Oklahoma 2024 2024 Regular Session

Oklahoma House Bill HB3972 Engrossed / Bill

Filed 03/05/2024

                     
ENGR. H. B. NO. 3972 	Page 1  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
  
 
ENGROSSED HOUSE 
BILL NO. 3972 	By: Echols, Hefner, Cantrell, 
and Townley of the House 
 
   and 
 
  Thompson (Roger) of the 
Senate 
 
 
 
 
An Act relating to state government; creating the 
State Parks Emergency Maintenance Act; requiring the 
creation of an Eight-Year State Parks Emergency 
Maintenance Plan; requiring annual reporting; listing 
specific information to be rep orted; establishing 
format and delivery requirements; creating the State 
Parks Emergency Maintenance Fund; establishing Fund 
with revolving fund characteristics; declaring funds 
appropriated; limiting expenditure to amounts as 
authorized by the Legislature ; limiting certain 
expenditure to certain percentage; providing 
budgeting and expenditure procedures and limitations; 
providing for noncodification; providing for 
codification; providing an effective date; and 
declaring an emergency. 
 
 
 
 
 
BE IT ENACTED BY THE PEOPLE OF THE STATE OF OKLAHOMA: 
SECTION 1.     NEW LAW     A new section of law not to be 
codified in the Oklahoma Statutes reads as follows: 
This act shall be known and may be cited as the "State Parks 
Emergency Maintenance Act ". 
SECTION 2.     NEW LAW     A new section of law to be codified 
in the Oklahoma Statutes as Section 2254.3A of Title 74, unless 
there is created a duplication in numbering, reads as follows:   
ENGR. H. B. NO. 3972 	Page 2  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
  
Beginning December 31, 2024, and no later than December 31 each 
year thereafter, the Oklahoma Tourism and Recreation Department 
shall submit in written or electronic format to the Go vernor, the 
Speaker of the Oklahoma House of Representatives, the President Pro 
Tempore of the Oklahoma State Senate, the Appropriations and Budget 
Chair of the Oklahoma House of Representatives, and the 
Appropriations Chair of the Oklahoma State Senate an annual report 
on the maintenance, infrastructure, and construction needs of the 
State Parks System overseen by the Oklah oma Tourism and Recreation 
Department.  The annual report shall be known and may be cited as 
the "Eight-Year State Parks Emergency Main tenance Plan", and shall 
include: 
1.  Maintenance, infrastructure, and construction projects 
listed in order of priority and critical need; 
2.  Cost estimates for each specific project listed in paragraph 
1 of this subsection; 
3.  Completion timeline for e ach specific project listed in 
paragraph 1 of this subsection; and 
4.  A summary of the status of projects previously funded and 
currently being funded pursuant to the provisions of the State Park 
Emergency Maintenance Act. 
SECTION 3.     NEW LAW     A new section of law to be codified 
in the Oklahoma Statutes as Section 2254.3B of Title 74, unl ess 
there is created a dupli cation in numbering, reads as follows:   
ENGR. H. B. NO. 3972 	Page 3  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
  
There is hereby created in the State Treasury a revolving fund 
for the Oklahoma Tourism and Recreation Department to be designated 
the "State Parks Emergency Maintenance Fund".  The fund sh all be a 
continuing fund, not subject to fiscal year limitations, and shall 
consist of all monies received by the Oklahoma Tourism and 
Recreation Department eligible under law and directed for deposit to 
such fund.  All monies accruing to the credit of sai d fund are 
hereby appropriated and may be budgeted and expended by the Oklahoma 
Tourism and Recreation Department in amounts as authorized by the 
Oklahoma Legislature, for the purpose of implementing the 
Department's Eight-Year State Park Emergency Mainten ance Plan, as 
described in Section 2 of this act; provided, that in no event shall 
an amount greater than twenty percent (20%) of the annual amount 
accruing to the fund shall be used for funding operational expenses 
of the Department in any given state fis cal year.  Expenditures from 
said fund shall be made upon warrants issued by the State Treasurer 
against claims filed as prescribed by law with the D irector of the 
Office of Management and Enterprise Services for approval and 
payment. 
SECTION 4.  This act shall become effective July 1, 2024. 
SECTION 5.  It being immediately necessary for the preservation 
of the public peace, health or safety, an emergency is hereby 
declared to exist, by reason whereof this act shall take effe ct and 
be in full force from and after its passage and approval.   
ENGR. H. B. NO. 3972 	Page 4  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
  
Passed the House of Representatives the 4th day of March, 2024. 
 
 
 
  
 	Presiding Officer of the House 
 	of Representatives 
 
 
 
Passed the Senate the ___ day of __________, 2024. 
 
 
 
  
 	Presiding Officer of the Senate 
 
 
 
  OTRD Capital Needs 8 Year Plan Year 1 
  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
   
 
Park Location 
 
 
Project Name 
 
 
Project Description 
 
 
Project Category 
 
 
Priority Category 
 
Project 
Planning Year 
 
Project Cost 
Estimate 
Priority 
Ranking 1- 
81 
 
 
Greenleaf 
 
 
Water Treatment Plant - Greenleaf 
 
Total replacement of water treatment facilities 
servicing the entire Greenleaf park 
 
 
Waste Water 
 
 
Health & Safety 
 
 
1 
 
 
5,250,000 
 
 
1 
 
 
 
Lake Murray - Lodge 
 
 
 
Cabin Repair/Renovation - Lake Murray 
 
Repair/renovation of 55 cabins, exterior and 
interior, at Lake Murray. Some structures will 
be assessed for complete replacement 
 
 
 
Cabins 
 
 
 
Health & Safety 
 
 
 
1 
 
 
 
12,000,000 
 
 
 
2 
 
 
Lake Texoma 
 
Water and Sewer Line Replacement - 
Lake Texoma 
Replace and relocate old failing fresh water 
and sewer lines back within state park 
boundaries 
 
 
Fresh Water 
 
 
Health & Safety 
 
 
1 
 
 
5,500,000 
 
 
3 
 
Sequoyah - Lodge 
 
Sewer Lines - Sequoyah Cabins 
Repair/replace failing sewer lines servicing the 
Sequoyah Cabins 
 
Waste Water 
 
Health & Safety 
 
1 
 
500,000 
 
4 
 
Alabaster Caverns 
 
Cave Repair - Alabaster Caverns 
Repair collapsed portion of the cave, cave 
entrance and stairs 
 
Cave 
 
Health & Safety 
 
1 
 
5,500,000 
 
5 
 
Lake Murray - Lodge 
 
Cabin Roofs - Lake Murray 
Replace hail damaged roofs, insurance claim in 
progress 
 
Cabins 
 
Health & Safety 
 
1 
 
283,571 
 
6 
 
Lake Murray - Lodge 
Room Access - Lake Murray Lodge and 
Cabins 
Replace existing room/cabin access system for 
the lodge and cabins 
 
Lodge Operations 
 
Health & Safety 
 
1 
 
250,000 
 
7 
 
Lake Murray - Lodge 
 
Lodge Roof - Lake Murray 
Replace hail damaged roofs, insurance claim in 
progress 
 
Lodge Operations 
 
Health & Safety 
 
1 
 
592,975 
 
8 
 
 
Beavers Bend 
 
Roof and Repair - Forest Heritage 
Center 
Replace failing roof and repair/renovate 
exterior and interior of the Forest Heritage 
Center. 
 
 
Park Operations 
 
 
Health & Safety 
 
 
1 
 
 
5,000,000 
 
 
9 
 
System Wide 
 
Tree Removal - System Wide 
Address need for statewide tree and brush 
removal at all state parks. 
 
Forestry 
 
Health & Safety 
 
1 
 
2,000,000 
 
10 
 
McGee Creek 
 
Well House and Pump - McGee Creek 
Repair/replace existing well house and pump 
at McGee Creek 
 
Fresh Water 
 
Health & Safety 
 
1 
 
50,000 
 
11 
 
Sequoyah 
 
Natural Gas Line - Sequoyah SP 
Assess and repair/replace natural gas lines 
throughout the entire park 
 
Gas 
 
Health & Safety 
 
1 
 
500,000 
 
12 
 
 
Lake Murray - Lodge 
 
 
Fresh Water Line - Lake Murray 
 
Replace existing water line servicing the pool, 
floating villas, water sports, and cabins 
 
 
Fresh Water 
 
 
Health & Safety 
 
 
1 
 
 
500,000 
 
 
13 
 
Robbers Cave 
 
Water Tower - Robbers Cave 
Demo existing structure and replace with new 
tower and supporting equipment 
 
Fresh Water 
 
Health & Safety 
 
1 
 
75,000 
 
14 
 
Sequoyah 
 
Fresh Water Line - Paradise Cove 
Install new water line to service existing 
pavilions and restrooms in Paradise Cove 
 
Fresh Water 
 
Health & Safety 
 
1 
 
150,000 
 
15 
 
 
Osage Hills 
 
 
Fresh Water Line - RV Campground 
Install new water line to service the existing 
restroom in the RV Campground, this will allow 
for year round facilities 
 
 
Fresh Water 
 
 
Health & Safety 
 
 
1 
 
 
150,000 
 
 
16 
 
Natural Falls 
 
Fresh Water Lines - Natural Falls 
Assess and install water shutoff values as 
needed throughout the park 
 
Fresh Water 
 
Health & Safety 
 
1 
 
200,000 
 
17 
 
 
Greenleaf 
 
 
Fresh Water Lines - Greenleaf 
Assess and repair/replace water lines 
throughout the Greenleaf Park, address 
failures and low pressure 
 
 
Fresh Water 
 
 
Health & Safety 
 
 
1 
 
 
1,500,000 
 
 
18 
 
Eufaula 
 
Fresh Water Line - Office to Dogwood 
Replace existing water line from the park office 
to the Dogwood Campground 
 
Fresh Water 
 
Health & Safety 
 
1 
 
1,500,000 
 
19 
 
 
Black Mesa 
 
 
Fresh Water Lines - Black Mesa 
Assess and repair/replace water lines 
throughout the Black Mesa Park, install 
additional shutoff as needed 
 
 
Fresh Water 
 
 
Health & Safety 
 
 
1 
 
 
1,500,000 
 
 
20 
 
 
Cherokee Landing 
 
Water and Sewer Line Replacement - 
Cherokee Landing 
 
Assess and repair/replace water and sewer 
lines throughout Cherokee Landing Area 
 
 
Fresh Water 
 
 
Health & Safety 
 
 
1 
 
 
2,000,000 
 
 
21 
 
 
Little Sahara 
 
 
Fresh Water - North Campgrounds 
 
Connect both Cowboy and Buttercup 
Campgrounds to Waynoka city water supply 
 
 
Fresh Water 
 
 
Health & Safety 
 
 
1 
 
 
250,000 
 
 
22 
 
 
Beavers Bend 
 
 
Sewer Lagoon - Carson Creek 
Repair existing lagoon serving multiple areas: 
Turkey RV, Quail RV, Carson Creek 
campgrounds 
 
 
Waste Water 
 
 
Health & Safety 
 
 
1 
 
 
250,000 
 
 
23 
 
 
Beavers Bend 
 
 
Sewer Lagoon - River Bend 
 
Repair existing lagoon serving multiple areas: 
Fern RV, Fern Restrooms, and Group Camp 2 
 
 
Waste Water 
 
 
Health & Safety 
 
 
1 
 
 
250,000 
 
 
24 
 
Fort Cobb 
 
Sewer Lagoons - Fort Cobb 
Remove trees and brush, install new fencing at 
3 Fort Cobb lagoons 
 
Waste Water 
 
Health & Safety 
 
1 
 
225,000 
 
25 
 
Greenleaf 
 
RV Dump Stations - Greenleaf 
Repair/replace equipment at two dump station 
locations 
 
Waste Water 
 
Health & Safety 
 
1 
 
300,000 
 
26 
 
Greenleaf 
 
Sewer Line - Cabin Area 
Replace sewer lines in the cabin area at 
Greenleaf 
 
Waste Water 
 
Health & Safety 
 
1 
 
1,000,000 
 
27 
 
Keystone 
 
Lift Station - Green Country 
 
Replace lift station and needed sewer lines 
 
Waste Water 
 
Health & Safety 
 
1 
 
50,000 
 
28 
 
Keystone 
 
Lift Station - Lake Country 
 
Replace lift station and needed sewer lines 
 
Waste Water 
 
Health & Safety 
 
1 
 
50,000 
 
29 
 
Lake Murray - Park 
Sewer Lagoons - Buzzards Roost and 
Marietta Landing 
Assess and Repair existing lagoons, both have 
water retention issues 
 
Waste Water 
 
Health & Safety 
 
1 
 
100,000 
 
30 
 
Lake Thunderbird 
 
Lift Station - Clear Bay Point 
Repair/replace Lift Station equipment servicing 
Clear Bay Point 
 
Waste Water 
 
Health & Safety 
 
1 
 
15,000 
 
31 
 
Lake Thunderbird 
 
Lift Station - Little Axe Campground 
Repair/replace Lift Station equipment servicing 
Little Axe Campground 
 
Waste Water 
 
Health & Safety 
 
1 
 
15,000 
 
32 
 
Lake Thunderbird 
 
Lift Station - Post Oak Campground 
Repair/replace Lift Station equipment servicing 
Post Oak Campground 
 
Waste Water 
 
Health & Safety 
 
1 
 
15,000 
 
33 
 
Lake Thunderbird 
 
Lift Station - Rose Rock Campground 
Repair/replace Lift Station equipment servicing 
Rose Rock Campground 
 
Waste Water 
 
Health & Safety 
 
1 
 
15,000 
 
34 
 
Lake Thunderbird 
 
RV Dump Station - Clear Bay 
Repair/replace Dump Station equipment 
servicing Clear Bay 
 
