1 2 3 4 5 6 7 8 9 83rd OREGON LEGISLATIVE ASSEMBLY--2025 Regular Session Senate Bill 128 Sponsored by Senator GOLDEN (Presession filed.) SUMMARY The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject to consideration by the Legislative Assembly. It is an editor’s brief statement of the essential features of the measure as introduced.The statement includes a measure digest written in compliance with applicable readability standards. Digest: Makes the PUC do a study on electric power and submit a report. (Flesch Readability Score:69.9). Requires the Public Utility Commission to study electric power. Directs the commission to sub- mit findings to the interim committees of the Legislative Assembly related to energy not later than September 15, 2026. Sunsets on January 2, 2027. A BILL FOR AN ACT Relating to the transmission of electric power. Be It Enacted by the People of the State of Oregon: SECTION 1. The Public Utility Commission shall study electric power. The commission shall submit a report in the manner provided by ORS 192.245, and may include recommen- dations for legislation, to the interim committees of the Legislative Assembly related to en- ergy no later than September 15, 2026. SECTION 2.Section 1 of this 2025 Act is repealed on January 2, 2027. NOTE:Matter in boldfaced type in an amended section is new; matter [italic and bracketed] is existing law to be omitted. New sections are in boldfaced type. LC 1332