Montana 2025 2025 Regular Session

Montana House Bill HB55 Enrolled / Bill

                     - 2025 
69th Legislature 2025 	HB 55
- 1 - Authorized Print Version – HB 55 
ENROLLED BILL
AN ACT REVISING PUBLIC UTILITY RESOURCE PLANNING LAWS; PROVIDING TIMELINES; PROVIDING 
FOR AN INDEPENDENT EVALUATOR AND DUTIES; PROVIDING A DEFINITION; PROVIDING 
RULEMAKING AUTHORITY; PROVIDING FOR A SPECIAL REVENUE ACCOUNT; PROVIDING AN 
APPROPRIATION; AMENDING SECTIONS 69-1-114, 69-3-1204, 69-3-1205, 69-3-1207, 69-3-1208, AND 69-
8-421, MCA; PROVIDING FOR CONTINGENT VOIDNESS; AND PROVIDING AN EFFECTIVE DATE.”
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MONTANA:
Section 1. Section 69-1-114, MCA, is amended to read:
"69-1-114.  (1) Each fee charged by the commission must be reasonable.
(2) Except for a fee assessed pursuant to 69-3-204(2), 69-3-1204(6)(b), 69-3-1207(4)(b) 69-3-
1207(5)(a), 69-3-1612(4), or 69-12-423(2), a fee set by the commission may not exceed $500.
(3) All fees collected by the department commission under 69-3-1204(6)(b) and 69-3-1207(4)(b) 
must be deposited in an account in the special revenue fund. Funds in this account must be used as provided 
in 69-3-1204(6)(b) and 69-3-1207(4)(b) 69-3-1207(5)(a).
(4) All fees collected by the commission under 69-3-1612(4) must be treated as financing costs 
and used in accordance with a financing order issued in accordance with 69-3-1606."
Section 2. Section 69-3-1204, MCA, is amended to read:
"69-3-1204.  (1) (a) The commission shall adopt rules requiring a public 
utility to prepare and file a plan at least every 3 years for meeting the requirements of its customers in the most 
cost-effective manner consistent with the public utility's obligation to serve and in accordance with this part.
(b) The rules must prescribe the content and the time for filing a plan.
(2) (a) A plan must contain but is not limited to:
(i) an evaluation of the full range of cost-effective means for the public utility to meet the service   - 2025 
69th Legislature 2025 	HB 55
- 2 - Authorized Print Version – HB 55 
ENROLLED BILL
requirements of its Montana customers, including conservation or similar improvements in the efficiency by 
which services are used and including demand-side management programs in accordance with 69-3-1209;
(ii) an annual electric demand and energy forecast developed pursuant to commission rules that 
includes energy and demand forecasts for each year within the planning period and historical data, as required 
by commission rule;
(iii) an assessment of planning reserve margins and contingency plans for the acquisition of 
additional resources developed pursuant to commission rules;
(iv) an assessment of the need for additional resources and the utility's plan for acquiring 
resources;
(v) the proposed process the utility intends to use to solicit bids for energy and capacity resources 
to be acquired through a competitive solicitation process in accordance with 69-3-1207; and
(vi) descriptions of at least two alternate scenarios that can be used to represent the costs and 
benefits from increasing amounts of renewable energy resources and demand-side management programs, 
based on rules developed by the commission.
(b) The utility shall fully explain, justify, and document the data, assumptions, methodologies, 
models, determinants, and any other inputs on which it relied to develop information required in subsection 
(2)(a).
(3) (a) The commission may adopt rules providing guidelines to be used in preparing a plan and 
identifying the criteria to be used in determining cost-effectiveness.
(b) The criteria may include externalities associated with the acquisition of a resource by a public 
utility.
(c) The rules must establish the minimum filing requirements for acceptance of a plan by the 
commission for further review. If a plan does not meet the minimum filing requirements, it must be returned to 
the public utility with a list of deficiencies filing requirements not met. A corrected plan must be submitted within 
the time established by the commission.
(4) A plan filed with the commission by a utility, as defined in 75-20-104, must be provided to the 
department of environmental quality and the consumer counsel.
