California 2017-2018 Regular Session

California Assembly Bill AB1879 Compare Versions

OldNewDifferences
1-Assembly Bill No. 1879 CHAPTER 481 An act to add Section 2775.7 to the Public Utilities Code, relating to gas corporations, and declaring the urgency thereof, to take effect immediately. [ Approved by Governor September 18, 2018. Filed with Secretary of State September 18, 2018. ] LEGISLATIVE COUNSEL'S DIGESTAB 1879, Santiago. Gas corporation: service connections.Under existing law the Public Utilities Commission has regulatory authority over public utilities, including gas corporations.This bill would require the Public Utilities Commission, if it determines that a moratorium on new natural gas service connections is necessary to prevent substantial and imminent harm or to ensure gas system reliability, to provide a report to specified policy committees of the Legislature and the affected gas corporation stating the necessity for the action. The bill would require the report to the policy committees to contain certain information. The bill would require a gas corporation, upon receiving a report from the commission that an action is pending to suspend new gas service connections, to immediately notify potential or current customers that may experience a service impact as a result of the proposed suspension. The bill would require the commission to present to the policy committees, at specified yearly information hearings, the status of the natural gas service connections and efforts to provide natural gas supply.This bill would declare that it is to take effect immediately as an urgency statute.Digest Key Vote: 2/3 Appropriation: NO Fiscal Committee: YES Local Program: NO Bill TextThe people of the State of California do enact as follows:SECTION 1. Section 2775.7 is added to the Public Utilities Code, to read:2775.7. (a) (1) If the commission determines that a moratorium on new natural gas service connections is necessary to prevent substantial and imminent harm or to ensure gas system reliability, the commission shall state the necessity for the action in a report provided to all of the following entities:(A) The Assembly Committee on Utilities and Energy.(B) The Senate Committee on Energy, Utilities and Communications.(C) All affected gas corporations.(2) The commission shall include in the report to the policy committees of the Legislature specified in paragraph (1) factual findings supporting the need to propose a moratorium on new natural gas service connections. The report shall include, but is not limited to, all of the following:(A) The number of pending gas service connection applications with each affected gas corporation.(B) The estimated gas load deferred under the proposed moratorium.(C) The system constraints that led to the proposed moratorium.(D) Alternative actions considered to address the proposed need for a moratorium, including increasing or restoring natural gas transmission and storage infrastructure, and the reason those actions were not taken or were insufficient.(E) The process for a customer to request an exemption from the moratorium.(b) When a gas corporation receives notification from the commission that an action is pending to suspend new gas service connections, the gas corporation shall immediately notify any known potential or current customers that may experience a service impact as a result of the proposed suspension.(c) The commission shall, at the yearly informational hearings pursuant to Section 321.6, present to the Assembly Committee on Utilities and Energy and the Senate Committee on Energy, Utilities and Communications the status of natural gas service connections and efforts to provide natural gas supply.SEC. 2. This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:To ensure that proper legislative oversight is provided for decisions by the Public Utilities Commission to impose a moratorium on new natural gas service connections, it is necessary for this measure to take effect immediately.
1+Enrolled September 05, 2018 Passed IN Senate August 31, 2018 Passed IN Assembly May 25, 2018 Amended IN Assembly May 01, 2018 CALIFORNIA LEGISLATURE 20172018 REGULAR SESSION Assembly Bill No. 1879Introduced by Assembly Member Santiago(Principal coauthor: Assembly Member Rubio)(Coauthors: Assembly Members ODonnell and Patterson)January 17, 2018 An act to add Section 2775.7 to the Public Utilities Code, relating to gas corporations, and declaring the urgency thereof, to take effect immediately. LEGISLATIVE COUNSEL'S DIGESTAB 1879, Santiago. Gas corporation: service connections.Under existing law the Public Utilities Commission has regulatory authority over public utilities, including gas corporations.This bill would require the Public Utilities Commission, if it determines that a moratorium on new natural gas service connections is necessary to prevent substantial and imminent harm or to ensure gas system reliability, to provide a report to specified policy committees of the Legislature and the affected gas corporation stating the necessity for the action. The bill would require the report to the policy committees to contain certain information. The bill would require a gas corporation, upon receiving a report from the commission that an action is pending to suspend new gas service connections, to immediately notify potential or current customers that may experience a service impact as a result of the proposed suspension. The bill would require the commission to present to the policy committees, at specified yearly information hearings, the status of the natural gas service connections and efforts to provide natural gas supply.This bill would declare that it is to take effect immediately as an urgency statute.Digest Key Vote: 2/3 Appropriation: NO Fiscal Committee: YES Local Program: NO Bill TextThe people of the State of California do enact as follows:SECTION 1. Section 2775.7 is added to the Public Utilities Code, to read:2775.7. (a) (1) If the commission determines that a moratorium on new natural gas service connections is necessary to prevent substantial and imminent harm or to ensure gas system reliability, the commission shall state the necessity for the action in a report provided to all of the following entities:(A) The Assembly Committee on Utilities and Energy.