Texas 2025 89th Regular

Texas Senate Bill SB1202 Introduced / Bill

Filed 02/10/2025

Download
.pdf .doc .html
                    89R4893 CS-D
 By: King S.B. No. 1202




 A BILL TO BE ENTITLED
 AN ACT
 relating to third-party review of property development documents
 and inspections of improvements related to those documents,
 including home backup power installations.
 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
 SECTION 1.  Chapter 247, Local Government Code, as added by
 Chapter 654 (H.B. 14), Acts of the 88th Legislature, Regular
 Session, 2023, is amended by adding Section 247.0025 to read as
 follows:
 Sec. 247.0025.  THIRD-PARTY REVIEW OR INSPECTION FOR HOME
 BACKUP POWER INSTALLATIONS.  (a)  In this section, "home backup
 power installation" means an electric generating facility,
 including an energy storage facility and any associated
 infrastructure and equipment, intended to provide electrical power
 to a one- or two-family dwelling that is connected at 600 volts or
 less.
 (b)  Notwithstanding Section 247.002:
 (1)  a person authorized to review a development
 document under Section 247.002(a) may review a development document
 required by a regulatory authority to install a home backup power
 installation without having to submit the document to the authority
 for review; and
 (2)  a person authorized to conduct a development
 inspection under Section 247.002(b) may conduct a development
 inspection required by a regulatory authority to install a home
 backup power installation without having to request the inspection
 from the authority.
 (c)  A regulatory authority shall:
 (1)  post on the authority's Internet website each law,
 rule, standard, and other document necessary for a person to review
 a development document or conduct a development inspection under
 this section; or
 (2)  provide on request an electronic copy of the
 information described by Subdivision (1) not later than the second
 business day after the date the regulatory authority receives the
 request.
 (d)  A person who reviews a development document or conducts
 a development inspection under this section may rely on the
 accuracy and completeness of the information provided by a
 regulatory authority under Subsection (c).
 (e)  A regulatory authority shall issue each approval,
 permit, or certification applicable to a review of a development
 document or development inspection conducted under this section not
 later than the second business day after the date the authority
 receives the notice prescribed by Section 247.004(a) that approves
 the document or inspection.
 (f)  A person may begin construction of a home backup power
 installation on submission of the notice prescribed by Section
 247.004(a) that approves the development document or development
 inspection.
 SECTION 2.  Section 247.003, Local Government Code, as added
 by Chapter 654 (H.B. 14), Acts of the 88th Legislature, Regular
 Session, 2023, is amended to read as follows:
 Sec. 247.003.  ADDITIONAL FEE PROHIBITED.  A regulatory
 authority may not impose a fee related to the review of a
 development document or the inspection of an improvement conducted
 under this chapter [Section 247.002].
 SECTION 3.  Section 247.004, Local Government Code, as added
 by Chapter 654 (H.B. 14), Acts of the 88th Legislature, Regular
 Session, 2023, is amended to read as follows:
 Sec. 247.004.  THIRD-PARTY REQUIREMENTS. (a)  A person who
 reviews a development document or conducts a development inspection
 under this chapter [Section 247.002] shall:
 (1)  review the document, conduct the inspection, and
 take all other related actions in accordance with all applicable
 provisions of law; and
 (2)  not later than the 15th day after the date the
 person completes the review or inspection, provide notice to the
 regulatory authority of the results of the review or inspection.
 (b)  A regulatory authority may prescribe a reasonable
 format for the notice required under Subsection (a).  If the
 regulatory authority has not prescribed a format, a person who
 reviews a development document or conducts a development inspection
 under this chapter may provide notice by e-mail to the e-mail
 address of the regulatory authority.
 SECTION 4.  This Act takes effect September 1, 2025.