Waste Water 
 
Health & Safety 
 
1 
 
75,000 
 
35 
   OTRD Capital Needs 8 Year Plan Year 1 
  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
   
 
Park Location 
 
 
Project Name 
 
 
Project Description 
 
 
Project Category 
 
 
Priority Category 
 
Project 
Planning Year 
 
Project Cost 
Estimate 
Priority 
Ranking 1- 
81 
 
McGee Creek 
 
Lift Station - Potapo Campground 
Repair/replace Lift Station equipment servicing 
Potapo Campground 
 
Waste Water 
 
Health & Safety 
 
1 
 
50,000 
 
36 
 
Osage Hills 
 
Sewer Line - Cabins 4 and 7 
Repair/replace sewer lines servicing cabins 4 
and 7 at Osage Hills 
 
Waste Water 
 
Health & Safety 
 
1 
 
25,000 
 
37 
 
Roman Nose 
 
Sewer Lagoon - Roman Nose 
Renovate existing lagoon with new bank 
support and fencing 
 
Waste Water 
 
Health & Safety 
 
1 
 
100,000 
 
38 
 
Roman Nose - Lodge 
 
Lift Station - Pioneer Cabin 
Repair/replace List Station equipment 
servicing Pioneer Cabin 
 
Waste Water 
 
Health & Safety 
 
1 
 
5,000 
 
39 
 
Roman Nose - Lodge 
 
Sewer Lines - Cabin Area 
Repair/replace sewer lines servicing Roman 
Nose Cabins 
 
Waste Water 
 
Health & Safety 
 
1 
 
250,000 
 
40 
 
Roman Nose - Lodge 
 
Sewer Lines - Roman Nose Lodge 
Repair/replace sewer lines servicing Roman 
Nose Lodge 
 
Waste Water 
 
Health & Safety 
 
1 
 
250,000 
 
41 
 
Tenkiller 
 
Sewer Lagoons - Tenkiller 
Assess and repair existing lagoons, currently 
working with DEQ 
 
Waste Water 
 
Health & Safety 
 
1 
 
400,000 
 
42 
 
Greenleaf 
 
Tree Removal - Greenleaf 
Remove dead trees across the park that are 
potential fire and safety hazards 
 
Forestry 
 
Health & Safety 
 
1 
 
150,000 
 
43 
 
Robbers Cave 
 
Tree Removal - Robbers Cave 
Remove dead trees across the park that are 
potential fire and safety hazards 
 
Forestry 
 
Health & Safety 
 
1 
 
100,000 
 
44 
 
Alabaster Caverns 
 
Vault Toilets - Canyon Campground 
Demo existing structure, install new vault 
toilets in Canyon Campground 
 
Restroom 
 
Health & Safety 
 
1 
 
125,000 
 
45 
 
 
Beavers Bend 
 
Vault Toilets - Yurt Area, Cold Hole 
Area, and Reasoner Area 
Install new vault toilets to high use areas, Yurt, 
Cold Hole, and Reasoner Areas, currently no 
facilities available 
 
 
Restroom 
 
 
Health & Safety 
 
 
1 
 
 
150,000 
 
 
46 
 
Bernice 
 
Restroom - Bernice 
Replace restroom at park entrance with new 
full service facilities 
 
Restroom 
 
Health & Safety 
 
1 
 
200,000 
 
47 
 
 
Black Mesa 
 
 
Vault Toilets - East Side 
 
Install new vault toilets: Tent area on the east 
side of the lake, currently no facilities available 
 
 
Restroom 
 
 
Health & Safety 
 
 
1 
 
 
100,000 
 
 
48 
 
 
Foss 
 
 
Vault Toilets - Foss Lake 
Install new vault toilets at two day use 
locations heavily used on weekends and 
holidays. 
 
 
Restroom 
 
 
Health & Safety 
 
 
1 
 
 
150,000 
 
 
49 
 
Cherokee Landing 
 
Restroom - Cherokee Landing 
Replace restroom in Cherokee Landing with 
new full service facilities 
 
Restroom 
 
Health & Safety 
 
1 
 
400,000 
 
50 
 
 
Tenkiller 
 
 
Restrooms - Tenkiller 
Replace 8 existing restrooms with new full 
service facilities at various campgrounds across 
Tenkiller State Park 
 
 
Restroom 
 
 
Health & Safety 
 
 
1 
 
 
1,600,000 
 
 
51 
 
 
Tenkiller 
 
 
Restroom - Day Use Areas 
Add portable restrooms to day use areas. 
Restrooms need to be moved when the areas 
are flooded 
 
 
Restroom 
 
 
Health & Safety 
 
 
1 
 
 
450,000 
 
 
52 
 
Cherokee Grand Lake 
 
Restroom - Grandview 
Repair/renovate restroom at Grandview 
Campground 
 
Restroom 
 
Health & Safety 
 
1 
 
75,000 
 
53 
 
Grand Cherokee 
 
Vault Toilets - Little Blue Area 
 
Install new vault toilets in the Little Blue Area 
 
Restroom 
 
Health & Safety 
 
1 
 
150,000 
 
54 
 
Twin Bridges 
 
Restroom - Twin Bridges 
Replace restroom at Twin Bridges with new full 
service facilities 
 
Restroom 
 
Health & Safety 
 
1 
 
200,000 
 
55 
 
Greenleaf 
 
Restroom - Gobbler Ridge 
Repair/renovate existing restroom in Gobbler 
Ridge Campground 
 
Restroom 
 
Health & Safety 
 
1 
 
100,000 
 
56 
 
 
Lake Texoma 
 
Vault Toilets - Bayview Boat Ramp and 
Ben's Campground 
Demo existing structures and install new vault 
toilets at the Bayview Boat Ramp and in Ben's 
Campground 
 
 
Restroom 
 
 
Health & Safety 
 
 
1 
 
 
150,000 
 
 
57 
 
Lake Texoma 
 
Restrooms - Location 2 and 9 
Demo and replace restrooms 2 and 9 with new 
full service facilities 
 
Restroom 
 
Health & Safety 
 
1 
 
450,000 
 
58 
 
Lake Thunderbird 
 
Vault Toilet - Denver Corner 
Demo existing structure and install new vault 
toilets at Denver Corner 
 
Restroom 
 
Health & Safety 
 
1 
 
60,000 
 
59 
 
Lake Thunderbird 
 
Vault Toilet - East Sentinel 
Demo existing structure and install new vault 
toilets at East Sentinel 
 
Restroom 
 
Health & Safety 
 
1 
 
60,000 
 
60 
 
Lake Thunderbird 
 
Vault Toilet - Fisherman's Point 
Demo existing structure and install new vault 
toilets at Fisherman's Point 
 
Restroom 
 
Health & Safety 
 
1 
 
60,000 
 
61 
 
Lake Thunderbird 
 
Vault Toilet - West Sentinel 
Demo existing structure and install new vault 
toilet at West Sentinel 
 
Restroom 
 
Health & Safety 
 
1 
 
60,000 
 
62 
 
Sequoyah Bay 
 
Restrooms - Sequoyah Bay 
Replace 4 restrooms at Sequoyah Bay with 
new full service facilities 
 
Restroom 
 
Health & Safety 
 
1 
 
800,000 
 
63 
 
Talimena 
 
Restroom - Talimena 
Replace restroom at Talimena with new full 
service facilities 
 
Restroom 
 
Health & Safety 
 
1 
 
400,000 
 
64 
 
Natural Falls 
 
Restroom - Natural Falls 
Renovate the existing main restroom, assess 
exterior and interior needs 
 
Restroom 
 
Health & Safety 
 
1 
 
150,000 
 
65 
 
 
Quartz Mountain - Park 
 
 
Restrooms - Dam and River Road Areas 
Repair/renovation of two CCC restrooms, need 
further assessment to determine feasibility of 
modifying both structures 
 
 
Restroom 
 
 
Health & Safety 
 
 
1 
 
 
500,000 
 
 
66 
 
 
Salt Plains 
 
 
Restroom - River Road Area 
 
Install booster pump to stabilize the restroom 
water pressure in the River Road area 
 
 
Restroom 
 
 
Health & Safety 
 
 
1 
 
 
1,500 
 
 
67 
 
Fort Cobb 
 
Replace Skylights - Park CXTs 
Replace skylights as needed in various CXT 
restrooms throughout the park 
 
Restroom 
 
Health & Safety 
 
1 
 
500,000 
 
68 
 
Fort Cobb 
 
Replace Windows - Park CXTs 
Replace windows as needed in various CXT 
restrooms throughout the park 
 
Restroom 
 
Health & Safety 
 
1 
 
500,000 
 
69 
 
 
Sequoyah - Lodge 
 
 
Laundry Facility - Sequoyah Lodge 
 
Add new laundry facility for Sequoyah Lodge, 
more storage and equipment are needed 
 
 
Laundry 
 
 
Health & Safety 
 
 
1 
 
 
1,000,000 
 
 
70 
 
 
Robbers Cave - Lodge 
 
 
Laundry Facility - Robbers Cave 
 
Add new laundry facility for Robbers Cave, 
more storage and equipment are needed 
 
 
Laundry 
 
 
Health & Safety 
 
 
1 
 
 
500,000 
 
 
71 
   OTRD Capital Needs 8 Year Plan Year 1 
  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
   
 
Park Location 
 
 
Project Name 
 
 
Project Description 
 
 
Project Category 
 
 
Priority Category 
 
Project 
Planning Year 
 
Project Cost 
Estimate 
Priority 
Ranking 1- 
81 
 
 
Tenkiller 
 
 
Laundry Facility - Tenkiller 
 
Assess and address the laundry facility at 
Tenkiller, need additional space and equipment 
 
 
Laundry 
 
 
Health & Safety 
 
 
1 
 
 
250,000 
 
 
72 
 
 
Boiling Springs 
 
 
Laundry Facility - Boiling Springs 
 
Add new laundry facility for Boiling Springs, 
more storage and equipment are needed 
 
 
Laundry 
 
 
Health & Safety 
 
 
1 
 
 
500,000 
 
 
73 
 
 
Salt Plains 
 
 
Laundry Facility - Salt Plains 
 
Assess and address the laundry facility at Salt 
Plains, need additional space and equipment 
 
 
Laundry 
 
 
Health & Safety 
 
 
1 
 
 
75,000 
 
 
74 
Quartz Mountain - 
Lodge 
Laundry Facility - Quartz Mountain 
Lodge 
Repair/renovate laundry facility supporting 
Quartz Mountain Lodge 
 
Laundry 
 
Health & Safety 
 
1 
 
100,000 
 
75 
 
 
Beavers Bend 
 
Cabin Repair/Renovation - Parkview 
Area 
 
Full exterior and interior repair/renovation of 
cabins 24-28 in the Parkview Area 
 
 
Cabins 
 
 
Health & Safety 
 
 
1 
 
 
800,000 
 
 
76 
 
 
Beavers Bend 
 
Cabin Repair/Renovation - Duplex 
Cabins 
 
Full exterior and interior repair/renovation of 
the 6 duplex cabins, total of 12 units 
 
 
Cabins 
 
 
Health & Safety 
 
 
1 
 
 
1,500,000 
 
 
77 
 
Sequoyah - Lodge 
 
Deck Replacement - Lakeview Cabins 
 
Repair/replace decks at the Lakeview Cabins 
 
Cabins 
 
Health & Safety 
 
1 
 
125,000 
 
78 
Spavinaw Restroom - Spavinaw 	Add new restroom to the Spavinaw Area Restroom Health & Safety 1 	350,000 79 
 
Quartz Mountain - 
Lodge 
 
 
Renovation - Quartz Mountain PAC 
 
Full assessment for renovation and/or 
repurposing of the PAC at Quartz Mountain 
 
 
PAC 
 
 
Health & Safety 
 
 
1 
 
 
5,000,000 
 
 
80 
System Wide Contingency Allowance - Year 1 Contingency Allowance - Year 1 Contingency Contingency 1 8,466,954 81 
  	Project Estimated Cost 
   	75,000,000 
 
  	Project Estimated Cost - Year 1    	75,000,000 
   OTRD Capital Needs 8 Year Plan Year 2 
  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
   
 
Park Location 
 
 
Project Name 
 
 
Project Description 
 
 
Project Category 
 
 
Priority Category 
 
Project 
Planning Year 
 
Project Cost 
Estimate 
Priority 
Ranking 1- 
42 
 
 
Sequoyah - Lodge 
 
Cabin Repair/Renovation - Sequoyah 
Cabins 
 
Full exterior and interior repair/renovation of 
45 cabins at Sequoyah 
 
 
Cabins 
 
 
Health & Safety 
 
 
2 
 
 
6,750,000 
 
 
1 
 
 
Greenleaf 
 
 
Cabin Repair/Renovation - Greenleaf 
 
Full exterior and interior repair/renovation of 
14 CC cabins at Greenleaf. 
 
