HLS 24RS-411 REENGROSSED 2024 Regular Session HOUSE BILL NO. 2 BY REPRESENTATIVE EMERSON CAPITAL OUTLAY: Provides for the comprehensive Capital Outlay budget 1 AN ACT 2To provide with respect to the capital outlay budget and the capital outlay program for state 3 government, state institutions, and other public entities; to provide for the 4 designation of projects and improvements; to provide for the financing thereof 5 making appropriations from certain sources; and to provide for related matters. 6Be it enacted by the Legislature of Louisiana: 7 Section 1. The following sums or so much thereof as may be necessary are 8hereby appropriated out of any monies in the state treasury from the sources specified, from 9federal funds and self-generated revenues belonging to the state of Louisiana and/or 10collected by boards, commissions, departments, and agencies thereof, all for making capital 11outlay and for the purposes and in the amounts specified herein for the Fiscal Year 12commencing July 1, 2024, and ending June 30, 2025, subject to the conditions thereafter 13provided: 14 A project with funding payable from General Obligation Bonds Priority 1 15indicates that the funding for the project includes the reauthorization of funding which was 16previously granted as a line of credit by the State Bond Commission in Fiscal Year 2023- 172024. As used in this Section, the term "general obligation bonds" means state general 18obligation bonds or other evidences of indebtedness payable from the Bond Security and 19Redemption Fund. The amount set forth in this Section opposite each project, or so much 20thereof as may be necessary, is hereby appropriated and payable from the source of funding 21indicated; provided, however, amounts appropriated and payable from federal funds may be Page 1 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1encumbered or expended only to the extent such amounts shall have been committed or 2received. Pursuant to the provisions of R.S. 39:82, funds for planning, acquisition, 3construction, and major repair projects appropriated by this Act may be retained until 4completion of the project, even if no bona fide liability exists on the last day of the fiscal 5year. 6 This Act shall constitute the comprehensive state capital outlay budget for the 72024-2025 Fiscal Year. Projects set forth which are payable from the proceeds available 8from the sale of general obligation bonds shall have the priorities as indicated. The Request 9for Line of Credit form used by the attorney general and Bond Counsel in evaluating 10Louisiana Constitutional, Internal Revenue Code, and applicable income tax regulations 11shall be filed with the commissioner of administration, State Bond Commission, and state 12attorney general. No general obligation bond cash lines of credit shall be granted to fund any 13lower priority project prior to the granting of general obligation bond cash lines of credit to 14fund all higher priority projects (the "general rule"), except as hereinafter provided. This 15prohibition against funding a lower priority project shall not apply upon a showing of an 16impossibility or impracticality either to proceed with all unfunded higher priority projects 17or to proceed with the funding of such projects or any part thereof through the issuance of 18general obligation bonds for any reason. Such showing shall be stated in reasonable detail 19in a certificate or certificates signed by the state agency responsible for administering the 20funding, and filed with the commissioner of administration and the State Bond Commission 21(hereinafter referred to as "the Commission"). Upon a determination by the Commission 22that proceeding with such a project or the funding thereof through the issuance of general 23obligation bonds is impractical or impossible, the Commission may then proceed with the 24sale of general obligation bonds or the granting of cash lines of credit without regard to the 25priority of the unfunded projects determined to be impossible or impractical. 26 Upon recommendation by the state agency responsible for administering the 27funding, if it is determined at any time that proceeding with the project or with the funding 28thereof is no longer impossible or impractical, the State Bond Commission may rescind the 29certificate of impossibility or impracticality and may proceed with the project or with the 30issuance of general obligation bonds or the granting of cash lines of credit to fund the Page 2 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1project. Alternatively, the Interim Emergency Board (hereinafter referred to as "the Board"), 2upon reviewing certificates as described above and determining that proceeding with such 3projects or the funding thereof through the issuance of general obligation bonds is 4impossible or impractical, may designate a lower priority for such projects. The Board's 5determination and lower priority designation shall be submitted to the members of the 6legislature for their approval in accordance with the provisions of Chapter 3-B of Subtitle 7I of Title 39 of the Louisiana Revised Statutes of 1950. In accordance with the provisions 8of Chapter 3-B of Subtitle I of Title 39 of the Louisiana Revised Statutes of 1950, whenever 9at the written request of the appropriate legislators and agency, the Board determines that 10an adjustment to a project description originally set forth in such capital budget adopted by 11the legislature for a current fiscal year is necessary to correct a mistake in a project 12description, clarify a description, change the scope of a description, or make any other 13adjustment the Board deems necessary to implement the purpose of the project, such 14adjustment shall become effective only upon the approval by majority vote of the elected 15members of each house of the legislature in the manner provided for in Chapter 3-B of 16Subtitle I of Title 39 of the Louisiana Revised Statutes of 1950. 17 If such approval is granted, notification by the chair or secretary of the Board of 18the results of the balloting shall be transmitted to the State Bond Commission, which may 19then proceed with the sale of general obligation bonds or the granting of cash lines of credit 20for each change approved upon request of the commissioner of administration in accordance 21with the general rule. 22 With respect to Priorities 1 through 5, a lower priority project may be moved to 23a higher priority only upon a showing of an emergency or other cause not reasonably 24anticipated by the legislature, which shall be stated in reasonable detail in a certificate signed 25by the head of the appropriate department, political subdivision, or agency and filed with the 26commissioner of administration and the Board. Upon a determination by the Board that such 27project should be moved to a higher priority because of an emergency or other cause not 28reasonably anticipated by the legislature, the Board shall designate a higher priority to the 29project. The matter then shall be submitted to and be subject to the same approval by the 30members of the legislature in the manner previously indicated in this Section. If such Page 3 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1approval is granted, notification by the chair or secretary of the Board of the change of 2priority shall be transmitted to the State Bond Commission, which then upon request of the 3commissioner of administration, may proceed with the sale of general obligation bonds or 4the granting of cash lines of credit in accordance with the general rule. As to projects within 5a priority, the State Bond Commission acting on requests submitted by the commissioner of 6administration shall determine when such project, or phases thereof, shall be funded. In 7making such determination, the State Bond Commission shall consider the amount of 8proceeds of general obligation bonds to be made available in light of money and capital 9market conditions; the expenditure requirements of the project; the time required for 10architectural plans and drawings, public bidding, and site acquisition and preparation; 11availability of receipt of federal monies; litigation affecting the undertaking or completion 12of a project; federal tax laws and regulations regarding the sale of municipal bonds; and 13other items of a similar nature bearing upon the possibility or the necessity to commence a 14project or any particular phase thereof. 15 Any other provision of this Act to the contrary notwithstanding, projects 16described in Priority 5 of this Act shall not be moved to a higher priority except upon one 17of the following conditions: (1) Funding is necessary to complete or additionally fund a 18project located elsewhere in the Capital Outlay Act. Determination of such condition shall 19be made by the head of the appropriate department or agency by means of a certificate to 20that effect filed with the Interim Emergency Board, who shall, by mail ballot, request 21approval of such change and if approved by a majority of each house of the legislature it 22shall be funded, or (2) unless required by an emergency or other cause not reasonably 23anticipated by the legislature, to be in accordance with procedures set forth in this Section. 24However, the State Bond Commission may authorize a non-cash line of credit for any 25project in Priority 5 which represents that portion of construction contracts which were let 26during a previous fiscal year, or construction contracts which will be let during the current 27fiscal year, but which will not require cash expenditures during the year. Such non-cash 28lines of credit, when combined with previously sold bonds or with higher priority bonds or 29lines of credit, or with funds appropriated from other sources, will provide sufficient Page 4 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1appropriated funds to award equipment or construction contracts. Contracts shall not be 2awarded without approval of the division of administration. 3 Upon approval by the State Bond Commission, and subject to compliance with 4its policies and procedures and the procedures set forth herein, a line of credit providing for 5the use of funds in anticipation of the sale of general obligation bonds may be granted to the 6appropriate administering agency or department from the Comprehensive Capital Outlay 7Escrow Account, or if there is not a sufficient amount available in such account, from other 8available state cash in the state treasury, for capital improvement projects for which bond 9proceeds are appropriated by a current capital budget, prior to the actual issuance of bonds 10for such projects, unless the attorney general advises that an impediment exists to the valid 11issuance of the bonds on the date such line of credit is granted. 12 All bonds that are to be repaid, in whole or in part, by revenues generated by the 13project shall be designated as "Reimbursement Bonds.” The State Bond Commission shall 14enter into such agreements as are necessary to provide that the agency or subdivision, whose 15project is reimbursable, shall pay the bond debt costs into the Bond Security and Redemption 16Fund. Such costs may be paid annually or at the end of the term of the bonds issued as 17determined by the State Bond Commission. 18 Priority 1 general obligation bond funding shall be limited to: 19 (1) Projects and amounts which were previously authorized by Act 465 of the 202023 Regular Session of the Legislature; and which were granted cash lines of credit by the 21State Bond Commission. The bonds to fund these projects were not sold in Fiscal Year 222023-2024. 23 (2) The reauthorization of the portion of the outstanding Fiscal Year 2023-2024 24Priority 5 Non-Cash Lines of Credit for projects which will require cash expenditures in 25Fiscal Year 2024-2025 and therefore must be converted to Cash Lines of Credit in Fiscal 26Year 2024-2025. 27 (3) Commitments made in the Higher Education Desegregation Settlement 28Agreement. 29 Priority 2 general obligation bond projects are for the completion of plans and 30specifications, land acquisition, site preparation, or for construction which will begin during Page 5 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1the fiscal year. It is presently anticipated that the listed projects will require the sale of 2bonds or extension of lines of credit during the fiscal year after adoption of this Act. 3 Priority 3 general obligation bond projects are for the preparation of plans and 4specifications, land acquisition, site preparation, or for construction and shall be limited to 5funding for the portion of construction contracts which will not require cash expenditures 6during the fiscal year. The projects in this category shall be considered future year projects 7in the state's five-year capital outlay plan. It is presently anticipated that the listed projects 8will not require the sale of bonds or extension of lines of credit during the fiscal year. 9 Priority 4 general obligation bond projects are for the preparation of plans and 10specifications, land acquisition, site preparation, or for construction and shall be limited to 11funding for the portion of construction contracts which will not require cash expenditures 12during the fiscal year. The projects in this category shall be considered future year projects 13in the state's five-year capital outlay plan. It is presently anticipated that the listed projects 14will not require the sale of bonds or extension of lines of credit during the fiscal year. 15 Priority 5 general obligation bond funding shall be limited to funding for the 16portion of construction contracts which will not require cash expenditures during the fiscal 17year. These funds, when combined with previously sold bonds or with higher priority bonds 18on lines of credit, or with funds appropriated from other sources, will provide sufficient 19appropriated funds to award contracts. Non-cash lines of credit shall be required prior to the 20award of these contracts. 21 In accordance with the cash management plan adopted pursuant to R.S. 2248:251(D) and the provisions of Act 161 of the 1998 First Extraordinary Session, the 23Department of Transportation and Development is authorized to enter into contracts or 24agreements for projects approved pursuant to the Highway Priority Program, Airport 25Construction and Development Priority Program, Port Construction and Development 26Priority Program, and Statewide Flood Control Program for projects bid and awarded, 27authorized, or commenced during the fiscal year which do not require cash expenditures for 28the full contract or agreement amount. Page 6 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1 EXECUTIVE DEPARTMENT 201/107DIVISION OF ADMINISTRATION 3(572214)Exterior Waterproofing and Repairs, Chief Justice 4 Pascal F. Calogero, Jr. Courthouse, Planning and 5 Construction 6 (Orleans) 7 Payable from General Obligation Bonds 8 Priority 1 $ 9,999,834 9(572664)State Office Buildings Major Repairs, Equipment 10 Replacement, and Renovations, Planning and 11 Construction 12 (Statewide) 13 Payable from General Obligation Bonds 14 Priority 5 $12,110,000 15(572703)State Capitol Repair/Replace East Plaza Deck/Roof, 16 Planning and Construction 17 (East Baton Rouge) 18 Payable from General Obligation Bonds 19 Priority 1 $ 600,000 20 Priority 5 $ 6,100,000 21 Total $ 6,700,000 22(572705)Pentagon Barracks Repair/Restore/Replace Equipment, 23 Planning and Construction 24 (East Baton Rouge) 25 Payable from General Obligation Bonds 26 Priority 5 $ 6,000,000 27(572706)Pentagon Barracks Repair Brick Walls/Mitigate Rising 28 Damp, Planning and Construction 29 (East Baton Rouge) 30 Payable from General Obligation Bonds 31 Priority 1 $ 3,000,000 32 Priority 5 $24,900,000 33 Total $27,900,000 34(572709)Exterior Waterproofing at State Capitol Building, 35 Planning and Construction 36 (East Baton Rouge) 37 Payable from General Obligation Bonds 38 Priority 1 $10,000,000 39 Priority 5 $105,500,000 40 Total $115,500,000 41(572868)Security System Replacement, Chief Justice 42 Pascal F. Calogero, Jr. Courthouse. Planning and 43 Construction 44 (Orleans) 45 Payable from Interagency Transfers $ 480,000 Page 7 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(573689)Major Repairs, Equipment Replacement and 2 Renovations for State Buildings to Address 3 Deferred Maintenance Backlog and Infrastructure, 4 Planning and Construction 5 (Statewide) 6 Payable from Interagency Transfers $25,000,000 7 Payable from State General Fund (Direct) Non-Recurring 8 Revenues $13,070,000 9 Payable from Fees and Self-Generated Revenues $10,000,000 10 Payable from Federal Funds via Interagency Transfers $10,000,000 11 Total $58,070,000 12(573786)Community Water Enrichment Program 13 (Statewide) 14 Payable from General Obligation Bonds 15 Priority 5 $11,000,000 16 Payable from State General Fund (Direct) Non-Recurring 17 Revenues $10,000,000 18 Total $21,000,000 19(573787)Local Government Assistance Program 20 (Statewide) 21 Payable from General Obligation Bonds 22 Priority 5 $10,000,000 23 Payable from State General Fund (Direct) Non-Recurring 24 Revenues $10,000,000 25 Total $20,000,000 26(573788)Americans with Disabilities Act Implementation for 27 State Facilities, Planning and Construction 28 (Statewide) 29 Payable from Interest Earnings $ 5,000,000 30(573789)Statewide Roofing Asset Management Program and 31 Waterproofing, Related Repairs and Equipment 32 Replacement Program 33 (Statewide) 34 Payable from State General Fund (Direct) Non-Recurring 35 Revenues $ 5,000,000 36 Payable from Interagency Transfers $10,000,000 37 Payable from Fees and Self-Generated Revenues $10,000,000 38 Payable from Federal Funds via Interagency Transfers $10,000,000 39 Total $35,000,000 40(573790)Repair, Restoration and Replacement for Declared 41 Disasters, Planning, Construction, Renovation, 42 and Acquisition 43 (Statewide) 44 Payable from General Obligation Bonds 45 Priority 1 $64,032,573 46 Priority 5 $53,000,000 47 Payable from Fees and Self-Generated Revenues $ 5,000,000 48 Payable from Federal Funds via Interagency Transfers $25,000,000 49 Payable from the balance of State General Fund (Direct) 50 previously allocated under the authority of Act 203 of 51 2007 for Mental Health Area C, New Psychiatric Hospital 52 at Central Louisiana State Hospital (Rapides), Act 29 of 53 2018 for LSU Baton Rouge, French House Renovation, 54 Acquisition, Planning and Construction (East Baton 55 Rouge), Act 20 of 2019 for LA. Educational Television Page 8 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1 Authority, LONI (Louisiana Optical Network 2 Infrastructure) Core Equipment Replacement (Statewide), 3 Act 117 of 2022 for Morgan City Harbor and Terminal 4 District, Berwick Bay Dredge Material Beneficial Use 5 Project, Planning and Construction (St. Mary), Act 20 of 6 2019 for Jefferson Parish, Upper Kraak Ditch Drainage 7 Pump Station Pump Replacement and Generator 8 Installation (Jefferson), Act 485 of 2021 for Lafayette 9 Parish, Cypress Island Swamp Spoil Bank Removal, 10 Planning and Construction (Lafayette, St. Martin), Act 20 11 of 2019 for Natchitoches Parish, Resurfacing of Roads in 12 Payne Subdivision, Planning and Construction 13 (Natchitoches), Act 20 of 2019 for Sabine Parish, Water 14 Treatment and Supply System Study (Sabine), Act 29 of 15 2018 for St. Mary Parish, Rehabilitation and Conversion 16 of MC Sheriff Building to Sheriff Regional Operation and 17 Training Center for St. Mary Parish Government, 18 Planning and Construction (St. Mary), Act 29 of 2018 for 19 Natchitoches, South Natchitoches Drainage 20 Improvements, including Adjacent Roadwork, Planning 21 and Construction (Natchitoches), Act 29 of 2018 for 22 Thibodaux, LA Hwy 20 (N. Canal Blvd.) Widening, 23 Planning and Construction (Lafourche), Act 485 of 2021 24 for St. Martin Economic Development Authority, North 25 Business Park, Planning and Construction (St. Martin), 26 Act 20 of 2019 for Baton Rouge Recreation and Parks 27 Commission, Cadillac Street Park Site Improvements 28 (East Baton Rouge), Act 29 of 2018 for Horseshoe Road 29 Water System, Inc., Horseshoe Water System, Planning 30 and Construction (Webster), Act 2 of 2020 for Livingston 31 Parish School Board, Widening and Turn Lane 32 Construction for LA Hwy 16 as Part of the New 33 Southside Elementary and Jr. High Schools 34 (Livingston) $ 2,715,682 35 Total $149,748,255 36(573791)Outstanding Percent for Arts Projects 37 (Statewide) 38 Payable from General Obligation Bonds 39 Priority 1 $ 1,769,156 40 Priority 5 $ 4,000,000 41 Total $ 5,769,156 4201/109COASTAL PROTECTION AND RESTORATION AUTHORITY 43(572552)Coastal Protection Projects, Planning and Construction 44 (Statewide) 45 Payable from General Obligation Bonds 46 Priority 1 $12,220,000 47 Priority 5 $262,500,000 48 Payable from Interagency Transfers $ 1,000,000 49 Payable from Coastal Protection and Restoration 50 Fund $96,781,486 51 Payable from Federal Funds $465,147,320 52 Total $837,648,806 53Provided, however that $220,000 of the Priority 1 appropriation, and $4,500,000 of the 54Priority 5 appropriation from General Obligation Bonds be used for the South Slidell – 55Fritchie Coastal Resilience, Planning and Construction project in St. Tammany Parish. Page 9 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1Provided, however that $4,500,000 of the Priority 5 appropriation from General Obligation 2Bonds be used for the Military Road Flood Risk Reduction, Planning and Construction 3project in St. Tammany Parish. 4Provided, however that $1,500,000 of the Priority 1 appropriation, and $3,000,000 of the 5Priority 5 appropriation from General Obligation Bonds be used for the Eden Isle Roadway 6Infrastructure Flood Resilience, Planning and Construction project in St. Tammany Parish. 7Provided, however that $10,000,000 of the Priority 5 appropriation from General Obligation 8Bonds shall be used for the Bayou Lafourche Freshwater District for the Construction of the 9Pumping Capacity Improvements, Phase I project. 10(572553)Atchafalaya Basin Protection and Enhancement 11 (Federal Match and Local/Sponsor Match) 12 (Assumption, Avoyelles, Iberia, Iberville, 13 Pointe Coupee, St. Landry, St. Martin, St. Mary) 14 Payable from General Obligation Bonds 15 Priority 1 $ 4,000,000 16 Priority 5 $ 4,000,000 17 Total $ 8,000,000 18(572554)Morganza to Gulf of Mexico Flood Control Feasibility 19 Study, Planning, Design, Right-of-Way and Construction 20 of Levees, Floodgates and Other Flood Control Systems 21 ($100,000,000 Local Match) 22 (Ascension, Assumption, Iberia, Iberville, Lafourche, 23 Pointe Coupee, St. Martin, St. Mary, Terrebonne, 24 West Baton Rouge) 25 Payable from General Obligation Bonds 26 Priority 5 $79,500,000 27(572558)Larose to Golden Meadow Hurricane Protection 28 Project, Planning and Construction 29 (Lafourche) 30 Payable from General Obligation Bonds 31 Priority 5 $20,000,000 32(572565)Union Diversion Project, Planning and Construction 33 (Ascension, Livingston, St. James, St. John the Baptist) 34 Payable from General Obligation Bonds 35 Priority 1 $ 2,350,000 36 Priority 5 $20,000,000 37 Total $22,350,000 3801/112DEPARTMENT OF MILITARY AFFAIRS 39(572021)Renovation Cadet Barracks Buildings 605, 606, 608, 40 Youth Challenge Program, Louisiana National Guard 41 Training Center Pineville, Pineville, Louisiana 42 (Rapides) 43 Payable from General Obligation Bonds 44 Priority 1 $ 900,000 45(572022)Renovate-Upgrade Cadet Barracks Building 131, 132, 46 and 133, Youth Challenge Program, Camp Minden, 47 Minden, Louisiana 48 (Webster) 49 Payable from General Obligation Bonds 50 Priority 1 $ 700,000 Page 10 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572027)Renovate-Upgrade Cadet Barracks Buildings 18, 21, 2 22, 23, and 24, Youth Challenge Program (YCP), 3 Carville, Louisiana 4 (Iberville) 5 Payable from General Obligation Bonds 6 Priority 1 $ 91,907 7(572029)Gillis W. Long Center, Water, Fire, and Sewage 8 Line Upgrades, Carville, Louisiana 9 (Iberville) 10 Payable from General Obligation Bonds 11 Priority 1 $ 2,280,189 12 Payable from Federal Funds $ 200,000 13 Total $ 2,480,189 14(572031)Bastrop Readiness Center Modernization 15 (Morehouse) 16 Payable from General Obligation Bonds 17 Priority 5 $ 676,000 18 Payable from State General Fund (Direct) Non-Recurring 19 Revenues $ 59,000 20 Payable from Federal Funds $ 2,200,000 21 Total $ 2,935,000 22(572032)Gonzales Readiness Center Modernization 23 (Ascension) 24 Payable from Federal Funds $ 2,200,000 25(572033)Plaquemine Readiness Center Modernization 26 (Iberville) 27 Payable from Federal Funds $ 2,200,000 28(572034)Thibodaux Readiness Center Modernization 29 (Lafourche) 30 Payable from General Obligation Bonds 31 Priority 5 $ 617,000 32 Payable from State General Fund (Direct) Non-Recurring 33 Revenues $ 59,000 34 Payable from Federal Funds $ 2,023,000 35 Total $ 2,699,000 36(572036)Statewide Backlog of Maintenance and Repair 37 (BMAR), Phase 3, and Statewide Infrastructure 38 Rehabilitation, Phase 3 39 (Statewide) 40 Payable from General Obligation Bonds 41 Priority 5 $19,600,000 42 Payable from State General Fund (Direct) Non-Recurring 43 Revenues $ 4,250,000 44 Payable from Federal Funds $38,534,000 45 Total $62,384,000 46(572037)Louisiana National Guard Readiness Center Complex, 47 Abbeville LA, Planning and Construction 48 (Vermilion) 49 Payable from General Obligation Bonds 50 Priority 1 $ 5,666,600 51 Priority 5 $ 2,350,000 52 Payable from Federal Funds $22,635,500 53 Total $30,652,100 Page 11 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572040)Louisiana National Guard Readiness Center 2 Replacement, Lafayette LA, Planning and Construction 3 (Lafayette) 4 Payable from General Obligation Bonds 5 Priority 1 $ 7,081,580 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 4,555,713 8 Payable from Federal Funds $33,995,719 9 Total $45,633,012 10(572041)Louisiana National Guard Training Center Pineville Road 11 Network Rehabilitation 12 (Rapides) 13 Payable from General Obligation Bonds 14 Priority 1 $ 1,522,956 1501/124LOUISIANA STADIUM AND EXP OSITION DISTRICT 16(573250)Bayou Segnette Recreation Complex, Land 17 Acquisition, Planning and Construction 18 (Jefferson) 19 Payable from General Obligation Bonds 20 Priority 1 $19,680,848 21 Payable from State General Fund (Direct) Non-Recurring 22 Revenues $ 5,000,000 23 Total $24,680,848 24(573256)Zephyr Field Improvements, Planning and Construction 25 (Jefferson) 26 Payable from General Obligation Bonds 27 Priority 1 $ 5,000,000 28 Priority 5 $ 5,000,000 29 Total $10,000,000 30 DEPARTMENT OF VETERANS AFFAIRS 3103/130DEPARTMENT OF VETERANS AFFAIRS 32(573113)Northeast Louisiana Veterans Cemetery Administration 33 Building Expansion, Planning and Construction 34 (Richland) 35 Payable from Interagency Transfers $ 215,115 3603/136SOUTHEAST LOUISIANA WAR VETERANS HOME 37(573370)Pond Restoration, Planning and Construction 38 (St. John the Baptist) 39 Payable from State General Fund (Direct) Non-Recurring 40 Revenues $ 600,000 41 Payable from Federal Funds via Interagency Transfers $ 540,000 42 Total $ 1,140,000 Page 12 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1 ELECTED OFFICIALS 204/139SECRETARY OF STATE 3(572310)Old State Capitol Exterior Repairs, Planning and 4 Construction 5 (East Baton Rouge) 6 Payable from General Obligation Bonds 7 Priority 1 $ 5,000,000 8 Priority 5 $ 2,400,000 9 Total $ 7,400,000 10(572311)Old Governor's Mansion Repairs and Renovation 11 (East Baton Rouge) 12 Payable from General Obligation Bonds 13 Priority 1 $ 300,000 14 DEPARTMENT OF ECONOMIC DEVELOP MENT 1505/252OFFICE OF BUSINESS DEVELOPMENT 16(572906)Economic Development Award Program for Infrastructure 17 Assistance 18 (Statewide) 19 Payable from General Obligation Bonds 20 Priority 5 $ 5,000,000 21 Payable from State General Fund (Direct) Non-Recurring 22 Revenues $ 5,000,000 23 Total $10,000,000 24(572907)NIRC Iberia BioInnovation Accelerator GMP CDMO 25 Planning and Construction 26 (Iberia) 27 Payable from General Obligation Bonds 28 Priority 5 $53,400,000 29(572908)NIRC BSL-3 Lab and Animal Housing, Planning and 30 Construction 31 (Iberia) 32 Payable from General Obligation Bonds 33 Priority 1 $10,000,000 34 Priority 5 $10,600,000 35 Total $20,600,000 36 DEPARTMENT OF CULTURE, RECREATION AND TOURISM 3706/263OFFICE OF STATE MUSEUM 38(573241)Construction of Civil Rights Museum, Planning and 39 Construction 40 (Orleans) 41 Payable from General Obligation Bonds 42 Priority 1 $ 224,778 Page 13 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 106/264OFFICE OF STATE PARKS 2(572073)Preventive Maintenance/Major Repairs and 3 Improvements 4 (Statewide) 5 Payable from General Obligation Bonds 6 Priority 1 $ 418,782 7 Priority 5 $ 2,000,000 8 Total $ 2,418,782 9(572074)Tunica Hills State Preservation Area, Construction, 10 Development and Acquisition 11 (West Feliciana) 12 Payable from General Obligation Bonds 13 Priority 5 $20,000,000 14(572075)Poverty Point State Historic Site - Land Acquisition, 15 Design, Museum/Interpretive Center and Expansion 16 (West Carroll) 17 Payable from General Obligation Bonds 18 Priority 1 $ 1,494,420 19 Priority 5 $22,500,000 20 Total $23,994,420 21(572076)Bogue Chitto State Park - Mountain Bike Trail Design, 22 Construction, Acquisition and Other Development 23 (Washington) 24 Payable from General Obligation Bonds 25 Priority 1 $ 686 26(572079)Bogue Chitto State Park Emergency Erosion, Planning, 27 Design, Construction and Other Development 28 (Washington) 29 Payable from General Obligation Bonds 30 Priority 1 $ 1,328,715 31 Priority 5 $ 840,000 32 Total $ 2,168,715 33(573705)Bayou Segnette State Park, Land Acquisition, 34 Additional Cabins, Planning and Construction 35 (Jefferson) 36 Payable from General Obligation Bonds 37 Priority 1 $ 429,104 3806/A20NEW ORLEANS CITY P ARK 39(572579)Repairs to Historic Structures, Planning and Construction 40 (Orleans) 41 Payable from General Obligation Bonds 42 Priority 1 $ 2,089,307 Page 14 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 106/A98LOUISIANA NAVAL WAR MEMORIAL COMMISSION 2(573403)Hull Repair & Reinforcement, Superstructure Repair, 3 Interior Restoration, & Painting of USS KIDD DD-661, 4 Docking Cradle Repairs & Upgrade, Planning, Transport, 5 Construction 6 (East Baton Rouge) 7 Payable from General Obligation Bonds 8 Priority 1 $ 8,350,000 9 Payable from State General Fund (Direct) Non-Recurring 10 Revenues $ 600,000 11 Total $ 8,950,000 12 DEPARTMENT OF TRANSPORTATION AND DEVELOP MENT 1307/270ADMINISTRATION 14(571722)City of Gonzales - GO Program LA Highway 30 15 Corridor, Planning and Construction 16 (Ascension) 17 Payable from General Obligation Bonds 18 Priority 1 $ 8,290,432 19 Priority 5 $ 2,500,000 20 Payable from State General Fund (Direct) Non-Recurring 21 Revenues $ 2,000,000 22 Total $12,790,432 23(571748)Improvements on LA 3038, Including Patching, Repairing 24 and Overlaying of the Highway, Planning and Construction 25 (Ascension) 26 Payable from General Obligation Bonds 27 Priority 1 $ 47,139 28(572584)LA 91: Bayou Plaquemine Brule Bridge Replacement, 29 Planning and Construction 30 (Acadia) 31 Payable from General Obligation Bonds 32 Priority 1 $ 1,000,000 33 Priority 5 $ 5,200,000 34 Total $ 6,200,000 35(572585)Beaver Creek, LA Highway 106, Planning and 36 Construction 37 (Evangeline) 38 Payable from General Obligation Bonds 39 Priority 5 $13,200,000 40(572586)LA 44 Widening, I-10 to LA 22, Planning, 41 Utilities, Right-of-Way and Construction 42 (Ascension) 43 Payable from General Obligation Bonds 44 Priority 1 $ 9,299,712 45 Priority 5 $ 9,000,000 46 Total $18,299,712 47(572588)Pecue Lane/I-10 Interchange and I-10, Planning, 48 Design, Rights-of-Way, Utilities and Construction 49 (East Baton Rouge) 50 Payable from General Obligation Bonds 51 Priority 1 $14,000,000 Page 15 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572589)Louisiana Highway 64 and Louisiana Highway 1019 2 Roundabout, Planning and Construction 3 (Livingston) 4 Payable from General Obligation Bonds 5 Priority 1 $ 175,000 6(572590)Claiborne Corridor Rehabilitation 7 (Orleans) 8 Payable from General Obligation Bonds 9 Priority 5 $20,000,000 10(572591)LA 429/I-10 Interchange, Planning and Construction 11 (Ascension) 12 Payable from General Obligation Bonds 13 Priority 5 $ 5,000,000 14(572592)LA 28 Widening (LA 3128 - LA 116) 15 (Rapides) 16 Payable from General Obligation Bonds 17 Priority 1 $ 350,000 18 Priority 5 $33,950,000 19 Total $34,300,000 20(572593)New Mississippi River Bridge 21 (Ascension, East Baton Rouge, Iberville, St. James, 22 West Baton Rouge) 23 Payable from General Obligation Bonds 24 Priority 1 $ 1,378,613 25 Priority 5 $ 3,000,000 26 Total $ 4,378,613 27(572594)Florida Avenue Bridge, Planning and Construction 28 (Orleans) 29 Payable from General Obligation Bonds 30 Priority 5 $ 7,200,000 31(572630)US 190 (Vine Street) Reconstruction 32 (St. Landry) 33 Payable from General Obligation Bonds 34 Priority 1 $ 200,000 35 Priority 5 $19,200,000 36 Total $19,400,000 37(572631)US 190 Widening: LA 25 - US 190 Bus 38 (St. Tammany) 39 Payable from General Obligation Bonds 40 Priority 1 $ 2,000,000 41 Priority 5 $ 3,100,000 42 Total $ 5,100,000 Page 16 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572677)Secretary's Emergency Fund for Bridge Damages, 2 Other Reimbursements, Local Matching Dollars, 3 Federal Funds, and Opportunity Grants Subject to 4 the Provisions of R.S. 48:232 5 (Statewide) 6 Payable from Interagency Transfers $25,000,000 7 Payable from Fees and Self-Generated Revenues $30,000,000 8 Payable from Transportation Trust Fund - Federal 9 Receipts $25,000,000 10 Payable from Federal Funds $ 2,500,000 11 Total $82,500,000 12(572679)Non-Federal Aid Eligible Highway Program 13 (Statewide) 14 Payable from State Highway Improvement Fund $31,900,000 15(572734)Highway Program (Up to $4,000,000 for Secretary's 16 Emergency Fund) 17 (Statewide) 18 Payable from General Obligation Bonds 19 Priority 1 $33,015,000 20 Priority 5 $202,735,000 21 Payable from State General Fund (Direct) Non-Recurring 22 Revenues $40,000,000 23 Payable from State General Fund (Direct) $62,800,000 24 Payable from Construction Subfund Preservation$50,000,000 25 Payable from Transportation Trust Fund - Construction 26 Subfund $187,100,000 27 Payable from Transportation Trust Fund - Federal 28 Receipts $1,300,000,000 29 Payable from Transportation Trust Fund - Regular $53,000,000 30 Payable from the balance of State General Fund (Direct) 31 Non-Recurring Revenue previously allocated under the 32 Authority of Act No. 465 of the 2023 Regular Session 33 for the LA 347: LA 355 - LA 686 (Bushville Hwy. from 34 Cecilia Bridge Hwy. to Canal Street) (St. Martin)$ 1,000,000 35 Total $1,929,650,000 36Provided, however, that the Department of Transportation and Development is authorized 37to implement or commence projects approved in this program for Fiscal Year 2024-2025 38identified for phased funding pursuant to the cash management plan established pursuant to 39R.S. 48:251(D), to provide funding for said projects on an as-needed basis by utilizing 40unspent cash balances appropriated in prior years' programs, which funds when combined 41with current appropriations will provide sufficient appropriated funds to award contracts. 