Arizona 2022 Regular Session

Arizona Senate Bill SB1600 Compare Versions

Only one version of the bill is available at this time.
OldNewDifferences
11 REFERENCE TITLE: water recharge; direct use State of Arizona Senate Fifty-fifth Legislature Second Regular Session 2022 SB 1600 Introduced by Senator Shope AN ACT amending section 45-802.01, Arizona Revised Statutes, as amended by Laws 2019, chapter 1, section 9; amending section 45-802.01, Arizona Revised Statutes, as amended by Laws 2019, chapter 1, section 10; relating to underground water storage. (TEXT OF BILL BEGINS ON NEXT PAGE)
22
33
44
55
66
77
88
99 REFERENCE TITLE: water recharge; direct use
1010 State of Arizona Senate Fifty-fifth Legislature Second Regular Session 2022
1111 SB 1600
1212 Introduced by Senator Shope
1313
1414 REFERENCE TITLE: water recharge; direct use
1515
1616
1717
1818
1919
2020
2121
2222
2323
2424 State of Arizona
2525
2626 Senate
2727
2828 Fifty-fifth Legislature
2929
3030 Second Regular Session
3131
3232 2022
3333
3434
3535
3636
3737
3838
3939
4040 SB 1600
4141
4242
4343
4444 Introduced by
4545
4646 Senator Shope
4747
4848
4949
5050
5151
5252 AN ACT
5353
5454
5555
5656 amending section 45-802.01, Arizona Revised Statutes, as amended by Laws 2019, chapter 1, section 9; amending section 45-802.01, Arizona Revised Statutes, as amended by Laws 2019, chapter 1, section 10; relating to underground water storage.
5757
5858
5959
6060
6161
6262 (TEXT OF BILL BEGINS ON NEXT PAGE)
6363
6464
6565
6666 Be it enacted by the Legislature of the State of Arizona: Section 1. Section 45-802.01, Arizona Revised Statutes, as amended by Laws 2019, chapter 1, section 9, is amended to read: START_STATUTE45-802.01. Definitions Unless the context otherwise requires, the terms defined in section 45-402 have the same meanings in this chapter and: 1. "Aquifer" means a geologic formation that contains sufficient saturated material to be capable of storing water and transmitting water in usable quantities to a well. 2. "Area of impact" means, as projected on the land surface, the area where the stored water has migrated or is located. 3. "CERCLA" means the comprehensive environmental response, compensation, and liability act of 1980, as amended (P.L. 96-510; 94 Stat. 2767; 42 United States Code sections 9601 through 9657), commonly known as "superfund". 4. "Constructed underground storage facility" means a facility that meets the requirements of section 45-811.01 and that is designed and constructed to store water underground pursuant to permits issued under this chapter. 5. "District" means a groundwater replenishment district established under title 48, chapter 27. 6. "District member" means a member of the groundwater replenishment district as provided by title 48, chapter 27. 7. "Electrical district" means a corporate body established pursuant to title 48, chapter 12. 8. "Existing effluent managed underground storage facility" means a managed underground storage facility that meets one of the following conditions: (a) The facility is operated pursuant to a storage facility permit that the director issued before January 1, 2019 and that authorizes the storage of effluent at the facility. (b) The facility is operated pursuant to a renewed or modified storage facility permit that the director issued after January 1, 2019 if the facility qualified as an existing effluent managed underground storage facility under subdivision (a), (c) or (d) of this paragraph at any time before the renewal or modification. (c) The facility is operated pursuant to a permit that the director issued after January 1, 2019 and that authorizes the storage of effluent at a location where the permit holder was authorized to store effluent pursuant to a storage facility permit that the director issued before January 1, 2019. (d) The facility is operated pursuant to a permit that the director issued after January 1, 2019 and that authorizes the storage of effluent at the facility, and the application to operate the facility was on file with the director as of January 1, 2019. 9. "Groundwater savings facility" means a facility that meets the requirements of section 45-812.01 in an active management area or an irrigation non-expansion area at which groundwater withdrawals are eliminated or reduced by recipients who use in lieu water on a gallon-for-gallon substitute basis for groundwater that otherwise would have been pumped from within that active management area or irrigation non-expansion area. 10. "In lieu water" means water that is delivered by a storer to a groundwater savings facility pursuant to permits issued under this chapter and that is used in an active management area or an irrigation non-expansion area by the recipient on a gallon-for-gallon substitute basis for groundwater that otherwise would have been pumped from within that active management area or irrigation non-expansion area. 11. "Long-term storage account" means an account established pursuant to section 45-852.01. 12. "Long-term storage credit" means stored water that meets the requirements of section 45-852.01 and that has been credited to a long-term storage account. 13. "Managed underground storage facility" means a facility that meets the requirements of section 45-811.01 and that is designed and managed to utilize the natural channel of a stream to store water underground pursuant to permits issued under this chapter through artificial and controlled releases of water other than surface water naturally present in the stream. Surface water flowing in its natural channel is not a managed underground storage facility. 14. "Master replenishment account" means an account established pursuant to section 45-858.01 for a groundwater replenishment district. 15. "Recipient" means a person who receives in lieu water for use at a groundwater savings facility. 16. "Recoverable amount" means the amount of water, as determined by the director, that will reach the aquifer through water storage. 17. "Replenishment" means the storage of water or use of long-term storage credits by a groundwater replenishment district to fulfill its duties under title 48, chapter 27, article 3, by a multi-county water conservation district to fulfill its duties under title 48, chapter 22, article 4 or by an active management area water district to fulfill its duties under title 48, chapter 28, article 7. 18. "Reserve target" has the same meaning prescribed in section 48-3701. 19. "Storage facility" means a groundwater savings facility or an underground storage facility. 20. "Stored water" means water that has been stored or saved underground pursuant to a storage permit issued under this chapter. 21. "Storer" means the holder of a water storage permit issued pursuant to section 45-831.01 or a person to whom a water storage permit has been conveyed pursuant to section 45-831.01, subsection F. 22. "Underground storage facility" means a constructed underground storage facility or a managed underground storage facility. 