Arizona 2023 Regular Session

Arizona House Bill HB2373 Compare Versions

OldNewDifferences
1-House Engrossed permits; automated permitting platform State of Arizona House of Representatives Fifty-sixth Legislature First Regular Session 2023 CHAPTER 33 HOUSE BILL 2373 An Act amending sections 9-468 and 11-323, Arizona Revised Statutes; relating to building permits. (TEXT OF BILL BEGINS ON NEXT PAGE)
1+House Engrossed permits; automated permitting platform State of Arizona House of Representatives Fifty-sixth Legislature First Regular Session 2023 HOUSE BILL 2373 An Act amending sections 9-468 and 11-323, Arizona Revised Statutes; relating to building permits. (TEXT OF BILL BEGINS ON NEXT PAGE)
2+
3+
24
35
46
57
68
79 House Engrossed permits; automated permitting platform
810 State of Arizona House of Representatives Fifty-sixth Legislature First Regular Session 2023
9-CHAPTER 33
1011 HOUSE BILL 2373
1112
1213 House Engrossed
1314
1415
1516
1617 permits; automated permitting platform
18+
19+
1720
1821
1922
2023
2124
2225
2326
2427 State of Arizona
2528
2629 House of Representatives
2730
2831 Fifty-sixth Legislature
2932
3033 First Regular Session
3134
3235 2023
3336
3437
3538
3639
3740
3841
3942
40-CHAPTER 33
43+HOUSE BILL 2373
4144
4245
43-
44-HOUSE BILL 2373
4546
4647
4748
4849 An Act
4950
5051
5152
5253 amending sections 9-468 and 11-323, Arizona Revised Statutes; relating to building permits.
5354
5455
5556
5657
5758
5859 (TEXT OF BILL BEGINS ON NEXT PAGE)
5960
6061
6162
6263 Be it enacted by the Legislature of the State of Arizona: Section 1. Section 9-468, Arizona Revised Statutes, is amended to read: START_STATUTE9-468. Solar construction permits; standards; definition A. Municipalities shall adopt the following standards for issuing permits for the use of certain solar energy devices: 1. For construction with solar photovoltaic systems that are intended to connect to a utility system, the following apply: (a) The location of the photovoltaic system installation shall be indicated on the construction plans, including the roof plan and elevation. (b) Photovoltaic panel mounting details shall be included in the installation plans. (c) The electrical diagrams shall include one-line and or three-line diagrams. A one-line or three-line electrical diagram is not required if a qualified online automated permitting platform is used to verify code compliance. (d) For direct current to alternating current conversions, the cut sheet and listings for inverters shall be included in the plans. (e) A municipality shall not require a stamp from a professional engineer for a solar photovoltaic system unless an engineering stamp is deemed necessary. If an engineering stamp is deemed necessary, the municipality shall provide the permittee a written explanation of why the engineering stamp is necessary. (f) A municipality may use a qualified online automated permitting platform to verify code compliance in order to satisfy the requirements of subdivisions (a), (b), and (c) of this paragraph. 2. For solar water heating systems, the following apply: (a) The location of the solar panel system shall be indicated on the construction plans, including the roof plan and elevation, and shall include mounting details for panel installation. (b) Construction plan notes shall include a requirement that solar water heating equipment be installed in compliance with applicable plumbing codes and as prescribed by a solar rating and certification corporation and any guidelines adopted by this state. (c) A municipality shall not require a stamp from a professional engineer for a single family single-family solar water heating system unless an engineering stamp is deemed necessary. If an engineering stamp is deemed necessary, the municipality shall provide the permittee a written explanation of why the engineering stamp is necessary. B. Any building or permit fee or charge assessed by a city or town for a building permit for solar construction must be attributable to and defray or cover the expense of the service for which the fee or charge is assessed. A fee or charge shall not exceed the actual cost of issuing a permit, and a written, itemized list of the individual costs associated with the permit fee shall be provided at the request of the permittee. C. Before adoption of a fee for service or an additional or separate charge pursuant to this section, a city or town shall hold a public hearing on the issue with at least fifteen days' published notice. D. The method by which a city or town arrives at an assessed permit or plan fee must be published and made available to the public. E. For the purposes of this section, "qualified online automated permitting platform" means a web-based portal that automates plan review, produces code-compliant approvals and issues permits for residential solar energy systems and residential energy storage systems paired with residential solar energy systems in real time. END_STATUTE Sec. 2. Section 11-323, Arizona Revised Statutes, is amended to read: START_STATUTE11-323. Solar construction permits; standards; definition