42Provided, however, that the Department of Transportation and Development shall use up to 43$2,500,000 of the appropriations from Transportation Trust Fund – Regular to fund the 44replacement of five bridges along LA 1232 between Highway 156 and Highway 501 in 45Winn Parish. 46Provided, however, that the Department of Transportation and Development shall use 47$1,000,000 of the appropriation from the balance of State General Fund (Direct) Non- 48Recurring Revenue previously allocated under the Authority of Act No. 465 of the 2023 49Regular Session for the LA 347: LA 355 - LA 686 (Bushville Hwy. from Cecilia Bridge 50Hwy. to Canal Street) in Highway District No. 3 to complete the patch, mill, and overlay of 51LA 347 (Bushville Hwy. from Cecilia Bridge Hwy. to Canal Street) in-house. 52Provided, however, that the Department of Transportation and Development shall use up to 53$40,000,000 of the appropriations from Transportation Trust Fund – Regular to meet Federal 54match obligations pursuant to competitive Federal grants. Page 17 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1Provided, however, that the Department of Transportation and Development shall use up to 2$62,800,000 of the appropriation from State General Fund (Direct) for State match to the 3Federal Highway Administration Formula. 4Provided, however, that the Department of Transportation shall use up to $40,000,000 of the 5appropriation from State General Fund (Direct) Non-Recurring for State match pursuant to 6August Redistribution Funding provided through the Federal Highway Administration. 7(572759)LA 22: North Hoover Road - Dunson Road 8 (Tangipahoa) 9 Payable from General Obligation Bonds 10 Priority 5 $12,600,000 11(572760)LA 964 (Groom Road - US 61) Highway Lighting 12 (East Baton Rouge) 13 Payable from General Obligation Bonds 14 Priority 1 $ 450,000 15 Priority 5 $ 1,950,000 16 Total $ 2,400,000 17(572761)LA 117 Widening (LA 8 - LA 118) 18 (Natchitoches, Vernon) 19 Payable from General Obligation Bonds 20 Priority 1 $ 5,952,055 21 Priority 5 $30,000,000 22 Total $35,952,055 23(572762)Earhart/Causeway Interchange, Planning, Engineering, 24 Right-of-Way, Utilities and Construction 25 (Jefferson) 26 Payable from General Obligation Bonds 27 Priority 1 $ 4,755,588 28 Priority 5 $44,500,000 29 Total $49,255,588 30(572764)Loyola/I-10 Interchange Improvements, Feasibility Study, 31 Interchange Modification Report, Environmental 32 Assessment, Engineering, Right-of-Ways, Utilities 33 and Construction 34 (Jefferson, Orleans) 35 Payable from General Obligation Bonds 36 Priority 1 $ 2,635,292 37(572765)LA 42 (US 61 to LA 44) Widening, including a Roundabout 38 at Joe Sevario Road, Planning and Construction 39 (Ascension) 40 Payable from General Obligation Bonds 41 Priority 1 $ 206,244 42(572767)Peters Road Bridge and Extension, Planning and 43 Construction 44 (Jefferson, Plaquemines) 45 Payable from General Obligation Bonds 46 Priority 1 $17,539,536 47 Priority 5 $ 7,000,000 48 Total $24,539,536 49(572769)Hooper Road Widening and Sewer Improvements 50 (Blackwater Bayou to Sullivan Road) Planning, 51 Engineering, Utilities and Construction 52 (East Baton Rouge) 53 Payable from General Obligation Bonds 54 Priority 1 $12,265,000 Page 18 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572770)I-49 South from Lafayette to Westbank Expressway, 2 Planning, Engineering, Right-of-Way, Utilities and 3 Construction 4 (Iberia, Jefferson, Lafayette, Lafourche, St. Charles, 5 St. Martin, St. Mary, Terrebonne) 6 Payable from General Obligation Bonds 7 Priority 1 $ 937,789 8 Priority 5 $188,000,000 9 Total $188,937,789 10(572771)I-610 and I-10 Fence Removal, Replacement, and Repairs, 11 due to Hurricane Ida Damage, Planning and Construction 12 (Orleans) 13 Payable from General Obligation Bonds 14 Priority 5 $ 600,000 15(572772)LA 22 Extension and Improvements, LA 22 Roundabout, 16 Design, Engineering, Planning and Construction 17 (St. Tammany) 18 Payable from General Obligation Bonds 19 Priority 1 $ 646,062 20 Priority 5 $ 3,240,000 21 Total $ 3,886,062 22(572773)Roundabout at LA 3233 and I-49 Northbound Service Road, 23 Planning and Construction 24 (St. Landry) 25 Payable from General Obligation Bonds 26 Priority 5 $ 9,600,000 27(572774)Livingston Roundabout at Corner of LA 16 and LA 42, 28 Planning and Construction 29 (Livingston) 30 Payable from General Obligation Bonds 31 Priority 5 $ 3,600,000 32(572818)Highway 397 in Calcasieu Parish, North and South 33 Turning Lanes 34 (Calcasieu) 35 Payable from General Obligation Bonds 36 Priority 1 $ 2,000,000 37 Priority 5 $ 2,300,000 38 Total $ 4,300,000 39(572819)LA 3241 (I-12 to Bush), Planning, Engineering, 40 Right-of-Way, Utilities and Construction 41 (St. Tammany) 42 Payable from General Obligation Bonds 43 Priority 5 $28,000,000 44(572821)LA 1 Improvements, Phase 2, Planning, Engineering, 45 Right-of-Way, Utilities and Construction 46 (Lafourche) 47 Payable from General Obligation Bonds 48 Priority 1 $29,172,098 49 Priority 5 $62,000,000 50 Total $91,172,098 Page 19 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572822)Jimmie Davis Bridge Rehabilitation and Lighting, or 2 Design, Engineering, Planning and Construction 3 (Bossier) 4 Payable from General Obligation Bonds 5 Priority 1 $18,117,480 6 Priority 5 $136,000,000 7 Total $154,117,480 8(572824)I-10 Calcasieu River Bridge, Environmental, Planning, 9 Engineering, Right-of-Way, Utilities, Demolition and 10 Construction 11 (Calcasieu) 12 Payable from General Obligation Bonds 13 Priority 1 $19,428,151 14 Priority 5 $80,000,000 15 Total $99,428,151 16(572825)LA 621 Realignment at LA 73, Planning and Construction 17 (Ascension) 18 Payable from General Obligation Bonds 19 Priority 1 $ 4,946,325 20 Priority 5 $ 7,100,000 21 Total $12,046,325 22(572826)LA 13 (Crowley to Vermilion Parish Line) 23 (Acadia) 24 Payable from General Obligation Bonds 25 Priority 1 $ 1,195,950 26 Priority 5 $ 5,500,000 27 Total $ 6,695,950 28(572827)LA 3227 - LA 157 Intersection Realignment, Planning 29 and Construction 30 (Bossier) 31 Payable from General Obligation Bonds 32 Priority 1 $ 1,500,000 33 Priority 5 $ 7,300,000 34 Payable from the Capital Outlay Savings Fund $ 100,000 35 Payable from State General Fund (Direct) Non-Recurring 36 Revenues $ 1,400,000 37 Total $10,300,000 38(572828)Roundabout at Intersection of LA 3125 and LA 3274 39 (St. James) 40 Payable from General Obligation Bonds 41 Priority 1 $ 2,347,500 42 Priority 5 $ 1,400,000 43 Total $ 3,747,500 44(572829)Intersection Improvements (Roundabouts), Planning and 45 Construction 46 (Lafayette) 47 Payable from General Obligation Bonds 48 Priority 1 $ 5,000,000 49 Priority 5 $ 5,000,000 50 Total $10,000,000 Page 20 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572830)LA 3034 Improvements 2 (East Baton Rouge) 3 Payable from General Obligation Bonds 4 Priority 1 $15,229,971 5 Priority 5 $20,000,000 6 Total $35,229,971 7(572831)Hooper Road Extension and Widening, Environmental, 8 Planning, Engineering, Right-of-Way, Utilities and 9 Construction 10 (East Baton Rouge, Livingston) 11 Payable from General Obligation Bonds 12 Priority 1 $ 8,066,728 13 Priority 5 $27,000,000 14 Total $35,066,728 15(572922)LA 92 - 1 (US 90 - LA 182), Planning and Construction 16 (St. Martin) 17 Payable from General Obligation Bonds 18 Priority 5 $ 4,600,000 19(572923)New Orleans International Airport Landside Access 20 Improvements 21 (Jefferson) 22 Payable from General Obligation Bonds 23 Priority 1 $16,000,000 24(572924)LA 29 Improvements (LA 13 - LA 758) 25 (Evangeline, St. Landry) 26 Payable from General Obligation Bonds 27 Priority 1 $ 5,120,000 28 Priority 5 $ 1,600,000 29 Total $ 6,720,000 30(572925)LA 335: LA 35 - LA 14, Planning and Construction 31 (Vermilion) 32 Payable from General Obligation Bonds 33 Priority 5 $17,100,000 34(572926)LA 31: LA 182 - 0.15 Mi N of N LA 96 35 (Iberia, St. Martin) 36 Payable from General Obligation Bonds 37 Priority 1 $ 9,600,000 38(572928)LA 74/I-10 Interchange, Planning and Construction 39 (Ascension) 40 Payable from General Obligation Bonds 41 Priority 5 $ 5,000,000 42(572929)LA 100: LA 97 - LA 91, Planning and Construction 43 (Acadia) 44 Payable from General Obligation Bonds 45 Priority 5 $ 7,400,000 46(572930)LA 758: US 190 - LA 29, Planning and Construction 47 (Evangeline, St. Landry) 48 Payable from General Obligation Bonds 49 Priority 5 $ 4,400,000 Page 21 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572931)LA 3277: LA 757 - LA 104, Planning and Construction 2 (Evangeline) 3 Payable from General Obligation Bonds 4 Priority 5 $ 6,900,000 5(572932)LA 409 (Liberty Road): LA 64 - East Feliciana Parish Line 6 Planning and Construction 7 (East Baton Rouge) 8 Payable from General Obligation Bonds 9 Priority 1 $ 1,000,000 10 Priority 5 $15,000,000 11 Total $16,000,000 12(572933)St. Landry, LA 106, Planning and Construction 13 (Evangeline) 14 Payable from General Obligation Bonds 15 Priority 5 $12,900,000 16(572934)Roundabout on LA 447 and LA 1025, Planning and 17 Construction 18 (Livingston) 19 Payable from General Obligation Bonds 20 Priority 1 $ 447,151 21 Priority 5 $ 5,000,000 22 Total $ 5,447,151 23(572935)Widening of Highway 447 and I-12 Overpass 24 Improvements, Environmental Phase Commencement, 25 Planning and Construction 26 (Livingston) 27 Payable from General Obligation Bonds 28 Priority 1 $ 1,468,351 29 Priority 5 $26,000,000 30 Total $27,468,351 31(572937)Relocate Hickory Avenue (LA Hwy. 48-11th Street) 32 (Mounes) (LA Hwy. 3154) Construction, Right of Way, 33 and Utilities 34 (Jefferson) 35 Payable from General Obligation Bonds 36 Priority 1 $ 1,000,000 37 Priority 5 $ 1,000,000 38 Total $ 2,000,000 39(572938)LA 699: LA 35 - LA 343, Planning and Construction 40 (Vermilion) 41 Payable from General Obligation Bonds 42 Priority 1 $ 7,870,000 43(572939)LA 95: LA 98 - Beginning of PCCP in Church Point, 44 Planning and Construction 45 (Acadia) 46 Payable from General Obligation Bonds 47 Priority 5 $10,800,000 48(572940)LA 755: LA 368 - LA 91, Planning and Construction 49 (Acadia) 50 Payable from General Obligation Bonds 51 Priority 5 $ 5,576,000 Page 22 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572941)LA 1100: LA 98 - LA 95, Planning and Construction 2 (Acadia) 3 Payable from General Obligation Bonds 4 Priority 5 $ 3,150,000 5(572942)LA 343 (Bosco Hwy) LA 98 - LA 356, Planning and 6 Construction 7 (St. Landry) 8 Payable from General Obligation Bonds 9 Priority 1 $ 6,985,000 10(572943)US 90: Lafayette Regional Airport - Assumption Parish 11 Line, Planning and Construction 12 (Iberia, Lafayette, St. Martin, St. Mary) 13 Payable from General Obligation Bonds 14 Priority 5 $40,000,000 15(572944)LA 3211: Yokley Road to LA 182, Planning and 16 Construction 17 (St. Mary) 18 Payable from General Obligation Bonds 19 Priority 5 $15,000,000 20(572945)LA 347: LA 355 to LA 686 (Bushville Highway from 21 Cecilia Bridge Highway to Canal Street), Planning and 22 Construction 23 (St. Martin) 24 Payable from General Obligation Bonds 25 Priority 5 $ 4,250,000 26(572946)LA 182 Resurfacing 27 (St. Mary) 28 Payable from General Obligation Bonds 29 Priority 5 $ 8,000,000 30(572947)LA 70 Resurfacing and Drainage Repairs 31 (St. Mary) 32 Payable from General Obligation Bonds 33 Priority 5 $ 6,460,000 34(572948)Roundabout at LA 3211 and Yokley Road 35 (St. Mary) 36 Payable from General Obligation Bonds 37 Priority 1 $ 3,500,000 38 Priority 5 $ 1,500,000 39 Total $ 5,000,000 40(572996)Verot School Road, State Hwy 339 Widening, 41 Planning and Construction 42 (Lafayette) 43 Payable from General Obligation Bonds 44 Priority 5 $60,500,000 45(573100)LA 92: LA 91 - LA 13 46 (Acadia) 47 Payable from General Obligation Bonds 48 Priority 5 $ 9,100,000 Page 23 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(573101)LA 35: Lafayette Parish Line - US 90 2 (Acadia) 3 Payable from General Obligation Bonds 4 Priority 5 $ 4,300,000 5(573379)LA 410 (Blackwater Road): LA 408 - LA 64 6 (East Baton Rouge) 7 Payable from General Obligation Bonds 8 Priority 5 $10,000,000 9(573381)US 371 Widening 10 (Webster) 11 Payable from General Obligation Bonds 12 Priority 5 $ 3,600,000 13(573385)LA 347: LA 351 - LA 328 14 (St. Martin) 15 Payable from General Obligation Bonds 16 Priority 5 $ 2,000,000 17(573459)Relocation of LA 67 at LA 408 due to Airport 18 Improvements 19 (East Baton Rouge) 20 Payable from General Obligation Bonds 21 Priority 5 $80,000,000 22(573739)Interchange Improvements on La. Highways 23 (current or former) in Lafayette Parish, Planning and 24 Construction 25 (Lafayette) 26 Payable from General Obligation Bonds 27 Priority 5 $15,000,000 28(573794)US 80: Flat River - Merrywoods Blvd 29 (Bossier) 30 Payable from General Obligation Bonds 31 Priority 5 $ 9,100,000 3207/274PUBLIC IMPROVEMENTS 33(571980)West of Atchafalaya Basin Feasibility Study 34 (Statewide) 35 Payable from General Obligation Bonds 36 Priority 5 $ 795,000 37(571981)Turkey Creek Lake Repairs, Planning and Construction 38 (Franklin) 39 Payable from General Obligation Bonds 40 Priority 1 $ 1,500,000 41 Priority 5 $ 4,241,560 42 Total $ 5,741,560 43(571982)Short Line Railroad Upgrades 44 (Statewide) 45 Payable from General Obligation Bonds 46 Priority 1 $11,427,019 47 Priority 5 $14,720,000 48 Total $26,147,019 Page 24 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(571983)Rehabilitation and Repair of State-Maintained Reservoirs 2 and Dams 3 (Statewide) 4 Payable from General Obligation Bonds 5 Priority 1 $ 5,995,926 6 Priority 5 $11,130,000 7 Total $17,125,926 8(571984)Ouachita River Bank Stabilization and Levee Repair 9 (Caldwell, Ouachita) 10 Payable from General Obligation Bonds 11 Priority 1 $ 5,135,000 12 Priority 5 $14,650,000 13 Total $19,785,000 14(571985)New Orleans Rail Gateway Finalize EIS to Complete Study 15 (Jefferson, Orleans) 16 Payable from General Obligation Bonds 17 Priority 1 $ 1,839,515 18(571987)Mississippi River Levee Raising, Arkansas to Old River, 19 Planning and Construction 20 (Avoyelles, Concordia, East Carroll, Madison, Pointe 21 Coupee, Tensas) 22 Payable from General Obligation Bonds 23 Priority 1 $11,747,945 24 Priority 5 $27,820,000 25 Total $39,567,945 26(571988)Mississippi River Deepening, Phase 3, Planning, 27 Design, Construction, Rights-of-Way, Relocations 28 and Utilities 29 (Ascension, East Baton Rouge, Jefferson, Orleans, 30 Plaquemines, St. Bernard, St. Charles, St. James, St. John 31 the Baptist, West Baton Rouge) 32 Payable from General Obligation Bonds 33 Priority 1 $61,677,714 34(571989)Jefferson Highway Rail Grade Crossing (New Orleans 35 Rail Gateway Program) 36 (Jefferson) 37 Payable from General Obligation Bonds 38 Priority 5 $10,600,000 39(571990)J. Bennett Johnston (Red River) Deepening 40 (Avoyelles, Bossier, Caddo, Grant, Natchitoches, 41 Rapides, Red River) 42 Payable from General Obligation Bonds 43 Priority 1 $ 1,030,000 44 Priority 5 $ 530,000 45 Total $ 1,560,000 46(571991)Comite River Diversion Canal Planning, Right-of-Way, 47 Utilities and Construction 48 (Ascension, East Baton Rouge, Livingston) 49 Payable from General Obligation Bonds 50 Priority 1 $ 652,703 Page 25 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(571992)Bundick Lake Level Control Structure, Planning and 2 Construction 3 (Beauregard) 4 Payable from General Obligation Bonds 5 Priority 1 $ 2,277,521 6 Priority 5 $ 3,180,000 7 Total $ 5,457,521 8(571993)Bayou Dechene Reservoir, Planning, Land Acquisition 9 and Construction 10 (Caldwell) 11 Payable from General Obligation Bonds 12 Priority 1 $10,378,886 13 Priority 5 $16,300,000 14 Total $26,678,886 15(571994)Acadiana Gulf of Mexico Access Channel (AGMAC), 16 Port of Iberia, Planning, Design, Construction, 17 Rights-of-Way, Relocations and Utilities 18 (Iberia, Vermilion) 19 Payable from General Obligation Bonds 20 Priority 1 $20,000,000 21(571995)Houma Navigational Canal Deepening Project, Planning, 22 Design, Construction, Rights-of-Ways, Relocations and 23 Utilities 24 (Terrebonne) 25 Payable from General Obligation Bonds 26 Priority 1 $ 9,650,000 27 Priority 5 $30,500,000 28 Total $40,150,000 29(572418)Flood Control Reservoirs in the Amite River Basin 30 Watershed 31 (Ascension, East Baton Rouge, East Feliciana, Livingston, 32 St. Helena) 33 Payable from General Obligation Bonds 34 Priority 5 $ 2,120,000 35(572459)Avondale Rail Grade Crossings (New Orleans Rail Gateway 36 Program) 37 (Jefferson) 38 Payable from General Obligation Bonds 39 Priority 5 $10,600,000 40(572507)Port Construction and Development Priority Program 41 (Statewide) 42 Payable from Transportation Trust Fund - Regular $39,400,000 43(572682)Statewide Flood Control Program 44 (Statewide) 45 Payable from Transportation Trust Fund - Regular $20,000,000 4607/276ENGINEERING AND OPERATIONS 47(571747)New Cameron Ferry 48 (Cameron) 49 Payable from General Obligation Bonds 50 Priority 1 $21,504,951 Page 26 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572286)Reconstruction and/or Rehabilitation of DOTD 2 Maintenance Unit Facilities 3 (Cameron) 4 Payable from General Obligation Bonds 5 Priority 5 $ 9,500,000 6(572678)Facilities Program Major Repairs, Renovations, Additions, 7 New Facilities, Equipment Replacement at Various DOTD 8 Sites, Planning and Construction 9 (Statewide) 10 Payable from Transportation Trust Fund - Regular $ 4,000,000 11(572680)Motor Vessel and Equipment Drydocking, Repairs, Various 12 Locations Statewide 13 (Statewide) 14 Payable from Transportation Trust Fund - Regular $ 1,500,000 1507/277AVIATION IMPROVEMENTS 16(572681)State Aviation and Airport Improvement Program 17 (Statewide) 18 Payable from Transportation Trust Fund - Regular $28,133,464 19 DEPARTMENT OF PUBLIC SAFETY AND CORRECTIONS 2008/400DEPARTMENT OF CORRECTIONS 21(571772)HVAC Installation, Offender Housing, Planning and 22 Construction 23 (Statewide) 24 Payable from General Obligation Bonds 25 Priority 1 $ 525,000 2608/402LOUISIANA STATE PENITENTIARY 27(571730)Electrical Distribution System Upgrade, Planning 28 and Construction 29 (West Feliciana) 30 Payable from General Obligation Bonds 31 Priority 1 $ 4,558,410 32(571942)Main Prison Shower and Cellblock Plumbing Upgrade, 33 Planning and Construction 34 (West Feliciana) 35 Payable from General Obligation Bonds 36 Priority 1 $ 1,563,382 3708/403OFFICE OF JUVENILE JUSTICE 38(572394)Community Based Program, Juvenile Justice Improvements, 39 Planning, Construction, Renovation, Acquisition, and 40 Equipment 41 (Statewide) 42 Payable from General Obligation Bonds 43 Priority 1 $ 6,932,832 44 Priority 5 $10,000,000 45 Total $16,932,832 Page 27 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 108/406LOUISIANA CORRECTIONAL INSTITUTE F OR WOMEN 2(571659)Rebuild and/or Replace Facility Due to Damage from 2016 3 Flood Event 4 (Iberville) 5 Payable from General Obligation Bonds 6 Priority 1 $19,400,000 708/416RAYBURN CORRECTIONAL CENTER 8(571439)Security Perimeter Fence, Planning and Construction 9 (Washington) 10 Payable from General Obligation Bonds 11 Priority 1 $ 250,000 12 Payable from State General Fund (Direct) Non-Recurring 13 Revenues $ 1,945,000 14 Total $ 2,195,000 1508/419OFFICE OF STATE POLICE 16(572267)New Louisiana State Police Troop L Facility, 17 Planning and Construction 18 (St. Tammany) 19 Payable from General Obligation Bonds 20 Priority 5 $27,000,000 21 Payable from State General Fund (Direct) Non-Recurring 22 Revenues $ 1,500,000 23 Total $28,500,000 24(573810)JESTC Training Facility Improvements, Planning and 25 Construction 26 (East Baton Rouge) 27 Payable from General Obligation Bonds 28 Priority 5 $ 3,750,000 29 LOUISIANA DEPARTMENT OF HEALTH 3009/320OFFICE OF AGING AND ADULT SERVICES 31(573710)Repair and Upgrade to Sewer System, Planning and 32 Construction 33 (East Feliciana) 34 Payable from General Obligation Bonds 35 Priority 1 $ 435,700 36 Priority 5 $ 6,170,000 37 Total $ 6,605,700 38(573711)Replace Roof and Storm Drains on all Patient Buildings, 39 Planning and Construction 40 (East Feliciana) 41 Payable from General Obligation Bonds 42 Priority 1 $ 6,865 Page 28 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 109/330OFFICE OF BEHAVIORAL HEALTH 2(572289)Center Building and Fire Alarm System Renovation and 3 Restoration, East Louisiana State Hospital, Planning and 4 Construction 5 (East Feliciana) 6 Payable from General Obligation Bonds 7 Priority 5 $ 5,000,000 8 Payable from the balance of State General Funds (Direct) 9 previously allocated under the authority of Act 203 of 10 2007 for Mental Health Area C, New Psychiatric Hospital 11 at Central Louisiana State Hospital 12 (Rapides) $ 307,183 13 Total $ 5,307,183 14(572290)Fire Alarm System Replacement for Ten Buildings, Planning 15 and Construction 16 (East Feliciana) 17 Payable from General Obligation Bonds 18 Priority 5 $ 2,453,200 19 DEPARTMENT OF WILDLIFE AND FISHERIES 2016/513OFFICE OF WILDLIFE 21(572845)Woodworth Central Office Complex and Pineville 22 Office/Region 3, Planning and Construction 23 (Rapides) 24 Payable from General Obligation Bonds 25 Priority 1 $ 6,300,000 26 Payable from State General Fund (Direct) Non-Recurring 27 Revenues $ 275,000 28 Total $ 6,575,000 29(572859)Hammond Headquarters, Planning and Construction 30 (Tangipahoa) 31 Payable from General Obligation Bonds 32 Priority 1 $ 1,500,000 33 DEPARTMENT OF EDUCATION 3419/601LSU BATON ROUG E 35(571518)Science - Strategic Capital Plan Repairs and Upgrades - 36 Food Science Renovation, New Science Building, 37 Infrastructure and Utilities, Planning and Construction 38 (East Baton Rouge) 39 Payable from General Obligation Bonds 40 Priority 1 $65,000,000 41 Priority 5 $24,175,000 42 Total $89,175,000 43Provided, however, that $475,000 of the Priority 5 appropriation shall be used to fund the 44construction or addition of a Vivarium on the Louisiana State University – Shreveport 45campus. Page 29 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(571597)Military and Security Sciences Center, Planning and 2 Construction 3 (East Baton Rouge) 4 Payable from General Obligation Bonds 5 Priority 1 $ 4,500,000 6 Priority 5 $17,500,000 7 Total $22,000,000 8(571598)Veterinary Medicine Facilities Repairs/Addition 9 (East Baton Rouge) 10 Payable from General Obligation Bonds 11 Priority 1 $ 5,603,336 12 Priority 5 $ 6,000,000 13 Total $11,603,336 14(571600)Strategic Capital Plan - Deferred Maintenance for 15 Infrastructure, Renovations, and Streets 16 (East Baton Rouge) 17 Payable from General Obligation Bonds 18 Priority 1 $ 8,090,623 19 Priority 5 $30,700,000 20 Total $38,790,623 21(571601)Louisiana State University Library Learning Commons 22 (East Baton Rouge) 23 Payable from General Obligation Bonds 24 Priority 1 $ 5,388,805 25 Priority 5 $72,500,000 26 Payable from Fees and Self-Generated Revenues $75,000,000 27 Total $152,888,805 2819/602LSU ALEXANDRIA 29(571639)Student Success Center, Planning and Construction 30 (Rapides) 31 Payable from General Obligation Bonds 32 Priority 1 $ 7,900,000 33(571685)Downtown Health Services Center, Planning and Construction 34 (Rapides) 35 Payable from General Obligation Bonds 36 Priority 1 $ 3,000,000 37 Priority 5 $26,185,000 38 Total $29,185,000 3919/603UNIVERSITY OF NEW ORLEANS 40(571820)Miscellaneous Roof Replacements, Planning and 41 Construction 42 (Orleans) 43 Payable from General Obligation Bonds 44 Priority 5 $ 4,800,000 Page 30 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(571822)Hotel, Restaurant and Tourism Program Relocation 2 Buildout to North Central Plant Building - Phase 1, 3 Planning and Construction 4 (Orleans) 5 Payable from General Obligation Bonds 6 Priority 1 $ 3,000,000 7 Priority 5 $ 2,800,000 8 Total $ 5,800,000 919/604NLSU HEALTH SCIENCES CENTER - NEW ORLEANS 10(571448)MEB 4th Floor Gross Anatomy and Virtual Anatomy Labs, 11 Planning and Construction 12 (Orleans) 13 Payable from Fees and Self-Generated Revenues $ 5,000,000 14(571450)LSUHSC-NO Campus Stormwater Infrastructure Upgrades, 15 Planning and Construction 16 (Orleans) 17 Payable from General Obligation Bonds 18 Priority 5 $ 3,000,000 19(571451)Health Science Center Facility Renovations - Dental 20 School Simulation Facility, Planning and Construction 21 (Orleans) 22 Payable from General Obligation Bonds 23 Priority 5 $40,000,000 24(571452)LSUHSC-NO Medical Education Building Laboratory 25 Renovation, Phase 1, Planning and Construction 26 (Orleans) 27 Payable from General Obligation Bonds 28 Priority 1 $51,000,000 29 Priority 5 $24,000,000 30 Total $75,000,000 31(571453)Elevated Walkways Structural and ADA Improvements, 32 Planning and Construction 33 (Orleans) 34 Payable from Fees and Self-Generated Revenues $ 3,000,000 35(571454)Center for Advanced Learning and Simulation 36 Infrastructure and Equipment, Planning and Construction 37 (Orleans) 38 Payable from General Obligation Bonds 39 Priority 5 $ 2,800,000 40(573840)Exterior Stair Connector, Seton and CALS 41 Walkways, Planning and Construction 42 (Orleans) 43 Payable from Fees and Self-Generated Revenues $ 2,500,000 Page 31 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 119/604SLSU HEALTH SCIENCES CENTER - SHREVEP ORT 2(571640)Comprehensive Emergency Water Supply Improvements, 3 Planning and Construction 4 (Caddo) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,000,000 7 Priority 5 $ 6,501,650 8 Total $ 7,501,650 9(571641)Medical School B-Building HVAC Replacement, 10 Planning and Construction 11 (Caddo) 12 Payable from General Obligation Bonds 13 Priority 1 $ 434,695 14(571642)Gross Anatomy Lab Expansion and Modernization, 15 Planning and Construction 16 (Caddo) 17 Payable from General Obligation Bonds 18 Priority 1 $ 2,070,896 19 Payable from State General Fund (Direct) Non-Recurring 20 Revenues $ 875,000 21 Total $ 2,945,896 22(571643)Stonewall Animal Research and Training Facility, 23 Planning and Construction 24 (DeSoto) 25 Payable from General Obligation Bonds 26 Priority 5 $ 5,000,000 27(571678)Center for Medical Education and Wellness, Planning and 28 Construction 29 (Caddo) 30 Payable from General Obligation Bonds 31 Priority 1 $ 5,184,483 3219/605LSU EUNICE 33(571636)Manuel Hall Exterior Wall and Roof Repair, Planning and 34 Construction 35 (Acadia) 36 Payable from General Obligation Bonds 37 Priority 1 $ 1,439,148 38(571638)Athletic Complex Facility, Planning and Construction 39 (Acadia) 40 Payable from General Obligation Bonds 41 Priority 1 $ 6,000,000 42 Priority 5 $ 5,750,000 43 Payable from the balance of general obligation bond 44 proceeds previously allocated under the authority of Act 45 2 of 2020 for Division of Administration, Repair, 46 Restoration and Replacement for Declared Disasters, 47 Planning, Construction, Renovation, and Acquisition 48 (Statewide) $ 2,000,000 49 Total $13,750,000 Page 32 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(571679)STEAM Innovation Center, Phase 1, Planning and 2 Construction 3 (Acadia) 4 Payable from General Obligation Bonds 5 Priority 5 $27,900,000 6 Payable from Federal Funds $ 3,250,000 7 Payable from the Capital Outlay Savings Fund $ 500,000 8 Total $31,650,000 919/606LSU SHREVEPORT 10(571634)Building Exterior Walls and Bridge Repair, Planning and 11 Construction 12 (Caddo) 13 Payable from General Obligation Bonds 14 Priority 1 $ 2,979,292 1519/607LSU AGRICULTURAL CENTER 16(571492)Food Innovation Center, Planning and Construction 17 (East Baton Rouge) 18 Payable from General Obligation Bonds 19 Priority 1 $ 1,000,000 20 Priority 5 $ 3,000,000 21 Total $ 4,000,000 22(571817)John M. Parker Agricultural Center & Livestock Show 23 