Montana 2025 2025 Regular Session

Montana House Bill HB808 Enrolled / Bill

                     - 2025 
69th Legislature 2025 	HB 808
- 1 - Authorized Print Version – HB 808 
ENROLLED BILL
AN ACT PROVIDING FOR THE MONTANA BROWNFIELDS REVITALIZATION ACT; PROVIDING 
DEFINITIONS; AUTHORIZING THE MONTANA BROWNFIELDS FUND; PROVIDING FOR BROWNFIELD 
REDEVELOPMENT VIABILITY AND ELIGIBILITY; PROVIDING RULEMAKING AUTHORITY; ELIMINATING 
THE MONTANA PETROLEUM BROWNFIELDS REVITALIZATION ACT; PROVIDING FOR A TRANSFER OF 
GENERAL FUNDS; PROVIDING A STATUTORY APPROPRIATION; AMENDING SECTIONS 17-7-502 AND 
75-11-309, MCA; AND REPEALING SECTIONS 75-11-401, 75-11-402, 75-11-403, 75-11-407, 75-11-408, AND 
75-11-409, MCA.”
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MONTANA:
Section 1.  [Sections 1 through 8] may be cited as the "Montana Brownfields 
Revitalization Act".
Section 2.  The legislature finds that:
(1) real properties exist across the state where the stigma of hazardous substance and petroleum 
contamination hinders the development or best use of the property. These properties may be eligible for 
brownfields funding.
(2) the assessment and cleanup of hazardous substance and petroleum brownfields sites should 
be encouraged and facilitated to reduce threats to human health and the environment, prepare properties for 
reuse and redevelopment, and return property to the local tax rolls;
(3) the petroleum tank release cleanup fund established in 75-11-313 does not immediately 
address all petroleum tank release sites in Montana;
(4) not all sites impacted by hazardous substances are assessed or cleaned up by the 
Comprehensive Environmental Cleanup and Responsibility Act in chapter 10, part 7, of this title or the federal   - 2025 
69th Legislature 2025 	HB 808
- 2 - Authorized Print Version – HB 808 
ENROLLED BILL
Comprehensive Environmental Response, Compensation, and Liability Act of 1980, 42 U.S.C. 9601, et seq.
Section 3.  (1) The definitions used in [sections 1 through 8] are for the purpose of 
determining the eligibility of sites to receive and expend federal brownfields funding received by a grant 
recipient from the United States environmental protection agency under the federal Brownfields Revitalization 
and Environmental Restoration Act of 2001, Title II of Public Law 107-118.
(2) As used in [ sections 1 through 8] unless the context clearly indicates otherwise, the following 
definitions apply:
(a) "Brownfield site" means an abandoned, idle, blighted, or underutilized property, for which the 
expansion, redevelopment, or reuse of may be complicated by the presence or potential presence of hazardous 
substances, pollutants, or contaminants.
(b) "Brownfields redevelopment" means any work or undertaking by a person to acquire a 
brownfield site and to raze, demolish, remove, reconstruct, renovate, or rehabilitate the site or existing 
buildings, structures, or other improvements at the site for the purpose of promoting the use of the site for 
residential, commercial, industrial, or other purposes. The term does not include construction of new facilities 
on the site for any purpose other than environmental remediation activities.
(c) "Department" means the department of environmental quality provided for in 2-15-3501.
(d) "Eligible entity" means a city, town, county, consolidated city-county, tribal government, 
economic development organization, nonprofit organization, or state agency that has received federal 
brownfields funding from the environmental protection agency or other state agency.
(e) "Environmental remediation activities" means:
(i) investigation, analysis, and monitoring of a brownfields site to determine the existence and 
extent of actual or potential environmental pollution;
(ii) redevelopment planning; or
(iii) abatement, removal, or containment of environmental pollution at a brownfields site.
(f) "Hazardous substance" has the same meaning as provided in 75-10-602.
(g) "Petroleum" or "petroleum product" has the same meaning as provided in 75-11-302.