A. Counties shall adopt the following standards for issuing permits for the use of certain solar energy devices: 1. For construction with solar photovoltaic systems that are intended to connect to a utility system, the following apply: (a) The location of the photovoltaic system installation shall be indicated on the construction plans, including the roof plan and elevation. (b) Photovoltaic panel mounting details shall be included in the installation plans. (c) The electrical diagrams shall include one-line and or three-line diagrams. A one-line or three-line electrical diagram is not required if a qualified online automated permitting platform is used to verify code compliance. (d) For direct current to alternating current conversions, the cut sheet and listings for inverters shall be included in the plans. (e) A county shall not require a stamp from a professional engineer for a solar photovoltaic system unless an engineering stamp is deemed necessary. If an engineering stamp is deemed necessary, the county shall provide the permittee a written explanation of why the engineering stamp is necessary. (f) A county may use a qualified online automated permitting platform to verify code compliance in order to satisfy the requirements of subdivisions (a), (b), and (c) of this paragraph. 2. For solar water heating systems, the following apply: (a) The location of the solar panel system shall be indicated on the construction plans, including the roof plan and elevation, and shall include mounting details for panel installation. (b) Construction plan notes shall include a requirement that solar water heating equipment be installed in compliance with applicable plumbing codes and as prescribed by a solar rating and certification corporation and any guidelines adopted by this state. (c) A county shall not require a stamp from a professional engineer for a single family single-family solar water heating system unless an engineering stamp is deemed necessary. If an engineering stamp is deemed necessary, the county shall provide the permittee a written explanation of why the engineering stamp is necessary. B. Any building or permit fee or charge assessed by a county for a building permit for solar construction must be attributable to and defray or cover the expense of the service for which the fee or charge is assessed. A fee or charge shall not exceed the actual cost of issuing a permit, and a written, itemized list of the individual costs associated with the permit fee shall be provided at the request of the permittee. C. Before adoption of a fee for service or an additional or separate charge pursuant to this section, a county shall hold a public hearing on the issue with at least fifteen days' published notice. D. The method by which a county arrives at an assessed permit or plan fee must be published and made available to the public. E. For the purposes of this section, "qualified online automated permitting platform" means a web-based portal that automates plan review, produces code-compliant approvals and issues permits for residential solar energy systems and residential energy storage systems paired with residential solar energy systems in real time. END_STATUTE
6364
6465 Be it enacted by the Legislature of the State of Arizona:
6566
6667 Section 1. Section 9-468, Arizona Revised Statutes, is amended to read:
6768
6869 START_STATUTE9-468. Solar construction permits; standards; definition
6970
7071 A. Municipalities shall adopt the following standards for issuing permits for the use of certain solar energy devices:
7172
7273 1. For construction with solar photovoltaic systems that are intended to connect to a utility system, the following apply:
7374
7475 (a) The location of the photovoltaic system installation shall be indicated on the construction plans, including the roof plan and elevation.
7576
7677 (b) Photovoltaic panel mounting details shall be included in the installation plans.
7778
7879 (c) The electrical diagrams shall include one-line and or three-line diagrams. A one-line or three-line electrical diagram is not required if a qualified online automated permitting platform is used to verify code compliance.
7980
8081 (d) For direct current to alternating current conversions, the cut sheet and listings for inverters shall be included in the plans.
8182
8283 (e) A municipality shall not require a stamp from a professional engineer for a solar photovoltaic system unless an engineering stamp is deemed necessary. If an engineering stamp is deemed necessary, the municipality shall provide the permittee a written explanation of why the engineering stamp is necessary.
8384
8485 (f) A municipality may use a qualified online automated permitting platform to verify code compliance in order to satisfy the requirements of subdivisions (a), (b), and (c) of this paragraph.
8586
8687 2. For solar water heating systems, the following apply:
8788
8889 (a) The location of the solar panel system shall be indicated on the construction plans, including the roof plan and elevation, and shall include mounting details for panel installation.