23. "Water that cannot reasonably be used directly" means water that the storer cannot reasonably put to a direct use during the calendar year, including: (a) Except as provided in subdivision (b) or (j) of this paragraph or except for an agricultural improvement district as provided in subdivision (d) of this paragraph, if the storer is a municipal provider, the amount of central Arizona project water that exceeds the amount of mined groundwater withdrawn during the calendar year by the storer in the active management area in which the storer's service area is located. If the storer withdrew mined groundwater during a calendar year in which the storer stored central Arizona project water underground pursuant to the storage permit, the amount of central Arizona project water stored underground during that year equal to the amount of mined groundwater withdrawn from the active management area in which the storer's service area is located shall not be credited to the storer's long-term storage account but may be considered as being available for recovery by the storer on an annual basis under section 45-851.01. In calculating the amount of mined groundwater withdrawn by the storer from the active management area, the director, at the request of the storer, shall exclude any groundwater withdrawn, treated and delivered for direct use as part of a remedial action undertaken pursuant to CERCLA or title 49, chapter 2, article 5. For the purposes of this subdivision, "mined groundwater" and "municipal provider" have the same meanings prescribed in section 45-561. (b) If the storer is a municipal provider that has been designated as having an assured water supply pursuant to section 45-576, the amount of central Arizona project water that exceeds the amount of deficit groundwater withdrawn during the calendar year by the storer in the active management area in which the storer's service area is located. If the storer withdrew deficit groundwater during a calendar year in which the storer stored central Arizona project water underground pursuant to the storage permit, the amount of the central Arizona project water stored underground during that year equal to the amount of deficit groundwater withdrawn from the active management area in which the storer's service area is located shall not be credited to the storer's long-term storage account but may be considered as being available for recovery by the storer on an annual basis pursuant to section 45-851.01. In calculating the amount of deficit groundwater withdrawn by the storer from the active management area, the director, at the request of the storer, shall exclude any groundwater withdrawn, treated and delivered for direct use as part of a remedial action undertaken pursuant to CERCLA or title 49, chapter 2, article 5. For the purposes of this subdivision, "municipal provider" has the same meaning prescribed in section 45-561 and "deficit groundwater" means that amount of groundwater withdrawn within an active management area for delivery and use within a service area by a municipal provider in excess of the amount of groundwater that may be withdrawn by the municipal provider consistent with the achievement of the active management area's management goals as prescribed by rules adopted by the director pursuant to section 45-576. (c) Except as provided in subdivision (d) of this paragraph, if the storer is not a municipal provider, the amount of central Arizona project water stored in an active management area that exceeds the amount of groundwater withdrawn during the calendar year by the storer in that active management area. If the storer withdrew groundwater in an active management area during a calendar year in which the storer stored central Arizona project water underground in that active management area pursuant to the storage permit, the amount of central Arizona project water stored underground during that year equal to the amount of groundwater withdrawn from the active management area shall not be credited to the storer's long-term storage account but may be considered as being available for recovery by the storer on an annual basis under section 45-851.01. For the purposes of this subdivision, "municipal provider" has the same meaning prescribed in section 45-561. In calculating the amount of groundwater withdrawn by the storer from the active management area, the director, at the request of the storer, shall exclude: (i) The amount of groundwater withdrawn, treated and delivered for direct use as part of a remedial action undertaken pursuant to CERCLA or title 49, chapter 2, article 5. (ii) The amount of groundwater withdrawn by the storer during the year for mineral extraction and metallurgical processing and delivered during that year for direct use to an irrigation district that is established pursuant to title 48, chapter 19 and that is located in the same active management area from which the amount of groundwater was withdrawn to the extent that the irrigation district or its customers demonstrate a reduction in the amount of groundwater that they otherwise would have withdrawn during that year within the irrigation district. (iii) The amount of groundwater withdrawn by the storer during the year for mineral extraction or metallurgical processing if the storer was engaged in mineral extraction and metallurgical processing within an initial active management area on or before January 1, 2011. (d) The amount of central Arizona project water stored in an active management area in any year after 1994 by an agricultural improvement district established pursuant to title 48, chapter 17 for use at those portions of electrical generating facilities that are constructed or expanded after June 12, 1980, subject to both of the following: (i) If groundwater was used during a year in an active management area at those portions of the electrical generating facilities that were owned and operated by the agricultural improvement district and that were constructed or expanded after June 12, 1980, the amount of the central Arizona project water stored during that year equal to the amount of the groundwater withdrawn during the year for use at those portions of the facilities that were owned and operated by the agricultural improvement district and that were constructed or expanded after June 12, 1980 shall not be credited to the agricultural improvement district's long-term storage account but may be considered as being available for recovery by the agricultural improvement district on an annual basis under section 45-851.01. (ii) Long-term storage credits accrued as a result of the storage of the central Arizona project water may be recovered within the active management area by the agricultural improvement district only for the purpose of providing central Arizona project water to electrical generating facilities that were owned and operated by the agricultural improvement district and only pursuant to any water requirement included in a facility's certificate of environmental compatibility. Subject to section 45-854.01, the long-term storage credits may be assigned by the agricultural improvement district only to the owner of an electrical generating facility for use pursuant to any water requirement included in that facility's certificate of environmental compatibility. (e) Surface water made available by dams constructed or modified after August 13, 1986. (f) Effluent. (g) If the storage facility is in an active management area, water from outside the active management area that would not have reached the active management area without the efforts of the storer. (h) If the storage facility is outside of an active management area, water from outside the groundwater basin in which the storage facility is located that would not have reached the groundwater basin without the efforts of the storer. (i) Water that is delivered through the central Arizona project and that is acquired by the Arizona water banking authority. (j) If the storer is a municipal provider in an active MANAGEMENT area that does not have a management goal of achieving or MAINTAINing a safe yield condition, the amount of central Arizona project water stored UNDERGROUND during the calendar year by the storer in the active management area in which the storer's service area is located. 