                    CALIFORNIA LEGISLATURE 20172018 REGULAR SESSION Assembly Bill No. 2606Introduced by Assembly Member FongFebruary 15, 2018 An act to amend Sections 25200 and 25205.7 of the Health and Safety Code, relating to hazardous waste. LEGISLATIVE COUNSEL'S DIGESTAB 2606, as introduced, Fong. Hazardous waste: facilities: permits: renewals.Existing law, as part of the hazardous waste control law, requires a facility handling hazardous waste to apply for and obtain a hazardous waste facilities permit from the Department of Toxic Substances Control. Existing law requires that a hazardous waste facilities permit be for a fixed term not to exceed 10 years for certain facilities. Existing law requires the owner or operator of a facility intending to extend the facilitys permit to submit a complete Part A application for a permit renewal before the fixed term of the permit expires and, at any time following the submittal of the Part A application, to submit a complete Part B application, or any portion of that application, and other relevant information, if requested by the department. Existing law requires a person who applies for, or requests, a renewal of an existing hazardous waste facilities permit to enter into a written agreement with the department pursuant to which that person is required to reimburse the department for the costs incurred by the department in processing the renewal application.This bill would deem a hazardous waste facilities permit renewal application approved 90 days after the submission of the application to the department, if the department has not taken action on the application and certain other conditions apply, including that operations at the hazardous waste facility have not changed significantly since the approval of the permit for the preceding term. The bill would impose an unspecified maximum on the amount of reimbursement to the department for the costs incurred by the department in processing an application or responding to a request for the renewal of an existing hazardous waste facilities permit.Digest Key Vote: MAJORITY  Appropriation: NO  Fiscal Committee: YES  Local Program: NO Bill TextThe people of the State of California do enact as follows:SECTION 1. Section 25200 of the Health and Safety Code is amended to read:25200. (a) The department shall issue hazardous waste facilities permits to use and operate one or more hazardous waste management units at a facility that in the judgment of the department meet the building standards published in the State Building Standards Code relating to hazardous waste facilities and the other standards and requirements adopted pursuant to this chapter. The department shall impose conditions on each hazardous waste facilities permit specifying the types of hazardous wastes that may be accepted for transfer, storage, treatment, or disposal. The department may impose any other conditions on a hazardous waste facilities permit that are consistent with the intent of this chapter.(b) The department may impose, as a condition of a hazardous waste facilities permit, a requirement that the owner or operator of a hazardous waste facility that receives hazardous waste from more than one producer comply with any order of the director that prohibits the facility operator from refusing to accept a hazardous waste based on geographical origin that is authorized to be accepted and may be accepted by the facility without extraordinary hazard.(c) (1) (A) Any A hazardous waste facilities permit issued by the department shall be for a fixed term, which shall not exceed 10 years for any land disposal facility, storage facility, incinerator, or other treatment facility.(B) Before the fixed term of a permit expires, the owner or operator of a facility intending to extend the term of the facilitys permit shall submit a complete Part A application for a permit renewal. At any time following the submittal of the Part A application, the owner or operator of a facility shall submit a complete Part B application, or any portion thereof, as well as any other relevant information, as and when requested by the department. To the extent not inconsistent with the federal act, when a complete Part A renewal application, and any other requested information, has been submitted before the end of the permits fixed term, the permit is deemed extended until the renewal application is approved or denied and the owner or operator has exhausted all applicable rights of appeal.(C) This section does not limit or restrict the departments authority to impose any additional or different conditions on an extended permit that are necessary to protect human health and the environment.(D) In adopting new conditions for an extended permit, the department shall follow the applicable permit modification procedures specified in this chapter and the regulations adopted pursuant to this chapter.(E) When prioritizing pending renewal applications for processing and in determining the need for any new conditions on an extended permit, the department shall consider any input received from the public.(2) A hazardous waste facilities permit renewal application shall be deemed approved 90 days after the submission of the application to the department pursuant to subparagraph (B) of paragraph (1), if the department has not taken action on the application and if all of the following apply:(A) Operations at the hazardous waste facility have not changed significantly since the approval of the permit for the preceding term.(B) The hazardous waste facility did not have any significant issues with compliance with this chapter during the preceding term of the permit.(C) The hazardous waste facility was not the subject of any significant public concerns during the preceding term of the permit.(2)(3) The department shall review each hazardous waste facilities permit for a land disposal facility five years after the date of issuance or reissuance, and shall modify the permit, as necessary, to assure ensure that the facility continues to comply with the currently applicable requirements of this chapter and the regulations adopted pursuant to this chapter.(3)(4) This subdivision does not prohibit the department from reviewing, modifying, or revoking a permit at any time during its term.(d) (1) When reviewing any an application for a permit renewal, the department shall consider improvements in the state of control and measurement technology as well as changes in applicable regulations.(2) Each permit issued or renewed under this section shall contain the terms and conditions that the department determines necessary to protect human health and the environment.(e) A permit issued pursuant to the federal act by the Environmental Protection Agency in the state for which no state hazardous waste facilities permit has been issued shall be deemed to be a state permit enforceable by the department until a state permit is issued. In addition to complying with the terms and conditions specified in a federal permit deemed to be a state permit pursuant to this section, an owner or operator who holds that permit shall comply with the requirements of this chapter and the regulations adopted by the department to implement this chapter.SEC. 2. Section 25205.7 of the Health and Safety Code is amended to read:25205.7. (a) (1) A person who applies for, or requests, any of the following shall enter into a written agreement with the department pursuant to which that person shall reimburse the department, pursuant to Article 9.2 (commencing with Section 25206.1), for the costs incurred by the department in processing the application or responding to the request:(A) A new hazardous waste facilities permit, including a standardized permit.(B) A hazardous waste facilities permit for postclosure.(C) A renewal of an existing hazardous waste facilities permit, including a standardized permit or postclosure permit. The amount of a reimbursement to the department pursuant to this subparagraph shall not exceed ____dollars ($____).(D) A class 2 or class 3 modification of an existing hazardous waste facilities permit or grant of interim status, including a standardized permit or grant of interim status or a postclosure permit.(E) A variance.(F) A waste classification determination.(2) An agreement required pursuant to paragraph (1) shall provide for at least 25 percent of the reimbursement to be made in advance of the processing of the application or the response to the request. The 25-percent advance payment shall be based upon the departments total estimated costs of processing the application or response to the request.(3) An agreement entered into pursuant to this section shall, if applicable, include costs of reviewing and overseeing corrective action as set forth in subdivision (b).(b) An applicant pursuant to paragraph (1) of subdivision (a) and the owner and the operator of the facility shall pay the departments costs in reviewing and overseeing any corrective action program described in the application for a standardized permit pursuant to subparagraph (C) of paragraph (2) of subdivision (c) of Section 25201.6 or required pursuant to subdivision (b) of Section 25200.10, and in reviewing and overseeing any corrective action work undertaken at the facility pursuant to that corrective action program.(c) (1) An applicant pursuant to paragraph (1) of subdivision (a) and the owner and the operator of the facility shall, pursuant to Section 21089 of the Public Resources Code, pay all costs incurred by the department for purposes of complying with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), in conjunction with an application or request for any of the activities identified in subdivision (a), including any activities associated with correction action.(2) Paragraph (1) does not apply to projects that are exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).(d) Any reimbursements received pursuant to this section shall be placed in the Hazardous Waste Control Account for appropriation in accordance with Section 25174.(e) Subdivision (a) does not apply to any variance granted pursuant to Article 4 (commencing with Section 66263.40) of Chapter 13 of Division 4.5 of Title 22 of the California Code of Regulations.(f) Subdivision (a) does not apply to any of the following:(1) Any variance issued to a public agency to transport wastes for purposes of operating a household hazardous waste collection facility, or to transport waste from a household hazardous waste collection facility, which receives household hazardous waste or hazardous waste from conditionally exempted small quantity generators pursuant to Article 10.8 (commencing with Section 25218).(2) A permanent household hazardous waste collection facility.(3) Any variance issued to a public agency to conduct a collection program for agricultural wastes.(g) Fees imposed pursuant to this section shall be administered and collected by the department.(h) (1) The changes made in this section by the act that added this subdivision apply to applications and requests submitted to the department on and after April 1, 2016.(2) If, on and after April 1, 2016, an applicant has submitted an application and paid a fee pursuant to subdivision (d), as that subdivision read on April 1, 2016, but before the act that added this subdivision took effect, the department shall determine the difference between the amount paid by the applicant and the amount due pursuant to subdivision (a), and that applicant shall be liable for that amount.(3)Acknowledging a limited period of retroactive application of the elimination of the flat fee option pursuant to this subdivision, the Legislature finds and declares all of the following:(A)The department expends a substantial amount of time and resources in processing permit applications and modifications.(B)The former flat fee option paid by applicants was most often insufficient to cover actual costs to the department in reviewing and processing the applications and modifications.(C)The applicant, being the primary beneficiary of the permit process, in fairness should pay the actual costs of the department in reviewing permit applications and modifications.(D)The amendment to this section during the 201516 Regular Session eliminating the flat fee option and requiring applicants to enter into a written reimbursement agreement with the department is intended to apply to applications and modification requests filed on or after April 1, 2016, in order to remedy this financial inequity and to avoid an influx of the submission of applications to the department before amendment to this section goes into effect.(3)Acknowledging a limited period of retroactive application of the elimination of the flat fee option pursuant to this subdivision, the Legislature finds and declares all of the following:(A)The department expends a substantial amount of time and resources in processing permit applications and modifications.(B)The former flat fee option paid by applicants was most often insufficient to cover actual costs to the department in reviewing and processing the applications and modifications.(C)The applicant, being the primary beneficiary of the permit process, in fairness should pay the actual costs of the department in reviewing permit applications and modifications.(D)The amendment to this section during the 201516 Regular Session eliminating the flat fee option and requiring applicants to enter into a written reimbursement agreement with the department is intended to apply to applications and modification requests filed on or after April 1, 2016, in order to remedy this financial inequity and to avoid an influx of the submission of applications to the department before amendment to this section goes into effect.

