California 2017-2018 Regular Session

California Assembly Bill AB2190 Compare Versions

OldNewDifferences
1-Assembly Bill No. 2190 CHAPTER 673 An act to add Sections 130062 and 130066 to the Health and Safety Code, relating to hospitals. [ Approved by Governor September 22, 2018. Filed with Secretary of State September 22, 2018. ] LEGISLATIVE COUNSEL'S DIGESTAB 2190, Reyes. Hospitals: seismic safety.Existing law, the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983, establishes, under the jurisdiction of the Office of Statewide Health Planning and Development, a program of seismic safety building standards for certain hospitals constructed on and after March 7, 1973. A violation of any provision of the act is a misdemeanor.Existing law provides that, after January 1, 2008, a general acute care hospital building that is determined to be a potential risk of collapse or to pose significant loss of life in the event of seismic activity be used only for nonacute care hospital purposes, except that the office may grant 5-year and 2-year extensions under prescribed circumstances, except as specified. Existing law requires an owner of a general acute care hospital building that is classified as nonconforming to submit a report to the office no later than November 1, 2010, describing the status of each building in complying with the extension provisions, and to annually update the office with any changes or adjustments. Existing law authorizes certain hospital owners who do not have the financial capacity or other reasons to bring certain buildings into compliance by the January 1, 2013, deadline to instead replace those buildings or take other action by January 1, 2020, as specified.This bill would require all hospitals with buildings subject to the January 1, 2020, deadline described above and that are seeking an extension for their buildings to submit an application to the Office of Statewide Health Planning and Development by April 1, 2019, that specifies the seismic compliance method each building will use, as specified. The bill would require the office to grant an additional extension of time to an owner who is subject to the January 1, 2020, deadline if specified conditions are met. The bill would authorize the additional extension to be until July 1, 2022, if the compliance plan is based upon replacement or retrofit, as defined, or up to 5 years if the compliance plan is for a rebuild, as defined. The bill would require the office, before June 1, 2019, to provide the Legislature with a specified inventory of the hospital buildings. The bill would authorize the office to promulgate emergency regulations as necessary to implement these provisions.Existing law requires, no later than January 1, 2030, the owner of an acute care inpatient hospital to either demolish, replace, or change to nonacute care use a hospital building that is not in substantial compliance with certain seismic safety regulations and standards developed by the office, or to seismically retrofit the building so that it is in substantial compliance.This bill would require, before January 1, 2020, the owner of an acute care inpatient hospital whose building does not substantially comply with the above-described seismic safety regulations or standards to submit to the office an attestation that the board of directors of that hospital is aware that the hospital building is required to meet the January 1, 2030, deadline for substantial compliance with those regulations and standards. By imposing new requirements under the act for owners of hospitals with regard to extension applications and the above-described attestation, this bill would expand the scope of a crime, thereby imposing a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: YES Bill TextThe people of the State of California do enact as follows:SECTION 1. Section 130062 is added to the Health and Safety Code, to read:130062. (a) For the purposes of this section, the following terms have the following meanings:(1) Rebuild plan means a plan to meet seismic standards primarily by constructing a new conforming SPC-5 building for use in lieu of an SPC-1 building.(2) Removal plan means a plan to meet seismic standards primarily by removing acute care services or beds from the hospitals license.(3) Replacement plan means a plan to meet seismic standards primarily by relocating acute care services or beds from nonconforming buildings into a conforming building.(4) Retrofit plan means a plan to meet seismic standards primarily by modifying the building in a manner that brings the building up to SPC-2, SPC-4D, or SPC-5 standards.(b) All hospitals seeking an extension for their SPC-1 buildings shall submit to the office an application, in a manner acceptable to the office, by April 1, 2019. At a minimum, the application shall state which of the seismic compliance methods described in subdivision (a) will be used for each SPC-1 building.(c) A hospital owner that has been granted an extension pursuant to subdivision (g) of Section 130060 or subdivision (b) of Section 130061.5 may request, and the office shall grant, an additional extension of time as set forth in this section.(d) (1) For a hospital that seeks an extension for compliance based on a replacement plan or retrofit plan, the owner shall submit a construction schedule, obtain a building permit, and begin construction by April 1, 2020.(2) Using the construction schedule submitted pursuant to paragraph (1), the hospital and the office shall identify at least two major milestones relating to the compliance plan that will be used as the basis for determining whether the hospital is making adequate progress toward meeting the seismic compliance deadline.(3) Failure to comply with the requirements described in paragraph (1) or (2), or to meet any milestone agreed to pursuant to paragraph (2), shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the requirements or milestones, respectively, are met.(4) Final seismic compliance shall be achieved by July 1, 2022.(e) (1) For a hospital that seeks an extension for compliance based on a rebuild plan, the office shall grant an extension of up to five years. The owner shall submit, in a manner acceptable to the office, no later than July 1, 2020, the rebuild plan, deemed ready for review, and shall submit a construction schedule, obtain a building permit, and begin construction no later than January 1, 2022.(2) The hospital and the office shall identify at least two major milestones, agreed upon by the hospital and the office, that will be used as the basis for determining whether the hospital is making adequate progress toward meeting the seismic compliance deadline.(3) Failure to comply with the requirements described in paragraph (1) or (4), or to meet any milestone agreed to pursuant to paragraph (2) or (4), shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the requirements or milestones, respectively, are met.(4) For a hospital that has previously submitted to the office a rebuild project under construction, the office may accept certification from the hospital that it has obtained appropriate building permits consistent with an approved incremental plan review and that construction thereunder has commenced and is continuing. The previously approved construction schedule shall be amended to reflect the extension being requested, and at least two new major milestones shall be identified. The owner shall not be required to resubmit construction plans previously submitted to the office, and the office may not impose new or different requirements for any increment already approved or building permit already issued by the office as a condition for granting an extension.(5) Final seismic compliance shall be achieved, and a certificate of occupancy shall be obtained, by January 1, 2025.(f) The office may grant an adjustment to the requirements described in paragraph (1) or (2) of subdivision (d) or paragraph (1) or (4) of subdivision (e), or the milestones agreed to pursuant to paragraph (2) of subdivision (d) or paragraph (2) or (4) of subdivision (e), as necessary to deal with contractor, labor, or material delays, or with acts of God, or with governmental entitlements, experienced by the hospital. If that adjustment is granted, the hospital shall submit a revised construction schedule, and the hospital and the office shall identify at least two new major milestones consistent with the adjustment. Failure to comply with the revised construction schedule or meet any of the major milestones shall result in penalties as specified in paragraph (3) of subdivision (d) and paragraph (3) of subdivision (e). The adjustment shall not exceed the corresponding final seismic compliance date specified in paragraph (4) of subdivision (d) or paragraph (5) of subdivision (e).(g) The duration of an extension granted by the office pursuant to this section shall not exceed the maximums permitted by this section. Moreover, within that limit, the office shall not grant an extension that exceeds the amount of time needed by the owner to come into compliance. The determination by the office regarding the length of the extension to be granted shall be based upon a showing by the owner of the facts necessitating the additional time. It shall include a review of the plan and all the documentation submitted in the application for the extension, and shall permit only that additional time necessary to allow the owner to deal with compliance plan issues that cannot be fully met without the extension.(h) No extension shall be granted pursuant to this section for SPC-1 buildings unless the owner has submitted to the office, by January 1, 2018, a seismic compliance plan.(i) An extension shall not be granted pursuant to this section for seismic compliance based upon a removal plan.(j) In lieu of the reporting requirements described in Section 130061, a hospital granted an extension pursuant to this section shall provide a quarterly status report to the office, with the first report due on July 1, 2019, and every October 1, January 1, April 1, and July 1 thereafter, until seismic compliance is achieved. The office shall post the status reports on its Internet Web site.(k) Before June 1, 2019, the office shall provide the Legislature with an inventory of the SPC category of each hospital building. A report submitted to the Legislature pursuant to this subdivision shall be submitted in compliance with Section 9795 of the Government Code.(l) (1) The office may revoke an extension granted pursuant to this section for a hospital building where the assessment for a penalty exceeds 60 days.(2) Notwithstanding any other law, any penalties assessed pursuant to this section shall be deposited into the General Fund within 45 days of assessment or within 45 days following a determination on appeal, if any. A hospital assessed a penalty pursuant to this section may appeal the assessment to the Hospital Building Safety Board, provided the hospital posts the funds for any penalties with the office, to be held pending the resolution of the appeal. (3) The office shall not issue a construction final or certificate of occupancy for the building until all assessed penalties accrued pursuant to this section have been paid in full or, if an appeal is pending, have been posted subject to resolution of the appeal. Penalties deposited by the hospital pursuant to paragraph (2) shall be considered paid in full for purposes of issuing a construction final or certificate of occupancy. This paragraph is in addition to, and is not intended to supersede, any other requirements that must be met by the hospital for issuance of a construction final or certificate of occupancy.(m) The office may promulgate emergency regulations as necessary to implement this section.SEC. 2. Section 130066 is added to the Health and Safety Code, to read:130066. Before January 1, 2020, the owner of an acute care inpatient hospital whose building does not substantially comply with the seismic safety regulations or standards described in Section 130065 shall submit to the office an attestation that the board of directors of that hospital is aware that the hospital building is required to meet the January 1, 2030, deadline for substantial compliance with those regulations and standards.SEC. 3. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