(B) The Senate Committee on Energy, Utilities and Communications.(C) All affected gas corporations.(2) The commission shall include in the report to the policy committees of the Legislature specified in paragraph (1) factual findings supporting the need to propose a moratorium on new natural gas service connections. The report shall include, but is not limited to, all of the following:(A) The number of pending gas service connection applications with each affected gas corporation.(B) The estimated gas load deferred under the proposed moratorium.(C) The system constraints that led to the proposed moratorium.(D) Alternative actions considered to address the proposed need for a moratorium, including increasing or restoring natural gas transmission and storage infrastructure, and the reason those actions were not taken or were insufficient.(E) The process for a customer to request an exemption from the moratorium.(b) When a gas corporation receives notification from the commission that an action is pending to suspend new gas service connections, the gas corporation shall immediately notify any known potential or current customers that may experience a service impact as a result of the proposed suspension.(c) The commission shall, at the yearly informational hearings pursuant to Section 321.6, present to the Assembly Committee on Utilities and Energy and the Senate Committee on Energy, Utilities and Communications the status of natural gas service connections and efforts to provide natural gas supply.SEC. 2. This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:To ensure that proper legislative oversight is provided for decisions by the Public Utilities Commission to impose a moratorium on new natural gas service connections, it is necessary for this measure to take effect immediately.
22
3- Assembly Bill No. 1879 CHAPTER 481 An act to add Section 2775.7 to the Public Utilities Code, relating to gas corporations, and declaring the urgency thereof, to take effect immediately. [ Approved by Governor September 18, 2018. Filed with Secretary of State September 18, 2018. ] LEGISLATIVE COUNSEL'S DIGESTAB 1879, Santiago. Gas corporation: service connections.Under existing law the Public Utilities Commission has regulatory authority over public utilities, including gas corporations.This bill would require the Public Utilities Commission, if it determines that a moratorium on new natural gas service connections is necessary to prevent substantial and imminent harm or to ensure gas system reliability, to provide a report to specified policy committees of the Legislature and the affected gas corporation stating the necessity for the action. The bill would require the report to the policy committees to contain certain information. The bill would require a gas corporation, upon receiving a report from the commission that an action is pending to suspend new gas service connections, to immediately notify potential or current customers that may experience a service impact as a result of the proposed suspension. The bill would require the commission to present to the policy committees, at specified yearly information hearings, the status of the natural gas service connections and efforts to provide natural gas supply.This bill would declare that it is to take effect immediately as an urgency statute.Digest Key Vote: 2/3 Appropriation: NO Fiscal Committee: YES Local Program: NO
3+ Enrolled September 05, 2018 Passed IN Senate August 31, 2018 Passed IN Assembly May 25, 2018 Amended IN Assembly May 01, 2018 CALIFORNIA LEGISLATURE 20172018 REGULAR SESSION Assembly Bill No. 1879Introduced by Assembly Member Santiago(Principal coauthor: Assembly Member Rubio)(Coauthors: Assembly Members ODonnell and Patterson)January 17, 2018 An act to add Section 2775.7 to the Public Utilities Code, relating to gas corporations, and declaring the urgency thereof, to take effect immediately. LEGISLATIVE COUNSEL'S DIGESTAB 1879, Santiago. Gas corporation: service connections.Under existing law the Public Utilities Commission has regulatory authority over public utilities, including gas corporations.This bill would require the Public Utilities Commission, if it determines that a moratorium on new natural gas service connections is necessary to prevent substantial and imminent harm or to ensure gas system reliability, to provide a report to specified policy committees of the Legislature and the affected gas corporation stating the necessity for the action. The bill would require the report to the policy committees to contain certain information. The bill would require a gas corporation, upon receiving a report from the commission that an action is pending to suspend new gas service connections, to immediately notify potential or current customers that may experience a service impact as a result of the proposed suspension. The bill would require the commission to present to the policy committees, at specified yearly information hearings, the status of the natural gas service connections and efforts to provide natural gas supply.This bill would declare that it is to take effect immediately as an urgency statute.Digest Key Vote: 2/3 Appropriation: NO Fiscal Committee: YES Local Program: NO
4+