 
Cabins 
 
 
Health & Safety 
 
 
2 
 
 
2,800,000 
 
 
2 
 
 
Greenleaf 
 
 
Erosion Control - Greenleaf Cabins 
 
Design and implement effective erosion 
control measures around the Greenleaf Cabins 
 
 
Cabins 
 
 
Health & Safety 
 
 
2 
 
 
500,000 
 
 
3 
 
McGee Creek 
Cabin Repair/Renovation - McGee 
Creek 
Repair/renovation of the Lake Huts at McGee 
Creek 
 
Cabins 
 
Health & Safety 
 
2 
 
2,000,000 
 
4 
 
Roman Nose - Lodge 
 
Cabin FFE - Roman Nose Cabins 
Replace bedframes and mattresses in all 
Roman Nose Cabins 
 
Cabins 
 
Health & Safety 
 
2 
 
25,000 
 
5 
 
Roman Nose - Lodge 
 
Cabin Windows - Roman Nose Cabins 
 
Install new windows at all Roman Nose Cabins 
 
Cabins 
 
Health & Safety 
 
2 
 
75,000 
 
6 
 
Roman Nose - Lodge 
 
Landscaping - Pioneer Cabin 
Update deck and landscaping around the 
Pioneer Cabin 
 
Cabins 
 
Health & Safety 
 
2 
 
50,000 
 
7 
 
Roman Nose - Lodge 
 
Entrance Doors - Roman Nose Lodge 
Repair/replace entrance doors at Roman Nose 
Lodge 
 
Lodge Operations 
 
Health & Safety 
 
2 
 
10,000 
 
8 
 
 
Sequoyah - Lodge 
 
 
Building Repairs - Sequoyah Lodge 
 
Repair/replace all entrances to Sequoyah Hall 
to prevent water from entering the building 
 
 
Lodge Operations 
 
 
Health & Safety 
 
 
2 
 
 
20,000 
 
 
9 
 
 
Sequoyah - Lodge 
 
 
Building Repairs - Sequoyah Lodge 
Repair/replace exterior items as needed for 
Sequoyah Lodge, also address landscaping 
issues 
 
 
Lodge Operations 
 
 
Health & Safety 
 
 
2 
 
 
2,150,000 
 
 
10 
 
Roman Nose - Lodge 
 
Building Repairs - Roman Nose Lodge 
Assess and repair water leaks to office and 
room 110 
 
Lodge Operations 
 
Health & Safety 
 
2 
 
25,000 
 
11 
 
Roman Nose - Lodge 
 
Room Repairs - Roman Nose Lodge 
Assess and replace shower pans and 
foundation issues in guest rooms 
 
Lodge Operations 
 
Health & Safety 
 
2 
 
55,000 
 
12 
Quartz Mountain - 
Lodge 
 
Building Repairs - Banquet Room 
Replace carpet in the foyer area of the banquet 
room 
 
Lodge Operations 
 
Health & Safety 
 
2 
 
75,000 
 
13 
Quartz Mountain - 
Lodge 
Replace Entrance Doors - Quartz 
Mountain Lodge 
Replace all entrance doors at the lodge and 
cabins 
 
Lodge Operations 
 
Health & Safety 
 
2 
 
150,000 
 
14 
Quartz Mountain - 
Lodge 
Building Repairs - Quartz Mountain 
Lodge 
Repair/replace exterior wood columns that are 
damaged 
 
Lodge Operations 
 
Health & Safety 
 
2 
 
150,000 
 
15 
Quartz Mountain - 
Lodge 
 
Pavilion Repairs - Quartz Mountain 
Repair/replace water lines at the Quartz 
Mountain Pavilions 
 
Lodge Operations 
 
Health & Safety 
 
2 
 
150,000 
 
16 
Quartz Mountain - 
Lodge 
Bunkhouse Repair/Renovation - Quartz 
Mountain 
Full exterior and interior repair/renovation of 
the Bunkhouse 
 
Lodge Operations 
 
Health & Safety 
 
2 
 
400,000 
 
17 
Quartz Mountain - 
Lodge 
Room Updates - Quartz Mountain 
Lodge 
Restroom repair for lodge rooms and cabin 10 
and 11 
 
Lodge Operations 
 
Health & Safety 
 
2 
 
500,000 
 
18 
 
Quartz Mountain - 
Lodge 
 
Amphitheater Repair/Renovation - 
Quartz Mountain 
 
Repair/renovation of the failing lodge 
amphitheater. Includes seating and stag areas 
 
 
Lodge Operations 
 
 
Health & Safety 
 
 
2 
 
 
400,000 
 
 
19 
 
 
 
Tenkiller 
 
 
 
RV Campground - Tenkiller 
Repair/renovation of all Blue Jay Knob, Shady 
Grove, Fox Squirrel, and Flying Squirrel RV 
sites. Will include: sitework, water, sewer, and 
electric. 
 
 
 
RV CG 
 
 
 
Health & Safety 
 
 
 
2 
 
 
 
7,000,000 
 
 
 
20 
 
 
 
 
Tenkiller 
 
 
 
 
Tent Campground - Tenkiller 
Repair/renovate Eagles Point, Bluff View, 
Upper Fisherman's Point, Hickory Flats, Lower 
Fisherman's Point tent sites with new fixtures 
and provide electric and water repairs as 
needed 
 
 
 
 
Tent CG 
 
 
 
 
Health & Safety 
 
 
 
 
2 
 
 
 
 
670,000 
 
 
 
 
21 
 
 
Lake Thunderbird 
 
 
RV Campground - Post Oak 
 
Repair/renovation of all Post Oak RV sites. Will 
include: sitework, water, sewer, and electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
2 
 
 
1,050,000 
 
 
22 
 
 
Lake Thunderbird 
 
 
RV Campground - Hog Creek Area 
Repair/renovation of all Hog Creek RV sites. 
Will include: sitework, water, sewer, and 
electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
2 
 
 
1,000,000 
 
 
23 
 
 
Lake Thunderbird 
 
RV Campground - Rose Rock 
Campground 
Repair/renovation of all Rose Rock RV sites. 
Will include: sitework, water, sewer, and 
electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
2 
 
 
950,000 
 
 
24 
 
 
Lake Thunderbird 
 
RV Campground - Little Sandy 
Campground 
Repair/renovation of all Little Sandy RV sites. 
Will include: sitework, water, sewer, and 
electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
2 
 
 
600,000 
 
 
25 
 
Lake Thunderbird 
 
RV Campground - Hickory Hill 
Replace retaining wall above sites 13-22 in the 
Hickory Hill Campground 
 
RV CG 
 
Health & Safety 
 
2 
 
50,000 
 
26 
 
 
Arrowhead 
 
 
RV Campground - Hitchin Post 
Repair/renovation of all Hitchin Post RV sites. 
Will include: sitework, water, sewer, and 
electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
2 
 
 
1,500,000 
 
 
27 
 
 
Keystone 
 
 
RV Campground - Lake Country 
 
Replace electric service and pedestals for all 
sites in the Lake Country RV Campground 
 
 
RV CG 
 
 
Health & Safety 
 
 
2 
 
 
500,000 
 
 
28 
Twin Bridges Boat Ramp - Anglers Paradise Repair/replace two existing boat ramps Boat Ramp Ramps 	2 100,000 29 
 
Honey Creek 
 
Boat Ramp - Honey Creek 
Repair/replace boat ramp and assess for better 
public access 
 
Boat Ramp 
 
Ramps 
 
2 
 
150,000 
 
30 
Tenkiller Boat Ramp - Fisherman's Point Repair/replace existing boat ramp Boat Ramp Ramps 	2 	50,000 31 
 
Sequoyah 
 
Boat Ramps - Sequoyah 
Repair/replace eight existing boat ramps 
throughout the park 
 
Boat Ramp 
 
Ramps 
 
2 
 
400,000 
 
32 
 
Greenleaf 
 
Boat Ramp - Cypress Row 
Replace existing boat ramp in the Cypress Row 
area 
 
Boat Ramp 
 
Ramps 
 
2 
 
50,000 
 
33 
Lake Thunderbird Boat Ramp - Sailboat Area Repair/replace existing boat ramp Boat Ramp Ramps 	2 	50,000 34 
Lake Thunderbird Boat Ramp - Post Oak 	Repair/replace existing boat ramp Boat Ramp Ramps 	2 	50,000 35 
Lake Thunderbird Boat Ramp - North Sentinel Repair/replace existing boat ramp Boat Ramp Ramps 	2 	50,000 36 
   OTRD Capital Needs 8 Year Plan Year 2 
  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
   
 
Park Location 
 
 
Project Name 
 
 
Project Description 
 
 
Project Category 
 
 
Priority Category 
 
Project 
Planning Year 
 
Project Cost 
Estimate 
Priority 
Ranking 1- 
42 
Lake Thunderbird Boat Ramp - Fisherman's Point Repair/replace the west side boat ramp Boat Ramp Ramps 	2 	50,000 37 
 
 
 
Lake Texoma 
 
 
 
Boat Ramps - Lake Texoma 
 
Repair/replace boat ramps in the following 
areas: Bay View, Catfish Bay, 300 Area, Joe's 
Campground, Ben's Campground 
 
 
 
Boat Ramp 
 
 
 
Ramps 
 
 
 
2 
 
 
 
250,000 
 
 
 
38 
 
Lake Murray - Park 
 
Boat Ramp - North Boat Ramp Area 
 
Repair/replace existing boat ramp 
 
Boat Ramp 
 
Ramps 
 
2 
 
50,000 
 
39 
 
Fort Cobb 
 
Boat Ramp - Lemons Landing 
Assess relocation of boat ramp to protect from 
wind exposure 
 
Boat Ramp 
 
Ramps 
 
2 
 
100,000 
 
40 
 
Black Mesa 
 
Boat Ramps - Black Mesa 
 
Repair/replace boat ramps at Lake Carl Etling 
 
Boat Ramp 
 
Ramps 
 
2 
 
100,000 
 
41 
System Wide Contingency Allowance - Year 2 Contingency Allowance - Year 2 Contingency Contingency 2 3,945,000 42 
  	Project Estimated Cost    	35,000,000  
  	Plus: Allocation for Roads/Parking 
   	7,500,000 
 
  	Project Estimated Cost - Year 2    	42,500,000  
   OTRD Capital Needs 8 Year Plan Year 3 
  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
   
 
Park Location 
 
 
Project Name 
 
 
Project Description 
 
 
Project Category 
 
 
Priority Category 
 
Project 
Planning Year 
 
Project Cost 
Estimate 
Priority 
Ranking 1- 
27 
 
Boiling Springs 
 
Cabin Additions - BS Golf Course 
Add 5 new cabins along the Boiling Springs Golf 
Course 
 
Cabins 
 
Upgrade 
 
3 
 
1,250,000 
 
1 
 
Boiling Springs 
Cabin Repair/Renovation - Boiling 
Springs 
Repair/renovation of exterior and interior of 
existing cabins 
 
Cabins 
 
Health & Safety 
 
3 
 
400,000 
 
2 
 
 
Lake Murray - Park 
 
RV Campgrounds - Tipps Point and 
Dukes Forest 
Repair/renovation of Tipps Point and Dukes 
Forest RV Campgrounds: includes site work, 
water, electric, and sewer 
 
 
RV CG 
 
 
Health & Safety 
 
 
3 
 
 
5,000,000 
 
 
3 
 
Lake Wister 
Cabin Repair/Renovation - Lake 
Wister 
Repair/renovation of exterior and interior of 
existing cabins 
 
Cabins 
 
Health & Safety 
 
3 
 
1,400,000 
 
4 
 
Lake Wister 
 
Cabin Foundation - Lake Wister 
Assess and propose repair options for 
foundation and structural damage 
 
Cabins 
 
Health & Safety 
 
3 
 
200,000 
 
5 
 
 
Greenleaf 
 
 
RV Campground - Playside Area 
 
Repair/renovation of all Playside RV sites. Will 
include: sitework, water, sewer, and electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
3 
 
 
1,280,000 
 
 
6 
 
 
Greenleaf 
 
 
Tent Campground - Greenleaf 
Repair/renovate tent sites with new fixtures 
and provide electric and water repairs as 
needed 
 
 
Tent CG 
 
 
Health & Safety 
 
 
3 
 
 
250,000 
 
 
7 
 
Cherokee Grand Lake 
RV Campground - Riverside 
Campground 
Repair electric service in Riverside RV 
Campground 
 
RV CG 
 
Health & Safety 
 
3 
 
75,000 
 
8 
 
Honey Creek 
 
Erosion Control - Squirrel Hollow 
Repair/replace erosion barriers in Squirrel 
Hollow Campground 
 
RV CG 
 
Health & Safety 
 
3 
 
200,000 
 
9 
 
Beavers Bend 
 
RV Campground - Fern Campground 
Replace water and electric service at Fern RV 
Campground 
 
RV CG 
 
Health & Safety 
 
3 
 
165,000 
 
10 
 
Beavers Bend 
 
RV Campground - Quail Campground 
Replace water and electric service to all sites in 
the Quail RV Campground 
 
RV CG 
 
Health & Safety 
 
3 
 
180,000 
 
11 
 
Beavers Bend 
RV Campground - Turkey 
Campground 
Replace water and electric service to all sites in 
the Turkey RV Campground 
 
RV CG 
 
Health & Safety 
 
3 
 
250,000 
 
12 
 
Eufaula 
 
RV Campground - Deep Fork RV 
Replace electric service and pedestals for all 
sites in Deep Fork RV Campground 
 
RV CG 
 
Health & Safety 
 
3 
 
240,000 
 
13 
 
 
Arrowhead 
 
 
RV Campground - Echo Ridge 
Repair/renovation of all Echo Ridge RV sites. 
Will include: sitework, water, sewer, and 
electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
3 
 
 
2,000,000 
 
 
14 
 
 
Greenleaf 
 
 
RV Campground - Cypress Row 
Repair/renovation of all Cypress Row RV sites. 
Will include: sitework, water, sewer, and 
electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
3 
 
 
2,000,000 
 
 
15 
 
 
Greenleaf 
 
RV Campground - Deer Run 
Campground 
Repair/renovation of all Deer Run RV sites. 
Will include: sitework, water, sewer, and 
electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
3 
 
 
2,080,000 
 
 
16 
 
 
Greenleaf 
 
 
RV Campground - Gobbler Ridge Area 
Repair/renovation of all Gobbler Ridge RV 
sites. Will include: sitework, water, sewer, and 
electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
3 
 
 
3,360,000 
 
 
17 
 
 
 
