 By: Hall S.B. No. 83


 A BILL TO BE ENTITLED
 AN ACT
 relating to protection of energy critical infrastructure from
 electromagnetic, geomagnetic, terrorist, and cyber-attack threats.
 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
 SECTION 1.  Chapter 418, Government Code, is amended by
 adding Subchapter I to read as follows:
 SUBCHAPTER I.  ELECTROMAGNETIC THREAT PREPAREDNESS
 Sec. 418.201.  ELECTROMAGNETIC THREAT PREPAREDNESS TASK
 FORCE. (a)  In this section, "energy critical infrastructure"
 means an electrical power-generating facility, substation,
 switching station, electrical control center, or electrical
 transmission or distribution facility and includes an associated
 electronic control center and other electronic infrastructure used
 in electric power delivery.
 (b)  The electromagnetic threat preparedness task force is
 created. The task force shall develop a comprehensive recovery
 plan.
 (c)  The task force consists of 10 members appointed by the
 chief described by Section 418.041. Each member must be a regional
 emergency management representative.
 (d)  The task force shall:
 (1)  identify and develop technical and electronic
 resources to assist the division in the division's functions;
 (2)  implement a program to educate owners and
 operators of energy critical infrastructure and vital utility
 facilities and emergency responders about electromagnetic,
 geomagnetic, and cyber-attack threats;
 (3)  evaluate emergency planning and response
 technologies related to electromagnetic, geomagnetic, and
 cyber-attack threats;
 (4)  develop a comprehensive threat protection and
 recovery plan for energy critical infrastructure and vital utility
 facilities of this state against electromagnetic, geomagnetic,
 terrorist, and cyber-attack threats; and
 (5)  identify and compile a comprehensive list of
 contractors capable of performing work to increase the security of
 the electric grid.
 (e)  Information collected by the task force related to the
 security of the electric grid is confidential and is not subject to
 disclosure under Chapter 552.
 (f)  Not later than September 1, 2018, the task force shall
 prepare and submit to the governor and the legislature a report of
 the task force's findings and recommendations.
 (g)  A member of the task force established under this
 section is not entitled to compensation. Members may be reimbursed
 for expenses as follows:
 (1)  a member is entitled to reimbursement for travel
 and other necessary expenses as provided in the General
 Appropriations Act; and
 (2)  a member appointed as a representative of a state
 agency is eligible for reimbursement for travel and other necessary
 expenses according to the applicable agency's policies.
 (h)  This section expires September 1, 2018.
 Sec. 418.202.  TECHNOLOGICAL HAZARDS. (a)  In this section,
 "energy critical infrastructure" means an electrical
 power-generating facility, substation, switching station,
 electrical control center, or electrical transmission or
 distribution facility and includes an associated electronic
 control center and other electronic infrastructure used in electric
 power delivery.
 (b)  The division shall implement the comprehensive threat
 protection and recovery plan developed by the electromagnetic
 threat preparedness task force for energy critical infrastructure
 and vital utility facilities of this state against electromagnetic,
 geomagnetic, terrorist, and cyber-attack threats.
 (c)  The governor may instruct an agency to take actions as
 are necessary to implement the comprehensive threat protection and
 recovery plan developed by the electromagnetic threat preparedness
 task force.
 (d)  Information collected by the division related to the
 security of the electric grid is confidential and is not subject to
 disclosure under Chapter 552.
 SECTION 2.  Chapter 39, Utilities Code, is amended by adding
 Subchapter M to read as follows:
 SUBCHAPTER M.  GRID SECURITY
 Sec. 39.601.  INFORMATION RELATED TO GRID SECURITY. The
 independent organization certified under Section 39.151 shall
 collect and compile information related to the security of the
 electric grid. The information is confidential and is not subject
 to disclosure under Chapter 552, Government Code.
 Sec. 39.602.  ELECTRIC GRID SECURITY PROGRAM. (a)  In this
 section:
 (1)  "Committee" means the Electric Grid Security
 Advisory Committee.
 (2)  "Energy critical infrastructure" has the meaning
 assigned by Section 418.202, Government Code.
 (b)  The commission shall establish a program to meet
 implementation deadlines and pay costs incurred to increase the
 security of the electric grid in ERCOT.  The program must be
 designed to pay for:
 (1)  an audit related to security of the electric grid
 and associated computer systems and networks conducted by:
 (A)  an independent security expert for a
 transmission and distribution utility;
 (B)  an independent organization certified by the
 commission under Section 39.151;
 (C)  an electric cooperative;
 (D)  a river authority; or
 (E)  a municipally owned utility operating in
 ERCOT;
 (2)  reimbursement of an investment made or expense
 incurred to implement a measure recommended by the committee or
 implement a recommendation made in an audit conducted under
 Subdivision (1) by:
 (A)  a transmission and distribution utility;
 (B)  an independent organization certified by the
 commission under Section 39.151;
 (C)  an electric cooperative;
 (D)  a river authority; or
 (E)  a municipally owned utility operating in
 ERCOT;
 (3)  an expense incurred by the committee related to
 the retention of a consultant or other necessary expert to assist
 the committee in performing a duty of the committee;
 (4)  reimbursement to a member of the committee for
 travel expenses; and
 (5)  reimbursement of a cost incurred by the commission
 in administering this section.
