California 2017-2018 Regular Session

California Assembly Bill AB3227 Compare Versions

Only one version of the bill is available at this time.
OldNewDifferences
11 CALIFORNIA LEGISLATURE 20172018 REGULAR SESSION Assembly Bill No. 3227Introduced by Assembly Member BurkeFebruary 16, 2018 An act to amend Section 957 of the Public Utilities Code, relating to public utilities. LEGISLATIVE COUNSEL'S DIGESTAB 3227, as introduced, Burke. Natural Gas Pipeline Safety Act of 2011: intrastate transmission lines: safety valves.Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including gas corporations. The Public Utilities Act authorizes the commission to ascertain and fix just and reasonable standards, classifications, regulations, practices, measurements, or services to be furnished, imposed, observed, and followed by specified public utilities, including gas corporations. Existing law requires the installation of automatic shutoff or remote controlled sectionalized block valves on certain intrastate gas transmission lines that are located in a high consequence area, as defined, or that traverse an active seismic earthquake fault. Existing law requires the owner or operator of a commission-regulated gas pipeline facility that is an intrastate transmission line to provide the commission with a valve location plan, along with any recommendations for valve locations, and authorizes the commission to make modifications to the valve location plan. This bill would make a nonsubstantive change to this provision.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: NO Local Program: NO Bill TextThe people of the State of California do enact as follows:SECTION 1. Section 957 of the Public Utilities Code is amended to read:957. (a) (1) Unless the commission determines that it is prohibited from doing so by subdivision (c) of Section 60104 of Title 49 of the United States Code, the commission shall require the installation of automatic shutoff or remote controlled sectionalized block valves on both of the following facilities, if it determines those valves are necessary for the protection of the public:(A) Intrastate transmission lines that are located in a high consequence area.(B) Intrastate transmission lines that traverse an active seismic earthquake fault.(2) Each owner or operator of a commission-regulated gas pipeline facility that is an intrastate transmission line shall provide the commission with a valve location plan, along with plan and any recommendations for valve locations. The commission may make modifications to the valve location plan or provide for variations from any location requirements adopted by the commission pursuant to this section that it deems necessary or appropriate and consistent with protection of the public.(3) The commission shall additionally establish action timelines, adopt standards for how to prioritize installation of automatic shutoff or remote controlled sectionalized block valves pursuant to paragraph (1), ensure that remote and automatic shutoff valves are installed as quickly as is reasonably possible, and establish ongoing procedures for monitoring progress in achieving the requirements of this section.(b) The commission shall authorize recovery in rates for all reasonably incurred costs incurred for implementation of the requirements of this section.(c) The commission, in consultation with the Pipeline and Hazardous Materials Safety Administration of the United States Department of Transportation, shall adopt and enforce compatible safety standards for commission-regulated gas pipeline facilities that the commission determines should be adopted to implement the requirements of this section.
22
33 CALIFORNIA LEGISLATURE 20172018 REGULAR SESSION Assembly Bill No. 3227Introduced by Assembly Member BurkeFebruary 16, 2018 An act to amend Section 957 of the Public Utilities Code, relating to public utilities. LEGISLATIVE COUNSEL'S DIGESTAB 3227, as introduced, Burke. Natural Gas Pipeline Safety Act of 2011: intrastate transmission lines: safety valves.Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including gas corporations. The Public Utilities Act authorizes the commission to ascertain and fix just and reasonable standards, classifications, regulations, practices, measurements, or services to be furnished, imposed, observed, and followed by specified public utilities, including gas corporations. Existing law requires the installation of automatic shutoff or remote controlled sectionalized block valves on certain intrastate gas transmission lines that are located in a high consequence area, as defined, or that traverse an active seismic earthquake fault. Existing law requires the owner or operator of a commission-regulated gas pipeline facility that is an intrastate transmission line to provide the commission with a valve location plan, along with any recommendations for valve locations, and authorizes the commission to make modifications to the valve location plan. This bill would make a nonsubstantive change to this provision.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: NO Local Program: NO
44
55
66
77
88
99 CALIFORNIA LEGISLATURE 20172018 REGULAR SESSION
1010
1111 Assembly Bill No. 3227
1212
1313 Introduced by Assembly Member BurkeFebruary 16, 2018
1414
1515 Introduced by Assembly Member Burke
1616 February 16, 2018
1717
1818 An act to amend Section 957 of the Public Utilities Code, relating to public utilities.
1919
2020 LEGISLATIVE COUNSEL'S DIGEST
2121
2222 ## LEGISLATIVE COUNSEL'S DIGEST
2323
2424 AB 3227, as introduced, Burke. Natural Gas Pipeline Safety Act of 2011: intrastate transmission lines: safety valves.
2525
2626 Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including gas corporations. The Public Utilities Act authorizes the commission to ascertain and fix just and reasonable standards, classifications, regulations, practices, measurements, or services to be furnished, imposed, observed, and followed by specified public utilities, including gas corporations. Existing law requires the installation of automatic shutoff or remote controlled sectionalized block valves on certain intrastate gas transmission lines that are located in a high consequence area, as defined, or that traverse an active seismic earthquake fault. Existing law requires the owner or operator of a commission-regulated gas pipeline facility that is an intrastate transmission line to provide the commission with a valve location plan, along with any recommendations for valve locations, and authorizes the commission to make modifications to the valve location plan. This bill would make a nonsubstantive change to this provision.