1+Enrolled September 04, 2018 Passed IN Senate August 29, 2018 Passed IN Assembly August 30, 2018 Amended IN Senate August 24, 2018 Amended IN Senate July 02, 2018 Amended IN Senate June 18, 2018 Amended IN Assembly April 26, 2018 Amended IN Assembly April 16, 2018 CALIFORNIA LEGISLATURE 20172018 REGULAR SESSION Assembly Bill No. 2190Introduced by Assembly Member Reyes(Coauthors: Assembly Members Lackey, Mayes, Nazarian, and Steinorth)February 12, 2018 An act to add Sections 130062 and 130066 to the Health and Safety Code, relating to hospitals. LEGISLATIVE COUNSEL'S DIGESTAB 2190, Reyes. Hospitals: seismic safety.Existing law, the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983, establishes, under the jurisdiction of the Office of Statewide Health Planning and Development, a program of seismic safety building standards for certain hospitals constructed on and after March 7, 1973. A violation of any provision of the act is a misdemeanor.Existing law provides that, after January 1, 2008, a general acute care hospital building that is determined to be a potential risk of collapse or to pose significant loss of life in the event of seismic activity be used only for nonacute care hospital purposes, except that the office may grant 5-year and 2-year extensions under prescribed circumstances, except as specified. Existing law requires an owner of a general acute care hospital building that is classified as nonconforming to submit a report to the office no later than November 1, 2010, describing the status of each building in complying with the extension provisions, and to annually update the office with any changes or adjustments. Existing law authorizes certain hospital owners who do not have the financial capacity or other reasons to bring certain buildings into compliance by the January 1, 2013, deadline to instead replace those buildings or take other action by January 1, 2020, as specified.This bill would require all hospitals with buildings subject to the January 1, 2020, deadline described above and that are seeking an extension for their buildings to submit an application to the Office of Statewide Health Planning and Development by April 1, 2019, that specifies the seismic compliance method each building will use, as specified. The bill would require the office to grant an additional extension of time to an owner who is subject to the January 1, 2020, deadline if specified conditions are met. The bill would authorize the additional extension to be until July 1, 2022, if the compliance plan is based upon replacement or retrofit, as defined, or up to 5 years if the compliance plan is for a rebuild, as defined. The bill would require the office, before June 1, 2019, to provide the Legislature with a specified inventory of the hospital buildings. The bill would authorize the office to promulgate emergency regulations as necessary to implement these provisions.Existing law requires, no later than January 1, 2030, the owner of an acute care inpatient hospital to either demolish, replace, or change to nonacute care use a hospital building that is not in substantial compliance with certain seismic safety regulations and standards developed by the office, or to seismically retrofit the building so that it is in substantial compliance.This bill would require, before January 1, 2020, the owner of an acute care inpatient hospital whose building does not substantially comply with the above-described seismic safety regulations or standards to submit to the office an attestation that the board of directors of that hospital is aware that the hospital building is required to meet the January 1, 2030, deadline for substantial compliance with those regulations and standards. By imposing new requirements under the act for owners of hospitals with regard to extension applications and the above-described attestation, this bill would expand the scope of a crime, thereby imposing a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: YES Bill TextThe people of the State of California do enact as follows:SECTION 1. Section 130062 is added to the Health and Safety Code, to read:130062. (a) For the purposes of this section, the following terms have the following meanings:(1) Rebuild plan means a plan to meet seismic standards primarily by constructing a new conforming SPC-5 building for use in lieu of an SPC-1 building.(2) Removal plan means a plan to meet seismic standards primarily by removing acute care services or beds from the hospitals license.(3) Replacement plan means a plan to meet seismic standards primarily by relocating acute care services or beds from nonconforming buildings into a conforming building.(4) Retrofit plan means a plan to meet seismic standards primarily by modifying the building in a manner that brings the building up to SPC-2, SPC-4D, or SPC-5 standards.(b) All hospitals seeking an extension for their SPC-1 buildings shall submit to the office an application, in a manner acceptable to the office, by April 1, 2019. At a minimum, the application shall state which of the seismic compliance methods described in subdivision (a) will be used for each SPC-1 building.(c) A hospital owner that has been granted an extension pursuant to subdivision (g) of Section 130060 or subdivision (b) of Section 130061.5 may request, and the office shall grant, an additional extension of time as set forth in this section.(d) (1) For a hospital that seeks an extension for compliance based on a replacement plan or retrofit plan, the owner shall submit a construction schedule, obtain a building permit, and begin construction by April 1, 2020.(2) Using the construction schedule submitted pursuant to paragraph (1), the hospital and the office shall identify at least two major milestones relating to the compliance plan that will be used as the basis for determining whether the hospital is making adequate progress toward meeting the seismic compliance deadline.(3) Failure to comply with the requirements described in paragraph (1) or (2), or to meet any milestone agreed to pursuant to paragraph (2), shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the requirements or milestones, respectively, are met.(4) Final seismic compliance shall be achieved by July 1, 2022.(e) (1) For a hospital that seeks an extension for compliance based on a rebuild plan, the office shall grant an extension of up to five years. The owner shall submit, in a manner acceptable to the office, no later than July 1, 2020, the rebuild plan, deemed ready for review, and shall submit a construction schedule, obtain a building permit, and begin construction no later than January 1, 2022.(2) The hospital and the office shall identify at least two major milestones, agreed upon by the hospital and the office, that will be used as the basis for determining whether the hospital is making adequate progress toward meeting the seismic compliance deadline.(3) Failure to comply with the requirements described in paragraph (1) or (4), or to meet any milestone agreed to pursuant to paragraph (2) or (4), shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the requirements or milestones, respectively, are met.(4) For a hospital that has previously submitted to the office a rebuild project under construction, the office may accept certification from the hospital that it has obtained appropriate building permits consistent with an approved incremental plan review and that construction thereunder has commenced and is continuing. The previously approved construction schedule shall be amended to reflect the extension being requested, and at least two new major milestones shall be identified. The owner shall not be required to resubmit construction plans previously submitted to the office, and the office may not impose new or different requirements for any increment already approved or building permit already issued by the office as a condition for granting an extension.(5) Final seismic compliance shall be achieved, and a certificate of occupancy shall be obtained, by January 1, 2025.(f) The office may grant an adjustment to the requirements described in paragraph (1) or (2) of subdivision (d) or paragraph (1) or (4) of subdivision (e), or the milestones agreed to pursuant to paragraph (2) of subdivision (d) or paragraph (2) or (4) of subdivision (e), as necessary to deal with contractor, labor, or material delays, or with acts of God, or with governmental entitlements, experienced by the hospital. If that adjustment is granted, the hospital shall submit a revised construction schedule, and the hospital and the office shall identify at least two new major milestones consistent with the adjustment. Failure to comply with the revised construction schedule or meet any of the major milestones shall result in penalties as specified in paragraph (3) of subdivision (d) and paragraph (3) of subdivision (e). The adjustment shall not exceed the corresponding final seismic compliance date specified in paragraph (4) of subdivision (d) or paragraph (5) of subdivision (e).(g) The duration of an extension granted by the office pursuant to this section shall not exceed the maximums permitted by this section. Moreover, within that limit, the office shall not grant an extension that exceeds the amount of time needed by the owner to come into compliance. The determination by the office regarding the length of the extension to be granted shall be based upon a showing by the owner of the facts necessitating the additional time. It shall include a review of the plan and all the documentation submitted in the application for the extension, and shall permit only that additional time necessary to allow the owner to deal with compliance plan issues that cannot be fully met without the extension.(h) No extension shall be granted pursuant to this section for SPC-1 buildings unless the owner has submitted to the office, by January 1, 2018, a seismic compliance plan.(i) An extension shall not be granted pursuant to this section for seismic compliance based upon a removal plan.