Foss 
 
 
RV Campground - Cottonwood 
Campground 
 
Repair/renovation and possible reconfiguration 
of Cottonwood Campground. Campground has 
ongoing flooding issues 
 
 
 
RV CG 
 
 
 
Health & Safety 
 
 
 
3 
 
 
 
3,200,000 
 
 
 
18 
 
 
Black Mesa 
 
 
RV Campground - Black Mesa 
 
Repair/renovation of Black Mesa RV area to 
include: sitework, water, sewer, and electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
3 
 
 
2,000,000 
 
 
19 
 
 
Quartz Mountain - Park 
 
 
RV Campground - Mountain View 
 
Repair/replace electric and add sewer to 5 sites 
in the Mountain View RV Campground 
 
 
RV CG 
 
 
Health & Safety 
 
 
3 
 
 
250,000 
 
 
20 
 
 
Quartz Mountain - Park 
 
 
RV Campground - River Run 
 
Repair/renovation of River Run RV sites. Will 
include: sitework, water, sewer, and electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
3 
 
 
480,000 
 
 
21 
 
 
Quartz Mountain - Park 
 
 
RV Campground - Upper Live Oak 
Repair/renovation of Upper Live Oak RV sites. 
Will include: sitework, water, sewer, and 
electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
3 
 
 
560,000 
 
 
22 
 
 
Quartz Mountain - Park 
 
 
RV Campground - Red Bud Area 
 
Repair/renovation of Red Bud RV sites. Will 
include: sitework, water, sewer, and electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
3 
 
 
800,000 
 
 
23 
 
 
Boiling Springs 
 
RV Campground - Whitetail 
Campground 
 
Repair/renovation of all Whitetail RV sites. Will 
include: sitework, water, sewer, and electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
3 
 
 
1,600,000 
 
 
24 
 
 
Boiling Springs 
 
RV Campground - Springhill 
Campground 
 
Repair/renovation of all Springhill RV sites. Will 
include: sitework, water, sewer, and electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
3 
 
 
1,800,000 
 
 
25 
 
 
Boiling Springs 
 
Erosion Control - Whitetail Tent 
Campground 
Assess and install retaining wall and sitework 
to better define camp sites and create and 
ADA accessible site. 
 
 
Tent CG 
 
 
Health & Safety 
 
 
3 
 
 
150,000 
 
 
26 
System Wide Contingency Allowance - Year 3 Contingency Allowance - Year 3 Contingency Contingency 3 3,830,000 27 
  	Project Estimated Cost    	35,000,000  
  	Plus: Allocation for Roads/Parking 
   	7,500,000 
 
  	Project Estimated Cost - Year 3    	42,500,000  
   OTRD Capital Needs 8 Year Plan Year 4 
  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
   
 
Park Location 
 
 
Project Name 
 
 
Project Description 
 
 
Project Category 
 
 
Priority Category 
 
Project 
Planning Year 
 
Project Cost 
Estimate 
Priority 
Ranking 1- 
27 
 
Keystone 
 
Cabin Repair/Renovation - Keystone 
Full exterior and interior renovation of 22 
cabins at Keystone 
 
Cabins 
 
Revenue Loss 
 
4 
 
3,500,000 
 
1 
 
Lake Wister 
 
Cabin Renovation - Lake Wister 
Assess to renovate or replace 3 cabins at Lake 
Wister. 
 
Cabins 
 
Revenue Loss 
 
4 
 
600,000 
 
2 
 
Lake Wister 
 
RV Campground - Victor Campground 
Erosion control need to campsite 51 in the 
Victor Campground 
 
RV CG 
 
Health & Safety 
 
4 
 
50,000 
 
3 
 
 
 
Little Sahara 
 
 
 
RV Campground - North Campgrounds 
 
Repair/renovation of Cowboy and Buttercup 
RV Campground sites. Will include: sitework, 
water, sewer, and electric. 
 
 
 
RV CG 
 
 
 
Health & Safety 
 
 
 
4 
 
 
 
2,000,000 
 
 
 
4 
 
 
Little Sahara 
 
 
RV Campground - Oasis Campground 
Repair/renovation of all Oasis RV Campground 
sites. Will include: sitework, water, sewer, and 
electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
4 
 
 
2,400,000 
 
 
5 
 
 
Little Sahara 
 
 
RV Campground - Little Sahara 
Repair/renovation of 2 RV campground areas 
at Little Sahara, need to assess further for site 
needs 
 
 
RV CG 
 
 
Health & Safety 
 
 
4 
 
 
2,500,000 
 
 
6 
 
 
Quartz Mountain - Park 
 
RV Campground - Scissortail 
Campground 
Repair/renovation of all Scissortail RV sites. 
Will include: sitework, water, sewer, and 
electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
4 
 
 
1,600,000 
 
 
7 
 
Quartz Mountain - Park 
RV Campground - Cottonwood 
Campground 
Repair/renovation of 37 Cottonwood RV sites, 
Will include: sitework and electric 
 
RV CG 
 
Health & Safety 
 
4 
 
1,850,000 
 
8 
 
 
Roman Nose 
 
 
RV Campground - Bitter Creek 
Repair/renovation of all Bitter Creek RV sites. 
Will include: sitework, water, sewer, and 
electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
4 
 
 
400,000 
 
 
9 
 
 
 
Roman Nose 
 
 
 
RV Campground - Cedar Cove 
 
Repair/renovation of all Cedar Cove RV sites. 
Will include: sitework, water, sewer, and 
electric. Add electric to tent sites 
 
 
 
RV CG 
 
 
 
Health & Safety 
 
 
 
4 
 
 
 
660,000 
 
 
 
10 
 
 
Roman Nose 
 
 
RV Campground - Canyon Vista 
Repair/renovation of Canyon Vista RV sites. 
Will include: sitework, water, sewer, and 
electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
4 
 
 
1,900,000 
 
 
11 
 
 
 
Fort Cobb 
 
 
RV Campground - Black Jack 
Campground 
Repair/renovation and assessment to 
reconfigure the Black Jack RV campground. 
Will include: sitework, water, sewer, and 
electric. 
 
 
 
RV CG 
 
 
 
Health & Safety 
 
 
 
4 
 
 
 
3,300,000 
 
 
 
12 
 
 
Fort Cobb 
 
RV Campground - Deer Run 
Campground 
Repair/renovation of all Deer Run RV sites. 
Will include: sitework, water, sewer, and 
electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
4 
 
 
5,800,000 
 
 
13 
 
 
 
Foss 
 
 
 
RV Campground 
Full renovation of all Mouse Creek RV sites. 
Will include: sitework, water, sewer, and 
electric. Redesign for better horse 
accommodation 
 
 
 
RV CG 
 
 
 
Revenue Loss 
 
 
 
4 
 
 
 
1,500,000 
 
 
 
14 
 
 
Foss 
 
 
RV Campground - Buffalo Bend 
 
Repair/renovate all Buffalo Bend RV sites. Will 
include: sitework, water, and electric 
 
 
RV CG 
 
 
Revenue Loss 
 
 
4 
 
 
700,000 
 
 
15 
 
 
Foss 
 
 
RV Campground - Cutberth Area 
 
Repair/renovate all Cutberth RV sites. Will 
include: sitework, water, and electric 
 
 
RV CG 
 
 
Revenue Loss 
 
 
4 
 
 
1,000,000 
 
 
16 
 
 
Tenkiller 
 
 
Pavilion Repairs - Tenkiller 
Assess and repair/replace any structural 
damage, electric, and fixtures in Pavilions 1, 2, 
3, 4 
 
 
Pavilions 
 
 
Health & Safety 
 
 
4 
 
 
300,000 
 
 
17 
 
 
Arrowhead 
 
Demo Structures - 2 pavilions and 3 
restrooms 
Demo existing structures to remove potential 
risk of injury to park guest. Various 
campgrounds 
 
 
Pavilions 
 
 
Health & Safety 
 
 
4 
 
 
50,000 
 
 
18 
Lake Texoma Demo Structures - Fun Park Demo abandoned Fun Park, safety hazard Park Operations Health & Safety 4 150,000 19 
 
 
Lake Texoma 
 
Building Renovation/Repair - Park 
Office and Nature Center 
 
Full exterior and interior repair/renovation of 
the Park Office and Nature Center 
 
 
Park Operations 
 
 
Health & Safety 
 
 
4 
 
 
500,000 
 
 
20 
 
Lake Texoma 
 
Pavilion Repairs - Lake Texoma 
Assess and repair/replace roofs, siding, fixtures 
at Pavilion 6, 7, and 8 
 
Pavilions 
 
Health & Safety 
 
4 
 
225,000 
 
21 
 
Lake Thunderbird 
 
Pavilion Roof - Archery Range 
 
Replace pavilion roof at the Archery Range 
 
Pavilions 
 
Health & Safety 
 
4 
 
20,000 
 
22 
Lake Thunderbird Pavilion Roof - Crow's Corral Replace pavilion roof at Crow's Corral Pavilions Health & Safety 4 	20,000 23 
 
Quartz Mountain - Park 
 
Roof Replacement - Park Pavilions 
Replace roofs on 5 pavilions at Quartz 
Mountain 
 
Pavilions 
 
Health & Safety 
 
4 
 
150,000 
 
24 
 
Great Plains State Park 
 
Pavilion Repairs - Great Plains 
Assess and repair/replace 7 mini shelters in the 
Great Plains Park 
 
Pavilions 
 
Health & Safety 
 
4 
 
30,000 
 
25 
 
Roman Nose 
Roof Replacement - Three Springs 
Pavilion 
 
Replace roof on the Three Springs Pavilion 
 
Pavilions 
 
Health & Safety 
 
4 
 
75,000 
 
26 
System Wide Contingency Allowance - Year 4 Contingency Allowance - Year 4 Contingency Contingency 4 3,720,000 27 
  	Project Estimated Cost    	35,000,000  
  	Plus: Allocation for Roads/Parking 
   	7,500,000 
 
  	Project Estimated Cost - Year 4    	42,500,000  
   OTRD Capital Needs 8 Year Plan Year 5 
  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
   
 
Park Location 
 
 
Project Name 
 
 
Project Description 
 
 
Project Category 
 
 
Priority Category 
 
Project 
Planning Year 
 
Project Cost 
Estimate 
Priority 
Ranking 1- 
90. 
 
 
Tenkiller 
 
 
Cabin Repair/Renovation - Tenkiller 
 
Full exterior and interior repair/renovation of 
38 cabins at Tenkiller 
 
 
Cabins 
 
 
Revenue Loss 
 
 
5 
 
 
5,700,000 
 
 
1 
 
Tenkiller 
Cabin Repair/Renovation - Courtyard 
Cottages 
Repair/renovate exterior and interior of the 
Courtyard Cottages 
 
Cabins 
 
Revenue Loss 
 
5 
 
1,000,000 
 
2 
 
Salt Plains 
 
RV Campground - Sandy Beach 
Renovate 27 Sandy Beach RV sites. Sitework 
only. 
 
RV CG 
 
Health & Safety 
 
5 
 
675,000 
 
3 
 
 
Salt Plains 
 
RV Campground - River Road and 
Sandy Beach 
 
Update electric and add sewer to RV sites in 
River Road and Sandy Beach RV Campgrounds 
 
 
RV CG 
 
 
Health & Safety 
 
 
5 
 
 
1,470,000 
 
 
4 
 
Salt Plains 
 
Playground - Sandy Beach 
 
Add new playground to the Sandy Beach Area 
 
Playground 
 
Upgrade 
 
5 
 
150,000 
 
5 
 
 
Fort Cobb 
 
 
RV Campground - Sunset Cove 
Repair/renovation of Sunset Cove RV sites. 
Will include: sitework, water, sewer, and 
electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
5 
 
 
3,200,000 
 
 
6 
 
 
Cherokee Landing 
 
RV Campground - Seminole, Creek, 
Chickasaw Ares 
Repair/renovation of Seminole, Creek, 
Chickasaw RV sites. Will include: sitework, 
water, sewer, and electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
5 
 
 
2,500,000 
 
 
7 
 
 
Black Mesa 
 
 
Pavilions - Black Mesa 
 
Repair/replace the small shade structures 
throughout the park in day use areas 
 
 
Pavilions 
 
 
Health & Safety 
 
 
5 
 
 
500,000 
 
 
8 
 
Boiling Springs 
 
Pavilion - Picnic Area 
Renovate CCC pavilion in Picnic Area, needs 
roof and rock work 
 
Pavilions 
 
Health & Safety 
 
5 
 
100,000 
 
9 
 
Boiling Springs 
 
Manager Residence - Boiling Springs 
Repair/renovation of exterior and interior of 
the manger's residence 
 
Residence 
 
Health & Safety 
 
5 
 
100,000 
 
10 
 
Boiling Springs 
 
Employee Residence - Boiling Springs 
Repair/renovation of exterior and interior of 
the employee residence 
 
Residence 
 
Health & Safety 
 
5 
 
100,000 
 
11 
 
Foss 
 
Manager Residence - Foss 
Repair/renovation of exterior and interior of 
the manger's residence 
 
Residence 
 
Health & Safety 
 
5 
 
75,000 
 
12 
Quartz Mountain - 
Lodge 
Roof Replacement - Manager's 
Residence 
Replace roof at the Quartz Mountain 
manager's residence 
 
Residence 
 
Health & Safety 
 
5 
 
25,000 
 
13 
 
 
McGee Creek 
 
 
Manager Residence - McGee Creek 
 
Exterior repairs to the manager's residence at 
McGee Creek: Roof, siding, porch area 
 
 
Residence 
 
 
Health & Safety 
 
 
5 
 
 
75,000 
 
 
14 
 
McGee Creek 
 
Ranger Residence - McGee Creek 
Exterior repairs and new HVAC system at the 
ranger's residence at McGee Creek 
 
Residence 
 
Health & Safety 
 
5 
 
75,000 
 
15 
 
Sequoyah 
 
Park Residences - Sequoyah 
Repair/renovate employee residences at 
Sequoyah 
 
Residence 
 
Health & Safety 
 
5 
 
375,000 
 
16 
 
Robbers Cave 
 
Demo Structure - Employee Residence 
 
Demo an employee residence at Robbers Cave 
 
Residence 
 
Health & Safety 
 
5 
 
15,000 
 
17 
 
Honey Creek 
 
Pool Renovation - Honey Creek 
Repair/replace pool interior and decking to 
address safety concerns for guest 
 
Pool 
 
Health & Safety 
 
5 
 
450,000 
 
18 
 
 
Honey Creek 
 
 
RV Campground - Raccoon Ridge 
 
Replace electric service and pedestals for all 
sites in the Raccoon Ridge RV Campground 
 
 
RV CG 
 
 
Revenue Loss 
 
 
5 
 
 
160,000 
 
 
19 
 
 
Twin Bridges 
 
RV Campground - Echo Hollow and 
Gopher Valley 
Replace electric service and pedestals for sites 
in the Echo Hollow and Gopher Valley RV 
Campgrounds 
 
 
RV CG 
 
 
Revenue Loss 
 
 
5 
 
 
100,000 
 
 
20 
 
Osage Hills 
 
Pool Repairs - Osage Hills 
Repair leaking gutter lines, gutter tiles, and 
sand filter at Osage Hills pool 
 
Pool 
 
Health & Safety 
 
5 
 
100,000 
 
21 
Osage Hills Pool Bathhouse - Osage Hills Renovate existing pool bathhouse Pool Health & Safety 5 150,000 22 
Quartz Mountain - 
Lodge 
 
Pool Deck - Quartz Mountain Lodge 
Repair/replace pool deck. Ongoing issues with 
decking cracks and holes. 
 
