Texas 2017 85th Regular

Texas House Bill HB2377 House Committee Report / Bill

Filed 02/02/2025

Download
.pdf .doc .html
                    85R23063 SLB-F
 By: Larson, Lucio III H.B. No. 2377
 Substitute the following for H.B. No. 2377:
 By:  Larson C.S.H.B. No. 2377


 A BILL TO BE ENTITLED
 AN ACT
 relating to the development of brackish groundwater.
 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
 SECTION 1.  Subchapter D, Chapter 36, Water Code, is amended
 by adding Section 36.1015 to read as follows:
 Sec. 36.1015.  RULES FOR PERMITS IN BRACKISH GROUNDWATER
 PRODUCTION ZONES. (a)  In this section:
 (1)  "Designated brackish groundwater production zone"
 means an aquifer, subdivision of an aquifer, or geologic stratum
 designated under Section 16.060(b)(5).
 (2)  "Development board" means the Texas Water
 Development Board.
 (3)  "Gulf Coast Aquifer" means the system of
 hydrogeologic units that run along the Gulf Coast from the Sabine
 River to the Rio Grande, including:
 (A)  the Catahoula confining system, including
 the Frio Formation, the Anahuac Formation, and the Catahoula Tuff
 or Sandstone;
 (B)  the Jasper Aquifer, including the Oakville
 Sandstone and Fleming Formation;
 (C)  the Burkeville confining system separating
 the Jasper Aquifer from the Evangeline Aquifer;
 (D)  the Evangeline Aquifer, including the Goliad
 Sand; and
 (E)  the Chicot Aquifer, including the Willis
 Sand, the Bentley and Montgomery Formations, the Beaumont Clay, and
 alluvial deposits at the surface.
 (b)  A district located over any part of a designated
 brackish groundwater production zone may adopt rules to govern the
 issuance of permits for the completion and operation of a well for
 the withdrawal of brackish groundwater from a designated brackish
 groundwater production zone and shall adopt rules described by this
 subsection if the district receives a petition from a person with a
 legally defined interest in groundwater in the district. The
 district must adopt the rules not later than the 180th day after the
 date the district receives the petition. Rules adopted under this
 subsection apply only to a permit for a project described by
 Subsection (c).
 (c)  A person may obtain a permit under rules adopted under
 this section for the following projects:
 (1)  a municipal project designed to treat brackish
 groundwater to drinking water standards for the purpose of
 providing a public source of drinking water; and
 (2)  an electric generation project to treat brackish
 groundwater to water quality standards sufficient for the project
 needs.
 (d)  The rules adopted must:
 (1)  provide for processing an application for a
 brackish groundwater production zone operating permit in the same
 manner as an application for an operating permit for a fresh
 groundwater well, except as provided by this section;
 (2)  allow withdrawals and rates of withdrawal of
 brackish groundwater from a designated brackish groundwater
 production zone not to exceed and consistent with the withdrawal
 amounts identified in Section 16.060(e);
 (3)  provide for a minimum term of 30 years for a permit
 issued for a well that produces brackish groundwater from a
 designated brackish groundwater production zone;
 (4)  require implementation of a monitoring system
 recommended by the development board to monitor water levels and
 water quality in the same or an adjacent aquifer, subdivision of an
 aquifer, or geologic stratum in which the designated brackish
 groundwater production zone is located;
 (5)  for a project located in a designated brackish
 groundwater production zone in the Gulf Coast Aquifer, require
 reasonable monitoring by the district of land elevations to
 determine if production from the project is causing or is likely to
 cause subsidence during the permit term;
 (6)  require from the holder of a permit issued under
 rules adopted under this section annual reports that must include:
 (A)  the amount of brackish groundwater
 withdrawn;
 (B)  the average monthly water quality of the
 brackish groundwater withdrawn and in the monitoring wells; and
 (C)  aquifer levels in both the designated
 brackish groundwater production zone and in any aquifer,
 subdivision of an aquifer, or geologic stratum for which the permit
 requires monitoring; and
 (7)  be consistent with and not impair property rights
 described by Sections 36.002(a) and (b).
 (e)  An application for a brackish groundwater production
 zone operating permit must include:
 (1)  the proposed well field design compared to the
 designated brackish groundwater production zone;
 (2)  the requested maximum groundwater withdrawal rate
 for the proposed project;
 (3)  the number and location of monitoring wells needed
 to determine the effects of the proposed project on water levels and
 water quality in the same or an adjacent aquifer, subdivision of an
 aquifer, or geologic stratum in which the designated brackish
 groundwater production zone is located; and
 (4)  a report that includes:
 (A)  a simulation of the projected effects of the
 proposed production on water levels and water quality in the same or
 an adjacent aquifer, subdivision of an aquifer, or geologic stratum
 in which the designated brackish groundwater production zone is
 located;
 (B)  a description of the model used for the
 simulation described by Paragraph (A); and
 (C)  sufficient information for a technical
 reviewer to understand the parameters and assumptions used in the
 model described by Paragraph (B).
 (f)  The district shall submit the application to the
 development board and the development board shall conduct a
 technical review of the application. The development board shall
 submit a report of the review of the application that includes:
 (1)  findings regarding the compatibility of the
 proposed well field design with the designated brackish groundwater
 production zone; and
 (2)  recommendations for the monitoring system
 described by Subsection (d)(4).
 (g)  The district may not schedule a hearing on the
 application until the district receives the report from the
 development board described by Subsection (f).
 (h)  The district shall provide the reports required under
 Subsection (d)(6) to the development board. Not later than the
 120th day after the date the development board receives a request
 from the district, the development board shall investigate and
 issue a report on whether brackish groundwater production under the
 project that is the subject of the report from the designated
 brackish groundwater production zone is projected to cause:
 (1)  significant aquifer level declines in the same or
 an adjacent aquifer, subdivision of an aquifer, or geologic stratum
 that were not anticipated by the development board in the
 designation of the zone;
 (2)  negative effects on quality of water in an
 aquifer, subdivision of an aquifer, or geologic stratum; or
 (3)  for a project located in a designated brackish
 groundwater production zone in the Gulf Coast Aquifer, subsidence
 during the permit term.
 (i)  After receiving from the development board a report
 issued under Subsection (h) and after notice and hearing subject to
 Subchapter M, the district may:
 (1)  amend the applicable permit to establish a
 production limit necessary to mitigate any negative effects
 identified by the report;
 (2)  approve a mitigation plan that alleviates any
 negative effects identified by the report; or
 (3)  both amend the permit to establish a production
 limit and approve a mitigation plan.
 SECTION 2.  Section 36.1132, Water Code, is amended by
 adding Subsection (d) to read as follows:
 (d)  Production under a permit issued under Section 36.1015
 to produce brackish groundwater from a designated brackish
 groundwater production zone is in addition to the amount of
 groundwater that may be produced based on Subsections (b)(1) and
 (2).  To the extent possible, a district shall issue permits up to
 the point that the total volume of exempt and permitted groundwater
 production in a designated brackish groundwater production zone
 equals the amount of brackish groundwater that may be produced
 annually to achieve the groundwater availability described by the
 Texas Water Development Board in its designation of the brackish
 groundwater production zone under Section 16.060(e).
 SECTION 3.  This Act takes effect September 1, 2017.