Barn Renovations and Repairs 24 (East Baton Rouge) 25 Payable from General Obligation Bonds 26 Priority 5 $23,000,000 27(571882)Animal and Food Science Facilities Renovations and 28 Modernizations, Phase II, Planning and Construction 29 (East Baton Rouge) 30 Payable from General Obligation Bonds 31 Priority 1 $ 260,720 32 Priority 5 $29,403,500 33 Total $29,664,220 34(571888)Dean Lee Tornado Damage Building Repairs and 35 Reconstruction 36 (Rapides) 37 Payable from General Obligation Bonds 38 Priority 1 $ 385,138 39 Payable from State General Fund (Direct) Non-Recurring 40 Revenues $ 2,000,000 41 Total $ 2,385,138 4219/610LOUISIANA HEALTH CARE SERVICES DIVISION 43(571662)Lallie Kemp Main Entrance and ER Canopies, 44 Planning and Construction 45 (Tangipahoa) 46 Payable from Fees and Self-Generated Revenues $ 1,980,000 47(571664)Lallie Kemp Clinic Building, Planning and Construction 48 (Tangipahoa) 49 Payable from Fees and Self-Generated Revenues $ 4,350,000 Page 33 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 119/612BATON ROUGE COMMUNITY COLLEG E 2(571927)Allied Health Facility and Other Campus Development, 3 with Equipment, Planning and Construction 4 (East Baton Rouge) 5 Payable from General Obligation Bonds 6 Priority 1 $21,500,000 7 Priority 5 $18,000,000 8 Total $39,500,000 9(571928)Campus Development, Planning and Construction 10 (Pointe Coupee) 11 Payable from General Obligation Bonds 12 Priority 1 $ 3,000,000 13 Priority 5 $ 3,000,000 14 Total $ 6,000,000 1519/614SOUTHERN UNIVERSITY LAW CENTER 16(571494)Renovations and Addition to Existing Law Library, 17 Planning and Construction 18 (East Baton Rouge) 19 Payable from General Obligation Bonds 20 Priority 1 $ 5,367,523 21 Priority 5 $ 4,250,000 22 Payable from State General Fund (Direct) Non-Recurring 23 Revenues $ 1,500,000 24 Total $11,117,523 2519/616SOUTHERN UNIVERSITY - BATON ROUG E 26(571496)Ravine, Bluff and Riverbank Stabilization Project, 27 Planning and Construction 28 (East Baton Rouge) 29 Payable from General Obligation Bonds 30 Priority 1 $ 1,500,000 31 Priority 5 $30,500,600 32 Total $32,000,600 33(571497)New STEM Science Complex, Planning and Construction 34 (East Baton Rouge) 35 Payable from General Obligation Bonds 36 Priority 1 $14,699,489 37 Priority 5 $51,800,000 38 Total $66,499,489 39(571498)School of Business/Professional Accountancy, Planning 40 and Construction 41 (East Baton Rouge) 42 Payable from General Obligation Bonds 43 Priority 1 $ 1,691,718 44 Priority 5 $42,250,000 45 Total $43,941,718 46(571499)J. K. Haynes Hall School of Nursing Renovation and 47 Addition, Planning and Construction 48 (East Baton Rouge) 49 Payable from General Obligation Bonds 50 Priority 5 $10,300,000 Page 34 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(571500)New Southern University Laboratory School Complex, 2 Planning and Construction 3 (East Baton Rouge) 4 Payable from General Obligation Bonds 5 Priority 5 $53,000,000 6(571501)Replace Chilled Water Lines, Planning and Construction 7 (East Baton Rouge) 8 Payable from General Obligation Bonds 9 Priority 5 $28,000,000 10(573770)Stewart Hall - Wall Mount HVAC Units 1st, 2nd and 11 3rd Floors, Planning and Construction 12 (East Baton Rouge) 13 Payable from General Obligation Bonds 14 Priority 1 $ 1,726,008 15(573771)A.O. Williams Hall Renovations, 16 Planning and Construction 17 (East Baton Rouge) 18 Payable from General Obligation Bonds 19 Priority 1 $ 1,296,191 20 Priority 5 $ 2,000,000 21 Payable from the balance of State General Funds (Direct) 22 previously allocated under the authority of Act 20 of 2019 23 for Lake Arthur, Flood Gate Repair, Planning and 24 Construction 25 (Jefferson Davis) $ 100,000 26 Total $ 3,396,191 2719/617SOUTHERN UNIVERSITY - NEW ORLEANS 28(571502)University Cafeteria, Planning and Construction 29 (Orleans) 30 Payable from General Obligation Bonds 31 Priority 1 $ 100,000 32 Priority 5 $ 9,900,000 33 Total $10,000,000 34(571503)ADA Compliant Restrooms and Public Accommodations 35 in the Cafeteria, University Center, Health and Physical 36 Education, Library and Administration Building, Planning 37 and Construction 38 (Orleans) 39 Payable from General Obligation Bonds 40 Priority 1 $ 1,000,000 41 Payable from State General Fund (Direct) Non-Recurring 42 Revenues $ 2,650,000 43 Total $ 3,650,000 44(571504)Campus Exterior Lighting Upgrades, Planning and 45 Construction 46 (Orleans) 47 Payable from General Obligation Bonds 48 Priority 1 $ 997,119 Page 35 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 119/618SOUTHERN UNIVERSITY - SHREVEP ORT 2(571506)Domestic Water Loop, Hot Water Loop and Drainage 3 Improvements, Planning and Construction 4 (Caddo) 5 Payable from General Obligation Bonds 6 Priority 5 $ 7,480,000 7 Payable from State General Fund (Direct) Non-Recurring 8 Revenues $ 520,000 9 Total $ 8,000,000 10(571507)Gym Complex, Planning and Construction 11 (Caddo) 12 Payable from General Obligation Bonds 13 Priority 5 $ 8,700,000 14(571508)New Workforce Training and Technology Center, Planning 15 and Construction 16 (Caddo) 17 Payable from General Obligation Bonds 18 Priority 1 $ 1,595,857 19 Priority 5 $17,500,000 20 Total $19,095,857 21(571509)Louis Collier Hall Science Building Renovation, Planning 22 and Construction 23 (Caddo) 24 Payable from General Obligation Bonds 25 Priority 1 $ 2,654,083 26 Priority 5 $13,950,000 27 Total $16,604,083 2819/619SOUTHERN UNIVERSITY AGRICULTURAL RESEARCH AND 29 EXTENSION CENTER 30(571510)Disaster Relief Mega Shelter, Planning and Construction 31 (East Baton Rouge) 32 Payable from General Obligation Bonds 33 Priority 1 $ 1,144,942 34 Priority 5 $ 9,200,000 35 Total $10,344,942 3619/621NICHOLLS STATE UNIVERSITY 37(571413)New Nursing Building, Planning and Construction 38 (Lafourche) 39 Payable from General Obligation Bonds 40 Priority 1 $ 8,874,856 41 Priority 5 $18,250,000 42 Total $27,124,856 43(571434)Women's Student Athlete Performance Center, 44 Planning and Construction 45 (Lafourche) 46 Payable from General Obligation Bonds 47 Priority 5 $ 3,700,000 Page 36 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(571436)Coastal Center Facility, Planning and 2 Construction 3 (Lafourche) 4 Payable from Interagency Transfers $ 2,000,000 519/623GRAMBLING STATE UNIVERSITY 6(571847)Reroof, Waterproof, Envelope Repairs for Various 7 Buildings, Planning and Construction 8 (Lincoln) 9 Payable from General Obligation Bonds 10 Priority 1 $ 1,000,000 11 Priority 5 $ 7,500,000 12 Total $ 8,500,000 13(571971)Criminal Justice Building Renovation 14 (Lincoln) 15 Payable from General Obligation Bonds 16 Priority 1 $ 696,301 17 Priority 5 $17,000,000 18 Total $17,696,301 19(571972)Campus Utility Infrastructure Assessment Emergency 20 Repair/Replacement, Planning and Construction 21 (Lincoln) 22 Payable from General Obligation Bonds 23 Priority 1 $ 7,933,824 2419/625LOUISIANA TECH UNIVERSITY 25(571711)Renovation of George T. Madison Hall, Planning and 26 Construction 27 (Lincoln) 28 Payable from General Obligation Bonds 29 Priority 1 $ 1,209,992 30 Priority 5 $36,000,000 31 Total $37,209,992 32(571712)Central Steam Generator - Switch Gear, Planning and 33 Construction 34 (Lincoln) 35 Payable from General Obligation Bonds 36 Priority 1 $ 203,855 37 Payable from State General Fund (Direct) Non-Recurring 38 Revenues $ 3,300,000 39 Total $ 3,503,855 40(571713)Athletic Academic Center, Planning and Construction 41 (Lincoln) 42 Payable from General Obligation Bonds 43 Priority 1 $ 163,983 44 Payable from State General Fund (Direct) Non-Recurring 45 Revenues $ 2,000,000 46 Total $ 2,163,983 Page 37 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(571714)Agriculture and Forestry Wood Products Education and 2 Research Center, Planning and Construction 3 (Lincoln) 4 Payable from General Obligation Bonds 5 Priority 1 $ 576,903 6 Priority 5 $ 9,000,000 7 Total $ 9,576,903 819/627MCNEESE STATE UNIVERSITY 9(571460)Shearman Fine Arts Building Renovation and Addition, 10 Planning and Construction 11 (Calcasieu) 12 Payable from General Obligation Bonds 13 Priority 1 $ 2,652,580 14 Priority 5 $ 4,700,000 15 Total $ 7,352,580 16(571462)Burton Business Center Exterior Mitigation, Planning and 17 Construction 18 (Calcasieu) 19 Payable from General Obligation Bonds 20 Priority 5 $ 7,000,000 21(573772)McNeese Disaster Recovery, Planning and Construction 22 (Calcasieu) 23 Payable from General Obligation Bonds 24 Priority 1 $ 3,700,576 25 Priority 5 $ 6,000,000 26 Total $ 9,700,576 27(573773)Contraband Bayou Erosion Retaining Wall, Phase II, 28 Planning and Construction 29 (Calcasieu) 30 Payable from General Obligation Bonds 31 Priority 1 $ 504,910 3219/629UNIVERSITY OF LOUISIANA - MONROE 33(571914)Health Science Complex Renovation, Sugar Hall and 34 Caldwell Hall, Planning and Construction 35 (Ouachita) 36 Payable from General Obligation Bonds 37 Priority 1 $16,055,794 38 Priority 5 $14,000,000 39 Total $30,055,794 40(571916)School of Construction Practice Lab Building, Planning 41 and Construction 42 (Ouachita) 43 Payable from General Obligation Bonds 44 Priority 5 $ 5,000,000 4519/631NORTHWESTERN STATE UNIVERSITY 46(571797)Renovation of Nursing Education Center at Warrington 47 Place (Shreveport Campus), Planning and Construction 48 (Caddo) 49 Payable from General Obligation Bonds 50 Priority 5 $13,450,000 51 Payable from Fees and Self-Generated Revenues $ 2,000,000 52 Total $15,450,000 Page 38 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(571798)Replacement of John S. Kyser Hall, Planning and 2 Construction 3 (Natchitoches) 4 Payable from General Obligation Bonds 5 Priority 1 $14,268,804 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 387,787 8 Total $14,656,591 919/634SOUTHEASTERN LOUISIANA UNIVERSITY 10(572113)Nursing and Health Science Building, Planning and 11 Construction 12 (Tangipahoa) 13 Payable from General Obligation Bonds 14 Priority 1 $ 517,771 15 Priority 5 $31,300,000 16 Total $31,817,771 17(572114)Academic Athletic Training and Ancillary Athletic Facility, 18 Planning and Construction 19 (Tangipahoa) 20 Payable from General Obligation Bonds 21 Priority 1 $ 708,373 22 Priority 5 $22,250,000 23 Total $22,958,373 24(572115)Baton Rouge Nursing Center Renovation, Planning and 25 Construction 26 (East Baton Rouge, Tangipahoa) 27 Payable from General Obligation Bonds 28 Priority 1 $ 590,900 29 Priority 5 $ 9,220,000 30 Total $ 9,810,900 31(572116)D. Vickers Hall Renovation and Addition, Planning and 32 Construction 33 (Tangipahoa) 34 Payable from General Obligation Bonds 35 Priority 1 $15,444,803 3619/640UNIVERSITY OF LOUISIANA - LAFAYETTE 37(571604)Performing Arts Center Complex, Planning and 38 Construction 39 (Lafayette) 40 Payable from General Obligation Bonds 41 Priority 5 $74,000,000 42(571617)Kinesiology, Hospitality Management, and Athletic 43 Administration Complex, Engineering, Stabilization, 44 Equipment, Planning and Construction 45 (Lafayette) 46 Payable from General Obligation Bonds 47 Priority 1 $ 454,663 48 Priority 5 $36,500,000 49 Total $36,954,663 Page 39 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(571618)Madison Hall Renovation, Planning and Construction 2 (Lafayette) 3 Payable from General Obligation Bonds 4 Priority 1 $ 6,000,000 5 Priority 5 $ 6,000,000 6 Payable from the balance of general obligation bond 7 proceeds previously allocated under the authority of 8 Act 2 of 2020 for Division of Administration, Repair, 9 Restoration and Replacement for Declared Disasters, 10 Planning, Construction, Renovation, and Acquisition 11 (Statewide) $10,000,000 12 Total $22,000,000 13(571619)Health Care Education and Training Facility and UL/LSU 14 Health Science Education Collaboration Building, Planning, 15 and Construction 16 (Lafayette) 17 Payable from General Obligation Bonds 18 Priority 1 $ 5,749,968 19 Priority 5 $70,000,000 20 Total $75,749,968 21(571620)Foster Hall Renovation, Planning and Construction 22 (Lafayette) 23 Payable from General Obligation Bonds 24 Priority 1 $ 412,290 25 Payable from State General Fund (Direct) Non-Recurring 26 Revenues $ 4,000,000 27 Total $ 4,412,290 28(571621)Engineering Classroom Building, Planning and 29 Construction 30 (Lafayette) 31 Payable from General Obligation Bonds 32 Priority 1 $ 6,766,191 33 Priority 5 $47,866,573 34 Total $54,632,764 35(571622)DeClouet Hall Renovation, Planning and Construction 36 (Lafayette) 37 Payable from General Obligation Bonds 38 Priority 1 $ 500,000 39 Payable from State General Fund (Direct) Non-Recurring 40 Revenues $ 5,500,000 41 Total $ 6,000,000 4219/646RIVER PARISHES COMMUNITY COLLEG E 43(571932)Donaldsonville Renovation Project, Planning and 44 Construction 45 (Ascension) 46 Payable from General Obligation Bonds 47 Priority 1 $ 1,100,000 48 Payable from the balance of State General Funds (Direct) 49 previously allocated under the authority of Act 465 of 50 2023 for Ascension Parish, Energy Transition Parkway, 51 Planning and Construction 52 (Ascension) $ 2,000,000 53 Total $ 3,100,000 Page 40 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 119/647LOUISIANA DELTA COMMUNITY COLLEG E 2(571931)Campus Development for Louisiana Delta Community 3 College, Planning and Construction 4 (Union) 5 Payable from General Obligation Bonds 6 Priority 5 $17,500,000 7(572131)Campus Development for Louisiana Delta Community 8 College Bastrop, Planning and Construction 9 (Morehouse) 10 Payable from General Obligation Bonds 11 Priority 1 $ 1,000,000 12 Priority 5 $15,500,000 13 Total $16,500,000 14(572133)Campus Expansion for Louisiana Delta Community 15 College, Winnsboro, Planning and Construction 16 (Franklin) 17 Payable from General Obligation Bonds 18 Priority 1 $ 4,129,260 19 Payable from State General Fund (Direct) Non-Recurring 20 Revenues $ 1,800,000 21 Total $ 5,929,260 2219/649LOUISIANA COMMUNITY AND TECHNICAL COLLEG E SYSTEM 23(571721)Central Louisiana Technical Community College - Campus 24 Development Rod Brady Campus, Planning and Construction 25 (LaSalle) 26 Payable from General Obligation Bonds 27 Priority 1 $ 1,500,000 28 Priority 5 $12,500,000 29 Total $14,000,000 30(571936)Resurface Campus Parking, Planning and Construction 31 (Calcasieu) 32 Payable from General Obligation Bonds 33 Priority 1 $ 135,020 34 Priority 5 $ 2,500,000 35 Total $ 2,635,020 36(573775)Maritime/Petroleum Workforce Training Academy, 37 Planning and Construction 38 (Terrebonne) 39 Payable from General Obligation Bonds 40 Priority 5 $ 9,334,817 4119/657LOUISIANA SCHOOL F OR MATH, SCIENCE AND THE ARTS 42(572500)Louisiana School for Math, Science, and the Arts and 43 Northwestern State University Innovation Center, Planning 44 and Construction 45 (Natchitoches) 46 Payable from General Obligation Bonds 47 Priority 5 $ 9,900,000 48 Payable from Fees and Self-Generated Revenues $ 6,000,000 49 Payable from Federal Funds via Interagency Transfers $ 2,100,000 50 Total $18,000,000 Page 41 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 119/671BOARD OF REGENTS 2(573606)System-Wide Telecommunications Wiring and Equipment, 3 Planning and Construction 4 (Statewide) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,995,822 7(573607)Major Repairs and Deferred Maintenance of Buildings and 8 Facilities, Planning and Construction 9 (Statewide) 10 Payable from General Obligation Bonds 11 Priority 5 $10,000,000 12(573774)Land Acquisition for Post Secondary Educational 13 Institutions 14 (Statewide) 15 Payable from General Obligation Bonds 16 Priority 1 $ 160,908 1719/673NEW ORLEANS CENTER F OR THE CREATIVE ARTS 18(572424)Building Acquisition for Academic Studio Program, 19 Planning and Construction 20 (Orleans) 21 Payable from General Obligation Bonds 22 Priority 5 $ 8,000,000 2319/674LOUISIANA UNIVERSITIES MARINE CONSORTIUM 24(573632)Research Vessel (R/V Pelican) Replacement 25 (Terrebonne) 26 Payable from General Obligation Bonds 27 Priority 1 $10,890,000 28 Priority 5 $19,500,000 29 Payable from State General Fund (Direct) Non-Recurring 30 Revenues $11,500,000 31 Total $41,890,000 32(573633)Houma Marine Campus Phase 2, Planning and 33 Construction 34 (Terrebonne) 35 Payable from General Obligation Bonds 36 Priority 1 $13,372,873 37 Priority 5 $ 1,600,000 38 Total $14,972,873 3919/712LOUISIANA TECHNICAL COLLEG E-SULLIVAN CAMPUS 40(571937)New Diesel Automotive Building, Northshore Technical 41 Community College - Sullivan Campus, Planning and 42 Construction 43 (Washington) 44 Payable from General Obligation Bonds 45 Priority 1 $ 1,000,000 46 Priority 5 $ 9,140,000 47 Total $10,140,000 Page 42 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 119/731FLETCHER TECHNICAL COMMUNITY COLLEG E 2(571929)Precision Agriculture Training Facility, Planning and 3 Construction 4 (Terrebonne) 5 Payable from General Obligation Bonds 6 Priority 1 $ 5,498,000 7 Priority 5 $ 1,602,000 8 Payable from State General Fund (Direct) Non-Recurring 9 Revenues $13,200,000 10 Total $20,300,000 1119/788NORTHSHORE TECHNICAL COMMUNITY COLLEG E 12(571934)Livingston Campus Expansion, Planning and Construction 13 (Livingston) 14 Payable from General Obligation Bonds 15 Priority 5 $ 9,000,000 16 JUDICAL EXPENSES 1723/949LOUISIANA JUDICIARY 18(573707)Land Acquisition, Planning, and Construction of New 19 Courthouse for the Louisiana Court of Appeal, 20 Third Circuit 21 (Calcasieu) 22 Payable from General Obligation Bonds 23 Priority 1 $ 268,700 24 LEVEE DISTRICTS AND PORTS 2536/L13PONTCHARTRAIN LEVEE DISTRICT 26(573164)Lake Pontchartrain West Shore Hurricane Protection Project 27 (Ascension, St. Charles, St. James, St. John the Baptist) 28 Payable from General Obligation Bonds 29 Priority 1 $ 2,630,229 30 Priority 5 $ 9,170,000 31 Total $11,800,229 32(573276)Bayou Manchac Clearing and Snagging 33 (Ascension, East Baton Rouge, Iberville) 34 Payable from General Obligation Bonds 35 Priority 5 $ 1,370,000 36 Payable from State General Fund (Direct) Non-Recurring 37 Revenues $ 180,000 38 Total $ 1,550,000 39(573281)Bayou Manchac Regional Flood Risk Reduction Permitting 40 (Ascension, East Baton Rouge, Iberville) 41 Payable from General Obligation Bonds 42 Priority 5 $ 1,240,000 43 Payable from State General Fund (Direct) Non-Recurring 44 Revenues $ 120,000 45 Total $ 1,360,000 Page 43 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(573283)Bayou Manchac Dredging - Planning 2 (Ascension, East Baton Rouge, Iberville) 3 Payable from General Obligation Bonds 4 Priority 5 $ 3,990,000 5 Payable from State General Fund (Direct) Non-Recurring 6 Revenues $ 1,250,000 7 Total $ 5,240,000 836/L15SQUIRREL RUN LEVEE DRAINAG E DISTRICT 9(572173)Maintenance of Levee and FEMA Certification 10 (Iberia) 11 Payable from General Obligation Bonds 12 Priority 1 $ 250,000 13 Priority 5 $ 200,000 14 Total $ 450,000 1536/L16SOUTH LAFOURCHE LEVEE DISTRICT 16(572622)Larose to Golden Meadow Hurricane Protection 17 System Improvements and Data Monitoring, 18 Planning and Construction 19 (Lafourche) 20 Payable from General Obligation Bonds 21 Priority 5 $ 400,000 22(573673)Larose to Golden Meadow Hurricane Protection System, 23 Planning and Construction 24 (Lafourche) 25 Payable from General Obligation Bonds 26 Priority 5 $10,200,000 2736/L25GRAND ISLE INDEPENDENT LEVEE DISTRICT 28(573453)Breakwater Protection, Planning and Construction 29 (Jefferson) 30 Payable from General Obligation Bonds 31 Priority 1 $ 2,669,160 32 Payable from the balance of State General Funds (Direct) 33 previously allocated under the authority of Act 2 of 2020 34 for Livingston Parish School Board, Widening and Turn 35 Lane Construction for LA Hwy 16 as Part of the New 36 Southside Elementary and Jr. High Schools 37 (Livingston) $ 55,460 38 Total $ 2,724,620 39(573454)Grand Isle Back Levee Flood Protection, Planning and 40 Construction 41 (Jefferson) 42 Payable from General Obligation Bonds 43 Priority 1 $ 1,500,000 4436/L26NATCHITOCHES LEVEE AND DRAINAG E DISTRICT 45(573053)Levee Setbacks for the Campti-Clarence Levee and 46 Powhatan Levee, Planning and Construction 47 (Natchitoches) 48 Payable from General Obligation Bonds 49 Priority 5 $ 1,665,000 50 Payable from State General Fund (Direct) Non-Recurring 51 Revenues $ 135,000 52 Total $ 1,800,000 Page 44 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(573674)Lower Cane River Area Flow Control Structure and Levee 2 Surface Restorations, Planning and Construction 3 (Natchitoches) 4 Payable from General Obligation Bonds 5 Priority 1 $ 12,228 636/L34LAKEFRONT MANAG EMENT AUTHORITY 7(572820)Seabrook Public Boat Launch Rehabilitation, Planning and 8 Construction 9 (Orleans) 10 Payable from General Obligation Bonds 11 Priority 1 $ 100,000 12 Priority 5 $ 1,780,000 13 Total $ 1,880,000 14(572823)Planning, Designing and Constructing Public Use Pavilions 15 Inclusive of Benches and Tables along 5.2 Miles of Public 16 Parks and Green Space along New Orleans Lakeshore Drive 17 (Orleans) 18 Payable from General Obligation Bonds 19 Priority 5 $ 168,750 2036/L36LAFITTE AREA INDEPENDENT LEVEE DISTRICT 21(573299)Lower Lafitte (Orange Street) Basin, Planning and 22 Construction 23 (Jefferson) 24 Payable from General Obligation Bonds 25 Priority 1 $ 5,133,981 26 Priority 5 $ 3,992,500 27 Payable from the balance of general obligation bond 28 proceeds previously allocated under the authority of Act 29 2 of 2020 for Division of Administration, Repair, 30 Restoration and Replacement for Declared Disasters, 31 Planning, Construction, Renovation, and Acquisition 32 (Statewide), Act 4 of 2017 for LSU Health Sciences 33 Center - Shreveport, Capital Improvement Projects, 34 Design and Engineering (Caddo), Act 20 of 2019 for 35 Greater Lafourche Port Commission, Minor Cheramie 36 Road Paving, Planning and Construction (Lafourche), Act 37 20 of 2019 for Madisonville, Rehabilitation of Sewer Lift 38 Stations, Planning and Construction 39 (St. Tammany) $ 957,432 40 Payable from the balance of State General Funds (Direct) 41 previously allocated under the authority of Act 20 of 2019 42 for Sabine Parish, Water Treatment and Supply System 43 Study 44 (Sabine) $ 17,600 45 Total $10,101,513 46(573300)Goose Bayou/The Pen Levee Basin, Planning and 47 Construction 48 (Jefferson) 49 Payable from General Obligation Bonds 50 Priority 1 $ 1,000,000 51 Priority 5 $14,066,000 52 Total $15,066,000 Page 45 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 136/P05WEST CALCASIEU PORT 2(572519)New Property Along Gulf Intracoastal Waterway, Planning 3 and Construction 4 (Calcasieu) 5 Payable from General Obligation Bonds 6 Priority 5 $ 2,000,000 736/P10GREATER LAFOURCHE PORT COMMISSION 8(573227)Port Fourchon to Belle Pass Channel Deepening 9 Project, Planning and Construction 10 (Lafourche) 11 Payable from General Obligation Bonds 12 Priority 5 $20,000,000 13(573229)Fourchon Bridge and Connector Road, Planning and 14 Construction 15 (Lafourche) 16 Payable from General Obligation Bonds 17 Priority 1 $ 3,500,000 18 Priority 5 $ 1,910,000 19 Total $ 5,410,000 2036/P17PORT OF NEW ORLEANS 21(572603)St. Claude Bridge Rehabilitation, Planning and Construction 22 (Orleans) 23 Payable from General Obligation Bonds 24 Priority 5 $27,500,000 25 Payable from State General Fund (Direct) Non-Recurring 26 Revenues $ 3,000,000 27 Total $30,500,000 28(572604)St. Bernard Transportation Corridor, Planning and 29 Construction 30 (St. Bernard) 31 Payable from General Obligation Bonds 32 Priority 1 $ 2,000,000 33 Priority 5 $48,000,000 34 Total $50,000,000 35(572815)Louisiana International Terminal Drainage, Site 36 Preparation, Mitigation, Roadway and Rail 37 Improvements, Planning and Construction 38 (St. Bernard) 39 Payable from General Obligation Bonds 40 Priority 5 $140,000,000 41 Payable from State General Fund (Direct) Non-Recurring 42 Revenues $10,000,000 43 Total $150,000,000 4436/P21PORT OF SOUTH LOUISIANA 45(572164)Globalplex Dock Access Bridge and Equipment 46 Replacement/Repair, Planning and Construction 47 (St. John the Baptist) 48 Payable from General Obligation Bonds 49 Priority 1 $10,800,750 Page 46 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572165)Globalplex Rail Connector, Planning and Construction 2 (St. John the Baptist) 3 Payable from General Obligation Bonds 4 Priority 5 $ 3,640,000 5 Payable from State General Fund (Direct) Non-Recurring 6 Revenues $ 320,000 7 Total $ 3,960,000 8(572166)Globalplex Road Improvements and Drainage between 9 Globalplex Buildings 71 and 76, Planning and 10 Construction 11 (St. John the Baptist) 12 Payable from General Obligation Bonds 13 Priority 1 $ 500,000 14(572167)Globalplex Roadway Improvements: Parking Area near 15 Building 60, Planning and Construction 16 (St. John the Baptist) 17 Payable from General Obligation Bonds 18 Priority 1 $ 1,290,000 19(572168)Globalplex Roadway Improvements at Parking Area near 20 Building 2, Planning and Construction 21 (St. John the Baptist) 22 Payable from General Obligation Bonds 23 Priority 1 $ 2,940,000 24(572169)Globalplex Terminal Building #71 and Other Globalplex 25 Terminal Building Upgrades, Planning and Construction 26 (St. John the Baptist) 27 Payable from General Obligation Bonds 28 Priority 1 $ 567,361 29 Priority 5 $ 1,000,000 30 Total $ 1,567,361 31(572170)Globalplex Warehouse and Conveyance System, Planning 32 and Construction 33 (St. John the Baptist) 34 Payable from General Obligation Bonds 35 Priority 5 $24,385,000 36 Payable from State General Fund (Direct) Non-Recurring 37 Revenues $ 2,300,000 38 Total $26,685,000 39(572171)Globalplex New Guard Station, Planning and Construction 40 (St. John the Baptist) 41 Payable from General Obligation Bonds 42 Priority 5 $ 1,580,000 43 Payable from State General Fund (Direct) Non-Recurring 44 Revenues $ 145,000 45 Total $ 1,725,000 46(572172)Globalplex Master Drainage Improvements, Planning and 47 Construction 48 (St. John the Baptist) 49 Payable from General Obligation Bonds 50 Priority 5 $ 1,425,000 51 Payable from State General Fund (Direct) Non-Recurring 52 Revenues $ 150,000 53 Total $ 1,575,000 Page 47 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 136/P23TERREBONNE PORT COMMISSION 2(572160)Maritime Manufacturing Facility, Planning and 3 Construction 4 (Terrebonne) 5 Payable from General Obligation Bonds 6 Priority 1 $ 4,000,000 7 Priority 5 $40,000,000 8 Total $44,000,000 9(572161)Slip Dredging, Houma Navigation Canal Dredging, 10 Planning and Construction 11 (Terrebonne) 12 Payable from General Obligation Bonds 13 Priority 1 $ 5,061,923 1436/P26PORT OF LAKE CHARLES 15(571902)Berths 4, 5, and 6 Wharf and Shed Reconstruction at 16 City Docks, Planning and Construction 17 (Calcasieu) 18 Payable from General Obligation Bonds 19 Priority 1 $40,997,262 20 Priority 5 $53,900,000 21 Total $94,897,262 22(573675)Two Mobile Harbor Cranes for BT-1, Planning and 23 Construction 24 (Calcasieu) 25 Payable from General Obligation Bonds 26 Priority 1 $ 2,304,987 2736/P34WEST ST. MARY PARISH PORT 28(572913)Warehouse Facilities and Related Infrastructure 29 Improvements (Baldwin Campus), Planning and 30 Construction 31 (St. Mary) 32 Payable from General Obligation Bonds 33 Priority 1 $ 2,000,000 3436/P35MERMENTAU RIVER HARBOR AND TERMINAL DISTRICT 35(573007)Slip Improvements, Planning and Construction 36 (Acadia) 37 Payable from General Obligation Bonds 38 Priority 1 $ 883,375 3936/P36CENTRAL LOUISIANA REG IONAL PORT 40(572355)Beaver Lake Industrial Park: A Strategic Initiative for 41 Dock Expansion, Road Accessibility, and Utility Services, 42 Planning and Construction 43 (Rapides) 44 Payable from General Obligation Bonds 45 Priority 5 $20,000,000 Page 48 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572413)CLRP High Water Hardstand and Access Road, 2 Planning and Construction 3 (Rapides) 4 Payable from General Obligation Bonds 5 Priority 1 $ 153,550 6 Priority 5 $ 1,800,000 7 Total $ 1,953,550 836/P41JEFFERSON PARISH ECONOMIC DEVELOP MENT AND PORT 9 DISTRICT 10(571998)Avondale Marine Facility Improvements, Planning and 11 Construction 12 (Jefferson) 13 Payable from General Obligation Bonds 14 Priority 1 $ 661,792 15(571999)Restore Rail Connection and Crossing to Avondale 16 Marine, Planning and Construction 17 (Jefferson) 18 Payable from General Obligation Bonds 19 Priority 1 $ 100,000 20 Priority 5 $ 3,700,000 21 Total $ 3,800,000 2236/P43COLUMBIA PORT COMMISSION 23(573124)Railroad Spur, Planning and Construction 24 (Caldwell) 25 Payable from General Obligation Bonds 26 Priority 1 $ 117,846 27 Priority 5 $ 1,841,000 28 Total $ 1,958,846 2936/P44AVOYELLES PORT COMMISSION 30(573677)Liquid Fertilizer Tank Terminal Expansion, Planning and 31 Construction 32 (Avoyelles) 33 Payable from General Obligation Bonds 34 Priority 1 $ 150,000 35 Priority 5 $ 600,000 36 Total $ 750,000 3736/P47GREATER OUACHITA P ORT COMMISSION 38(573652)Container Handler Equipment 39 (Ouachita) 40 Payable from the balance of Capital Outlay Savings 41 Fund previously allocated under the authority of Act 42 465 of the 2023 Regular Session for the Grand Isle 43 Port Commission, Improvements to the Grand Isle 44 Port Facility 45 (Jefferson) $ 600,000 Page 49 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1 MISCELLANEOUS NON-STATE 250/J01ACADIA PARISH 3(573009)Old Spanish Trail Roadway Improvements to Provide For 4 Freight Traffic Bypass of Dangerous Railroad 5 Crossing, Planning and Construction 6 (Acadia) 7 Payable from General Obligation Bonds 8 Priority 1 $ 745,000 950/J02ALLEN PARISH 10(571789)Road Rehabilitation, Planning and Construction 11 (Allen) 12 Payable from General Obligation Bonds 13 Priority 5 $ 1,550,000 14(571790)Bridge Improvements, Planning and Construction 15 (Allen) 16 Payable from General Obligation Bonds 17 Priority 5 $ 3,050,000 1850/J03ASCENSION PARISH 19(572278)Parish Utilities of Ascension Water Plant Feed Tank, 20 Planning and Construction 21 (Ascension) 22 Payable from General Obligation Bonds 23 Priority 5 $ 520,000 24(572279)Early Childhood Education Project, Planning and 25 Construction 26 (Ascension) 27 Payable from General Obligation Bonds 28 Priority 5 $ 2,700,000 29 Payable from the balance of State General Fund (Direct) 30 previously allocated under the authority of Act 465 of 31 2023 for Ascension Parish, Energy Transition Parkway, 32 Planning and Construction 33 (Ascension) $ 2,000,000 34 Total $ 4,700,000 35(572573)LA 431 at LA 931 Roundabout, Planning and Construction 36 (Ascension) 37 Payable from General Obligation Bonds 38 Priority 5 $ 1,400,000 39 Payable from State General Fund (Direct) Non-Recurring 40 Revenues $ 400,000 41 Total $ 1,800,000 42(572574)LA 73 at LA 30 Roundabout, Planning and Construction 43 (Ascension) 44 Payable from the balance of State General Fund (Direct) 45 previously allocated under the authority of Act 465 of 46 2023 for Ascension Parish, 4-Lane LA 30 from I-10 to 47 LA 73, Planning and Construction 48 (Ascension) $ 5,000,000 Page 50 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572580)Parish Utilities of Ascension Water Plant Clarifiers, 2 Planning and Construction 3 (Ascension) 4 Payable from General Obligation Bonds 5 Priority 5 $ 1,240,000 6(573812)LA 44 at LA 933/Parker Road Roundabout, Planning and 7 Construction 8 (Ascension) 9 Payable from General Obligation Bonds 10 Priority 5 $ 2,150,000 11 Payable from State General Fund (Direct) Non-Recurring 12 Revenues $ 400,000 13 Total $ 2,550,000 1450/J04ASSUMPTION PARISH 15(572805)Assumption Parish Pumps and Drainage, Planning and 16 Construction 17 (Assumption) 18 Payable from General Obligation Bonds 19 Priority 1 $ 470,000 20(572806)Plattenville Drainage