(j) In lieu of the reporting requirements described in Section 130061, a hospital granted an extension pursuant to this section shall provide a quarterly status report to the office, with the first report due on July 1, 2019, and every October 1, January 1, April 1, and July 1 thereafter, until seismic compliance is achieved. The office shall post the status reports on its Internet Web site.(k) Before June 1, 2019, the office shall provide the Legislature with an inventory of the SPC category of each hospital building. A report submitted to the Legislature pursuant to this subdivision shall be submitted in compliance with Section 9795 of the Government Code.(l) (1) The office may revoke an extension granted pursuant to this section for a hospital building where the assessment for a penalty exceeds 60 days.(2) Notwithstanding any other law, any penalties assessed pursuant to this section shall be deposited into the General Fund within 45 days of assessment or within 45 days following a determination on appeal, if any. A hospital assessed a penalty pursuant to this section may appeal the assessment to the Hospital Building Safety Board, provided the hospital posts the funds for any penalties with the office, to be held pending the resolution of the appeal. (3) The office shall not issue a construction final or certificate of occupancy for the building until all assessed penalties accrued pursuant to this section have been paid in full or, if an appeal is pending, have been posted subject to resolution of the appeal. Penalties deposited by the hospital pursuant to paragraph (2) shall be considered paid in full for purposes of issuing a construction final or certificate of occupancy. This paragraph is in addition to, and is not intended to supersede, any other requirements that must be met by the hospital for issuance of a construction final or certificate of occupancy.(m) The office may promulgate emergency regulations as necessary to implement this section.SEC. 2. Section 130066 is added to the Health and Safety Code, to read:130066. Before January 1, 2020, the owner of an acute care inpatient hospital whose building does not substantially comply with the seismic safety regulations or standards described in Section 130065 shall submit to the office an attestation that the board of directors of that hospital is aware that the hospital building is required to meet the January 1, 2030, deadline for substantial compliance with those regulations and standards.SEC. 3. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
22
3- Assembly Bill No. 2190 CHAPTER 673 An act to add Sections 130062 and 130066 to the Health and Safety Code, relating to hospitals. [ Approved by Governor September 22, 2018. Filed with Secretary of State September 22, 2018. ] LEGISLATIVE COUNSEL'S DIGESTAB 2190, Reyes. Hospitals: seismic safety.Existing law, the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983, establishes, under the jurisdiction of the Office of Statewide Health Planning and Development, a program of seismic safety building standards for certain hospitals constructed on and after March 7, 1973. A violation of any provision of the act is a misdemeanor.Existing law provides that, after January 1, 2008, a general acute care hospital building that is determined to be a potential risk of collapse or to pose significant loss of life in the event of seismic activity be used only for nonacute care hospital purposes, except that the office may grant 5-year and 2-year extensions under prescribed circumstances, except as specified. Existing law requires an owner of a general acute care hospital building that is classified as nonconforming to submit a report to the office no later than November 1, 2010, describing the status of each building in complying with the extension provisions, and to annually update the office with any changes or adjustments. Existing law authorizes certain hospital owners who do not have the financial capacity or other reasons to bring certain buildings into compliance by the January 1, 2013, deadline to instead replace those buildings or take other action by January 1, 2020, as specified.This bill would require all hospitals with buildings subject to the January 1, 2020, deadline described above and that are seeking an extension for their buildings to submit an application to the Office of Statewide Health Planning and Development by April 1, 2019, that specifies the seismic compliance method each building will use, as specified. The bill would require the office to grant an additional extension of time to an owner who is subject to the January 1, 2020, deadline if specified conditions are met. The bill would authorize the additional extension to be until July 1, 2022, if the compliance plan is based upon replacement or retrofit, as defined, or up to 5 years if the compliance plan is for a rebuild, as defined. The bill would require the office, before June 1, 2019, to provide the Legislature with a specified inventory of the hospital buildings. The bill would authorize the office to promulgate emergency regulations as necessary to implement these provisions.Existing law requires, no later than January 1, 2030, the owner of an acute care inpatient hospital to either demolish, replace, or change to nonacute care use a hospital building that is not in substantial compliance with certain seismic safety regulations and standards developed by the office, or to seismically retrofit the building so that it is in substantial compliance.This bill would require, before January 1, 2020, the owner of an acute care inpatient hospital whose building does not substantially comply with the above-described seismic safety regulations or standards to submit to the office an attestation that the board of directors of that hospital is aware that the hospital building is required to meet the January 1, 2030, deadline for substantial compliance with those regulations and standards. By imposing new requirements under the act for owners of hospitals with regard to extension applications and the above-described attestation, this bill would expand the scope of a crime, thereby imposing a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: YES
3+ Enrolled September 04, 2018 Passed IN Senate August 29, 2018 Passed IN Assembly August 30, 2018 Amended IN Senate August 24, 2018 Amended IN Senate July 02, 2018 Amended IN Senate June 18, 2018 Amended IN Assembly April 26, 2018 Amended IN Assembly April 16, 2018 CALIFORNIA LEGISLATURE 20172018 REGULAR SESSION Assembly Bill No. 2190Introduced by Assembly Member Reyes(Coauthors: Assembly Members Lackey, Mayes, Nazarian, and Steinorth)February 12, 2018 An act to add Sections 130062 and 130066 to the Health and Safety Code, relating to hospitals. LEGISLATIVE COUNSEL'S DIGESTAB 2190, Reyes. Hospitals: seismic safety.Existing law, the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983, establishes, under the jurisdiction of the Office of Statewide Health Planning and Development, a program of seismic safety building standards for certain hospitals constructed on and after March 7, 1973. A violation of any provision of the act is a misdemeanor.Existing law provides that, after January 1, 2008, a general acute care hospital building that is determined to be a potential risk of collapse or to pose significant loss of life in the event of seismic activity be used only for nonacute care hospital purposes, except that the office may grant 5-year and 2-year extensions under prescribed circumstances, except as specified. Existing law requires an owner of a general acute care hospital building that is classified as nonconforming to submit a report to the office no later than November 1, 2010, describing the status of each building in complying with the extension provisions, and to annually update the office with any changes or adjustments. Existing law authorizes certain hospital owners who do not have the financial capacity or other reasons to bring certain buildings into compliance by the January 1, 2013, deadline to instead replace those buildings or take other action by January 1, 2020, as specified.This bill would require all hospitals with buildings subject to the January 1, 2020, deadline described above and that are seeking an extension for their buildings to submit an application to the Office of Statewide Health Planning and Development by April 1, 2019, that specifies the seismic compliance method each building will use, as specified. The bill would require the office to grant an additional extension of time to an owner who is subject to the January 1, 2020, deadline if specified conditions are met. The bill would authorize the additional extension to be until July 1, 2022, if the compliance plan is based upon replacement or retrofit, as defined, or up to 5 years if the compliance plan is for a rebuild, as defined. The bill would require the office, before June 1, 2019, to provide the Legislature with a specified inventory of the hospital buildings. The bill would authorize the office to promulgate emergency regulations as necessary to implement these provisions.Existing law requires, no later than January 1, 2030, the owner of an acute care inpatient hospital to either demolish, replace, or change to nonacute care use a hospital building that is not in substantial compliance with certain seismic safety regulations and standards developed by the office, or to seismically retrofit the building so that it is in substantial compliance.This bill would require, before January 1, 2020, the owner of an acute care inpatient hospital whose building does not substantially comply with the above-described seismic safety regulations or standards to submit to the office an attestation that the board of directors of that hospital is aware that the hospital building is required to meet the January 1, 2030, deadline for substantial compliance with those regulations and standards. By imposing new requirements under the act for owners of hospitals with regard to extension applications and the above-described attestation, this bill would expand the scope of a crime, thereby imposing a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: YES
4+
5+ Enrolled September 04, 2018 Passed IN Senate August 29, 2018 Passed IN Assembly August 30, 2018 Amended IN Senate August 24, 2018 Amended IN Senate July 02, 2018 Amended IN Senate June 18, 2018 Amended IN Assembly April 26, 2018 Amended IN Assembly April 16, 2018
6+
7+Enrolled September 04, 2018
8+Passed IN Senate August 29, 2018
9+Passed IN Assembly August 30, 2018
10+Amended IN Senate August 24, 2018
11+Amended IN Senate July 02, 2018
12+Amended IN Senate June 18, 2018
13+Amended IN Assembly April 26, 2018
14+Amended IN Assembly April 16, 2018
15+
16+ CALIFORNIA LEGISLATURE 20172018 REGULAR SESSION
417
518 Assembly Bill No. 2190
6-CHAPTER 673
19+
20+Introduced by Assembly Member Reyes(Coauthors: Assembly Members Lackey, Mayes, Nazarian, and Steinorth)February 12, 2018
21+
22+Introduced by Assembly Member Reyes(Coauthors: Assembly Members Lackey, Mayes, Nazarian, and Steinorth)
23+February 12, 2018
724
825 An act to add Sections 130062 and 130066 to the Health and Safety Code, relating to hospitals.
9-
10- [ Approved by Governor September 22, 2018. Filed with Secretary of State September 22, 2018. ]