2727
2828 Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including gas corporations. The Public Utilities Act authorizes the commission to ascertain and fix just and reasonable standards, classifications, regulations, practices, measurements, or services to be furnished, imposed, observed, and followed by specified public utilities, including gas corporations.
2929
3030 Existing law requires the installation of automatic shutoff or remote controlled sectionalized block valves on certain intrastate gas transmission lines that are located in a high consequence area, as defined, or that traverse an active seismic earthquake fault. Existing law requires the owner or operator of a commission-regulated gas pipeline facility that is an intrastate transmission line to provide the commission with a valve location plan, along with any recommendations for valve locations, and authorizes the commission to make modifications to the valve location plan.
3131
3232 This bill would make a nonsubstantive change to this provision.
3333
3434 ## Digest Key
3535
3636 ## Bill Text
3737
3838 The people of the State of California do enact as follows:SECTION 1. Section 957 of the Public Utilities Code is amended to read:957. (a) (1) Unless the commission determines that it is prohibited from doing so by subdivision (c) of Section 60104 of Title 49 of the United States Code, the commission shall require the installation of automatic shutoff or remote controlled sectionalized block valves on both of the following facilities, if it determines those valves are necessary for the protection of the public:(A) Intrastate transmission lines that are located in a high consequence area.(B) Intrastate transmission lines that traverse an active seismic earthquake fault.(2) Each owner or operator of a commission-regulated gas pipeline facility that is an intrastate transmission line shall provide the commission with a valve location plan, along with plan and any recommendations for valve locations. The commission may make modifications to the valve location plan or provide for variations from any location requirements adopted by the commission pursuant to this section that it deems necessary or appropriate and consistent with protection of the public.(3) The commission shall additionally establish action timelines, adopt standards for how to prioritize installation of automatic shutoff or remote controlled sectionalized block valves pursuant to paragraph (1), ensure that remote and automatic shutoff valves are installed as quickly as is reasonably possible, and establish ongoing procedures for monitoring progress in achieving the requirements of this section.(b) The commission shall authorize recovery in rates for all reasonably incurred costs incurred for implementation of the requirements of this section.(c) The commission, in consultation with the Pipeline and Hazardous Materials Safety Administration of the United States Department of Transportation, shall adopt and enforce compatible safety standards for commission-regulated gas pipeline facilities that the commission determines should be adopted to implement the requirements of this section.
3939
4040 The people of the State of California do enact as follows:
4141
4242 ## The people of the State of California do enact as follows:
4343
4444 SECTION 1. Section 957 of the Public Utilities Code is amended to read:957. (a) (1) Unless the commission determines that it is prohibited from doing so by subdivision (c) of Section 60104 of Title 49 of the United States Code, the commission shall require the installation of automatic shutoff or remote controlled sectionalized block valves on both of the following facilities, if it determines those valves are necessary for the protection of the public:(A) Intrastate transmission lines that are located in a high consequence area.(B) Intrastate transmission lines that traverse an active seismic earthquake fault.(2) Each owner or operator of a commission-regulated gas pipeline facility that is an intrastate transmission line shall provide the commission with a valve location plan, along with plan and any recommendations for valve locations. The commission may make modifications to the valve location plan or provide for variations from any location requirements adopted by the commission pursuant to this section that it deems necessary or appropriate and consistent with protection of the public.(3) The commission shall additionally establish action timelines, adopt standards for how to prioritize installation of automatic shutoff or remote controlled sectionalized block valves pursuant to paragraph (1), ensure that remote and automatic shutoff valves are installed as quickly as is reasonably possible, and establish ongoing procedures for monitoring progress in achieving the requirements of this section.(b) The commission shall authorize recovery in rates for all reasonably incurred costs incurred for implementation of the requirements of this section.(c) The commission, in consultation with the Pipeline and Hazardous Materials Safety Administration of the United States Department of Transportation, shall adopt and enforce compatible safety standards for commission-regulated gas pipeline facilities that the commission determines should be adopted to implement the requirements of this section.
4545
4646 SECTION 1. Section 957 of the Public Utilities Code is amended to read:
4747
4848 ### SECTION 1.
4949
5050 957. (a) (1) Unless the commission determines that it is prohibited from doing so by subdivision (c) of Section 60104 of Title 49 of the United States Code, the commission shall require the installation of automatic shutoff or remote controlled sectionalized block valves on both of the following facilities, if it determines those valves are necessary for the protection of the public:(A) Intrastate transmission lines that are located in a high consequence area.(B) Intrastate transmission lines that traverse an active seismic earthquake fault.(2) Each owner or operator of a commission-regulated gas pipeline facility that is an intrastate transmission line shall provide the commission with a valve location plan, along with plan and any recommendations for valve locations. The commission may make modifications to the valve location plan or provide for variations from any location requirements adopted by the commission pursuant to this section that it deems necessary or appropriate and consistent with protection of the public.(3) The commission shall additionally establish action timelines, adopt standards for how to prioritize installation of automatic shutoff or remote controlled sectionalized block valves pursuant to paragraph (1), ensure that remote and automatic shutoff valves are installed as quickly as is reasonably possible, and establish ongoing procedures for monitoring progress in achieving the requirements of this section.(b) The commission shall authorize recovery in rates for all reasonably incurred costs incurred for implementation of the requirements of this section.(c) The commission, in consultation with the Pipeline and Hazardous Materials Safety Administration of the United States Department of Transportation, shall adopt and enforce compatible safety standards for commission-regulated gas pipeline facilities that the commission determines should be adopted to implement the requirements of this section.