Pool 
 
Health & Safety 
 
5 
 
50,000 
 
23 
 
Arrowhead 
 
Renovation - Arrowhead Park Office 
Complete renovation of the Arrowhead park 
office 
 
Park Operations 
 
Health & Safety 
 
5 
 
2,000,000 
 
24 
 
Eufaula 
 
Roof Replacement - Eufaula Park Office 
Replace park office roof, assess for additional 
renovation needs 
 
Park Operations 
 
Health & Safety 
 
5 
 
500,000 
 
25 
 
Lake Murray - Park 
Tucker Tower Renovation - Lake 
Murray 
Assess and provide repairs to address water 
leaks and HVAC issues 
 
Park Operations 
 
Health & Safety 
 
5 
 
500,000 
 
26 
 
Lake Thunderbird 
Maintenance Barn Roof - Lake 
Thunderbird 
Replace the roof on the Maintenance Barn at 
Lake Thunderbird 
 
Park Operations 
 
Health & Safety 
 
5 
 
15,000 
 
27 
 
Lake Thunderbird 
Entrance Redesign - Little Axe 
Campground 
Demo or remove the existing gatehouse and 
redesign entrance to campground 
 
Park Operations 
 
Health & Safety 
 
5 
 
15,000 
 
28 
 
 
Lake Thunderbird 
 
 
Fuel Cells - Lake Thunderbird 
 
Replace existing hazardous fuel tanks with new 
fuel cells, 2 cells needed at 2 locations 
 
 
Park Operations 
 
 
Health & Safety 
 
 
5 
 
 
50,000 
 
 
29 
 
Sequoyah 
Enclosure Repairs - Sequoyah Beaver 
Pond 
Repair the pond in the beaver enclosure at 
Sequoyah 
 
Park Operations 
 
Health & Safety 
 
5 
 
1,000 
 
30 
 
Sequoyah 
 
Maintenance Barn - Sequoyah 
Add new maintenance barn to the Sequoyah 
Maintenance Yard 
 
Park Operations 
 
Health & Safety 
 
5 
 
100,000 
 
31 
 
Sequoyah 
 
Animal Enclosures - Sequoyah 
Expand the existing animal enclosures at 
Sequoyah 
 
Park Operations 
 
Health & Safety 
 
5 
 
100,000 
 
32 
 
Sequoyah 
Repair/Renovation - Sequoyah Nature 
Center 
Repair/Renovate the interior of the Nature 
Center 
 
Park Operations 
 
Health & Safety 
 
5 
 
150,000 
 
33 
 
Robbers Cave 
 
Building Repairs - Nature Center 
Repair/replace logs and doors at the Robbers 
Cave Nature Center 
 
Park Operations 
 
Health & Safety 
 
5 
 
250,000 
 
34 
 
Salt Plains 
 
Demo Structure - Community Building 
Demo existing structure, prepare site for future 
use 
 
Park Operations 
 
Health & Safety 
 
5 
 
15,000 
 
35 
 
Natural Falls 
 
HVAC Replacement - Park Office 
 
Replace the HVAC system at the park office 
 
Park Operations 
 
Health & Safety 
 
5 
 
25,000 
 
36 
 
Natural Falls 
 
Window Replacement - Park Office 
 
Replace windows at the park office 
 
Park Operations 
 
Health & Safety 
 
5 
 
50,000 
 
37 
   OTRD Capital Needs 8 Year Plan Year 5 
  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
   
 
Park Location 
 
 
Project Name 
 
 
Project Description 
 
 
Project Category 
 
 
Priority Category 
 
Project 
Planning Year 
 
Project Cost 
Estimate 
Priority 
Ranking 1- 
90. 
 
Bernice 
Water and Sewer Lines - Maintenance 
Building 
Add new water and sewer lines to the existing 
Maintenance Building 
 
Park Operations 
 
Health & Safety 
 
5 
 
75,000 
 
38 
 
Bernice 
 
Building Repair - Nature Center 
Repair/renovate the Nature Center and 
connecting restroom 
 
Park Operations 
 
Health & Safety 
 
5 
 
500,000 
 
39 
 
Greenleaf 
Roof Replacement - Greenleaf Park 
Office 
 
Replace park office roof 
 
Park Operations 
 
Health & Safety 
 
5 
 
25,000 
 
40 
 
Greenleaf 
 
ADA Dock - Kids Pond 
 
Replace the ADA fishing dock for the Kids Pond 
 
Park Operations 
 
Health & Safety 
 
5 
 
50,000 
 
41 
 
Greenleaf 
Building Repair/Renovation - Hoot Owl 
Building 
Repair/renovate exterior and provide ADA 
parking and building access 
 
Park Operations 
 
Health & Safety 
 
5 
 
200,000 
 
42 
 
Cherokee Landing 
Roof Replacement - Maintenance 
Building 
 
Replace roof on the Maintenance Building 
 
Park Operations 
 
Health & Safety 
 
5 
 
20,000 
 
43 
 
Cherokee Landing 
 
Entrance Gate - Cherokee Landing 
Install new entrance gate for better traffic 
control into the park 
 
Park Operations 
 
Health & Safety 
 
5 
 
50,000 
 
44 
 
 
Cherokee Landing 
 
 
Area Redesign - Maintenance Area 
Assess and redesign the maintenance 
compound, add new fuel cells and demo 
unwanted structures 
 
 
Park Operations 
 
 
Health & Safety 
 
 
5 
 
 
100,000 
 
 
45 
 
Boiling Springs 
Roof Replacement - Boiling Springs 
Park Office 
 
Replace park office roof 
 
Park Operations 
 
Health & Safety 
 
5 
 
25,000 
 
46 
 
Boiling Springs 
Patio and Stairway Renovation - Boiling 
Springs Park Office 
Repair/replace existing patio and stairway to 
the springs at the park office. 
 
Park Operations 
 
Health & Safety 
 
5 
 
75,000 
 
47 
 
 
 
Boiling Springs 
 
 
 
Site Work - Shaul Lake Shoreline 
 
Assess and perform sitework around Shaul 
Lake to provide walkways and fishing areas for 
the public, include ADA access 
 
 
 
Park Operations 
 
 
 
Health & Safety 
 
 
 
5 
 
 
 
500,000 
 
 
 
48 
 
 
Foss 
 
Building Repair/Renovation - Park 
Office 
 
Repair/renovate the exterior and interior of 
the park office, includes updated landscaping 
 
 
Park Operations 
 
 
Health & Safety 
 
 
5 
 
 
250,000 
 
 
49 
 
Fort Cobb 
 
Replace Roofs - Park Buildings 
Replace multiple roofs on park operations 
building in the Fort Cobb Park 
 
Park Operations 
 
Health & Safety 
 
5 
 
250,000 
 
50 
Fort Cobb Replace Windows - Park Office Replace windows in the Park Office Park Operations Health & Safety 5 250,000 51 
 
Great Plains State Park 
HVAC Replacement - Great Plains 
Visitor Center 
HVAC replacement at the Great Plains Visitor 
Center 
 
Park Operations 
 
Health & Safety 
 
5 
 
15,000 
 
52 
 
Great Plains State Park 
 
Demo Water Tower - Great Plains 
Demo an old water tower behind the Boat 
Ramp CXT 
 
Park Operations 
 
Health & Safety 
 
5 
 
15,000 
 
53 
 
McGee Creek 
 
Park Office - McGee Creek 
Exterior repairs to the park office at McGee 
Creek 
 
Park Operations 
 
Health & Safety 
 
5 
 
75,000 
 
54 
 
Lake Wister 
 
Demo Old Restroom - Quarry Island 
Demo old structure next to new restroom on 
Quarry Island 
 
Park Operations 
 
Health & Safety 
 
5 
 
15,000 
 
55 
Lake Wister Fuel Cells - Lake Wister Replace 2 fuel cells 	Park Operations Health & Safety 5 	20,000 56 
 
Black Mesa 
 
Building Repairs - Maintenance Area 
Repair/replace existing maintenance structures 
at Black Mesa 
 
Park Operations 
 
Health & Safety 
 
5 
 
50,000 
 
57 
 
Bernice 
 
Trail - Bernice 
Widen and resurface trail to allow for ADA 
access 
 
Trails 
 
Health & Safety 
 
5 
 
150,000 
 
58 
 
Bernice 
 
Trail Towers - ADA Trail 
 
Install two new wildlife towers on the ADA Trail 
 
Trails 
 
Health & Safety 
 
5 
 
150,000 
 
59 
 
 
Greenleaf 
 
Trail Maintenance - Greenleaf Main 
Trail 
 
Perform general maintenance and widening of 
the main hiking trail at Greenleaf 
 
 
Trails 
 
 
Health & Safety 
 
 
5 
 
 
500,000 
 
 
60 
 
Cherokee Landing 
 
Trail ADA Access - Redfox Trail 
Assess and resurface Redfox Trail to convert to 
ADA accessible 
 
Trails 
 
Health & Safety 
 
5 
 
200,000 
 
61 
 
Boiling Springs 
 
Trail Bridges - River Trail 
 
Repair/replace two bridges on the River Trail 
 
Trails 
 
Health & Safety 
 
5 
 
50,000 
 
62 
 
Boiling Springs 
 
Trail Bridges - Scout Trail 
 
Repair/replace 9 bridges on the Scout Trail 
 
Trails 
 
Health & Safety 
 
5 
 
225,000 
 
63 
Lake Thunderbird Trail Bridge - Hog Creek Repair/replace trail bridge in Hog Creek Trails Health & Safety 5 	50,000 64 
 
Lake Thunderbird 
 
Trail - ADA Hiking Trail 
ADA Trail updates to include: Erosion control, 
signage, seating areas 
 
Trails 
 
Health & Safety 
 
5 
 
50,000 
 
65 
 
Lake Murray - Park 
 
Trail Bridge - Pecan Grove 
Replace damaged trail bridge in the Pecan 
Grove area 
 
Trails 
 
Health & Safety 
 
5 
 
750,000 
 
66 
 
Roman Nose 
 
Trail - ADA Trail 
Complete the ADA from the springs to the 
parking lot 
 
Trails 
 
Health & Safety 
 
5 
 
100,000 
 
67 
 
Lake Murray - Park 
 
Dam Cleanup - Lake Murray Dam 
Remove trees and brush along the Lake 
Murray Dam 
 
Dams 
 
Health & Safety 
 
5 
 
150,000 
 
68 
 
Fort Cobb 
 
Dock Repairs - Lemon Hill 
Repair/replace failing ADA courtesy dock at 
Lemon Hill Day Use 
 
Dock 
 
Health & Safety 
 
5 
 
50,000 
 
69 
 
 
Sequoyah 
 
 
Dock Repair - Sequoyah Lodge 
 
Extend the fishing dock further into the lake to 
better handle high or low water conditions 
 
 
Dock 
 
 
Health & Safety 
 
 
5 
 
 
50,000 
 
 
70 
 
Robbers Cave 
 
Swim Dock - Robbers Cave 
Repair/Replace existing swim platform in the 
beach area of Lake Carlton 
 
Dock 
 
Health & Safety 
 
5 
 
50,000 
 
71 
 
Great Plains State Park 
 
Dock Replacement - Great Plains 
Replace damaged fishing dock at Great Plains, 
need to consult with BOR 
 
Dock 
 
Health & Safety 
 
5 
 
150,000 
 
72 
 
 
Foss 
 
 
Shade Structures - Sunset Beach 
Repair/replace Palapa shade structures in the 
Sunset Beach Area. Replace ADA access, vault 
toilets 
 
 
Day Use 
 
 
Health & Safety 
 
 
5 
 
 
200,000 
 
 
73 
 
 
Foss 
 
 
Erosion Control - Sunset Beach 
Install retaining wall to control erosion and 
blowing sand around the parking area of 
Sunset Beach 
 
 
Day Use 
 
 
Health & Safety 
 
 
5 
 
 
100,000 
 
 
74 
 
Foss 
Sewer Lagoon - Cottonwood 
Campground 
Install new fencing around the lagoon at 
Cottonwood Campground 
 
Fencing 
 
Health & Safety 
 
5 
 
75,000 
 
75 
 
Sequoyah 
 
Fencing - Horse Stable Area 
Replace fencing around the horse stables and 
riding areas 
 
Fencing 
 
Health & Safety 
 
5 
 
25,000 
 
76 
   OTRD Capital Needs 8 Year Plan Year 5 
  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
   
 
Park Location 
 
 
Project Name 
 
 
Project Description 
 
 
Project Category 
 
 
Priority Category 
 
Project 
Planning Year 
 
Project Cost 
Estimate 
Priority 
Ranking 1- 
90. 
 