1126
1227 LEGISLATIVE COUNSEL'S DIGEST
1328
1429 ## LEGISLATIVE COUNSEL'S DIGEST
1530
1631 AB 2190, Reyes. Hospitals: seismic safety.
1732
1833 Existing law, the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983, establishes, under the jurisdiction of the Office of Statewide Health Planning and Development, a program of seismic safety building standards for certain hospitals constructed on and after March 7, 1973. A violation of any provision of the act is a misdemeanor.Existing law provides that, after January 1, 2008, a general acute care hospital building that is determined to be a potential risk of collapse or to pose significant loss of life in the event of seismic activity be used only for nonacute care hospital purposes, except that the office may grant 5-year and 2-year extensions under prescribed circumstances, except as specified. Existing law requires an owner of a general acute care hospital building that is classified as nonconforming to submit a report to the office no later than November 1, 2010, describing the status of each building in complying with the extension provisions, and to annually update the office with any changes or adjustments. Existing law authorizes certain hospital owners who do not have the financial capacity or other reasons to bring certain buildings into compliance by the January 1, 2013, deadline to instead replace those buildings or take other action by January 1, 2020, as specified.This bill would require all hospitals with buildings subject to the January 1, 2020, deadline described above and that are seeking an extension for their buildings to submit an application to the Office of Statewide Health Planning and Development by April 1, 2019, that specifies the seismic compliance method each building will use, as specified. The bill would require the office to grant an additional extension of time to an owner who is subject to the January 1, 2020, deadline if specified conditions are met. The bill would authorize the additional extension to be until July 1, 2022, if the compliance plan is based upon replacement or retrofit, as defined, or up to 5 years if the compliance plan is for a rebuild, as defined. The bill would require the office, before June 1, 2019, to provide the Legislature with a specified inventory of the hospital buildings. The bill would authorize the office to promulgate emergency regulations as necessary to implement these provisions.Existing law requires, no later than January 1, 2030, the owner of an acute care inpatient hospital to either demolish, replace, or change to nonacute care use a hospital building that is not in substantial compliance with certain seismic safety regulations and standards developed by the office, or to seismically retrofit the building so that it is in substantial compliance.This bill would require, before January 1, 2020, the owner of an acute care inpatient hospital whose building does not substantially comply with the above-described seismic safety regulations or standards to submit to the office an attestation that the board of directors of that hospital is aware that the hospital building is required to meet the January 1, 2030, deadline for substantial compliance with those regulations and standards. By imposing new requirements under the act for owners of hospitals with regard to extension applications and the above-described attestation, this bill would expand the scope of a crime, thereby imposing a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.
1934
2035 Existing law, the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983, establishes, under the jurisdiction of the Office of Statewide Health Planning and Development, a program of seismic safety building standards for certain hospitals constructed on and after March 7, 1973. A violation of any provision of the act is a misdemeanor.
2136
2237 Existing law provides that, after January 1, 2008, a general acute care hospital building that is determined to be a potential risk of collapse or to pose significant loss of life in the event of seismic activity be used only for nonacute care hospital purposes, except that the office may grant 5-year and 2-year extensions under prescribed circumstances, except as specified. Existing law requires an owner of a general acute care hospital building that is classified as nonconforming to submit a report to the office no later than November 1, 2010, describing the status of each building in complying with the extension provisions, and to annually update the office with any changes or adjustments. Existing law authorizes certain hospital owners who do not have the financial capacity or other reasons to bring certain buildings into compliance by the January 1, 2013, deadline to instead replace those buildings or take other action by January 1, 2020, as specified.
2338
2439 This bill would require all hospitals with buildings subject to the January 1, 2020, deadline described above and that are seeking an extension for their buildings to submit an application to the Office of Statewide Health Planning and Development by April 1, 2019, that specifies the seismic compliance method each building will use, as specified. The bill would require the office to grant an additional extension of time to an owner who is subject to the January 1, 2020, deadline if specified conditions are met. The bill would authorize the additional extension to be until July 1, 2022, if the compliance plan is based upon replacement or retrofit, as defined, or up to 5 years if the compliance plan is for a rebuild, as defined. The bill would require the office, before June 1, 2019, to provide the Legislature with a specified inventory of the hospital buildings. The bill would authorize the office to promulgate emergency regulations as necessary to implement these provisions.
2540
2641 Existing law requires, no later than January 1, 2030, the owner of an acute care inpatient hospital to either demolish, replace, or change to nonacute care use a hospital building that is not in substantial compliance with certain seismic safety regulations and standards developed by the office, or to seismically retrofit the building so that it is in substantial compliance.
2742
2843 This bill would require, before January 1, 2020, the owner of an acute care inpatient hospital whose building does not substantially comply with the above-described seismic safety regulations or standards to submit to the office an attestation that the board of directors of that hospital is aware that the hospital building is required to meet the January 1, 2030, deadline for substantial compliance with those regulations and standards.
2944
3045 By imposing new requirements under the act for owners of hospitals with regard to extension applications and the above-described attestation, this bill would expand the scope of a crime, thereby imposing a state-mandated local program.
3146
3247 The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
3348
3449 This bill would provide that no reimbursement is required by this act for a specified reason.
3550
3651 ## Digest Key
3752
3853 ## Bill Text
3954
4055 The people of the State of California do enact as follows:SECTION 1. Section 130062 is added to the Health and Safety Code, to read:130062. (a) For the purposes of this section, the following terms have the following meanings:(1) Rebuild plan means a plan to meet seismic standards primarily by constructing a new conforming SPC-5 building for use in lieu of an SPC-1 building.(2) Removal plan means a plan to meet seismic standards primarily by removing acute care services or beds from the hospitals license.(3) Replacement plan means a plan to meet seismic standards primarily by relocating acute care services or beds from nonconforming buildings into a conforming building.(4) Retrofit plan means a plan to meet seismic standards primarily by modifying the building in a manner that brings the building up to SPC-2, SPC-4D, or SPC-5 standards.(b) All hospitals seeking an extension for their SPC-1 buildings shall submit to the office an application, in a manner acceptable to the office, by April 1, 2019. At a minimum, the application shall state which of the seismic compliance methods described in subdivision (a) will be used for each SPC-1 building.(c) A hospital owner that has been granted an extension pursuant to subdivision (g) of Section 130060 or subdivision (b) of Section 130061.5 may request, and the office shall grant, an additional extension of time as set forth in this section.(d) (1) For a hospital that seeks an extension for compliance based on a replacement plan or retrofit plan, the owner shall submit a construction schedule, obtain a building permit, and begin construction by April 1, 2020.(2) Using the construction schedule submitted pursuant to paragraph (1), the hospital and the office shall identify at least two major milestones relating to the compliance plan that will be used as the basis for determining whether the hospital is making adequate progress toward meeting the seismic compliance deadline.(3) Failure to comply with the requirements described in paragraph (1) or (2), or to meet any milestone agreed to pursuant to paragraph (2), shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the requirements or milestones, respectively, are met.(4) Final seismic compliance shall be achieved by July 1, 2022.(e) (1) For a hospital that seeks an extension for compliance based on a rebuild plan, the office shall grant an extension of up to five years. The owner shall submit, in a manner acceptable to the office, no later than July 1, 2020, the rebuild plan, deemed ready for review, and shall submit a construction schedule, obtain a building permit, and begin construction no later than January 1, 2022.(2) The hospital and the office shall identify at least two major milestones, agreed upon by the hospital and the office, that will be used as the basis for determining whether the hospital is making adequate progress toward meeting the seismic compliance deadline.(3) Failure to comply with the requirements described in paragraph (1) or (4), or to meet any milestone agreed to pursuant to paragraph (2) or (4), shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the requirements or milestones, respectively, are met.(4) For a hospital that has previously submitted to the office a rebuild project under construction, the office may accept certification from the hospital that it has obtained appropriate building permits consistent with an approved incremental plan review and that construction thereunder has commenced and is continuing. The previously approved construction schedule shall be amended to reflect the extension being requested, and at least two new major milestones shall be identified. The owner shall not be required to resubmit construction plans previously submitted to the office, and the office may not impose new or different requirements for any increment already approved or building permit already issued by the office as a condition for granting an extension.(5) Final seismic compliance shall be achieved, and a certificate of occupancy shall be obtained, by January 1, 2025.(f) The office may grant an adjustment to the requirements described in paragraph (1) or (2) of subdivision (d) or paragraph (1) or (4) of subdivision (e), or the milestones agreed to pursuant to paragraph (2) of subdivision (d) or paragraph (2) or (4) of subdivision (e), as necessary to deal with contractor, labor, or material delays, or with acts of God, or with governmental entitlements, experienced by the hospital. If that adjustment is granted, the hospital shall submit a revised construction schedule, and the hospital and the office shall identify at least two new major milestones consistent with the adjustment. Failure to comply with the revised construction schedule or meet any of the major milestones shall result in penalties as specified in paragraph (3) of subdivision (d) and paragraph (3) of subdivision (e). The adjustment shall not exceed the corresponding final seismic compliance date specified in paragraph (4) of subdivision (d) or paragraph (5) of subdivision (e).