California 2013 2013-2014 Regular Session

California Senate Bill SB743 Amended / Bill

Filed 09/06/2013

 BILL NUMBER: SB 743AMENDED BILL TEXT AMENDED IN ASSEMBLY SEPTEMBER 6, 2013 INTRODUCED BY  Senators   Steinberg     and Padilla   Senator   Steinberg   (   Coauthors:   Senators   Gaines,   Galgiani,   Nielsen,   and Wolk   )   (   Coauthors:   Assembly Members   Cooley,   Dickinson,   Logue,   and Pan   )  FEBRUARY 22, 2013  An act to amend Section 739.1 of the Public Utilities Code, relating to electricity.   An act to amend Sections 21181, 21186, 21187, 21189.1, and 21189.3 of, to repeal and add Section 21185 of, and to add and repeal Section 21168.6.6 of, the Public Resources Code, relating to environmental quality.  LEGISLATIVE COUNSEL'S DIGEST SB 743, as amended, Steinberg.  Electricity: rates.   Environmental quality: judicial review streamlining for environmental leadership development projects and entertainment and   sports center in the City of Sacramento.   (1) The Jobs and Economic Improvement Through Environmental Leadership Act of 2011 requires a party bringing an action or proceeding alleging that a lead agency's approval of a project certified by the Governor as an environmental leadership development project is in violation of the California Environmental Quality Act to file the action or proceeding with the Court of Appeal with geographic jurisdiction over the project and requires the Court of Appeal to issue its decision within 175 days of the filing of the petition. The Jobs and Economic Improvement Through Environmental Leadership Act of 2011 requires the lead agency to concurrently prepare the record of proceeding for the leadership project with the review and consideration of the project. The Jobs and Economic Improvement Through Environmental Leadership Act of 2011 provides that the above provision does not apply to a project for which a lead agency fails to certify an environmental impact report on or before June 1, 2014. The Jobs and Economic Improvement Through Environmental Leadership Act of 2011 is repealed by its own terms on January 1, 2015.   This bill would instead require the Judicial Council, on or before July 1, 2014, to adopt a rule of court to establish procedures applicable to actions or proceedings seeking judicial review of a public agency's action in certifying the environmental impact report and in granting project approval that requires the actions or proceedings, including any appeals therefrom, be resolved, to the extent feasible, within 270 days of the certification of the record of proceedings. The bill would extend the operation of the judicial review procedures unless the lead agency fails to certify an environmental impact report for an environmental leadership project on or before January 1, 2016. The bill would provide that the above provisions do not apply to a project if the Governor does not certify the project as an environmental leadership development project prior to January 1, 2016. Because this bill would extend the time period for which a lead agency would be required to concurrently prepare the record of proceeding with the review and consideration of the environmental leadership development projects, this bill would impose a state-mandated local program. The bill would require the lead agency, within 10 days of the Governor's certification, to issue, at the applicant's expense, a specified public notice, thereby imposing a state-mandated local program. The bill would repeal the Jobs and Economic Improvement Through Environmental Leadership Act of 2011 on January 1, 2017.   (2) The California Environmental Quality Act, commonly known as CEQA, requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of, an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment. CEQA establishes a procedure by which a person may seek judicial review of the decision of the lead agency made pursuant to CEQA.   This bill would require the public agency, in certifying the environmental impact report and in granting approvals for a specified entertainment and sports center project located in the City of Sacramento, including the concurrent preparation of the record of proceedings and the certification of the record of proceeding within 5 days of the filing of a specified notice, to comply with specified procedures. Because a public agency would be required to comply with those new procedures, this bill would impose a state-mandated local program. The bill would require the Judicial Council, on or before July 1, 2014, to adopt a rule of court to establish procedures applicable to actions or proceedings seeking judicial review of a public agency's action in certifying the environmental impact report and in granting project approval that requires the actions or proceedings, including any appeals therefrom, be resolved, to the extent feasible, within 270 days of the certification of the record of proceedings. The bill would provide that the above provisions are inoperative and repealed on January 1 of the following year if the applicant fails to notify the lead agency before the release of the draft environmental impact report for public comment that the applicant is electing to proceed pursuant to the above provisions.   This bill would make findings and declarations as to the necessity of a special statute for the City of Sacramento.   (3) The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.   This bill would provide that no reimbursement is required by this act for a specified reason.   Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations, as defined. Existing law authorizes the commission to fix the rates and charges for every public utility, and requires that those rates and charges be just and reasonable. Existing law requires the commission to designate a baseline quantity of electricity and gas necessary to supply a significant portion of the reasonable energy needs of the average residential customer and requires that electrical and gas corporations file rates and charges, to be approved by the commission, providing baseline rates. Existing law requires the commission to establish a program of assistance to specified low-income electric and gas customers, referred to as the California Alternate Rates for Energy (CARE) program.   Existing law revises certain prohibitions upon raising residential electrical rates adopted during the energy crisis of 2000-01, to authorize the commission to increase the rates in effect for CARE program participants for electricity usage up to 130% of baseline quantities by the annual percentage increase in benefits under the CalWORKs program, as defined, not to exceed 3%, and subject to the limitation that the CARE rates not exceed 80% of the corresponding rates charged to residential customers not participating in the CARE program.   This bill would replace the existing authorization to increase CARE rates based upon the annual percentage increase in benefits under the CalWORKs program and instead authorize the commission to increase the rates in effect for CARE program participants for electricity usage up to 130% of baseline quantities by the annual percentage increase of the Consumer Price Index from the prior year but not to exceed 4% per year, and subject to the limitation that the CARE rates not exceed 80% of the corresponding rates charged to residential customers not participating in the CARE program.  Vote: majority. Appropriation: no. Fiscal committee: yes. State-mandated local program:  no   yes  . THE PEOPLE OF THE STATE OF CALIFORNIA DO ENACT AS FOLLOWS:  SECTION 1.   The Legislature finds and declares all of the following:   (a) The Federal Reserve has stated that "  m]ost policymakers estimate the longer-run normal rate of unemployment is between 5.2 and 6 percent." At 7.6 percent, the current United States unemployment rate remains markedly higher than the normal rate and both the unemployment rates in Sacramento County and California are higher than the current national unemployment rate.   (b) The California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) requires that the environmental impacts of development projects be identified and mitigated. The act also guarantees the public an opportunity to review and comment on the environmental impacts of a project and to participate meaningfully in the development of mitigation measures for potentially significant environmental impacts.   (c) The existing home of the City of Sacramento's National Basketball Association (NBA) team, the Sleep Train Arena, is an old and outmoded facility located outside of the City of Sacramento's downtown area and is not serviced by the region's existing heavy and light rail transportation networks. It was constructed 25 years ago and a new, more efficient entertainment and sports center located in downtown Sacramento is needed to meet the city's and region's needs.   (d) The City of Sacramento and the region would greatly benefit from the addition of a multipurpose event center capable of hosting a wide range of events including exhibitions, conventions, sporting events, as well as musical, artistic, and cultural events in downtown Sacramento.   (e) The proposed entertainment and sports center project is a public-private partnership between the City of Sacramento and the applicant that will result in the construction of a new state-of-the-art multipurpose event center, and surrounding infill development in downtown Sacramento as described in the notice of preparation released by the City of Sacramento on April 12, 2013.   (f) The project will generate over 4,000 full-time jobs including employees hired both during construction and operation of the entertainment and sports center project. This employment estimate does not include the substantial job generation that will occur with the surrounding development uses, which will generate additional hospitality, office, restaurant, and retail jobs in Sacramento's downtown area.   (g) The project also presents an unprecedented opportunity to implement innovative measures that will significantly reduce traffic and air quality impacts and mitigate the greenhouse gas emissions resulting from the project. The project site is located in downtown Sacramento near heavy and light rail transit facilities, situated to maximize opportunities to encourage nonautomobile modes of travel to the entertainment and sports center project, and is consistent with the policies and regional vision included in the Sustainable Communities Strategy adopted pursuant to Chapter 728 of the Statutes of 2008 by the Sacramento Area Council of Governments in April of 2012. The project is also located within close proximity to three major infill development areas including projects (The Bridge District, Railyards, and Township Nine) that received infill infrastructure grants from the state pursuant to Proposition 1C.   (h) It is in the interest of the state to expedite judicial review of the entertainment and sports center project, as appropriate, while protecting the environment and the right of the public to review, comment on, and, if necessary, seek judicial review of, the adequacy of the environmental impact report for the project.   SEC. 2.   