8990
9091 (b) Construction plan notes shall include a requirement that solar water heating equipment be installed in compliance with applicable plumbing codes and as prescribed by a solar rating and certification corporation and any guidelines adopted by this state.
9192
9293 (c) A municipality shall not require a stamp from a professional engineer for a single family single-family solar water heating system unless an engineering stamp is deemed necessary. If an engineering stamp is deemed necessary, the municipality shall provide the permittee a written explanation of why the engineering stamp is necessary.
9394
9495 B. Any building or permit fee or charge assessed by a city or town for a building permit for solar construction must be attributable to and defray or cover the expense of the service for which the fee or charge is assessed. A fee or charge shall not exceed the actual cost of issuing a permit, and a written, itemized list of the individual costs associated with the permit fee shall be provided at the request of the permittee.
9596
9697 C. Before adoption of a fee for service or an additional or separate charge pursuant to this section, a city or town shall hold a public hearing on the issue with at least fifteen days' published notice.
9798
9899 D. The method by which a city or town arrives at an assessed permit or plan fee must be published and made available to the public.
99100
100101 E. For the purposes of this section, "qualified online automated permitting platform" means a web-based portal that automates plan review, produces code-compliant approvals and issues permits for residential solar energy systems and residential energy storage systems paired with residential solar energy systems in real time. END_STATUTE
101102
102103 Sec. 2. Section 11-323, Arizona Revised Statutes, is amended to read:
103104
104105 START_STATUTE11-323. Solar construction permits; standards; definition
105106
106107 A. Counties shall adopt the following standards for issuing permits for the use of certain solar energy devices:
107108
108109 1. For construction with solar photovoltaic systems that are intended to connect to a utility system, the following apply:
109110
110111 (a) The location of the photovoltaic system installation shall be indicated on the construction plans, including the roof plan and elevation.
111112
112113 (b) Photovoltaic panel mounting details shall be included in the installation plans.
113114
114115 (c) The electrical diagrams shall include one-line and or three-line diagrams. A one-line or three-line electrical diagram is not required if a qualified online automated permitting platform is used to verify code compliance.
115116
116117 (d) For direct current to alternating current conversions, the cut sheet and listings for inverters shall be included in the plans.
117118
118119 (e) A county shall not require a stamp from a professional engineer for a solar photovoltaic system unless an engineering stamp is deemed necessary. If an engineering stamp is deemed necessary, the county shall provide the permittee a written explanation of why the engineering stamp is necessary.
119120
120121 (f) A county may use a qualified online automated permitting platform to verify code compliance in order to satisfy the requirements of subdivisions (a), (b), and (c) of this paragraph.
121122
122123 2. For solar water heating systems, the following apply:
123124
124125 (a) The location of the solar panel system shall be indicated on the construction plans, including the roof plan and elevation, and shall include mounting details for panel installation.
125126
126127 (b) Construction plan notes shall include a requirement that solar water heating equipment be installed in compliance with applicable plumbing codes and as prescribed by a solar rating and certification corporation and any guidelines adopted by this state.
127128
128129 (c) A county shall not require a stamp from a professional engineer for a single family single-family solar water heating system unless an engineering stamp is deemed necessary. If an engineering stamp is deemed necessary, the county shall provide the permittee a written explanation of why the engineering stamp is necessary.
129130
130131 B. Any building or permit fee or charge assessed by a county for a building permit for solar construction must be attributable to and defray or cover the expense of the service for which the fee or charge is assessed. A fee or charge shall not exceed the actual cost of issuing a permit, and a written, itemized list of the individual costs associated with the permit fee shall be provided at the request of the permittee.
131132
132133 C. Before adoption of a fee for service or an additional or separate charge pursuant to this section, a county shall hold a public hearing on the issue with at least fifteen days' published notice.
133134
134135 D. The method by which a county arrives at an assessed permit or plan fee must be published and made available to the public.
135136
136137 E. For the purposes of this section, "qualified online automated permitting platform" means a web-based portal that automates plan review, produces code-compliant approvals and issues permits for residential solar energy systems and residential energy storage systems paired with residential solar energy systems in real time. END_STATUTE
137-
138- APPROVED BY THE GOVERNOR APRIL 11, 2023. FILED IN THE OFFICE OF THE SECRETARY OF STATE APRIL 11, 2023.
139-
140-
141-