(g) The duration of an extension granted by the office pursuant to this section shall not exceed the maximums permitted by this section. Moreover, within that limit, the office shall not grant an extension that exceeds the amount of time needed by the owner to come into compliance. The determination by the office regarding the length of the extension to be granted shall be based upon a showing by the owner of the facts necessitating the additional time. It shall include a review of the plan and all the documentation submitted in the application for the extension, and shall permit only that additional time necessary to allow the owner to deal with compliance plan issues that cannot be fully met without the extension.(h) No extension shall be granted pursuant to this section for SPC-1 buildings unless the owner has submitted to the office, by January 1, 2018, a seismic compliance plan.(i) An extension shall not be granted pursuant to this section for seismic compliance based upon a removal plan.(j) In lieu of the reporting requirements described in Section 130061, a hospital granted an extension pursuant to this section shall provide a quarterly status report to the office, with the first report due on July 1, 2019, and every October 1, January 1, April 1, and July 1 thereafter, until seismic compliance is achieved. The office shall post the status reports on its Internet Web site.(k) Before June 1, 2019, the office shall provide the Legislature with an inventory of the SPC category of each hospital building. A report submitted to the Legislature pursuant to this subdivision shall be submitted in compliance with Section 9795 of the Government Code.(l) (1) The office may revoke an extension granted pursuant to this section for a hospital building where the assessment for a penalty exceeds 60 days.(2) Notwithstanding any other law, any penalties assessed pursuant to this section shall be deposited into the General Fund within 45 days of assessment or within 45 days following a determination on appeal, if any. A hospital assessed a penalty pursuant to this section may appeal the assessment to the Hospital Building Safety Board, provided the hospital posts the funds for any penalties with the office, to be held pending the resolution of the appeal. (3) The office shall not issue a construction final or certificate of occupancy for the building until all assessed penalties accrued pursuant to this section have been paid in full or, if an appeal is pending, have been posted subject to resolution of the appeal. Penalties deposited by the hospital pursuant to paragraph (2) shall be considered paid in full for purposes of issuing a construction final or certificate of occupancy. This paragraph is in addition to, and is not intended to supersede, any other requirements that must be met by the hospital for issuance of a construction final or certificate of occupancy.(m) The office may promulgate emergency regulations as necessary to implement this section.SEC. 2. Section 130066 is added to the Health and Safety Code, to read:130066. Before January 1, 2020, the owner of an acute care inpatient hospital whose building does not substantially comply with the seismic safety regulations or standards described in Section 130065 shall submit to the office an attestation that the board of directors of that hospital is aware that the hospital building is required to meet the January 1, 2030, deadline for substantial compliance with those regulations and standards.SEC. 3. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
4156
4257 The people of the State of California do enact as follows:
4358
4459 ## The people of the State of California do enact as follows:
4560
4661 SECTION 1. Section 130062 is added to the Health and Safety Code, to read:130062. (a) For the purposes of this section, the following terms have the following meanings:(1) Rebuild plan means a plan to meet seismic standards primarily by constructing a new conforming SPC-5 building for use in lieu of an SPC-1 building.(2) Removal plan means a plan to meet seismic standards primarily by removing acute care services or beds from the hospitals license.(3) Replacement plan means a plan to meet seismic standards primarily by relocating acute care services or beds from nonconforming buildings into a conforming building.(4) Retrofit plan means a plan to meet seismic standards primarily by modifying the building in a manner that brings the building up to SPC-2, SPC-4D, or SPC-5 standards.(b) All hospitals seeking an extension for their SPC-1 buildings shall submit to the office an application, in a manner acceptable to the office, by April 1, 2019. At a minimum, the application shall state which of the seismic compliance methods described in subdivision (a) will be used for each SPC-1 building.(c) A hospital owner that has been granted an extension pursuant to subdivision (g) of Section 130060 or subdivision (b) of Section 130061.5 may request, and the office shall grant, an additional extension of time as set forth in this section.(d) (1) For a hospital that seeks an extension for compliance based on a replacement plan or retrofit plan, the owner shall submit a construction schedule, obtain a building permit, and begin construction by April 1, 2020.(2) Using the construction schedule submitted pursuant to paragraph (1), the hospital and the office shall identify at least two major milestones relating to the compliance plan that will be used as the basis for determining whether the hospital is making adequate progress toward meeting the seismic compliance deadline.(3) Failure to comply with the requirements described in paragraph (1) or (2), or to meet any milestone agreed to pursuant to paragraph (2), shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the requirements or milestones, respectively, are met.(4) Final seismic compliance shall be achieved by July 1, 2022.(e) (1) For a hospital that seeks an extension for compliance based on a rebuild plan, the office shall grant an extension of up to five years. The owner shall submit, in a manner acceptable to the office, no later than July 1, 2020, the rebuild plan, deemed ready for review, and shall submit a construction schedule, obtain a building permit, and begin construction no later than January 1, 2022.(2) The hospital and the office shall identify at least two major milestones, agreed upon by the hospital and the office, that will be used as the basis for determining whether the hospital is making adequate progress toward meeting the seismic compliance deadline.(3) Failure to comply with the requirements described in paragraph (1) or (4), or to meet any milestone agreed to pursuant to paragraph (2) or (4), shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the requirements or milestones, respectively, are met.(4) For a hospital that has previously submitted to the office a rebuild project under construction, the office may accept certification from the hospital that it has obtained appropriate building permits consistent with an approved incremental plan review and that construction thereunder has commenced and is continuing. The previously approved construction schedule shall be amended to reflect the extension being requested, and at least two new major milestones shall be identified. The owner shall not be required to resubmit construction plans previously submitted to the office, and the office may not impose new or different requirements for any increment already approved or building permit already issued by the office as a condition for granting an extension.(5) Final seismic compliance shall be achieved, and a certificate of occupancy shall be obtained, by January 1, 2025.(f) The office may grant an adjustment to the requirements described in paragraph (1) or (2) of subdivision (d) or paragraph (1) or (4) of subdivision (e), or the milestones agreed to pursuant to paragraph (2) of subdivision (d) or paragraph (2) or (4) of subdivision (e), as necessary to deal with contractor, labor, or material delays, or with acts of God, or with governmental entitlements, experienced by the hospital. If that adjustment is granted, the hospital shall submit a revised construction schedule, and the hospital and the office shall identify at least two new major milestones consistent with the adjustment. Failure to comply with the revised construction schedule or meet any of the major milestones shall result in penalties as specified in paragraph (3) of subdivision (d) and paragraph (3) of subdivision (e). The adjustment shall not exceed the corresponding final seismic compliance date specified in paragraph (4) of subdivision (d) or paragraph (5) of subdivision (e).(g) The duration of an extension granted by the office pursuant to this section shall not exceed the maximums permitted by this section. Moreover, within that limit, the office shall not grant an extension that exceeds the amount of time needed by the owner to come into compliance. The determination by the office regarding the length of the extension to be granted shall be based upon a showing by the owner of the facts necessitating the additional time. It shall include a review of the plan and all the documentation submitted in the application for the extension, and shall permit only that additional time necessary to allow the owner to deal with compliance plan issues that cannot be fully met without the extension.(h) No extension shall be granted pursuant to this section for SPC-1 buildings unless the owner has submitted to the office, by January 1, 2018, a seismic compliance plan.(i) An extension shall not be granted pursuant to this section for seismic compliance based upon a removal plan.(j) In lieu of the reporting requirements described in Section 130061, a hospital granted an extension pursuant to this section shall provide a quarterly status report to the office, with the first report due on July 1, 2019, and every October 1, January 1, April 1, and July 1 thereafter, until seismic compliance is achieved. The office shall post the status reports on its Internet Web site.(k) Before June 1, 2019, the office shall provide the Legislature with an inventory of the SPC category of each hospital building. A report submitted to the Legislature pursuant to this subdivision shall be submitted in compliance with Section 9795 of the Government Code.(l) (1) The office may revoke an extension granted pursuant to this section for a hospital building where the assessment for a penalty exceeds 60 days.(2) Notwithstanding any other law, any penalties assessed pursuant to this section shall be deposited into the General Fund within 45 days of assessment or within 45 days following a determination on appeal, if any. A hospital assessed a penalty pursuant to this section may appeal the assessment to the Hospital Building Safety Board, provided the hospital posts the funds for any penalties with the office, to be held pending the resolution of the appeal. (3) The office shall not issue a construction final or certificate of occupancy for the building until all assessed penalties accrued pursuant to this section have been paid in full or, if an appeal is pending, have been posted subject to resolution of the appeal. Penalties deposited by the hospital pursuant to paragraph (2) shall be considered paid in full for purposes of issuing a construction final or certificate of occupancy. This paragraph is in addition to, and is not intended to supersede, any other requirements that must be met by the hospital for issuance of a construction final or certificate of occupancy.(m) The office may promulgate emergency regulations as necessary to implement this section.
4762
4863 SECTION 1. Section 130062 is added to the Health and Safety Code, to read:
4964
5065 ### SECTION 1.