Little Sahara 
 
Fencing - Oasis Campground 
Install wind break fencing at Oasis 
Campground 
 
Fencing 
 
Health & Safety 
 
5 
 
75,000 
 
77 
 
Osage Hills 
 
Playground - RV Campground 
 
Replace playground in the RV Campground 
 
Playground 
 
Health & Safety 
 
5 
 
150,000 
 
78 
 
Lake Texoma 
 
Playground - Lake Texoma 
Replace, install new playground in Catfish Bay 
and Joe's Campgrounds 
 
Playground 
 
Health & Safety 
 
5 
 
300,000 
 
79 
 
Keystone 
 
Playground - Green Country 
 
Replace playground in the Green Country Area 
 
Playground 
 
Health & Safety 
 
5 
 
150,000 
 
80 
 
 
Greenleaf 
 
 
Playground - Greenleaf 
 
Replace, install new playgrounds in the 
Playside Area and Gobble Ridge Campground 
 
 
Playground 
 
 
Health & Safety 
 
 
5 
 
 
300,000 
 
 
81 
 
Great Plains State Park 
 
Playground - Great Plains 
 
Replace playground in the Day Use Area 
 
Playground 
 
Health & Safety 
 
5 
 
150,000 
 
82 
 
 
Foss 
 
 
Playground - Foss 
 
Replace playgrounds in Buffalo Bend, Cutberth, 
Cedar Point, and Sandy Beach areas. 
 
 
Playground 
 
 
Health & Safety 
 
 
5 
 
 
600,000 
 
 
83 
 
Fort Cobb 
 
Playground - Black Jack Campground 
Replace playground in the Black Jack 
Campground 
 
Playground 
 
Health & Safety 
 
5 
 
150,000 
 
84 
 
Bernice 
 
Playground - Bernice 
Replace two playground areas in the Bernice 
Area 
 
Playground 
 
Health & Safety 
 
5 
 
300,000 
 
85 
 
 
Arrowhead - Golf Course 
 
 
Cart Path - Arrowhead GC 
Repair/replace damaged portions of the 
existing cart path, reroute as needed to 
address erosion issues 
 
 
Golf 
 
 
Health & Safety 
 
 
5 
 
 
300,000 
 
 
86 
Cedar Creek - Golf 
Course 
 
Cart Path - Cedar Creek GC 
Repair/replace damaged portions of the 
existing cart path 
 
Golf 
 
Health & Safety 
 
5 
 
300,000 
 
87 
 
Roman Nose - Golf 
Course 
 
 
Cart Path - Roman Nose GC 
Repair/replace damaged portions of the 
existing cart path, reroute as needed to 
address erosion issues 
 
 
Golf 
 
 
Health & Safety 
 
 
5 
 
 
150,000 
 
 
88 
 
 
Lake Wister 
 
 
RV Campground - Wards Campground 
 
Renovate all Ward's Campground RV sites. Will 
include: sitework, water, and electric 
 
 
RV CG 
 
 
Health & Safety 
 
 
5 
 
 
1,250,000 
 
 
89 
System Wide Contingency Allowance - Year 5 Contingency Allowance - Year 5 Contingency Contingency 5 4,274,000 90 
  	Project Estimated Cost    	35,000,000  
  	Plus: Allocation for Roads/Parking 
   	7,500,000 
 
  	Project Estimated Cost - Year 5    	42,500,000  
   OTRD Capital Needs 8 Year Plan Year 6 
  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
   
 
Park Location 
 
 
Project Name 
 
 
Project Description 
 
 
Project Category 
 
 
Priority Category 
 
Project 
Planning Year 
 
Project Cost 
Estimate 
Priority 
Ranking 1- 
74 
 
 
Sequoyah Bay 
 
 
RV Campground - Sequoyah Bay 
Repair/renovation of 100 Sequoyah Bay RV 
sites. Will include: sitework, water, sewer, and 
electric. 
 
 
RV CG 
 
 
Revenue Loss 
 
 
6 
 
 
8,000,000 
 
 
1 
Sequoyah Bay Playground - Sequoyah Bay Add new playground at Sequoyah Bay Playground Revenue Loss 6 150,000 2 
 
 
 
Sequoyah 
 
 
 
RV Campground - Cherokee Area 
Full repair/renovation of Cherokee RV sites. 
Will include: sitework, water, sewer, and 
electric. Redesign layout for more space 
between sites 
 
 
 
RV CG 
 
 
 
Revenue Loss 
 
 
 
6 
 
 
 
5,000,000 
 
 
 
3 
 
Sequoyah - Lodge 
 
Cabin Repair/Renovation - Bunkhouse 
Full exterior and interior repair/renovation of 
the Bunkhouse 
 
Cabins 
 
Revenue Loss 
 
6 
 
800,000 
 
4 
 
 
Lake Wister 
 
Building Repair/Renovation - Group 
Camp 
 
Repair/renovate exterior and interior of the 
dining hall and restroom at the Group Camp 
 
 
Group Camp 
 
 
Revenue Loss 
 
 
6 
 
 
750,000 
 
 
5 
 
Keystone 
 
Pavilion Repairs - Keystone 
Replace existing pavilions with new structures, 
5 locations 
 
Pavilions 
 
Revenue Loss 
 
6 
 
750,000 
 
6 
 
Alabaster Caverns 
 
RV Campground - Mesa Campground 
Replace electric service and pedestals for all 
sites in the Mesa RV Campground 
 
RV CG 
 
Revenue Loss 
 
6 
 
55,000 
 
7 
 
Cherokee Grand Lake 
RV Campground - Lakeside 
Campground 
Replace electric service and pedestals for all 
sites in the Lakeview RV Campground 
 
RV CG 
 
Revenue Loss 
 
6 
 
75,000 
 
8 
 
 
Lake Thunderbird 
 
 
Tent Campground - Rose Rock 
 
Renovate tent sites with new fixtures and 
provide electric and water repairs as needed 
 
 
Tent CG 
 
 
Revenue Loss 
 
 
6 
 
 
110,000 
 
 
9 
 
 
Lake Thunderbird 
 
 
Tent Campground - Hog Creek 
 
Renovate tent sites with new fixtures and 
provide electric and water repairs as needed 
 
 
Tent CG 
 
 
Revenue Loss 
 
 
6 
 
 
380,000 
 
 
10 
 
 
Lake Thunderbird 
 
 
Tent Campground - North Sentinel 
 
Renovate tent sites with new fixtures and 
provide electric and water repairs as needed 
 
 
Tent CG 
 
 
Revenue Loss 
 
 
6 
 
 
160,000 
 
 
11 
 
 
Tenkiller 
 
 
Tree Removal - Tenkiller Cabins 
 
Remove dead and unwanted trees and brush 
restricting lake views from the Tenkiller Cabins 
 
 
Forestry 
 
 
Revenue Loss 
 
 
6 
 
 
100,000 
 
 
12 
 
Lake Murray - Golf 
Course 
 
 
Cart Path - Lake Murray GC 
Repair/replace damaged portions of the 
existing cart path, reroute as needed to 
address erosion issues 
 
 
Golf 
 
 
Revenue Loss 
 
 
6 
 
 
500,000 
 
 
13 
 
 
Lake Murray - Lodge 
 
HVAC Replacement - Lake Murray 
Lodge 
Assess and replace the existing HVAC 
equipment. Need to determine room and 
common area requirements 
 
 
Lodge Operations 
 
 
Revenue Loss 
 
 
6 
 
 
500,000 
 
 
14 
 
Lake Murray - Lodge 
Building Maintenance - Lake Murray 
Lodge 
 
Repaint the exterior of all lodge structures 
 
Lodge Operations 
 
Revenue Loss 
 
6 
 
200,000 
 
15 
 
Bernice 
 
Roof Replacement - Bernice Structures 
Replace roofs on 2 restrooms, pavilion, well 
house, and storage building 
 
Park Operations 
 
Revenue Loss 
 
6 
 
100,000 
 
16 
Gloss Mountain Kiosk Repairs - Gloss Mountain Renovate and repair information kiosk Park Operations Revenue Loss 6 	75,000 17 
 
Great Plains State Park 
 
Erosion Control - Great Plains 
Repair/replace existing retaining wall at select 
campsites 
 
Park Operations 
 
Revenue Loss 
 
6 
 
20,000 
 
18 
 
 
Roman Nose 
 
 
Site Work - Boecher Lake Shoreline 
 
Assess and perform sitework around Boecher 
Lake to provide better public access 
 
 
Park Operations 
 
 
Revenue Loss 
 
 
6 
 
 
250,000 
 
 
19 
 
Sequoyah 
Building Repair/Renovation - Riding 
Stables 
 
Renovate the Riding Stables at Sequoyah 
 
Park Operations 
 
Revenue Loss 
 
6 
 
20,000 
 
20 
Sequoyah Eagle Enclosure - Sequoyah Add new Eagle Enclosure at Sequoyah Park Operations Revenue Loss 6 	10,000 21 
 
 
Twin Bridges 
 
 
Roof Replacements - Twin Bridges 
 
Multiple roof replacements: Regional Admin, 
Lake Huts, Restrooms, and Slant Huts 
 
 
Park Operations 
 
 
Revenue Loss 
 
 
6 
 
 
280,000 
 
 
22 
 
Alabaster Caverns 
 
Trail Bridge - Canyon Campground 
Install new bridge across the creek in the 
Canyon Campground 
 
Park Operations 
 
Upgrade 
 
6 
 
25,000 
 
23 
Fort Cobb HWY Signage - Fort Cobb Install park signage on HWY 152 and 146 Signage Revenue Loss 6 	40,000 24 
 
Foss 
 
Signage - Foss 
Install new signage within the park and on 
access HWYs 
 
Signage 
 
Revenue Loss 
 
6 
 
100,000 
 
25 
Greenleaf Signage - Greenleaf 	Repair/replace select park signs Signage Revenue Loss 6 250,000 26 
Honey Creek Entrance Sign - Honey Creek Replace, install new park entrance sign Signage Revenue Loss 6 	20,000 27 
Honey Creek Signage - Honey Creek Repair/replace select park signs Signage Revenue Loss 6 	20,000 28 
 
Greenleaf 
 
Trail Repairs - Family Fun Trail 
Replace the overlook deck along the Family 
Fun Trail 
 
Trails 
 
Revenue Loss 
 
6 
 
25,000 
 
29 
 
Foss 
 
Picnic Tables - Overlook Area 
 
Replace picnic tables in the Overlook Area 
 
Day Use 
 
Upgrade 
 
6 
 
15,000 
 
30 
 
 
Lake Texoma 
 
Cabin Repair/Renovation - Lake 
Texoma 
 
Full exterior and interior repair/renovation of 4 
cabins at Lake Texoma 
 
 
Cabins 
 
 
Revenue Loss 
 
 
6 
 
 
1,000,000 
 
 
31 
 
 
Twin Bridges 
 
Cabin Repair/Renovation - Twin 
Bridges 
 
Repair/renovate the interior and HVAC of the 
huts to allow for better year round usage 
 
 
Cabins 
 
 
Revenue Loss 
 
 
6 
 
 
125,000 
 
 
32 
 
 
Roman Nose 
 
 
Tent Campground - Beaver Dam 
Repair/renovate tent sites with new fixtures 
and provide electric and water repairs as 
needed 
 
 
Tent CG 
 
 
Revenue Loss 
 
 
6 
 
 
160,000 
 
 
33 
 
 
Cherokee Landing 
 
 
Tent Campground - Cherokee Landing 
Repair/renovate tent sites with new fixtures 
and provide electric and water repairs as 
needed 
 
 
Tent CG 
 
 
Revenue Loss 
 
 
6 
 
 
200,000 
 
 
34 
 
 
Sequoyah 
 
 
Tent Campground - Creek Area 
Repair/renovate tent sites with new fixtures 
and provide electric and water repairs as 
needed 
 
 
Tent CG 
 
 
Revenue Loss 
 
 
6 
 
 
200,000 
 
 
35 
 
 
 
Sequoyah 
 
 
 
Tent Campground - Chickasaw Area 
 
Repair/renovate tent sites with new fixtures 
and provide electric and water repairs as 
needed. Assess for new restroom facilities 
 
 
 
Tent CG 
 
 
 
Revenue Loss 
 
 
 
6 
 
 
 
350,000 
 
 
 
36 
   OTRD Capital Needs 8 Year Plan Year 6 
  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
   
 
Park Location 
 
 
Project Name 
 
 
Project Description 
 
 
Project Category 
 
 
Priority Category 
 
Project 
Planning Year 
 
Project Cost 
Estimate 
Priority 
Ranking 1- 
74 
 
 
Sequoyah 
 
 
Tent Campground - Sequoyah 
Repair/renovate tent sites with new fixtures 
and provide electric and water repairs as 
needed 
 
 
Tent CG 
 
 
Revenue Loss 
 
 
6 
 
 
350,000 
 
 
37 
 
Boiling Springs 
 
Group Camp Repairs - Group Camp 2 
Demo existing unsafe pavilions, resurface sport 
court in Group Camp 2 
 
