As Passed by the Senate 136th General Assembly Regular Session Am. Sub. S. B. No. 2 2025-2026 Senators Reineke, Wilkin Cosponsors: Senators Antonio, Brenner, Chavez, Cirino, Craig, Cutrona, DeMora, Gavarone, Hicks-Hudson, Johnson, Koehler, Landis, Manning, Patton, Reynolds, Romanchuk, Schaffer, Smith, Timken, Weinstein To amend sections 303.213, 519.213, 713.081, 3313.372, 3313.373, 4905.03, 4906.01, 4906.03, 4906.06, 4906.07, 4906.10, 4909.04, 4909.05, 4909.052, 4909.06, 4909.07, 4909.08, 4909.15, 4909.156, 4909.173, 4909.174, 4909.18, 4909.19, 4909.191, 4909.42, 4928.01, 4928.05, 4928.08, 4928.14, 4928.141, 4928.142, 4928.144, 4928.17, 4928.20, 4928.23, 4928.231, 4928.232, 4928.34, 4928.542, 4928.64, 4928.645, 4929.20, 4933.81, 5711.01, 5727.01, 5727.031, 5727.06, 5727.11, 5727.111, and 5727.75; to enact sections 122.161, 3313.377, 3313.378, 4903.27, 4905.23, 4905.311, 4905.321, 4905.331, 4909.041, 4909.042, 4909.181, 4909.192, 4909.193, 4928.041, 4928.101, 4928.102, 4928.103, 4928.105, 4928.107, 4928.149, 4928.1410, 4928.73, 4929.221, 4929.222, and 5727.76; and to repeal sections 3706.40, 3706.41, 3706.43, 3706.431, 3706.45, 3706.46, 3706.49, 3706.491, 3706.55, 3706.551, 3706.59, 3706.63, 3706.65, 4928.143, 4928.148, and 4928.642 of the Revised Code regarding public utilities law, to make changes regarding utility tangible personal 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Am. Sub. S. B. No. 2 Page 2 As Passed by the Senate property taxation, and to repeal parts of H.B. 6 of the 133rd General Assembly. BE IT ENACTED BY THE GENERAL ASSEMBLY OF THE STATE OF OHIO: Section 1. That sections 303.213, 519.213, 713.081, 3313.372, 3313.373, 4905.03, 4906.01, 4906.03, 4906.06, 4906.07, 4906.10, 4909.04, 4909.05, 4909.052, 4909.06, 4909.07, 4909.08, 4909.15, 4909.156, 4909.173, 4909.174, 4909.18, 4909.19, 4909.191, 4909.42, 4928.01, 4928.05, 4928.08, 4928.14, 4928.141, 4928.142, 4928.144, 4928.17, 4928.20, 4928.23, 4928.231, 4928.232, 4928.34, 4928.542, 4928.64, 4928.645, 4929.20, 4933.81, 5711.01, 5727.01, 5727.031, 5727.06, 5727.11, 5727.111, and 5727.75 be amended and sections 122.161, 3313.377, 3313.378, 4903.27, 4905.23, 4905.311, 4905.321, 4905.331, 4909.041, 4909.042, 4909.181, 4909.192, 4909.193, 4928.041, 4928.101, 4928.102, 4928.103, 4928.105 , 4928.107, 4928.149, 4928.1410, 4928.73, 4929.221, 4929.222, and 5727.76 of the Revised Code be enacted to read as follows: Sec. 122.161. (A) As used in this section: (1) "Subdivision" means a municipal corporation, township, or county. (2) "Legislative authority" means the legislative authority of a municipal corporation, a board of the township trustees, or a board of county commissioners. (3) "Subdivision's territory" means, in the case of a municipal corporation, the territory of the municipal corporation; in the case of a township, the unincorporated 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Am. Sub. S. B. No. 2 Page 3 As Passed by the Senate territory of the township; or, in the case of a county, the unincorporated territory of the county. (4) "Brownfield" has the same meaning as in section 122.6511 of the Revised Code. (5) "Former coal mine" means a location that was, but is no longer, used in connection with the extraction of coal from its natural deposit in the earth. (6) "Qualifying property" has the same meaning as in section 5727.76 of the Revised Code. (B) A legislative authority may adopt and certify to the director of development an ordinance or resolution requesting that the director designate the site of a brownfield or former coal mine within the subdivision's territory as a priority investment area. The ordinance or resolution shall describe the boundaries of the proposed area and shall specify that qualifying property in the priority investment area shall be exempt from taxation for five years pursuant to section 5727.76 of the Revised Code. The director, upon receipt of that certification, shall designate the proposed area as a priority investment area if the director determines that the area meets the designation standards set forth in rules adopted by the director. Those standards shall specify that the director must prioritize the designation of areas negatively impacted by the decline of the coal industry. The director shall notify the legislative authority of the director's decision within ninety days after receiving the certified ordinance or resolution. If the director does not issue a decision within those ninety days, the request for 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 Am. Sub. S. B. No. 2 Page 4 As Passed by the Senate designation shall be considered approved by operation of law. (C) The director of development shall immediately notify the public utilities commission, the power siting board, and the tax commissioner if the director approves the designation of a priority investment area under division (B) of this section or if the designation is approved by operation of law. Sec. 303.213. (A) As used in this section: (1) "Small wind farm" means wind turbines and associated facilities that are not subject to the jurisdiction of the power siting board under sections 4906.20 and 4906.201 of the Revised Code. (2) "Small solar facility" means solar panels and associated facilities with a single interconnection to the electrical grid and designed for, or capable of, operation at an aggregate capacity of less than fifty megawatts. (3) "Anaerobic digester" means a facility used to treat organic materials, such as food waste, manure, and sewage sludge, to produce biogas and digestate. (4) "Other small electric generating facility" means an electric generating plant and associated facilities designed for, or capable of, operation at a capacity of less than fifty megawatts that is not a small wind farm, small solar facility, or anaerobic digester. (B) Notwithstanding division (A) of section 303.211 of the Revised Code, sections 303.01 to 303.25 of the Revised Code confer power on a board of county commissioners or board of zoning appeals to adopt zoning regulations governing the location, erection, construction, reconstruction, change, alteration, maintenance, removal, use, or enlargement of any 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 Am. Sub. S. B. No. 2 Page 5 As Passed by the Senate small wind farm or , small solar facility, anaerobic digester, or other small electric generating facility, whether publicly or privately owned, or the use of land for that purpose. With regard to a small wind farm, the regulations may be more strict than the regulations prescribed in rules adopted under division (B)(2) of section 4906.20 of the Revised Code. (C) The designation under this section of a small wind farm or a , small solar facility , anaerobic digester, or other small electric generating facility as a public utility for purposes of sections 303.01 to 303.25 of the Revised Code shall not affect the classification of a small wind farm or a , small solar facility, anaerobic digester, or other small electric generating facility for purposes of state or local taxation. (D) Nothing in division (C) of this section shall be construed as affecting the classification of a telecommunications tower as defined in division (B) or (E) of section 303.211 of the Revised Code or any other public utility for purposes of state and local taxation. Sec. 519.213. (A) As used in this section: (1) "Small wind farm" means wind turbines and associated facilities that are not subject to the jurisdiction of the power siting board under sections 4906.20 and 4906.201 of the Revised Code. (2) "Small solar facility" means solar panels and associated facilities with a single interconnection to the electrical grid and designed for, or capable of, operation at an aggregate capacity of less than fifty megawatts. (3) "Anaerobic digester" means a facility used to treat organic materials, such as food waste, manure, and sewage 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 Am. Sub. S. B. No. 2 Page 6 As Passed by the Senate sludge, to produce biogas and digestate. (4) "Other small electric generating facility" means an electric generating plant and associated facilities designed for, or capable of, operation at a capacity of less than fifty megawatts that is not a small wind farm, small solar facility, or anaerobic digester. (B) Notwithstanding division (A) of section 519.211 of the Revised Code, sections 519.02 to 519.25 of the Revised Code confer power on a board of township trustees or board of zoning appeals with respect to the location, erection, construction, reconstruction, change, alteration, maintenance, removal, use, or enlargement of any small wind farm or , small solar facility, anaerobic digester, or other small electric generating facility, whether publicly or privately owned, or the use of land for that purpose. With regard to a small wind farm, the regulations may be more strict than the regulations prescribed in rules adopted under division (B)(2) of section 4906.20 of the Revised Code. (C) The designation under this section of a small wind farm or a , small solar facility , anaerobic digester, or other small electric generating facility as a public utility for purposes of sections 519.02 to 519.25 of the Revised Code shall not affect the classification of a small wind farm, a small solar facility, an anaerobic digester, other small electric generating facility, or any other public utility for purposes of state or local taxation. (D) Nothing in division (C) of this section shall be construed as affecting the classification of a telecommunications tower as defined in division (B) or (E) of section 519.211 of the Revised Code or any other public utility for purposes of state and local taxation. 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 Am. Sub. S. B. No. 2 Page 7 As Passed by the Senate Sec. 713.081. (A) As used in this section: (1) "Small wind farm" means wind turbines and associated facilities that are not subject to the jurisdiction of the power siting board under sections 4906.20 and 4906.201 of the Revised Code. (2) "Small solar facility" means solar panels and associated facilities with a single interconnection to the electrical grid and designed for, or capable of, operation at an aggregate capacity of less than fifty megawatts. (3) "Anaerobic digester" means a facility used to treat organic materials, such as food waste, manure, and sewage sludge, to produce biogas and digestate. (4) "Other small electric generating facility" means an electric generating plant and associated facilities designed for, or capable of, operation at a capacity of less than fifty megawatts that is not a small wind farm, small solar facility, or anaerobic digester. (B) Sections 713.06 to 713.15 of the Revised Code confer power on the legislative authority of a municipal corporation with respect to the location, erection, construction, reconstruction, change, alteration, maintenance, removal, use, or enlargement of any small wind farm or , small solar facility , anaerobic digester, or other small electric generating facility as a public utility, whether publicly or privately owned, or the use of land for that purpose. With regard to a small wind farm, the regulations may be more strict than the regulations prescribed in rules adopted under division (B)(2) of section 4906.20 of the Revised Code. (C) The designation under this section of a small wind 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 Am. Sub. S. B. No. 2 Page 8 As Passed by the Senate farm or a , small solar facility , anaerobic digester, or other small electric generating facility as a public utility for purposes of sections 713.06 to 713.15 of the Revised Code shall not affect the classification of a small wind farm, a small solar facility, an anaerobic digester, other small electric generating facility, or any other public utility for purposes of state or local taxation. Sec. 3313.372. (A) As used in this section, "energy conservation measure" means an installation or modification of an installation in, or remodeling of, a building, to reduce energy consumption. It includes: (1) Insulation of the building structure and systems within the building; (2) Storm windows and doors, multiglazed windows and doors, heat absorbing or heat reflective glazed and coated window and door systems, additional glazing, reductions in glass area, and other window and door system modifications that reduce energy consumption; (3) Automatic energy control systems; (4) Heating, ventilating, or air conditioning system modifications or replacements; (5) Caulking and weatherstripping; (6) Replacement or modification of lighting fixtures to increase the energy efficiency of the system without increasing the overall illumination of a facility, unless such increase in illumination is necessary to conform to the applicable state or local building code for the proposed lighting system; (7) Energy recovery systems; 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 Am. Sub. S. B. No. 2 Page 9 As Passed by the Senate (8) Cogeneration systems that produce steam or forms of energy such as heat, as well as electricity, for use primarily within a building or complex of buildings; (9) Solar panels; (10) Any other modification, installation, or remodeling approved by the Ohio facilities construction commission as an energy conservation measure. (B) A board of education of a city, exempted village, local, or joint vocational school district may enter into an installment payment contract for the purchase and installation of energy conservation measures. The provisions of such installment payment contracts dealing with interest charges and financing terms shall not be subject to the competitive bidding requirements of section 3313.46 of the Revised Code, and shall be on the following terms: (1) Not less than one-fifteenth of the costs thereof shall be paid within two years from the date of purchase. (2) The remaining balance of the costs thereof shall be paid within fifteen years from the date of purchase. The provisions of any installment payment contract entered into pursuant to this section shall provide that all payments, except payments for repairs and obligations on termination of the contract prior to its expiration, shall not exceed the calculated energy, water, or waste water cost savings, avoided operating costs, and avoided capital costs attributable to the one or more measures over a defined period of time. Those payments shall be made only to the extent that the savings described in this division actually occur. The energy services company shall warrant and guarantee that the energy conservation 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 Am. Sub. S. B. No. 2 Page 10 As Passed by the Senate measures shall realize guaranteed savings and shall be responsible to pay an amount equal to any savings shortfall. An installment payment contract entered into by a board of education under this section shall require the board to contract in accordance with division (A) of section 3313.46 of the Revised Code for the installation, modification, or remodeling of energy conservation measures unless division (A) of section 3313.46 of the Revised Code does not apply pursuant to division (B)(3) of that section, in which case the contract shall be awarded through a competitive selection process pursuant to rules adopted by the facilities construction commission. An installment payment contract entered into by a board of education under this section may include services for measurement and verification of energy savings associated with the guarantee. The annual cost of measurement and verification services shall not exceed ten per cent of the guaranteed savings in any year of the installment payment contract. (C) If a board of education determines that a surety bond is necessary to secure energy, water, or waste water cost savings guaranteed in a contract entered into by the board of education under this section, the energy services company shall provide a surety bond that satisfies all of the following requirements: (1) The penal sum of the surety bond for the first guarantee year shall equal the amount of savings included in the annual guaranteed savings amount that is measured and calculated in accordance with the measurement and verification plan included in the contract, but may not include guaranteed savings that are not measured or that are stipulated in the contract. The annual guaranteed savings amount shall include only the 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 Am. Sub. S. B. No. 2 Page 11 As Passed by the Senate savings guaranteed in the contract for the one-year term that begins on the first day of the first savings guarantee year and may not include amounts from subsequent years. (2) The surety bond shall have a term of not more than one year unless renewed. At the option of the board of education, the surety bond may be renewed for one or two additional terms, each term not to exceed one year. The surety bond may not be renewed or extended so that it is in effect for more than three consecutive years. In the event of a renewal, the penal sum of the surety bond for each renewed year shall be revised so that the penal sum equals the annual guaranteed savings amount for such renewal year that is measured and calculated in accordance with the measurement and verification plan included in the contract, but may not include guaranteed savings that are not measured or that are stipulated in the contract. Regardless of the number of renewals of the bond, the aggregate liability under each renewed bond may not exceed the penal sum stated in the renewal certificate for the applicable renewal year. (3) The surety bond for the first year shall be issued within thirty days of the commencement of the first savings guarantee year under the contract. In the event of renewal, the surety shall deliver to the board of education a renewal certificate reflecting the revised penal sum within thirty days of the board of education's request. The board of education shall deliver the request for renewal not less than thirty days prior to the expiration date of the surety bond then in existence. A surety bond furnished pursuant to section 153.54 of the Revised Code shall not secure obligations related to energy, water, or waste water cost 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 Am. Sub. S. B. No. 2 Page 12 As Passed by the Senate savings as referenced in division (C) of this section. (D) The board may issue the notes of the school district signed by the president and the treasurer of the board and specifying the terms of the purchase and securing the deferred payments provided in this section, payable at the times provided and bearing interest at a rate not exceeding the rate determined as provided in section 9.95 of the Revised Code. The notes may contain an option for prepayment and shall not be subject to Chapter 133. of the Revised Code. In the resolution authorizing the notes, the board may provide, without the vote of the electors of the district, for annually levying and collecting taxes in amounts sufficient to pay the interest on and retire the notes, except that the total net indebtedness of the district without a vote of the electors incurred under this and all other sections of the Revised Code, except section 3318.052 of the Revised Code, shall not exceed one per cent of the district's tax valuation. Revenues derived from local taxes or otherwise, for the purpose of conserving energy or for defraying the current operating expenses of the district, may be applied to the payment of interest and the retirement of such notes. The notes may be sold at private sale or given to the energy services company under the installment payment contract authorized by division (B) of this section. (E) Debt incurred under this section shall not be included in the calculation of the net indebtedness of a school district under section 133.06 of the Revised Code. (F) No school district board shall enter into an installment payment contract under division (B) of this section unless it first obtains a report of the costs of the energy conservation measures and the savings thereof as described under 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 Am. Sub. S. B. No. 2 Page 13 As Passed by the Senate division (G)(1) of section 133.06 of the Revised Code as a requirement for issuing energy securities, makes a finding that the amount spent on such measures is not likely to exceed the amount of money it would save in energy costs and resultant operational and maintenance costs as described in that division, except that that finding shall cover the ensuing fifteen years, and the facilities construction commission determines that the district board's findings are reasonable and approves the contract as described in that division. The district board shall monitor the savings and maintain a report of those savings, which shall be submitted to the commission in the same manner as required by division (G) of section 133.06 of the Revised Code in the case of energy securities. (G) A board of education may apply to the Ohio facilities construction commission for a loan from the school energy performance contracting loan fund, established by section 3313.378 of the Revised Code, for purposes of paying for all or part of an installment contract under division (B) of this section. Sec. 3313.373. (A) As used in this section: (1) "Energy saving measure" means both of the following: (a) The acquisition and installation, by purchase, lease, lease purchase, lease with an option to buy, or installment purchase, of an energy conservation measure as defined in section 3313.372 of the Revised Code and any attendant architectural and engineering consulting services. (b) Architectural and engineering consulting services related to energy conservation. 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 Am. Sub. S. B. No. 2 Page 14 As Passed by the Senate (2) "Shared-savings contract" means a contract for one or more energy savings measures, which contract provides that all payments, except payments for maintenance and repairs and obligations on termination of the contract prior to its expiration, are to be a stated percentage of calculated savings of energy costs attributable to the energy saving measure over a defined period of time and are to be made only to the extent that such savings occur. A contract that requires any additional capital investment or contribution of funds, other than funds available from state or federal energy grants, or that is for an initial term of longer than ten years is not a shared-savings contract. (B) The board of education of a city, local, exempted village, or joint vocational school district may enter into a shared-savings contract with any person experienced in the design and implementation of energy saving measures for buildings owned or rented by the board. Such contract is not subject to section 3313.46 of the Revised Code. If the contract is for a term extending beyond the fiscal year, it shall be considered to be a continuing contract within the meaning of division (D) of section 5705.41 of the Revised Code. A board of education entering into an installment contract under this section shall also comply with section 3313.372 of the Revised Code. (C) In the case of a shared-savings contract running beyond the fiscal year in which it is entered into, the board shall include in its annual appropriations measure for each subsequent year any amounts payable under shared-savings contracts during such year and shall furnish the certification required by section 5705.44 of the Revised Code, but the failure of a board to make such an appropriation or furnish the 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 Am. Sub. S. B. No. 2 Page 15 As Passed by the Senate certificates referred to in division (D) of section 5705.41, or 5705.412 or 5705.44 of the Revised Code, shall not affect the validity of the shared-savings contract or the board's obligations under the contract. (D) A board of education may apply to the Ohio facilities construction commission for a loan from the school energy performance contracting loan fund, established by section 3313.378 of the Revised Code, for purposes of paying for all or part of a shared-savings contract under this section. Sec. 3313.377. (A) As used in this section: (1) "Energy conservation measure" has the same meaning as in section 3313.372 of the Revised Code; (2) "Energy saving measure" has the same meaning as in section 3313.373 of the Revised Code. (B) The Ohio facilities construction commission may issue a loan from funds in the school energy performance contracting loan fund created in section 3313.378 of the Revised Code to a board of education of a city, exempted village, local, or joint vocational school district that applies for a loan under section 3313.372 or 3313.373 of the Revised Code. (C) Nothing in this section prohibits a board of education that receives a loan under this section from utilizing any other energy efficiency program. (D) The terms of a loan issued under this section shall be as follows: (1) Two per cent annual interest on the loan; (2) The full loan amount, plus interest, shall be repaid in not more than ten years from the issuance of the loan; 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 Am. Sub. S. B. No. 2 Page 16 As Passed by the Senate (3) Repayment on the loan begins six months after the installation of the energy conservation measures is complete or the implementation of energy savings measures is completed; (4) Any other provision considered appropriate by the commission. (E) All repayment amounts for any loans issued under this section shall be made to the commission. The commission shall deposit all repayment amounts received in the school energy performance contracting loan fund created in section 3313.378 of the Revised Code. (F) If the commission enters into an agreement with a board for a loan under this section, the commission shall promptly direct the treasurer of state to remit money from the school energy performance contracting loan fund to the board as provided in the terms of the agreement. (G) The commission shall adopt rules to implement this section, including a loan application. Sec. 3313.378. (A) The school energy performance contracting loan fund is created in the custody of the state treasurer, but is not part of the state treasury. The money in the fund shall be used for purposes of funding loans issued under section 3313.377 of the Revised Code. The fund shall consist of the funds transferred from the solar generation fund, repayments of loans from this fund, interest on amounts in the school energy performance contracting loan fund, and any appropriations, grants, or gifts made to the fund. (B) The fund shall be administered by the Ohio facilities construction commission, and the commission shall request the treasurer of state to create the account for the fund. The 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 Am. Sub. S. B. No. 2 Page 17 As Passed by the Senate treasurer of state shall distribute the money in the fund in accordance with directions provided by the commission. Sec. 4903.27. For all cases involving an application pursuant to section 4909.18 of the Revised Code, the public utilities commission shall not permit any new discovery beginning not later than two hundred fifteen days after the application is submitted. Sec. 4905.03. As used in this chapter, any person, firm, copartnership, voluntary association, joint-stock association, company, or corporation, wherever organized or incorporated, is: (A) A telephone company, when engaged in the business of transmitting telephonic messages to, from, through, or in this state; (B) A for-hire motor carrier, when engaged in the business of transporting persons or property by motor vehicle for compensation, except when engaged in any of the operations in intrastate commerce described in divisions (B)(1) to (9) of section 4921.01 of the Revised Code, but including the carrier's agents, officers, and representatives, as well as employees responsible for hiring, supervising, training, assigning, or dispatching drivers and employees concerned with the installation, inspection, and maintenance of motor-vehicle equipment and accessories; (C) An electric light company, when engaged in the business of supplying electricity for light, heat, or power purposes to consumers within this state, including supplying electric transmission service for electricity delivered to consumers in this state, but excluding a regional transmission organization approved by the federal energy regulatory 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 Am. Sub. S. B. No. 2 Page 18 As Passed by the Senate commission; . An electric light company does not include a self- generator or mercantile customer self-power system. (D) A gas company, when engaged in the business of supplying artificial gas for lighting, power, or heating purposes to consumers within this state or when engaged in the business of supplying artificial gas to gas companies or to natural gas companies within this state, but a producer engaged in supplying to one or more gas or natural gas companies, only such artificial gas as is manufactured by that producer as a by- product of some other process in which the producer is primarily engaged within this state is not thereby a gas company. All rates, rentals, tolls, schedules, charges of any kind, or agreements between any gas company and any other gas company or any natural gas company providing for the supplying of artificial gas and for compensation for the same are subject to the jurisdiction of the public utilities commission. (E) A natural gas company, when engaged in the business of supplying natural gas for lighting, power, or heating purposes to consumers within this state. Notwithstanding the above, neither the delivery nor sale of Ohio-produced natural gas or Ohio-produced raw natural gas liquids by a producer or gatherer under a public utilities commission-ordered exemption, adopted before, as to producers, or after, as to producers or gatherers, January 1, 1996, or the delivery or sale of Ohio-produced natural gas or Ohio-produced raw natural gas liquids by a producer or gatherer of Ohio-produced natural gas or Ohio- produced raw natural gas liquids, either to a lessor under an oil and gas lease of the land on which the producer's drilling unit is located, or the grantor incident to a right-of-way or 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 Am. Sub. S. B. No. 2 Page 19 As Passed by the Senate easement to the producer or gatherer, shall cause the producer or gatherer to be a natural gas company for the purposes of this section. All rates, rentals, tolls, schedules, charges of any kind, or agreements between a natural gas company and other natural gas companies or gas companies providing for the supply of natural gas and for compensation for the same are subject to the jurisdiction of the public utilities commission. The commission, upon application made to it, may relieve any producer or gatherer of natural gas, defined in this section as a gas company or a natural gas company, of compliance with the obligations imposed by this chapter and Chapters 4901., 4903., 4907., 4909., 4921., and 4923. of the Revised Code, so long as the producer or gatherer is not affiliated with or under the control of a gas company or a natural gas company engaged in the transportation or distribution of natural gas, or so long as the producer or gatherer does not engage in the distribution of natural gas to consumers. Nothing in division (E) of this section limits the authority of the commission to enforce sections 4905.90 to 4905.96 of the Revised Code. (F) A pipe-line company, when engaged in the business of transporting natural gas, oil, or coal or its derivatives through pipes or tubing, either wholly or partly within this state, but not when engaged in the business of the transport associated with gathering lines, raw natural gas liquids, or finished product natural gas liquids; (G) A water-works company, when engaged in the business of supplying water through pipes or tubing, or in a similar manner, to consumers within this state; 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 Am. Sub. S. B. No. 2 Page 20 As Passed by the Senate (H) A heating or cooling company, when engaged in the business of supplying water, steam, or air through pipes or tubing to consumers within this state for heating or cooling purposes; (I) A messenger company, when engaged in the business of supplying messengers for any purpose; (J) A street railway company, when engaged in the business of operating as a common carrier, a railway, wholly or partly within this state, with one or more tracks upon, along, above, or below any public road, street, alleyway, or ground, within any municipal corporation, operated by any motive power other than steam and not a part of an interurban railroad, whether the railway is termed street, inclined-plane, elevated, or underground railway; (K) A suburban railroad company, when engaged in the business of operating as a common carrier, whether wholly or partially within this state, a part of a street railway constructed or extended beyond the limits of a municipal corporation, and not a part of an interurban railroad; (L) An interurban railroad company, when engaged in the business of operating a railroad, wholly or partially within this state, with one or more tracks from one municipal corporation or point in this state to another municipal corporation or point in this state, whether constructed upon the public highways or upon private rights-of-way, outside of municipal corporations, using electricity or other motive power than steam power for the transportation of passengers, packages, express matter, United States mail, baggage, and freight. Such an interurban railroad company is included in the term "railroad" as used in section 4907.02 of the Revised Code. 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 Am. Sub. S. B. No. 2 Page 21 As Passed by the Senate (M) A sewage disposal system company, when engaged in the business of sewage disposal services through pipes or tubing, and treatment works, or in a similar manner, within this state. As used in division (E) of this section, "natural gas" includes natural gas that has been processed to enable consumption or to meet gas quality standards or that has been blended with propane, hydrogen, biologically derived methane gas, or any other artificially produced or processed gas. As used in this section, "gathering lines" has the same meaning as in section 4905.90 of the Revised Code, and "raw natural gas liquids" and "finished product natural gas liquids" have the same meanings as in section 4906.01 of the Revised Code. As used in this section, "self-generator" has the same meaning as in section 4928.01 of the Revised Code, and "mercantile customer self-power system" has the same meaning as in section 4928.73 of the Revised Code. Sec. 4905.23. (A) As used in this section, "base load electric generating facility" means an electric generating plant and associated facilities located in this state that primarily uses a nonrenewable fuel source to generate electricity, including natural gas and nuclear reaction, and that is not owned or operated by a public utility, municipal corporation, or electric cooperative. (B) No person shall enter into a settlement to abandon, close, or shut down a base load electric generating facility or a generating plant owned or operated by a public utility. Sec. 4905.311. (A) As used in this section, "electric distribution utility" has the same meaning as in section 4928.01 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 Am. Sub. S. B. No. 2 Page 22 As Passed by the Senate of the Revised Code. (B) Notwithstanding any provision of the Revised Code to the contrary, an electric distribution utility may supply behind the meter electric generation service, provided that any behind the meter electric generation facilities that the utility intends to use to supply such service were in operation prior to the effective date of this section. (C) No electric distribution utility shall recover any of the following costs through any rate, charge, or recovery from retail electric service customers that are not receiving behind the meter electric generation service from the utility: (1) Costs associated with supplying behind the meter electric generation service; (2) Costs associated with any behind the meter electric generation service facility; (3) Stranded costs associated with the closing of any behind the meter electric generation service facility or an end- use customer of the behind the meter electric generation service ceasing operations. (D) No electric distribution utility shall offer direct, associated inducements for contracting with the utility for any behind the meter electric generation service. (E) The public utilities commission shall periodically audit all electric distribution utilities that provide any behind the meter electric generation service to ensure compliance with this section. Sec. 4905.321. (A) Notwithstanding section 4905.32 of the Revised Code, all revenues collected from customers by a public 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634 Am. Sub. S. B. No. 2 Page 23 As Passed by the Senate utility as part of a rider or rates that are later found to be unreasonable, unlawful, or otherwise improper by the supreme court shall be subject to refund from the date of the issuance of the supreme court's decision until the date when, on remand, the public utilities commission makes changes to the rider or rates to implement the supreme court's decision. (B) The commission shall order the payment of the refunds described in division (A) of this section in a manner designed to allocate the refunds to customer classes in the same proportion as the charges were originally collected. (C) The commission shall determine how to allocate any remaining funds described in division (A) of this section that cannot be refunded for whatever reason. (D) The commission shall order the payment of the funds described in division (A) of this section and shall determine how to allocate any remaining funds that cannot be refunded not more than thirty days after the date of the issuance of the supreme court's decision. Sec. 4905.331. (A) As used in this section: (1) "Electric distribution utility" has the same meaning as in section 4928.01 of the Revised Code. (2) "Electric service" means any service involved in supplying or arranging for the supply of electricity to ultimate consumers in this state. "Electric service" includes "retail electric service" as defined in section 4928.01 of the Revised Code. (3) "Proceeding" includes a proceeding relating to electric service under Chapters 4909. and 4928. of the Revised Code. 