4 A BILL FOR AN ACT ENTITLED: “AN ACT GENERALLY REVISING UTILITY LINES AND FACILITIES LAWS; 
5 ALLOWING THE COMMISSION TO GRANT A PUBLIC UTILITY A CERTIFICATE OF PUBLIC 
6 CONVENIENCE AND NECESSITY FOR ELECTRIC TRANSMISSION FACILITY CONSTRUCTION; 
7 ESTABLISHING OPTIONAL RATEMAKING PROCEDURES AND TIMELINES; PROVIDING RULEMAKING 
8 AUTHORITY; PROVIDING DEFINITIONS; AND PROVIDING AN IMMEDIATE EFFECTIVE DATE.”
9
10 WHEREAS, ADVANCED TRANSMISSION TECHNOLOGY OFFERS MULTIPLE ADVANTAGES, INCLUDING INCREASED 
11, SIGNIFICANTLY REDUCED WILDFIRE RISK, AND IMPROVED GRID 
12, AND IS A COST-EFFECTIVE SOLUTION TO MONTANA'S CURRENT CONGESTION AND CURTAILMENTS OF 
13; AND
14 WHEREAS, THE INTENTION OF THIS LEGISLATION IS TO EXPEDITE THE NECESSARY AND OVERDUE 
15-INCREASING DEMAND OF POWER; AND
16 WHEREAS, THE PUBLIC SERVICE C
17
18.
19
20 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MONTANA:
21
22 NEW SECTION. Section 1.  As used IN [sections 1 through 3], unless the context clearly 
23 indicates otherwise, the following definitions apply:
24 (1) "Advanced transmission technology" means a technology that increases the capacity, 
25 efficiency, and reliability of an existing or new transmission facility, as defined in 42 U.S.C. 16422. For the 
26 purposes of [sections 1 through 3], the term applies to the following technology:
27 (a) underground cables;
28 (b) advanced conductor technology, such as advanced composite conductors, high temperature   - 2025 
69th Legislature 2025 	SB0301.3
- 2 - Authorized Print Version – SB 301 
1 low-sag conductors, and fiber optic temperature sensing conductors;
2 (c) high-capacity ceramic electric wire, connectors, and insulators;
3 (d) high-voltage direct-current technology;
4 (e) flexible alternate-current transmission systems;
5 (f) energy storage devices, such as pumped storage hydropower, compressed air, 
6 superconducting magnetic energy storage, flywheels, and batteries;
7 (g) distributed generation, such as photovoltaic solar cells, fuel cells, and microturbines;
8 (h)(F) enhanced power device monitoring;
9 (i) direct system-state sensors;
10 (j)() power electronics and related software, including real-time monitoring and analytical software; 
11 and
12 (k)(H) any other technologies the commission considers appropriate.
13 (2) "Certificate of public convenience and necessity" means a written authorization to operate 
14 issued by the commission for constructing an electric transmission facility.
15 (3) "Department" means the department of environmental quality provided for in 2-15-3501.
16 (4) "Transmission facility" means those facilities that are controlled or operated by a utility and 
17 used to provide transmission services as determined by the federal energy regulatory commission and the 
18 public service commission. The term includes advanced transmission technology.
19
20 NEW SECTION. Section 2. 
21 (1) A public utility, as defined in 69-3-101, or any other entity required to 
22 submit a certification application to the department pursuant to Title 75, chapter 20, may request a certificate of 
23 public convenience and necessity from the commission prior to commencing actual construction work on an 
24 electric transmission facility that is rated higher than 69 kilovolts.
25 (2) A UTILITY  NECESSITY 
26 PURSUANT TO SUBSECTION (1) .. THE UTILITY SHALL NOTIFY THE COMMISSION IN WRITING THAT IT SEEKS 
27 CERTIFICATE .. IF THE UTILITY NOTIFIES REQUESTS A CERTIFICATE  FROM 
28 (1), THE DEPARTMENT MAY NOT MAKE A DETERMINATION REGARDING   - 2025 
69th Legislature 2025 	SB0301.3
- 3 - Authorized Print Version – SB 301 
1  75-20-301(1)(),(1)()(III), AND (1)(F).
2 (2)(3) (a) Upon receiving a request from a public utility or entity, the commission shall determine 
3 within 270 300 days whether the construction of the proposed transmission facility is in the public interest and 
4 may grant or deny the certificate of public convenience and necessity.
5 (b) In making a determination, the commission may consider:
6 (i) the need for the proposed transmission facility to ensure reliable service for customers;
7 (ii) the ability of the proposed transmission facility to improve customer access to reliable and cost-
8 effective electric generation or storage facilities;
9 (iii) the anticipated costs and benefits of the proposed facility;
10 (iv) the use of advanced transmission technology; and
11 (v) any other factors deemed appropriate by the commission.
