Texas Senate Bill SB1287 Introduced / Bill

Filed 02/28/2023

Download
.pdf .doc .html
                    88R4001 DIO-F
 By: King S.B. No. 1287


 A BILL TO BE ENTITLED
 AN ACT
 relating to the cost of interconnecting certain electric generation
 and energy storage facilities with the ERCOT transmission system.
 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
 SECTION 1.  Section 35.004, Utilities Code, is amended by
 amending Subsection (d) and adding Subsections (d-1) and (d-2) to
 read as follows:
 (d)  The commission shall price wholesale transmission
 services within ERCOT based on the postage stamp method of pricing
 under which a transmission-owning utility's rate is based on the
 ERCOT utilities' combined annual costs of transmission, other than
 costs described by Subsection (d-2), divided by the total demand
 placed on the combined transmission systems of all such
 transmission-owning utilities within a power region.  An electric
 utility subject to the freeze period imposed by Section 39.052 may
 treat transmission costs in excess of transmission revenues during
 the freeze period as an expense for purposes of determining annual
 costs in the annual report filed under Section 39.257.
 Notwithstanding Section 36.201, the commission may approve
 wholesale rates that may be periodically adjusted to ensure timely
 recovery of transmission investment.  Notwithstanding Section
 36.054(a), if the commission determines that conditions warrant the
 action, the commission may authorize the inclusion of construction
 work in progress in the rate base for transmission investment
 required by the commission under Section 39.203(e).
 (d-1)  The commission by rule shall establish an allowance to
 be applied on a per megawatt basis for capital costs incurred to
 interconnect generation resources and electric energy storage
 resources described by Section 35.152(a) with the ERCOT
 transmission system, including costs of utility interconnection
 facilities and all necessary system upgrades.  The allowance must:
 (1)  take into account average historical
 interconnection costs and system upgrade costs, other than
 transmission costs associated with Section 39.904(g); and
 (2)  be designed to lower costs to consumers and
 encourage owners of generation resources and electric energy
 storage resources to locate the resources closer to load.
 (d-2)  Capital costs in excess of the allowance provided by
 Subsection (d-1) incurred to interconnect generation resources and
 electric energy storage resources described by Section 35.152(a)
 with the ERCOT transmission system, including costs of utility
 interconnection facilities and all necessary system upgrades, must
 be directly assigned to the generation resource or electric energy
 storage resource receiving interconnection service through the
 facilities.
 SECTION 2.  This Act takes effect September 1, 2023.