 (c)  Entities other than the commission seeking
 reimbursement from the program shall provide adequate
 documentation to the committee to demonstrate that the investment,
 expense, or cost is eligible for reimbursement under this section.
 The commission shall authorize reimbursement of an eligible
 investment, expense, or cost on receipt of a certification from the
 committee that the item is eligible under this section not later
 than five business days after the date of the receipt of a valid
 certification.
 (d)  The commission shall report each quarter the total
 amount paid by the program for each of the categories listed in
 Subsection (b) to the governor, lieutenant governor, and speaker of
 the house of representatives.
 (e)  This section does not prevent recovery authorized by
 this title for a cost incurred through a reasonable and necessary
 expenditure related to an ongoing effort to secure electric
 facilities from physical and cybersecurity threats by:
 (1)  a transmission and distribution utility;
 (2)  an independent organization certified by the
 commission under Section 39.151;
 (3)  an electric cooperative;
 (4)  a river authority; or
 (5)  a municipally owned utility operating in ERCOT.
 (f)  The program may not pay for an audit described by
 Subsection (b)(1) that is conducted by an independent security
 expert unless the expert meets professional standards adopted by
 commission rule that are at least as stringent as those required for
 certification as a:
 (1)  certified information systems security
 professional (CISSP) by the International Information System
 Security Certification Consortium; or
 (2)  global industrial cyber security professional
 (GICSP) by the Global Information Assurance Certification.
 Sec. 39.603.  GRID SECURITY ADVISORY COMMITTEE.  (a)  The
 Electric Grid Security Advisory Committee is composed of the
 following members:
 (1)  two members appointed by the governor;
 (2)  two members appointed by the lieutenant governor;
 and
 (3)  two members appointed by the speaker of the house
 of representatives.
 (b)  The governor shall designate a member of the committee
 to serve as presiding officer.
 (c)  The committee shall convene at the call of the presiding
 officer.
 (d)  The committee shall study the Texas electric grid and
 the computer systems and networks related to the grid. The study
 must:
 (1)  evaluate and summarize the current state of the
 electric grid and associated computer systems and networks;
 (2)  research and consider potential security threats
 to the electric grid and to associated computer systems and
 networks;
 (3)  assess whether further efforts are needed to
 secure the electric grid and associated computer systems and
 networks against damage, including the threat of electromagnetic
 pulse or other attacks and natural threats, including solar flares;
 (4)  recommend measures to secure the electric grid and
 associated computer systems and networks against damage;
 (5)  recommend a program to develop technical expertise
 in the protection of the electric transmission and distribution
 system against electromagnetic, geomagnetic, and cyber-attack
 threats;
 (6)  determine energy critical infrastructure and
 vital utility facilities that are at risk from electromagnetic,
 geomagnetic, and cyber-attack threats;
 (7)  evaluate technologies available to improve the
 resiliency of energy critical infrastructure and vital utility
 facilities against electromagnetic, geomagnetic, or cyber-attack
 threats;
 (8)  evaluate the capabilities of energy critical
 infrastructure and vital utility facilities to recover from
 electromagnetic, geomagnetic, or cyber-attack threats; and
 (9)  develop a comprehensive plan to protect the energy
 critical infrastructure and vital utility facilities of this state
 against electromagnetic, geomagnetic, terrorist, and cyber-attack
 threats.
 (e)  The committee may share its findings with any state
 agency it considers important to the security of the electric grid
 or associated computer systems or networks. To the extent allowed
 by law, a state agency with which the committee shares information
 is encouraged to implement any recommendations that the agency
 determines will improve the security of the state's electric grid
 or associated computer systems or networks.
 (f)  ERCOT shall cooperate with the committee to provide any
 information and resources the committee considers important to the
 study.
 (g)  A member of the committee is not entitled to
 compensation but is entitled to reimbursement for the member's
 travel expenses as provided by Chapter 660, Government Code, and
 the General Appropriations Act.
 (h)  A vacancy on the committee shall be filled for the
 unexpired term in the same manner as the original appointment.
 (i)  The committee is not subject to Chapter 2110, Government
 Code.
 (j)  Not later than December 1, 2018, the committee shall
 prepare a report of its findings, including any recommendations for
 legislation resulting from the findings, and shall submit the
 report to the governor, the lieutenant governor, and the speaker of
 the house of representatives.
 (k)  The committee's work relates to sensitive matters of
 security. Notwithstanding any other law, the meetings, work, and
 findings of the committee are not subject to the requirements of
 Chapter 551 or 552, Government Code.
 Sec. 39.604.  GRID PROTECTION. (a) This section applies to:
 (1)  a transmission and distribution utility;
 (2)  an electric cooperative operating in ERCOT;
 (3)  a river authority operating in ERCOT; and
 (4)  a municipally owned utility operating in ERCOT.