Section 21168.6.6 is added to the   Public Resources Code   , to read:   21168.6.6. (a) For the purposes of this section, the following definitions shall have the following meanings: (1) "Applicant" means a private entity or its affiliates that proposes the project and its successors, heirs, and assignees. (2) "City" means the City of Sacramento. (3) "Downtown arena" means an arena that is constructed to meet the standards required for Leadership in Energy and Environmental Design (LEED) silver certification or better by the United States Green Building Council, associated public spaces, and facility and infrastructure for ingress, egress, and use of the arena facility from demolition and site preparation through operation proposed as part of the entertainment and sports center project that will become the new home to the City of Sacramento's National Basketball Association (NBA) team. (4) "Entertainment and sports center project" or "project" means a project that substantially conforms to the project description for the entertainment and sports center project set forth in the notice of preparation released by the City of Sacramento on April 12, 2013. (b) The city may prosecute an eminent domain action associated with the downtown arena through order of possession pursuant to the Eminent Domain Law (Title 7 (commencing with Section 1230.010) of Part 3 of the Code of Civil Procedure) prior to certification of the environmental impact report on the project. (c) Notwithstanding any other law, the procedures established pursuant to subdivision (d) shall apply to an action or proceeding brought to attack, review, set aside, void, or annul the certification of the environmental impact report for the project or the granting of any project approvals. (d) On or before July 1, 2014, the Judicial Council shall adopt a rule of court to establish procedures applicable to actions or proceedings brought to attack, review, set aside, void, or annul the certification of the environmental impact report for the project or the granting of any project approvals that require the actions or proceedings, including any potential appeals therefrom, be resolved, to the extent feasible, within 270 days of certification of the record of proceedings pursuant to subdivision (f). (e) (1) The draft and final environmental impact report shall include a notice in not less than 12-point type stating the following: THIS EIR IS SUBJECT TO SECTION 21168.6.6 OF THE PUBLIC RESOURCES CODE, WHICH PROVIDES, AMONG OTHER THINGS, THAT THE LEAD AGENCY NEED NOT CONSIDER CERTAIN COMMENTS FILED AFTER THE CLOSE OF THE PUBLIC COMMENT PERIOD FOR THE DRAFT EIR. ANY JUDICIAL ACTION CHALLENGING THE CERTIFICATION OF THE EIR OR THE APPROVAL OF THE PROJECT DESCRIBED IN THE EIR IS SUBJECT TO THE PROCEDURES SET FORTH IN SECTION 21168.6.6 OF THE PUBLIC RESOURCES CODE. A COPY OF SECTION 21168.6.6 OF THE PUBLIC RESOURCES CODE IS INCLUDED IN THE APPENDIX TO THIS EIR. (2) The draft environmental impact report and final environmental impact report shall contain, as an appendix, the full text of this section. (3) Within 10 days after the release of the draft environmental impact report, the lead agency shall conduct an informational workshop to inform the public of the key analyses and conclusions of that report. (4) Within 10 days before the close of the public comment period, the lead agency shall hold a public hearing to receive testimony on the draft environmental impact report. A transcript of the hearing shall be included as an appendix to the final environmental impact report. (5) (A) Within five days following the close of the public comment period, a commenter on the draft environmental impact report may submit to the lead agency a written request for nonbinding mediation. The lead agency and applicant shall participate in nonbinding mediation with all commenters who submitted timely comments on the draft environmental impact report and who requested the mediation. Mediation conducted pursuant to this paragraph shall end no later than 35 days after the close of the public comment period. (B) A request for mediation shall identify all areas of dispute raised in the comment submitted by the commenter that are to be mediated. (C) The lead agency shall select one or more mediators who shall be retired judges or recognized experts with at least five years experience in land use and environmental law or science, or mediation. The applicant shall bear the costs of mediation. (D) A mediation session shall be conducted on each area of dispute with the parties requesting mediation on that area of dispute. (E) The lead agency shall adopt, as a condition of approval, any measures agreed upon by the lead agency, the applicant, and any commenter who requested mediation. A commenter who agrees to a measure pursuant to this subparagraph shall not raise the issue addressed by that measure as a basis for an action or proceeding challenging the lead agency's decision to certify the environmental impact report or to grant one or more initial project approvals. (6) The lead agency need not consider written comments submitted after the close of the public comment period, unless those comments address any of the following: (A) New issues raised in the response to comments by the lead agency. (B) New information released by the public agency subsequent to the release of the draft environmental impact report, such as new information set forth or embodied in a staff report, proposed permit, proposed resolution, ordinance, or similar documents. (C) Changes made to the project after the close of the public comment period. (D) Proposed conditions for approval, mitigation measures, or proposed findings required by Section 21081 or a proposed reporting and monitoring program required by paragraph (1) of subdivision (a) of Section 