(h) "Petroleum tank release site" means a site where there has been a release from a petroleum   - 2025 
69th Legislature 2025 	HB 808
- 3 - Authorized Print Version – HB 808 
ENROLLED BILL
storage tank and assessment or remediation, or both, are being pursued in accordance with Title 75, chapter 
11, part 3.
(i) "Reasonable steps" means, as appropriate, stopping continuing releases, preventing 
threatened future releases, or preventing or limiting human, environmental, or natural resource exposure to 
previous petroleum, petroleum product, or hazardous substance releases. The term may include limiting access 
to the property, monitoring known contaminants, and complying with state, local, or both state and local 
requirements.
(j) "Responsible party" means:
(i) a person responsible for conducting the assessment, investigation, and cleanup at a brownfield 
site as determined through:
(A) a judgment rendered in a court of law or an administrative order;
(B) an enforcement action by federal authorities or the department; or
(C) a citizen suit, contribution action, or other third-party claim brought against the current owner of 
a brownfield site; or
(ii) a current owner of a brownfield site who:
(A) dispensed or disposed of petroleum or petroleum product or hazardous substance 
contamination at the site;
(B) exacerbated existing contamination at the site;
(C) owned the site when any dispensing or disposal of petroleum or hazardous substances by 
others took place; or
(D) failed to take reasonable steps with regard to contamination at the site.
(k) "Viable responsible party" means a responsible party determined by the department to have 
the financial capability to conduct environmental remediation activities at a brownfield site.
Section 4.  (1) For the purpose of determining the viability of a 
responsible party at a brownfield site where petroleum contamination is the predominant contaminant, the 
department shall presume that:
(a) ongoing businesses or companies and government entities are viable unless there is   - 2025 
69th Legislature 2025 	HB 808
- 4 - Authorized Print Version – HB 808 
ENROLLED BILL
information suggesting that the presumption is not appropriate, and the department determines the information 
is sufficient to rebut the presumption in a particular case; and
(b) individuals and defunct or insolvent companies are not viable unless there is information 
suggesting that the presumption is not appropriate, and the department determines the information is sufficient 
to rebut the presumption in a particular case.
(2) The department may not determine that a responsible party is viable based solely on the fact 
that the owner or operator of a petroleum tank release site is eligible to be reimbursed by the petroleum tank 
release compensation board established in 2-15-2108 from the petroleum tank release cleanup fund 
established in 75-11-313.
(3) It is an applicant's responsibility to provide the department with sufficient financial information 
about a responsible party identified in a petroleum brownfields site eligibility application to determine whether 
the responsible party is a viable responsible party.
Section 5.  (1) Before an 
eligible entity may expend federal brownfields funds at a brownfield site, either the United States environmental 
protection agency or the department shall make a written determination that:
(a) there is no viable responsible party for the contamination as determined pursuant to [section 4];
(b) the brownfield site will not be assessed, investigated, or cleaned up by a responsible party; and
(c) the brownfield site is not subject to an order under section 9003(h) of the federal Solid Waste 
Disposal Act, 42 U.S.C. 6991b(h), or Title 75, chapter 11.
(2) After the department or the United States environmental protection agency determines that a 
brownfield site is eligible for federal brownfields funding, the department shall encourage and may not limit the 
use of an eligible entity’s federal brownfields funding at the site even if the site owner or operator, as defined in 
75-11-302, is eligible for funding from the petroleum tank release cleanup fund established in 75-11-313.
(3) The department may not limit the use of money from the petroleum tank release cleanup fund 
established in 75-11-313 when used as a commitment to a federal brownfields loan to an eligible entity for 
remediation of petroleum at a brownfield site.
(4) (a) Except as provided in subsection (4)(b), a determination made by the department or the   - 2025 
69th Legislature 2025 	HB 808
- 5 - Authorized Print Version – HB 808 
ENROLLED BILL
United States environmental protection agency that a brownfield site is eligible for federal brownfields funding 
does not limit or alter the responsible party's, owner's, or operator's responsibility to assess or remediate:
(i) a petroleum or hazardous substance release in accordance with Title 75, chapter 11; or
(ii) a liability at a facility subject to the Comprehensive Environmental Cleanup and Responsibility 
Act in accordance with Title 75, chapter 10.