 (b)  Not later than December 31, 2018, each entity to which
 this section applies shall assess and report to the technological
 hazards unit of the Texas Division of Emergency Management the
 vulnerabilities the equipment, facilities, and systems the utility
 uses to provide power have from the following:
 (1)  a high altitude electromagnetic pulse device;
 (2)  geomagnetic storms; and
 (3)  intentional electromagnetic interference.
 (c)  Not later than December 31, 2021, each entity to which
 this section applies shall complete enhancements to transformers,
 control centers, substations, and other equipment sufficient to
 comply with the following standards, as applicable to the equipment
 or facility:
 (1)  MIL-STD 188-125-1, "High-Altitude Electromagnetic
 Pulse (HEMP) Protection for Ground-Based C4I Facilities Performing
 Critical, Time-Urgent Missions, Part 1: Fixed Facilities," April 7,
 2005;
 (2)  Cigré TB 600, "Protection of High-Voltage Power
 Network Control Electronics Against Intentional Electromagnetic
 Interference (IEMI)," November 2014;
 (3)  IEEE Std 1642-2015, "IEEE Recommended Practice for
 Protecting Publicly Accessible Computer Systems from Intentional
 Electromagnetic Interference (IEMI)";
 (4)  IEC/TR 61000-1-3 Ed. 1.0 (2002-06):
 Electromagnetic compatibility (EMC) - Part 1-3: General - The
 effects of high-altitude EMP (HEMP) on civil equipment and systems;
 (5)  IEC/TR 61000-1-5 Ed. 1.0 (2004-11):
 Electromagnetic compatibility (EMC) - Part 1-5: General - High
 power electromagnetic (HPEM) effects on civil systems;
 (6)  IEC 61000-2-9 Ed. 1.0 (1996-02): Electromagnetic
 compatibility (EMC) - Part 2: Environment - Section 9: Description
 of HEMP environment - Radiated disturbance;
 (7)  IEC 61000-2-10 Ed. 1.0 (1998-11): Electromagnetic
 compatibility (EMC) - Part 2-10: Environment - Description of HEMP
 environment - Conducted disturbance;
 (8)  IEC 61000-2-11 Ed. 1.0 (1999-10): Electromagnetic
 compatibility (EMC) - Part 2-11: Environment - Classification of
 HEMP environments;
 (9)  IEC 61000-2-13 Ed. 1.0 (2005-03): Electromagnetic
 compatibility (EMC) - Part 2-13: Environment - High-power
 electromagnetic (HPEM) environments - Radiated and conducted;
 (10)  IEC 61000-4-23 Ed. 1.0 (2000-10):
 Electromagnetic compatibility (EMC) - Part 4-23: Testing and
 measurement techniques - Test methods for protective devices for
 HEMP and other radiated disturbances;
 (11)  IEC 61000-4-24 Ed. 1.0 (2011-15):
 Electromagnetic compatibility (EMC) - Part 4: Testing and
 measurement techniques - Section 24: Test methods for protective
 devices for HEMP conducted disturbance;
 (12)  IEC 61000-4-25 Ed. 1.1 (2012-05):
 Electromagnetic compatibility (EMC) - Part 4-25: Testing and
 measurement techniques - HEMP immunity test methods for equipment
 and systems;
 (13)  IEC 61000-4-36 Ed. 1.0 (2014-11):
 Electromagnetic compatibility (EMC) - Part 4-36: Testing and
 measurement techniques - IEMI immunity test methods for equipment
 and systems;
 (14)  IEC/TR 61000-5-3 Ed. 1.0 (1999-07):
 Electromagnetic compatibility (EMC) - Part 5-3: Installation and
 mitigation guidelines - HEMP protection concepts;
 (15)  IEC/TR 61000-5-6 Ed. 1.0 (2002-06):
 Electromagnetic compatibility (EMC) - Part 5-6: Installation and
 mitigation guidelines - Mitigation of external EM influences;
 (16)  IEC/TS 61000-5-8 Ed. 1.0 (2009-08):
 Electromagnetic compatibility (EMC) - Part 5-8: Installation and
 mitigation guidelines - HEMP protection methods for the distributed
 infrastructure;
 (17)  IEC/TS 61000-5-9 Ed. 1.0 (2009-07):
 Electromagnetic compatibility (EMC) - Part 5-9: Installation and
 mitigation guidelines - System-level susceptibility assessments
 for HEMP and HPEM; and
 (18)  IEC 61000-6-6 Ed. 1.0 (2003-04): Electromagnetic
 compatibility (EMC) - Part 6-6: Generic standards - HEMP immunity
 for indoor equipment.
 (d)  An entity to which this section applies that is required
 to complete enhancements under this section may recover costs
 incurred in completing the enhancements from the reimbursement
 program established under Section 39.602.
 SECTION 3.  The governor, the lieutenant governor, and the
 speaker of the house of representatives shall appoint members to
 the Electric Grid Security Advisory Committee, as required by this
 Act, as soon as practicable after the effective date of this Act,
 but not later than the 120th day after the effective date of this
 Act.
 SECTION 4.  This Act takes effect immediately if it receives
 a vote of two-thirds of all the members elected to each house, as
 provided by Section 39, Article III, Texas Constitution.  If this
 Act does not receive the vote necessary for immediate effect, this
 Act takes effect September 1, 2017.