Oklahoma 2025 2025 Regular Session

Oklahoma House Bill HB1374 Comm Sub / Bill

Filed 04/24/2025

                     
 
Req. No. 2058 	Page 1  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
  
STATE OF OKLAHOMA 
 
1st Session of the 60th Legislature (2025) 
 
COMMITTEE SUBSTITUTE 
FOR ENGROSSED 
HOUSE BILL 1374 	By: Boles, Hefner, and Adams of 
the House 
 
  and 
 
  Green of the Senate 
 
 
 
 
COMMITTEE SUBSTITUTE 
 
[ electric vehicle charging statio ns - safety 
standards - rule promulgation - penalties - deposit - 
codification - effective date ] 
 
 
 
 
 
BE IT ENACTED BY THE PEOPLE OF THE STATE OF OKLAHOMA: 
SECTION 1.     NEW LAW     A new section of law to be codified 
in the Oklahoma Statutes as Section 6513 of Title 68, unless there 
is created a duplication in numbering, reads as follows: 
A. The Corporation Commission shall establish minimum fire 
safety standards which require charging station operators who 
provide access to elec tric vehicle charging equipment housed in 
multistory buildings to comply with the provisions of this section. 
B.  Each charging station operator who provides access to 
electric vehicle charging equipment housed in multistory buildings   
 
Req. No. 2058 	Page 2  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
  
shall attest annually to the Corporation Commission that charging 
stations are compliant with the following standards: 
1.  Electric vehicle charging stations shall comply with the 
minimums set forth in Article 625 of the National Electric al Code 
(NEC) and the National Fire Pro tection Association (NFPA) codes 70 
and 88a for the design, installation, and continued operation of 
electric vehicle charging equipment housed in multistory buildings; 
2.  Electric vehicle charging stations shall be housed on the 
ground floor of any m ultilevel structure; 
3.  Electric vehicle charging stations shall be housed no more 
than twenty-five (25) feet from an entry point to a multilevel 
structure accessible by a public right -of-way or by a private drive 
accessible from a public right -of-way; 
4. Installation of signage at all points of egress for a 
parking structure indicating the Corporation Commission registration 
number for the charging station operator, locations of electric 
vehicle charging stations, an emergency contact for the charging 
station operator listed in paragraph 9 of this subsection , and the 
location of the emergency call box listed in paragrap h 5 of this 
subsection; 
5.  Installation of one emergency call box and one ten -pound 
Class C fire extinguisher no more than twenty -five (25) feet from 
electric vehicle charging stations;   
 
Req. No. 2058 	Page 3  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
  
6.  Installation of sufficient lighting in accordance with 
Chapter 10 of the Oklahoma International Building Code; 
7.  Installation of a fire alarm system with notification 
capability in accordance with Chap ter 10 of the Oklahoma 
International Building Code; 
8.  Installation of continuous video surveillance with seventy -
two-hour recall capability in the immediate vicinity of electric 
vehicle charging stations ; 
9. Designation of an emergency contact for the charging station 
operator with contact information for both business hours and after -
hours emergencies; and 
10. Any other applicable rules or minimum fire safety standards 
promulgated by the Corporation Commission pursuant to this section. 
C. The Corporation Commission may promulgate rules to implement 
the provisions of this section which shall, at minimum, include the 
following: 
1.  Require annual reports be filed by charging station 
operators in accordance with the provisions of Section 6501 et seq. 
of Title 68 of the Oklahoma Statutes and the rules of the 
Commission, attesting the continuous compliance with requirements in 
this section; 
2.  Authorize third-party inspections in accordance with Section 
6509 of Title 68 of the Oklahoma Statutes ; and   
 
Req. No. 2058 	Page 4  1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
  
3.  Set fees necessary to carry out the duties and 
responsibilities of the Commission pursuant to this section. 
D.  If a charging station operator fails to meet the 
requirements of this section or any rules promulgated to implement 
the requirements of this section, t he charging station operator 
shall be subject to an administrative penalty from the Corporation 
Commission not to exceed Five Hundred Dollars ($500.00) per day, per 
violation as provided by law. 
E.  All fees, fines, or assessments collected through the 
provisions of this section shall be deposited into the Corporation 
Commission Revolving Fund created in Section 180.7 of Title 17 of 
the Oklahoma Statutes. 
SECTION 2.  This act shall become effective November 1, 2025. 
 
60-1-2058 RD 4/24/2025 12:59:29 PM