24. "Water storage" means adding water to an aquifer or saving water in an aquifer pursuant to permits issued under this chapter. 25. "Water storage permit" means a permit issued pursuant to section 45-831.01 to store water at a storage facility. END_STATUTE Sec. 2. Section 45-802.01, Arizona Revised Statutes, as amended by Laws 2019, chapter 1, section 10, is amended to read: START_STATUTE45-802.01. Definitions Unless the context otherwise requires, the terms defined in section 45-402 have the same meanings in this chapter and: 1. "Aquifer" means a geologic formation that contains sufficient saturated material to be capable of storing water and transmitting water in usable quantities to a well. 2. "Area of impact" means, as projected on the land surface, the area where the stored water has migrated or is located. 3. "CERCLA" means the comprehensive environmental response, compensation, and liability act of 1980, as amended (P.L. 96-510; 94 Stat. 2767; 42 United States Code sections 9601 through 9657), commonly known as "superfund". 4. "Constructed underground storage facility" means a facility that meets the requirements of section 45-811.01 and that is designed and constructed to store water underground pursuant to permits issued under this chapter. 5. "District" means a groundwater replenishment district established under title 48, chapter 27. 6. "District member" means a member of the groundwater replenishment district as provided by title 48, chapter 27. 7. "Electrical district" means a corporate body established pursuant to title 48, chapter 12. 8. "Existing effluent managed underground storage facility" means a managed underground storage facility that meets one of the following conditions: (a) The facility is operated pursuant to a storage facility permit that the director issued before January 1, 2019 and that authorizes the storage of effluent at the facility. (b) The facility is operated pursuant to a renewed or modified storage facility permit that the director issued after January 1, 2019 if the facility qualified as an existing effluent managed underground storage facility under subdivision (a), (c) or (d) of this paragraph at any time before the renewal or modification. (c) The facility is operated pursuant to a permit that the director issued after January 1, 2019 and that authorizes the storage of effluent at a location where the permit holder was authorized to store effluent pursuant to a storage facility permit that the director issued before January 1, 2019. (d) The facility is operated pursuant to a permit that the director issued after January 1, 2019 and that authorizes the storage of effluent at the facility, and the application to operate the facility was on file with the director as of January 1, 2019. 9. "Groundwater savings facility" means a facility that meets the requirements of section 45-812.01 in an active management area or an irrigation non-expansion area at which groundwater withdrawals are eliminated or reduced by recipients who use in lieu water on a gallon-for-gallon substitute basis for groundwater that otherwise would have been pumped from within that active management area or irrigation non-expansion area. 10. "In lieu water" means water that is delivered by a storer to a groundwater savings facility pursuant to permits issued under this chapter and that is used in an active management area or an irrigation non-expansion area by the recipient on a gallon-for-gallon substitute basis for groundwater that otherwise would have been pumped from within that active management area or irrigation non-expansion area. 11. "Long-term storage account" means an account established pursuant to section 45-852.01. 12. "Long-term storage credit" means stored water that meets the requirements of section 45-852.01 and that has been credited to a long-term storage account. 13. "Managed underground storage facility" means a facility that meets the requirements of section 45-811.01 and that is designed and managed to utilize the natural channel of a stream to store water underground pursuant to permits issued under this chapter through artificial and controlled releases of water other than surface water naturally present in the stream. Surface water flowing in its natural channel is not a managed underground storage facility. 14. "Master replenishment account" means an account established pursuant to section 45-858.01 for a groundwater replenishment district. 15. "Recipient" means a person who receives in lieu water for use at a groundwater savings facility. 16. "Recoverable amount" means the amount of water, as determined by the director, that will reach the aquifer through water storage. 17. "Replenishment" means the storage of water or use of long-term storage credits by a groundwater replenishment district to fulfill its duties under title 48, chapter 27, article 3, by a multi-county water conservation district to fulfill its duties under title 48, chapter 22, article 4 or by an active management area water district to fulfill its duties under title 48, chapter 28, article 7. 18. "Reserve target" has the same meaning prescribed in section 48-3701. 19. "Storage facility" means a groundwater savings facility or an underground storage facility. 20. "Stored water" means water that has been stored or saved underground pursuant to a storage permit issued under this chapter. 21. "Storer" means the holder of a water storage permit issued pursuant to section 45-831.01 or a person to whom a water storage permit has been conveyed pursuant to section 45-831.01, subsection F. 22. "Underground storage facility" means a constructed underground storage facility or a managed underground storage facility. 