(5) The Within 120 days of receipt of a complete plan, the commission shall:  - 2025 
69th Legislature 2025 	HB 55
- 3 - Authorized Print Version – HB 55 
ENROLLED BILL
(a) shall review the plan;
(b) shall publish a copy of the plan;
(c) shall allow for a minimum of 60  60 days for the public to comment on the plan; and
(d) shall provide public meetings in accordance with 69-3-1205.
(6) (a) The commission may identify deficiencies in the plan, including:
(i) any concerns of the commission regarding the public utility's compliance with commission 
rules; and
(ii) ways to remedy the concerns.
(b) The commission may engage independent engineering, financial, and management 
consultants or advisory services to evaluate a public utility's plan. The consultants must have demonstrated 
shall demonstrate knowledge and experience with resource procurement and resource portfolio management, 
modeling, risk management, and engineering practices. The commission shall charge a fee to the public utility 
to pay for the costs of consultants or advisory services. These costs are recoverable in rates."
Section 3. Section 69-3-1205, MCA, is amended to read:
"69-3-1205.  (1) When developing a plan in accordance with 
this part and prior to submitting a plan to the commission, a public utility shall hold at least two four public 
meetings in the utility's Montana service territory to ensure a plan best meets the diverse goals of shareholders, 
ratepayers, and society.
(2) The public utility shall consider written and oral comments respecting the proposed plan 
received during public meetings or meetings of the resource planning advisory committee held pursuant to 69-
3-1208. The public utility shall summarize and respond to substantive comments received and file those as part 
of the plan.
(2)(3) After a plan is submitted, the commission shall shall conduct two two public meetings for the 
purpose of receiving comment on a plan. The commission or the department of public service regulation may 
comment on the plan. A comment by the commission or the department may not be construed as preapproval 
by the commission of rate treatment for any proposed resource.
(3)(4) The department of environmental quality:  - 2025 
69th Legislature 2025 	HB 55
- 4 - Authorized Print Version – HB 55 
ENROLLED BILL
(a) shall review a plan submitted to the commission and comment on the need for new resources, 
the alternatives evaluated to meet the need, the environmental implications of the resource choices, and other 
related issues that it considers important. The department shall coordinate and deliver all comments from other 
executive branch agencies.
(b) may use a plan in the development of studies for a specific energy facility for which an 
application for a certificate of compliance is submitted under Title 75, chapter 20.
(4)(5) The consumer counsel shall review and may comment on a submitted plan."
Section 4. Section 69-3-1207, MCA, is amended to read:
"69-3-1207. 
evaluator -- department of environmental quality PUBLIC SERVICE COMMISSION role. (1) (a) Except as 
provided in subsection (5) (6), a public utility that intends to seek approval by the commission pursuant to 69-8-
421 establish in rates for the acquisition, construction, or purchase of an electricity supply resource shall 
conduct a competitive solicitation process.
(b) A public utility may not prohibit a qualifying small power production facility as defined in 69-3-
601 or another utility or supplier that owns an electricity supply resource or intends to construct an electricity 
supply resource from participating in a competitive solicitation process.
(c) A competitive solicitation process that is open to bids that would result in the ownership of an 
electricity supply resource by the public utility issuing the solicitation must include the use of a third-party 
administrator selected by the public utility to open, consider, and evaluate bids submitted An independent 
evaluator must be used to oversee a public utility's competitive solicitation. The commission shall select the 
independent evaluator pursuant to a solicitation subsection (4).
(d) An independent evaluator:
(i) shall monitor the evaluation of bids pursuant to a competitive solicitation;
(ii) shall provide oversight to ensure a fair and transparent competitive solicitation;
(iii) must be familiar with competitive bid and evaluation processes; and
(iv) shall evaluate and document the process used by the public utility to solicit and evaluate bids 
received during a competitive solicitation.  - 2025 
69th Legislature 2025 	HB 55
- 5 - Authorized Print Version – HB 55 
ENROLLED BILL
(e) A public utility  may conduct a competitive solicitation in conjunction with the development of 
an integrated least-cost plan in accordance with 69-3-1204.
