent such amounts shall have been committed or
2received.  Pursuant to the provisions of R.S. 39:82, funds for planning, acquisition,
3construction, and major repair projects appropriated by this Act may be retained until
4completion of the project, even if no bona fide liability exists on the last day of the fiscal
5year.
6 This Act shall constitute the comprehensive state capital outlay budget for the
72024-2025 Fiscal Year. Projects set forth which are payable from the proceeds available
8from the sale of general obligation bonds shall have the priorities as indicated. The Request
9for Line of Credit form used by the attorney general and Bond Counsel in evaluating
10Louisiana Constitutional, Internal Revenue Code, and applicable income tax regulations
11shall be filed with the commissioner of administration, State Bond Commission, and state
12attorney general. No general obligation bond cash lines of credit shall be granted to fund any
13lower priority project prior to the granting of general obligation bond cash lines of credit to
14fund all higher priority projects (the "general rule"), except as hereinafter provided.  This
15prohibition against funding a lower priority project shall not apply upon a showing of an
16impossibility or impracticality either to proceed with all unfunded higher priority projects
17or to proceed with the funding of such projects or any part thereof through the issuance of
18general obligation bonds for any reason. Such showing shall be stated in reasonable detail
19in a certificate or certificates signed by the state agency responsible for administering the
20funding, and filed with the commissioner of administration and the State Bond Commission
21(hereinafter referred to as "the Commission").  Upon a determination by the Commission
22that proceeding with such a project or the funding thereof through the issuance of general
23obligation bonds is impractical or impossible, the Commission may then proceed with the
24sale of general obligation bonds or the granting of cash lines of credit without regard to the
25priority of the unfunded projects determined to be impossible or impractical.
26 Upon recommendation by the state agency responsible for administering the
27funding, if it is determined at any time that proceeding with the project or with the funding
28thereof is no longer impossible or impractical, the State Bond Commission may rescind the
29certificate of impossibility or impracticality and may proceed with the project or with the
30issuance of general obligation bonds or the granting of cash lines of credit to fund the
Page 2 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1project. Alternatively, the Interim Emergency Board (hereinafter referred to as "the Board"),
2upon reviewing certificates as described above and determining that proceeding with such
3projects or the funding thereof through the issuance of general obligation bonds is
4impossible or impractical, may designate a lower priority for such projects.  The Board's
5determination and lower priority designation shall be submitted to the members of the
6legislature for their approval in accordance with the provisions of Chapter 3-B of Subtitle
7I of Title 39 of the Louisiana Revised Statutes of 1950.  In accordance with the provisions
8of Chapter 3-B of Subtitle I of Title 39 of the Louisiana Revised Statutes of 1950, whenever
9at the written request of the appropriate legislators and agency, the Board determines that
10an adjustment to a project description originally set forth in such capital budget adopted by
11the legislature for a current fiscal year is necessary to correct a mistake in a project
12description, clarify a description, change the scope of a description, or make any other
13adjustment the Board deems necessary to implement the purpose of the project, such
14adjustment shall become effective only upon the approval by majority vote of the elected
15members of each house of the legislature in the manner provided for in Chapter 3-B of
16Subtitle I of Title 39 of the Louisiana Revised Statutes of 1950.
17 If such approval is granted, notification by the chair or secretary of the Board of
18the results of the balloting shall be transmitted to the State Bond Commission, which may
19then proceed with the sale of general obligation bonds or the granting of cash lines of credit
20for each change approved upon request of the commissioner of administration in accordance
21with the general rule.
22 With respect to Priorities 1 through 5, a lower priority project may be moved to
23a higher priority only upon a showing of an emergency or other cause not reasonably
24anticipated by the legislature, which shall be stated in reasonable detail in a certificate signed
25by the head of the appropriate department, political subdivision, or agency and filed with the
26commissioner of administration and the Board. Upon a determination by the Board that such
27project should be moved to a higher priority because of an emergency or other cause not
28reasonably anticipated by the legislature, the Board shall designate a higher priority to the
29project.  The matter then shall be submitted to and be subject to the same approval by the
30members of the legislature in the manner previously indicated in this Section.  If such
Page 3 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1approval is granted, notification by the chair or secretary of the Board of the change of
2priority shall be transmitted to the State Bond Commission, which then upon request of the
3commissioner of administration, may proceed with the sale of general obligation bonds or
4the granting of cash lines of credit in accordance with the general rule. As to projects within
5a priority, the State Bond Commission acting on requests submitted by the commissioner of
6administration shall determine when such project, or phases thereof, shall be funded.  In
7making such determination, the State Bond Commission shall consider the amount of
8proceeds of general obligation bonds to be made available in light of money and capital
9market conditions; the expenditure requirements of the project; the time required for
10architectural plans and drawings, public bidding, and site acquisition and preparation;
11availability of receipt of federal monies; litigation affecting the undertaking or completion
12of a project; federal tax laws and regulations regarding the sale of municipal bonds; and
13other items of a similar nature bearing upon the possibility or the necessity to commence a
14project or any particular phase thereof.
15 Any other provision of this Act to the contrary notwithstanding, projects
16described in Priority 5 of this Act shall not be moved to a higher priority except upon one
17of the following conditions: (1) Funding is necessary to complete or additionally fund a
18project located elsewhere in the Capital Outlay Act. Determination of such condition shall
19be made by the head of the appropriate department or agency by means of a certificate to
20that effect filed with the Interim Emergency Board, who shall, by mail ballot, request
21approval of such change and if approved by a majority of each house of the legislature it
22shall be funded, or (2) unless required by an emergency or other cause not reasonably
23anticipated by the legislature, to be in accordance with procedures set forth in this Section.
24However, the State Bond Commission may authorize a non-cash line of credit for any
25project in Priority 5 which represents that portion of construction contracts which were let
26during a previous fiscal year, or construction contracts which will be let during the current
27fiscal year, but which will not require cash expenditures during the year.  Such non-cash
28lines of credit, when combined with previously sold bonds or with higher priority bonds or
29lines of credit, or with funds appropriated from other sources, will provide sufficient
Page 4 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1appropriated funds to award equipment or construction contracts. Contracts shall not be
2awarded without approval of the division of administration.
3 Upon approval by the State Bond Commission, and subject to compliance with
4its policies and procedures and the procedures set forth herein, a line of credit providing for
5the use of funds in anticipation of the sale of general obligation bonds may be granted to the
6appropriate administering agency or department from the Comprehensive Capital Outlay
7Escrow Account, or if there is not a sufficient amount available in such account, from other
8available state cash in the state treasury, for capital improvement projects for which bond
9proceeds are appropriated by a current capital budget, prior to the actual issuance of bonds
10for such projects, unless the attorney general advises that an impediment exists to the valid
11issuance of the bonds on the date such line of credit is granted.
12 All bonds that are to be repaid, in whole or in part, by revenues generated by the
13project shall be designated as "Reimbursement Bonds.” The State Bond Commission shall
14enter into such agreements as are necessary to provide that the agency or subdivision, whose
15project is reimbursable, shall pay the bond debt costs into the Bond Security and Redemption
16Fund.  Such costs may be paid annually or at the end of the term of the bonds issued as
17determined by the State Bond Commission.
18 Priority 1 general obligation bond funding shall be limited to:
19 (1)  Projects and amounts which were previously authorized by Act 465 of the
202023 Regular Session of the Legislature; and which were granted cash lines of credit by the
21State Bond Commission.  The bonds to fund these projects were not sold in Fiscal Year
222023-2024.
23 (2)  The reauthorization of the portion of the outstanding Fiscal Year 2023-2024
24Priority 5 Non-Cash Lines of Credit for projects which will require cash expenditures in
25Fiscal Year 2024-2025 and therefore must be converted to Cash Lines of Credit in Fiscal
26Year 2024-2025.
27 (3)  Commitments made in the Higher Education Desegregation Settlement
28Agreement.
29 Priority 2 general obligation bond projects are for the completion of plans and
30specifications, land acquisition, site preparation, or for construction which will begin during
Page 5 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1the fiscal year.  It is presently anticipated that the listed projects will require the sale of
2bonds or extension of lines of credit during the fiscal year after adoption of this Act.
3 Priority 3 general obligation bond projects are for the preparation of plans and
4specifications, land acquisition, site preparation, or for construction and shall be limited to
5funding for the portion of construction contracts which will not require cash expenditures
6during the fiscal year. The projects in this category shall be considered future year projects
7in the state's five-year capital outlay plan. It is presently anticipated that the listed projects
8will not require the sale of bonds or extension of lines of credit during the fiscal year.
9 Priority 4 general obligation bond projects are for the preparation of plans and
10specifications, land acquisition, site preparation, or for construction and shall be limited to
11funding for the portion of construction contracts which will not require cash expenditures
12during the fiscal year. The projects in this category shall be considered future year projects
13in the state's five-year capital outlay plan. It is presently anticipated that the listed projects
14will not require the sale of bonds or extension of lines of credit during the fiscal year.
15 Priority 5 general obligation bond funding shall be limited to funding for the
16portion of construction contracts which will not require cash expenditures during the fiscal
17year. These funds, when combined with previously sold bonds or with higher priority bonds
18on lines of credit, or with funds appropriated from other sources, will provide sufficient
19appropriated funds to award contracts. Non-cash lines of credit shall be required prior to the
20award of these contracts.
21 In accordance with the cash management plan adopted pursuant to R.S.
2248:251(D) and the provisions of Act 161 of the 1998 First Extraordinary Session, the
23Department of Transportation and Development is authorized to enter into contracts or
24agreements for projects approved pursuant to the Highway Priority Program, Airport
25Construction and Development Priority Program, Port Construction and Development
26Priority Program, and Statewide Flood Control Program for projects bid and awarded,
27authorized, or commenced during the fiscal year which do not require cash expenditures for
28the full contract or agreement amount.
Page 6 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1	EXECUTIVE DEPARTMENT
201/107DIVISION OF ADMINISTRATION
3(572214)Exterior Waterproofing and Repairs, Chief Justice 
4 Pascal F. Calogero, Jr. Courthouse, Planning and 
5 Construction
6 (Orleans)
7 Payable from General Obligation Bonds
8	Priority 1	$ 9,999,834
9(572664)State Office Buildings Major Repairs, Equipment 
10 Replacement, and Renovations, Planning and 
11 Construction
12 (Statewide)
13 Payable from General Obligation Bonds
14	Priority 5	$12,110,000
15(572703)State Capitol Repair/Replace East Plaza Deck/Roof, 
16 Planning and Construction
17 (East Baton Rouge)
18 Payable from General Obligation Bonds
19	Priority 1	$ 600,000
20	Priority 5	$ 6,100,000
21 Total	$ 6,700,000
22(572705)Pentagon Barracks Repair/Restore/Replace Equipment, 
23 Planning and Construction
24 (East Baton Rouge)
25 Payable from General Obligation Bonds
26	Priority 5	$ 6,000,000
27(572706)Pentagon Barracks Repair Brick Walls/Mitigate Rising 
28 Damp, Planning and Construction
29 (East Baton Rouge)
30 Payable from General Obligation Bonds
31	Priority 1	$ 3,000,000
32	Priority 5	$24,900,000
33 Total	$27,900,000
34(572709)Exterior Waterproofing at State Capitol Building, 
35 Planning and Construction
36 (East Baton Rouge)
37 Payable from General Obligation Bonds
38	Priority 1	$10,000,000
39	Priority 5	$105,500,000
40 Total	$115,500,000
41(572868)Security System Replacement, Chief Justice 
42 Pascal F. Calogero, Jr. Courthouse. Planning and 
43 Construction
44 (Orleans)
45 Payable from Interagency Transfers	$ 480,000
Page 7 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(573689)Major Repairs, Equipment Replacement and 
2 Renovations for State Buildings to Address 
3 Deferred Maintenance Backlog and Infrastructure, 
4 Planning and Construction
5 (Statewide)
6 Payable from Interagency Transfers	$25,000,000
7 Payable from State General Fund (Direct) Non-Recurring
8 Revenues	$13,070,000
9 Payable from Fees and Self-Generated Revenues $10,000,000
10 Payable from Federal Funds via Interagency Transfers $10,000,000
11 Total	$58,070,000
12(573786)Community Water Enrichment Program
13 (Statewide)
14 Payable from General Obligation Bonds
15	Priority 5	$11,000,000
16 Payable from State General Fund (Direct) Non-Recurring
17 Revenues	$10,000,000
18 Total	$21,000,000
19(573787)Local Government Assistance Program
20 (Statewide)
21 Payable from General Obligation Bonds
22	Priority 5	$10,000,000
23 Payable from State General Fund (Direct) Non-Recurring
24 Revenues	$10,000,000
25 Total	$20,000,000
26(573788)Americans with Disabilities Act Implementation for 
27 State Facilities, Planning and Construction
28 (Statewide)
29 Payable from Interest Earnings	$ 5,000,000
30(573789)Statewide Roofing Asset Management Program and 
31 Waterproofing, Related Repairs and Equipment 
32 Replacement Program
33 (Statewide)
34 Payable from State General Fund (Direct) Non-Recurring
35 Revenues	$ 5,000,000
36 Payable from Interagency Transfers	$10,000,000
37 Payable from Fees and Self-Generated Revenues $10,000,000
38 Payable from Federal Funds via Interagency Transfers $10,000,000
39 Total	$35,000,000
40(573790)Repair, Restoration and Replacement for Declared 
41 Disasters, Planning, Construction, Renovation, 
42 and Acquisition
43 (Statewide)
44 Payable from General Obligation Bonds
45	Priority 1	$64,032,573
46	Priority 5	$53,000,000
47 Payable from Fees and Self-Generated Revenues $ 5,000,000
48 Payable from Federal Funds via Interagency Transfers $25,000,000
49 Payable from the balance of State General Fund (Direct)
50 previously allocated under the authority of Act 203 of
51 2007 for Mental Health Area C, New Psychiatric Hospital
52 at Central Louisiana State Hospital (Rapides), Act 29 of
53 2018 for LSU Baton Rouge, French House Renovation,
54 Acquisition, Planning and Construction (East Baton
55 Rouge), Act 20 of 2019 for LA. Educational Television
Page 8 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1 Authority, LONI (Louisiana Optical Network
2 Infrastructure) Core Equipment Replacement (Statewide),
3 Act 117 of 2022 for Morgan City Harbor and Terminal
4 District, Berwick Bay Dredge Material Beneficial Use
5 Project, Planning and Construction (St. Mary), Act 20 of
6 2019 for Jefferson Parish, Upper Kraak Ditch Drainage
7 Pump Station Pump Replacement and Generator
8 Installation (Jefferson), Act 485 of 2021 for Lafayette
9 Parish, Cypress Island Swamp Spoil Bank Removal,
10 Planning and Construction (Lafayette, St. Martin), Act 20
11 of 2019 for Natchitoches Parish, Resurfacing of Roads in
12 Payne Subdivision, Planning and Construction
13 (Natchitoches), Act 20 of 2019 for Sabine Parish, Water
14 Treatment and Supply System Study (Sabine), Act 29 of
15 2018 for St. Mary Parish, Rehabilitation and Conversion
16 of MC Sheriff Building to Sheriff Regional Operation and
17 Training Center for St. Mary Parish Government,
18 Planning and Construction (St. Mary), Act 29 of 2018 for
19 Natchitoches, South Natchitoches Drainage
20 Improvements, including Adjacent Roadwork, Planning
21 and Construction (Natchitoches), Act 29 of 2018 for
22 Thibodaux, LA Hwy 20 (N. Canal Blvd.) Widening,
23 Planning and Construction  (Lafourche), Act 485 of 2021
24 for St. Martin Economic Development Authority, North
25 Business Park, Planning and Construction (St. Martin),
26 Act 20 of 2019 for Baton Rouge Recreation and Parks
27 Commission, Cadillac Street Park Site Improvements
28 (East Baton Rouge), Act 29 of 2018 for Horseshoe Road
29 Water System, Inc., Horseshoe Water System, Planning
30 and Construction (Webster), Act 2 of 2020 for Livingston
31 Parish School Board, Widening and Turn Lane
32 Construction for LA Hwy 16 as Part of the New
33 Southside Elementary and Jr. High Schools 
34 (Livingston)	$ 2,715,682
35 Total	$149,748,255
36(573791)Outstanding Percent for Arts Projects
37 (Statewide)
38 Payable from General Obligation Bonds
39	Priority 1	$ 1,769,156
40	Priority 5	$ 4,000,000
41 Total	$ 5,769,156
4201/109COASTAL PROTECTION AND RESTORATION AUTHORITY
43(572552)Coastal Protection Projects, Planning and Construction
44 (Statewide)
45 Payable from General Obligation Bonds
46	Priority 1	$12,220,000
47	Priority 5	$262,500,000
48 Payable from Interagency Transfers	$ 1,000,000
49 Payable from Coastal Protection and Restoration
50 Fund	$96,781,486
51 Payable from Federal Funds	$465,147,320
52 Total	$837,648,806
53Provided, however that $220,000 of the Priority 1 appropriation, and $4,500,000 of the
54Priority 5 appropriation from General Obligation Bonds be used for the South Slidell –
55Fritchie Coastal Resilience, Planning and Construction project in St. Tammany Parish.
Page 9 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1Provided, however that $4,500,000 of the Priority 5 appropriation from General Obligation
2Bonds be used for the Military Road Flood Risk Reduction, Planning and Construction
3project in St. Tammany Parish.
4Provided, however that $1,500,000 of the Priority 1 appropriation, and $3,000,000 of the
5Priority 5 appropriation from General Obligation Bonds be used for the Eden Isle Roadway
6Infrastructure Flood Resilience, Planning and Construction project in St. Tammany Parish.
7Provided, however that $10,000,000 of the Priority 5 appropriation from General Obligation
8Bonds shall be used for the Bayou Lafourche Freshwater District for the Construction of the
9Pumping Capacity Improvements, Phase I project.
10(572553)Atchafalaya Basin Protection and Enhancement 
11 (Federal Match and Local/Sponsor Match)
12 (Assumption, Avoyelles, Iberia, Iberville, 
13 Pointe Coupee, St. Landry, St. Martin, St. Mary)
14 Payable from General Obligation Bonds
15	Priority 1	$ 4,000,000
16	Priority 5	$ 4,000,000
17 Total	$ 8,000,000
18(572554)Morganza to Gulf of Mexico Flood Control Feasibility 
19 Study, Planning, Design, Right-of-Way and Construction 
20 of Levees, Floodgates and Other Flood Control Systems 
21 ($100,000,000 Local Match)
22 (Ascension, Assumption, Iberia, Iberville, Lafourche, 
23 Pointe Coupee, St. Martin, St. Mary, Terrebonne, 
24 West Baton Rouge)
25 Payable from General Obligation Bonds
26	Priority 5	$79,500,000
27(572558)Larose to Golden Meadow Hurricane Protection 
28 Project, Planning and Construction
29 (Lafourche)
30 Payable from General Obligation Bonds
31	Priority 5	$20,000,000
32(572565)Union Diversion Project, Planning and Construction
33 (Ascension, Livingston, St. James, St. John the Baptist)
34 Payable from General Obligation Bonds
35	Priority 1	$ 2,350,000
36	Priority 5	$20,000,000
37 Total	$22,350,000
3801/112DEPARTMENT OF MILITARY AFFAIRS
39(572021)Renovation Cadet Barracks Buildings 605, 606, 608, 
40 Youth Challenge Program, Louisiana National Guard 
41 Training Center Pineville, Pineville, Louisiana
42 (Rapides)
43 Payable from General Obligation Bonds
44	Priority 1	$ 900,000
45(572022)Renovate-Upgrade Cadet Barracks Building 131, 132, 
46 and 133, Youth Challenge Program, Camp Minden, 
47 Minden, Louisiana
48 (Webster)
49 Payable from General Obligation Bonds
50	Priority 1	$ 700,000
Page 10 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(572027)Renovate-Upgrade Cadet Barracks Buildings 18, 21, 
2 22, 23, and 24, Youth Challenge Program (YCP), 
3 Carville, Louisiana
4 (Iberville)
5 Payable from General Obligation Bonds
6	Priority 1	$ 91,907
7(572029)Gillis W. Long Center, Water, Fire, and Sewage 
8 Line Upgrades, Carville, Louisiana
9 (Iberville)
10 Payable from General Obligation Bonds
11	Priority 1	$ 2,280,189
12 Payable from Federal Funds	$ 200,000
13 Total	$ 2,480,189
14(572031)Bastrop Readiness Center Modernization
15 (Morehouse)
16 Payable from General Obligation Bonds
17	Priority 5	$ 676,000
18 Payable from State General Fund (Direct) Non-Recurring
19 Revenues	$ 59,000
20 Payable from Federal Funds	$ 2,200,000
21 Total	$ 2,935,000
22(572032)Gonzales Readiness Center Modernization
23 (Ascension)
24 Payable from Federal Funds	$ 2,200,000
25(572033)Plaquemine Readiness Center Modernization
26 (Iberville)
27 Payable from Federal Funds	$ 2,200,000
28(572034)Thibodaux Readiness Center Modernization
29 (Lafourche)
30 Payable from General Obligation Bonds
31	Priority 5	$ 617,000
32 Payable from State General Fund (Direct) Non-Recurring
33 Revenues	$ 59,000
34 Payable from Federal Funds	$ 2,023,000
35 Total	$ 2,699,000
36(572036)Statewide Backlog of Maintenance and Repair 
37 (BMAR), Phase 3, and Statewide Infrastructure 
38 Rehabilitation, Phase 3
39 (Statewide)
40 Payable from General Obligation Bonds
41	Priority 5	$19,600,000
42 Payable from State General Fund (Direct) Non-Recurring
43 Revenues	$ 4,250,000
44 Payable from Federal Funds	$22,000,000
45 Total	$45,850,000
46(572037)Louisiana National Guard Readiness Center Complex, 
47 Abbeville LA, Planning and Construction
48 (Vermilion)
49 Payable from General Obligation Bonds
50	Priority 1	$ 5,666,600
51	Priority 5	$ 2,350,000
52 Payable from Federal Funds	$16,925,500
53 Total	$24,942,100
Page 11 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(572039)New Administration, Emergency Operations and 
2 Warehouse Building, Planning and Construction
3 (Rapides)
4 Payable from State General Fund (Direct) Non-Recurring
5 Revenues	$ 620,000
6(572040)Louisiana National Guard Readiness Center 
7 Replacement, Lafayette LA, Planning and Construction
8 (Lafayette)
9 Payable from General Obligation Bonds
10	Priority 1	$ 7,081,580
11 Payable from State General Fund (Direct) Non-Recurring
12 Revenues	$ 4,555,713
13 Payable from Federal Funds	$33,995,719
14 Total	$45,633,012
15(572041)Louisiana National Guard Training Center Pineville Road 
16 Network Rehabilitation
17 (Rapides)
18 Payable from General Obligation Bonds
19	Priority 1	$ 1,522,956
2001/124LOUISIANA STADIUM AND EXP OSITION DISTRICT
21(573250)Bayou Segnette Recreation Complex, Land 
22 Acquisition, Planning and Construction
23 (Jefferson)
24 Payable from General Obligation Bonds
25	Priority 1	$19,680,848
26 Payable from State General Fund (Direct) Non-Recurring
27 Revenues	$ 5,000,000
28 Total	$24,680,848
29(573256)Zephyr Field Improvements, Planning and Construction
30 (Jefferson)
31 Payable from General Obligation Bonds
32	Priority 1	$ 5,000,000
33	Priority 5	$ 5,000,000
34 Total	$10,000,000
35	DEPARTMENT OF VETERANS AFFAIRS
3603/130DEPARTMENT OF VETERANS AFFAIRS
37(573113)Northeast Louisiana Veterans Cemetery Administration 
38 Building Expansion, Planning and Construction
39 (Richland)
40 Payable from Interagency Transfers	$ 215,115
4103/134SOUTHWEST LOUISIANA WAR VETERANS HOME
42(573161)Reconstruct Communal Shower Rooms and Isolation 
43 Shower Rooms/Bathrooms, Planning and Construction
44 (Jefferson Davis)
45 Payable from State General Fund (Direct) Non-Recurring
46 Revenues	$ 200,000
Page 12 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
103/136SOUTHEAST LOUISIANA WAR VETERANS HOME
2(573370)Pond Restoration, Planning and Construction
3 (St. John the Baptist)
4 Payable from State General Fund (Direct) Non-Recurring
5 Revenues	$ 600,000
6 Payable from Federal Funds via Interagency Transfers $ 540,000
7 Total	$ 1,140,000
8	ELECTED OFFICIALS
904/139SECRETARY OF STATE
10(572310)Old State Capitol Exterior Repairs, Planning and 
11 Construction
12 (East Baton Rouge)
13 Payable from General Obligation Bonds
14	Priority 1	$ 5,000,000
15	Priority 5	$ 2,400,000
16 Total	$ 7,400,000
17(572311)Old Governor's Mansion Repairs and Renovation
18 (East Baton Rouge)
19 Payable from General Obligation Bonds
20	Priority 1	$ 300,000
21	DEPARTMENT OF ECONOMIC DEVELOP MENT
2205/252OFFICE OF BUSINESS DEVELOPMENT
23(572906)Economic Development Award Program for Infrastructure 
24 Assistance
25 (Statewide)
26 Payable from General Obligation Bonds
27	Priority 5	$ 5,000,000
28 Payable from State General Fund (Direct) Non-Recurring
29 Revenues	$ 5,000,000
30 Total	$10,000,000
31(572907)NIRC Iberia BioInnovation Accelerator GMP CDMO 
32 Planning and Construction
33 (Iberia)
34 Payable from General Obligation Bonds
35	Priority 5	$53,400,000
36(572908)NIRC BSL-3 Lab and Animal Housing, Planning and 
37 Construction
38 (Iberia)
39 Payable from General Obligation Bonds
40	Priority 1	$10,000,000
41	Priority 5	$10,600,000
42 Total	$20,600,000
Page 13 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1 DEPARTMENT OF CULTURE, RECREATION AND TOURISM
206/263OFFICE OF STATE MUSEUM
3(573241)Construction of Civil Rights Museum, Planning and 
4 Construction
5 (Orleans)
6 Payable from General Obligation Bonds
7	Priority 1	$ 224,778
806/264OFFICE OF STATE PARKS
9(572073)Preventive Maintenance/Major Repairs and 
10 Improvements
11 (Statewide)
12 Payable from General Obligation Bonds
13	Priority 1	$ 418,782
14	Priority 5	$ 2,000,000
15 Total	$ 2,418,782
16(572074)Tunica Hills State Preservation Area, Construction, 
17 Development and Acquisition
18 (West Feliciana)
19 Payable from General Obligation Bonds
20	Priority 5	$20,000,000
21(572075)Poverty Point State Historic Site - Land Acquisition, 
22 Design, Museum/Interpretive Center and Expansion
23 (West Carroll)
24 Payable from General Obligation Bonds
25	Priority 1	$ 1,494,420
26	Priority 5	$22,500,000
27 Total	$23,994,420
28(572076)Bogue Chitto State Park - Mountain Bike Trail Design, 
29 Construction, Acquisition and Other Development
30 (Washington)
31 Payable from General Obligation Bonds
32	Priority 1	$ 686
33(572079)Bogue Chitto State Park Emergency Erosion, Planning, 
34 Design, Construction and Other Development
35 (Washington)
36 Payable from General Obligation Bonds
37	Priority 1	$ 1,328,715
38	Priority 5	$ 840,000
39 Total	$ 2,168,715
40(573705)Bayou Segnette State Park, Land Acquisition, 
41 Additional Cabins, Planning and Construction
42 (Jefferson)
43 Payable from General Obligation Bonds
44	Priority 1	$ 429,104
4506/A20NEW ORLEANS CITY P ARK
46(572579)Repairs to Historic Structures, Planning and Construction
47 (Orleans)
48 Payable from General Obligation Bonds
49	Priority 1	$ 2,089,307
Page 14 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
106/A98LOUISIANA NAVAL WAR MEMORIAL COMMISSION
2(573403)Hull Repair & Reinforcement, Superstructure Repair, 
3 Interior Restoration, & Painting of USS KIDD DD-661, 
4 Docking Cradle Repairs & Upgrade, Planning, Transport, 
5 Construction
6 (East Baton Rouge)
7 Payable from General Obligation Bonds
8	Priority 1	$ 8,350,000
9 Payable from State General Fund (Direct) Non-Recurring
10 Revenues	$ 600,000
11 Total	$ 8,950,000
12 DEPARTMENT OF TRANSPORTATION AND DEVELOP MENT
1307/270ADMINISTRATION
14(571722)City of Gonzales - GO Program LA Highway 30 
15 Corridor, Planning and Construction
16 (Ascension)
17 Payable from General Obligation Bonds
18	Priority 1	$ 8,290,432 
19	Priority 5	$ 2,500,000
20 Payable from State General Fund (Direct) Non-Recurring
21 Revenues	$ 2,000,000
22 Total	$12,790,432
23(571748)Improvements on LA 3038, Including Patching, Repairing 
24 and Overlaying of the Highway, Planning and Construction
25 (Ascension)
26 Payable from General Obligation Bonds
27	Priority 1	$ 47,139
28(572584)LA 91: Bayou Plaquemine Brule Bridge Replacement, 
29 Planning and Construction
30 (Acadia)
31 Payable from General Obligation Bonds
32	Priority 1	$ 1,000,000
33	Priority 5	$ 5,200,000
34 Total	$ 6,200,000
35(572585)Beaver Creek, LA Highway 106, Planning and 
36 Construction
37 (Evangeline)
38 Payable from General Obligation Bonds
39	Priority 5	$13,200,000
40(572586)LA 44 Widening, I-10 to LA 22, Planning, 
41 Utilities, Right-of-Way and Construction
42 (Ascension)
43 Payable from General Obligation Bonds
44	Priority 1	$ 9,299,712
45	Priority 5	$ 9,000,000
46 Total	$18,299,712
47(572588)Pecue Lane/I-10 Interchange and I-10, Planning, 
48 Design, Rights-of-Way, Utilities and Construction
49 (East Baton Rouge)
50 Payable from General Obligation Bonds
51	Priority 1	$14,000,000
Page 15 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(572589)Louisiana Highway 64 and Louisiana Highway 1019 
2 Roundabout, Planning and Construction
3 (Livingston)
4 Payable from General Obligation Bonds
5	Priority 1	$ 175,000
6(572590)Claiborne Corridor Rehabilitation
7 (Orleans)
8 Payable from General Obligation Bonds
9	Priority 5	$20,000,000
10(572591)LA 429/I-10 Interchange, Planning and Construction
11 (Ascension)
12 Payable from General Obligation Bonds
13	Priority 5	$ 5,000,000
14(572592)LA 28 Widening (LA 3128 - LA 116)
15 (Rapides)
16 Payable from General Obligation Bonds
17	Priority 1	$ 350,000
18	Priority 5	$33,950,000
19 Total	$34,300,000
20(572593)New Mississippi River Bridge
21 (Ascension, East Baton Rouge, Iberville, St. James, 
22 West Baton Rouge)
23 Payable from General Obligation Bonds
24	Priority 1	$ 1,378,613
25	Priority 5	$ 3,000,000
26 Total	$ 4,378,613
27(572594)Florida Avenue Bridge, Planning and Construction
28 (Orleans)
29 Payable from General Obligation Bonds
30	Priority 5	$ 7,200,000
31(572630)US 190 (Vine Street) Reconstruction
32 (St. Landry)
33 Payable from General Obligation Bonds
34	Priority 1	$ 200,000
35	Priority 5	$19,200,000
36 Total	$19,400,000
37(572631)US 190 Widening: LA 25 - US 190 Bus
38 (St. Tammany)
39 Payable from General Obligation Bonds
40	Priority 1	$ 2,000,000
41	Priority 5	$ 3,100,000
42 Total	$ 5,100,000
Page 16 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(572677)Secretary's Emergency Fund for Bridge Damages, 
2 Other Reimbursements, Local Matching Dollars, 
3 Federal Funds, and Opportunity Grants Subject to 
4 the Provisions of R.S. 48:232
5 (Statewide)
6 Payable from Interagency Transfers	$25,000,000
7 Payable from Fees and Self-Generated Revenues $30,000,000
8 Payable from Transportation Trust Fund - Federal
9 Receipts	$25,000,000
10 Payable from Federal Funds	$ 2,500,000
11 Total	$82,500,000
12(572679)Non-Federal Aid Eligible Highway Program
13 (Statewide)
14 Payable from State Highway Improvement Fund $31,900,000
15(572734)Highway Program (Up to $4,000,000 for Secretary's 
16 Emergency Fund)
17 (Statewide)
18 Payable from General Obligation Bonds
19	Priority 1	$33,015,000
20	Priority 5	$202,735,000
21 Payable from State General Fund (Direct) Non-Recurring
22 Revenues	$40,000,000
23 Payable from State General Fund (Direct) $62,800,000
24 Payable from Construction Subfund Preservation$50,000,000
25 Payable from Transportation Trust Fund - Construction
26 Subfund	$187,100,000
27 Payable from Transportation Trust Fund - Federal
28 Receipts	$1,300,000,000
29 Payable from Transportation Trust Fund - Regular $53,000,000
30 Total	$1,928,650,000
31Provided, however, that the Department of Transportation and Development is authorized
32to implement or commence projects approved in this program for Fiscal Year 2024-2025
33identified for phased funding pursuant to the cash management plan established pursuant to
34R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing
35unspent cash balances appropriated in prior years' programs, which funds when combined
36with current appropriations will provide sufficient appropriated funds to award contracts.