(b) The department shall approve a comprehensive remediation plan and allow for the use of 
federal brownfields funding at the brownfield site if
the department determines that an eligible entity has proposed to conduct timely and comprehensive 
environmental remediation activities using federal brownfields funding at a brownfield site that:
(i) is eligible for brownfield funding as determined by the department or U.S. environmental 
protection agency;
(ii) proposes a remediation plan of environmental remediation activities that meets or exceeds 
department remediation standards; and
(iii) meets or exceeds financial commitments required by the petroleum tank release compensation 
board pursuant to Title 75, chapter 11, part 3.
Section 6.  Upon presentation of the proper credentials, an authorized representative of 
the department may enter any building, property, premises, place, or facility where brownfield redevelopment or 
environmental remediation activities are being performed or have been performed for the purpose of making an 
inspection to ensure compliance by any person pursuant to the provisions of [sections 1 through 8] or rules 
promulgated pursuant to [sections 1 through 8].
Section 7.  The department may adopt rules to implement the provisions of 
[sections 1 through 8] and to:
(1) prescribe the form and content of applications for assistance from the brownfields site 
redevelopment fund;
(2) apply eligibility criteria for awarding assistance from the brownfields site redevelopment fund;
(3) establish additional terms and conditions for assistance from the brownfields site   - 2025 
69th Legislature 2025 	HB 808
- 6 - Authorized Print Version – HB 808 
ENROLLED BILL
redevelopment fund;
(4) establish maximum amounts for an individual award of assistance from the brownfields site 
redevelopment fund, if considered appropriate and necessary for the successful administration of the program;
(5) ensure compliance of the program with the provisions of the Small Business Liability Relief and 
Brownfields Revitalization Act, Public Law 107-118, and rules promulgated under the act unless these matters 
are specifically governed by [sections 8]; and
(6) maintain the financial integrity of the program.
Section 8.  (1) It is the intent of 
the brownfield program to strengthen communities throughout this state and to promote economic development 
by encouraging environmental remediation activities and brownfields redevelopment of properties blighted by 
real or perceived contamination.
(2) The brownfields site redevelopment fund is an account in the state special revenue fund for 
assessment and cleanup of brownfield sites.
(3) The money in the account:
(a) may be deposited through an allocation of money.
(b) must be deposited through money received by the department in the form of legislative 
appropriations, reimbursements, gifts, or donations from any source that is intended to be used for the 
purposes of this account.
(4) The money in the account is statutorily appropriated, as provided in 17-7-502, to the 
department to be used only for:
(a) investigation and cleanup of petroleum or hazardous substances on an eligible site or facility 
for the purposes of brownfields redevelopment;
(b) demolition of structures, buildings, or other improvements located on an eligible site or facility;
(c) interior contaminant abatement activities on an eligible site or facility for asbestos abatement 
activities, as described in 75-2-502, or lead-based paint abatement activities as described in 40 CFR, part 745, 
subpart E; or
(d) removal of underground tank systems.  - 2025 
69th Legislature 2025 	HB 808
- 7 - Authorized Print Version – HB 808 
ENROLLED BILL
(5) Any unspent or unencumbered money in the account at the end of a fiscal year must remain in 
the account.
(6) Interest income on the account must deposited and remain in the account.
Section 9. Section 17-7-502, MCA, is amended to read:
"17-7-502.  (1) A statutory 
appropriation is an appropriation made by permanent law that authorizes spending by a state agency without 
the need for a biennial legislative appropriation or budget amendment.
(2) Except as provided in subsection (4), to be effective, a statutory appropriation must comply with 
both of the following provisions:
(a) The law containing the statutory authority must be listed in subsection (3).
(b) The law or portion of the law making a statutory appropriation must specifically state that a 
statutory appropriation is made as provided in this section.