Improvements, Planning and 21 Construction 22 (Assumption) 23 Payable from General Obligation Bonds 24 Priority 1 $ 1,733,750 25(573667)Lee Drive Repaving, Planning and Construction 26 (Assumption) 27 Payable from General Obligation Bonds 28 Priority 1 $ 286,500 29 Priority 5 $ 1,428,000 30 Total $ 1,714,500 3150/J05AVOYELLES PARISH 32(572200)Recreation and Education Complex, 33 Planning and Construction 34 (Avoyelles) 35 Payable from the Capital Outlay Savings Fund $ 3,000,000 36(572202)Parishwide Roadway Improvements, Planning and 37 Construction 38 (Avoyelles) 39 Payable from General Obligation Bonds 40 Priority 1 $ 500,000 41 Priority 5 $ 1,000,000 42 Total $ 1,500,000 4350/J06BEAUREGARD PARISH 44(572673)Camp Edgewood Road Improvements - 45 Beauregard Parish Police Jury 46 (Beauregard) 47 Payable from General Obligation Bonds 48 Priority 1 $ 750,000 Page 51 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(573668)Longview Road Improvements, Beauregard Parish 2 Police Jury, Planning and Construction 3 (Beauregard) 4 Payable from General Obligation Bonds 5 Priority 5 $ 360,000 650/J08BOSSIER PARISH 7(572655)US Hwy 71 Four Lane Extension/Colleen Drive 8 Improvements, Planning and Construction 9 (Bossier) 10 Payable from General Obligation Bonds 11 Priority 5 $ 4,580,000 12(572660)Improvements to Highway 157, LA Highway 3227 to 13 US Highway 80, Planning and Construction 14 (Bossier) 15 Payable from General Obligation Bonds 16 Priority 5 $11,200,000 17 Payable from State General Fund (Direct) Non-Recurring 18 Revenues $ 1,000,000 19 Total $12,200,000 20(572662)Improvements to LA Highway 3 (Benton Road) and 21 I-220 Interchange, Planning and Construction 22 (Bossier) 23 Payable from General Obligation Bonds 24 Priority 5 $ 4,000,000 2550/J10CALCASIEU PARISH 26(571864)Calcasieu Police Jury Gravity Sewer Trunk Mains and 27 Pumping Station South Ward 3 and South Ward 4, 28 Planning and Construction 29 (Calcasieu) 30 Payable from General Obligation Bonds 31 Priority 1 $ 1,051,454 32 Priority 5 $12,000,000 33 Total $13,051,454 3450/J11CALDWELL PARISH 35(572936)Swim Lake Road, Planning and Construction 36 (Caldwell) 37 Payable from General Obligation Bonds 38 Priority 1 $ 450,000 39(573669)Wiles Road and Kountry Korner Road, Planning 40 and Construction 41 (Caldwell) 42 Payable from General Obligation Bonds 43 Priority 1 $ 500,000 4450/J12CAMERON PARISH 45(573132)North Cameron Emergency Operations Center, 46 Planning and Construction 47 (Cameron) 48 Payable from the Capital Outlay Savings Fund $ 250,000 Page 52 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/J15CONCORDIA PARISH 2(572969)Roadway Reconstruction, Doty Road, 3 Planning and Construction 4 (Concordia) 5 Payable from General Obligation Bonds 6 Priority 5 $ 1,800,000 750/J17EAST BATON ROUG E PARISH 8(572689)East Baton Rouge Parish Flood Risk Reduction Project- 9 Expand, Repair, and Modify Drainage System throughout 10 East Baton Rouge Parish 11 (East Baton Rouge) 12 Payable from General Obligation Bonds 13 Priority 1 $12,924,999 14 Priority 5 $22,000,000 15 Total $34,924,999 1650/J18EAST CARROLL PARISH 17(573740)Spillway Structure Repairs for Lake Providence Lake and 18 Cleaning of Outfall Canal from the Lake Downstream, 19 Planning and Construction 20 (East Carroll) 21 Payable from General Obligation Bonds 22 Priority 1 $ 100,000 23 Priority 5 $ 300,000 24 Total $ 400,000 2550/J21FRANKLIN PARISH 26(572323)Franklin Parish Activity Center, Planning and 27 Construction 28 (Franklin) 29 Payable from General Obligation Bonds 30 Priority 1 $ 1,520,000 31(572754)Dr. Rogers Road Improvements, Planning and Construction 32 (Franklin) 33 Payable from General Obligation Bonds 34 Priority 5 $ 600,000 35(572755)Riley Road Improvements, Planning and Construction 36 (Franklin) 37 Payable from General Obligation Bonds 38 Priority 5 $ 1,000,000 39(572758)Erosion Control and Bank Stabilization at Big Creek Bridge 40 and Looney Canal, Planning and Construction 41 (Franklin) 42 Payable from General Obligation Bonds 43 Priority 5 $ 600,000 44(573741)LD Knox Road Reconstruction, Planning and Construction 45 (Franklin) 46 Payable from General Obligation Bonds 47 Priority 5 $ 1,555,000 Page 53 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/J22GRANT PARISH 2(572949)Landfill Road Improvements, Planning and Construction 3 (Grant) 4 Payable from General Obligation Bonds 5 Priority 5 $ 765,000 650/J23IBERIA PARISH 7(571681)LaSalle Street and Hanger Road Extensions, Planning and 8 Construction 9 (Iberia) 10 Payable from General Obligation Bonds 11 Priority 1 $ 400,000 12(572985)Parish Jail Improvements, Planning and Construction 13 (Iberia) 14 Payable from General Obligation Bonds 15 Priority 1 $ 840,000 16 Payable from State General Fund (Direct) Non-Recurring 17 Revenues $ 400,000 18 Total $ 1,240,000 19(573742)Courthouse Elevators, Planning and Construction 20 (Iberia) 21 Payable from General Obligation Bonds 22 Priority 1 $ 171,900 23(573743)Evacuation Center at Acadiana Fairgrounds, Planning and 24 Construction 25 (Iberia) 26 Payable from General Obligation Bonds 27 Priority 5 $ 8,000,000 2850/J24IBERVILLE PARISH 29(572184)Manchac Roadway Improvements 30 (Iberville) 31 Payable from General Obligation Bonds 32 Priority 1 $ 2,400,000 3350/J25JACKSON PARISH 34(572566)Lakeshore Drive Rehabilitation and Improvements, 35 Planning and Construction 36 (Jackson) 37 Payable from General Obligation Bonds 38 Priority 1 $ 1,989,000 3950/J26JEFFERSON PARISH 40(571523)Airline Drive (US 61) at 17th Street Canal Drainage 41 Crossing and Railroad Bridge Replacement 42 (Jefferson) 43 Payable from General Obligation Bonds 44 Priority 1 $ 7,291,250 45 Priority 5 $14,090,000 46 Total $21,381,250 Page 54 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(571524)11th Street Roadway Replacement and Upgrade of 2 Subsurface Drainage System between Queens and 3 Manhattan Boulevard, Planning and Construction 4 (Jefferson) 5 Payable from General Obligation Bonds 6 Priority 1 $ 200,000 7 Priority 5 $ 9,175,000 8 Total $ 9,375,000 9(571525)Bonnabel Canal Bank Stabilization (West Side) - 10 Veterans Blvd. to West Esplanade, Planning and 11 Construction 12 (Jefferson) 13 Payable from General Obligation Bonds 14 Priority 1 $ 1,100,000 15 Priority 5 $ 7,000,000 16 Total $ 8,100,000 17(571526)Bainbridge Canal Closure from Veterans Boulevard to 18 Terminal Drive, Planning and Construction 19 (Jefferson) 20 Payable from General Obligation Bonds 21 Priority 1 $ 930,000 22 Priority 5 $13,800,000 23 Total $14,730,000 24(571527)Sewer Lift Station Backup Generators - North, 25 Planning and Construction 26 (Jefferson) 27 Payable from General Obligation Bonds 28 Priority 1 $ 26,921 29(571528)Brown Avenue Canal Improvements between the 30 Westbank Expressway and Harold Street, Planning 31 and Construction 32 (Jefferson) 33 Payable from General Obligation Bonds 34 Priority 1 $ 1,705,920 35 Priority 5 $ 1,500,000 36 Total $ 3,205,920 37(571529)Woodmere Playground Improvements, Planning and 38 Construction 39 (Jefferson) 40 Payable from General Obligation Bonds 41 Priority 1 $ 2,039,163 42(571530)Woodmere Youth Center, Planning and Construction 43 (Jefferson) 44 Payable from General Obligation Bonds 45 Priority 1 $ 99,862 46(571531)Bucktown Harbor Wave Attenuation Jetty, Planning 47 and Construction 48 (Jefferson) 49 Payable from General Obligation Bonds 50 Priority 1 $ 464,000 Page 55 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(571532)West Esplanade Pump Station, Planning and 2 Construction 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 1 $ 3,500,000 6 Priority 5 $ 3,700,000 7 Total $ 7,200,000 8(571533)Woodlake Estates Drainage Improvements, Planning and 9 Construction 10 (Jefferson) 11 Payable from General Obligation Bonds 12 Priority 1 $ 500,000 13 Priority 5 $ 4,650,000 14 Total $ 5,150,000 15(571534)Shrewsbury Road at Jefferson Highway Culvert 16 Replacement, Planning and Construction 17 (Jefferson) 18 Payable from General Obligation Bonds 19 Priority 1 $ 450,000 20(571537)Jefferson Park Sport Field Renovation, Planning and 21 Construction 22 (Jefferson) 23 Payable from General Obligation Bonds 24 Priority 5 $ 6,840,000 25(571539)Hickory Avenue (LA 3154) Rehabilitation (River Road 26 to 10th Street), Planning and Construction 27 (Jefferson) 28 Payable from General Obligation Bonds 29 Priority 1 $ 600,000 30 Priority 5 $ 6,270,000 31 Total $ 6,870,000 32(571540)4th Street Shared-Use Path (Barataria Blvd. to Gretna 33 City Limits), Planning and Construction 34 (Jefferson) 35 Payable from General Obligation Bonds 36 Priority 1 $ 225,000 37 Priority 5 $ 4,146,600 38 Total $ 4,371,600 39(571542)Bucktown Harbor Boardwalk and Kayak Launch, 40 Planning and Construction 41 (Jefferson) 42 Payable from General Obligation Bonds 43 Priority 5 $ 1,575,000 44(571543)Gretna Government Complex Parking Lot, Planning 45 and Construction 46 (Jefferson) 47 Payable from General Obligation Bonds 48 Priority 1 $ 2,928,000 49 Priority 5 $ 7,671,600 50 Total $10,599,600 Page 56 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(571544)Vietnamese American Cultural and Service Center, 2 Planning and Construction 3 (Jefferson) 4 Payable from General Obligation Bonds 5 Priority 5 $ 3,550,000 6(571554)Preservation and Restoration of Historic Structures 7 for Hope Haven/Madonna Manor Campus, Planning 8 and Construction 9 (Jefferson) 10 Payable from General Obligation Bonds 11 Priority 1 $ 7,047,048 12(571571)East Bank Backup Generators West: Sewer Lift Station 13 Backup Generators (Camp Plauche, Transcontinental 14 at West Metairie, and Transcontinental at Vineland) 15 (Jefferson) 16 Payable from General Obligation Bonds 17 Priority 5 $ 2,000,000 18(571582)Barataria Blvd. (LA 45) Drainage Improvements 19 (Merlin Lane to Pritchard Road), Planning and Construction 20 (Jefferson) 21 Payable from General Obligation Bonds 22 Priority 5 $ 6,500,000 23(571583)Woodland West Drainage Improvements, Planning and 24 Construction 25 (Jefferson) 26 Payable from General Obligation Bonds 27 Priority 1 $ 344,655 28 Priority 5 $ 1,000,000 29 Total $ 1,344,655 30(571584)Riverside Senior Center, Planning and Construction 31 (Jefferson) 32 Payable from General Obligation Bonds 33 Priority 1 $ 948,000 34 Priority 5 $ 1,455,000 35 Total $ 2,403,000 36(571586)Canal #13 Concrete Lining (Loyola Drive to Butler Canal) 37 (Jefferson) 38 Payable from General Obligation Bonds 39 Priority 1 $ 250,000 40 Priority 5 $ 3,750,000 41 Total $ 4,000,000 42(571587)East Bank Backup Generators East: Sewer Lift Station 43 Backup Generators (Clearview at W. Napoleon, Cleary 44 at W. Napoleon, Houma at W. Napoleon and Galleria 45 Sewer Station), Planning and Construction 46 (Jefferson) 47 Payable from General Obligation Bonds 48 Priority 1 $ 250,000 49 Priority 5 $ 1,500,000 50 Total $ 1,750,000 Page 57 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(571589)New Access Road in the Churchill Technology and 2 Business Park for Delgado's Advanced Manufacturing 3 and River City Campus, Planning and Construction 4 (Jefferson) 5 Payable from General Obligation Bonds 6 Priority 1 $ 200,000 7 Priority 5 $ 1,350,000 8 Total $ 1,550,000 950/J28LAFAYETTE PARISH 10(571465)State Interchange Improvements, Planning and 11 Construction 12 (Lafayette) 13 Payable from General Obligation Bonds 14 Priority 5 $11,325,000 15(571466)Rue Du Belier Widening, Planning and 16 Construction 17 (Lafayette) 18 Payable from General Obligation Bonds 19 Priority 1 $ 2,000,000 20 Priority 5 $ 5,000,000 21 Total $ 7,000,000 22(571467)Parish Road Overlay, Planning and Construction 23 (Lafayette) 24 Payable from General Obligation Bonds 25 Priority 5 $ 7,000,000 26(571469)Lake Farm to Verot School Road Extension, Planning and 27 Construction 28 (Lafayette) 29 Payable from General Obligation Bonds 30 Priority 5 $ 2,500,000 31(571470)Isaac Verot Coulee - Main Channel Hardening, Planning 32 and Construction 33 (Lafayette) 34 Payable from General Obligation Bonds 35 Priority 5 $11,000,000 36(571472)Ingress and Egress Interchange Improvements, Planning 37 and Construction 38 (Lafayette) 39 Payable from General Obligation Bonds 40 Priority 5 $10,000,000 41(571473)E Broussard Roundabout, Planning and Construction 42 (Lafayette) 43 Payable from General Obligation Bonds 44 Priority 5 $ 2,000,000 45(571474)Cue Road Extension, Planning and Construction 46 (Lafayette) 47 Payable from General Obligation Bonds 48 Priority 5 $ 3,500,000 Page 58 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(571475)University Avenue Corridor Improvements, 2 Planning, Construction and Acquisition 3 (Lafayette) 4 Payable from General Obligation Bonds 5 Priority 1 $13,000,000 6(571476)Bayou Vermilion Flood Control, Planning and 7 Construction 8 (Lafayette) 9 Payable from General Obligation Bonds 10 Priority 1 $13,000,000 11 Priority 5 $22,000,000 12 Total $35,000,000 13(571477)Parish Government Complex, Parish Courthouse, 14 Planning and Construction 15 (Lafayette) 16 Payable from General Obligation Bonds 17 Priority 1 $ 4,365,450 18(571478)Parish Government Complex, Jail, New Design, Planning, 19 and Construction 20 (Lafayette) 21 Payable from General Obligation Bonds 22 Priority 5 $35,000,000 23(571480)Heymann Park Improvements Project, Planning and 24 Construction 25 (Lafayette) 26 Payable from General Obligation Bonds 27 Priority 1 $ 1,925,000 2850/J29LAFOURCHE PARISH 29(572994)Butch Hill Pump Station Replacement, Planning and 30 Construction 31 (Lafourche) 32 Payable from General Obligation Bonds 33 Priority 1 $ 646,000 34 Priority 5 $ 3,100,000 35 Total $ 3,746,000 36(572995)South Lafourche Airport Corridor Project 37 (Lafourche) 38 Payable from General Obligation Bonds 39 Priority 1 $ 6,621,024 4050/J31LINCOLN PARISH 41(573131)Bridge Replacements on Mitchell and Shady 42 Grove Roads, Planning and Construction 43 (Lincoln) 44 Payable from General Obligation Bonds 45 Priority 1 $ 380,000 Page 59 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/J32LIVINGSTON PARISH 2(571905)Cook Road Extension Economic Development 3 Corridor (Pete's Highway Frontage Road) 4 (Livingston) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,949,731 7 Payable from the Capital Outlay Savings Fund $ 1,000,000 8 Total $ 2,949,731 9(571906)Juban Road North Extension between US 190 10 (Florida Blvd.) and LA 1026 (Lockhart Road), 11 Planning and Construction 12 (Livingston) 13 Payable from General Obligation Bonds 14 Priority 5 $ 6,005,000 1550/J34MOREHOUSE PARISH 16(573105)Public Works Center, Planning and Construction 17 (Morehouse) 18 Payable from General Obligation Bonds 19 Priority 1 $ 301,750 2050/J35NATCHITOCHES P ARISH 21(572896)Resurfacing of Goldonna Road, Planning and Construction 22 (Natchitoches) 23 Payable from General Obligation Bonds 24 Priority 5 $ 3,560,000 25 Payable from State General Fund (Direct) Non-Recurring 26 Revenues $ 440,000 27 Total $ 4,000,000 28(573744)Courthouse Security Improvements, Planning and 29 Construction 30 (Natchitoches) 31 Payable from General Obligation Bonds 32 Priority 1 $ 2,154,895 3350/J37OUACHITA PARISH 34(572950)Cheniere Lake Area 1 Improvements, Planning and 35 Construction 36 (Ouachita) 37 Payable from General Obligation Bonds 38 Priority 1 $ 1,080,000 39(572951)Steep Bayou Sewer - Phase 3, Planning, Construction 40 and Right-of-Way Acquisition 41 (Ouachita) 42 Payable from General Obligation Bonds 43 Priority 1 $ 354,137 44 Priority 5 $ 3,580,000 45 Total $ 3,934,137 46(572952)Bayou Mouchoir Drainage Improvements 47 (Ouachita) 48 Payable from General Obligation Bonds 49 Priority 1 $ 477,500 Page 60 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572956)Force Main Replacement for Lift Station N, Planning, 2 Right-of-Way, and Construction 3 (Ouachita) 4 Payable from General Obligation Bonds 5 Priority 5 $ 1,000,000 6(572958)Elkins Road Improvements, Planning, 7 Right-of-Way, and Construction 8 (Ouachita) 9 Payable from General Obligation Bonds 10 Priority 5 $ 1,535,000 11(573745)Hannah's Run Control Structure, Planning and Construction 12 (Ouachita) 13 Payable from General Obligation Bonds 14 Priority 1 $ 187,385 1550/J38PLAQUEMINES PARISH 16(572485)Empire Bridge Lighting, Planning and Construction 17 (Plaquemines) 18 Payable from General Obligation Bonds 19 Priority 1 $ 197,000 20(573828)Plaquemines Parish Public Safety Answering Point 21 (PSAP), Planning and Construction 22 (Plaquemines) 23 Payable from General Obligation Bonds 24 Priority 5 $ 2,000,000 2550/J39POINTE COUPEE PARISH 26(573207)Portage Canal Drainage Project, Planning and Construction 27 (Pointe Coupee) 28 Payable from General Obligation Bonds 29 Priority 5 $ 2,000,000 30(573208)Watershed Drainage Improvements Bayou Grosse Tete, 31 Bayou Cholpe, Bayou Choctaw, False River Outfall 32 Channel, and Johnson Bayou, Planning and Construction 33 (Pointe Coupee) 34 Payable from General Obligation Bonds 35 Priority 1 $ 1,956,500 36(573209)False River Ecosystem Restoration Project, Including 37 Bulkhead Replacement, Planning and Construction 38 (Pointe Coupee) 39 Payable from General Obligation Bonds 40 Priority 1 $ 2,205,070 41 Priority 5 $ 5,600,000 42 Total $ 7,805,070 43(573746)Courthouse Restoration - Phase 2, Planning and 44 Construction 45 (Pointe Coupee) 46 Payable from General Obligation Bonds 47 Priority 1 $ 2,943,750 Page 61 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/J40RAPIDES PARISH 2(572489)Philadelphia Road Street Improvements, Planning and 3 Construction 4 (Rapides) 5 Payable from General Obligation Bonds 6 Priority 1 $ 500,000 7 Priority 5 $ 2,950,000 8 Total $ 3,450,000 9(572490)Gunter Road/Barron Chapel Road Street 10 Improvements, Planning and Construction 11 (Rapides) 12 Payable from General Obligation Bonds 13 Priority 1 $ 1,450,000 14(572491)New Fire Station at LSU Alexandria Serving Rapides 15 Parish - Fire District 18, Planning and Construction 16 (Rapides) 17 Payable from General Obligation Bonds 18 Priority 5 $ 1,300,000 1950/J43SABINE PARISH 20(573747)Plainview Road Rehabilitation, Planning and Construction 21 (Sabine) 22 Payable from General Obligation Bonds 23 Priority 1 $ 1,837,720 2450/J44ST. BERNARD PARISH 25(572526)St. Bernard Parish Jail Renovations, Planning and 26 Construction 27 (St. Bernard) 28 Payable from General Obligation Bonds 29 Priority 1 $ 2,947,500 30 Priority 5 $ 5,000,000 31 Total $ 7,947,500 3250/J45ST. CHARLES PARISH 33(572419)Des Allemans Bulkhead - Phase 1, Planning and 34 Construction 35 (St. Charles) 36 Payable from General Obligation Bonds 37 Priority 1 $ 150,000 38 Priority 5 $ 2,622,500 39 Total $ 2,772,500 40(572512)Fairfield and Oakland Pump Station Discharge 41 Improvements, Planning and Construction 42 (St. Charles) 43 Payable from General Obligation Bonds 44 Priority 1 $ 825,000 Page 62 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572577)Paul Fredrick Street and Kinler Street Demolition and 2 Reconstruction 3 (St. Charles) 4 Payable from General Obligation Bonds 5 Priority 1 $ 175,000 6 Priority 5 $ 2,825,000 7 Total $ 3,000,000 8(572676)Fifth Street Drainage Improvements, Planning and 9 Construction 10 (St. Charles) 11 Payable from General Obligation Bonds 12 Priority 1 $ 350,107 13 Priority 5 $ 450,000 14 Total $ 800,107 1550/J46ST. HELENA PARISH 16(572833)Audubon Library, Planning and Construction 17 (St. Helena) 18 Payable from General Obligation Bonds 19 Priority 1 $ 1,163,600 2050/J47ST. JAMES PARISH 21(573190)LA 3127 Widening (LA 20 to LA 3213), Planning and 22 Construction 23 (St. James) 24 Payable from General Obligation Bonds 25 Priority 1 $ 979,708 26 Priority 5 $11,900,000 27 Total $12,879,708 28(573191)Storm Damage Repair to Dock on Blind River, Planning 29 and Construction 30 (St. James) 31 Payable from General Obligation Bonds 32 Priority 5 $ 500,000 33(573192)West Shore Risk Reduction Connector Levee 34 (St. James) 35 Payable from General Obligation Bonds 36 Priority 1 $ 3,650,000 37 Priority 5 $15,200,000 38 Total $18,850,000 39(573193)Parishwide Road Rehabilitation, Planning and Construction 40 (St. James) 41 Payable from General Obligation Bonds 42 Priority 1 $ 1,000,000 4350/J49ST. LANDRY PARISH 44(572306)Parish Wide Road Program, Planning and Construction 45 (St. Landry) 46 Payable from General Obligation Bonds 47 Priority 1 $ 2,500,000 48 Priority 5 $ 2,500,000 49 Total $ 5,000,000 Page 63 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(573748)Parish Wide Drainage Project, Planning and Construction 2 (St. Landry) 3 Payable from General Obligation Bonds 4 Priority 1 $ 1,000,000 5(573749)Courthouse Renovations, Planning and Construction 6 (St. Landry) 7 Payable from General Obligation Bonds 8 Priority 1 $ 60,190 950/J50ST. MARTIN PARISH 10(571680)I-10 Frontage Road, LA 328 to LA 347, Planning and 11 Construction 12 (St. Martin) 13 Payable from General Obligation Bonds 14 Priority 5 $ 1,000,000 15(572062)Spanish Trail Industrial Park Access Road, Planning and 16 Construction 17 (St. Martin) 18 Payable from General Obligation Bonds 19 Priority 1 $ 4,100,000 20(572063)Road Improvements on Four-Mile Bayou Road 21 (St. Martin) 22 Payable from General Obligation Bonds 23 Priority 1 $ 72,263 24 Priority 5 $ 500,000 25 Total $ 572,263 26(572064)Joe Daigre Canal Drainage Improvements, Planning and 27 Construction 28 (St. Martin) 29 Payable from General Obligation Bonds 30 Priority 1 $ 700,398 31 Priority 5 $ 550,000 32 Total $ 1,250,398 3350/J51ST. MARY PARISH 34(572436)Infrastructure Improvements and Construction of a 35 Welding Training Center Facility at the Charenton Canal 36 Industrial Park 37 (St. Mary) 38 Payable from General Obligation Bonds 39 Priority 5 $ 527,000 40(572437)Reconstruction of Martin Luther King Roadway in Charenton 41 for St. Mary Parish Government, within Existing 42 Right-of-Way, Planning and Construction 43 (St. Mary) 44 Payable from General Obligation Bonds 45 Priority 1 $ 47,245 46(572438)Emergency Power Improvements at St. Mary Parish 47 Courthouse, Planning and Construction 48 (St. Mary) 49 Payable from General Obligation Bonds 50 Priority 1 $ 238,750 Page 64 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/J52ST. TAMMANY PARISH 2(573337)Harrison Avenue Widening, Planning and Construction 3 (St. Tammany) 4 Payable from General Obligation Bonds 5 Priority 5 $13,300,000 6(573338)University Square Learning Center Facilities, Planning 7 and Construction 8 (St. Tammany) 9 Payable from General Obligation Bonds 10 Priority 1 $ 208,740 11 Priority 5 $10,630,000 12 Total $10,838,740 13(573340)Highway 11 - Opportunity Zone, Sewer & Water 14 Improvements, Planning and Construction 15 (St. Tammany) 16 Payable from General Obligation Bonds 17 Priority 5 $28,000,000 18(573341)Fabourg Coquille Water Quality Improvements, Planning 19 and Construction 20 (St. Tammany) 21 Payable from General Obligation Bonds 22 Priority 5 $ 6,050,000 23(573343)East St. Tammany Regional Sewer Consolidation 24 Design, Planning and Construction 25 (St. Tammany) 26 Payable from General Obligation Bonds 27 Priority 5 $30,000,000 28(573346)Safe Haven Campus for Behavioral and Mental Health, 29 Planning, Construction and Renovation for Triage 30 (St. Tammany) 31 Payable from General Obligation Bonds 32 Priority 1 $ 3,118,694 33 Priority 5 $ 8,350,000 34 Total $11,468,694 35(573347)Ben Thomas - Stone Road to Powell Drive, Design, 36 Planning, and Construction 37 (St. Tammany) 38 Payable from General Obligation Bonds 39 Priority 1 $ 500,000 40 Priority 5 $ 3,200,000 41 Total $ 3,700,000 42(573348)South Slidell Levee Protection Rehabilitation: (USACE 43 533d Report or Planning, Land Acquisition, and 44 Construction of Levees West and East of Interstate 10) 45 (St. Tammany) 46 Payable from General Obligation Bonds 47 Priority 1 $ 750,000 48 Priority 5 $ 9,108,000 49 Total $ 9,858,000 Page 65 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(573355)LA 1077 Widening, Design, Right of Way, Planning and 2 Construction 3 (St. Tammany) 4 Payable from General Obligation Bonds 5 Priority 1 $ 20,000 6 Priority 5 $20,000,000 7 Total $20,020,000 8(573356)Sharp Road Improvements and Sidewalk, Planning and 9 Construction 10 (St. Tammany) 11 Payable from General Obligation Bonds 12 Priority 5 $ 6,125,000 13(573357)Emerald Forrest Boulevard to LA 59, Design, Planning 14 and Construction 15 (St. Tammany) 16 Payable from General Obligation Bonds 17 Priority 5 $13,000,000 18(573363)Hwy 1088/I-12 AML Corridor Initiative, 19 Planning and Construction 20 (St. Tammany) 21 Payable from General Obligation Bonds 22 Priority 5 $ 5,625,000 23(573813)Safe Haven Behavioral Health Campus Roads, 24 Design, Planning and Construction 25 (St. Tammany) 26 Payable from General Obligation Bonds 27 Priority 5 $ 2,250,000 28(573824)Hwy 11 Regional Water Consolidation Design, Planning 29 and Construction 30 (St. Tammany) 31 Payable from General Obligation Bonds 32 Priority 5 $20,000,000 3350/J53TANGIPAHOA PARISH 34(572581)North Hoover Road Improvements Phase 2, Planning and 35 Construction 36 (Tangipahoa) 37 Payable from General Obligation Bonds 38 Priority 1 $ 2,725,000 39(572605)South Airport Road, North Hoover Road 40 Improvements, Planning and Construction 41 (Tangipahoa) 42 Payable from General Obligation Bonds 43 Priority 1 $ 386,789 44 Priority 5 $ 2,000,000 45 Total $ 2,386,789 4650/J54TENSAS PARISH 47(571744)Tensas Parish/Port Priority Site Plan, Planning and 48 Construction 49 (Tensas) 50 Payable from General Obligation Bonds 51 Priority 1 $ 214,800 Page 66 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(571745)Lide Road Improvements, Planning and Construction 2 (Tensas) 3 Payable from General Obligation Bonds 4 Priority 1 $ 776,277 5(571746)Recreation Facility, Planning and Construction 6 (Tensas) 7 Payable from General Obligation Bonds 8 Priority 1 $ 230,000 9 Priority 5 $ 5,048,000 10 Total $ 5,278,000 1150/J55TERREBONNE PARISH 12(572636)Company Canal Miter Gate in Bourg, Planning and 13 Construction 14 (Terrebonne) 15 Payable from General Obligation Bonds 16 Priority 5 $ 9,000,000 17 Payable from State General Fund (Direct) Non-Recurring 18 Revenues $ 500,000 19 Total $ 9,500,000 20(572637)Bayou Terrebonne Miter Gate, Twin Span Location, 21 Planning and Construction 22 (Terrebonne) 23 Payable from General Obligation Bonds 24 Priority 5 $ 9,000,000 25 Payable from State General Fund (Direct) Non-Recurring 26 Revenues $ 500,000 27 Total $ 9,500,000 28(572638)Valhi Extension (Savanne to LA 311), Planning and 29 Construction 30 (Terrebonne) 31 Payable from General Obligation Bonds 32 Priority 5 $32,000,000 33(572640)Industrial Boulevard Pump Station, Planning and 34 Construction 35 (Terrebonne) 36 Payable from General Obligation Bonds 37 Priority 5 $ 900,000 38(572642)Bayou LaCarpe Watershed Project, Location C, Design and 39 Construction 40 (Terrebonne) 41 Payable from General Obligation Bonds 42 Priority 1 $ 675,000 43 Priority 5 $ 9,000,000 44 Total $ 9,675,000 45(572668)Replacement of D-18 Pump Station Falgout Canal, 46 Theriot, La., Planning and Construction 47 (Terrebonne) 48 Payable from General Obligation Bonds 49 Priority 5 $ 2,125,000 Page 67 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572669)Replacement of Brady Road Bridge, Planning and 2 Construction 3 (Terrebonne) 4 Payable from General Obligation Bonds 5 Priority 1 $ 1,811,000 6 Priority 5 $ 4,035,000 7 Total $ 5,846,000 8(572753)South Louisiana Wetland Discovery Center - Phase 2 - 9 Bayou Country Institute, Planning and Construction 10 (Terrebonne) 11 Payable from General Obligation Bonds 12 Priority 1 $ 387,931 13(573172)Terrebonne Sports Complex, Planning and Construction 14 (Terrebonne) 15 Payable from General Obligation Bonds 16 Priority 1 $ 1,158,534 17(573173)Westside/Alma Street Drainage, Planning and Construction 18 (Terrebonne) 19 Payable from General Obligation Bonds 20 Priority 1 $ 101,868 2150/J58VERNON PARISH 22(572065)Tom Beckom Road Improvements, 23 Planning and Construction 24 (Vernon) 25 Payable from General Obligation Bonds 26 Priority 5 $ 900,000 27(572069)Bailey Road Improvements, Planning and Construction 28 (Vernon) 29 Payable from General Obligation Bonds 30 Priority 5 $ 5,280,000 31 Payable from State General Fund (Direct) Non-Recurring 32 Revenues $ 480,000 33 Total $ 5,760,000 34(572070)East Hawthorne Road Improvements, 35 Planning and Construction 36 (Vernon) 37 Payable from General Obligation Bonds 38 Priority 5 $ 1,800,000 39(572071)Lake Vernon Road and Spillway Road Improvements, 40 Planning and Construction 41 (Vernon) 42 Payable from General Obligation Bonds 43 Priority 5 $ 1,910,000 44 Payable from State General Fund (Direct) Non-Recurring 45 Revenues $ 250,000 46 Total $ 2,160,000 47(573750)Vernon/Fort Johnson formerly Fort Polk Thoroughfare 48 Electrical Power Extension, and Utilities Including 49 Generators 50 (Vernon) 51 Payable from General Obligation Bonds 52 Priority 1 $ 468,000 Page 68 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/J59WASHINGTON PARISH 2(573751)Pearl River Navigational Canal, Planning, Construction, 3 and Acquisition 4 (Washington) 5 Payable from General Obligation Bonds 6 Priority 1 $ 500,000 7(573752)Washington Parish Jail Renovations Including HVAC, 8 Security and ADA, Planning and Construction 9 (Washington) 10 Payable from General Obligation Bonds 11 Priority 1 $ 936,400 12(573753)Washington Parish Courthouse Renovation and 13 HVAC, Planning and Construction 14 (Washington) 15 Payable from General Obligation Bonds 16 Priority 1 $ 382,000 1750/J63WEST FELICIANA PARISH 18(572265)West Feliciana Port Infrastructure, Planning, Engineering, 19 and Construction 20 (West Feliciana) 21 Payable from General Obligation Bonds 22 Priority 1 $ 736,563 23 Priority 5 $ 2,140,000 24 Total $ 2,876,563 2550/J64WINN PARISH 26(572235)Roadway Reconstruction, Mars Hill Church Road, 27 Planning and Construction 28 (Winn) 29 Payable from General Obligation Bonds 30 Priority 5 $ 1,800,000 31(572244)Roadway Reconstruction, Eugene Garrett Road, 32 Planning and Construction 33 (Winn) 34 Payable from General Obligation Bonds 35 Priority 1 $ 367,675 36(572246)Roadway Reconstruction, Frank White Road, Planning and 37 Construction 38 (Winn) 39 Payable from General Obligation Bonds 40 Priority 1 $ 439,300 41(572247)Roadway Reconstruction, Brownville Road, Planning and 42 Construction 43 (Winn) 44 Payable from General Obligation Bonds 45 Priority 1 $ 319,925 46(573147)Roadway Reconstruction, Lum Fox Road, Planning and 47 Construction 48 (Winn) 49 Payable from State General Fund (Direct) Non-Recurring 50 Revenues $ 440,000 Page 69 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(573754)Roadway Reconstruction, Williams Loop, Cole, Oak 2 Ridge and Pine Ridge Roadways, Planning and Construction 3 (Winn) 4 Payable from General Obligation Bonds 5 Priority 1 $ 7,918 650/M01ABBEVILLE 7(573382)Street and Sidewalk Improvements, 8 Planning and Construction 9 (Vermilion) 10 Payable from General Obligation Bonds 11 Priority 5 $ 1,125,000 1250/M05ALEXANDRIA 13(572882)Sugarhouse Road/Eddie Williams Boulevard to LA 14 Highway 1, Phase I and II, Planning and Construction 15 ($5,000,000 Local Match) 16 (Rapides) 17 Payable from General Obligation Bonds 18 Priority 1 $ 2,972,100 19 Priority 5 $ 4,620,000 20 Total $ 7,592,100 2150/M06AMITE 22(573091)Regional Wastewater Treatment and Transmission 23 Facilities, Planning and Construction 24 (Tangipahoa) 25 Payable from General Obligation Bonds 26 Priority 5 $32,750,000 27 Payable from State General Fund (Direct) Non-Recurring 28 Revenues $ 8,000,000 29 Total $40,750,000 