23. "Water that cannot reasonably be used directly" means water that the storer cannot reasonably put to a direct use during the calendar year, including: (a) Except as provided in subdivision (b) or (j) of this paragraph or except for an agricultural improvement district as provided in subdivision (d) of this paragraph, if the storer is a municipal provider, the amount of central Arizona project water that exceeds the amount of mined groundwater withdrawn during the calendar year by the storer in the active management area in which the storer's service area is located. If the storer withdrew mined groundwater during a calendar year in which the storer stored central Arizona project water underground pursuant to the storage permit, the amount of central Arizona project water stored underground during that year equal to the amount of mined groundwater withdrawn from the active management area in which the storer's service area is located shall not be credited to the storer's long-term storage account but may be considered as being available for recovery by the storer on an annual basis under section 45-851.01. In calculating the amount of mined groundwater withdrawn by the storer from the active management area, the director, at the request of the storer, shall exclude any groundwater withdrawn, treated and delivered for direct use as part of a remedial action undertaken pursuant to CERCLA or title 49, chapter 2, article 5. For the purposes of this subdivision, "mined groundwater" and "municipal provider" have the same meanings prescribed in section 45-561. (b) If the storer is a municipal provider that has been designated as having an assured water supply pursuant to section 45-576, the amount of central Arizona project water that exceeds the amount of deficit groundwater withdrawn during the calendar year by the storer in the active management area in which the storer's service area is located. If the storer withdrew deficit groundwater during a calendar year in which the storer stored central Arizona project water underground pursuant to the storage permit, the amount of the central Arizona project water stored underground during that year equal to the amount of deficit groundwater withdrawn from the active management area in which the storer's service area is located shall not be credited to the storer's long-term storage account but may be considered as being available for recovery by the storer on an annual basis pursuant to section 45-851.01. In calculating the amount of deficit groundwater withdrawn by the storer from the active management area, the director, at the request of the storer, shall exclude any groundwater withdrawn, treated and delivered for direct use as part of a remedial action undertaken pursuant to CERCLA or title 49, chapter 2, article 5. For the purposes of this subdivision, "municipal provider" has the same meaning prescribed in section 45-561 and "deficit groundwater" means that amount of groundwater withdrawn within an active management area for delivery and use within a service area by a municipal provider in excess of the amount of groundwater that may be withdrawn by the municipal provider consistent with the achievement of the active management area's management goals as prescribed by rules adopted by the director pursuant to section 45-576. (c) Except as provided in subdivision (d) of this paragraph, if the storer is not a municipal provider, the amount of central Arizona project water stored in an active management area that exceeds the amount of groundwater withdrawn during the calendar year by the storer in that active management area. If the storer withdrew groundwater in an active management area during a calendar year in which the storer stored central Arizona project water underground in that active management area pursuant to the storage permit, the amount of central Arizona project water stored underground during that year equal to the amount of groundwater withdrawn from the active management area shall not be credited to the storer's long-term storage account but may be considered as being available for recovery by the storer on an annual basis under section 45-851.01. For the purposes of this subdivision, "municipal provider" has the same meaning prescribed in section 45-561. In calculating the amount of groundwater withdrawn by the storer from the active management area, the director, at the request of the storer, shall exclude: (i) The amount of any groundwater withdrawn, treated and delivered for direct use as part of a remedial action undertaken pursuant to CERCLA or title 49, chapter 2, article 5. (ii) The amount of groundwater withdrawn by the storer during the year for mineral extraction or metallurgical processing if the storer was engaged in mineral extraction and metallurgical processing within an initial active management area on or before January 1, 2011. (d) The amount of central Arizona project water stored in an active management area in any year after 1994 by an agricultural improvement district established pursuant to title 48, chapter 17 for use at those portions of electrical generating facilities that are constructed or expanded after June 12, 1980, subject to both of the following: (i) If groundwater was used during a year in an active management area at those portions of the electrical generating facilities that were owned and operated by the agricultural improvement district and that were constructed or expanded after June 12, 1980, the amount of the central Arizona project water stored during that year equal to the amount of the groundwater withdrawn during the year for use at those portions of the facilities that were owned and operated by the agricultural improvement district and that were constructed or expanded after June 12, 1980 shall not be credited to the agricultural improvement district's long-term storage account but may be considered as being available for recovery by the agricultural improvement district on an annual basis under section 45-851.01. (ii) Long-term storage credits accrued as a result of the storage of the central Arizona project water may be recovered within the active management area by the agricultural improvement district only for the purpose of providing central Arizona project water to electrical generating facilities that were owned and operated by the agricultural improvement district and only pursuant to any water requirement included in a facility's certificate of environmental compatibility. Subject to section 45-854.01, the long-term storage credits may be assigned by the agricultural improvement district only to the owner of an electrical generating facility for use pursuant to any water requirement included in that facility's certificate of environmental compatibility. (e) Surface water made available by dams constructed or modified after August 13, 1986. (f) Effluent. (g) If the storage facility is in an active management area, water from outside the active management area that would not have reached the active management area without the efforts of the storer. (h) If the storage facility is outside of an active management area, water from outside the groundwater basin in which the storage facility is located that would not have reached the groundwater basin without the efforts of the storer. (i) Water that is delivered through the central Arizona project and that is acquired by the Arizona water banking authority. (j) If the storer is a municipal provider in an active MANAGEMENT area that does not have a management goal of achieving or MAINTAINing a safe yield condition, the amount of central Arizona project water stored UNDERGROUND during the calendar year by the storer in the active management area in which the storer's service area is located. 24. "Water storage" means adding water to an aquifer or saving water in an aquifer pursuant to permits issued under this chapter. 25. "Water storage permit" means a permit issued pursuant to section 45-831.01 to store water at a storage facility. END_STATUTE Sec. 3. Effective date Section 45-802.01, Arizona Revised Statutes, as amended by Laws 2019, chapter 1, section 10 and this act, is effective from and after December 31, 2024.