21081.6, where the lead agency releases those documents subsequent to the release of the draft environmental impact report. (E) New information that was not reasonably known and could not have been reasonably known during the public comment period. (7) The lead agency shall file the notice required by subdivision (a) of Section 21152 within five days after the last initial project approval. (f) (1) The lead agency shall prepare and certify the record of the proceedings in accordance with this subdivision and in accordance with Rule 3.1365 of the California Rules of Court. The applicant shall pay the lead agency for all costs of preparing and certifying the record of proceedings. (2) No later than three business days following the date of the release of the draft environmental impact report, the lead agency shall make available to the public in a readily accessible electronic format the draft environmental impact report and all other documents submitted to or relied on by the lead agency in the preparation of the draft environmental impact report. A document prepared by the lead agency or submitted by the applicant after the date of the release of the draft environmental impact report that is a part of the record of the proceedings shall be made available to the public in a readily accessible electronic format within five business days after the document is prepared or received by the lead agency. (3) Notwithstanding paragraph (2), documents submitted to or relied on by the lead agency that were not prepared specifically for the project and are copyright protected are not required to be made readily accessible in an electronic format. For those copyright protected documents, the lead agency shall make an index of these documents available in an electronic format no later than the date of the release of the draft environmental impact report, or within five business days if the document is received or relied on by the lead agency after the release of the draft environmental impact report. The index must specify the libraries or lead agency offices in which hardcopies of the copyrighted materials are available for public review. (4) The lead agency shall encourage written comments on the project to be submitted in a readily accessible electronic format, and shall make any such comment available to the public in a readily accessible electronic format within five days of its receipt. (5) Within seven business days after the receipt of any comment that is not in an electronic format, the lead agency shall convert that comment into a readily accessible electronic format and make it available to the public in that format. (6) The lead agency shall indicate in the record of the proceedings comments received that were not considered by the lead agency pursuant to paragraph (6) of subdivision (e) and need not include the content of the comments as a part of the record. (7) Within five days after the filing of the notice required by subdivision (a) of Section 21152, the lead agency shall certify the record of the proceedings for the approval or determination and shall provide an electronic copy of the record to a party that has submitted a written request for a copy. The lead agency may charge and collect a reasonable fee from a party requesting a copy of the record for the electronic copy, which shall not exceed the reasonable cost of reproducing that copy. (8) Within 10 days after being served with a complaint or a petition for a writ of mandate, the lead agency shall lodge a copy of the certified record of proceedings with the superior court. (9) Any dispute over the content of the record of the proceedings shall be resolved by the superior court. Unless the superior court directs otherwise, a party disputing the content of the record shall file a motion to augment the record at the time it files its initial brief. (10) The contents of the record of proceedings shall be as set forth in subdivision (e) of Section 21167.6. (g) As a condition of approval of the project subject to this section, the lead agency shall require the applicant, with respect to any measures specific to the operation of the project, to implement those measures that will meet the requirements of this division by the end of the first NBA season during which an NBA team has played at the downtown arena. To maximize public health, environmental, and employment benefits, the lead agency shall place the highest priority on feasible measures that will reduce greenhouse gas emissions on the downtown arena site and in the neighboring communities of the downtown arena. Offset credits shall be employed by the applicant only after feasible local emission reduction measures have been implemented. The applicant shall, to the extent feasible, place the highest priority on the purchase of offset credits that produce emission reductions within the city or the boundaries of the Sacramento Metropolitan Air Quality Management District. (h) (1) (A) In granting relief in an action or proceeding brought pursuant to this section, the court shall not stay or enjoin the construction or operation of the downtown arena unless the court finds either of the following: (i) The continued construction or operation of the downtown arena presents an imminent threat to the public health and safety. (ii) The downtown arena site contains unforeseen important Native American artifacts or unforeseen important historical, archaeological, or ecological values that would be materially, permanently, and adversely affected by the continued construction or operation of the downtown arena unless the court stays or enjoins the construction or operation of the downtown arena. (B) If the