 CALIFORNIA LEGISLATURE 20172018 REGULAR SESSION Assembly Bill No. 2606Introduced by Assembly Member FongFebruary 15, 2018 An act to amend Sections 25200 and 25205.7 of the Health and Safety Code, relating to hazardous waste. LEGISLATIVE COUNSEL'S DIGESTAB 2606, as introduced, Fong. Hazardous waste: facilities: permits: renewals.Existing law, as part of the hazardous waste control law, requires a facility handling hazardous waste to apply for and obtain a hazardous waste facilities permit from the Department of Toxic Substances Control. Existing law requires that a hazardous waste facilities permit be for a fixed term not to exceed 10 years for certain facilities. Existing law requires the owner or operator of a facility intending to extend the facilitys permit to submit a complete Part A application for a permit renewal before the fixed term of the permit expires and, at any time following the submittal of the Part A application, to submit a complete Part B application, or any portion of that application, and other relevant information, if requested by the department. Existing law requires a person who applies for, or requests, a renewal of an existing hazardous waste facilities permit to enter into a written agreement with the department pursuant to which that person is required to reimburse the department for the costs incurred by the department in processing the renewal application.This bill would deem a hazardous waste facilities permit renewal application approved 90 days after the submission of the application to the department, if the department has not taken action on the application and certain other conditions apply, including that operations at the hazardous waste facility have not changed significantly since the approval of the permit for the preceding term. The bill would impose an unspecified maximum on the amount of reimbursement to the department for the costs incurred by the department in processing an application or responding to a request for the renewal of an existing hazardous waste facilities permit.Digest Key Vote: MAJORITY  Appropriation: NO  Fiscal Committee: YES  Local Program: NO 





 CALIFORNIA LEGISLATURE 20172018 REGULAR SESSION

Assembly Bill No. 2606

Introduced by Assembly Member FongFebruary 15, 2018

Introduced by Assembly Member Fong
February 15, 2018

 An act to amend Sections 25200 and 25205.7 of the Health and Safety Code, relating to hazardous waste. 

LEGISLATIVE COUNSEL'S DIGEST

## LEGISLATIVE COUNSEL'S DIGEST

AB 2606, as introduced, Fong. Hazardous waste: facilities: permits: renewals.

Existing law, as part of the hazardous waste control law, requires a facility handling hazardous waste to apply for and obtain a hazardous waste facilities permit from the Department of Toxic Substances Control. Existing law requires that a hazardous waste facilities permit be for a fixed term not to exceed 10 years for certain facilities. Existing law requires the owner or operator of a facility intending to extend the facilitys permit to submit a complete Part A application for a permit renewal before the fixed term of the permit expires and, at any time following the submittal of the Part A application, to submit a complete Part B application, or any portion of that application, and other relevant information, if requested by the department. Existing law requires a person who applies for, or requests, a renewal of an existing hazardous waste facilities permit to enter into a written agreement with the department pursuant to which that person is required to reimburse the department for the costs incurred by the department in processing the renewal application.This bill would deem a hazardous waste facilities permit renewal application approved 90 days after the submission of the application to the department, if the department has not taken action on the application and certain other conditions apply, including that operations at the hazardous waste facility have not changed significantly since the approval of the permit for the preceding term. The bill would impose an unspecified maximum on the amount of reimbursement to the department for the costs incurred by the department in processing an application or responding to a request for the renewal of an existing hazardous waste facilities permit.

Existing law, as part of the hazardous waste control law, requires a facility handling hazardous waste to apply for and obtain a hazardous waste facilities permit from the Department of Toxic Substances Control. Existing law requires that a hazardous waste facilities permit be for a fixed term not to exceed 10 years for certain facilities. Existing law requires the owner or operator of a facility intending to extend the facilitys permit to submit a complete Part A application for a permit renewal before the fixed term of the permit expires and, at any time following the submittal of the Part A application, to submit a complete Part B application, or any portion of that application, and other relevant information, if requested by the department. Existing law requires a person who applies for, or requests, a renewal of an existing hazardous waste facilities permit to enter into a written agreement with the department pursuant to which that person is required to reimburse the department for the costs incurred by the department in processing the renewal application.

This bill would deem a hazardous waste facilities permit renewal application approved 90 days after the submission of the application to the department, if the department has not taken action on the application and certain other conditions apply, including that operations at the hazardous waste facility have not changed significantly since the approval of the permit for the preceding term. The bill would impose an unspecified maximum on the amount of reimbursement to the department for the costs incurred by the department in processing an application or responding to a request for the renewal of an existing hazardous waste facilities permit.