37Provided, however, that the Department of Transportation and Development shall use up to
38$2,500,000 of the appropriations from Transportation Trust Fund – Regular to fund the
39replacement of five bridges along LA 1232 between Highway 156 and Highway 501 in
40Winn Parish.
41Provided, however, that the Department of Transportation and Development shall use up to
42$40,000,000 of the appropriations from Transportation Trust Fund – Regular to meet Federal
43match obligations pursuant to competitive Federal grants.
44Provided, however, that the Department of Transportation and Development shall use up to
45$62,800,000 of the appropriation from State General Fund (Direct) for State match to the
46Federal Highway Administration Formula.
47Provided, however, that the Department of Transportation shall use up to $40,000,000 of the
48appropriation from State General Fund (Direct) Non-Recurring for State match pursuant to
49August Redistribution Funding provided through the Federal Highway Administration.
Page 17 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(572759)LA 22: North Hoover Road - Dunson Road
2 (Tangipahoa)
3 Payable from General Obligation Bonds
4	Priority 5	$12,600,000
5(572760)LA 964 (Groom Road - US 61) Highway Lighting
6 (East Baton Rouge)
7 Payable from General Obligation Bonds
8	Priority 1	$ 450,000
9	Priority 5	$ 1,950,000
10 Total	$ 2,400,000
11(572761)LA 117 Widening (LA 8 - LA 118)
12 (Natchitoches, Vernon)
13 Payable from General Obligation Bonds
14	Priority 1	$ 5,952,055
15	Priority 5	$30,000,000
16 Total	$35,952,055
17(572762)Earhart/Causeway Interchange, Planning, Engineering, 
18 Right-of-Way, Utilities and Construction
19 (Jefferson)
20 Payable from General Obligation Bonds
21	Priority 1	$ 4,755,588
22	Priority 5	$44,500,000
23 Total	$49,255,588
24(572764)Loyola/I-10 Interchange Improvements, Feasibility Study, 
25 Interchange Modification Report, Environmental 
26 Assessment, Engineering, Right-of-Ways, Utilities 
27 and Construction
28 (Jefferson, Orleans)
29 Payable from General Obligation Bonds
30	Priority 1	$ 2,635,292
31(572765)LA 42 (US 61 to LA 44) Widening, including a Roundabout 
32 at Joe Sevario Road, Planning and Construction
33 (Ascension)
34 Payable from General Obligation Bonds
35	Priority 1	$ 206,244
36(572767)Peters Road Bridge and Extension, Planning and 
37 Construction
38 (Jefferson, Plaquemines)
39 Payable from General Obligation Bonds
40	Priority 1	$17,539,536
41	Priority 5	$ 7,000,000
42 Total	$24,539,536
43(572769)Hooper Road Widening and Sewer Improvements 
44 (Blackwater Bayou to Sullivan Road) Planning, 
45 Engineering, Utilities and Construction
46 (East Baton Rouge)
47 Payable from General Obligation Bonds
48	Priority 1	$12,265,000
Page 18 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(572770)I-49 South from Lafayette to Westbank Expressway, 
2 Planning, Engineering, Right-of-Way, Utilities and 
3 Construction
4 (Iberia, Jefferson, Lafayette, Lafourche, St. Charles, 
5 St. Martin, St. Mary, Terrebonne)
6 Payable from General Obligation Bonds
7	Priority 1	$ 937,789
8	Priority 5	$188,000,000
9 Total	$188,937,789
10(572771)I-610 and I-10 Fence Removal, Replacement, and Repairs, 
11 due to Hurricane Ida Damage, Planning and Construction
12 (Orleans)
13 Payable from General Obligation Bonds
14	Priority 5	$ 600,000
15(572772)LA 22 Extension and Improvements, LA 22 Roundabout, 
16 Design, Engineering, Planning and Construction
17 (St. Tammany)
18 Payable from General Obligation Bonds
19	Priority 1	$ 646,062
20	Priority 5	$ 3,240,000
21 Total	$ 3,886,062
22(572773)Roundabout at LA 3233 and I-49 Northbound Service Road, 
23 Planning and Construction
24 (St. Landry)
25 Payable from General Obligation Bonds
26	Priority 5	$ 9,600,000
27(572774)Livingston Roundabout at Corner of LA 16 and LA 42, 
28 Planning and Construction
29 (Livingston)
30 Payable from General Obligation Bonds
31	Priority 5	$ 3,600,000
32(572818)Highway 397 in Calcasieu Parish, North and South 
33 Turning Lanes
34 (Calcasieu)
35 Payable from General Obligation Bonds
36	Priority 1	$ 2,000,000
37	Priority 5	$ 2,300,000
38 Total	$ 4,300,000
39(572819)LA 3241 (I-12 to Bush), Planning, Engineering, 
40 Right-of-Way, Utilities and Construction
41 (St. Tammany)
42 Payable from General Obligation Bonds
43	Priority 5	$28,000,000
44(572821)LA 1 Improvements, Phase 2, Planning, Engineering, 
45 Right-of-Way, Utilities and Construction
46 (Lafourche)
47 Payable from General Obligation Bonds
48	Priority 1	$29,172,098
49	Priority 5	$62,000,000
50 Total	$91,172,098
Page 19 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(572822)Jimmie Davis Bridge Rehabilitation and Lighting, or 
2 Design, Engineering, Planning and Construction
3 (Bossier)
4 Payable from General Obligation Bonds
5	Priority 1	$18,117,480
6	Priority 5	$136,000,000
7 Total	$154,117,480
8(572824)I-10 Calcasieu River Bridge, Environmental, Planning, 
9 Engineering, Right-of-Way, Utilities, Demolition and 
10 Construction
11 (Calcasieu)
12 Payable from General Obligation Bonds
13	Priority 1	$19,428,151
14	Priority 5	$80,000,000
15 Total	$99,428,151
16(572825)LA 621 Realignment at LA 73, Planning and Construction
17 (Ascension)
18 Payable from General Obligation Bonds
19	Priority 1	$ 4,946,325
20	Priority 5	$ 7,100,000
21 Total	$12,046,325
22(572826)LA 13 (Crowley to Vermilion Parish Line)
23 (Acadia)
24 Payable from General Obligation Bonds
25	Priority 1	$ 1,195,950
26	Priority 5	$ 5,500,000
27 Total	$ 6,695,950
28(572827)LA 3227 - LA 157 Intersection Realignment, Planning 
29 and Construction
30 (Bossier)
31 Payable from General Obligation Bonds
32	Priority 1	$ 1,500,000
33	Priority 5	$ 7,300,000
34 Total	$ 8,800,000
35(572828)Roundabout at Intersection of LA 3125 and LA 3274
36 (St. James)
37 Payable from General Obligation Bonds
38	Priority 1	$ 2,347,500
39	Priority 5	$ 1,400,000
40 Total	$ 3,747,500
41(572829)Intersection Improvements (Roundabouts), Planning and 
42 Construction
43 (Lafayette)
44 Payable from General Obligation Bonds
45	Priority 1	$ 5,000,000
46	Priority 5	$ 5,000,000
47 Total	$10,000,000
Page 20 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(572830)LA 3034 Improvements
2 (East Baton Rouge)
3 Payable from General Obligation Bonds
4	Priority 1	$15,229,971
5	Priority 5	$20,000,000
6 Total	$35,229,971
7(572831)Hooper Road Extension and Widening, Environmental, 
8 Planning, Engineering, Right-of-Way, Utilities and 
9 Construction
10 (East Baton Rouge, Livingston)
11 Payable from General Obligation Bonds
12	Priority 1	$ 8,066,728 
13	Priority 5	$27,000,000
14 Total	$35,066,728
15(572922)LA 92 - 1 (US 90 - LA 182), Planning and Construction
16 (St. Martin)
17 Payable from General Obligation Bonds
18	Priority 5	$ 4,600,000
19(572923)New Orleans International Airport Landside Access 
20 Improvements
21 (Jefferson)
22 Payable from General Obligation Bonds
23	Priority 1	$16,000,000
24(572924)LA 29 Improvements (LA 13 - LA 758)
25 (Evangeline, St. Landry)
26 Payable from General Obligation Bonds
27	Priority 1	$ 5,120,000
28	Priority 5	$ 1,600,000
29 Total	$ 6,720,000
30(572925)LA 335: LA 35 - LA 14, Planning and Construction
31 (Vermilion)
32 Payable from General Obligation Bonds
33	Priority 5	$17,100,000
34(572926)LA 31: LA 182 - 0.15 Mi N of N LA 96
35 (Iberia, St. Martin)
36 Payable from General Obligation Bonds
37	Priority 1	$ 9,600,000
38(572928)LA 74/I-10 Interchange, Planning and Construction
39 (Ascension)
40 Payable from General Obligation Bonds
41	Priority 5	$ 5,000,000
42(572929)LA 100: LA 97 - LA 91, Planning and Construction
43 (Acadia)
44 Payable from General Obligation Bonds
45	Priority 5	$ 7,400,000
46(572930)LA 758: US 190 - LA 29, Planning and Construction
47 (Evangeline, St. Landry)
48 Payable from General Obligation Bonds
49	Priority 5	$ 4,400,000
Page 21 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(572931)LA 3277: LA 757 - LA 104, Planning and Construction
2 (Evangeline)
3 Payable from General Obligation Bonds
4	Priority 5	$ 6,900,000
5(572932)LA 409 (Liberty Road): LA 64 - East Feliciana Parish Line 
6 Planning and Construction
7 (East Baton Rouge)
8 Payable from General Obligation Bonds
9	Priority 1	$ 1,000,000
10	Priority 5	$15,000,000
11 Total	$16,000,000
12(572933)St. Landry, LA 106, Planning and Construction
13 (Evangeline)
14 Payable from General Obligation Bonds
15	Priority 5	$12,900,000
16(572934)Roundabout on LA 447 and LA 1025, Planning and 
17 Construction
18 (Livingston)
19 Payable from General Obligation Bonds
20	Priority 1	$ 447,151
21	Priority 5	$ 5,000,000
22 Total	$ 5,447,151
23(572935)Widening of Highway 447 and I-12 Overpass 
24 Improvements, Environmental Phase Commencement, 
25 Planning and Construction
26 (Livingston)
27 Payable from General Obligation Bonds
28	Priority 1	$ 1,468,351
29	Priority 5	$26,000,000
30 Total	$27,468,351
31(572937)Relocate Hickory Avenue (LA Hwy. 48-11th Street) 
32 (Mounes) (LA Hwy. 3154) Construction, Right of Way, 
33 and Utilities
34 (Jefferson)
35 Payable from General Obligation Bonds
36	Priority 1	$ 1,000,000
37	Priority 5	$ 1,000,000
38 Total	$ 2,000,000
39(572938)LA 699: LA 35 - LA 343, Planning and Construction
40 (Vermilion)
41 Payable from General Obligation Bonds
42	Priority 1	$ 7,870,000
43(572939)LA 95: LA 98 - Beginning of PCCP in Church Point, 
44 Planning and Construction
45 (Acadia)
46 Payable from General Obligation Bonds
47	Priority 5	$10,800,000
48(572940)LA 755: LA 368 - LA 91, Planning and Construction
49 (Acadia)
50 Payable from General Obligation Bonds
51	Priority 5	$ 5,576,000
Page 22 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(572941)LA 1100: LA 98 - LA 95, Planning and Construction
2 (Acadia)
3 Payable from General Obligation Bonds
4	Priority 5	$ 3,150,000
5(572942)LA 343 (Bosco Hwy) LA 98 - LA 356, Planning and 
6 Construction
7 (St. Landry)
8 Payable from General Obligation Bonds
9	Priority 1	$ 6,985,000
10(572943)US 90: Lafayette Regional Airport - Assumption Parish 
11 Line, Planning and Construction
12 (Iberia, Lafayette, St. Martin, St. Mary)
13 Payable from General Obligation Bonds
14	Priority 5	$40,000,000
15(572944)LA 3211: Yokley Road to LA 182, Planning and 
16 Construction
17 (St. Mary)
18 Payable from General Obligation Bonds
19	Priority 5	$15,000,000
20(572945)LA 347: LA 355 to LA 686 (Bushville Highway from 
21 Cecilia Bridge Highway to Canal Street), Planning and 
22 Construction
23 (St. Martin)
24 Payable from General Obligation Bonds
25	Priority 5	$ 4,250,000
26(572946)LA 182 Resurfacing
27 (St. Mary)
28 Payable from General Obligation Bonds
29	Priority 5	$ 8,000,000
30(572947)LA 70 Resurfacing and Drainage Repairs
31 (St. Mary)
32 Payable from General Obligation Bonds
33	Priority 5	$ 6,460,000
34(572948)Roundabout at LA 3211 and Yokley Road
35 (St. Mary)
36 Payable from General Obligation Bonds
37	Priority 1	$ 3,500,000
38	Priority 5	$ 1,500,000
39 Total	$ 5,000,000
40(572996)Verot School Road, State Hwy 339 Widening, 
41 Planning and Construction
42 (Lafayette)
43 Payable from General Obligation Bonds
44	Priority 5	$60,500,000
45(573100)LA 92: LA 91 - LA 13
46 (Acadia)
47 Payable from General Obligation Bonds
48	Priority 5	$ 9,100,000
Page 23 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(573101)LA 35: Lafayette Parish Line - US 90
2 (Acadia)
3 Payable from General Obligation Bonds
4	Priority 5	$ 4,300,000
5(573379)LA 410 (Blackwater Road): LA 408 - LA 64
6 (East Baton Rouge)
7 Payable from General Obligation Bonds
8	Priority 5	$10,000,000
9(573381)US 371 Widening
10 (Webster)
11 Payable from General Obligation Bonds
12	Priority 5	$ 3,600,000
13(573385)LA 347: LA 351 - LA 328
14 (St. Martin)
15 Payable from General Obligation Bonds
16	Priority 5	$ 2,000,000
17(573459)Relocation of LA 67 at LA 408 due to Airport 
18 Improvements
19 (East Baton Rouge)
20 Payable from General Obligation Bonds
21	Priority 5	$80,000,000
22(573739)Interchange Improvements on La. Highways 
23 (current or former) in Lafayette Parish, Planning and 
24 Construction
25 (Lafayette)
26 Payable from General Obligation Bonds
27	Priority 5	$15,000,000
28(573794)US 80: Flat River - Merrywoods Blvd
29 (Bossier)
30 Payable from General Obligation Bonds
31	Priority 5	$ 9,100,000
3207/274PUBLIC IMPROVEMENTS
33(571980)West of Atchafalaya Basin Feasibility Study
34 (Statewide)
35 Payable from General Obligation Bonds
36	Priority 5	$ 795,000
37(571981)Turkey Creek Lake Repairs, Planning and Construction
38 (Franklin)
39 Payable from General Obligation Bonds
40	Priority 1	$ 1,500,000
41	Priority 5	$ 4,241,560
42 Total	$ 5,741,560
43(571982)Short Line Railroad Upgrades
44 (Statewide)
45 Payable from General Obligation Bonds
46	Priority 1	$11,427,019
47	Priority 5	$14,720,000
48 Total	$26,147,019
Page 24 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(571983)Rehabilitation and Repair of State-Maintained Reservoirs 
2 and Dams
3 (Statewide)
4 Payable from General Obligation Bonds
5	Priority 1	$ 5,995,926
6	Priority 5	$11,130,000
7 Total	$17,125,926
8(571984)Ouachita River Bank Stabilization and Levee Repair
9 (Caldwell, Ouachita)
10 Payable from General Obligation Bonds
11	Priority 1	$ 5,135,000
12	Priority 5	$14,650,000
13 Total	$19,785,000
14(571985)New Orleans Rail Gateway Finalize EIS to Complete Study
15 (Jefferson, Orleans)
16 Payable from General Obligation Bonds
17	Priority 1	$ 1,839,515
18(571987)Mississippi River Levee Raising, Arkansas to Old River, 
19 Planning and Construction
20 (Avoyelles, Concordia, East Carroll, Madison, Pointe 
21 Coupee, Tensas)
22 Payable from General Obligation Bonds
23	Priority 1	$11,747,945
24	Priority 5	$27,820,000
25 Total	$39,567,945
26(571988)Mississippi River Deepening, Phase 3, Planning, 
27 Design, Construction, Rights-of-Way, Relocations 
28 and Utilities
29 (Ascension, East Baton Rouge, Jefferson, Orleans, 
30 Plaquemines, St. Bernard, St. Charles, St. James, St. John 
31 the Baptist, West Baton Rouge)
32 Payable from General Obligation Bonds
33	Priority 1	$61,677,714
34(571989)Jefferson Highway Rail Grade Crossing (New Orleans 
35 Rail Gateway Program)
36 (Jefferson)
37 Payable from General Obligation Bonds
38	Priority 5	$10,600,000
39(571990)J. Bennett Johnston (Red River) Deepening
40 (Avoyelles, Bossier, Caddo, Grant, Natchitoches, 
41 Rapides, Red River)
42 Payable from General Obligation Bonds
43	Priority 1	$ 1,030,000
44	Priority 5	$ 530,000
45 Total	$ 1,560,000
46(571991)Comite River Diversion Canal Planning, Right-of-Way, 
47 Utilities and Construction
48 (Ascension, East Baton Rouge, Livingston)
49 Payable from General Obligation Bonds
50	Priority 1	$ 652,703
Page 25 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(571992)Bundick Lake Level Control Structure, Planning and 
2 Construction
3 (Beauregard)
4 Payable from General Obligation Bonds
5	Priority 1	$ 2,277,521
6	Priority 5	$ 3,180,000
7 Total	$ 5,457,521
8(571993)Bayou Dechene Reservoir, Planning, Land Acquisition 
9 and Construction
10 (Caldwell)
11 Payable from General Obligation Bonds
12	Priority 1	$10,378,886
13	Priority 5	$16,300,000
14 Total	$26,678,886
15(571994)Acadiana Gulf of Mexico Access Channel (AGMAC), 
16 Port of Iberia, Planning, Design, Construction, 
17 Rights-of-Way, Relocations and Utilities
18 (Iberia, Vermilion)
19 Payable from General Obligation Bonds
20	Priority 1	$20,000,000
21(571995)Houma Navigational Canal Deepening Project, Planning, 
22 Design, Construction, Rights-of-Ways, Relocations and 
23 Utilities
24 (Terrebonne)
25 Payable from General Obligation Bonds
26	Priority 1	$ 9,650,000
27	Priority 5	$30,500,000
28 Total	$40,150,000
29(572418)Flood Control Reservoirs in the Amite River Basin 
30 Watershed
31 (Ascension, East Baton Rouge, East Feliciana, Livingston, 
32 St. Helena)
33 Payable from General Obligation Bonds
34	Priority 5	$ 2,120,000
35(572459)Avondale Rail Grade Crossings (New Orleans Rail Gateway 
36 Program)
37 (Jefferson)
38 Payable from General Obligation Bonds
39	Priority 5	$10,600,000
40(572507)Port Construction and Development Priority Program
41 (Statewide)
42 Payable from Transportation Trust Fund - Regular $39,400,000
43(572682)Statewide Flood Control Program
44 (Statewide)
45 Payable from Transportation Trust Fund - Regular $20,000,000
4607/276ENGINEERING AND OPERATIONS
47(571747)New Cameron Ferry
48 (Cameron)
49 Payable from General Obligation Bonds
50	Priority 1	$21,504,951
Page 26 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(572286)Reconstruction and/or Rehabilitation of DOTD 
2 Maintenance Unit Facilities
3 (Cameron)
4 Payable from General Obligation Bonds
5	Priority 5	$ 9,500,000
6(572678)Facilities Program Major Repairs, Renovations, Additions, 
7 New Facilities, Equipment Replacement at Various DOTD 
8 Sites, Planning and Construction
9 (Statewide)
10 Payable from Transportation Trust Fund - Regular $ 4,000,000
11(572680)Motor Vessel and Equipment Drydocking, Repairs, Various 
12 Locations Statewide
13 (Statewide)
14 Payable from Transportation Trust Fund - Regular $ 1,500,000
1507/277AVIATION IMPROVEMENTS
16(572681)State Aviation and Airport Improvement Program
17 (Statewide)
18 Payable from Transportation Trust Fund - Regular $28,133,464
19 DEPARTMENT OF PUBLIC SAFETY AND CORRECTIONS
2008/400DEPARTMENT OF CORRECTIONS
21(571772)HVAC Installation, Offender Housing, Planning and 
22 Construction
23 (Statewide)
24 Payable from General Obligation Bonds
25	Priority 1	$ 525,000
2608/402LOUISIANA STATE PENITENTIARY
27(571730)Electrical Distribution System Upgrade, Planning 
28 and Construction
29 (West Feliciana)
30 Payable from General Obligation Bonds
31	Priority 1	$ 4,558,410
32(571942)Main Prison Shower and Cellblock Plumbing Upgrade, 
33 Planning and Construction
34 (West Feliciana)
35 Payable from General Obligation Bonds
36	Priority 1	$ 1,563,382
3708/403OFFICE OF JUVENILE JUSTICE
38(572394)Community Based Program, Juvenile Justice Improvements, 
39 Planning, Construction, Renovation, Acquisition, and 
40 Equipment
41 (Statewide)
42 Payable from General Obligation Bonds
43	Priority 1	$ 6,932,832
44	Priority 5	$10,000,000
45 Total	$16,932,832
Page 27 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(572396)Acadiana Center for Youth - Renovation to Create 
2 Behavioral Intervention Rooms
3 (Avoyelles)
4 Payable from State General Fund (Direct) Non-Recurring
5 Revenues	$ 400,000
608/406LOUISIANA CORRECTIONAL INSTITUTE F OR WOMEN
7(571659)Rebuild and/or Replace Facility Due to Damage from 2016 
8 Flood Event
9 (Iberville)
10 Payable from General Obligation Bonds
11	Priority 1	$19,400,000
1208/416RAYBURN CORRECTIONAL CENTER
13(571439)Security Perimeter Fence, Planning and Construction
14 (Washington)
15 Payable from General Obligation Bonds
16	Priority 1	$ 250,000
17 Payable from State General Fund (Direct) Non-Recurring
18 Revenues	$ 1,945,000
19 Total	$ 2,195,000
2008/418PUBLIC SAFETY OFFICE OF MANAGEMENT AND FINANCE
21(573819)OMF/OMV Headquarters Office Renovation Project, 
22 Planning and Construction
23 (East Baton Rouge)
24 Payable from State General Fund (Direct) Non-Recurring
25 Revenues	$ 616,000
2608/419OFFICE OF STATE POLICE
27(572267)New Louisiana State Police Troop L Facility, 
28 Planning and Construction
29 (St. Tammany)
30 Payable from General Obligation Bonds
31	Priority 5	$27,000,000
32 Payable from State General Fund (Direct) Non-Recurring
33 Revenues	$ 1,500,000
34 Total	$28,500,000
35(573810)JESTC Training Facility Improvements, Planning and 
36 Construction
37 (East Baton Rouge)
38 Payable from General Obligation Bonds
39	Priority 5	$ 3,750,000
40	LOUISIANA DEPARTMENT OF HEALTH
4109/320OFFICE OF AGING AND ADULT SERVICES
42(573710)Repair and Upgrade to Sewer System, Planning and 
43 Construction
44 (East Feliciana)
45 Payable from General Obligation Bonds
46	Priority 1	$ 435,700
47	Priority 5	$ 6,170,000
48 Total	$ 6,605,700
Page 28 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(573711)Replace Roof and Storm Drains on all Patient Buildings, 
2 Planning and Construction
3 (East Feliciana)
4 Payable from General Obligation Bonds
5	Priority 1	$ 6,865
609/330OFFICE OF BEHAVIORAL HEALTH
7(572289)Center Building and Fire Alarm System Renovation and 
8 Restoration, East Louisiana State Hospital, Planning and 
9 Construction
10 (East Feliciana)
11 Payable from General Obligation Bonds
12	Priority 5	$ 5,000,000
13 Payable from the balance of State General Funds (Direct)
14 previously allocated under the authority of Act 203 of
15 2007 for Mental Health Area C, New Psychiatric Hospital
16 at Central Louisiana State Hospital 
17 (Rapides)	$ 307,183
18 Total	$ 5,307,183
19(572290)Fire Alarm System Replacement for Ten Buildings, Planning 
20 and Construction
21 (East Feliciana)
22 Payable from General Obligation Bonds
23	Priority 5	$ 2,453,200
24	DEPARTMENT OF WILDLIFE AND FISHERIES
2516/513OFFICE OF WILDLIFE
26(572845)Woodworth Central Office Complex and Pineville 
27 Office/Region 3, Planning and Construction
28 (Rapides)
29 Payable from General Obligation Bonds
30	Priority 1	$ 6,300,000
31 Payable from State General Fund (Direct) Non-Recurring
32 Revenues	$ 275,000
33 Total	$ 6,575,000
34(572859)Hammond Headquarters, Planning and Construction
35 (Tangipahoa)
36 Payable from General Obligation Bonds
37	Priority 1	$ 1,500,000
38(572861)Region 5/Lake Charles Office
39 (Calcasieu)
40 Payable from State General Fund (Direct) Non-Recurring
41 Revenues	$ 3,000,000
Page 29 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1	DEPARTMENT OF EDUCATION
219/601LSU BATON ROUG E
3(571518)Science - Strategic Capital Plan Repairs and Upgrades - 
4 Food Science Renovation, New Science Building, 
5 Infrastructure and Utilities, Planning and Construction
6 (East Baton Rouge)
7 Payable from General Obligation Bonds
8	Priority 1	$65,000,000
9	Priority 5	$24,175,000
10 Total	$89,175,000
11Provided, however, that $475,000 of the Priority 5 appropriation shall be used to fund the
12construction or addition of a Vivarium on the Louisiana State University – Shreveport
13campus.
