Colorado 2025 Regular Session

Colorado House Bill HB1292

Introduced
3/3/25  
Refer
3/3/25  
Report Pass
3/25/25  
Refer
3/25/25  
Report Pass
4/7/25  
Refer
4/7/25  
Report Pass
4/29/25  
Refer
4/29/25  
Engrossed
4/30/25  
Refer
4/30/25  
Report Pass
5/5/25  
Refer
5/5/25  
Report Pass
5/5/25  
Refer
5/5/25  
Enrolled
5/7/25  
Engrossed
5/8/25  
Engrossed
5/8/25  
Enrolled
5/8/25  

Caption

Transmission Lines in State Highway Rights-of-Way

Impact

The legislative sentiment regarding HB 1292 highlights its significance for facilitating energy transmission and advancing Colorado’s renewable energy goals. However, there is an evident concern regarding protecting local communities and wildlife. Proponents argue that utilizing highway space for transmission lines can mitigate the environmental impact compared to new constructions in untouched areas. The bill mandates a thorough evaluation of potential community effects, particularly on disproportionately impacted populations, as well as a requirement for mitigation strategies for any identified risks associated with the projects.

Summary

House Bill 1292 aims to allow the construction and maintenance of high voltage transmission lines within state highway rights-of-way in Colorado. The bill recognizes the need for enhancing electric transmission infrastructure to meet the state’s clean energy targets and reliability requirements. It lays down clear definitions, stipulating that any transmission line exceeding 115 kilovolts can be co-located within highway spaces, with guidelines for public safety and environmental considerations. Additionally, the bill outlines a surcharge system for developers wishing to use these rights-of-way, which includes options for lump-sum payments or annual fees over a 20-year term.

Sentiment

The sentiment around HB 1292 is mixed. Supporters advocate for its potential to streamline energy transmission, thus aiding in the transition to clean energy. They emphasize that this could significantly enhance access to renewable energy sources. Conversely, opponents argue that co-locating high voltage lines could pose risks to public safety and disrupt local ecosystems. The bill’s provisions for community engagement are crucial to addressing these concerns, as they aim to ensure that project impacts are considered and mitigated appropriately.

Contention

A notable point of contention involves the balance between energy development and local environmental and community impacts. Critics express fears that the bill may prioritize infrastructure expansion at the expense of local health and safety standards, particularly if adequate oversight is not maintained. The process for issuing permits and evaluating the potential risks associated with the proposed projects requires careful consideration, particularly given that express consent is necessary when developments intersect with Indian reservations. Community engagement practices and adherence to environmental justice frameworks are deemed essential to responsibly implement such infrastructural changes.

Companion Bills

No companion bills found.

Previously Filed As

CO HB1266

Local Government Utility Relocation in Right-of-Way

CO HB1233

Electric Vehicle Charging And Parking Requirements

CO SB016

Greenhouse Gas Emission Reduction Measures

CO SB091

Rights-of-Way Permits for Broadband Deployment

CO SB100

Commercial Vehicle Highway Safety Measures

CO HB1246

Electric Grid Resilience Temporary Carbon Dioxide Regulation

CO SB218

Modernize Energy Distribution Systems

CO SB212

Local Govs Renewable Energy Projects

CO SB051

Conforming Workforce Development Statutes

CO SB184

Support Surface Transportation Infrastructure Development

Similar Bills

CO HB1339

Merge Department Of Revenue Division Of Motor Vehicles Cash Funds

CO HB1104

Powerline Trails

CO SB127

Optimizing Colorado Electric Transmission System

CO HJR1007

Water Projects Eligibility Lists

CO SJR004

Water Projects Eligibility Lists

CO SJR002

Water Projects Eligibility Lists