court finds that clause (i) or (ii) is satisfied, the court shall only enjoin those specific activities associated with the downtown arena that present an imminent threat to public health and safety or that materially, permanently, and adversely affect unforeseen important Native American artifacts or unforeseen important historical, archaeological, or ecological values. (2) In granting relief associated with the downtown arena in an action or proceeding brought pursuant to this section, the court shall enter an order mandating that the public agency conduct further environmental review, including consideration of additional feasible mitigation measures where available and necessary to bring the determination, finding, or decision into compliance with this division. (3) Paragraphs (1) and (2) set forth the sole remedies available in an action or proceeding brought pursuant to this section challenging the downtown arena and no provision of law that is inconsistent or conflicts with this subdivision shall apply to an action or proceeding subject to this section. (4) Where an action or proceeding brought pursuant to this section challenges aspects of the project other than the downtown arena and those portions or specific project activities are severable from the downtown arena, the court may enter an order as to aspects of the project other than the downtown arena that includes one or more of the remedies set forth in Section 21168.9. (i) The provisions of this section are severable. If any provision of this section or its application is held invalid, that invalidity shall not affect other provisions or applications that can be given effect without the invalid provision or application. (j) (1) This section does not apply to the project and shall become inoperative on the date of the release of the draft environmental impact report and is repealed on January 1 of the following year, if the applicant fails to notify the lead agency prior to the release of the draft environmental impact report for public comment that the applicant is electing to proceed pursuant to this section. (2) The lead agency shall notify the Secretary of State if the applicant fails to notify the lead agency of its election to proceed pursuant to this section.   SEC. 3.  Section 21181 of the   Public Resources Code   is amended to read:  21181. This chapter does not apply to a project if the  applicant fails to notify a lead agency prior to the release of the draft environmental impact report for public comment that the applicant is electing to proceed pursuant to this chapter. The lead agency shall notify the Secretary of the Natural Resources Agency if the applicant fails to provide notification pursuant to this section.   Governor does not certify a project as an environmental leadership development project eligible for streamlining provided pursuant to this chapter prior to January 1, 2016.   SEC. 4.   Section 21185 of the   Public Resources Code   is repealed.   21185. (a) Notwithstanding any other law, any action or proceeding alleging that a public agency or has approved or is undertaking a leadership project certified by the Governor in violation of this division shall be conducted in accordance with the following streamlining benefits: (1) The action or proceeding shall be filed in the Court of Appeal with geographic jurisdiction over the project. (2) Any party bringing such a claim shall also file concurrently any other claims alleging that a public agency has granted land use approvals for the leadership project in violation of the law. The Court of Appeal shall have original jurisdiction over all those claims. (3) The Court of Appeal shall issue its decision in the case within 175 days of the filing of the petition. (4) The court may appoint a master to assist the court in managing and processing the case. (5) The court may grant extensions of time only for good cause shown and in order to promote the interests of justice. (b) On or before July 1, 2012, the Judicial Council shall adopt Rules of Court to implement this chapter.   SEC. 5.   Section 21185 is added to the   Public Resources Code   , to read:   21185. On or before July 1, 2014, the Judicial Council shall adopt a rule of court to establish procedures applicable to actions or proceedings brought to attack, review, set aside, void, or annul the certification of the environmental impact report for an environmental leadership development project certified by the Governor pursuant to this chapter or the granting of any project approvals that require the actions or proceedings, including any potential appeals therefrom, be resolved, to the extent feasible, within 270 days of certification of the record of proceedings pursuant to Section 21186.   SEC. 6.   Section 21186 of the  Public Resources Code   is amended to read:  21186. Notwithstanding any other law, the preparation and certification of the administrative record for a leadership project certified by the Governor shall be performed in the following manner: (a) The lead agency for the project shall prepare the administrative record pursuant to this division concurrently with the administrative process. (b) All documents and other materials placed in the administrative record shall be posted on, and be downloadable from, an Internet Web site maintained by the lead agency commencing with the date of the release of the draft environmental impact report. (c) The lead agency shall make available to the public in a readily accessible electronic format the draft environmental impact report and all other documents submitted to, or relied on by, the lead agency in the preparation of the draft environmental impact