14(571597)Military and Security Sciences Center, Planning and 
15 Construction
16 (East Baton Rouge)
17 Payable from General Obligation Bonds
18	Priority 1	$ 4,500,000
19	Priority 5	$17,500,000
20 Total	$22,000,000
21(571598)Veterinary Medicine Facilities Repairs/Addition
22 (East Baton Rouge)
23 Payable from General Obligation Bonds
24	Priority 1	$ 5,603,336
25	Priority 5	$ 6,000,000
26 Total	$11,603,336
27(571600)Strategic Capital Plan - Deferred Maintenance for 
28 Infrastructure, Renovations, and Streets
29 (East Baton Rouge)
30 Payable from General Obligation Bonds
31	Priority 1	$ 8,090,623
32	Priority 5	$30,700,000
33 Total	$38,790,623
34(571601)Louisiana State University Library Learning Commons
35 (East Baton Rouge)
36 Payable from General Obligation Bonds
37	Priority 1	$ 5,388,805
38	Priority 5	$72,500,000
39 Payable from Fees and Self-Generated Revenues $75,000,000
40 Total	$152,888,805
4119/602LSU ALEXANDRIA
42(571639)Student Success Center, Planning and Construction
43 (Rapides)
44 Payable from General Obligation Bonds
45	Priority 1	$ 7,900,000
Page 30 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(571685)Downtown Health Services Center, Planning and Construction
2 (Rapides)
3 Payable from General Obligation Bonds
4	Priority 1	$ 3,000,000
5	Priority 5	$26,185,000
6 Total	$29,185,000
719/603UNIVERSITY OF NEW ORLEANS
8(571820)Miscellaneous Roof Replacements, Planning and 
9 Construction
10 (Orleans)
11 Payable from General Obligation Bonds
12	Priority 5	$ 4,800,000
13(571822)Hotel, Restaurant and Tourism Program Relocation 
14 Buildout to North Central Plant Building - Phase 1, 
15 Planning and Construction
16 (Orleans)
17 Payable from General Obligation Bonds
18	Priority 1	$ 3,000,000
19	Priority 5	$ 2,800,000
20 Total	$ 5,800,000
2119/604NLSU HEALTH SCIENCES CENTER - NEW ORLEANS
22(571448)MEB 4th Floor Gross Anatomy and Virtual Anatomy Labs, 
23 Planning and Construction
24 (Orleans)
25 Payable from Fees and Self-Generated Revenues $ 5,000,000
26(571450)LSUHSC-NO Campus Stormwater Infrastructure Upgrades,
27 Planning and Construction
28 (Orleans)
29 Payable from General Obligation Bonds
30	Priority 5	$ 3,000,000
31(571451)Health Science Center Facility Renovations - Dental 
32 School Simulation Facility, Planning and Construction
33 (Orleans)
34 Payable from General Obligation Bonds
35	Priority 5	$40,000,000
36(571452)LSUHSC-NO Medical Education Building Laboratory 
37 Renovation, Phase 1, Planning and Construction
38 (Orleans)
39 Payable from General Obligation Bonds
40	Priority 1	$51,000,000
41	Priority 5	$24,000,000
42 Total	$75,000,000
43(571453)Elevated Walkways Structural and ADA Improvements, 
44 Planning and Construction
45 (Orleans)
46 Payable from Fees and Self-Generated Revenues $ 3,000,000
Page 31 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(571454)Center for Advanced Learning and Simulation 
2 Infrastructure and Equipment, Planning and Construction
3 (Orleans)
4 Payable from General Obligation Bonds
5	Priority 5	$ 2,800,000
619/604SLSU HEALTH SCIENCES CENTER - SHREVEP ORT
7(571640)Comprehensive Emergency Water Supply Improvements, 
8 Planning and Construction
9 (Caddo)
10 Payable from General Obligation Bonds
11	Priority 1	$ 1,000,000
12	Priority 5	$ 6,501,650
13 Total	$ 7,501,650
14(571641)Medical School B-Building HVAC Replacement, 
15 Planning and Construction
16 (Caddo)
17 Payable from General Obligation Bonds
18	Priority 1	$ 434,695
19(571642)Gross Anatomy Lab Expansion and Modernization, 
20 Planning and Construction
21 (Caddo)
22 Payable from General Obligation Bonds
23	Priority 1	$ 2,070,896
24 Payable from State General Fund (Direct) Non-Recurring
25 Revenues	$ 875,000
26 Total	$ 2,945,896
27(571643)Stonewall Animal Research and Training Facility, 
28 Planning and Construction
29 (DeSoto)
30 Payable from General Obligation Bonds
31	Priority 5	$ 5,000,000
32(571678)Center for Medical Education and Wellness, Planning and 
33 Construction
34 (Caddo)
35 Payable from General Obligation Bonds
36	Priority 1	$ 5,184,483
3719/605LSU EUNICE
38(571636)Manuel Hall Exterior Wall and Roof Repair, Planning and 
39 Construction
40 (Acadia)
41 Payable from General Obligation Bonds
42	Priority 1	$ 1,439,148
Page 32 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(571638)Athletic Complex Facility, Planning and Construction
2 (Acadia)
3 Payable from General Obligation Bonds
4	Priority 1	$ 6,000,000
5	Priority 5	$ 5,750,000
6 Payable from the balance of general obligation bond
7 proceeds previously allocated under the authority of Act
8 2 of 2020 for Division of Administration, Repair,
9 Restoration and Replacement for Declared Disasters,
10 Planning, Construction, Renovation, and Acquisition
11 (Statewide)	$ 2,000,000
12 Total	$13,750,000
13(571679)STEAM Innovation Center, Phase 1, Planning and 
14 Construction
15 (Acadia)
16 Payable from General Obligation Bonds
17	Priority 5	$27,900,000
1819/606LSU SHREVEPORT
19(571634)Building Exterior Walls and Bridge Repair, Planning and 
20 Construction
21 (Caddo)
22 Payable from General Obligation Bonds
23	Priority 1	$ 2,979,292
2419/607LSU AGRICULTURAL CENTER
25(571492)Food Innovation Center, Planning and Construction
26 (East Baton Rouge)
27 Payable from General Obligation Bonds
28	Priority 1	$ 1,000,000
29	Priority 5	$ 3,000,000
30 Total	$ 4,000,000
31(571817)John M. Parker Agricultural Center & Livestock Show 
32 Barn Renovations and Repairs
33 (East Baton Rouge)
34 Payable from General Obligation Bonds
35	Priority 5	$23,000,000
36(571882)Animal and Food Science Facilities Renovations and 
37 Modernizations, Phase II, Planning and Construction
38 (East Baton Rouge)
39 Payable from General Obligation Bonds
40	Priority 1	$ 260,720
41	Priority 5	$29,403,500
42 Total	$29,664,220
43(571888)Dean Lee Tornado Damage Building Repairs and 
44 Reconstruction
45 (Rapides)
46 Payable from General Obligation Bonds
47	Priority 1	$ 385,138
48 Payable from State General Fund (Direct) Non-Recurring
49 Revenues	$ 2,000,000
50 Total	$ 2,385,138
Page 33 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
119/610LOUISIANA HEALTH CARE SERVICES DIVISION
2(571662)Lallie Kemp Main Entrance and ER Canopies, 
3 Planning and Construction
4 (Tangipahoa)
5 Payable from Fees and Self-Generated Revenues $ 1,980,000
6(571664)Lallie Kemp Clinic Building, Planning and Construction
7 (Tangipahoa)
8 Payable from Fees and Self-Generated Revenues $ 4,350,000
919/612BATON ROUGE COMMUNITY COLLEG E
10(571927)Allied Health Facility and Other Campus Development, 
11 with Equipment, Planning and Construction
12 (East Baton Rouge)
13 Payable from General Obligation Bonds
14	Priority 1	$21,500,000
15	Priority 5	$18,000,000
16 Total	$39,500,000
17(571928)Campus Development, Planning and Construction
18 (Pointe Coupee)
19 Payable from General Obligation Bonds
20	Priority 1	$ 3,000,000
21	Priority 5	$ 3,000,000
22 Total	$ 6,000,000
2319/614SOUTHERN UNIVERSITY LAW CENTER
24(571494)Renovations and Addition to Existing Law Library, 
25 Planning and Construction
26 (East Baton Rouge)
27 Payable from General Obligation Bonds
28	Priority 1	$ 5,367,523
29	Priority 5	$ 4,250,000
30 Payable from State General Fund (Direct) Non-Recurring
31 Revenues	$ 1,500,000
32 Total	$11,117,523
3319/616SOUTHERN UNIVERSITY - BATON ROUG E
34(571496)Ravine, Bluff and Riverbank Stabilization Project, 
35 Planning and Construction
36 (East Baton Rouge)
37 Payable from General Obligation Bonds
38	Priority 1	$ 1,500,000
39	Priority 5	$30,500,600
40 Total	$32,000,600
41(571497)New STEM Science Complex, Planning and Construction
42 (East Baton Rouge)
43 Payable from General Obligation Bonds
44	Priority 1	$14,699,489
45	Priority 5	$51,800,000
46 Total	$66,499,489
Page 34 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(571498)School of Business/Professional Accountancy, Planning 
2 and Construction
3 (East Baton Rouge)
4 Payable from General Obligation Bonds
5	Priority 1	$ 1,691,718
6	Priority 5	$42,250,000
7 Total	$43,941,718
8(571499)J. K. Haynes Hall School of Nursing Renovation and 
9 Addition, Planning and Construction
10 (East Baton Rouge)
11 Payable from General Obligation Bonds
12	Priority 5	$10,300,000
13(571500)New Southern University Laboratory School Complex, 
14 Planning and Construction
15 (East Baton Rouge)
16 Payable from General Obligation Bonds
17	Priority 5	$53,000,000
18(571501)Replace Chilled Water Lines, Planning and Construction
19 (East Baton Rouge)
20 Payable from General Obligation Bonds
21	Priority 5	$28,000,000
22(573770)Stewart Hall - Wall Mount HVAC Units 1st, 2nd and 
23 3rd Floors, Planning and Construction
24 (East Baton Rouge)
25 Payable from General Obligation Bonds
26	Priority 1	$ 1,726,008
27(573771)A.O. Williams Hall Renovations, 
28 Planning and Construction
29 (East Baton Rouge)
30 Payable from General Obligation Bonds
31	Priority 1	$ 1,296,191
32	Priority 5	$ 2,000,000
33 Payable from the balance of State General Funds (Direct)
34 previously allocated under the authority of Act 20 of 2019
35 for Lake Arthur, Flood Gate Repair, Planning and 
36 Construction 
37 (Jefferson Davis)	$ 100,000
38 Total	$ 3,396,191
3919/617SOUTHERN UNIVERSITY - NEW ORLEANS
40(571502)University Cafeteria, Planning and Construction
41 (Orleans)
42 Payable from General Obligation Bonds
43	Priority 1	$ 100,000
44	Priority 5	$ 9,900,000
45 Total	$10,000,000
Page 35 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(571503)ADA Compliant Restrooms and Public Accommodations 
2 in the Cafeteria, University Center, Health and Physical 
3 Education, Library and Administration Building, Planning 
4 and Construction
5 (Orleans)
6 Payable from General Obligation Bonds
7	Priority 1	$ 1,000,000
8 Payable from State General Fund (Direct) Non-Recurring
9 Revenues	$ 2,650,000
10 Total	$ 3,650,000
11(571504)Campus Exterior Lighting Upgrades, Planning and 
12 Construction
13 (Orleans)
14 Payable from General Obligation Bonds
15	Priority 1	$ 997,119
1619/618SOUTHERN UNIVERSITY - SHREVEP ORT
17(571506)Domestic Water Loop, Hot Water Loop and Drainage 
18 Improvements, Planning and Construction
19 (Caddo)
20 Payable from General Obligation Bonds
21	Priority 5	$ 7,480,000
22 Payable from State General Fund (Direct) Non-Recurring
23 Revenues	$ 520,000
24 Total	$ 8,000,000
25(571507)Gym Complex, Planning and Construction
26 (Caddo)
27 Payable from General Obligation Bonds
28	Priority 5	$ 8,700,000
29(571508)New Workforce Training and Technology Center, Planning 
30 and Construction
31 (Caddo)
32 Payable from General Obligation Bonds
33	Priority 1	$ 1,595,857
34	Priority 5	$17,500,000
35 Total	$19,095,857
36(571509)Louis Collier Hall Science Building Renovation, Planning 
37 and Construction
38 (Caddo)
39 Payable from General Obligation Bonds
40	Priority 1	$ 2,654,083
41	Priority 5	$13,950,000
42 Total	$16,604,083
4319/619SOUTHERN UNIVERSITY AGRICULTURAL RESEARCH AND
44 EXTENSION CENTER
45(571510)Disaster Relief Mega Shelter, Planning and Construction
46 (East Baton Rouge)
47 Payable from General Obligation Bonds
48	Priority 1	$ 1,144,942
49	Priority 5	$ 9,200,000
50 Total	$10,344,942
Page 36 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
119/621NICHOLLS STATE UNIVERSITY
2(571413)New Nursing Building, Planning and Construction
3 (Lafourche)
4 Payable from General Obligation Bonds
5	Priority 1	$ 8,874,856
6	Priority 5	$18,250,000
7 Total	$27,124,856
8(571434)Women's Student Athlete Performance Center, 
9 Planning and Construction
10 (Lafourche)
11 Payable from General Obligation Bonds
12	Priority 5	$ 3,700,000
1319/623GRAMBLING STATE UNIVERSITY
14(571847)Reroof, Waterproof, Envelope Repairs for Various 
15 Buildings, Planning and Construction
16 (Lincoln)
17 Payable from General Obligation Bonds
18	Priority 1	$ 1,000,000
19	Priority 5	$ 7,500,000
20 Total	$ 8,500,000
21(571971)Criminal Justice Building Renovation
22 (Lincoln)
23 Payable from General Obligation Bonds
24	Priority 1	$ 696,301
25	Priority 5	$17,000,000
26 Total	$17,696,301
27(571972)Campus Utility Infrastructure Assessment Emergency 
28 Repair/Replacement, Planning and Construction
29 (Lincoln)
30 Payable from General Obligation Bonds
31	Priority 1	$ 7,933,824
3219/625LOUISIANA TECH UNIVERSITY
33(571711)Renovation of George T. Madison Hall, Planning and 
34 Construction
35 (Lincoln)
36 Payable from General Obligation Bonds
37	Priority 1	$ 1,209,992
38	Priority 5	$36,000,000
39 Total	$37,209,992
40(571712)Central Steam Generator - Switch Gear, Planning and 
41 Construction
42 (Lincoln)
43 Payable from General Obligation Bonds
44	Priority 1	$ 203,855
45 Payable from State General Fund (Direct) Non-Recurring
46 Revenues	$ 3,300,000
47 Total	$ 3,503,855
Page 37 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(571713)Athletic Academic Center, Planning and Construction
2 (Lincoln)
3 Payable from General Obligation Bonds
4	Priority 1	$ 163,983
5 Payable from State General Fund (Direct) Non-Recurring
6 Revenues	$ 2,000,000
7 Total	$ 2,163,983
8(571714)Agriculture and Forestry Wood Products Education and 
9 Research Center, Planning and Construction
10 (Lincoln)
11 Payable from General Obligation Bonds
12	Priority 1	$ 576,903
13	Priority 5	$ 9,000,000
14 Total	$ 9,576,903
1519/627MCNEESE STATE UNIVERSITY
16(571460)Shearman Fine Arts Building Renovation and Addition, 
17 Planning and Construction
18 (Calcasieu)
19 Payable from General Obligation Bonds
20	Priority 1	$ 2,652,580
21	Priority 5	$ 4,700,000
22 Total	$ 7,352,580
23(571462)Burton Business Center Exterior Mitigation, Planning and 
24 Construction
25 (Calcasieu)
26 Payable from General Obligation Bonds
27	Priority 5	$ 7,000,000
28(573772)McNeese Disaster Recovery, Planning and Construction
29 (Calcasieu)
30 Payable from General Obligation Bonds
31	Priority 1	$ 3,700,576
32	Priority 5	$ 6,000,000
33 Total	$ 9,700,576
34(573773)Contraband Bayou Erosion Retaining Wall, Phase II, 
35 Planning and Construction
36 (Calcasieu)
37 Payable from General Obligation Bonds
38	Priority 1	$ 504,910
3919/629UNIVERSITY OF LOUISIANA - MONROE
40(571914)Health Science Complex Renovation, Sugar Hall and 
41 Caldwell Hall, Planning and Construction
42 (Ouachita)
43 Payable from General Obligation Bonds
44	Priority 1	$16,055,794
45	Priority 5	$14,000,000
46 Total	$30,055,794
47(571916)School of Construction Practice Lab Building, Planning 
48 and Construction
49 (Ouachita)
50 Payable from General Obligation Bonds
51	Priority 5	$ 5,000,000
Page 38 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
119/631NORTHWESTERN STATE UNIVERSITY
2(571797)Renovation of Nursing Education Center at Warrington 
3 Place (Shreveport Campus), Planning and Construction
4 (Caddo)
5 Payable from General Obligation Bonds
6	Priority 5	$13,450,000
7 Payable from Fees and Self-Generated Revenues $ 2,000,000
8 Total	$15,450,000
9(571798)Replacement of John S. Kyser Hall, Planning and 
10 Construction
11 (Natchitoches)
12 Payable from General Obligation Bonds
13	Priority 1	$14,268,804
14 Payable from State General Fund (Direct) Non-Recurring
15 Revenues	$ 387,787
16 Total	$14,656,591
1719/634SOUTHEASTERN LOUISIANA UNIVERSITY
18(572113)Nursing and Health Science Building, Planning and 
19 Construction
20 (Tangipahoa)
21 Payable from General Obligation Bonds
22	Priority 1	$ 517,771
23	Priority 5	$31,300,000
24 Total	$31,817,771
25(572114)Academic Athletic Training and Ancillary Athletic Facility, 
26 Planning and Construction
27 (Tangipahoa)
28 Payable from General Obligation Bonds
29	Priority 1	$ 708,373
30	Priority 5	$22,250,000
31 Total	$22,958,373
32(572115)Baton Rouge Nursing Center Renovation, Planning and 
33 Construction
34 (East Baton Rouge, Tangipahoa)
35 Payable from General Obligation Bonds
36	Priority 1	$ 590,900
37	Priority 5	$ 9,220,000
38 Total	$ 9,810,900
39(572116)D. Vickers Hall Renovation and Addition, Planning and 
40 Construction
41 (Tangipahoa)
42 Payable from General Obligation Bonds
43	Priority 1	$15,444,803
4419/640UNIVERSITY OF LOUISIANA - LAFAYETTE
45(571604)Performing Arts Center Complex, Planning and 
46 Construction
47 (Lafayette)
48 Payable from General Obligation Bonds
49	Priority 5	$74,000,000
Page 39 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(571617)Kinesiology, Hospitality Management, and Athletic 
2 Administration Complex, Engineering, Stabilization, 
3 Equipment, Planning and Construction
4 (Lafayette)
5 Payable from General Obligation Bonds
6	Priority 1	$ 454,663
7	Priority 5	$36,500,000
8 Total	$36,954,663
9(571618)Madison Hall Renovation, Planning and Construction
10 (Lafayette)
11 Payable from General Obligation Bonds
12	Priority 1	$ 6,000,000
13	Priority 5	$ 6,000,000
14 Payable from the balance of general obligation bond
15 proceeds previously allocated under the authority of
16 Act 2 of 2020 for Division of Administration, Repair,
17 Restoration and Replacement for Declared Disasters,
18 Planning, Construction, Renovation, and Acquisition
19 (Statewide)	$10,000,000
20 Total	$22,000,000
21(571619)Health Care Education and Training Facility and UL/LSU 
22 Health Science Education Collaboration Building, Planning, 
23 and Construction
24 (Lafayette)
25 Payable from General Obligation Bonds
26	Priority 1	$ 5,749,968
27	Priority 5	$70,000,000
28 Total	$75,749,968
29(571620)Foster Hall Renovation, Planning and Construction
30 (Lafayette)
31 Payable from General Obligation Bonds
32	Priority 1	$ 412,290
33 Payable from State General Fund (Direct) Non-Recurring
34 Revenues	$ 4,000,000
35 Total	$ 4,412,290
36(571621)Engineering Classroom Building, Planning and
37 Construction
38 (Lafayette)
39 Payable from General Obligation Bonds
40	Priority 1	$ 6,766,191
41	Priority 5	$47,866,573
42 Total	$54,632,764
43(571622)DeClouet Hall Renovation, Planning and Construction
44 (Lafayette)
45 Payable from General Obligation Bonds
46	Priority 1	$ 500,000
47 Payable from State General Fund (Direct) Non-Recurring
48 Revenues	$ 5,500,000
49 Total	$ 6,000,000
Page 40 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
119/646RIVER PARISHES COMMUNITY COLLEG E
2(571932)Donaldsonville Renovation Project, Planning and 
3 Construction
4 (Ascension)
5 Payable from General Obligation Bonds
6	Priority 1	$ 1,100,000
7 Payable from the balance of State General Funds (Direct)
8 previously allocated under the authority of Act 465 of
9 2023 for Ascension Parish, Energy Transition Parkway,
10 Planning and Construction
11 (Ascension)	$ 2,000,000
12 Total	$ 3,100,000
1319/647LOUISIANA DELTA COMMUNITY COLLEG E
14(571931)Campus Development for Louisiana Delta Community 
15 College, Planning and Construction
16 (Union)
17 Payable from General Obligation Bonds
18	Priority 5	$17,500,000
19(572131)Campus Development for Louisiana Delta Community 
20 College Bastrop, Planning and Construction
21 (Morehouse)
22 Payable from General Obligation Bonds
23	Priority 1	$ 1,000,000
24	Priority 5	$15,500,000
25 Total	$16,500,000
26(572133)Campus Expansion for Louisiana Delta Community 
27 College, Winnsboro, Planning and Construction
28 (Franklin)
29 Payable from General Obligation Bonds
30	Priority 1	$ 4,129,260
31 Payable from State General Fund (Direct) Non-Recurring
32 Revenues	$ 1,800,000
33 Total	$ 5,929,260
3419/649LOUISIANA COMMUNITY AND TECHNICAL COLLEG E SYSTEM
35(571721)Central Louisiana Technical Community College - Campus 
36 Development Rod Brady Campus, Planning and Construction
37 (LaSalle)
38 Payable from General Obligation Bonds
39	Priority 1	$ 1,500,000
40	Priority 5	$12,500,000
41 Total	$14,000,000
42(571936)Resurface Campus Parking, Planning and Construction
43 (Calcasieu)
44 Payable from General Obligation Bonds
45	Priority 1	$ 135,020
46	Priority 5	$ 2,500,000
47 Total	$ 2,635,020
Page 41 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(573775)Maritime/Petroleum Workforce Training Academy, 
2 Planning and Construction
3 (Terrebonne)
4 Payable from General Obligation Bonds
5	Priority 5	$ 9,334,817
619/657LOUISIANA SCHOOL F OR MATH, SCIENCE AND THE ARTS
7(572500)Louisiana School for Math, Science, and the Arts and
8 Northwestern State University Innovation Center, Planning
9 and Construction
10 (Natchitoches)
11 Payable from General Obligation Bonds
12	Priority 5	$ 9,900,000
13 Payable from Fees and Self-Generated Revenues $ 750,000
14 Payable from Federal Funds via Interagency Transfers $ 750,000
15 Total	$11,400,000
1619/671BOARD OF REGENTS
17(573606)System-Wide Telecommunications Wiring and Equipment, 
18 Planning and Construction
19 (Statewide)
20 Payable from General Obligation Bonds
21	Priority 1	$ 1,995,822
22(573607)Major Repairs and Deferred Maintenance of Buildings and 
23 Facilities, Planning and Construction
24 (Statewide)
25 Payable from General Obligation Bonds
26	Priority 5	$10,000,000
27(573774)Land Acquisition for Post Secondary Educational
28 Institutions
29 (Statewide)
30 Payable from General Obligation Bonds
31	Priority 1	$ 160,908
3219/673NEW ORLEANS CENTER F OR THE CREATIVE ARTS
33(572424)Building Acquisition for Academic Studio Program, 
34 Planning and Construction
35 (Orleans)
36 Payable from General Obligation Bonds
37	Priority 5	$ 8,000,000
3819/674LOUISIANA UNIVERSITIES MARINE CONSORTIUM
39(573632)Research Vessel (R/V Pelican) Replacement
40 (Terrebonne)
41 Payable from General Obligation Bonds
42	Priority 1	$10,890,000
43	Priority 5	$19,500,000
44 Payable from State General Fund (Direct) Non-Recurring
45 Revenues	$11,500,000
46 Total	$41,890,000
Page 42 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(573633)Houma Marine Campus Phase 2, Planning and 
2 Construction
3 (Terrebonne)
4 Payable from General Obligation Bonds
5	Priority 1	$13,372,873
6	Priority 5	$ 1,600,000
7 Total	$14,972,873
819/712LOUISIANA TECHNICAL COLLEG E-SULLIVAN CAMPUS
9(571937)New Diesel Automotive Building, Northshore Technical 
10 Community College - Sullivan Campus, Planning and 
11 Construction
12 (Washington)
13 Payable from General Obligation Bonds
14	Priority 1	$ 1,000,000
15	Priority 5	$ 9,140,000
16 Total	$10,140,000
1719/731FLETCHER TECHNICAL COMMUNITY COLLEG E
18(571929)Precision Agriculture Training Facility, Planning and 
19 Construction
20 (Terrebonne)
21 Payable from General Obligation Bonds
22	Priority 1	$ 5,498,000
23	Priority 5	$ 1,602,000
24 Payable from State General Fund (Direct) Non-Recurring
25 Revenues	$13,200,000
26 Total	$20,300,000
2719/788NORTHSHORE TECHNICAL COMMUNITY COLLEG E
28(571934)Livingston Campus Expansion, Planning and Construction
29 (Livingston)
30 Payable from General Obligation Bonds
31	Priority 5	$ 9,000,000
32	JUDICAL EXPENSES
3323/949LOUISIANA JUDICIARY
34(573707)Land Acquisition, Planning, and Construction of New 
35 Courthouse for the Louisiana Court of Appeal, 
36 Third Circuit
37 (Calcasieu)
38 Payable from General Obligation Bonds
39	Priority 1	$ 268,700
40	LEVEE DISTRICTS AND PORTS
4136/L13PONTCHARTRAIN LEVEE DISTRICT
42(573164)Lake Pontchartrain West Shore Hurricane Protection Project 
43 (Ascension, St. Charles, St. James, St. John the Baptist)
44 Payable from General Obligation Bonds
45	Priority 1	$ 2,630,229
46	Priority 5	$ 9,170,000
47 Total	$11,800,229
Page 43 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(573276)Bayou Manchac Clearing and Snagging
2 (Ascension, East Baton Rouge, Iberville)
3 Payable from General Obligation Bonds
4	Priority 5	$ 1,370,000
5 Payable from State General Fund (Direct) Non-Recurring
6 Revenues	$ 180,000
7 Total	$ 1,550,000
8(573281)Bayou Manchac Regional Flood Risk Reduction Permitting
9 (Ascension, East Baton Rouge, Iberville)
10 Payable from General Obligation Bonds
11	Priority 5	$ 1,240,000
12 Payable from State General Fund (Direct) Non-Recurring
13 Revenues	$ 120,000
14 Total	$ 1,360,000
15(573283)Bayou Manchac Dredging - Planning
16 (Ascension, East Baton Rouge, Iberville)
17 Payable from General Obligation Bonds
18	Priority 5	$ 3,990,000
19 Payable from State General Fund (Direct) Non-Recurring
20 Revenues	$ 1,250,000
21 Total	$ 5,240,000
2236/L15SQUIRREL RUN LEVEE DRAINAG E DISTRICT
23(572173)Maintenance of Levee and FEMA Certification
24 (Iberia)
25 Payable from General Obligation Bonds
26	Priority 1	$ 250,000
27	Priority 5	$ 200,000
28 Total	$ 450,000
2936/L16SOUTH LAFOURCHE LEVEE DISTRICT
30(572622)Larose to Golden Meadow Hurricane Protection
31 System Improvements and Data Monitoring,
32 Planning and Construction
33 (Lafourche)
34 Payable from General Obligation Bonds
35	Priority 5	$ 400,000
36(573673)Larose to Golden Meadow Hurricane Protection System, 
37 Planning and Construction
38 (Lafourche)
39 Payable from General Obligation Bonds
40	Priority 5	$10,200,000
4136/L25GRAND ISLE INDEPENDENT LEVEE DISTRICT
42(573453)Breakwater Protection, Planning and Construction
43 (Jefferson)
44 Payable from General Obligation Bonds
45	Priority 1	$ 2,669,160
46 Payable from the balance of State General Funds (Direct)
47 previously allocated under the authority of Act 2 of 2020
48 for Livingston Parish School Board, Widening and Turn
49 Lane Construction for LA Hwy 16 as Part of the New
50 Southside Elementary and Jr. High Schools
51 (Livingston)	$ 55,460
52 Total	$ 2,724,620
Page 44 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(573454)Grand Isle Back Levee Flood Protection, Planning and 
2 Construction
3 (Jefferson)
4 Payable from General Obligation Bonds
5	Priority 1	$ 1,500,000
636/L26NATCHITOCHES LEVEE AND DRAINAG E DISTRICT
7(573053)Levee Setbacks for the Campti-Clarence Levee and 
8 Powhatan Levee, Planning and Construction
9 (Natchitoches)
10 Payable from General Obligation Bonds
11	Priority 5	$ 1,665,000
12 Payable from State General Fund (Direct) Non-Recurring 
13 Revenues	$ 135,000
14 Total	$ 1,800,000
15(573674)Lower Cane River Area Flow Control Structure and Levee 
16 Surface Restorations, Planning and Construction
17 (Natchitoches)
18 Payable from General Obligation Bonds
19	Priority 1	$ 12,228
2036/L34LAKEFRONT MANAG EMENT AUTHORITY
21(572820)Seabrook Public Boat Launch Rehabilitation, Planning and 
22 Construction
23 (Orleans)
24 Payable from General Obligation Bonds
25	Priority 1	$ 100,000
26	Priority 5	$ 1,780,000
27 Total	$ 1,880,000
28(572823)Planning, Designing and Constructing Public Use Pavilions 
29 Inclusive of Benches and Tables along 5.2 Miles of Public 
30 Parks and Green Space along New Orleans Lakeshore Drive
31 (Orleans)
32 Payable from General Obligation Bonds
33	Priority 5	$ 168,750
3436/L36LAFITTE AREA INDEPENDENT LEVEE DISTRICT
35(573299)Lower Lafitte (Orange Street) Basin, Planning and 
36 Construction
37 (Jefferson)
38 Payable from General Obligation Bonds
39	Priority 1	$ 5,133,981
40	Priority 5	$ 3,992,500
41 Payable from the balance of general obligation bond
42 proceeds previously allocated under the authority of Act
43 2 of 2020 for Division of Administration, Repair,
44 Restoration and Replacement for Declared Disasters,
45 Planning, Construction, Renovation, and Acquisition
46 (Statewide), Act 4 of 2017 for LSU Health Sciences
47 Center - Shreveport, Capital Improvement Projects,
48 Design and Engineering (Caddo), Act 20 of 2019 for
49 Greater Lafourche Port Commission, Minor Cheramie
50 Road Paving, Planning and Construction (Lafourche), Act
51 20 of 2019 for Madisonville, Rehabilitation of Sewer Lift
52 Stations, Planning and Construction 
Page 45 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1 (St. Tammany)	$ 957,432
2 Payable from the balance of State General Funds (Direct)
3 previously allocated under the authority of Act 20 of 2019
4 for Sabine Parish, Water Treatment and Supply System
5 Study 
6 (Sabine) 	$ 17,600
7 Total	$10,101,513
8(573300)Goose Bayou/The Pen Levee Basin, Planning and 
9 Construction
10 (Jefferson)
11 Payable from General Obligation Bonds
12	Priority 1	$ 1,000,000
13	Priority 5	$14,066,000
14 Total	$15,066,000
1536/P05WEST CALCASIEU PORT
16(572519)New Property Along Gulf Intracoastal Waterway, Planning 
17 and Construction
18 (Calcasieu)
19 Payable from General Obligation Bonds
20	Priority 5	$ 2,000,000
2136/P10GREATER LAFOURCHE PORT COMMISSION
22(573227)Port Fourchon to Belle Pass Channel Deepening 
23 Project, Planning and Construction
24 (Lafourche)
25 Payable from General Obligation Bonds
26	Priority 5	$20,000,000
27(573229)Fourchon Bridge and Connector Road, Planning and 
28 Construction
29 (Lafourche)
30 Payable from General Obligation Bonds
31	Priority 1	$ 3,500,000
32	Priority 5	$ 1,910,000
33 Total	$ 5,410,000
3436/P17PORT OF NEW ORLEANS
35(572603)St. Claude Bridge Rehabilitation, Planning and Construction
36 (Orleans)
37 Payable from General Obligation Bonds
38	Priority 5	$27,500,000
39 Payable from State General Fund (Direct) Non-Recurring 
40 Revenues	$ 3,000,000
41 Total	$30,500,000
42(572604)St. Bernard Transportation Corridor, Planning and 
43 Construction
44 (St. Bernard)
45 Payable from General Obligation Bonds
46	Priority 1	$ 2,000,000
47	Priority 5	$48,000,000
48 Total	$50,000,000
Page 46 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(572815)Louisiana International Terminal Drainage, Site 
2 Preparation, Mitigation, Roadway and Rail 
3 Improvements, Planning and Construction
4 (St. Bernard)
5 Payable from General Obligation Bonds
6	Priority 5	$140,000,000
7 Payable from State General Fund (Direct) Non-Recurring 
8 Revenues	$10,000,000
9 Total	$150,000,000
1036/P21PORT OF SOUTH LOUISIANA
11(572164)Globalplex Dock Access Bridge and Equipment 
12 Replacement/Repair, Planning and Construction
13 (St. John the Baptist)
14 Payable from General Obligation Bonds
15	Priority 1	$10,800,750
16(572165)Globalplex Rail Connector, Planning and Construction
17 (St. John the Baptist)
18 Payable from General Obligation Bonds
19	Priority 5	$ 3,640,000
20 Payable from State General Fund (Direct) Non-Recurring
21 Revenues	$ 320,000
22 Total	$ 3,960,000
23(572166)Globalplex Road Improvements and Drainage between 
24 Globalplex Buildings 71 and 76, Planning and 
25 Construction
26 (St. John the Baptist)
27 Payable from General Obligation Bonds
28	Priority 1	$ 500,000
29(572167)Globalplex Roadway Improvements: Parking Area near 
30 Building 60, Planning and Construction
31 (St. John the Baptist)
32 Payable from General Obligation Bonds
33	Priority 1	$ 1,290,000
34(572168)Globalplex Roadway Improvements at Parking Area near 
35 Building 2, Planning and Construction
36 (St. John the Baptist)
37 Payable from General Obligation Bonds
38	Priority 1	$ 2,940,000
39(572169)Globalplex Terminal Building #71 and Other Globalplex 
40 Terminal Building Upgrades, Planning and Construction
41 (St. John the Baptist)
42 Payable from General Obligation Bonds
43	Priority 1	$ 567,361
44	Priority 5	$ 1,000,000
45 Total	$ 1,567,361
Page 47 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(572170)Globalplex Warehouse and Conveyance System, Planning 
2 and Construction
3 (St. John the Baptist)
4 Payable from General Obligation Bonds
5	Priority 5	$24,385,000
6 Payable from State General Fund (Direct) Non-Recurring
7 Revenues	$ 2,300,000
8 Total	$26,685,000
9(572171)Globalplex New Guard Station, Planning and Construction
10 (St. John the Baptist)
11 Payable from General Obligation Bonds
12	Priority 5	$ 1,580,000
13 Payable from State General Fund (Direct) Non-Recurring
14 Revenues	$ 145,000
15 Total	$ 1,725,000
16(572172)Globalplex Master Drainage Improvements, Planning and 
