Printed on recycled paper 132nd MAINE LEGISLATURE FIRST REGULAR SESSION-2025 Legislative Document No. 1085H.P. 707House of Representatives, March 18, 2025 Resolve, Directing the Judicial Branch to Perform an Inspection and Study of the Rumford Courthouse Building Received by the Clerk of the House on March 14, 2025. Referred to the Committee on Judiciary pursuant to Joint Rule 308.2 and ordered printed pursuant to Joint Rule 401. ROBERT B. HUNT Clerk Presented by Representative HENDERSON of Rumford. Cosponsored by Senator CARNEY of Cumberland and Representatives: CARUSO of Caratunk, LEE of Auburn, O'HALLORAN of Brewer, SATO of Gorham, Senator: MARTIN of Oxford. Page 1 - 132LR1874(01)1 2 That the judicial branch shall perform an inspection 3 and space study of the building that houses the Rumford Court located at 145 Congress 4 Street, Rumford, including the space occupied by the Rumford Police Department, to 5 determine the feasibility of necessary updates required to resume jury trials at the building, 6 including all required updates, structural and cosmetic improvements and an estimated 7 timeline for completion of the renovations. 8 That, by April 1, 2027, the judicial branch shall issue a 9 report on the inspection and space study, including all required updates, structural and 10 cosmetic improvements and an estimated timeline for completion of the renovations. The 11 judicial branch shall issue the report to the joint standing committee of the Legislature 12 having jurisdiction over judicial matters, which may report out a bill based upon the report. 13 14 This resolve directs the judicial branch to perform an inspection and space study of the 15 building that houses the Rumford Court and issue a report within 18 months of the effective 16 date of this resolve on all the necessary updates, structural and cosmetic improvements 17 required and an estimated timeline of completion of renovations to resume jury trials in the 18 building. 14 15 16 17 18