(3) The following laws are the only laws containing statutory appropriations: 2-17-105; 5-11-120; 5-
11-407; 5-13-403; 5-13-404; 7-4-2502; 7-4-2924; 7-32-236; 10-1-108; 10-1-1202; 10-1-1303; 10-2-603; 10-2-
807; 10-3-203; 10-3-310; 10-3-312; 10-3-314; 10-3-316; 10-3-802; 10-3-1304; 10-4-304; 10-4-310; 15-1-121; 
15-1-142; 15-1-143; 15-1-218; 15-1-2302; 15-31-165; 15-31-1004; 15-31-1005; 15-35-108; 15-36-332; 15-37-
117; 15-39-110; 15-65-121; 15-70-128; 15-70-131; 15-70-132; 15-70-433; 16-11-119; 16-11-509; 17-3-106; 17-
3-212; 17-3-222; 17-3-241; 17-6-101; 17-6-214; 17-7-133; 17-7-215; 18-11-112; 19-3-319; 19-3-320; 19-6-410; 
19-9-702; 19-13-604; 19-17-301; 19-18-512; 19-19-305; 19-19-506; 19-20-604; 19-20-607; 19-21-203; 20-3-
369; 20-7-1709; 20-8-107; 20-9-250; 20-9-534; 20-9-622; [ 20-15-328]; 20-26-617; 20-26-1503; 22-1-327; 22-3-
116; 22-3-117; [ 22-3-1004]; 23-4-105; 23-5-306; 23-5-409; 23-5-612; 23-7-301; 23-7-402; 30-10-1004; 37-43-
204; 37-50-209; 37-54-113; 39-71-503; 41-5-2011; 42-2-105; 44-4-1101; 44-4-1506; 44-12-213; 44-13-102; 50-
1-115; 53-1-109; 53-6-148; 53-9-113; 53-24-108; 53-24-206; 60-5-530; 60-11-115; 61-3-321; 61-3-415; 67-1-
309; 69-3-870; 69-4-527; 75-1-1101; 75-5-1108; 75-6-214; 75-11-313; [section 8]; 75-26-308; 76-13-150; 76-
13-151; 76-13-417; 76-17-103; 77-1-108; 77-2-362; 80-2-222; 80-4-416; 80-11-518; 80-11-1006; 81-1-112; 81-
1-113; 81-2-203; 81-7-106; 81-7-123; 81-10-103; 82-11-161; 85-20-1504; 85-20-1505; [ 85-25-102]; 87-1-603; 
87-5-909; 90-1-115; 90-1-205; 90-1-504; 90-6-331; and 90-9-306.  - 2025 
69th Legislature 2025 	HB 808
- 8 - Authorized Print Version – HB 808 
ENROLLED BILL
(4) There is a statutory appropriation to pay the principal, interest, premiums, and any costs or fees 
associated with issuing, paying, securing, redeeming, or defeasing all bonds, notes, or other obligations, as due 
in the ordinary course or when earlier called for redemption or defeased, that have been authorized and issued 
pursuant to the laws of Montana. Agencies that have entered into agreements authorized by the laws of 
Montana to pay the state treasurer, for deposit in accordance with 17-2-101 through 17-2-107, as determined 
by the state treasurer, an amount sufficient to pay the principal and interest as due on the bonds or notes have 
statutory appropriation authority for the payments. (In subsection (3): pursuant to sec. 10, Ch. 360, L. 1999, the 
inclusion of 19-20-604 terminates contingently when the amortization period for the teachers' retirement 
system's unfunded liability is 10 years or less; pursuant to sec. 73, Ch. 44, L. 2007, the inclusion of 19-6-410 
terminates contingently upon the death of the last recipient eligible under 19-6-709(2) for the supplemental 
benefit provided by 19-6-709; pursuant to sec. 5, Ch. 383, L. 2015, the inclusion of 85-25-102 is effective on 
occurrence of contingency; pursuant to sec. 6, Ch. 423, L. 2015, the inclusion of 22-3-116 and 22-3-117 
terminates June 30, 2025; pursuant to sec. 4, Ch. 122, L. 2017, the inclusion of 10-3-1304 terminates 
September 30, 2025; pursuant to sec. 1, Ch. 213, L. 2017, the inclusion of 90-6-331 terminates June 30, 2027; 
pursuant to sec. 10, Ch. 374, L. 2017, the inclusion of 76-17-103 terminates June 30, 2027; pursuant to secs. 
