Texas 2023 88th Regular

Texas House Bill HB1443 Introduced / Bill

Filed 01/19/2023

                    88R6819 PRL-D
 By: Slawson H.B. No. 1443


 A BILL TO BE ENTITLED
 AN ACT
 relating to the operation of a wind-powered generation facility
 near a joint-use airport.
 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
 SECTION 1.  Section 39.002, Utilities Code, as amended by
 Chapters 908 (H.B. 4492) and 950 (S.B. 1580), Acts of the 87th
 Legislature, Regular Session, 2021, is reenacted and amended to
 read as follows:
 Sec. 39.002.  APPLICABILITY. This chapter, other than
 Sections 39.151, 39.1516, 39.155, 39.157(e), 39.159, 39.160,
 39.203, 39.904, 39.9051, 39.9052, 39.9056, and 39.914(e), and
 Subchapters M and N, does not apply to a municipally owned utility
 or an electric cooperative. Sections 39.157(e), 39.203, and
 39.904, however, apply only to a municipally owned utility or an
 electric cooperative that is offering customer choice. If there is
 a conflict between the specific provisions of this chapter and any
 other provisions of this title, except for Chapters 40 and 41, the
 provisions of this chapter control.
 SECTION 2.  Subchapter Z, Chapter 39, Utilities Code, is
 amended by adding Section 39.9056 to read as follows:
 Sec. 39.9056.  OPERATION OF WIND-POWERED GENERATION
 FACILITY NEAR JOINT-USE AIRPORT. (a) In this section, "joint-use
 airport" means an airport:
 (1)  that is owned or operated by a federal defense
 agency;
 (2)  at which both military and civilian aircraft make
 shared use of the airfield; and
 (3)  that provides air traffic control for all military
 and civilian aircraft operating within 60 nautical miles of the
 airport's boundaries.
 (b)  A power generation company or other person required by
 commission rule to register with the commission before generating
 electricity may not operate a wind-powered generation facility in
 the ERCOT power region at a location that is within 65 nautical
 miles of the boundaries of a joint-use airport located in this
 state.
 (c)  An electric cooperative or municipally owned utility
 may not operate a wind-powered generation facility in the ERCOT
 power region at a location that is within 65 nautical miles of the
 boundaries of a joint-use airport located in this state.
 SECTION 3.  Section 39.9056, Utilities Code, as added by
 this Act, applies only to a wind-powered generation facility
 installed on or after the effective date of this Act. A wind-powered
 generation facility installed before the effective date of this Act
 is governed by the law as it existed immediately before that date,
 and that law is continued in effect for that purpose.
 SECTION 4.  To the extent of any conflict, this Act prevails
 over another Act of the 88th Legislature, Regular Session, 2023,
 relating to nonsubstantive additions to and corrections in enacted
 codes.
 SECTION 5.  This Act takes effect September 1, 2023.