Oregon 2025 2025 Regular Session

Oregon Senate Bill SB128 Introduced / Bill

                    1
2
3
4
5
6
7
8
9
83rd OREGON LEGISLATIVE ASSEMBLY--2025 Regular Session
Senate Bill 128
Sponsored by Senator GOLDEN (Presession filed.)
SUMMARY
The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject
to consideration by the Legislative Assembly. It is an editor’s brief statement of the essential features of the
measure as introduced.The statement includes a measure digest written in compliance with applicable readability
standards.
Digest: Makes the PUC do a study on electric power and submit a report. (Flesch Readability
Score:69.9).
Requires the Public Utility Commission to study electric power. Directs the commission to sub-
mit findings to the interim committees of the Legislative Assembly related to energy not later than
September 15, 2026.
Sunsets on January 2, 2027.
A BILL FOR AN ACT
Relating to the transmission of electric power.
Be It Enacted by the People of the State of Oregon:
SECTION 1.	The Public Utility Commission shall study electric power. The commission
shall submit a report in the manner provided by ORS 192.245, and may include recommen-
dations for legislation, to the interim committees of the Legislative Assembly related to en-
ergy no later than September 15, 2026.
SECTION 2.Section 1 of this 2025 Act is repealed on January 2, 2027.
NOTE:Matter in boldfaced type in an amended section is new; matter [italic and bracketed] is existing law to be omitted.
New sections are in boldfaced type.
LC 1332