Montana 2025 2025 Regular Session

Montana House Bill HB31 Enrolled / Bill

                     - 2025 
69th Legislature 2025 	HB 31
- 1 - Authorized Print Version – HB 31 
ENROLLED BILL
AN ACT CLARIFYING CERTAIN BONDING REQUIREMENTS FOR WIND AND SOLAR GENERATION 
FACILITIES; PROVIDING FOR A DECOMMISSIONING LIEN; AMENDING SECTION SECTIONS 75-26-304, 
AND 75-26-308, MCA; AND PROVIDING AN IMMEDIATE EFFECTIVE DATE.”
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MONTANA:
Section 1. Section 75-26-304, MCA, is amended to read:
"75-26-304.  (1) (a) Within 12 months of a wind generation 
facility or solar facility commencing commercial operation, the owner of a wind generation facility or solar facility 
operating in Montana shall:
(i) notify the department in writing of the date that the facility began commercial operation;
(ii) subject to subsection (2), submit a plan for decommissioning the facility to the department, 
including the scope of work to be completed and cost estimates for completion; and
(iii) submit to the department an abstract of any leasing agreement between a facility owner and a 
landowner on whose property the facility is sited; and
(iii)(iv) provide the department with any other necessary information in accordance with this part and 
rules adopted pursuant to this part in order for the department to determine bond requirements in accordance 
with this section.
(b) Except as provided in subsection (1)(c), if a wind generation facility or solar facility commenced 
commercial operation before May 7, 2019, the owner of the facility shall submit to the department the 
information required in subsection (1)(a) on or before July 1, 2020.
(c) If a wind generation facility commenced commercial operation before May 7, 2019, and the 
owner of the facility submitted information required by subsection (1)(a) on or before July 1, 2018, the owner is 
not required to resubmit the information.  - 2025 
69th Legislature 2025 	HB 31
- 2 - Authorized Print Version – HB 31 
ENROLLED BILL
(d) Within 90 days of a wind generation facility or solar facility commencing construction, the owner 
of the wind generation facility or solar facility shall notify the department that construction of the facility has 
commenced.
(2) If a property owner and the owner of a wind generation facility or solar facility reach an 
agreement concerning alternative restoration of buildings, cabling, electrical components, roads, or any other 
associated facilities, instead of removal, or alternative plans for reclamation of surface lands, or both, 
decommissioning does not include removal, plans for reclamation, or both, as long as a copy of the agreement 
is provided to the department.
(3) (a) If necessary, the department may modify a plan for decommissioning to determine bond 
requirements in accordance with subsections (4) through (8).
(b) The department shall notify the owner of the facility of any modification. The owner of the wind 
generation facility or solar facility may appeal a modification by the department of a plan for decommissioning to 
the board within 60 days of receiving notice of the modification to the plan.
(4) (a) In determining the amount of a bond required in accordance with subsection (6), the 
department shall consider:
(a)(i) the character and nature of the site where the wind generation facility or solar facility is located; 
and
(b)(ii) the current market salvage value of the wind generation facility or solar facility, as determined 
by an independent evaluator.
(b) The amount of the decommissioning bond a facility owner shall pay is 100% of the amount 
calculated by the department pursuant to subsections (3) through (5) and (12).
(5) Except as provided in subsections (7) and (8) and in accordance with subsection (6), the owner 
of a wind generation facility or solar facility shall submit to the department a bond payable to the state of 
Montana in a form acceptable by the department and in the sum determined by the department, conditioned on 
the faithful decommissioning of the wind generation facility or solar facility.
(6) (a) Except as provided in subsections (7) and (8), if a wind generation facility or solar facility 
commenced commercial operation on or before January 1, 2007, the operator owner shall submit the 
decommissioning bond to the department prior to the conclusion of the 16th year of operation of the wind   - 2025 
69th Legislature 2025 	HB 31
- 3 - Authorized Print Version – HB 31 
ENROLLED BILL
generation facility or solar facility.
(b) Except as provided in subsections (6)(d), (7), and (8), if a wind generation facility or solar 
facility commenced commercial operation after January 1, 2007, but before October 1, 2025, the owner shall 
submit the decommissioning bond to the department prior to the conclusion of the 15th year of operation of the 
wind generation facility or solar facility.
(b)(c) Except as provided in subsections (6)(d), (7), and (8), if a wind generation facility or solar 
facility commenced commercial operation after January 1, 2007 on or after October 1, 2025, the operator owner 
shall submit the decommissioning bond to the department prior to the conclusion of the 15th 12th year of 
operation of the wind generation facility or solar facility.
(d) Except as provided in subsections (7) and (8), for a wind generation facility or solar facility with 
assets that are operating, constructed, or partially constructed, if a property lease for the facility terminates prior 
to the conclusion of the 12th year of operation of the facility, the owner shall submit the decommissioning bond 
to the department 1 year prior to the property lease termination date.
(7) If a wind generation facility or solar facility is repurposed, as determined by the department in 
consultation with the owner, the owner is not required to provide a bond, and any existing bond must be 
released until the repurposed facility reaches its 5th year of operation.
(8) An owner of a wind generation facility or solar facility is exempt from the requirements of 
subsection (6) if:
(a) for that portion of a wind generation facility or solar facility, the owner posts has posted a 
decommissioning bond with a federal agency, with the department of natural resources and conservation for 
the lease of state land, or with a tribal, county, or local government;
(b) the owner furnishes documents to the department that prove the owner is responsible under 
the terms and conditions of a lease agreement to provide private bonding. The parties shall agree that release 
of the agreed upon on bond is subject to the approval of the department upon on completion of reclamation.