6767
6868 Be it enacted by the Legislature of the State of Arizona:
6969
7070 Section 1. Section 45-802.01, Arizona Revised Statutes, as amended by Laws 2019, chapter 1, section 9, is amended to read:
7171
7272 START_STATUTE45-802.01. Definitions
7373
7474 Unless the context otherwise requires, the terms defined in section 45-402 have the same meanings in this chapter and:
7575
7676 1. "Aquifer" means a geologic formation that contains sufficient saturated material to be capable of storing water and transmitting water in usable quantities to a well.
7777
7878 2. "Area of impact" means, as projected on the land surface, the area where the stored water has migrated or is located.
7979
8080 3. "CERCLA" means the comprehensive environmental response, compensation, and liability act of 1980, as amended (P.L. 96-510; 94 Stat. 2767; 42 United States Code sections 9601 through 9657), commonly known as "superfund".
8181
8282 4. "Constructed underground storage facility" means a facility that meets the requirements of section 45-811.01 and that is designed and constructed to store water underground pursuant to permits issued under this chapter.
8383
8484 5. "District" means a groundwater replenishment district established under title 48, chapter 27.
8585
8686 6. "District member" means a member of the groundwater replenishment district as provided by title 48, chapter 27.
8787
8888 7. "Electrical district" means a corporate body established pursuant to title 48, chapter 12.
8989
9090 8. "Existing effluent managed underground storage facility" means a managed underground storage facility that meets one of the following conditions:
9191
9292 (a) The facility is operated pursuant to a storage facility permit that the director issued before January 1, 2019 and that authorizes the storage of effluent at the facility.
9393
9494 (b) The facility is operated pursuant to a renewed or modified storage facility permit that the director issued after January 1, 2019 if the facility qualified as an existing effluent managed underground storage facility under subdivision (a), (c) or (d) of this paragraph at any time before the renewal or modification.
9595
9696 (c) The facility is operated pursuant to a permit that the director issued after January 1, 2019 and that authorizes the storage of effluent at a location where the permit holder was authorized to store effluent pursuant to a storage facility permit that the director issued before January 1, 2019.
9797
9898 (d) The facility is operated pursuant to a permit that the director issued after January 1, 2019 and that authorizes the storage of effluent at the facility, and the application to operate the facility was on file with the director as of January 1, 2019.
9999
100100 9. "Groundwater savings facility" means a facility that meets the requirements of section 45-812.01 in an active management area or an irrigation non-expansion area at which groundwater withdrawals are eliminated or reduced by recipients who use in lieu water on a gallon-for-gallon substitute basis for groundwater that otherwise would have been pumped from within that active management area or irrigation non-expansion area.
101101
102102 10. "In lieu water" means water that is delivered by a storer to a groundwater savings facility pursuant to permits issued under this chapter and that is used in an active management area or an irrigation non-expansion area by the recipient on a gallon-for-gallon substitute basis for groundwater that otherwise would have been pumped from within that active management area or irrigation non-expansion area.
103103
104104 11. "Long-term storage account" means an account established pursuant to section 45-852.01.
105105
106106 12. "Long-term storage credit" means stored water that meets the requirements of section 45-852.01 and that has been credited to a long-term storage account.
107107
108108 13. "Managed underground storage facility" means a facility that meets the requirements of section 45-811.01 and that is designed and managed to utilize the natural channel of a stream to store water underground pursuant to permits issued under this chapter through artificial and controlled releases of water other than surface water naturally present in the stream. Surface water flowing in its natural channel is not a managed underground storage facility.
109109
110110 14. "Master replenishment account" means an account established pursuant to section 45-858.01 for a groundwater replenishment district.
111111
112112 15. "Recipient" means a person who receives in lieu water for use at a groundwater savings facility.
113113
114114 16. "Recoverable amount" means the amount of water, as determined by the director, that will reach the aquifer through water storage.
115115
116116 17. "Replenishment" means the storage of water or use of long-term storage credits by a groundwater replenishment district to fulfill its duties under title 48, chapter 27, article 3, by a multi-county water conservation district to fulfill its duties under title 48, chapter 22, article 4 or by an active management area water district to fulfill its duties under title 48, chapter 28, article 7.
117117
118118 18. "Reserve target" has the same meaning prescribed in section 48-3701.
119119
120120 19. "Storage facility" means a groundwater savings facility or an underground storage facility.
121121
122122 20. "Stored water" means water that has been stored or saved underground pursuant to a storage permit issued under this chapter.
123123
124124 21. "Storer" means the holder of a water storage permit issued pursuant to section 45-831.01 or a person to whom a water storage permit has been conveyed pursuant to section 45-831.01, subsection F.
125125
126126 22. "Underground storage facility" means a constructed underground storage facility or a managed underground storage facility.
127127
128128 23. "Water that cannot reasonably be used directly" means water that the storer cannot reasonably put to a direct use during the calendar year, including:
129129
130130 (a) Except as provided in subdivision (b) or (j) of this paragraph or except for an agricultural improvement district as provided in subdivision (d) of this paragraph, if the storer is a municipal provider, the amount of central Arizona project water that exceeds the amount of mined groundwater withdrawn during the calendar year by the storer in the active management area in which the storer's service area is located. If the storer withdrew mined groundwater during a calendar year in which the storer stored central Arizona project water underground pursuant to the storage permit, the amount of central Arizona project water stored underground during that year equal to the amount of mined groundwater withdrawn from the active management area in which the storer's service area is located shall not be credited to the storer's long-term storage account but may be considered as being available for recovery by the storer on an annual basis under section 45-851.01. In calculating the amount of mined groundwater withdrawn by the storer from the active management area, the director, at the request of the storer, shall exclude any groundwater withdrawn, treated and delivered for direct use as part of a remedial action undertaken pursuant to CERCLA or title 49, chapter 2, article 5. For the purposes of this subdivision, "mined groundwater" and "municipal provider" have the same meanings prescribed in section 45-561.