## Digest Key

## Bill Text

The people of the State of California do enact as follows:SECTION 1. Section 25200 of the Health and Safety Code is amended to read:25200. (a) The department shall issue hazardous waste facilities permits to use and operate one or more hazardous waste management units at a facility that in the judgment of the department meet the building standards published in the State Building Standards Code relating to hazardous waste facilities and the other standards and requirements adopted pursuant to this chapter. The department shall impose conditions on each hazardous waste facilities permit specifying the types of hazardous wastes that may be accepted for transfer, storage, treatment, or disposal. The department may impose any other conditions on a hazardous waste facilities permit that are consistent with the intent of this chapter.(b) The department may impose, as a condition of a hazardous waste facilities permit, a requirement that the owner or operator of a hazardous waste facility that receives hazardous waste from more than one producer comply with any order of the director that prohibits the facility operator from refusing to accept a hazardous waste based on geographical origin that is authorized to be accepted and may be accepted by the facility without extraordinary hazard.(c) (1) (A) Any A hazardous waste facilities permit issued by the department shall be for a fixed term, which shall not exceed 10 years for any land disposal facility, storage facility, incinerator, or other treatment facility.(B) Before the fixed term of a permit expires, the owner or operator of a facility intending to extend the term of the facilitys permit shall submit a complete Part A application for a permit renewal. At any time following the submittal of the Part A application, the owner or operator of a facility shall submit a complete Part B application, or any portion thereof, as well as any other relevant information, as and when requested by the department. To the extent not inconsistent with the federal act, when a complete Part A renewal application, and any other requested information, has been submitted before the end of the permits fixed term, the permit is deemed extended until the renewal application is approved or denied and the owner or operator has exhausted all applicable rights of appeal.(C) This section does not limit or restrict the departments authority to impose any additional or different conditions on an extended permit that are necessary to protect human health and the environment.(D) In adopting new conditions for an extended permit, the department shall follow the applicable permit modification procedures specified in this chapter and the regulations adopted pursuant to this chapter.(E) When prioritizing pending renewal applications for processing and in determining the need for any new conditions on an extended permit, the department shall consider any input received from the public.(2) A hazardous waste facilities permit renewal application shall be deemed approved 90 days after the submission of the application to the department pursuant to subparagraph (B) of paragraph (1), if the department has not taken action on the application and if all of the following apply:(A) Operations at the hazardous waste facility have not changed significantly since the approval of the permit for the preceding term.(B) The hazardous waste facility did not have any significant issues with compliance with this chapter during the preceding term of the permit.(C) The hazardous waste facility was not the subject of any significant public concerns during the preceding term of the permit.(2)(3) The department shall review each hazardous waste facilities permit for a land disposal facility five years after the date of issuance or reissuance, and shall modify the permit, as necessary, to assure ensure that the facility continues to comply with the currently applicable requirements of this chapter and the regulations adopted pursuant to this chapter.(3)(4) This subdivision does not prohibit the department from reviewing, modifying, or revoking a permit at any time during its term.(d) (1) When reviewing any an application for a permit renewal, the department shall consider improvements in the state of control and measurement technology as well as changes in applicable regulations.(2) Each permit issued or renewed under this section shall contain the terms and conditions that the department determines necessary to protect human health and the environment.(e) A permit issued pursuant to the federal act by the Environmental Protection Agency in the state for which no state hazardous waste facilities permit has been issued shall be deemed to be a state permit enforceable by the department until a state permit is issued. In addition to complying with the terms and conditions specified in a federal permit deemed to be a state permit pursuant to this section, an owner or operator who holds that permit shall comply with the requirements of this chapter and the regulations adopted by the department to implement this chapter.SEC. 2. Section 25205.7 of the Health and Safety Code is amended to read:25205.7. (a) (1) A person who applies for, or requests, any of the following shall enter into a written agreement with the department pursuant to which that person shall reimburse the department, pursuant to Article 9.2 (commencing with Section 25206.1), for the costs incurred by the department in processing the application or responding to the request:(A) A new hazardous waste facilities permit, including a standardized permit.(B) A hazardous waste facilities permit for postclosure.(C) A renewal of an existing hazardous waste facilities permit, including a standardized permit or postclosure permit. The amount of a reimbursement to the department pursuant to this subparagraph shall not exceed ____dollars ($____).(D) A class 2 or class 3 modification of an existing hazardous waste facilities permit or grant of interim status, including a standardized permit or grant of interim status or a postclosure permit.(E) A variance.(F) A waste classification determination.(2) An agreement required pursuant to paragraph (1) shall provide for at least 25 percent of the reimbursement to be made in advance of the processing of the application or the response to the request. The 25-percent advance payment shall be based upon the departments total estimated costs of processing the application or response to the request.(3) An agreement entered into pursuant to this section shall, if applicable, include costs of reviewing and overseeing corrective action as set forth in subdivision (b).(b) An applicant pursuant to paragraph (1) of subdivision (a) and the owner and the operator of the facility shall pay the departments costs in reviewing and overseeing any corrective action program described in the application for a standardized permit pursuant to subparagraph (C) of paragraph (2) of subdivision (c) of Section 25201.6 or required pursuant to subdivision (b) of Section 25200.10, and in reviewing and overseeing any corrective action work undertaken at the facility pursuant to that corrective action program.(c) (1) An applicant pursuant to paragraph (1) of subdivision (a) and the owner and the operator of the facility shall, pursuant to Section 21089 of the Public Resources Code, pay all costs incurred by the department for purposes of complying with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), in conjunction with an application or request for any of the activities identified in subdivision (a), including any activities associated with correction action.(2) Paragraph (1) does not apply to projects that are exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).(d) Any reimbursements received pursuant to this section shall be placed in the Hazardous Waste Control Account for appropriation in accordance with Section 25174.(e) Subdivision (a) does not apply to any variance granted pursuant to Article 4 (commencing with Section 66263.40) of Chapter 13 of Division 4.5 of Title 22 of the California Code of Regulations.(f) Subdivision (a) does not apply to any of the following:(1) Any variance issued to a public agency to transport wastes for purposes of operating a household hazardous waste collection facility, or to transport waste from a household hazardous waste collection facility, which receives household hazardous waste or hazardous waste from conditionally exempted small quantity generators pursuant to Article 10.8 (commencing with Section 25218).(2) A permanent household hazardous waste collection facility.(3) Any variance issued to a public agency to conduct a collection program for agricultural wastes.(g) Fees imposed pursuant to this section shall be administered and collected by the department.(h) (1) The changes made in this section by the act that added this subdivision apply to applications and requests submitted to the department on and after April 1, 2016.(2) If, on and after April 1, 2016, an applicant has submitted an application and paid a fee pursuant to subdivision (d), as that subdivision read on April 1, 2016, but before the act that added this subdivision took effect, the department shall determine the difference between the amount paid by the applicant and the amount due pursuant to subdivision (a), and that applicant shall be liable for that amount.(3)Acknowledging a limited period of retroactive application of the elimination of the flat fee option pursuant to this subdivision, the Legislature finds and declares all of the following:(A)The department expends a substantial amount of time and resources in processing permit applications and modifications.(B)The former flat fee option paid by applicants was most often insufficient to cover actual costs to the department in reviewing and processing the applications and modifications.(C)The applicant, being the primary beneficiary of the permit process, in fairness should pay the actual costs of the department in reviewing permit applications and modifications.(D)The amendment to this section during the 201516 Regular Session eliminating the flat fee option and requiring applicants to enter into a written reimbursement agreement with the department is intended to apply to applications and modification requests filed on or after April 1, 2016, in order to remedy this financial inequity and to avoid an influx of the submission of applications to the department before amendment to this section goes into effect.(3)Acknowledging a limited period of retroactive application of the elimination of the flat fee option pursuant to this subdivision, the Legislature finds and declares all of the following:(A)The department expends a substantial amount of time and resources in processing permit applications and modifications.(B)The former flat fee option paid by applicants was most often insufficient to cover actual costs to the department in reviewing and processing the applications and modifications.(C)The applicant, being the primary beneficiary of the permit process, in fairness should pay the actual costs of the department in reviewing permit applications and modifications.(D)The amendment to this section during the 201516 Regular Session eliminating the flat fee option and requiring applicants to enter into a written reimbursement agreement with the department is intended to apply to applications and modification requests filed on or after April 1, 2016, in order to remedy this financial inequity and to avoid an influx of the submission of applications to the department before amendment to this section goes into effect.

The people of the State of California do enact as follows:

## The people of the State of California do enact as follows:

SECTION 1. Section 25200 of the Health and Safety Code is amended to read:25200. (a) The department shall issue hazardous waste facilities permits to use and operate one or more hazardous waste management units at a facility that in the judgment of the department meet the building standards published in the State Building Standards Code relating to hazardous waste facilities and the other standards and requirements adopted pursuant to this chapter. The department shall impose conditions on each hazardous waste facilities permit specifying the types of hazardous wastes that may be accepted for transfer, storage, treatment, or disposal. The department may impose any other conditions on a hazardous waste facilities permit that are consistent with the intent of this chapter.(b) The department may impose, as a condition of a hazardous waste facilities permit, a requirement that the owner or operator of a hazardous waste facility that receives hazardous waste from more than one producer comply with any order of the director that prohibits the facility operator from refusing to accept a hazardous waste based on geographical origin that is authorized to be accepted and may be accepted by the facility without extraordinary hazard.(c) (1) (A) Any A hazardous waste facilities permit issued by the department shall be for a fixed term, which shall not exceed 10 years for any land disposal facility, storage facility, incinerator, or other treatment facility.(B) Before the fixed term of a permit expires, the owner or operator of a facility intending to extend the term of the facilitys permit shall submit a complete Part A application for a permit renewal. At any time following the submittal of the Part A application, the owner or operator of a facility shall submit a complete Part B application, or any portion thereof, as well as any other relevant information, as and when requested by the department. To the extent not inconsistent with the federal act, when a complete Part A renewal application, and any other requested information, has been submitted before the end of the permits fixed term, the permit is deemed extended until the renewal application is approved or denied and the owner or operator has exhausted all applicable rights of appeal.(C) This section does not limit or restrict the departments authority to impose any additional or different conditions on an extended permit that are necessary to protect human health and the environment.(D) In adopting new conditions for an extended permit, the department shall follow the applicable permit modification procedures specified in this chapter and the regulations adopted pursuant to this chapter.(E) When prioritizing pending renewal applications for processing and in determining the need for any new conditions on an extended permit, the department shall consider any input received from the public.(2) A hazardous waste facilities permit renewal application shall be deemed approved 90 days after the submission of the application to the department pursuant to subparagraph (B) of paragraph (1), if the department has not taken action on the application and if all of the following apply:(A) Operations at the hazardous waste facility have not changed significantly since the approval of the permit for the preceding term.(B) The hazardous waste facility did not have any significant issues with compliance with this chapter during the preceding term of the permit.(C) The hazardous waste facility was not the subject of any significant public concerns during the preceding term of the permit.(2)(3) The department shall review each hazardous waste facilities permit for a land disposal facility five years after the date of issuance or reissuance, and shall modify the permit, as necessary, to assure ensure that the facility continues to comply with the currently applicable requirements of this chapter and the regulations adopted pursuant to this chapter.(3)(4) This subdivision does not prohibit the department from reviewing, modifying, or revoking a permit at any time during its term.(d) (1) When reviewing any an application for a permit renewal, the department shall consider improvements in the state of control and measurement technology as well as changes in applicable regulations.(2) Each permit issued or renewed under this section shall contain the terms and conditions that the department determines necessary to protect human health and the environment.(e) A permit issued pursuant to the federal act by the Environmental Protection Agency in the state for which no state hazardous waste facilities permit has been issued shall be deemed to be a state permit enforceable by the department until a state permit is issued. In addition to complying with the terms and conditions specified in a federal permit deemed to be a state permit pursuant to this section, an owner or operator who holds that permit shall comply with the requirements of this chapter and the regulations adopted by the department to implement this chapter.

SECTION 1. Section 25200 of the Health and Safety Code is amended to read:

### SECTION 1.

25200. (a) The department shall issue hazardous waste facilities permits to use and operate one or more hazardous waste management units at a facility that in the judgment of the department meet the building standards published in the State Building Standards Code relating to hazardous waste facilities and the other standards and requirements adopted pursuant to this chapter. The department shall impose conditions on each hazardous waste facilities permit specifying the types of hazardous wastes that may be accepted for transfer, storage, treatment, or disposal. The department may impose any other conditions on a hazardous waste facilities permit that are consistent with the intent of this chapter.(b) The department may impose, as a condition of a hazardous waste facilities permit, a requirement that the owner or operator of a hazardous waste facility that receives hazardous waste from more than one producer comply with any order of the director that prohibits the facility operator from refusing to accept a hazardous waste based on geographical origin that is authorized to be accepted and may be accepted by the facility without extraordinary hazard.(c) (1) (A) Any A hazardous waste facilities permit issued by the department shall be for a fixed term, which shall not exceed 10 years for any land disposal facility, storage facility, incinerator, or other treatment facility.(B) Before the fixed term of a permit expires, the owner or operator of a facility intending to extend the term of the facilitys permit shall submit a complete Part A application for a permit renewal. At any time following the submittal of the Part A application, the owner or operator of a facility shall submit a complete Part B application, or any portion thereof, as well as any other relevant information, as and when requested by the department. To the extent not inconsistent with the federal act, when a complete Part A renewal application, and any other requested information, has been submitted before the end of the permits fixed term, the permit is deemed extended until the renewal application is approved or denied and the owner or operator has exhausted all applicable rights of appeal.(C) This section does not limit or restrict the departments authority to impose any additional or different conditions on an extended permit that are necessary to protect human health and the environment.(D) In adopting new conditions for an extended permit, the department shall follow the applicable permit modification procedures specified in this chapter and the regulations adopted pursuant to this chapter.(E) When prioritizing pending renewal applications for processing and in determining the need for any new conditions on an extended permit, the department shall consider any input received from the public.(2) A hazardous waste facilities permit renewal application shall be deemed approved 90 days after the submission of the application to the department pursuant to subparagraph (B) of paragraph (1), if the department has not taken action on the application and if all of the following apply:(A) Operations at the hazardous waste facility have not changed significantly since the approval of the permit for the preceding term.(B) The hazardous waste facility did not have any significant issues with compliance with this chapter during the preceding term of the permit.(C) The hazardous waste facility was not the subject of any significant public concerns during the preceding term of the permit.(2)(3) The department shall review each hazardous waste facilities permit for a land disposal facility five years after the date of issuance or reissuance, and shall modify the permit, as necessary, to assure ensure that the facility continues to comply with the currently applicable requirements of this chapter and the regulations adopted pursuant to this chapter.(3)(4) This subdivision does not prohibit the department from reviewing, modifying, or revoking a permit at any time during its term.(d) (1) When reviewing any an application for a permit renewal, the department shall consider improvements in the state of control and measurement technology as well as changes in applicable regulations.(2) Each permit issued or renewed under this section shall contain the terms and conditions that the department determines necessary to protect human health and the environment.(e) A permit issued pursuant to the federal act by the Environmental Protection Agency in the state for which no state hazardous waste facilities permit has been issued shall be deemed to be a state permit enforceable by the department until a state permit is issued. In addition to complying with the terms and conditions specified in a federal permit deemed to be a state permit pursuant to this section, an owner or operator who holds that permit shall comply with the requirements of this chapter and the regulations adopted by the department to implement this chapter.

25200. (a) The department shall issue hazardous waste facilities permits to use and operate one or more hazardous waste management units at a facility that in the judgment of the department meet the building standards published in the State Building Standards Code relating to hazardous waste facilities and the other standards and requirements adopted pursuant to this chapter. The department shall impose conditions on each hazardous waste facilities permit specifying the types of hazardous wastes that may be accepted for transfer, storage, treatment, or disposal. The department may impose any other conditions on a hazardous waste facilities permit that are consistent with the intent of this chapter.(b) The department may impose, as a condition of a hazardous waste facilities permit, a requirement that the owner or operator of a hazardous waste facility that receives hazardous waste from more than one producer comply with any order of the director that prohibits the facility operator from refusing to accept a hazardous waste based on geographical origin that is authorized to be accepted and may be accepted by the facility without extraordinary hazard.(c) (1) (A) Any A hazardous waste facilities permit issued by the department shall be for a fixed term, which shall not exceed 10 years for any land disposal facility, storage facility, incinerator, or other treatment facility.(B) Before the fixed term of a permit expires, the owner or operator of a facility intending to extend the term of the facilitys permit shall submit a complete Part A application for a permit renewal. At any time following the submittal of the Part A application, the owner or operator of a facility shall submit a complete Part B application, or any portion thereof, as well as any other relevant information, as and when requested by the department. To the extent not inconsistent with the federal act, when a complete Part A renewal application, and any other requested information, has been submitted before the end of the permits fixed term, the permit is deemed extended until the renewal application is approved or denied and the owner or operator has exhausted all applicable rights of appeal.(C) This section does not limit or restrict the departments authority to impose any additional or different conditions on an extended permit that are necessary to protect human health and the environment.(D) In adopting new conditions for an extended permit, the department shall follow the applicable permit modification procedures specified in this chapter and the regulations adopted pursuant to this chapter.(E) When prioritizing pending renewal applications for processing and in determining the need for any new conditions on an extended permit, the department shall consider any input received from the public.(2) A hazardous waste facilities permit renewal application shall be deemed approved 90 days after the submission of the application to the department pursuant to subparagraph (B) of paragraph (1), if the department has not taken action on the application and if all of the following apply:(A) Operations at the hazardous waste facility have not changed significantly since the approval of the permit for the preceding term.(B) The hazardous waste facility did not have any significant issues with compliance with this chapter during the preceding term of the permit.(C) The hazardous waste facility was not the subject of any significant public concerns during the preceding term of the permit.(2)(3) The department shall review each hazardous waste facilities permit for a land disposal facility five years after the date of issuance or reissuance, and shall modify the permit, as necessary, to assure ensure that the facility continues to comply with the currently applicable requirements of this chapter and the regulations adopted pursuant to this chapter.(3)(4) This subdivision does not prohibit the department from reviewing, modifying, or revoking a permit at any time during its term.(d) (1) When reviewing any an application for a permit renewal, the department shall consider improvements in the state of control and measurement technology as well as changes in applicable regulations.(2) Each permit issued or renewed under this section shall contain the terms and conditions that the department determines necessary to protect human health and the environment.(e) A permit issued pursuant to the federal act by the Environmental Protection Agency in the state for which no state hazardous waste facilities permit has been issued shall be deemed to be a state permit enforceable by the department until a state permit is issued. In addition to complying with the terms and conditions specified in a federal permit deemed to be a state permit pursuant to this section, an owner or operator who holds that permit shall comply with the requirements of this chapter and the regulations adopted by the department to implement this chapter.