(c) the private landowner on whose land the wind generation facility or solar facility is located owns 
a 10% or greater share of the wind generation facility or solar facility, as determined by the department; or
(d) the facility:
(i) commenced commercial operation on or before January 1, 2018, is a wind generation facility,   - 2025 
69th Legislature 2025 	HB 31
- 4 - Authorized Print Version – HB 31 
ENROLLED BILL
and has less than 25 megawatts in nameplate capacity; or
(ii) commenced commercial operation on or before January 1, 2020, is a solar facility, and has less 
than 2 megawatts in nameplate capacity.
(9) (a) If the owner of the wind generation facility or solar facility fails to submit a decommissioning 
bond acceptable to the department within the timeframe required by this section, the department shall provide 
notice to the facility owner. If after 30 days the owner of a wind generation facility or solar facility has not 
submitted a decommissioning bond, the department may assess an administrative penalty of not more than 
$1,500 and an additional administrative penalty of not more than $1,500 for each day the failure to submit the 
decommissioning bond continues.
(b) The owner of the wind generation facility or solar facility may appeal the department's penalty 
assessment to the board within 20 days after receipt of written notice of the penalty. The contested case 
provisions of the Montana Administrative Procedure Act, Title 2, chapter 4, part 6, apply to a hearing before the 
board under this subsection (9).
(10) If the owner of a wind generation facility or solar facility transfers ownership of the facility to a 
successor owner, the first owner's bond must be released after 90 days. The new owner shall submit any 
necessary bond within 90 days after transfer of ownership or be subject to penalties in accordance with this 
section.
(11) Once every 5 years after a facility is bonded, the owner of a wind generation facility or solar 
facility may submit an amended plan for the department's approval. As part of the submission, the owner of a 
wind generation facility or solar facility may also apply to the department for a reduction in the amount of the 
decommissioning bond applicable to the wind energy facility or solar facility. The owner's application to the 
department must include a detailed description of any material changes to information considered by the 
department in setting the initial amount of the bond and may include an amended decommissioning plan for the 
department's approval.
(12) Submitting a bond in accordance with this section does not absolve the owner of a wind 
generation facility or solar facility from complying with applicable regulations and requirements for:
(a) areas subject to local zoning adopted under Title 76, chapter 2;
(b) military affected areas under Title 10, chapter 1, part 15; or  - 2025 
69th Legislature 2025 	HB 31
- 5 - Authorized Print Version – HB 31 
ENROLLED BILL
(c) airport affected areas under Title 67, chapter 7."
Section 2.  (1) For a wind generation facility or solar facility that has not 
submitted a bond to the department or within 30 days of abandonment of a wind generation facility or solar 
facility, the department shall file a lien on the generation assets of the facility in an amount not less than the 
estimated decommissioning costs in the decommissioning plan filed pursuant to 75-26-304 plus an annual 
inflationary amount determined by the department.
(2) The department shall release a lien secured pursuant to subsection (1) following the receipt 
and acceptance of a decommissioning bond submitted as required by 75-26-304(6)(b), (6)(c), or (6)(d).
(3) If the owner of a wind generation facility or solar facility fails to properly decommission a wind 
generation facility or solar facility and the owner has not commenced action to rectify deficiencies within 90 
days after notice by the department, the department may foreclose on the lien. The department, through 
department staff, equipment, resources, and material under its control or a contract with others, may take any 
action necessary to decommission the wind generation facility or solar facility.
Section 3. Section 75-26-308, MCA, is amended to read:
"75-26-308.  (1) There is 
a wind and solar decommissioning account within the state special revenue fund established in 17-2-102. There 
must be paid into the account:
(a) penalties collected in accordance with 75-26-304(9);
(b) proceeds from the sale of assets secured by liens on a wind generation facility or solar facility 
that has been liquidated pursuant to [section 2(3)]; and
(b)(c) interest income earned on the account.
(2) Funds in the wind and solar decommissioning account are statutorily appropriated, as provided 
in 17-7-502, to the department.
(3) (a) Money in the account may only be used by the department in implementing this part and 
rules adopted pursuant to this part.
(b) The department shall administer this part using existing resources and money in the account   - 2025 
69th Legislature 2025 	HB 31
- 6 - Authorized Print Version – HB 31 
ENROLLED BILL
pursuant to subsection (1).
(4) The department shall maintain and hold bonds or other surety received by the department as 
authorized in 75-26-304 for use in accordance with this part."
Section 4.  [This act] is effective on passage and approval.
Section 5.  [Section 2] is intended to be codified as an integral part of Title 
75, chapter 26, part 3, and the provisions of Title 75, chapter 26, part 3, apply to [section 2].
- END - I hereby certify that the within bill,
HB 31, originated in the House.
___________________________________________
Chief Clerk of the House 
___________________________________________
Speaker of the House 
Signed this _______________________________day
of____________________________________, 2025.
___________________________________________
President of the Senate
Signed this _______________________________day
of____________________________________, 2025. HOUSE BILL NO. 31
INTRODUCED BY N. DURAM
BY REQUEST OF THE DEPARTMENT OF ENVIRONMENTAL QUALITY
AN ACT CLARIFYING CERTAIN BONDING REQUIREMENTS FOR WIND AND SOLAR GENERATION 
FACILITIES; PROVIDING FOR A DECOMMISSIONING LIEN; AMENDING SECTION SECTIONS 75-26-304, 
AND 75-26-308, MCA; AND PROVIDING AN IMMEDIATE EFFECTIVE DATE.”