Arizona 2023 Regular Session

Arizona House Bill HCR2024 Compare Versions

Only one version of the bill is available at this time.
OldNewDifferences
11 REFERENCE TITLE: Bartlett Dam; height increase State of Arizona House of Representatives Fifty-sixth Legislature First Regular Session 2023 HCR 2024 Introduced by Representative Griffin A Concurrent Resolution supporting a feasibility study to increase the height of bartlett dam. (TEXT OF BILL BEGINS ON NEXT PAGE)
22
33
44
55
66
77
88
99 REFERENCE TITLE: Bartlett Dam; height increase
1010 State of Arizona House of Representatives Fifty-sixth Legislature First Regular Session 2023
1111 HCR 2024
1212 Introduced by Representative Griffin
1313
1414 REFERENCE TITLE: Bartlett Dam; height increase
1515
1616
1717
1818
1919
2020
2121
2222
2323
2424 State of Arizona
2525
2626 House of Representatives
2727
2828 Fifty-sixth Legislature
2929
3030 First Regular Session
3131
3232 2023
3333
3434
3535
3636
3737
3838
3939
4040 HCR 2024
4141
4242
4343
4444 Introduced by
4545
4646 Representative Griffin
4747
4848
4949
5050
5151
5252
5353
5454
5555
5656
5757
5858
5959
6060
6161
6262
6363
6464 A Concurrent Resolution
6565
6666
6767
6868 supporting a feasibility study to increase the height of bartlett dam.
6969
7070
7171
7272
7373
7474 (TEXT OF BILL BEGINS ON NEXT PAGE)
7575
7676
7777
7878 Whereas, in 1916, Congress enacted legislation that directed the Secretary of the Interior to provide water, under the 1902 Reclamation Act, to 631 ten-acre allotments on the Salt River Indian Reservation; and Whereas, with a lack of developed water infrastructure there would not be sufficient supply for all irrigable land in the Phoenix valley; and Whereas, to satisfy the directive, the Secretary of the Interior agreed to construct Bartlett Dam on the Verde River; and Whereas, in 1936, the Bureau of Reclamation began constructing the multiple arch dam, with the costs being funded 80% by the Salt River Project and 20% by the Bureau of Indian Affairs on behalf of the Salt River Pima-Maricopa Indian community; and Whereas, Bartlett Dam was completed in 1939, coming in under budget by approximately $270,000. It provided the government with 60,000 acre-feet of reservoir water storage, with the right to take a maximum of 20,000 acre-feet annually for use on the community's land; and Whereas, Bartlett Dam is named after Bill Bartlett, a government surveyor who is credited with discovering the dam site, which is located approximately 48 miles northeast of Phoenix; and Whereas, between 1994 and 1996, several modifications were made to the dam to address safety concerns, including raising its height by 21.5 feet to prevent overtopping; and Whereas, a new, unlined auxiliary spillway was built 1,500 feet south of the dam's left abutment, along with a concrete control structure and three-segment fuse plug embankment. These alterations allow for a quick release of water; and Whereas, Bartlett Dam currently stands at 308.5 feet tall and 823 feet long and has a reservoir with a storage capacity of 178,000 acre-feet, making it the second largest capacity dam in the Phoenix area; and Whereas, Bartlett Dam provides for flood control and irrigation water for Salt River Valley residents and the Salt River Indian Reservation; and Whereas, Horseshoe Dam is an earthfill dam that is located north of Bartlett Dam and was built between 1944 and 1946; and Whereas, a 2012 Light Detection and Ranging (LiDAR) survey estimated that over 45,000 acre-feet of water storage capacity has been lost to sediment accumulation in Horseshoe Reservoir, reducing the storage capacity to 98,000 acre-feet; and Whereas, raising the current height of Bartlett Dam between 62 and 97 feet would allow for an increase storage yield of between 60,000 and 115,000 acre-feet. That is enough to serve an additional 180,000 to 345,000 households, greatly reducing reliance on nonrenewable water supplies, such as groundwater; and Whereas, Horseshoe Reservoir would benefit from the Bartlett Dam height increase by further helping to manage flooding and sediment inflow, creating a protective barrier for endangered fish and providing more natural habitat for wildlife; and Whereas, raising the dam height would also increase the total water storage capacity on the Verde River, further improving access to renewable surface water supplies. Therefore Be it resolved by the House of Representatives of the State of Arizona, the Senate concurring: 1. That the Members of the Legislature recognize the importance of raising the height of Bartlett Dam and preventing sediment buildup in the Horseshoe Reservoir. 2. That the Members of the Legislature support the United States Congress providing funding to conduct a feasibility study for increasing the height of Bartlett Dam.