25200. (a) The department shall issue hazardous waste facilities permits to use and operate one or more hazardous waste management units at a facility that in the judgment of the department meet the building standards published in the State Building Standards Code relating to hazardous waste facilities and the other standards and requirements adopted pursuant to this chapter. The department shall impose conditions on each hazardous waste facilities permit specifying the types of hazardous wastes that may be accepted for transfer, storage, treatment, or disposal. The department may impose any other conditions on a hazardous waste facilities permit that are consistent with the intent of this chapter.(b) The department may impose, as a condition of a hazardous waste facilities permit, a requirement that the owner or operator of a hazardous waste facility that receives hazardous waste from more than one producer comply with any order of the director that prohibits the facility operator from refusing to accept a hazardous waste based on geographical origin that is authorized to be accepted and may be accepted by the facility without extraordinary hazard.(c) (1) (A) Any A hazardous waste facilities permit issued by the department shall be for a fixed term, which shall not exceed 10 years for any land disposal facility, storage facility, incinerator, or other treatment facility.(B) Before the fixed term of a permit expires, the owner or operator of a facility intending to extend the term of the facilitys permit shall submit a complete Part A application for a permit renewal. At any time following the submittal of the Part A application, the owner or operator of a facility shall submit a complete Part B application, or any portion thereof, as well as any other relevant information, as and when requested by the department. To the extent not inconsistent with the federal act, when a complete Part A renewal application, and any other requested information, has been submitted before the end of the permits fixed term, the permit is deemed extended until the renewal application is approved or denied and the owner or operator has exhausted all applicable rights of appeal.(C) This section does not limit or restrict the departments authority to impose any additional or different conditions on an extended permit that are necessary to protect human health and the environment.(D) In adopting new conditions for an extended permit, the department shall follow the applicable permit modification procedures specified in this chapter and the regulations adopted pursuant to this chapter.(E) When prioritizing pending renewal applications for processing and in determining the need for any new conditions on an extended permit, the department shall consider any input received from the public.(2) A hazardous waste facilities permit renewal application shall be deemed approved 90 days after the submission of the application to the department pursuant to subparagraph (B) of paragraph (1), if the department has not taken action on the application and if all of the following apply:(A) Operations at the hazardous waste facility have not changed significantly since the approval of the permit for the preceding term.(B) The hazardous waste facility did not have any significant issues with compliance with this chapter during the preceding term of the permit.(C) The hazardous waste facility was not the subject of any significant public concerns during the preceding term of the permit.(2)(3) The department shall review each hazardous waste facilities permit for a land disposal facility five years after the date of issuance or reissuance, and shall modify the permit, as necessary, to assure ensure that the facility continues to comply with the currently applicable requirements of this chapter and the regulations adopted pursuant to this chapter.(3)(4) This subdivision does not prohibit the department from reviewing, modifying, or revoking a permit at any time during its term.(d) (1) When reviewing any an application for a permit renewal, the department shall consider improvements in the state of control and measurement technology as well as changes in applicable regulations.(2) Each permit issued or renewed under this section shall contain the terms and conditions that the department determines necessary to protect human health and the environment.(e) A permit issued pursuant to the federal act by the Environmental Protection Agency in the state for which no state hazardous waste facilities permit has been issued shall be deemed to be a state permit enforceable by the department until a state permit is issued. In addition to complying with the terms and conditions specified in a federal permit deemed to be a state permit pursuant to this section, an owner or operator who holds that permit shall comply with the requirements of this chapter and the regulations adopted by the department to implement this chapter.



25200. (a) The department shall issue hazardous waste facilities permits to use and operate one or more hazardous waste management units at a facility that in the judgment of the department meet the building standards published in the State Building Standards Code relating to hazardous waste facilities and the other standards and requirements adopted pursuant to this chapter. The department shall impose conditions on each hazardous waste facilities permit specifying the types of hazardous wastes that may be accepted for transfer, storage, treatment, or disposal. The department may impose any other conditions on a hazardous waste facilities permit that are consistent with the intent of this chapter.

(b) The department may impose, as a condition of a hazardous waste facilities permit, a requirement that the owner or operator of a hazardous waste facility that receives hazardous waste from more than one producer comply with any order of the director that prohibits the facility operator from refusing to accept a hazardous waste based on geographical origin that is authorized to be accepted and may be accepted by the facility without extraordinary hazard.

(c) (1) (A) Any A hazardous waste facilities permit issued by the department shall be for a fixed term, which shall not exceed 10 years for any land disposal facility, storage facility, incinerator, or other treatment facility.

(B) Before the fixed term of a permit expires, the owner or operator of a facility intending to extend the term of the facilitys permit shall submit a complete Part A application for a permit renewal. At any time following the submittal of the Part A application, the owner or operator of a facility shall submit a complete Part B application, or any portion thereof, as well as any other relevant information, as and when requested by the department. To the extent not inconsistent with the federal act, when a complete Part A renewal application, and any other requested information, has been submitted before the end of the permits fixed term, the permit is deemed extended until the renewal application is approved or denied and the owner or operator has exhausted all applicable rights of appeal.

(C) This section does not limit or restrict the departments authority to impose any additional or different conditions on an extended permit that are necessary to protect human health and the environment.

(D) In adopting new conditions for an extended permit, the department shall follow the applicable permit modification procedures specified in this chapter and the regulations adopted pursuant to this chapter.

(E) When prioritizing pending renewal applications for processing and in determining the need for any new conditions on an extended permit, the department shall consider any input received from the public.

(2) A hazardous waste facilities permit renewal application shall be deemed approved 90 days after the submission of the application to the department pursuant to subparagraph (B) of paragraph (1), if the department has not taken action on the application and if all of the following apply:

(A) Operations at the hazardous waste facility have not changed significantly since the approval of the permit for the preceding term.

(B) The hazardous waste facility did not have any significant issues with compliance with this chapter during the preceding term of the permit.

(C) The hazardous waste facility was not the subject of any significant public concerns during the preceding term of the permit.

(2)



(3) The department shall review each hazardous waste facilities permit for a land disposal facility five years after the date of issuance or reissuance, and shall modify the permit, as necessary, to assure ensure that the facility continues to comply with the currently applicable requirements of this chapter and the regulations adopted pursuant to this chapter.

(3)



(4) This subdivision does not prohibit the department from reviewing, modifying, or revoking a permit at any time during its term.

(d) (1) When reviewing any an application for a permit renewal, the department shall consider improvements in the state of control and measurement technology as well as changes in applicable regulations.

(2) Each permit issued or renewed under this section shall contain the terms and conditions that the department determines necessary to protect human health and the environment.