Group Camp 
 
Health & Safety 
 
6 
 
225,000 
 
38 
 
Boiling Springs 
 
Pavilion Repairs - South (Small) 
Assess and repair/replace any structural 
damage, electric, and fixtures in South Pavilion 
 
Pavilions 
 
Revenue Loss 
 
6 
 
50,000 
 
39 
 
 
Boiling Springs 
 
 
Pavilion Repairs - E.L. Ware 
Assess and repair/replace any structural 
damage, electric, and fixtures in E.L. Ware 
Pavilion 
 
 
Pavilions 
 
 
Revenue Loss 
 
 
6 
 
 
75,000 
 
 
40 
 
Boiling Springs 
 
Pavilion Repairs - North (Large) 
Assess and repair/replace any structural 
damage, electric, and fixtures in North Pavilion 
 
Pavilions 
 
Revenue Loss 
 
6 
 
75,000 
 
41 
 
Lake Murray - Park 
Building Repair/Renovation - Group 
Camp 1 
 
Add HVAC to 30 cabins and Recreation Hall 
 
Group Camp 
 
Revenue Loss 
 
6 
 
500,000 
 
42 
Beavers Bend Lodge Room PTACs - Beavers Bend Lodge Replace PTAC units in all lodge rooms Lodge Operations Revenue Loss 6 100,000 43 
Beavers Bend Lodge Room Updates - Beavers Bend Lodge Replace patio doors with built-in blinds Lodge Operations Upgrade 	6 	40,000 44 
Sequoyah - Lodge Building Repairs - Sequoyah Hall Replace the garage door at Sequoyah Hall Lodge Operations Revenue Loss 6 	40,000 45 
 
Sequoyah - Lodge 
Furniture Updates - Lobby and Lounge 
Areas 
Replace FFE in the Lodge Lobby and Lounge 
areas 
 
Lodge Operations 
 
Revenue Loss 
 
6 
 
50,000 
 
46 
Sequoyah - Lodge Furniture Updates - Pool Area Replace FFE in the Pool Area 	Lodge Operations Revenue Loss 6 	50,000 47 
 
Sequoyah - Lodge 
 
Room Updates - Sequoyah Lodge 
Replace the blinds and window shades in all 
lodge rooms 
 
Lodge Operations 
 
Revenue Loss 
 
6 
 
210,000 
 
48 
Sequoyah - Lodge Room Updates - Sequoyah Lodge Replace bedframes and mattresses in all rooms Lodge Operations Revenue Loss 6 300,000 49 
 
Sequoyah 
Amphitheater Repair/Renovation - 
Sequoyah 
Repair/renovation of the amphitheater. 
Includes seating and stag areas 
 
Park Operations 
 
Revenue Loss 
 
6 
 
150,000 
 
50 
 
Sequoyah - Lodge 
 
Sports Court - Sequoyah Lodge 
Repair/renovate the sports court, new fencing 
and lights 
 
Park Operations 
 
Revenue Loss 
 
6 
 
125,000 
 
51 
 
Little Sahara 
Building Repair/Renovation - North 
Building 
Renovate building and convert to a new gift 
shop 
 
Park Operations 
 
Revenue Loss 
 
6 
 
100,000 
 
52 
 
Roman Nose - Lodge 
 
Landscaping - Roman Nose Lodge 
Update landscaping around the lodge to be 
more maintenance free 
 
Lodge Operations 
 
Upgrade 
 
6 
 
75,000 
 
53 
 
Roman Nose - Lodge 
Equipment Storage - Roman Nose 
Lodge 
Need additional storage space for lodge tables 
and chairs 
 
Lodge Operations 
 
Revenue Loss 
 
6 
 
25,000 
 
54 
 
Roman Nose - Lodge 
 
Room Updates - Roman Nose Lodge 
 
Install new window shades in all lodge rooms 
 
Lodge Operations 
 
Revenue Loss 
 
6 
 
22,000 
 
55 
Quartz Mountain - 
Lodge 
 
Landscaping - Quartz Mountain Lodge 
Update landscaping around the lodge to be 
more maintenance free 
 
Lodge Operations 
 
Upgrade 
 
6 
 
100,000 
 
56 
Quartz Mountain - 
Lodge 
Fountain Repairs - Quartz Mountain 
Lodge 
 
Repair leaks in the courtyard fountain 
 
Lodge Operations 
 
Revenue Loss 
 
6 
 
25,000 
 
57 
 
Osage Hills 
 
Cabin Repair/Renovation - Osage Hills 
Full exterior and interior renovation of 8 cabins 
at Osage Hills 
 
Cabins 
 
Revenue Loss 
 
6 
 
800,000 
 
58 
 
Roman Nose - Lodge 
 
HVAC - Cabins 
Install new mini-splits to replace existing 
window units 
 
Cabins 
 
Revenue Loss 
 
6 
 
100,000 
 
59 
 
Roman Nose - Lodge 
 
Building Maintenance - Pioneer Cabin 
Exterior and floors need to be 
restained/painted 
 
Cabins 
 
Revenue Loss 
 
6 
 
10,000 
 
60 
 
Salt Plains 
 
Cabin FFE - Salt Plains Cabins 
Replace all interior FFE items in all Salt Plains 
Cabins 
 
Cabins 
 
Revenue Loss 
 
6 
 
60,000 
 
61 
 
Osage Hills 
Building Repair/Renovation - Group 
Camp Lodge 
Repair/renovate the lodge building at the 
Group Camp for year round use 
 
Group Camp 
 
Revenue Loss 
 
6 
 
250,000 
 
62 
 
Osage Hills 
Building Repairs - Group Camp 
Bunkhouses 
Repair/renovate the exterior and interior of 
the Group Camp Bunkhouses 
 
Group Camp 
 
Revenue Loss 
 
6 
 
900,000 
 
63 
 
Sequoyah 
Building Repair/Renovation - Group 
Camp 
Repair/renovate Group Camp facilities to 
attract more usage 
 
Group Camp 
 
Revenue Loss 
 
6 
 
500,000 
 
64 
 
Sequoyah 
 
Pavilions - Sequoyah 
Replace existing pavilions with new structures, 
6 locations 
 
Pavilions 
 
Revenue Loss 
 
6 
 
1,200,000 
 
65 
 
 
McGee Creek 
 
 
RV Campground - Buster Heights 
Full renovation of all Buster Heights RV sites. 
Will include: sitework, water, sewer, and 
electric. 
 
 
RV CG 
 
 
Revenue Loss 
 
 
6 
 
 
2,000,000 
 
 
66 
 
McGee Creek 
 
RV Campground - Potapo Area 
Replace electric service and pedestals for sites 
in the Potapo RV Campgrounds 
 
RV CG 
 
Revenue Loss 
 
6 
 
200,000 
 
67 
 
Lake Texoma 
 
RV Campground - Joe's Campground 
Replace electric service and pedestals for all 
sites in the Joe's RV Campground 
 
RV CG 
 
Revenue Loss 
 
6 
 
230,000 
 
68 
Lake Murray - Golf 
Course 
 
Practice Green - Lake Murray GC 
Expand the practice green to better serve 
guest needs 
 
Golf 
 
Revenue Loss 
 
6 
 
40,000 
 
69 
Lake Murray - Golf 
Course 
 
Tee Box Repair - Lake Murray GC 
Rebuild tee boxes for better accommodation of 
increased play 
 
Golf 
 
Revenue Loss 
 
6 
 
150,000 
 
70 
 
Cedar Creek - Golf 
Course 
 
 
Erosion Control - Cedar Creek GC 
 
Repair various areas around the course to 
allow for better drainage and erosion control 
 
 
Golf 
 
 
Revenue Loss 
 
 
6 
 
 
50,000 
 
 
71 
Cedar Creek - Golf 
Course 
 
Tee Box Repair - Cedar Creek GC 
Rebuild tee boxes for better accommodation of 
increased play 
 
Golf 
 
Revenue Loss 
 
6 
 
100,000 
 
72 
Cedar Creek - Golf 
Course 
 
Turf Admin - Cedar Creek GC 
Remove trees, add top soil and sod to improve 
playing conditions 
 
Golf 
 
Revenue Loss 
 
6 
 
250,000 
 
73 
System Wide Contingency Allowance - Year 6 Contingency Allowance - Year 6 Contingency Contingency 6 4,658,000 74 
  	Project Estimated Cost    	35,000,000  
  	Plus: Allocation for Roads/Parking 
   	7,500,000 
 
  	Project Estimated Cost - Year 6    	42,500,000  
   OTRD Capital Needs 8 Year Plan Year 7 
  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
   
 
Park Location 
 
 
Project Name 
 
 
Project Description 
 
 
Project Category 
 
 
Priority Category 
 
Project 
Planning Year 
 
Project Cost 
Estimate 
Priority 
Ranking 1- 
58 
 
Osage Hills 
 
RV Campground 
 
Repair/renovation of RV site 18 for ADA access 
 
RV CG 
 
Health & Safety 
 
7 
 
80,000 
 
1 
 
 
Osage Hills 
 
 
RV Campground - Osage Hills 
Repair/renovation of all Osage Hills RV sites. 
Will include: sitework, water, sewer, and 
electric. 
 
 
RV CG 
 
 
Health & Safety 
 
 
7 
 
 
1,520,000 
 
 
2 
 
 
Fort Cobb 
 
 
RV Campground - Catfish Cove 
Repair/renovation of 89 Catfish Cove RV sites. 
Will include: sitework, water, sewer, and 
electric. 
 
 
RV CG 
 
 
Revenue Loss 
 
 
7 
 
 
7,100,000 
 
 
3 
 
Fort Cobb 
 
RV Campground - Tent Hill 
Repair/renovation of 11 RV and 14 Tent sites in 
the Tent Hill Campground 
 
RV CG 
 
Revenue Loss 
 
7 
 
1,000,000 
 
4 
Fort Cobb RV Campground - Eagle's Nest Add sewer to 25 existing sites 	RV CG Revenue Loss 7 250,000 5 
 
Great Plains State Park 
 
RV Campground - Great Plains 
Repair/renovate 34 Great Plains RV sites. This 
will include sitework only 
 
RV CG 
 
Revenue Loss 
 
7 
 
850,000 
 
6 
 
Natural Falls 
 
RV Campground - Natural Falls 
Replace electric service and pedestals for sites 
in the Natural Falls RV Campground 
 
RV CG 
 
Revenue Loss 
 
7 
 
225,000 
 
7 
 
Cherokee Landing 
 
RV Campground - Cherokee Area 
Replace electric service and pedestals for sites 
in the Cherokee RV Campground 
 
RV CG 
 
Revenue Loss 
 
7 
 
50,000 
 
8 
 
 
Beavers Bend 
 
Cabin Repair/Renovation - Riverfront 
Area 
Exterior renovation to include repair/replace 
siding, windows, and doors in the Riverfront 
Area 
 
 
Cabins 
 
 
Revenue Loss 
 
 
7 
 
 
800,000 
 
 
9 
 
Arrowhead - Golf Course 
 
Water Pump - Irrigation Pond 
Replace water pump servicing the golf course 
irrigation pond 
 
Golf 
 
Revenue Loss 
 
7 
 
25,000 
 
10 
 
Arrowhead - Golf Course 
 
Erosion Control - Arrowhead Hole 17 
Replace culvert on hole 17 to allow for better 
drainage 
 
Golf 
 
Revenue Loss 
 
7 
 
20,000 
 
11 
 
Arrowhead - Golf Course 
 
Tee Box Renovation - Arrowhead GC 
Rebuild tee boxes for better accommodation of 
increased play 
 
Golf 
 
Revenue Loss 
 
7 
 
100,000 
 
12 
 
Fort Cobb - Golf Course 
 
Irrigation System - Fort Cobb GC 
Repair/replace the irrigation system for the 
complete golf course 
 
Golf 
 
Revenue Loss 
 
7 
 
1,200,000 
 
13 
 
 
Fort Cobb - Golf Course 
 
 
Cart Path - Fort Cobb GC 
Repair/replace damaged portions of the 
existing cart path, reroute as needed to 
address erosion issues 
 
 
Golf 
 
 
Revenue Loss 
 
 
7 
 
 
100,000 
 
 
14 
 
 
Fort Cobb - Golf Course 
 
 
Water Pump - Irrigation System 
 
Install new pump equipment to keep golf 
course irrigation system functioning properly 
 
 
Golf 
 
 
Revenue Loss 
 
 
7 
 
 
50,000 
 
 
15 
 
Fort Cobb - Golf Course 
 
Tree Removal - Fort Cobb GC 
Tree and brush removal along the lake for 
better visibility from the course 
 
Golf 
 
Revenue Loss 
 
7 
 
50,000 
 
16 
 
Fort Cobb - Golf Course 
 
Turf Admin - Fort Cobb GC 
Complete the greens renovation with new 
TifEagle Bermuda 
 
Golf 
 
Revenue Loss 
 
7 
 
75,000 
 
17 
Roman Nose - Golf 
Course 
 
Cart Storage - Roman Nose GC 
 
Add storage facility for golf carts 
 
Golf 
 
Revenue Loss 
 
7 
 
200,000 
 
18 
Roman Nose - Golf 
Course 
 
Irrigation System - Roman Nose GC 
Repair/replace the irrigation system for all 
areas around the golf course 
 
Golf 
 
Revenue Loss 
 
7 
 
1,200,000 
 
19 
Roman Nose - Golf 
Course 
 
Tee Box Repair - Roman Nose GC 
Rebuild tee boxes for better accommodation of 
year round play 
 
Golf 
 
Revenue Loss 
 
7 
 
150,000 
 
20 
 
Roman Nose 
Building Repair/Renovation - Group 
Camp Bunkhouses 
Repair/renovate exterior and interior of the A- 
frame bunkhouses 
 
Group Camp 
 
Revenue Loss 
 
7 
 
1,000,000 
 
21 
 
Roman Nose 
Building Repair/Renovation - Group 
Camp Community Building 
Repair/renovate exterior and interior of the 
Community Building 
 
Group Camp 
 
Revenue Loss 
 
7 
 
1,000,000 
 
22 
 
Roman Nose 
 
Restroom - Group Camp 
Repair/renovate the restroom at the Turkey 
Roost Group Camp 
 
Group Camp 
 
Revenue Loss 
 
7 
 
250,000 
 
23 
 
 
 
Quartz Mountain - Park 
 
 
Building Repair/Renovation - Group 
Camp 
Repair/renovate exteriors and interiors of all 
Group Camp structures to allow for year round 
usage, remove unwanted and hazardous trees 
from the area 
 
 
 
Group Camp 
 
 
 
Revenue Loss 
 
 
 
7 
 
 
 
1,800,000 
 
 
 
24 
 
 
Robbers Cave 
 
Building Repair/Renovation - Group 
Camp 2 
Repair/renovate exteriors and interiors of all 
Group Camp 2 structures to allow for year 
round usage 
 
 
Group Camp 
 
 
Revenue Loss 
 
 
7 
 
 
1,500,000 
 
 
25 
 
 
Tenkiller 
 
Building Repair/Renovation - 
Community Building 
 
Repair/renovate exterior and interior of the 
Community Building, assess for new decking 
 
 
Park Operations 
 
 
Revenue Loss 
 
 
7 
 
 
350,000 
 
 
26 
 
Tenkiller 
Building Repair/Renovation - 
Maintenance Compound 
Repair/renovate one of the buildings and demo 
the others. 
 