5151
5252 957. (a) (1) Unless the commission determines that it is prohibited from doing so by subdivision (c) of Section 60104 of Title 49 of the United States Code, the commission shall require the installation of automatic shutoff or remote controlled sectionalized block valves on both of the following facilities, if it determines those valves are necessary for the protection of the public:(A) Intrastate transmission lines that are located in a high consequence area.(B) Intrastate transmission lines that traverse an active seismic earthquake fault.(2) Each owner or operator of a commission-regulated gas pipeline facility that is an intrastate transmission line shall provide the commission with a valve location plan, along with plan and any recommendations for valve locations. The commission may make modifications to the valve location plan or provide for variations from any location requirements adopted by the commission pursuant to this section that it deems necessary or appropriate and consistent with protection of the public.(3) The commission shall additionally establish action timelines, adopt standards for how to prioritize installation of automatic shutoff or remote controlled sectionalized block valves pursuant to paragraph (1), ensure that remote and automatic shutoff valves are installed as quickly as is reasonably possible, and establish ongoing procedures for monitoring progress in achieving the requirements of this section.(b) The commission shall authorize recovery in rates for all reasonably incurred costs incurred for implementation of the requirements of this section.(c) The commission, in consultation with the Pipeline and Hazardous Materials Safety Administration of the United States Department of Transportation, shall adopt and enforce compatible safety standards for commission-regulated gas pipeline facilities that the commission determines should be adopted to implement the requirements of this section.
5353
5454 957. (a) (1) Unless the commission determines that it is prohibited from doing so by subdivision (c) of Section 60104 of Title 49 of the United States Code, the commission shall require the installation of automatic shutoff or remote controlled sectionalized block valves on both of the following facilities, if it determines those valves are necessary for the protection of the public:(A) Intrastate transmission lines that are located in a high consequence area.(B) Intrastate transmission lines that traverse an active seismic earthquake fault.(2) Each owner or operator of a commission-regulated gas pipeline facility that is an intrastate transmission line shall provide the commission with a valve location plan, along with plan and any recommendations for valve locations. The commission may make modifications to the valve location plan or provide for variations from any location requirements adopted by the commission pursuant to this section that it deems necessary or appropriate and consistent with protection of the public.(3) The commission shall additionally establish action timelines, adopt standards for how to prioritize installation of automatic shutoff or remote controlled sectionalized block valves pursuant to paragraph (1), ensure that remote and automatic shutoff valves are installed as quickly as is reasonably possible, and establish ongoing procedures for monitoring progress in achieving the requirements of this section.(b) The commission shall authorize recovery in rates for all reasonably incurred costs incurred for implementation of the requirements of this section.(c) The commission, in consultation with the Pipeline and Hazardous Materials Safety Administration of the United States Department of Transportation, shall adopt and enforce compatible safety standards for commission-regulated gas pipeline facilities that the commission determines should be adopted to implement the requirements of this section.
5555
5656
5757
5858 957. (a) (1) Unless the commission determines that it is prohibited from doing so by subdivision (c) of Section 60104 of Title 49 of the United States Code, the commission shall require the installation of automatic shutoff or remote controlled sectionalized block valves on both of the following facilities, if it determines those valves are necessary for the protection of the public:
5959
6060 (A) Intrastate transmission lines that are located in a high consequence area.
6161
6262 (B) Intrastate transmission lines that traverse an active seismic earthquake fault.
6363
6464 (2) Each owner or operator of a commission-regulated gas pipeline facility that is an intrastate transmission line shall provide the commission with a valve location plan, along with plan and any recommendations for valve locations. The commission may make modifications to the valve location plan or provide for variations from any location requirements adopted by the commission pursuant to this section that it deems necessary or appropriate and consistent with protection of the public.
6565
6666 (3) The commission shall additionally establish action timelines, adopt standards for how to prioritize installation of automatic shutoff or remote controlled sectionalized block valves pursuant to paragraph (1), ensure that remote and automatic shutoff valves are installed as quickly as is reasonably possible, and establish ongoing procedures for monitoring progress in achieving the requirements of this section.
6767
6868 (b) The commission shall authorize recovery in rates for all reasonably incurred costs incurred for implementation of the requirements of this section.
6969
7070 (c) The commission, in consultation with the Pipeline and Hazardous Materials Safety Administration of the United States Department of Transportation, shall adopt and enforce compatible safety standards for commission-regulated gas pipeline facilities that the commission determines should be adopted to implement the requirements of this section.