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 Am. Sub. S. B. No. 2 Page 24 As Passed by the Senate (B) No electric distribution utility or its affiliate may do either of the following to induce any party to a public utilities commission proceeding to enter into a settlement of a matter pending before the commission: (1) Make a cash payment to that party; (2) Enter into any agreement or any financial or private arrangement with that party that is not made part of the public case record. (C) Notwithstanding division (B) of this section, the commission may do any of the following: (1) Reasonably allocate costs among rate schedules; (2) Reasonably design rates within a rate schedule; (3) Approve reasonable rates designed for particular customers or classes of customers; (4) Approve a resolution of a proceeding under section 4905.26 of the Revised Code; (5) Approve payments to any governmental entity, nonprofit organization, or other association for implementing low-income weatherization service programs, subject to the following conditions: (a) The payments are at a rate that is reasonably tailored to the costs of providing the programs. (b) The payments are for programs that are subject to an existing or new audit procedure. (c) The payments are not for low-income weatherization education programs. Sec. 4906.01. As used in Chapter 4906. of the Revised 664 665 666 667 668 669 670 671 672 673 674 675 676 677 678 679 680 681 682 683 684 685 686 687 688 689 690 Am. Sub. S. B. No. 2 Page 25 As Passed by the Senate Code: (A) "Person" means an individual, corporation, business trust, association, estate, trust, or partnership or any officer, board, commission, department, division, or bureau of the state or a political subdivision of the state, or any other entity. (B)(1) "Major utility facility" means: (a) Electric generating plant and associated facilities designed for, or capable of, operation at a capacity of fifty megawatts or more; (b) An electric transmission line and associated facilities of a design capacity of one hundred kilovolts or more; (c) A gas pipeline that is greater than five hundred feet in length, and its associated facilities, is more than nine inches in outside diameter and is designed for transporting gas at a maximum allowable operating pressure in excess of one hundred twenty-five pounds per square inch. (2) "Major utility facility" does not include any of the following: (a) Gas transmission lines over which an agency of the United States has exclusive jurisdiction; (b) Any solid waste facilities as defined in section 6123.01 of the Revised Code; (c) Electric distributing lines and associated facilities as defined by the power siting board; (d) Any manufacturing facility that creates byproducts 691 692 693 694 695 696 697 698 699 700 701 702 703 704 705 706 707 708 709 710 711 712 713 714 715 716 717 Am. Sub. S. B. No. 2 Page 26 As Passed by the Senate that may be used in the generation of electricity as defined by the power siting board; (e) Gathering lines, gas gathering pipelines, and processing plant gas stub pipelines as those terms are defined in section 4905.90 of the Revised Code and associated facilities; (f) Any gas processing plant as defined in section 4905.90 of the Revised Code; (g) Natural gas liquids finished product pipelines; (h) Pipelines from a gas processing plant as defined in section 4905.90 of the Revised Code to a natural gas liquids fractionation plant, including a raw natural gas liquids pipeline, or to an interstate or intrastate gas pipeline; (i) Any natural gas liquids fractionation plant; (j) A production operation as defined in section 1509.01 of the Revised Code, including all pipelines upstream of any gathering lines; (k) Any compressor stations used by the following: (i) A gathering line, a gas gathering pipeline, a processing plant gas stub pipeline, or a gas processing plant as those terms are defined in section 4905.90 of the Revised Code; (ii) A natural gas liquids finished product pipeline, a natural gas liquids fractionation plant, or any pipeline upstream of a natural gas liquids fractionation plant; or (iii) A production operation as defined in section 1509.01 of the Revised Code. (C) "Commence to construct" means any clearing of land, 718 719 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 Am. Sub. S. B. No. 2 Page 27 As Passed by the Senate excavation, or other action that would adversely affect the natural environment of the site or route of a major utility facility, but does not include surveying changes needed for temporary use of sites or routes for nonutility purposes, or uses in securing geological data, including necessary borings to ascertain foundation conditions. (D) "Certificate" means a certificate of environmental compatibility and public need issued by the power siting board under section 4906.10 of the Revised Code or a construction certificate issued by the board under rules adopted under division divisions (E) or (F) to (H) of section 4906.03 of the Revised Code. (E) "Gas" means natural gas, flammable gas, or gas that is toxic or corrosive. (F) "Natural gas liquids finished product pipeline" means a pipeline that carries finished product natural gas liquids to the inlet of an interstate or intrastate finished product natural gas liquid transmission pipeline, rail loading facility, or other petrochemical or refinery facility. (G) "Large solar facility" means an electric generating plant that consists of solar panels and associated facilities with a single interconnection to the electrical grid that is a major utility facility. (H) "Large wind farm" means an electric generating plant that consists of wind turbines and associated facilities with a single interconnection to the electrical grid that is a major utility facility. (I) "Natural gas liquids fractionation plant" means a facility that takes a feed of raw natural gas liquids and 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 Am. Sub. S. B. No. 2 Page 28 As Passed by the Senate produces finished product natural gas liquids. (J) "Raw natural gas" means hydrocarbons that are produced in a gaseous state from gas wells and that generally include methane, ethane, propane, butanes, pentanes, hexanes, heptanes, octanes, nonanes, and decanes, plus other naturally occurring impurities like water, carbon dioxide, hydrogen sulfide, nitrogen, oxygen, and helium. (K) "Raw natural gas liquids" means naturally occurring hydrocarbons contained in raw natural gas that are extracted in a gas processing plant and liquefied and generally include mixtures of ethane, propane, butanes, and natural gasoline. (L) "Finished product natural gas liquids" means an individual finished product produced by a natural gas liquids fractionation plant as a liquid that meets the specifications for commercial products as defined by the gas processors association. Those products include ethane, propane, iso-butane, normal butane, and natural gasoline. Sec. 4906.03. The power siting board shall: (A) Require such information from persons subject to its jurisdiction as it considers necessary to assist in the conduct of hearings and any investigations or studies it may undertake; (B) Conduct any studies or investigations that it considers necessary or appropriate to carry out its responsibilities under this chapter; (C) Adopt rules establishing criteria for evaluating the effects on environmental values of proposed and alternative sites, and projected needs for electric power, and such other rules as are necessary and convenient to implement this chapter, including rules governing application fees, supplemental 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 793 794 795 796 797 798 799 800 801 802 Am. Sub. S. B. No. 2 Page 29 As Passed by the Senate application fees, and other reasonable fees to be paid by persons subject to the board's jurisdiction. The board shall make an annual accounting of its collection and use of these fees and shall issue an annual report of its accounting, in the form and manner prescribed by its rules, not later than the last day of June of the year following the calendar year to which the report applies. (D) Approve, disapprove, or modify and approve applications for certificates; (E) Notwithstanding sections 4906.06 to 4906.14 of the Revised Code, the board may adopt rules to provide for an accelerated review of an application for a construction certificate for construction of a major utility facility related to a coal research and development project as defined in section 1555.01 of the Revised Code, or to a coal development project as defined in section 1551.30 of the Revised Code, submitted to the Ohio coal development office for review under division (B)(7) of section 1551.33 of the Revised Code. Applications for construction certificates for construction of major utility facilities for Ohio coal research and development shall be filed with the board on the same day as the proposed facility or project is submitted to the Ohio coal development office for review. The board shall render a decision on an application for a construction certificate within ninety days after receipt of the application and all of the data and information it may require from the applicant. In rendering a decision on an application for a construction certificate, the board shall only consider the criteria and make the findings and determinations set forth in divisions (A)(2), (3), (5), and (7) and division (B) of 803 804 805 806 807 808 809 810 811 812 813 814 815 816 817 818 819 820 821 822 823 824 825 826 827 828 829 830 831 832 Am. Sub. S. B. No. 2 Page 30 As Passed by the Senate section 4906.10 of the Revised Code. (F) Notwithstanding sections 4906.06 to 4906.14 of the Revised Code, the board shall adopt rules to provide for an accelerated review of an application for a construction certificate for any of the following: (1) An electric transmission line that is: (a) Not more than two miles in length; (b) Primarily needed to attract or meet the requirements of a specific customer or specific customers; (c) Necessary to maintain reliable electric service as a result of the retirement or shutdown of an electric generating facility located within the state; or (d) A rebuilding of an existing transmission line. (2) An electric generating facility that uses waste heat or natural gas and is primarily within the current boundary of an existing industrial or electric generating facility; (3) A gas pipeline that is not more than five miles in length or is primarily needed to meet the requirements of a specific customer or specific customers. The board shall adopt rules that provide for the automatic certification to any entity described in this division when an application by any such entity is not suspended by the board, an administrative law judge, or the chairperson or executive director of the board for good cause shown, within ninety days of submission of the application. If an application is suspended, the board shall approve, disapprove, or modify and approve the application not later than ninety days after the date of the suspension. 833 834 835 836 837 838 839 840 841 842 843 844 845 846 847 848 849 850 851 852 853 854 855 856 857 858 859 860 Am. Sub. S. B. No. 2 Page 31 As Passed by the Senate (G) Notwithstanding sections 4906.06 to 4906.14 of the Revised Code, the board shall adopt rules to provide for the accelerated review of an application for a construction certificate for any of the following that are located in a priority investment area designated and approved under section 122.161 of the Revised Code: (1) An electric generating plant and associated facilities; (2) An electric transmission line and associated facilities; (3) Gas Pipeline infrastructure. The chairperson of the board, not later than forty-five days after receipt of an application submitted under division (G) of this section, shall determine if it complies with all application requirements set by the public utilities commission by rule. If the chairperson does not issue a determination within the time period required by this division, the application shall be deemed in compliance by operation of law. The board shall render a decision on an application submitted under this division not later than forty-five days after the application is determined in compliance with all requirements set by the commission. If the board does not render a decision within forty-five days, the application shall be considered approved by operation of law, and the board shall issue a certificate to the applicant. The board shall adopt rules to implement this division, including rules that prioritize applications for construction on areas negatively impacted by the decline of the coal industry. (H) Notwithstanding sections 4906.06 to 4906.14 of the 861 862 863 864 865 866 867 868 869 870 871 872 873 874 875 876 877 878 879 880 881 882 883 884 885 886 887 888 889 Am. Sub. S. B. No. 2 Page 32 As Passed by the Senate Revised Code, the board shall adopt rules to provide for the accelerated review of an application for a construction certificate for a major utility facility if at the time the application is filed the construction will be located, in whole, on property owned by, or under a lease with a term of twenty- five years or more with, the applicant; in whole or in part, on an easement or right-of-way; or on any combination of such property, easement, or right-of-way. No accelerated application shall be granted under the rules adopted under division (H) of this section for construction of a major utility facility, in whole or in part, on property under a lease or an easement or right-of-way, if additional consent for construction on the property, easement, or right-of-way is required by any person or entity other than the power siting board. The board shall render a decision on an application submitted under this division not later than forty-five days after receipt of the application. If the board does not render a decision within forty-five days, the application shall be considered approved by operation of law, and the board shall issue a certificate to the applicant. Sec. 4906.06. (A) An applicant for a certificate shall file with the office of the chairperson of the power siting board an application, in such form as the board prescribes, containing the following information: (1) A description of the location and of the major utility facility; (2) A summary of any studies that have been made by or for the applicant of the environmental impact of the facility; 890 891 892 893 894 895 896 897 898 899 900 901 902 903 904 905 906 907 908 909 910 911 912 913 914 915 916 917 918 Am. Sub. S. B. No. 2 Page 33 As Passed by the Senate (3) A statement explaining the need for the facility; (4) A statement of the reasons why the proposed location is best suited for the facility; (5) A statement of how the facility fits into the applicant's forecast contained in the report submitted under section 4935.04 of the Revised Code; (6) Such other information as the applicant may consider relevant or as the board by rule or order may require. Copies of the studies referred to in division (A)(2) of this section shall be filed with the office of the chairperson, if ordered, and shall be available for public inspection. The application shall be filed not more than five years prior to the planned date of commencement of construction. The five-year period may be waived by the board for good cause shown. (B) Each application shall be accompanied by proof of service of a copy of such application on the chief executive officer of each municipal corporation and county, and the head of each public agency charged with the duty of protecting the environment or of planning land use, in the area in which any portion of such facility is to be located. (C) Each applicant within fifteen days after the date of the filing of the application shall give public notice to persons residing in the municipal corporations and counties entitled to receive notice under division (B) of this section, by the publication of a summary of the application in newspapers of general circulation in such area. Proof of such publication shall be filed with the office of the chairperson. (D) Inadvertent failure of service on, or notice to, any 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933 934 935 936 937 938 939 940 941 942 943 944 945 946 947 Am. Sub. S. B. No. 2 Page 34 As Passed by the Senate of the persons identified in divisions (B) and (C) of this section may be cured pursuant to orders of the board designed to afford them adequate notice to enable them to participate effectively in the proceeding. In addition, the board, after filing, may require the applicant to serve notice of the application or copies thereof or both upon such other persons, and file proof thereof, as the board considers appropriate. (E) An application for an amendment of a certificate shall be in such form and contain such information as the board prescribes. Notice of such an application shall be given as required in divisions (B) and (C) of this section. (F) Each application for certificate or an amendment shall be accompanied by the application fee prescribed by board rule. All application fees, supplemental application fees, and other fees collected by the board shall be deposited in the state treasury to the credit of the power siting board fund, which is hereby created. The chairperson shall administer and authorize expenditures from the fund for any of the purposes of this chapter. If the chairperson determines that moneys credited to the fund from an applicant's fee are not sufficient to pay the board's expenses associated with its review of the application, the chairperson shall request the approval of the controlling board to assess a supplemental application fee upon an applicant to pay anticipated additional expenses associated with the board's review of the application or an amendment to an application. If the chairperson finds that an application fee exceeds the amount needed to pay the board's expenses for review of the application, the chairperson shall cause a refund of the excess amount to be issued to the applicant from the fund. (G) The chairperson shall determine whether an application 948 949 950 951 952 953 954 955 956 957 958 959 960 961 962 963 964 965 966 967 968 969 970 971 972 973 974 975 976 977 Am. Sub. S. B. No. 2 Page 35 As Passed by the Senate is in compliance with this section not more than forty-five days after the application is filed. If the chairperson does not issue a determination within the time period required by this division, the application shall be deemed in compliance by operation of law. Sec. 4906.07. (A) Upon the receipt of an application complying with section 4906.06 of the Revised Code, the power siting board shall promptly fix a date for a public hearing thereon, not less than sixty forty-five nor more than ninety sixty days after such receipt, and shall conclude the proceeding as expeditiously as practicable. (B) On an application for an amendment of a certificate, the board shall hold a hearing in the same manner as a hearing is held on an application for a certificate if the proposed change in the facility would result in any material increase in any environmental impact of the facility or a substantial change in the location of all or a portion of such facility other than as provided in the alternates set forth in the application. (C) The chairperson of the power siting board shall cause each application filed with the board to be investigated and shall, not less than fifteen five days prior to the date any application is set for hearing submit a written report to the board and to the applicant. A copy of such report shall be made available to any person upon request. Such report shall set forth the nature of the investigation, and shall contain recommended findings with regard to division (A) of section 4906.10 of the Revised Code and shall become part of the record and served upon all parties to the proceeding. Sec. 4906.10. (A) The power siting board shall render a decision upon the record either granting or denying the 978 979 980 981 982 983 984 985 986 987 988 989 990 991 992 993 994 995 996 997 998 999 1000 1001 1002 1003 1004 1005 1006 1007 Am. Sub. S. B. No. 2 Page 36 As Passed by the Senate application as filed, or granting it upon such terms, conditions, or modifications of the construction, operation, or maintenance of the major utility facility as the board considers appropriate. The certificate shall be subject to sections 4906.101, 4906.102, and 4906.103 of the Revised Code and conditioned upon the facility being in compliance with standards and rules adopted under section 4561.32 and Chapters 3704., 3734., and 6111. of the Revised Code. An applicant may withdraw an application if the board grants a certificate on terms, conditions, or modifications other than those proposed by the applicant in the application. The board shall not grant a certificate for the construction, operation, and maintenance of a major utility facility, either as proposed or as modified by the board, unless it finds and determines all of the following: (1) The basis of the need for the facility if the facility is an electric transmission line or gas pipeline; (2) The nature of the probable environmental impact; (3) That the facility represents the minimum adverse environmental impact, considering the state of available technology and the nature and economics of the various alternatives, and other pertinent considerations; (4) In the case of an electric transmission line or generating facility, that the facility is consistent with regional plans for expansion of the electric power grid of the electric systems serving this state and interconnected utility systems and that the facility will serve the interests of electric system economy and reliability; (5) That the facility will comply with Chapters 3704., 1008 1009 1010 1011 1012 1013 1014 1015 1016 1017 1018 1019 1020 1021 1022 1023 1024 1025 1026 1027 1028 1029 1030 1031 1032 1033 1034 1035 1036 Am. Sub. S. B. No. 2 Page 37 As Passed by the Senate 3734., and 6111. of the Revised Code and all rules and standards adopted under those chapters and under section 4561.32 of the Revised Code. In determining whether the facility will comply with all rules and standards adopted under section 4561.32 of the Revised Code, the board shall consult with the office of aviation of the division of multi-modal planning and programs of the department of transportation under section 4561.341 of the Revised Code. (6) That the facility will serve the public interest, convenience, and necessity; (7) In addition to the provisions contained in divisions (A)(1) to (6) of this section and rules adopted under those divisions, what its impact will be on the viability as agricultural land of any land in an existing agricultural district established under Chapter 929. of the Revised Code that is located within the site and alternative site of the proposed major utility facility. Rules adopted to evaluate impact under division (A)(7) of this section shall not require the compilation, creation, submission, or production of any information, document, or other data pertaining to land not located within the site and alternative site. (8) That the facility incorporates maximum feasible water conservation practices as determined by the board, considering available technology and the nature and economics of the various alternatives. (B) If the board determines that the location of all or a part of the proposed facility should be modified, it may condition its certificate upon that modification, provided that the municipal corporations and counties, and persons residing therein, affected by the modification shall have been given 1037 1038 1039 1040 1041 1042 1043 1044 1045 1046 1047 1048 1049 1050 1051 1052 1053 1054 1055 1056 1057 1058 1059 1060 1061 1062 1063 1064 1065 1066 Am. Sub. S. B. No. 2 Page 38 As Passed by the Senate reasonable notice thereof. (C) A copy of the decision and any opinion issued therewith shall be served upon each party. (D) The board shall render a decision under this section not later than one hundred twenty days after the date the application is found in compliance with section 4906.06 of the Revised Code. If the board does not render a decision within the time period required by this division, the application shall be deemed approved by operation of law, and the board shall issue a certificate to the applicant subject to the conditions contained within the staff report issued under section 4906.07 of the Revised Code. Sec. 4909.04. (A) The public utilities commission, for the purpose of ascertaining the reasonableness and justice of rates and charges for the service rendered by public utilities or railroads, or for any other purpose authorized by law, may investigate and ascertain the value of the property of any public utility or railroad in this state used or useful for the service and convenience of the public, using the same criteria that are set forth in section sections 4909.042 and 4909.05 of the Revised Code. At the request of the legislative authority of any municipal corporation, the commission, after hearing and determining that such a valuation is necessary, may also investigate and ascertain the value of the property of any public utility used and useful for the service and convenience of the public where the whole or major portion of such public utility is situated in such municipal corporation. (B) To assist the commission in preparing such a valuation, every public utility or railroad shall: 1067 1068 1069 1070 1071 1072 1073 1074 1075 1076 1077 1078 1079 1080 1081 1082 1083 1084 1085 1086 1087 1088 1089 1090 1091 1092 1093 1094 1095 Am. Sub. S. B. No. 2 Page 39 As Passed by the Senate (1) Furnish to the commission, or to its agents, as the commission requires, maps, profiles, schedules of rates and tariffs, contracts, reports of engineers, and other documents, records, and papers, or copies of any of them, in aid of any investigation and ascertainment of the value of its property; (2) Grant to the commission or its agents free access to all of its premises and property and its accounts, records, and memoranda whenever and wherever requested by any such authorized agent; (3) Cooperate with and aid the commission and its agents in the work of the valuation of its property in such further particulars and to such extent as the commission requires and directs. (C) The commission may make all rules which seem necessary to ascertain the value of the property and plant of each public utility or railroad. Sec. 4909.041. As used in sections 4909.041, 4909.042, and 4909.05 of the Revised Code: (A) A "lease purchase agreement" is an agreement pursuant to which a public utility leasing property is required to make rental payments for the term of the agreement and either the utility is granted the right to purchase the property upon the completion of the term of the agreement and upon the payment of an additional fixed sum of money or title to the property vests in the utility upon the making of the final rental payment. (B) A "leaseback" is the sale or transfer of property by a public utility to another person contemporaneously followed by the leasing of the property to the public utility on a long-term basis. 1096 1097 1098 1099 1100 1101 1102 1103 1104 1105 1106 1107 1108 1109 1110 1111 1112 1113 1114 1115 1116 1117 1118 1119 1120 1121 1122 1123 1124 Am. Sub. S. B. No. 2 Page 40 As Passed by the Senate Sec. 4909.042. (A) With respect to an electric light company that chooses to file a forecasted test period under section 4909.18 of the Revised Code, the public utilities commission shall prescribe the form and details of the valuation report of the property of the utility. Such report shall include all the kinds and classes of property, with the value of each, owned, held, or projected to be owned or held during the test period, by the utility for the service and convenience of the public. (B) Such report shall contain the following facts in detail: (1) The original cost of each parcel of land owned in fee and projected to be owned in fee and in use during the test period, determined by the commission; and also a statement of the conditions of acquisition, whether by direct purchase, by donation, by exercise of the power of eminent domain, or otherwise; (2) The actual acquisition cost, not including periodic rental fees, of rights-of-way, trailways, or other land rights projected to be held during the test period, by virtue of easements, leases, or other forms of grants of rights as to usage; (3) The original cost of all other kinds and classes of property projected to be used and useful during the test period, in the rendition of service to the public. Such original costs of property, other than land owned in fee, shall be the cost, as determined to be reasonable by the commission, to the person that first dedicated or dedicates the property to the public use and shall be set forth in property accounts and subaccounts as prescribed by the commission; 1125 1126 1127 1128 1129 1130 1131 1132 1133 1134 1135 1136 1137 1138 1139 1140 1141 1142 1143 1144 1145 1146 1147 1148 1149 1150 1151 1152 1153 1154 Am. Sub. S. B. No. 2 Page 41 As Passed by the Senate (4) The cost of property constituting all or part of a project projected to be leased to or used by the utility during the test period, under Chapter 165., 3706., 6121., or 6123. of the Revised Code and not included under division (B)(3) of this section exclusive of any interest directly or indirectly paid by the utility with respect thereto whether or not capitalized; (5) In the discretion of the commission, the cost to a utility, in an amount determined to be reasonable by the commission, of property constituting all or part of a project projected to be leased to the utility during the test period, under a lease purchase agreement or a leaseback and not included under division (B)(3) of this section exclusive of any interest directly or indirectly paid by the utility with respect thereto whether or not capitalized; (6) The proper and adequate reserve for depreciation, as determined to be reasonable by the commission; (7) Any sums of money or property that the utility is projected to receive during the test period, as total or partial defrayal of the cost of its property; (8) The valuation of the property of the utility, which shall be the sum of the amounts contained in the report pursuant to divisions (B)(1) to (5) of this section, less the sum of the amounts contained in the report pursuant to divisions (B)(6) and (7) of this section. (C) The report shall show separately the property projected to be used and useful to or held by the utility during the test period, and such other items as the commission considers proper. The commission may require an additional report showing the extent to which the property is projected to 1155 1156 1157 1158 1159 1160 1161 1162 1163 1164 1165 1166 1167 1168 1169 1170 1171 1172 1173 1174 1175 1176 1177 1178 1179 1180 1181 1182 1183 Am. Sub. S. B. No. 2 Page 42 As Passed by the Senate be used and useful during the test period. Such reports shall be filed in the office of the commission for the information of the governor and the general assembly. Sec. 4909.05. As used in this section: (A) A "lease purchase agreement" is an agreement pursuant to which a public utility leasing property is required to make rental payments for the term of the agreement and either the utility is granted the right to purchase the property upon the completion of the term of the agreement and upon the payment of an additional fixed sum of money or title to the property vests in the utility upon the making of the final rental payment. (B) A "leaseback" is the sale or transfer of property by a public utility to another person contemporaneously followed by the leasing of the property to the public utility on a long-term basis. (C) The With respect to every public utility, other than an electric light company that chooses to file a forecasted test period under section 4909.18 of the Revised Code, the public utilities commission shall prescribe the form and details of the valuation report of the property of each public utility or railroad in the state. Such report shall include all the kinds and classes of property, with the value of each, owned, held, or, with respect to a natural gas, water-works, or sewage disposal system company, projected to be owned or held as of the date certain, by each public utility or railroad used and useful, or, with respect to a natural gas, water-works, or sewage disposal system company, projected to be used and useful as of the date certain, for the service and convenience of the public. Such 1184 1185 1186 1187 1188 1189 1190 1191 1192 1193 1194 1195 1196 1197 1198 1199 1200 1201 1202 1203 1204 1205 1206 1207 1208 1209 1210 1211 1212 Am. Sub. S. B. No. 2 Page 43 As Passed by the Senate (B) Such report shall contain the following facts in detail: (1) The original cost of each parcel of land owned in fee and in use, or, with respect to a natural gas, water-works, or sewage disposal system company, projected to be owned in fee and in use as of the date certain, determined by the commission; and also a statement of the conditions of acquisition, whether by direct purchase, by donation, by exercise of the power of eminent domain, or otherwise; (2) The actual acquisition cost, not including periodic rental fees, of rights-of-way, trailways, or other land rights held, or, with respect to a natural gas, water-works, or sewage disposal system company, projected to be held as of the date certain, by virtue of easements, leases, or other forms of grants of rights as to usage; (3) The original cost of all other kinds and classes of property used and useful, or, with respect to a natural gas, water-works, or sewage disposal system company, projected to be used and useful as of the date certain, in the rendition of service to the public. Subject to section 4909.052 of the Revised Code, such original costs of property, other than land owned in fee, shall be the cost, as determined to be reasonable by the commission, to the person that first dedicated or dedicates the property to the public use and shall be set forth in property accounts and subaccounts as prescribed by the commission. To the extent that the costs of property comprising a coal research and development facility, as defined in section 1555.01 of the Revised Code, or a coal development project, as defined in section 1551.30 of the Revised Code, have been allowed for recovery as Ohio coal research and development costs 1213 1214 1215 1216 1217 1218 1219 1220 1221 1222 1223 1224 1225 1226 1227 1228 1229 1230 1231 1232 1233 1234 1235 1236 1237 1238 1239 1240 1241 1242 Am. Sub. S. B. No. 2 Page 44 As Passed by the Senate under section 4905.304 of the Revised Code, none of those costs shall be included as a cost of property under this division. (4) The cost of property constituting all or part of a project leased to or used by the utility, or, with respect to a natural gas, water-works, or sewage disposal system company, projected to be leased to or used by the utility as of the date certain, under Chapter 165., 3706., 6121., or 6123. of the Revised Code and not included under division (C)(3)(B)(3) of this section exclusive of any interest directly or indirectly paid by the utility with respect thereto whether or not capitalized; (5) In the discretion of the commission, the cost to a utility, in an amount determined to be reasonable by the commission, of property constituting all or part of a project leased to the utility, or, with respect to a natural gas, water- works, or sewage disposal system company, projected to be leased to the utility as of the date certain, under a lease purchase agreement or a leaseback and not included under division (C)(3) (B)(3) of this section exclusive of any interest directly or indirectly paid by the utility with respect thereto whether or not capitalized; (6) The cost of the replacement of water service lines incurred by a water-works company under section 4909.173 of the Revised Code and the water service line replacement reimbursement amounts provided to customers under section 4909.174 of the Revised Code; (7) The proper and adequate reserve for depreciation, as determined to be reasonable by the commission; (8) Any sums of money or property that the company may 1243 1244 1245 1246 1247 1248 1249 1250 1251 1252 1253 1254 1255 1256 1257 1258 1259 1260 1261 1262 1263 1264 1265 1266 1267 1268 1269 1270 1271 Am. Sub. S. B. No. 2 Page 45 As Passed by the Senate have received, or, with respect to a natural gas, water-works, or sewage disposal system company, is projected to receive as of the date certain, as total or partial defrayal of the cost of its property; (9) The valuation of the property of the company, which shall be the sum of the amounts contained in the report pursuant to divisions (C)(1)(B)(1) to (6) of this section, less the sum of the amounts contained in the report pursuant to divisions (C) (7)(B)(7) and (8) of this section. (C) The report shall show separately the property used and useful to such public utility or railroad in the furnishing of the service to the public, the property held by such public utility or railroad for other purposes, and the property projected to be used and useful to or held by a natural gas, water-works, or sewage disposal system company as of the date certain, and such other items as the commission considers proper. The commission may require an additional report showing the extent to which the property is used and useful, or, with respect to a natural gas, water-works, or sewage disposal system company, projected to be used and useful as of the date certain. Such reports shall be filed in the office of the commission for the information of the governor and the general assembly. Sec. 4909.052. Subject to a finding that such costs are just and reasonable, the public utilities commission in evaluating a petition submitted under section 4905.481 of the Revised Code shall accept the original cost, reported under division (C)(3) (B)(3) of section 4909.05 of the Revised Code, of the acquisition of a municipal water-works or sewage disposal system company that is acquired by a large water-works or sewage disposal system company, provided that the original cost is 1272 1273 1274 1275 1276 1277 1278 1279 1280 1281 1282 1283 1284 1285 1286 1287 1288 1289 1290 1291 1292 1293 1294 1295 1296 1297 1298 1299 1300 1301 Am. Sub. S. B. No. 2 Page 46 As Passed by the Senate determined according to all of the following requirements: (A) The acquiring company has three appraisals performed on the property of the company being acquired. (B) The three appraisals are performed by three independent utility-valuation experts mutually selected by the acquiring company and the company being acquired from the list maintained under section 4909.054 of the Revised Code. (C) The average of the three appraisals is used as the fair market value of the company being acquired. (D) Each utility-valuation expert does all of the following: (1) Determines the fair market value of the company to be acquired by establishing the amount for which the company would be sold in a voluntary transaction between a willing buyer and a willing seller under no obligation to buy or sell; (2) Determines the fair market value in compliance with the uniform standards of professional appraisal practice; (3) Employs the cost, market, and income approach to independently quantify the future benefits of the company to be acquired; (4) Incorporates the assessment described in division (D) (5) of this section into the appraisal under the cost, market, and income approach; (5) Engages one engineer who is licensed to prepare an assessment of the tangible assets of the company to be acquired. The original source of funding for any part of the tangible assets shall not be relevant to the determination of the value of those assets. 1302 1303 1304 1305 1306 1307 1308 1309 1310 1311 1312 1313 1314 1315 1316 1317 1318 1319 1320 1321 1322 1323 1324 1325 1326 1327 1328 1329 Am. Sub. S. B. No. 2 Page 47 As Passed by the Senate (E) The lesser of the purchase price or the fair market value, described in division (C) of this section, is reported as the original cost under division (C)(3) (B)(3) of section 4909.05 of the Revised Code of the company to be acquired. Sec. 4909.06. The investigation and report required by section section 4909.042 or 4909.05 of the Revised Code shall show, when the public utilities commission deems it necessary, the amounts, dates, and rates of interest of all bonds outstanding against each public utility or railroad, the property upon which such bonds are a lien, the amounts paid for them, and, the original capital stock and the moneys received by any such public utility or railroad by reason of any issue of stock, bonds, or other securities. Such report shall also show the net and gross receipts of such public utility or railroad and the method by which moneys were expended or paid out and the purpose of such payments. The commission may prescribe the procedure to be followed in making the investigation and valuation, the form in which the results of the ascertainment of the value of each public utility or railroad shall be submitted, and the classifications of the elements that constitute the ascertained value. Such investigation shall also show the value of the property of every public utility or railroad as a whole, and if such property is in more than one county, the value of its property in each of such counties. "Valuation" and "value," as used in this section, may include, with : (A) With respect to a public utility that is a natural gas, water-works, or sewage disposal system company, projected valuation and value as of the date certain, if applicable because of a future date certain under section 4909.15 of the 1330 1331 1332 1333 1334 1335 1336 1337 1338 1339 1340 1341 1342 1343 1344 1345 1346 1347 1348 1349 1350 1351 1352 1353 1354 1355 1356 1357 1358 1359 Am. Sub. S. B. No. 2 Page 48 As Passed by the Senate Revised Code; (B) With respect to an electric light company that chooses to file a forecasted test period under section 4909.18 of the Revised Code, the valuation and value during the forecasted test period. Sec. 4909.07. The public utilities commission, during the making of the valuation provided for in sections 4909.04 to 4909.13 of the Revised Code, and after its completion, shall in like manner keep itself informed through its engineers, experts, and other assistants of all extensions, improvements, or other changes in the condition and value of the property of all public utilities or railroads and shall ascertain the value of such extensions, improvements, and changes. The commission shall, as is required for the proper regulation of such public utilities or railroads, revise and correct its valuations of property, showing such revisions and corrections as a whole and as to each county. Such revisions and corrections shall be filed in the same manner as original reports. "Valuation" and "value," as used in this section, may include, with : (A) With respect to a public utility that is a natural gas, water-works, or sewage disposal system company, projected valuation and value as of the date certain, if applicable because of a future date certain under section 4909.15 of the Revised Code; (B) With respect to an electric light company that chooses to file a forecasted test period under section 4909.18 of the Revised Code, the valuation and value during the forecasted test period. 