Texas 2023 88th Regular

Texas House Bill HB3390 Enrolled / Bill

Filed 05/16/2023

                    H.B. No. 3390


 AN ACT
 relating to the provision of information regarding distributed
 generation and certain electrical loads.
 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
 SECTION 1.  Section 39.9165, Utilities Code, is amended to
 read as follows:
 Sec. 39.9165.  DISTRIBUTED GENERATION FACILITY REPORTING.
 (a) In this section:
 (1)  "Distributed generation facility" [, "distributed
 generation"] is an electrical generating facility, including an
 energy storage facility, that:
 (A)  [(1)  may be located at a customer's point of
 delivery;
 [(2)]  is connected at a voltage less than 60
 kilovolts; and
 (B)  is capable of being [(3)  may be] connected
 in parallel operation to the utility system.
 (2)  "Transmission service provider" means a
 transmission and distribution utility, municipally owned utility,
 or electric cooperative that owns or operates facilities used for
 the transmission of electricity.
 (b)  An independent organization certified under Section
 39.151 may establish protocols to [shall] require a person who owns
 or operates a [an owner or operator of] distributed generation
 facility interconnected to a utility system operating in the power
 region served by the independent organization, or who seeks to
 interconnect such a facility, to provide to the interconnecting
 transmission and distribution utility, municipally owned utility,
 or electric cooperative information about the distributed
 generation facility that the independent organization determines
 is necessary for maintaining system reliability [to register with
 the organization and interconnecting transmission and distribution
 utility information necessary for the interconnection of the
 distributed generator].
 (b-1)  Protocols adopted under Subsection (b) may require
 that the information be provided as a condition to interconnecting
 the distributed generation facility.
 (c)  An independent organization certified under Section
 39.151 may establish protocols to require a transmission service
 provider operating in the power region served by the independent
 organization to report to the independent organization, in
 aggregate by delivery point, information the independent
 organization determines is necessary for maintaining system
 reliability regarding distributed generation facilities and
 distribution-connected loads that:
 (1)  are not registered with the independent
 organization; and
 (2)  are connected to the utility systems served by the
 transmission service provider.
 (d)  An independent organization certified under Section
 39.151 may establish protocols to require a transmission and
 distribution utility, municipally owned utility, or electric
 cooperative that is not required to report load information
 directly to the independent organization regarding the delivery
 points interconnected with its facilities to provide information to
 the utility's or cooperative's transmission service provider for
 purposes of the report described by Subsection (c).
 (e)  For a distributed generation facility interconnected
 before September 1, 2023, any protocols the independent
 organization certified under Section 39.151 establishes under
 Subsections (c) and (d) may require a transmission and distribution
 utility, municipally owned utility, or electric cooperative to:
 (1)  request information about the distributed
 generation facility from the owner or operator of the facility; and
 (2)  in the absence of any timely response to the
 request for information under Subdivision (1) or if the information
 reasonably appears to be incorrect, provide to its transmission
 service provider a good-faith estimate of the information based on
 field observation or other data using reasonable engineering
 judgment.
 (f)  Notwithstanding Subsection (e), the transmission and
 distribution utility, municipally owned utility, or electric
 cooperative, in fulfilling any reporting obligation, may rely on
 any existing record regarding the information required for a
 distributed generation facility, if the transmission and
 distribution utility, municipally owned utility, or electric
 cooperative reasonably believes the information is accurate [This
 section does not apply to distributed generation serving a
 residential property].
 SECTION 2.  Section 39.9165(b-1), Utilities Code, as added
 by this Act, applies only to a distributed generation facility
 interconnected on or after September 1, 2023.
 SECTION 3.  This Act takes effect immediately if it receives
 a vote of two-thirds of all the members elected to each house, as
 provided by Section 39, Article III, Texas Constitution.  If this
 Act does not receive the vote necessary for immediate effect, this
 Act takes effect September 1, 2023.
 ______________________________ ______________________________
 President of the Senate Speaker of the House
 I certify that H.B. No. 3390 was passed by the House on May 1,
 2023, by the following vote:  Yeas 142, Nays 0, 2 present, not
 voting.
 ______________________________
 Chief Clerk of the House
 I certify that H.B. No. 3390 was passed by the Senate on May
 15, 2023, by the following vote:  Yeas 31, Nays 0.