12 (3)(4) A commission-approved certificate of public convenience and necessity may satisfy the 
13 requirements set forth in 75-20-301(1)(a), (1)(d), AND (1)(f), and (2) when the department considers siting 
14 applications for proposed transmission facilities.
15 (4)(5) The commission shall adopt rules for the implementation of this section.
16 (6) NT75, CHAPTER 20.
17 (7) N IN THIS SECTION REQUIRES THE PUBLIC SERVICE COMMISSION TO APPROVE RECOVERY OF 
18.
19
20 NEW SECTION. SECTION 3. PPROVAL ADVANCED COST APPROVAL OF TRANSMISSION AND RELATED 
21.(1)A APPROVAL OF TRANSMISSION 
22, PROVIDED THE UTILITY COMPLIES WITH [SECTION 2].
23 (2) WITHIN 45 DAYS OF A UTILITY'S APPLICATION , THE COMMISSION 
24'S MINIMUM FILING 
25.IF THE COMMISSION DETERMINES THE APPLICATION IS INADEQUATE, IT SHALL EXPLAIN THE 
26.
27 (3) THE COMMISSION SHALL ISSUE AN ORDER WITHIN 90 DAYS AFTER RECEIVING AN APPLICATION FOR 
28, UNLESS THE COMMISSION DETERMINES THAT EXTRAORDINARY   - 2025 
69th Legislature 2025 	SB0301.3
- 4 - Authorized Print Version – SB 301 
1.
2 (4) SUBJECT TO [SECTION 2(2)]
3 PURSUANT  T75, CHAPTER 20, AS APPLICABLE,
4:
5 (A), IN WHOLE OR IN PART:
6 (I) ; AND
7 (II); AND
8 (B)
9.
10
11 NEW SECTION. Section 3.  Electric transmission optional ratemaking procedures -- 
12 (1) A public utility operating electric transmission facilities that are part of a bulk electric system 
13 subject to regulation by the federal energy regulatory commission and whose rates are set by the federal 
14 energy regulatory commission using a formula rate process is eligible for optional ratemaking procedures as 
15 described in this section.
16 (2) An eligible public utility may establish the optional ratemaking procedures in a general rate 
17 filing pursuant to Title 69, chapter 3, part 3. If the public utility is eligible and the proposed optional ratemaking 
18 procedures are consistent with this section, the commission may ap prove optional ratemaking procedures that 
19 include the following elements:
20 (a) The revenues and costs associated with providing electric transmission service must be 
21 unbundled from the revenues and costs associated with providing all other services. Cost recovery and savings 
22 from advanced transmission technology compared to legacy transmission technology must be considered over 
23 the expected life of the transmission line.
24 (b) The rates associated with the provisions of electric transmission service must be set annually 
25 using forecasted revenues and costs expected over a 12-month period, including forecasted revenues the 
26 public utility anticipates it will collect from the provisions of the federal energy regulatory commission 
27 jurisdictional transmission services during that same period.
28 (c) (i) At the conclusion of each forecasted 12-month period, a public utility shall make a filing to   - 2025 
69th Legislature 2025 	SB0301.3
- 5 - Authorized Print Version – SB 301 
1 adjust for a recovery that is above or below the actual, prudently incurred costs and for any revenues the public 
2 utility receives from providing federal energy regulatory commission jurisdictional services.
3 (ii) If the federal energy regulatory commission grants the recovery of costs in the rate base during 
4 construction, the public utility may seek similar treatment of these costs through the optional ratemaking 
5 procedures described in this section.
6 (3) Following the initial implementation of unbundled electric transmission rates and optional 
7 ratemaking procedures, the commission shall:
8 (a) authorize the public utility to change the rates it charges that are associated with its provision of 
9 electric transmission service on a schedule comparable to the schedule the public utility uses to change its 
10 federal energy regulatory commission formula rates; and
11 (b) authorize a change in the rates associated with the provision of electric transmission service 
12 that is set to go into effect no later than 30 days from the date of filing on an interim basis.
13 (4) A filing to change rates pursuant to this section must comply with the Montana Administrative 
14 Procedure Act, Title 2, chapter 4, part 6.
15 (5) The commission may adopt rules for the implementation of this section."
16
17 NEW SECTION. Section 4.  [Sections 1 through 3] are intended to be 
18 codified as an integral part of Title 69, chapter 4, part 1, and the provisions of Title 69, chapter 4, part 1, apply 
19 to [sections 1 through 3].
20
21 NEW SECTION. Section 5.  [This act] is effective on passage and approval.