17 Construction
18 (St. John the Baptist)
19 Payable from General Obligation Bonds
20	Priority 5	$ 1,425,000
21 Payable from State General Fund (Direct) Non-Recurring
22 Revenues	$ 150,000
23 Total	$ 1,575,000
2436/P23TERREBONNE PORT COMMISSION
25(572160)Maritime Manufacturing Facility, Planning and 
26 Construction
27 (Terrebonne)
28 Payable from General Obligation Bonds
29	Priority 1	$ 4,000,000
30	Priority 5	$40,000,000
31 Total	$44,000,000
32(572161)Slip Dredging, Houma Navigation Canal Dredging, 
33 Planning and Construction
34 (Terrebonne)
35 Payable from General Obligation Bonds
36	Priority 1	$ 5,061,923
3736/P26PORT OF LAKE CHARLES
38(571902)Berths 4, 5, and 6 Wharf and Shed Reconstruction at 
39 City Docks, Planning and Construction
40 (Calcasieu)
41 Payable from General Obligation Bonds
42	Priority 1	$40,997,262
43	Priority 5	$53,900,000
44 Total	$94,897,262
45(573675)Two Mobile Harbor Cranes for BT-1, Planning and 
46 Construction
47 (Calcasieu)
48 Payable from General Obligation Bonds
49	Priority 1	$ 2,304,987
Page 48 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
136/P34WEST ST. MARY PARISH PORT
2(572913)Warehouse Facilities and Related Infrastructure 
3 Improvements (Baldwin Campus), Planning and 
4 Construction
5 (St. Mary)
6 Payable from General Obligation Bonds
7	Priority 1	$ 2,000,000
836/P35MERMENTAU RIVER HARBOR AND TERMINAL DISTRICT
9(573007)Slip Improvements, Planning and Construction
10 (Acadia)
11 Payable from General Obligation Bonds
12	Priority 1	$ 883,375
1336/P36CENTRAL LOUISIANA REG IONAL PORT
14(572355)Beaver Lake Industrial Park: A Strategic Initiative for
15 Dock Expansion, Road Accessibility, and Utility Services,
16 Planning and Construction
17 (Rapides)
18 Payable from General Obligation Bonds
19	Priority 5	$20,000,000
20(572413)CLRP High Water Hardstand and Access Road, 
21 Planning and Construction
22 (Rapides)
23 Payable from General Obligation Bonds
24	Priority 1	$ 153,550
25	Priority 5	$ 1,800,000
26 Total	$ 1,953,550
2736/P41JEFFERSON PARISH ECONOMIC DEVELOP MENT AND PORT 
28 DISTRICT
29(571998)Avondale Marine Facility Improvements, Planning and 
30 Construction
31 (Jefferson)
32 Payable from General Obligation Bonds
33	Priority 1	$ 661,792
34(571999)Restore Rail Connection and Crossing to Avondale 
35 Marine, Planning and Construction
36 (Jefferson)
37 Payable from General Obligation Bonds
38	Priority 1	$ 100,000
39	Priority 5	$ 3,700,000
40 Total	$ 3,800,000
4136/P43COLUMBIA PORT COMMISSION
42(573124)Railroad Spur, Planning and Construction
43 (Caldwell)
44 Payable from General Obligation Bonds
45	Priority 1	$ 117,846
46	Priority 5	$ 1,841,000
47 Total	$ 1,958,846
Page 49 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
136/P44AVOYELLES PORT COMMISSION
2(573677)Liquid Fertilizer Tank Terminal Expansion, Planning and 
3 Construction
4 (Avoyelles)
5 Payable from General Obligation Bonds
6	Priority 1	$ 150,000
7	Priority 5	$ 600,000
8 Total	$ 750,000
9	MISCELLANEOUS NON-STATE
1050/J01ACADIA PARISH
11(573009)Old Spanish Trail Roadway Improvements to Provide For 
12 Freight Traffic Bypass of Dangerous Railroad 
13 Crossing, Planning and Construction
14 (Acadia)
15 Payable from General Obligation Bonds
16	Priority 1	$ 745,000
1750/J02ALLEN PARISH
18(571789)Road Rehabilitation, Planning and Construction
19 (Allen)
20 Payable from General Obligation Bonds
21	Priority 5	$ 1,550,000
22(571790)Bridge Improvements, Planning and Construction
23 (Allen)
24 Payable from General Obligation Bonds
25	Priority 5	$ 3,050,000
2650/J03ASCENSION PARISH
27(572278)Parish Utilities of Ascension Water Plant Feed Tank, 
28 Planning and Construction
29 (Ascension)
30 Payable from General Obligation Bonds
31	Priority 5	$ 520,000
32(572279)Early Childhood Education Project, Planning and 
33 Construction
34 (Ascension)
35 Payable from General Obligation Bonds
36	Priority 5	$ 2,700,000
37 Payable from the balance of State General Fund (Direct)
38 previously allocated under the authority of Act 465 of
39 2023 for Ascension Parish, Energy Transition Parkway,
40 Planning and Construction
41 (Ascension)	$ 2,000,000
42 Total	$ 4,700,000
43(572573)LA 431 at LA 931 Roundabout, Planning and Construction
44 (Ascension)
45 Payable from General Obligation Bonds
46	Priority 5	$ 1,400,000
47 Payable from State General Fund (Direct) Non-Recurring
48 Revenues	$ 400,000
49 Total	$ 1,800,000
Page 50 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(572574)LA 73 at LA 30 Roundabout, Planning and Construction
2 (Ascension)
3 Payable from the balance of State General Fund (Direct)
4 previously allocated under the authority of Act 465 of
5 2023 for Ascension Parish, 4-Lane LA 30 from I-10 to
6 LA 73, Planning and Construction
7 (Ascension)	$ 5,000,000
8(572580)Parish Utilities of Ascension Water Plant Clarifiers, 
9 Planning and Construction
10 (Ascension)
11 Payable from General Obligation Bonds
12	Priority 5	$ 1,240,000
13(573812)LA 44 at LA 933/Parker Road Roundabout, Planning and 
14 Construction
15 (Ascension)
16 Payable from General Obligation Bonds
17	Priority 5	$ 2,150,000
18 Payable from State General Fund (Direct) Non-Recurring
19 Revenues	$ 400,000
20 Total	$ 2,550,000
2150/J04ASSUMPTION PARISH
22(572805)Assumption Parish Pumps and Drainage, Planning and 
23 Construction
24 (Assumption)
25 Payable from General Obligation Bonds
26	Priority 1	$ 470,000
27(572806)Plattenville Drainage Improvements, Planning and 
28 Construction
29 (Assumption)
30 Payable from General Obligation Bonds
31	Priority 1	$ 1,733,750
32(573667)Lee Drive Repaving, Planning and Construction
33 (Assumption)
34 Payable from General Obligation Bonds
35	Priority 1	$ 286,500
36	Priority 5	$ 1,428,000
37 Total	$ 1,714,500
3850/J05AVOYELLES PARISH
39(572202)Parishwide Roadway Improvements, Planning and 
40 Construction
41 (Avoyelles)
42 Payable from General Obligation Bonds
43	Priority 1	$ 500,000
44	Priority 5	$ 1,000,000
45 Total	$ 1,500,000
4650/J06BEAUREGARD PARISH
47(572673)Camp Edgewood Road Improvements - 
48 Beauregard Parish Police Jury
49 (Beauregard)
50 Payable from General Obligation Bonds
51	Priority 1	$ 750,000
Page 51 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(573668)Longview Road Improvements, Beauregard Parish 
2 Police Jury, Planning and Construction
3 (Beauregard)
4 Payable from General Obligation Bonds
5	Priority 5	$ 360,000
650/J08BOSSIER PARISH
7(572655)US Hwy 71 Four Lane Extension/Colleen Drive
8 Improvements, Planning and Construction
9 (Bossier)
10 Payable from General Obligation Bonds
11	Priority 5	$ 4,580,000
12(572660)Improvements to Highway 157, LA Highway 3227 to 
13 US Highway 80, Planning and Construction
14 (Bossier)
15 Payable from General Obligation Bonds
16	Priority 5	$11,200,000
17 Payable from State General Fund (Direct) Non-Recurring
18 Revenues	$ 2,000,000
19 Total	$13,200,000
20(572662)Improvements to LA Highway 3 (Benton Road) and
21 I-220 Interchange, Planning and Construction
22 (Bossier)
23 Payable from General Obligation Bonds
24	Priority 5	$ 4,000,000
2550/J10CALCASIEU PARISH
26(571864)Calcasieu Police Jury Gravity Sewer Trunk Mains and 
27 Pumping Station South Ward 3 and South Ward 4, 
28 Planning and Construction
29 (Calcasieu)
30 Payable from General Obligation Bonds
31	Priority 1	$ 1,051,454
32	Priority 5	$12,000,000
33 Total	$13,051,454
3450/J11CALDWELL PARISH
35(572936)Swim Lake Road, Planning and Construction
36 (Caldwell)
37 Payable from General Obligation Bonds
38	Priority 1	$ 450,000
39(573669)Wiles Road and Kountry Korner Road, Planning 
40 and Construction
41 (Caldwell)
42 Payable from General Obligation Bonds
43	Priority 1	$ 500,000
4450/J15CONCORDIA PARISH
45(572969)Roadway Reconstruction, Doty Road,
46 Planning and Construction
47 (Concordia)
48 Payable from General Obligation Bonds
49	Priority 5	$ 1,800,000
Page 52 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/J17EAST BATON ROUG E PARISH
2(572689)East Baton Rouge Parish Flood Risk Reduction Project- 
3 Expand, Repair, and Modify Drainage System throughout 
4 East Baton Rouge Parish
5 (East Baton Rouge)
6 Payable from General Obligation Bonds
7	Priority 1	$12,924,999
8	Priority 5	$22,000,000
9 Total	$34,924,999
1050/J18EAST CARROLL PARISH
11(573740)Spillway Structure Repairs for Lake Providence Lake and 
12 Cleaning of Outfall Canal from the Lake Downstream, 
13 Planning and Construction
14 (East Carroll)
15 Payable from General Obligation Bonds
16	Priority 1	$ 100,000
17	Priority 5	$ 300,000
18 Total	$ 400,000
1950/J21FRANKLIN PARISH
20(572323)Franklin Parish Activity Center, Planning and 
21 Construction
22 (Franklin)
23 Payable from General Obligation Bonds
24	Priority 1	$ 1,520,000
25(572754)Dr. Rogers Road Improvements, Planning and Construction
26 (Franklin)
27 Payable from General Obligation Bonds
28	Priority 5	$ 600,000
29(572755)Riley Road Improvements, Planning and Construction
30 (Franklin)
31 Payable from General Obligation Bonds
32	Priority 5	$ 1,000,000
33(572758)Erosion Control and Bank Stabilization at Big Creek Bridge 
34 and Looney Canal, Planning and Construction
35 (Franklin)
36 Payable from General Obligation Bonds
37	Priority 5	$ 600,000
38(573741)LD Knox Road Reconstruction, Planning and Construction
39 (Franklin)
40 Payable from General Obligation Bonds
41	Priority 5	$ 1,555,000
4250/J22GRANT PARISH
43(572949)Landfill Road Improvements, Planning and Construction
44 (Grant)
45 Payable from General Obligation Bonds
46	Priority 5	$ 765,000
Page 53 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/J23IBERIA PARISH
2(571681)LaSalle Street and Hanger Road Extensions, Planning and 
3 Construction
4 (Iberia)
5 Payable from General Obligation Bonds
6	Priority 1	$ 400,000
7(572985)Parish Jail Improvements, Planning and Construction
8 (Iberia)
9 Payable from General Obligation Bonds
10	Priority 1	$ 840,000
11 Payable from State General Fund (Direct) Non-Recurring
12 Revenues	$ 400,000
13 Total	$ 1,240,000
14(573742)Courthouse Elevators, Planning and Construction
15 (Iberia)
16 Payable from General Obligation Bonds
17	Priority 1	$ 171,900
18(573743)Evacuation Center at Acadiana Fairgrounds, Planning and 
19 Construction
20 (Iberia)
21 Payable from General Obligation Bonds
22	Priority 5	$ 8,000,000
2350/J24IBERVILLE PARISH
24(572184)Manchac Roadway Improvements
25 (Iberville)
26 Payable from General Obligation Bonds
27	Priority 1	$ 2,400,000
2850/J25JACKSON PARISH
29(572566)Lakeshore Drive Rehabilitation and Improvements, 
30 Planning and Construction
31 (Jackson)
32 Payable from General Obligation Bonds
33	Priority 1	$ 1,989,000
3450/J26JEFFERSON PARISH
35(571523)Airline Drive (US 61) at 17th Street Canal Drainage 
36 Crossing and Railroad Bridge Replacement
37 (Jefferson)
38 Payable from General Obligation Bonds
39	Priority 1	$ 7,291,250
40	Priority 5	$14,090,000
41 Total	$21,381,250
42(571524)11th Street Roadway Replacement and Upgrade of 
43 Subsurface Drainage System between Queens and 
44 Manhattan Boulevard, Planning and Construction
45 (Jefferson)
46 Payable from General Obligation Bonds
47	Priority 1	$ 200,000
48	Priority 5	$ 9,175,000
49 Total	$ 9,375,000
Page 54 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(571525)Bonnabel Canal Bank Stabilization (West Side) - 
2 Veterans Blvd. to West Esplanade, Planning and 
3 Construction
4 (Jefferson)
5 Payable from General Obligation Bonds
6	Priority 1	$ 1,100,000
7	Priority 5	$ 7,000,000
8 Total	$ 8,100,000
9(571526)Bainbridge Canal Closure from Veterans Boulevard to 
10 Terminal Drive, Planning and Construction
11 (Jefferson)
12 Payable from General Obligation Bonds
13	Priority 1	$ 930,000
14	Priority 5	$13,800,000
15 Total	$14,730,000
16(571527)Sewer Lift Station Backup Generators - North, 
17 Planning and Construction
18 (Jefferson)
19 Payable from General Obligation Bonds
20	Priority 1	$ 26,921
21(571528)Brown Avenue Canal Improvements between the 
22 Westbank Expressway and Harold Street, Planning 
23 and Construction
24 (Jefferson)
25 Payable from General Obligation Bonds
26	Priority 1	$ 1,705,920
27	Priority 5	$ 1,500,000
28 Total	$ 3,205,920
29(571529)Woodmere Playground Improvements, Planning and 
30 Construction
31 (Jefferson)
32 Payable from General Obligation Bonds
33	Priority 1	$ 2,039,163
34(571530)Woodmere Youth Center, Planning and Construction
35 (Jefferson)
36 Payable from General Obligation Bonds
37	Priority 1	$ 99,862
38(571531)Bucktown Harbor Wave Attenuation Jetty, Planning 
39 and Construction
40 (Jefferson)
41 Payable from General Obligation Bonds
42	Priority 1	$ 464,000
43(571532)West Esplanade Pump Station, Planning and 
44 Construction
45 (Jefferson)
46 Payable from General Obligation Bonds
47	Priority 1	$ 3,500,000
48	Priority 5	$ 3,700,000
49 Total	$ 7,200,000
Page 55 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(571533)Woodlake Estates Drainage Improvements, Planning and 
2 Construction
3 (Jefferson)
4 Payable from General Obligation Bonds
5	Priority 1	$ 500,000
6	Priority 5	$ 4,650,000
7 Total	$ 5,150,000
8(571534)Shrewsbury Road at Jefferson Highway Culvert 
9 Replacement, Planning and Construction
10 (Jefferson)
11 Payable from General Obligation Bonds
12	Priority 1	$ 450,000
13(571537)Jefferson Park Sport Field Renovation, Planning and 
14 Construction
15 (Jefferson)
16 Payable from General Obligation Bonds
17	Priority 5	$ 6,840,000
18(571539)Hickory Avenue (LA 3154) Rehabilitation (River Road 
19 to 10th Street), Planning and Construction
20 (Jefferson)
21 Payable from General Obligation Bonds
22	Priority 1	$ 600,000
23	Priority 5	$ 6,270,000
24 Total	$ 6,870,000
25(571540)4th Street Shared-Use Path (Barataria Blvd. to Gretna 
26 City Limits), Planning and Construction
27 (Jefferson)
28 Payable from General Obligation Bonds
29	Priority 1	$ 225,000
30	Priority 5	$ 4,146,600
31 Total	$ 4,371,600
32(571542)Bucktown Harbor Boardwalk and Kayak Launch, 
33 Planning and Construction
34 (Jefferson)
35 Payable from General Obligation Bonds
36	Priority 5	$ 1,575,000
37(571543)Gretna Government Complex Parking Lot, Planning 
38 and Construction
39 (Jefferson)
40 Payable from General Obligation Bonds
41	Priority 1	$ 2,928,000
42	Priority 5	$ 7,671,600
43 Total	$10,599,600
44(571544)Vietnamese American Cultural and Service Center, 
45 Planning and Construction
46 (Jefferson)
47 Payable from General Obligation Bonds
48	Priority 5	$ 3,550,000
Page 56 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(571554)Preservation and Restoration of Historic Structures 
2 for Hope Haven/Madonna Manor Campus, Planning 
3 and Construction
4 (Jefferson)
5 Payable from General Obligation Bonds
6	Priority 1	$ 7,047,048
7(571571)East Bank Backup Generators West: Sewer Lift Station 
8 Backup Generators (Camp Plauche, Transcontinental 
9 at West Metairie, and Transcontinental at Vineland)
10 (Jefferson)
11 Payable from General Obligation Bonds
12	Priority 5	$ 2,000,000
13(571582)Barataria Blvd. (LA 45) Drainage Improvements 
14 (Merlin Lane to Pritchard Road), Planning and Construction
15 (Jefferson)
16 Payable from General Obligation Bonds
17	Priority 5	$ 6,500,000
18(571583)Woodland West Drainage Improvements, Planning and 
19 Construction
20 (Jefferson)
21 Payable from General Obligation Bonds
22	Priority 1	$ 344,655
23	Priority 5	$ 1,000,000
24 Total	$ 1,344,655
25(571584)Riverside Senior Center, Planning and Construction
26 (Jefferson)
27 Payable from General Obligation Bonds
28	Priority 1	$ 948,000
29	Priority 5	$ 1,455,000
30 Total	$ 2,403,000
31(571586)Canal #13 Concrete Lining (Loyola Drive to Butler Canal)
32 (Jefferson)
33 Payable from General Obligation Bonds
34	Priority 1	$ 250,000
35	Priority 5	$ 3,750,000
36 Total	$ 4,000,000
37(571587)East Bank Backup Generators East: Sewer Lift Station 
38 Backup Generators (Clearview at W. Napoleon, Cleary 
39 at W. Napoleon, Houma at W. Napoleon and Galleria 
40 Sewer Station), Planning and Construction
41 (Jefferson)
42 Payable from General Obligation Bonds
43	Priority 1	$ 250,000
44	Priority 5	$ 1,500,000
45 Total	$ 1,750,000
46(571589)New Access Road in the Churchill Technology and 
47 Business Park for Delgado's Advanced Manufacturing 
48 and River City Campus, Planning and Construction
49 (Jefferson)
50 Payable from General Obligation Bonds
51	Priority 1	$ 200,000
52	Priority 5	$ 1,350,000
53 Total	$ 1,550,000
Page 57 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/J28LAFAYETTE PARISH
2(571465)State Interchange Improvements, Planning and 
3 Construction
4 (Lafayette)
5 Payable from General Obligation Bonds
6	Priority 5	$11,325,000
7(571466)Rue Du Belier Widening, Planning and 
8 Construction
9 (Lafayette)
10 Payable from General Obligation Bonds
11	Priority 1	$ 2,000,000
12	Priority 5	$ 5,000,000
13 Total	$ 7,000,000
14(571467)Parish Road Overlay, Planning and Construction
15 (Lafayette)
16 Payable from General Obligation Bonds
17	Priority 5	$ 7,000,000
18(571469)Lake Farm to Verot School Road Extension, Planning and 
19 Construction
20 (Lafayette)
21 Payable from General Obligation Bonds
22	Priority 5	$ 2,500,000
23(571470)Isaac Verot Coulee - Main Channel Hardening, Planning 
24 and Construction
25 (Lafayette)
26 Payable from General Obligation Bonds
27	Priority 5	$11,000,000
28(571472)Ingress and Egress Interchange Improvements, Planning 
29 and Construction
30 (Lafayette)
31 Payable from General Obligation Bonds
32	Priority 5	$10,000,000
33(571473)E Broussard Roundabout, Planning and Construction
34 (Lafayette)
35 Payable from General Obligation Bonds
36	Priority 5	$ 2,000,000
37(571474)Cue Road Extension, Planning and Construction
38 (Lafayette)
39 Payable from General Obligation Bonds
40	Priority 5	$ 3,500,000
41(571475)University Avenue Corridor Improvements, 
42 Planning, Construction and Acquisition
43 (Lafayette)
44 Payable from General Obligation Bonds
45	Priority 1	$13,000,000
Page 58 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(571476)Bayou Vermilion Flood Control, Planning and 
2 Construction
3 (Lafayette)
4 Payable from General Obligation Bonds
5	Priority 1	$13,000,000
6	Priority 5	$22,000,000
7 Total	$35,000,000
8(571477)Parish Government Complex, Parish Courthouse, 
9 Planning and Construction
10 (Lafayette)
11 Payable from General Obligation Bonds
12	Priority 1	$ 4,365,450
13(571478)Parish Government Complex, Jail, New Design, Planning, 
14 and Construction
15 (Lafayette)
16 Payable from General Obligation Bonds
17	Priority 5	$35,000,000
18(571480)Heymann Park Improvements Project, Planning and 
19 Construction
20 (Lafayette)
21 Payable from General Obligation Bonds
22	Priority 1	$ 1,925,000
2350/J29LAFOURCHE PARISH
24(572994)Butch Hill Pump Station Replacement, Planning and 
25 Construction
26 (Lafourche)
27 Payable from General Obligation Bonds
28	Priority 1	$ 646,000
29	Priority 5	$ 3,100,000
30 Total	$ 3,746,000
31(572995)South Lafourche Airport Corridor Project
32 (Lafourche)
33 Payable from General Obligation Bonds
34	Priority 1	$ 6,621,024
3550/J31LINCOLN PARISH
36(573131)Bridge Replacements on Mitchell and Shady 
37 Grove Roads, Planning and Construction
38 (Lincoln)
39 Payable from General Obligation Bonds
40	Priority 1	$ 380,000
4150/J32LIVINGSTON PARISH
42(571905)Cook Road Extension Economic Development 
43 Corridor (Pete's Highway Frontage Road)
44 (Livingston)
45 Payable from General Obligation Bonds
46	Priority 1	$ 1,949,731
Page 59 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(571906)Juban Road North Extension between US 190 
2 (Florida Blvd.) and LA 1026 (Lockhart Road), 
3 Planning and Construction
4 (Livingston)
5 Payable from General Obligation Bonds
6	Priority 5	$ 6,005,000
750/J34MOREHOUSE PARISH
8(573105)Public Works Center, Planning and Construction
9 (Morehouse)
10 Payable from General Obligation Bonds
11	Priority 1	$ 301,750
1250/J35NATCHITOCHES P ARISH
13(572896)Resurfacing of Goldonna Road, Planning and Construction
14 (Natchitoches)
15 Payable from General Obligation Bonds
16	Priority 5	$ 3,560,000
17 Payable from State General Fund (Direct) Non-Recurring 
18 Revenues	$ 440,000
19 Total	$ 4,000,000
20(573744)Courthouse Security Improvements, Planning and 
21 Construction
22 (Natchitoches)
23 Payable from General Obligation Bonds
24	Priority 1	$ 2,154,895
2550/J37OUACHITA PARISH
26(572950)Cheniere Lake Area 1 Improvements, Planning and 
27 Construction
28 (Ouachita)
29 Payable from General Obligation Bonds
30	Priority 1	$ 1,080,000
31(572951)Steep Bayou Sewer - Phase 3, Planning, Construction 
32 and Right-of-Way Acquisition
33 (Ouachita)
34 Payable from General Obligation Bonds
35	Priority 1	$ 354,137
36	Priority 5	$ 3,580,000
37 Total	$ 3,934,137
38(572952)Bayou Mouchoir Drainage Improvements
39 (Ouachita)
40 Payable from General Obligation Bonds
41	Priority 1	$ 477,500
42(572956)Force Main Replacement for Lift Station N, Planning, 
43 Right-of-Way, and Construction
44 (Ouachita)
45 Payable from General Obligation Bonds
46	Priority 5	$ 1,000,000
Page 60 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(572957)Black Bayou Lake Control Structure & Canal to Bayou 
2 DeSiard, Planning, Right-of-Way and Construction
3 (Ouachita)
4 Payable from State General Fund (Direct) Non-Recurring
5 Revenues	$ 1,700,000
6(572958)Elkins Road Improvements, Planning,
7 Right-of-Way, and Construction
8 (Ouachita)
9 Payable from General Obligation Bonds
10	Priority 5	$ 1,535,000
11(573745)Hannah's Run Control Structure, Planning and Construction
12 (Ouachita)
13 Payable from General Obligation Bonds
14	Priority 1	$ 187,385
1550/J38PLAQUEMINES PARISH
16(572485)Empire Bridge Lighting, Planning and Construction
17 (Plaquemines)
18 Payable from General Obligation Bonds
19	Priority 1	$ 197,000
20(573828)Plaquemines Parish Public Safety Answering Point 
21 (PSAP), Planning and Construction
22 (Plaquemines)
23 Payable from General Obligation Bonds
24	Priority 5	$ 2,000,000
2550/J39POINTE COUPEE PARISH
26(573207)Portage Canal Drainage Project, Planning and Construction
27 (Pointe Coupee)
28 Payable from General Obligation Bonds
29	Priority 5	$ 2,000,000
30(573208)Watershed Drainage Improvements Bayou Grosse Tete, 
31 Bayou Cholpe, Bayou Choctaw, False River Outfall 
32 Channel, and Johnson Bayou, Planning and Construction
33 (Pointe Coupee)
34 Payable from General Obligation Bonds
35	Priority 1	$ 1,956,500
36(573209)False River Ecosystem Restoration Project, Including 
37 Bulkhead Replacement, Planning and Construction
38 (Pointe Coupee)
39 Payable from General Obligation Bonds
40	Priority 1	$ 2,205,070
41	Priority 5	$ 5,600,000
42 Total	$ 7,805,070
43(573746)Courthouse Restoration - Phase 2, Planning and 
44 Construction
45 (Pointe Coupee)
46 Payable from General Obligation Bonds
47	Priority 1	$ 2,943,750
Page 61 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/J40RAPIDES PARISH
2(572489)Philadelphia Road Street Improvements, Planning and 
3 Construction
4 (Rapides)
5 Payable from General Obligation Bonds
6	Priority 1	$ 500,000
7	Priority 5	$ 2,950,000
8 Total	$ 3,450,000
9(572490)Gunter Road/Barron Chapel Road Street 
10 Improvements, Planning and Construction
11 (Rapides)
12 Payable from General Obligation Bonds
13	Priority 1	$ 1,450,000
14(572491)New Fire Station at LSU Alexandria Serving Rapides 
15 Parish - Fire District 18, Planning and Construction
16 (Rapides)
17 Payable from General Obligation Bonds
18	Priority 5	$ 1,300,000
1950/J43SABINE PARISH
20(573747)Plainview Road Rehabilitation, Planning and Construction
21 (Sabine)
22 Payable from General Obligation Bonds
23	Priority 1	$ 1,837,720
2450/J44ST. BERNARD PARISH
25(572526)St. Bernard Parish Jail Renovations, Planning and 
26 Construction
27 (St. Bernard)
28 Payable from General Obligation Bonds
29	Priority 1	$ 2,947,500
30	Priority 5	$ 5,000,000
31 Total	$ 7,947,500
3250/J45ST. CHARLES PARISH
33(572419)Des Allemans Bulkhead - Phase 1, Planning and 
34 Construction
35 (St. Charles)
36 Payable from General Obligation Bonds
37	Priority 1	$ 150,000
38	Priority 5	$ 2,622,500
39 Total	$ 2,772,500
40(572512)Fairfield and Oakland Pump Station Discharge 
41 Improvements, Planning and Construction
42 (St. Charles)
43 Payable from General Obligation Bonds
44	Priority 1	$ 825,000
Page 62 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(572577)Paul Fredrick Street and Kinler Street Demolition and 
2 Reconstruction
3 (St. Charles)
4 Payable from General Obligation Bonds
5	Priority 1	$ 175,000
6	Priority 5	$ 2,825,000
7 Total	$ 3,000,000
8(572676)Fifth Street Drainage Improvements, Planning and 
9 Construction
10 (St. Charles)
11 Payable from General Obligation Bonds
12	Priority 1	$ 350,107
13	Priority 5	$ 450,000
14 Total	$ 800,107
1550/J46ST. HELENA PARISH
16(572833)Audubon Library, Planning and Construction
17 (St. Helena)
18 Payable from General Obligation Bonds
19	Priority 1	$ 1,163,600
2050/J47ST. JAMES PARISH
21(573190)LA 3127 Widening (LA 20 to LA 3213), Planning and 
22 Construction
23 (St. James)
24 Payable from General Obligation Bonds
25	Priority 1	$ 979,708
26	Priority 5	$11,900,000
27 Total	$12,879,708
28(573191)Storm Damage Repair to Dock on Blind River, Planning 
29 and Construction
30 (St. James)
31 Payable from General Obligation Bonds
32	Priority 5	$ 500,000
33(573192)West Shore Risk Reduction Connector Levee
34 (St. James)
35 Payable from General Obligation Bonds
36	Priority 1	$ 3,650,000
37	Priority 5	$15,200,000
38 Total	$18,850,000
39(573193)Parishwide Road Rehabilitation, Planning and Construction
40 (St. James)
41 Payable from General Obligation Bonds
42	Priority 1	$ 1,000,000
4350/J49ST. LANDRY PARISH
44(572306)Parish Wide Road Program, Planning and Construction
45 (St. Landry)
46 Payable from General Obligation Bonds
47	Priority 1	$ 2,500,000
48	Priority 5	$ 2,500,000
49 Total	$ 5,000,000
Page 63 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(573748)Parish Wide Drainage Project, Planning and Construction
2 (St. Landry)
3 Payable from General Obligation Bonds
4	Priority 1	$ 1,000,000
5(573749)Courthouse Renovations, Planning and Construction
6 (St. Landry)
7 Payable from General Obligation Bonds
8	Priority 1	$ 60,190
950/J50ST. MARTIN PARISH
10(571680)I-10 Frontage Road, LA 328 to LA 347, Planning and 
11 Construction
12 (St. Martin)
13 Payable from General Obligation Bonds
14	Priority 5	$ 1,000,000
15(572062)Spanish Trail Industrial Park Access Road, Planning and 
16 Construction
17 (St. Martin)
18 Payable from General Obligation Bonds
19	Priority 1	$ 4,100,000
20(572063)Road Improvements on Four-Mile Bayou Road
21 (St. Martin)
22 Payable from General Obligation Bonds
23	Priority 1	$ 72,263
24	Priority 5	$ 500,000
25 Total	$ 572,263
26(572064)Joe Daigre Canal Drainage Improvements, Planning and 
27 Construction
28 (St. Martin)
29 Payable from General Obligation Bonds
30	Priority 1	$ 700,398
31	Priority 5	$ 550,000
32 Total	$ 1,250,398
3350/J51ST. MARY PARISH
34(572436)Infrastructure Improvements and Construction of a 
35 Welding Training Center Facility at the Charenton Canal 
36 Industrial Park
37 (St. Mary)
38 Payable from General Obligation Bonds
39	Priority 5	$ 527,000
40(572437)Reconstruction of Martin Luther King Roadway in Charenton 
41 for St. Mary Parish Government, within Existing 
42 Right-of-Way, Planning and Construction
43 (St. Mary)
44 Payable from General Obligation Bonds
45	Priority 1	$ 47,245
46(572438)Emergency Power Improvements at St. Mary Parish 
47 Courthouse, Planning and Construction
48 (St. Mary)
49 Payable from General Obligation Bonds
50	Priority 1	$ 238,750
Page 64 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/J52ST. TAMMANY PARISH
2(573337)Harrison Avenue Widening, Planning and Construction
3 (St. Tammany)
4 Payable from General Obligation Bonds
5	Priority 5	$13,300,000
6(573338)University Square Learning Center Facilities, Planning 
7 and Construction
8 (St. Tammany)
9 Payable from General Obligation Bonds
10	Priority 1	$ 208,740
11	Priority 5	$10,630,000
12 Total	$10,838,740
13(573340)Highway 11 - Opportunity Zone, Sewer & Water 
14 Improvements, Planning and Construction
15 (St. Tammany)
16 Payable from General Obligation Bonds
17	Priority 5	$28,000,000
18(573341)Fabourg Coquille Water Quality Improvements, Planning 
19 and Construction
20 (St. Tammany)
21 Payable from General Obligation Bonds
22	Priority 5	$ 6,050,000
23(573343)East St. Tammany Regional Sewer Consolidation 
24 Design, Planning and Construction
25 (St. Tammany)
26 Payable from General Obligation Bonds
27	Priority 5	$30,000,000
28(573346)Safe Haven Campus for Behavioral and Mental Health, 
29 Planning, Construction and Renovation for Triage
30 (St. Tammany)
31 Payable from General Obligation Bonds
32	Priority 1	$ 3,118,694
33	Priority 5	$ 8,350,000
34 Total	$11,468,694
35(573347)Ben Thomas - Stone Road to Powell Drive, Design, 
36 Planning, and Construction
37 (St. Tammany)
38 Payable from General Obligation Bonds
39	Priority 1	$ 500,000
40	Priority 5	$ 3,200,000
41 Total	$ 3,700,000
42(573348)South Slidell Levee Protection Rehabilitation: (USACE 
43 533d  Report or Planning, Land Acquisition, and 
44 Construction of Levees West and East of Interstate 10)
45 (St. Tammany)
46 Payable from General Obligation Bonds
47	Priority 1	$ 750,000
48	Priority 5	$ 9,108,000
49 Total	$ 9,858,000
Page 65 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(573355)LA 1077 Widening, Design, Right of Way, Planning and 
2 Construction
3 (St. Tammany)
4 Payable from General Obligation Bonds
5	Priority 1	$ 20,000
6	Priority 5	$20,000,000
7 Total	$20,020,000
8(573356)Sharp Road Improvements and Sidewalk, Planning and 
9 Construction
10 (St. Tammany)
11 Payable from General Obligation Bonds
12	Priority 5	$ 6,125,000
13(573357)Emerald Forrest Boulevard to LA 59, Design, Planning 
14 and Construction
15 (St. Tammany)
16 Payable from General Obligation Bonds
17	Priority 5	$13,000,000
18(573363)Hwy 1088/I-12 AML Corridor Initiative,
19 Planning and Construction
20 (St. Tammany)
21 Payable from General Obligation Bonds
22	Priority 5	$ 5,625,000
23(573813)Safe Haven Behavioral Health Campus Roads, 
24 Design, Planning and Construction
25 (St. Tammany)
26 Payable from General Obligation Bonds
27	Priority 5	$ 2,250,000
28(573824)Hwy 11 Regional Water Consolidation Design, Planning 
29 and Construction
30 (St. Tammany)
31 Payable from General Obligation Bonds
32	Priority 5	$20,000,000
3350/J53TANGIPAHOA PARISH
34(572581)North Hoover Road Improvements Phase 2, Planning and 
35 Construction
36 (Tangipahoa)
37 Payable from General Obligation Bonds
38	Priority 1	$ 2,725,000
39(572605)South Airport Road, North Hoover Road 
40 Improvements, Planning and Construction
41 (Tangipahoa)
42 Payable from General Obligation Bonds
43	Priority 1	$ 386,789
44	Priority 5	$ 2,000,000
45 Total	$ 2,386,789
4650/J54TENSAS PARISH
47(571744)Tensas Parish/Port Priority Site Plan, Planning and 
48 Construction
49 (Tensas)
50 Payable from General Obligation Bonds
51	Priority 1	$ 214,800
Page 66 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(571745)Lide Road Improvements, Planning and Construction
2 (Tensas)
3 Payable from General Obligation Bonds
4	Priority 1	$ 776,277
5(571746)Recreation Facility, Planning and Construction
6 (Tensas)
7 Payable from General Obligation Bonds
8	Priority 1	$ 230,000
9	Priority 5	$ 5,048,000
10 Total	$ 5,278,000
1150/J55TERREBONNE PARISH