(2) A public utility that plans to conduct a competitive solicitation process shall submit the following 
information to the commission:
(a) a description of the competitive solicitation process that the public utility will use and proof of 
compliance with subsections (1)(b) and (1)(c), if applicable; and
(b) a complete draft of the proposal soliciting electricity supply resources, citing the need for 
resourcesrequested resource parameters and inviting bids from all resource types.
(3) The commission may accept public comment on the information shallprovide notice and accept 
public comment regarding information received in accordance with subsection (2).
(4) (a) The Montana consumer counsel may request, select, and retain a person or organization to 
act as an independent monitor for a competitive solicitation process. Subject to public comments received 
pursuant to subsection (4)(b), the commission shall:
(i) solicit, evaluate, and maintain a list of independent evaluators for the competitive solicitation 
process;
(ii) develop a process to disqualify and remove from the list those independent evaluators who do 
not comply with established qualifications or who may have a conflict of interest;
(iii) update the list at least every 3 years; and
(iv) after information is submitted to the commission in accordance with subsection (2) and subject 
to rules adopted by the commission pursuant to subsection (4)(c), select an independent evaluator from the list.
(b) The commission shall accept public comment when developing and updating the list.
(c) On or before July 1, 2026, the commission shall adopt rules for:
(i) evaluating independent evaluators for inclusion on the list;
(ii) selecting an independent evaluator in accordance with this section;
(iii) implementing this subsection (4); and
(iv) prescribing the scope of work for the independent evaluator pursuant to the duties in [section  
5].  - 2025 
69th Legislature 2025 	HB 55
- 6 - Authorized Print Version – HB 55 
ENROLLED BILL
(b)(5) (a) The commission shall  commission may charge a fee to the public utility to pay for the costs 
of selecting and representing an independent monitor evaluator. This fee must be deposited in the  state 
special revenue fund to the credit of the department for expenses incurred selecting the independent evaluator. 
These costs are recoverable in rates. 
(c) The independent monitor may assist the Montana consumer counsel by:
(i) providing comments on the consistency of the competitive solicitation process with industry 
standards;
(ii) monitoring and observing the competitive solicitation process, paying particular attention to the 
public utility's evaluation of electricity supply resources that may result in utility ownership of the resource, to 
ensure that the utility conducts a fair and proper process in accordance with industry standards;
(iii) notifying the utility and the consumer counsel on a timely basis prior to the utility's selection of 
the resources of any discrepancies observed in the process and resolving any differences of opinion; and
(iv) preparing a closing report prior to the final selection of the resources regarding the consistency 
of the process, including selection and notification of electricity supply resources taking part in the solicitation 
process based on industry standards.
(b) After the commission selects an independent evaluator in accordance with subsection (4), the 
public utility shall execute a contract for service with the independent evaluator. The contract must include the 
scope of work developed pursuant to subsection (4)(c)(iv) and the duties in [section  5].
(5)(6) This section does not apply to:
(a) a request for proposals or purchase by a public utility intended solely to meet the short-term 
operational needs of the utility for a period of less than 12 months; or
(b) an application made to the commission by a public utility to acquire, construct, or purchase an 
opportunity resource.
(6)(7) For the purposes of this section, "opportunity resource" means an electricity supply resource 
necessary to meet a need demonstrated in a plan in accordance with 69-3-1204(2)(a)(iv) that is either new or 
existing and that remains unknown as to its availability for purchase until an opportunity to purchase arises."  - 2025 
69th Legislature 2025 	HB 55
- 7 - Authorized Print Version – HB 55 
ENROLLED BILL
Section 5.  (1) The independent evaluator shall oversee the competitive 
solicitation conducted by the public utility to protect the public interest and advance the policies in 69-3-1202.
