Us Congress 2025 2025-2026 Regular Session

Us Congress House Bill HB2295 Introduced / Bill

Filed 04/04/2025

                    I 
119THCONGRESS 
1
STSESSION H. R. 2295 
To research the impact of obstructions on radar detection and prediction 
capabilities, and for other purposes. 
IN THE HOUSE OF REPRESENTATIVES 
MARCH24, 2025 
Mr. F
EENSTRA(for himself, Mrs. BICE, Mr. NEGUSE, Mr. HARIDOPOLOS, 
Mrs. R
ADEWAGEN, Mrs. MILLER-MEEKS, Mr. FITZPATRICK, and Mr. 
M
OYLAN) introduced the following bill; which was referred to the Com-
mittee on Science, Space, and Technology 
A BILL 
To research the impact of obstructions on radar detection 
and prediction capabilities, and for other purposes. 
Be it enacted by the Senate and House of Representa-1
tives of the United States of America in Congress assembled, 2
SECTION 1. SHORT TITLE. 3
This Act may be cited as the ‘‘Weather Innovation 4
for the Next Generation Act of 2025’’ or the ‘‘WING Act 5
of 2025’’. 6
VerDate Sep 11 2014 01:20 Mar 29, 2025 Jkt 059200 PO 00000 Frm 00001 Fmt 6652 Sfmt 6201 E:\BILLS\H2295.IH H2295
kjohnson on DSK7ZCZBW3PROD with $$_JOB 2 
•HR 2295 IH
SEC. 2. RADAR OBSTRUCTION RESEARCH, DEVELOPMENT, 1
TEST, AND EVALUATION PROGRAM. 2
(a) E
STABLISHMENT.—The Director of the National 3
Weather Service, in coordination with the Assistant Ad-4
ministrator for Oceanic and Atmospheric Research, shall 5
establish a Research, Development, Test, and Evaluation 6
Program (in this section referred to as the ‘‘Program’’) 7
to ensure the continued performance of weather radar de-8
tection and prediction capabilities with physical obstruc-9
tions in the line of sight of such radar. 10
(b) R
EQUIREMENTS.—In carrying out the Program, 11
the Director, in consultation with the Interagency Council 12
for Advancing Meteorological Services, shall— 13
(1) partner with industry, academia, Federal, 14
State, and local government entities, and any other 15
entity the Director considers appropriate; 16
(2) identify and test existing or near-commer-17
cial technologies and solutions that mitigate the po-18
tential impact of obstructions on weather radar; 19
(3) research additional solutions that could 20
mitigate the effects of an obstruction on weather 21
radar, including— 22
(A) signal processing algorithms; 23
(B) short-term forecasting algorithms to 24
replace contaminated data; and 25
VerDate Sep 11 2014 01:20 Mar 29, 2025 Jkt 059200 PO 00000 Frm 00002 Fmt 6652 Sfmt 6201 E:\BILLS\H2295.IH H2295
kjohnson on DSK7ZCZBW3PROD with $$_JOB 3 
•HR 2295 IH
(C) the use of dual polarization character-1
istics in mitigating the effects of wind turbines 2
on weather radar; and 3
(4) develop commercially viable technical miti-4
gation solutions for obstructions to weather radar 5
capabilities. 6
(c) P
RIORITY.—In carrying out the requirements de-7
scribed in subsection (b), the Director shall prioritize con-8
sideration of the following technology-based mitigation so-9
lutions: 10
(1) Multifunction phased array radar. 11
(2) The replacement of contaminated data with 12
commercial radar data. 13
(3) The utilization of data from private-sector- 14
associated meteorological towers. 15
(4) Providing wind farm boundaries and con-16
solidated wind farm areas to display on local fore-17
casting equipment. 18
(5) Installing and providing access to rain 19
gauges. 20
(6) Any other technology-based mitigation solu-21
tion the Director determines could overcome beam 22
blockage or ghost echoes. 23
(d) T
ERMINATION.—The authority of the Director to 24
carry out the Program shall terminate on the earlier of— 25
VerDate Sep 11 2014 01:20 Mar 29, 2025 Jkt 059200 PO 00000 Frm 00003 Fmt 6652 Sfmt 6201 E:\BILLS\H2295.IH H2295
kjohnson on DSK7ZCZBW3PROD with $$_JOB 4 
•HR 2295 IH
(1) September 30, 2030; or 1
(2) one year after date on which the final rec-2
ommendation required by subsection (e)(2) is sub-3
mitted by the Director. 4
(e) R
EPORT; RECOMMENDATION .— 5
(1) I
N GENERAL.—Not later than two years 6
after the date of the enactment of this section and 7
annually thereafter until the Program terminates 8
pursuant to subsection (d), the Director shall submit 9
to Congress a report on the implementation of the 10
Program, including an evaluation of each tech-11
nology-based mitigation solution identified for pri-12
ority consideration pursuant to subsection (c), and a 13
recommendation regarding additional identification 14
and testing of new technologies based on such con-15
sideration. 16
(2) F
INAL RECOMMENDATION .—Not later than 17
five years after the date of the enactment of this 18
section, the Director shall provide to Congress a rec-19
ommendation on whether additional research, test-20
ing, and development through the Program estab-21
lished under subsection (a) is needed, and a deter-22
mination of whether a cessation of field research, de-23
velopment, testing, and evaluation is appropriate. 24
(f) D
EFINITIONS.—In this section: 25
VerDate Sep 11 2014 01:20 Mar 29, 2025 Jkt 059200 PO 00000 Frm 00004 Fmt 6652 Sfmt 6201 E:\BILLS\H2295.IH H2295
kjohnson on DSK7ZCZBW3PROD with $$_JOB 5 
•HR 2295 IH
(1) BEAM BLOCKAGE.—The term ‘‘beam block-1
age’’ means a signal that is partially or fully blocked 2
due to an obstruction. 3
(2) D
IRECTOR.—The term ‘‘Director’’ means 4
the Director of the National Weather Service. 5
(3) G
HOST ECHO.—The term ‘‘ghost echo’’ 6
means radar signal reflectivity or velocity return er-7
rors in radar data due to the close proximity of an 8
obstruction. 9
(4) O
BSTRUCTION.—The term obstruction in-10
cludes— 11
(A) a wind turbine that could limit the ef-12
fectiveness of a weather radar system; and 13
(B) any building that disrupts or limits the 14
effectiveness of a weather radar system. 15
Æ 
VerDate Sep 11 2014 01:20 Mar 29, 2025 Jkt 059200 PO 00000 Frm 00005 Fmt 6652 Sfmt 6301 E:\BILLS\H2295.IH H2295
kjohnson on DSK7ZCZBW3PROD with $$_JOB