5+ Enrolled September 05, 2018 Passed IN Senate August 31, 2018 Passed IN Assembly May 25, 2018 Amended IN Assembly May 01, 2018
6+
7+Enrolled September 05, 2018
8+Passed IN Senate August 31, 2018
9+Passed IN Assembly May 25, 2018
10+Amended IN Assembly May 01, 2018
11+
12+ CALIFORNIA LEGISLATURE 20172018 REGULAR SESSION
413
514 Assembly Bill No. 1879
6-CHAPTER 481
15+
16+Introduced by Assembly Member Santiago(Principal coauthor: Assembly Member Rubio)(Coauthors: Assembly Members ODonnell and Patterson)January 17, 2018
17+
18+Introduced by Assembly Member Santiago(Principal coauthor: Assembly Member Rubio)(Coauthors: Assembly Members ODonnell and Patterson)
19+January 17, 2018
720
821 An act to add Section 2775.7 to the Public Utilities Code, relating to gas corporations, and declaring the urgency thereof, to take effect immediately.
9-
10- [ Approved by Governor September 18, 2018. Filed with Secretary of State September 18, 2018. ]
1122
1223 LEGISLATIVE COUNSEL'S DIGEST
1324
1425 ## LEGISLATIVE COUNSEL'S DIGEST
1526
1627 AB 1879, Santiago. Gas corporation: service connections.
1728
1829 Under existing law the Public Utilities Commission has regulatory authority over public utilities, including gas corporations.This bill would require the Public Utilities Commission, if it determines that a moratorium on new natural gas service connections is necessary to prevent substantial and imminent harm or to ensure gas system reliability, to provide a report to specified policy committees of the Legislature and the affected gas corporation stating the necessity for the action. The bill would require the report to the policy committees to contain certain information. The bill would require a gas corporation, upon receiving a report from the commission that an action is pending to suspend new gas service connections, to immediately notify potential or current customers that may experience a service impact as a result of the proposed suspension. The bill would require the commission to present to the policy committees, at specified yearly information hearings, the status of the natural gas service connections and efforts to provide natural gas supply.This bill would declare that it is to take effect immediately as an urgency statute.
1930
2031 Under existing law the Public Utilities Commission has regulatory authority over public utilities, including gas corporations.
2132
2233 This bill would require the Public Utilities Commission, if it determines that a moratorium on new natural gas service connections is necessary to prevent substantial and imminent harm or to ensure gas system reliability, to provide a report to specified policy committees of the Legislature and the affected gas corporation stating the necessity for the action. The bill would require the report to the policy committees to contain certain information. The bill would require a gas corporation, upon receiving a report from the commission that an action is pending to suspend new gas service connections, to immediately notify potential or current customers that may experience a service impact as a result of the proposed suspension. The bill would require the commission to present to the policy committees, at specified yearly information hearings, the status of the natural gas service connections and efforts to provide natural gas supply.
2334
2435 This bill would declare that it is to take effect immediately as an urgency statute.
2536
2637 ## Digest Key
2738
2839 ## Bill Text
2940
3041 The people of the State of California do enact as follows:SECTION 1. Section 2775.7 is added to the Public Utilities Code, to read:2775.7. (a) (1) If the commission determines that a moratorium on new natural gas service connections is necessary to prevent substantial and imminent harm or to ensure gas system reliability, the commission shall state the necessity for the action in a report provided to all of the following entities:(A) The Assembly Committee on Utilities and Energy.(B) The Senate Committee on Energy, Utilities and Communications.(C) All affected gas corporations.(2) The commission shall include in the report to the policy committees of the Legislature specified in paragraph (1) factual findings supporting the need to propose a moratorium on new natural gas service connections. The report shall include, but is not limited to, all of the following:(A) The number of pending gas service connection applications with each affected gas corporation.(B) The estimated gas load deferred under the proposed moratorium.(C) The system constraints that led to the proposed moratorium.(D) Alternative actions considered to address the proposed need for a moratorium, including increasing or restoring natural gas transmission and storage infrastructure, and the reason those actions were not taken or were insufficient.(E) The process for a customer to request an exemption from the moratorium.(b) When a gas corporation receives notification from the commission that an action is pending to suspend new gas service connections, the gas corporation shall immediately notify any known potential or current customers that may experience a service impact as a result of the proposed suspension.(c) The commission shall, at the yearly informational hearings pursuant to Section 321.6, present to the Assembly Committee on Utilities and Energy and the Senate Committee on Energy, Utilities and Communications the status of natural gas service connections and efforts to provide natural gas supply.SEC. 2. This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:To ensure that proper legislative oversight is provided for decisions by the Public Utilities Commission to impose a moratorium on new natural gas service connections, it is necessary for this measure to take effect immediately.