12(572636)Company Canal Miter Gate in Bourg, Planning and 
13 Construction
14 (Terrebonne)
15 Payable from General Obligation Bonds
16	Priority 5	$ 9,000,000
17 Payable from State General Fund (Direct) Non-Recurring
18 Revenues	$ 500,000
19 Total	$ 9,500,000
20(572637)Bayou Terrebonne Miter Gate, Twin Span Location, 
21 Planning and Construction
22 (Terrebonne)
23 Payable from General Obligation Bonds
24	Priority 5	$ 9,000,000
25 Payable from State General Fund (Direct) Non-Recurring
26 Revenues	$ 500,000
27 Total	$ 9,500,000
28(572638)Valhi Extension (Savanne to LA 311), Planning and 
29 Construction
30 (Terrebonne)
31 Payable from General Obligation Bonds
32	Priority 5	$32,000,000
33(572640)Industrial Boulevard Pump Station, Planning and 
34 Construction
35 (Terrebonne)
36 Payable from General Obligation Bonds
37	Priority 5	$ 900,000
38(572642)Bayou LaCarpe Watershed Project, Location C, Design and 
39 Construction
40 (Terrebonne)
41 Payable from General Obligation Bonds
42	Priority 1	$ 675,000
43	Priority 5	$ 9,000,000
44 Total	$ 9,675,000
45(572668)Replacement of D-18 Pump Station Falgout Canal, 
46 Theriot, La., Planning and Construction
47 (Terrebonne)
48 Payable from General Obligation Bonds
49	Priority 5	$ 2,125,000
Page 67 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(572669)Replacement of Brady Road Bridge, Planning and 
2 Construction
3 (Terrebonne)
4 Payable from General Obligation Bonds
5	Priority 1	$ 1,811,000
6	Priority 5	$ 4,035,000
7 Total	$ 5,846,000
8(572753)South Louisiana Wetland Discovery Center - Phase 2 - 
9 Bayou Country Institute, Planning and Construction
10 (Terrebonne)
11 Payable from General Obligation Bonds
12	Priority 1	$ 387,931
13(573172)Terrebonne Sports Complex, Planning and Construction
14 (Terrebonne)
15 Payable from General Obligation Bonds
16	Priority 1	$ 1,158,534
17(573173)Westside/Alma Street Drainage, Planning and Construction
18 (Terrebonne)
19 Payable from General Obligation Bonds
20	Priority 1	$ 101,868
2150/J58VERNON PARISH
22(572065)Tom Beckom Road Improvements,
23 Planning and Construction
24 (Vernon)
25 Payable from General Obligation Bonds
26	Priority 5	$ 900,000
27(572069)Bailey Road Improvements, Planning and Construction
28 (Vernon)
29 Payable from General Obligation Bonds
30	Priority 5	$ 5,280,000
31 Payable from State General Fund (Direct) Non-Recurring
32 Revenues	$ 480,000
33 Total	$ 5,760,000
34(572070)East Hawthorne Road Improvements,
35 Planning and Construction
36 (Vernon)
37 Payable from General Obligation Bonds
38	Priority 5	$ 1,800,000
39(572071)Lake Vernon Road and Spillway Road Improvements, 
40 Planning and Construction
41 (Vernon)
42 Payable from General Obligation Bonds
43	Priority 5	$ 1,910,000
44 Payable from State General Fund (Direct) Non-Recurring
45 Revenues	$ 250,000
46 Total	$ 2,160,000
47(573750)Vernon/Fort Johnson formerly Fort Polk Thoroughfare 
48 Electrical Power Extension, and Utilities Including
49 Generators
50 (Vernon)
51 Payable from General Obligation Bonds
52	Priority 1	$ 468,000
Page 68 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/J59WASHINGTON PARISH
2(573751)Pearl River Navigational Canal, Planning, Construction, 
3 and Acquisition
4 (Washington)
5 Payable from General Obligation Bonds
6	Priority 1	$ 500,000
7(573752)Washington Parish Jail Renovations Including HVAC, 
8 Security and ADA, Planning and Construction
9 (Washington)
10 Payable from General Obligation Bonds
11	Priority 1	$ 936,400
12(573753)Washington Parish Courthouse Renovation and 
13 HVAC, Planning and Construction
14 (Washington)
15 Payable from General Obligation Bonds
16	Priority 1	$ 382,000
1750/J63WEST FELICIANA PARISH
18(572265)West Feliciana Port Infrastructure, Planning, Engineering, 
19 and Construction
20 (West Feliciana)
21 Payable from General Obligation Bonds
22	Priority 1	$ 736,563
23	Priority 5	$ 2,140,000
24 Total	$ 2,876,563
2550/J64WINN PARISH
26(572235)Roadway Reconstruction, Mars Hill Church Road, 
27 Planning and Construction
28 (Winn)
29 Payable from General Obligation Bonds
30	Priority 5	$ 1,800,000
31(572244)Roadway Reconstruction, Eugene Garrett Road, 
32 Planning and Construction
33 (Winn)
34 Payable from General Obligation Bonds
35	Priority 1	$ 367,675
36(572246)Roadway Reconstruction, Frank White Road, Planning and 
37 Construction
38 (Winn)
39 Payable from General Obligation Bonds
40	Priority 1	$ 439,300
41(572247)Roadway Reconstruction, Brownville Road, Planning and 
42 Construction
43 (Winn)
44 Payable from General Obligation Bonds
45	Priority 1	$ 319,925
46(573147)Roadway Reconstruction, Lum Fox Road, Planning and 
47 Construction
48 (Winn)
49 Payable from State General Fund (Direct) Non-Recurring 
50 Revenues	$ 440,000
Page 69 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(573754)Roadway Reconstruction, Williams Loop, Cole, Oak 
2 Ridge and Pine Ridge Roadways, Planning and Construction
3 (Winn)
4 Payable from General Obligation Bonds
5	Priority 1	$ 7,918
650/M01ABBEVILLE
7(573382)Street and Sidewalk Improvements,
8 Planning and Construction
9 (Vermilion)
10 Payable from General Obligation Bonds
11	Priority 5	$ 1,125,000
1250/M05ALEXANDRIA
13(572882)Sugarhouse Road/Eddie Williams Boulevard to LA 
14 Highway 1, Phase I and II, Planning and Construction 
15 ($5,000,000 Local Match)
16 (Rapides)
17 Payable from General Obligation Bonds
18	Priority 1	$ 2,972,100
19	Priority 5	$ 4,620,000
20 Total	$ 7,592,100
2150/M06AMITE
22(573091)Regional Wastewater Treatment and Transmission 
23 Facilities, Planning and Construction
24 (Tangipahoa)
25 Payable from General Obligation Bonds
26	Priority 5	$32,750,000
27 Payable from State General Fund (Direct) Non-Recurring
28 Revenues	$ 8,000,000
29 Total	$40,750,000
30(573804)Amite Governmental Complex, Planning and Construction
31 (Tangipahoa)
32 Payable from General Obligation Bonds
33	Priority 1	$ 310,000
34	Priority 5	$ 2,600,000
35 Total	$ 2,910,000
3650/M07ANACOCO
37(573757)Street Rehabilitation - Ross Road, Lula Street, and Loop 
38 Drive, Planning and Construction
39 (Vernon)
40 Payable from General Obligation Bonds
41	Priority 1	$ 33,636
4250/M14BAKER
43(573650)Sidewalk Construction for Underdeveloped Streets and 
44 Culverts, Planning and Construction
45 (East Baton Rouge)
46 Payable from General Obligation Bonds
47	Priority 5	$ 1,875,000
Page 70 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(573651)Drainage Improvements and Upgrades, Planning and 
2 Construction
3 (East Baton Rouge)
4 Payable from General Obligation Bonds
5	Priority 5	$ 2,600,000
650/M15BALDWIN
7(573818)Potable Water System Improvements, Planning and 
8 Construction
9 (St. Mary)
10 Payable from General Obligation Bonds
11	Priority 1	$ 116,591
12	Priority 5	$ 700,000
13 Total	$ 816,591
14(573829)Wastewater System Repair and Improvements, Planning and 
15 Construction
16 (St. Mary)
17 Payable from General Obligation Bonds
18	Priority 5	$ 1,000,000
1950/M17BASILE
20(572425)Re-Coating of Elevated Water Tank,
21 Planning and Construction
22 (Evangeline)
23 Payable from General Obligation Bonds
24	Priority 5	$ 565,000
2550/M19BASTROP
26(573653)City Hall - Roof Replacement, Planning and Construction
27 (Morehouse)
28 Payable from General Obligation Bonds
29	Priority 1	$ 347,150
3050/M20BATON ROUGE
31(572687)Chaneyville Fire District No. 7 Reames Road Fire 
32 Station, Planning and Construction
33 (East Baton Rouge)
34 Payable from General Obligation Bonds
35	Priority 5	$ 300,000
36(572688)Old Hammond Hwy. (LA 426) Roadway Improvements 
37 from Blvd. De Province to Millerville Road, Planning 
38 and Construction
39 (East Baton Rouge)
40 Payable from General Obligation Bonds
41	Priority 1	$ 450,000
42	Priority 5	$ 9,250,000
43 Total	$ 9,700,000
44(572691)Hooper Road Widening and Sewer Improvements 
45 (Blackwater Bayou to Sullivan Road) Planning, 
46 Engineering, Utilities and Construction
47 (East Baton Rouge)
48 Payable from General Obligation Bonds
49	Priority 1	$ 5,000,000
50	Priority 5	$ 4,500,000
51 Total	$ 9,500,000
Page 71 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/M22BENTON
2(572867)Wastewater Collection Improvements (Courthouse
3 Subbasin), Planning and Construction
4 (Bossier)
5 Payable from General Obligation Bonds
6	Priority 5	$ 3,400,000
750/M27BOGALUSA
8(572154)Community Center and Emergency Shelter, Planning 
9 and Construction
10 (Washington)
11 Payable from General Obligation Bonds
12	Priority 1	$ 500,000
13	Priority 5	$10,500,000
14 Total	$11,000,000
15(572155)City Hall Renovations
16 (Washington)
17 Payable from General Obligation Bonds
18	Priority 1	$ 210,000
19(573756)Davenport Avenue Bridge, Servitude Street Emergency 
20 Replacement and Repair, Planning and Construction
21 (Washington)
22 Payable from General Obligation Bonds
23	Priority 5	$ 565,000
2450/M28BONITA
25(572711)Municipal Complex, Planning and Construction
26 (Morehouse)
27 Payable from General Obligation Bonds
28	Priority 1	$ 400,000
29	Priority 5	$ 1,850,000
30 Total	$ 2,250,000
3150/M31BREAUX BRIDGE
32(573758)Water Treatment Plant Improvements, Planning and 
33 Construction
34 (St. Martin)
35 Payable from General Obligation Bonds
36	Priority 1	$ 35,500
3750/M32BROUSSARD
38(571676)Water System Groundwater Storage Tank, Planning and 
39 Construction
40 (Lafayette)
41 Payable from General Obligation Bonds
42	Priority 1	$ 125,000
43	Priority 5	$ 1,000,000
44 Total	$ 1,125,000
45(571950)Highway 89 Improvements, Planning and Construction
46 (Lafayette)
47 Payable from General Obligation Bonds
48	Priority 1	$ 3,842,500
49	Priority 5	$ 4,000,000
50 Total	$ 7,842,500
Page 72 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(571951)Albertson Parkway Water Well and Ground Storage 
2 Tank, Planning and Construction
3 (Lafayette)
4 Payable from General Obligation Bonds
5	Priority 1	$ 390,000
6	Priority 5	$ 4,216,000
7 Total	$ 4,606,000
8(571952)Marteau Road Water Well, Planning and Construction
9 (Lafayette)
10 Payable from General Obligation Bonds
11	Priority 1	$ 390,000
12	Priority 5	$ 4,200,000
13 Total	$ 4,590,000
14(573759)Reconstruct South Bernard Road from LA Hwy 182 to 
15 US Hwy 90, Planning and Construction
16 (Lafayette)
17 Payable from General Obligation Bonds
18	Priority 1	$ 4,430,490
1950/M39CARENCRO
20(571784)City Wide Water Main Rehabilitation Project, Planning
21 and Construction
22 (Lafayette)
23 Payable from General Obligation Bonds
24	Priority 5	$ 6,000,000
25 Payable from State General Fund (Direct) Non-Recurring
26 Revenues	$ 1,000,000
27 Total	$ 7,000,000
28(573760)I-49 to Gloria Switch Coulee Project, Planning and 
29 Construction
30 (Lafayette)
31 Payable from General Obligation Bonds
32	Priority 1	$ 419,972
33(573762)Wastewater and City Infrastructure Flood Damages, Planning 
34 and Construction
35 (Lafayette)
36 Payable from General Obligation Bonds
37	Priority 1	$ 359,077
3850/M44CHOUDRANT
39(573303)New Town Hall, Planning and Construction
40 (Lincoln)
41 Payable from General Obligation Bonds
42	Priority 1	$ 150,000
43	Priority 5	$ 1,096,586
44 Total	$ 1,246,586
4550/M45CHURCH POINT
46(573023)Street and Drainage Improvements, Planning and 
47 Construction
48 (Acadia)
49 Payable from General Obligation Bonds
50	Priority 1	$ 548,000
Page 73 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(573763)Sewer System Improvements, Planning and Construction
2 (Acadia)
3 Payable from General Obligation Bonds
4	Priority 1	$ 54,341
550/M50COLFAX
6(572498)Street Improvements, Planning and Construction
7 (Grant)
8 Payable from General Obligation Bonds
9	Priority 1	$ 762,000
10	Priority 5	$ 1,250,000
11 Total	$ 2,012,000
1250/M54COTTON VALLEY
13(573764)Sewerage System Improvements, Planning and Construction
14 (Webster)
15 Payable from General Obligation Bonds
16	Priority 1	$ 1,189,000
1750/M57COVINGTON
18(573214)Downtown Historic District Overlays, Planning and 
19 Construction
20 (St. Tammany)
21 Payable from General Obligation Bonds
22	Priority 1	$ 80,000
23	Priority 5	$ 640,000
24 Total	$ 720,000
25(573216)Covington Wastewater Treatment Plant, Planning and 
26 Construction
27 (St. Tammany)
28 Payable from General Obligation Bonds
29	Priority 1	$ 56,850
3050/M58CROWLEY
31(573765)Renovation and Repairs to Rice Festival Building, 
32 Including the Repair or Replacement of the Roof, 
33 Planning and Construction
34 (Acadia)
35 Payable from General Obligation Bonds
36	Priority 1	$ 219,650
37(573766)Installation of Comminutor for the City of Crowley 
38 Main Sewerage Pump Station, Planning and Construction
39 (Acadia)
40 Payable from General Obligation Bonds
41	Priority 1	$ 225,181
4250/M61DELHI
43(572423)Sapa Drive Extension, Planning and Construction
44 (Richland)
45 Payable from General Obligation Bonds
46	Priority 1	$ 443,300
47	Priority 5	$ 1,556,700
48 Total	$ 2,000,000
Page 74 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/M65DERIDDER
2(571889)Wastewater Treatment Plant Improvements, 
3 Planning and Construction
4 (Beauregard)
5 Payable from General Obligation Bonds
6	Priority 5	$ 900,000
7(571891)Disposal Facility, Planning and Construction
8 (Beauregard)
9 Payable from General Obligation Bonds
10	Priority 5	$ 750,000
1150/M68DONALDSONVILLE
12(572623)Natural Gas System Infrastructure Improvement 
13 Phase III, Planning and Construction
14 (Ascension)
15 Payable from General Obligation Bonds
16	Priority 1	$ 1,100,000
17(572624)Lala Regira Field Renovations, Planning and Construction
18 (Ascension)
19 Payable from General Obligation Bonds
20	Priority 1	$ 300,000
21(572625)Natural Gas System Infrastructure Improvements, 
22 Phase II, Planning and Construction
23 (Ascension)
24 Payable from General Obligation Bonds
25	Priority 1	$ 4,614
26(572721)LA 3127 Connector from Hwy 70 to LA 1, Planning 
27 and Construction
28 (Ascension)
29 Payable from General Obligation Bonds
30	Priority 5	$ 7,000,000
3150/M70DOYLINE
32(573767)Village of Doyline Wastewater Treatment Facility Upgrades
33 (Webster)
34 Payable from General Obligation Bonds
35	Priority 1	$ 13,000
3650/M74DUSON
37(571740)LA Highway 95 Roundabout, Planning and Construction
38 (Acadia)
39 Payable from General Obligation Bonds
40	Priority 1	$ 2,595,378
4150/M83EUNICE
42(572869)Renovations to City Hall/Police Department,
43 Planning and Construction
44 (St. Landry)
45 Payable from General Obligation Bonds
46	Priority 5	$ 990,000
Page 75 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(573533)Sewer Collection System Rehabilitation,
2 Planning and Construction
3 (St. Landry)
4 Payable from General Obligation Bonds
5	Priority 5	$ 1,035,000
650/M84EVERGREEN
7(572328)Evergreen Water System Improvements
8 (Avoyelles)
9 Payable from General Obligation Bonds
10	Priority 1	$ 897,470
1150/M85FARMERVILLE
12(572988)Lake D'Arbonne Mega Ramp, Planning and Construction
13 (Union)
14 Payable from General Obligation Bonds
15	Priority 5	$ 4,185,000
1650/M87FERRIDAY
17(572884)Town of Ferriday Auditorium, Planning and Construction
18 (Concordia)
19 Payable from General Obligation Bonds
20	Priority 1	$ 700,000
21	Priority 5	$18,800,000
22 Total	$19,500,000
23(572885)Water Renovations, Planning and Construction
24 (Concordia)
25 Payable from General Obligation Bonds
26	Priority 1	$ 298,987
27	Priority 5	$ 3,000,000
28 Total	$ 3,298,987
2950/M89FLORIEN
30(573484)Village of Florien Town Hall, Planning and Construction
31 (Sabine)
32 Payable from General Obligation Bonds
33	Priority 1	$ 385,505
3450/M91FORDOCHE
35(572150)Water Storage Improvements, Planning and Construction
36 (Pointe Coupee)
37 Payable from General Obligation Bonds
38	Priority 1	$ 1,535,000
39 Payable from State General Fund (Direct) Non-Recurring
40 Revenues	$ 162,000
41 Total	$ 1,697,000
42(572151)Water Distribution System Improvements, Planning and 
43 Construction
44 (Pointe Coupee)
45 Payable from General Obligation Bonds
46	Priority 1	$ 3,558,170
47 Payable from State General Fund (Direct) Non-Recurring
48 Revenues	$ 380,000
49 Total	$ 3,938,170
Page 76 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/M94FRANKLIN
2(572225)Cayce Street Repairs, Planning and Construction
3 (St. Mary)
4 Payable from General Obligation Bonds
5	Priority 1	$ 2,054,310
650/MA3GOLDEN MEADOW
7(572383)Upgrade to North Sewerage Treatment Plant, Planning and 
8 Construction
9 (Lafourche)
10 Payable from General Obligation Bonds
11	Priority 1	$ 163,940
1250/MA5GONZALES
13(572998)Connector Road for City of Gonzales Hospital District, 
14 Planning and Construction
15 (Ascension)
16 Payable from General Obligation Bonds
17	Priority 1	$ 237,208
18	Priority 5	$ 2,505,000
19 Total	$ 2,742,208
20(573671)Veteran's Ave. to Commerce Ave. Connector Road, Planning 
21 and Construction
22 (Ascension)
23 Payable from General Obligation Bonds
24	Priority 1	$ 30,942
2550/MA6GRAMBLING
26(572252)Wastewater System Expansion, Planning and Construction
27 (Lincoln)
28 Payable from General Obligation Bonds
29	Priority 5	$ 2,000,000
30(572255)Water Distribution System Replacement, Planning and 
31 Construction
32 (Lincoln)
33 Payable from General Obligation Bonds
34	Priority 5	$ 1,000,000
35(573139)Community Center Expansion, Planning and Construction
36 (Lincoln)
37 Payable from General Obligation Bonds
38	Priority 1	$ 286,500
3950/MB1GRAND ISLE
40(573672)Historic Recreation Center/Community Center, Planning 
41 and Construction
42 (Jefferson)
43 Payable from General Obligation Bonds
44	Priority 1	$ 17,000
Page 77 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/MB5GRETNA
2(573541)City Hall Exterior and Interior Renovation
3 (Jefferson)
4 Payable from General Obligation Bonds
5	Priority 1	$ 1,277,500
6	Priority 5	$ 1,500,000
7 Total	$ 2,777,500
8(573543)Downtown Drainage Improvements, Planning and 
9 Construction
10 (Jefferson)
11 Payable from General Obligation Bonds
12	Priority 5	$ 1,000,000
1350/MB9HAMMOND
14(573050)Historic Downtown Hammond Lighting Project,
15 Planning and Construction
16 (Tangipahoa)
17 Payable from General Obligation Bonds
18	Priority 5	$ 540,000
19(573055)Land Clearing and Wetlands Mitigation for the 
20 Hammond Airport, Planning and Construction
21 (Tangipahoa)
22 Payable from General Obligation Bonds
23	Priority 5	$ 400,000
24(573676)Roadside Drainage Improvements, Planning and 
25 Construction
26 (Tangipahoa)
27 Payable from General Obligation Bonds
28	Priority 1	$ 225,000
2950/MC1HARAHAN
30(573821)Emergency Sewer Collection and Treatment System 
31 Overhaul, Planning and Construction
32 (Jefferson)
33 Payable from General Obligation Bonds
34	Priority 5	$ 1,000,000
3550/MC4HAYNESVILLE
36(572300)Town of Haynesville Street Improvements, Planning and 
37 Construction
38 (Claiborne)
39 Payable from General Obligation Bonds
40	Priority 1	$ 50,000
41	Priority 5	$ 300,000
42 Total	$ 350,000
43(572301)Water Distribution System Improvements, Planning and 
44 Construction
45 (Claiborne)
46 Payable from General Obligation Bonds
47	Priority 5	$ 855,000
Page 78 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/MC6HENDERSON
2(573825)Sewer System Improvements, Planning and Construction
3 (St. Martin)
4 Payable from General Obligation Bonds
5	Priority 5	$ 3,000,000
650/MC7HESSMER
7(573285)Water System Improvements, Planning and 
8 Construction
9 (Avoyelles)
10 Payable from General Obligation Bonds
11	Priority 5	$ 860,000
1250/MC9HOMER
13(573494)Town Hall Renovations, Planning and Construction
14 (Claiborne)
15 Payable from General Obligation Bonds
16	Priority 1	$ 796,404
17(573495)Street Improvement Project, Planning and Construction
18 (Claiborne)
19 Payable from General Obligation Bonds
20	Priority 1	$ 600,000
21(573496)Wastewater Collection System Inflow 
22 and Infiltration (I&I), Planning and Construction
23 (Claiborne)
24 Payable from General Obligation Bonds
25	Priority 5	$ 5,220,000
26(573502)Wastewater Treatment Plant,
27 Planning and Construction
28 (Claiborne)
29 Payable from General Obligation Bonds
30	Priority 5	$ 360,000
3150/MD1HORNBECK
32(573678)West Side Water System Expansion, Planning and 
33 Construction
34 (Sabine, Vernon)
35 Payable from General Obligation Bonds
36	Priority 1	$ 74,903
3750/MD4IDA
38(573683)Water System Improvements, Water Wells, Tanks, 
39 and Booster Stations Construction, Planning and 
40 Construction
41 (Caddo)
42 Payable from General Obligation Bonds
43	Priority 1	$ 42,435
44	Priority 5	$ 1,050,000
45 Total	$ 1,092,435
Page 79 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/MD5 INDEPENDENCE
2(573151)Water Line Replacement, Planning and Construction
3 (Tangipahoa)
4 Payable from General Obligation Bonds
5	Priority 5	$ 120,000
650/MD6IOTA
7(573025)Street Improvements, Planning and Construction
8 (Acadia)
9 Payable from General Obligation Bonds
10	Priority 5	$ 1,625,000
11(573026)Belt Press System for Sanitary Sewerage Sludge
12 Treatment, Planning and Construction
13 (Acadia)
14 Payable from General Obligation Bonds
15	Priority 5	$ 1,680,000
1650/ME1JEAN LAFITTE
17(573508)Lafitte Wetlands Museum Addition, including 
18 Exhibits, Planning and Construction
19 (Jefferson)
20 Payable from the balance of State General Fund (Direct)
21 previously allocated under the authority of Act 485 of
22 2021 for St. Martin Economic Development Authority,
23 North Business Park,Planning and Construction 
24 (St. Martin)	$ 220,000
25(573509)Amphitheater Stage, Planning and Construction
26 (Jefferson)
27 Payable from General Obligation Bonds
28	Priority 5	$ 400,000
2950/ME2JEANERETTE
30(573644)Water System Improvements, Planning and Construction
31 (Iberia)
32 Payable from General Obligation Bonds
33	Priority 5	$ 575,000
34(573645)Sewer System Improvements, Planning and Construction
35 (Iberia)
36 Payable from General Obligation Bonds
37	Priority 5	$ 3,320,000
38(573646)City Hall Renovations, Planning and Construction
39 (Iberia)
40 Payable from General Obligation Bonds
41	Priority 5	$ 370,000
4250/ME5JONESBORO
43(573413)Garrett & Maxwell Lift Stations Rehabilitation, Planning 
44 and Construction
45 (Jackson)
46 Payable from State General Fund (Direct) Non-Recurring 
47 Revenues	$ 300,000
Page 80 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/MF1KENNER
2(571868)Pump to the River Pump Station Phase I, Planning and 
3 Construction
4 (Jefferson)
5 Payable from General Obligation Bonds
6	Priority 1	$ 1,650,000
7	Priority 5	$15,050,000
8 Total	$16,700,000
9(571870)Kenner Fire Department Facility Replacement - New Fire 
10 Station, Planning and Construction
11 (Jefferson)
12 Payable from General Obligation Bonds
13	Priority 5	$ 2,000,000
14(571878)New Bridge Over Canal No. 12, Planning and Construction
15 (Jefferson)
16 Payable from General Obligation Bonds
17	Priority 5	$ 1,000,000
18 Payable from State General Fund (Direct) Non-Recurring
19 Revenues	$ 145,500
20 Total	$ 1,145,500
21(571884)Lincoln Manor Drainage Phase 2, Planning and Construction
22 (Jefferson)
23 Payable from General Obligation Bonds
24	Priority 1	$ 500,000
25(573426)Roosevelt Boulevard Improvements (Airline Drive to 
26 West Metairie Ave.), Planning and Construction
27 (Jefferson)
28 Payable from General Obligation Bonds
29	Priority 5	$ 3,730,000
30 Payable from State General Fund (Direct) Non-Recurring
31 Revenues	$ 500,000
32 Total	$ 4,230,000
33(573690)Lincoln Manor Subdivision Drainage Improvement, 
34 including 30th Street Roadway and Drainage Improvements 
35 from Loyola Drive to Ohio Street, Planning and 
36 Construction
37 (Jefferson)
38 Payable from General Obligation Bonds
39	Priority 1	$ 119,998
4050/MF8LAKE ARTHUR
41(572495)Wastewater Collection System Improvements, Planning 
42 and Construction
43 (Jefferson Davis)
44 Payable from General Obligation Bonds
45	Priority 5	$ 990,000
46(573809)Water System Improvements, Planning and Construction
47 (Jefferson Davis)
48 Payable from General Obligation Bonds
49	Priority 5	$ 990,000
Page 81 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(573826)Wastewater Treatment Facility Improvements, Planning 
2 and Construction
3 (Jefferson Davis)
4 Payable from General Obligation Bonds
5	Priority 5	$ 1,050,000
650/MF9LAKE CHARLES
7(573034)Relocation of Public Works Campus, Planning and 
8 Construction
9 (Calcasieu)
10 Payable from General Obligation Bonds
11	Priority 1	$ 5,000,000
12	Priority 5	$ 4,000,000
13 Total	$ 9,000,000
14(573035)Lakefront Development
15 (Calcasieu)
16 Payable from General Obligation Bonds
17	Priority 1	$ 1,925,000
18(573038)Enterprise Boulevard Extension, Planning and Construction
19 (Calcasieu)
20 Payable from General Obligation Bonds
21	Priority 1	$ 350,000
22	Priority 5	$ 3,150,000
23 Total	$ 3,500,000
2450/MG3LEESVILLE
25(571910)Fort Johnson Entrance Road Fire Substation, Planning 
26 and Construction
27 (Vernon)
28 Payable from General Obligation Bonds
29	Priority 5	$ 972,000
30(571911)Street Rehabilitation and Extension, Planning and 
31 Construction
32 (Vernon)
33 Payable from General Obligation Bonds
34	Priority 1	$ 3,433
35	Priority 5	$ 250,000
36 Total	$ 253,433
37(571912)City of Leesville, Sanitary Sewer Extension for Fort 
38 Johnson formerly Fort Polk Entrance Road, Planning 
39 and Construction
40 (Vernon)
41 Payable from General Obligation Bonds
42	Priority 1	$ 2,281,726
43	Priority 5	$ 4,000,000
44 Total	$ 6,281,726
4550/MG8LIVONIA
46(572145)Water Well, Planning and Construction
47 (Pointe Coupee)
48 Payable from General Obligation Bonds
49	Priority 1	$ 1,035,000
50 Payable from State General Fund (Direct) Non-Recurring
51 Revenues	$ 600,000
52 Total	$ 1,635,000
Page 82 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/MH1LOGANSPORT
2(573065)Recreational Improvements, Planning and Construction
3 (DeSoto)
4 Payable from General Obligation Bonds
5	Priority 1	$ 150,000
6	Priority 5	$ 1,150,000
7 Total	$ 1,300,000
850/MH6MADISONVILLE
9(572144)Wastewater Collection and Treatment System
10 Improvements, Planning and Construction
11 (St. Tammany)
12 Payable from General Obligation Bonds
13	Priority 5	$ 2,000,000
1450/MH9MANGHAM
15(572179)Mangham Recreation Complex, Planning and Construction
16 (Richland)
17 Payable from General Obligation Bonds
18	Priority 1	$ 520,250
1950/MI3MANY
20(571955)Water Treatment Plant Improvements, Acquisition, 
21 Planning and Construction
22 (Sabine)
23 Payable from General Obligation Bonds
24	Priority 5	$ 1,500,000
2550/MI8MAURICE
26(571742)New Village Hall, Planning and Construction
27 (Vermilion)
28 Payable from General Obligation Bonds
29	Priority 1	$ 765,000
30	Priority 5	$ 600,000
31 Total	$ 1,365,000
3250/MJ2MERMENTAU
33(573027)Street Improvements, Planning and Construction
34 (Acadia)
35 Payable from General Obligation Bonds
36	Priority 5	$ 435,000
3750/MJ5MINDEN
38(572198)Potable Water Ground Storage Tank, Planning and 
39 Construction
40 (Webster)
41 Payable from General Obligation Bonds
42	Priority 1	$ 3,445,100
Page 83 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/MJ6MONROE
2(572124)Booker T. Washington Stormwater System Evaluation
3 and Upgrades, Planning and Construction
4 (Ouachita)
5 Payable from General Obligation Bonds
6	Priority 5	$ 3,030,000
7(572125)I-20 Interchange Improvement and Kansas Garrett 
8 Connector, Kansas Lane Connector, Planning and 
9 Construction ($1,000,000 Local and $6,000,000 
10 Federal Match)
11 (Ouachita)
12 Payable from General Obligation Bonds
13	Priority 1	$22,958,923
14	Priority 5	$11,600,000
15 Total	$34,558,923
16(572127)Youngs Bayou Watershed Enhancement of 
17 Channel Capacity, Planning and Construction
18 (Ouachita)
19 Payable from General Obligation Bonds
20	Priority 1	$ 500,000
21	Priority 5	$10,900,000
22 Total	$11,400,000
23(572128)Georgia Street Pump Station, Including Generator 
24 and Auxiliary Pumps, Planning, Engineering, 
25 Right-of-Way, Utilities and Construction
26 (Ouachita)
27 Payable from General Obligation Bonds
28	Priority 1	$ 2,000,000
29(572129)River Pump Station Water Treatment Plant, Planning and 
30 Construction
31 (Ouachita)
32 Payable from General Obligation Bonds
33	Priority 5	$ 300,000
34(572130)Calypso Street Pump Station Rehabilitation, Planning, 
35 Engineering, Design, Right-of-Way, Utilities, and 
36 Construction
37 (Ouachita)
38 Payable from General Obligation Bonds
39	Priority 1	$ 30,000
40	Priority 5	$ 1,770,000
41 Total	$ 1,800,000
4250/MK2MORGAN CITY
43(572794)LA Highway 182 Resurfacing, Planning and 
44 Construction
45 (St. Mary)
46 Payable from General Obligation Bonds
47	Priority 5	$ 6,000,000
48(572800)LA Highway 70 Resurfacing and Drainage
49 Repairs, Planning and Construction
50 (St. Mary)
51 Payable from General Obligation Bonds
52	Priority 5	$ 5,460,000
Page 84 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/MK4MORSE
2(573029)Wastewater Treatment Facility, Planning and Construction
3 (Acadia)
4 Payable from General Obligation Bonds
5	Priority 1	$ 1,350,000
6(573691)Water Tower Improvements, Planning and Construction
7 (Acadia)
8 Payable from General Obligation Bonds
9	Priority 1	$ 29,585
1050/MK9NATCHITOCHES
11(573072)Second Street and Touline Street Concrete Pavement and 
12 Replacement, Planning and Construction
13 (Natchitoches)
14 Payable from General Obligation Bonds
15	Priority 5	$ 2,000,000
1650/ML1NEW IBERIA
17(571677)Frontage Road Improvements, Planning and Construction
18 (Iberia)
19 Payable from General Obligation Bonds
20	Priority 1	$ 1,000,000
21(572080)Banks Street Aquatic Center, Planning and Construction
22 (Iberia)
23 Payable from General Obligation Bonds
24	Priority 5	$ 3,750,000
25 Payable from State General Fund (Direct) Non-Recurring
26 Revenues	$ 400,000
27 Total	$ 4,150,000
28(573693)Ann Street Park, Planning and Construction
29 (Iberia)
30 Payable from General Obligation Bonds
31	Priority 1	$ 300,000
32(573695)City Park and West End Community Centers 
33 Improvements, Planning and Construction
34 (Iberia)
35 Payable from General Obligation Bonds
36	Priority 1	$ 262,023
37(573696)Bayou Teche Museum Expansion and George Rodrigue 
38 Park
39 (Iberia)
40 Payable from General Obligation Bonds
41	Priority 1	$ 1,354,112
4250/ML2NEW LLANO
43(573123)Maintenance Building Improvements, Planning and 
44 Construction
45 (Vernon)
46 Payable from State General Fund (Direct) Non-Recurring
47 Revenues	$ 240,000
Page 85 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/ML3NEW ORLEANS
2(572361)New Sewerage and Water Board Power Plant, Planning and 
3 Construction
4 (Orleans)
5 Payable from General Obligation Bonds
6	Priority 1	$24,446,296
7	Priority 5	$29,000,000
8 Total	$53,446,296
9(572362)Old New Orleans VA Building Rehabilitation
10 (Orleans)
11 Payable from General Obligation Bonds
12	Priority 1	$ 1,925,000
13	Priority 5	$ 8,000,000
14 Total	$ 9,925,000
15(572363)Lower Ninth Ward Green Infrastructure Project, Planning 
16 and Construction
17 (Orleans)
18 Payable from General Obligation Bonds
19	Priority 1	$ 250,000
20	Priority 5	$ 2,650,000
21 Total	$ 2,900,000
22(572364)West Bank Park Improvements Including New Soccer 
23 and Recreational Facilities, Planning and Construction
24 (Orleans)
25 Payable from General Obligation Bonds
26	Priority 1	$ 3,115,506
27	Priority 5	$11,225,400
28 Total	$14,340,906
29Provided, however, that $1,750,000 of the Priority 1 appropriation shall be used to fund the
30George W. Carver Playground Renovations project, and $200,000 of the Priority 1
31appropriation shall be used to fund the Skateboard Park at the West Bank Park project.