11, 12, and 14, Ch. 343, L. 2019, the inclusion of 15-35-108 terminates June 30, 2027; pursuant to sec. 1, Ch. 
408, L. 2019, the inclusion of 17-7-215 terminates June 30, 2029; pursuant to secs. 1, 2, 3, Ch. 139, L. 2021, 
the inclusion of 53-9-113 terminates June 30, 2027; pursuant to sec. 8, Ch. 200, L. 2021, the inclusion of 10-4-
310 terminates July 1, 2031; pursuant to secs. 3, 4, Ch. 404, L. 2021, the inclusion of 30-10-1004 terminates 
June 30, 2027; pursuant to sec. 5, Ch. 548, L. 2021, the inclusion of 50-1-115 terminates June 30, 2025; 
pursuant to secs. 5 and 12, Ch. 563, L. 2021, the inclusion of 22-3-1004 is effective July 1, 2027; pursuant to 
sec. 1, Ch. 20, L. 2023, sec. 2, Ch. 20, L. 2023, and sec. 3, Ch. 20, L. 2023, the inclusion of 81-1-112, 81-1-
113, and 81-7-106 terminates June 30, 2029; pursuant to sec. 9, Ch. 44, L. 2023, the inclusion of 15-1-142 
terminates December 31, 2025; pursuant to sec. 10, Ch. 47, L. 2023, the inclusion of 15-1-2302 terminates 
June 30, 2025; pursuant to sec. 2, Ch. 374, L. 2023, the inclusion of 10-3-802 terminates June 30, 2031; 
pursuant to sec. 12, Ch. 558, L. 2023, the inclusion of 20-9-250 terminates December 31, 2029; pursuant to 
sec. 4, Ch. 621, L. 2023, the inclusion of 22-1-327 terminates July 1, 2029; pursuant to sec. 24, Ch. 722, L. 
2023, the inclusion of 17-7-133 terminates June 30, 2027; pursuant to sec. 10, Ch. 758, L. 2023, the inclusion   - 2025 
69th Legislature 2025 	HB 808
- 9 - Authorized Print Version – HB 808 
ENROLLED BILL
of 44-4-1506 terminates June 30, 2027; and pursuant to sec. 10, Ch. 764, L. 2023, the inclusion of 15-1-143 
terminates December 31, 2025.)"
Section 10. Section 75-11-309, MCA, is amended to read:
"75-11-309.  (1) An 
owner or operator seeking reimbursement for eligible costs and the department shall comply with the following 
procedures:
(a) If an owner or operator discovers or is provided evidence that a release may have occurred 
from the owner's or operator's petroleum storage tank, the owner or operator shall immediately notify the 
department of the release and conduct an initial response to the release in accordance with state and federal 
laws and rules to protect the public health and safety and the environment.
(b) Except for a tank for which a permit is sought under 75-11-308(1)(b)(iii) and that is closed 
within 120 days of discovery of the release, following discovery of the release, the petroleum storage tank must 
remain in compliance with applicable state and federal laws and rules that the board determines pertain to 
prevention and mitigation of petroleum releases.
(c) The owner or operator shall conduct a thorough investigation of the release and, subject to 
subsection (1)(d), report the findings to the department, and, as determined necessary by the department, 
prepare and submit for approval by the department a corrective action plan that conforms with state, tribal 
(when applicable), and federal corrective action requirements.
(d) For a release in which the costs are expected to exceed $100,000, an owner or operator, a 
representative of the owner or operator, the department, the board, and board staff shall meet to discuss the 
response to the release. For a release in which the costs are expected to be less than $100,000, an owner or 
operator, a representative of the owner or operator, the department, the board, and board staff may meet to 
discuss the response to the release if any party requests a meeting.