5166
5267 130062. (a) For the purposes of this section, the following terms have the following meanings:(1) Rebuild plan means a plan to meet seismic standards primarily by constructing a new conforming SPC-5 building for use in lieu of an SPC-1 building.(2) Removal plan means a plan to meet seismic standards primarily by removing acute care services or beds from the hospitals license.(3) Replacement plan means a plan to meet seismic standards primarily by relocating acute care services or beds from nonconforming buildings into a conforming building.(4) Retrofit plan means a plan to meet seismic standards primarily by modifying the building in a manner that brings the building up to SPC-2, SPC-4D, or SPC-5 standards.(b) All hospitals seeking an extension for their SPC-1 buildings shall submit to the office an application, in a manner acceptable to the office, by April 1, 2019. At a minimum, the application shall state which of the seismic compliance methods described in subdivision (a) will be used for each SPC-1 building.(c) A hospital owner that has been granted an extension pursuant to subdivision (g) of Section 130060 or subdivision (b) of Section 130061.5 may request, and the office shall grant, an additional extension of time as set forth in this section.(d) (1) For a hospital that seeks an extension for compliance based on a replacement plan or retrofit plan, the owner shall submit a construction schedule, obtain a building permit, and begin construction by April 1, 2020.(2) Using the construction schedule submitted pursuant to paragraph (1), the hospital and the office shall identify at least two major milestones relating to the compliance plan that will be used as the basis for determining whether the hospital is making adequate progress toward meeting the seismic compliance deadline.(3) Failure to comply with the requirements described in paragraph (1) or (2), or to meet any milestone agreed to pursuant to paragraph (2), shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the requirements or milestones, respectively, are met.(4) Final seismic compliance shall be achieved by July 1, 2022.(e) (1) For a hospital that seeks an extension for compliance based on a rebuild plan, the office shall grant an extension of up to five years. The owner shall submit, in a manner acceptable to the office, no later than July 1, 2020, the rebuild plan, deemed ready for review, and shall submit a construction schedule, obtain a building permit, and begin construction no later than January 1, 2022.(2) The hospital and the office shall identify at least two major milestones, agreed upon by the hospital and the office, that will be used as the basis for determining whether the hospital is making adequate progress toward meeting the seismic compliance deadline.(3) Failure to comply with the requirements described in paragraph (1) or (4), or to meet any milestone agreed to pursuant to paragraph (2) or (4), shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the requirements or milestones, respectively, are met.(4) For a hospital that has previously submitted to the office a rebuild project under construction, the office may accept certification from the hospital that it has obtained appropriate building permits consistent with an approved incremental plan review and that construction thereunder has commenced and is continuing. The previously approved construction schedule shall be amended to reflect the extension being requested, and at least two new major milestones shall be identified. The owner shall not be required to resubmit construction plans previously submitted to the office, and the office may not impose new or different requirements for any increment already approved or building permit already issued by the office as a condition for granting an extension.(5) Final seismic compliance shall be achieved, and a certificate of occupancy shall be obtained, by January 1, 2025.(f) The office may grant an adjustment to the requirements described in paragraph (1) or (2) of subdivision (d) or paragraph (1) or (4) of subdivision (e), or the milestones agreed to pursuant to paragraph (2) of subdivision (d) or paragraph (2) or (4) of subdivision (e), as necessary to deal with contractor, labor, or material delays, or with acts of God, or with governmental entitlements, experienced by the hospital. If that adjustment is granted, the hospital shall submit a revised construction schedule, and the hospital and the office shall identify at least two new major milestones consistent with the adjustment. Failure to comply with the revised construction schedule or meet any of the major milestones shall result in penalties as specified in paragraph (3) of subdivision (d) and paragraph (3) of subdivision (e). The adjustment shall not exceed the corresponding final seismic compliance date specified in paragraph (4) of subdivision (d) or paragraph (5) of subdivision (e).(g) The duration of an extension granted by the office pursuant to this section shall not exceed the maximums permitted by this section. Moreover, within that limit, the office shall not grant an extension that exceeds the amount of time needed by the owner to come into compliance. The determination by the office regarding the length of the extension to be granted shall be based upon a showing by the owner of the facts necessitating the additional time. It shall include a review of the plan and all the documentation submitted in the application for the extension, and shall permit only that additional time necessary to allow the owner to deal with compliance plan issues that cannot be fully met without the extension.(h) No extension shall be granted pursuant to this section for SPC-1 buildings unless the owner has submitted to the office, by January 1, 2018, a seismic compliance plan.(i) An extension shall not be granted pursuant to this section for seismic compliance based upon a removal plan.(j) In lieu of the reporting requirements described in Section 130061, a hospital granted an extension pursuant to this section shall provide a quarterly status report to the office, with the first report due on July 1, 2019, and every October 1, January 1, April 1, and July 1 thereafter, until seismic compliance is achieved. The office shall post the status reports on its Internet Web site.(k) Before June 1, 2019, the office shall provide the Legislature with an inventory of the SPC category of each hospital building. A report submitted to the Legislature pursuant to this subdivision shall be submitted in compliance with Section 9795 of the Government Code.(l) (1) The office may revoke an extension granted pursuant to this section for a hospital building where the assessment for a penalty exceeds 60 days.(2) Notwithstanding any other law, any penalties assessed pursuant to this section shall be deposited into the General Fund within 45 days of assessment or within 45 days following a determination on appeal, if any. A hospital assessed a penalty pursuant to this section may appeal the assessment to the Hospital Building Safety Board, provided the hospital posts the funds for any penalties with the office, to be held pending the resolution of the appeal. (3) The office shall not issue a construction final or certificate of occupancy for the building until all assessed penalties accrued pursuant to this section have been paid in full or, if an appeal is pending, have been posted subject to resolution of the appeal. Penalties deposited by the hospital pursuant to paragraph (2) shall be considered paid in full for purposes of issuing a construction final or certificate of occupancy. This paragraph is in addition to, and is not intended to supersede, any other requirements that must be met by the hospital for issuance of a construction final or certificate of occupancy.(m) The office may promulgate emergency regulations as necessary to implement this section.
5368
5469 130062. (a) For the purposes of this section, the following terms have the following meanings:(1) Rebuild plan means a plan to meet seismic standards primarily by constructing a new conforming SPC-5 building for use in lieu of an SPC-1 building.(2) Removal plan means a plan to meet seismic standards primarily by removing acute care services or beds from the hospitals license.(3) Replacement plan means a plan to meet seismic standards primarily by relocating acute care services or beds from nonconforming buildings into a conforming building.(4) Retrofit plan means a plan to meet seismic standards primarily by modifying the building in a manner that brings the building up to SPC-2, SPC-4D, or SPC-5 standards.(b) All hospitals seeking an extension for their SPC-1 buildings shall submit to the office an application, in a manner acceptable to the office, by April 1, 2019. At a minimum, the application shall state which of the seismic compliance methods described in subdivision (a) will be used for each SPC-1 building.(c) A hospital owner that has been granted an extension pursuant to subdivision (g) of Section 130060 or subdivision (b) of Section 130061.5 may request, and the office shall grant, an additional extension of time as set forth in this section.(d) (1) For a hospital that seeks an extension for compliance based on a replacement plan or retrofit plan, the owner shall submit a construction schedule, obtain a building permit, and begin construction by April 1, 2020.(2) Using the construction schedule submitted pursuant to paragraph (1), the hospital and the office shall identify at least two major milestones relating to the compliance plan that will be used as the basis for determining whether the hospital is making adequate progress toward meeting the seismic compliance deadline.(3) Failure to comply with the requirements described in paragraph (1) or (2), or to meet any milestone agreed to pursuant to paragraph (2), shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the requirements or milestones, respectively, are met.(4) Final seismic compliance shall be achieved by July 1, 2022.(e) (1) For a hospital that seeks an extension for compliance based on a rebuild plan, the office shall grant an extension of up to five years. The owner shall submit, in a manner acceptable to the office, no later than July 1, 2020, the rebuild plan, deemed ready for review, and shall submit a construction schedule, obtain a building permit, and begin construction no later than January 1, 2022.(2) The hospital and the office shall identify at least two major milestones, agreed upon by the hospital and the office, that will be used as the basis for determining whether the hospital is making adequate progress toward meeting the seismic compliance deadline.(3) Failure to comply with the requirements described in paragraph (1) or (4), or to meet any milestone agreed to pursuant to paragraph (2) or (4), shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the requirements or milestones, respectively, are met.(4) For a hospital that has previously submitted to the office a rebuild project under construction, the office may accept certification from the hospital that it has obtained appropriate building permits consistent with an approved incremental plan review and that construction thereunder has commenced and is continuing. The previously approved construction schedule shall be amended to reflect the extension being requested, and at least two new major milestones shall be identified. The owner shall not be required to resubmit construction plans previously submitted to the office, and the office may not impose new or different requirements for any increment already approved or building permit already issued by the office as a condition for granting an extension.(5) Final seismic compliance shall be achieved, and a certificate of occupancy shall be obtained, by January 1, 2025.