32(572366)Monticello Canal Culverts at Airline Highway
33 (Orleans)
34 Payable from General Obligation Bonds
35	Priority 1	$ 1,250,000
36	Priority 5	$ 7,750,000
37 Total	$ 9,000,000
38(572368)Dryades Kitchen Incubator, Planning and Construction
39 (Orleans)
40 Payable from General Obligation Bonds
41	Priority 5	$ 350,000
42(572370)West Bank Ferry Terminal Renovations, Planning and 
43 Construction
44 (Orleans)
45 Payable from General Obligation Bonds
46	Priority 1	$ 300,000
47	Priority 5	$ 300,000
48 Total	$ 600,000
Page 86 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(572371)Richard Lee Playground, Planning and Construction
2 (Orleans)
3 Payable from General Obligation Bonds
4	Priority 1	$ 184,437
5	Priority 5	$ 3,000,000
6 Total	$ 3,184,437
750/ML4NEW ROADS
8(573699)Industrial Park Development Project, Including Underground 
9 Electrical System Upgrades, Planning and Construction
10 (Pointe Coupee)
11 Payable from General Obligation Bonds
12	Priority 1	$ 988,000
1350/ML8NORWOOD
14(572138)Sewer Collection and Treatment System Improvements, 
15 Planning and Construction
16 (East Feliciana)
17 Payable from General Obligation Bonds
18	Priority 5	$ 1,080,000
1950/MM2OAKDALE
20(572205)Oakdale City Hall Renovations, Roof, and Reconstruction
21 (Allen)
22 Payable from General Obligation Bonds
23	Priority 1	$ 19,050
2450/MM4OIL CITY
25(573814)Water Treatment Plant, Transmission Main, and Distribution 
26 System Improvements, Planning and Construction
27 (Caddo)
28 Payable from the balance of State General Fund (Direct)
29 previously allocated under the authority of Act 485 of
30 2021 for St. Martin Economic Development Authority,
31 North Business Park, Planning and Construction 
32 (St. Martin)	$ 111,000
3350/MM6OPELOUSAS
34(573700)Water Meter Replacement and Upgrades, Planning and 
35 Construction
36 (St. Landry)
37 Payable from General Obligation Bonds
38	Priority 1	$ 405,582
39(573703)Opelousas Street and Drainage Improvements
40 (St. Landry)
41 Payable from General Obligation Bonds
42	Priority 1	$ 2,250,000
43	Priority 5	$ 1,000,000
44 Total	$ 3,250,000
4550/MM9PATTERSON
46(573615)Replacement of Water and Gas Meters in Patterson, Planning 
47 and Construction
48 (St. Mary)
49 Payable from General Obligation Bonds
50	Priority 1	$ 439,300
Page 87 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/MN3PINEVILLE
2(572187)Consolidated Municipal and Court Complex, Planning 
3 and Construction
4 (Rapides)
5 Payable from General Obligation Bonds
6	Priority 5	$11,090,000
7(573704)Cedar Lake Pump Station Reconstruction, Design, Planning 
8 and Construction
9 (Rapides)
10 Payable from General Obligation Bonds
11	Priority 5	$ 585,000
1250/MO1PONCHATOULA
13(573563)Fire Station Complex US 51 - Veterans Avenue, Land 
14 Acquisition, Planning and Construction
15 (Tangipahoa)
16 Payable from General Obligation Bonds
17	Priority 1	$ 1,075,000
18	Priority 5	$ 800,000
19 Total	$ 1,875,000
2050/MO2PORT ALLEN
21(573099)Street and Drainage Improvements, Planning and 
22 Construction
23 (West Baton Rouge)
24 Payable from General Obligation Bonds
25	Priority 1	$ 80,000
26	Priority 5	$ 3,520,000
27 Total	$ 3,600,000
2850/MO6PROVENCAL
29(572002)New Water Well and Emergency Water Connection, 
30 Planning and Construction
31 (Natchitoches)
32 Payable from General Obligation Bonds
33	Priority 5	$ 600,000
3450/MO8RAYNE
35(573706)Martin Luther King Community Center 
36 Improvements, Planning and Construction
37 (Acadia)
38 Payable from General Obligation Bonds
39	Priority 1	$ 21,721
4050/MO9RAYVILLE
41(572197)Wastewater Transport and Treatment Facilities for 
42 Economic Development
43 (Richland)
44 Payable from General Obligation Bonds
45	Priority 1	$ 3,500,000
46Provided, however, that this appropriation is used for the extension of sewer lines south
47along Highway 425.
Page 88 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(572726)Municipal Complex, Planning and Construction
2 (Richland)
3 Payable from General Obligation Bonds
4	Priority 5	$ 5,000,000
5(573109)Water Service Facilities for Economic Development, 
6 Planning and Construction
7 (Richland)
8 Payable from General Obligation Bonds
9	Priority 1	$ 394,570
10	Priority 5	$ 8,022,300
11 Total	$ 8,416,870
1250/MP3RICHWOOD
13(573708)Municipal Complex, Planning and Construction
14 (Ouachita)
15 Payable from General Obligation Bonds
16	Priority 1	$ 150,000
17	Priority 5	$ 3,400,000
18 Total	$ 3,550,000
1950/MP8ROSEDALE
20(573714)New Rosedale Fire Station, Planning and Construction
21 (Iberville)
22 Payable from General Obligation Bonds
23	Priority 1	$ 28,033
2450/MQ1ROSEPINE
25(572237)Rehabilitation of Main Street, Planning and Construction
26 (Vernon)
27 Payable from General Obligation Bonds
28	Priority 5	$ 450,000
29 Payable from State General Fund (Direct) Non-Recurring
30 Revenues	$ 450,000
31 Total	$ 900,000
3250/MQ2RUSTON
33(572723)East Kentucky/Cedar Creek Road Intersection 
34 Improvements, Planning and Construction
35 (Lincoln)
36 Payable from General Obligation Bonds
37	Priority 1	$ 200,000
38	Priority 5	$ 1,060,000
39 Total	$ 1,260,000
40(572724)New Road from Highway 150 to I-20 South Frontage 
41 Road, Planning and Construction
42 (Lincoln)
43 Payable from General Obligation Bonds
44	Priority 1	$ 815,718
45	Priority 5	$ 1,000,000
46 Total	$ 1,815,718
Page 89 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/MQ3ST. FRANCISVILLE
2(572134)Water Meter Upgrades, Planning and Construction
3 (West Feliciana)
4 Payable from General Obligation Bonds
5	Priority 5	$ 804,000
6(572135)Commerce Street Improvements and Utilities 
7 Relocation, Planning and Construction
8 (West Feliciana)
9 Payable from General Obligation Bonds
10	Priority 5	$ 2,100,000
11(572136)Emergency Erosion Repairs, Planning and Construction
12 (West Feliciana)
13 Payable from General Obligation Bonds
14	Priority 1	$ 3,251,750
1550/MQ4ST. JOSEPH
16(572258)St. Joseph's Community House, Planning and Construction
17 (Tensas)
18 Payable from General Obligation Bonds
19	Priority 5	$ 690,000
2050/MQ5ST. MARTINVILLE
21(572307)Main Street Enhancement Project, Planning and Construction
22 (St. Martin)
23 Payable from General Obligation Bonds
24	Priority 1	$ 1,450,000
25(573716)Water Drainage Project, Planning and Construction
26 (St. Martin)
27 Payable from General Obligation Bonds
28	Priority 1	$ 200,000
2950/MQ8SCOTT
30(572881)Roundabout at Exit 97 Westbound, Planning, Construction, 
31 and Land Acquisition
32 (Lafayette)
33 Payable from General Obligation Bonds
34	Priority 5	$ 3,600,000
35 Payable from State General Fund (Direct) Non-Recurring
36 Revenues	$ 450,000
37 Total	$ 4,050,000
38(572886)Eraste Landry Road Extension, Planning and Construction
39 (Lafayette)
40 Payable from General Obligation Bonds
41	Priority 1	$ 415,000
42	Priority 5	$ 8,592,000
43 Total	$ 9,007,000
44(572888)LA 93 Roadway Improvements- I-10 Ramp to Renaud 
45 Drive, Planning, Construction, and Land Acquisition
46 (Lafayette)
47 Payable from General Obligation Bonds
48	Priority 1	$ 2,800,000
49	Priority 5	$ 695,000
50 Total	$ 3,495,000
Page 90 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(572889)Roundabout at LA 93 and Renaud Drive, Planning, 
2 Construction, and Land Acquisition
3 (Lafayette)
4 Payable from General Obligation Bonds
5	Priority 5	$ 3,050,000
6 Payable from State General Fund (Direct) Non-Recurring
7 Revenues	$ 380,000
8 Total	$ 3,430,000
9(572891)Water and Sewer Line Installation along Apollo Road 
10 Extension, including Utilities, Planning and Construction
11 (Lafayette)
12 Payable from General Obligation Bonds
13	Priority 1	$ 1,238,750
14	Priority 5	$ 1,890,000
15 Total	$ 3,128,750
1650/MR1SHREVEPORT
17(572780)Shreveport Healthcare and Development Corridor, 
18 Planning and Construction
19 (Caddo)
20 Payable from General Obligation Bonds
21	Priority 5	$40,000,000
22(572783)C.C. Antoine Museum and Arts Center, Planning and 
23 Construction ($64,000 Local Match)
24 (Caddo)
25 Payable from General Obligation Bonds
26	Priority 1	$ 425,000
27	Priority 5	$ 100,000
28 Total	$ 525,000
29(572785)C.C. Antoine Park, Planning and Construction
30 (Caddo)
31 Payable from General Obligation Bonds
32	Priority 1	$ 1,855,039
33	Priority 5	$ 350,000
34 Total	$ 2,205,039
35(572787)Valencia Park Spray Park, Planning and Construction
36 (Caddo)
37 Payable from General Obligation Bonds
38	Priority 1	$ 71,625
39(572788)Greenwood Road Extension, (Greenwood Industrial 
40 Park Road - Asphalt Road), Planning and Construction
41 (Caddo)
42 Payable from General Obligation Bonds
43	Priority 1	$ 120,000
44	Priority 5	$ 2,000,000
45 Total	$ 2,120,000
4650/MR6SIMPSON
47(573732)Rehabilitation of Various Roads, Planning and Construction
48 (Vernon)
49 Payable from General Obligation Bonds
50	Priority 1	$ 35,000
Page 91 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/MR8SLAUGHTER
2(572120)Water System Improvements, Planning and Construction
3 (East Feliciana)
4 Payable from General Obligation Bonds
5	Priority 5	$ 1,000,000
650/MR9SLIDELL
7(573515)Replace Sewer Force Main, Lindberg PS
8 to WWTP, Planning and Construction
9 (St. Tammany)
10 Payable from General Obligation Bonds
11	Priority 5	$ 3,000,000
1250/MS4SPRINGFIELD
13(572118)Water System Improvements and Upgrades, Planning and 
14 Construction
15 (Livingston)
16 Payable from General Obligation Bonds
17	Priority 5	$ 1,547,400
1850/MS5SPRINGHILL
19(572100)Water System Improvements - Phase 3, Planning and 
20 Construction
21 (Webster)
22 Payable from General Obligation Bonds
23	Priority 5	$ 5,700,000
24(572101)Wastewater Treatment Plant Rehabilitation, Planning and 
25 Construction
26 (Webster)
27 Payable from General Obligation Bonds
28	Priority 1	$ 1,200,000
2950/MS9SULPHUR
30(572003)Maplewood Drive Rehabilitation
31 (Calcasieu)
32 Payable from General Obligation Bonds
33	Priority 1	$ 5,522,383
34	Priority 5	$ 4,137,500
35 Total	$ 9,659,883
36(572004)Maplewood Pump Station, Planning and Construction
37 (Calcasieu)
38 Payable from General Obligation Bonds
39	Priority 5	$ 1,075,000
4050/MT1SUN
41(573733)Roof Replacement of Town Hall Building
42 (St. Tammany)
43 Payable from General Obligation Bonds
44	Priority 1	$ 200,000
Page 92 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/MT2SUNSET
2(573734)Sunset Police and Fire Emergency Facility, Planning and 
3 Construction
4 (St. Landry)
5 Payable from General Obligation Bonds
6	Priority 1	$ 400,000
750/MT3TALLULAH
8(573110)Emergency Water Production, Transmission and 
9 Treatment, Acquisition, Planning and Construction
10 (Madison)
11 Payable from General Obligation Bonds
12	Priority 1	$ 121,150
1350/MT5THIBODAUX
14(573386)Replacement of Canal Boulevard Bridges and Construction 
15 of Menard Pedestrian Bike Trail, Planning and Construction
16 (Lafourche)
17 Payable from General Obligation Bonds
18	Priority 1	$ 1,932,500
19	Priority 5	$ 4,400,000
20 Total	$ 6,332,500
21(573387)LA 648/Acadia Road Intersection Improvements 
22 Project, Planning and Construction
23 (Lafourche)
24 Payable from General Obligation Bonds
25	Priority 5	$ 3,000,000
2650/MU2VIDALIA
27(572000)Utility System Upgrade, Planning, Acquisition, Construction 
28 and Equipment
29 (Concordia)
30 Payable from General Obligation Bonds
31	Priority 1	$ 9,823,217
32	Priority 5	$ 7,000,000
33 Total	$16,823,217
34(572001)Development of a Slackwater Port on the Mississippi 
35 River, Planning and Construction
36 (Concordia)
37 Payable from General Obligation Bonds
38	Priority 1	$ 4,142,583
3950/MU4VILLE PLATTE
40(572909)New Fire Station, Planning and Construction
41 (Evangeline)
42 Payable from General Obligation Bonds
43	Priority 5	$ 2,320,000
44(572911)Ville Platte Evangeline Recreational District
45 (Evangeline)
46 Payable from General Obligation Bonds
47	Priority 1	$ 855,000
48	Priority 5	$ 885,000
49 Total	$ 1,740,000
Page 93 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(573735)Infrastructure Improvements, Planning and Construction
2 (Evangeline)
3 Payable from General Obligation Bonds
4	Priority 1	$ 160,887
550/MU5VINTON
6(572360)Water Plant Improvements, Planning and
7 Construction
8 (Calcasieu)
9 Payable from General Obligation Bonds
10	Priority 5	$ 1,800,000
1150/MU6VIVIAN
12(573736)Water and Wastewater System Improvements and 
13 Extension, Planning and Construction
14 (Caddo)
15 Payable from General Obligation Bonds
16	Priority 1	$ 240,164
1750/MV1WELSH
18(571949)Frontage Road Extension, Planning and Construction
19 (Jefferson Davis)
20 Payable from General Obligation Bonds
21	Priority 1	$ 500,000
22	Priority 5	$ 1,645,000
23 Total	$ 2,145,000
2450/MV2WEST MONROE
25(571899)Sunshine Heights Drainage Improvements, Planning 
26 and Construction
27 (Ouachita)
28 Payable from General Obligation Bonds
29	Priority 1	$ 1,375,000
30(571900)Cotton Street Improvements and
31 Sidewalks, Planning and Construction
32 (Ouachita)
33 Payable from General Obligation Bonds
34	Priority 5	$ 1,350,000
35(572611)Mid-City Drainage Improvements, Planning and 
36 Construction
37 (Ouachita)
38 Payable from General Obligation Bonds
39	Priority 1	$ 1,000,000
40	Priority 5	$ 4,000,000
41 Total	$ 5,000,000
4250/MV3WESTLAKE
43(572013)Landry Road Improvements, Planning and Construction
44 (Calcasieu)
45 Payable from State General Fund (Direct) Non-Recurring
46 Revenues	$ 750,000
Page 94 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(573737)Compressed Natural Gas Fueling Station, Planning and 
2 Construction
3 (Calcasieu)
4 Payable from General Obligation Bonds
5	Priority 1	$ 470,000
6	Priority 5	$ 1,600,000
7 Total	$ 2,070,000
850/MV4WESTWEGO
9(572539)The WHARF, Planning, Construction, and Site Preparation
10 (Jefferson)
11 Payable from General Obligation Bonds
12	Priority 1	$ 3,800,493
13	Priority 5	$ 2,200,000
14 Total	$ 6,000,493
15(572542)Water Tower, Line and Improvements, Water 
16 Meter Replacement, Planning and Construction
17 (Jefferson)
18 Payable from General Obligation Bonds
19	Priority 1	$ 225
20	Priority 5	$ 1,000,000
21 Total	$ 1,000,225
22(572543)Park Land and Improvements, Including Improvements 
23 to Existing Parks and Land Acquisition, Planning and 
24 Construction
25 (Jefferson)
26 Payable from General Obligation Bonds
27	Priority 1	$ 489,702
28	Priority 5	$ 1,000,000
29 Total	$ 1,489,702
30(572544)Sala Avenue Street and Infrastructure Improvements
31 (Jefferson)
32 Payable from General Obligation Bonds
33	Priority 1	$ 208,300
34	Priority 5	$ 850,000
35 Total	$ 1,058,300
36(572545)Emergency Preparedness Building, Planning and 
37 Construction
38 (Jefferson)
39 Payable from General Obligation Bonds
40	Priority 1	$ 83,851
41(572548)Riverboat Landing, Phase III, Planning
42 and Construction
43 (Jefferson)
44 Payable from General Obligation Bonds
45	Priority 5	$ 1,205,000
46(572551)Wastewater Treatment Plant Improvements, Planning and 
47 Construction
48 (Jefferson)
49 Payable from General Obligation Bonds
50	Priority 5	$ 4,503,500
Page 95 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/MV5WHITE CASTLE
2(573003)Training and Learning Center, Planning and Construction
3 (Iberville)
4 Payable from General Obligation Bonds
5	Priority 5	$ 1,000,000
650/MV7WINNFIELD
7(572251)South Winnfield Drainage Improvements - Phase 1, 
8 Planning and Construction
9 (Winn)
10 Payable from General Obligation Bonds
11	Priority 1	$ 71,625
12	Priority 5	$ 600,000
13 Total	$ 671,625
1450/MW2YOUNGSVILLE
15(573056)Fortune Road Extension, Planning and Construction
16 (Lafayette)
17 Payable from General Obligation Bonds
18	Priority 1	$ 1,500,000
19(573058)New Fire Station, Planning and Construction
20 (Lafayette)
21 Payable from General Obligation Bonds
22	Priority 5	$ 3,250,000
23(573059)Highway 92 Improvements, Planning and Construction
24 (Lafayette)
25 Payable from General Obligation Bonds
26	Priority 5	$ 5,405,000
27(573060)Chemin Metairie Parkway Widening, Planning and 
28 Construction
29 (Lafayette)
30 Payable from General Obligation Bonds
31	Priority 1	$ 2,385,000
32	Priority 5	$ 1,495,000
33 Total	$ 3,880,000
34(573061)Highway 92/Prescott Boulevard Roundabout, Design, 
35 Planning, and Construction
36 (Lafayette)
37 Payable from General Obligation Bonds
38	Priority 5	$ 2,614,000
39(573062)Wastewater System Improvements, Planning and 
40 Construction
41 (Lafayette)
42 Payable from General Obligation Bonds
43	Priority 5	$ 4,500,000
44(573063)Langlinais Road Extension, Planning and Construction
45 (Lafayette)
46 Payable from General Obligation Bonds
47	Priority 5	$ 5,580,000
Page 96 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(573064)Highway 89 Improvements, Planning and Construction
2 (Lafayette)
3 Payable from General Obligation Bonds
4	Priority 1	$ 5,595,000
5	Priority 5	$16,945,515
6 Total	$22,540,515
750/MW6ST. GABRIEL
8(573551)City Council Chambers Phase 2, Planning and Construction
9 (Iberville)
10 Payable from General Obligation Bonds
11	Priority 1	$ 1,938,500
12	Priority 5	$ 700,000
13 Total	$ 2,638,500
14(573738)City Council Chambers - New Construction
15 (Iberville)
16 Payable from General Obligation Bonds
17	Priority 1	$ 875,899
1850/MW8CENTRAL
19(572814)Central Community School System Multi-Use Activity 
20 Center, Recreational Facility, Planning and Construction
21 (East Baton Rouge)
22 Payable from General Obligation Bonds
23	Priority 1	$ 1,200,000
24	Priority 5	$ 9,800,000
25 Total	$11,000,000
26(572816)Administration Building
27 (East Baton Rouge)
28 Payable from General Obligation Bonds
29	Priority 1	$ 16,943
30(572817)Wax Road, LA 3034, Extension,
31 Planning and Construction
32 (East Baton Rouge)
33 Payable from General Obligation Bonds
34	Priority 5	$ 1,600,000
3550/N03AUDUBON NATURE INSTITUTE, INC.
36(573089)Audubon Facility Renovations and Improvements: Audubon 
37 Zoo, Planning and Construction
38 (Orleans)
39 Payable from General Obligation Bonds
40	Priority 1	$ 9,500,000
41	Priority 5	$ 9,500,000
42 Total	$19,000,000
4350/N05NEW ORLEANS EXHIBITION HALL AUTHORITY
44(573512)Property Development Project
45 (Orleans)
46 Payable from General Obligation Bonds
47	Priority 1	$ 500,000
48	Priority 5	$25,000,000
49 Total	$25,500,000
Page 97 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/N06STATE FAIR OF LOUISIANA
2(573629)Hirsch Memorial Coliseum and Louisiana State 
3 Fairgrounds Improvements Project
4 (Caddo)
5 Payable from General Obligation Bonds
6	Priority 1	$ 273,295
7	Priority 5	$ 3,280,000
8 Total	$ 3,553,295
950/N07ST. BERNARD PARISH SHERIFF'S OFFICE
10(573415)St. Bernard Parish SOD Building on LA 47, Planning and 
11 Construction
12 (St. Bernard)
13 Payable from General Obligation Bonds
14	Priority 5	$ 2,000,000
1550/N13CHENNAULT INTERNATIONAL AIRP ORT AUTHORITY
16(573806)Firewater Pumphouse #3 and Infrastructure, Planning and 
17 Construction
18 (Calcasieu)
19 Payable from General Obligation Bonds
20	Priority 5	$ 6,000,000
2150/N17NEW ORLEANS CAREER CENTER
22(573670)Expanding High Wage, High Demand Career and Technical 
23 Training, Planning and Construction
24 (Orleans)
25 Payable from General Obligation Bonds
26	Priority 1	$ 1,000,000
27	Priority 5	$ 2,000,000
28 Total	$ 3,000,000
2950/N18IBERIA PARISH AIRPORT AUTHORITY
30(572422)Acadiana Regional Airport Improvements, Planning and 
31 Construction
32 (Iberia)
33 Payable from General Obligation Bonds
34	Priority 1	$ 7,150,000
35	Priority 5	$33,000,000
36 Total	$40,150,000
37(573176)Rehabilitation of Hangar #88 and Associated Parking 
38 Lot, Planning and Construction
39 (Iberia)
40 Payable from General Obligation Bonds
41	Priority 1	$ 900,000
4250/N19PAUL S. MORTON SCHOLARSHIP FOUNDATION
43(573679)Paul S. Morton Scholarship Foundation Greater Works 
44 Family Life Center, Planning and Construction
45 (Orleans)
46 Payable from General Obligation Bonds
47	Priority 5	$ 6,200,000
Page 98 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/N33ENGLAND ECONOMIC & INDUSTRIAL DEVELOPMENT DISTRICT
2(572921)High Bay Aircraft Maintenance Hangar, Planning and 
3 Construction
4 (Rapides)
5 Payable from General Obligation Bonds
6	Priority 1	$ 1,713,915
7	Priority 5	$15,425,000
8 Total	$17,138,915
950/N34ODYSSEY HOUSE LOUISIANA, INC.
10(572792)Odyssey House Louisiana Renovation Project, Planning 
11 and Construction
12 (Orleans)
13 Payable from General Obligation Bonds
14	Priority 1	$ 6,614,300
15(572793)Odyssey House Louisiana Gambling Treatment 
16 Center, Planning and Construction
17 (Orleans)
18 Payable from General Obligation Bonds
19	Priority 5	$ 5,000,000
2050/N36WALKER COMMUNITY RESOURCE AND RECREATION CENTER
21(573776)Walker Community Resource and Recreation Center, Planning 
22 and Construction
23 (Lafayette)
24 Payable from General Obligation Bonds
25	Priority 5	$ 750,000
2650/N40LAFAYETTE ECONOMIC DEVELOP MENT AUTHORITY
27(573373)Lafayette Innovation Center, Planning and Construction
28 (Lafayette)
29 Payable from General Obligation Bonds
30	Priority 1	$ 3,179,679
3150/N41BATON ROUGE METROPOLITAN AIRPORT
32(573170)Airport Aviation Business Park, Planning and Construction
33 (East Baton Rouge)
34 Payable from General Obligation Bonds
35	Priority 1	$ 2,661,361
36	Priority 5	$ 4,750,000
37 Total	$ 7,411,361
3850/N52LAFAYETTE PARISH SHERIFF'S OFFICE
39(572379)Range Upgrades, Planning and Construction
40 (Lafayette)
41 Payable from General Obligation Bonds
42	Priority 5	$ 2,565,000
43(572380)Fitness Center, Planning and Construction
44 (Lafayette)
45 Payable from General Obligation Bonds
46	Priority 1	$ 2,010,000
Page 99 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1(572381)Crime Scene and Evidence Storage, Planning and 
2 Construction
3 (Lafayette)
4 Payable from General Obligation Bonds
5	Priority 1	$ 2,485,000
6(572382)Law Enforcement Center, Planning and Construction
7 (Lafayette)
8 Payable from General Obligation Bonds
9	Priority 5	$46,500,000
1050/N53ORLEANS PARISH COMMUNICATIONS DISTRICT
11(572016)Orleans Parish Communications District Expansion 
12 Project, Planning and Construction
13 (Orleans)
14 Payable from General Obligation Bonds
15	Priority 5	$33,600,000
1650/N71NORTH LAFOURCHE CONSERVATION, LEVEE AND DRAINAG E 
17 DISTRICT
18(573084)Raceland Prairie Levee Improvements, Planning and Construction
19 (Lafourche)
20 Payable from General Obligation Bonds
21	Priority 1	$ 1,225,000
22	Priority 5	$ 2,750,000
23 Total	$ 3,975,000
2450/N72RIVER ROAD AFRICAN AMERICAN MUSEUM
25(573681)River Road African American Museum, Planning and 
26 Construction
27 (Ascension)
28 Payable from General Obligation Bonds
29	Priority 5	$ 1,000,000
3050/N74NATIONAL WORLD WAR II MUSEUM, INC.
31(572801)Eight Projects under FP&C Management Plus Liberation 
32 Pavilion: Bricks and Mortar, Exhibit Fabrication, Media 
33 Production, Planning and Construction
34 (Orleans)
35 Payable from General Obligation Bonds
36	Priority 1	$17,889,647
37	Priority 5	$12,300,000
38 Total	$30,189,647
3950/N79TANGIPAHOA PARISH FIRE DISTRICT 1
40(572356)Bruce Cutrer Regional Fire Training Facility of Tangipahoa 
41 Parish, Planning and Construction
42 (Tangipahoa)
43 Payable from General Obligation Bonds
44	Priority 1	$ 132,160
45	Priority 5	$ 2,000,000
46 Total	$ 2,132,160
Page 100 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/N99AMITE RIVER BASIN COMMISSION
2(573569)Upper Amite River Flood Risk Reduction and 
3 Restoration, Planning and Construction
4 (East Baton Rouge, East Feliciana, Livingston, St. Helena)
5 Payable from General Obligation Bonds
6	Priority 5	$65,000,000
7 Payable from State General Fund (Direct) Non-Recurring
8 Revenues	$ 2,000,000
9 Total	$67,000,000
1050/NA2LAFAYETTE AIRPORT COMMISSION
11(573682)Construction of a New Passenger Facility Terminal and 
12 Associated Infrastructure at Lafayette Regional Airport
13 (Lafayette)
14 Payable from General Obligation Bonds
15	Priority 1	$ 173,105
1650/NAAPOINTE COUPEE COUNCIL ON AGING
17(572012)Senior Center, Planning and Construction
18 (Pointe Coupee)
19 Payable from General Obligation Bonds
20	Priority 1	$ 2,315,400
2150/NADMU ZETA FOUNDATION, INC.
22(573684)Expansion Project, Planning and Construction
23 (East Baton Rouge)
24 Payable from General Obligation Bonds
25	Priority 1	$ 179,765
2650/NAJEFFORTS OF GRACE, INC.
27(573449)Ashe Too, Planning and Construction
28 (Orleans)
29 Payable from General Obligation Bonds
30	Priority 1	$ 1,000,000
3150/NAZHOSPICE OF ACADIANA FOUNDATION, INC.
32(573692)Calcutta House, Planning and Construction
33 (Lafayette)
34 Payable from General Obligation Bonds
35	Priority 1	$ 249,795
36	Priority 5	$ 600,000
37 Total	$ 849,795
3850/NB1CENTER FOR INNOVATIVE TRAINING OF YOUTH
39(573807)STEM NOLA's Innovation Hub, Planning and Construction
40 (Orleans)
41 Payable from General Obligation Bonds
42	Priority 5	$ 8,600,000
Page 101 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/NBCCAPITOL CITY FAMILY HEALTH CENTER, INC.
2(573694)Care South Medical and Dental Expansion, Planning and 
3 Construction
4 (East Baton Rouge)
5 Payable from General Obligation Bonds
6	Priority 1	$ 704,765
7	Priority 5	$ 550,000
8 Total	$ 1,254,765
950/NBFCOMMUNITY RECEIVING HOME, INC.
10(572189)Rapides Parish Juvenile Justice Complex, Planning and 
11 Construction
12 (Rapides)
13 Payable from General Obligation Bonds
14	Priority 5	$25,300,000
15(573697)Renaissance Home for Youth, New Administrative 
16 Building, Renovation of Existing Administrative Building, 
17 Roads and Parking Areas, Planning and Construction
18 (Rapides)
19 Payable from General Obligation Bonds
20	Priority 1	$ 29,586
2150/NBJJONESVILLE FIRE DISTRICT
22(572204)New Fire Station at U.S. Hwy 84 and 3rd Street, Planning 
23 and Construction
24 (Catahoula)
25 Payable from General Obligation Bonds
26	Priority 5	$ 800,000
2750/NBVCAPITAL AREA GROUND WATER CONSERVATION DISTRICT
28(572917)Water Monitoring System, Planning and Construction
29 (Ascension, East Baton Rouge, East Feliciana, Pointe 
30 Coupee, West Baton Rouge, West Feliciana)
31 Payable from General Obligation Bonds
32	Priority 1	$ 965,991
33	Priority 5	$ 1,800,000
34 Total	$ 2,765,991
3550/NC2BATON ROUGE RECREATION AND PARKS COMMISSION
36(572737)J.S. Clark Golf Course Renovation in Greenwood Community 
37 Park, Planning and Construction
38 (East Baton Rouge)
39 Payable from General Obligation Bonds
40	Priority 1	$ 50,000
41	Priority 5	$ 800,000
42 Total	$ 850,000
43(572740)Baker Youth Tournament Ball Fields, Planning and 
44 Construction
45 (East Baton Rouge)
46 Payable from General Obligation Bonds
47	Priority 1	$ 65,000
Page 102 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/NCFTECHE ACTION BOARD, INC.
