85R12219 JXC-F By: Hall S.B. No. 2098 A BILL TO BE ENTITLED AN ACT relating to requirements for underground facility damage prevention and safety. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: SECTION 1. Section 251.002(6), Utilities Code, is amended to read as follows: (6) "Excavator" means an individual who or legal entity [a person] that actually excavates or intends to excavate in this state. SECTION 2. Subchapter A, Chapter 251, Utilities Code, is amended by adding Section 251.0045 to read as follows: Sec. 251.0045. EXCAVATION BY SUBCONTRACTOR. A subcontractor who performs an excavation operation may not begin the excavation unless the subcontractor has complied with the requirements this chapter imposes on an excavator, regardless of whether the general contractor that hired the subcontractor has complied with the requirements. SECTION 3. Section 251.151, Utilities Code, is amended by amending Subsection (a) and adding Subsection (a-1) to read as follows: (a) Except as provided by Sections 251.155 and 251.156, an excavator [a person] who intends to excavate shall notify a notification center not earlier than the 14th day before the date the excavation is to begin [or later than the 48th hour before the time the excavation is to begin], excluding Saturdays, Sundays, and legal holidays. An excavator may not excavate: (1) before 8 a.m. on the third day after the date on which the excavator gives the notice, excluding Saturdays, Sundays, and legal holidays; or (2) after the 21st day after the date on which the excavator gives the notice, including Saturdays, Sundays, and legal holidays. (a-1) If markings made by an operator after notice is given under Subsection (a) for an excavation operation showing the location of underground facilities in the excavation area are no longer visible, are unclear, or are damaged, the excavator shall give another notice under Subsection (a) for the unfinished portions of the excavation operation. SECTION 4. Sections 251.157(a) and (d), Utilities Code, are amended to read as follows: (a) Each Class A underground facility operator contacted by the notification system shall mark the approximate location of its underground facilities at or near the site of the proposed excavation if the operator believes that marking the location is necessary. The operator shall mark the location not later than: (1) 8 a.m. on the third day following the date on which the excavator gives to the notification system notice of intent to excavate under Section 251.151(a) [the 48th hour after the time the excavator gives to the notification system notice of intent to excavate], excluding Saturdays, Sundays, and legal holidays; [(2) 11:59 a.m. on the Tuesday following a Saturday notification unless the intervening Monday is a holiday; [(3) 11:59 a.m. on the Wednesday following a Saturday notification if the intervening Monday is a holiday;] or (2) [(4)] a time agreed to by the operator and the excavator. (d) Not later than 8 a.m. on the third day following the date on which the excavator gives to the notification system notice of intent to excavate under Section 251.151(a), excluding Saturdays, Sundays, and legal holidays [the 48th hour after the time the excavator gives to the notification center notice of intent to excavate], an operator contacted by the notification center shall notify the excavator of the operator's plans to not mark the proximate location of an underground facility at or near the site of the proposed excavation. The operator must provide the notification by e-mail or facsimile or by another verifiable electronic method approved by the board. SECTION 5. Section 251.151(b), Utilities Code, is repealed. SECTION 6. This Act takes effect September 1, 2017.