1360 1361 1362 1363 1364 1365 1366 1367 1368 1369 1370 1371 1372 1373 1374 1375 1376 1377 1378 1379 1380 1381 1382 1383 1384 1385 1386 1387 1388 Am. Sub. S. B. No. 2 Page 49 As Passed by the Senate Sec. 4909.08. When the public utilities commission has completed the valuation of the property of any public utility or railroad and before such valuation becomes final, it shall give notice by registered letter to such public utility or railroad, and if a substantial portion of said public utility or railroad is situated in a municipal corporation, then to the mayor of such municipal corporation, stating the valuations placed upon the several kinds and classes of property of such public utility or railroad and upon the property as a whole and give such further notice by publication or otherwise as it shall deem necessary to apprise the public of such valuation. If, within thirty days after such notification, no protest has been filed with the commission, such valuation becomes final. If notice of protest has been filed by any public utility or railroad, the commission shall fix a time for hearing such protest and shall consider at such hearing any matter material thereto presented by such public utility, railroad, or municipal corporation, in support of its protest or by any representative of the public against such protest. If, after the hearing of any protest of any valuation so fixed, the commission is of the opinion that its inventory is incomplete or inaccurate or that its valuation is incorrect, it shall make such changes as are necessary and shall issue an order making such corrected valuations final. A final valuation by the commission and all classifications made for the ascertainment of such valuations shall be public and are prima-facie evidence relative to the value of the property. "Valuation" and "value," as used in this section, may include, with : (A) With respect to a public utility that is a natural gas, water-works, or sewage disposal system company, projected valuation and value as of the date certain, if applicable 1389 1390 1391 1392 1393 1394 1395 1396 1397 1398 1399 1400 1401 1402 1403 1404 1405 1406 1407 1408 1409 1410 1411 1412 1413 1414 1415 1416 1417 1418 1419 Am. Sub. S. B. No. 2 Page 50 As Passed by the Senate because of a future date certain under section 4909.15 of the Revised Code; (B) With respect to an electric light company that chooses to file a forecasted test period under section 4909.18 of the Revised Code, the valuation and value during the forecasted test period. Sec. 4909.15. (A) The public utilities commission, when fixing and determining just and reasonable rates, fares, tolls, rentals, and charges, shall determine: (1) The (1)(a) With respect to a public utility that is a natural gas, water-works, or sewage disposal system company, or that is an electric light company that chooses not to file a forecasted test period under section 4909.18 of the Revised Code, the valuation as of the date certain of the property of the public utility that is used and useful or, with respect to a natural gas, water-works, or sewage disposal system company, is projected to be used and useful as of the date certain, in rendering the public utility service for which rates are to be fixed and determined. The (b) With respect to an electric light company that chooses to file a forecasted test period under section 4909.18 of the Revised Code, the valuation of the property of the utility that is projected to be used and useful during the forecasted test period in rendering the public utility service for which rates are to be fixed and determined. (c) The valuation so determined under division (A)(1) of this section for any public utility shall be the total value as set forth in division (C)(9)(B)(8) of section 4909.042 of the Revised Code and division (B)(9) of section 4909.05 of the 1420 1421 1422 1423 1424 1425 1426 1427 1428 1429 1430 1431 1432 1433 1434 1435 1436 1437 1438 1439 1440 1441 1442 1443 1444 1445 1446 1447 1448 Am. Sub. S. B. No. 2 Page 51 As Passed by the Senate Revised Code, and a reasonable allowance for materials and supplies and a reasonable allowance for cash working capital as determined by the commission. The commission, in its discretion, may include in the valuation a reasonable allowance for construction work in progress but, in no event, may such an allowance be made by the commission until it has determined that the particular construction project is at least seventy-five per cent complete. In determining the percentage completion of a particular construction project, the commission shall consider, among other relevant criteria, the per cent of time elapsed in construction; the per cent of construction funds, excluding allowance for funds used during construction, expended, or obligated to such construction funds budgeted where all such funds are adjusted to reflect current purchasing power; and any physical inspection performed by or on behalf of any party, including the commission's staff. A reasonable allowance for construction work in progress shall not exceed ten per cent of the total valuation as stated in this division, not including such allowance for construction work in progress. Where the commission permits an allowance for construction work in progress, the dollar value of the project or portion thereof included in the valuation as construction work in progress shall not be included in the valuation as plant in service until such time as the total revenue effect of the construction work in progress allowance is offset by the total revenue effect of the plant in service exclusion. Carrying charges calculated in a manner similar to allowance for funds used during construction shall accrue on that portion of the 1449 1450 1451 1452 1453 1454 1455 1456 1457 1458 1459 1460 1461 1462 1463 1464 1465 1466 1467 1468 1469 1470 1471 1472 1473 1474 1475 1476 1477 1478 Am. Sub. S. B. No. 2 Page 52 As Passed by the Senate project in service but not reflected in rates as plant in service, and such accrued carrying charges shall be included in the valuation of the property at the conclusion of the offset period for purposes of division (C)(9) of section 4909.05 of the Revised Code. From and after April 10, 1985, no allowance for construction work in progress as it relates to a particular construction project shall be reflected in rates for a period exceeding forty-eight consecutive months commencing on the date the initial rates reflecting such allowance become effective, except as otherwise provided in this division. The applicable maximum period in rates for an allowance for construction work in progress as it relates to a particular construction project shall be tolled if, and to the extent, a delay in the in-service date of the project is caused by the action or inaction of any federal, state, county, or municipal agency having jurisdiction, where such action or inaction relates to a change in a rule, standard, or approval of such agency, and where such action or inaction is not the result of the failure of the utility to reasonably endeavor to comply with any rule, standard, or approval prior to such change. In the event that such period expires before the project goes into service, the commission shall exclude, from the date of expiration, the allowance for the project as construction work in progress from rates, except that the commission may extend the expiration date up to twelve months for good cause shown. In the event that a utility has permanently canceled, abandoned, or terminated construction of a project for which it was previously permitted a construction work in progress 1479 1480 1481 1482 1483 1484 1485 1486 1487 1488 1489 1490 1491 1492 1493 1494 1495 1496 1497 1498 1499 1500 1501 1502 1503 1504 1505 1506 1507 1508 Am. Sub. S. B. No. 2 Page 53 As Passed by the Senate allowance, the commission immediately shall exclude the allowance for the project from the valuation. In the event that a construction work in progress project previously included in the valuation is removed from the valuation pursuant to this division, any revenues collected by the utility from its customers after April 10, 1985, that resulted from such prior inclusion shall be offset against future revenues over the same period of time as the project was included in the valuation as construction work in progress. The total revenue effect of such offset shall not exceed the total revenues previously collected. In no event shall the total revenue effect of any offset or offsets provided under division (A)(1) of this section exceed the total revenue effect of any construction work in progress allowance. (2) A fair and reasonable rate of return to the utility on the valuation as determined in division (A)(1) of this section; (3) The dollar annual return to which the utility is entitled by applying the fair and reasonable rate of return as determined under division (A)(2) of this section to the valuation of the utility determined under division (A)(1) of this section; (4) The cost to the utility of rendering the public utility service for the test period used for the determination under division (C)(1) of this section, less the total of any interest on cash or credit refunds paid, pursuant to section 4909.42 of the Revised Code, by the utility during the test period. (a) Federal, state, and local taxes imposed on or measured 1509 1510 1511 1512 1513 1514 1515 1516 1517 1518 1519 1520 1521 1522 1523 1524 1525 1526 1527 1528 1529 1530 1531 1532 1533 1534 1535 1536 1537 Am. Sub. S. B. No. 2 Page 54 As Passed by the Senate by net income may, in the discretion of the commission, be computed by the normalization method of accounting, provided the utility maintains accounting reserves that reflect differences between taxes actually payable and taxes on a normalized basis, provided that no determination as to the treatment in the rate- making process of such taxes shall be made that will result in loss of any tax depreciation or other tax benefit to which the utility would otherwise be entitled, and further provided that such tax benefit as redounds to the utility as a result of such a computation may not be retained by the company, used to fund any dividend or distribution, or utilized for any purpose other than the defrayal of the operating expenses of the utility and the defrayal of the expenses of the utility in connection with construction work. (b) The amount of any tax credits granted to an electric light company under section 5727.391 of the Revised Code for Ohio coal burned prior to January 1, 2000, shall not be retained by the company, used to fund any dividend or distribution, or utilized for any purposes other than the defrayal of the allowable operating expenses of the company and the defrayal of the allowable expenses of the company in connection with the installation, acquisition, construction, or use of a compliance facility. The amount of the tax credits granted to an electric light company under that section for Ohio coal burned prior to January 1, 2000, shall be returned to its customers within three years after initially claiming the credit through an offset to the company's rates or fuel component, as determined by the commission, as set forth in schedules filed by the company under section 4905.30 of the Revised Code. As used in division (A)(4) (b) of this section, "compliance facility" has the same meaning as in section 5727.391 of the Revised Code. 1538 1539 1540 1541 1542 1543 1544 1545 1546 1547 1548 1549 1550 1551 1552 1553 1554 1555 1556 1557 1558 1559 1560 1561 1562 1563 1564 1565 1566 1567 1568 Am. Sub. S. B. No. 2 Page 55 As Passed by the Senate (B) The commission shall compute the gross annual revenues to which the utility is entitled by adding the dollar amount of return under division (A)(3) of this section to the cost, for the test period used for the determination under division (C)(1) of this section, of rendering the public utility service under division (A)(4) of this section. (C)(1) Except as provided in division (D) of this section, the revenues and expenses of the utility shall be determined during a test period . The utility may as follows: (a) Electric light companies may propose a forecasted test period. If the company proposes a forecasted test period, the company shall propose annual base rates for three consecutive twelve-month periods in a single forecasted test period application. During the first twelve-month period, the company may propose a reasonably forecasted rate base during a thirteen- month average, revenues, and expenses for the first twelve months that new base rates will be in effect. During the second twelve-month period, the base rate revenue requirement shall be adjusted for the return of, and return on, incremental rate base additions approved by the commission in the initial application. During the third twelve- month period, the base rate revenue requirement may be adjusted for the return of and return on incremental rate base additions approved by the commission in the initial application. For each twelve-month period, forecasted plant investment, forecasted revenue, and forecasted expenses versus actual investment, actual revenue, and actual expenses shall be trued up via a cost recovery mechanism approved by the commission. Each true-up process shall include an adjustment to actual 1569 1570 1571 1572 1573 1574 1575 1576 1577 1578 1579 1580 1581 1582 1583 1584 1585 1586 1587 1588 1589 1590 1591 1592 1593 1594 1595 1596 1597 Am. Sub. S. B. No. 2 Page 56 As Passed by the Senate for the rate of return that the company is authorized to earn on the actual investments made. The company shall provide the commission with actual financial information during the true-up process to ensure accuracy. As part of the true-up process, the commission shall include only rate base components that have been found by the commission to be used and useful in rendering public utility service. (b) All utilities, except for electric light companies that choose to file under division (C)(1)(a) of this section, shall propose a test period for this determination that is any twelve-month period beginning not more than six months prior to the date the application is filed and ending not more than nine months subsequent to that date. The test period for determining revenues and expenses of the utility shall be the test period proposed by the utility, unless otherwise ordered by the commission. (2) The For utilities filing under division (C)(1)(b) of this section, the date certain shall be not later than the date of filing, except that it shall be, for a natural gas, water- works, or sewage disposal system company, not later than the end of the test period. (D) A natural gas, water-works, or sewage disposal system company Utilities filing under division (C)(1)(b) of this section may propose adjustments to the revenues and expenses to be determined under division (C)(1) of this section for any changes that are, during the test period or the twelve-month period immediately following the test period, reasonably expected to occur. The natural gas, water-works, or sewage disposal system company utility shall identify and quantify, individually, any proposed adjustments. The commission shall 1598 1599 1600 1601 1602 1603 1604 1605 1606 1607 1608 1609 1610 1611 1612 1613 1614 1615 1616 1617 1618 1619 1620 1621 1622 1623 1624 1625 1626 1627 Am. Sub. S. B. No. 2 Page 57 As Passed by the Senate incorporate the proposed adjustments into the determination if the adjustments are just and reasonable. (E) When the commission is of the opinion, after hearing and after making the determinations under divisions (A) and (B) of this section, that any rate, fare, charge, toll, rental, schedule, classification, or service, or any joint rate, fare, charge, toll, rental, schedule, classification, or service rendered, charged, demanded, exacted, or proposed to be rendered, charged, demanded, or exacted, is, or will be, unjust, unreasonable, unjustly discriminatory, unjustly preferential, or in violation of law, that the service is, or will be, inadequate, or that the maximum rates, charges, tolls, or rentals chargeable by any such public utility are insufficient to yield reasonable compensation for the service rendered, and are unjust and unreasonable, the commission shall: (1) With due regard among other things to the value of all property of the public utility actually used and useful for the convenience of the public as determined under division (A)(1) of this section, excluding from such value the value of any franchise or right to own, operate, or enjoy the same in excess of the amount, exclusive of any tax or annual charge, actually paid to any political subdivision of the state or county, as the consideration for the grant of such franchise or right, and excluding any value added to such property by reason of a monopoly or merger, with due regard in determining the dollar annual return under division (A)(3) of this section to the necessity of making reservation out of the income for surplus, depreciation, and contingencies, and; (2) With due regard to all such other matters as are proper, according to the facts in each case, 1628 1629 1630 1631 1632 1633 1634 1635 1636 1637 1638 1639 1640 1641 1642 1643 1644 1645 1646 1647 1648 1649 1650 1651 1652 1653 1654 1655 1656 1657 Am. Sub. S. B. No. 2 Page 58 As Passed by the Senate (a) Including a fair and reasonable rate of return determined by the commission with reference to a cost of debt equal to the actual embedded cost of debt of such public utility, (b) But not including the portion of any periodic rental or use payments representing that cost of property that is included in the valuation report under divisions (C)(4)(B)(4) and (5) of section 4909.042 of the Revised Code and divisions (B)(4) and (5) of section 4909.05 of the Revised Code, fix and determine the just and reasonable rate, fare, charge, toll, rental, or service to be rendered, charged, demanded, exacted, or collected for the performance or rendition of the service that will provide the public utility the allowable gross annual revenues under division (B) of this section, and order such just and reasonable rate, fare, charge, toll, rental, or service to be substituted for the existing one. After such determination and order no change in the rate, fare, toll, charge, rental, schedule, classification, or service shall be made, rendered, charged, demanded, exacted, or changed by such public utility without the order of the commission, and any other rate, fare, toll, charge, rental, classification, or service is prohibited. (F) Upon application of any person or any public utility, and after notice to the parties in interest and opportunity to be heard as provided in Chapters 4901., 4903., 4905., 4907., 4909., 4921., and 4923. of the Revised Code for other hearings, has been given, the commission may rescind, alter, or amend an order fixing any rate, fare, toll, charge, rental, classification, or service, or any other order made by the commission. Certified copies of such orders shall be served and take effect as provided for original orders. 1658 1659 1660 1661 1662 1663 1664 1665 1666 1667 1668 1669 1670 1671 1672 1673 1674 1675 1676 1677 1678 1679 1680 1681 1682 1683 1684 1685 1686 1687 Am. Sub. S. B. No. 2 Page 59 As Passed by the Senate Sec. 4909.156. In fixing the just, reasonable, and compensatory rates, joint rates, tolls, classifications, charges, or rentals to be observed and charged for service by any public utility, the public utilities commission shall, in action upon an application filed pursuant to section 4909.18 of the Revised Code, require a public utility to file a report showing the proportionate amounts of the valuation of the property of the utility, as determined under section 4909.042 or 4909.05 of the Revised Code, and the proportionate amounts of the revenues and expenses of the utility that are proposed to be considered as attributable to the service area involved in the application. "Valuation," as used in this section, may include , with : (A) With respect to a public utility that is a natural gas, water-works, or sewage disposal system company, projected valuation as of the date certain, if applicable because of a future date certain under section 4909.15 of the Revised Code ; (B) With respect to an electric light company that chooses to file a forecasted test period under section 4909.18 of the Revised Code, the valuation and value during the forecasted test period. Sec. 4909.173. (A) As used in this section and section 4909.174 of the Revised Code: (1) "Customer-owned water service line" means the water service line connected to the water-works company's water service line at the curb of a customer's property. (2) "Water-works company" means an entity defined under division (G) of section 4905.03 of the Revised Code that is a public utility under section 4905.02 of the Revised Code. 1688 1689 1690 1691 1692 1693 1694 1695 1696 1697 1698 1699 1700 1701 1702 1703 1704 1705 1706 1707 1708 1709 1710 1711 1712 1713 1714 1715 1716 Am. Sub. S. B. No. 2 Page 60 As Passed by the Senate (B) A water-works company may do any of the following: (1) Replace lead customer-owned water service lines concurrently with a scheduled utility main replacement project, an emergency replacement, or company-initiated lead water service line replacement program; (2) Replace lead customer-owned water service lines when mandated or ordered to replace such lines by law or a state or federal regulatory agency; (3) Replace customer-owned water service lines of other composition when mandated or ordered to replace such lines by law or a state or federal regulatory agency. (C) If a water-works company replaces customer-owned water service lines under this section, then the company shall include the cost of the replacement of the water service lines, including the cost of replacement of both company side and customer-owned water service lines and the cost to evaluate customer-owned water service lines of unknown composition, in the valuation report of the property of the company as required under division (C)(6)(B)(6) of section 4909.05 of the Revised Code for inclusion in a rate case under this chapter. (D) The water service customer who is responsible for the customer-owned water service line that was replaced under this section shall hold legal title to the replaced water service line. Sec. 4909.174. (A) A water-works company shall reimburse a customer who replaces the customer's customer-owned water service line, if both of the following occur: (1) The company confirms that the customer-owned water service line was composed of lead or other composition that was 1717 1718 1719 1720 1721 1722 1723 1724 1725 1726 1727 1728 1729 1730 1731 1732 1733 1734 1735 1736 1737 1738 1739 1740 1741 1742 1743 1744 1745 Am. Sub. S. B. No. 2 Page 61 As Passed by the Senate mandated or ordered to be replaced by law or a state or federal regulatory agency; (2) The customer submits the reimbursement request to the company not later than twelve months after the completion of the water line replacement. (B) A water-works company that provides a reimbursement to a customer under this section shall include the reimbursement amount in the valuation report of the property of the company as required under division (C)(6)(B)(6) of section 4909.05 of the Revised Code for inclusion in a rate case under this chapter. Sec. 4909.18. Any public utility desiring to establish any rate, joint rate, toll, classification, charge, or rental, or to modify, amend, change, increase, or reduce any existing rate, joint rate, toll, classification, charge, or rental, or any regulation or practice affecting the same, shall file a written application with the public utilities commission. Except for actions under section 4909.16 of the Revised Code, no public utility may issue the notice of intent to file an application pursuant to division (B) of section 4909.43 of the Revised Code to increase any existing rate, joint rate, toll, classification, charge, or rental, until a final order under this section has been issued by the commission on any pending prior application to increase the same rate, joint rate, toll, classification, charge, or rental or until two hundred seventy-five days after filing such application, whichever is sooner. Such application shall be verified by the president or a vice-president and the secretary or treasurer of the applicant. Such application shall contain a schedule of the existing rate, joint rate, toll, classification, charge, or rental, or regulation or practice affecting the same, a schedule of the modification amendment, 1746 1747 1748 1749 1750 1751 1752 1753 1754 1755 1756 1757 1758 1759 1760 1761 1762 1763 1764 1765 1766 1767 1768 1769 1770 1771 1772 1773 1774 1775 Am. Sub. S. B. No. 2 Page 62 As Passed by the Senate change, increase, or reduction sought to be established, and a statement of the facts and grounds upon which such application is based. If such application proposes a new service or the use of new equipment, or proposes the establishment or amendment of a regulation, the application shall fully describe the new service or equipment, or the regulation proposed to be established or amended, and shall explain how the proposed service or equipment differs from services or equipment presently offered or in use, or how the regulation proposed to be established or amended differs from regulations presently in effect. The application shall provide such additional information as the commission may require in its discretion. If the commission determines that such application is not for an increase in any rate, joint rate, toll, classification, charge, or rental, the commission may permit the filing of the schedule proposed in the application and fix the time when such schedule shall take effect. If it appears to the commission that the proposals in the application may be unjust or unreasonable, the commission shall set the matter for hearing and shall give notice of such hearing by sending written notice of the date set for the hearing to the public utility and publishing notice of the hearing one time in a newspaper of general circulation in each county in the service area affected by the application. At such hearing, the burden of proof to show that the proposals in the application are just and reasonable shall be upon the public utility. After such hearing, the commission shall, where practicable, issue an appropriate order within six months from the date the application was filed. If the commission determines that said application is for an increase in any rate, joint rate, toll, classification, charge, or rental there shall also, unless otherwise ordered by 1776 1777 1778 1779 1780 1781 1782 1783 1784 1785 1786 1787 1788 1789 1790 1791 1792 1793 1794 1795 1796 1797 1798 1799 1800 1801 1802 1803 1804 1805 1806 Am. Sub. S. B. No. 2 Page 63 As Passed by the Senate the commission, be filed with the application in duplicate the following exhibits: (A) A report of its property used and useful, or, with respect to a natural gas, water-works, or sewage disposal system company, projected to be used and useful , as of the date certain, or during the forecasted test period, if the application is filed under division (C)(1)(a) of section 4909.15 of the Revised Code, in rendering the service referred to in such application, as provided in section sections 4909.042 and 4909.05 of the Revised Code; (B) A complete operating statement of its last fiscal year, showing in detail all its receipts, revenues, and incomes from all sources, all of its operating costs and other expenditures, and any analysis such public utility deems applicable to the matter referred to in said application; (C) A statement of the income and expense anticipated under the application filed; (D) A statement of financial condition summarizing assets, liabilities, and net worth; (E) Such other information as the commission may require in its discretion. Sec. 4909.181. (A) As used in this section, "electric distribution utility" has the same meaning as in section 4928.01 of the Revised Code. (B) Not later than December 31, 2029, and at least every three years thereafter, each electric distribution utility shall file a rate case application regarding distribution service under section 4909.18 of the Revised Code. 1807 1808 1809 1810 1811 1812 1813 1814 1815 1816 1817 1818 1819 1820 1821 1822 1823 1824 1825 1826 1827 1828 1829 1830 1831 1832 1833 1834 Am. Sub. S. B. No. 2 Page 64 As Passed by the Senate Sec. 4909.19. (A) Upon the filing of any application for increase provided for by section 4909.18 of the Revised Code the public utility shall forthwith publish notice of such application, in a form approved by the public utilities commission, once a week for two consecutive weeks in a newspaper published and in general circulation throughout the territory in which such public utility operates and directly affected by the matters referred to in said application. The notice shall include instructions for direct electronic access to the application or other documents on file with the public utilities commission. The first publication of the notice shall be made in its entirety and may be made in a preprinted insert in the newspaper. The second publication may be abbreviated if all of the following apply: (1) The abbreviated notice is at least one-fourth of the size of the notice in the first publication. (2) At the same time the abbreviated notice is published, the notice in the first publication is posted in its entirety on the newspaper's web site, if the newspaper has a web site, and the commission's web site. (3) The abbreviated notice contains a statement of the web site posting or postings, as applicable, and instructions for accessing the posting or postings. (B) The commission shall determine a format for the content of all notices required under this section, and shall consider costs and technological efficiencies in making that determination. Defects in the publication of said notice shall not affect the legality or sufficiency of notices published under this section provided that the commission has substantially complied with this section, as described in 1835 1836 1837 1838 1839 1840 1841 1842 1843 1844 1845 1846 1847 1848 1849 1850 1851 1852 1853 1854 1855 1856 1857 1858 1859 1860 1861 1862 1863 1864 Am. Sub. S. B. No. 2 Page 65 As Passed by the Senate section 4905.09 of the Revised Code. (C) The commission shall at once cause an investigation to be made of the facts set forth in said application and the exhibits attached thereto, and of the matters connected therewith. Within a reasonable time as determined by the commission one hundred eighty days after the filing of such application is determined to be complete , a written report shall be made and filed with the commission, a copy of which shall be sent by certified mail to the applicant, the mayor of any municipal corporation affected by the application, and to such other persons as the commission deems interested. If no objection to such report is made by any party interested within thirty days after such filing and the mailing of copies thereof, the commission shall fix a date within ten days for the final hearing upon said application, giving notice thereof to all parties interested. At such hearing the commission shall consider the matters set forth in said application and make such order respecting the prayer thereof as to it seems just and reasonable. If objections are filed with the commission, the commission shall cause a pre-hearing conference to be held between all parties, intervenors, and the commission staff in all cases involving more than one hundred thousand customers. If objections are filed with the commission within thirty days after the filing of such report, the application shall be promptly set down for hearing of testimony before the commission or be forthwith referred to an attorney examiner designated by the commission to take all the testimony with respect to the application and objections which may be offered by any interested party. The commission shall also fix the time and 1865 1866 1867 1868 1869 1870 1871 1872 1873 1874 1875 1876 1877 1878 1879 1880 1881 1882 1883 1884 1885 1886 1887 1888 1889 1890 1891 1892 1893 1894 Am. Sub. S. B. No. 2 Page 66 As Passed by the Senate place to take testimony giving ten days' written notice of such time and place to all parties. The taking of testimony shall commence on the date fixed in said notice and shall continue from day to day until completed. The attorney examiner may, upon good cause shown, grant continuances for not more than three days, excluding Saturdays, Sundays, and holidays. The commission may grant continuances for a longer period than three days upon its order for good cause shown. At any hearing involving rates or charges sought to be increased, the burden of proof to show that the increased rates or charges are just and reasonable shall be on the public utility. When the taking of testimony is completed, a full and complete record of such testimony noting all objections made and exceptions taken by any party or counsel, shall be made, signed by the attorney examiner, and filed with the commission. Prior to the formal consideration of the application by the commission and the rendition of any order respecting the prayer of the application, a quorum of the commission shall consider the recommended opinion and order of the attorney examiner, in an open, formal, public proceeding in which an overview and explanation is presented orally. Thereafter, the commission shall make such order respecting the prayer of such application as seems just and reasonable to it. In all proceedings before the commission in which the taking of testimony is required, except when heard by the commission, attorney examiners shall be assigned by the commission to take such testimony and fix the time and place therefor, and such testimony shall be taken in the manner prescribed in this section. All testimony shall be under oath or affirmation and taken down and transcribed by a reporter and made a part of the record in the case. The commission may hear 1895 1896 1897 1898 1899 1900 1901 1902 1903 1904 1905 1906 1907 1908 1909 1910 1911 1912 1913 1914 1915 1916 1917 1918 1919 1920 1921 1922 1923 1924 1925 Am. Sub. S. B. No. 2 Page 67 As Passed by the Senate the testimony or any part thereof in any case without having the same referred to an attorney examiner and may take additional testimony. Testimony shall be taken and a record made in accordance with such general rules as the commission prescribes and subject to such special instructions in any proceedings as it, by order, directs. Sec. 4909.191. (A) If the public utilities commission, under division (D) of section 4909.15 of the Revised Code, incorporated proposed adjustments to revenues and expenses into the commission's determination under that section, the natural gas, water-works, or sewage disposal system company public utility shall, not later than ninety days after actual data for all of the incorporated adjustments becomes known, submit to the commission proposed rate or charge adjustments that provide for the recalculation of rates or charges, reflective of customer- class responsibility, corresponding to the differences, if any, between the incorporated adjustments to revenues and expenses and the actual revenues and expenses associated with the incorporated adjustments. (B) If the commission incorporated projected value or valuation of property into the commission's determination under division (A)(1)(A)(1)(a) of section 4909.15 of the Revised Code, the natural gas, water-works, or sewage disposal system company shall, not later than ninety days after data for the actual value or valuation as of the date certain becomes known, submit to the commission proposed rate or charge adjustments that provide for the recalculation of rates or charges, reflective of customer-class responsibility, corresponding to the differences, if any, between the projected value or valuation incorporated into the commission's determination and the actual value or valuation as of the date certain. 1926 1927 1928 1929 1930 1931 1932 1933 1934 1935 1936 1937 1938 1939 1940 1941 1942 1943 1944 1945 1946 1947 1948 1949 1950 1951 1952 1953 1954 1955 1956 Am. Sub. S. B. No. 2 Page 68 As Passed by the Senate (C) The commission shall review the proposed rate or charge adjustments submitted under divisions (A) and (B) of this section. The review shall not include a hearing unless the commission finds that the proposed rate or charge adjustments may be unreasonable, in which case the commission may, in its discretion, schedule the matter for a hearing. (D) The commission shall issue, not later than one hundred fifty days after the date that any proposed rate or charge adjustments are submitted under division (A) or (B) of this section, a final order on the proposed rate or charge adjustments. Any rate or charge adjustments authorized under this division shall be limited to amounts that are not greater than those consistent with the proposed adjustments to revenues and expenses that were incorporated into the commission's determination under division (D) of section 4909.15 of the Revised Code, and not greater than those consistent with the incorporated projected value or valuation. In no event shall rate or charge adjustments authorized under this division be upward. After the commission has issued such a final order, the natural gas, water-works, or sewage disposal system companypublic utility, if applicable, shall submit to the commission proposed reconciliation adjustments that refund to customers the difference between the actual revenues collected by the natural gas, water-works, or sewage disposal system company,utility under the rates and charges determined by the commission under section 4909.15 of the Revised Code, and the rates or charges recalculated under the adjustments authorized under this division. The reconciliation adjustments shall be effective for a twelve-month period. 1957 1958 1959 1960 1961 1962 1963 1964 1965 1966 1967 1968 1969 1970 1971 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 Am. Sub. S. B. No. 2 Page 69 As Passed by the Senate (E) The reconciliation adjustments ordered under division (D) of this section may be subject to a final reconciliation by the commission. Any such final reconciliation shall occur after the twelve-month period described in division (D) of this section. Sec. 4909.192. When considering an application to increase rates under section 4909.18 of the Revised Code, the public utilities commission may approve the following: (A) Nondiscriminatory programs available for all energy- intensive customers to implement economic development, job growth, job retention, or interruptible rates that enhance distribution and transmission grid reliability and promote economic development. (B) Nondiscriminatory programs available for all mercantile customers, as defined in section 4928.01 of the Revised Code, that align retail rate recovery with how transmission costs are incurred by or charged to the electric distribution utility, as defined in section 4928.01 of the Revised Code, or programs that allow customers to be billed directly for transmission service by a competitive retail electric service provider. (C) Nondiscriminatory programs available for residential customers and small commercial customers, as defined in section 4928.101 of the Revised Code, that reduce demand at peak times for purposes of grid reliability or to help lower customer rates, including peak demand reduction programs under section 4928.107 of the Revised Code. Any programs to reduce demand proposed in an application to increase rates shall include terms permitting competitive retail electric service providers, certified under section 4928.08 of the Revised Code, to offer 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Am. Sub. S. B. No. 2 Page 70 As Passed by the Senate their customers access to these programs. Sec. 4909.193. The public utilities commission shall determine whether an application for an increase filed under section 4909.18 of the Revised Code is complete not more than forty-five days after the application is filed. If the commission does not issue a determination within the time period required by this section, the application shall be deemed complete by operation of law. Sec. 4909.42. If the proceeding on an application filed with the public utilities commission under section 4909.18 of the Revised Code by any public utility requesting an increase on any rate, rate mechanism, joint rate, toll, classification, charge, or rental or requesting a change in a regulation or practice affecting the same has not been concluded and an order entered pursuant to section 4909.19 of the Revised Code at the expiration of two hundred seventy-five two hundred ninety days from the date of filing the application is determined complete , an the public utility may request a temporary increase not to exceed the proposed increase and any party to the proceeding may request a temporary decrease, which shall go into effect upon the filing of a bond or a letter of credit by the public utilityand remain in effect until modified in accordance with the commission's determination on the merits of the application . The bond or letter of credit shall be filed with the commission and shall be payable to the state for the use and benefit of the customers affected by the proposed increase or change If the commission does not issue an order within three hundred twenty days after the application is deemed complete, the application shall be deemed approved by operation of law. A temporary increase or decrease under this section shall not exceed the midpoint of the rates recommended in the staff report filed 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 Am. Sub. S. B. No. 2 Page 71 As Passed by the Senate pursuant to section 4909.19 of the Revised Code and is subject to refund. An affidavit attached to the bond or letter of credit must be signed by two of the officers of the utility, under oath, and must contain a promise on behalf of the utility to refund any amounts collected by the utility over the rate, joint rate, toll, classification, charge, or rental, as determined in the final order of the commission. All refunds shall include interest at the rate stated in section 1343.03 of the Revised Code. The refund shall be in the form of a temporary reduction in rates following the final order of the commission, and shall be accomplished in such manner as shall be prescribed by the commission in its final order. The commission shall exercise continuing and exclusive jurisdiction over such refunds. If the public utilities commission has not entered a final order within five hundred forty-five days from the date of the filing of an application for an increase in rates under section 4909.18 of the Revised Code, a public utility shall have no obligation to make a refund of amounts collected after the five hundred forty-fifth day which exceed the amounts authorized by the commission's final order. Nothing in this section shall be construed to mitigate any duty of the commission to issue a final order under section 4909.19 of the Revised Code. Sec. 4928.01. (A) As used in this chapter: (1) "Ancillary service" means any function necessary to the provision of electric transmission or distribution service to a retail customer and includes, but is not limited to, scheduling, system control, and dispatch services; reactive 2048 2049 2050 2051 2052 2053 2054 2055 2056 2057 2058 2059 2060 2061 2062 2063 2064 2065 2066 2067 2068 2069 2070 2071 2072 2073 2074 2075 2076 Am. Sub. S. B. No. 2 Page 72 As Passed by the Senate supply from generation resources and voltage control service; reactive supply from transmission resources service; regulation service; frequency response service; energy imbalance service; operating reserve-spinning reserve service; operating reserve- supplemental reserve service; load following; back-up supply service; real-power loss replacement service; dynamic scheduling; system black start capability; and network stability service. (2) "Billing and collection agent" means a fully independent agent, not affiliated with or otherwise controlled by an electric utility, electric services company, electric cooperative, or governmental aggregator subject to certification under section 4928.08 of the Revised Code, to the extent that the agent is under contract with such utility, company, cooperative, or aggregator solely to provide billing and collection for retail electric service on behalf of the utility company, cooperative, or aggregator. (3) "Certified territory" means the certified territory established for an electric supplier under sections 4933.81 to 4933.90 of the Revised Code. (4) "Competitive retail electric service" means a component of retail electric service that is competitive as provided under division (B) of this section. (5) "Electric cooperative" means a not-for-profit electric light company that both is or has been financed in whole or in part under the "Rural Electrification Act of 1936," 49 Stat. 1363, 7 U.S.C. 901, and owns or operates facilities in this state to generate, transmit, or distribute electricity, or a not-for-profit successor of such company. 