2(573641)Construction and Completion of New Health Center Facility 
3 for Teche Action Clinic at Gramercy in Gramercy, 
4 LA, Planning and Construction
5 (St. James)
6 Payable from General Obligation Bonds
7	Priority 5	$ 3,700,000
850/NCMFIFTH WARD RECREATION DISTRICT OF ST. HELENA PARISH
9(573527)Recreation District Baseball Fields, Planning and 
10 Construction
11 (St. Helena)
12 Payable from General Obligation Bonds
13	Priority 1	$ 950,417
1450/NCNSOUTH TOLEDO BEND WATERWORK S DISTRICT
15(571957)Vaco Road, Prospect Road, and Firesheets Lane, Planning 
16 and Construction
17 (Sabine)
18 Payable from General Obligation Bonds
19	Priority 1	$ 25,000
20	Priority 5	$ 200,000
21 Total	$ 225,000
2250/NCRLAFAYETTE PARISH WATERWORK S DISTRICT- NORTH
23(572616)Water Filtration Plant Construction
24 (Lafayette)
25 Payable from General Obligation Bonds
26	Priority 5	$ 8,000,000
2750/ND5LAFOURCHE PARISH WATER DISTRICT
28(573698)Kraemer Water Line Upgrades, Planning and Construction
29 (Lafourche)
30 Payable from General Obligation Bonds
31	Priority 1	$ 100,000
32	Priority 5	$ 1,500,000
33 Total	$ 1,600,000
3450/ND9NORTHEAST LOUISIANA CHILDREN'S MUSEUM
35(572618)Northeast Louisiana Children's Museum Relocation, Planning 
36 and Construction
37 (Ouachita)
38 Payable from General Obligation Bonds
39	Priority 5	$10,000,000
4050/NDNOPPORTUNITIES INDUSTRIALIZ ATION CENTER 
41 INCORPORATED OF OUACHITA
42(573486)New Education Building, Planning and Construction
43 (Ouachita)
44 Payable from General Obligation Bonds
45	Priority 1	$ 386,775
46	Priority 5	$ 1,845,000
47 Total	$ 2,231,775
Page 103 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/NDQTANGIPAHOA AFRICAN AMERICAN HERITAG E 
2 MUSEUM AND VETERANS' ARCHIVES
3(573730)Tangipahoa African American Heritage Museum Roof 
4 Replacement, Planning and Construction
5 (Tangipahoa)
6 Payable from General Obligation Bonds
7	Priority 5	$ 540,000
850/NDXNEW ORLEANS COUNCIL ON AG ING, INC.
9(572515)New Orleans Council on Aging Office and Senior Community 
10 Center, Planning, Purchase, and Renovation of a Building 
11 and/or Acquire Land and Construct a New Building
12 (Orleans)
13 Payable from General Obligation Bonds
14	Priority 1	$ 4,998,358
1550/NDYJEFFERSON DAVIS WATER AND SEWER 
16 DISTRICT COMMISSION #1
17(571909)Water System Improvements, Planning and Construction
18 (Jefferson Davis)
19 Payable from General Obligation Bonds
20	Priority 1	$ 1,000,000
21	Priority 5	$ 4,200,000
22 Total	$ 5,200,000
2350/NEEBIOMEDICAL RESEARCH AND INNOVATION P ARK
24(572674)Biomedical Research and Innovation Park Building, 
25 Planning and Construction
26 (Ouachita)
27 Payable from General Obligation Bonds
28	Priority 1	$ 8,599,795
29	Priority 5	$14,900,000
30 Total	$23,499,795
3150/NERST. HELENA PARISH HOSPITAL SERVICE DISTRICT NO. 1
32(573701)Hospital Renovation, Expansion, and Equipment 
33 Replacement, Planning and Construction
34 (St. Helena)
35 Payable from General Obligation Bonds
36	Priority 1	$ 4,181,045
3750/NEVHOSPITAL SERVICE DISTRICT 1 TERREBONNE P ARISH
38(572904)Emergency Power System Replacement and Upgrade, 
39 Planning and Construction
40 (Terrebonne)
41 Payable from General Obligation Bonds
42	Priority 5	$15,800,000
4350/NEYORLEANS PARISH HOSPITAL SERVICE DISTRICT A
44(573636)Parish Hospital Service District for the Parish of Orleans - 
45 District A- Obstetrics Service Line Expansion Level 2 
46 Unit, Planning and Construction
47 (Orleans)
48 Payable from General Obligation Bonds
49	Priority 1	$ 3,200,000
Page 104 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/NF6ST. MARTIN PARISH SHERIFF'S OFFICE
2(572802)Regional Law Enforcement Training Academy, Planning 
3 and Construction
4 (St. Martin)
5 Payable from General Obligation Bonds
6	Priority 1	$ 900,000
750/NFECAJUNDOME
8(572427)Cajundome and Convention Center Indoor Air Quality 
9 Improvements, Planning and Construction
10 (Lafayette)
11 Payable from General Obligation Bonds
12	Priority 5	$ 6,364,182
1350/NFXTHE O.W. DILLON TRAINING AND COMMUNITY 
14 DEVELOPMENT CENTER, INC.
15(573540)The O.W. Dillon Training and Community Development 
16 Center Building, Planning and Construction
17 (Tangipahoa)
18 Payable from General Obligation Bonds
19	Priority 1	$ 1,463,437
20	Priority 5	$ 4,500,000
21 Total	$ 5,963,437
2250/NFZOUR LADY OF LOURDES REGIONAL MEDICAL CENTER
23(573442)Our Lady of Lourdes Regional Medical Center, Planning 
24 and Construction
25 (Lafayette)
26 Payable from General Obligation Bonds
27	Priority 1	$ 4,500,000
28	Priority 5	$ 8,500,000
29 Total	$13,000,000
3050/NG6THE LOUISIANA BLACK HISTORY HALL OF FAME
31(573702)Museum and Cultural Center, Planning and Construction
32 (East Baton Rouge)
33 Payable from General Obligation Bonds
34	Priority 1	$ 1,964,737
3550/NGALINCOLN PARISH FIRE PROTECTION DISTRICT #1
36(573217)Renovations to Existing Facility and Additional Buildings, 
37 Acquisition, Planning and Construction
38 (Lincoln)
39 Payable from General Obligation Bonds
40	Priority 1	$ 120,000
41	Priority 5	$ 765,000
42 Total	$ 885,000
Page 105 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/NGMNEW ORLEANS AFRICAN AMERICAN MUSEUM OF ART, CULTURE 
2 AND HISTORY
3(573434)New Orleans African American Museum of Art, Culture and 
4 History: Renovation and New Construction
5 (Orleans)
6 Payable from General Obligation Bonds
7	Priority 1	$ 374,765
8	Priority 5	$ 4,000,000
9 Total	$ 4,374,765
1050/NGNLOUISIANA CHAMBER OF COMMERCE F OUNDATION, INC.
11(573712)Louisiana Chamber of Commerce's Business Innovation 
12 Center, Planning and Construction
13 (Calcasieu)
14 Payable from General Obligation Bonds
15	Priority 1	$ 1,645,000
1650/NGQTHE STRAND THEATRE OF SHREVEPORT CORPORATION
17(572337)Repair and Renovation to the Strand Theatre of Shreveport
18 (Caddo)
19 Payable from General Obligation Bonds
20	Priority 5	$ 984,000
2150/NH7CEMETERY MAINTENANCE Z ACHARY
22(573713)Public Cemetery Maintenance, Planning and Construction
23 (East Baton Rouge)
24 Payable from General Obligation Bonds
25	Priority 5	$ 3,750,000
2650/NHEST. JAMES PARISH HOSPITAL
27(572671)West Bank Health Clinic, Planning and Construction
28 (St. James)
29 Payable from General Obligation Bonds
30	Priority 1	$ 1,789,295
31	Priority 5	$ 1,500,000
32 Total	$ 3,289,295
3350/NHGLAFAYETTE CENTRE DEVELOP MENT DISTRICT
34(572602)Downtown Lafayette Public Infrastructure Improvements and 
35 Upgrades, Planning and Construction
36 (Lafayette)
37 Payable from General Obligation Bonds
38	Priority 1	$ 500,000
3950/NI7HOSPITAL SERVICE DISTRICT 1 IBERIA PARISH DBA IBERIA 
40 MEDICAL CENTER
41(571776)Addition of Medical, Surgical, and Psychiatric Inpatient 
42 Rooms, Planning, Construction, and Equipment
43 (Iberia)
44 Payable from General Obligation Bonds
45	Priority 1	$ 3,500,000
46	Priority 5	$ 3,675,000
47 Total	$ 7,175,000
Page 106 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/NI9ASCENSION-ST. JAMES AIRPORT AND TRANSPORTATION 
2 AUTHORITY
3(571996)Commercial Hangar Complex - Louisiana Regional 
4 Airport, Gonzales, LA, Planning and Construction
5 (Ascension)
6 Payable from General Obligation Bonds
7	Priority 5	$ 1,000,000
8(573715)Drinking Water, Fire Suppression, and ADA Compliance - 
9 Louisiana Regional Airport, Gonzales, LA, Planning 
10 and Construction
11 (Ascension)
12 Payable from General Obligation Bonds
13	Priority 1	$ 190,000
1450/NJACECILIA WATER CORP ORATION
15(573717)Water System Improvements, Planning and Construction
16 (St. Martin)
17 Payable from General Obligation Bonds
18	Priority 1	$ 495,000
1950/NJKREDDELL VIDRINE WATER DISTRICT
20(573392)Refurbishment of Water Wells and New
21 Office Building, Planning and Construction
22 (Evangeline)
23 Payable from General Obligation Bonds
24	Priority 5	$ 960,000
2550/NJLBASTION COMMUNITY OF RESILIENCE
26(573272)Veterans Wellness Facility in New Orleans, Planning 
27 and Construction
28 (Orleans)
29 Payable from General Obligation Bonds
30	Priority 1	$ 1,900,000
31	Priority 5	$ 1,000,000
32 Total	$ 2,900,000
3350/NK1NORTH LOUISIANA ECONOMIC P ARTNERSHIP
34(573600)Northwest Louisiana Industrial Redevelopment of Closed 
35 Libby Glass Property, Planning and Construction
36 (Caddo)
37 Payable from General Obligation Bonds
38	Priority 5	$ 7,350,000
39 Payable from State General Fund (Direct) Non-Recurring
40 Revenues	$ 5,700,000
41 Total	$13,050,000
4250/NKQTHIBODAUX REG IONAL HEALTH SYSTEM
43(571986)Emergency Power System Replacement and Upgrade, 
44 Planning and Construction
45 (Lafourche)
46 Payable from General Obligation Bonds
47	Priority 5	$15,800,000
Page 107 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/NL1BEAUREGARD PARISH WATER WORK S DISTRICT #2
2(573827)Booster Station Upgrades, Planning and Construction
3 (Beauregard)
4 Payable from General Obligation Bonds
5	Priority 5	$ 1,080,000
650/NLMFOUNDATION FOR SCIENCE AND MATHEMATICS EDUCATION, 
7 INC.
8(571977)A Model for a 21st Century Workforce Development Urban 
9 High School - New Orleans Science and Mathematics High 
10 School
11 (Orleans)
12 Payable from General Obligation Bonds
13	Priority 1	$ 624,448
14	Priority 5	$ 1,000,000
15 Total	$ 1,624,448
1650/NLOOUR LADY OF THE ANGELS HOSPITAL
17(573423)Medical Office Building, Planning and Construction
18 (Washington)
19 Payable from General Obligation Bonds
20	Priority 5	$ 4,400,000
2150/NMDBELMONT WATERWORK S, INC.
22(573718)Water System Improvements, Planning and Construction
23 (Sabine)
24 Payable from General Obligation Bonds
25	Priority 1	$ 23,598
2650/NNKPIERRE PART BELLE RIVER MUSEUM
27(572009)Pierre Part Belle River Museum, Planning and Construction
28 (Assumption)
29 Payable from General Obligation Bonds
30	Priority 5	$ 2,000,000
3150/NNNCALCASIEU CONSOLIDATED G RAVITY DRAINAGE
32 DISTRICT NO. 1
33(572391)Lateral W-3 Improvements, Planning
34 and Construction
35 (Calcasieu)
36 Payable from General Obligation Bonds
37	Priority 5	$ 5,850,000
3850/NP1ACADIANA CRIMINALISTICS LABORATORY DISTRICT
39(571887)New Crime Laboratory, Planning, Design, Construction, 
40 and Equipment
41 (Iberia)
42 Payable from General Obligation Bonds
43	Priority 1	$22,752,332
4450/NP3BAYOU LAFOURCHE FRESH WATER DISTRICT
45(573586)Donaldsonville Flood Control, Planning and Construction
46 (Ascension, Assumption, Lafourche, Terrebonne)
47 Payable from General Obligation Bonds
48	Priority 1	$ 753,000
Page 108 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/NPDIBERIA ECONOMIC DEVELOP MENT AUTHORITY
2(572421)Progress Point Business Park and Airport Gateway, Land
3 Acquisition, Planning and Construction
4 (Iberia)
5 Payable from General Obligation Bonds
6	Priority 1	$ 1,214,923
750/NPELOUISIANA MUSIC AND HERITAG E EXPERIENCE, INC.
8(572811)The Louisiana Music and Heritage Experience, Inc., 
9 Planning and Construction
10 (Orleans)
11 Payable from General Obligation Bonds
12	Priority 5	$41,900,000
13 Payable from State General Fund (Direct) Non-Recurring
14 Revenues	$ 2,500,000
15 Total	$44,400,000
1650/NQ2GRAVITY DRAINAGE DISTRICT 6 CALCASIEU PARISH
17(571862)Buxton Creek Drainage Improvements, Planning and 
18 Construction
19 (Calcasieu)
20 Payable from General Obligation Bonds
21	Priority 1	$ 4,100,000
22	Priority 5	$ 2,000,000
23 Total	$ 6,100,000
2450/NQGLAFAYETTE METROP OLITAN EXPRESSWAY COMMISSION
25(573384)Lafayette Loop Project, Planning and Construction
26 (Lafayette)
27 Payable from General Obligation Bonds
28	Priority 1	$ 4,000,000
29	Priority 5	$ 2,500,000
30 Total	$ 6,500,000
3150/NQNLSU REAL ESTATE AND FACILITIES FOUNDATION
32(573143)University Lakes Restoration Project to Address Flood 
33 Control, Environmental, Safety, Health and Other Issues 
34 (Matching Funds)
35 (East Baton Rouge)
36 Payable from General Obligation Bonds
37	Priority 1	$34,000,000
38	Priority 5	$ 6,000,000
39 Total	$40,000,000
4050/NQVBEAUREGARD WATERWORK S DISTRICT #6
41(571858)Water System Improvements, Planning and Construction
42 (Beauregard)
43 Payable from General Obligation Bonds
44	Priority 5	$ 1,000,000
Page 109 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/NR7COMMCARE CORP ORATION
2(573331)Wynhoven Health Care Expansion, including St. Andrew's 
3 Village, Planning and Construction
4 (Jefferson)
5 Payable from General Obligation Bonds
6	Priority 1	$ 3,428,171
7	Priority 5	$ 1,999,750
8 Total	$ 5,427,921
950/NRUEAST BATON ROUG E COUNCIL ON AGING
10(572986)Lotus Village at the Lakes Senior Community, Planning, 
11 Development and Construction
12 (East Baton Rouge)
13 Payable from General Obligation Bonds
14	Priority 5	$ 7,184,000
15(573491)Lotus Village Phase II, Acquisition, Planning, 
16 Rehabilitation, and Construction
17 (East Baton Rouge)
18 Payable from General Obligation Bonds
19	Priority 1	$ 1,000,000
2050/NSPEDEN HOUSE
21(573719)New Orleans Emergency Shelter, Planning and 
22 Construction
23 (Orleans)
24 Payable from General Obligation Bonds
25	Priority 1	$ 850,000
2650/NSTDOWNTOWN DEVELOP MENT DISTRICT NEW ORLEANS
27(572274)Harmony Circle, Planning and Construction
28 (Orleans)
29 Payable from General Obligation Bonds
30	Priority 5	$ 4,000,000
3150/NT7CITIZENS MEDICAL CENTER
32(572349)Expansion of Emergency Department, ICU, and Imaging, 
33 Planning, Design, and Construction
34 (Caldwell)
35 Payable from General Obligation Bonds
36	Priority 5	$11,900,000
3750/NTAEAST CARROLL PARISH SHERRIFF'S OFFICE
38(573301)Training and Recreation Center, Planning and Construction
39 (East Carroll)
40 Payable from General Obligation Bonds
41	Priority 5	$ 3,000,000
4250/NTKTHE UNION LINCOLN REG IONAL WATER SUPPLY INITIATIVE
43(573720)Development of Alternative Water Supply from Lake 
44 D'Arbonne for Lincoln and Union Parishes
45 (Lincoln, Union)
46 Payable from General Obligation Bonds
47	Priority 1	$ 1,397,200
48	Priority 5	$ 2,400,000
49 Total	$ 3,797,200
Page 110 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150-NU2LOUISIANA ENDOWMENT F OR THE HUMANITIES
2(571968)Critical Repairs and Restoration of Historic Turners 
3 Hall, Planning and Construction
4 (Orleans)
5 Payable from State General Fund (Direct) Non-Recurring 
6 Revenues	$ 550,000
750/NU99TH WARD STADIUM, INC.
8(573721)Multi-Sport Venue in Eastern New Orleans and Lower 
9 Ninth Ward, Planning and Construction
10 (Orleans)
11 Payable from General Obligation Bonds
12	Priority 1	$ 3,449,765
1350/NUQLOUISIANA HIBERNIAN CHARITY
14(573722)Four Acre Irish Heritage Park in the Lakeview 
15 Neighborhood, Planning and Construction
16 (Orleans)
17 Payable from General Obligation Bonds
18	Priority 1	$ 183,522
1950/NUTCATHOLIC CHARITIES OF ACADIANA
20(572683)St. Joseph Diner and FoodNet Program for Acadiana, 
21 Planning and Construction
22 (Lafayette)
23 Payable from State General Fund (Direct) Non-Recurring
24 Revenues	$ 1,700,000
2550/NVYWASHINGTON PARISH HOSPITAL SERVICE DISTRICT NO. 1
26(571979)Emergency Upgrades including Power Generation System 
27 Upgrade, Mechanical Systems, and Roofing, Planning and 
28 Construction
29 (Washington)
30 Payable from General Obligation Bonds
31	Priority 1	$ 1,922,147
32	Priority 5	$ 3,100,000
33 Total	$ 5,022,147
3450/NWGCHILDREN'S ADVOCACY NETWORK , INC.
35(572181)Children's Advocacy Network Campus, Planning and 
36 Construction
37 (Rapides)
38 Payable from General Obligation Bonds
39	Priority 5	$ 2,000,000
4050/NWOAIRPORT DISTRICT 1 OF CALCASIEU PARISH
41(572468)Airport Entrance and Access Road Improvements and 
42 Marquee, Planning and Construction
43 (Calcasieu)
44 Payable from General Obligation Bonds
45	Priority 5	$ 1,000,000
Page 111 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/NWRLOUISIANA SWAMP BASE, INC.
2(571967)Camp Atchafalaya Swamp Base, Planning, Design, and 
3 Construction
4 (St. Martin)
5 Payable from General Obligation Bonds
6	Priority 1	$ 472,500
7	Priority 5	$ 9,000,000
8 Total	$ 9,472,500
950/NWSLAFAYETTE CENTRAL P ARK, INC.
10(571961)Lafayette Central Park Improvements, Planning and 
11 Construction
12 (Lafayette)
13 Payable from General Obligation Bonds
14	Priority 1	$ 3,197,500
15	Priority 5	$ 5,637,000
16 Total	$ 8,834,500
1750/NXCLIVINGSTON PARISH SHERIFF'S OFFICE
18(573308)Livingston Parish Emergency Response and Evacuation 
19 Center, Planning and Construction
20 (Livingston)
21 Payable from General Obligation Bonds
22	Priority 1	$ 1,000,000
23	Priority 5	$43,920,000
24 Total	$44,920,000
2550/NXIHEBERT WATER SYSTEM, INC.
26(572466)Water System Improvements, Planning and Construction
27 (Caldwell)
28 Payable from General Obligation Bonds
29	Priority 1	$ 213,583
30	Priority 5	$ 1,000,000
31 Total	$ 1,213,583
3250/NXYCONCORDIA PARISH HOSPITAL SERVICE DISTRICT #1
33(573723)Construction of Turn Lane on U.S. 84/425
34 (Concordia)
35 Payable from General Obligation Bonds
36	Priority 1	$ 225,000
3750/NYNOPELOUSAS HEIGHTS, INC.
38(573724)Opelousas Heights Proposed Subdivision, Planning and 
39 Construction
40 (St. Landry)
41 Payable from General Obligation Bonds
42	Priority 1	$ 1,184,790
4350/NYPSECOND HARVEST F OOD BANK OF GREATER 
44 NEW ORLEANS AND ACADIANA
45(573725)Roof Replacement and HVAC Installation, Planning 
46 and Construction
47 (Jefferson)
48 Payable from General Obligation Bonds
49	Priority 1	$ 352,888
Page 112 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/NYSHOLY ROSARY REDEVELOP MENT
2(573327)Holy Rosary Institute, Planning, Construction, and 
3 Restoration
4 (Lafayette)
5 Payable from General Obligation Bonds
6	Priority 1	$ 4,293,532
7	Priority 5	$ 3,200,000
8 Total	$ 7,493,532
950/NZ3BEAUREGARD MEMORIAL HOSP ITAL
10(572357)Emergency Department Addition and Renovation 
11 and Women's Center Renovation, Planning and Construction
12 (Beauregard)
13 Payable from General Obligation Bonds
14	Priority 5	$ 2,700,000
15 Payable from State General Fund (Direct) Non-Recurring
16 Revenues	$ 2,200,000
17 Total	$ 4,900,000
1850/NZBLIVINGSTON PARISH AIRPORT DISTRICT
19(572216)Livingston Executive Airport, Planning and Construction
20 (Livingston)
21 Payable from General Obligation Bonds
22	Priority 1	$ 2,824,303
23	Priority 5	$ 3,485,000
24 Total	$ 6,309,303
2550/NZDHOSPITAL SERVICE DISTRICT NO. 1, PARISH OF ST. MARY
26(573726)Franklin Foundation Hospital Wellness Center
27 (St. Mary)
28 Payable from General Obligation Bonds
29	Priority 1	$ 2,000,000
3050/NZKTHE ROBERT A. BOGAN BATON ROUGE FIRE MUSEUM
31(573727)Museum Restoration, Planning and Construction
32 (East Baton Rouge)
33 Payable from General Obligation Bonds
34	Priority 5	$ 3,165,000
3550/NZXWEST CALCASIEU CAMERON HOSP ITAL
36(573257)West Calcasieu Cameron Hospital Medical Office 
37 Building, Planning and Construction
38 (Calcasieu)
39 Payable from General Obligation Bonds
40	Priority 1	$ 265,624
41	Priority 5	$ 4,022,000
42 Total	$ 4,287,624
4350/S10CALCASIEU PARISH SCHOOL BOARD
44(573728)Renovations to Lake Charles Boston Stadium, Planning 
45 and Construction
46 (Calcasieu)
47 Payable from General Obligation Bonds
48	Priority 1	$ 167,000
49	Priority 5	$ 823,000
50 Total	$ 990,000
Page 113 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
150/S39POINTE COUPEE PARISH SCHOOL BOARD
2(573729)Pointe Coupee Parish School Board Office Relocation, 
3 to be Located at 8777 Morganza Highway, Formerly 
4 Labarre Elementary School Site, Due to Flooding Caused 
5 by Hurricane Gustav, Planning and Construction
6 (Pointe Coupee)
7 Payable from General Obligation Bonds
8	Priority 1	$ 2,468,060
9	Priority 5	$ 1,900,000
10 Total	$ 4,368,060
1150/S63WEST FELICIANA PARISH SCHOOL BOARD
12(571707)Julius Freyhan Cultural/Conference Center, Planning 
13 and Construction
14 (West Feliciana)
15 Payable from General Obligation Bonds
16	Priority 1	$ 1,497,000
1750/S67CENTRAL COMMUNITY SCHOOL SYSTEM
18(572059)Central City Community Sports Complex Infrastructure, 
19 and School Board Administration Building and Meeting 
20 Room, Planning and Construction
21 (East Baton Rouge)
22 Payable from General Obligation Bonds
23	Priority 5	$ 2,000,000
24 Section 2. (A) Appropriated Debt Projects. The projects in this section are to be
25funded through the sale bonds and secured by or payable from state appropriation.
26 (B) Notwithstanding anything contained in this Capital Outlay Act, or any
27previous Capital Outlay Act to the contrary, or any other provision of law, the Division of
28Administration may finance the design, construction, furnishing and equipping of facilities
29through the issuance of revenue bonds by the Office Facilities Corporation to be secured by
30and payable from State appropriations.  The issuance of such revenue bonds shall require the
31approval of the State Bond Commission.
32 Section 3.  The expenditure of funds appropriated in this Act shall be in
33conformity to all existing statutes relative to public bidding, contractual review, and R.S.
3439:101 through 128 and any other statutes affecting the capital outlay program for state
35government, state institutions, and political entities.
36 Section 4.  Payment for projects specified in this Act must be made by warrant
37submitted to the division of administration, Department of Transportation and Development,
38the state treasurer or other administering agency as provided in Section 8, whichever is
39appropriate, only to the extent of funds required for immediate payment.  Copies of invoices
40or other supporting documentation shall be submitted with warrants. In the event that any
Page 114 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1equipment included in this Act, is procured pursuant to the provisions of the State Lease-
2Purchase Act, R.S. 39:1761 et seq., the amounts included in this Act for each such piece of
3equipment shall not be appropriated.  The provisions of R.S. 39:1771 which require
4equipment to be leased under the State Lease-Purchase Act to be included in the executive
5budget and approved by the legislature through inclusion in the General Appropriation Act
6shall be considered waived upon the inclusion of such equipment in this Act.  Projects
7contained in this Act may, at the direction of the division of administration and with the
8approval of the State Bond Commission, alternatively be funded through financing programs
9heretofore or hereafter provided by a public trust and public corporation duly organized
10pursuant to R.S. 9:2341 et seq., having for its beneficiary the state and the Louisiana Local
11Government Environmental Facilities and Community Development Authority, pursuant to
12R.S. 33:4548.1 et seq.
13 Section 5.  If at any time during the Fiscal Year 2024-2025, the governor should
14find, or the Joint Legislative Committee on the Budget or the commissioner of
15administration should report to the governor, that the receipts of the treasury are falling short
16or appear likely to fall short of the revenue estimates for the fiscal year and that a cash
17deficit is likely to be incurred, the governor shall take such steps as deemed necessary to
18prevent the occurrence of a cash deficit. In the event that a capital outlay project funded in
19this Act falls under an agency which is abolished or for which funds are not appropriated in
20the 2024-2025 General Appropriation Act, then the funds appropriated in this Act for such
21capital outlay projects shall not be expended unless deemed necessary by the governor to
22protect life or property. In the event that legislation is enacted which transfers facilities or
23programs for which projects are funded in this Act, on behalf of one agency, institution,
24department, or management board to another agency, institution, department, or management
25board, then the projects in this Act shall be deemed transferred also.
26 Section 6.  All monies appropriated by this Act and any applicable funds of a
27prior capital outlay budget act adopted by the legislature shall be deposited by the state
28treasurer in the Comprehensive Capital Outlay Escrow Account, established by this Section,
29in the state treasury. In accordance with R.S. 36:764, no later than sixty days following the
30end of each quarter, the state treasurer shall report to the Joint Legislative Committee on the
31Budget and the commissioner of administration, all funds contained in the Miscellaneous
32Fund of the Comprehensive Capital Outlay Escrow Account. Notwithstanding any
Page 115 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1provisions contained herein or other law to the contrary, any original issue premium or
2accrued interest proceeds received pursuant to the sale of general obligation bonds shall
3remain on deposit to the credit of the Bond Security and Redemption Fund until such time
4as they may be utilized in accordance with U.S. Department of the Treasury Regulations
5promulgated pursuant to the Internal Revenue Code of 1986. All such monies shall be
6administered according to the particular act pertaining to the fiscal year in which such
7monies were appropriated.  If it is determined by the director of the office of facility
8planning and control, division of administration, that the funds appropriated by this Act or
9any prior capital outlay budget Act are not sufficient to complete the projects contained in
10any capital outlay budget Act, through unavoidable deficiencies in appropriation, including
11administrative and legal requirements, the commissioner of administration, subject to
12approval of the Joint Legislative Committee on the Budget, may direct the use of interest
13earned from the investment of general obligation bond or note proceeds in the
14Comprehensive Capital Outlay Escrow Account, not to exceed an aggregate of five million
15dollars in any one fiscal year, for the purpose of completing the projects contained in any
16capital outlay budget Act and such money shall be deemed appropriated in specific amounts
17necessary for such purpose.  All appropriations in this Act which are made as additions to
18funds for previously authorized projects shall be included, for accounting purposes, in the
19account of the previously authorized projects. If it is determined by the director of the office
20of facility planning and control, division of administration, that it is cost effective and
21practical to combine individual appropriations, the commissioner of administration, subject
22to the approval of the Joint Legislative Committee on the Budget, may direct that two or
23more appropriations or parts thereof may be combined into a single project for accounting
24and audit purposes. The commissioner of administration may direct that funding in the
25various statewide and/or multiple parish projects for improvements for state facilities may
26be transferred to any project, in this Act or any previous Capital Outlay Act, which require
27supplemental funding for improvements for state facilities which qualify for funding through
28the various statewide and/or multiple parish projects for improvements for state facilities.
29The office of facility planning and control, division of administration is authorized to receive
30settlements and vendor rebates and to add a portion or all of these receipts to the existing
31project funds relating to the settlement and/or vendor rebates and appropriated in this Act
32or any previous Capital Outlay Act including those previously appropriated funds that
Page 116 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1become unavailable.  Approval of the Joint Legislative Committee on the Budget will be
2obtained if the settlement and/or vendor rebates will be added to any projects in this Act or
3any previous Capital Outlay Act which are unrelated to the project from which the settlement
4and/or vendor rebates were received. The office of facility planning and control, division of
5administration is authorized to receive insurance payments and are hereby authorized to
6immediately repair facilities that suffer insurance losses without those projects being
7included in the Act and shall report to the Joint Legislative Committee on the Budget any
8expenditures from insurance funds received pursuant to this section. A portion, as
9determined by the commissioner of administration and not to exceed one percent (1%), of
10the funding for projects which qualify for the Percent for Art Program and not to exceed
11$450,000 for an individual, qualifying project, may be transferred from the qualifying
12project budgets, to the Department of Culture, Recreation and Tourism for costs of acquiring
13art and admCnistering the program.  For all Percent for Art Program projects in this or any
14previous capital outlay, up to ten percent (10%) of the aforementioned one percent (1%) may
15be used for the costs of administering the projects.
16 Section 7.  No later than February 1, 2025, agencies administering capital outlay
17projects will submit reports identifying completed projects and cash balances to the Joint
18Legislative Committee on Capital Outlay pursuant to the reporting requirements of R.S.
1939:105 and R.S. 39:116.
20 Section 8.  The commissioner of administration, with the approval of the Joint
21Legislative Committee on the Budget, is authorized to supplement or substitute the
22appropriations specified in this or previous capital outlay acts with any federal or other funds
23which are or may become available and such funds shall be deemed appropriated in specific
24amounts necessary for the purposes of this Act. Any funds received by the State Bond
25Commission as a result of a prepayment of reimbursement contracts as authorized by law
26and the policy and procedure for reimbursement contracts of the Department of Treasury,
27office of State Bond Commission, shall be deposited as set forth in such policy and
28procedure and shall be deemed available and appropriated in specific amounts necessary for
29the purposes of this Act pursuant to the procedure set forth in this section.
30 Section 9.(A) All projects herein authorized and funded shall be subject to the
31provisions of R.S. 39:101 through 128. With the exception of appropriations made to the
32Department of Military Affairs, the Legislature, the Louisiana Stadium and Exposition
Page 117 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1District, the Department of Economic Development, the Coastal Protection and Restoration
2Authority, the Division of Administration for Supplemental State  Funds for  Local
3Government Assistance Program, the Division of Administration for the Community Water
4Enrichment Program or the Department of Transportation and Development, all funds herein
5appropriated shall be considered as having been appropriated directly to the Office of
6Facility Planning and Control, Division of Administration. All cooperative endeavor
7agreements for non-state entities shall be prepared by the appropriate administering agency
8and submitted to the office of State Procurement for review and approval. As part of its
9review, the office of State Procurement shall consult with bond counsel to the State relative
10to any federal tax issues.
11 (1) Notwithstanding anything contained in this act to the contrary or any other
12provision of law, the appropriations made for the Louisiana Stadium and Exposition District
13shall be appropriated directly to the Louisiana Stadium and Exposition District, and are
14public purposes pursuant to the provisions of Article VII, Section 14 of the Constitution of
15Louisiana primarily for economic development, including the generation of tax revenue,
16creation of jobs, and the generation of tourism, and may be used to reimburse any
17expenditure made prior to the granting of a line of credit or the sale of bonds by the State
18Bond Commission, determination by the State Treasurer that cash funding has been
19deposited in the Comprehensive Capital Outlay Escrow Account for the project.
20 (2) Further, with respect to appropriations to the Louisiana Stadium and
21Exposition District for the TPC Louisiana, Planning and Construction project, the Louisiana
22Stadium and Exposition District shall be permitted to use alternative competitive
23procurement and delivery methods for the award of any contracts to be funded through such
24appropriation.
25 (3) The Louisiana Stadium and Exposition District shall have the authority to
26directly appoint a design professional from a list of a minimum of three architectural firms
27or joint ventures with professional sports facility design experience acceptable to the
28Commissioner of Administration and shall be exempt from other state requirements for
29selection of designers. The design professional fee shall be in accordance with state
30guidelines administered by the Office of Facility Planning and Control, Division of
31Administration.
Page 118 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1 (B)(1)(a) Funds appropriated in the Capital Outlay Act under the name of non-
2state entities shall be administered by the Office of Facility Planning and Control, Division
3of Administration under cooperative endeavor agreements; however, projects involving state
4or federal highways may be administered by the Department of Transportation and
5Development, if appropriate.  Except as provided in Section 8(A), cooperative endeavor
6agreements entered into pursuant to appropriations in this Act shall not be required to be
7submitted to the Division of Administration, Office of State Procurement.