131131
132132 (b) If the storer is a municipal provider that has been designated as having an assured water supply pursuant to section 45-576, the amount of central Arizona project water that exceeds the amount of deficit groundwater withdrawn during the calendar year by the storer in the active management area in which the storer's service area is located. If the storer withdrew deficit groundwater during a calendar year in which the storer stored central Arizona project water underground pursuant to the storage permit, the amount of the central Arizona project water stored underground during that year equal to the amount of deficit groundwater withdrawn from the active management area in which the storer's service area is located shall not be credited to the storer's long-term storage account but may be considered as being available for recovery by the storer on an annual basis pursuant to section 45-851.01. In calculating the amount of deficit groundwater withdrawn by the storer from the active management area, the director, at the request of the storer, shall exclude any groundwater withdrawn, treated and delivered for direct use as part of a remedial action undertaken pursuant to CERCLA or title 49, chapter 2, article 5. For the purposes of this subdivision, "municipal provider" has the same meaning prescribed in section 45-561 and "deficit groundwater" means that amount of groundwater withdrawn within an active management area for delivery and use within a service area by a municipal provider in excess of the amount of groundwater that may be withdrawn by the municipal provider consistent with the achievement of the active management area's management goals as prescribed by rules adopted by the director pursuant to section 45-576.
133133
134134 (c) Except as provided in subdivision (d) of this paragraph, if the storer is not a municipal provider, the amount of central Arizona project water stored in an active management area that exceeds the amount of groundwater withdrawn during the calendar year by the storer in that active management area. If the storer withdrew groundwater in an active management area during a calendar year in which the storer stored central Arizona project water underground in that active management area pursuant to the storage permit, the amount of central Arizona project water stored underground during that year equal to the amount of groundwater withdrawn from the active management area shall not be credited to the storer's long-term storage account but may be considered as being available for recovery by the storer on an annual basis under section 45-851.01. For the purposes of this subdivision, "municipal provider" has the same meaning prescribed in section 45-561. In calculating the amount of groundwater withdrawn by the storer from the active management area, the director, at the request of the storer, shall exclude:
135135
136136 (i) The amount of groundwater withdrawn, treated and delivered for direct use as part of a remedial action undertaken pursuant to CERCLA or title 49, chapter 2, article 5.
137137
138138 (ii) The amount of groundwater withdrawn by the storer during the year for mineral extraction and metallurgical processing and delivered during that year for direct use to an irrigation district that is established pursuant to title 48, chapter 19 and that is located in the same active management area from which the amount of groundwater was withdrawn to the extent that the irrigation district or its customers demonstrate a reduction in the amount of groundwater that they otherwise would have withdrawn during that year within the irrigation district.
139139
140140 (iii) The amount of groundwater withdrawn by the storer during the year for mineral extraction or metallurgical processing if the storer was engaged in mineral extraction and metallurgical processing within an initial active management area on or before January 1, 2011.
141141
142142 (d) The amount of central Arizona project water stored in an active management area in any year after 1994 by an agricultural improvement district established pursuant to title 48, chapter 17 for use at those portions of electrical generating facilities that are constructed or expanded after June 12, 1980, subject to both of the following:
143143
144144 (i) If groundwater was used during a year in an active management area at those portions of the electrical generating facilities that were owned and operated by the agricultural improvement district and that were constructed or expanded after June 12, 1980, the amount of the central Arizona project water stored during that year equal to the amount of the groundwater withdrawn during the year for use at those portions of the facilities that were owned and operated by the agricultural improvement district and that were constructed or expanded after June 12, 1980 shall not be credited to the agricultural improvement district's long-term storage account but may be considered as being available for recovery by the agricultural improvement district on an annual basis under section 45-851.01.
145145
146146 (ii) Long-term storage credits accrued as a result of the storage of the central Arizona project water may be recovered within the active management area by the agricultural improvement district only for the purpose of providing central Arizona project water to electrical generating facilities that were owned and operated by the agricultural improvement district and only pursuant to any water requirement included in a facility's certificate of environmental compatibility. Subject to section 45-854.01, the long-term storage credits may be assigned by the agricultural improvement district only to the owner of an electrical generating facility for use pursuant to any water requirement included in that facility's certificate of environmental compatibility.
147147
148148 (e) Surface water made available by dams constructed or modified after August 13, 1986.
149149
150150 (f) Effluent.
151151
152152 (g) If the storage facility is in an active management area, water from outside the active management area that would not have reached the active management area without the efforts of the storer.
153153
154154 (h) If the storage facility is outside of an active management area, water from outside the groundwater basin in which the storage facility is located that would not have reached the groundwater basin without the efforts of the storer.
155155
156156 (i) Water that is delivered through the central Arizona project and that is acquired by the Arizona water banking authority.
157157
158158 (j) If the storer is a municipal provider in an active MANAGEMENT area that does not have a management goal of achieving or MAINTAINing a safe yield condition, the amount of central Arizona project water stored UNDERGROUND during the calendar year by the storer in the active management area in which the storer's service area is located.
159159
160160 24. "Water storage" means adding water to an aquifer or saving water in an aquifer pursuant to permits issued under this chapter.