2077 2078 2079 2080 2081 2082 2083 2084 2085 2086 2087 2088 2089 2090 2091 2092 2093 2094 2095 2096 2097 2098 2099 2100 2101 2102 2103 2104 2105 Am. Sub. S. B. No. 2 Page 73 As Passed by the Senate (6) "Electric distribution utility" means an electric utility that supplies at least retail electric distribution service and does not own or operate an electric generating facility. (7) "Electric light company" has the same meaning as in section 4905.03 of the Revised Code and includes an electric services company, but excludes any self-generator to the extent that it consumes electricity it so produces, sells that electricity for resale, or obtains electricity from a generating facility it hosts on its premises . (8) "Electric load center" has the same meaning as in section 4933.81 of the Revised Code. (9) "Electric services company" means an electric light company that is engaged on a for-profit or not-for-profit basis in the business of supplying or arranging for the supply of only a competitive retail electric service in this state. "Electric services company" includes a power marketer, power broker, aggregator, or independent power producer but excludes an electric cooperative, municipal electric utility, governmental aggregator, or billing and collection agent. (10) "Electric supplier" has the same meaning as in section 4933.81 of the Revised Code. (11) "Electric utility" means an electric light company that has a certified territory and is engaged on a for-profit basis either in the business of supplying at least a noncompetitive retail electric service in this state or in the businesses of supplying both a noncompetitive and a competitive retail electric service in this state . "Electric utility" excludes a municipal electric utility or a billing and 2106 2107 2108 2109 2110 2111 2112 2113 2114 2115 2116 2117 2118 2119 2120 2121 2122 2123 2124 2125 2126 2127 2128 2129 2130 2131 2132 2133 2134 Am. Sub. S. B. No. 2 Page 74 As Passed by the Senate collection agent. (12) "Firm electric service" means electric service other than nonfirm electric service. (13) "Governmental aggregator" means a legislative authority of a municipal corporation, a board of township trustees, or a board of county commissioners acting as an aggregator for the provision of a competitive retail electric service under authority conferred under section 4928.20 of the Revised Code. (14) A person acts "knowingly," regardless of the person's purpose, when the person is aware that the person's conduct will probably cause a certain result or will probably be of a certain nature. A person has knowledge of circumstances when the person is aware that such circumstances probably exist. (15) "Level of funding for low-income customer energy efficiency programs provided through electric utility rates" means the level of funds specifically included in an electric utility's rates on October 5, 1999, pursuant to an order of the public utilities commission issued under Chapter 4905. or 4909. of the Revised Code and in effect on October 4, 1999, for the purpose of improving the energy efficiency of housing for the utility's low-income customers. The term excludes the level of any such funds committed to a specific nonprofit organization or organizations pursuant to a stipulation or contract. (16) "Low-income customer assistance programs" means the percentage of income payment plan program, the home energy assistance program, the home weatherization assistance program, and the targeted energy efficiency and weatherization program. (17) "Market development period" for an electric utility 2135 2136 2137 2138 2139 2140 2141 2142 2143 2144 2145 2146 2147 2148 2149 2150 2151 2152 2153 2154 2155 2156 2157 2158 2159 2160 2161 2162 2163 Am. Sub. S. B. No. 2 Page 75 As Passed by the Senate means the period of time beginning on the starting date of competitive retail electric service and ending on the applicable date for that utility as specified in section 4928.40 of the Revised Code, irrespective of whether the utility applies to receive transition revenues under this chapter. (18) "Market power" means the ability to impose on customers a sustained price for a product or service above the price that would prevail in a competitive market. (19) "Mercantile customer" means a commercial or industrial customer if the electricity consumed is for nonresidential use and the customer consumes more than seven hundred thousand kilowatt hours per year or is part of a national account involving multiple facilities in one or more states. (20) "Municipal electric utility" means a municipal corporation that owns or operates facilities to generate, transmit, or distribute electricity. (21) "Noncompetitive retail electric service" means a component of retail electric service that is noncompetitive as provided under division (B) of this section. (22) "Nonfirm electric service" means electric service provided pursuant to a schedule filed under section 4905.30 of the Revised Code or pursuant to an arrangement under section 4905.31 of the Revised Code, which schedule or arrangement includes conditions that may require the customer to curtail or interrupt electric usage during nonemergency circumstances upon notification by an electric utility. (23) "Percentage of income payment plan arrears" means funds eligible for collection through the percentage of income 2164 2165 2166 2167 2168 2169 2170 2171 2172 2173 2174 2175 2176 2177 2178 2179 2180 2181 2182 2183 2184 2185 2186 2187 2188 2189 2190 2191 2192 Am. Sub. S. B. No. 2 Page 76 As Passed by the Senate payment plan rider, but uncollected as of July 1, 2000. (24) "Person" has the same meaning as in section 1.59 of the Revised Code. (25) "Advanced energy project" means any technologies, products, activities, or management practices or strategies that facilitate the generation or use of electricity or energy and that reduce or support the reduction of energy consumption or support the production of clean, renewable energy for industrial, distribution, commercial, institutional, governmental, research, not-for-profit, or residential energy users, including, but not limited to, advanced energy resources and renewable energy resources. "Advanced energy project" also includes any project described in division (A), (B), or (C) of section 4928.621 of the Revised Code. (26) "Regulatory assets" means the unamortized net regulatory assets that are capitalized or deferred on the regulatory books of the electric utility, pursuant to an order or practice of the public utilities commission or pursuant to generally accepted accounting principles as a result of a prior commission rate-making decision, and that would otherwise have been charged to expense as incurred or would not have been capitalized or otherwise deferred for future regulatory consideration absent commission action. "Regulatory assets" includes, but is not limited to, all deferred demand-side management costs; all deferred percentage of income payment plan arrears; post-in-service capitalized charges and assets recognized in connection with statement of financial accounting standards no. 109 (receivables from customers for income taxes); future nuclear decommissioning costs and fuel disposal costs as those costs have been determined by the commission in the 2193 2194 2195 2196 2197 2198 2199 2200 2201 2202 2203 2204 2205 2206 2207 2208 2209 2210 2211 2212 2213 2214 2215 2216 2217 2218 2219 2220 2221 2222 Am. Sub. S. B. No. 2 Page 77 As Passed by the Senate electric utility's most recent rate or accounting application proceeding addressing such costs; the undepreciated costs of safety and radiation control equipment on nuclear generating plants owned or leased by an electric utility; and fuel costs currently deferred pursuant to the terms of one or more settlement agreements approved by the commission. (27) "Retail electric service" means any service involved in supplying or arranging for the supply of electricity to ultimate consumers in this state, from the point of generation to the point of consumption. For the purposes of this chapter, retail electric service includes one or more of the following "service components": generation service, aggregation service, power marketing service, power brokerage service, transmission service, distribution service, ancillary service, metering service, and billing and collection service. (28) "Starting date of competitive retail electric service" means January 1, 2001. (29) "Customer-generator" means a user of a net metering system. (30) "Net metering" means measuring the difference in an applicable billing period between the electricity supplied by an electric service provider and the electricity generated by a customer-generator that is fed back to the electric service provider. (31) "Net metering system" means a facility for the production of electrical energy that does all of the following: (a) Uses as its fuel either solar, wind, biomass, landfill gas, or hydropower, or uses a microturbine or a fuel cell; (b) Is located on a customer-generator's premises; 2223 2224 2225 2226 2227 2228 2229 2230 2231 2232 2233 2234 2235 2236 2237 2238 2239 2240 2241 2242 2243 2244 2245 2246 2247 2248 2249 2250 2251 Am. Sub. S. B. No. 2 Page 78 As Passed by the Senate (c) Operates in parallel with the electric utility's transmission and distribution facilities; (d) Is intended primarily to offset part or all of the customer-generator's requirements for electricity. For an industrial customer-generator with a net metering system that has a capacity of less than twenty megawatts and uses wind as energy, this means the net metering system was sized so as to not exceed one hundred per cent of the customer-generator's annual requirements for electric energy at the time of interconnection. (32) "Self-generator" means an entity in this state that owns or hosts on its premises property the entity controls an electric generation facility that produces electricity primarily for the owner's consumption and that may provide any such excess electricity to another entity, whether the and that meets all of the following: (a) The facility is installed or operated by the owner or by an agent a third party under a contract, including a lease, purchase power agreement, or other service contract. (b) The facility connects directly to the owner's side of the electric meter. (c) The facility delivers electricity to the owner's side of the electric meter without the use of an electric distribution utility's or electric cooperative's distribution system or transmission system . (33) "Rate plan" means the standard service offer in effect on the effective date of the amendment of this section by S.B. 221 of the 127th general assembly, July 31, 2008. (34) "Advanced energy resource" means any of the 2252 2253 2254 2255 2256 2257 2258 2259 2260 2261 2262 2263 2264 2265 2266 2267 2268 2269 2270 2271 2272 2273 2274 2275 2276 2277 2278 2279 2280 Am. Sub. S. B. No. 2 Page 79 As Passed by the Senate following: (a) Any method or any modification or replacement of any property, process, device, structure, or equipment that increases the generation output of an electric generating facility to the extent such efficiency is achieved without additional carbon dioxide emissions by that facility; (b) Any distributed generation system consisting of customer cogeneration technology; (c) Clean coal technology that includes a carbon-based product that is chemically altered before combustion to demonstrate a reduction, as expressed as ash, in emissions of nitrous oxide, mercury, arsenic, chlorine, sulfur dioxide, or sulfur trioxide in accordance with the American society of testing and materials standard D1757A or a reduction of metal oxide emissions in accordance with standard D5142 of that society, or clean coal technology that includes the design capability to control or prevent the emission of carbon dioxide, which design capability the commission shall adopt by rule and shall be based on economically feasible best available technology or, in the absence of a determined best available technology, shall be of the highest level of economically feasible design capability for which there exists generally accepted scientific opinion; (d) Advanced nuclear energy technology consisting of generation III technology as defined by the nuclear regulatory commission; other, later technology; or significant improvements to existing facilities; (e) Any fuel cell used in the generation of electricity, including, but not limited to, a proton exchange membrane fuel 2281 2282 2283 2284 2285 2286 2287 2288 2289 2290 2291 2292 2293 2294 2295 2296 2297 2298 2299 2300 2301 2302 2303 2304 2305 2306 2307 2308 2309 Am. Sub. S. B. No. 2 Page 80 As Passed by the Senate cell, phosphoric acid fuel cell, molten carbonate fuel cell, or solid oxide fuel cell; (f) Advanced solid waste or construction and demolition debris conversion technology, including, but not limited to, advanced stoker technology, and advanced fluidized bed gasification technology, that results in measurable greenhouse gas emissions reductions as calculated pursuant to the United States environmental protection agency's waste reduction model (WARM); (g) Demand-side management and any energy efficiency improvement; (h) Any new, retrofitted, refueled, or repowered generating facility located in Ohio, including a simple or combined-cycle natural gas generating facility or a generating facility that uses biomass, coal, modular nuclear, or any other fuel as its input; (i) Any uprated capacity of an existing electric generating facility if the uprated capacity results from the deployment of advanced technology. "Advanced energy resource" does not include a waste energy recovery system that is, or has been, included in an energy efficiency program of an electric distribution utility pursuant to requirements under section 4928.66 of the Revised Code. (35) "Air contaminant source" has the same meaning as in section 3704.01 of the Revised Code. (36) "Cogeneration technology" means technology that produces electricity and useful thermal output simultaneously. (37)(a) "Renewable energy resource" means any of the 2310 2311 2312 2313 2314 2315 2316 2317 2318 2319 2320 2321 2322 2323 2324 2325 2326 2327 2328 2329 2330 2331 2332 2333 2334 2335 2336 2337 Am. Sub. S. B. No. 2 Page 81 As Passed by the Senate following: (i) Solar photovoltaic or solar thermal energy; (ii) Wind energy; (iii) Power produced by a hydroelectric facility; (iv) Power produced by a small hydroelectric facility, which is a facility that operates, or is rated to operate, at an aggregate capacity of less than six megawatts; (v) Power produced by a run-of-the-river hydroelectric facility placed in service on or after January 1, 1980, that is located within this state, relies upon the Ohio river, and operates, or is rated to operate, at an aggregate capacity of forty or more megawatts; (vi) Geothermal energy; (vii) Fuel derived from solid wastes, as defined in section 3734.01 of the Revised Code, through fractionation, biological decomposition, or other process that does not principally involve combustion; (viii) Biomass energy; (ix) Energy produced by cogeneration technology that is placed into service on or before December 31, 2015, and for which more than ninety per cent of the total annual energy input is from combustion of a waste or byproduct gas from an air contaminant source in this state, which source has been in operation since on or before January 1, 1985, provided that the cogeneration technology is a part of a facility located in a county having a population of more than three hundred sixty-five thousand but less than three hundred seventy thousand according to the most recent federal decennial census; 2338 2339 2340 2341 2342 2343 2344 2345 2346 2347 2348 2349 2350 2351 2352 2353 2354 2355 2356 2357 2358 2359 2360 2361 2362 2363 2364 2365 Am. Sub. S. B. No. 2 Page 82 As Passed by the Senate (x) Biologically derived methane gas; (xi) Heat captured from a generator of electricity, boiler, or heat exchanger fueled by biologically derived methane gas; (xii) Energy derived from nontreated by-products of the pulping process or wood manufacturing process, including bark, wood chips, sawdust, and lignin in spent pulping liquors. "Renewable energy resource" includes, but is not limited to, any fuel cell used in the generation of electricity, including, but not limited to, a proton exchange membrane fuel cell, phosphoric acid fuel cell, molten carbonate fuel cell, or solid oxide fuel cell; a linear generator; wind turbine located in the state's territorial waters of Lake Erie; methane gas emitted from an abandoned coal mine; waste energy recovery system placed into service or retrofitted on or after the effective date of the amendment of this section by S.B. 315 of the 129th general assembly, September 10, 2012, except that a waste energy recovery system described in division (A)(38)(b) of this section may be included only if it was placed into service between January 1, 2002, and December 31, 2004; storage facility that will promote the better utilization of a renewable energy resource; or distributed generation system used by a customer to generate electricity from any such energy. "Renewable energy resource" does not include a waste energy recovery system that is, or was, on or after January 1, 2012, included in an energy efficiency program of an electric distribution utility pursuant to requirements under section 4928.66 of the Revised Code. (b) As used in division (A)(37) of this section, 2366 2367 2368 2369 2370 2371 2372 2373 2374 2375 2376 2377 2378 2379 2380 2381 2382 2383 2384 2385 2386 2387 2388 2389 2390 2391 2392 2393 2394 Am. Sub. S. B. No. 2 Page 83 As Passed by the Senate "hydroelectric facility" means a hydroelectric generating facility that is located at a dam on a river, or on any water discharged to a river, that is within or bordering this state or within or bordering an adjoining state and meets all of the following standards: (i) The facility provides for river flows that are not detrimental for fish, wildlife, and water quality, including seasonal flow fluctuations as defined by the applicable licensing agency for the facility. (ii) The facility demonstrates that it complies with the water quality standards of this state, which compliance may consist of certification under Section 401 of the "Clean Water Act of 1977," 91 Stat. 1598, 1599, 33 U.S.C. 1341, and demonstrates that it has not contributed to a finding by this state that the river has impaired water quality under Section 303(d) of the "Clean Water Act of 1977," 114 Stat. 870, 33 U.S.C. 1313. (iii) The facility complies with mandatory prescriptions regarding fish passage as required by the federal energy regulatory commission license issued for the project, regarding fish protection for riverine, anadromous, and catadromous fish. (iv) The facility complies with the recommendations of the Ohio environmental protection agency and with the terms of its federal energy regulatory commission license regarding watershed protection, mitigation, or enhancement, to the extent of each agency's respective jurisdiction over the facility. (v) The facility complies with provisions of the "Endangered Species Act of 1973," 87 Stat. 884, 16 U.S.C. 1531 to 1544, as amended. 2395 2396 2397 2398 2399 2400 2401 2402 2403 2404 2405 2406 2407 2408 2409 2410 2411 2412 2413 2414 2415 2416 2417 2418 2419 2420 2421 2422 2423 Am. Sub. S. B. No. 2 Page 84 As Passed by the Senate (vi) The facility does not harm cultural resources of the area. This can be shown through compliance with the terms of its federal energy regulatory commission license or, if the facility is not regulated by that commission, through development of a plan approved by the Ohio historic preservation office, to the extent it has jurisdiction over the facility. (vii) The facility complies with the terms of its federal energy regulatory commission license or exemption that are related to recreational access, accommodation, and facilities or, if the facility is not regulated by that commission, the facility complies with similar requirements as are recommended by resource agencies, to the extent they have jurisdiction over the facility; and the facility provides access to water to the public without fee or charge. (viii) The facility is not recommended for removal by any federal agency or agency of any state, to the extent the particular agency has jurisdiction over the facility. (c) The standards in divisions (A)(37)(b)(i) to (viii) of this section do not apply to a small hydroelectric facility under division (A)(37)(a)(iv) of this section. (38) "Waste energy recovery system" means any of the following: (a) A facility that generates electricity through the conversion of energy from either of the following: (i) Exhaust heat from engines or manufacturing, industrial, commercial, or institutional sites, except for exhaust heat from a facility whose primary purpose is the generation of electricity; (ii) Reduction of pressure in gas pipelines before gas is 2424 2425 2426 2427 2428 2429 2430 2431 2432 2433 2434 2435 2436 2437 2438 2439 2440 2441 2442 2443 2444 2445 2446 2447 2448 2449 2450 2451 2452 Am. Sub. S. B. No. 2 Page 85 As Passed by the Senate distributed through the pipeline, provided that the conversion of energy to electricity is achieved without using additional fossil fuels. (b) A facility at a state institution of higher education as defined in section 3345.011 of the Revised Code that recovers waste heat from electricity-producing engines or combustion turbines and that simultaneously uses the recovered heat to produce steam, provided that the facility was placed into service between January 1, 2002, and December 31, 2004; (c) A facility that produces steam from recovered waste heat from a manufacturing process and uses that steam, or transfers that steam to another facility, to provide heat to another manufacturing process or to generate electricity. (39) "Smart grid" means capital improvements to an electric distribution utility's distribution infrastructure that improve reliability, efficiency, resiliency, or reduce energy demand or use, including, but not limited to, advanced metering and automation of system functions. (40) "Combined heat and power system" means the coproduction of electricity and useful thermal energy from the same fuel source designed to achieve thermal-efficiency levels of at least sixty per cent, with at least twenty per cent of the system's total useful energy in the form of thermal energy. (41) "Legacy generation resource" means all generating facilities owned directly or indirectly by a corporation that was formed prior to 1960 by investor-owned utilities for the original purpose of providing power to the federal government for use in the nation's defense or in furtherance of national interests, including the Ohio valley electric corporation. 2453 2454 2455 2456 2457 2458 2459 2460 2461 2462 2463 2464 2465 2466 2467 2468 2469 2470 2471 2472 2473 2474 2475 2476 2477 2478 2479 2480 2481 Am. Sub. S. B. No. 2 Page 86 As Passed by the Senate (42) "Prudently incurred costs related to a legacy generation resource" means costs, including deferred costs, allocated pursuant to a power agreement approved by the federal energy regulatory commission that relates to a legacy generation resource, less any revenues realized from offering the contractual commitment for the power agreement into the wholesale markets, provided that where the net revenues exceed net costs, those excess revenues shall be credited to customers. Such costs shall exclude any return on investment in common equity and, in the event of a premature retirement of a legacy generation resource, shall exclude any recovery of remaining debt. Such costs shall include any incremental costs resulting from the bankruptcy of a current or former sponsor under such power agreement or co-owner of the legacy generation resource if not otherwise recovered through a utility rate cost recovery mechanism. (43)(a) (41)(a) "Green energy" means any energy generated by using an energy resource that does one or more of the following: (i) Releases reduced air pollutants, thereby reducing cumulative air emissions; (ii) Is more sustainable and reliable relative to some fossil fuels. (b) "Green energy" includes energy generated using the following: (i) Natural gas as a resource; (ii) Nuclear reaction. (42) "Linear generator" means an integrated system consisting of oscillators, cylinders, electricity conversion 2482 2483 2484 2485 2486 2487 2488 2489 2490 2491 2492 2493 2494 2495 2496 2497 2498 2499 2500 2501 2502 2503 2504 2505 2506 2507 2508 2509 2510 Am. Sub. S. B. No. 2 Page 87 As Passed by the Senate equipment, and associated balance of plant components that meet the following criteria: (a) Converts the linear motion of oscillators directly into electricity without the use of a flame or spark; (b) Is dispatchable with the ability to vary power output across all loads; (c) Can operate on multiple fuel types including renewable fuels such as hydrogen, ammonia, and biogas. (B) For the purposes of this chapter, a retail electric service component shall be deemed a competitive retail electric service if the service component is competitive pursuant to a declaration by a provision of the Revised Code or pursuant to an order of the public utilities commission authorized under division (A) of section 4928.04 of the Revised Code. Otherwise, the service component shall be deemed a noncompetitive retail electric service. Sec. 4928.041. (A) Except as provided in sections 4928.141 and 4928.142 of the Revised Code, no electric utility shall provide a competitive retail electric service in this state if that service was deemed competitive or otherwise legally classified as competitive prior to the effective date of this section. (B) The standard service offer under section 4928.141 of the Revised Code shall continue to be provided to consumers in this state by electric utilities. Sec. 4928.05. (A)(1) On and after the starting date of competitive retail electric service, a A competitive retail electric service supplied by an electric utility or electric services company, or by an electric utility consistent with 2511 2512 2513 2514 2515 2516 2517 2518 2519 2520 2521 2522 2523 2524 2525 2526 2527 2528 2529 2530 2531 2532 2533 2534 2535 2536 2537 2538 2539 Am. Sub. S. B. No. 2 Page 88 As Passed by the Senate section 4928.141 of the Revised Code, shall not be subject to supervision and regulation by a municipal corporation under Chapter 743. of the Revised Code or by the public utilities commission under Chapters 4901. to 4909., 4933., 4935., and 4963. of the Revised Code, except sections 4905.10 and 4905.31, division (B) of section 4905.33, and sections 4905.35 and 4933.81 to 4933.90; except sections 4905.06, 4935.03, 4963.40, and 4963.41 of the Revised Code only to the extent related to service reliability and public safety; and except as otherwise provided in this chapter. The commission's authority to enforce those excepted provisions with respect to a competitive retail electric service shall be such authority as is provided for their enforcement under Chapters 4901. to 4909., 4933., 4935., and 4963. of the Revised Code and this chapter. Nothing in this division shall be construed to limit the commission's authority under sections 4928.141 to , 4928.142, and 4928.144 of the Revised Code. On and after the starting date of competitive retail electric service, a (2) A competitive retail electric service supplied by an electric cooperative shall not be subject to supervision and regulation by the commission under Chapters 4901. to 4909., 4933., 4935., and 4963. of the Revised Code, except as otherwise expressly provided in sections 4928.01 to 4928.10 and 4928.16 of the Revised Code. (2) On and after the starting date of competitive retail electric service, a (B)(1) A noncompetitive retail electric service supplied by an electric utility shall be subject to supervision and regulation by the commission under Chapters 4901. to 4909., 4933., 4935., and 4963. of the Revised Code and this chapter, to the extent that authority is not preempted by federal law. The commission's authority to enforce those 2540 2541 2542 2543 2544 2545 2546 2547 2548 2549 2550 2551 2552 2553 2554 2555 2556 2557 2558 2559 2560 2561 2562 2563 2564 2565 2566 2567 2568 2569 2570 Am. Sub. S. B. No. 2 Page 89 As Passed by the Senate provisions with respect to a noncompetitive retail electric service shall be the authority provided under those chapters and this chapter, to the extent the authority is not preempted by federal law. Notwithstanding Chapters 4905. and 4909. of the Revised Code, commission authority under this chapter shall include the authority to provide for the recovery, through a reconcilable rider on an electric distribution utility's distribution rates, of all transmission and transmission-related costs, including ancillary and congestion costs, imposed on or charged to the utility by the federal energy regulatory commission or a regional transmission organization, independent transmission operator, or similar organization approved by the federal energy regulatory commission. (2) The commission shall exercise its jurisdiction with respect to the delivery of electricity by an electric utility in this state on or after the starting date of competitive retail electric service so as to ensure that no aspect of the delivery of electricity by the utility to consumers in this state that consists of a noncompetitive retail electric service is unregulated. On and after that starting date, a (3) A noncompetitive retail electric service supplied by an electric cooperative shall not be subject to supervision and regulation by the commission under Chapters 4901. to 4909., 4933., 4935., and 4963. of the Revised Code, except sections 4933.81 to 4933.90 and 4935.03 of the Revised Code. The commission's authority to enforce those excepted sections with respect to a noncompetitive retail electric service of an electric cooperative shall be such authority as is provided for their enforcement under Chapters 4933. and 4935. of the Revised Code. 2571 2572 2573 2574 2575 2576 2577 2578 2579 2580 2581 2582 2583 2584 2585 2586 2587 2588 2589 2590 2591 2592 2593 2594 2595 2596 2597 2598 2599 2600 Am. Sub. S. B. No. 2 Page 90 As Passed by the Senate (B) Nothing in this chapter affects the authority of the commission under Title XLIX of the Revised Code to regulate an electric light company in this state or an electric service supplied in this state prior to the starting date of competitive retail electric service. Sec. 4928.08. (A) This section applies to an electric cooperative, or to a governmental aggregator that is a municipal electric utility, only to the extent of a competitive retail electric service it provides to a customer to whom it does not provide a noncompetitive retail electric service through transmission or distribution facilities it singly or jointly owns or operates. (B) (B)(1) No electric utility, electric services company, electric cooperative, or governmental aggregator shall provide a competitive retail electric service to a consumer in this state on and after the starting date of competitive retail electric service without first being certified by the public utilities commission regarding its managerial, technical, and financial capability to provide that service and providing a financial guarantee sufficient to protect customers and electric distribution utilities from default. Certification shall be granted pursuant to procedures and standards the commission shall prescribe in accordance with division (C) of this section, except that certification or certification renewal shall be deemed approved thirty days after the filing of an application with the commission unless the commission suspends that approval for good cause shown. In the case of such a suspension, the commission shall act to approve or deny certification or certification renewal to the applicant not later than ninety days after the date of the suspension. 2601 2602 2603 2604 2605 2606 2607 2608 2609 2610 2611 2612 2613 2614 2615 2616 2617 2618 2619 2620 2621 2622 2623 2624 2625 2626 2627 2628 2629 2630 Am. Sub. S. B. No. 2 Page 91 As Passed by the Senate (2) The public utilities commission shall establish rules to require an electric services company to maintain financial assurances sufficient to protect customers and electric distribution utilities from default. Such rules also shall specifically allow an electric distribution utility to set reasonable standards for its security and the security of its customers through financial requirements set in its tariffs. (3) As used in division (B)(2) of this section, an "electric services company" has the same meaning as in section 4928.01 of the Revised Code, but excludes a power broker or aggregator. (C) Capability standards adopted in rules under division (B) of this section shall be sufficient to ensure compliance with the minimum service requirements established under section 4928.10 of the Revised Code and with section 4928.09 of the Revised Code. The standards shall allow flexibility for voluntary aggregation, to encourage market creativity in responding to consumer needs and demands, and shall allow flexibility for electric services companies that exclusively provide installation of small electric generation facilities, to provide ease of market access. The rules shall include procedures for biennially renewing certification. (D) The commission may suspend, rescind, or conditionally rescind the certification of any electric utility, electric services company, electric cooperative, or governmental aggregator issued under this section if the commission determines, after reasonable notice and opportunity for hearing, that the utility, company, cooperative, or aggregator has failed to comply with any applicable certification standards or has engaged in anticompetitive or unfair, deceptive, or 2631 2632 2633 2634 2635 2636 2637 2638 2639 2640 2641 2642 2643 2644 2645 2646 2647 2648 2649 2650 2651 2652 2653 2654 2655 2656 2657 2658 2659 2660 Am. Sub. S. B. No. 2 Page 92 As Passed by the Senate unconscionable acts or practices in this state. (E) No electric distribution utility on and after the starting date of competitive retail electric service shall knowingly distribute electricity, to a retail consumer in this state, for any supplier of electricity that has not been certified by the commission pursuant to this section. (F) Notwithstanding any provision of section 121.95 of the Revised Code to the contrary, a regulatory restriction contained in a rule adopted under section 4928.08 of the Revised Code is not subject to sections 121.95 to 121.953 of the Revised Code. Sec. 4928.101. (A) As used in this section and section 4928.102 of the Revised Code: (1) "Small commercial customer" means any customer that receives electric service pursuant to a nonresidential tariff if the customer's demand for electricity does not exceed twenty- five kilowatts within the last twelve months. (2) "Small commercial customer" excludes any customer that does one or both of the following: (a) Manages multiple electric meters and, within the last twelve months, the electricity demand for at least one of the meters is twenty-five kilowatts or more; (b) Has, at the customer's discretion, aggregated the demand for the customer-managed meters. (B) The consumer protections described in section 4928.10 of the Revised Code and the rules adopted pursuant to that section apply to small commercial customers and to all other customers as set forth in the rules. Sec. 4928.102. (A) If a competitive retail electric 2661 2662 2663 2664 2665 2666 2667 2668 2669 2670 2671 2672 2673 2674 2675 2676 2677 2678 2679 2680 2681 2682 2683 2684 2685 2686 2687 2688 Am. Sub. S. B. No. 2 Page 93 As Passed by the Senate service supplier offers a residential or small commercial customer a contract for a fixed introductory rate that converts to a variable rate upon the expiration of the fixed rate, the supplier shall send two notices to each residential and small commercial customer that enters into such a contract. Each notice shall provide all of the following information to the customer: (1) The fixed rate that is expiring under the contract; (2) The expiration date of the contract's fixed rate; (3) The rate to be charged upon the contract's conversion to a variable rate; (4) The public utilities commission web site that, as a comparison tool, lists rates offered by competitive retail electric service suppliers; (5) A statement explaining that appearing on each customer's bill is a price-to-compare notice that lists the utility's standard service offer price. (B) The notices shall be sent by standard United States mail as follows: (1) The supplier shall send the first notice not earlier than ninety days, and not later than sixty days, prior to the expiration of the fixed rate. (2) The supplier shall send the second notice not earlier than forty-five days, and not later than thirty days, prior to the expiration of the fixed rate. (C) A competitive retail electric service supplier shall provide an annual notice, by standard United States mail, to each residential and small commercial customer that has entered 2689 2690 2691 2692 2693 2694 2695 2696 2697 2698 2699 2700 2701 2702 2703 2704 2705 2706 2707 2708 2709 2710 2711 2712 2713 2714 2715 2716 Am. Sub. S. B. No. 2 Page 94 As Passed by the Senate into a contract with the supplier that has converted to a variable rate upon the expiration of the contract's fixed introductory rate. The notice shall inform the customer that the customer is currently subject to a variable rate and that other fixed rate contracts are available. (D) Not later than one hundred fifty days after the effective date of this section, the commission shall adopt rules in order to implement divisions (A) to (C) of this section. The rules, at a minimum, shall include the following requirements regarding the notices required under divisions (A) to (C) of this section: (1) To use clear and unambiguous language in order to enable the customer to make an informed decision; (2) To design the notices in a way to ensure that they cannot be confused with marketing materials. (E) Notwithstanding any provision of section 121.95 of the Revised Code to the contrary, a regulatory restriction contained in a rule adopted under section 4928.102 of the Revised Code is not subject to sections 121.95 to 121.953 of the Revised Code. Sec. 4928.103. (A) As used in this section, "customer account information" means a unique electric distribution utility number or other customer identification number used by the utility to identify a customer and the customer's account record. (B) The public utilities commission shall adopt rules to ensure that an electric distribution utility processes a customer's change in competitive retail electric supplier by using customer account information. A customer who consents to a change of supplier shall not be required to provide customer 2717 2718 2719 2720 2721 2722 2723 2724 2725 2726 2727 2728 2729 2730 2731 2732 2733 2734 2735 2736 2737 2738 2739 2740 2741 2742 2743 2744 2745 Am. Sub. S. B. No. 2 Page 95 As Passed by the Senate account information to the supplier if the customer provides a valid form of government-issued identification issued to the customer or a sufficient alternative form of identification that allows the supplier to establish the customer's identity accurately. (C) Notwithstanding any provision of section 121.95 of the Revised Code to the contrary, a regulatory restriction contained in a rule adopted under this section is not subject to sections 121.95 to 121.953 of the Revised Code. Sec. 4928.105. (A) Upon receiving a certified request from a competitive retail electric service supplier under a service agreement that explicitly authorizes an expedited return to an electric distribution utility's standard service offer, voluntarily entered into by a mercantile customer, a utility shall complete the request within three business days. (B) The electric distribution utility shall not be held liable for any disputes arising from the expedited return to the utility's standard service offer, provided the utility acts in accordance with the public utilities commission's rules. (C) The commission shall establish rules governing the process for an expedited return to the utility's standard service offer pursuant to this section, including the content of the certified request and any notice to the affected customer, and permitting electric distribution utilities to recover the administrative costs of processing requests under this section through reasonable fees assessed to competitive retail electric service suppliers. Sec. 4928.107. (A) As used in this section, "small commercial customer" has the same meaning as in section 4928.101 2746 2747 2748 2749 2750 2751 2752 2753 2754 2755 2756 2757 2758 2759 2760 2761 2762 2763 2764 2765 2766 2767 2768 2769 2770 2771 2772 2773 2774 Am. Sub. S. B. No. 2 Page 96 As Passed by the Senate of the Revised Code. (B) An electric distribution utility may create a voluntary demand response program to lower demand at peak times for residential customers and small commercial customers as described by this section. (C)(1) Each demand response program under this section shall be evaluated by the public utilities commission to determine if the program is cost-effective for customers. (2) No electric distribution utility shall offer a demand reduction program under this section unless the program is approved by the commission. (D) An electric distribution utility may enter into an agreement with a residential customer or small commercial customer for the customer to participate in the utility's demand response program. (E) For customers that participate in the program, the utility may take actions to reduce the customer's load at peak times, such as reducing the temperature on the customer's air conditioner. (F) A customer that participates in the program may override the utility's action to reduce the customer's load. (G) A customer that agrees to participate in the utility's demand response program shall be paid by the utility an annual fee of forty dollars, or other amount determined by the commission under division (H) of this section, if the customer does not override the utility's action to reduce the customer's load more than fifty per cent of the requested time. (H) The commission may raise or lower the fee amount under 2775 2776 2777 2778 2779 2780 2781 2782 2783 2784 2785 2786 2787 2788 2789 2790 2791 2792 2793 2794 2795 2796 2797 2798 2799 2800 2801 2802 Am. Sub. S. B. No. 2 Page 97 As Passed by the Senate division (G) of this section at the time of the utility's rate case or true up based on the current demand in the utility's certified territory. Sec. 4928.14. The (A) Except as provided in division (C) of this section, the failure of a supplier to provide retail electric generation service to customers within the certified territory of an electric distribution utility shall result in the supplier's customers, after reasonable notice, defaulting to the utility's standard service offer under sections 4928.141 , and 4928.142, and 4928.143 of the Revised Code until the customer chooses an alternative supplier. A (B) A supplier is deemed under this section to have failed to provide such retail electric generation service if the commission finds, after reasonable notice and opportunity for hearing, that any of the following conditions are met: (A) (1) The supplier has defaulted on its contracts with customers, is in receivership, or has filed for bankruptcy. (B) (2) The supplier is no longer capable of providing the service. (C) (3) The supplier is unable to provide delivery to transmission or distribution facilities for such period of time as may be reasonably specified by commission rule adopted under division (A) of section 4928.06 of the Revised Code. (D) (4) The supplier's certification has been suspended, conditionally rescinded, or rescinded under division (D) of section 4928.08 of the Revised Code. (C) If an electric distribution utility has an electric security plan that was approved under section 4928.143 of the Revised Code as that section existed prior to the amendments to 2803 2804 2805 2806 2807 2808 2809 2810 2811 2812 2813 2814 2815 2816 2817 2818 2819 2820 2821 2822 2823 2824 2825 2826 2827 2828 2829 2830 2831 Am. Sub. S. B. No. 2 Page 98 As Passed by the Senate this section by this act, the failure of a supplier to provide retail electric generation service to customers within the certified territory of that utility shall result in the supplier's customers, after reasonable notice, defaulting to the utility's standard service offer under that electric security plan until the customer chooses an alternative supplier or until the utility's standard service offer is authorized under section 4928.142 of the Revised Code. Sec. 