30(573804)Amite Governmental Complex, Planning and Construction 31 (Tangipahoa) 32 Payable from General Obligation Bonds 33 Priority 1 $ 310,000 34 Priority 5 $ 2,600,000 35 Total $ 2,910,000 3650/M07ANACOCO 37(573757)Street Rehabilitation - Ross Road, Lula Street, and Loop 38 Drive, Planning and Construction 39 (Vernon) 40 Payable from General Obligation Bonds 41 Priority 1 $ 33,636 4250/M14BAKER 43(573650)Sidewalk Construction for Underdeveloped Streets and 44 Culverts, Planning and Construction 45 (East Baton Rouge) 46 Payable from General Obligation Bonds 47 Priority 5 $ 1,875,000 Page 70 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(573651)Drainage Improvements and Upgrades, Planning and 2 Construction 3 (East Baton Rouge) 4 Payable from General Obligation Bonds 5 Priority 5 $ 2,600,000 650/M15BALDWIN 7(573818)Potable Water System Improvements, Planning and 8 Construction 9 (St. Mary) 10 Payable from General Obligation Bonds 11 Priority 1 $ 116,591 12 Priority 5 $ 700,000 13 Total $ 816,591 14(573829)Wastewater System Repair and Improvements, Planning and 15 Construction 16 (St. Mary) 17 Payable from General Obligation Bonds 18 Priority 5 $ 1,000,000 1950/M17BASILE 20(572425)Re-Coating of Elevated Water Tank, 21 Planning and Construction 22 (Evangeline) 23 Payable from General Obligation Bonds 24 Priority 5 $ 565,000 2550/M19BASTROP 26(573653)City Hall - Roof Replacement, Planning and Construction 27 (Morehouse) 28 Payable from General Obligation Bonds 29 Priority 1 $ 347,150 3050/M20BATON ROUGE 31(572687)Chaneyville Fire District No. 7 Reames Road Fire 32 Station, Planning and Construction 33 (East Baton Rouge) 34 Payable from General Obligation Bonds 35 Priority 5 $ 300,000 36(572688)Old Hammond Hwy. (LA 426) Roadway Improvements 37 from Blvd. De Province to Millerville Road, Planning 38 and Construction 39 (East Baton Rouge) 40 Payable from General Obligation Bonds 41 Priority 1 $ 450,000 42 Priority 5 $ 9,250,000 43 Total $ 9,700,000 44(572691)Hooper Road Widening and Sewer Improvements 45 (Blackwater Bayou to Sullivan Road) Planning, 46 Engineering, Utilities and Construction 47 (East Baton Rouge) 48 Payable from General Obligation Bonds 49 Priority 1 $ 5,000,000 50 Priority 5 $ 4,500,000 51 Total $ 9,500,000 Page 71 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/M22BENTON 2(572867)Wastewater Collection Improvements (Courthouse 3 Subbasin), Planning and Construction 4 (Bossier) 5 Payable from General Obligation Bonds 6 Priority 5 $ 3,400,000 7 Payable from the Capital Outlay Savings Fund $ 100,000 8 Total $ 3,500,000 950/M27BOGALUSA 10(572154)Community Center and Emergency Shelter, Planning 11 and Construction 12 (Washington) 13 Payable from General Obligation Bonds 14 Priority 1 $ 500,000 15 Priority 5 $10,500,000 16 Total $11,000,000 17(572155)City Hall Renovations 18 (Washington) 19 Payable from General Obligation Bonds 20 Priority 1 $ 210,000 21(573756)Davenport Avenue Bridge, Servitude Street Emergency 22 Replacement and Repair, Planning and Construction 23 (Washington) 24 Payable from General Obligation Bonds 25 Priority 5 $ 565,000 2650/M28BONITA 27(572711)Municipal Complex, Planning and Construction 28 (Morehouse) 29 Payable from General Obligation Bonds 30 Priority 1 $ 400,000 31 Priority 5 $ 1,850,000 32 Total $ 2,250,000 3350/M31BREAUX BRIDGE 34(573758)Water Treatment Plant Improvements, Planning and 35 Construction 36 (St. Martin) 37 Payable from General Obligation Bonds 38 Priority 1 $ 35,500 3950/M32BROUSSARD 40(571676)Water System Groundwater Storage Tank, Planning and 41 Construction 42 (Lafayette) 43 Payable from General Obligation Bonds 44 Priority 1 $ 125,000 45 Priority 5 $ 1,000,000 46 Total $ 1,125,000 Page 72 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(571950)Highway 89 Improvements, Planning and Construction 2 (Lafayette) 3 Payable from General Obligation Bonds 4 Priority 1 $ 3,842,500 5 Priority 5 $ 4,000,000 6 Total $ 7,842,500 7(571951)Albertson Parkway Water Well and Ground Storage 8 Tank, Planning and Construction 9 (Lafayette) 10 Payable from General Obligation Bonds 11 Priority 1 $ 390,000 12 Priority 5 $ 4,216,000 13 Total $ 4,606,000 14(571952)Marteau Road Water Well, Planning and Construction 15 (Lafayette) 16 Payable from General Obligation Bonds 17 Priority 1 $ 390,000 18 Priority 5 $ 4,200,000 19 Total $ 4,590,000 20(573759)Reconstruct South Bernard Road from LA Hwy 182 to 21 US Hwy 90, Planning and Construction 22 (Lafayette) 23 Payable from General Obligation Bonds 24 Priority 1 $ 4,430,490 2550/M39CARENCRO 26(571784)City Wide Water Main Rehabilitation Project, Planning 27 and Construction 28 (Lafayette) 29 Payable from General Obligation Bonds 30 Priority 5 $ 6,000,000 31 Payable from State General Fund (Direct) Non-Recurring 32 Revenues $ 1,000,000 33 Payable from the Capital Outlay Savings Fund $ 1,000,000 34 Total $ 8,000,000 35(573760)I-49 to Gloria Switch Coulee Project, Planning and 36 Construction 37 (Lafayette) 38 Payable from General Obligation Bonds 39 Priority 1 $ 419,972 40(573762)Wastewater and City Infrastructure Flood Damages, Planning 41 and Construction 42 (Lafayette) 43 Payable from General Obligation Bonds 44 Priority 1 $ 359,077 4550/M44CHOUDRANT 46(573303)New Town Hall, Planning and Construction 47 (Lincoln) 48 Payable from General Obligation Bonds 49 Priority 1 $ 150,000 50 Priority 5 $ 1,096,586 51 Total $ 1,246,586 Page 73 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/M45CHURCH POINT 2(573023)Street and Drainage Improvements, Planning and 3 Construction 4 (Acadia) 5 Payable from General Obligation Bonds 6 Priority 1 $ 548,000 7(573763)Sewer System Improvements, Planning and Construction 8 (Acadia) 9 Payable from General Obligation Bonds 10 Priority 1 $ 54,341 1150/M50COLFAX 12(572498)Street Improvements, Planning and Construction 13 (Grant) 14 Payable from General Obligation Bonds 15 Priority 1 $ 762,000 16 Priority 5 $ 1,250,000 17 Total $ 2,012,000 1850/M54COTTON VALLEY 19(573764)Sewerage System Improvements, Planning and Construction 20 (Webster) 21 Payable from General Obligation Bonds 22 Priority 1 $ 1,189,000 2350/M57COVINGTON 24(573214)Downtown Historic District Overlays, Planning and 25 Construction 26 (St. Tammany) 27 Payable from General Obligation Bonds 28 Priority 1 $ 80,000 29 Priority 5 $ 640,000 30 Total $ 720,000 31(573216)Covington Wastewater Treatment Plant, Planning and 32 Construction 33 (St. Tammany) 34 Payable from General Obligation Bonds 35 Priority 1 $ 56,850 3650/M58CROWLEY 37(573765)Renovation and Repairs to Rice Festival Building, 38 Including the Repair or Replacement of the Roof, 39 Planning and Construction 40 (Acadia) 41 Payable from General Obligation Bonds 42 Priority 1 $ 219,650 43(573766)Installation of Comminutor for the City of Crowley 44 Main Sewerage Pump Station, Planning and Construction 45 (Acadia) 46 Payable from General Obligation Bonds 47 Priority 1 $ 225,181 Page 74 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/M61DELHI 2(572423)Sapa Drive Extension, Planning and Construction 3 (Richland) 4 Payable from General Obligation Bonds 5 Priority 1 $ 443,300 6 Priority 5 $ 1,556,700 7 Total $ 2,000,000 850/M65DERIDDER 9(571889)Wastewater Treatment Plant Improvements, 10 Planning and Construction 11 (Beauregard) 12 Payable from General Obligation Bonds 13 Priority 5 $ 900,000 14(571891)Disposal Facility, Planning and Construction 15 (Beauregard) 16 Payable from General Obligation Bonds 17 Priority 5 $ 750,000 1850/M68DONALDSONVILLE 19(572623)Natural Gas System Infrastructure Improvement 20 Phase III, Planning and Construction 21 (Ascension) 22 Payable from General Obligation Bonds 23 Priority 1 $ 1,100,000 24(572624)Lala Regira Field Renovations, Planning and Construction 25 (Ascension) 26 Payable from General Obligation Bonds 27 Priority 1 $ 300,000 28(572625)Natural Gas System Infrastructure Improvements, 29 Phase II, Planning and Construction 30 (Ascension) 31 Payable from General Obligation Bonds 32 Priority 1 $ 4,614 33(572721)LA 3127 Connector from Hwy 70 to LA 1, Planning 34 and Construction 35 (Ascension) 36 Payable from General Obligation Bonds 37 Priority 5 $ 7,000,000 3850/M70DOYLINE 39(573767)Village of Doyline Wastewater Treatment Facility Upgrades 40 (Webster) 41 Payable from General Obligation Bonds 42 Priority 1 $ 13,000 4350/M74DUSON 44(571740)LA Highway 95 Roundabout, Planning and Construction 45 (Acadia) 46 Payable from General Obligation Bonds 47 Priority 1 $ 2,595,378 Page 75 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/M83EUNICE 2(572869)Renovations to City Hall/Police Department, 3 Planning and Construction 4 (St. Landry) 5 Payable from General Obligation Bonds 6 Priority 5 $ 990,000 7(573533)Sewer Collection System Rehabilitation, 8 Planning and Construction 9 (St. Landry) 10 Payable from General Obligation Bonds 11 Priority 5 $ 1,035,000 1250/M84EVERGREEN 13(572328)Evergreen Water System Improvements 14 (Avoyelles) 15 Payable from General Obligation Bonds 16 Priority 1 $ 897,470 1750/M85FARMERVILLE 18(572988)Lake D'Arbonne Mega Ramp, Planning and Construction 19 (Union) 20 Payable from General Obligation Bonds 21 Priority 5 $ 4,185,000 2250/M87FERRIDAY 23(572884)Town of Ferriday Auditorium, Planning and Construction 24 (Concordia) 25 Payable from General Obligation Bonds 26 Priority 1 $ 700,000 27 Priority 5 $18,800,000 28 Total $19,500,000 29(572885)Water Renovations, Planning and Construction 30 (Concordia) 31 Payable from General Obligation Bonds 32 Priority 1 $ 298,987 33 Priority 5 $ 3,000,000 34 Total $ 3,298,987 3550/M89FLORIEN 36(573484)Village of Florien Town Hall, Planning and Construction 37 (Sabine) 38 Payable from General Obligation Bonds 39 Priority 1 $ 385,505 4050/M91FORDOCHE 41(572150)Water Storage Improvements, Planning and Construction 42 (Pointe Coupee) 43 Payable from General Obligation Bonds 44 Priority 1 $ 1,535,000 45 Payable from State General Fund (Direct) Non-Recurring 46 Revenues $ 162,000 47 Total $ 1,697,000 Page 76 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572151)Water Distribution System Improvements, Planning and 2 Construction 3 (Pointe Coupee) 4 Payable from General Obligation Bonds 5 Priority 1 $ 3,558,170 6 Payable from State General Fund (Direct) Non-Recurring 7 Revenues $ 380,000 8 Total $ 3,938,170 950/M94FRANKLIN 10(572225)Cayce Street Repairs, Planning and Construction 11 (St. Mary) 12 Payable from General Obligation Bonds 13 Priority 1 $ 2,054,310 1450/MA3GOLDEN MEADOW 15(572383)Upgrade to North Sewerage Treatment Plant, Planning and 16 Construction 17 (Lafourche) 18 Payable from General Obligation Bonds 19 Priority 1 $ 163,940 2050/MA5GONZALES 21(572998)Connector Road for City of Gonzales Hospital District, 22 Planning and Construction 23 (Ascension) 24 Payable from General Obligation Bonds 25 Priority 1 $ 237,208 26 Priority 5 $ 2,505,000 27 Total $ 2,742,208 28(573671)Veteran's Ave. to Commerce Ave. Connector Road, Planning 29 and Construction 30 (Ascension) 31 Payable from General Obligation Bonds 32 Priority 1 $ 30,942 3350/MA6GRAMBLING 34(572252)Wastewater System Expansion, Planning and Construction 35 (Lincoln) 36 Payable from General Obligation Bonds 37 Priority 5 $ 2,000,000 38(572255)Water Distribution System Replacement, Planning and 39 Construction 40 (Lincoln) 41 Payable from General Obligation Bonds 42 Priority 5 $ 1,000,000 43(573139)Community Center Expansion, Planning and Construction 44 (Lincoln) 45 Payable from General Obligation Bonds 46 Priority 1 $ 286,500 Page 77 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/MB1GRAND ISLE 2(573672)Historic Recreation Center/Community Center, Planning 3 and Construction 4 (Jefferson) 5 Payable from General Obligation Bonds 6 Priority 1 $ 17,000 750/MB5GRETNA 8(573541)City Hall Exterior and Interior Renovation 9 (Jefferson) 10 Payable from General Obligation Bonds 11 Priority 1 $ 1,277,500 12 Priority 5 $ 1,500,000 13 Total $ 2,777,500 14(573543)Downtown Drainage Improvements, Planning and 15 Construction 16 (Jefferson) 17 Payable from General Obligation Bonds 18 Priority 5 $ 1,000,000 1950/MB9HAMMOND 20(573050)Historic Downtown Hammond Lighting Project, 21 Planning and Construction 22 (Tangipahoa) 23 Payable from General Obligation Bonds 24 Priority 5 $ 540,000 25(573055)Land Clearing and Wetlands Mitigation for the 26 Hammond Airport, Planning and Construction 27 (Tangipahoa) 28 Payable from General Obligation Bonds 29 Priority 5 $ 400,000 30(573676)Roadside Drainage Improvements, Planning and 31 Construction 32 (Tangipahoa) 33 Payable from General Obligation Bonds 34 Priority 1 $ 225,000 3550/MC1HARAHAN 36(573821)Emergency Sewer Collection and Treatment System 37 Overhaul, Planning and Construction 38 (Jefferson) 39 Payable from General Obligation Bonds 40 Priority 5 $ 1,000,000 4150/MC4HAYNESVILLE 42(572300)Town of Haynesville Street Improvements, Planning and 43 Construction 44 (Claiborne) 45 Payable from General Obligation Bonds 46 Priority 1 $ 50,000 47 Priority 5 $ 300,000 48 Total $ 350,000 Page 78 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572301)Water Distribution System Improvements, Planning and 2 Construction 3 (Claiborne) 4 Payable from General Obligation Bonds 5 Priority 5 $ 855,000 650/MC6HENDERSON 7(573825)Sewer System Improvements, Planning and Construction 8 (St. Martin) 9 Payable from General Obligation Bonds 10 Priority 5 $ 3,000,000 1150/MC7HESSMER 12(573285)Water System Improvements, Planning and 13 Construction 14 (Avoyelles) 15 Payable from General Obligation Bonds 16 Priority 5 $ 860,000 1750/MC9HOMER 18(573494)Town Hall Renovations, Planning and Construction 19 (Claiborne) 20 Payable from General Obligation Bonds 21 Priority 1 $ 796,404 22(573495)Street Improvement Project, Planning and Construction 23 (Claiborne) 24 Payable from General Obligation Bonds 25 Priority 1 $ 600,000 26(573496)Wastewater Collection System Inflow 27 and Infiltration (I&I), Planning and Construction 28 (Claiborne) 29 Payable from General Obligation Bonds 30 Priority 5 $ 5,220,000 31(573502)Wastewater Treatment Plant, 32 Planning and Construction 33 (Claiborne) 34 Payable from General Obligation Bonds 35 Priority 5 $ 360,000 3650/MD1HORNBECK 37(573678)West Side Water System Expansion, Planning and 38 Construction 39 (Sabine, Vernon) 40 Payable from General Obligation Bonds 41 Priority 1 $ 74,903 4250/MD4IDA 43(573683)Water System Improvements, Water Wells, Tanks, 44 and Booster Stations Construction, Planning and 45 Construction 46 (Caddo) 47 Payable from General Obligation Bonds 48 Priority 1 $ 42,435 49 Priority 5 $ 1,050,000 50 Total $ 1,092,435 Page 79 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/MD5 INDEPENDENCE 2(573151)Water Line Replacement, Planning and Construction 3 (Tangipahoa) 4 Payable from General Obligation Bonds 5 Priority 5 $ 120,000 650/MD6IOTA 7(573025)Street Improvements, Planning and Construction 8 (Acadia) 9 Payable from General Obligation Bonds 10 Priority 5 $ 1,625,000 11(573026)Belt Press System for Sanitary Sewerage Sludge 12 Treatment, Planning and Construction 13 (Acadia) 14 Payable from General Obligation Bonds 15 Priority 5 $ 1,680,000 1650/ME1JEAN LAFITTE 17(573508)Lafitte Wetlands Museum Addition, including 18 Exhibits, Planning and Construction 19 (Jefferson) 20 Payable from the balance of State General Fund (Direct) 21 previously allocated under the authority of Act 485 of 22 2021 for St. Martin Economic Development Authority, 23 North Business Park, Planning and Construction 24 (St. Martin) $ 220,000 25 Payable from the Capital Outlay Savings Fund $ 1,000,000 26 Total $ 1,220,000 27(573509)Amphitheater Stage, Planning and Construction 28 (Jefferson) 29 Payable from General Obligation Bonds 30 Priority 5 $ 400,000 3150/ME2JEANERETTE 32(573644)Water System Improvements, Planning and Construction 33 (Iberia) 34 Payable from General Obligation Bonds 35 Priority 5 $ 575,000 36(573645)Sewer System Improvements, Planning and Construction 37 (Iberia) 38 Payable from General Obligation Bonds 39 Priority 5 $ 3,320,000 40(573646)City Hall Renovations, Planning and Construction 41 (Iberia) 42 Payable from General Obligation Bonds 43 Priority 5 $ 370,000 4450/ME5JONESBORO 45(573413)Garrett & Maxwell Lift Stations Rehabilitation, Planning 46 and Construction 47 (Jackson) 48 Payable from State General Fund (Direct) Non-Recurring 49 Revenues $ 300,000 Page 80 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/MF1KENNER 2(571868)Pump to the River Pump Station Phase I, Planning and 3 Construction 4 (Jefferson) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,650,000 7 Priority 5 $15,050,000 8 Total $16,700,000 9(571870)Kenner Fire Department Facility Replacement - New Fire 10 Station, Planning and Construction 11 (Jefferson) 12 Payable from General Obligation Bonds 13 Priority 5 $ 2,000,000 14(571878)New Bridge Over Canal No. 12, Planning and Construction 15 (Jefferson) 16 Payable from General Obligation Bonds 17 Priority 5 $ 1,000,000 18 Payable from State General Fund (Direct) Non-Recurring 19 Revenues $ 145,500 20 Total $ 1,145,500 21(571884)Lincoln Manor Drainage Phase 2, Planning and Construction 22 (Jefferson) 23 Payable from General Obligation Bonds 24 Priority 1 $ 500,000 25(573426)Roosevelt Boulevard Improvements (Airline Drive to 26 West Metairie Ave.), Planning and Construction 27 (Jefferson) 28 Payable from General Obligation Bonds 29 Priority 5 $ 3,730,000 30 Payable from State General Fund (Direct) Non-Recurring 31 Revenues $ 500,000 32 Total $ 4,230,000 33(573690)Lincoln Manor Subdivision Drainage Improvement, 34 including 30th Street Roadway and Drainage Improvements 35 from Loyola Drive to Ohio Street, Planning and 36 Construction 37 (Jefferson) 38 Payable from General Obligation Bonds 39 Priority 1 $ 119,998 4050/MF8LAKE ARTHUR 41(572495)Wastewater Collection System Improvements, Planning 42 and Construction 43 (Jefferson Davis) 44 Payable from General Obligation Bonds 45 Priority 5 $ 990,000 46(573809)Water System Improvements, Planning and Construction 47 (Jefferson Davis) 48 Payable from General Obligation Bonds 49 Priority 5 $ 990,000 Page 81 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(573826)Wastewater Treatment Facility Improvements, Planning 2 and Construction 3 (Jefferson Davis) 4 Payable from General Obligation Bonds 5 Priority 5 $ 1,050,000 650/MF9LAKE CHARLES 7(573034)Relocation of Public Works Campus, Planning and 8 Construction 9 (Calcasieu) 10 Payable from General Obligation Bonds 11 Priority 1 $ 5,000,000 12 Priority 5 $ 4,000,000 13 Total $ 9,000,000 14(573035)Lakefront Development 15 (Calcasieu) 16 Payable from General Obligation Bonds 17 Priority 1 $ 1,925,000 18(573038)Enterprise Boulevard Extension, Planning and Construction 19 (Calcasieu) 20 Payable from General Obligation Bonds 21 Priority 1 $ 350,000 22 Priority 5 $ 3,150,000 23 Total $ 3,500,000 2450/MG3LEESVILLE 25(571910)Fort Johnson Entrance Road Fire Substation, Planning 26 and Construction 27 (Vernon) 28 Payable from General Obligation Bonds 29 Priority 5 $ 972,000 30(571911)Street Rehabilitation and Extension, Planning and 31 Construction 32 (Vernon) 33 Payable from General Obligation Bonds 34 Priority 1 $ 3,433 35 Priority 5 $ 250,000 36 Total $ 253,433 37(571912)City of Leesville, Sanitary Sewer Extension for Fort 38 Johnson formerly Fort Polk Entrance Road, Planning 39 and Construction 40 (Vernon) 41 Payable from General Obligation Bonds 42 Priority 1 $ 2,281,726 43 Priority 5 $ 4,000,000 44 Total $ 6,281,726 4550/MG8LIVONIA 46(572145)Water Well, Planning and Construction 47 (Pointe Coupee) 48 Payable from General Obligation Bonds 49 Priority 1 $ 1,035,000 50 Payable from State General Fund (Direct) Non-Recurring 51 Revenues $ 600,000 52 Total $ 1,635,000 Page 82 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/MH1LOGANSPORT 2(573065)Recreational Improvements, Planning and Construction 3 (DeSoto) 4 Payable from General Obligation Bonds 5 Priority 1 $ 150,000 6 Priority 5 $ 1,150,000 7 Total $ 1,300,000 850/MH6MADISONVILLE 9(572144)Wastewater Collection and Treatment System 10 Improvements, Planning and Construction 11 (St. Tammany) 12 Payable from General Obligation Bonds 13 Priority 5 $ 2,000,000 1450/MH9MANGHAM 15(572179)Mangham Recreation Complex, Planning and Construction 16 (Richland) 17 Payable from General Obligation Bonds 18 Priority 1 $ 520,250 1950/MI3MANY 20(571955)Water Treatment Plant Improvements, Acquisition, 21 Planning and Construction 22 (Sabine) 23 Payable from General Obligation Bonds 24 Priority 5 $ 1,500,000 2550/MI8MAURICE 26(571742)New Village Hall, Planning and Construction 27 (Vermilion) 28 Payable from General Obligation Bonds 29 Priority 1 $ 765,000 30 Priority 5 $ 600,000 31 Total $ 1,365,000 3250/MJ2MERMENTAU 33(573027)Street Improvements, Planning and Construction 34 (Acadia) 35 Payable from General Obligation Bonds 36 Priority 5 $ 435,000 3750/MJ5MINDEN 38(572198)Potable Water Ground Storage Tank, Planning and 39 Construction 40 (Webster) 41 Payable from General Obligation Bonds 42 Priority 1 $ 3,445,100 Page 83 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/MJ6MONROE 2(572124)Booker T. Washington Stormwater System Evaluation 3 and Upgrades, Planning and Construction 4 (Ouachita) 5 Payable from General Obligation Bonds 6 Priority 5 $ 3,030,000 7(572125)I-20 Interchange Improvement and Kansas Garrett 8 Connector, Kansas Lane Connector, Planning and 9 Construction ($1,000,000 Local and $6,000,000 10 Federal Match) 11 (Ouachita) 12 Payable from General Obligation Bonds 13 Priority 1 $22,958,923 14 Priority 5 $11,600,000 15 Total $34,558,923 16(572127)Young's Bayou Watershed Enhancement of 17 Channel Capacity, Planning and Construction 18 (Ouachita) 19 Payable from General Obligation Bonds 20 Priority 1 $ 500,000 21 Priority 5 $10,900,000 22 Total $11,400,000 23(572128)Georgia Street Pump Station, Including Generator 24 and Auxiliary Pumps, Planning, Engineering, 25 Right-of-Way, Utilities and Construction 26 (Ouachita) 27 Payable from General Obligation Bonds 28 Priority 1 $ 2,000,000 29(572129)River Pump Station Water Treatment Plant, Planning and 30 Construction 31 (Ouachita) 32 Payable from General Obligation Bonds 33 Priority 5 $ 300,000 34(572130)Calypso Street Pump Station Rehabilitation, Planning, 35 Engineering, Design, Right-of-Way, Utilities, and 36 Construction 37 (Ouachita) 38 Payable from General Obligation Bonds 39 Priority 1 $ 30,000 40 Priority 5 $ 1,770,000 41 Total $ 1,800,000 4250/MK2MORGAN CITY 43(572794)LA Highway 182 Resurfacing, Planning and 44 Construction 45 (St. Mary) 46 Payable from General Obligation Bonds 47 Priority 5 $ 6,000,000 48 Payable from the Capital Outlay Savings Fund $ 100,000 49 Total $ 6,100,000 Page 84 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572800)LA Highway 70 Resurfacing and Drainage 2 Repairs, Planning and Construction 3 (St. Mary) 4 Payable from General Obligation Bonds 5 Priority 5 $ 5,460,000 6 Payable from the Capital Outlay Savings Fund $ 100,000 7 Total $ 5,560,000 850/MK4MORSE 9(573029)Wastewater Treatment Facility, Planning and Construction 10 (Acadia) 11 Payable from General Obligation Bonds 12 Priority 1 $ 1,350,000 13(573691)Water Tower Improvements, Planning and Construction 14 (Acadia) 15 Payable from General Obligation Bonds 16 Priority 1 $ 29,585 1750/MK9NATCHITOCHES 18(573072)Second Street and Touline Street Concrete Pavement and 19 Replacement, Planning and Construction 20 (Natchitoches) 21 Payable from General Obligation Bonds 22 Priority 5 $ 2,000,000 2350/ML1NEW IBERIA 24(571677)Frontage Road Improvements, Planning and Construction 25 (Iberia) 26 Payable from General Obligation Bonds 27 Priority 1 $ 1,000,000 28(572080)Banks Street Aquatic Center, Planning and Construction 29 (Iberia) 30 Payable from General Obligation Bonds 31 Priority 5 $ 3,750,000 32(572177)Pepperplex Improvements, Planning and Construction 33 (Iberia) 34 Payable from the Capital Outlay Savings Fund $ 1,000,000 35(573693)Ann Street Park, Planning and Construction 36 (Iberia) 37 Payable from General Obligation Bonds 38 Priority 1 $ 300,000 39(573695)City Park and West End Community Centers 40 Improvements, Planning and Construction 41 (Iberia) 42 Payable from General Obligation Bonds 43 Priority 1 $ 262,023 44(573696)Bayou Teche Museum Expansion and George Rodrigue 45 Park 46 (Iberia) 47 Payable from General Obligation Bonds 48 Priority 1 $ 1,354,112 Page 85 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/ML2NEW LLANO 2(573123)Maintenance Building Improvements, Planning and 3 Construction 4 (Vernon) 5 Payable from State General Fund (Direct) Non-Recurring 6 Revenues $ 240,000 750/ML3NEW ORLEANS 8(572361)New Sewerage and Water Board Power Plant, Planning and 9 Construction 10 (Orleans) 11 Payable from General Obligation Bonds 12 Priority 1 $24,446,296 13 Priority 5 $29,000,000 14 Payable from State General Fund (Direct) Non-Recurring 15 Revenues $ 2,500,000 16 Total $55,946,296 17(572362)Old New Orleans VA Building Rehabilitation 18 (Orleans) 19 Payable from General Obligation Bonds 20 Priority 1 $ 1,925,000 21 Priority 5 $ 8,000,000 22 Total $ 9,925,000 23(572363)Lower Ninth Ward Green Infrastructure Project, Planning 24 and Construction 25 (Orleans) 26 Payable from General Obligation Bonds 27 Priority 1 $ 250,000 28 Priority 5 $ 2,650,000 29 Total $ 2,900,000 30(572364)West Bank Park Improvements Including New Soccer 31 and Recreational Facilities, Planning and Construction 32 (Orleans) 33 Payable from General Obligation Bonds 34 Priority 1 $ 3,115,506 35 Priority 5 $11,225,400 36 Total $14,340,906 37Provided, however, that $1,750,000 of the Priority 1 appropriation shall be used to fund the 38George W. Carver Playground Renovations project, and $200,000 of the Priority 1 39appropriation shall be used to fund the Skateboard Park at the West Bank Park project. 40(572366)Monticello Canal Culverts at Airline Highway 41 (Orleans) 42 Payable from General Obligation Bonds 43 Priority 1 $ 1,250,000 44 Priority 5 $ 7,750,000 45 Total $ 9,000,000 46(572368)Dryades Kitchen Incubator, Planning and Construction 47 (Orleans) 48 Payable from General Obligation Bonds 49 Priority 5 $ 350,000 Page 86 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572370)West Bank Ferry Terminal Renovations, Planning and 2 Construction 3 (Orleans) 4 Payable from General Obligation Bonds 5 Priority 1 $ 300,000 6 Priority 5 $ 300,000 7 Total $ 600,000 8(572371)Richard Lee Playground, Planning and Construction 9 (Orleans) 10 Payable from General Obligation Bonds 11 Priority 1 $ 184,437 12 Priority 5 $ 3,000,000 13 Total $ 3,184,437 1450/ML4NEW ROADS 15(573699)Industrial Park Development Project, Including Underground 16 Electrical System Upgrades, Planning and Construction 17 (Pointe Coupee) 18 Payable from General Obligation Bonds 19 Priority 1 $ 988,000 2050/ML8NORWOOD 21(572138)Sewer Collection and Treatment System Improvements, 22 Planning and Construction 23 (East Feliciana) 24 Payable from General Obligation Bonds 25 Priority 5 $ 1,080,000 2650/MM2OAKDALE 27(572205)Oakdale City Hall Renovations, Roof, and Reconstruction 28 (Allen) 29 Payable from General Obligation Bonds 30 Priority 1 $ 19,050 3150/MM4OIL CITY 32(573814)Water Treatment Plant, Transmission Main, and Distribution 33 System Improvements, Planning and Construction 34 (Caddo) 35 Payable from the balance of State General Fund (Direct) 36 previously allocated under the authority of Act 485 of 37 2021 for St. Martin Economic Development Authority, 38 North Business Park, Planning and Construction 39 (St. Martin) $ 111,000 4050/MM6OPELOUSAS 41(573700)Water Meter Replacement and Upgrades, Planning and 42 Construction 43 (St. Landry) 44 Payable from General Obligation Bonds 45 Priority 1 $ 405,582 46(573703)Opelousas Street and Drainage Improvements 47 (St. Landry) 48 Payable from General Obligation Bonds 49 Priority 1 $ 2,250,000 50 Priority 5 $ 1,000,000 51 Total $ 3,250,000 Page 87 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/MM9PATTERSON 2(573615)Replacement of Water and Gas Meters in Patterson, Planning 3 and Construction 4 (St. Mary) 5 Payable from General Obligation Bonds 6 Priority 1 $ 439,300 750/MN3PINEVILLE 8(572187)Consolidated Municipal and Court Complex, Planning 9 and Construction 10 (Rapides) 11 Payable from General Obligation Bonds 12 Priority 5 $11,090,000 13(573704)Cedar Lake Pump Station Reconstruction, Design, Planning 14 and Construction 15 (Rapides) 16 Payable from General Obligation Bonds 17 Priority 5 $ 585,000 1850/MO1PONCHATOULA 19(573563)Fire Station Complex US 51 - Veterans Avenue, Land 20 Acquisition, Planning and Construction 21 (Tangipahoa) 22 Payable from General Obligation Bonds 23 Priority 1 $ 1,075,000 24 Priority 5 $ 800,000 25 Total $ 1,875,000 2650/MO2PORT ALLEN 27(573099)Street and Drainage Improvements, Planning and 28 Construction 29 (West Baton Rouge) 30 Payable from General Obligation Bonds 31 Priority 1 $ 80,000 32 Priority 5 $ 3,520,000 33 Total $ 3,600,000 3450/MO6PROVENCAL 35(572002)New Water Well and Emergency Water Connection, 36 Planning and Construction 37 (Natchitoches) 38 Payable from General Obligation Bonds 39 Priority 5 $ 600,000 4050/MO8RAYNE 41(573706)Martin Luther King Community Center 42 Improvements, Planning and Construction 43 (Acadia) 44 Payable from General Obligation Bonds 45 Priority 1 $ 21,721 Page 88 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/MO9RAYVILLE 2(572197)Wastewater Transport and Treatment Facilities for 3 Economic Development 4 (Richland) 5 Payable from General Obligation Bonds 6 Priority 1 $ 3,500,000 7Provided, however, that this appropriation is used for the extension of sewer lines south 8along Highway 425. 