Texas 2025 89th Regular

Texas House Bill HB905 Introduced / Bill

Filed 11/12/2024

Download
.pdf .doc .html
                    89R1017 CMO-D
 By: Cain H.B. No. 905




 A BILL TO BE ENTITLED
 AN ACT
 relating to the imposition of tolls on Fairmont Parkway in Harris
 County.
 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
 SECTION 1.  Section 228.011(a), Transportation Code, is
 amended to read as follows:
 (a)  This section applies only to a county acting under
 Chapter 284 for:
 (1)  the widening, expansion, reconstruction, and
 continued operation of existing toll projects of the county; or
 (2)  the development, construction, and operation of
 all or a portion of any of the following toll projects, a component
 of that project, or the functional equivalent of that project:
 (A)  Beltway 8 Tollway East, between US 59 North
 and US 90 East;
 (B)  Hardy Downtown Connector, consisting of the
 proposed direct connection from the Hardy Toll Road southern
 terminus at Loop 610 to downtown Houston;
 (C)  State Highway 288, between US 59 and Grand
 Parkway South (State Highway 99);
 (D)  US 290 Toll Lanes, between IH 610 West and the
 Grand Parkway Northwest (State Highway 99);
 (E)  [Fairmont Parkway East, between Beltway 8
 East and Grand Parkway East (State Highway 99);
 [(F)]  South Post Oak Road Extension, between IH
 610 South and near the intersection of Beltway 8 and Hillcroft in
 the vicinity of the Fort Bend Parkway Tollway;
 (F) [(G)]  Westpark Toll Road Phase II, between
 Grand Parkway (State Highway 99) and FM 1463;
 (G) [(H)]  Fort Bend Parkway, between State
 Highway 6 and the Brazos River; and
 (H) [(I)]  Montgomery County Parkway, between
 State Highway 242 and the Grand Parkway (State Highway 99), and if
 the Grand Parkway project has not begun construction, a nontolled
 extension of the Montgomery County Parkway to allow a connection to
 Interstate Highway 45.
 SECTION 2.  Subchapter B, Chapter 372, Transportation Code,
 is amended by adding Section 372.060 to read as follows:
 Sec. 372.060.  FAIRMONT PARKWAY. A toll project entity may
 not impose a toll on any portion of Fairmont Parkway in Harris
 County.
 SECTION 3.  This Act takes effect September 1, 2025.