161161
162162 25. "Water storage permit" means a permit issued pursuant to section 45-831.01 to store water at a storage facility. END_STATUTE
163163
164164 Sec. 2. Section 45-802.01, Arizona Revised Statutes, as amended by Laws 2019, chapter 1, section 10, is amended to read:
165165
166166 START_STATUTE45-802.01. Definitions
167167
168168 Unless the context otherwise requires, the terms defined in section 45-402 have the same meanings in this chapter and:
169169
170170 1. "Aquifer" means a geologic formation that contains sufficient saturated material to be capable of storing water and transmitting water in usable quantities to a well.
171171
172172 2. "Area of impact" means, as projected on the land surface, the area where the stored water has migrated or is located.
173173
174174 3. "CERCLA" means the comprehensive environmental response, compensation, and liability act of 1980, as amended (P.L. 96-510; 94 Stat. 2767; 42 United States Code sections 9601 through 9657), commonly known as "superfund".
175175
176176 4. "Constructed underground storage facility" means a facility that meets the requirements of section 45-811.01 and that is designed and constructed to store water underground pursuant to permits issued under this chapter.
177177
178178 5. "District" means a groundwater replenishment district established under title 48, chapter 27.
179179
180180 6. "District member" means a member of the groundwater replenishment district as provided by title 48, chapter 27.
181181
182182 7. "Electrical district" means a corporate body established pursuant to title 48, chapter 12.
183183
184184 8. "Existing effluent managed underground storage facility" means a managed underground storage facility that meets one of the following conditions:
185185
186186 (a) The facility is operated pursuant to a storage facility permit that the director issued before January 1, 2019 and that authorizes the storage of effluent at the facility.
187187
188188 (b) The facility is operated pursuant to a renewed or modified storage facility permit that the director issued after January 1, 2019 if the facility qualified as an existing effluent managed underground storage facility under subdivision (a), (c) or (d) of this paragraph at any time before the renewal or modification.
189189
190190 (c) The facility is operated pursuant to a permit that the director issued after January 1, 2019 and that authorizes the storage of effluent at a location where the permit holder was authorized to store effluent pursuant to a storage facility permit that the director issued before January 1, 2019.
191191
192192 (d) The facility is operated pursuant to a permit that the director issued after January 1, 2019 and that authorizes the storage of effluent at the facility, and the application to operate the facility was on file with the director as of January 1, 2019.
193193
194194 9. "Groundwater savings facility" means a facility that meets the requirements of section 45-812.01 in an active management area or an irrigation non-expansion area at which groundwater withdrawals are eliminated or reduced by recipients who use in lieu water on a gallon-for-gallon substitute basis for groundwater that otherwise would have been pumped from within that active management area or irrigation non-expansion area.
195195
196196 10. "In lieu water" means water that is delivered by a storer to a groundwater savings facility pursuant to permits issued under this chapter and that is used in an active management area or an irrigation non-expansion area by the recipient on a gallon-for-gallon substitute basis for groundwater that otherwise would have been pumped from within that active management area or irrigation non-expansion area.
197197
198198 11. "Long-term storage account" means an account established pursuant to section 45-852.01.
199199
200200 12. "Long-term storage credit" means stored water that meets the requirements of section 45-852.01 and that has been credited to a long-term storage account.
201201
202202 13. "Managed underground storage facility" means a facility that meets the requirements of section 45-811.01 and that is designed and managed to utilize the natural channel of a stream to store water underground pursuant to permits issued under this chapter through artificial and controlled releases of water other than surface water naturally present in the stream. Surface water flowing in its natural channel is not a managed underground storage facility.
203203
204204 14. "Master replenishment account" means an account established pursuant to section 45-858.01 for a groundwater replenishment district.
205205
206206 15. "Recipient" means a person who receives in lieu water for use at a groundwater savings facility.
207207
208208 16. "Recoverable amount" means the amount of water, as determined by the director, that will reach the aquifer through water storage.
209209
210210 17. "Replenishment" means the storage of water or use of long-term storage credits by a groundwater replenishment district to fulfill its duties under title 48, chapter 27, article 3, by a multi-county water conservation district to fulfill its duties under title 48, chapter 22, article 4 or by an active management area water district to fulfill its duties under title 48, chapter 28, article 7.
211211
212212 18. "Reserve target" has the same meaning prescribed in section 48-3701.
213213
214214 19. "Storage facility" means a groundwater savings facility or an underground storage facility.
215215
216216 20. "Stored water" means water that has been stored or saved underground pursuant to a storage permit issued under this chapter.
217217
218218 21. "Storer" means the holder of a water storage permit issued pursuant to section 45-831.01 or a person to whom a water storage permit has been conveyed pursuant to section 45-831.01, subsection F.
219219
220220 22. "Underground storage facility" means a constructed underground storage facility or a managed underground storage facility.
221221
222222 23. "Water that cannot reasonably be used directly" means water that the storer cannot reasonably put to a direct use during the calendar year, including:
223223
224224 (a) Except as provided in subdivision (b) or (j) of this paragraph or except for an agricultural improvement district as provided in subdivision (d) of this paragraph, if the storer is a municipal provider, the amount of central Arizona project water that exceeds the amount of mined groundwater withdrawn during the calendar year by the storer in the active management area in which the storer's service area is located. If the storer withdrew mined groundwater during a calendar year in which the storer stored central Arizona project water underground pursuant to the storage permit, the amount of central Arizona project water stored underground during that year equal to the amount of mined groundwater withdrawn from the active management area in which the storer's service area is located shall not be credited to the storer's long-term storage account but may be considered as being available for recovery by the storer on an annual basis under section 45-851.01. In calculating the amount of mined groundwater withdrawn by the storer from the active management area, the director, at the request of the storer, shall exclude any groundwater withdrawn, treated and delivered for direct use as part of a remedial action undertaken pursuant to CERCLA or title 49, chapter 2, article 5. For the purposes of this subdivision, "mined groundwater" and "municipal provider" have the same meanings prescribed in section 45-561.