7979
8080
8181
8282 Whereas, in 1916, Congress enacted legislation that directed the Secretary of the Interior to provide water, under the 1902 Reclamation Act, to 631 ten-acre allotments on the Salt River Indian Reservation; and
8383
8484 Whereas, with a lack of developed water infrastructure there would not be sufficient supply for all irrigable land in the Phoenix valley; and
8585
8686 Whereas, to satisfy the directive, the Secretary of the Interior agreed to construct Bartlett Dam on the Verde River; and
8787
8888 Whereas, in 1936, the Bureau of Reclamation began constructing the multiple arch dam, with the costs being funded 80% by the Salt River Project and 20% by the Bureau of Indian Affairs on behalf of the Salt River Pima-Maricopa Indian community; and
8989
9090 Whereas, Bartlett Dam was completed in 1939, coming in under budget by approximately $270,000. It provided the government with 60,000 acre-feet of reservoir water storage, with the right to take a maximum of 20,000 acre-feet annually for use on the community's land; and
9191
9292 Whereas, Bartlett Dam is named after Bill Bartlett, a government surveyor who is credited with discovering the dam site, which is located approximately 48 miles northeast of Phoenix; and
9393
9494 Whereas, between 1994 and 1996, several modifications were made to the dam to address safety concerns, including raising its height by 21.5 feet to prevent overtopping; and
9595
9696 Whereas, a new, unlined auxiliary spillway was built 1,500 feet south of the dam's left abutment, along with a concrete control structure and three-segment fuse plug embankment. These alterations allow for a quick release of water; and
9797
9898 Whereas, Bartlett Dam currently stands at 308.5 feet tall and 823 feet long and has a reservoir with a storage capacity of 178,000 acre-feet, making it the second largest capacity dam in the Phoenix area; and
9999
100100 Whereas, Bartlett Dam provides for flood control and irrigation water for Salt River Valley residents and the Salt River Indian Reservation; and
101101
102102 Whereas, Horseshoe Dam is an earthfill dam that is located north of Bartlett Dam and was built between 1944 and 1946; and
103103
104104 Whereas, a 2012 Light Detection and Ranging (LiDAR) survey estimated that over 45,000 acre-feet of water storage capacity has been lost to sediment accumulation in Horseshoe Reservoir, reducing the storage capacity to 98,000 acre-feet; and
105105
106106 Whereas, raising the current height of Bartlett Dam between 62 and 97 feet would allow for an increase storage yield of between 60,000 and 115,000 acre-feet. That is enough to serve an additional 180,000 to 345,000 households, greatly reducing reliance on nonrenewable water supplies, such as groundwater; and
107107
108108 Whereas, Horseshoe Reservoir would benefit from the Bartlett Dam height increase by further helping to manage flooding and sediment inflow, creating a protective barrier for endangered fish and providing more natural habitat for wildlife; and
109109
110110 Whereas, raising the dam height would also increase the total water storage capacity on the Verde River, further improving access to renewable surface water supplies.
111111
112112 Therefore
113113
114114 Be it resolved by the House of Representatives of the State of Arizona, the Senate concurring:
115115
116116 1. That the Members of the Legislature recognize the importance of raising the height of Bartlett Dam and preventing sediment buildup in the Horseshoe Reservoir.
117117
118118 2. That the Members of the Legislature support the United States Congress providing funding to conduct a feasibility study for increasing the height of Bartlett Dam.