(e) A permit issued pursuant to the federal act by the Environmental Protection Agency in the state for which no state hazardous waste facilities permit has been issued shall be deemed to be a state permit enforceable by the department until a state permit is issued. In addition to complying with the terms and conditions specified in a federal permit deemed to be a state permit pursuant to this section, an owner or operator who holds that permit shall comply with the requirements of this chapter and the regulations adopted by the department to implement this chapter.

SEC. 2. Section 25205.7 of the Health and Safety Code is amended to read:25205.7. (a) (1) A person who applies for, or requests, any of the following shall enter into a written agreement with the department pursuant to which that person shall reimburse the department, pursuant to Article 9.2 (commencing with Section 25206.1), for the costs incurred by the department in processing the application or responding to the request:(A) A new hazardous waste facilities permit, including a standardized permit.(B) A hazardous waste facilities permit for postclosure.(C) A renewal of an existing hazardous waste facilities permit, including a standardized permit or postclosure permit. The amount of a reimbursement to the department pursuant to this subparagraph shall not exceed ____dollars ($____).(D) A class 2 or class 3 modification of an existing hazardous waste facilities permit or grant of interim status, including a standardized permit or grant of interim status or a postclosure permit.(E) A variance.(F) A waste classification determination.(2) An agreement required pursuant to paragraph (1) shall provide for at least 25 percent of the reimbursement to be made in advance of the processing of the application or the response to the request. The 25-percent advance payment shall be based upon the departments total estimated costs of processing the application or response to the request.(3) An agreement entered into pursuant to this section shall, if applicable, include costs of reviewing and overseeing corrective action as set forth in subdivision (b).(b) An applicant pursuant to paragraph (1) of subdivision (a) and the owner and the operator of the facility shall pay the departments costs in reviewing and overseeing any corrective action program described in the application for a standardized permit pursuant to subparagraph (C) of paragraph (2) of subdivision (c) of Section 25201.6 or required pursuant to subdivision (b) of Section 25200.10, and in reviewing and overseeing any corrective action work undertaken at the facility pursuant to that corrective action program.(c) (1) An applicant pursuant to paragraph (1) of subdivision (a) and the owner and the operator of the facility shall, pursuant to Section 21089 of the Public Resources Code, pay all costs incurred by the department for purposes of complying with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), in conjunction with an application or request for any of the activities identified in subdivision (a), including any activities associated with correction action.(2) Paragraph (1) does not apply to projects that are exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).(d) Any reimbursements received pursuant to this section shall be placed in the Hazardous Waste Control Account for appropriation in accordance with Section 25174.(e) Subdivision (a) does not apply to any variance granted pursuant to Article 4 (commencing with Section 66263.40) of Chapter 13 of Division 4.5 of Title 22 of the California Code of Regulations.(f) Subdivision (a) does not apply to any of the following:(1) Any variance issued to a public agency to transport wastes for purposes of operating a household hazardous waste collection facility, or to transport waste from a household hazardous waste collection facility, which receives household hazardous waste or hazardous waste from conditionally exempted small quantity generators pursuant to Article 10.8 (commencing with Section 25218).(2) A permanent household hazardous waste collection facility.(3) Any variance issued to a public agency to conduct a collection program for agricultural wastes.(g) Fees imposed pursuant to this section shall be administered and collected by the department.(h) (1) The changes made in this section by the act that added this subdivision apply to applications and requests submitted to the department on and after April 1, 2016.(2) If, on and after April 1, 2016, an applicant has submitted an application and paid a fee pursuant to subdivision (d), as that subdivision read on April 1, 2016, but before the act that added this subdivision took effect, the department shall determine the difference between the amount paid by the applicant and the amount due pursuant to subdivision (a), and that applicant shall be liable for that amount.(3)Acknowledging a limited period of retroactive application of the elimination of the flat fee option pursuant to this subdivision, the Legislature finds and declares all of the following:(A)The department expends a substantial amount of time and resources in processing permit applications and modifications.(B)The former flat fee option paid by applicants was most often insufficient to cover actual costs to the department in reviewing and processing the applications and modifications.(C)The applicant, being the primary beneficiary of the permit process, in fairness should pay the actual costs of the department in reviewing permit applications and modifications.(D)The amendment to this section during the 201516 Regular Session eliminating the flat fee option and requiring applicants to enter into a written reimbursement agreement with the department is intended to apply to applications and modification requests filed on or after April 1, 2016, in order to remedy this financial inequity and to avoid an influx of the submission of applications to the department before amendment to this section goes into effect.(3)Acknowledging a limited period of retroactive application of the elimination of the flat fee option pursuant to this subdivision, the Legislature finds and declares all of the following:(A)The department expends a substantial amount of time and resources in processing permit applications and modifications.(B)The former flat fee option paid by applicants was most often insufficient to cover actual costs to the department in reviewing and processing the applications and modifications.(C)The applicant, being the primary beneficiary of the permit process, in fairness should pay the actual costs of the department in reviewing permit applications and modifications.(D)The amendment to this section during the 201516 Regular Session eliminating the flat fee option and requiring applicants to enter into a written reimbursement agreement with the department is intended to apply to applications and modification requests filed on or after April 1, 2016, in order to remedy this financial inequity and to avoid an influx of the submission of applications to the department before amendment to this section goes into effect.

SEC. 2. Section 25205.7 of the Health and Safety Code is amended to read:

### SEC. 2.

25205.7. (a) (1) A person who applies for, or requests, any of the following shall enter into a written agreement with the department pursuant to which that person shall reimburse the department, pursuant to Article 9.2 (commencing with Section 25206.1), for the costs incurred by the department in processing the application or responding to the request:(A) A new hazardous waste facilities permit, including a standardized permit.(B) A hazardous waste facilities permit for postclosure.(C) A renewal of an existing hazardous waste facilities permit, including a standardized permit or postclosure permit. The amount of a reimbursement to the department pursuant to this subparagraph shall not exceed ____dollars ($____).(D) A class 2 or class 3 modification of an existing hazardous waste facilities permit or grant of interim status, including a standardized permit or grant of interim status or a postclosure permit.(E) A variance.(F) A waste classification determination.(2) An agreement required pursuant to paragraph (1) shall provide for at least 25 percent of the reimbursement to be made in advance of the processing of the application or the response to the request. The 25-percent advance payment shall be based upon the departments total estimated costs of processing the application or response to the request.(3) An agreement entered into pursuant to this section shall, if applicable, include costs of reviewing and overseeing corrective action as set forth in subdivision (b).(b) An applicant pursuant to paragraph (1) of subdivision (a) and the owner and the operator of the facility shall pay the departments costs in reviewing and overseeing any corrective action program described in the application for a standardized permit pursuant to subparagraph (C) of paragraph (2) of subdivision (c) of Section 25201.6 or required pursuant to subdivision (b) of Section 25200.10, and in reviewing and overseeing any corrective action work undertaken at the facility pursuant to that corrective action program.(c) (1) An applicant pursuant to paragraph (1) of subdivision (a) and the owner and the operator of the facility shall, pursuant to Section 21089 of the Public Resources Code, pay all costs incurred by the department for purposes of complying with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), in conjunction with an application or request for any of the activities identified in subdivision (a), including any activities associated with correction action.(2) Paragraph (1) does not apply to projects that are exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).(d) Any reimbursements received pursuant to this section shall be placed in the Hazardous Waste Control Account for appropriation in accordance with Section 25174.(e) Subdivision (a) does not apply to any variance granted pursuant to Article 4 (commencing with Section 66263.40) of Chapter 13 of Division 4.5 of Title 22 of the California Code of Regulations.(f) Subdivision (a) does not apply to any of the following:(1) Any variance issued to a public agency to transport wastes for purposes of operating a household hazardous waste collection facility, or to transport waste from a household hazardous waste collection facility, which receives household hazardous waste or hazardous waste from conditionally exempted small quantity generators pursuant to Article 10.8 (commencing with Section 25218).(2) A permanent household hazardous waste collection facility.(3) Any variance issued to a public agency to conduct a collection program for agricultural wastes.(g) Fees imposed pursuant to this section shall be administered and collected by the department.(h) (1) The changes made in this section by the act that added this subdivision apply to applications and requests submitted to the department on and after April 1, 2016.(2) If, on and after April 1, 2016, an applicant has submitted an application and paid a fee pursuant to subdivision (d), as that subdivision read on April 1, 2016, but before the act that added this subdivision took effect, the department shall determine the difference between the amount paid by the applicant and the amount due pursuant to subdivision (a), and that applicant shall be liable for that amount.(3)Acknowledging a limited period of retroactive application of the elimination of the flat fee option pursuant to this subdivision, the Legislature finds and declares all of the following:(A)The department expends a substantial amount of time and resources in processing permit applications and modifications.(B)The former flat fee option paid by applicants was most often insufficient to cover actual costs to the department in reviewing and processing the applications and modifications.(C)The applicant, being the primary beneficiary of the permit process, in fairness should pay the actual costs of the department in reviewing permit applications and modifications.(D)The amendment to this section during the 201516 Regular Session eliminating the flat fee option and requiring applicants to enter into a written reimbursement agreement with the department is intended to apply to applications and modification requests filed on or after April 1, 2016, in order to remedy this financial inequity and to avoid an influx of the submission of applications to the department before amendment to this section goes into effect.(3)Acknowledging a limited period of retroactive application of the elimination of the flat fee option pursuant to this subdivision, the Legislature finds and declares all of the following:(A)The department expends a substantial amount of time and resources in processing permit applications and modifications.(B)The former flat fee option paid by applicants was most often insufficient to cover actual costs to the department in reviewing and processing the applications and modifications.(C)The applicant, being the primary beneficiary of the permit process, in fairness should pay the actual costs of the department in reviewing permit applications and modifications.(D)The amendment to this section during the 201516 Regular Session eliminating the flat fee option and requiring applicants to enter into a written reimbursement agreement with the department is intended to apply to applications and modification requests filed on or after April 1, 2016, in order to remedy this financial inequity and to avoid an influx of the submission of applications to the department before amendment to this section goes into effect.