(2) The independent evaluator shall:
(a) provide comments to the public utility and the commission on the fairness, transparency, and 
consistency of a competitive solicitation process with industry standards;
(b) monitor, evaluate, and observe the competitive solicitation process, paying particular attention 
to the public utility's evaluation of electric supply resources that may result in utility ownership of the resource to 
ensure that the utility conducts a fair and proper process in accordance with industry standards;
(c) notify the utility and the commission on a timely basis prior to the utility selection of the 
resources of any discrepancies observed in the process and resolve any differences of opinion; and
(d) prepare a closing report prior to the final selection of the resources regarding the fairness, 
transparency, and consistency of the process, including selection and notification of electricity supply resources 
taking part in the solicitation process based on industry standards. Public utilities shall include the closing report 
in applications for future cost-recovery dockets. The closing report must be made available to the public.
(3) The commission shall grant the independent evaluator the right of intervention in future cost-
recovery proceedings for the purpose of entering the closing report into the evidentiary record and representing 
the independent evaluator during discovery and hearings.
Section 6. Section 69-3-1208, MCA, is amended to read:
"69-3-1208.  (1) A public utility shall maintain a broad-
based advisory committee to review, evaluate, and make recommendations on technical, economic, and policy 
issues related to a utility's electricity system.
(2) The committee may advise the utility on demand-side management, portfolio planning, and 
management and procurement completed in accordance with this part."
(3) The utility shall publish the committee membership.
(4) A committee meeting must be open to the public  unless the majority of committee members 
vote to close the advisory meeting."  - 2025 
69th Legislature 2025 	HB 55
- 8 - Authorized Print Version – HB 55 
ENROLLED BILL
Section 7. Section 69-8-421, MCA, is amended to read:
"69-8-421. 
commission for approval of an electricity supply resource that:
(a) is not yet procured; and
(b) is subject to a competitive solicitation process when applicable in accordance with 69-3-1207.
(2) Within 45 days of the public utility's submission of an application for approval, the commission 
shall determine whether or not the application is adequate and in compliance with the commission's minimum 
filing requirements. If the commission determines that the application is inadequate, it shall explain the 
deficiencies.
(3) The commission shall issue an order within 180 days of receipt of an adequate application for 
approval of a power purchase agreement from an existing generating resource unless it determines that 
extraordinary circumstances require additional time.
(4) (a) Except as provided in subsections (4)(b) through (4)(d), the commission shall issue an order 
within 270 days of receipt of an adequate application for approval of a lease, an acquisition of an equity interest 
in a new or existing plant or equipment used to generate electricity, or a power purchase agreement for which 
approval would result in construction of a new electric generating resource. The commission may extend the 
time limit up to an additional 90 days if it determines that extraordinary circumstances require it.
(b) If an air quality permit pursuant to Title 75, chapter 2, is required for a new electrical generation 
resource or a modification to an existing resource, the commission shall hold the public meetings on the 
application for approval in accordance with 69-3-1205(2) 69-3-1205(3) at least 30 days after the issuance of the 
final air quality permit.
(c) If a final air quality permit is not issued within the time limit pursuant to subsection (4)(a), the 
commission shall extend the time limit in order to comply with subsection (4)(b).
(d) The commission may extend the time limit for issuing an order for an additional 60 days 
following the meetings pursuant to subsection (4)(b).
(5) To facilitate timely consideration of an application, the commission may initiate proceedings to 
evaluate planning and procurement activities related to a potential resource procurement, if necessary, in 
accordance with 69-3-1207 prior to the public utility's submission of an application for approval.  - 2025 
69th Legislature 2025 	HB 55
- 9 - Authorized Print Version – HB 55 
ENROLLED BILL
(6) (a) The commission may approve or deny, in whole or in part, an application for approval of an 
electricity supply resource.
(b) The commission may consider all relevant information known up to the time that the 
administrative record in the proceeding is closed in the evaluation of an application for approval.
(c) A commission order granting approval of an application must include the following findings:
(i) approval, in whole or in part, is in the public interest; and
(ii) procurement of the electricity supply resource is consistent with the requirements and 
objectives in 69-3-201, 69-3-1201 through 69-3-1209, and commission rules.