3142
3243 The people of the State of California do enact as follows:
3344
3445 ## The people of the State of California do enact as follows:
3546
3647 SECTION 1. Section 2775.7 is added to the Public Utilities Code, to read:2775.7. (a) (1) If the commission determines that a moratorium on new natural gas service connections is necessary to prevent substantial and imminent harm or to ensure gas system reliability, the commission shall state the necessity for the action in a report provided to all of the following entities:(A) The Assembly Committee on Utilities and Energy.(B) The Senate Committee on Energy, Utilities and Communications.(C) All affected gas corporations.(2) The commission shall include in the report to the policy committees of the Legislature specified in paragraph (1) factual findings supporting the need to propose a moratorium on new natural gas service connections. The report shall include, but is not limited to, all of the following:(A) The number of pending gas service connection applications with each affected gas corporation.(B) The estimated gas load deferred under the proposed moratorium.(C) The system constraints that led to the proposed moratorium.(D) Alternative actions considered to address the proposed need for a moratorium, including increasing or restoring natural gas transmission and storage infrastructure, and the reason those actions were not taken or were insufficient.(E) The process for a customer to request an exemption from the moratorium.(b) When a gas corporation receives notification from the commission that an action is pending to suspend new gas service connections, the gas corporation shall immediately notify any known potential or current customers that may experience a service impact as a result of the proposed suspension.(c) The commission shall, at the yearly informational hearings pursuant to Section 321.6, present to the Assembly Committee on Utilities and Energy and the Senate Committee on Energy, Utilities and Communications the status of natural gas service connections and efforts to provide natural gas supply.
3748
3849 SECTION 1. Section 2775.7 is added to the Public Utilities Code, to read:
3950
4051 ### SECTION 1.
4152
4253 2775.7. (a) (1) If the commission determines that a moratorium on new natural gas service connections is necessary to prevent substantial and imminent harm or to ensure gas system reliability, the commission shall state the necessity for the action in a report provided to all of the following entities:(A) The Assembly Committee on Utilities and Energy.(B) The Senate Committee on Energy, Utilities and Communications.(C) All affected gas corporations.(2) The commission shall include in the report to the policy committees of the Legislature specified in paragraph (1) factual findings supporting the need to propose a moratorium on new natural gas service connections. The report shall include, but is not limited to, all of the following:(A) The number of pending gas service connection applications with each affected gas corporation.(B) The estimated gas load deferred under the proposed moratorium.(C) The system constraints that led to the proposed moratorium.(D) Alternative actions considered to address the proposed need for a moratorium, including increasing or restoring natural gas transmission and storage infrastructure, and the reason those actions were not taken or were insufficient.(E) The process for a customer to request an exemption from the moratorium.(b) When a gas corporation receives notification from the commission that an action is pending to suspend new gas service connections, the gas corporation shall immediately notify any known potential or current customers that may experience a service impact as a result of the proposed suspension.(c) The commission shall, at the yearly informational hearings pursuant to Section 321.6, present to the Assembly Committee on Utilities and Energy and the Senate Committee on Energy, Utilities and Communications the status of natural gas service connections and efforts to provide natural gas supply.