4928.141. (A) Beginning January 1, 2009, an (A)(1) An electric distribution utility shall provide consumers, on a comparable and nondiscriminatory basis within its certified territory, a standard service offer of all competitive retail electric services necessary to maintain essential electric service to consumers, including a firm supply of electric generation service. To that end, the electric distribution utility shall apply to the public utilities commission to establish the standard service offer in accordance with section 4928.142 or 4928.143 of the Revised Code and, at its discretion, may apply simultaneously under both sections, except that the utility's first standard service offer application at minimum shall include a filing under section 4928.143 of the Revised Code. Only Except as provided in division (A)(2) of this section, a standard service offer authorized in accordance with section 4928.142 or 4928.143 of the Revised Code, shall serve as the utility's standard service offer for the purpose of compliance with this section ;, and that standard service offer shall serve as the utility's default standard service offer for the purpose of section 4928.14 of the Revised Code. Notwithstanding the foregoing provision, the rate (2) An electric distribution utility's electric security plan of an electric distribution utility that was approved under 2832 2833 2834 2835 2836 2837 2838 2839 2840 2841 2842 2843 2844 2845 2846 2847 2848 2849 2850 2851 2852 2853 2854 2855 2856 2857 2858 2859 2860 2861 2862 Am. Sub. S. B. No. 2 Page 99 As Passed by the Senate section 4928.143 of the Revised Code as that section existed prior to the amendments to this section by this act shall continue for the purpose of the utility's compliance with this division (A)(1) of this section until a standard service offer is first authorized to be effective under section 4928.142 or 4928.143 of the Revised Code, and, as applicable, pursuant to division (D) of section 4928.143 of the Revised Code, any rate . Each security plan that extends approved before the effective date of the amendments to this section by this act shall extend beyond December 31, 2008, shall continue to be in effect for the subject electric distribution utility for the duration of the plan's termthrough the final standard service offer auction delivery period approved by the public utilities commission under the plan as of the effective date of the amendments to this section by this act and thereafter shall terminate . (3) A standard service offer under section 4928.142 or 4928.143 of the Revised Code shall exclude any previously authorized allowances for transition costs, with such exclusion being effective on and after the date that the allowance is scheduled to end under the utility's rate electric security plan. (B) The commission shall set the time for hearing of a filing under section 4928.142 or 4928.143 of the Revised Code, send written notice of the hearing to the electric distribution utility, and publish notice in a newspaper of general circulation in each county in the utility's certified territory. The commission shall adopt rules regarding filings under those sections the section. Sec. 4928.142. (A) For the purpose of complying with section 4928.141 of the Revised Code and subject to division (D) 2863 2864 2865 2866 2867 2868 2869 2870 2871 2872 2873 2874 2875 2876 2877 2878 2879 2880 2881 2882 2883 2884 2885 2886 2887 2888 2889 2890 2891 2892 Am. Sub. S. B. No. 2 Page 100 As Passed by the Senate of this section and, as applicable, subject to the rate plan requirement requirements of division (A) of section 4928.141 of the Revised Code, an electric distribution utility may shall establish a standard service offer price for retail electric generation service that is delivered to the utility under a market-rate offer. (1) The market-rate offer shall be determined through a competitive bidding process that provides for all of the following: (a) Open, fair, and transparent competitive solicitation; (b) Clear product definition; (c) Standardized bid evaluation criteria; (d) Oversight by an independent third party that shall design the solicitation, administer the bidding, and ensure that the criteria specified in division divisions (A)(1)(a) to (c) of this section are met; (e) Evaluation of the submitted bids prior to the selection of the least-cost bid winner or winners. No generation supplier shall be prohibited from participating in the bidding process. (2) The public utilities commission shall modify rules, or adopt new rules as necessary, concerning the conduct of the competitive bidding process and the qualifications of bidders, which rules shall foster supplier participation in the bidding process and shall be consistent with the requirements of division (A)(1) of this section. (B) Prior to initiating a competitive bidding process for a market-rate offer under division (A) of this section, the 2893 2894 2895 2896 2897 2898 2899 2900 2901 2902 2903 2904 2905 2906 2907 2908 2909 2910 2911 2912 2913 2914 2915 2916 2917 2918 2919 2920 Am. Sub. S. B. No. 2 Page 101 As Passed by the Senate electric distribution utility shall file an application with the commission. An electric distribution utility may file its application with the commission prior to the effective date of the commission rules required under division (A)(2) of this section, and, as the commission determines necessary, the utility shall immediately conform its filing to the rules upon their taking effect. An application under this division shall detail the electric distribution utility's proposed compliance with the requirements of division (A)(1) of this section and with commission rules under division (A)(2) of this section and demonstrate that all of the following requirements are met: (1) The electric distribution utility or its transmission service affiliate belongs to at least one regional transmission organization that has been approved by the federal energy regulatory commission; or there otherwise is comparable and nondiscriminatory access to the electric transmission grid. (2) Any such regional transmission organization has a market-monitor function and the ability to take actions to identify and mitigate market power or the electric distribution utility's market conduct; or a similar market monitoring function exists with commensurate ability to identify and monitor market conditions and mitigate conduct associated with the exercise of market power. (3) A published source of information is available publicly or through subscription that identifies pricing information for traded electricity on- and off-peak energy products that are contracts for delivery beginning at least two years from the date of the publication and is updated on a regular basis. 2921 2922 2923 2924 2925 2926 2927 2928 2929 2930 2931 2932 2933 2934 2935 2936 2937 2938 2939 2940 2941 2942 2943 2944 2945 2946 2947 2948 2949 2950 Am. Sub. S. B. No. 2 Page 102 As Passed by the Senate The commission shall initiate a proceeding and, within ninety days after the application's filing date, shall determine by order whether the electric distribution utility and its market-rate offer meet all of the foregoing requirements. If the finding is positive, the electric distribution utility may shall initiate its competitive bidding process. If the finding is negative as to one or more requirements, the commission in the order shall direct the electric distribution utility regarding how any deficiency may shall be timely remedied in a timely manner to the commission's satisfaction ; otherwise, the electric distribution utility shall withdraw the application. However, if such remedy is made and the subsequent finding is positive and also if the electric distribution utility made a simultaneous filing under this section and section 4928.143 of the Revised Code, the utility shall not initiate its competitive bid until at least one hundred fifty days after the filing date of those applications. (C) Upon the completion of the competitive bidding process authorized by divisions (A) and (B) of this section , including for the purpose of division (D) of this section , the commission shall select the least-cost bid winner or winners of that process, and such selected bid or bids, as prescribed as retail rates by the commission, shall be the electric distribution utility's standard service offer unless the commission, by order issued before the third calendar day following the conclusion of the competitive bidding process for the market rate offer, determines that one or more of the following criteria were not met: (1) Each portion of the bidding process was oversubscribed, such that the amount of supply bid upon was greater than the amount of the load bid out. 2951 2952 2953 2954 2955 2956 2957 2958 2959 2960 2961 2962 2963 2964 2965 2966 2967 2968 2969 2970 2971 2972 2973 2974 2975 2976 2977 2978 2979 2980 2981 Am. Sub. S. B. No. 2 Page 103 As Passed by the Senate (2) There were four or more bidders. (3) At least twenty-five per cent of the load is bid upon by one or more persons other than the electric distribution utility. All costs incurred by the electric distribution utility as a result of or related to the competitive bidding process or to procuring generation service to provide the standard service offer, including the costs of energy and capacity and the costs of all other products and services procured as a result of the competitive bidding process, shall be timely recovered through the standard service offer price, and, for that purpose, the commission shall approve a reconciliation mechanism, other recovery mechanism, or a combination of such mechanisms for the utility. (D) The first application filed under this section by an electric distribution utility that, as of July 31, 2008, directly owns, in whole or in part, operating electric generating facilities that had been used and useful in this state shall require that a portion of that the utility's standard service offer load for the first five years of the market rate offer be competitively bid under division (A) of this section as follows: ten per cent of the load in year one, not more than twenty per cent in year two, thirty per cent in year three, forty per cent in year four, and fifty per cent in year five. Consistent with those percentages, the commission shall determine the actual percentages for each year of years one through five. The standard service offer price for retail electric generation service under this first application shall be a proportionate blend of the bid price and the generation service price for the remaining standard service offer load, 2982 2983 2984 2985 2986 2987 2988 2989 2990 2991 2992 2993 2994 2995 2996 2997 2998 2999 3000 3001 3002 3003 3004 3005 3006 3007 3008 3009 3010 3011 Am. Sub. S. B. No. 2 Page 104 As Passed by the Senate which latter price shall be equal to the electric distribution utility's most recent standard service offer price, adjusted upward or downward as the commission determines reasonable, relative to the jurisdictional portion of any known and measurable changes from the level of any one or more of the following costs as reflected in that most recent standard service offer price: (1) The electric distribution utility's prudently incurred cost of fuel used to produce electricity; (2) Its prudently incurred purchased power costs; (3) Its prudently incurred costs of satisfying the supply and demand portfolio requirements of this state, including, but not limited to, renewable energy resource and energy efficiency requirements; (4) Its costs prudently incurred to comply with environmental laws and regulations, with consideration of the derating of any facility associated with those costs. In making any adjustment to the most recent standard service offer price on the basis of costs described in division (D) of this section, the commission shall include the benefits that may become available to the electric distribution utility as a result of or in connection with the costs included in the adjustment, including, but not limited to, the utility's receipt of emissions credits or its receipt of tax benefits or of other benefits, and, accordingly, the commission may impose such conditions on the adjustment to ensure that any such benefits are properly aligned with the associated cost responsibility. The commission shall also determine how such adjustments will affect the electric distribution utility's return on common 3012 3013 3014 3015 3016 3017 3018 3019 3020 3021 3022 3023 3024 3025 3026 3027 3028 3029 3030 3031 3032 3033 3034 3035 3036 3037 3038 3039 3040 Am. Sub. S. B. No. 2 Page 105 As Passed by the Senate equity that may be achieved by those adjustments. The commission shall not apply its consideration of the return on common equity to reduce any adjustments authorized under this division unless the adjustments will cause the electric distribution utility to earn a return on common equity that is significantly in excess of the return on common equity that is earned by publicly traded companies, including utilities, that face comparable business and financial risk, with such adjustments for capital structure as may be appropriate. The burden of proof for demonstrating that significantly excessive earnings will not occur shall be on the electric distribution utility. Additionally, the commission may adjust the electric distribution utility's most recent standard service offer price by such just and reasonable amount that the commission determines necessary to address any emergency that threatens the utility's financial integrity or to ensure that the resulting revenue available to the utility for providing the standard service offer is not so inadequate as to result, directly or indirectly, in a taking of property without compensation pursuant to Section 19 of Article I, Ohio Constitution. The electric distribution utility has the burden of demonstrating that any adjustment to its most recent standard service offer price is proper in accordance with this division. (E) Beginning in the second year of a blended price under division (D) of this section and notwithstanding any other requirement of this section, the commission may alter prospectively the proportions specified in that division to mitigate any effect of an abrupt or significant change in the electric distribution utility's standard service offer price that would otherwise result in general or with respect to any rate group or rate schedule but for such alteration. Any such 3041 3042 3043 3044 3045 3046 3047 3048 3049 3050 3051 3052 3053 3054 3055 3056 3057 3058 3059 3060 3061 3062 3063 3064 3065 3066 3067 3068 3069 3070 3071 Am. Sub. S. B. No. 2 Page 106 As Passed by the Senate alteration shall be made not more often than annually, and the commission shall not, by altering those proportions and in any event, including because of the length of time, as authorized under division (C) of this section, taken to approve the market rate offer, cause the duration of the blending period to exceed ten years as counted from the effective date of the approved market rate offer. Additionally, any such alteration shall be limited to an alteration affecting the prospective proportions used during the blending period and shall not affect any blending proportion previously approved and applied by the commission under this division. (F) An electric distribution utility that has received commission approval of its first application under division (C) of this section shall not, nor ever shall be authorized or required by the commission to, file an application under section 4928.143 of the Revised Code . Sec. 4928.144. The public utilities commission by order may authorize any just and reasonable phase-in of any electric distribution utility rate or price established under sections 4928.141 to 4928.143 and 4928.142 of the Revised Code, and inclusive of carrying charges, as the commission considers necessary to ensure rate or price stability for consumers. If the commission's order includes such a phase-in, the order also shall provide for the creation of regulatory assets pursuant to generally accepted accounting principles, by authorizing the deferral of incurred costs equal to the amount not collected, plus carrying charges on that amount. Further, the order shall authorize the collection of those deferrals through a nonbypassable surcharge on any such rate or price so established for the electric distribution utility by the commission. 3072 3073 3074 3075 3076 3077 3078 3079 3080 3081 3082 3083 3084 3085 3086 3087 3088 3089 3090 3091 3092 3093 3094 3095 3096 3097 3098 3099 3100 3101 Am. Sub. S. B. No. 2 Page 107 As Passed by the Senate Sec. 4928.149. No electric distribution utility may use any electric energy storage system to participate in the wholesale market, if the utility purchased or acquired that system for distribution service. Sec. 4928.1410. If an electric distribution utility has an existing electric security plan under which the commission had authorized the creation or continuation of riders, then, to the extent those riders will cease to exist after termination of the electric security plan, the electric distribution utility is authorized to create necessary regulatory assets or liabilities, along with carrying costs at the utility's weighted average cost of debt, for the resolution of any outstanding under-collection or over-collection of funds under such riders. The resolution of such regulatory assets or liabilities shall be addressed in the first distribution rate case under section 4909.18 of the Revised Code that occurs after the plan's expiration. Sec. 4928.17. (A) Except as otherwise provided in sections 4928.141 or 4928.142 or 4928.143 or 4928.31 to 4928.40 of the Revised Code and beginning on the starting date of competitive retail electric service , no electric utility shall engage in this state, either directly or through an affiliate, in the businesses of supplying a noncompetitive retail electric service and supplying a competitive retail electric service, or in the businesses of supplying a noncompetitive retail electric service and supplying a product or service other than retail electric service, unless the utility implements and operates under a corporate separation plan that is approved by the public utilities commission under this section, is consistent with the policy specified in section 4928.02 of the Revised Code, and achieves all of the following: 3102 3103 3104 3105 3106 3107 3108 3109 3110 3111 3112 3113 3114 3115 3116 3117 3118 3119 3120 3121 3122 3123 3124 3125 3126 3127 3128 3129 3130 3131 Am. Sub. S. B. No. 2 Page 108 As Passed by the Senate (1) The plan provides, at minimum, for the provision of the competitive retail electric service or the nonelectric product or service through a fully separated affiliate of the utility, and the plan includes separate accounting requirements, the code of conduct as ordered by the commission pursuant to a rule it shall adopt under division (A) of section 4928.06 of the Revised Code, and such other measures as are necessary to effectuate the policy specified in section 4928.02 of the Revised Code. (2) The plan satisfies the public interest in preventing unfair competitive advantage and preventing the abuse of market power. (3) The plan is sufficient to ensure that the utility will not extend any undue preference or advantage to any affiliate, division, or part of its own business engaged in the business of supplying the competitive retail electric service or nonelectric product or service, including, but not limited to, utility resources such as trucks, tools, office equipment, office space, supplies, customer and marketing information, advertising, billing and mailing systems, personnel, and training, without compensation based upon fully loaded embedded costs charged to the affiliate; and to ensure that any such affiliate, division, or part will not receive undue preference or advantage from any affiliate, division, or part of the business engaged in business of supplying the noncompetitive retail electric service. No such utility, affiliate, division, or part shall extend such undue preference. Notwithstanding any other division of this section, a utility's obligation under division (A)(3) of this section shall be effective January 1, 2000. (B) The commission may approve, modify and approve, or 3132 3133 3134 3135 3136 3137 3138 3139 3140 3141 3142 3143 3144 3145 3146 3147 3148 3149 3150 3151 3152 3153 3154 3155 3156 3157 3158 3159 3160 3161 Am. Sub. S. B. No. 2 Page 109 As Passed by the Senate disapprove a corporate separation plan filed with the commission under division (A) of this section. As part of the code of conduct required under division (A)(1) of this section, the commission shall adopt rules pursuant to division (A) of section 4928.06 of the Revised Code regarding corporate separation and procedures for plan filing and approval. The rules shall include limitations on affiliate practices solely for the purpose of maintaining a separation of the affiliate's business from the business of the utility to prevent unfair competitive advantage abuse of market power by virtue of that relationship. The rules also shall include an opportunity for any person having a real and substantial interest in the corporate separation plan to file specific objections to the plan and propose specific responses to issues raised in the objections, which objections and responses the commission shall address in its final order. Prior to commission approval of the plan, the commission shall afford a hearing upon those aspects of the plan that the commission determines reasonably require a hearing. The commission may reject and require refiling of a substantially inadequate plan under this section. (C) The commission shall issue an order approving or modifying and approving a corporate separation plan under this section, to be effective on the date specified in the order, only upon findings that the plan reasonably complies with the requirements of division (A) of this section and will provide for ongoing compliance with the policy specified in section 4928.02 of the Revised Code. However, for good cause shown, the commission may issue an order approving or modifying and approving a corporate separation plan under this section that does not comply with division (A)(1) of this section but complies with such functional separation requirements as the 3162 3163 3164 3165 3166 3167 3168 3169 3170 3171 3172 3173 3174 3175 3176 3177 3178 3179 3180 3181 3182 3183 3184 3185 3186 3187 3188 3189 3190 3191 3192 Am. Sub. S. B. No. 2 Page 110 As Passed by the Senate commission authorizes to apply for an interim period prescribed in the order, upon a finding that such alternative plan will provide for ongoing compliance with the policy specified in section 4928.02 of the Revised Code. (D) Any party may seek an amendment to a corporate separation plan approved under this section, and the commission, pursuant to a request from any party or on its own initiative, may order as it considers necessary the filing of an amended corporate separation plan to reflect changed circumstances. (E) No electric distribution utility shall sell or transfer any generating asset it wholly or partly owns at any time without obtaining prior commission approval. Sec. 4928.20. (A) The legislative authority of a municipal corporation may adopt an ordinance, or the board of township trustees of a township or the board of county commissioners of a county may adopt a resolution, under which , on or after the starting date of competitive retail electric service, it may aggregate in accordance with this section the retail electrical loads located, respectively, within the municipal corporation, township, or unincorporated area of the county and, for that purpose, may enter into service agreements to facilitate for those loads the sale and purchase of electricity. The legislative authority or board also may exercise such authority jointly with any other such legislative authority or board. For customers that are not mercantile customers, an ordinance or resolution under this division shall specify whether the aggregation will occur only with the prior, affirmative consent of each person owning, occupying, controlling, or using an electric load center proposed to be aggregated or will occur automatically for all such persons pursuant to the opt-out 3193 3194 3195 3196 3197 3198 3199 3200 3201 3202 3203 3204 3205 3206 3207 3208 3209 3210 3211 3212 3213 3214 3215 3216 3217 3218 3219 3220 3221 3222 Am. Sub. S. B. No. 2 Page 111 As Passed by the Senate requirements of division (D) of this section. The aggregation of mercantile customers shall occur only with the prior, affirmative consent of each such person owning, occupying, controlling, or using an electric load center proposed to be aggregated. Nothing in this division, however, authorizes the aggregation of the retail electric loads of an electric load center, as defined in section 4933.81 of the Revised Code, that is located in the certified territory of a nonprofit electric supplier under sections 4933.81 to 4933.90 of the Revised Code or an electric load center served by transmission or distribution facilities of a municipal electric utility. (B) If an ordinance or resolution adopted under division (A) of this section specifies that aggregation of customers that are not mercantile customers will occur automatically as described in that division, the ordinance or resolution shall direct the board of elections to submit the question of the authority to aggregate to the electors of the respective municipal corporation, township, or unincorporated area of a county at a special election on the day of the next primary or general election in the municipal corporation, township, or county. The legislative authority or board shall certify a copy of the ordinance or resolution to the board of elections not less than ninety days before the day of the special election. No ordinance or resolution adopted under division (A) of this section that provides for an election under this division shall take effect unless approved by a majority of the electors voting upon the ordinance or resolution at the election held pursuant to this division. (C) Upon the applicable requisite authority under divisions (A) and (B) of this section, the legislative authority or board shall develop a plan of operation and governance for 3223 3224 3225 3226 3227 3228 3229 3230 3231 3232 3233 3234 3235 3236 3237 3238 3239 3240 3241 3242 3243 3244 3245 3246 3247 3248 3249 3250 3251 3252 3253 Am. Sub. S. B. No. 2 Page 112 As Passed by the Senate the aggregation program so authorized. Before adopting a plan under this division, the legislative authority or board shall hold at least two public hearings on the plan. Before the first hearing, the legislative authority or board shall publish notice of the hearings once a week for two consecutive weeks in a newspaper of general circulation in the jurisdiction or as provided in section 7.16 of the Revised Code. The notice shall summarize the plan and state the date, time, and location of each hearing. (D) No legislative authority or board, pursuant to an ordinance or resolution under divisions (A) and (B) of this section that provides for automatic aggregation of customers that are not mercantile customers as described in division (A) of this section, shall aggregate the electrical load of any electric load center located within its jurisdiction unless it in advance clearly discloses to the person owning, occupying, controlling, or using the load center that the person will be enrolled automatically in the aggregation program and will remain so enrolled unless the person affirmatively elects by a stated procedure not to be so enrolled. The disclosure shall state prominently the rates, charges, and other terms and conditions of enrollment. The stated procedure shall allow any person enrolled in the aggregation program the opportunity to opt out of the program every three years, without paying a switching fee. Any such person that opts out before the commencement of the aggregation program pursuant to the stated procedure shall default to the standard service offer provided under section 4928.14 or division (D) of section 4928.35 of the Revised Code until the person chooses an alternative supplier. (E)(1) With respect to a governmental aggregation for a municipal corporation that is authorized pursuant to divisions 3254 3255 3256 3257 3258 3259 3260 3261 3262 3263 3264 3265 3266 3267 3268 3269 3270 3271 3272 3273 3274 3275 3276 3277 3278 3279 3280 3281 3282 3283 3284 Am. Sub. S. B. No. 2 Page 113 As Passed by the Senate (A) to (D) of this section, resolutions may be proposed by initiative or referendum petitions in accordance with sections 731.28 to 731.41 of the Revised Code. (2) With respect to a governmental aggregation for a township or the unincorporated area of a county, which aggregation is authorized pursuant to divisions (A) to (D) of this section, resolutions may be proposed by initiative or referendum petitions in accordance with sections 731.28 to 731.40 of the Revised Code, except that: (a) The petitions shall be filed, respectively, with the township fiscal officer or the board of county commissioners, who shall perform those duties imposed under those sections upon the city auditor or village clerk. (b) The petitions shall contain the signatures of not less than ten per cent of the total number of electors in, respectively, the township or the unincorporated area of the county who voted for the office of governor at the preceding general election for that office in that area. (F) A governmental aggregator under division (A) of this section is not a public utility engaging in the wholesale purchase and resale of electricity, and provision of the aggregated service is not a wholesale utility transaction. A governmental aggregator shall be subject to supervision and regulation by the public utilities commission only to the extent of any competitive retail electric service it provides and commission authority under this chapter. (G) This section does not apply in the case of a municipal corporation that supplies such aggregated service to electric load centers to which its municipal electric utility also 3285 3286 3287 3288 3289 3290 3291 3292 3293 3294 3295 3296 3297 3298 3299 3300 3301 3302 3303 3304 3305 3306 3307 3308 3309 3310 3311 3312 3313 Am. Sub. S. B. No. 2 Page 114 As Passed by the Senate supplies a noncompetitive retail electric service through transmission or distribution facilities the utility singly or jointly owns or operates. (H) A governmental aggregator shall not include in its aggregation the accounts of any of the following: (1) A customer that has opted out of the aggregation; (2) A customer in contract with a certified electric services company; (3) A customer that has a special contract with an electric distribution utility; (4) A customer that is not located within the governmental aggregator's governmental boundaries; (5) Subject to division (C) of section 4928.21 of the Revised Code, a customer who appears on the "do not aggregate" list maintained under that section. (I) Customers that are part of a governmental aggregation under this section shall be responsible only for such portion of a surcharge under section 4928.144 of the Revised Code that is proportionate to the benefits, as determined by the commission, that electric load centers within the jurisdiction of the governmental aggregation as a group receive. The proportionate surcharge so established shall apply to each customer of the governmental aggregation while the customer is part of that aggregation. If a customer ceases being such a customer, the otherwise applicable surcharge shall apply. Nothing in this section shall result in less than full recovery by an electric distribution utility of any surcharge authorized under section 4928.144 of the Revised Code. Nothing in this section shall result in less than the full and timely imposition, charging, 3314 3315 3316 3317 3318 3319 3320 3321 3322 3323 3324 3325 3326 3327 3328 3329 3330 3331 3332 3333 3334 3335 3336 3337 3338 3339 3340 3341 3342 Am. Sub. S. B. No. 2 Page 115 As Passed by the Senate collection, and adjustment by an electric distribution utility, its assignee, or any collection agent, of the phase-in-recovery charges authorized pursuant to a final financing order issued pursuant to sections 4928.23 to 4928.2318 of the Revised Code. (J) On behalf of the customers that are part of a governmental aggregation under this section and by filing written notice with the public utilities commission, the legislative authority that formed or is forming that governmental aggregation may elect not to receive standby service within the meaning of division (B)(2)(d) of section 4928.143 of the Revised Code from an electric distribution utility in whose certified territory the governmental aggregation is located and that operates under an approved electric security plan under that section. Upon the filing of that notice, the electric distribution utility shall not charge any such customer to whom competitive retail electric generation service is provided by another supplier under the governmental aggregation for the standby service. Any such consumer that returns to the utility for competitive retail electric service shall pay the market price of power incurred by the utility to serve that consumer plus any amount attributable to the utility's cost of compliance with the renewable energy resource provisions of section 4928.64 of the Revised Code to serve the consumer. Such market price shall include, but not be limited to, capacity and energy charges; all charges associated with the provision of that power supply through the regional transmission organization, including, but not limited to, transmission, ancillary services, congestion, and settlement and administrative charges; and all other costs incurred by the utility that are associated with the procurement, provision, and administration of that power supply, as such costs may be 3343 3344 3345 3346 3347 3348 3349 3350 3351 3352 3353 3354 3355 3356 3357 3358 3359 3360 3361 3362 3363 3364 3365 3366 3367 3368 3369 3370 3371 3372 3373 Am. Sub. S. B. No. 2 Page 116 As Passed by the Senate approved by the commission. The period of time during which the market price and renewable energy resource amount shall be so assessed on the consumer shall be from the time the consumer so returns to the electric distribution utility until the expiration of the electric security plan. However, if that period of time is expected to be more than two years, the commission may reduce the time period to a period of not less than two years. (K) The commission shall adopt rules and issue orders in proceedings under sections 4928.141 and 4928.142 of the Revised Code to encourage and promote large-scale governmental aggregation in this state. For that purpose, the commission shall conduct an immediate review of any rules it has adopted for the purpose of this section that are in effect on the effective date of the amendment of this section by S.B. 221 of the 127th general assembly, July 31, 2008. Further, within the context of an electric security plan under section 4928.143 of the Revised Code, as that section existed prior to its repeal by this act, or a market rate offer under section 4928.142 of the Revised Code, as amended by this act, the commission shall consider the effect on large-scale governmental aggregation of any nonbypassable generation charges, however collected, under that plan, or that would be established under that planoffer, except any nonbypassable generation charges that relate to any cost incurred by the electric distribution utility, the deferral of which has been authorized by the commission prior to the effective date of the amendment of this section by S.B. 221 of the 127th general assembly, July 31, 2008. Sec. 4928.23. As used in sections 4928.23 to 4928.2318 of the Revised Code: 3374 3375 3376 3377 3378 3379 3380 3381 3382 3383 3384 3385 3386 3387 3388 3389 3390 3391 3392 3393 3394 3395 3396 3397 3398 3399 3400 3401 3402 3403 Am. Sub. S. B. No. 2 Page 117 As Passed by the Senate (A) "Ancillary agreement" means any bond insurance policy, letter of credit, reserve account, surety bond, swap arrangement, hedging arrangement, liquidity or credit support arrangement, or other similar agreement or arrangement entered into in connection with the issuance of phase-in-recovery bonds that is designed to promote the credit quality and marketability of the bonds or to mitigate the risk of an increase in interest rates. (B) "Assignee" means any person or entity to which an interest in phase-in-recovery property is sold, assigned, transferred, or conveyed, other than as security, and any successor to or subsequent assignee of such a person or entity. (C) "Bond" includes debentures, notes, certificates of participation, certificates of beneficial interest, certificates of ownership or other evidences of indebtedness or ownership that are issued by an electric distribution utility or an assignee under a final financing order, the proceeds of which are used directly or indirectly to recover, finance, or refinance phase-in costs and financing costs, and that are secured by or payable from revenues from phase-in-recovery charges. (D) "Bondholder" means any holder or owner of a phase-in- recovery bond. (E) "Financing costs" means any of the following: (1) Principal, interest, and redemption premiums that are payable on phase-in-recovery bonds; (2) Any payment required under an ancillary agreement; (3) Any amount required to fund or replenish a reserve account or another account established under any indenture, 3404 3405 3406 3407 3408 3409 3410 3411 3412 3413 3414 3415 3416 3417 3418 3419 3420 3421 3422 3423 3424 3425 3426 3427 3428 3429 3430 3431 3432 Am. Sub. S. B. No. 2 Page 118 As Passed by the Senate ancillary agreement, or other financing document relating to phase-in-recovery bonds; (4) Any costs of retiring or refunding any existing debt and equity securities of an electric distribution utility in connection with either the issuance of, or the use of proceeds from, phase-in-recovery bonds; (5) Any costs incurred by an electric distribution utility to obtain modifications of or amendments to any indenture, financing agreement, security agreement, or similar agreement or instrument relating to any existing secured or unsecured obligation of the electric distribution utility in connection with the issuance of phase-in-recovery bonds; (6) Any costs incurred by an electric distribution utility to obtain any consent, release, waiver, or approval from any holder of an obligation described in division (E)(5) of this section that are necessary to be incurred for the electric distribution utility to issue or cause the issuance of phase-in- recovery bonds; (7) Any taxes, franchise fees, or license fees imposed on phase-in-recovery revenues; (8) Any costs related to issuing or servicing phase-in- recovery bonds or related to obtaining a financing order, including servicing fees and expenses, trustee fees and expenses, legal, accounting, or other professional fees and expenses, administrative fees, placement fees, underwriting fees, capitalized interest and equity, and rating-agency fees; (9) Any other similar costs that the public utilities commission finds appropriate. (F) "Financing order" means an order issued by the public 3433 3434 3435 3436 3437 3438 3439 3440 3441 3442 3443 3444 3445 3446 3447 3448 3449 3450 3451 3452 3453 3454 3455 3456 3457 3458 3459 3460 3461 Am. Sub. S. B. No. 2 Page 119 As Passed by the Senate utilities commission under section 4928.232 of the Revised Code that authorizes an electric distribution utility or an assignee to issue phase-in-recovery bonds and recover phase-in-recovery charges. (G) "Final financing order" means a financing order that has become final and has taken effect as provided in section 4928.233 of the Revised Code. (H) "Financing party" means either of the following: (1) Any trustee, collateral agent, or other person acting for the benefit of any bondholder; (2) Any party to an ancillary agreement, the rights and obligations of which relate to or depend upon the existence of phase-in-recovery property, the enforcement and priority of a security interest in phase-in-recovery property, the timely collection and payment of phase-in-recovery revenues, or a combination of these factors. (I) "Financing statement" has the same meaning as in section 1309.102 of the Revised Code. (J) "Phase-in costs" means costs, inclusive of carrying charges incurred before, on, or after the effective date of this section March 22, 2012, authorized by the commission before, on, or after the effective date of this section March 22, 2012, to be securitized or deferred as regulatory assets in proceedings under section 4909.18 of the Revised Code , sections 4928.141 to 4928.143, 4928.142, or 4928.144 of the Revised Code, or section 4928.14 of the Revised Code as it existed prior to July 31, 2008, or section 4928.143 of the Revised Code as it existed prior to the effective date of the amendments to this section by this act pursuant to a final order for which appeals have been 3462 3463 3464 3465 3466 3467 3468 3469 3470 3471 3472 3473 3474 3475 3476 3477 3478 3479 3480 3481 3482 3483 3484 3485 3486 3487 3488 3489 3490 Am. Sub. S. B. No. 2 Page 120 As Passed by the Senate exhausted. "Phase-in costs" excludes the following: (1) With respect to any electric generating facility that, on and after the effective date of this section March 22, 2012, is owned, in whole or in part, by an electric distribution utility applying for a financing order under section 4928.231 of the Revised Code, costs that are authorized under division (B) (2)(b) or (c) of section 4928.143 of the Revised Code as that section existed prior to the effective date of the amendments to this section by this act ; (2) Costs incurred after the effective date of this section March 22, 2012, related to the ongoing operation of an electric generating facility, but not environmental clean-up or remediation costs incurred by an electric distribution utility because of its ownership or operation of an electric generating facility prior to the effective date of this section March 22, 2012, which such clean-up or remediation costs are imposed or incurred pursuant to federal or state law , rules, or regulations and for which the commission approves or approved recovery in accordance with section 4909.18 of the Revised Code , sections 4928.141 to 4928.143, 4928.142, or 4928.144 of the Revised Code, or section 4928.14 of the Revised Code as it existed prior to July 31, 2008, or section 4928.143 of the Revised Code as it existed prior to the effective date of the amendments to this section by this act. (K) "Phase-in-recovery property" means the property, rights, and interests of an electric distribution utility or an assignee under a final financing order, including the right to impose, charge, and collect the phase-in-recovery charges that shall be used to pay and secure the payment of phase-in-recovery bonds and financing costs, and including the right to obtain 3491 3492 3493 3494 3495 3496 3497 3498 3499 3500 3501 3502 3503 3504 3505 3506 3507 3508 3509 3510 3511 3512 3513 3514 3515 3516 3517 3518 3519 3520 Am. Sub. S. B. No. 2 Page 121 As Passed by the Senate adjustments to those charges, and any revenues, receipts, collections, rights to payment, payments, moneys, claims, or other proceeds arising from the rights and interests created under the final financing order. (L) "Phase-in-recovery revenues" means all revenues, receipts, collections, payments, moneys, claims, or other proceeds arising from phase-in-recovery property. (M) "Successor" means, with respect to any entity, another entity that succeeds by operation of law to the rights and obligations of the first legal entity pursuant to any bankruptcy, reorganization, restructuring, or other insolvency proceeding, any merger, acquisition, or consolidation, or any sale or transfer of assets, regardless of whether any of these occur as a result of a restructuring of the electric power industry or otherwise. Sec. 4928.231. (A) An electric distribution utility may apply to the public utilities commission for a financing order that authorizes the following: (1) The issuance of phase-in-recovery bonds, in one or more series, to recover uncollected phase-in costs; (2) The imposition, charging, and collection of phase-in- recovery charges, in accordance with the adjustment mechanism approved by the commission under section 4928.232 of the Revised Code, and consistent with the commission's authority regarding governmental aggregation as provided in division (I) of section 4928.20 of the Revised Code, to recover both of the following: (a) Uncollected phase-in costs; (b) Financing costs. 