(f) The office may grant an adjustment to the requirements described in paragraph (1) or (2) of subdivision (d) or paragraph (1) or (4) of subdivision (e), or the milestones agreed to pursuant to paragraph (2) of subdivision (d) or paragraph (2) or (4) of subdivision (e), as necessary to deal with contractor, labor, or material delays, or with acts of God, or with governmental entitlements, experienced by the hospital. If that adjustment is granted, the hospital shall submit a revised construction schedule, and the hospital and the office shall identify at least two new major milestones consistent with the adjustment. Failure to comply with the revised construction schedule or meet any of the major milestones shall result in penalties as specified in paragraph (3) of subdivision (d) and paragraph (3) of subdivision (e). The adjustment shall not exceed the corresponding final seismic compliance date specified in paragraph (4) of subdivision (d) or paragraph (5) of subdivision (e).(g) The duration of an extension granted by the office pursuant to this section shall not exceed the maximums permitted by this section. Moreover, within that limit, the office shall not grant an extension that exceeds the amount of time needed by the owner to come into compliance. The determination by the office regarding the length of the extension to be granted shall be based upon a showing by the owner of the facts necessitating the additional time. It shall include a review of the plan and all the documentation submitted in the application for the extension, and shall permit only that additional time necessary to allow the owner to deal with compliance plan issues that cannot be fully met without the extension.(h) No extension shall be granted pursuant to this section for SPC-1 buildings unless the owner has submitted to the office, by January 1, 2018, a seismic compliance plan.(i) An extension shall not be granted pursuant to this section for seismic compliance based upon a removal plan.(j) In lieu of the reporting requirements described in Section 130061, a hospital granted an extension pursuant to this section shall provide a quarterly status report to the office, with the first report due on July 1, 2019, and every October 1, January 1, April 1, and July 1 thereafter, until seismic compliance is achieved. The office shall post the status reports on its Internet Web site.(k) Before June 1, 2019, the office shall provide the Legislature with an inventory of the SPC category of each hospital building. A report submitted to the Legislature pursuant to this subdivision shall be submitted in compliance with Section 9795 of the Government Code.(l) (1) The office may revoke an extension granted pursuant to this section for a hospital building where the assessment for a penalty exceeds 60 days.(2) Notwithstanding any other law, any penalties assessed pursuant to this section shall be deposited into the General Fund within 45 days of assessment or within 45 days following a determination on appeal, if any. A hospital assessed a penalty pursuant to this section may appeal the assessment to the Hospital Building Safety Board, provided the hospital posts the funds for any penalties with the office, to be held pending the resolution of the appeal. (3) The office shall not issue a construction final or certificate of occupancy for the building until all assessed penalties accrued pursuant to this section have been paid in full or, if an appeal is pending, have been posted subject to resolution of the appeal. Penalties deposited by the hospital pursuant to paragraph (2) shall be considered paid in full for purposes of issuing a construction final or certificate of occupancy. This paragraph is in addition to, and is not intended to supersede, any other requirements that must be met by the hospital for issuance of a construction final or certificate of occupancy.(m) The office may promulgate emergency regulations as necessary to implement this section.
5570
5671 130062. (a) For the purposes of this section, the following terms have the following meanings:(1) Rebuild plan means a plan to meet seismic standards primarily by constructing a new conforming SPC-5 building for use in lieu of an SPC-1 building.(2) Removal plan means a plan to meet seismic standards primarily by removing acute care services or beds from the hospitals license.(3) Replacement plan means a plan to meet seismic standards primarily by relocating acute care services or beds from nonconforming buildings into a conforming building.(4) Retrofit plan means a plan to meet seismic standards primarily by modifying the building in a manner that brings the building up to SPC-2, SPC-4D, or SPC-5 standards.(b) All hospitals seeking an extension for their SPC-1 buildings shall submit to the office an application, in a manner acceptable to the office, by April 1, 2019. At a minimum, the application shall state which of the seismic compliance methods described in subdivision (a) will be used for each SPC-1 building.(c) A hospital owner that has been granted an extension pursuant to subdivision (g) of Section 130060 or subdivision (b) of Section 130061.5 may request, and the office shall grant, an additional extension of time as set forth in this section.(d) (1) For a hospital that seeks an extension for compliance based on a replacement plan or retrofit plan, the owner shall submit a construction schedule, obtain a building permit, and begin construction by April 1, 2020.(2) Using the construction schedule submitted pursuant to paragraph (1), the hospital and the office shall identify at least two major milestones relating to the compliance plan that will be used as the basis for determining whether the hospital is making adequate progress toward meeting the seismic compliance deadline.(3) Failure to comply with the requirements described in paragraph (1) or (2), or to meet any milestone agreed to pursuant to paragraph (2), shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the requirements or milestones, respectively, are met.(4) Final seismic compliance shall be achieved by July 1, 2022.(e) (1) For a hospital that seeks an extension for compliance based on a rebuild plan, the office shall grant an extension of up to five years. The owner shall submit, in a manner acceptable to the office, no later than July 1, 2020, the rebuild plan, deemed ready for review, and shall submit a construction schedule, obtain a building permit, and begin construction no later than January 1, 2022.(2) The hospital and the office shall identify at least two major milestones, agreed upon by the hospital and the office, that will be used as the basis for determining whether the hospital is making adequate progress toward meeting the seismic compliance deadline.(3) Failure to comply with the requirements described in paragraph (1) or (4), or to meet any milestone agreed to pursuant to paragraph (2) or (4), shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the requirements or milestones, respectively, are met.(4) For a hospital that has previously submitted to the office a rebuild project under construction, the office may accept certification from the hospital that it has obtained appropriate building permits consistent with an approved incremental plan review and that construction thereunder has commenced and is continuing. The previously approved construction schedule shall be amended to reflect the extension being requested, and at least two new major milestones shall be identified. The owner shall not be required to resubmit construction plans previously submitted to the office, and the office may not impose new or different requirements for any increment already approved or building permit already issued by the office as a condition for granting an extension.(5) Final seismic compliance shall be achieved, and a certificate of occupancy shall be obtained, by January 1, 2025.(f) The office may grant an adjustment to the requirements described in paragraph (1) or (2) of subdivision (d) or paragraph (1) or (4) of subdivision (e), or the milestones agreed to pursuant to paragraph (2) of subdivision (d) or paragraph (2) or (4) of subdivision (e), as necessary to deal with contractor, labor, or material delays, or with acts of God, or with governmental entitlements, experienced by the hospital. If that adjustment is granted, the hospital shall submit a revised construction schedule, and the hospital and the office shall identify at least two new major milestones consistent with the adjustment. Failure to comply with the revised construction schedule or meet any of the major milestones shall result in penalties as specified in paragraph (3) of subdivision (d) and paragraph (3) of subdivision (e). The adjustment shall not exceed the corresponding final seismic compliance date specified in paragraph (4) of subdivision (d) or paragraph (5) of subdivision (e).(g) The duration of an extension granted by the office pursuant to this section shall not exceed the maximums permitted by this section. Moreover, within that limit, the office shall not grant an extension that exceeds the amount of time needed by the owner to come into compliance. The determination by the office regarding the length of the extension to be granted shall be based upon a showing by the owner of the facts necessitating the additional time. It shall include a review of the plan and all the documentation submitted in the application for the extension, and shall permit only that additional time necessary to allow the owner to deal with compliance plan issues that cannot be fully met without the extension.(h) No extension shall be granted pursuant to this section for SPC-1 buildings unless the owner has submitted to the office, by January 1, 2018, a seismic compliance plan.(i) An extension shall not be granted pursuant to this section for seismic compliance based upon a removal plan.(j) In lieu of the reporting requirements described in Section 130061, a hospital granted an extension pursuant to this section shall provide a quarterly status report to the office, with the first report due on July 1, 2019, and every October 1, January 1, April 1, and July 1 thereafter, until seismic compliance is achieved. The office shall post the status reports on its Internet Web site.(k) Before June 1, 2019, the office shall provide the Legislature with an inventory of the SPC category of each hospital building. A report submitted to the Legislature pursuant to this subdivision shall be submitted in compliance with Section 9795 of the Government Code.(l) (1) The office may revoke an extension granted pursuant to this section for a hospital building where the assessment for a penalty exceeds 60 days.(2) Notwithstanding any other law, any penalties assessed pursuant to this section shall be deposited into the General Fund within 45 days of assessment or within 45 days following a determination on appeal, if any. A hospital assessed a penalty pursuant to this section may appeal the assessment to the Hospital Building Safety Board, provided the hospital posts the funds for any penalties with the office, to be held pending the resolution of the appeal. (3) The office shall not issue a construction final or certificate of occupancy for the building until all assessed penalties accrued pursuant to this section have been paid in full or, if an appeal is pending, have been posted subject to resolution of the appeal. Penalties deposited by the hospital pursuant to paragraph (2) shall be considered paid in full for purposes of issuing a construction final or certificate of occupancy. This paragraph is in addition to, and is not intended to supersede, any other requirements that must be met by the hospital for issuance of a construction final or certificate of occupancy.(m) The office may promulgate emergency regulations as necessary to implement this section.