(d) The commission order may include a provision for allowable generation assets cost of service 
when the utility has filed an application for the lease or acquisition of an equity interest in a plant or equipment 
used to generate electricity.
(e) When issuing an order for the acquisition of an equity interest or lease in a facility or equipment 
that is constructed after January 1, 2007, and that is used to generate electricity that is primarily fueled by 
natural or synthetic gas, the commission shall require the applicant to implement cost-effective carbon offsets. 
Expenditures required for cost-effective carbon offsets pursuant to this subsection (6)(e) are fully recoverable in 
rates. By March 31, 2008, the commission shall adopt rules for the implementation of this subsection (6)(e).
(f) The commission order may include other findings that the commission determines are 
necessary.
(g) A commission order that denies approval must describe why the findings required in subsection 
(6)(c) could not be reached.
(h) The commission order must approve or deny an initial cost finding, in whole or in part. Any 
additional costs in excess of the commission approved amount must be approved or denied, in whole or in part, 
in a subsequent proceeding.
(7) Notwithstanding any provision of this chapter to the contrary, if the commission has issued an 
order containing the findings required under subsection (6)(c), the commission may not subsequently disallow 
the recovery of costs related to the approved electricity supply resource based on contrary findings.
(8) Until the state or federal government has adopted uniformly applicable statewide standards for 
the capture and sequestration of carbon dioxide, the commission may not approve an application for the   - 2025 
69th Legislature 2025 	HB 55
- 10 - Authorized Print Version – HB 55 
ENROLLED BILL
acquisition of an equity interest or lease in a facility or equipment used to generate electricity that is primarily 
fueled by coal and that is constructed after January 1, 2007, unless the facility or equipment captures and 
sequesters a minimum of 50% of the carbon dioxide produced by the facility. Carbon dioxide captured by a 
facility or equipment may be sequestered offsite from the facility or equipment.
(9) Nothing limits the commission's ability to subsequently, in any future rate proceeding, inquire 
into the manner in which the public utility has managed, dispatched, operated, or maintained any resource or 
managed any power purchase agreement as part of its overall resource portfolio. The commission may 
subsequently disallow rate recovery for the costs that result from the failure of a public utility to reasonably 
manage, dispatch, operate, maintain, or administer electricity supply resources in a manner consistent with 69-
3-201 and commission rules.
(10) The commission shall adopt rules prescribing minimum filing requirements for applications filed 
pursuant to this part."
Section 8.  There is appropriated $200,000 from the general fund to the public service 
commission for the biennium beginning July 1, 2025, to the meet the requirements of [this act].
Section 9.  [  Section 5] is intended to be codified as an integral part of 
Title 69, chapter 3, part 12, and the provisions of Title 69, chapter 3, part 12, apply to [  section 5].
Section 10.  If [this act] does not include the appropriation pursuant to [section 
8], then [section    is void.
Section 11.  [This act] is effective July 1, 2025.
- END - I hereby certify that the within bill,
HB 55, originated in the House.
___________________________________________
Chief Clerk of the House 
___________________________________________
Speaker of the House 
Signed this _______________________________day
of____________________________________, 2025.
___________________________________________
President of the Senate
Signed this _______________________________day
of____________________________________, 2025. HOUSE BILL NO. 55
INTRODUCED BY G. PARRY, 
BY REQUEST OF THE SELECT COMMITTEE ON ENERGY RESOURCE PLANNING AND ACQUISITION
AN ACT REVISING PUBLIC UTILITY RESOURCE PLANNING LAWS; PROVIDING TIMELINES; PROVIDING 
FOR AN INDEPENDENT EVALUATOR AND DUTIES; PROVIDING A DEFINITION; PROVIDING RULEMAKING 
AUTHORITY; PROVIDING FOR A SPECIAL REVENUE ACCOUNT; PROVIDING AN APPROPRIATION; 
AMENDING SECTIONS 69-1-114, 69-3-1204, 69-3-1205, 69-3-1207, 69-3-1208, AND 69-8-421, MCA; 
PROVIDING FOR CONTINGENT VOIDNESS; AND PROVIDING AN EFFECTIVE DATE.”