(e) (i) The department shall review the corrective action plan and forward a copy to a local 
government office, the board, and, when applicable, a tribal government office with jurisdiction over a corrective 
action for the release. The local or tribal government office and the board shall inform the department if it wants 
any modification of the proposed plan.  - 2025 
69th Legislature 2025 	HB 808
- 10 - Authorized Print Version – HB 808 
ENROLLED BILL
(ii) Based on its own review and comments received from a local government, a tribal government, 
the board, or other source, the department, subject to 75-11-408(4)(b) [section 5(4)(b)], may approve the 
proposed corrective action plan, make or request the owner or operator to modify the proposed plan, or prepare 
its own plan for compliance by the owner or operator. A plan finally approved by the department through any 
process provided in this subsection (1)(d) is the approved corrective action plan.
(iii) After the department approves a corrective action plan, a local government, or a tribal 
government, or the board may not impose different corrective action requirements on the owner or operator.
(f) A corrective action plan prepared by the owner, operator, or department for any petroleum 
storage tank release may include the establishment of a petroleum mixing zone as defined in 75-11-503.
(g) The department shall notify the owner or operator of its approval of a corrective action plan and 
shall promptly submit a copy of the approved corrective action plan to the board.
(h) The owner or operator shall implement the corrective action plan or plans approved by the 
department until the release is resolved. The department may oversee the implementation of the plan, require 
reports and monitoring from the owner or operator, undertake inspections, and otherwise exercise its authority 
concerning corrective action under Title 75, chapter 10, part 7, Title 75, chapter 11, part 5, and other applicable 
law and rules.
(i) (i) The owner or operator shall document in the manner required by the board all expenses 
incurred in preparing and implementing the corrective action plan. The owner or operator shall submit claims 
and substantiating documents to the board in the form and manner required by the board.
(ii) The board shall review each claim and determine if the claims are actual, reasonable, and 
necessary costs of responding to the release and implementing the corrective action plan.
(iii) If the board requires additional information to determine if a claimed cost is actual, reasonable, 
and necessary, the board may request comment from the department and the owner or operator.
(iv) If the department determines that an owner or operator is failing to properly implement a 
corrective action plan, it shall notify the board.
(j) The owner or operator shall document, in the manner required by the board, any payments to a 
third party for bodily injury or property damage caused by a release. The owner or operator shall submit claims 
and substantiating documents to the board in the form and manner required by the board.  - 2025 
69th Legislature 2025 	HB 808
- 11 - Authorized Print Version – HB 808 
ENROLLED BILL
(k) In addition to the documentation in subsections (1)(i) and (1)(j), when the release is claimed to 
have originated from a properly designed and installed double-walled tank system, the owner or operator shall 
document, in the manner required by the board, the following:
(i) the date that the release was discovered; and
(ii) that the originating tank was part of a properly designed and installed double-walled tank 
system.
(2) If an owner or operator is issued an administrative order for failure to comply with requirements 
imposed by or pursuant to Title 75, chapter 11, part 5, or rules adopted pursuant to Title 75, chapter 11, part 5, 
all reimbursement of claims submitted after the date of the order must be suspended. Upon a written 
determination by the department that the owner or operator has returned to compliance with the requirements 
of Title 75, chapter 11, part 5, or rules adopted pursuant to Title 75, chapter 11, part 5, suspended and future 
claims may be reimbursed according to criteria established by the board. In establishing the criteria, the board 
shall consider the effect and duration of the noncompliance.
(3) The board shall review each claim received under subsections (1)(i) and (1)(j), make the 
determination required by this subsection, inform the owner or operator of its determination, and, as 
appropriate, reimburse the owner or operator from the fund. Before approving a reimbursement, the board shall 
affirmatively determine that:
(a) the expenses for which reimbursement is claimed:
(i) are eligible costs; and
(ii) were actually, necessarily, and reasonably incurred for the preparation or implementation of a 
corrective action plan approved by the department or for payments to a third party for bodily injury or property 
damage; and
(b) the owner or operator:
(i) is eligible for reimbursement under 75-11-308; and
(ii) has complied with this section and any rules adopted pursuant to this section. Upon a 
determination by the board that the owner or operator has not complied with this section or rules adopted 
pursuant to this section, all reimbursement of pending and future claims must be suspended. Upon a 
determination by the board that the owner or operator has returned to compliance with this section or rules   - 2025 
69th Legislature 2025 	HB 808
- 12 - Authorized Print Version – HB 808 
ENROLLED BILL
adopted pursuant to this section, suspended and future claims may be reimbursed according to criteria 
established by the board. In establishing the criteria, the board shall consider the effect and duration of the 
noncompliance.