25205.7. (a) (1) A person who applies for, or requests, any of the following shall enter into a written agreement with the department pursuant to which that person shall reimburse the department, pursuant to Article 9.2 (commencing with Section 25206.1), for the costs incurred by the department in processing the application or responding to the request:(A) A new hazardous waste facilities permit, including a standardized permit.(B) A hazardous waste facilities permit for postclosure.(C) A renewal of an existing hazardous waste facilities permit, including a standardized permit or postclosure permit. The amount of a reimbursement to the department pursuant to this subparagraph shall not exceed ____dollars ($____).(D) A class 2 or class 3 modification of an existing hazardous waste facilities permit or grant of interim status, including a standardized permit or grant of interim status or a postclosure permit.(E) A variance.(F) A waste classification determination.(2) An agreement required pursuant to paragraph (1) shall provide for at least 25 percent of the reimbursement to be made in advance of the processing of the application or the response to the request. The 25-percent advance payment shall be based upon the departments total estimated costs of processing the application or response to the request.(3) An agreement entered into pursuant to this section shall, if applicable, include costs of reviewing and overseeing corrective action as set forth in subdivision (b).(b) An applicant pursuant to paragraph (1) of subdivision (a) and the owner and the operator of the facility shall pay the departments costs in reviewing and overseeing any corrective action program described in the application for a standardized permit pursuant to subparagraph (C) of paragraph (2) of subdivision (c) of Section 25201.6 or required pursuant to subdivision (b) of Section 25200.10, and in reviewing and overseeing any corrective action work undertaken at the facility pursuant to that corrective action program.(c) (1) An applicant pursuant to paragraph (1) of subdivision (a) and the owner and the operator of the facility shall, pursuant to Section 21089 of the Public Resources Code, pay all costs incurred by the department for purposes of complying with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), in conjunction with an application or request for any of the activities identified in subdivision (a), including any activities associated with correction action.(2) Paragraph (1) does not apply to projects that are exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).(d) Any reimbursements received pursuant to this section shall be placed in the Hazardous Waste Control Account for appropriation in accordance with Section 25174.(e) Subdivision (a) does not apply to any variance granted pursuant to Article 4 (commencing with Section 66263.40) of Chapter 13 of Division 4.5 of Title 22 of the California Code of Regulations.(f) Subdivision (a) does not apply to any of the following:(1) Any variance issued to a public agency to transport wastes for purposes of operating a household hazardous waste collection facility, or to transport waste from a household hazardous waste collection facility, which receives household hazardous waste or hazardous waste from conditionally exempted small quantity generators pursuant to Article 10.8 (commencing with Section 25218).(2) A permanent household hazardous waste collection facility.(3) Any variance issued to a public agency to conduct a collection program for agricultural wastes.(g) Fees imposed pursuant to this section shall be administered and collected by the department.(h) (1) The changes made in this section by the act that added this subdivision apply to applications and requests submitted to the department on and after April 1, 2016.(2) If, on and after April 1, 2016, an applicant has submitted an application and paid a fee pursuant to subdivision (d), as that subdivision read on April 1, 2016, but before the act that added this subdivision took effect, the department shall determine the difference between the amount paid by the applicant and the amount due pursuant to subdivision (a), and that applicant shall be liable for that amount.(3)Acknowledging a limited period of retroactive application of the elimination of the flat fee option pursuant to this subdivision, the Legislature finds and declares all of the following:(A)The department expends a substantial amount of time and resources in processing permit applications and modifications.(B)The former flat fee option paid by applicants was most often insufficient to cover actual costs to the department in reviewing and processing the applications and modifications.(C)The applicant, being the primary beneficiary of the permit process, in fairness should pay the actual costs of the department in reviewing permit applications and modifications.(D)The amendment to this section during the 201516 Regular Session eliminating the flat fee option and requiring applicants to enter into a written reimbursement agreement with the department is intended to apply to applications and modification requests filed on or after April 1, 2016, in order to remedy this financial inequity and to avoid an influx of the submission of applications to the department before amendment to this section goes into effect.(3)Acknowledging a limited period of retroactive application of the elimination of the flat fee option pursuant to this subdivision, the Legislature finds and declares all of the following:(A)The department expends a substantial amount of time and resources in processing permit applications and modifications.(B)The former flat fee option paid by applicants was most often insufficient to cover actual costs to the department in reviewing and processing the applications and modifications.(C)The applicant, being the primary beneficiary of the permit process, in fairness should pay the actual costs of the department in reviewing permit applications and modifications.(D)The amendment to this section during the 201516 Regular Session eliminating the flat fee option and requiring applicants to enter into a written reimbursement agreement with the department is intended to apply to applications and modification requests filed on or after April 1, 2016, in order to remedy this financial inequity and to avoid an influx of the submission of applications to the department before amendment to this section goes into effect.