5772
5873
5974
6075 130062. (a) For the purposes of this section, the following terms have the following meanings:
6176
6277 (1) Rebuild plan means a plan to meet seismic standards primarily by constructing a new conforming SPC-5 building for use in lieu of an SPC-1 building.
6378
6479 (2) Removal plan means a plan to meet seismic standards primarily by removing acute care services or beds from the hospitals license.
6580
6681 (3) Replacement plan means a plan to meet seismic standards primarily by relocating acute care services or beds from nonconforming buildings into a conforming building.
6782
6883 (4) Retrofit plan means a plan to meet seismic standards primarily by modifying the building in a manner that brings the building up to SPC-2, SPC-4D, or SPC-5 standards.
6984
7085 (b) All hospitals seeking an extension for their SPC-1 buildings shall submit to the office an application, in a manner acceptable to the office, by April 1, 2019. At a minimum, the application shall state which of the seismic compliance methods described in subdivision (a) will be used for each SPC-1 building.
7186
7287 (c) A hospital owner that has been granted an extension pursuant to subdivision (g) of Section 130060 or subdivision (b) of Section 130061.5 may request, and the office shall grant, an additional extension of time as set forth in this section.
7388
7489 (d) (1) For a hospital that seeks an extension for compliance based on a replacement plan or retrofit plan, the owner shall submit a construction schedule, obtain a building permit, and begin construction by April 1, 2020.
7590
7691 (2) Using the construction schedule submitted pursuant to paragraph (1), the hospital and the office shall identify at least two major milestones relating to the compliance plan that will be used as the basis for determining whether the hospital is making adequate progress toward meeting the seismic compliance deadline.
7792
7893 (3) Failure to comply with the requirements described in paragraph (1) or (2), or to meet any milestone agreed to pursuant to paragraph (2), shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the requirements or milestones, respectively, are met.
7994
8095 (4) Final seismic compliance shall be achieved by July 1, 2022.
8196
8297 (e) (1) For a hospital that seeks an extension for compliance based on a rebuild plan, the office shall grant an extension of up to five years. The owner shall submit, in a manner acceptable to the office, no later than July 1, 2020, the rebuild plan, deemed ready for review, and shall submit a construction schedule, obtain a building permit, and begin construction no later than January 1, 2022.
8398
8499 (2) The hospital and the office shall identify at least two major milestones, agreed upon by the hospital and the office, that will be used as the basis for determining whether the hospital is making adequate progress toward meeting the seismic compliance deadline.
85100
86101 (3) Failure to comply with the requirements described in paragraph (1) or (4), or to meet any milestone agreed to pursuant to paragraph (2) or (4), shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the requirements or milestones, respectively, are met.
87102
88103 (4) For a hospital that has previously submitted to the office a rebuild project under construction, the office may accept certification from the hospital that it has obtained appropriate building permits consistent with an approved incremental plan review and that construction thereunder has commenced and is continuing. The previously approved construction schedule shall be amended to reflect the extension being requested, and at least two new major milestones shall be identified. The owner shall not be required to resubmit construction plans previously submitted to the office, and the office may not impose new or different requirements for any increment already approved or building permit already issued by the office as a condition for granting an extension.
89104
90105 (5) Final seismic compliance shall be achieved, and a certificate of occupancy shall be obtained, by January 1, 2025.
91106
92107 (f) The office may grant an adjustment to the requirements described in paragraph (1) or (2) of subdivision (d) or paragraph (1) or (4) of subdivision (e), or the milestones agreed to pursuant to paragraph (2) of subdivision (d) or paragraph (2) or (4) of subdivision (e), as necessary to deal with contractor, labor, or material delays, or with acts of God, or with governmental entitlements, experienced by the hospital. If that adjustment is granted, the hospital shall submit a revised construction schedule, and the hospital and the office shall identify at least two new major milestones consistent with the adjustment. Failure to comply with the revised construction schedule or meet any of the major milestones shall result in penalties as specified in paragraph (3) of subdivision (d) and paragraph (3) of subdivision (e). The adjustment shall not exceed the corresponding final seismic compliance date specified in paragraph (4) of subdivision (d) or paragraph (5) of subdivision (e).
93108
94109 (g) The duration of an extension granted by the office pursuant to this section shall not exceed the maximums permitted by this section. Moreover, within that limit, the office shall not grant an extension that exceeds the amount of time needed by the owner to come into compliance. The determination by the office regarding the length of the extension to be granted shall be based upon a showing by the owner of the facts necessitating the additional time. It shall include a review of the plan and all the documentation submitted in the application for the extension, and shall permit only that additional time necessary to allow the owner to deal with compliance plan issues that cannot be fully met without the extension.
95110
96111 (h) No extension shall be granted pursuant to this section for SPC-1 buildings unless the owner has submitted to the office, by January 1, 2018, a seismic compliance plan.
97112
98113 (i) An extension shall not be granted pursuant to this section for seismic compliance based upon a removal plan.
99114
100115 (j) In lieu of the reporting requirements described in Section 130061, a hospital granted an extension pursuant to this section shall provide a quarterly status report to the office, with the first report due on July 1, 2019, and every October 1, January 1, April 1, and July 1 thereafter, until seismic compliance is achieved. The office shall post the status reports on its Internet Web site.
101116
102117 (k) Before June 1, 2019, the office shall provide the Legislature with an inventory of the SPC category of each hospital building. A report submitted to the Legislature pursuant to this subdivision shall be submitted in compliance with Section 9795 of the Government Code.
103118
104119 (l) (1) The office may revoke an extension granted pursuant to this section for a hospital building where the assessment for a penalty exceeds 60 days.
105120
106121 (2) Notwithstanding any other law, any penalties assessed pursuant to this section shall be deposited into the General Fund within 45 days of assessment or within 45 days following a determination on appeal, if any. A hospital assessed a penalty pursuant to this section may appeal the assessment to the Hospital Building Safety Board, provided the hospital posts the funds for any penalties with the office, to be held pending the resolution of the appeal.
107122
108123 (3) The office shall not issue a construction final or certificate of occupancy for the building until all assessed penalties accrued pursuant to this section have been paid in full or, if an appeal is pending, have been posted subject to resolution of the appeal. Penalties deposited by the hospital pursuant to paragraph (2) shall be considered paid in full for purposes of issuing a construction final or certificate of occupancy. This paragraph is in addition to, and is not intended to supersede, any other requirements that must be met by the hospital for issuance of a construction final or certificate of occupancy.
109124
110125 (m) The office may promulgate emergency regulations as necessary to implement this section.
111126
112127 SEC. 2. Section 130066 is added to the Health and Safety Code, to read:130066. Before January 1, 2020, the owner of an acute care inpatient hospital whose building does not substantially comply with the seismic safety regulations or standards described in Section 130065 shall submit to the office an attestation that the board of directors of that hospital is aware that the hospital building is required to meet the January 1, 2030, deadline for substantial compliance with those regulations and standards.
113128
114129 SEC. 2. Section 130066 is added to the Health and Safety Code, to read:
115130
116131 ### SEC. 2.
117132
118133 130066. Before January 1, 2020, the owner of an acute care inpatient hospital whose building does not substantially comply with the seismic safety regulations or standards described in Section 130065 shall submit to the office an attestation that the board of directors of that hospital is aware that the hospital building is required to meet the January 1, 2030, deadline for substantial compliance with those regulations and standards.
119134
120135 130066. Before January 1, 2020, the owner of an acute care inpatient hospital whose building does not substantially comply with the seismic safety regulations or standards described in Section 130065 shall submit to the office an attestation that the board of directors of that hospital is aware that the hospital building is required to meet the January 1, 2030, deadline for substantial compliance with those regulations and standards.
121136
122137 130066. Before January 1, 2020, the owner of an acute care inpatient hospital whose building does not substantially comply with the seismic safety regulations or standards described in Section 130065 shall submit to the office an attestation that the board of directors of that hospital is aware that the hospital building is required to meet the January 1, 2030, deadline for substantial compliance with those regulations and standards.
123138
124139
125140
126141 130066. Before January 1, 2020, the owner of an acute care inpatient hospital whose building does not substantially comply with the seismic safety regulations or standards described in Section 130065 shall submit to the office an attestation that the board of directors of that hospital is aware that the hospital building is required to meet the January 1, 2030, deadline for substantial compliance with those regulations and standards.
127142
128143 SEC. 3. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
129144
130145 SEC. 3. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
131146
132147 SEC. 3. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
133148
134149 ### SEC. 3.