Arizona 2023 Regular Session

Arizona House Bill HB2278 Compare Versions

Only one version of the bill is available at this time.
OldNewDifferences
11 REFERENCE TITLE: well drilling; groundwater basins. State of Arizona House of Representatives Fifty-sixth Legislature First Regular Session 2023 HB 2278 Introduced by Representative Cano An Act amending title 45, chapter 2, article 10, Arizona Revised Statutes, by adding section 45-596.02; relating to wells. (TEXT OF BILL BEGINS ON NEXT PAGE)
22
33
44
55
66
77
88
99 REFERENCE TITLE: well drilling; groundwater basins.
1010 State of Arizona House of Representatives Fifty-sixth Legislature First Regular Session 2023
1111 HB 2278
1212 Introduced by Representative Cano
1313
1414 REFERENCE TITLE: well drilling; groundwater basins.
1515
1616
1717
1818
1919
2020
2121
2222
2323
2424 State of Arizona
2525
2626 House of Representatives
2727
2828 Fifty-sixth Legislature
2929
3030 First Regular Session
3131
3232 2023
3333
3434
3535
3636
3737
3838
3939
4040 HB 2278
4141
4242
4343
4444 Introduced by
4545
4646 Representative Cano
4747
4848
4949
5050
5151
5252
5353
5454
5555
5656
5757
5858
5959
6060
6161
6262
6363
6464 An Act
6565
6666
6767
6868 amending title 45, chapter 2, article 10, Arizona Revised Statutes, by adding section 45-596.02; relating to wells.
6969
7070
7171
7272
7373
7474 (TEXT OF BILL BEGINS ON NEXT PAGE)
7575
7676
7777
7878 Be it enacted by the Legislature of the State of Arizona: Section 1. Title 45, chapter 2, article 10, Arizona Revised Statutes, is amended by adding section 45-596.02, to read: START_STATUTE45-596.02. Well drilling moratorium; upper San Pedro and Verde Valley groundwater basins; exemptions Beginning on the effective date of this section, a person may not construct and the department may not issue a permit or drilling card for a new well in the upper San Pedro groundwater basin or the Verde Valley groundwater subbasin except for: 1. A replacement well as prescribed in rules adopted by the director. 2. A well that the director determines will not pump the subflow of a river system or source. 3. A well that is constructed after the conclusion of the general adjudication of water rights in the Gila River. END_STATUTE
7979
8080 Be it enacted by the Legislature of the State of Arizona:
8181
8282 Section 1. Title 45, chapter 2, article 10, Arizona Revised Statutes, is amended by adding section 45-596.02, to read:
8383
8484 START_STATUTE45-596.02. Well drilling moratorium; upper San Pedro and Verde Valley groundwater basins; exemptions
8585
8686 Beginning on the effective date of this section, a person may not construct and the department may not issue a permit or drilling card for a new well in the upper San Pedro groundwater basin or the Verde Valley groundwater subbasin except for:
8787
8888 1. A replacement well as prescribed in rules adopted by the director.
8989
9090 2. A well that the director determines will not pump the subflow of a river system or source.
9191
9292 3. A well that is constructed after the conclusion of the general adjudication of water rights in the Gila River. END_STATUTE