Arizona 2022 Regular Session

Arizona Senate Bill SB1023 Latest Draft

Bill / Introduced Version Filed 12/16/2021

                            PREFILED DEC 16 2021    REFERENCE TITLE: well drilling; groundwater basins               State of Arizona Senate Fifty-fifth Legislature Second Regular Session 2022         SB 1023           Introduced by  Senator Steele        AN ACT   amending Title 45, chapter 2, article 10, Arizona Revised Statutes, by adding section 45-596.02; relating to wells.     (TEXT OF BILL BEGINS ON NEXT PAGE)   

 

 

PREFILED DEC 16 2021

REFERENCE TITLE: well drilling; groundwater basins
State of Arizona Senate Fifty-fifth Legislature Second Regular Session 2022
SB 1023
Introduced by  Senator Steele

REFERENCE TITLE: well drilling; groundwater basins

 

 

 

 

 

State of Arizona

Senate

Fifty-fifth Legislature

Second Regular Session

2022

 

 

SB 1023

 

Introduced by 

Senator Steele

 

 

AN ACT

 

amending Title 45, chapter 2, article 10, Arizona Revised Statutes, by adding section 45-596.02; relating to wells.

 

 

(TEXT OF BILL BEGINS ON NEXT PAGE)

 

 Be it enacted by the Legislature of the State of Arizona: Section 1. Title 45, chapter 2, article 10, Arizona Revised Statutes, is amended by adding section 45-596.02, to read: START_STATUTE45-596.02. Well drilling moratorium; upper San Pedro, Verde Valley groundwater basins; exemptions Beginning on the effective date of this section, a person may not construct and the department may not issue a permit or drilling card for a new well in the upper San Pedro groundwater basin or the Verde Valley groundwater subbasin, except for: 1. A replacement well as prescribed in rules adopted by the director. 2. A well that the director determines will not pump the subflow of a river system or source. 3. A well that is constructed after the conclusion of the general adjudication of water rights in the Gila River. END_STATUTE 

Be it enacted by the Legislature of the State of Arizona:

Section 1. Title 45, chapter 2, article 10, Arizona Revised Statutes, is amended by adding section 45-596.02, to read:

START_STATUTE45-596.02. Well drilling moratorium; upper San Pedro, Verde Valley groundwater basins; exemptions

Beginning on the effective date of this section, a person may not construct and the department may not issue a permit or drilling card for a new well in the upper San Pedro groundwater basin or the Verde Valley groundwater subbasin, except for:

1. A replacement well as prescribed in rules adopted by the director.

2. A well that the director determines will not pump the subflow of a river system or source.

3. A well that is constructed after the conclusion of the general adjudication of water rights in the Gila River. END_STATUTE