225225
226226 (b) If the storer is a municipal provider that has been designated as having an assured water supply pursuant to section 45-576, the amount of central Arizona project water that exceeds the amount of deficit groundwater withdrawn during the calendar year by the storer in the active management area in which the storer's service area is located. If the storer withdrew deficit groundwater during a calendar year in which the storer stored central Arizona project water underground pursuant to the storage permit, the amount of the central Arizona project water stored underground during that year equal to the amount of deficit groundwater withdrawn from the active management area in which the storer's service area is located shall not be credited to the storer's long-term storage account but may be considered as being available for recovery by the storer on an annual basis pursuant to section 45-851.01. In calculating the amount of deficit groundwater withdrawn by the storer from the active management area, the director, at the request of the storer, shall exclude any groundwater withdrawn, treated and delivered for direct use as part of a remedial action undertaken pursuant to CERCLA or title 49, chapter 2, article 5. For the purposes of this subdivision, "municipal provider" has the same meaning prescribed in section 45-561 and "deficit groundwater" means that amount of groundwater withdrawn within an active management area for delivery and use within a service area by a municipal provider in excess of the amount of groundwater that may be withdrawn by the municipal provider consistent with the achievement of the active management area's management goals as prescribed by rules adopted by the director pursuant to section 45-576.
227227
228228 (c) Except as provided in subdivision (d) of this paragraph, if the storer is not a municipal provider, the amount of central Arizona project water stored in an active management area that exceeds the amount of groundwater withdrawn during the calendar year by the storer in that active management area. If the storer withdrew groundwater in an active management area during a calendar year in which the storer stored central Arizona project water underground in that active management area pursuant to the storage permit, the amount of central Arizona project water stored underground during that year equal to the amount of groundwater withdrawn from the active management area shall not be credited to the storer's long-term storage account but may be considered as being available for recovery by the storer on an annual basis under section 45-851.01. For the purposes of this subdivision, "municipal provider" has the same meaning prescribed in section 45-561. In calculating the amount of groundwater withdrawn by the storer from the active management area, the director, at the request of the storer, shall exclude:
229229
230230 (i) The amount of any groundwater withdrawn, treated and delivered for direct use as part of a remedial action undertaken pursuant to CERCLA or title 49, chapter 2, article 5.
231231
232232 (ii) The amount of groundwater withdrawn by the storer during the year for mineral extraction or metallurgical processing if the storer was engaged in mineral extraction and metallurgical processing within an initial active management area on or before January 1, 2011.
233233
234234 (d) The amount of central Arizona project water stored in an active management area in any year after 1994 by an agricultural improvement district established pursuant to title 48, chapter 17 for use at those portions of electrical generating facilities that are constructed or expanded after June 12, 1980, subject to both of the following:
235235
236236 (i) If groundwater was used during a year in an active management area at those portions of the electrical generating facilities that were owned and operated by the agricultural improvement district and that were constructed or expanded after June 12, 1980, the amount of the central Arizona project water stored during that year equal to the amount of the groundwater withdrawn during the year for use at those portions of the facilities that were owned and operated by the agricultural improvement district and that were constructed or expanded after June 12, 1980 shall not be credited to the agricultural improvement district's long-term storage account but may be considered as being available for recovery by the agricultural improvement district on an annual basis under section 45-851.01.
237237
238238 (ii) Long-term storage credits accrued as a result of the storage of the central Arizona project water may be recovered within the active management area by the agricultural improvement district only for the purpose of providing central Arizona project water to electrical generating facilities that were owned and operated by the agricultural improvement district and only pursuant to any water requirement included in a facility's certificate of environmental compatibility. Subject to section 45-854.01, the long-term storage credits may be assigned by the agricultural improvement district only to the owner of an electrical generating facility for use pursuant to any water requirement included in that facility's certificate of environmental compatibility.
239239
240240 (e) Surface water made available by dams constructed or modified after August 13, 1986.
241241
242242 (f) Effluent.
243243
244244 (g) If the storage facility is in an active management area, water from outside the active management area that would not have reached the active management area without the efforts of the storer.
245245
246246 (h) If the storage facility is outside of an active management area, water from outside the groundwater basin in which the storage facility is located that would not have reached the groundwater basin without the efforts of the storer.
247247
248248 (i) Water that is delivered through the central Arizona project and that is acquired by the Arizona water banking authority.
249249
250250 (j) If the storer is a municipal provider in an active MANAGEMENT area that does not have a management goal of achieving or MAINTAINing a safe yield condition, the amount of central Arizona project water stored UNDERGROUND during the calendar year by the storer in the active management area in which the storer's service area is located.
251251
252252 24. "Water storage" means adding water to an aquifer or saving water in an aquifer pursuant to permits issued under this chapter.
253253
254254 25. "Water storage permit" means a permit issued pursuant to section 45-831.01 to store water at a storage facility. END_STATUTE
255255
256256 Sec. 3. Effective date
257257
258258 Section 45-802.01, Arizona Revised Statutes, as amended by Laws 2019, chapter 1, section 10 and this act, is effective from and after December 31, 2024.