25205.7. (a) (1) A person who applies for, or requests, any of the following shall enter into a written agreement with the department pursuant to which that person shall reimburse the department, pursuant to Article 9.2 (commencing with Section 25206.1), for the costs incurred by the department in processing the application or responding to the request:(A) A new hazardous waste facilities permit, including a standardized permit.(B) A hazardous waste facilities permit for postclosure.(C) A renewal of an existing hazardous waste facilities permit, including a standardized permit or postclosure permit. The amount of a reimbursement to the department pursuant to this subparagraph shall not exceed ____dollars ($____).(D) A class 2 or class 3 modification of an existing hazardous waste facilities permit or grant of interim status, including a standardized permit or grant of interim status or a postclosure permit.(E) A variance.(F) A waste classification determination.(2) An agreement required pursuant to paragraph (1) shall provide for at least 25 percent of the reimbursement to be made in advance of the processing of the application or the response to the request. The 25-percent advance payment shall be based upon the departments total estimated costs of processing the application or response to the request.(3) An agreement entered into pursuant to this section shall, if applicable, include costs of reviewing and overseeing corrective action as set forth in subdivision (b).(b) An applicant pursuant to paragraph (1) of subdivision (a) and the owner and the operator of the facility shall pay the departments costs in reviewing and overseeing any corrective action program described in the application for a standardized permit pursuant to subparagraph (C) of paragraph (2) of subdivision (c) of Section 25201.6 or required pursuant to subdivision (b) of Section 25200.10, and in reviewing and overseeing any corrective action work undertaken at the facility pursuant to that corrective action program.(c) (1) An applicant pursuant to paragraph (1) of subdivision (a) and the owner and the operator of the facility shall, pursuant to Section 21089 of the Public Resources Code, pay all costs incurred by the department for purposes of complying with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), in conjunction with an application or request for any of the activities identified in subdivision (a), including any activities associated with correction action.(2) Paragraph (1) does not apply to projects that are exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).(d) Any reimbursements received pursuant to this section shall be placed in the Hazardous Waste Control Account for appropriation in accordance with Section 25174.(e) Subdivision (a) does not apply to any variance granted pursuant to Article 4 (commencing with Section 66263.40) of Chapter 13 of Division 4.5 of Title 22 of the California Code of Regulations.(f) Subdivision (a) does not apply to any of the following:(1) Any variance issued to a public agency to transport wastes for purposes of operating a household hazardous waste collection facility, or to transport waste from a household hazardous waste collection facility, which receives household hazardous waste or hazardous waste from conditionally exempted small quantity generators pursuant to Article 10.8 (commencing with Section 25218).(2) A permanent household hazardous waste collection facility.(3) Any variance issued to a public agency to conduct a collection program for agricultural wastes.(g) Fees imposed pursuant to this section shall be administered and collected by the department.(h) (1) The changes made in this section by the act that added this subdivision apply to applications and requests submitted to the department on and after April 1, 2016.(2) If, on and after April 1, 2016, an applicant has submitted an application and paid a fee pursuant to subdivision (d), as that subdivision read on April 1, 2016, but before the act that added this subdivision took effect, the department shall determine the difference between the amount paid by the applicant and the amount due pursuant to subdivision (a), and that applicant shall be liable for that amount.(3)Acknowledging a limited period of retroactive application of the elimination of the flat fee option pursuant to this subdivision, the Legislature finds and declares all of the following:(A)The department expends a substantial amount of time and resources in processing permit applications and modifications.(B)The former flat fee option paid by applicants was most often insufficient to cover actual costs to the department in reviewing and processing the applications and modifications.(C)The applicant, being the primary beneficiary of the permit process, in fairness should pay the actual costs of the department in reviewing permit applications and modifications.(D)The amendment to this section during the 201516 Regular Session eliminating the flat fee option and requiring applicants to enter into a written reimbursement agreement with the department is intended to apply to applications and modification requests filed on or after April 1, 2016, in order to remedy this financial inequity and to avoid an influx of the submission of applications to the department before amendment to this section goes into effect.(3)Acknowledging a limited period of retroactive application of the elimination of the flat fee option pursuant to this subdivision, the Legislature finds and declares all of the following:(A)The department expends a substantial amount of time and resources in processing permit applications and modifications.(B)The former flat fee option paid by applicants was most often insufficient to cover actual costs to the department in reviewing and processing the applications and modifications.(C)The applicant, being the primary beneficiary of the permit process, in fairness should pay the actual costs of the department in reviewing permit applications and modifications.(D)The amendment to this section during the 201516 Regular Session eliminating the flat fee option and requiring applicants to enter into a written reimbursement agreement with the department is intended to apply to applications and modification requests filed on or after April 1, 2016, in order to remedy this financial inequity and to avoid an influx of the submission of applications to the department before amendment to this section goes into effect.



25205.7. (a) (1) A person who applies for, or requests, any of the following shall enter into a written agreement with the department pursuant to which that person shall reimburse the department, pursuant to Article 9.2 (commencing with Section 25206.1), for the costs incurred by the department in processing the application or responding to the request:

(A) A new hazardous waste facilities permit, including a standardized permit.

(B) A hazardous waste facilities permit for postclosure.

(C) A renewal of an existing hazardous waste facilities permit, including a standardized permit or postclosure permit. The amount of a reimbursement to the department pursuant to this subparagraph shall not exceed ____dollars ($____).

(D) A class 2 or class 3 modification of an existing hazardous waste facilities permit or grant of interim status, including a standardized permit or grant of interim status or a postclosure permit.

(E) A variance.

(F) A waste classification determination.

(2) An agreement required pursuant to paragraph (1) shall provide for at least 25 percent of the reimbursement to be made in advance of the processing of the application or the response to the request. The 25-percent advance payment shall be based upon the departments total estimated costs of processing the application or response to the request.

(3) An agreement entered into pursuant to this section shall, if applicable, include costs of reviewing and overseeing corrective action as set forth in subdivision (b).

(b) An applicant pursuant to paragraph (1) of subdivision (a) and the owner and the operator of the facility shall pay the departments costs in reviewing and overseeing any corrective action program described in the application for a standardized permit pursuant to subparagraph (C) of paragraph (2) of subdivision (c) of Section 25201.6 or required pursuant to subdivision (b) of Section 25200.10, and in reviewing and overseeing any corrective action work undertaken at the facility pursuant to that corrective action program.

(c) (1) An applicant pursuant to paragraph (1) of subdivision (a) and the owner and the operator of the facility shall, pursuant to Section 21089 of the Public Resources Code, pay all costs incurred by the department for purposes of complying with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), in conjunction with an application or request for any of the activities identified in subdivision (a), including any activities associated with correction action.

(2) Paragraph (1) does not apply to projects that are exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).

(d) Any reimbursements received pursuant to this section shall be placed in the Hazardous Waste Control Account for appropriation in accordance with Section 25174.

(e) Subdivision (a) does not apply to any variance granted pursuant to Article 4 (commencing with Section 66263.40) of Chapter 13 of Division 4.5 of Title 22 of the California Code of Regulations.

(f) Subdivision (a) does not apply to any of the following:

(1) Any variance issued to a public agency to transport wastes for purposes of operating a household hazardous waste collection facility, or to transport waste from a household hazardous waste collection facility, which receives household hazardous waste or hazardous waste from conditionally exempted small quantity generators pursuant to Article 10.8 (commencing with Section 25218).

(2) A permanent household hazardous waste collection facility.

(3) Any variance issued to a public agency to conduct a collection program for agricultural wastes.

(g) Fees imposed pursuant to this section shall be administered and collected by the department.

(h) (1) The changes made in this section by the act that added this subdivision apply to applications and requests submitted to the department on and after April 1, 2016.

(2) If, on and after April 1, 2016, an applicant has submitted an application and paid a fee pursuant to subdivision (d), as that subdivision read on April 1, 2016, but before the act that added this subdivision took effect, the department shall determine the difference between the amount paid by the applicant and the amount due pursuant to subdivision (a), and that applicant shall be liable for that amount.

(3)Acknowledging a limited period of retroactive application of the elimination of the flat fee option pursuant to this subdivision, the Legislature finds and declares all of the following:



(A)The department expends a substantial amount of time and resources in processing permit applications and modifications.



(B)The former flat fee option paid by applicants was most often insufficient to cover actual costs to the department in reviewing and processing the applications and modifications.



(C)The applicant, being the primary beneficiary of the permit process, in fairness should pay the actual costs of the department in reviewing permit applications and modifications.



(D)The amendment to this section during the 201516 Regular Session eliminating the flat fee option and requiring applicants to enter into a written reimbursement agreement with the department is intended to apply to applications and modification requests filed on or after April 1, 2016, in order to remedy this financial inequity and to avoid an influx of the submission of applications to the department before amendment to this section goes into effect.



(3)Acknowledging a limited period of retroactive application of the elimination of the flat fee option pursuant to this subdivision, the Legislature finds and declares all of the following:



(A)The department expends a substantial amount of time and resources in processing permit applications and modifications.



(B)The former flat fee option paid by applicants was most often insufficient to cover actual costs to the department in reviewing and processing the applications and modifications.



(C)The applicant, being the primary beneficiary of the permit process, in fairness should pay the actual costs of the department in reviewing permit applications and modifications.



(D)The amendment to this section during the 201516 Regular Session eliminating the flat fee option and requiring applicants to enter into a written reimbursement agreement with the department is intended to apply to applications and modification requests filed on or after April 1, 2016, in order to remedy this financial inequity and to avoid an influx of the submission of applications to the department before amendment to this section goes into effect.