Texas 2025 89th Regular

Texas House Bill HB4007 Introduced / Bill

Filed 03/06/2025

Download
.pdf .doc .html
                    89R13572 SCL-D
 By: Money H.B. No. 4007




 A BILL TO BE ENTITLED
 AN ACT
 relating to the authority of a county to adopt subdivision
 requirements that include reasonable specifications for lot size,
 setback lines, and side lot lines.
 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
 SECTION 1.  Section 232.003, Local Government Code, is
 amended to read as follows:
 Sec. 232.003.  SUBDIVISION REQUIREMENTS.  By an order
 adopted and entered in the minutes of the commissioners court, and
 after a notice is published in a newspaper of general circulation in
 the county, the commissioners court may:
 (1)  require a right-of-way on a street or road that
 functions as a main artery in a subdivision, of a width of not less
 than 50 feet or more than 100 feet;
 (2)  require a right-of-way on any other street or road
 in a subdivision of not less than 40 feet or more than 70 feet;
 (3)  require that the shoulder-to-shoulder width on
 collectors or main arteries within the right-of-way be not less
 than 32 feet or more than 56 feet, and that the shoulder-to-shoulder
 width on any other street or road be not less than 25 feet or more
 than 35 feet;
 (4)  adopt, based on the amount and kind of travel over
 each street or road in a subdivision, reasonable specifications
 relating to the construction of each street or road;
 (5)  adopt reasonable specifications to provide
 adequate drainage for each street or road in a subdivision in
 accordance with standard engineering practices;
 (6)  require that each purchase contract made between a
 subdivider and a purchaser of land in the subdivision contain a
 statement describing the extent to which water will be made
 available to the subdivision and, if it will be made available, how
 and when;
 (7)  require that the owner of the tract to be
 subdivided execute a good and sufficient bond in the manner
 provided by Section 232.004;
 (8)  adopt reasonable specifications that provide for
 drainage in the subdivision to:
 (A)  efficiently manage the flow of stormwater
 runoff in the subdivision; and
 (B)  coordinate subdivision drainage with the
 general storm drainage pattern for the area; [and]
 (9)  require lot and block monumentation to be set by a
 registered professional surveyor before recordation of the plat;
 and
 (10)  adopt reasonable specifications for lot size,
 setback lines, and side lot lines.
 SECTION 2.  This Act takes effect immediately if it receives
 a vote of two-thirds of all the members elected to each house, as
 provided by Section 39, Article III, Texas Constitution.  If this
 Act does not receive the vote necessary for immediate effect, this
 Act takes effect September 1, 2025.