Park Operations 
 
Revenue Loss 
 
7 
 
250,000 
 
27 
 
 
Cedar Creek - Golf 
Course 
 
 
Building Repair/Renovation - Cedar 
Creek Proshop 
 
Repair/renovate exterior and interior, assess 
the ability to increase the size to better handle 
more play and tournaments 
 
 
 
Golf 
 
 
 
Revenue Loss 
 
 
 
7 
 
 
 
1,000,000 
 
 
 
28 
Cedar Creek - Golf 
Course 
 
Cart Storage - Cedar Creek GC 
 
Add storage facility for golf carts 
 
Golf 
 
Revenue Loss 
 
7 
 
200,000 
 
29 
 
Fort Cobb - Golf Course 
Building Repair/Renovation - Fort Cobb 
GC 
Repair/renovate exterior and interior of 
proshop 
 
Golf 
 
Revenue Loss 
 
7 
 
750,000 
 
30 
 
Fort Cobb - Golf Course 
 
Cart Storage - Fort Cobb GC 
 
Add storage facility for golf carts 
 
Golf 
 
Revenue Loss 
 
7 
 
200,000 
 
31 
Grand Cherokee - Golf 
Course 
 
Cart Storage - Grand Cherokee GC 
 
Add storage facility for golf carts 
 
Golf 
 
Revenue Loss 
 
7 
 
200,000 
 
32 
Grand Cherokee - Golf 
Course 
 
Bunkers - Grand Cherokee GC 
 
Restore all bunkers on the course 
 
Golf 
 
Revenue Loss 
 
7 
 
150,000 
 
33 
 
Sequoyah - Golf Course 
 
Irrigation System - Sequoyah GC 
Repair/replace the irrigation system for select 
areas around the golf course 
 
Golf 
 
Revenue Loss 
 
7 
 
500,000 
 
34 
 
 
Sequoyah - Golf Course 
 
 
Cart Path - Sequoyah GC 
Repair/replace damaged portions of the 
existing cart path, reroute as needed to 
address erosion issues 
 
 
Golf 
 
 
Revenue Loss 
 
 
7 
 
 
150,000 
 
 
35 
 
Sequoyah - Golf Course 
 
Bridge Addition - Sequoyah GC 
 
Add new bridges to holes 13, 14 
 
Golf 
 
Revenue Loss 
 
7 
 
150,000 
 
36 
   OTRD Capital Needs 8 Year Plan Year 7 
  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
   
 
Park Location 
 
 
Project Name 
 
 
Project Description 
 
 
Project Category 
 
 
Priority Category 
 
Project 
Planning Year 
 
Project Cost 
Estimate 
Priority 
Ranking 1- 
58 
 
Sequoyah - Golf Course 
 
Erosion Control - Sequoyah GC 
Site work needed around cart path around 
10/18 for better drainage 
 
Golf 
 
Revenue Loss 
 
7 
 
25,000 
 
37 
 
Sequoyah - Golf Course 
 
Erosion Control - Sequoyah GC 
 
Add new pond to course for water runoff 
 
Golf 
 
Revenue Loss 
 
7 
 
25,000 
 
38 
 
Sequoyah - Golf Course 
 
Tee Box Relocation - Sequoyah GC 
Relocate the tee box on hole 13 due to flooding 
issues 
 
Golf 
 
Revenue Loss 
 
7 
 
6,000 
 
39 
 
Sequoyah - Golf Course 
 
Turf Admin - Sequoyah GC 
Add top soil and sod on fairways and tee boxes 
to improve playing conditions 
 
Golf 
 
Revenue Loss 
 
7 
 
200,000 
 
40 
 
Sequoyah - Golf Course 
 
Expand Green - Sequoyah GC 
Expand the green on 14, 17, 18 to allow for 
more pin placements 
 
Golf 
 
Revenue Loss 
 
7 
 
75,000 
 
41 
 
Sequoyah - Golf Course 
 
Bunkers - Sequoya GC 
 
Add 9 new bunkers to improve course layout 
 
Golf 
 
Revenue Loss 
 
7 
 
90,000 
 
42 
 
Sequoyah - Golf Course 
 
Disc Golf - Sequoyah GC 
 
Add new disc golf course at Sequoyah 
 
Golf 
 
Revenue Loss 
 
7 
 
20,000 
 
43 
 
Sequoyah - Golf Course 
 
Front 9 Reopen - Sequoyah GC 
 
Reopen the front nine of the golf course 
 
Golf 
 
Revenue Loss 
 
7 
 
175,000 
 
44 
 
Cherokee Landing 
 
Sports Court - Cherokee Landing 
 
Repair and relocate sand volleyball court 
 
Park Operations 
 
Upgrade 
 
7 
 
25,000 
 
45 
 
Cherokee Landing 
 
Sports Field - Cherokee Landing 
 
Repair/renovate the softball field area 
 
Park Operations 
 
Upgrade 
 
7 
 
50,000 
 
46 
 
Roman Nose 
Building Repair/Renovation - Park 
Office/Proshop 
Repair or replace the existing park 
office/proshop building at Roman Nose 
 
Park Operations 
 
Revenue Loss 
 
7 
 
2,000,000 
 
47 
 
Tenkiller 
Renovate/Relocate - Park Office and 
Nature Center 
Assess the potential for relocating the park 
office and nature center 
 
Park Operations 
 
Revenue Loss 
 
7 
 
250,000 
 
48 
 
 
Tenkiller 
 
 
Pool Conversion - Tenkiller 
 
Convert the pool area to a splash pad. 
Personnel shortages impact pool operations 
 
 
Pool 
 
 
Revenue Loss 
 
 
7 
 
 
250,000 
 
 
49 
 
Sequoyah - Golf Course 
 
Building Renovation - Proshop 
 
Repair exterior and interior of proshop 
 
Golf 
 
Revenue Loss 
 
7 
 
500,000 
 
50 
 
 
Sequoyah - Golf Course 
 
Building Renovation - Tournament 
Barn 
 
Repair/renovate to accommodate larger 
tournament groups an other events in the park 
 
 
Golf 
 
 
Revenue Loss 
 
 
7 
 
 
250,000 
 
 
51 
 
Sequoyah Bay 
Building Repair/Renovation - 
Maintenance Barn 
Repair/renovate the existing maintenance 
facility at Sequoyah Bay 
 
Park Operations 
 
Revenue Loss 
 
7 
 
300,000 
 
52 
 
Boiling Springs 
Building Renovation - Group Camp 2 
Water Tower 
 
Repair the exterior of the CCC water tower 
 
Park Operations 
 
Revenue Loss 
 
7 
 
30,000 
 
53 
 
 
Boiling Springs 
 
 
Restroom - Group Camp 2 
 
Assess restrooms for repair or replacement. 
There are two separate structures 
 
 
Group Camp 
 
 
Revenue Loss 
 
 
7 
 
 
500,000 
 
 
54 
 
Boiling Springs 
Building Repair/Renovation - Group 
Camp 2 Bunkhouses 
Repair/renovate the exteriors and add ADA 
compliant parking 
 
Group Camp 
 
Revenue Loss 
 
7 
 
550,000 
 
55 
 
 
Boiling Springs 
 
Building Repair/Renovation - Group 
Camp 2 Community Building 
 
Repair/renovate exterior and interior of the 
building, update restroom for ADA access 
 
 
Group Camp 
 
 
Revenue Loss 
 
 
7 
 
 
300,000 
 
 
56 
 
Boiling Springs 
Building Repair/Renovation - Group 
Camp 2 Chapel 
Repair the Chapel to allow for more guest 
usage 
 
Group Camp 
 
Revenue Loss 
 
7 
 
250,000 
 
57 
System Wide Contingency Allowance - Year 7 Contingency Allowance - Year 7 Contingency Contingency 7 4,634,000 58 
  	Project Estimated Cost    	35,000,000  
  	Plus: Allocation for Roads/Parking 
   	7,500,000 
 
  	Project Estimated Cost - Year 7    	42,500,000  
   OTRD Capital Needs 8 Year Plan Year 8 
  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
   
 
Park Location 
 
 
Project Name 
 
 
Project Description 
 
 
Project Category 
 
 
Priority Category 
 
Project 
Planning Year 
 
Project Cost 
Estimate 
Priority 
Ranking 1- 
14 
 
 
Foss 
 
 
Pavilions - Foss 
 
Repair/replace the small shade structures 
throughout the park in tent and day use areas 
 
 
Pavilions 
 
 
Revenue Loss 
 
 
8 
 
 
750,000 
 
 
1 
 
Honey Creek 
Building Repair/Renovation - Park 
Office 
 
Repair/renovate the park office at Honey Creek 
 
Park Operations 
 
Revenue Loss 
 
8 
 
250,000 
 
2 
 
Sequoyah - Lodge 
 
Splash Pad - Sequoyah Lodge 
Repair/replace the splash pad fixtures at the 
pool 
 
Pool 
 
Revenue Loss 
 
8 
 
100,000 
 
3 
 
Quartz Mountain - Park 
 
RV Campground - Lake View 
Assess and repair/renovate Lake View RV 
Campground, 
 
RV CG 
 
Revenue Loss 
 
8 
 
600,000 
 
4 
 
Fort Cobb 
Building Repair/Renovation - Caddo 
Hill Community Building 
Replace windows, doors, and flooring. Need 
interior FFE 
 
Park Operations 
 
Revenue Loss 
 
8 
 
250,000 
 
5 
 
Fort Cobb 
Building Repair/Renovation - Eagle's 
Nest Community Building 
Replace windows, doors, and flooring. Need 
interior FFE 
 
Park Operations 
 
Revenue Loss 
 
8 
 
250,000 
 
6 
 
 
Black Mesa 
 
Building Repair/Renovation - Group 
Camp 
Demo old cabins and renovate the community 
building. Assess the area for better use of the 
space and facilities 
 
 
Group Camp 
 
 
Revenue Loss 
 
 
8 
 
 
500,000 
 
 
7 
 
 
Black Mesa 
 
Building Repair/Renovation - Park 
Office 
Assess the park office for renovation or 
replacement. Current office is small with 
limited space for staff and gift shop 
 
 
Park Operations 
 
 
Revenue Loss 
 
 
8 
 
 
750,000 
 
 
8 
 
Boiling Springs 
 
Building Renovation - Nurses Cabin 
Repair/renovate existing structure and convert 
to a rentable cabin 
 
Group Camp 
 
Revenue Loss 
 
8 
 
250,000 
 
9 
 
 
Boiling Springs 
 
Building Renovation - Group Camp 1 
Chapel 
Repair/renovate exterior and interior and 
create a new entrance and connection to 
Whitetail Campground 
 
 
Group Camp 
 
 
Revenue Loss 
 
 
8 
 
 
500,000 
 
 
10 
 
Boiling Springs 
Building Renovation - Group Camp 1 
Community Building 
Repair/renovate exterior and interior of CCC 
Community Building 
 
Group Camp 
 
Revenue Loss 
 
8 
 
750,000 
 
11 
 
 
 
Boiling Springs 
 
 
Building Renovation - Group Camp 1 
Bunkhouses 
 
Repair/renovate existing bunkhouses and 
convert to rentable cabins, reconfigure or add 
roadways through the cabin area 
 
 
 
Group Camp 
 
 
 
Revenue Loss 
 
 
 
8 
 
 
 
3,000,000 
 
 
 
12 
 
 
Robbers Cave 
 
 
Cabin Replacement - Group Camp 1 
 
Add new cabins in the Group Camp 1 Area, 
need to assess overall scope for the area 
 
 
Group Camp 
 
 
Revenue Loss 
 
 
8 
 
 
3,000,000 
 
 
13 
 
System Wide 
 
Contingency Allowance - Year 8 
 
Contingency Allowance - Year 8 
 
Contingency 
 
Contingency 
 
8 
 
2,280,000 
 
14 
  	Project Estimated Cost    	13,230,000  
  	Plus: Allocation for Roads/Parking 
   	6,770,000 
 
  	Project Estimated Cost - Year 8    	20,000,000