Rhode Island 2025 Regular Session

Rhode Island Senate Bill S1121

Introduced
6/2/25  

Caption

Allows preferred sites to be developed without being subject to the cap or rate reduction in the net metering statute.

Companion Bills

No companion bills found.

Previously Filed As

RI S2035

Allows a property owner with eligible net-metering systems with a master meter to allocate excess net metering credits to any meter on the property.

RI S0684

Net Metering

RI H5853

Net Metering

RI S2536

Prohibits utility companies from limiting the eligibility of a net metering site based on prior consumption and requires excess energy not consumed under the net metering system to be credited to the consumer.

RI H7018

Prohibits utility companies from limiting eligibility of net metering site based on prior consumption and requires excess energy not consumed to be credited to consumer. Also amends definition of excess renewable net-metering credit.

RI H7808

Prohibits utility companies from limiting eligibility of net metering site based on prior consumption and requires excess energy not consumed to be credited to consumer. Also amends definition of excess renewable net-metering credit.

RI H5540

Net Metering

RI H5033

Net Metering

RI S0170

Net-metering

RI S2151

Modifies the definition of "core forest" to refer to unfragmented forest blocks or single or multiple parcels totaling 250 acres or greater and at least 25 yards from mapped roads.

Similar Bills

CA AB691

Inefficient heating, ventilation, and air conditioning systems at schools: report.

RI S2689

Distributed Generation Interconnection

RI H8028

Distributed Generation Interconnection

CA AB354

Energy efficient appliance rebate program.

CA SB83

Public utilities: electrical distribution grid: energization.

CA SB410

Powering Up Californians Act.

MN HF5097

Initiation of proceeding at Public Utilities Commission regarding cost allocation of distribution system upgrades required, interconnection ombudsperson position at Public Utilities Commission established, and interconnection applications surcharge established.

MN SF5395

Initiation requirement of a proceeding at the Public Utilities Commission regarding cost allocation of distribution system upgrades