8 (b) Further, for all projects in the Capital Outlay Act or a previous Capital Outlay
9Act which are appropriated to the Office of Facility Planning and Control, Division of
10Administration, including those administered by cooperative endeavor agreements, up to six
11percent of each line-item may be used for costs of administering the projects.
12 (c) For all projects in Capital Outlay Act or a previous Capital Outlay Act
13appropriated to the Department of Transportation and Development, up to six percent of
14each line-item may be used for costs of administering the projects, or for field
15engineering/construction supervision.
16 (2) Notwithstanding anything in this Act, or a previous Capital Outlay Act, the
17Office of Facility Planning and Control may enter into a cooperative endeavor agreement
18with the Archdiocese of New Orleans and Jefferson Parish for the Preservation and
19Restoration of Historic Structure for Hope Haven/Madonna Manor Campus, Planning and
20Construction project.
21 (C) Line-item general obligation bond projects appropriated to the Department
22of Transportation and Development in the Capital Outlay Act or a previous Capital Outlay
23Act shall be authorized to draw Transportation Trust Funds from the Highway Program
24appropriation, for supplemental funding on overruns in excess of the original estimated
25project cost as determined by the Department of Transportation and Development, provided
26however that said projects are in the state or federal highway system and in the priority
27program, and the overrun is less than $50,000. Any such overrun of $50,000 or more must
28be approved by the Joint Legislative Committee on the Budget.
29 (D) All ports, levee districts and other non-state entities must follow the
30provisions of R.S. 39:122.
Page 119 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1 (E) Pursuant to R.S. 39:122(B)(2), funds to be reimbursed by the state which a
2non-state entity attempts to obligate prior to the receipt of funding shall not be eligible for
3reimbursement or payment by the state; however,  
4 (1) Notwithstanding anything in this Act or any previous Capital Outlay Acts to
5the contrary, contracts may be entered into for the Lafayette Economic Development
6Authority, Lafayette Innovation Center (Lafayette) prior to the receipt of funding and the
7State is authorized to financially participate in obligations created by such contracts.
8 (2) Notwithstanding anything contained in this Act or any other provision of law,
9Lafayette Parish is authorized to execute contracts for the Bayou Vermilion Flood Control
10project prior to execution of a cooperative endeavor agreement, the granting of a line of
11credit or the sale of bonds. The appropriation for this project may be used to pay any
12obligation incurred or to reimburse any expenditure made pursuant to such contracts unless
13the Commissioner of Administration is advised by bond counsel to the state that such may
14violate federal tax law. The office of facility planning and control shall consult with bond
15counsel to the State relative to any federal tax issues.
16 (3) Notwithstanding anything contained in this Act or any other provision of law,
17Lafayette Parish is authorized to execute contracts for the Parish Government Complex,
18Parish Courthouse project prior to execution of a cooperative endeavor agreement, the
19granting of a line of credit, or the sale of bonds. The appropriation for this project may be
20used to pay any obligation incurred or to reimburse any expenditure made pursuant to such
21contracts unless the Commissioner of Administration is advised by bond counsel to the state
22that such may violate federal tax law. The office of facility planning and control shall consult
23with bond counsel to the State relative to any federal tax issues.
24 (4) Notwithstanding anything contained in this Act or any previous Capital
25Outlay Act or any provision of law to the contrary, contracts may be entered into for the
26Acadia Parish, Street Improvements of Hains Road project prior to receipt of concurrence
27by the Office of Facility Planning and Control and are excepted from bid opening extensions
28associated with addenda to bidding documents and the state is authorized to financially
29participate in obligations created for such project.
30 (F) Pursuant to R.S. 39:112(E)(2), non-state entity projects shall require a match
31for each appropriation in this act; however,
Page 120 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1 (1) Notwithstanding anything contained in this Act, any prior Capital Outlay
2Acts, any other provision of law, or the provisions of R.S. 39:112(E)(2), the projects for the
3City of Opelousas for the Water Meter Replacement and Upgrades and for the Bridge
4Replacement and Upgrades shall be exempt for all match requirements.
5 (G) Notwithstanding anything contained in this Act or the Capital Outlay Act to
6the contrary or any other Act or provision of law, the appropriations made for the Executive
7Department for facilities which promote economic development included in the Repair,
8Restoration, and Replacement for Declared Disasters, Planning, Construction, Renovation,
9and Acquisition project, and the Department of Economic Development projects are for
10public purposes pursuant to the provisions of Article VII, Section 14 of the Constitution of
11Louisiana primarily for economic development, including the generation of tax revenues,
12creation of jobs, promotion of tourism, and creation of facilities for charitable, cultural,
13artistic, educational, social, civic, research, service, economic development activities, or
14provide facilities for professional golf events, pursuant to the terms of cooperative endeavor
15agreements, including leases and all expenditures of these appropriations and may be
16exempted, by the Commissioner of Administration, from all statutes relative to public
17bidding, contractual review and the provisions of R.S. 33:9029.2(D) and in lieu thereof be
18allowed to use alternative competitive contracting arrangements where the appropriate
19administering entity submits documentation to the Commissioner  of Administration
20substantiating that it is in the best interest of the citizens of the state, due to economic and/or
21operational benefits, and the necessity to complete the projects in a timely manner; and, the
22appropriate administering entity shall have the authority to directly appoint the design
23professional from a list of a minimum of three design firms or joint ventures with the
24appropriate specialized facility design experience submitted to and acceptable to the
25Commissioner of Administration and shall be exempt from other state requirements for
26selection of designers, and may include expenditures for computers, fixtures, furniture, and
27other equipment as such is deemed  to be capital outlay in nature, and unless the
28Commissioner of Administration is advised by bond counsel to the State that such may
29violate federal tax law, may be used to reimburse any expenditure made prior to the granting
30of a line of credit or the sale of bonds by the State Bond Commission, determination by the
31State Treasurer that cash funding has been deposited in the Comprehensive Capital Outlay
32Escrow Account for the project or the execution of a cooperative endeavor agreement from
Page 121 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1the Office of Facility Planning and Control, and may be used to acquire land or real property,
2the title to which is held in the name of an entity exempt from taxation under the provisions
3of 26 U.S.C. 501(c)(3).
4 (H) Notwithstanding any other provision of this Act or the Capital Outlay Act or
5any other provision of law to the contrary, all of the funds herein appropriated to the
6Department of Economic Development in connection with projects or programs  for which
7the Department of Economic Development utilizes a cooperative endeavor agreement to
8further economic development as  permitted under Article VII, Section 14 of the  Louisiana
9Constitution, including the generation of tax revenues and creation of jobs, shall be
10considered as having been appropriated to the Department of Economic Development, may
11be used to reimburse any expenditure made prior to the granting of a line of credit and made
12prior to the execution of a cooperative endeavor agreement and shall be administered solely
13by the Department of Economic Development pursuant to, in compliance with, and on the
14terms contained in such cooperative endeavor agreements without compliance with any other
15law, including, but not limited to, the provisions of R.S. 39:101 through 128. Additionally,
16all expenditures of these appropriations may be exempted by the Commissioner of
17Administration, from all statutes relative to public bidding, contractual review and the
18provisions of R.S. 33:9029.2(D).
19 (I)(1) Notwithstanding any other provision of this Act or the Capital Outlay Act
20or any other provision of law to the contrary, funds appropriated for the Economic
21Development Award Program project for the Office of Business Development are to be used
22solely for capital and infrastructure improvements subject to verification by the Division of
23Administration, Office of Facility Planning and Control.
24 (2) Eligible expenses for Economic Development Award Program funds may
25include documented project expenses beginning on the date of LEDC Board approval of the
26project and may be reimbursed upon execution of the cooperative endeavor agreement for
27the project.
28 (J)(1) Due to the state's current investment in TPC Louisiana and the financial
29support it provides to the PGA TOUR event currently played at said facility, said PGA
30TOUR event shall not be played at New Orleans City Park Golf Complex without the prior
31agreement of the Commissioner of Administration and the Chairman of the Jefferson Parish
32Council.
Page 122 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1 (2) Notwithstanding the foregoing, the City Park Golf Complex may host any
2other golf tournament or event, including but not limited to any other PGA-affiliated or
3sponsored tournament or event.
4 (K)(1) For all projects administered by the Office of Facility Planning and
5Control and payable from proceeds of self-generated revenues, funds shall be remitted to the
6Office of Facility Planning and Control for deposit in the state treasury at such time as may
7be deemed necessary by the Office of Facility Planning and Control in order to cover the
8amount of contracts or other project expenses.
9 (2) Notwithstanding any provisions contained herein or any other law to the
10contrary, for projects with other means of financing provided to the administering agency
11by interagency transfer, the authority to draw these funds shall remain with the user agency.
12 (3) Any revenue bonds appropriated in Section 1 or Section 1. (A) of the Capital
13Outlay Act shall not be secured by the full faith and credit of the state.
14 (4) The State Treasurer shall refund to the appropriate source any surplus self-
15generated funds, advanced insurance funds received by the Office of Facility Planning and
16Control as Interagency Transfer from Office of Risk Management associated with hurricane
17damage recovery, and interest earned on these funds, provided the Treasurer's Office is
18notified, when these funds are deposited in the state treasury, that the user agency or Office
19of Risk Management intends to request a refund of this interest.
20 (L) Notwithstanding any provisions contained in this Act, the Capital Outlay Act,
21or any other provision of law to the contrary, any funds expended by the parish of St. Mary
22for the purpose of securing a federal grant, for the Infrastructure Improvements and
23Construction of a Welding Training Center Facility at the Charenton Canal Industrial Park,
24shall be eligible for reimbursement from any cash line of credit approved for the project.
25 (M) Notwithstanding anything contained in this Act to the contrary or any other
26provision of law, the resolution adopted by the Joint Legislative Committee on the Budget
27(the committee) on March 19, 2019 approving State of Louisiana Grant Anticipation
28Revenue Bonds, in one or more series, not exceeding $650,000,000, and approving the
29related projects and providing for other matters in connection therewith, contains the
30following approvals:
Page 123 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1 (1) The first series of bonds in the original principal amount of not exceeding
2$185,000,000 in order to fund the following projects in the following estimated amounts:
3Barksdale Project ($61,600,000) and portions of the Loyola Project ($77,600,000) and the
4I-10 Project ($30,601,000) with the understanding that the Department has the ability to
5manage the actual application of bond proceeds in order to appropriately fund the Projects
6and meet expenditure requirements of the Internal Revenue Service.
7 (2) The second series of bonds for the express purpose of granting the required
8contracts in the principal amount of approximately $142,000,000 in order to fund the
9following projects in the following estimated amounts: the balance of the Barksdale Project
10($16,518,000), the balance of the Loyola Project ($87,500,000), portions of the I-10 Project
11($37,982,000) and the Belle Chasse Project ($12,500,000) with the understanding that the
12Department has the ability to manage the actual application of Bond proceeds in order to
13appropriately fund the Projects and meet expenditure requirements of the Internal Revenue
14Service provided, however, the Department of Transportation and Development seeks
15approval from the Committee for the issuance of the second series of bonds and all
16subsequent series of bonds.
17 (N) Notwithstanding anything contained in this Act to the contrary or any other
18provision of law, the Research Vessel (R/V) Pelican Replacement is deemed to be a capital
19asset and the appropriation to Louisiana Universities Marine Consortium (LUMCON) to
20replace the R/V Pelican is for a public purpose and has a significant economic impact
21providing a variety of oceanographic research missions.  Further, LUMCON shall be
22permitted to use an alternative delivery method to award contracts for design of the proposed
23replacement vessel. LUMCON shall have the authority to select the design professional from
24a list of a minimum of two engineering firms or joint ventures with ship design experience
25acceptable to the Commissioner of Administration and the selection shall be exempt from
26other state requirements for the selection of designers. The design professional fee shall be
27in accordance with state guidelines administered by the Office of Facility Planning and
28Control, Division of Administration.  LUMCON shall further be permitted to use an
29alternative delivery method to award contracts for the construction of the proposed
30replacement vessel. LUMCON shall have the authority to select the contractor from a list
31of a minimum of three highly qualified ship builders/shipyards with relevant vessel
32construction experience acceptable to the Commissioner of Administration and the selection
Page 124 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1shall be exempt from other state requirements for the selection of contractors. The
2construction contract shall be administered by the Office of Facility Planning and Control,
3Division of Administration in accordance with state guidelines.
4 (O) Notwithstanding anything contained in this Act to the contrary or any other
5provision of law, the appropriations for Major Repairs for Higher Education Facilities –
6Infrastructure, and Buildings Based on Statewide Condition Assessment, Planning and
7Construction, in Act 7 of 2008 identifying specific projects for higher education is deemed
8to be complete, and any remaining residual funds are hereby authorized to be combined and
9accumulated to accomplish additional major repair projects within the higher education
10systems, as deemed necessary and approved by the Board of Regents and Facility Planning
11and Control.  At the completion of the program, Facility Planning and Control shall submit
12a report to the Joint Legislative Committee on the Budget concerning the use of the
13remaining residual funds.
14 (P) Notwithstanding anything contained in this Act or any other provision of law,
15LSU Real Estate and Facilities Foundation (LRFF) is authorized to execute contracts for the
16University Lakes Restoration Project to Address Flood Control, Environmental, Safety,
17Health and Other Issues project prior to execution of a cooperative endeavor agreement, the
18granting of a line of credit or the sale of bonds. The appropriation for this project may be
19used to pay any obligation incurred or to reimburse any expenditure made pursuant to such
20contracts unless the Commissioner of Administration is advised by bond counsel to the state
21that such may violate federal tax law, after execution of a cooperative endeavor agreement.
22The Office of Facility Planning and Control shall consult with bond counsel to the State
23relative to any federal tax issues. Further, LRFF may use alternative competitive contracting
24arrangements with the prior approval of the Commissioner of Administration.
25 (Q) Notwithstanding anything contained in this Act to the contrary or any other
26provision of law, the USS KIDD DD-661, a World War II era Fletcher class destroyer and
27National Historic Landmark, is deemed to be a capital asset and the appropriation to the
28Louisiana Naval War Memorial Commission for Hull Repair & Reinforcement,
29Superstructure Repair, Interior Restoration & Painting and Docking Cradle Repairs &
30Upgrade is for a public purpose and will allow the vessel to continue to serve the citizens of
31Louisiana as a proven highly successful tourist attraction, educational institution, military
32memorial, patriotic ceremonial platform and documentary/theatrical film set. Further, the
Page 125 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1USS KIDD DD-661 the only surviving Fletcher class destroyer in her original WW2
2configuration and the restoration project requires special consideration in the selection of a
3restoration contractor and in the location and complete identification of the repairs to be
4performed. Therefore, the Louisiana Naval War Memorial Commission, through the Office
5of Culture, Recreation & Tourism, shall be permitted to use an alternative delivery method
6to award construction contract(s) for the proposed repairs and renovations to the USS KIDD
7and its cradle. The Louisiana Naval War Memorial Commission, through the Office of
8Culture, Recreation & Tourism, shall have the authority to select the contractor(s) from a list
9of a minimum of three highly qualified ship builders/shipyards with relevant restoration
10experience acceptable to the Commissioner of Administration and the selection shall be
11exempt from other state requirements for the selection of contractors. The construction
12contract(s) shall be administered by the Office of Facility Planning and Control, Division
13of Administration in accordance with state guidelines and all restoration and repairs shall
14adhere to the U.S. Department of Interiors’ Standards for Historic Ship Preservation
15Projects. 
16 (R) Pursuant to R.S. 39:102, each capital outlay budget request submitted as
17required by R.S. 39:101 shall include a detailed project description and justification for each
18new project requested; however,
19 (1) Notwithstanding anything contained in this Act or the Capital Outlay Act to
20the contrary or any other provision of law, the scope of the appropriations made in this or
21any other Capital Outlay Act for the New Orleans West Bank Park Improvements, New
22Soccer and Recreational Facilities project shall be deemed to include the George W. Carver
23Playground, Renovations and Upgrades project for the West Bank Park project.
24 (2) Notwithstanding anything contained in this Act or the Capital Outlay Act to
25the contrary or any other provision of law, the scope of the appropriations made in this or
26any other Capital Outlay Act for the Pointe Coupee Parish School Board Office Relocation,
27Due to Flooding Caused by Hurricane Gustav, Planning and Construction project shall be
28deemed to include that the School Board Office is to be Located at 8777 Morganza
29Highway.
30 (3) Notwithstanding anything in this Act, any previous capital outlay act, or other
31provision of law to the contrary, the scope of the appropriation for the Port of South
32Louisiana Globalplex Terminal Building #71 Upgrade project shall be deemed to also
Page 126 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1include similar upgrades for other Globalplex Terminal Buildings and a Heavy Load
2Capacity Foundation or Floor.
3 (4) Notwithstanding anything in this Act, any previous capital outlay act, or other
4provision of law to the contrary, monies appropriated herein for the Port of South Louisiana
5Globalplex Terminal Building #71 and Other Globalplex Terminal Building Upgrades,
6Planning and Construction may be expended for design fees related to the conveyor system
7and ancillary equipment that exceed the customary ten percent limitation on design fee costs.
8 (5) Notwithstanding anything in this Act, any previous capital outlay act, or other
9provision of law to the contrary, the scope of the appropriation for the Port of South
10Louisiana Globalplex Dock Access Bridge and Equipment Replacement/Repair project shall
11be deemed to also include an Access Road.
12 (6) Notwithstanding anything in this Act, any previous capital outlay act, or other
13provision of law to the contrary, the scope of the appropriation for the Port of South
14Louisiana Globalplex Rail Siding project shall be deemed to also include a Rail Spur.
15 (7) Notwithstanding anything contained in this Act or the Capital Outlay Act to
16the contrary or any other provision of law, the scope of the appropriations made in this or
17any other Capital Outlay Act for the Pontchartrain Levee District Lake Pontchartrain West
18Shore Hurricane Protection, Planning and Construction project shall be deemed to include
19Ascension Parish.
20 (8) Notwithstanding anything contained in this Act or the Capital Act to the
21contrary or any other provision of law, the scope of the appropriation made in this or any
22other Capital Outlay Act for the Statewide Roofing Asset Management Program and
23Waterproofing, Related Repairs and Equipment Replacement Program project shall be
24deemed to include Peltier Hall at Nicholls State University.
25 (9) Notwithstanding anything contained in this Act or the Capital Act to the
26contrary or any other provision of law, the scope of the appropriation made in this or any
27other Capital Outlay Act  for the Longview Road Improvements, Beauregard Parish Police
28Jury project shall be deemed to include Longville Road Improvements for the Beauregard
29Parish Police Jury.
30 (10) Notwithstanding anything contained in this Act or the Capital Act to the
31contrary or any other provision of law, the scope of the appropriation made in this or any
Page 127 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1other Capital Outlay Act for the JESTC Training Facility Improvements project shall be
2deemed to include facilities at JESTC to accommodate a less than lethal training program
3utilizing mobile virtual training.
4 (11) Notwithstanding anything contained in this Act, any previous capital outlay
5act to the contrary, or any other provision of law, the scope of the appropriations made in
6this or any other capital outlay act for the Industrial Park Development project for New
7Roads shall be deemed to include underground electrical system upgrades.
8 (12) Notwithstanding anything contained in this Act, any previous capital outlay
9act to the contrary, or any other provision of law, the scope of the appropriations made in
10this or any other capital outlay act for the Lincoln Manner Subdivision Drainage project for
11Kenner shall be deemed to include 30
th
 Street Roadway and Drainage Improvements from
12Loyola Drive to Ohio Street.
13 (13) Notwithstanding anything contained in this Act or the Capital Outlay Act
14to the contrary or any other provision of law, the scope of the appropriations made in this
15or any other Capital Outlay Act for the Tensas Parish Recreational Facility project shall be
16deemed to include Recreational Facilities at Newellton, St. Joseph, and Waterproof.
17 (14)  Notwithstanding anything contained in this Act, any previous capital outlay
18act to the contrary, or any other provision of law, the scope of the appropriations made in
19this or any other capital outlay act for the LA 93 Roadway Improvements - I-10 Ramp to
20Renaud Drive, Planning and Construction project for Scott shall be deemed to include the
21planning and design of the Roundabout at Exit 97 Westbound, Planning, Construction, and
22Land Acquisition project for Scott and the planning and design of the Roundabout at LA 93
23and Renaud Drive, Planning, Construction, and Land Acquisition for Scott.
24 (15)  Notwithstanding anything contained in this Act, any previous capital outlay
25act to the contrary, or any other provision of law, the scope of the appropriations made in
26this or any other capital outlay act for the Water and Sewer Line Installation along Apollo
27Road Extension, Planning and Construction project for Scott shall be deemed to include the
28placement of water and sewer line utilities along the roadway.
29 (16)  Notwithstanding anything contained in this Act, any previous capital outlay
30act to the contrary, or any other provision of law, the scope of the appropriations made in
31this or any other capital outlay act for the Young's Bayou Enhancement of Channel Capacity,
Page 128 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1Planning and Construction project for Monroe shall be deemed to include streams and
2contributing tributaries flowing into the Young's Bayou Watershed.
3 (17)  Notwithstanding anything contained in this Act, any previous capital outlay
4act to the contrary, or any other provision of law, the scope of the appropriations made in
5this or any other capital outlay act for the Central Louisiana State Hospital Relocation to
6Pinecrest project for the Office of Behavioral Health shall be deemed to include new
7construction and renovations of buildings.
8 (18)  Notwithstanding anything contained in this Act, any previous capital outlay
9act to the contrary, or any other provision of law, the scope of the appropriations made in
10this or any other capital outlay act for the New Education Building project for the
11Opportunities Industrialization Center Incorporated of Ouachita shall be deemed to include
12new construction and renovations of buildings.
13 (19)  Notwithstanding anything contained in this Act, any previous capital outlay
14act to the contrary, or any other provision of law, the scope of the appropriations made in
15this or any other capital outlay act for the New Orleans Emergency Shelter project for Eden
16House shall be deemed to include acquisitions, renovations, and new construction of other
17Eden House facilities statewide.
18 (20)  The following revisions are hereby made to Act 465 of the 2023 Regular
19Legislative Session of the Louisiana Legislature for the purpose of transferring the projects
20listed below to the appropriate agency:
21 (a) Notwithstanding any provisions of law to the contrary, including the
22provisions of the Capital Outlay Act, the appropriation to 50/NC2  BATON ROUGE
23RECREATION AND PARKS COMMISSION for The Inspiration Center – Howell
24Community Park (East Baton Rouge) project is hereby amended and reenacted to 50/R01
25BATON ROUGE LAW ENFORCEMENT AND CRIMINAL JUSTICE FOUNDATION.
26 (b) Notwithstanding any provisions of law to the contrary, including the
27provisions of the Capital Outlay Act, the appropriation to 50/N34  ODYSSEY HOUSE
28LOUISIANA, INC. for the Odyssey House Louisiana Gambling Treatment Center (Orleans)
29project is hereby amended and reenacted to 09/304 METROPOLITAN HUMAN SERVICES
30DISTRICT.
Page 129 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1 (S) Notwithstanding anything contained in this Act to the contrary or any other
2provision of law, all non-state projects that include water systems in the scope of work shall
3also be required to include a rate study as part of the project.
4 (T) Notwithstanding anything contained in this Act or any other provision of law,
5the appropriations included herein identified as "Payable from State General Fund (Direct)
6Non-Recurring Revenues" are appropriated for the purpose of making supplemental capital
7outlay appropriations for Fiscal Year 2023-2024.
8 (U) Notwithstanding anything contained in this Act to the contrary or any other
9provision of the law, the appropriations included herein identified as "Payable from Interest
10Earnings" are appropriated for the purpose of making supplemental capital outlay
11appropriations for Fiscal Year 2023-2024.
12 (V) Notwithstanding anything contained in this Act to the contrary or any other
13provision of law, any water/sewer project that submitted by August 31, 2022 for the Water
14Sector Program shall be deemed to be submitted timely provided a capital outlay request is
15submitted and is otherwise compliant with the provisions of R.S. 39:101 and R.S. 39:102.
16Such request together with supporting information and documents shall constitute the
17feasibility study required by Article VI, Section 11(C) of the Constitution of Louisiana.
18 (W) Notwithstanding anything contained in this Act or any other provision of
19law, the Port of New Orleans is authorized to execute contracts for the Louisiana
20International Terminal Roadway and Rail Improvements, Planning and Construction and the
21Louisiana International Terminal, Drainage, Site Preparation and Mitigation, Planning and
22Construction prior to execution of a cooperative endeavor agreement, the granting of a line
23of credit, or the sale of bonds. The appropriation for this project may be used to pay any
24obligation incurred or to reimburse any expenditure made pursuant to such contracts unless
25the commissioner of administration is advised by bond counsel to the state that such may
26violate federal tax law. The office of facility planning and control shall consult with bond
27counsel to the state relative to any federal tax issues.
28 (X) Notwithstanding anything contained in this Act or any other provision of law,
29the Board of Commissioners for the Port of New Orleans is authorized to execute contracts
30for the Louisiana International Terminal Roadway and Rail Improvements, Planning and
31Construction and the Louisiana International Terminal, Drainage, Site Preparation and
Page 130 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1Mitigation, Planning and Construction project prior to execution of a cooperative endeavor
2agreement, the granting of a line of credit, or the sale of bonds. The appropriation for this
3project may be used to pay any obligation incurred or to reimburse any expenditure made
4pursuant to such contracts unless the commissioner of administration is advised by bond
5counsel to the state that such may violate federal tax law. The office of facility planning and
6control shall consult with bond counsel to the state relative to any federal tax issues.
7 (Y) Notwithstanding anything contained in this Act or any previous Capital
8Outlay Act or any provision of law to the contrary, capital outlay expenditures by the Local
9Government Assistance Program (LGAP) shall comply with the definition contained in La.
10R.S. 39:2(9) exclusively.
11 Section 10.  Notwithstanding any provisions contained herein or any other law
12to the contrary, the provisions of Chapter 16 of Subtitle III of Title 39 of the Louisiana
13Revised Statutes of 1950 as amended, shall not apply to architectural and engineering
14contracts, administered by the office of facility planning and control, division of
15administration pursuant to this or any other capital outlay act.
16 Section 11.  All funds appropriated herein to agencies administering capital
17outlay projects, on behalf of non-state entities, by cooperative endeavor agreements pursuant
18to this Act shall be expended within two (2) years from the date of the issuance of the bonds.
19Agencies administering capital outlay projects pursuant to a cooperative endeavor agreement
20shall notify the non-state entity of the date the bonds are issued within three (3) months from
21the issuance thereof.  If the funds appropriated herein and administered under cooperative
22endeavor agreements pursuant to this Act are not totally expended within two (2) years from
23the issuance of the bonds, the administering agency can close the project and recommend
24that the reallocation of any unexpended proceeds to any project contained in this Act or any
25previous Capital Outlay Acts.
26 Section 12.  Notwithstanding any provisions contained herein or law to the
27contrary, the proceeds of revenue bonds to be utilized to fund certain projects authorized in
28Section 1. and Section 1. (A) hereof may, in accordance with Article VII, Section 9 of the
29Louisiana Constitution of 1974, be deposited in special accounts held outside the state
30treasury in accordance with the provisions of any bond resolution, indenture, reimbursement
31contract, or other bond or financing covenant which provides for the pledge of such funds
Page 131 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1in connection with the issuance of revenue bonds. For all projects administered by the office
2of facility planning and control, division of administration, authorized in Section 1. And
3Section 1. (A) hereof which are payable from the proceeds of revenue bonds, only the office
4of facility planning and control, division of administration, will be authorized to requisition
5funds from the special accounts described immediately above, at such time or times as may
6be deemed necessary by the office of facility planning and control, division of
7administration, in order to cover contract amounts or other project expenses.
8 Section 13.  The governor shall have the power to veto any line-item in this Act.
9 Section 14.  Except as otherwise provided herein, no funds shall be expended on
10any highway projects on highways within the state highway system as established in R.S.
1148:191 under the jurisdiction of the Department of Transportation and Development unless
12and until such project is in the Highway Program, R.S. 48:228 through 232, approved by the
13Joint Legislative Committee on Transportation, Highways and Public Works. Pursuant to
14R.S. 49:214.6.2(B), no integrated coastal protection construction project shall be undertaken
15with funds included in this bill except those included in an annual plan finally approved by
16the legislature in accordance with the provisions of R.S. 49:214.5.3. No funds appropriated
17to the Coastal Protection and Restoration Authority in this Act as a contribution for a project
18cost-share or otherwise, for the national economic development and national ecosystem
19restoration components of the Southwest Coastal Louisiana Study shall be used or provided
20for the expropriation of property or use of eminent domain, except where such funds are to
21be used to obtain property voluntarily offered for project purposes, where at least seventy-
22five percent of the owners have voluntarily offered the property, or where the record or
23apparent owners have voluntarily offered the property but do not have clear title.
24 Section 15.  The word "statewide" used in place of the specific parish designation
25for projects contained in this Act indicates that the project or program is applicable to all
26sixty- four parishes in the state. The description of any project in this Act shall be deemed
27to include planning, design, master planning, studies, permits, surveys, testing, construction,
28land and/or building/improvement acquisition, reconstruction, renovation, repair, right-of-
29way and utilities, site and other improvements, miscellaneous/contingencies, lease hold
30improvements ultimately owned by the state or a political subdivision of the state, equipment
31and other acquisitions, and any other component of the project if such are included or
Page 132 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
1indicated in the capital outlay request for such projects required by R. S. 39:101 subject to
2the provisions of Title 39 of the Louisiana Revised Statutes of 1950. For new construction
3or renovation projects, equipment or other acquisitions, which can reasonably be considered
4necessary for the facility to be functional, may be deemed to be included in the project, even
5if such equipment or other acquisitions are not included or indicated in the project name or
6the capital outlay request. When local or federal match is referenced in a project title, but
7only a portion of the state appropriation is granted a line of credit or otherwise funded, then
8the amount of local or federal match, required to be made available, may be prorated relative
9to the amount of state appropriation made available through lines of credit.
10 Section 16.  The provisions, items, and projects contained in this Act are
11severable and if any provision, item, or project contained herein, or the application of any
12such provision, item, or project, is held invalid, such invalidity shall not affect other
13provisions, items, projects, or applications of the Act which can be given effect without the
14invalid provision, project, item, or application.
15 Section 17.  Notwithstanding any other provisions of law to the contrary, the state
16shall not grant cash lines of credit, or authorize or issue general obligation bonds in a
17principal amount in excess of $1,649,198,419 for Fiscal Year 2024-2025.
18 Section 18.  Notwithstanding any contrary provision of this Act or any contrary
19provision of law, no funds appropriated by this Act shall be released or provided to any
20recipient of an appropriation made in this Act if, when, and for as long as, the recipient fails
21or refuses to comply with the provisions of R.S. 24:513. No recipient shall be considered to
22fail or refuse to comply with the provisions of R.S. 24:513 pursuant to this Section during
23any extension of time granted by the legislative auditor to the recipient to comply.
24 Section 19.  This Act shall become effective upon signature by the governor or,
25if not signed by the governor, upon expiration of the time for bills to become law without
26signature by the governor, as provided in Article III, Section 18 of the Constitution of
27Louisiana.  If vetoed by the governor and subsequently approved by the legislature, this Act
28shall become effective on the day following such approval.
Page 133 of 134 HLS 24RS-411	ENGROSSED
HB NO. 2
DIGEST
The digest printed below was prepared by House Legislative Services.  It constitutes no part
of the legislative instrument.  The keyword, one-liner, abstract, and digest do not constitute
part of the law or proof or indicia of legislative intent.  [R.S. 1:13(B) and 24:177(E)]
HB 2 Engrossed 2024 Regular Session	Emerson
Provides for the capital outlay budget and program for FY 2024-2025; provides for the
funding of the capital outlays from the specified sources of monies in the specified amounts
as follows:
Federal Funds	$549,391,539
Federal Funds via Interagency Transfer $46,290,000
Coastal Protection and Restoration Fund	$96,781,486
Transportation Trust Fund (TTF) – Regular $146,033,464
Transportation Trust Fund (TTF) – Federal $1,325,000,000
Transportation Trust Fund (TTF) – Construction
Subfund	$187,100,000
Construction Subfund Preservation $50,000,000
State Highway Improvement Fund	$31,900,000
Interagency Transfers	$61,695,115
Fees and Self-Generated Revenues	$147,080,000
Re-appropriated Cash	$12,526,925
Interest Earnings	$ 5,000,000
State General Fund (Direct)	$62,800,000
State General Fund (Direct) Non-Recurring
Revenues	$211,500,000
TOTAL CASH PORTION	$2,933,098,529
Authorizes the funding of certain capital outlay projects from the sale of general obligation
bonds for the projects delineated as follows:
Priority 1	$1,670,734,737
Priority 5	$5,832,979,683
TOTAL GENERAL OBLIGATION BONDS	$7,503,714,420
BONDS NRP	$12,957,432
GRAND TOTAL OF ALL MEANS OF FINANCING $10,449,770,381
Effective upon signature of the governor or lapse of time for gubernatorial action.
Summary of Amendments Adopted by House
The Committee Amendments Proposed by House Committee on Ways and Means to
the original bill:
1. Change General Obligation Bond funding as follows:
Priority 1	$ 27,478,000
Priority 5	$ 98,363,386
Page 134 of 134