89R1017 CMO-D By: Cain H.B. No. 905 A BILL TO BE ENTITLED AN ACT relating to the imposition of tolls on Fairmont Parkway in Harris County. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: SECTION 1. Section 228.011(a), Transportation Code, is amended to read as follows: (a) This section applies only to a county acting under Chapter 284 for: (1) the widening, expansion, reconstruction, and continued operation of existing toll projects of the county; or (2) the development, construction, and operation of all or a portion of any of the following toll projects, a component of that project, or the functional equivalent of that project: (A) Beltway 8 Tollway East, between US 59 North and US 90 East; (B) Hardy Downtown Connector, consisting of the proposed direct connection from the Hardy Toll Road southern terminus at Loop 610 to downtown Houston; (C) State Highway 288, between US 59 and Grand Parkway South (State Highway 99); (D) US 290 Toll Lanes, between IH 610 West and the Grand Parkway Northwest (State Highway 99); (E) [Fairmont Parkway East, between Beltway 8 East and Grand Parkway East (State Highway 99); [(F)] South Post Oak Road Extension, between IH 610 South and near the intersection of Beltway 8 and Hillcroft in the vicinity of the Fort Bend Parkway Tollway; (F) [(G)] Westpark Toll Road Phase II, between Grand Parkway (State Highway 99) and FM 1463; (G) [(H)] Fort Bend Parkway, between State Highway 6 and the Brazos River; and (H) [(I)] Montgomery County Parkway, between State Highway 242 and the Grand Parkway (State Highway 99), and if the Grand Parkway project has not begun construction, a nontolled extension of the Montgomery County Parkway to allow a connection to Interstate Highway 45. SECTION 2. Subchapter B, Chapter 372, Transportation Code, is amended by adding Section 372.060 to read as follows: Sec. 372.060. FAIRMONT PARKWAY. A toll project entity may not impose a toll on any portion of Fairmont Parkway in Harris County. SECTION 3. This Act takes effect September 1, 2025.