4354
4455 2775.7. (a) (1) If the commission determines that a moratorium on new natural gas service connections is necessary to prevent substantial and imminent harm or to ensure gas system reliability, the commission shall state the necessity for the action in a report provided to all of the following entities:(A) The Assembly Committee on Utilities and Energy.(B) The Senate Committee on Energy, Utilities and Communications.(C) All affected gas corporations.(2) The commission shall include in the report to the policy committees of the Legislature specified in paragraph (1) factual findings supporting the need to propose a moratorium on new natural gas service connections. The report shall include, but is not limited to, all of the following:(A) The number of pending gas service connection applications with each affected gas corporation.(B) The estimated gas load deferred under the proposed moratorium.(C) The system constraints that led to the proposed moratorium.(D) Alternative actions considered to address the proposed need for a moratorium, including increasing or restoring natural gas transmission and storage infrastructure, and the reason those actions were not taken or were insufficient.(E) The process for a customer to request an exemption from the moratorium.(b) When a gas corporation receives notification from the commission that an action is pending to suspend new gas service connections, the gas corporation shall immediately notify any known potential or current customers that may experience a service impact as a result of the proposed suspension.(c) The commission shall, at the yearly informational hearings pursuant to Section 321.6, present to the Assembly Committee on Utilities and Energy and the Senate Committee on Energy, Utilities and Communications the status of natural gas service connections and efforts to provide natural gas supply.
4556
4657 2775.7. (a) (1) If the commission determines that a moratorium on new natural gas service connections is necessary to prevent substantial and imminent harm or to ensure gas system reliability, the commission shall state the necessity for the action in a report provided to all of the following entities:(A) The Assembly Committee on Utilities and Energy.(B) The Senate Committee on Energy, Utilities and Communications.(C) All affected gas corporations.(2) The commission shall include in the report to the policy committees of the Legislature specified in paragraph (1) factual findings supporting the need to propose a moratorium on new natural gas service connections. The report shall include, but is not limited to, all of the following:(A) The number of pending gas service connection applications with each affected gas corporation.(B) The estimated gas load deferred under the proposed moratorium.(C) The system constraints that led to the proposed moratorium.(D) Alternative actions considered to address the proposed need for a moratorium, including increasing or restoring natural gas transmission and storage infrastructure, and the reason those actions were not taken or were insufficient.(E) The process for a customer to request an exemption from the moratorium.(b) When a gas corporation receives notification from the commission that an action is pending to suspend new gas service connections, the gas corporation shall immediately notify any known potential or current customers that may experience a service impact as a result of the proposed suspension.(c) The commission shall, at the yearly informational hearings pursuant to Section 321.6, present to the Assembly Committee on Utilities and Energy and the Senate Committee on Energy, Utilities and Communications the status of natural gas service connections and efforts to provide natural gas supply.
4758
4859
4960
5061 2775.7. (a) (1) If the commission determines that a moratorium on new natural gas service connections is necessary to prevent substantial and imminent harm or to ensure gas system reliability, the commission shall state the necessity for the action in a report provided to all of the following entities:
5162
5263 (A) The Assembly Committee on Utilities and Energy.
5364
5465 (B) The Senate Committee on Energy, Utilities and Communications.
5566
5667 (C) All affected gas corporations.
5768
5869 (2) The commission shall include in the report to the policy committees of the Legislature specified in paragraph (1) factual findings supporting the need to propose a moratorium on new natural gas service connections. The report shall include, but is not limited to, all of the following:
5970
6071 (A) The number of pending gas service connection applications with each affected gas corporation.
6172
6273 (B) The estimated gas load deferred under the proposed moratorium.
6374
6475 (C) The system constraints that led to the proposed moratorium.
6576
6677 (D) Alternative actions considered to address the proposed need for a moratorium, including increasing or restoring natural gas transmission and storage infrastructure, and the reason those actions were not taken or were insufficient.
6778
6879 (E) The process for a customer to request an exemption from the moratorium.
6980
7081 (b) When a gas corporation receives notification from the commission that an action is pending to suspend new gas service connections, the gas corporation shall immediately notify any known potential or current customers that may experience a service impact as a result of the proposed suspension.
7182
7283 (c) The commission shall, at the yearly informational hearings pursuant to Section 321.6, present to the Assembly Committee on Utilities and Energy and the Senate Committee on Energy, Utilities and Communications the status of natural gas service connections and efforts to provide natural gas supply.
7384
7485 SEC. 2. This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:To ensure that proper legislative oversight is provided for decisions by the Public Utilities Commission to impose a moratorium on new natural gas service connections, it is necessary for this measure to take effect immediately.
7586
7687 SEC. 2. This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:To ensure that proper legislative oversight is provided for decisions by the Public Utilities Commission to impose a moratorium on new natural gas service connections, it is necessary for this measure to take effect immediately.
7788
7889 SEC. 2. This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:
7990
8091 ### SEC. 2.
8192
8293 To ensure that proper legislative oversight is provided for decisions by the Public Utilities Commission to impose a moratorium on new natural gas service connections, it is necessary for this measure to take effect immediately.