9(572726)Municipal Complex, Planning and Construction 10 (Richland) 11 Payable from General Obligation Bonds 12 Priority 5 $ 5,000,000 13(573109)Water Service Facilities for Economic Development, 14 Planning and Construction 15 (Richland) 16 Payable from General Obligation Bonds 17 Priority 1 $ 394,570 18 Priority 5 $ 8,022,300 19 Total $ 8,416,870 2050/MP3RICHWOOD 21(573708)Municipal Complex, Planning and Construction 22 (Ouachita) 23 Payable from General Obligation Bonds 24 Priority 1 $ 150,000 25 Priority 5 $ 3,400,000 26 Total $ 3,550,000 2750/MP8ROSEDALE 28(573714)New Rosedale Fire Station, Planning and Construction 29 (Iberville) 30 Payable from General Obligation Bonds 31 Priority 1 $ 28,033 3250/MQ1ROSEPINE 33(572237)Rehabilitation of Main Street, Planning and Construction 34 (Vernon) 35 Payable from General Obligation Bonds 36 Priority 5 $ 450,000 37 Payable from State General Fund (Direct) Non-Recurring 38 Revenues $ 450,000 39 Total $ 900,000 4050/MQ2RUSTON 41(572723)East Kentucky/Cedar Creek Road Intersection 42 Improvements, Planning and Construction 43 (Lincoln) 44 Payable from General Obligation Bonds 45 Priority 1 $ 200,000 46 Priority 5 $ 1,060,000 47 Total $ 1,260,000 Page 89 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572724)New Road from Highway 150 to I-20 South Frontage 2 Road, Planning and Construction 3 (Lincoln) 4 Payable from General Obligation Bonds 5 Priority 1 $ 815,718 6 Priority 5 $ 1,000,000 7 Total $ 1,815,718 850/MQ3ST. FRANCISVILLE 9(572134)Water Meter Upgrades, Planning and Construction 10 (West Feliciana) 11 Payable from General Obligation Bonds 12 Priority 5 $ 804,000 13(572135)Commerce Street Improvements and Utilities 14 Relocation, Planning and Construction 15 (West Feliciana) 16 Payable from General Obligation Bonds 17 Priority 5 $ 2,100,000 18(572136)Emergency Erosion Repairs, Planning and Construction 19 (West Feliciana) 20 Payable from General Obligation Bonds 21 Priority 1 $ 3,251,750 2250/MQ4ST. JOSEPH 23(572258)St. Joseph's Community House, Planning and Construction 24 (Tensas) 25 Payable from General Obligation Bonds 26 Priority 5 $ 690,000 2750/MQ5ST. MARTINVILLE 28(572307)Main Street Enhancement Project, Planning and Construction 29 (St. Martin) 30 Payable from General Obligation Bonds 31 Priority 1 $ 1,450,000 32(573716)Water Drainage Project, Planning and Construction 33 (St. Martin) 34 Payable from General Obligation Bonds 35 Priority 1 $ 200,000 3650/MQ8SCOTT 37(572881)Roundabout at Exit 97 Westbound, Planning, Construction, 38 and Land Acquisition 39 (Lafayette) 40 Payable from General Obligation Bonds 41 Priority 5 $ 3,600,000 42(572886)Eraste Landry Road Extension, Planning and Construction 43 (Lafayette) 44 Payable from General Obligation Bonds 45 Priority 1 $ 415,000 46 Priority 5 $ 8,592,000 47 Total $ 9,007,000 Page 90 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572888)LA 93 Roadway Improvements- I-10 Ramp to Renaud 2 Drive, Planning, Construction, and Land Acquisition 3 (Lafayette) 4 Payable from General Obligation Bonds 5 Priority 1 $ 2,800,000 6 Priority 5 $ 695,000 7 Total $ 3,495,000 8(572889)Roundabout at LA 93 and Renaud Drive, Planning, 9 Construction, and Land Acquisition 10 (Lafayette) 11 Payable from General Obligation Bonds 12 Priority 5 $ 3,050,000 13(572891)Water and Sewer Line Installation along Apollo Road 14 Extension, including Utilities, Planning and Construction 15 (Lafayette) 16 Payable from General Obligation Bonds 17 Priority 1 $ 1,238,750 18 Priority 5 $ 1,890,000 19 Payable from the Capital Outlay Savings Fund $ 900,000 20 Payable from State General Fund (Direct) Non-Recurring 21 Revenues $ 830,000 22 Total $ 4,858,750 2350/MR1SHREVEPORT 24(572780)Shreveport Healthcare and Development Corridor, 25 Planning and Construction 26 (Caddo) 27 Payable from General Obligation Bonds 28 Priority 5 $40,000,000 29(572783)C.C. Antoine Museum and Arts Center, Planning and 30 Construction ($64,000 Local Match) 31 (Caddo) 32 Payable from General Obligation Bonds 33 Priority 1 $ 425,000 34 Priority 5 $ 100,000 35 Total $ 525,000 36(572785)C.C. Antoine Park, Planning and Construction 37 (Caddo) 38 Payable from General Obligation Bonds 39 Priority 1 $ 1,855,039 40 Priority 5 $ 350,000 41 Total $ 2,205,039 42(572787)Valencia Park Spray Park, Planning and Construction 43 (Caddo) 44 Payable from General Obligation Bonds 45 Priority 1 $ 71,625 46(572788)Greenwood Road Extension, (Greenwood Industrial 47 Park Road - Asphalt Road), Planning and Construction 48 (Caddo) 49 Payable from General Obligation Bonds 50 Priority 1 $ 120,000 51 Priority 5 $ 2,000,000 52 Total $ 2,120,000 Page 91 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/MR6SIMPSON 2(573732)Rehabilitation of Various Roads, Planning and Construction 3 (Vernon) 4 Payable from General Obligation Bonds 5 Priority 1 $ 35,000 650/MR8SLAUGHTER 7(572120)Water System Improvements, Planning and Construction 8 (East Feliciana) 9 Payable from General Obligation Bonds 10 Priority 5 $ 1,000,000 1150/MR9SLIDELL 12(573515)Replace Sewer Force Main, Lindberg PS 13 to WWTP, Planning and Construction 14 (St. Tammany) 15 Payable from General Obligation Bonds 16 Priority 5 $ 3,000,000 1750/MS4SPRINGFIELD 18(572118)Water System Improvements and Upgrades, Planning and 19 Construction 20 (Livingston) 21 Payable from General Obligation Bonds 22 Priority 5 $ 1,547,400 2350/MS5SPRINGHILL 24(572100)Water System Improvements - Phase 3, Planning and 25 Construction 26 (Webster) 27 Payable from General Obligation Bonds 28 Priority 5 $ 5,700,000 29(572101)Wastewater Treatment Plant Rehabilitation, Planning and 30 Construction 31 (Webster) 32 Payable from General Obligation Bonds 33 Priority 1 $ 1,200,000 3450/MS9SULPHUR 35(572003)Maplewood Drive Rehabilitation 36 (Calcasieu) 37 Payable from General Obligation Bonds 38 Priority 1 $ 5,522,383 39 Priority 5 $ 4,137,500 40 Total $ 9,659,883 41(572004)Maplewood Pump Station, Planning and Construction 42 (Calcasieu) 43 Payable from General Obligation Bonds 44 Priority 5 $ 1,075,000 Page 92 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/MT1SUN 2(573733)Roof Replacement of Town Hall Building 3 (St. Tammany) 4 Payable from General Obligation Bonds 5 Priority 1 $ 200,000 650/MT2SUNSET 7(573734)Sunset Police and Fire Emergency Facility, Planning and 8 Construction 9 (St. Landry) 10 Payable from General Obligation Bonds 11 Priority 1 $ 400,000 1250/MT3TALLULAH 13(573110)Emergency Water Production, Transmission and 14 Treatment, Acquisition, Planning and Construction 15 (Madison) 16 Payable from General Obligation Bonds 17 Priority 1 $ 121,150 1850/MT5THIBODAUX 19(573386)Replacement of Canal Boulevard Bridges and Construction 20 of Menard Pedestrian Bike Trail, Planning and Construction 21 (Lafourche) 22 Payable from General Obligation Bonds 23 Priority 1 $ 1,932,500 24 Priority 5 $ 4,400,000 25 Total $ 6,332,500 26(573387)LA 648/Acadia Road Intersection Improvements 27 Project, Planning and Construction 28 (Lafourche) 29 Payable from General Obligation Bonds 30 Priority 5 $ 3,000,000 3150/MU2VIDALIA 32(572000)Utility System Upgrade, Planning, Acquisition, Construction 33 and Equipment 34 (Concordia) 35 Payable from General Obligation Bonds 36 Priority 1 $ 9,823,217 37 Priority 5 $ 7,000,000 38 Total $16,823,217 39(572001)Development of a Slackwater Port on the Mississippi 40 River, Planning and Construction 41 (Concordia) 42 Payable from General Obligation Bonds 43 Priority 1 $ 4,142,583 4450/MU4VILLE PLATTE 45(572909)New Fire Station, Planning and Construction 46 (Evangeline) 47 Payable from General Obligation Bonds 48 Priority 5 $ 2,320,000 Page 93 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572911)Ville Platte Evangeline Recreational District 2 (Evangeline) 3 Payable from General Obligation Bonds 4 Priority 1 $ 855,000 5 Priority 5 $ 885,000 6 Total $ 1,740,000 7(573735)Infrastructure Improvements, Planning and Construction 8 (Evangeline) 9 Payable from General Obligation Bonds 10 Priority 1 $ 160,887 1150/MU5VINTON 12(572360)Water Plant Improvements, Planning and 13 Construction 14 (Calcasieu) 15 Payable from General Obligation Bonds 16 Priority 5 $ 1,800,000 1750/MU6VIVIAN 18(573736)Water and Wastewater System Improvements and 19 Extension, Planning and Construction 20 (Caddo) 21 Payable from General Obligation Bonds 22 Priority 1 $ 240,164 2350/MV1WELSH 24(571949)Frontage Road Extension, Planning and Construction 25 (Jefferson Davis) 26 Payable from General Obligation Bonds 27 Priority 1 $ 500,000 28 Priority 5 $ 1,645,000 29 Total $ 2,145,000 3050/MV2WEST MONROE 31(571899)Sunshine Heights Drainage Improvements, Planning 32 and Construction 33 (Ouachita) 34 Payable from General Obligation Bonds 35 Priority 1 $ 1,375,000 36 Payable from the Capital Outlay Savings Fund $ 1,375,000 37 Total $ 2,750,000 38(571900)Cotton Street Improvements and 39 Sidewalks, Planning and Construction 40 (Ouachita) 41 Payable from General Obligation Bonds 42 Priority 5 $ 1,350,000 43(572611)Mid-City Drainage Improvements, Planning and 44 Construction 45 (Ouachita) 46 Payable from General Obligation Bonds 47 Priority 1 $ 1,000,000 48 Priority 5 $ 4,000,000 49 Total $ 5,000,000 Page 94 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/MV3WESTLAKE 2(573737)Compressed Natural Gas Fueling Station, Planning and 3 Construction 4 (Calcasieu) 5 Payable from General Obligation Bonds 6 Priority 1 $ 470,000 7 Priority 5 $ 1,600,000 8 Total $ 2,070,000 950/MV4WESTWEGO 10(572539)The WHARF, Planning, Construction, and Site Preparation 11 (Jefferson) 12 Payable from General Obligation Bonds 13 Priority 1 $ 3,800,493 14 Priority 5 $ 2,200,000 15 Total $ 6,000,493 16(572542)Water Tower, Line and Improvements, Water 17 Meter Replacement, Planning and Construction 18 (Jefferson) 19 Payable from General Obligation Bonds 20 Priority 1 $ 225 21 Priority 5 $ 1,000,000 22 Total $ 1,000,225 23(572543)Park Land and Improvements, Including Improvements 24 to Existing Parks and Land Acquisition, Planning and 25 Construction 26 (Jefferson) 27 Payable from General Obligation Bonds 28 Priority 1 $ 489,702 29 Priority 5 $ 1,000,000 30 Total $ 1,489,702 31(572544)Sala Avenue Street and Infrastructure Improvements 32 (Jefferson) 33 Payable from General Obligation Bonds 34 Priority 1 $ 208,300 35 Priority 5 $ 850,000 36 Total $ 1,058,300 37(572545)Emergency Preparedness Building, Planning and 38 Construction 39 (Jefferson) 40 Payable from General Obligation Bonds 41 Priority 1 $ 83,851 42(572548)Riverboat Landing, Phase III, Planning 43 and Construction 44 (Jefferson) 45 Payable from General Obligation Bonds 46 Priority 5 $ 1,205,000 47(572551)Wastewater Treatment Plant Improvements, Planning and 48 Construction 49 (Jefferson) 50 Payable from General Obligation Bonds 51 Priority 5 $ 4,503,500 Page 95 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/MV5WHITE CASTLE 2(573003)Training and Learning Center, Planning and Construction 3 (Iberville) 4 Payable from General Obligation Bonds 5 Priority 5 $ 1,000,000 650/MV7WINNFIELD 7(572251)South Winnfield Drainage Improvements - Phase 1, 8 Planning and Construction 9 (Winn) 10 Payable from General Obligation Bonds 11 Priority 1 $ 71,625 12 Priority 5 $ 600,000 13 Total $ 671,625 1450/MW2YOUNGSVILLE 15(573056)Fortune Road Extension, Planning and Construction 16 (Lafayette) 17 Payable from General Obligation Bonds 18 Priority 1 $ 1,500,000 19(573058)New Fire Station, Planning and Construction 20 (Lafayette) 21 Payable from General Obligation Bonds 22 Priority 5 $ 3,250,000 23(573059)Highway 92 Improvements, Planning and Construction 24 (Lafayette) 25 Payable from General Obligation Bonds 26 Priority 5 $ 5,405,000 27(573060)Chemin Metairie Parkway Widening, Planning and 28 Construction 29 (Lafayette) 30 Payable from General Obligation Bonds 31 Priority 1 $ 2,385,000 32 Priority 5 $ 1,495,000 33 Total $ 3,880,000 34(573061)Highway 92/Prescott Boulevard Roundabout, Design, 35 Planning, and Construction 36 (Lafayette) 37 Payable from General Obligation Bonds 38 Priority 5 $ 2,614,000 39(573062)Wastewater System Improvements, Planning and 40 Construction 41 (Lafayette) 42 Payable from General Obligation Bonds 43 Priority 5 $ 4,500,000 44(573063)Langlinais Road Extension, Planning and Construction 45 (Lafayette) 46 Payable from General Obligation Bonds 47 Priority 5 $ 5,580,000 Page 96 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(573064)Highway 89 Improvements, Planning and Construction 2 (Lafayette) 3 Payable from General Obligation Bonds 4 Priority 1 $ 5,595,000 5 Priority 5 $16,945,515 6 Total $22,540,515 750/MW6ST. GABRIEL 8(573551)City Council Chambers Phase 2, Planning and Construction 9 (Iberville) 10 Payable from General Obligation Bonds 11 Priority 1 $ 1,938,500 12 Priority 5 $ 700,000 13 Total $ 2,638,500 14(573738)City Council Chambers - New Construction 15 (Iberville) 16 Payable from General Obligation Bonds 17 Priority 1 $ 875,899 1850/MW8CENTRAL 19(572814)Central Community School System Multi-Use Activity 20 Center, Recreational Facility, Planning and Construction 21 (East Baton Rouge) 22 Payable from General Obligation Bonds 23 Priority 1 $ 1,200,000 24 Priority 5 $ 9,800,000 25 Total $11,000,000 26(572816)Administration Building 27 (East Baton Rouge) 28 Payable from General Obligation Bonds 29 Priority 1 $ 16,943 30(572817)Wax Road, LA 3034, Extension, 31 Planning and Construction 32 (East Baton Rouge) 33 Payable from General Obligation Bonds 34 Priority 5 $ 1,600,000 3550/N03AUDUBON NATURE INSTITUTE, INC. 36(573089)Audubon Facility Renovations and Improvements: Audubon 37 Zoo, Planning and Construction 38 (Orleans) 39 Payable from General Obligation Bonds 40 Priority 1 $ 9,500,000 41 Priority 5 $ 9,500,000 42 Total $19,000,000 4350/N05NEW ORLEANS EXHIBITION HALL AUTHORITY 44(573512)Property Development Project 45 (Orleans) 46 Payable from General Obligation Bonds 47 Priority 1 $ 500,000 48 Priority 5 $25,000,000 49 Total $25,500,000 Page 97 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/N06STATE FAIR OF LOUISIANA 2(573629)Hirsch Memorial Coliseum and Louisiana State 3 Fairgrounds Improvements Project 4 (Caddo) 5 Payable from General Obligation Bonds 6 Priority 1 $ 273,295 7 Priority 5 $ 3,280,000 8 Total $ 3,553,295 950/N07ST. BERNARD PARISH SHERIFF'S OFFICE 10(573415)St. Bernard Parish SOD Building on LA 47, Planning and 11 Construction 12 (St. Bernard) 13 Payable from General Obligation Bonds 14 Priority 5 $ 2,000,000 1550/N13CHENNAULT INTERNATIONAL AIRP ORT AUTHORITY 16(573806)Firewater Pumphouse #3 and Infrastructure, Planning and 17 Construction 18 (Calcasieu) 19 Payable from General Obligation Bonds 20 Priority 5 $ 6,000,000 2150/N17NEW ORLEANS CAREER CENTER 22(573670)Expanding High Wage, High Demand Career and Technical 23 Training, Planning and Construction 24 (Orleans) 25 Payable from General Obligation Bonds 26 Priority 1 $ 1,000,000 27 Priority 5 $ 2,000,000 28 Total $ 3,000,000 2950/N18IBERIA PARISH AIRPORT AUTHORITY 30(572422)Acadiana Regional Airport Improvements, Planning and 31 Construction 32 (Iberia) 33 Payable from General Obligation Bonds 34 Priority 1 $ 7,150,000 35 Priority 5 $33,000,000 36 Total $40,150,000 37(573176)Rehabilitation of Hangar #88 and Associated Parking 38 Lot, Planning and Construction 39 (Iberia) 40 Payable from General Obligation Bonds 41 Priority 1 $ 900,000 4250/N19PAUL S. MORTON SCHOLARSHIP FOUNDATION 43(573679)Paul S. Morton Scholarship Foundation Greater Works 44 Family Life Center, Planning and Construction 45 (Orleans) 46 Payable from General Obligation Bonds 47 Priority 5 $ 6,200,000 Page 98 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/N33ENGLAND ECONOMIC & INDUSTRIAL DEVELOPMENT DISTRICT 2(572921)High Bay Aircraft Maintenance Hangar, Planning and 3 Construction 4 (Rapides) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,713,915 7 Priority 5 $15,425,000 8 Total $17,138,915 950/N34ODYSSEY HOUSE LOUISIANA, INC. 10(572792)Odyssey House Louisiana Renovation Project, Planning 11 and Construction 12 (Orleans) 13 Payable from General Obligation Bonds 14 Priority 1 $ 6,614,300 15(572793)Odyssey House Louisiana Gambling Treatment 16 Center, Planning and Construction 17 (Orleans) 18 Payable from General Obligation Bonds 19 Priority 5 $ 5,000,000 2050/N36WALKER COMMUNITY RESOURCE AND RECREATION CENTER 21(573776)Walker Community Resource and Recreation Center, Planning 22 and Construction 23 (Lafayette) 24 Payable from General Obligation Bonds 25 Priority 5 $ 750,000 2650/N40LAFAYETTE ECONOMIC DEVELOP MENT AUTHORITY 27(573373)Lafayette Innovation Center, Planning and Construction 28 (Lafayette) 29 Payable from General Obligation Bonds 30 Priority 1 $ 3,179,679 3150/N41BATON ROUGE METROPOLITAN AIRPORT 32(573170)Airport Aviation Business Park, Planning and Construction 33 (East Baton Rouge) 34 Payable from General Obligation Bonds 35 Priority 1 $ 2,661,361 36 Priority 5 $ 4,750,000 37 Total $ 7,411,361 3850/N52LAFAYETTE PARISH SHERIFF'S OFFICE 39(572379)Range Upgrades, Planning and Construction 40 (Lafayette) 41 Payable from General Obligation Bonds 42 Priority 5 $ 2,565,000 43(572380)Fitness Center, Planning and Construction 44 (Lafayette) 45 Payable from General Obligation Bonds 46 Priority 1 $ 2,010,000 Page 99 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1(572381)Crime Scene and Evidence Storage, Planning and 2 Construction 3 (Lafayette) 4 Payable from General Obligation Bonds 5 Priority 1 $ 2,485,000 6(572382)Law Enforcement Center, Planning and Construction 7 (Lafayette) 8 Payable from General Obligation Bonds 9 Priority 5 $46,500,000 1050/N53ORLEANS PARISH COMMUNICATIONS DISTRICT 11(572016)Orleans Parish Communications District Expansion 12 Project, Planning and Construction 13 (Orleans) 14 Payable from General Obligation Bonds 15 Priority 5 $33,600,000 1650/N71NORTH LAFOURCHE CONSERVATION, LEVEE AND DRAINAG E 17 DISTRICT 18(573084)Raceland Prairie Levee Improvements, Planning and Construction 19 (Lafourche) 20 Payable from General Obligation Bonds 21 Priority 1 $ 1,225,000 22 Priority 5 $ 2,750,000 23 Total $ 3,975,000 2450/N72RIVER ROAD AFRICAN AMERICAN MUSEUM 25(573681)River Road African American Museum, Planning and 26 Construction 27 (Ascension) 28 Payable from General Obligation Bonds 29 Priority 5 $ 1,000,000 3050/N74NATIONAL WORLD WAR II MUSEUM, INC. 31(572801)Eight Projects under FP&C Management Plus Liberation 32 Pavilion: Bricks and Mortar, Exhibit Fabrication, Media 33 Production, Planning and Construction 34 (Orleans) 35 Payable from General Obligation Bonds 36 Priority 1 $17,889,647 37 Priority 5 $12,300,000 38 Total $30,189,647 3950/N79TANGIPAHOA PARISH FIRE DISTRICT 1 40(572356)Bruce Cutrer Regional Fire Training Facility of Tangipahoa 41 Parish, Planning and Construction 42 (Tangipahoa) 43 Payable from General Obligation Bonds 44 Priority 1 $ 132,160 45 Priority 5 $ 2,000,000 46 Total $ 2,132,160 Page 100 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/N99AMITE RIVER BASIN COMMISSION 2(573569)Upper Amite River Flood Risk Reduction and 3 Restoration, Planning and Construction 4 (East Baton Rouge, East Feliciana, Livingston, St. Helena) 5 Payable from General Obligation Bonds 6 Priority 5 $65,000,000 7 Payable from State General Fund (Direct) Non-Recurring 8 Revenues $ 2,000,000 9 Total $67,000,000 1050/NA2LAFAYETTE AIRPORT COMMISSION 11(573682)Construction of a New Passenger Facility Terminal and 12 Associated Infrastructure at Lafayette Regional Airport 13 (Lafayette) 14 Payable from General Obligation Bonds 15 Priority 1 $ 173,105 1650/NAAPOINTE COUPEE COUNCIL ON AGING 17(572012)Senior Center, Planning and Construction 18 (Pointe Coupee) 19 Payable from General Obligation Bonds 20 Priority 1 $ 2,315,400 2150/NADMU ZETA FOUNDATION, INC. 22(573684)Expansion Project, Planning and Construction 23 (East Baton Rouge) 24 Payable from General Obligation Bonds 25 Priority 1 $ 179,765 2650/NAJEFFORTS OF GRACE, INC. 27(573449)Ashe Too, Planning and Construction 28 (Orleans) 29 Payable from General Obligation Bonds 30 Priority 1 $ 1,000,000 3150/NAZHOSPICE OF ACADIANA FOUNDATION, INC. 32(573692)Calcutta House, Planning and Construction 33 (Lafayette) 34 Payable from General Obligation Bonds 35 Priority 1 $ 249,795 36 Priority 5 $ 600,000 37 Total $ 849,795 3850/NB1CENTER FOR INNOVATIVE TRAINING OF YOUTH 39(573807)STEM NOLA's Innovation Hub, Planning and Construction 40 (Orleans) 41 Payable from General Obligation Bonds 42 Priority 5 $ 8,600,000 Page 101 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/NBCCAPITOL CITY FAMILY HEALTH CENTER, INC. 2(573694)Care South Medical and Dental Expansion, Planning and 3 Construction 4 (East Baton Rouge) 5 Payable from General Obligation Bonds 6 Priority 1 $ 704,765 7 Priority 5 $ 550,000 8 Total $ 1,254,765 950/NBFCOMMUNITY RECEIVING HOME, INC. 10(572189)Rapides Parish Juvenile Justice Complex, Planning and 11 Construction 12 (Rapides) 13 Payable from General Obligation Bonds 14 Priority 5 $25,300,000 15(573697)Renaissance Home for Youth, New Administrative 16 Building, Renovation of Existing Administrative Building, 17 Roads and Parking Areas, Planning and Construction 18 (Rapides) 19 Payable from General Obligation Bonds 20 Priority 1 $ 29,586 2150/NBJJONESVILLE FIRE DISTRICT 22(572204)New Fire Station at U.S. Hwy 84 and 3rd Street, Planning 23 and Construction 24 (Catahoula) 25 Payable from General Obligation Bonds 26 Priority 5 $ 800,000 2750/NBVCAPITAL AREA GROUND WATER CONSERVATION DISTRICT 28(572917)Water Monitoring System, Planning and Construction 29 (Ascension, East Baton Rouge, East Feliciana, Pointe 30 Coupee, West Baton Rouge, West Feliciana) 31 Payable from General Obligation Bonds 32 Priority 1 $ 965,991 33 Priority 5 $ 1,800,000 34 Total $ 2,765,991 3550/NC2BATON ROUGE RECREATION AND PARKS COMMISSION 36(572737)J.S. Clark Golf Course Renovation in Greenwood Community 37 Park, Planning and Construction 38 (East Baton Rouge) 39 Payable from General Obligation Bonds 40 Priority 1 $ 50,000 41 Priority 5 $ 800,000 42 Total $ 850,000 43(572740)Baker Youth Tournament Ball Fields, Planning and 44 Construction 45 (East Baton Rouge) 46 Payable from General Obligation Bonds 47 Priority 1 $ 65,000 Page 102 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/NCFTECHE ACTION BOARD, INC. 2(573641)Construction and Completion of New Health Center Facility 3 for Teche Action Clinic at Gramercy in Gramercy, 4 LA, Planning and Construction 5 (St. James) 6 Payable from General Obligation Bonds 7 Priority 5 $ 3,700,000 850/NCMFIFTH WARD RECREATION DISTRICT OF ST. HELENA PARISH 9(573527)Recreation District Baseball Fields, Planning and 10 Construction 11 (St. Helena) 12 Payable from General Obligation Bonds 13 Priority 1 $ 950,417 1450/NCNSOUTH TOLEDO BEND WATERWORK S DISTRICT 15(571957)Vaco Road, Prospect Road, and Firesheets Lane, Planning 16 and Construction 17 (Sabine) 18 Payable from General Obligation Bonds 19 Priority 1 $ 25,000 20 Priority 5 $ 200,000 21 Total $ 225,000 2250/NCRLAFAYETTE PARISH WATERWORK S DISTRICT- NORTH 23(572616)Water Filtration Plant Construction 24 (Lafayette) 25 Payable from General Obligation Bonds 26 Priority 5 $ 8,000,000 2750/ND5LAFOURCHE PARISH WATER DISTRICT 28(573698)Kraemer Water Line Upgrades, Planning and Construction 29 (Lafourche) 30 Payable from General Obligation Bonds 31 Priority 1 $ 100,000 32 Priority 5 $ 1,500,000 33 Total $ 1,600,000 3450/ND9NORTHEAST LOUISIANA CHILDREN'S MUSEUM 35(572618)Northeast Louisiana Children's Museum Relocation, Planning 36 and Construction 37 (Ouachita) 38 Payable from General Obligation Bonds 39 Priority 5 $10,000,000 4050/NDNOPPORTUNITIES INDUSTRIALIZ ATION CENTER 41 INCORPORATED OF OUACHITA 42(573486)New Education Building, Planning and Construction 43 (Ouachita) 44 Payable from General Obligation Bonds 45 Priority 1 $ 386,775 46 Priority 5 $ 1,845,000 47 Total $ 2,231,775 Page 103 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/NDQTANGIPAHOA AFRICAN AMERICAN HERITAG E 2 MUSEUM AND VETERANS' ARCHIVES 3(573730)Tangipahoa African American Heritage Museum Roof 4 Replacement, Planning and Construction 5 (Tangipahoa) 6 Payable from General Obligation Bonds 7 Priority 5 $ 540,000 850/NDXNEW ORLEANS COUNCIL ON AG ING, INC. 9(572515)New Orleans Council on Aging Office and Senior Community 10 Center, Planning, Purchase, and Renovation of a Building 11 and/or Acquire Land and Construct a New Building 12 (Orleans) 13 Payable from General Obligation Bonds 14 Priority 1 $ 4,998,358 1550/NDYJEFFERSON DAVIS WATER AND SEWER 16 DISTRICT COMMISSION #1 17(571909)Water System Improvements, Planning and Construction 18 (Jefferson Davis) 19 Payable from General Obligation Bonds 20 Priority 1 $ 1,000,000 21 Priority 5 $ 4,200,000 22 Total $ 5,200,000 2350/NEEBIOMEDICAL RESEARCH AND INNOVATION P ARK 24(572674)Biomedical Research and Innovation Park Building, 25 Planning and Construction 26 (Ouachita) 27 Payable from General Obligation Bonds 28 Priority 1 $ 8,599,795 29 Priority 5 $14,900,000 30 Total $23,499,795 3150/NERST. HELENA PARISH HOSPITAL SERVICE DISTRICT NO. 1 32(573701)Hospital Renovation, Expansion, and Equipment 33 Replacement, Planning and Construction 34 (St. Helena) 35 Payable from General Obligation Bonds 36 Priority 1 $ 4,181,045 3750/NEVHOSPITAL SERVICE DISTRICT 1 TERREBONNE P ARISH 38(572904)Emergency Power System Replacement and Upgrade, 39 Planning and Construction 40 (Terrebonne) 41 Payable from General Obligation Bonds 42 Priority 5 $15,800,000 4350/NEYORLEANS PARISH HOSPITAL SERVICE DISTRICT A 44(573636)Parish Hospital Service District for the Parish of Orleans - 45 District A- Obstetrics Service Line Expansion Level 2 46 Unit, Planning and Construction 47 (Orleans) 48 Payable from General Obligation Bonds 49 Priority 1 $ 3,200,000 Page 104 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/NF6ST. MARTIN PARISH SHERIFF'S OFFICE 2(572802)Regional Law Enforcement Training Academy, Planning 3 and Construction 4 (St. Martin) 5 Payable from General Obligation Bonds 6 Priority 1 $ 900,000 750/NFECAJUNDOME 8(572427)Cajundome and Convention Center Indoor Air Quality 9 Improvements, Planning and Construction 10 (Lafayette) 11 Payable from General Obligation Bonds 12 Priority 5 $ 6,364,182 1350/NFXTHE O.W. DILLON TRAINING AND COMMUNITY 14 DEVELOPMENT CENTER, INC. 15(573540)The O.W. Dillon Training and Community Development 16 Center Building, Planning and Construction 17 (Tangipahoa) 18 Payable from General Obligation Bonds 19 Priority 1 $ 1,463,437 20 Priority 5 $ 4,500,000 21 Total $ 5,963,437 2250/NFZOUR LADY OF LOURDES REGIONAL MEDICAL CENTER 23(573442)Our Lady of Lourdes Regional Medical Center, Planning 24 and Construction 25 (Lafayette) 26 Payable from General Obligation Bonds 27 Priority 1 $ 4,500,000 28 Priority 5 $ 8,500,000 29 Total $13,000,000 3050/NG6THE LOUISIANA BLACK HISTORY HALL OF FAME 31(573702)Museum and Cultural Center, Planning and Construction 32 (East Baton Rouge) 33 Payable from General Obligation Bonds 34 Priority 1 $ 1,964,737 3550/NGALINCOLN PARISH FIRE PROTECTION DISTRICT #1 36(573217)Renovations to Existing Facility and Additional Buildings, 37 Acquisition, Planning and Construction 38 (Lincoln) 39 Payable from General Obligation Bonds 40 Priority 1 $ 120,000 41 Priority 5 $ 765,000 42 Total $ 885,000 Page 105 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/NGMNEW ORLEANS AFRICAN AMERICAN MUSEUM OF ART, CULTURE 2 AND HISTORY 3(573434)New Orleans African American Museum of Art, Culture and 4 History: Renovation and New Construction 5 (Orleans) 6 Payable from General Obligation Bonds 7 Priority 1 $ 374,765 8 Priority 5 $ 4,000,000 9 Total $ 4,374,765 1050/NGNLOUISIANA CHAMBER OF COMMERCE F OUNDATION, INC. 11(573712)Louisiana Chamber of Commerce's Business Innovation 12 Center, Planning and Construction 13 (Calcasieu) 14 Payable from General Obligation Bonds 15 Priority 1 $ 1,645,000 1650/NGQTHE STRAND THEATRE OF SHREVEPORT CORPORATION 17(572337)Repair and Renovation to the Strand Theatre of Shreveport 18 (Caddo) 19 Payable from General Obligation Bonds 20 Priority 5 $ 984,000 2150/NH7CEMETERY MAINTENANCE Z ACHARY 22(573713)Public Cemetery Maintenance, Planning and Construction 23 (East Baton Rouge) 24 Payable from General Obligation Bonds 25 Priority 5 $ 3,750,000 2650/NHEST. JAMES PARISH HOSPITAL 27(572671)West Bank Health Clinic, Planning and Construction 28 (St. James) 29 Payable from General Obligation Bonds 30 Priority 1 $ 1,789,295 31 Priority 5 $ 1,500,000 32 Total $ 3,289,295 3350/NHGLAFAYETTE CENTRE DEVELOP MENT DISTRICT 34(572602)Downtown Lafayette Public Infrastructure Improvements and 35 Upgrades, Planning and Construction 36 (Lafayette) 37 Payable from General Obligation Bonds 38 Priority 1 $ 500,000 3950/NI7HOSPITAL SERVICE DISTRICT 1 IBERIA PARISH DBA IBERIA 40 MEDICAL CENTER 41(571776)Addition of Medical, Surgical, and Psychiatric Inpatient 42 Rooms, Planning, Construction, and Equipment 43 (Iberia) 44 Payable from General Obligation Bonds 45 Priority 1 $ 3,500,000 46 Priority 5 $ 3,675,000 47 Total $ 7,175,000 Page 106 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/NI9ASCENSION-ST. JAMES AIRPORT AND TRANSPORTATION 2 AUTHORITY 3(571996)Commercial Hangar Complex - Louisiana Regional 4 Airport, Gonzales, LA, Planning and Construction 5 (Ascension) 6 Payable from General Obligation Bonds 7 Priority 5 $ 1,000,000 8(573715)Drinking Water, Fire Suppression, and ADA Compliance - 9 Louisiana Regional Airport, Gonzales, LA, Planning 10 and Construction 11 (Ascension) 12 Payable from General Obligation Bonds 13 Priority 1 $ 190,000 1450/NJACECILIA WATER CORP ORATION 15(573717)Water System Improvements, Planning and Construction 16 (St. Martin) 17 Payable from General Obligation Bonds 18 Priority 1 $ 495,000 1950/NJKREDDELL VIDRINE WATER DISTRICT 20(573392)Refurbishment of Water Wells and New 21 Office Building, Planning and Construction 22 (Evangeline) 23 Payable from General Obligation Bonds 24 Priority 5 $ 960,000 2550/NJLBASTION COMMUNITY OF RESILIENCE 26(573272)Veterans Wellness Facility in New Orleans, Planning 27 and Construction 28 (Orleans) 29 Payable from General Obligation Bonds 30 Priority 1 $ 1,900,000 31 Priority 5 $ 1,000,000 32 Total $ 2,900,000 3350/NK1NORTH LOUISIANA ECONOMIC P ARTNERSHIP 34(573600)Northwest Louisiana Industrial Redevelopment of Closed 35 Libby Glass Property, Planning and Construction 36 (Caddo) 37 Payable from General Obligation Bonds 38 Priority 5 $ 7,350,000 39 Payable from State General Fund (Direct) Non-Recurring 40 Revenues $ 5,700,000 41 Total $13,050,000 4250/NKQTHIBODAUX REG IONAL HEALTH SYSTEM 43(571986)Emergency Power System Replacement and Upgrade, 44 Planning and Construction 45 (Lafourche) 46 Payable from General Obligation Bonds 47 Priority 5 $15,800,000 Page 107 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/NL1BEAUREGARD PARISH WATER WORK S DISTRICT #2 2(573827)Booster Station Upgrades, Planning and Construction 3 (Beauregard) 4 Payable from General Obligation Bonds 5 Priority 5 $ 1,080,000 650/NLMFOUNDATION FOR SCIENCE AND MATHEMATICS EDUCATION, 7 INC. 8(571977)A Model for a 21st Century Workforce Development Urban 9 High School - New Orleans Science and Mathematics High 10 School 11 (Orleans) 12 Payable from General Obligation Bonds 13 Priority 1 $ 624,448 14 Priority 5 $ 1,000,000 15 Total $ 1,624,448 1650/NLOOUR LADY OF THE ANGELS HOSPITAL 17(573423)Medical Office Building, Planning and Construction 18 (Washington) 19 Payable from General Obligation Bonds 20 Priority 5 $ 4,400,000 2150/NMDBELMONT WATERWORK S, INC. 22(573718)Water System Improvements, Planning and Construction 23 (Sabine) 24 Payable from General Obligation Bonds 25 Priority 1 $ 23,598 2650/NNKPIERRE PART BELLE RIVER MUSEUM 27(572009)Pierre Part Belle River Museum, Planning and Construction 28 (Assumption) 29 Payable from General Obligation Bonds 30 Priority 5 $ 2,000,000 3150/NNNCALCASIEU CONSOLIDATED G RAVITY DRAINAGE 32 DISTRICT NO. 1 33(572391)Lateral W-3 Improvements, Planning 34 and Construction 35 (Calcasieu) 36 Payable from General Obligation Bonds 37 Priority 5 $ 5,850,000 3850/NP1ACADIANA CRIMINALISTICS LABORATORY DISTRICT 39(571887)New Crime Laboratory, Planning, Design, Construction, 40 and Equipment 41 (Iberia) 42 Payable from General Obligation Bonds 43 Priority 1 $22,752,332 4450/NP3BAYOU LAFOURCHE FRESH WATER DISTRICT 45(573586)Donaldsonville Flood Control, Planning and Construction 46 (Ascension, Assumption, Lafourche, Terrebonne) 47 Payable from General Obligation Bonds 48 Priority 1 $ 753,000 Page 108 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/NPDIBERIA ECONOMIC DEVELOP MENT AUTHORITY 2(572421)Progress Point Business Park and Airport Gateway, Land 3 Acquisition, Planning and Construction 4 (Iberia) 5 Payable from General Obligation Bonds 6 Priority 1 $ 1,214,923 750/NPELOUISIANA MUSIC AND HERITAG E EXPERIENCE, INC. 8(572811)The Louisiana Music and Heritage Experience, Inc., 9 Planning and Construction 10 (Orleans) 11 Payable from General Obligation Bonds 12 Priority 5 $41,900,000 1350/NQ2GRAVITY DRAINAGE DISTRICT 6 CALCASIEU PARISH 14(571862)Buxton Creek Drainage Improvements, Planning and 15 Construction 16 (Calcasieu) 17 Payable from General Obligation Bonds 18 Priority 1 $ 4,100,000 19 Priority 5 $ 2,000,000 20 Total $ 6,100,000 2150/NQGLAFAYETTE METROP OLITAN EXPRESSWAY COMMISSION 