(4) (a) If an owner or operator disagrees with a board determination under subsection (3), the 
owner or operator may submit a written request for a hearing before the board.
(b) A written request for a hearing must be received by the board within 120 days after notice of 
the board's determination is served on the owner or operator by certified mail. The notice of determination must 
advise the owner or operator of the 120-day time limit for submitting a written request for a hearing to the board. 
Not less than 50 days or more than 60 days after the board serves the notice of determination, the board shall 
serve on the owner or operator a second notice by certified mail advising the owner or operator of the deadline 
for requesting a hearing. Service by certified mail is complete on the date shown on the certified mail receipt.
(c) If a written request is received within 120 days, the hearing must be held at a meeting of the 
board or as otherwise permitted under the Montana Administrative Procedure Act no later than 120 days 
following receipt of the request or at a time mutually agreed to by the board and the owner or operator.
(d) If a written request is not received within 120 days, the determination of the board is final.
(5) The board shall obligate money for reimbursement of eligible costs of owners and operators in 
the order that the costs are finally approved by the board.
(6) (a) The board may, at the request of an owner or operator, guarantee in writing the 
reimbursement of eligible costs that have been approved by the board but for which money is not currently 
available from the fund for reimbursement.
(b) The board may, at the request of an owner or operator, guarantee in writing reimbursement of 
eligible costs not yet approved by the board, including estimated costs not yet incurred. A guarantee for 
payment under this subsection (6)(b) does not affect the order in which money in the fund is obligated under 
subsection (5).
(c) When considering a request for a guarantee of payment, the board may require pertinent 
information or documentation from the owner or operator. The board may grant or deny, in whole or in part, any 
request for a guarantee."  - 2025 
69th Legislature 2025 	HB 808
- 13 - Authorized Print Version – HB 808 
ENROLLED BILL
Section 11.  The following sections of the Montana Code Annotated are repealed:
75-11-401. Short title.
75-11-402. Findings and intent -- purposes.
75-11-403. Definitions -- application.
75-11-407. Viability.
75-11-408. Brownfields site eligibility at petroleum tank release sites -- determinations and limitations.
75-11-409. Use of petroleum brownfields funding acquired by state -- limitations.
Section 12.  The secretary of state shall send a copy of [this act] 
to each federally recognized tribal government in Montana.
Section 13.  The state treasurer shall transfer the following amounts from the 
general fund to the brownfields site redevelopment fund provided for in [section 8]:
Fiscal year 2026 $200,000
Fiscal year 2027 $200,000
Section 14.  [Sections 1 through 8] are intended to be codified as an 
integral part of Title 75, chapter 11, and the provisions of Title 75, chapter 11, apply to [sections 1 through 8].
- END - I hereby certify that the within bill,
HB 808, originated in the House.
___________________________________________
Chief Clerk of the House 
___________________________________________
Speaker of the House 
Signed this _______________________________day
of____________________________________, 2025.
___________________________________________
President of the Senate
Signed this _______________________________day
of____________________________________, 2025. HOUSE BILL NO. 808
INTRODUCED BY P. TUSS
AN ACT PROVIDING FOR THE MONTANA BROWNFIELDS REVITALIZATION ACT; PROVIDING 
DEFINITIONS; AUTHORIZING THE MONTANA BROWNFIELDS FUND; PROVIDING FOR BROWNFIELD 
REDEVELOPMENT VIABILITY AND ELIGIBILITY; PROVIDING RULEMAKING AUTHORITY; ELIMINATING 
THE MONTANA PETROLEUM BROWNFIELDS REVITALIZATION ACT; PROVIDING FOR A TRANSFER OF 
GENERAL FUNDS; PROVIDING A STATUTORY APPROPRIATION; AMENDING SECTIONS 17-7-502 AND 
75-11-309, MCA; AND REPEALING SECTIONS 75-11-401, 75-11-402, 75-11-403, 75-11-407, 75-11-408, AND 
75-11-409, MCA.”