Page 1 - 131LR2160(03) STATE OF MAINE _____ IN THE YEAR OF OUR LORD TWO THOUSAND TWENTY-THREE _____ H.P. 1098 - L.D. 1709 An Act to Update the Elevator and Tramway Safety Laws Regarding Construction Hoists Be it enacted by the People of the State of Maine as follows: Sec. 1. 32 MRSA §15202, sub-§3-A is enacted to read: 3-A. Construction hoist. part of a building or structure; is installed inside or outside the building or structure during the construction, alteration or demolition of the building or structure; and is used to raise and lower workers, other personnel and materials. "Construction hoist" does not include: A. An elevator that is temporarily installed in a hoistway during the construction of a building or structure and that incorporates a part of a permanent elevator that will be installed later; B. A hoist for raising and lowering materials that is not designed to carry workers or other personnel; C. A manlift that operates through a counterbalance mechanism or through the use of a continuous belt; D. A mine hoist; E. A wire rope hoist, whether guided or unguided; or F. A transport platform. Sec. 2. 32 MRSA §15202, sub-§3-B is enacted to read: 3-B. Construction hoist operator. operates or is responsible for the operation of a construction hoist. Sec. 3. 32 MRSA §15230 is enacted to read: §15230. Construction hoist operators; rules The director shall adopt rules regarding the proper operation of construction hoists and training requirements for construction hoist operators. After adoption of the rules, a person may not operate a construction hoist except as in accordance with the rules adopted by the APPROVED JUNE 26, 2023 BY GOVERNOR CHAPTER 326 PUBLIC LAW Page 2 - 131LR2160(03) director. Rules adopted under this section are routine technical rules as defined in Title 5, chapter 375, subchapter 2-A.