22(573384)Lafayette Loop Project, Planning and Construction 23 (Lafayette) 24 Payable from General Obligation Bonds 25 Priority 1 $ 4,000,000 26 Priority 5 $ 2,500,000 27 Total $ 6,500,000 2850/NQNLSU REAL ESTATE AND FACILITIES FOUNDATION 29(573143)University Lakes Restoration Project to Address Flood 30 Control, Environmental, Safety, Health and Other Issues 31 (Matching Funds) 32 (East Baton Rouge) 33 Payable from General Obligation Bonds 34 Priority 1 $34,000,000 35 Priority 5 $ 6,000,000 36 Total $40,000,000 3750/NQVBEAUREGARD WATERWORK S DISTRICT #6 38(571858)Water System Improvements, Planning and Construction 39 (Beauregard) 40 Payable from General Obligation Bonds 41 Priority 5 $ 1,000,000 Page 109 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/NR7COMMCARE CORP ORATION 2(573331)Wynhoven Health Care Expansion, including St. Andrew's 3 Village, Planning and Construction 4 (Jefferson) 5 Payable from General Obligation Bonds 6 Priority 1 $ 3,428,171 7 Priority 5 $ 1,999,750 8 Total $ 5,427,921 950/NRUEAST BATON ROUG E COUNCIL ON AGING 10(572986)Lotus Village at the Lakes Senior Community, Planning, 11 Development and Construction 12 (East Baton Rouge) 13 Payable from General Obligation Bonds 14 Priority 5 $ 7,184,000 15(573491)Lotus Village Phase II, Acquisition, Planning, 16 Rehabilitation, and Construction 17 (East Baton Rouge) 18 Payable from General Obligation Bonds 19 Priority 1 $ 1,000,000 2050/NSPEDEN HOUSE 21(573719)New Orleans Emergency Shelter, Planning and 22 Construction 23 (Orleans) 24 Payable from General Obligation Bonds 25 Priority 1 $ 850,000 2650/NSTDOWNTOWN DEVELOP MENT DISTRICT NEW ORLEANS 27(572274)Harmony Circle, Planning and Construction 28 (Orleans) 29 Payable from General Obligation Bonds 30 Priority 5 $ 4,000,000 3150/NT7CITIZENS MEDICAL CENTER 32(572349)Expansion of Emergency Department, ICU, and Imaging, 33 Planning, Design, and Construction 34 (Caldwell) 35 Payable from General Obligation Bonds 36 Priority 5 $11,900,000 3750/NTAEAST CARROLL PARISH SHERRIFF'S OFFICE 38(573301)Training and Recreation Center, Planning and Construction 39 (East Carroll) 40 Payable from General Obligation Bonds 41 Priority 5 $ 3,000,000 4250/NTKTHE UNION LINCOLN REG IONAL WATER SUPPLY INITIATIVE 43(573720)Development of Alternative Water Supply from Lake 44 D'Arbonne for Lincoln and Union Parishes 45 (Lincoln, Union) 46 Payable from General Obligation Bonds 47 Priority 1 $ 1,397,200 48 Priority 5 $ 2,400,000 49 Total $ 3,797,200 Page 110 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/NU99TH WARD STADIUM, INC. 2(573721)Multi-Sport Venue in Eastern New Orleans and Lower 3 Ninth Ward, Planning and Construction 4 (Orleans) 5 Payable from General Obligation Bonds 6 Priority 1 $ 3,449,765 750/NUQLOUISIANA HIBERNIAN CHARITY 8(573722)Four Acre Irish Heritage Park in the Lakeview 9 Neighborhood, Planning and Construction 10 (Orleans) 11 Payable from General Obligation Bonds 12 Priority 1 $ 183,522 1350/NVYWASHINGTON PARISH HOSPITAL SERVICE DISTRICT NO. 1 14(571979)Emergency Upgrades including Power Generation System 15 Upgrade, Mechanical Systems, and Roofing, Planning and 16 Construction 17 (Washington) 18 Payable from General Obligation Bonds 19 Priority 1 $ 1,922,147 20 Priority 5 $ 3,100,000 21 Total $ 5,022,147 2250/NWGCHILDREN'S ADVOCACY NETWORK , INC. 23(572181)Children's Advocacy Network Campus, Planning and 24 Construction 25 (Rapides) 26 Payable from General Obligation Bonds 27 Priority 5 $ 2,000,000 2850/NWOAIRPORT DISTRICT 1 OF CALCASIEU PARISH 29(572468)Airport Entrance and Access Road Improvements and 30 Marquee, Planning and Construction 31 (Calcasieu) 32 Payable from General Obligation Bonds 33 Priority 5 $ 1,000,000 3450/NWRLOUISIANA SWAMP BASE, INC. 35(571967)Camp Atchafalaya Swamp Base, Planning, Design, and 36 Construction 37 (St. Martin) 38 Payable from General Obligation Bonds 39 Priority 1 $ 472,500 40 Priority 5 $ 9,000,000 41 Total $ 9,472,500 Page 111 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/NWSLAFAYETTE CENTRAL P ARK, INC. 2(571961)Lafayette Central Park Improvements, Planning and 3 Construction 4 (Lafayette) 5 Payable from General Obligation Bonds 6 Priority 1 $ 3,197,500 7 Priority 5 $ 5,637,000 8 Total $ 8,834,500 950/NXCLIVINGSTON PARISH SHERIFF'S OFFICE 10(573308)Livingston Parish Emergency Response and Evacuation 11 Center, Planning and Construction 12 (Livingston) 13 Payable from General Obligation Bonds 14 Priority 1 $ 1,000,000 15 Priority 5 $43,920,000 16 Total $44,920,000 1750/NXIHEBERT WATER SYSTEM, INC. 18(572466)Water System Improvements, Planning and Construction 19 (Caldwell) 20 Payable from General Obligation Bonds 21 Priority 1 $ 213,583 22 Priority 5 $ 1,000,000 23 Total $ 1,213,583 2450/NXYCONCORDIA PARISH HOSPITAL SERVICE DISTRICT #1 25(573723)Construction of Turn Lane on U.S. 84/425 26 (Concordia) 27 Payable from General Obligation Bonds 28 Priority 1 $ 225,000 2950/NYNOPELOUSAS HEIGHTS, INC. 30(573724)Opelousas Heights Proposed Subdivision, Planning and 31 Construction 32 (St. Landry) 33 Payable from General Obligation Bonds 34 Priority 1 $ 1,184,790 3550/NYPSECOND HARVEST F OOD BANK OF GREATER 36 NEW ORLEANS AND ACADIANA 37(573725)Roof Replacement and HVAC Installation, Planning 38 and Construction 39 (Jefferson) 40 Payable from General Obligation Bonds 41 Priority 1 $ 352,888 Page 112 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/NYSHOLY ROSARY REDEVELOP MENT 2(573327)Holy Rosary Institute, Planning, Construction, and 3 Restoration 4 (Lafayette) 5 Payable from General Obligation Bonds 6 Priority 1 $ 4,293,532 7 Priority 5 $ 3,200,000 8 Total $ 7,493,532 950/NZ3BEAUREGARD MEMORIAL HOSP ITAL 10(572357)Emergency Department Addition and Renovation 11 and Women's Center Renovation, Planning and Construction 12 (Beauregard) 13 Payable from General Obligation Bonds 14 Priority 5 $ 2,700,000 15 Payable from State General Fund (Direct) Non-Recurring 16 Revenues $ 2,200,000 17 Total $ 4,900,000 1850/NZBLIVINGSTON PARISH AIRPORT DISTRICT 19(572216)Livingston Executive Airport, Planning and Construction 20 (Livingston) 21 Payable from General Obligation Bonds 22 Priority 1 $ 2,824,303 23 Priority 5 $ 3,485,000 24 Total $ 6,309,303 2550/NZDHOSPITAL SERVICE DISTRICT NO. 1, PARISH OF ST. MARY 26(573726)Franklin Foundation Hospital Wellness Center 27 (St. Mary) 28 Payable from General Obligation Bonds 29 Priority 1 $ 2,000,000 3050/NZKTHE ROBERT A. BOGAN BATON ROUGE FIRE MUSEUM 31(573727)Museum Restoration, Planning and Construction 32 (East Baton Rouge) 33 Payable from General Obligation Bonds 34 Priority 5 $ 3,165,000 3550/NZXWEST CALCASIEU CAMERON HOSP ITAL 36(573257)West Calcasieu Cameron Hospital Medical Office 37 Building, Planning and Construction 38 (Calcasieu) 39 Payable from General Obligation Bonds 40 Priority 1 $ 265,624 41 Priority 5 $ 4,022,000 42 Total $ 4,287,624 4350/S10CALCASIEU PARISH SCHOOL BOARD 44(573728)Renovations to Lake Charles Boston Stadium, Planning 45 and Construction 46 (Calcasieu) 47 Payable from General Obligation Bonds 48 Priority 1 $ 167,000 49 Priority 5 $ 823,000 50 Total $ 990,000 Page 113 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 150/S39POINTE COUPEE PARISH SCHOOL BOARD 2(573729)Pointe Coupee Parish School Board Office Relocation, 3 to be Located at 8777 Morganza Highway, Formerly 4 Labarre Elementary School Site, Due to Flooding Caused 5 by Hurricane Gustav, Planning and Construction 6 (Pointe Coupee) 7 Payable from General Obligation Bonds 8 Priority 1 $ 2,468,060 9 Priority 5 $ 1,900,000 10 Total $ 4,368,060 1150/S63WEST FELICIANA PARISH SCHOOL BOARD 12(571707)Julius Freyhan Cultural/Conference Center, Planning 13 and Construction 14 (West Feliciana) 15 Payable from General Obligation Bonds 16 Priority 1 $ 1,497,000 1750/S67CENTRAL COMMUNITY SCHOOL SYSTEM 18(572059)Central City Community Sports Complex Infrastructure, 19 and School Board Administration Building and Meeting 20 Room, Planning and Construction 21 (East Baton Rouge) 22 Payable from General Obligation Bonds 23 Priority 5 $ 2,000,000 24 Section 2. (A) Appropriated Debt Projects. The projects in this section are to be 25funded through the sale bonds and secured by or payable from state appropriation. 26 (B) Notwithstanding anything contained in this Capital Outlay Act, or any 27previous Capital Outlay Act to the contrary, or any other provision of law, the Division of 28Administration may finance the design, construction, furnishing and equipping of facilities 29through the issuance of revenue bonds by the Office Facilities Corporation to be secured by 30and payable from State appropriations. The issuance of such revenue bonds shall require the 31approval of the State Bond Commission. 32 Section 3. The expenditure of funds appropriated in this Act shall be in 33conformity to all existing statutes relative to public bidding, contractual review, and R.S. 3439:101 through 128 and any other statutes affecting the capital outlay program for state 35government, state institutions, and political entities. 36 Section 4. Payment for projects specified in this Act must be made by warrant 37submitted to the division of administration, Department of Transportation and Development, 38the state treasurer or other administering agency as provided in Section 8, whichever is 39appropriate, only to the extent of funds required for immediate payment. Copies of invoices Page 114 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1or other supporting documentation shall be submitted with warrants. In the event that any 2equipment included in this Act, is procured pursuant to the provisions of the State Lease- 3Purchase Act, R.S. 39:1761 et seq., the amounts included in this Act for each such piece of 4equipment shall not be appropriated. The provisions of R.S. 39:1771 which require 5equipment to be leased under the State Lease-Purchase Act to be included in the executive 6budget and approved by the legislature through inclusion in the General Appropriation Act 7shall be considered waived upon the inclusion of such equipment in this Act. Projects 8contained in this Act may, at the direction of the division of administration and with the 9approval of the State Bond Commission, alternatively be funded through financing programs 10heretofore or hereafter provided by a public trust and public corporation duly organized 11pursuant to R.S. 9:2341 et seq., having for its beneficiary the state and the Louisiana Local 12Government Environmental Facilities and Community Development Authority, pursuant to 13R.S. 33:4548.1 et seq. 14 Section 5. If at any time during the Fiscal Year 2024-2025, the governor should 15find, or the Joint Legislative Committee on the Budget or the commissioner of 16administration should report to the governor, that the receipts of the treasury are falling short 17or appear likely to fall short of the revenue estimates for the fiscal year and that a cash 18deficit is likely to be incurred, the governor shall take such steps as deemed necessary to 19prevent the occurrence of a cash deficit. In the event that a capital outlay project funded in 20this Act falls under an agency which is abolished or for which funds are not appropriated in 21the 2024-2025 General Appropriation Act, then the funds appropriated in this Act for such 22capital outlay projects shall not be expended unless deemed necessary by the governor to 23protect life or property. In the event that legislation is enacted which transfers facilities or 24programs for which projects are funded in this Act, on behalf of one agency, institution, 25department, or management board to another agency, institution, department, or management 26board, then the projects in this Act shall be deemed transferred also. 27 Section 6. All monies appropriated by this Act and any applicable funds of a 28prior capital outlay budget act adopted by the legislature shall be deposited by the state 29treasurer in the Comprehensive Capital Outlay Escrow Account, established by this Section, 30in the state treasury. In accordance with R.S. 36:764, no later than sixty days following the 31end of each quarter, the state treasurer shall report to the Joint Legislative Committee on the Page 115 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1Budget and the commissioner of administration, all funds contained in the Miscellaneous 2Fund of the Comprehensive Capital Outlay Escrow Account. Notwithstanding any 3provisions contained herein or other law to the contrary, any original issue premium or 4accrued interest proceeds received pursuant to the sale of general obligation bonds shall 5remain on deposit to the credit of the Bond Security and Redemption Fund until such time 6as they may be utilized in accordance with U.S. Department of the Treasury Regulations 7promulgated pursuant to the Internal Revenue Code of 1986. All such monies shall be 8administered according to the particular act pertaining to the fiscal year in which such 9monies were appropriated. If it is determined by the director of the office of facility 10planning and control, division of administration, that the funds appropriated by this Act or 11any prior capital outlay budget Act are not sufficient to complete the projects contained in 12any capital outlay budget Act, through unavoidable deficiencies in appropriation, including 13administrative and legal requirements, the commissioner of administration, subject to 14approval of the Joint Legislative Committee on the Budget, may direct the use of interest 15earned from the investment of general obligation bond or note proceeds in the 16Comprehensive Capital Outlay Escrow Account, not to exceed an aggregate of five million 17dollars in any one fiscal year, for the purpose of completing the projects contained in any 18capital outlay budget Act and such money shall be deemed appropriated in specific amounts 19necessary for such purpose. All appropriations in this Act which are made as additions to 20funds for previously authorized projects shall be included, for accounting purposes, in the 21account of the previously authorized projects. If it is determined by the director of the office 22of facility planning and control, division of administration, that it is cost effective and 23practical to combine individual appropriations, the commissioner of administration, subject 24to the approval of the Joint Legislative Committee on the Budget, may direct that two or 25more appropriations or parts thereof may be combined into a single project for accounting 26and audit purposes. The commissioner of administration may direct that funding in the 27various statewide and/or multiple parish projects for improvements for state facilities may 28be transferred to any project, in this Act or any previous Capital Outlay Act, which require 29supplemental funding for improvements for state facilities which qualify for funding through 30the various statewide and/or multiple parish projects for improvements for state facilities. 31The office of facility planning and control, division of administration is authorized to receive Page 116 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1settlements and vendor rebates and to add a portion or all of these receipts to the existing 2project funds relating to the settlement and/or vendor rebates and appropriated in this Act 3or any previous Capital Outlay Act including those previously appropriated funds that 4become unavailable. Approval of the Joint Legislative Committee on the Budget will be 5obtained if the settlement and/or vendor rebates will be added to any projects in this Act or 6any previous Capital Outlay Act which are unrelated to the project from which the settlement 7and/or vendor rebates were received. The office of facility planning and control, division of 8administration is authorized to receive insurance payments and are hereby authorized to 9immediately repair facilities that suffer insurance losses without those projects being 10included in the Act and shall report to the Joint Legislative Committee on the Budget any 11expenditures from insurance funds received pursuant to this section. A portion, as 12determined by the commissioner of administration and not to exceed one percent (1%), of 13the funding for projects which qualify for the Percent for Art Program and not to exceed 14$450,000 for an individual, qualifying project, may be transferred from the qualifying 15project budgets, to the Department of Culture, Recreation and Tourism for costs of acquiring 16art and admCnistering the program. For all Percent for Art Program projects in this or any 17previous capital outlay, up to ten percent (10%) of the aforementioned one percent (1%) may 18be used for the costs of administering the projects. 19 Section 7. No later than February 1, 2025, agencies administering capital outlay 20projects will submit reports identifying completed projects and cash balances to the Joint 21Legislative Committee on Capital Outlay pursuant to the reporting requirements of R.S. 2239:105 and R.S. 39:116. 23 Section 8. The commissioner of administration, with the approval of the Joint 24Legislative Committee on the Budget, is authorized to supplement or substitute the 25appropriations specified in this or previous capital outlay acts with any federal or other funds 26which are or may become available and such funds shall be deemed appropriated in specific 27amounts necessary for the purposes of this Act. Any funds received by the State Bond 28Commission as a result of a prepayment of reimbursement contracts as authorized by law 29and the policy and procedure for reimbursement contracts of the Department of Treasury, 30office of State Bond Commission, shall be deposited as set forth in such policy and Page 117 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1procedure and shall be deemed available and appropriated in specific amounts necessary for 2the purposes of this Act pursuant to the procedure set forth in this section. 3 Section 9.(A) All projects herein authorized and funded shall be subject to the 4provisions of R.S. 39:101 through 128. With the exception of appropriations made to the 5Department of Military Affairs, the Legislature, the Louisiana Stadium and Exposition 6District, the Department of Economic Development, the Coastal Protection and Restoration 7Authority, the Division of Administration for Supplemental State Funds for Local 8Government Assistance Program, the Division of Administration for the Community Water 9Enrichment Program or the Department of Transportation and Development, all funds herein 10appropriated shall be considered as having been appropriated directly to the Office of 11Facility Planning and Control, Division of Administration. All cooperative endeavor 12agreements for non-state entities shall be prepared by the appropriate administering agency 13and submitted to the office of State Procurement for review and approval. As part of its 14review, the office of State Procurement shall consult with bond counsel to the State relative 15to any federal tax issues. 16 (1) Notwithstanding anything contained in this act to the contrary or any other 17provision of law, the appropriations made for the Louisiana Stadium and Exposition District 18shall be appropriated directly to the Louisiana Stadium and Exposition District, and are 19public purposes pursuant to the provisions of Article VII, Section 14 of the Constitution of 20Louisiana primarily for economic development, including the generation of tax revenue, 21creation of jobs, and the generation of tourism, and may be used to reimburse any 22expenditure made prior to the granting of a line of credit or the sale of bonds by the State 23Bond Commission, determination by the State Treasurer that cash funding has been 24deposited in the Comprehensive Capital Outlay Escrow Account for the project. 25 (2) Further, with respect to appropriations to the Louisiana Stadium and 26Exposition District for the TPC Louisiana, Planning and Construction project, the Louisiana 27Stadium and Exposition District shall be permitted to use alternative competitive 28procurement and delivery methods for the award of any contracts to be funded through such 29appropriation. 30 (3) The Louisiana Stadium and Exposition District shall have the authority to 31directly appoint a design professional from a list of a minimum of three architectural firms Page 118 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1or joint ventures with professional sports facility design experience acceptable to the 2Commissioner of Administration and shall be exempt from other state requirements for 3selection of designers. The design professional fee shall be in accordance with state 4guidelines administered by the Office of Facility Planning and Control, Division of 5Administration. 6 (B)(1)(a) Funds appropriated in the Capital Outlay Act under the name of non- 7state entities shall be administered by the Office of Facility Planning and Control, Division 8of Administration under cooperative endeavor agreements; however, projects involving state 9or federal highways may be administered by the Department of Transportation and 10Development, if appropriate. Except as provided in Section 8(A), cooperative endeavor 11agreements entered into pursuant to appropriations in this Act shall not be required to be 12submitted to the Division of Administration, Office of State Procurement. 13 (b) Further, for all projects in the Capital Outlay Act or a previous Capital Outlay 14Act which are appropriated to the Office of Facility Planning and Control, Division of 15Administration, including those administered by cooperative endeavor agreements, up to six 16percent of each line-item may be used for costs of administering the projects. 17 (c) For all projects in Capital Outlay Act or a previous Capital Outlay Act 18appropriated to the Department of Transportation and Development, up to six percent of 19each line-item may be used for costs of administering the projects, or for field 20engineering/construction supervision. 21 (2) Notwithstanding anything in this Act, or a previous Capital Outlay Act, the 22Office of Facility Planning and Control may enter into a cooperative endeavor agreement 23with the Archdiocese of New Orleans and Jefferson Parish for the Preservation and 24Restoration of Historic Structure for Hope Haven/Madonna Manor Campus, Planning and 25Construction project. 26 (C) Line-item general obligation bond projects appropriated to the Department 27of Transportation and Development in the Capital Outlay Act or a previous Capital Outlay 28Act shall be authorized to draw Transportation Trust Funds from the Highway Program 29appropriation, for supplemental funding on overruns in excess of the original estimated 30project cost as determined by the Department of Transportation and Development, provided 31however that said projects are in the state or federal highway system and in the priority Page 119 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1program, and the overrun is less than $50,000. Any such overrun of $50,000 or more must 2be approved by the Joint Legislative Committee on the Budget. 3 (D) All ports, levee districts and other non-state entities must follow the 4provisions of R.S. 39:122. 5 (E) Pursuant to R.S. 39:122(B)(2), funds to be reimbursed by the state which a 6non-state entity attempts to obligate prior to the receipt of funding shall not be eligible for 7reimbursement or payment by the state; however, 8 (1) Notwithstanding anything in this Act or any previous Capital Outlay Acts to 9the contrary, contracts may be entered into for the Lafayette Economic Development 10Authority, Lafayette Innovation Center (Lafayette) prior to the receipt of funding and the 11State is authorized to financially participate in obligations created by such contracts. 12 (2) Notwithstanding anything contained in this Act or any other provision of law, 13Lafayette Parish is authorized to execute contracts for the Bayou Vermilion Flood Control 14project prior to execution of a cooperative endeavor agreement, the granting of a line of 15credit or the sale of bonds. The appropriation for this project may be used to pay any 16obligation incurred or to reimburse any expenditure made pursuant to such contracts unless 17the Commissioner of Administration is advised by bond counsel to the state that such may 18violate federal tax law. The office of facility planning and control shall consult with bond 19counsel to the State relative to any federal tax issues. 20 (3) Notwithstanding anything contained in this Act or any other provision of law, 21Lafayette Parish is authorized to execute contracts for the Parish Government Complex, 22Parish Courthouse project prior to execution of a cooperative endeavor agreement, the 23granting of a line of credit, or the sale of bonds. The appropriation for this project may be 24used to pay any obligation incurred or to reimburse any expenditure made pursuant to such 25contracts unless the Commissioner of Administration is advised by bond counsel to the state 26that such may violate federal tax law. The office of facility planning and control shall consult 27with bond counsel to the State relative to any federal tax issues. 28 (4) Notwithstanding anything contained in this Act or any previous Capital 29Outlay Act or any provision of law to the contrary, contracts may be entered into for the 30Acadia Parish, Street Improvements of Hains Road project prior to receipt of concurrence 31by the Office of Facility Planning and Control and are excepted from bid opening extensions Page 120 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1associated with addenda to bidding documents and the state is authorized to financially 2participate in obligations created for such project. 3 (F) Pursuant to R.S. 39:112(E)(2), non-state entity projects shall require a match 4for each appropriation in this act; however, 5 (1) Notwithstanding anything contained in this Act, any prior Capital Outlay 6Acts, any other provision of law, or the provisions of R.S. 39:112(E)(2), the projects for the 7City of Opelousas for the Water Meter Replacement and Upgrades and for the Bridge 8Replacement and Upgrades shall be exempt for all match requirements. 9 (G) Notwithstanding anything contained in this Act or the Capital Outlay Act to 10the contrary or any other Act or provision of law, the appropriations made for the Executive 11Department for facilities which promote economic development included in the Repair, 12Restoration, and Replacement for Declared Disasters, Planning, Construction, Renovation, 13and Acquisition project, and the Department of Economic Development projects are for 14public purposes pursuant to the provisions of Article VII, Section 14 of the Constitution of 15Louisiana primarily for economic development, including the generation of tax revenues, 16creation of jobs, promotion of tourism, and creation of facilities for charitable, cultural, 17artistic, educational, social, civic, research, service, economic development activities, or 18provide facilities for professional golf events, pursuant to the terms of cooperative endeavor 19agreements, including leases and all expenditures of these appropriations and may be 20exempted, by the Commissioner of Administration, from all statutes relative to public 21bidding, contractual review and the provisions of R.S. 33:9029.2(D) and in lieu thereof be 22allowed to use alternative competitive contracting arrangements where the appropriate 23administering entity submits documentation to the Commissioner of Administration 24substantiating that it is in the best interest of the citizens of the state, due to economic and/or 25operational benefits, and the necessity to complete the projects in a timely manner; and, the 26appropriate administering entity shall have the authority to directly appoint the design 27professional from a list of a minimum of three design firms or joint ventures with the 28appropriate specialized facility design experience submitted to and acceptable to the 29Commissioner of Administration and shall be exempt from other state requirements for 30selection of designers, and may include expenditures for computers, fixtures, furniture, and 31other equipment as such is deemed to be capital outlay in nature, and unless the Page 121 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1Commissioner of Administration is advised by bond counsel to the State that such may 2violate federal tax law, may be used to reimburse any expenditure made prior to the granting 3of a line of credit or the sale of bonds by the State Bond Commission, determination by the 4State Treasurer that cash funding has been deposited in the Comprehensive Capital Outlay 5Escrow Account for the project or the execution of a cooperative endeavor agreement from 6the Office of Facility Planning and Control, and may be used to acquire land or real property, 7the title to which is held in the name of an entity exempt from taxation under the provisions 8of 26 U.S.C. 501(c)(3). 9 (H) Notwithstanding any other provision of this Act or the Capital Outlay Act or 10any other provision of law to the contrary, all of the funds herein appropriated to the 11Department of Economic Development in connection with projects or programs for which 12the Department of Economic Development utilizes a cooperative endeavor agreement to 13further economic development as permitted under Article VII, Section 14 of the Louisiana 14Constitution, including the generation of tax revenues and creation of jobs, shall be 15considered as having been appropriated to the Department of Economic Development, may 16be used to reimburse any expenditure made prior to the granting of a line of credit and made 17prior to the execution of a cooperative endeavor agreement and shall be administered solely 18by the Department of Economic Development pursuant to, in compliance with, and on the 19terms contained in such cooperative endeavor agreements without compliance with any other 20law, including, but not limited to, the provisions of R.S. 39:101 through 128. Additionally, 21all expenditures of these appropriations may be exempted by the Commissioner of 22Administration, from all statutes relative to public bidding, contractual review and the 23provisions of R.S. 33:9029.2(D). 24 (I)(1) Notwithstanding any other provision of this Act or the Capital Outlay Act 25or any other provision of law to the contrary, funds appropriated for the Economic 26Development Award Program project for the Office of Business Development are to be used 27solely for capital and infrastructure improvements subject to verification by the Division of 28Administration, Office of Facility Planning and Control. 29 (2) Eligible expenses for Economic Development Award Program funds may 30include documented project expenses beginning on the date of LEDC Board approval of the Page 122 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1project and may be reimbursed upon execution of the cooperative endeavor agreement for 2the project. 3 (J)(1) Due to the state's current investment in TPC Louisiana and the financial 4support it provides to the PGA TOUR event currently played at said facility, said PGA 5TOUR event shall not be played at New Orleans City Park Golf Complex without the prior 6agreement of the Commissioner of Administration and the Chairman of the Jefferson Parish 7Council. 