report. (d) A document prepared by the lead agency or submitted by the applicant after the date of the release of the draft environmental impact report that is a part of the record of the proceedings shall be made available to the public in a readily accessible electronic format within five business days after the document is released or received by the lead agency. (e) The lead agency shall encourage written comments on the project to be submitted in a readily accessible electronic format, and shall make any comment available to the public in a readily accessible electronic format within five days of its receipt. (f) Within seven business days after the receipt of any comment that is not in an electronic format, the lead agency shall convert that comment into a readily accessible electronic format and make it available to the public in that format.  (g) Notwithstanding paragraphs (b) to (f), inclusive, documents submitted to or relied on by the lead agency that were not prepared specifically for the project and are copyright protected are not required to be made readily accessible in an electronic format. For those copyright-protected documents, the lead agency shall make an index of these documents available in an electronic format no later than the date of the release of the draft environmental impact report, or within five business days if the document is received or relied on by the lead agency after the release of the draft environmental impact report. The index must specify the libraries or lead agency offices in which hardcopies of the copyrighted materials are available for public review.   (g)   (h)  The lead agency shall certify the final administrative record within five days of its approval of the project.  (h)   (i)  Any dispute arising from the administrative record shall be resolved by the  Court of Appeal pursuant to Section 21185.   superior court. Unless the superior court directs otherwise, a party disputing the content of the record shall file a motion to augment the record at the time it files its initial brief.   (j) The contents of the record of proceedings shall be as set forth in subdivision (e) of Section 21167.6.   SEC. 7.   Section 21187 of the   Public Resources Code   is amended to read:  21187.  The draft and final environmental impact report shall include a   Within 10 days of the Governor certifying an environmental leadership development project pursuant to this section, the lead agency shall, at the applicant's expense, issue a public  notice in no less than 12-point type stating the following:  "THIS EIR IS SUBJECT TO   "THE   APPLICANT HAS ELECTED TO PROCEED UNDER  CHAPTER 6.5 (COMMENCING WITH SECTION 21178) OF THE PUBLIC RESOURCES CODE, WHICH PROVIDES, AMONG OTHER THINGS, THAT ANY JUDICIAL ACTION CHALLENGING THE CERTIFICATION OF THE EIR OR THE APPROVAL OF THE PROJECT DESCRIBED IN THE EIR IS SUBJECT TO THE PROCEDURES SET FORTH IN  SECTION 21178.2   SECTIONS 21185 TO 21186, INCLUSIVE,  OF THE PUBLIC RESOURCES  CODE AND MUST BE FILED WITH THE COURT OF APPEAL.   CODE.  A COPY OF CHAPTER 6.5  (COMMENCING WITH SECTION 21178)  OF THE PUBLIC RESOURCES CODE IS INCLUDED  IN THE APPENDIX TO THIS EIR."   BELOW."   The public notice shall be distributed by the lead agency as required for public notices issued pursuant to paragraph (3) of subdivision (b) of Section 21092.   SEC. 8.   Section 21189.1 of the   Public Resources Code   is amended to read:  21189.1.  (a)    If  , prior to January 1, 2016,  a lead agency fails to  certify an environmental impact report for a leadership   approve a  project  subject to this chapter on or before June 1, 2014, this chapter shall not apply to that project. The lead agency shall notify the Secretary of the Natural Resources Agency by July 1, 2014, if an environmental impact report subject to this chapter has not been certified by that date.   certified by the Governor pursuant to this chapter, then the certification expires and is no longer valid.   (b) If, prior to June 1, 2014, a certification issued pursuant to this chapter has not been used or the time period during which an action or proceeding, for purposes of Section 21185, may be filed under this chapter has not elapsed, the certification expires and is no longer valid.   SEC. 9.   Section 21189.3 of the   Public Resources Code   is amended to read:  21189.3. This chapter shall remain in effect until January 1,  2015,   2017,  and as of that date is repealed unless a later enacted statute extends or repeals that date.  SEC. 10.   With respect to certain provisions of this measure, the Legislature finds and declares that a special law is necessary and that a general law cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique need for the development of an entertainment and sports center project in the City of Sacramento in an expeditious manner.   SEC. 11.   No reimbursement is required by this act pursuant to Section 6 of Article XIII B of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.       SECTION 1.   