3521 3522 3523 3524 3525 3526 3527 3528 3529 3530 3531 3532 3533 3534 3535 3536 3537 3538 3539 3540 3541 3542 3543 3544 3545 3546 3547 3548 Am. Sub. S. B. No. 2 Page 122 As Passed by the Senate (3) The creation of phase-in-recovery property under the financing order. (B) The application shall include all of the following: (1) A description of the uncollected phase-in costs that the electric distribution utility seeks to recover through the issuance of phase-in-recovery bonds; (2) An estimate of the date each series of phase-in- recovery bonds are expected to be issued; (3) The expected term during which the phase-in costs associated with the issuance of each series of phase-in-recovery bonds are expected to be recovered; (4) An estimate of the financing costs, as described in section 4928.23 of the Revised Code, associated with the issuance of each series of phase-in-recovery bonds; (5) An estimate of the amount of phase-in-recovery charges necessary to recover the phase-in costs and financing costs set forth in the application and the calculation for that estimate, which calculation shall take into account the estimated date or dates of issuance and the estimated principal amount of each series of phase-in-recovery bonds; (6) For phase-in-recovery charges not subject to allocation according to an existing order, a proposed methodology for allocating phase-in-recovery charges among customer classes, including a proposed methodology for allocating such charges to governmental aggregation customers based upon the proportionate benefit determination made under division (I) of section 4928.20 of the Revised Code; (7) A description of a proposed adjustment mechanism for 3549 3550 3551 3552 3553 3554 3555 3556 3557 3558 3559 3560 3561 3562 3563 3564 3565 3566 3567 3568 3569 3570 3571 3572 3573 3574 3575 3576 Am. Sub. S. B. No. 2 Page 123 As Passed by the Senate use as described in division (A)(2) of this section; (8) A description and valuation of how the issuance of the phase-in-recovery bonds, including financing costs, will both result in cost savings to customers and mitigate rate impacts to customers when compared to the use of other financing mechanisms or cost-recovery methods available to the electric distribution utility; (9) Any other information required by the commission. (C) The electric distribution utility may restate or incorporate by reference in the application any information required under division (B)(9) of this section that the electric distribution utility filed with the commission under section 4909.18 or sections 4928.141 to 4928.144 of the Revised Code or , section 4928.14 of the Revised Code as it existed prior to July 31, 2008, or section 4928.143 of the Revised Code as it existed prior to the amendments to this section by this act . Sec. 4928.232. (A) Proceedings before the public utilities commission on an application submitted by an electric distribution utility under section 4928.231 of the Revised Code shall be governed by Chapter 4903. of the Revised Code, but only to the extent that chapter is not inconsistent with this section or section 4928.233 of the Revised Code. Any party that participated in the proceeding in which phase-in costs were approved under section 4909.18 or sections 4928.141 to 4928.144 of the Revised Code or , section 4928.14 of the Revised Code as it existed prior to July 31, 2008, or section 4928.143 of the Revised Code as it existed prior to the amendments to this section by this act shall have standing to participate in proceedings under sections 4928.23 to 4928.2318 of the Revised Code. 3577 3578 3579 3580 3581 3582 3583 3584 3585 3586 3587 3588 3589 3590 3591 3592 3593 3594 3595 3596 3597 3598 3599 3600 3601 3602 3603 3604 3605 3606 Am. Sub. S. B. No. 2 Page 124 As Passed by the Senate (B) When reviewing an application for a financing order pursuant to sections 4928.23 to 4928.2318 of the Revised Code, the commission may hold such hearings, make such inquiries or investigations, and examine such witnesses, books, papers, documents, and contracts as the commission considers proper to carry out these sections. Within thirty days after the filing of an application under section 4928.231 of the Revised Code, the commission shall publish a schedule of the proceeding. (C)(1) Not later than one hundred thirty-five days after the date the application is filed, the commission shall issue either a financing order, granting the application in whole or with modifications, or an order suspending or rejecting the application. (2) If the commission suspends an application for a financing order, the commission shall notify the electric distribution utility of the suspension and may direct the electric distribution utility to provide additional information as the commission considers necessary to evaluate the application. Not later than ninety days after the suspension, the commission shall issue either a financing order, granting the application in whole or with modifications, or an order rejecting the application. (D)(1) The commission shall not issue a financing order under division (C) of this section unless the commission determines that the financing order is consistent with section 4928.02 of the Revised Code. (2) Except as provided in division (D)(1) of this section, the commission shall issue a financing order under division (C) of this section if, at the time the financing order is issued, the commission finds that the issuance of the phase-in-recovery 3607 3608 3609 3610 3611 3612 3613 3614 3615 3616 3617 3618 3619 3620 3621 3622 3623 3624 3625 3626 3627 3628 3629 3630 3631 3632 3633 3634 3635 3636 Am. Sub. S. B. No. 2 Page 125 As Passed by the Senate bonds and the phase-in-recovery charges authorized by the order results in, consistent with market conditions, both measurably enhancing cost savings to customers and mitigating rate impacts to customers as compared with traditional financing mechanisms or traditional cost-recovery methods available to the electric distribution utility or, if the commission previously approved a recovery method, as compared with that recovery method. (E) The commission shall include all of the following in a financing order issued under division (C) of this section: (1) A determination of the maximum amount and a description of the phase-in costs that may be recovered through phase-in-recovery bonds issued under the financing order; (2) A description of phase-in-recovery property, the creation of which is authorized by the financing order; (3) A description of the financing costs that may be recovered through phase-in-recovery charges and the period over which those costs may be recovered; (4) For phase-in-recovery charges not subject to allocation according to an existing order, a description of the methodology and calculation for allocating phase-in-recovery charges among customer classes, including the allocation of such charges, if any, to governmental aggregation customers based upon the proportionate benefit determination made under division (I) of section 4928.20 of the Revised Code; (5) A description of the adjustment mechanism for use in the imposition, charging, and collection of the phase-in- recovery charges; (6) The maximum term of the phase-in-recovery bonds; 3637 3638 3639 3640 3641 3642 3643 3644 3645 3646 3647 3648 3649 3650 3651 3652 3653 3654 3655 3656 3657 3658 3659 3660 3661 3662 3663 3664 Am. Sub. S. B. No. 2 Page 126 As Passed by the Senate (7) Any other provision the commission considers appropriate to ensure the full and timely imposition, charging, collection, and adjustment, pursuant to an approved adjustment mechanism, of the phase-in-recovery charges described in divisions (E)(3) to (5) of this section. (F) The commission may, in a financing order, afford the electric distribution utility flexibility in establishing the terms and conditions for the phase-in-recovery bonds to accommodate changes in market conditions, including repayment schedules, interest rates, financing costs, collateral requirements, required debt service and other reserves, and the ability of the electric distribution utility, at its option, to effect a series of issuances of phase-in-recovery bonds and correlated assignments, sales, pledges, or other transfers of phase-in-recovery property. Any changes made under this section to terms and conditions for the phase-in-recovery bonds shall be in conformance with the financing order. (G) A financing order may provide that the creation of phase-in-recovery property shall be simultaneous with the sale of that property to an assignee as provided in the application and the pledge of the property to secure phase-in-recovery bonds. (H) The commission shall, in a financing order, require that after the final terms of each issuance of phase-in-recovery bonds have been established, and prior to the issuance of those bonds, the electric distribution utility shall determine the resulting phase-in-recovery charges in accordance with the adjustment mechanism described in the financing order. These phase-in-recovery charges shall be final and effective upon the issuance of the phase-in-recovery bonds, without further 3665 3666 3667 3668 3669 3670 3671 3672 3673 3674 3675 3676 3677 3678 3679 3680 3681 3682 3683 3684 3685 3686 3687 3688 3689 3690 3691 3692 3693 3694 Am. Sub. S. B. No. 2 Page 127 As Passed by the Senate commission action. Sec. 4928.34. (A) The public utilities commission shall not approve or prescribe a transition plan under division (A) or (B) of section 4928.33 of the Revised Code unless the commission first makes all of the following determinations: (1) The unbundled components for the electric transmission component of retail electric service, as specified in the utility's rate unbundling plan required by division (A)(1) of section 4928.31 of the Revised Code, equal the tariff rates determined by the federal energy regulatory commission that are in effect on the date of the approval of the transition plan under sections 4928.31 to 4928.40 of the Revised Code, as each such rate is determined applicable to each particular customer class and rate schedule by the commission. The unbundled transmission component shall include a sliding scale of charges under division (B) of section 4905.31 of the Revised Code to ensure that refunds determined or approved by the federal energy regulatory commission are flowed through to retail electric customers. (2) The unbundled components for retail electric distribution service in the rate unbundling plan equal the difference between the costs attributable to the utility's transmission and distribution rates and charges under its schedule of rates and charges in effect on the effective date of this section, based upon the record in the most recent rate proceeding of the utility for which the utility's schedule was established, and the tariff rates for electric transmission service determined by the federal energy regulatory commission as described in division (A)(1) of this section. (3) All other unbundled components required by the 3695 3696 3697 3698 3699 3700 3701 3702 3703 3704 3705 3706 3707 3708 3709 3710 3711 3712 3713 3714 3715 3716 3717 3718 3719 3720 3721 3722 3723 3724 Am. Sub. S. B. No. 2 Page 128 As Passed by the Senate commission in the rate unbundling plan equal the costs attributable to the particular service as reflected in the utility's schedule of rates and charges in effect on the effective date of this section. (4) The unbundled components for retail electric generation service in the rate unbundling plan equal the residual amount remaining after the determination of the transmission, distribution, and other unbundled components, and after any adjustments necessary to reflect the effects of the amendment of section 5727.111 of the Revised Code by Sub. S.B. No. 3 of the 123rd general assembly. (5) All unbundled components in the rate unbundling plan have been adjusted to reflect any base rate reductions on file with the commission and as scheduled to be in effect by December 31, 2005, under rate settlements in effect on the effective date of this section. However, all earnings obligations, restrictions, or caps imposed on an electric utility in a commission order prior to the effective date of this section are void. (6) Subject to division (A)(5) of this section, the total of all unbundled components in the rate unbundling plan are capped and shall equal during the market development period, except as specifically provided in this chapter, the total of all rates and charges in effect under the applicable bundled schedule of the electric utility pursuant to section 4905.30 of the Revised Code in effect on the day before the effective date of this section, including the transition charge determined under section 4928.40 of the Revised Code, adjusted for any changes in the taxation of electric utilities and retail electric service under Sub. S.B. No. 3 of the 123rd General 3725 3726 3727 3728 3729 3730 3731 3732 3733 3734 3735 3736 3737 3738 3739 3740 3741 3742 3743 3744 3745 3746 3747 3748 3749 3750 3751 3752 3753 3754 Am. Sub. S. B. No. 2 Page 129 As Passed by the Senate Assembly, the universal service rider authorized by section 4928.51 of the Revised Code, and the temporary rider authorized by section 4928.61 of the Revised Code. For the purpose of this division, the rate cap applicable to a customer receiving electric service pursuant to an arrangement approved by the commission under section 4905.31 of the Revised Code is, for the term of the arrangement, the total of all rates and charges in effect under the arrangement. For any rate schedule filed pursuant to section 4905.30 of the Revised Code or any arrangement subject to approval pursuant to section 4905.31 of the Revised Code, the initial tax-related adjustment to the rate cap required by this division shall be equal to the rate of taxation specified in section 5727.81 of the Revised Code and applicable to the schedule or arrangement. To the extent such total annual amount of the tax-related adjustment is greater than or less than the comparable amount of the total annual tax reduction experienced by the electric utility as a result of the provisions of Sub. S.B. No. 3 of the 123rd general assembly, such difference shall be addressed by the commission through accounting procedures, refunds, or an annual surcharge or credit to customers, or through other appropriate means, to avoid placing the financial responsibility for the difference upon the electric utility or its shareholders. Any adjustments in the rate of taxation specified in section 5727.81 of the Revised Code section shall not occur without a corresponding adjustment to the rate cap for each such rate schedule or arrangement. The department of taxation shall advise the commission and self- assessors under section 5727.81 of the Revised Code prior to the effective date of any change in the rate of taxation specified under that section, and the commission shall modify the rate cap to reflect that adjustment so that the rate cap adjustment is effective as of the effective date of the change in the rate of 3755 3756 3757 3758 3759 3760 3761 3762 3763 3764 3765 3766 3767 3768 3769 3770 3771 3772 3773 3774 3775 3776 3777 3778 3779 3780 3781 3782 3783 3784 3785 3786 Am. Sub. S. B. No. 2 Page 130 As Passed by the Senate taxation. This division shall be applied, to the extent possible, to eliminate any increase in the price of electricity for customers that otherwise may occur as a result of establishing the taxes contemplated in section 5727.81 of the Revised Code. (7) The rate unbundling plan complies with any rules adopted by the commission under division (A) of section 4928.06 of the Revised Code. (8) The corporate separation plan required by division (A) (2) of section 4928.31 of the Revised Code complies with section 4928.17 of the Revised Code and any rules adopted by the commission under division (A) of section 4928.06 of the Revised Code. (9) Any plan or plans the commission requires to address operational support systems and any other technical implementation issues pertaining to competitive retail electric service comply with any rules adopted by the commission under division (A) of section 4928.06 of the Revised Code. (10) The employee assistance plan required by division (A) (4) of section 4928.31 of the Revised Code sufficiently provides severance, retraining, early retirement, retention, outplacement, and other assistance for the utility's employees whose employment is affected by electric industry restructuring under this chapter. (11) The consumer education plan required under division (A)(5) of section 4928.31 of the Revised Code complies with former section 4928.42 of the Revised Code and any rules adopted by the commission under division (A) of section 4928.06 of the Revised Code. 3787 3788 3789 3790 3791 3792 3793 3794 3795 3796 3797 3798 3799 3800 3801 3802 3803 3804 3805 3806 3807 3808 3809 3810 3811 3812 3813 3814 3815 Am. Sub. S. B. No. 2 Page 131 As Passed by the Senate (12) The transition revenues for which an electric utility is authorized a revenue opportunity under sections 4928.31 to 4928.40 of the Revised Code are the allowable transition costs of the utility as such costs are determined by the commission pursuant to section 4928.39 of the Revised Code, and the transition charges for the customer classes and rate schedules of the utility are the charges determined pursuant to section 4928.40 of the Revised Code. (13) Any independent transmission plan included in the transition plan filed under section 4928.31 of the Revised Code reasonably complies with section 4928.12 of the Revised Code and any rules adopted by the commission under division (A) of section 4928.06 of the Revised Code, unless the commission, for good cause shown, authorizes the utility to defer compliance until an order is issued under division (G) of section 4928.35 of the Revised Code. (14) The utility is in compliance with sections 4928.01 to 4928.11 of the Revised Code and any rules or orders of the commission adopted or issued under those sections. (15) All unbundled components in the rate unbundling plan have been adjusted to reflect the elimination of the tax on gross receipts imposed by section 5727.30 of the Revised Code. In addition, a transition plan approved by the commission under section 4928.33 of the Revised Code but not containing an approved independent transmission plan shall contain the express conditions that the utility will comply with an order issued under division (G) of section 4928.35 of the Revised Code. (B) Subject to division (E) of section 4928.17 of the Revised Code, if If the commission finds that any part of the 3816 3817 3818 3819 3820 3821 3822 3823 3824 3825 3826 3827 3828 3829 3830 3831 3832 3833 3834 3835 3836 3837 3838 3839 3840 3841 3842 3843 3844 Am. Sub. S. B. No. 2 Page 132 As Passed by the Senate transition plan would constitute an abandonment under sections 4905.20 and 4905.21 of the Revised Code, the commission shall not approve that part of the transition plan unless it makes the finding required for approval of an abandonment application under section 4905.21 of the Revised Code. Sections 4905.20 and 4905.21 of the Revised Code otherwise shall not apply to a transition plan under sections 4928.31 to 4928.40 of the Revised Code. Sec. 4928.542. The winning bid or bids selected through the competitive procurement process established under section 4928.54 of the Revised Code shall meet all of the following requirements: (A) Be designed to provide reliable competitive retail electric service to percentage of income payment plan program customers; (B) Reduce the cost of the percentage of income payment plan program relative to the otherwise applicable standard service offer established under sections 4928.141 , and 4928.142, and 4928.143 of the Revised Code; (C) Result in the best value for persons paying the universal service rider under section 4928.52 of the Revised Code. Sec. 4928.64. (A)(1) As used in this section, "qualifying renewable energy resource" means a renewable energy resource, as defined in section 4928.01 of the Revised Code that: (a) Has a placed-in-service date on or after January 1, 1998; (b) Is any run-of-the-river hydroelectric facility that has an in-service date on or after January 1, 1980; 3845 3846 3847 3848 3849 3850 3851 3852 3853 3854 3855 3856 3857 3858 3859 3860 3861 3862 3863 3864 3865 3866 3867 3868 3869 3870 3871 3872 3873 Am. Sub. S. B. No. 2 Page 133 As Passed by the Senate (c) Is a small hydroelectric facility; (d) Is created on or after January 1, 1998, by the modification or retrofit of any facility placed in service prior to January 1, 1998; or (e) Is a mercantile customer-sited renewable energy resource, whether new or existing, that the mercantile customer commits for integration into the electric distribution utility's demand-response, energy efficiency, or peak demand reduction programs as provided under division (A)(2)(c) of section 4928.66 of the Revised Code, including, but not limited to, any of the following: (i) A resource that has the effect of improving the relationship between real and reactive power; (ii) A resource that makes efficient use of waste heat or other thermal capabilities owned or controlled by a mercantile customer; (iii) Storage technology that allows a mercantile customer more flexibility to modify its demand or load and usage characteristics; (iv) Electric generation equipment owned or controlled by a mercantile customer that uses a renewable energy resource. (2) For the purpose of this section and as it considers appropriate, the public utilities commission may classify any new technology as such a qualifying renewable energy resource. (B)(1) By the end of 2026, an electric distribution utility shall have provided from qualifying renewable energy resources, including, at its discretion, qualifying renewable energy resources obtained pursuant to an electricity supply 3874 3875 3876 3877 3878 3879 3880 3881 3882 3883 3884 3885 3886 3887 3888 3889 3890 3891 3892 3893 3894 3895 3896 3897 3898 3899 3900 3901 Am. Sub. S. B. No. 2 Page 134 As Passed by the Senate contract, a portion of the electricity supply required for its standard service offer under section sections 4928.141 and 4928.142 of the Revised Code, and an electric services company shall have provided a portion of its electricity supply for retail consumers in this state from qualifying renewable energy resources, including, at its discretion, qualifying renewable energy resources obtained pursuant to an electricity supply contract. That portion shall equal eight and one-half per cent of the total number of kilowatt hours of electricity sold by the subject utility or company to any and all retail electric consumers whose electric load centers are served by that utility and are located within the utility's certified territory or, in the case of an electric services company, are served by the company and are located within this state. However, nothing in this section precludes a utility or company from providing a greater percentage. (2) Subject to section 4928.642 of the Revised Code, the The portion required under division (B)(1) of this section shall be generated from renewable energy resources in accordance with the following benchmarks: 1 2 3 ABy end of year Renewable energy resources Solar energy resources B 2009 0.25% 0.004% C 2010 0.50% 0.010% D 2011 1% 0.030% E 2012 1.5% 0.060% 3902 3903 3904 3905 3906 3907 3908 3909 3910 3911 3912 3913 3914 3915 3916 3917 3918 3919 3920 3921 3922 Am. Sub. S. B. No. 2 Page 135 As Passed by the Senate F 2013 2% 0.090% G 2014 2.5% 0.12% H 2015 2.5% 0.12% I 2016 2.5% 0.12% J 2017 3.5% 0.15% K 2018 4.5% 0.18% L 2019 5.5% 0.22% M 2020 5.5% 0% N 2021 6% 0% O 2022 6.5% 0% P 2023 7% 0% Q 2024 7.5% 0% R 2025 8% 0% S 2026 8.5% 0% (3) The qualifying renewable energy resources implemented by the utility or company shall be met either: (a) Through facilities located in this state; or (b) With resources that can be shown to be deliverable into this state. (C)(1) The commission annually shall review an electric 3923 3924 3925 3926 3927 3928 Am. Sub. S. B. No. 2 Page 136 As Passed by the Senate distribution utility's or electric services company's compliance with the most recent applicable benchmark under division (B)(2) of this section and, in the course of that review, shall identify any undercompliance or noncompliance of the utility or company that it determines is weather-related, related to equipment or resource shortages for qualifying renewable energy resources as applicable, or is otherwise outside the utility's or company's control. (2) Subject to the cost cap provisions of division (C)(3) of this section, if the commission determines, after notice and opportunity for hearing, and based upon its findings in that review regarding avoidable undercompliance or noncompliance, but subject to division (C)(4) of this section, that the utility or company has failed to comply with any such benchmark, the commission shall impose a renewable energy compliance payment on the utility or company. (a) The compliance payment pertaining to the solar energy resource benchmarks under division (B)(2) of this section shall be an amount per megawatt hour of undercompliance or noncompliance in the period under review, as follows: (i) Three hundred dollars for 2014, 2015, and 2016; (ii) Two hundred fifty dollars for 2017 and 2018; (iii) Two hundred dollars for 2019. (b) The compliance payment pertaining to the renewable energy resource benchmarks under division (B)(2) of this section shall equal the number of additional renewable energy credits that the electric distribution utility or electric services company would have needed to comply with the applicable benchmark in the period under review times an amount that shall 3929 3930 3931 3932 3933 3934 3935 3936 3937 3938 3939 3940 3941 3942 3943 3944 3945 3946 3947 3948 3949 3950 3951 3952 3953 3954 3955 3956 3957 Am. Sub. S. B. No. 2 Page 137 As Passed by the Senate begin at forty-five dollars and shall be adjusted annually by the commission to reflect any change in the consumer price index as defined in section 101.27 of the Revised Code , but shall not be less than forty-five dollars. As used in this division, "consumer price index" means the consumer price index prepared by the United States bureau of labor statistics (U.S. city average for urban wage earners and clerical workers: all items, 1982-1984=100), or, if that index is no longer published, a generally available comparable index. (c) The compliance payment shall not be passed through by the electric distribution utility or electric services company to consumers. The compliance payment shall be remitted to the commission, for deposit to the credit of the advanced energy fund created under section 4928.61 of the Revised Code. Payment of the compliance payment shall be subject to such collection and enforcement procedures as apply to the collection of a forfeiture under sections 4905.55 to 4905.60 and 4905.64 of the Revised Code. (3) An electric distribution utility or an electric services company need not comply with a benchmark under division (B)(2) of this section to the extent that its reasonably expected cost of that compliance exceeds its reasonably expected cost of otherwise producing or acquiring the requisite electricity by three per cent or more. The cost of compliance shall be calculated as though any exemption from taxes and assessments had not been granted under section 5727.75 of the Revised Code. (4)(a) An electric distribution utility or electric services company may request the commission to make a force majeure determination pursuant to this division regarding all or 3958 3959 3960 3961 3962 3963 3964 3965 3966 3967 3968 3969 3970 3971 3972 3973 3974 3975 3976 3977 3978 3979 3980 3981 3982 3983 3984 3985 3986 3987 Am. Sub. S. B. No. 2 Page 138 As Passed by the Senate part of the utility's or company's compliance with any minimum benchmark under division (B)(2) of this section during the period of review occurring pursuant to division (C)(2) of this section. The commission may require the electric distribution utility or electric services company to make solicitations for renewable energy resource credits as part of its default service before the utility's or company's request of force majeure under this division can be made. (b) Within ninety days after the filing of a request by an electric distribution utility or electric services company under division (C)(4)(a) of this section, the commission shall determine if qualifying renewable energy resources are reasonably available in the marketplace in sufficient quantities for the utility or company to comply with the subject minimum benchmark during the review period. In making this determination, the commission shall consider whether the electric distribution utility or electric services company has made a good faith effort to acquire sufficient qualifying renewable energy or, as applicable, solar energy resources to so comply, including, but not limited to, by banking or seeking renewable energy resource credits or by seeking the resources through long-term contracts. Additionally, the commission shall consider the availability of qualifying renewable energy or solar energy resources in this state and other jurisdictions in the PJM interconnection regional transmission organization, L.L.C., or its successor and the midcontinent independent system operator or its successor. (c) If, pursuant to division (C)(4)(b) of this section, the commission determines that qualifying renewable energy or solar energy resources are not reasonably available to permit the electric distribution utility or electric services company 3988 3989 3990 3991 3992 3993 3994 3995 3996 3997 3998 3999 4000 4001 4002 4003 4004 4005 4006 4007 4008 4009 4010 4011 4012 4013 4014 4015 4016 4017 4018 Am. Sub. S. B. No. 2 Page 139 As Passed by the Senate to comply, during the period of review, with the subject minimum benchmark prescribed under division (B)(2) of this section, the commission shall modify that compliance obligation of the utility or company as it determines appropriate to accommodate the finding. Commission modification shall not automatically reduce the obligation for the electric distribution utility's or electric services company's compliance in subsequent years. If it modifies the electric distribution utility or electric services company obligation under division (C)(4)(c) of this section, the commission may require the utility or company, if sufficient renewable energy resource credits exist in the marketplace, to acquire additional renewable energy resource credits in subsequent years equivalent to the utility's or company's modified obligation under division (C)(4)(c) of this section. (5) The commission shall establish a process to provide for at least an annual review of the renewable energy resource market in this state and in the service territories of the regional transmission organizations that manage transmission systems located in this state. The commission shall use the results of this study to identify any needed changes to the amount of the renewable energy compliance payment specified under divisions (C)(2)(a) and (b) of this section. Specifically, the commission may increase the amount to ensure that payment of compliance payments is not used to achieve compliance with this section in lieu of actually acquiring or realizing energy derived from qualifying renewable energy resources. However, if the commission finds that the amount of the compliance payment should be otherwise changed, the commission shall present this finding to the general assembly for legislative enactment. (D) The commission annually shall submit to the general 4019 4020 4021 4022 4023 4024 4025 4026 4027 4028 4029 4030 4031 4032 4033 4034 4035 4036 4037 4038 4039 4040 4041 4042 4043 4044 4045 4046 4047 4048 4049 Am. Sub. S. B. No. 2 Page 140 As Passed by the Senate assembly in accordance with section 101.68 of the Revised Code a report describing all of the following: (1) The compliance of electric distribution utilities and electric services companies with division (B) of this section; (2) The average annual cost of renewable energy credits purchased by utilities and companies for the year covered in the report; (3) Any strategy for utility and company compliance or for encouraging the use of qualifying renewable energy resources in supplying this state's electricity needs in a manner that considers available technology, costs, job creation, and economic impacts. The commission shall begin providing the information described in division (D)(2) of this section in each report submitted after September 10, 2012. The commission shall allow and consider public comments on the report prior to its submission to the general assembly. Nothing in the report shall be binding on any person, including any utility or company for the purpose of its compliance with any benchmark under division (B) of this section, or the enforcement of that provision under division (C) of this section. (E) All costs incurred by an electric distribution utility in complying with the requirements of this section shall be bypassable by any consumer that has exercised choice of supplier under section 4928.03 of the Revised Code. Sec. 4928.645. (A) An electric distribution utility or electric services company may use, for the purpose of complying with the requirements under divisions (B)(1) and (2) of section 4928.64 of the Revised Code, renewable energy credits any time 4050 4051 4052 4053 4054 4055 4056 4057 4058 4059 4060 4061 4062 4063 4064 4065 4066 4067 4068 4069 4070 4071 4072 4073 4074 4075 4076 4077 4078 Am. Sub. S. B. No. 2 Page 141 As Passed by the Senate in the five calendar years following the date of their purchase or acquisition from any entity, including, but not limited to, the following: (1) A mercantile customer; (2) An owner or operator of a hydroelectric generating facility that is located at a dam on a river, or on any water discharged to a river, that is within or bordering this state or within or bordering an adjoining state, or that produces power that can be shown to be deliverable into this state; (3) A seller of compressed natural gas that has been produced from biologically derived methane gas, provided that the seller may only provide renewable energy credits for metered amounts of gas. (B)(1) The public utilities commission shall adopt rules specifying that one unit of credit shall equal one megawatt hour of electricity derived from renewable energy resources, except that, for a generating facility of seventy-five megawatts or greater that is situated within this state and has committed by December 31, 2009, to modify or retrofit its generating unit or units to enable the facility to generate principally from biomass energy by June 30, 2013, each megawatt hour of electricity generated principally from that biomass energy shall equal, in units of credit, the product obtained by multiplying the actual percentage of biomass feedstock heat input used to generate such megawatt hour by the quotient obtained by dividing the then existing unit dollar amount used to determine a renewable energy compliance payment as provided under division (C)(2)(b) of section 4928.64 of the Revised Code by the then existing market value of one renewable energy credit, but such megawatt hour shall not equal less than one unit of credit. 