8 (2) Notwithstanding the foregoing, the City Park Golf Complex may host any 9other golf tournament or event, including but not limited to any other PGA-affiliated or 10sponsored tournament or event. 11 (K)(1) For all projects administered by the Office of Facility Planning and 12Control and payable from proceeds of self-generated revenues, funds shall be remitted to the 13Office of Facility Planning and Control for deposit in the state treasury at such time as may 14be deemed necessary by the Office of Facility Planning and Control in order to cover the 15amount of contracts or other project expenses. 16 (2) Notwithstanding any provisions contained herein or any other law to the 17contrary, for projects with other means of financing provided to the administering agency 18by interagency transfer, the authority to draw these funds shall remain with the user agency. 19 (3) Any revenue bonds appropriated in Section 1 or Section 1. (A) of the Capital 20Outlay Act shall not be secured by the full faith and credit of the state. 21 (4) The State Treasurer shall refund to the appropriate source any surplus self- 22generated funds, advanced insurance funds received by the Office of Facility Planning and 23Control as Interagency Transfer from Office of Risk Management associated with hurricane 24damage recovery, and interest earned on these funds, provided the Treasurer's Office is 25notified, when these funds are deposited in the state treasury, that the user agency or Office 26of Risk Management intends to request a refund of this interest. 27 (L) Notwithstanding any provisions contained in this Act, the Capital Outlay Act, 28or any other provision of law to the contrary, any funds expended by the parish of St. Mary 29for the purpose of securing a federal grant, for the Infrastructure Improvements and 30Construction of a Welding Training Center Facility at the Charenton Canal Industrial Park, 31shall be eligible for reimbursement from any cash line of credit approved for the project. Page 123 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1 (M) Notwithstanding anything contained in this Act to the contrary or any other 2provision of law, the resolution adopted by the Joint Legislative Committee on the Budget 3(the committee) on March 19, 2019 approving State of Louisiana Grant Anticipation 4Revenue Bonds, in one or more series, not exceeding $650,000,000, and approving the 5related projects and providing for other matters in connection therewith, contains the 6following approvals: 7 (1) The first series of bonds in the original principal amount of not exceeding 8$185,000,000 in order to fund the following projects in the following estimated amounts: 9Barksdale Project ($61,600,000) and portions of the Loyola Project ($77,600,000) and the 10I-10 Project ($30,601,000) with the understanding that the Department has the ability to 11manage the actual application of bond proceeds in order to appropriately fund the Projects 12and meet expenditure requirements of the Internal Revenue Service. 13 (2) The second series of bonds for the express purpose of granting the required 14contracts in the principal amount of approximately $142,000,000 in order to fund the 15following projects in the following estimated amounts: the balance of the Barksdale Project 16($16,518,000), the balance of the Loyola Project ($87,500,000), portions of the I-10 Project 17($37,982,000) and the Belle Chasse Project ($12,500,000) with the understanding that the 18Department has the ability to manage the actual application of Bond proceeds in order to 19appropriately fund the Projects and meet expenditure requirements of the Internal Revenue 20Service provided, however, the Department of Transportation and Development seeks 21approval from the Committee for the issuance of the second series of bonds and all 22subsequent series of bonds. 23 (N) Notwithstanding anything contained in this Act to the contrary or any other 24provision of law, the Research Vessel (R/V) Pelican Replacement is deemed to be a capital 25asset and the appropriation to Louisiana Universities Marine Consortium (LUMCON) to 26replace the R/V Pelican is for a public purpose and has a significant economic impact 27providing a variety of oceanographic research missions. Further, LUMCON shall be 28permitted to use an alternative delivery method to award contracts for design of the proposed 29replacement vessel. LUMCON shall have the authority to select the design professional from 30a list of a minimum of two engineering firms or joint ventures with ship design experience 31acceptable to the Commissioner of Administration and the selection shall be exempt from Page 124 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1other state requirements for the selection of designers. The design professional fee shall be 2in accordance with state guidelines administered by the Office of Facility Planning and 3Control, Division of Administration. LUMCON shall further be permitted to use an 4alternative delivery method to award contracts for the construction of the proposed 5replacement vessel. LUMCON shall have the authority to select the contractor from a list 6of a minimum of three highly qualified ship builders/shipyards with relevant vessel 7construction experience acceptable to the Commissioner of Administration and the selection 8shall be exempt from other state requirements for the selection of contractors. The 9construction contract shall be administered by the Office of Facility Planning and Control, 10Division of Administration in accordance with state guidelines. 11 (O) Notwithstanding anything contained in this Act to the contrary or any other 12provision of law, the appropriations for Major Repairs for Higher Education Facilities – 13Infrastructure, and Buildings Based on Statewide Condition Assessment, Planning and 14Construction, in Act 7 of 2008 identifying specific projects for higher education is deemed 15to be complete, and any remaining residual funds are hereby authorized to be combined and 16accumulated to accomplish additional major repair projects within the higher education 17systems, as deemed necessary and approved by the Board of Regents and Facility Planning 18and Control. At the completion of the program, Facility Planning and Control shall submit 19a report to the Joint Legislative Committee on the Budget concerning the use of the 20remaining residual funds. 21 (P) Notwithstanding anything contained in this Act or any other provision of law, 22LSU Real Estate and Facilities Foundation (LRFF) is authorized to execute contracts for the 23University Lakes Restoration Project to Address Flood Control, Environmental, Safety, 24Health and Other Issues project prior to execution of a cooperative endeavor agreement, the 25granting of a line of credit or the sale of bonds. The appropriation for this project may be 26used to pay any obligation incurred or to reimburse any expenditure made pursuant to such 27contracts unless the Commissioner of Administration is advised by bond counsel to the state 28that such may violate federal tax law, after execution of a cooperative endeavor agreement. 29The Office of Facility Planning and Control shall consult with bond counsel to the State 30relative to any federal tax issues. Further, LRFF may use alternative competitive contracting 31arrangements with the prior approval of the Commissioner of Administration. Page 125 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1 (Q) Notwithstanding anything contained in this Act to the contrary or any other 2provision of law, the USS KIDD DD-661, a World War II era Fletcher class destroyer and 3National Historic Landmark, is deemed to be a capital asset and the appropriation to the 4Louisiana Naval War Memorial Commission for Hull Repair & Reinforcement, 5Superstructure Repair, Interior Restoration & Painting and Docking Cradle Repairs & 6Upgrade is for a public purpose and will allow the vessel to continue to serve the citizens of 7Louisiana as a proven highly successful tourist attraction, educational institution, military 8memorial, patriotic ceremonial platform and documentary/theatrical film set. Further, the 9USS KIDD DD-661 the only surviving Fletcher class destroyer in her original WW2 10configuration and the restoration project requires special consideration in the selection of a 11restoration contractor and in the location and complete identification of the repairs to be 12performed. Therefore, the Louisiana Naval War Memorial Commission, through the Office 13of Culture, Recreation & Tourism, shall be permitted to use an alternative delivery method 14to award construction contract(s) for the proposed repairs and renovations to the USS KIDD 15and its cradle. The Louisiana Naval War Memorial Commission, through the Office of 16Culture, Recreation & Tourism, shall have the authority to select the contractor(s) from a list 17of a minimum of three highly qualified ship builders/shipyards with relevant restoration 18experience acceptable to the Commissioner of Administration and the selection shall be 19exempt from other state requirements for the selection of contractors. The construction 20contract(s) shall be administered by the Office of Facility Planning and Control, Division 21of Administration in accordance with state guidelines and all restoration and repairs shall 22adhere to the U.S. Department of Interiors’ Standards for Historic Ship Preservation 23Projects. 24 (R) Pursuant to R.S. 39:102, each capital outlay budget request submitted as 25required by R.S. 39:101 shall include a detailed project description and justification for each 26new project requested; however, 27 (1) Notwithstanding anything contained in this Act or the Capital Outlay Act to 28the contrary or any other provision of law, the scope of the appropriations made in this or 29any other Capital Outlay Act for the New Orleans West Bank Park Improvements, New 30Soccer and Recreational Facilities project shall be deemed to include the George W. Carver 31Playground, Renovations and Upgrades project for the West Bank Park project. Page 126 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1 (2) Notwithstanding anything contained in this Act or the Capital Outlay Act to 2the contrary or any other provision of law, the scope of the appropriations made in this or 3any other Capital Outlay Act for the Pointe Coupee Parish School Board Office Relocation, 4Due to Flooding Caused by Hurricane Gustav, Planning and Construction project shall be 5deemed to include that the School Board Office is to be Located at 8777 Morganza 6Highway. 7 (3) Notwithstanding anything in this Act, any previous capital outlay act, or other 8provision of law to the contrary, the scope of the appropriation for the Port of South 9Louisiana Globalplex Terminal Building #71 Upgrade project shall be deemed to also 10include similar upgrades for other Globalplex Terminal Buildings and a Heavy Load 11Capacity Foundation or Floor. 12 (4) Notwithstanding anything in this Act, any previous capital outlay act, or other 13provision of law to the contrary, monies appropriated herein for the Port of South Louisiana 14Globalplex Terminal Building #71 and Other Globalplex Terminal Building Upgrades, 15Planning and Construction may be expended for design fees related to the conveyor system 16and ancillary equipment that exceed the customary ten percent limitation on design fee costs. 17 (5) Notwithstanding anything in this Act, any previous capital outlay act, or other 18provision of law to the contrary, the scope of the appropriation for the Port of South 19Louisiana Globalplex Dock Access Bridge and Equipment Replacement/Repair project shall 20be deemed to also include an Access Road. 21 (6) Notwithstanding anything in this Act, any previous capital outlay act, or other 22provision of law to the contrary, the scope of the appropriation for the Port of South 23Louisiana Globalplex Rail Siding project shall be deemed to also include a Rail Spur. 24 (7) Notwithstanding anything contained in this Act or the Capital Outlay Act to 25the contrary or any other provision of law, the scope of the appropriations made in this or 26any other Capital Outlay Act for the Pontchartrain Levee District Lake Pontchartrain West 27Shore Hurricane Protection, Planning and Construction project shall be deemed to include 28Ascension Parish. 29 (8) Notwithstanding anything contained in this Act or the Capital Act to the 30contrary or any other provision of law, the scope of the appropriation made in this or any 31other Capital Outlay Act for the Statewide Roofing Asset Management Program and Page 127 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1Waterproofing, Related Repairs and Equipment Replacement Program project shall be 2deemed to include Peltier Hall at Nicholls State University. 3 (9) Notwithstanding anything contained in this Act or the Capital Act to the 4contrary or any other provision of law, the scope of the appropriation made in this or any 5other Capital Outlay Act for the Longview Road Improvements, Beauregard Parish Police 6Jury project shall be deemed to include Longville Road Improvements for the Beauregard 7Parish Police Jury. 8 (10) Notwithstanding anything contained in this Act or the Capital Act to the 9contrary or any other provision of law, the scope of the appropriation made in this or any 10other Capital Outlay Act for the JESTC Training Facility Improvements project shall be 11deemed to include facilities at JESTC to accommodate a less than lethal training program 12utilizing mobile virtual training. 13 (11) Notwithstanding anything contained in this Act, any previous capital outlay 14act to the contrary, or any other provision of law, the scope of the appropriations made in 15this or any other capital outlay act for the Industrial Park Development project for New 16Roads shall be deemed to include underground electrical system upgrades. 17 (12) Notwithstanding anything contained in this Act, any previous capital outlay 18act to the contrary, or any other provision of law, the scope of the appropriations made in 19this or any other capital outlay act for the Lincoln Manner Subdivision Drainage project for 20Kenner shall be deemed to include 30 th Street Roadway and Drainage Improvements from 21Loyola Drive to Ohio Street. 22 (13) Notwithstanding anything contained in this Act or the Capital Outlay Act 23to the contrary or any other provision of law, the scope of the appropriations made in this 24or any other Capital Outlay Act for the Tensas Parish Recreational Facility project shall be 25deemed to include Recreational Facilities at Newellton, St. Joseph, and Waterproof. 26 (14) Notwithstanding anything contained in this Act, any previous capital outlay 27act to the contrary, or any other provision of law, the scope of the appropriations made in 28this or any other capital outlay act for the LA 93 Roadway Improvements - I-10 Ramp to 29Renaud Drive, Planning and Construction project for Scott shall be deemed to include the 30planning and design of the Roundabout at Exit 97 Westbound, Planning, Construction, and Page 128 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1Land Acquisition project for Scott and the planning and design of the Roundabout at LA 93 2and Renaud Drive, Planning, Construction, and Land Acquisition for Scott. 3 (15) Notwithstanding anything contained in this Act, any previous capital outlay 4act to the contrary, or any other provision of law, the scope of the appropriations made in 5this or any other capital outlay act for the Water and Sewer Line Installation along Apollo 6Road Extension, Planning and Construction project for Scott shall be deemed to include the 7placement of water and sewer line utilities along the roadway. 8 (16) Notwithstanding anything contained in this Act, any previous capital outlay 9act to the contrary, or any other provision of law, the scope of the appropriations made in 10this or any other capital outlay act for the Young's Bayou Enhancement of Channel Capacity, 11Planning and Construction project for Monroe shall be deemed to include streams and 12contributing tributaries flowing into the Young's Bayou Watershed. 13 (17) Notwithstanding anything contained in this Act, any previous capital outlay 14act to the contrary, or any other provision of law, the scope of the appropriations made in 15this or any other capital outlay act for the Central Louisiana State Hospital Relocation to 16Pinecrest project for the Office of Behavioral Health shall be deemed to include new 17construction and renovations of buildings. 18 (18) Notwithstanding anything contained in this Act, any previous capital outlay 19act to the contrary, or any other provision of law, the scope of the appropriations made in 20this or any other capital outlay act for the New Education Building project for the 21Opportunities Industrialization Center Incorporated of Ouachita shall be deemed to include 22new construction and renovations of buildings. 23 (19) Notwithstanding anything contained in this Act, any previous capital outlay 24act to the contrary, or any other provision of law, the scope of the appropriations made in 25this or any other capital outlay act for the New Orleans Emergency Shelter project for Eden 26House shall be deemed to include acquisitions, renovations, and new construction of other 27Eden House facilities statewide. 28 (20) The following revisions are hereby made to Act 465 of the 2023 Regular 29Legislative Session of the Louisiana Legislature for the purpose of transferring the projects 30listed below to the appropriate agency: Page 129 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1 (a) Notwithstanding any provisions of law to the contrary, including the 2provisions of the Capital Outlay Act, the appropriation to 50/NC2 BATON ROUGE 3RECREATION AND PARKS COMMISSION for The Inspiration Center – Howell 4Community Park (East Baton Rouge) project is hereby amended and reenacted to 50/R01 5BATON ROUGE LAW ENFORCEMENT AND CRIMINAL JUSTICE FOUNDATION. 6 (b) Notwithstanding any provisions of law to the contrary, including the 7provisions of the Capital Outlay Act, the appropriation to 50/N34 ODYSSEY HOUSE 8LOUISIANA, INC. for the Odyssey House Louisiana Gambling Treatment Center (Orleans) 9project is hereby amended and reenacted to 09/304 METROPOLITAN HUMAN SERVICES 10DISTRICT. 11 (S) Notwithstanding anything contained in this Act to the contrary or any other 12provision of law, all non-state projects that include water systems in the scope of work shall 13also be required to include a rate study as part of the project. 14 (T) Notwithstanding anything contained in this Act or any other provision of law, 15the appropriations included herein identified as "Payable from State General Fund (Direct) 16Non-Recurring Revenues" are appropriated for the purpose of making supplemental capital 17outlay appropriations for Fiscal Year 2023-2024. 18 (U) Notwithstanding anything contained in this Act to the contrary or any other 19provision of the law, the appropriations included herein identified as "Payable from Interest 20Earnings" are appropriated for the purpose of making supplemental capital outlay 21appropriations for Fiscal Year 2023-2024. 22 (V) Notwithstanding anything contained in this Act to the contrary or any other 23provision of law, any water/sewer project that submitted by August 31, 2022 for the Water 24Sector Program shall be deemed to be submitted timely provided a capital outlay request is 25submitted and is otherwise compliant with the provisions of R.S. 39:101 and R.S. 39:102. 26Such request together with supporting information and documents shall constitute the 27feasibility study required by Article VI, Section 11(C) of the Constitution of Louisiana. 28 (W) Notwithstanding anything contained in this Act or any other provision of 29law, the Port of New Orleans is authorized to execute contracts for the Louisiana 30International Terminal Roadway and Rail Improvements, Planning and Construction and the 31Louisiana International Terminal, Drainage, Site Preparation and Mitigation, Planning and Page 130 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1Construction prior to execution of a cooperative endeavor agreement, the granting of a line 2of credit, or the sale of bonds. The appropriation for this project may be used to pay any 3obligation incurred or to reimburse any expenditure made pursuant to such contracts unless 4the commissioner of administration is advised by bond counsel to the state that such may 5violate federal tax law. The office of facility planning and control shall consult with bond 6counsel to the state relative to any federal tax issues. 7 (X) Notwithstanding anything contained in this Act or any other provision of law, 8the Board of Commissioners for the Port of New Orleans is authorized to execute contracts 9for the Louisiana International Terminal Roadway and Rail Improvements, Planning and 10Construction and the Louisiana International Terminal, Drainage, Site Preparation and 11Mitigation, Planning and Construction project prior to execution of a cooperative endeavor 12agreement, the granting of a line of credit, or the sale of bonds. The appropriation for this 13project may be used to pay any obligation incurred or to reimburse any expenditure made 14pursuant to such contracts unless the commissioner of administration is advised by bond 15counsel to the state that such may violate federal tax law. The office of facility planning and 16control shall consult with bond counsel to the state relative to any federal tax issues. 17 (Y) Notwithstanding anything contained in this Act or any previous Capital 18Outlay Act or any provision of law to the contrary, capital outlay expenditures by the Local 19Government Assistance Program (LGAP) shall comply with the definition contained in La. 20R.S. 39:2(9) exclusively. 21 Section 10. Notwithstanding any provisions contained herein or any other law 22to the contrary, the provisions of Chapter 16 of Subtitle III of Title 39 of the Louisiana 23Revised Statutes of 1950 as amended, shall not apply to architectural and engineering 24contracts, administered by the office of facility planning and control, division of 25administration pursuant to this or any other capital outlay act. 26 Section 11. All funds appropriated herein to agencies administering capital 27outlay projects, on behalf of non-state entities, by cooperative endeavor agreements pursuant 28to this Act shall be expended within two (2) years from the date of the issuance of the bonds. 29Agencies administering capital outlay projects pursuant to a cooperative endeavor agreement 30shall notify the non-state entity of the date the bonds are issued within three (3) months from 31the issuance thereof. If the funds appropriated herein and administered under cooperative Page 131 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1endeavor agreements pursuant to this Act are not totally expended within two (2) years from 2the issuance of the bonds, the administering agency can close the project and recommend 3that the reallocation of any unexpended proceeds to any project contained in this Act or any 4previous Capital Outlay Acts. 5 Section 12. Notwithstanding any provisions contained herein or law to the 6contrary, the proceeds of revenue bonds to be utilized to fund certain projects authorized in 7Section 1. and Section 1. (A) hereof may, in accordance with Article VII, Section 9 of the 8Louisiana Constitution of 1974, be deposited in special accounts held outside the state 9treasury in accordance with the provisions of any bond resolution, indenture, reimbursement 10contract, or other bond or financing covenant which provides for the pledge of such funds 11in connection with the issuance of revenue bonds. For all projects administered by the office 12of facility planning and control, division of administration, authorized in Section 1. And 13Section 1. (A) hereof which are payable from the proceeds of revenue bonds, only the office 14of facility planning and control, division of administration, will be authorized to requisition 15funds from the special accounts described immediately above, at such time or times as may 16be deemed necessary by the office of facility planning and control, division of 17administration, in order to cover contract amounts or other project expenses. 18 Section 13. The governor shall have the power to veto any line-item in this Act. 19 Section 14. Except as otherwise provided herein, no funds shall be expended on 20any highway projects on highways within the state highway system as established in R.S. 2148:191 under the jurisdiction of the Department of Transportation and Development unless 22and until such project is in the Highway Program, R.S. 48:228 through 232, approved by the 23Joint Legislative Committee on Transportation, Highways and Public Works. Pursuant to 24R.S. 49:214.6.2(B), no integrated coastal protection construction project shall be undertaken 25with funds included in this bill except those included in an annual plan finally approved by 26the legislature in accordance with the provisions of R.S. 49:214.5.3. No funds appropriated 27to the Coastal Protection and Restoration Authority in this Act as a contribution for a project 28cost-share or otherwise, for the national economic development and national ecosystem 29restoration components of the Southwest Coastal Louisiana Study shall be used or provided 30for the expropriation of property or use of eminent domain, except where such funds are to 31be used to obtain property voluntarily offered for project purposes, where at least seventy- Page 132 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1five percent of the owners have voluntarily offered the property, or where the record or 2apparent owners have voluntarily offered the property but do not have clear title. 3 Section 15. The word "statewide" used in place of the specific parish designation 4for projects contained in this Act indicates that the project or program is applicable to all 5sixty- four parishes in the state. The description of any project in this Act shall be deemed 6to include planning, design, master planning, studies, permits, surveys, testing, construction, 7land and/or building/improvement acquisition, reconstruction, renovation, repair, right-of- 8way and utilities, site and other improvements, miscellaneous/contingencies, lease hold 9improvements ultimately owned by the state or a political subdivision of the state, equipment 10and other acquisitions, and any other component of the project if such are included or 11indicated in the capital outlay request for such projects required by R. S. 39:101 subject to 12the provisions of Title 39 of the Louisiana Revised Statutes of 1950. For new construction 13or renovation projects, equipment or other acquisitions, which can reasonably be considered 14necessary for the facility to be functional, may be deemed to be included in the project, even 15if such equipment or other acquisitions are not included or indicated in the project name or 16the capital outlay request. When local or federal match is referenced in a project title, but 17only a portion of the state appropriation is granted a line of credit or otherwise funded, then 18the amount of local or federal match, required to be made available, may be prorated relative 19to the amount of state appropriation made available through lines of credit. 20 Section 16. The provisions, items, and projects contained in this Act are 21severable and if any provision, item, or project contained herein, or the application of any 22such provision, item, or project, is held invalid, such invalidity shall not affect other 23provisions, items, projects, or applications of the Act which can be given effect without the 24invalid provision, project, item, or application. 25 Section 17. Notwithstanding any other provisions of law to the contrary, the state 26shall not grant cash lines of credit, or authorize or issue general obligation bonds in a 27principal amount in excess of $1,649,198,419 for Fiscal Year 2024-2025. 28 Section 18. Notwithstanding any contrary provision of this Act or any contrary 29provision of law, no funds appropriated by this Act shall be released or provided to any 30recipient of an appropriation made in this Act if, when, and for as long as, the recipient fails 31or refuses to comply with the provisions of R.S. 24:513. No recipient shall be considered to Page 133 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 1fail or refuse to comply with the provisions of R.S. 24:513 pursuant to this Section during 2any extension of time granted by the legislative auditor to the recipient to comply. 3 Section 19. This Act shall become effective upon signature by the governor or, 4if not signed by the governor, upon expiration of the time for bills to become law without 5signature by the governor, as provided in Article III, Section 18 of the Constitution of 6Louisiana. If vetoed by the governor and subsequently approved by the legislature, this Act 7shall become effective on the day following such approval. DIGEST The digest printed below was prepared by House Legislative Services. It constitutes no part of the legislative instrument. The keyword, one-liner, abstract, and digest do not constitute part of the law or proof or indicia of legislative intent. [R.S. 1:13(B) and 24:177(E)] HB 2 Reengrossed 2024 Regular Session Emerson Provides for the capital outlay budget and program for FY 2024-2025; provides for the funding of the capital outlays from the specified sources of monies in the specified amounts as follows: Federal Funds $574,885,539 Federal Funds via Interagency Transfer $47,640,000 Coastal Protection and Restoration Fund $96,781,486 Transportation Trust Fund (TTF) – Regular $146,033,464 Transportation Trust Fund (TTF) – Federal $1,325,000,000 Transportation Trust Fund (TTF) – Construction Subfund $187,100,000 Construction Subfund Preservation $50,000,000 State Highway Improvement Fund $31,900,000 Interagency Transfers $63,695,115 Fees and Self-Generated Revenues $154,830,000 Re-appropriated Cash $14,126,925 Interest Earnings $ 5,000,000 State General Fund (Direct) $62,800,000 State General Fund (Direct) Non-Recurring Revenues $201,964,000 Capital Outlay Savings Fund $10,425,000 TOTAL CASH PORTION $2,972,181,529 Authorizes the funding of certain capital outlay projects from the sale of general obligation bonds for the projects delineated as follows: Priority 1 $1,670,734,737 Priority 5 $5,832,979,683 TOTAL GENERAL OBLIGATION BONDS $7,503,714,420 BONDS NRP $12,957,432 GRAND TOTAL OF ALL MEANS OF FINANCING $10,488,853,381 Effective upon signature of the governor or lapse of time for gubernatorial action. Page 134 of 135 HLS 24RS-411 REENGROSSED HB NO. 2 Summary of Amendments Adopted by House The Committee Amendments Proposed by House Committee on Ways and Means to the original bill: 1. Change General Obligation Bond funding as follows: Priority 1 $ 27,478,000 Priority 5 $ 98,363,386 The Committee Amendments Proposed by House Committee on Appropriations to the engrossed bill: 1. Change the cash portion as follows: State General Fund (Direct) Non-Recurring Revenues $ (9,536,000) Capital Outlay Savings Fund $ 10,425,000 Re-appropriated Cash $ 1,600,000 Fees and Self-Generated Revenues $ 7,750,000 Interagency Transfers $ 2,000,000 Federal Funds $ 25,494,000 Federal Funds via Interagency Transfer $ 1,350,000 Page 135 of 135