Section 739.1 of the Public Utilities Code is amended to read: 739.1. (a) As used in this section, the following terms have the following meanings: (1) "Baseline quantity" has the same meaning as defined in Section 739. (2) "California Solar Initiative" means the program providing ratepayer funded incentives for eligible solar energy systems adopted by the commission in Decision 05-12-044 and Decision 06-01-024, as modified by Article 1 (commencing with Section 2851) of Chapter 9 of Part 2 and Chapter 8.8 (commencing with Section 25780) of Division 15 of the Public Resources Code. (3) "Public goods charge" means the nonbypassable separate rate component imposed pursuant to Article 7 (commencing with Section 381) of Chapter 2.3 and the nonbypassable system benefits charge imposed pursuant to the Reliable Electric Service Investments Act (Article 15 (commencing with Section 399) of Chapter 2.3). (b) (1) The commission shall establish a program of assistance to low-income electric and gas customers with annual household incomes that are no greater than 200 percent of the federal poverty guideline levels, the cost of which shall not be borne solely by any single class of customer. The program shall be referred to as the California Alternate Rates for Energy or CARE program. The commission shall ensure that the level of discount for low-income electric and gas customers correctly reflects the level of need. (2) The commission may, subject to the limitation in paragraph (4), increase the rates in effect for CARE program participants for electricity usage up to 130 percent of baseline quantities by the annual percentage increase in the Consumer Price Index from the prior year but not to exceed 4 percent per year. For purposes of this subdivision, the annual percentage change in the Consumer Price Index shall be calculated using the same formula that was used to determine the annual Social Security Cost of Living Adjustment on January 1, 2008. (3) Beginning January 1, 2019, the commission may, subject to the limitation in paragraph (4), establish rates for CARE program participants pursuant to this section and Sections 739 and 739.9, subject to both of the following: (A) The requirements of subdivision (b) of Section 382 that the commission ensure that low-income ratepayers are not jeopardized or overburdened by monthly energy expenditures. (B) The requirement that the level of the discount for low-income electricity and gas ratepayers correctly reflects the level of need as determined by the needs assessment conducted pursuant to subdivision (d) of Section 382. (4) Tier 1, tier 2, and tier 3 CARE rates shall not exceed 80 percent of the corresponding tier 1, tier 2, and tier 3 rates charged to residential customers not participating in the CARE program, excluding any Department of Water Resources bond charge imposed pursuant to Division 27 (commencing with Section 80000) of the Water Code, the CARE surcharge portion of the public goods charge, any charge imposed pursuant to the California Solar Initiative, and any charge imposed to fund any other program that exempts CARE participants from paying the charge. (5) Rates charged to CARE program participants shall not have more than three tiers. An electrical corporation that does not have a tier 3 CARE rate may introduce a tier 3 CARE rate that, in order to moderate the impact on program participants whose usage exceeds 130 percent of baseline quantities, shall be phased in to 80 percent of the corresponding rates charged to residential customers not participating in the CARE program, excluding any Department of Water Resources bond charge imposed pursuant to Division 27 (commencing with Section 80000) of the Water Code, the CARE surcharge portion of the public goods charge, any charge imposed pursuant to the California Solar Initiative, and any other charge imposed to fund a program that exempts CARE participants from paying the charge. For an electrical corporation that does not have a tier 3 CARE rate that introduces a tier 3 CARE rate, the initial rate shall be no more than 150 percent of the CARE baseline rate. Any additional revenues collected by an electrical corporation resulting from the adoption of a tier 3 CARE rate shall, until the utility's next periodic general rate case review of cost allocation and rate design, be credited to reduce rates of residential ratepayers not participating in the CARE program with usage above 130 percent of baseline quantities. (c) The commission shall work with electrical and gas corporations to establish penetration goals. The commission shall authorize recovery of all administrative costs associated with the implementation of the CARE program that the commission determines to be reasonable, through a balancing account mechanism. Administrative costs shall include, but are not limited to, outreach, marketing, regulatory compliance, certification and verification, billing, measurement and evaluation, and capital improvements and upgrades to communications and processing equipment. (d) The commission shall examine methods to improve CARE enrollment and participation. This examination shall include, but need not be limited to, comparing information from CARE and the Universal Lifeline Telephone Service (ULTS) to determine the most effective means of utilizing that information to increase CARE enrollment, automatic enrollment of ULTS customers who are eligible for the CARE program, customer privacy issues, and alternative mechanisms for outreach to potential enrollees. The commission shall ensure that a customer consents prior to enrollment. The commission shall consult with interested parties, including ULTS providers, to develop the best methods of informing ULTS customers about other available low-income programs, as well as the best mechanism for telephone providers to recover reasonable costs incurred pursuant to this section. (e) (1) The commission shall improve the CARE application process by cooperating with other entities and representatives of California government, including the California Health and Human Services Agency and the Secretary of California Health and Human Services, to ensure that all gas and electric customers eligible for public assistance programs in California that reside within the service territory of an electrical corporation or gas corporation, are