4079 4080 4081 4082 4083 4084 4085 4086 4087 4088 4089 4090 4091 4092 4093 4094 4095 4096 4097 4098 4099 4100 4101 4102 4103 4104 4105 4106 4107 4108 Am. Sub. S. B. No. 2 Page 142 As Passed by the Senate Renewable energy resources do not have to be converted to electricity in order to be eligible to receive renewable energy credits. The rules shall specify that, for purposes of converting the quantity of energy derived from biologically derived methane gas to an electricity equivalent, one megawatt hour equals 3,412,142 British thermal units. (2) The rules also shall provide for this state a system of registering renewable energy credits by specifying which of any generally available registries shall be used for that purpose and not by creating a registry. That selected system of registering renewable energy credits shall allow a hydroelectric generating facility to be eligible for obtaining renewable energy credits and shall allow customer-sited projects or actions the broadest opportunities to be eligible for obtaining renewable energy credits. (C) Beginning January 1, 2020, a qualifying solar resource as defined in section 3706.40 of the Revised Code is not eligible to obtain a renewable energy credit under this section for any megawatt hour for which the resource has been issued a solar energy credit under section 3706.45 of the Revised Code. (D) Except for compressed natural gas that has been produced from biologically derived methane gas, energy generated by using natural gas as a resource is not eligible to obtain a renewable energy credit under this section. Sec. 4928.73. (A) As used in this section: (1) "Mercantile customer member" means a mercantile customer connected to a mercantile customer self-power system. (2) "Mercantile customer self-power system" means one or more electric generation facilities, electric storage 4109 4110 4111 4112 4113 4114 4115 4116 4117 4118 4119 4120 4121 4122 4123 4124 4125 4126 4127 4128 4129 4130 4131 4132 4133 4134 4135 4136 4137 Am. Sub. S. B. No. 2 Page 143 As Passed by the Senate facilities, or both, along with any associated facilities, that meet all of the following: (a) Produce electricity primarily for the consumption of a mercantile customer member or a group of mercantile customer members; (b) Connect directly to the mercantile customer member's side of the electric meter; (c) Deliver electricity to the mercantile customer member's side of the electric meter without the use of an electric distribution utility's or an electric cooperative's distribution system or transmission system; (d) Is located on either of the following: (i) A property owned or controlled by a mercantile customer member or the entity that owns or operates the mercantile customer self-power system, provided that the property is not located more than one mile from the customer or group of customers that consume the electricity produced by the facilities; (ii) Land adjacent to a mercantile customer member if the facilities connect directly with the customer. (B) The mercantile customer self-power system may be owned or operated by a mercantile customer member, group of mercantile customer members, or an entity that is not a mercantile customer member. (C) A mercantile customer self-power system may provide electric generation service to one or more mercantile customers. (D) The public utilities commission shall adopt rules to implement this section that are applicable to electric 4138 4139 4140 4141 4142 4143 4144 4145 4146 4147 4148 4149 4150 4151 4152 4153 4154 4155 4156 4157 4158 4159 4160 4161 4162 4163 4164 4165 Am. Sub. S. B. No. 2 Page 144 As Passed by the Senate distribution utilities. (E) Nothing in this section prohibits an electric distribution utility or an electric cooperative from charging a mercantile customer for distribution or transmission service used by a mercantile customer. Sec. 4929.20. (A)(A)(1) No governmental aggregator as defined in division (K)(1) of section 4929.01 of the Revised Code or no retail natural gas supplier shall provide a competitive retail natural gas service on or after thirteen months following the effective date of this section June 26, 2001, to a consumer in this state without first being certified by the public utilities commission regarding its managerial, technical, and financial capability to provide that service and providing reasonable financial assurances sufficient to protect customers and natural gas companies from default. In addition, a retail natural gas supplier may be required to provide a performance bond sufficient to protect customers and natural gas companies from default. Certification shall be granted pursuant to procedures and standards the commission shall prescribe in accordance with rules adopted under section 4929.10 of the Revised Code. However, certification or certification renewal shall be deemed approved thirty days after the filing of an application with the commission unless the commission suspends that approval for good cause shown. In the case of such a suspension, the commission shall act to approve or deny certification or certification renewal to the applicant not later than ninety days after the date of the suspension. (2) The commission shall establish rules to require a competitive retail natural gas supplier to maintain financial assurances sufficient to protect customers and natural gas 4166 4167 4168 4169 4170 4171 4172 4173 4174 4175 4176 4177 4178 4179 4180 4181 4182 4183 4184 4185 4186 4187 4188 4189 4190 4191 4192 4193 4194 4195 Am. Sub. S. B. No. 2 Page 145 As Passed by the Senate companies from default. Such rules also shall specifically allow a natural gas company to set reasonable standards for its security and the security of its customers through financial requirements set in its tariffs. (3) As used in division (A)(2) of this section, "retail natural gas supplier" has the same meaning as in section 4929.01 of the Revised Code, but excludes a broker or aggregator. (B) Capability standards adopted in rules pursuant to division (A) of this section shall be sufficient to ensure compliance with section 4929.22 of the Revised Code and with the minimum service requirements established under section 4929.23 of the Revised Code. The standards shall allow flexibility for voluntary aggregation, to encourage market creativity in responding to consumer needs and demands. The rules shall include procedures for biennially renewing certification. (C)(1) The commission may suspend, rescind, or conditionally rescind the certification of any retail natural gas supplier or governmental aggregator issued under this section if the commission determines, after reasonable notice and opportunity for hearing, that the retail natural gas supplier or governmental aggregator has failed to comply with any applicable certification standards prescribed in rules adopted pursuant to this section or section 4929.22 of the Revised Code. (2) An affected natural gas company may file an application with the commission for approval of authority to recover in accordance with division (C)(2) of this section incremental costs reasonably and prudently incurred by the company in connection with the commission's continuation, suspension, rescission, or conditional rescission of a 4196 4197 4198 4199 4200 4201 4202 4203 4204 4205 4206 4207 4208 4209 4210 4211 4212 4213 4214 4215 4216 4217 4218 4219 4220 4221 4222 4223 4224 4225 Am. Sub. S. B. No. 2 Page 146 As Passed by the Senate particular retail natural gas supplier's certification under division (C)(1) of this section. Upon the filing of such an application, the commission shall conduct an audit of such incremental costs as are specified in the application. Cost recovery shall be through a rider on the base rates of customers of the company for which there is a choice of supplier of commodity sales service as a result of revised schedules approved under division (C) of section 4929.29 of the Revised Code, a rule or order adopted or issued by the commission under Chapter 4905. of the Revised Code, or an exemption granted by the commission under sections 4929.04 to 4929.08 of the Revised Code. The rider shall take effect ninety days after the date of the application's filing unless the commission, based on the audit results and for good cause shown, sets the matter for hearing. After the hearing, the commission shall approve the application, and authorize such cost recovery rider effective on the date specified in the order, only for such incremental costs as the commission determines were reasonably and prudently incurred by the company in connection with the continuation, suspension, rescission, or conditional rescission of a retail natural gas supplier's certification under division (C)(1) of this section. Any proceeding under division (C)(2) of this section shall be governed by Chapter 4903. of the Revised Code. (D) No natural gas company, on and after thirteen months following the effective date of this section June 26, 2001, shall knowingly distribute natural gas, to a retail consumer in this state, for any governmental aggregator, as defined in division (K)(1) of section 4929.01 of the Revised Code, or retail natural gas supplier, that has not been certified by the commission pursuant to this section. (E) Notwithstanding any provision of section 121.95 of the 4226 4227 4228 4229 4230 4231 4232 4233 4234 4235 4236 4237 4238 4239 4240 4241 4242 4243 4244 4245 4246 4247 4248 4249 4250 4251 4252 4253 4254 4255 4256 Am. Sub. S. B. No. 2 Page 147 As Passed by the Senate Revised Code to the contrary, a regulatory restriction contained in a rule adopted under section 4929.20 of the Revised Code is not subject to sections 121.95 to 121.953 of the Revised Code. Sec. 4929.221. (A) If a competitive retail natural gas service supplier offers a residential customer or non-mercantile commercial customer a contract for a fixed introductory rate that converts to a variable rate upon the expiration of the fixed rate, the supplier shall send two notices to each residential customer and non-mercantile commercial customer that enters into such a contract. Each notice shall provide all of the following information to the customer: (1) The fixed rate that is expiring under the contract; (2) The expiration date of the contract's fixed rate; (3) The rate to be charged upon the contract's conversion to a variable rate; (4) The public utilities commission web site that, as a comparison tool, lists rates offered by competitive retail natural gas service suppliers; (5) A statement explaining that appearing on each customer's bill is a price-to-compare notice that lists the natural gas company's default rate for natural gas charged to customers who decide not to shop for a competitive supplier. (B) The notices shall be sent by standard United States mail as follows: (1) The supplier shall send the first notice not earlier than ninety days and not later than sixty days prior to the expiration of the fixed rate. (2) The supplier shall send the second notice not earlier 4257 4258 4259 4260 4261 4262 4263 4264 4265 4266 4267 4268 4269 4270 4271 4272 4273 4274 4275 4276 4277 4278 4279 4280 4281 4282 4283 4284 Am. Sub. S. B. No. 2 Page 148 As Passed by the Senate than forty-five days and not later than thirty days prior to the expiration of the fixed rate. (C) A competitive retail natural gas service supplier shall provide an annual notice, by standard United States mail, to each residential customer and non-mercantile commercial customer that has entered into a contract with the supplier that has converted to a variable rate upon the expiration of the contract's fixed introductory rate. The notice shall inform the customer that the customer is currently subject to a variable rate and that other fixed rate contracts are available. (D) Not later than one hundred fifty days after the effective date of this section, the commission shall adopt rules in order to implement divisions (A) to (C) of this section. The rules, at a minimum, shall include the following requirements regarding the notices required under divisions (A) to (C) of this section: (1) To use clear and unambiguous language in order to enable the customer to make an informed decision; (2) To design the notices in a way to ensure that they cannot be confused with marketing materials. (E) Notwithstanding any provision of section 121.95 of the Revised Code to the contrary, a regulatory restriction contained in a rule adopted under section 4929.221 of the Revised Code is not subject to sections 121.95 to 121.953 of the Revised Code. Sec. 4929.222. (A) As used in this section, "customer account information" means a unique natural gas company number or other customer identification number used by the company to identify a customer and the customer's account record. (B) The public utilities commission shall adopt rules to 4285 4286 4287 4288 4289 4290 4291 4292 4293 4294 4295 4296 4297 4298 4299 4300 4301 4302 4303 4304 4305 4306 4307 4308 4309 4310 4311 4312 4313 Am. Sub. S. B. No. 2 Page 149 As Passed by the Senate ensure that a natural gas company processes a customer's change in competitive retail natural gas supplier by using customer account information. A customer who consents to a change of supplier shall not be required to provide customer account information to the supplier if the customer provides a valid form of government-issued identification issued to the customer or a sufficient alternative form of identification that allows the supplier to establish the customer's identity accurately. (C) Notwithstanding any provision of section 121.95 of the Revised Code to the contrary, a regulatory restriction contained in a rule adopted under this section is not subject to sections 121.95 to 121.953 of the Revised Code. Sec. 4933.81. As used in sections 4933.81 to 4933.90 of the Revised Code: (A) "Electric supplier" means any electric light company as defined in section 4905.03 of the Revised Code, including electric light companies organized as nonprofit corporations, but not including municipal corporations or other units of local government that provide electric service. (B) "Adequate facilities" means distribution lines or facilities having sufficient capacity to meet the maximum estimated electric service requirements of its existing customers and of any new customer occurring during the year following the commencement of permanent electric service, and to assure all such customers of reasonable continuity and quality of service. Distribution facilities and lines of an electric supplier shall be considered "adequate facilities" if such supplier offers to undertake to make its distribution facilities and lines meet such service requirements and, in the determination of the public utilities commission, can do so 4314 4315 4316 4317 4318 4319 4320 4321 4322 4323 4324 4325 4326 4327 4328 4329 4330 4331 4332 4333 4334 4335 4336 4337 4338 4339 4340 4341 4342 4343 Am. Sub. S. B. No. 2 Page 150 As Passed by the Senate within a reasonable time. (C) "Distribution line" means any electric line that is being or has been used primarily to provide electric service directly to electric load centers by the owner of such line. (D) "Existing distribution line" means any distribution line of an electric supplier which was in existence on January 1, 1977, or under construction on that date. (E) "Electric load center" means all the electric- consuming facilities of any type or character owned, occupied, controlled, or used by a person at a single location, which facilities have been, are, or will be connected to and served at a metered point of delivery and to which electric service has been, is, or will be rendered. (F) "Electric service" means retail electric service furnished to an electric load center for ultimate consumption, but excludes furnishing electric power or energy at wholesale for resale. In the case of a for-profit electric supplier and beginning on the starting date of competitive retail electric service as defined in section 4928.01 of the Revised Code, "electric service" also excludes a competitive retail electric service. , and, starting after the effective date of amendments to this section by this act, excludes: (1) Retail electric service provided to a mercantile customer member by its own mercantile customer self-power system as those terms are defined in section 4928.73 of the Revised Code; (2) Retail electric service provided to an electric load center to the extent the center is acting as a self-generator as defined in section 4928.01 of the Revised Code. 4344 4345 4346 4347 4348 4349 4350 4351 4352 4353 4354 4355 4356 4357 4358 4359 4360 4361 4362 4363 4364 4365 4366 4367 4368 4369 4370 4371 4372 Am. Sub. S. B. No. 2 Page 151 As Passed by the Senate In the case of a not-for-profit electric supplier and beginning on that competitive retail electric service starting date, "electric service" also excludes any service component of competitive retail electric service that is specified in an irrevocable filing the electric supplier makes with the public utilities commission for informational purposes only to eliminate permanently its certified territory under sections 4933.81 to 4933.90 of the Revised Code as to that service component and further excludes any new electric load centers going into service after the effective date of amendments to this section by this act that use retail electric service described in division (F)(1) or (2) of this section . The filing shall specify the date on which such territory is so eliminated. Notwithstanding division (B) of section 4928.01 of the Revised Code, such a service component may include retail ancillary, metering, or billing and collection service irrespective of whether that service component has or has not been declared competitive under section 4928.04 of the Revised Code. Upon receipt of the filing by the commission, the not-for-profit electric supplier's certified territory shall be eliminated permanently as to the service component specified in the filing as of the date specified in the filing. As used in this division, "competitive retail electric service" and "retail electric service" have the same meanings as in section 4928.01 of the Revised Code. (G) "Certified territory" means a geographical area the boundaries of which have been established pursuant to sections 4933.81 to 4933.90 of the Revised Code within which an electric supplier is authorized and required to provide electric service. (H) "Other unit of local government" means any governmental unit or body that may come into existence after 4373 4374 4375 4376 4377 4378 4379 4380 4381 4382 4383 4384 4385 4386 4387 4388 4389 4390 4391 4392 4393 4394 4395 4396 4397 4398 4399 4400 4401 4402 4403 Am. Sub. S. B. No. 2 Page 152 As Passed by the Senate July 12, 1978, with powers and authority similar to those of a municipal corporation, or that is created to replace or exercise the relevant powers of any one or more municipal corporations. Sec. 5711.01. As used in this chapter: (A)(1) "Taxable property" includes all the kinds of property mentioned in division (B) of section 5709.01 and section 5709.02 of the Revised Code, and also the amount or value as of the date of conversion of all taxable property converted into bonds or other securities not taxed on or after the first day of November in the year preceding the date of listing, and of all other taxable property converted into deposits after the date as of which deposits are required to be listed in such year, except in the usual course of the taxpayer's business, to the extent the taxpayer may hold or control such bonds, securities, or deposits on such day, without deduction for indebtedness created in the purchase of such bonds or securities from the taxpayer's credits. "Taxable property" does not include such investments and deposits as are taxable at the source as provided in sections 5725.01 to 5725.26 of the Revised Code, surrender values under policies of insurance, or any tangible personal property acquired from a public utility or interexchange telecommunications company as defined in section 5727.01 of the Revised Code and leased back to the public utility or interexchange telecommunications company pursuant to a sale and leaseback transaction as defined in division (I) of section 5727.01 of the Revised Code. For tax year 2007 and thereafter, "taxable property" of a telephone, telegraph, or interexchange telecommunications company, as defined in section 5727.01 of the Revised Code, includes property subject to such a sale and leaseback transaction. 4404 4405 4406 4407 4408 4409 4410 4411 4412 4413 4414 4415 4416 4417 4418 4419 4420 4421 4422 4423 4424 4425 4426 4427 4428 4429 4430 4431 4432 4433 Am. Sub. S. B. No. 2 Page 153 As Passed by the Senate (2) For tax year 2007 and thereafter, taxable property leased to a telephone, telegraph, or interexchange telecommunications company, as defined in section 5727.01 of the Revised Code, other than pursuant to a sale and leaseback transaction, shall be listed and assessed by the owner of the property as follows: (a) If the property leased to such a company is not governed by division (C) of section 5711.22 of the Revised Code in tax years 2007 and 2008, it shall be listed and assessed at the percentage of true value in money required under division (G) of section 5711.22 of the Revised Code. (b) All property leased to such a company in tax years 2009 and 2010 shall be listed and assessed at the percentage of true value in money required under division (H) of section 5711.22 of the Revised Code. (3) For tax years 2009 and 2010, the lessor of property subject to division (A)(2) of this section shall have the true value of the property the lessor leases to a telephone, telegraph, or interexchange telecommunications company determined under divisions (A)(5)(A)(6) and (E) of section 5727.06 of the Revised Code. (B) "Taxpayer" means any owner of taxable property, including property exempt under division (C) of section 5709.01 of the Revised Code, and includes every person residing in, or incorporated or organized by or under the laws of this state, or doing business in this state, or owning or having a beneficial interest in taxable personal property in this state and every fiduciary required by sections 5711.01 to 5711.36 of the Revised Code, to make a return for or on behalf of another. For tax year 2007 and thereafter, "taxpayer" includes telephone companies, 4434 4435 4436 4437 4438 4439 4440 4441 4442 4443 4444 4445 4446 4447 4448 4449 4450 4451 4452 4453 4454 4455 4456 4457 4458 4459 4460 4461 4462 4463 Am. Sub. S. B. No. 2 Page 154 As Passed by the Senate telegraph companies, and interexchange telecommunications company as defined in section 5727.01 of the Revised Code. The tax commissioner may by rule define and designate the taxpayer, as to any taxable property which would not otherwise be required by this section to be returned; and any such rule shall be considered supplementary to the enumeration of kinds of taxpayers following: (1) Individuals of full age and sound mind residing in this state; (2) Partnerships, corporations, associations, and joint- stock companies, under whatever laws organized or existing, doing business or having taxable property in this state; and corporations incorporated by or organized under the laws of this state, wherever their actual business is conducted; (3) Fiduciaries appointed by any court in this state or having title, possession, or custody of taxable personal property in this state or engaged in business in this state; (4) Unincorporated mutual funds. "Taxpayer" excludes all individuals, partnerships, corporations, associations, and joint-stock companies, their executors, administrators, and receivers who are defined in Title LVII of the Revised Code as financial institutions, dealers in intangibles, domestic insurance companies, or public utilities, except to the extent they may be required by sections 5711.01 to 5711.36 of the Revised Code, to make returns as fiduciaries, or by section 5725.26 of the Revised Code, to make returns of property leased, or held for the purpose of leasing, to others if the owner or lessor of the property acquired it for the sole purpose of leasing it to others or to the extent that 4464 4465 4466 4467 4468 4469 4470 4471 4472 4473 4474 4475 4476 4477 4478 4479 4480 4481 4482 4483 4484 4485 4486 4487 4488 4489 4490 4491 4492 Am. Sub. S. B. No. 2 Page 155 As Passed by the Senate property is taxable under section 5725.25 of the Revised Code. (C) "Return" means the taxpayer's annual report of taxable property. (D) "List" means the designation, in a return, of the description of taxable property, the valuation or amount thereof, the name of the owner, and the taxing district where assessable. (E) "Taxing district" means, in the case of property assessable on the classified tax list and duplicate, a municipal corporation or the territory in a county outside the limits of all municipal corporations therein; in the case of property assessable on the general tax list and duplicate, a municipal corporation or township, or part thereof, in which the aggregate rate of taxation is uniform. (F) "Assessor" includes the tax commissioner and the county auditor as deputy of the commissioner. (G) "Fiduciary" includes executors, administrators, parents, guardians, receivers, assignees, official custodians, factors, bailees, lessees, agents, attorneys, and employees, but does not include trustees unless the sense so requires. (H) "General tax list and duplicate" means the books or records containing the assessments of property subject to local tax levies. (I) "Classified tax list and duplicate" means the books or records containing the assessments of property not subject to local tax levies. (J) "Investment company" means any corporation, the shares of which are regularly offered for sale to the public, engaged 4493 4494 4495 4496 4497 4498 4499 4500 4501 4502 4503 4504 4505 4506 4507 4508 4509 4510 4511 4512 4513 4514 4515 4516 4517 4518 4519 4520 Am. Sub. S. B. No. 2 Page 156 As Passed by the Senate solely in the business of investing and reinvesting funds in real property or investments, or holding or selling real property or investments for the purpose of realizing income or profit which is distributed to its shareholders. Investment company does not include any dealer in intangibles, as defined in section 5725.01 of the Revised Code. (K) "Unincorporated mutual fund" means any partnership, each partner of which is a corporation, engaged solely in the business of investing and reinvesting funds in investments, or holding or selling investments for the purpose of realizing income or profit which is distributed to its partners and which is subject to Chapter 1707. of the Revised Code. An unincorporated mutual fund does not include any dealer in intangibles as defined in section 5725.01 of the Revised Code. Sec. 5727.01. As used in this chapter: (A) "Public utility" means each person referred to as a telephone company, telegraph company, electric company, natural gas company, pipe-line company, water-works company, water transportation company, heating company, rural electric company, railroad company, combined company, or energy company. (B) "Gross receipts" means the entire receipts for business done by any person from operations as a public utility, or incidental thereto, or in connection therewith, including any receipts received under Chapter 4928. of the Revised Code. The gross receipts for business done by an incorporated company engaged in operation as a public utility includes the entire receipts for business done by such company under the exercise of its corporate powers, whether from the operation as a public utility or from any other business. 4521 4522 4523 4524 4525 4526 4527 4528 4529 4530 4531 4532 4533 4534 4535 4536 4537 4538 4539 4540 4541 4542 4543 4544 4545 4546 4547 4548 4549 Am. Sub. S. B. No. 2 Page 157 As Passed by the Senate (C) "Rural electric company" means any nonprofit corporation, organization, association, or cooperative engaged in the business of supplying electricity to its members or persons owning an interest therein in an area the major portion of which is rural. "Rural electric company" excludes an energy company. (D) Any person: (1) Is a telegraph company when engaged in the business of transmitting telegraphic messages to, from, through, or in this state; (2) Is a telephone company when primarily engaged in the business of providing local exchange telephone service, excluding cellular radio service, in this state; (3) Is an electric company when engaged in the business of generating, transmitting, or distributing electricity within this state for use by others, but excludes a rural electric company or an energy company; (4) Is a natural gas company when engaged in the business of supplying or distributing natural gas for lighting, power, or heating purposes to consumers within this state, excluding a person that is a governmental aggregator or retail natural gas supplier as defined in section 4929.01 of the Revised Code; (5) Is a pipe-line company when engaged in the business of transporting natural gas, oil, or coal or its derivatives through pipes or tubing, either wholly or partially within this state; (6) Is a water-works company when engaged in the business of supplying water through pipes or tubing, or in a similar manner, to consumers within this state; 4550 4551 4552 4553 4554 4555 4556 4557 4558 4559 4560 4561 4562 4563 4564 4565 4566 4567 4568 4569 4570 4571 4572 4573 4574 4575 4576 4577 4578 Am. Sub. S. B. No. 2 Page 158 As Passed by the Senate (7) Is a water transportation company when engaged in the transportation of passengers or property, by boat or other watercraft, over any waterway, whether natural or artificial, from one point within this state to another point within this state, or between points within this state and points without this state; (8) Is a heating company when engaged in the business of supplying water, steam, or air through pipes or tubing to consumers within this state for heating purposes; (9) Is a railroad company when engaged in the business of owning or operating a railroad either wholly or partially within this state on rights-of-way acquired and held exclusively by such company, or otherwise, and includes a passenger, street, suburban, or interurban railroad company; (10) Is an energy company when engaged in the business of generating, transmitting, storing and releasing, or distributing electricity within this state for use by others solely from an energy facility with an aggregate nameplate capacity in excess of two hundred fifty kilowatts. As used in division (D)(2) of this section, "local exchange telephone service" means making available or furnishing access and a dial tone to all persons within a local calling area for use in originating and receiving voice grade communications over a switched network operated by the provider of the service within the area and for gaining access to other telecommunication services. (E) "Taxable property" means the property required by section 5727.06 of the Revised Code to be assessed by the tax commissioner, but does not include either of the following: 4579 4580 4581 4582 4583 4584 4585 4586 4587 4588 4589 4590 4591 4592 4593 4594 4595 4596 4597 4598 4599 4600 4601 4602 4603 4604 4605 4606 4607 Am. Sub. S. B. No. 2 Page 159 As Passed by the Senate (1) An item of tangible personal property that for the period subsequent to the effective date of an air, water, or noise pollution control certificate and continuing so long as the certificate is in force, has been certified as part of the pollution control facility with respect to which the certificate has been issued; (2) An item of tangible personal property that during the construction of a plant or facility and until the item is first capable of operation, whether actually used in operation or not, is incorporated in or being held exclusively for incorporation in that plant or facility. Notwithstanding section 5701.03 of the Revised Code, for tax year 2006 and thereafter, "taxable property" includes patterns, jigs, dies, and drawings of an electric company or a combined company for use in the activity of an electric company. (F) "Taxing district" means a municipal corporation or township, or part thereof, in which the aggregate rate of taxation is uniform. (G) "Telecommunications service" has the same meaning as in division (AA) of section 5739.01 of the Revised Code. (H) "Interexchange telecommunications company" means a person that is engaged in the business of transmitting telephonic messages to, from, through, or in this state, but that is not a telephone company. (I) "Sale and leaseback transaction" means a transaction in which a public utility or interexchange telecommunications company sells any tangible personal property to a person other than a public utility or interexchange telecommunications company and leases that property back from the buyer. 4608 4609 4610 4611 4612 4613 4614 4615 4616 4617 4618 4619 4620 4621 4622 4623 4624 4625 4626 4627 4628 4629 4630 4631 4632 4633 4634 4635 4636 Am. Sub. S. B. No. 2 Page 160 As Passed by the Senate (J) "Production equipment" means all taxable steam, nuclear, hydraulic, renewable resource, clean coal technology, and other production plant equipment used to generate or store and release electricity. For tax years prior to 2001, "production equipment" includes taxable station equipment that is located at a production plant. (K) "Tax year" means the year for which property or gross receipts are subject to assessment under this chapter. This division does not limit the tax commissioner's ability to assess and value property or gross receipts outside the tax year. (L) "Combined company" means any person engaged in the activity of an electric company or rural electric company that is also engaged in the activity of a heating company or a natural gas company, or any combination thereof. (M) "Public utility property lessor" means any person, other than a public utility or an interexchange telecommunications company, that leases personal property, other than in a sale and leaseback transaction, to a public utility, other than a railroad, water transportation, telephone, or telegraph company if the property would be taxable property if owned by the public utility. A public utility property lessor is subject to this chapter only for the purposes of reporting and paying tax on taxable property it leases to a public utility other than a telephone or telegraph company. A public utility property lessor that leases property to a public utility other than a telephone or telegraph company is not a public utility, but it shall report its property and be assessed in the same manner as the utility to which it leases the property. (N) "Energy resource" means any of the following: 4637 4638 4639 4640 4641 4642 4643 4644 4645 4646 4647 4648 4649 4650 4651 4652 4653 4654 4655 4656 4657 4658 4659 4660 4661 4662 4663 4664 4665 Am. Sub. S. B. No. 2 Page 161 As Passed by the Senate (1) "Renewable energy resource " as defined in section 4928.01 of the Revised Code; (2) "Clean coal technology " as described in division (A) (34)(c) of section 4928.01 of the Revised Code; (3) "Advanced nuclear technology " as described in division (A)(34)(d) of section 4928.01 of the Revised Code; (4) "Cogeneration technology " as described in division (A) (34)(b) of section 4928.01 of the Revised Code ; (5) Energy storage system . (O) "Energy conversion equipment" means tangible personal property connected to a wind turbine tower, connected to and behind solar radiation collector areas and designed to convert the radiant energy of the sun into electricity or heat, or connected to any other property used to generate or store and release electricity from an energy resource, through which electricity is transferred to controls, transformers, or power electronics and to the transmission interconnection point. "Energy conversion equipment" includes, but is not limited to, inverters, batteries, switch gears, wiring, collection lines, substations, ancillary tangible personal property, or any lines and associated tangible personal property located between substations and the transmission interconnection point. (P) "Energy facility" means one or more interconnected wind turbines, solar panels, energy storage systems, or other tangible personal property used to generate or store and release electricity from an energy resource owned by the same person, including: (1) All interconnection equipment, devices, and related 4666 4667 4668 4669 4670 4671 4672 4673 4674 4675 4676 4677 4678 4679 4680 4681 4682 4683 4684 4685 4686 4687 4688 4689 4690 4691 4692 4693 Am. Sub. S. B. No. 2 Page 162 As Passed by the Senate apparatus connected to such tangible personal property; (2) All cables, equipment, devices, and related apparatus that connect the generators to an electricity grid or to a building or facility that directly consumes the electricity produced, that facilitate the transmission of electrical energy from the generators to the grid, building, or facility, and, where applicable, that transform voltage before ultimate delivery of electricity to the grid, building, or facility. "Energy facility" includes buildings, structures, improvements, or fixtures exclusively used to house, support, or stabilize tangible personal property constituting the facility or that are otherwise necessary for the operation of that property; and so much of the land on which such tangible personal property is situated as is required for operation of the facility and is not devoted to some other use, not to exceed, in the case of wind turbines, one-half acre for each wind turbine, and regardless of whether the land is owned by the owner or lessee of the tangible personal property or by another person. (Q) "Nameplate capacity" means the original interconnected maximum rated alternating current output of a generator or other electric production equipment under specific conditions designated by the manufacturer, expressed in the number of kilowatts or megawatts. (R) "Qualifying production equipment" means production equipment and energy conversion equipment that is first used in business in this state beginning in calendar year 2026 and thereafter. (S) "Energy storage system" means tangible personal 4694 4695 4696 4697 4698 4699 4700 4701 4702 4703 4704 4705 4706 4707 4708 4709 4710 4711 4712 4713 4714 4715 4716 4717 4718 4719 4720 4721 4722 Am. Sub. S. B. No. 2 Page 163 As Passed by the Senate property that is capable of storing and releasing energy. Sec. 5727.031. (A) A person that is engaged in some other primary business to which the supplying of electricity to others is incidental shall file a report under section 5727.08 of the Revised Code as an electric company but shall only report therein as taxable property the amounts required in divisions (B) and (C) of this section. All time limits and other procedural requirements of this chapter for the reporting and assessment of property of electric companies apply to persons required to file a report under this section. For the purposes of this section, "the supplying of electricity to others" shall not include donating all of the electricity a person generates to a political subdivision of the state. (B) A person subject to this section shall report the true value of the boilers, machinery, equipment, and any personal property used to supply electricity to others, which shall be the sum of the following: (1) The true value of the property that is taxable production equipment , as such true value it would be determined for an electric company under section 5727.11 of the Revised Code, multiplied by the per cent of the electricity generated in the preceding calendar year that was not used by the person who generated it; plus (2) The true value of the property that is not production equipment, as it such true value would be determined for an electric company under section 5727.11 of the Revised Code , multiplied by the per cent of the electricity generated in the preceding calendar year that was not used by the person who generated it. 4723 4724 4725 4726 4727 4728 4729 4730 4731 4732 4733 4734 4735 4736 4737 4738 4739 4740 4741 4742 4743 4744 4745 4746 4747 4748 4749 4750 4751 Am. Sub. S. B. No. 2 Page 164 As Passed by the Senate (C) The property reported under division (B) of this section shall be listed and assessed at an amount equal to the sum of the products determined under divisions (C)(1) and (2) of this section. (1) Multiply the portion of the true value determined under division (B)(1) of this section by the assessment rate in section 5727.111 of the Revised Code that is applicable to the taxable production equipment of an electric company; (2) Multiply the portion of the true value determined under division (B)(2) of this section by the assessment rate in section 5727.111 of the Revised Code that is applicable to the taxable property of an electric company that is not production equipment. Sec. 5727.06. (A) Except as otherwise provided by law, the following constitutes the taxable property of a public utility, interexchange telecommunications company, or public utility property lessor that shall be assessed by the tax commissioner: (1) For tax years before tax year 2006: (a) In the case of a railroad company, all real property and tangible personal property owned or operated by the railroad company in this state on the thirty-first day of December of the preceding year; (b) In the case of a water transportation company, all tangible personal property, except watercraft, owned or operated by the water transportation company in this state on the thirty- first day of December of the preceding year and all watercraft owned or operated by the water transportation company in this state during the preceding calendar year; (c) In the case of all other public utilities and 4752 4753 4754 4755 4756 4757 4758 4759 4760 4761 4762 4763 4764 4765 4766 4767 4768 4769 4770 4771 4772 4773 4774 4775 4776 4777 4778 4779 4780 Am. Sub. S. B. No. 2 Page 165 As Passed by the Senate interexchange telecommunications companies, all tangible personal property that on the thirty-first day of December of the preceding year was both located in this state and: (i) Owned by the public utility or interexchange telecommunications company; or (ii) Leased by the public utility or interexchange telecommunications company under a sale and leaseback transaction. (2) For tax years 2006, 2007, and 2008: (a) In the case of a railroad company, all real property used in railroad operations and tangible personal property owned or operated by the railroad company in this state on the thirty- first day of December of the preceding year; (b) In the case of a water transportation company, all tangible personal property, except watercraft, owned or operated by the water transportation company in this state on the thirty- first day of December of the preceding year and all watercraft owned or operated by the water transportation company in this state during the preceding calendar year; (c) In the case of all other public utilities except telephone and telegraph companies, all tangible personal property that on the thirty-first day of December of the preceding year was both located in this state and either owned by the public utility or leased by the public utility under a sale and leaseback transaction. (3) For tax year years 2009 and each tax year thereafter to 2026: (a) In the case of a railroad company, all real property 4781 4782 4783 4784 4785 4786 4787 4788 4789 4790 4791 4792 4793 4794 4795 4796 4797 4798 4799 4800 4801 4802 4803 4804 4805 4806 4807 4808 Am. Sub. S. B. No. 2 Page 166 As Passed by the Senate used in railroad operations and tangible personal property owned or operated by the railroad company in this state on the thirty- first day of December of the preceding year; (b) In the case of a water transportation company, all tangible personal property, except watercraft, owned or operated by the water transportation company in this state on the thirty- first day of December of the preceding year and all watercraft owned or operated by the water transportation company in this state during the preceding calendar year; (c) In the case of all other public utilities except telephone and telegraph companies, all tangible personal property that on the thirty-first day of December of the preceding year was both located in this state and either owned by the public utility or leased by the public utility under a sale and leaseback transaction, and that is not exempted from taxation under section 5727.75 of the Revised Code; (d) In the case of a public utility property lessor, all personal property that on the thirty-first day of December of the preceding year was both located in this state and leased, in other than a sale and leaseback transaction, to a public utility other than a railroad, telephone, telegraph, or water transportation company. The assessment rate used under section 5727.111 of the Revised Code shall be based on the assessment rate that would apply if the public utility owned the property, and that is not exempted from taxation under section 5727.75 of the Revised Code. (4) For tax year 2027 and each tax year thereafter: (a) In the case of a railroad company, all real property used in railroad operations and tangible personal property owned 4809 4810 4811 4812 4813 4814 4815 4816 4817 4818 4819 4820 4821 4822 4823 4824 4825 4826 4827 4828 4829 4830 4831 4832 4833 4834 4835 4836 4837 Am. Sub. S. B. No. 2 Page 167 As Passed by the Senate or operated by the railroad company in this state on the thirty- first day of December of the preceding year; (b) In the case of a water transportation company, all tangible personal property, except watercraft, owned or operated by the water transportation company in this state on the thirty- first day of December of the preceding year and all watercraft owned or operated by the water transportation company in this state during the preceding calendar year; (c) In the case of all other public utilities except telephone and telegraph companies, all tangible personal property except qualifying production equipment that on the thirty-first day of December of the preceding year was both located in this state and either owned by the public utility or leased by the public utility under a sale and leaseback transaction, and that is not exempted from taxation under section 5727.75 of the Revised Code; (d) In the case of a public utility property lessor, all personal property except qualifying production equipment that on the thirty-first day of December of the preceding year was both located in this state and leased, in other than a sale and leaseback transaction, to a public utility other than a railroad, telephone, telegraph, or water transportation company. The assessment rate used under section 5727.111 of the Revised Code shall be based on the assessment rate that would apply if the public utility owned the property, and that is not exempted from taxation under section 5727.75 of the Revised Code. (5) For tax years 2005 and 2006, in the case of telephone, telegraph, or interexchange telecommunications companies, all tangible personal property that on the thirty-first day of December of the preceding year was both located in this state 4838 4839 4840 4841 4842 4843 4844 4845 4846 4847 4848 4849 4850 4851 4852 4853 4854 4855 4856 4857 4858 4859 4860 4861 4862 4863 4864 4865 4866 4867 Am. Sub. S. B. No. 2 Page 168 As Passed by the Senate and either owned by the telephone, telegraph, or interexchange telecommunications company or leased by the telephone, telegraph, or interexchange telecommunications company under a sale and leaseback transaction. (5)(a)(6)(a) For tax year 2007 and thereafter, in the case of telephone, telegraph, or interexchange telecommunications companies, all tangible personal property shall be listed and assessed for taxation under Chapter 5711. of the Revised Code, but the tangible personal property shall be valued in accordance with this chapter using the composite annual allowances and other valuation procedures prescribed under section 5727.11 of the Revised Code by the tax commissioner for such property for tax year 2006, notwithstanding any section of Chapter 5711. of the Revised Code to the contrary. (b) A telephone, telegraph, or interexchange telecommunications company subject to division (A)(5)(a)(A)(6) (a) of this section shall file a combined return with the tax commissioner in accordance with section 5711.13 of the Revised Code even if the company has tangible personal property in only one county. Such a company also is subject to the issuance of a preliminary assessment certificate by the tax commissioner under section 5711.25 of the Revised Code. Such a company is not required to file a county supplemental return under section 5711.131 of the Revised Code. (6)(7) In the case of an energy company , for : (a) For tax year years 2011 and each tax year thereafter to 2026, all tangible personal property that on the thirty-first day of December of the preceding year was both located in this state and either owned by the company or leased by the company under a sale and leaseback transaction, and that is not exempted 4868 4869 4870 4871 4872 4873 4874 4875 4876 4877 4878 