enrolled in the CARE program. To the extent practicable, the commission shall develop a CARE application process using the existing ULTS application process as a model. The commission shall work with public utility electrical and gas corporations and the Low-Income Oversight Board established in Section 382.1 to meet the low-income objectives in this section. (2) The commission shall ensure that an electrical corporation or gas corporation with a commission-approved program to provide discounts based upon economic need in addition to the CARE program, including a Family Electric Rate Assistance program, utilize a single application form, to enable an applicant to alternatively apply for any assistance program for which the applicant may be eligible. It is the intent of the Legislature to allow applicants under one program, that may not be eligible under that program, but that may be eligible under an alternative assistance program based upon economic need, to complete a single application for any commission-approved assistance program offered by the public utility. (f) The commission's program of assistance to low-income electric and gas customers shall, as soon as practicable, include nonprofit group living facilities specified by the commission, if the commission finds that the residents in these facilities substantially meet the commission's low-income eligibility requirements and there is a feasible process for certifying that the assistance shall be used for the direct benefit, such as improved quality of care or improved food service, of the low-income residents in the facilities. The commission shall authorize utilities to offer discounts to eligible facilities licensed or permitted by appropriate state or local agencies, and to facilities, including women's shelters, hospices, and homeless shelters, that may not have a license or permit but provide other proof satisfactory to the utility that they are eligible to participate in the program. (g) It is the intent of the Legislature that the commission ensure CARE program participants are afforded the lowest possible electric and gas rates and, to the extent possible, are exempt from additional surcharges attributable to the energy crisis of 2000-01. (h) (1) In addition to existing assessments of eligibility, an electrical corporation may require proof of income eligibility for those CARE program participants whose electricity usage, in any monthly or other billing period, exceeds 400 percent of baseline usage. The authority of an electrical corporation to require proof of income eligibility is not limited by the means by which the CARE program participant enrolled in the program, including if the participant was automatically enrolled in the CARE program because of participation in a governmental assistance program. If a CARE program participant's electricity usage exceeds 400 percent of baseline usage, the electrical corporation may require the CARE program participant to participate in the Energy Savings Assistance Program (ESAP), which includes a residential energy assessment, in order to provide the CARE program participant with information and assistance in reducing his or her energy usage. Continued participation in the CARE program may be conditioned upon the CARE program participant agreeing to participate in ESAP within 45 days of notice being given by the electrical corporation pursuant to this paragraph. The electrical corporation may require the CARE program participant to notify the utility of whether the residence is rented, and if so, a means by which to contact the landlord, and the electrical corporation may share any evaluation and recommendation relative to the residential structure that is made as part of an energy assessment, with the landlord of the CARE program participant. Requirements imposed pursuant to this paragraph shall be consistent with procedures adopted by the commission. (2) If a CARE program participant's electricity usage exceeds 600 percent of baseline usage, the electrical corporation shall require the CARE program participant to participate in ESAP, which includes a residential energy assessment, in order to provide the CARE program participant with information and assistance in reducing his or her energy usage. Continued participation in the CARE program shall be conditioned upon the CARE program participant agreeing to participate in ESAP within 45 days of a notice made by the electrical corporation pursuant to this paragraph. The electrical corporation may require the CARE program participant to notify the utility of whether the residence is rented, and if so, a means by which to contact the landlord, and the electrical corporation may share any evaluation and recommendation relative to the residential structure that is made as part of an energy assessment, with the landlord of the CARE program participant. Following the completion of the energy assessment, if the CARE program participant's electricity usage continues to exceed 600 percent of baseline usage, the electrical corporation may remove the CARE program participant from the program if the removal is consistent with procedures adopted by the commission. Nothing in this paragraph shall prevent a CARE program participant with electricity usage exceeding 600 percent of baseline usage from participating in an appeals process with the electrical corporation to determine whether the participant's usage levels are legitimate. (3) A CARE program participant in a rental residence shall not be removed from the program in situations where the landlord is nonresponsive when contacted by the electrical corporation or does not provide for ESAP participation.