4879 4880 4881 4882 4883 4884 4885 4886 4887 4888 4889 4890 4891 4892 4893 4894 4895 4896 4897 Am. Sub. S. B. No. 2 Page 169 As Passed by the Senate from taxation under section 5727.75 of the Revised Code. (b) For tax year 2027 and each tax year thereafter, all tangible personal property except qualifying production equipment that on the thirty-first day of December of the preceding year was both located in this state and either owned by the company or leased by the company under a sale and leaseback transaction, and that is not exempted from taxation under section 5727.75 of the Revised Code. (B) This division applies to tax years before tax year 2007. In the case of an interexchange telecommunications company, all taxable property shall be subject to the provisions of this chapter and shall be valued by the commissioner in accordance with division (A) of section 5727.11 of the Revised Code. A person described by this division shall file the report required by section 5727.08 of the Revised Code. Persons described in this division shall not be considered taxpayers, as defined in division (B) of section 5711.01 of the Revised Code, and shall not be required to file a return and list their taxable property under any provision of Chapter 5711. of the Revised Code. (C) The lien of the state for taxes levied each year on the real and personal property of public utilities and interexchange telecommunications companies and on the personal property of public utility property lessors shall attach thereto on the thirty-first day of December of the preceding year. (D) Property that is required by division (A)(3)(b) of this section to be assessed by the tax commissioner under this chapter shall not be listed by the owner of the property under 4898 4899 4900 4901 4902 4903 4904 4905 4906 4907 4908 4909 4910 4911 4912 4913 4914 4915 4916 4917 4918 4919 4920 4921 4922 4923 4924 4925 4926 Am. Sub. S. B. No. 2 Page 170 As Passed by the Senate Chapter 5711. of the Revised Code. (E) The ten-thousand-dollar exemption provided for in division (C)(3) of section 5709.01 of the Revised Code does not apply to any personal property that is valued under this chapter. (F) The tax commissioner may adopt rules governing the listing of the taxable property of public utilities and interexchange telecommunications companies and the determination of true value. Sec. 5727.11. (A) Except as otherwise provided in this section, the true value of all taxable property, except property of a railroad company, required by section 5727.06 of the Revised Code to be assessed by the tax commissioner shall be determined by a method of valuation using cost as capitalized on the public utility's books and records less composite annual allowances as prescribed by the commissioner. If the commissioner finds that application of this method will not result in the determination of true value of the public utility's taxable property, the commissioner may use another method of valuation. (B)(1) Except as provided in division (B)(2) of this section, the true value of current gas stored underground is the cost of that gas shown on the books and records of the public utility on the thirty-first day of December of the preceding year. (2) For tax year 2001 and thereafter, the true value of current gas stored underground is the quotient obtained by dividing (a) the average value of the current gas stored underground, which shall be determined by adding the value of 4927 4928 4929 4930 4931 4932 4933 4934 4935 4936 4937 4938 4939 4940 4941 4942 4943 4944 4945 4946 4947 4948 4949 4950 4951 4952 4953 4954 4955 Am. Sub. S. B. No. 2 Page 171 As Passed by the Senate the gas on hand at the end of each calendar month in the calendar year preceding the tax year, or, if applicable, the last day of business of each month for a partial month, divided by (b) the total number of months the natural gas company was in business during the calendar year prior to the beginning of the tax year. With the approval of the tax commissioner, a natural gas company may use a date other than the end of a calendar month to value its current gas stored underground. (C) The true value of noncurrent gas stored underground is thirty-five per cent of the cost of that gas shown on the books and records of the public utility on the thirty-first day of December of the preceding year. (D)(1) Except as provided in division (D)(2) of this section, the true value of the taxable production equipment of an electric company and the true value of all taxable property of a rural electric company is the equipment's or property's cost as capitalized on the company's books and records less fifty per cent of that cost as an allowance for depreciation and obsolescence. (2) The true value of the taxable production equipment or energy conversion equipment of an electric company, rural electric company, or energy company purchased, transferred, or placed into service after October 5, 1999, is the purchase price of the equipment as capitalized on the company's books and records less composite annual allowances as prescribed by the tax commissioner. (E) The true value of taxable property, except property of a railroad company, required by section 5727.06 of the Revised Code to be assessed by the tax commissioner shall not include the allowance for funds used during construction or interest 4956 4957 4958 4959 4960 4961 4962 4963 4964 4965 4966 4967 4968 4969 4970 4971 4972 4973 4974 4975 4976 4977 4978 4979 4980 4981 4982 4983 4984 4985 Am. Sub. S. B. No. 2 Page 172 As Passed by the Senate during construction that has been capitalized on the public utility's books and records as part of the total cost of the taxable property. This division shall not apply to the taxable property of an electric company or a rural electric company, excluding transmission and distribution property, first placed into service after December 31, 2000, or to the taxable property a person purchases, which includes transfers, if that property was used in business by the seller prior to the purchase. (F) The true value of watercraft owned or operated by a water transportation company shall be determined by multiplying the true value of the watercraft as determined under division (A) of this section by a fraction, the numerator of which is the number of revenue-earning miles traveled by the watercraft in the waters of this state and the denominator of which is the number of revenue-earning miles traveled by the watercraft in all waters. (G) The cost of property subject to a sale and leaseback transaction is the cost of the property as capitalized on the books and records of the public utility owning the property immediately prior to the sale and leaseback transaction. (H) The cost as capitalized on the books and records of a public utility includes amounts capitalized that represent regulatory assets, if such amounts previously were included on the company's books and records as capitalized costs of taxable personal property. (I) Any change in the composite annual allowances as prescribed by the commissioner on a prospective basis shall not be admissible in any judicial or administrative action or proceeding as evidence of value with regard to prior years' taxes. Information about the business, property, or transactions 4986 4987 4988 4989 4990 4991 4992 4993 4994 4995 4996 4997 4998 4999 5000 5001 5002 5003 5004 5005 5006 5007 5008 5009 5010 5011 5012 5013 5014 5015 Am. Sub. S. B. No. 2 Page 173 As Passed by the Senate of any taxpayer obtained by the commissioner for the purpose of adopting or modifying the composite annual allowances shall not be subject to discovery or disclosure. Sec. 5727.111. The taxable property of each public utility, except a railroad company, and of each interexchange telecommunications company shall be assessed at the following percentages of true value: (A) In the case of a rural electric company, fifty per cent in the case of its taxable transmission and distribution property first subject to taxation in this state before tax year 2027 and its energy conversion equipment, and twenty-five per cent for all its other taxable property; (B) In the case of a telephone or telegraph company, twenty-five per cent for taxable property first subject to taxation in this state for tax year 1995 or thereafter for tax years before tax year 2007, and pursuant to division (H) of section 5711.22 of the Revised Code for tax year 2007 and thereafter, and the following for all other taxable property: (1) For tax years prior to 2005, eighty-eight per cent; (2) For tax year 2005, sixty-seven per cent; (3) For tax year 2006, forty-six per cent; (4) For tax year 2007 and thereafter, pursuant to division (H) of section 5711.22 of the Revised Code. (C) Twenty-five per cent in the case of (1) a natural gas company or (2) a water-works company for taxable property first subject to taxation in this state for tax year 2017 and thereafter; (D) Eighty-eight per cent in the case of taxable property 5016 5017 5018 5019 5020 5021 5022 5023 5024 5025 5026 5027 5028 5029 5030 5031 5032 5033 5034 5035 5036 5037 5038 5039 5040 5041 5042 5043 Am. Sub. S. B. No. 2 Page 174 As Passed by the Senate of a pipe-line company first subject to taxation in this state before tax year 2027 , a water-works company for taxable property first subject to taxation in this state before tax year 2017, or a heating company; (E)(1) For tax year 2005, eighty-eight per cent in the case of the taxable transmission and distribution property of an electric company, and twenty-five per cent for all its other taxable property; (2) For tax year years 2006 and each tax year thereafter to 2026, in the case of an electric company, eighty-five per cent in the case of its taxable transmission and distribution property and its energy conversion equipment, and twenty-four per cent for all its other taxable property. (3) For tax year 2027 and each tax year thereafter, in the case of an electric company, eighty-five per cent of its taxable transmission and distribution property first subject to taxation in this state before tax year 2027 and its energy conversion equipment, twenty-five per cent in the case of its other taxable transmission and distribution property, and twenty-four per cent for all its other taxable property. (F)(1) Twenty-five per cent in the case of an interexchange telecommunications company for tax years before tax year 2007; (2) Pursuant to division (H) of section 5711.22 of the Revised Code for tax year 2007 and thereafter. (G) Twenty-five per cent in the case of a water transportation company; (H)(H)(1) For tax year years 2011 and each tax year thereafter to 2026, in the case of an energy company, twenty- 5044 5045 5046 5047 5048 5049 5050 5051 5052 5053 5054 5055 5056 5057 5058 5059 5060 5061 5062 5063 5064 5065 5066 5067 5068 5069 5070 5071 5072 Am. Sub. S. B. No. 2 Page 175 As Passed by the Senate four per cent in the case of its taxable production equipment, and eighty-five per cent for all its other taxable property. (2) For tax year 2027 and each tax year thereafter, in the case of an energy company, twenty-four per cent in the case of its taxable production equipment, twenty-five per cent for its taxable transmission and distribution property first subject to taxation in this state for tax year 2027 and thereafter, and eighty-five per cent for all its other taxable property. (I) Twenty-five per cent in the case of taxable property of a pipe-line company first subject to taxation in this state for tax year 2027 and thereafter. Sec. 5727.75. (A) For purposes of this section: (1) "Qualified energy project" means an energy project certified by the director of development pursuant to this section. (2) "Energy project" means a project to provide electric power through the construction, installation, and use of an energy facility. (3) "Alternative energy zone" means a county declared as such by the board of county commissioners under division (E)(1) (b) or (c) of this section. (4) "Full-time equivalent employee" means the total number of employee-hours for which compensation was paid to individuals employed at a qualified energy project for services performed at the project during the calendar year divided by two thousand eighty hours. For the purpose of this calculation, "performed at the project" includes only hours worked at the qualified energy project and devoted to site preparation or protection, construction and installation, and the unloading and 5073 5074 5075 5076 5077 5078 5079 5080 5081 5082 5083 5084 5085 5086 5087 5088 5089 5090 5091 5092 5093 5094 5095 5096 5097 5098 5099 5100 5101 Am. Sub. S. B. No. 2 Page 176 As Passed by the Senate distribution of materials at the project site, but does not include hours worked by superintendents, owners, manufacturers' representatives, persons employed in a bona fide executive, management, supervisory, or administrative capacity, or persons whose sole employment on the project is transporting materials or persons to the project site. (5) "Solar energy project" means an energy project composed of an energy facility using solar panels to generate electricity. (6) "Internet identifier of record" has the same meaning as in section 9.312 of the Revised Code. (7) "Applicable year" means the later of the following: (a) The tax year in which the secretary of the treasury of the United States, or the secretary's delegate, determines, in accordance with section 45Y of the Internal Revenue Code, that the annual greenhouse gas emissions from the production of electricity in the United States are equal to or less than twenty-five per cent of the annual greenhouse gas emissions from the production of electricity in the United States for calendar year 2022; (b) Tax year 2029. (8) "Internal Revenue Code" means the Internal Revenue Code as of the effective date of this amendment October 3, 2023. (B)(1) Tangible personal property of a qualified energy project using renewable energy resources is exempt from taxation for tax years 2011 through the applicable year if all of the following conditions are satisfied: (a) On or before the last day of the tax year preceding 5102 5103 5104 5105 5106 5107 5108 5109 5110 5111 5112 5113 5114 5115 5116 5117 5118 5119 5120 5121 5122 5123 5124 5125 5126 5127 5128 5129 Am. Sub. S. B. No. 2 Page 177 As Passed by the Senate the applicable year, the owner or a lessee pursuant to a sale and leaseback transaction of the project submits an application to the power siting board for a certificate under section 4906.20 of the Revised Code, or if that section does not apply, submits an application for any approval, consent, permit, or certificate or satisfies any condition required by a public agency or political subdivision of this state for the construction or initial operation of an energy project. (b) Construction or installation of the energy facility begins on or after January 1, 2009, and before the first day of the applicable year. For the purposes of this division, construction begins on the earlier of the date of application for a certificate or other approval or permit described in division (B)(1)(a) of this section, or the date the contract for the construction or installation of the energy facility is entered into. (c) For a qualified energy project with a nameplate capacity of twenty megawatts or greater, a board of county commissioners of a county in which property of the project is located has adopted a resolution under division (E)(1)(b) or (c) of this section to approve the application submitted under division (E) of this section to exempt the property located in that county from taxation. A board's adoption of a resolution rejecting an application or its failure to adopt a resolution approving the application does not affect the tax-exempt status of the qualified energy project's property that is located in another county. (2) If tangible personal property of a qualified energy project using renewable energy resources was exempt from taxation under this section beginning in any of tax years 2011 5130 5131 5132 5133 5134 5135 5136 5137 5138 5139 5140 5141 5142 5143 5144 5145 5146 5147 5148 5149 5150 5151 5152 5153 5154 5155 5156 5157 5158 5159 Am. Sub. S. B. No. 2 Page 178 As Passed by the Senate through the applicable year, and the certification under division (E)(2) of this section has not been revoked, the tangible personal property of the qualified energy project is exempt from taxation for the tax year following the applicable year and all ensuing tax years if the property was placed into service before the first day of the tax year following the applicable year, as certified in the construction progress report required under division (F)(2) of this section. Tangible personal property that has not been placed into service before that date is taxable property subject to taxation. An energy project for which certification has been revoked is ineligible for further exemption under this section. Revocation does not affect the tax-exempt status of the project's tangible personal property for the tax year in which revocation occurs or any prior tax year. (C) Tangible personal property of a qualified energy project using clean coal technology, advanced nuclear technology, or cogeneration technology is exempt from taxation for the first tax year that the property would be listed for taxation and all subsequent years if all of the following circumstances are met: (1) The property was placed into service before January 1, 2021. Tangible personal property that has not been placed into service before that date is taxable property subject to taxation. (2) For such a qualified energy project with a nameplate capacity of twenty megawatts or greater, a board of county commissioners of a county in which property of the qualified energy project is located has adopted a resolution under division (E)(1)(b) or (c) of this section to approve the 5160 5161 5162 5163 5164 5165 5166 5167 5168 5169 5170 5171 5172 5173 5174 5175 5176 5177 5178 5179 5180 5181 5182 5183 5184 5185 5186 5187 5188 5189 Am. Sub. S. B. No. 2 Page 179 As Passed by the Senate application submitted under division (E) of this section to exempt the property located in that county from taxation. A board's adoption of a resolution rejecting the application or its failure to adopt a resolution approving the application does not affect the tax-exempt status of the qualified energy project's property that is located in another county. (3) The certification for the qualified energy project issued under division (E)(2) of this section has not been revoked. An energy project for which certification has been revoked is ineligible for exemption under this section. Revocation does not affect the tax-exempt status of the project's tangible personal property for the tax year in which revocation occurs or any prior tax year. (D) Except as otherwise provided in this section, real property of a qualified energy project is exempt from taxation for any tax year for which the tangible personal property of the qualified energy project is exempted under this section. (E)(1)(a) A person may apply to the director of development for certification of an energy project as a qualified energy project on or before the following dates: (i) The last day of the tax year preceding the applicable year, for an energy project using renewable energy resources; (ii) December 31, 2017, for an energy project using clean coal technology, advanced nuclear technology, or cogeneration technology. (b) The director shall forward a copy of each application for certification of an energy project with a nameplate capacity of twenty megawatts or greater to the board of county commissioners of each county in which the project is located and 5190 5191 5192 5193 5194 5195 5196 5197 5198 5199 5200 5201 5202 5203 5204 5205 5206 5207 5208 5209 5210 5211 5212 5213 5214 5215 5216 5217 5218 Am. Sub. S. B. No. 2 Page 180 As Passed by the Senate to each taxing unit with territory located in each of the affected counties. Any board that receives from the director a copy of an application submitted under this division shall adopt a resolution approving or rejecting the application unless it has adopted a resolution under division (E)(1)(c) of this section. A resolution adopted under division (E)(1)(b) or (c) of this section may require an annual service payment to be made in addition to the service payment required under division (G) of this section. The sum of the service payment required in the resolution and the service payment required under division (G) of this section shall not exceed nine thousand dollars per megawatt of nameplate capacity located in the county. The resolution shall specify the time and manner in which the payments required by the resolution shall be paid to the county treasurer. The county treasurer shall deposit the payment to the credit of the county's general fund to be used for any purpose for which money credited to that fund may be used. The board shall send copies of the resolution to the owner of the facility and the director by certified mail or, if the board has record of an internet identifier of record associated with the owner or director, by ordinary mail and by that internet identifier of record. The board shall send such notice within thirty days after receipt of the application, or a longer period of time if authorized by the director. (c) A board of county commissioners may adopt a resolution declaring the county to be an alternative energy zone and declaring all applications submitted to the director of development under this division after the adoption of the resolution, and prior to its repeal, to be approved by the board. 5219 5220 5221 5222 5223 5224 5225 5226 5227 5228 5229 5230 5231 5232 5233 5234 5235 5236 5237 5238 5239 5240 5241 5242 5243 5244 5245 5246 5247 5248 Am. Sub. S. B. No. 2 Page 181 As Passed by the Senate All tangible personal property and real property of an energy project with a nameplate capacity of twenty megawatts or greater is taxable if it is located in a county in which the board of county commissioners adopted a resolution rejecting the application submitted under this division or failed to adopt a resolution approving the application under division (E)(1)(b) or (c) of this section. (2) The director shall certify an energy project if all of the following circumstances exist: (a) The application was timely submitted. (b) For an energy project with a nameplate capacity of twenty megawatts or greater, a board of county commissioners of at least one county in which the project is located has adopted a resolution approving the application under division (E)(1)(b) or (c) of this section. (c) No portion of the project's facility was used to supply electricity before December 31, 2009. (d) For construction or installation of a qualified energy project described in division (B)(1)(b) of this section, that the project is subject to wage requirements described in section 45(b)(7)(A) of the Internal Revenue Code and apprenticeship requirements described in section 45(b)(8)(A)(i) of the Internal Revenue Code, provided both of the following apply: (i) The person applies for such certificate after the effective date of this amendment October 3, 2023. (ii) A board of commissioners of at least one county in which the project is located is required to adopt a resolution approving the application under division (E)(1)(b) or (c) of this section. 5249 5250 5251 5252 5253 5254 5255 5256 5257 5258 5259 5260 5261 5262 5263 5264 5265 5266 5267 5268 5269 5270 5271 5272 5273 5274 5275 5276 5277 Am. Sub. S. B. No. 2 Page 182 As Passed by the Senate (3) The director shall deny a certification application if the director determines the person has failed to comply with any requirement under this section. The director may revoke a certification if the director determines the person, or subsequent owner or lessee pursuant to a sale and leaseback transaction of the qualified energy project, has failed to comply with any requirement under this section. Upon certification or revocation, the director shall notify the person, owner, or lessee, the tax commissioner, and the county auditor of a county in which the project is located of the certification or revocation. Notice shall be provided in a manner convenient to the director. (F) The owner or a lessee pursuant to a sale and leaseback transaction of a qualified energy project shall do each of the following: (1) Comply with all applicable regulations; (2) File with the director of development a certified construction progress report before the first day of March of each year during the energy facility's construction or installation indicating the percentage of the project completed, and the project's nameplate capacity, as of the preceding thirty-first day of December. Unless otherwise instructed by the director of development, the owner or lessee of an energy project shall file a report with the director on or before the first day of March each year after completion of the energy facility's construction or installation indicating the project's nameplate capacity as of the preceding thirty-first day of December. Not later than sixty days after June 17, 2010, the owner or lessee of an energy project, the construction of which was completed before June 17, 2010, shall file a certificate 5278 5279 5280 5281 5282 5283 5284 5285 5286 5287 5288 5289 5290 5291 5292 5293 5294 5295 5296 5297 5298 5299 5300 5301 5302 5303 5304 5305 5306 5307 Am. Sub. S. B. No. 2 Page 183 As Passed by the Senate indicating the project's nameplate capacity. (3) File with the director of development, in a manner prescribed by the director, a report of the total number of full-time equivalent employees, and the total number of full- time equivalent employees domiciled in Ohio, who are employed in the construction or installation of the energy facility; (4) For energy projects with a nameplate capacity of twenty megawatts or greater, repair all roads, bridges, and culverts affected by construction as reasonably required to restore them to their preconstruction condition, as determined by the county engineer in consultation with the local jurisdiction responsible for the roads, bridges, and culverts. In the event that the county engineer deems any road, bridge, or culvert to be inadequate to support the construction or decommissioning of the energy facility, the road, bridge, or culvert shall be rebuilt or reinforced to the specifications established by the county engineer prior to the construction or decommissioning of the facility. The owner or lessee of the facility shall post a bond in an amount established by the county engineer and to be held by the board of county commissioners to ensure funding for repairs of roads, bridges, and culverts affected during the construction. The bond shall be released by the board not later than one year after the date the repairs are completed. The energy facility owner or lessee pursuant to a sale and leaseback transaction shall post a bond, as may be required by the Ohio power siting board in the certificate authorizing commencement of construction issued pursuant to section 4906.10 of the Revised Code, to ensure funding for repairs to roads, bridges, and culverts resulting from decommissioning of the facility. The energy facility owner or lessee and the county engineer may enter into an agreement 5308 5309 5310 5311 5312 5313 5314 5315 5316 5317 5318 5319 5320 5321 5322 5323 5324 5325 5326 5327 5328 5329 5330 5331 5332 5333 5334 5335 5336 5337 5338 Am. Sub. S. B. No. 2 Page 184 As Passed by the Senate regarding specific transportation plans, reinforcements, modifications, use and repair of roads, financial security to be provided, and any other relevant issue. (5) Provide or facilitate training for fire and emergency responders for response to emergency situations related to the energy project and, for energy projects with a nameplate capacity of twenty megawatts or greater, at the person's expense, equip the fire and emergency responders with proper equipment as reasonably required to enable them to respond to such emergency situations; (6)(a) Except as otherwise provided in this division, for projects for which certification as a qualified energy project was applied for, under division (E) of this section, before the effective date of this amendment October 3, 2023, maintain a ratio of Ohio-domiciled full-time equivalent employees employed in the construction or installation of the energy project to total full-time equivalent employees employed in the construction or installation of the energy project of not less than eighty per cent in the case of a solar energy project, and not less than fifty per cent in the case of any other energy project. A person applying for such a qualified energy project may certify to the director of development that the project will be voluntarily subject to the wage requirements described in section 45(b)(7)(A) of the Internal Revenue Code and apprenticeship requirements described in section 45(b)(8)(A)(i) of the Internal Revenue Code as authorized in division (F)(6)(b) of this section. Upon receipt of that certification, the project shall comply with division (F)(6)(b) of this section rather than division (F)(6)(a) of this section. (b) For projects for which certification as a qualified 5339 5340 5341 5342 5343 5344 5345 5346 5347 5348 5349 5350 5351 5352 5353 5354 5355 5356 5357 5358 5359 5360 5361 5362 5363 5364 5365 5366 5367 5368 Am. Sub. S. B. No. 2 Page 185 As Passed by the Senate energy project was applied for, under division (E) of this section, on or after the effective date of this amendment October 3, 2023, maintain a ratio of Ohio-domiciled full-time equivalent employees employed in the construction or installation of the energy project to total full-time equivalent employees employed in the construction or installation of the energy project of not less than seventy per cent in the case of a solar energy project, and not less than fifty per cent in the case of any other energy project. (c) For purposes of divisions (F)(6)(a) and (b) of this section, in the case of an energy project for which certification from the power siting board is required under section 4906.20 of the Revised Code, the number of full-time equivalent employees employed in the construction or installation of the energy project equals the number actually employed or the number projected to be employed in the certificate application, if such projection is required under regulations adopted pursuant to section 4906.03 of the Revised Code, whichever is greater. For all other energy projects, the number of full-time equivalent employees employed in the construction or installation of the energy project equals the number actually employed or the number projected to be employed by the director of development, whichever is greater. To estimate the number of employees to be employed in the construction or installation of an energy project, the director shall use a generally accepted job-estimating model in use for renewable energy projects, including but not limited to the job and economic development impact model. The director may adjust an estimate produced by a model to account for variables not accounted for by the model. (7) For energy projects with a nameplate capacity in 5369 5370 5371 5372 5373 5374 5375 5376 5377 5378 5379 5380 5381 5382 5383 5384 5385 5386 5387 5388 5389 5390 5391 5392 5393 5394 5395 5396 5397 5398 5399 Am. Sub. S. B. No. 2 Page 186 As Passed by the Senate excess of twenty megawatts, establish a relationship with any of the following to educate and train individuals for careers in the wind or solar energy industry: (a) A member of the university system of Ohio as defined in section 3345.011 of the Revised Code; (b) A person offering an apprenticeship program registered with the employment and training administration within the United States department of labor or with the apprenticeship council created by section 4139.02 of the Revised Code; (c) A career-technical center, joint vocational school district, comprehensive career-technical center, or compact career-technical center; (d) A training center operated by a labor organization, or with a training center operated by a for-profit or nonprofit organization. The relationship may include endowments, cooperative programs, internships, apprenticeships, research and development projects, and curriculum development. (8) Offer to sell power or renewable energy credits from the energy project to electric distribution utilities or electric service companies subject to renewable energy resource requirements under section 4928.64 of the Revised Code that have issued requests for proposal for such power or renewable energy credits. If no electric distribution utility or electric service company issues a request for proposal on or before December 31, 2010, or accepts an offer for power or renewable energy credits within forty-five days after the offer is submitted, power or renewable energy credits from the energy project may be sold to other persons. Division (F)(8) of this section does not apply 5400 5401 5402 5403 5404 5405 5406 5407 5408 5409 5410 5411 5412 5413 5414 5415 5416 5417 5418 5419 5420 5421 5422 5423 5424 5425 5426 5427 5428 Am. Sub. S. B. No. 2 Page 187 As Passed by the Senate if: (a) The owner or lessee is a rural electric company or a municipal power agency as defined in section 3734.058 of the Revised Code. (b) The owner or lessee is a person that, before completion of the energy project, contracted for the sale of power or renewable energy credits with a rural electric company or a municipal power agency. (c) The owner or lessee contracts for the sale of power or renewable energy credits from the energy project before June 17, 2010. (9) Make annual service payments as required by division (G) of this section and as may be required in a resolution adopted by a board of county commissioners under division (E) of this section. (G) The owner or a lessee pursuant to a sale and leaseback transaction of a qualified energy project shall make annual service payments in lieu of taxes to the county treasurer on or before the final dates for payments of taxes on public utility personal property on the real and public utility personal property tax list for each tax year for which property of the energy project is exempt from taxation under this section. The county treasurer shall allocate the payment on the basis of the project's physical location. Upon receipt of a payment, or if timely payment has not been received, the county treasurer shall certify such receipt or non-receipt to the director of development and tax commissioner in a form determined by the director and commissioner, respectively. Each payment shall be in the following amount: 5429 5430 5431 5432 5433 5434 5435 5436 5437 5438 5439 5440 5441 5442 5443 5444 5445 5446 5447 5448 5449 5450 5451 5452 5453 5454 5455 5456 5457 Am. Sub. S. B. No. 2 Page 188 As Passed by the Senate (1) In the case of a solar energy project, seven thousand dollars per megawatt of nameplate capacity located in the county as of the thirty-first-day of December of the preceding tax year; (2) In the case of any other energy project using renewable energy resources, the following: (a) If the project maintains during the construction or installation of the energy facility a ratio of Ohio-domiciled full-time equivalent employees to total full-time equivalent employees of not less than seventy-five per cent, six thousand dollars per megawatt of nameplate capacity located in the county as of the thirty-first day of December of the preceding tax year; (b) If the project maintains during the construction or installation of the energy facility a ratio of Ohio-domiciled full-time equivalent employees to total full-time equivalent employees of less than seventy-five per cent but not less than sixty per cent, seven thousand dollars per megawatt of nameplate capacity located in the county as of the thirty-first day of December of the preceding tax year; (c) If the project maintains during the construction or installation of the energy facility a ratio of Ohio-domiciled full-time equivalent employees to total full-time equivalent employees of less than sixty per cent but not less than fifty per cent, eight thousand dollars per megawatt of nameplate capacity located in the county as of the thirty-first day of December of the preceding tax year. (3) In the case of an energy project using clean coal technology, advanced nuclear technology, or cogeneration 5458 5459 5460 5461 5462 5463 5464 5465 5466 5467 5468 5469 5470 5471 5472 5473 5474 5475 5476 5477 5478 5479 5480 5481 5482 5483 5484 5485 5486 Am. Sub. S. B. No. 2 Page 189 As Passed by the Senate technology, the following: (a) If the project maintains during the construction or installation of the energy facility a ratio of Ohio-domiciled full-time equivalent employees to total full-time equivalent employees of not less than seventy-five per cent, six thousand dollars per megawatt of nameplate capacity located in the county as of the thirty-first day of December of the preceding tax year; (b) If the project maintains during the construction or installation of the energy facility a ratio of Ohio-domiciled full-time equivalent employees to total full-time equivalent employees of less than seventy-five per cent but not less than sixty per cent, seven thousand dollars per megawatt of nameplate capacity located in the county as of the thirty-first day of December of the preceding tax year; (c) If the project maintains during the construction or installation of the energy facility a ratio of Ohio-domiciled full-time equivalent employees to total full-time equivalent employees of less than sixty per cent but not less than fifty per cent, eight thousand dollars per megawatt of nameplate capacity located in the county as of the thirty-first day of December of the preceding tax year. (H) The director of development in consultation with the tax commissioner shall adopt rules pursuant to Chapter 119. of the Revised Code to implement and enforce this section. (I) This section and any payments in lieu of taxes made as required under this section continue to apply and be required notwithstanding the enactment of S.B. 2 of the 136th general assembly. 5487 5488 5489 5490 5491 5492 5493 5494 5495 5496 5497 5498 5499 5500 5501 5502 5503 5504 5505 5506 5507 5508 5509 5510 5511 5512 5513 5514 5515 Am. Sub. S. B. No. 2 Page 190 As Passed by the Senate Sec. 5727.76. (A) As used in this section, "qualifying property" means tangible personal property that is dedicated to transporting or transmitting electricity or natural gas and that is placed into service in a priority investment area designated under section 122.161 of the Revised Code during a time when that designation is in effect. (B) Qualifying property shall be exempt from taxation for the tax year following the year in which the property is placed into service and for the ensuing four tax years. Section 2. That existing sections 303.213, 519.213, 713.081, 3313.372, 3313.373, 4905.03, 4906.01, 4906.03, 4906.06, 4906.07, 4906.10, 4909.04, 4909.05, 4909.052, 4909.06, 4909.07, 4909.08, 4909.15, 4909.156, 4909.173, 4909.174, 4909.18, 4909.19, 4909.191, 4909.42, 4928.01, 4928.05, 4928.08, 4928.14, 4928.141, 4928.142, 4928.144, 4928.17, 4928.20, 4928.23, 4928.231, 4928.232, 4928.34, 4928.542, 4928.64, 4928.645, 4929.20, 4933.81, 5711.01, 5727.01, 5727.031, 5727.06, 5727.11, 5727.111, and 5727.75 of the Revised Code are hereby repealed. Section 3. That sections 3706.40, 3706.41, 3706.43, 3706.431, 3706.45, 3706.46, 3706.49, 3706.491, 3706.55, 3706.551, 3706.59, 3706.63, 3706.65, 4928.143, 4928.148, and 4928.642 of the Revised Code are hereby repealed. Section 4. (A) Beginning on the effective date of this section, no electric distribution utility shall collect from its retail customers in this state any charge that was authorized under section 4928.148 of the Revised Code prior to the repeal of that section by this act for retail recovery of prudently incurred costs related to a legacy generation resource. Beginning on the effective date of this section, the electric distribution utility shall not apply for, and the public 5516 5517 5518 5519 5520 5521 5522 5523 5524 5525 5526 5527 5528 5529 5530 5531 5532 5533 5534 5535 5536 5537 5538 5539 5540 5541 5542 5543 5544 5545 Am. Sub. S. B. No. 2 Page 191 As Passed by the Senate utilities commission shall not authorize, any rider or cost recovery mechanism for a legacy generation resource. The public utilities commission shall continue any investigation commenced pursuant to section 4928.148 of the Revised Code prior to the repeal of that section by this act for purposes of determining the prudence and reasonableness of the actions of electric distribution utilities with ownership interests in the legacy generation resource, including their decisions related to offering the contractual commitment into the wholesale markets, and excluding from recovery those costs that the commission determines imprudent and unreasonable. (B) Beginning on the effective date of this section, no electric distribution utility shall collect from its retail customers in the state any charge that was authorized under section 3706.46 of the Revised Code to meet the revenue requirement for disbursements from the Solar Generation Fund to owners or operators of qualifying solar resources that was required under section 3706.55 of the Revised Code before the repeal of these sections by this act. Beginning on the effective date of this section, the Ohio Air Quality Development Authority is prohibited from directing the Treasurer of State to remit, and the Treasurer of State is prohibited from remitting, any money from the Solar Generation Fund to owners or operators of qualifying solar resources, which remittance was permitted under section 3706.55 of the Revised Code prior to the repeal of that section by this act. Section 5. Section 4909.193 as enacted by this act and the amendments to sections 4909.19 and 4909.42 of the Revised Code by this act apply to applications filed under section 4909.18 of the Revised Code on or after the effective date of this section. 5546 5547 5548 5549 5550 5551 5552 5553 5554 5555 5556 5557 5558 5559 5560 5561 5562 5563 5564 5565 5566 5567 5568 5569 5570 5571 5572 5573 5574 5575 Am. Sub. S. B. No. 2 Page 192 As Passed by the Senate Section 6. On the effective date of this section, or as soon as possible thereafter, the Treasurer of State shall transfer the cash balance of amounts remaining in the solar generation fund to the school energy performance contracting loan fund created in section 3313.378 of the Revised Code. Section 7. Section 4928.01 of the Revised Code is presented in this act as a composite of the section as amended by both H.B. 308 and H.B. 315 of the 135th General Assembly. The General Assembly, applying the principle stated in division (B) of section 1.52 of the Revised Code that amendments are to be harmonized if reasonably capable of simultaneous operation, finds that the composite is the resulting version of the section in effect prior to the effective date of the section as presented in this act. 5576 5577 5578 5579 5580 5581 5582 5583 5584 5585 5586 5587 5588 5589